Loading...
HomeMy WebLinkAboutB02-0223 expired ******************************�*************************************************�*********** TOWN OF VAIL, COLORADOCopy Reprinted on 10-24-2013 at 12:16:03 10/24/2013 Statement **��******�********+******�****************+************************************************ Statement Number: R030004543 Amount: $6, 683.70 08/25/200309:33 AM Payment Method: Check Init: GR Notation: ----------------------------------------------------------------------------- Permit No: B02-0223 Type: NEW (SFR, P/S, DUP) PERMIT Parcel No: 2101-023-0100-5 Site Address: 3275 KATSOS RANCH RD VAIL Location: 3275 KATSOS Total Fees: $6, 683.70 This Payment: $6, 683.70 Total ALL Pmts: $6, 683.70 Balance: $0.00 ****************************�*******************************************�******************* ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------------- ------------------------------ ------------ BP 00100003111100 BUILDING PERMIT FEES 3, 640. 00 PF 00100003112300 PLAN CHECK FEES 2, 366.00 RF 11100003112700 RECREATION FEES 674 .70 WC 00100003112800 WILL CALL INSPECTION FEE 3.00 ----------------------------------------------------------------------------- � - - - - - - u �' APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UNS Project #: ���� -(�t�lf� Building Permit #: 970-479-2149 (Inspections) u TOW ING PER T APPLICATION Separ uire or electrical, i , , ' 75 S. tage Vail, olorado 7 r� RA FaRMAT General Contr�ctor: � Town of Vail Reg. No.: � Contact and Phone #'s: "a�4�F' � fG/� �t G%�l � _ .� _ Contractor Sigr�ature• / � > — �=ft� T ��C �_— COMPLETE VALUATIONS FOR BUILDING PERMIT Labor & Materials BUILDING: $ ' '"` � ' `9"' ELECTRICAL: $( � OTHER: $ .--� PLUMBING: $ �� ,� � � ��'' MECHANICAL: $ � �� TOTAL: $ � ` � `cer#Contact Ea /e Coun Assessors O�ce at 970-328-8640 or visit www.ea /e-coun .com Pa rcel ' tion will not be acce ted without arcel number `�' � � (J `"`' " P p � "� ri'��' ' )ob Name: � I rn�� i�?,,�-Ci;�i=�� �i-�°�= Job Address: �' °2�� ���;;j�-j�� K'����a"f�--1—°' y `'�' Legal Description Lot: � � Block: � Filing: `� � Subdivision: ��L.� l.��L��� Owners Nam : �� Address: Phone: �'� �� Architect/Desi�n��� �!���� Address: Phone: ,.1 Engineer� �� L� Address: Phone: Detailed description of work: � ;I 5 S S'�' �i� �' ��I��1 ic���1� Work Class: New ('p� Addition ( ) Remodel ( ) Repair ( ) Demo ( ) Other ( ) Work Type: Interior( ) Exterior ( ) Both (�) Does an EHU exist at this location: Yes ( ) No (j� Type of Bldg.: Single-family(� Two-family( ) Multi-family( ) Commercial ( ) Restaurant( ) Other( ) No. of Existing Dwelling Units in this building: � No. of Accommodation Units in this building: No/T e of Fire laces Existin : Gas A liances Gas Lo s Wood Pellet Wood Burnin No e of Fire laces Pro osed: Gas A liances r Gas Lo s Wood/Pellet Wood Burnin NOT ALLOWED Does a Fire Alarm Exist: Yes ( ) No ( ) Does a Fire Sprinkler System Exist: Yes ( ) No ( ) ,���,���,��,��,��������,�������,�����������*xFOR OFFICE USE ONLY��:���,����**����x�,��*����������,�*����*� Other Fees: Type of Construction: Acce ted By_ _ J� DRB Fees: Occu ap ncy Group: Planner Sign� �,.. � � Date Received: � j � F:/everyone/forms/bldgperm `� `� ` �e \ � � � `. ^ � ` � � ,--°`�-�..� Questions? Call the Building Team at 479-2325 � �� � ��� �°�d�' Bui/dinq Permit Sc�b�aitt�/ Check/ist � � � � ��'�'����'�� (,�1� ��,��� � Department of Community Development Project Name: __�a��3l�1� I ��� � � Project Address: �?l� 7� �� ✓ This Check/ist must be comv/eted before a Bui/ding Permit app/ication is ac e ted, All pages of application is complete .� Has DRB approval obtained (if required) Provide a copy of approval form �f{�❑ Corqdominium Association letter of approval attached if project is a Multi-Family complex � ��omplete site plan submitted ❑ Public Way Permit application included if applicable (refer to Public Works checklist) r� Staging plan included (refer to Public Works checklist) No dumpster,qarking or material storaae allowed on roadways and shoulders without written approval �o�,ocsbestos test and results submitted if demolition is occurring � Architect stamp and signature (All Commercial and Multi family) �Full floor plans including building sections and elevations(4 sets of plans for Multi-Family and Co ercial) �ndow and door schedule �Full,��uctural plans, including design criteria (ie.loads) tructural Engineer stamp and signature on structural plans (All Commercial and Multi Family) rY��ils Report must be submitted prior to footing inspection `�i� �Q�-�L���'- 1 �( .re resistive assemblies specified and penetrations indicated �' S e detectors shown on plans �9' Types and quantity of fireplaces shown �°�/ �.� ��} C,' (�`'�� ��� �" �e� �� '�� � r Applicant's Signature d�- �-'� �� �<_ Date of submittaL• Received By: F:/everyone/forms/bld perm 2 � �, � ,. T019NOF YAIL xy HOW DID WE RATE WITH YOU? Town of Vaii Survey . Cammunity Development De�artment Russeli Forrest, Director, (970j 479-2139 Check allthat applies. 1. Which Department(s) did you contact? Buiiding Environmental Housing Admin Planning - DRB PEC ` ` 2. Was your initial contact with our staff immediate siow or no one avaiiable ? 3. If you were required to wait, how long was it before you were heIped? 4. Was your project reviewed on a timeiy basis?Yes/No If no, why not? 5. Was this your ftrst time to file a DRB app PEC app „ Bldg Permit N/A 6. Please rate the performance of the staff person who assisted you: � 5 4 3 2 1 Name: (knowiedge; responsiveness, availabiiity) 7. Ovefai) effec#iveness of the Front Service Counter. 5 4 3 2 1 8. What is the best time of day for you to use the Front Service Counter? 9. Any comme�ts you have which would allow us to be�er serve you next time? Thank you for taking the fime to comple#e this survey. We are commitked to improving our senrice. II � 1 V�t� �i` f'C!' LG WHEN A "PUBLIC WAY PERMIT" �S REQUIRED PLEASE READ AND CHECK OFF EACH OF THE FOLLOWING QUESTIONS REGARDING THE NEED FOR A ', •,PUBL �WAY PERMIT": / II / Is this a new residence? YES �� NO �� ❑ Does demolition work being performed require the us �f the Right-of-Way, easements or public property? YES NO � ❑ Is any utility work needed? YES v NO ❑ Is the drivewa bein re aved? YES NO `� Y 9 P II �� . ❑ Is a different access needed to the site other than the existing driveway? YES NO �'"�� ❑ Is any drainage work ng done that affects the Right-of-Way, easements, or public property? YES NO � ❑ Is a°Revocable Right-of-Way Permit" required? YES NO--�� ❑ Is the Ri ht-of-Wa e � ? g y. ments or public property to be used for staging, parking or fencing. YES NO � If answer is N0, is a p ing, staging or fencing plan required by Public Works? li YES NO L� IIf you answered YES to any of these questions, a"Public Way Permit" must be obtained. "Public Way Permit"applications may be obtained at the Public Work's office or at Community Development (a sample is attached). If you have any questions please call Leonard Sandoval in Public Works at 479-2198. I HAVE READ AN N��IE ALL T�ABOVE UESTIONS. �/' Q � � L'��,�1`L �' �~!�t Contractor Signatur Company Name Job or Project Name: �tr�'�.� S Date Signed: /� �"�"""" F:/everyone/forms/bldperm4 s � T1UWN�F�'��, PUBLIC WORKS AND THE PUBLIC WAY PERMIT PROCESS How it relates to Buildin6 Permit • � s. ➢ Fill out the attached check list with the Building Permit A�lication. If yes was answered to any of the questions then a °Public Way" permit is required. You can pick up an application at either Community Development, located at 75 South Frontage Road or Public Works, located at 1309 Elkhorn Drive. � � r Notice sign-ofFs for utility companies. ALL utilities must field verify (locate) respective utilities prior to si nin a lication. Some utili com anies re uire u to 48 hours notice to 9 9 PP tY P q P schedule a locate. � A construction traffic control/staging plan must be prepared on a separate sheet of paper. An approved site plan may also be used. This plan will show locations of all traffic control devices (signs, cones, etc.) and the work zone, (area of construction, staging, etc.). This plan will expire on November lst and will need to be resubmitted for consideration for approval through the winter. Be aware that your resubmission for winter may be denied depending on the location of construction. v Sketch of work being performed must be submitted indicating dimensions (length, width and depth of work). This may be drawn on the traffic control plan or a site plan for the job. � ➢ Submit completed application to the Public Work's office for review. If required, locates will be scheduled for the Town of Vail electricians and irrigation crew. The locates take place in the morning, but may require up to 48 hours to perform. ➢ The Public Work's Construction Inspector will review the application and approve or deny the permit. You wiil be contacted as to the status and any requirements that may be needed. Most permits are released within 48 hours of being received, but please allow up to one (1) week to process. Y As soon as the permit is approved, the Building Department will be notified, allowing the „ - „ ., • „ ', Building Permit to be released. Please do not confuse the Public Way Permit with a "Building Permit". ➢ NOTE: The above process is for work in a public way ONLY. Pubiic Way Permits are valid only until November 15th. A new Public Way Permit is required each year if work is not complete. Re-application each November 15th does not mean an aut ic renewal. I have r ad nd der an e above. ° Signature Date Signed F:/everyone/forms/bld perm 5 _ __ . �i f 11 t� � �DWN�F Y�I� BUILDING PERMIT ISSUANCE TIME FRAME If this permit requires a Town of Vail Fire Department Approval, Engineer's (Public Works) review and approval, a Planning Department review or Health Department review, and a review by the Building Department, the estimated time for a total review will take as long as three (3) weeks. All commercial (large or small) and alf multi-family permits will have to follow the above mentioned maximum requirements. Residential and small projects should take a lesser amount of time. However, if residential or smaller projects impact the .various above mentioned departments with regard to necessary review, these projects may aiso take three (3) weeks to review and approve. Every attempt will be made by this department to expedite this permit as soon as possible. I, the undersigned, understand the plan check procedure and time frame. I also understand I' that if the permit is not picked up by the expiration date, that I must still pay the plan check fee �I and that if I fail to do so it may affect future permits that I apply for. i �� Agreed to b . �— Print name �.������ ���0���,,,�6� � �.__._ Si nature Project Name: 1 ��-� Date: � `�----.. F:everyone/forms/bldperm3 f _ . PW#: ❑ U " ❑ ❑ ❑ L� t APPLICATION Parce� #: ❑ ❑ ❑ ❑ " ❑ ❑ ❑ - ❑ ❑ ' ❑ ❑ ❑ �,��,, PUB IC WAY�PERMIT 19 Bldg. Permit#: ❑B ❑ ❑� ❑ ❑ i�l L�l 'y T0�'NOF i�Al�, 1' Job Name Street Address � ❑ � _ �1 (If unknown cail �--� 479-2138 e�rt.0) 2' Excavating Contractor Name Mailing Address TOV Contractor's License Plumber REQUiRED � ) City State Zip Phone# 3' Start Date Com letion Date Permit Ex iration Date � p � P ) 4. Work is fOr(circle one) Water Sewer Gas Electric Telephone CATV Landscaping Temp. Site Access Other � 5. Trench-width Length Depth (min. 4') Total SF $ Total LF $ Bond Amount r 't F Total Permit Fee $ Pe mi ee $ 6. ALL MATERIAL, EQUIPMENT, AND TRAFFIC CO ST BE ON THE JOBSITE BEFORE THE JOB IS STARTED. . 7. Rubber out-riggers are required on excav g t en working on asphalt. . Asphalt surfaces underneath the buc t a g i otected at ali times. 8. A signature below indicates a revie h utility locations and approvals. Once all utility company signatures are obtained, permittee t uting application through the Public Works office to obtain the necessary Town of Vail signatures. ow up to one week to process. Public Service Company (1-800-922 ) Public Service Natural Gas Group (1-800-922-1987) U.S. West(1-800-922-1987) TCI Cablevision of the Rockies (1-800-922-1987) Eagle River Water& SanitatiQn District(970-476-7480, ext. 114) Holy Cross Electric Company (1-800-922-1987) Town of Vail Electricians (970-479-2158) Town of Vail Irrigation (970-479-2158) Town of Vail Public Works Construction Inspector (970-479-2198) 9. THERE WILL BE NO TOTAL STREET CLOSURES! A construction traffic control plan must be approved by the Public Works Department prior to issuance of the permit. � 10. All exeavation must be done by hand within 18" of utilities—(Senate Bill 172), 11. Permittee must contact Public Works Department at 479 2198 24 hours �rior to commencing of work: Failure to notify the Town wil{ result in forfeiture of bond money. Scheduled inspections which are not ready may result in tha Town charging the contractor a reinspection fee. 12. I certify that I have read all chapters of Title 8—Public Ways and Property, of the Vail Municipal Code and all utility company agreements, signed by me, and will abide by the same, and that all utilities have been notified as required. Contractor's Signature of Agreement Print name clearly Date of Signature ATTACH PLAN OF WORK, INCLUDING CONSTRUCTION TRAFFIC CONTROL PLAN White—Public Works Show streets with names, buildings, and location of cuts. USE DASH LINES FOR CUT. Yellow—Contractor 1 li � 1 ll�i T �L' �Il1L DRAINAGE AND CULVERT INSPECTIONS ARE REQUIRED BY PUBLIC WORKS� Please read and check off each of the items below: ❑ The Town of Vail Building Department has developed the following procedures to ensure that new construction sites have adequately established proper drainage from building sites along and adjacent to Town of Vail roads or streets. ❑ The Town of Vail Public Works Department will be required to inspect and approve drainage adjacent to Town of Vail roads or streets and the instal{ation of temporary or permanent culverts at access points from the road or street onto the construction site. Such approval must be obtained prior to any requests for inspection by the Town of Vail Building Department for footings, temporary electrical or any other inspection. Please call Leonard Sandoval at 479-2198 to request an inspection from the Public Works Department. Allow a minimum of 24 hour notice. ❑ Also, the Town of Vail Public Warks Department will be approving all final drainage and culvert installation with resulting road patching as necessary. Such approval must be obtained prior to any Final Certificate of OccupancX issuance. O Agreed to by: � . �s� J��.�-�-- Pri t Na � �� Signature Project Name: �'6�--��� � Date Signed: ' � � F:/everyone/forms/bldperm6 / _ u � T�WN tlF�AII, MATERIAL STORAGE AND CONSTRUCTION PARKING Please read and check off each of the items below. (Copies of complete text are available upon request) CODE 5-2-10: DEPOSITS ON PUBLIC WAYS PROHIBITED ❑ Unlawful deposits: Subject to subsection C thereof, it is unlawful for any person to litter, track or deposit, or cause to be littered, tracked or deposited, sand, gravel, rocks, mud, dirt, snow, ice, or any other debris or materi I a upon any street, sidewalk, alley or public place, or any portion thereof. ❑ Notice; Abatement: The Director of Public Works may notify and require any person who violates or causes another to violate the provision of subsection A hereof, or who has in the Director's employment a person who violates or causes another to violate the same, top remove such sand, gravel, rocks, mud, d+rt, snaw, ice or any other debris or material within twenty four (24) hours after receipt of said notice by the Director of Public Works. In the event the person so notified does not comply with the notice within the period of time herein specified, the Director of Public Works, or other authorized agent, may cause any such sand, gravel, rocks, mud, dirt, snow, ice, debris or any other material to be removed from any street or alley at the expense of the notified, ❑ Summons and Penalty: As an alternative to the notice for removal provided in subsection B above, any person who violates or causes another to violate the same, may be issued a summons to appear before the Municipal Court of the Town for said violations, and upon being found guilty of a violation hereunder be punished as provided in Section 1-4-1 of this code. ❑ Notice and Penalty: It is unlawful for any person to fail or refuse to comply with the notice of the Director of Public Works as provided in subsection B hereof, and any such person shall, in addifion to payment of the expense of removal incurred by the Director of Public Works, as provided in subsection B hereof, upon being found guilty of a violation hereunder, be punishable as provided in Section 1-4-1 of this Code. (1997 Code: Ordinance 6 (1979). CODES 7-3A-i AND 7-3A-3: PARKING OBSTRUCTING TRAFFIC &IMPOUNDMENT AUTHORIZED , ❑ No person shall park any vehicle upon a street or at any other place within this Municipality in such a manner or under such conditions as to interfere with the free movement of vehicular traffic or proper street or highway maintenance. (Ord. 2(1968) § 1) ❑ Whenever any police officer finds a vehicle attended or unattended standin u on an ortion of a , 9 P Y P street or upon any place within this Municipality in such a manner as to constitute a violation of any section of this Article, or left unattended for a period of twenty four (24) hours or more and presumed to be abandoned under the conditions prescribed by Colorado Revised Statutes section 42-4-1102, as amended, the officer shall require the vehic(e to be removed or cause it to be removed and placed in storage in the nearest garage or other place of safety designated or maintai y this Muni � 'ty, and the charges for towing and storage of such vehicle shall be charged th owner the ve le in addition to a ten dollar ($10) impoundment charge. (Ord. 2(1968) 3: rd. (198 § 1) 1 have read and will comply with the above code provisions: � __ __ Print Name � �,/ ✓'.�`��� �'�,�c�`—�— Signature Position or Relationship t Proje : �'�2.���,�IC"`7'`��� Date Signed: � ¢' �'`�- F:/everyane/forni s/b1 cYperm7 - t .,� �I , f �' � ��: �� `_ �� T01���10�V�I� � � � � Vai12002 � � � Vail Village/Lionshead Construction Hours Handout Probiem Statement The Vail Village and Lionshead are invaluable assets to the community. Thousands of people come to Vail each year to sightsee, recreate, shop and to enjoy the Vail Valley. The community and merchants rely upon the summer/winter tourism to generate revenue. Our summer/winter guests expect a pleasant experience while in Vail. � To insure that all of the proposed construction has as little negative impact on the community and on our guest as possible, the Town of Vail finds it imperative to create � and implement the Vail Village/Lionshead Construction Master Plan. Maps of the Village and Lionshead are included to show areas of construction being affected by this plan. It would be irresponsible for the Town of Vail, the Construction Contractors and the Merchants, to not actively participate to minimize the impact of construction on the Village and Lionshead areas. Givens The following givens are intended to provide the basic foundation by which construction will be completed in the Village: If • The public's health, safety and welfare shall be honored at all times. • Adequate pedestrian, loading/delivery, vehicle, and emergency vehicle access and �'�, circulation shall be maintained. I' � Roadways and pedestrian walkways shall be kept clean and free of dirt and debris. • All construction deliveries, equipment, tools, materials, etc. to the Village must go through Check Point Charlie. All Lionshead construction activity must go to the Vail Police Department for a parking permit. Do not use delivery zones for construction arkin refer to a r v ke other arran ements for arkin . p g, pp o ed staging plan or ma g p g . II • The hours of Outside Construction Activity shall be as follows: - April 15 — June 21 & September 9 - November 15, 7 a.m. until 7 p.m., seven days a week. Between June 22 —September 6 work must end by 4:00 p.m. on Fridavs. November 15 —April 15, 2003 work allowed within daylight hours only. - Deliveries shall be restricted to the hours of 7 a.m. to 11:30 a.m. on Gore Creek Drive and 7 a.m. to 8:30 a.m. on Bridge Street. - Special delivery permits must be requested in advance, from Public Works in I' conjunction with Code Enforcement at Checkpoint Charlie. - No construction activity shall occur on Saturday or Sunday between June 22 8 September 6 � - No outside construction activity shall occur on the following dates: : Friday, February 15, Saturday, February 16, Sunday, February 17, and Monday, February 18. �Presidents Weekend) Saturday, May 25, Sunday, May 26 and Monday, May 27 (Memorial Dav) Friday, June 28, Saturday, June 29 and Sunday, June 30. (Vail Arts Festival) Wednesday, July 3, Thursday, July 4. Friday, July 5, Saturday, July 6 and Sunday, July 7. (Independence Dav) Saturday, August 31, Sunday, September 1, and Monday, September 2 (Labor Day). Friday, September 13, Saturday, September 14, Sunday, September 15 in (Lionshead) and then on Saturday, September 21 and Sunday, September 22. (Vail Village) - (0ctober Fest) Thursday, November 28, �Thanksgivinq Day) Friday, November 29, Saturday, November 30 and Sunday, December 1. Wednesday, December 25, Thursday, December 26, Friday, December 27 Saturday, December 28, Sunday, December 29. (Christmas Day Holiday) Monday, December 30, Tuesday, December 31, Wednesday January 1, �New Year 20031 No Work allowed the entire week of the Christmas/New Year Holiday. • The Town of Vail Noise Ordinance has been waived by the Town Manager from 7a.m. —7p.m. For construction activities from April 15 through June 21, and from September 9 through November 15. The Noise Ordinance shall be in effect and strictly regulated ' from June 22 through September 8 and November 15 to April 15, 2001 • All construction sites will be required to obtain an Approved Construction-Staqinq Plan from the Town of Vail Public Works Department in conjunction with Code Enforcement. (The approved staging/parking plan is required to be on site at all times). • The Town of Vail reserves the right to amend the Vail Village/Lionshead Construction Plan regulations at anytime should abuses or problems arise. • The Three-Strike Rule will be enforced. Step 1. (Written warning), Step 2. (Written warning), Step 3. (Construction site will be Red Tag until all issues are resolved). Expectations The following expectations are established to insure the success of the Vail Village/Lionshead Construction Master Plan: • Full and complete cooperation and understanding from all parties involved in the construction activity in regards to this plan. • Strict adherence and compliance with the requirements outlined in the construction plan. • Respect and consideration for the affected interests and parties. If you have any question, Please contact the Town of Vail Public Works Department , (Construction Inspector) or Vail Police Department (Code Enforcement Officer) 970-479-2198 970-476-7603 ! � MI�� �� �'Q�'IV OF YAIL � Vail 2002 Staging / Parking Plan Information The Sta�ing / Parking Plan Philosophv- Is a very important step in the building process. Striking a balance between safe public access and giving construction projects room to build is becoming increasingly challenging, for us to meet all the needs of those who will be impacted by construction projects. The fact is, there is less room to build in the Town of VaiL Developing a creative Staging Plan is a must. Staging in the Town of Vail Public Right of Way is a Privilege, not a given right. We take into account when we review and approve staging / parking plans, impacts on neighborhoods, tourism, business and the traveling public along with your right to build. ' The General Contractor is responsib[e for al! subcontractors and all construction activitv relating to tlze buildin�prolect. The staging plan will be enforced according to the Approved Set of Building and Staging Plans. You are required to keep a copy of the Approved Staging Plan on site. Two staging /parking plans are required, a summer and winter. Summer staging plans expire on November 1, and winter staging plans expire on April 15. (Note: There is no on street parkin� in the winter season and all materials, ec�uipment, etc must be 10' off the ed 7e� of asphalt). Enforcement of all staging /parking plan is as follows. A) Staging/Parking Plans to scale required. B) Once the plan is approved, they will be held to complete compliance. C) We will use a 3 step and you're out, process. Sten One- Verbal and written warnings as to the staging plan violation, then have contractor sign and date field memo warning. Step Two- Police Department issue tickets and tows or public works writes second written warning to all violators who have been notified under step one and who are still in violation of the approved Staging / Parking Plan. The Town of Vail Chief Building Official will call the contractor and notify them, the next time any violation happens, the ` building department will red tag the construction site for 48 hours. Step Three- If still in violation after step two, a 48 hour Red Ta� will be issued to the project site. If you have any Questions, Please contact the Town of Vail Construction Inspector at 970-479-2198 F:\cdev\FORMSIPERMITS\Staging-Parking.doc ! Y Requirements for an Acceptable Staging Plan It is preferred that and Approved Site Plan is used to draw a staging plan, but a hand drawn plan may be used as long as it is dawn to scale and is neat and legible. 1.) The Staging Plan must show the following: a Show all arkin th t i ' Q O p g a s required for the �ob site. (Includinb construction equipment). (b) Show the location of all material that will be staged on site. (c) Show the location of all dumpsters and port-o john that are to be on site. (d) If a fence is required, then show the location of the fence and describe the material used for the fence. (e) If trees and / or vegetation is required to be protected, then show how this will be done. (� If this staging plan is for a Demo Permit, then show staging for dump trucks and all related equipment. If the Town of Vail Right of Way area is needed for staging, then a Traffic Control Plan is required in conjunction with the staging plan. (g) Please provide and show an Erosion Control Plan. (h) No equipment, vehicles, materials are allowed on Town of Vail Right of Way in the Winter Staging Plan. 2.) If work needs to occur in the right of way, then add a Traffic Control Plan to the staging plan showing the following: (a) The work zone (area that is to be performed) (b) Traffic Control Devices (warning, signs, cones, flaggers, etc.) (c) Distances that all devices will be set up from the work zone. Also show all dimensions of work being performed in the right of way. All traffic eontrol plans must confarm to the MUTCD manuaL(Manual of Uniform Traffic Control Devices) 2.) This plan will be reviewed by Public Works and if Necessary the Police, Fire, and Community Development Department. Once the staging plan is approved, it will be registered with the departments listed above and enforced. '� 3.) The Village and Lionshead area have outside construction restrictions, Please become . familiar with the Vail 2002,Vail Village and Lionshead Construction Hours handout. I � F:\cdev\FORMS\PERMITS\Staging-Parking.doc - - - 'I '� � � _. i 1 (� 'i T'�WN�� YAI� BUILDING PERMIT MANUAL BUILDING PERMIT : B02-0223 � CONTRACTOR: WADEL DEV. JOB NAME: REIMERS RESIDENCE NSFR JOB ADDRESS: 32 75 KA TSOS DR IMPORTANT DOCUMENTS ENCLOSED INSPECTION PHONE # �79-2.��9 THIS BOOK MUST REMAIN ON JOB SITE AT AL TIMES � • INSPECTION RECORD BUILDING DEPARTMENT Building Permit No._B02-0223 TOWN OF VAIL THIS CARD MUST BE POSTED ON JOB SITE AT ALL TIMES Job Address 3275 KATSOS Date Issued I Nature of Work Use of Building Type of Construction Owner JOHN REIMERS Contractor WADEL DEVELOPMENT INSPECTOR MUST SIGN ALL SPACES PERTAINING TO THIS JOB INSPECTION DATE INSPECTOR REQ �i Access Public Works) Cuivert & Drainage (Public Works) Above must be signed before any other inspections will occur. Tem ora ower Footin s/Steel Foundation/Steel • Weather roofin Foundation ILC DO NOT place concrete until above has been signed. Electrical Groundwork Plumbing (Groundwork) Gas Pipin (Groundwork) DO NOT place floor until above has been signed. Rou h Electrical Rou h Plumbin /D.W.V. Rou h Plumbin /Water Rou h Gas Pipin Rou h Heating &Ventilation Rou h Drivewa Gradin /Slo e Rough Sprinkler Rou h Alarm Wirin FRAMING ILC , Above must be si ned rior to framin ins ection. 9 P 9 P I Framin Insulation Sheet Rock Nail � Exterior Stucco Wire Nailin DO NOT cover work until above has been signed. � • Final Electric Finat Plumbin Final Mech ni a cal Public Works TCO Ap roval Plannin Dept TCO A proval Fire De t TCO Ap roval Buildin Dept TCO Approval Public Works Final C/O Approval Plannin De t Final C/O A roval Fire De t Final C/O A proval Final Certificate of Occupancy COMMENTS . REQUEST FOR TEMPORARY CERTIFICATE OF OCCUPANCY OR FINAL CERTIFICATE OF OCCUPANCY MUST BE DONE IN PERSON. RETURN THIS BOOK TO THE COMMUNITY DEVELOPMENT DEPARTMENT TO REQUEST TCO OR FINAL C/O INSPECTION $40.00 REPLACEMENT CHARGE FOR A LOST INSPECTION CARD. FOR INSPECTIONS CALL 479-2149 -24 HOURS IN ADVANCE- MONDAY THROUGH FRIDAY FOR FIRE DEPT. INSPECTIONS CALL 479-2252 48 HRS IN ADVANCE MONDAY-FRIDAY *�-f IG�f LIC�-f�� IT�MS R�QL(I1Z.�INSt�CT"IONS* �