HomeMy WebLinkAboutB06-0161��
Community Development Department
75 South Frontage Road
Vail, Colorado LISA 81657
CERTIFICATE OF OCCUPANCY
This certificate is issued pursuant to the requirements of Title 10, Section 10-1-2, ADOPTED CODES of the Vail Town
Code certifying that, at the time of issuance, this portion of the structure was found to be substantially in compliance
with the various ordinances of the town regulating building consh�uction or use for the following:
Name and description of project Sin�le Familv Home
Address of project: 1979 Sunburs# Drive
Owner name and address: Samuel H and Luleta Maslak 961 Hi h Road Woodside Ca. 94062
IBC Edition: 2003 IBC Occupancy Group(s): _ R3, Type(s) of Construction: VB
Permit Number s): B06-0161 Occupant Load
�'
Mar ' Haeberle, Chief Building Official
19_ Sprinkler Svstem Y/N Type:
1 z�-�;�
Date
�'. � .GEORGE SHAEFFER � �� �
P.O. Box 373
Vail, Colorado 81658
(970) 845-5656
iown of Vail
OF�_.� �q� �� PY
June14,2007
Town of Vail
75 South Frontage Road
Vail, CO 81657
Attn: Building Department
To Whom It May Concern,
.
r
George Shaeffer Construction Company has acquired the contract for building permit #06-0161. We will be replacing
Beck Building Company as the General Contractor. Please contact us for any additional information required.
Sincerely,
GEORGE SHAEFFER CONSTRUCTION COMPANY
(? S
�
Jeff Kissane
Superintendent
JK/rn
cc: Rob Fawcett
Tiffany Ingoldsby
a
JUN. 14. 20Q7 2;18PM
� �
J une 14, 2007
Town of Vail
75 South �rontage Road
Vail, CO 81657
VIA �AX 479-2452
To Whom It May Concern,
BECK BUILDING CO
/
N0, 4627 P. 1
r
BUILDIN6
COMPANY
�
O
�
t��
�j
Beck Building Company will no longer be the General Contractor on building permit #06-0161. Please accept
�his le er as notification that Beck Building Company is relinquishing the rights to thls building permit to
Ceor e Shaeffer Construction Company. If you have any further questions please contact Jeff Kissane at
Ge ge Shaeffer Canstruction.
S �rely,
N
nyBek
C�0
Beck Building Campany
cc Jaff Kissane
BUILDING A LEGACY OF TRUST FOR OVER 30 VEARS
TOWN OF VAIL
75 S. FRONTAGE ROAD
VAIL, CO 81657
970-479-2138
Job Address:
Location.....:
Parcel No...:
G
LLPARTMENT OF COMMUNITY DEVELvPMENT
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
NEW (SFR,P/S,DUP) PERMIT
1979 SUNBURST DR VAIL
1979 SUNBURST DR
210109103002
OWNER MASLAK, SAMUEL H. & LULETA 06/22/2006
961 HIGH RD
WOODSIDE
CA 94062
APPLICANT BECK BUILDING COMPANY
P.O. BOX 4030
VAIL
CO 81658
License: 117-A
CONTRACTOR BECK BUILDING COMPANY
P.O. BOX 4030
VAIL
CO 81658
License: 117-A
Desciption: CONSTRUCTION OF A NEW SFR
Occupancy Type
RESIDENT/1 & 2 FAM ( ZONE 3 VB
Totals...
Number of Dwelling Units: 1
Town of Vail Adjusted Valuation: 2,800,000.00
Permit #:
Project #:
Status . . . .
Applied . . :
Issued . . .
Expires.....:
B06-0161
PRJOS-0417
ISSUED
06/22/2006
09/O1/2006
02/28/2007
06/22/2006 Phone: 970-949-1800
�c=� � �
v��v��. �-�-�
.�
06/22/2006 Phone: 970-949-1800
�l�,e; �v � �
Factor Sq Feet Valuation
126.96 7,948 $1,009,078.08
7,948 $2,800,000.00*
Revision Valuation: $0.00
********��*************��***************a:************�*************** FEE SUMMARY ************�:***********�**********************************
Building-----> $12,17s.75 Restuarant Plan Review--> $0. 00 Total Calculated Fees-----> $21, 290. i4
Plan Check--- > $ 7, 916 .19 Recreation Fee------------> $1,19 2. 2 0 Additional Fees------------ > $ 0. 0 0
Investigation-> $0.00 TOTAL FEES-------------> $21, 290.14 Total Permit Fee-----------> $21, 290.14
Will Call-----> $3 . 00 Payments-------------------> $21, 290. 14
BALANCE DUE---------> $ o. o 0
***�*�*************************************************x:******************x*�**�***************�*�**************�********�*�****�****************
Approvals:
Item: 05100 BUILDING DEPARTMENT
08/13/2006 MROYER Action: DN Comment letter faxed to contractor,
architect and
engineer 08/13/2006.
08/24/2006 MROYER Action: AP Review complete. Waiting for revised plan
to be
approved by all departments before collating the office copy of plans.
Item: 05400 PLANNING DEPARTMENT
06/27/2006 bgibson Action: AP
Item: 05600 FIRE DEPARTMENT
06/26/2006 JJR Action: COND See conditions.
08/24/2006 JJR Action: AP Revision approved.
Item: 05500 PUBLIC WORKS
06/29/2006 gc Action: AP Provide a Revo�able Right of Way permit
before C/O.
09/O1/2006 gc Action: AP Revisions approved 9/1/06
Provide a revocable Right of Way permit.
Item: 05550 ENGINEERING CIVILS
******************�***�**********+**�*�****************************************************************�*****************************************
See the Conditions section of this Document for any conditions that may apply to this permit.
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan
and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all
Town ordinances and state laws, and to build this structure according to the towns zomn d subdivision codes, design review
approved, International Building and Residential Codes and other ord�ances o�th� To n pplicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN
AM - 4 PM. %,
AT 479-2149 OR AT OUR OFFICE FROM 8:00
OWNER OR CDNxRACTOR FOR HIMSELF AND OWNEF
�***�*�****��*�*�*****��***�****�*�*������*****�**���******��*�*�����*�*�**�***������**�*��*����*�*�****
CONDITIONS OF APPROVAL
Permit #: B06-0161 as of 09-01-2006 Status: ISSUED
�*�x****�*��x*���*�***��*�x�:*��x**�:***�*�****�:���*�:��x��x�:****�:�*�:�*�:*�:��***�:******�**�*�*�:��:**�**�x�:�***�*�:*�*
Permit Type: NEW (SFR,P/S,DUP) PERMIT Applied: 06/22/2006
Applicant: BECK BUILDING COMPANY Issued: 09/O1/2006
Job Address: 1979 SUNBURST DR VAIL
Location: 1979 SUNBURST DR
Parcel No: 210109103002
�x*�****:�***��x*�����:�x��:�*�**�x�:�*:x�*�*���*��:******��*��x*�:x�***�****��*��:**���x�**�::x*****�:*�:*�����****�*�x��:*
CONDITIONS
:�x��*�:**�****�x***�**����x*�**�x�:**�**�x*�x*�*:�**�x�***:�**��x**�*�:�:��x*:�******�**=x**�x*�x****:���x��*��********�*�***
Cond: 33
(PLAN) THIS PROJECT WILL REQUIRED A SITE IMPROVEMENT SURVEY. SUCH SURVEY SHALL
BE SUBMITTED AND APPROVED PRIOR TO REQUEST FOR A FRAME INSPECTION.
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.
Cond: CON0008206
Fire sprinkler system required and shall comply with NFPAI3R(2002) and VFES
standards.
Cond: CON0008207
Monitored �re alarm system required and shall comply with NFPA 72(2002) and
VFES standards.
********************************************************************************************
TOWN OF VAIL, COLORADO Statement
**************************************+*****************************************************
Statement Number: R060001363 Amount: $13,373.9509/O1/200602:52 PM
Payment Method: Check Init: DDG
Notation: Beck Building
12012
-----------------------------------------------------------------------------
Permit No: B06-0161 Type: NEW (SFR,P/S,DUP) PERMIT
Parcel No: 2101-091-0300-2
Site Address: 1979 SUNBURST DR VAIL
Location: 1979 SUNBURST DR
Total Fees: $21,290.14
This Payment: $13,373.95 Total ALL Pmts: $21,290.14
Balance: $0.00 ,
********************************************************+****�******************************
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------------- ------------------------------ ------------
BP 00100003111100 BUILDING PERMIT FEES 12,178.75
PF 00100003112300 PLAN CHECK FEES -3,958.10
PF 00100003112300, PLAN CK - project GFP012 3,958.10
RF 11100003112700 RECREATION FEES 1,192.20
WC 00100003112800 WILL CALL INSPECTION FEE 3.00
-----------------------------------------------------------------------------
i I
� �
� LEE ALAN DOROTHY 8-st s2-saonaz,
<��► � ,20(�'�
��B�a� � LU'1�-�' O� V �� $ �- l "oZ <<-�:5� ,
�tr.�.c�c�S,R�i � o `i �SC�°O � � 8 �"�"
ALPINE BANK & TRUST '
(3031328-1666
P. O. BOX 70
EAGLE, CO 81631
�,I ( � ����i
�ax `1�Lc�w�' IM litek��� — – - - ""-
�: !.
**********************************�*****************************************�***************
TOWN OF VAIL, COLORADO Statement
*****�**************************************************************************************
Statement Number: R060001363 Amount: $13,373.9509/01/200602:52 PM
Payment Method: Check Init: DDG
Notation: Beck Building
12012
-----------------------------------------------------------------------------
Permit No: B06-0161 Type: NEW (SFR,P/S,DUP) PERMIT
Parcel No: 2101-091-0300-2
Site Address: 1979 SUNBURST DR VAIL
Location: 1979 SUNBURST DR
Total Fees: $21,290.14
This Payment: $13,373.95 Total ALL Pmts: $21,290.14
Balance: $0.00
***************************�**********************�***********************************�*****
ACCOUNT ITEM LIST:
Account Code
BP 00100003111100
PF 00100003112300
PF 00100003112300,
RF 11100003112700
WC 00100003112800
Description
BUILDING PERMIT FEES
PLAN CHECK FEES
PLAN CK - project GFP012
RECREATION FEES
WILL CALL INSPECTION FEE
Current Pmts
12,178.75
-3,958.10
3,958.10
1,192.20
3.00
- o
�-
���� o
APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UNSI �`� ,� — V���
Project #: v�v✓ /
Building Permit #: ' �
� �� � •:
�; ���� ��. . , 9 �.� �tt�t� ')
�������' � TOWN OF VAIL BUILDING PERMIT APPLICATION
Separate Permits are required for electrical, plumbing, mechanical, etc.!
75 S. Frontage Rd.
Vail, Colorado 81657
CONTRACTOR INFORMATION
COMPLETE VALUATIONS FOR BUILDING PERMIT (Labor & Materials)
BUILDING: $ II ELECTRICAL: $ II OTHER: $
PLUMBING: $ MECHANICAL: $ TOTAL: $ as��i 1••�L« tcyv�.
*********�*****************,�,�*****�***�******FOR OFFICE USE ONLY*�************�*******�**,�***�******�****�*********,�:�
F: \cdev\FORMS\Permits\Building\building�ermit_4-21-06. DOC
� �� ��
�UN
1of16
����
_ -�..._�
I 1 i� :
? 2 2006 ;
I
04 21/2006
� �...4�,� � �. _.____ _�
August 23, 2006
Dear Matt,
The Maslak Residence, at 1979 Sunburst Drive in Vail, Co is going to be compietely
sprinklered. Therefore we are permitted to have four levels of wood frame construction.
Please see IBC 504.2.
If you have any further questions or comments don't hesitate to call.
1000 South Frontage Road West, Suite 102 • Vail, Colorado 81657 • Tel: (970) 476-1147 • fax: (970) 476-1612 • Email: gpsxvailC�aol.com
;��.:
�::. .
��� ;�._
..
�_�; _��_.
aa�
,�-..��++�e^�""�""n�^—.��e, �'�..
������i����1��'�;�����
�,..
AGENCY
08/25/2006
Charlie Davis
Chief Building Official, Town of Vail
75 South Frontage Road
Vail, CO 81657
RE: PROJECT:
PLAN REVIEW:
ADDRESS:
Dear Mr. Davis:
Maslak Residence
#B06-0161
1979 Sunburst Lane
Colorado Inspection Agency has completed a review of the following documents:
Plans:
■ 36 — sheets stamped by the Architect
■ 3— sheets stamped by the Architect
■ 8— sheets structural stamped by Engineer
These documents were reviewed only for their conformance to the provisions of the 2003
International Residential Code, 2003 International Mechanical Code, 2003 International
Plumbing Code, 2005 National Electrical Code,. Colorado Inspection Agency finds the
documents submitted to be complete for construction and ready for issuance of the building
permit. Please see attached conditions of approval.
Sincerely,
Matthew Royer
Building Official
Colorado Inspection Agency
Colorado Inspection Agency P: 970328.]790
1286 Chambers Ave, Eagle CO 81631 F: 970328.1791
, TOWN OF VAIL
Building Department Plan Review List: Permit #�'01(u �
One and Two Family Dwelling and
Townhouse
V-B construction Review date: OS ! ZOOCo
2003 IRC plan revisions re uirect N
Reviewed by: :�
IRC Approval date: 08 2��
Architectural:
Correction
Required
Two-Family Dwellinq Units:
Y/ One hour wall assembly for vertical separations to underside of roof sheeting (IRC R317.1)
Y/ One hour floor/ceiling assembly for horizontal separations. Supporting construction shall also
have equal fire resistive rating. (IRC R317.1.1)
Y/ Check common walls or floors have minimum sound transmission class (STC) of 50. (IBC 1207)
Townhouse:
Y/ (Two) one hour wall assemblies, or (one) two hour wall assembly (plumbing/mechanical
penetrations not permitted) (IRC R321.2)
Y/ Check common walls have minimum sound transmission class (STC) of 50. (IBC 1207)
Y/ Continuity of common wall shall be continuous from foundation to roof sheeting and extend full
length of the wall. (IRC R317.2.1)
Y/ Parapets shall be required unless alternate construction is provided per exceptions (IRC
R317.2.2 and R317.2.3)
Y/ Each townhouse shall be structurally independent (IRC R317.2.4)
Y/ Check common wall detail is per actual structural wall/floor/roof conditions.
Building planning:
Y/� Check location on property for exterior wall, overhang and opening protection.
One hour walls less than 3', overhangs, no openings <3' (IRC R302)
Y/,A� Check dwelling unit is maximum 3 stories and maximum 40' height (IBC Table 503, 101.2)
Y/�d' Check separation and opening protection specified between dwelling/garage or carport if
not open on 2 or more sides (IRC R309)
Y Check no openings from garage directly into sleeping rooms (IRC R309)
Y� Check %2' gypsum board specified on underside of enclosed usable space under stairs
(IRC R311.2.2)
Y/,� Check minimum of one side hinged 3 ft. x 6ft.8in. exit door provided from dwelling to exterior.
Exit path may not travel through the garage. (IRC R311)
Y� Check minimum room areas. One room 120 s.f., habitable rooms not less than 70 s.f. (IRCR304)
Y/�` Check habitable rooms not less than 7' in any dimension (IRC R304)
Y/� Check minimum 7' ceiling height in habitable rooms, hallways, bathrooms, laundry rooms and
basements (IRC R305)
`-� Y/.� Check for glazing area (8% of floor area) and natural ventilation (4% of floor area) in habitable
�^��u��� rooms (IRC R303). See exceptions for mechanical ventilation.
-R�: 2- Y� Check ventilation in bathrooms (IRC R303.3)
� aq��sfd<<T Y/J� Check illumination provided at stairways (IRC R303.6)
Y/,@� Check bedrooms and basement for emergency escape door or window and window well
(IRC R310) Mark egress windows on the plans for the field inspector.
Check safety glazing provided in hazardous locations, highlight windows on floor plans for field
inspector:(IRC R308)
Y/�' glass in side hinged doors, sliding doors, and shower doors
Y/� glass in shower, bath, hot tub, sauna etc. enclosures where window is <60" above floor
Y/�d' glass within 24" of either door edge in closed position and <60" above floor.
Y/� any glass panels >9 s.f. and <18" but >36" above floor
Y /�d glass in railings
Y/ glass within 5' of water's edge of pool or spa and <60" above floor
Y glass at top or sides of stairways within 36"
Y� glass at bottom of stairways within 5'
C:�Documents and Settings\mroyerUvly Documents\Plan Review\Checklists�2003_IRC_ plan_review checklist_VaiI.DOC
Y / �f
�/ N
�X7�.YLto it- �/ N
1.��"��q2-� Y l�
(
�� ti�t� -
r��
Y /�11'
Y /�
Y /�!'
Y /�F
Y /,�
�
Y /�f
TO WN OF VAIL
Check rafter space or attic space ventilation specified and ridge/eave detail provided
(IRC R806)
Check underfloor ventilation specified, or plans show other approved method per
exceptions (IRC R408)
Check floor level and landings at doors. See exception for additional doors (IRC R311.4.3)
Check guards provided where required and detail provided. (R312)
Check stairway for tread/riser size and nosing profile, open risers, width, landing size,
handrail/guard (IRC R311) SFrr� �D��7 H/�' —
Check fireplace chimney termination, 2' above roof within 10'. If decorative shroud is used on
factory built fireplace, it must be listed for use with the specific fireplace. (IRC R1004)
Check weather protection specified on exterior walls and any waterproof decks with
enclosed space below. (IRC R703)
Check dampproofing/waterproofing specified on basement foundation walls (IRC R406)
Check roof covering/underlayment specified. (IRC Ch. 9)
Check vapor retarder installed on warm side of insulation. (IRC R318)
Check any foam plastic insulation specified to have thermal barrier installed where exposed to
interior of building or crawl space. (IRC R314)
Check for pool, hot tub or spa on site plan. Check compliance with pool barrier
provisions. Flag file for separate permit required if plans are not included. (IRC Appendix G)
c bui ing ermit application construction valuation. Verify minimum building valuation per
e a and charts. (Look for modifiers)
IRC
Mechanical: o
Correction �'.g �
Re uired µq.s
Y/ Check required heating is provided (IRC R303.8)
Check clothes drver location:
� Check vent length, and termination comply with (IRC M1501) . ?
Check mechanical equipment location:
Y/�'' Check mechanical equipment is not located in a sleeping rooms, bathroom/toilet rooms or
storage closet unless allowed per exceptions. (IRC G2406)
Y/�d' Check any equipment in garage specified to be 6' above floor unless vehicle barrier
is provided, then 18" above floor permitted. (IRC G2408.3, G2408.4, M1307.3)
Y/� Check 30" deep working space provided in front of equipment (IRC M1305.1)
Y/,� Check door large enough to remove equipment (IRC M1305.1.2)
Y/�#' Check mechanical room large in comparison with size of equipment (IRC G2409.4.1)
Y/� Check floor drain provided in mechanical room (IMC 1004.6 )
�'/ N Check mechanical equipment vent shaft and vent termination shown. (IRC M1804.2.)
Check fireplaces:
�/� Check factory built units specified to have gas log set and outside combustion air.
��N Check fireplaces in bedrooms are sealed units with outside combustion air. (IMC 303 and IRC
M 1701.4)
Y/� Check wood burning specified to be EPA Phase II listed (verify local amendment)
2000 UPC
Plumbing:
Correction
Y�Re ui�ed
Check minimum sanitation facilities provided: bathroom, kitchen, water, sewage disposal. (UPC
304, UPC 413.1 and IRC R306)
Y/� Check garage floor drains. Floor drains may not be connected to sewer unless sand/oil
interceptor is provided. Daylight drain is permitted
Y/�i' Check any floor drains other than mechanical room noted to be provided with trap primers where
necessary. Laundry etc. (UPC 1007)
C:�Documents and Settings�mroyer�lvly Documents�Plan Review\Checkfists�2003_IRC_ plan_review_checklist Vai1.DOC
TO WN OF VAIL
�
Check bathrooms: aq� � ? �
�/,P� Check for minimum clearances at water closet, 30" wide, 24" clear in front (UPC 408.6)
Y/c�d' Check for minimum clearances at tub/shower, 24" clear in front (IRC R307)
Y/� Check shower compartment meets minimum size, 1,024 sq. in.", 30" circle (UPC 412.7)
�11� Check for minimum clearances at lavatories, 21" clear in front (IRC R307)
IRC
ElectricaL•
Correction
�Re uir�ed �I�N ��C•D " �t-Ia�l� �R6 I�cT �rvtp�,ST'E.
�l N Check smoke detector locations. For interior remodels/additions, note requirements for
installation in existing dwelling. (IRC R317)
�' pt' Check stairway illumination is provided at interior and exterior stairways. (IRC R303.4)
Y/ N Stamp concrete encased electrode requirements on foundation plan. (IRC E3508.1.2)
Y/ N Check location main electric service and sub-panel
Check for working clearances at panels
Check for location or required lighting outlets: (IRC E3808, NEC 210-70)
habitable rooms, bathrooms, hallways, stairways, attached garages, exterior doors, or
underfloor/basemenUattic containing equipment or used as storage
Three-way switch required at all stairways with more than 6 risers
Check light fixture clearance in closets (NEC 410-8)
Check for location of required receptacle outlets: (IRC E3801, NEC 210-52)
General use receptacles (IRC 3801.2):
Y/ N located so that no point along floor line in any wall space is more than 6' from an outlet, and any
wall space more than 2' wide requires outlet. Railings/room dividers are counted as wall space.
Hallwavs (IRC E3801.10)
Y/ N One receptacle in hallways greater than 10'
Counter-top receptacles (IRC E3801.4):
Y/ N All counter space 12" or wider receptacles shall be located so that no point along wall is more
than 24" from an outlet.
Y/ N Island counter space 12" x 24" or larger shafl have a minimum of one receptacle.
Y/ N Peninsular counter space 12" x 24" or larger shall have a minimum of one receptacle.
Bathroom receptacles (IRC E3801.6)
Y/ N A minimum one receptacle located within 36" of the outside edge of each lavatory.
Laundrv room (IRC E3801.8)
Y/ N One receptacle within 6' of appliance locations.
Outdoors (IRC E3801.7)
Y/ N Two receptacles, one at front and one at back of house accessible at grade level
Unfinished basemenUGaraqe (IRC E3801.8)
Y/ N One receptacle minimum, in addition to any provided for equipment.
Check for location of receptacles requirinq GFCI protection: (IRC E3802, NEC 210-8)
Y / N Garage receptacles
Y / N Bathrooms receptacles
Y / N Outdoors receptacles
Y / N Kitchen receptacles
Y/ N Bar sink receptacles
Y / N Unfinished basements/underfloor
IRC
Structural:
Correction
Reauired
Y/� Check structural sheets of plans and details wet stamped and signed by Colorado State Licensed
Engineer or Architect (IRC R301.1.3)
C:�Documents and Settings�nroyerUvly Documents�Plan Review\Checklists�2003_IRC_ plan_review_checklist VaiI.DOC
Y�
Y�
Y /�
Y�
�
�
Y l�iY
Y /,pY'
Y�
Y /�'
Yy�'
Y /�
Y/�
Y /�
Y�
Y /�"
Y�
Y /�'
Y /,�
Y�
Y /�d'
Y /„A11"
Y /�4'
Y /�A+
Y ��
Y /�-
Y / �--
Y�
Y /�
Y�
Walls:
Y /�Dd"
Y /�
Y /�"
Y /.D�
TOWN OF VAIL
Check the followinq plans are inciuded:
structurai design loads and materiai specifications sheet
foundation plans and details
dedicated floor framing plans for each floor level
dedicated roof/ceiling framing plans or truss layout
framing details
soils report for correct lot
Check design criteria used in structural desiqn:
roof and deck live load per adopted snow load tables, verify site elevation •� 1(
floor design for 40/30 psf live load and min. dead load if concrete topping or stone
wind design for minimum 90mph (3 second gust), exposure referenced
seismic design for zone C
foundation designed per soils report bearing capacity.
Check specifications called out for lumber grades/species, beams (LVL, Glulam etc.), log grades,
concrete, foundation reinforcing, steel framing
Footing/foundation, slab and floors:
Check retaining wall design provided where greater than 4' in height
Check footing /foundation sized in accordance with soils report
Check footing, foundation stepped if site grade slopes greater than 10%. Top of wall/bottom of
footing elevations shown.
Check foundation sections/details are provided for each type of footing/foundation and referenced
on the foundation plan, dimensions clearly shown
Check foundation sill plate pressure treated or redwood, bolt spacing specified. Check
joist/foundation wall connection details.
Check minimum frost depth specified for bottom of footing
Check minimum slab thickness is specified and expansion joints are shown between thickened
slab at bearing walls and post footings per soils report if expansive soil
Check proper bearing is provided at all bearing walls/columns. Trace loads from all levels above
to the foundation.
Check floorjoist and beam spans, minimum bearing for beams orjoists ends
Check deck joist and beam spans, joist material suitable for exterior
Check joist hangers and beam hangers are specified, beam to beam connections specified
Check through bolting connections specified for side loaded (4) member LVL beams
Check minimum underfloor joisbgirder clearances
Check floor sheathing type thickness and attachment
Check all wood framing minimum 6" above grade
Check wood framing not supporting dead load of masonry/concrete over 4" thick. See exceptions
for veneer.
Check support detail is provided for stone or masonry veneer and height not exceeding 30'
Check if masonry fireplace or prefab masonry type fireplace. Non-combustible support and
construction details provided.
Check stud size and spacing and height specified and comply with specifications for bearing stud
heights indicated on the plans.
Check header specified over openings in stud wall
Check columns clearly specified at concentrated loads. Columns clearly shown where
transferring from upper level
Check stud wall lateral bracing specified on plans.
Roof:
Y/�SG' Check rafter, hip, valley, beam spans
Y/� Check ridge designed as beam or rafters ties provided at ceiling level
Y/� Check rafter hangers are shown, beam to beam connections specified, welding or bolting
connections for bent beams specified
Y/1� Check through bolting connections specified for side loaded (4) member LVL beams
C:�Documents and SettingsUnroyer\My Documents�Plan Review\Checklists�2003_IRC_ plan_review checklist Vai1.DOC
TO WN OF VAIL
Y/� Check construction details provided for site built trusses (log or timber)
Y/�' Check truss layout plan if manufactured trusses, note truss shop drawings to be submitted at
frame inspection
Y/,� Check overframing at infill areas size/spacing specified
Y/ fjF Check roof sheathing type, thickness and attachment specified
C:�Documents and Settings\mroyerWly Documents�Plan Review\Checklists�2003_IRC_ plan_review_checklist Vai1.DOC
DATE,TIME
FAX N0.lNAME
DURATION
PAGE(S)
RESULT
MODE
TRANSMISSION VERIFICATION REPORT
BUSV: BUSVINO RESPOhISE
1�104 03:37
9491577
0�: 00: 06
6�
BUSV
STAhIDARD
TIME
NAME
FAX
TEL
SER.#
: 10/�4/2006 03:37
: �00H5J625498
COLORADO INSPECTION AGENCY PLAN REVIEW COMMENTS
TO:
FAX/EMAIL:
Contractor
Beck Building Co
Lee
949-4335
NUMBER OF PAGES:
FROM:
DATE:
BUILDING PERMIT #:
OWNERS NAME:
SITE ADDRESS:
SUBDIVISION:
OCCUPANCY GROUP:
TYPE OF CONSTRUCTION:
NUMBER OF STORIES:
Architect
Gwathmey, Pratt, Schultz
476-1612
2
Matthew Royer
08/13/2006
B06-0161
Maslak
1979 Sunburst Lane
Vail Vailley
R-3
V-B
3+Basement
Enqineer
KRM Consultants
949-1577
The design documents submitted for this project have been reviewed for compliance with the locally
adopted codes and amendments. The following comments must be addressed before a building
permit is issued.
For processing:
. Please sub_mit (4) complete sets of revised construction documents containinq the requested
information or plan revisions with all revisions clouded or ofherwise identified.
Please respond in writinq to each comment bv markinq the attached list or creatinq a
response letter. Indicate which plan sheet, detail, specification, or calculation shows the
r�uested information. Please send revisions to the attention of the plans examiner with the
buildinq permit application number noted.
Responses such as "will comply with code" are not adequate. Revised drawings must
clearly show code compliance.
A RESPONSE LETTER MUST BE INCLUDED WITH THE REVISED PLAN SUBMITTAL.
Please be sure to include on the resubmittal the enqineer's or architecYs "wet" stamp, siqnature,
reaistration number and date on the cover paqe of anv structural calculations, all structural details
and structural sheets of the plans. For commercial or multi-familv proiects all sheets of the plans
must be stamped.
Re-submittal shall be made to the Town of Vail Building Dept.
C:\Documents and Settings\mroyeruvly Documents�Plan Review\tov-b06-0161.DOC
BUILDING DEPARTMENT COMMENTS:
Architectural Comments:
1. Provide calculations that state the grade plane elevation of the residence. This is used to determine
the number of stories. (R301.2.2.4.1)
2. Please verify the lower level finished floor elevation. Sheet A2.1 shows the top of slab at 8249'-5"
and the exterior top of stone outside of the Family room at 8249'-8". Please clarify. The doors at this
location swing in therefore there can not be a step down into the residence.
3. Please clarify. The room outside of the mechanical room appears to be unfinished. Is this correct? If
the room is finished, provide light, ventilation and all other applicable code required elements.
4. Provide a crawlspace ventilation detail or amend plans to identify the exceptions and specify on the
plans. (R408)
5. It appears that the observatory is accessed by an alternating tread device. This type of stair is not
permitted in a residence to access a habitable space. Please amend plans to show an approved stair
design to this floor level. (R311.5)
6. There shall be 15" clear between the centerline of water closet and wall and 15" clear between the
centerline of the water closet and the tub. Bath 4& 5 does not have 30" clear. The tub encroaches
into the required floor space. (R307.1)
7. Amend plans to clearly show 21" of clear floor space between the front of the water closet and the
opposing wall. (R307.1)
Structural Comments:
8. Provide soils report for this building location for review.
9. Please clarify the detail that is referenced on the foundation plan in the plan lower left corner of the
building 12/S6. This appears to be a misplaced tag.
10. Amend structural plan to show a detail for the exterior pad footings and columns.
11. Amend plans to include a beam pocket detail.
12. Please clarify the 6'-5'/4" x 3' widened footing at plan right on the interior. This widened footing is not
labeled for additional reinforcement nor tagged to reference the spread footing schedule.
13�' Provide dome manufacture's approvals, specifications, listings and installation instructions for
` verification of compliance with applicable codes for loading and attachment requirements.
Please refer to the cover sheet for information and instructions for resubmitting plans. The recheck of plans
usually occurs within 3-5 working days of plan resubmittal. In order to avoid delays please check all requested
information is included with the resubmitted plans.
Plan Review Comments
Matthew Royer
Building Official
Colorado Inspection Agency
970-328-1790
C:�Documents and Settings�nroyer�Ivly Documents�Plan Review\tov-606-0161 DOC
Gwathmev Pratt Schultz Architects, p.c. PLAN REVIEW COMMENTS
1. Wood framed construction, three stories above grade: Limits given in Table
R602.10.1, Vail falls under the category C for Seismic Design, which allows the
building to be three stories, wood framed construction. The observatory is an
unconditioned, not habitable, space.
� Correct lower level top of slab is 8249'-5". Correction has been made to outside
level.
� The room outside the mechanical room is a general work space. This room will
be mechanically ventilated with lighting and will comply with all necessary code
requirements for this space. Note has been added to plan.
� Total area crawlspace= 57.5 ft. Provided on plan, 2x (4"x8") vents on opposite
walls for better ventilation. Total vent opening= 64 sq. inches, as set out in
(R408.1). Note has been added to plan.
��,
,! Will continue same staircase up to observatory level with a 42" high guardrail in
��
observatory.
� Correction has been made, all WC's now comply to (R307.1)
�Correction has been made, all WC's now exceed the minimum 21" as required
(R307.1)
Ewald Els
COLORADO INSPECTION AGENCY PLAN REVIEW COMMENTS
2"d Review Comments are shown below the original comment in Bold Italics. Comments that were
addressed by the resubmitted documents have been removed from the letter.
TO:
FAX/EMAIL:
Contractor
Beck Building Co
Lee
949-4335
NUMBER OF PAGES:
FROM:
DATE:
BUILDING PERMIT #:
OWNERS NAME:
SITE ADDRESS:
SUBDIVISION:
OCCUPANCY GROUP:
TYPE OF CONSTRUCTION:
NUMBER OF STORIES:
Architect
Gwathmey, Pratt, Schultz
476-1612
3
Matthew Royer
08/22/2006
B06-0161
Maslak
1979 Sunburst Lane
Vail Vailley
R-3
V-B
3+Basement
Enqineer
KRM Consultants
949-1577
The design documents submitted for this project have been reviewed for compliance with the locally
adopted codes and amendments. The following comments must be addressed before a building
permit is issued.
For processing:
. Please submit (4) complete sets of revised construction documents containinq the requested
information or plan revisions with all revisions c%uded or ofherwise identified.
Please respond in writinq to each comment bv markinq the attached list or creatinq a
response letter. Indicate which plan sheet, detail, specification, or calculation shows the
requested information. Please send revisions to the attention of the plans examiner with the
buildinq permit application number noted.
Responses such as "will comply with code" are not adequate. Revised drawings must
clearly show code compliance.
A RESPONSE LETTER MUST BE INCLUDED WITH THE REVISED PLAN SUBMITTAL.
Please be sure to include on the resubmittal the enpineer's or architect's "wet" stamp siqnature
re�istration number and date on the cover paqe of anv structural calculations all structural details
and structural sheets of the qlans. For commercial or multi-familv projects all sheets of the plans
must be stamped.
Re-submittal shall be made to the Town of Vail Building Dept.
V:�PIan Review\Vail\tov-b06-01612.DOC
BUILDING DEPARTMENT COMMENTS:
Architectural Comments:
� Provide calculations that state the grade plane elevation of the residence. This is used to determine
the number of stories. (R301.2.2.4.1) z�/�.``
c� -�`� •
The requested information was not provided. P/ease provide the grade plane elevation. The
space in question is a location in which occupants of the residence can be. This enc/osed
occupy-able area is considered by code to be counted as a floor. Residences governed by the
/RC are limited as you have stated to 3 stories. Provide calculations for grade plane and
determine whefher or not the lower level is considered the first floor or a basement.
5. It appears that the observatory is accessed by an alternating tread device. This type of stair is not
permitted in a residence to access a habitable space. Please amend plans to show an approved stair
design to this floor level. (R311.5)
Stairs provided to the observatory are not compliant to the code. P/ease amend stair design
to comply with width requiremenfs. Provide rise and run speci�cations for fhe stairs fo this
area.
Structural Comments:
;�f Provide soils report for this building location for review.
%'
No response has been provided for this comment.
�Please clarify the detail that is referenced on the foundation plan in the plan lower left corner of the
building 12/S6. This appears to be a misplaced tag.
No response has been provided for this comment.
'j�' Amend structural plan to show a detail for the exterior pad footings and columns.
G
No response has been provided for this comment.
�. Amend plans to include a beam pocket detail.
No response has been provided for this comment.
. Please clarify the 6'-5 %4" x 3' widened footing at plan right on the interior. This widened footing is not
labeled for additional reinforcement nor tagged to reference the spread footing schedule.
No response has been provided for this commenf.
� Provide dome manufacture's approvals, specifications, listings and installation instructions for
'�-� verification of compliance with applicable codes for loading and attachment requirements.
No response has been provided for this comment.
Please refer to the cover sheet for information and instructions for resubmitting plans. The recheck of plans
usually occurs within 3-5 working days of plan resubmittal. In order to avoid delays please check all requested
information is included with the resubmitted plans.
V:\Plan Review\Vail\tov-b06-0161.2.DOC
Plan Review Comments
Matthew Royer
Building Official
Colorado Inspection Agency
970-328-1790
V:�Plan Review\Vail\tov-606-0161.2.DOC
I �-�4
f��
�� Code Review (IRC)
Definitions:
:;:
[B]MEZZANINE,LOFT. An intermediate 1 �t��I ,±�a� between the�
with an aggregate floor area of not more than one-third of the area of
the level or levels are located.
_ Floor levels consisting of relatively small floor reas opening into la
meuanines. Located at an intermediate leve '- eiling sp
limited to one-third of the area t room in whi it is loc d. Becq
relatively small size, a Ioft mezz ni e is not an a' story. �
and ceiling of any story
r�11�ce in which
are loft
, a loft me nine is
: of its o�ess and
ATTIC. The unfinished space be n the ceil' ists of the top story and the roof rafters.
Several provisions apply to the area o a i in such as thos to ventilation of
the attic space. The code identifi n attic n hed space tw he ceiling joists of
the top story and the roof rafters. h a space w Id b the top stor athe han the attic if it is
finished and occupiable.
B]HEIGHT, STORY. The vertical di ance fr of two successive 'ers of beams or
finished floor surfaces; and, for the pm story, om he top of the flo h to the top
of the ceiling joists or, where there i ot a ceiling, t top of the r rafte
_ Wifhin the building itself, the heigh f an i tory is determined by asuring the
vertical distance between two succe ive fi hed floor surtaces. In a single-s ry building or for
the uppermost floor in a multistory st cture, he measurement is taken from t finished floor
surface to the top of the ceiling joists r to t�.rrN�irifi6ide of the roof deck (top of the roof rafters)
where a ceiling is not provided. See mmentary Figure R2Q2 (12).
[B] STORY. That portion of a building nclude een the upper surface of a floor and the
upper surface of the floor or roof next bove.
_ A story is that portion of a building fr a flo r surface to the floor surface or roof above. In the
case of the top-most story, the height the st 's measured from the floor surface to the top of
the ceiling joists of an attic. Where a c'ling create an attic, such as a cathedral ceiling,
the story height is measured to the top f the roo a s. See .Story Above Grade.
R301.2.2.4.1 Height limitations. Wood
grade or the limits given in Table R602.
to twostories above grade in accordanc
shall not be considered as stories.
_ This section limits the building height si
overloaded during an earthquake. It prov
height of structures. Wood framed buildir
Seismic Desian Cateaorv D2. where the I
� shall be limited to three stories above
d steel framed buildings shall be limited
.Mezzanines as defined in Section 202
M�'prce-resisting elements will not be
references to other sections that limit the
ierally limited to three stories except in
�ries in accordance with Table R602.10.1.
R312.1 Guards required. Porches, balconi or raisedfloor
surfaces located more than 30 inches (762 m) above the floor
or grade below shall have guards not less tha 36 inches (914
mm)in height.Open sides of stairswith a total rise of more than
30 inches (762 mm) above the floor or grade below shall have
guards not less than 34 inches (864 mm) in height measured
vertically from the nosing of the treads.
Porches and decks which are enclosed with insect screening
shall be provided with guards where the walking surface is lo-
cated more than 30 inches (762 mm) above the floor or grade
below.
MEZZANINES NEED GUARDS
�
�
�
�`
N
�
�
O
�
R101.2 Scope. The provisions of the Intemafiona/ Residential Code for One- and TwaFamily
Dwellings shail appiy to the construction, alteration, movement, enlargement, replacement, repair,
equipment, use and occupancy, location, removal and demolition of detached one- and two-
family dwellings and multiple single-family dwellings (townhouses) not more than three stories in
heiaht with a seqaratemeans of egress and their accessory structures.
_ The provisions of the IRC apply to all aspects of
construction for detached one-and two-family dwell-
ings, multiple single-family dwellings defined as town-
houses and all structures accessory to the dwellings
and townhouses. This section sets a limitation in its
scope of application to include only those townhouses
and dwellings that are up to and including three sto-
ries. Additionally, the provisions require each two-fam-
ily dwelling or townhouse to have separa�te�egress�sys�
tems for each of the dwelling units �`t�;��� ����ll�t�g�o�
�- �������. A . .� � � �� The actual
height of the building, measured in feet and as applied
to the height of each story, is limited by the governing
provisions for each specific material as found in Chap-
ter 6 of the code. The user of the code will discover
that, depending upon which material is selected for the
wall construction, the result may be buildings of differ-
ent permitted heights. For instance, where the wall
system is of insulating concrete form construction as
prescribed in Section R611, the building is limited to
two stories above grade and each story is limited to 10
feet (3048 mm) in height. If wood stud wall framing is
used pursuant to the requirements of Section R602,
the allowable story height and the overall building
height will greatly exceed those permitted for the insu-
lating concrete form wall construction method. The
code does not limit the area of the building.
The provisions address all aspects of constructing,
altering, repairing, maintaining, using, occupying, en-
larging, locating, removing or demolishing any one-
family dwelling, two-family dwelling, townhouse or ac-
cessory structure. The code regulates any and all
activities that modify the buildings as well as any struc-
tures that are of incidental use to the main buildings
and that are also located on the same lot. The code
regulates all construction, plumbing, mechanical,
electrical, equipment, fixture and gas piping installa-
tions that are done to the building and its operating
systems as well as to other structures incidental to the
main building and on the same lot. Even work that is
specifically exempted from permits must comply with
the requirements of the code.
IBC Code Review
Definitions:
STORY. That portion of a building included between the upper surFace of a floor and the upper
surface of the floor or roof next above (also see "Basement,° "Mezzanine" and Section 502.1). It
is measured as the vertical distance from top to top of two successive tiers of beams or finished
floor surfaces and, for the topmost story, from the top of the floor finish to the top of the ceiling
I���� Residential occupancies where the occupants are primarily permanent in nature and not
classified as R-1, R-2, R-4 or I and where buildings do not contain more than two dwelling units
as applicable in Section 101.2, or adult and child care facilities that provide accommodations for
five or fewer persons of any age for less than 24 hours. Adult and child care facilities that are
within a single-family home are permitted to comply with the International Residential Code in
accordance with Section 101.2.
R-3 IN TYPE V IS ALLOWED 3 STORIES.
SECTION 504
HEIGHT MODIFICATIONS
504.1 General. The heights permitted by Table 503 shall only be increased in accordance with
this section.
504.2 Automatic sprinkler system increase. Where a building is equipped throughout with an
approved automatic sprinkler system in accordance with Section 903.3.1.1, the value specified in
Table 503 for maximum height is increased by 20 feet (6096 mm) and the maximum number of
stories is increased by one story. These increases are permitted in addition to the area increase
in accordance with Sections 506.2 and 506 3. r� �' i. £ `�� ��"
� ��. ��_ > �k�-, �-y��- R . ' � � _� � W � � ���1
.
� ��
: �, ' � � � � � � ��1'.
.
,: � ��
�'r� �` �. ,�., � � � � � ��
a1
f� 1 � ��ia� '� �:r
s�"�`�t� �, r s.=� . � �°� . _ a�� : ��... ��� �. �.m�� � ,. �s or 60 feet (18 288 mm),
respectively.
SECTION 505
MEZZANINES
505.1 General. A mezzanine or mezzanines in compliance with this section shall be considered a
portion of the floor below. Such mezzanines shall not contribute to either the building area or
number of stories as regulated by Section 503.1. The a�ea of the mezzanine shall be included in
determining the fire area defined in Section 702. The clear height above and below the
mezzanine floor construction shall not be less than 7 feet (2134 mm).
ZjMezzanines are required to have a ceiling height of
not less than 7 feet (2134 mm), and the ceiling height
below the mezzanine must also be 7 feet (2134 mm).
Even habitable rooms located in mezzanines may have
a ceiling height of 7 feet (2134 mm), in accordance with
Exception 4 in Section 1208.2.
505.2 Area limitation. The aggregate area of a mezzanine or mezzanines within a room shall not
exceed one-third of the area of that room or space in which they are located. The enclosed
portions of rooms shall not be included in a determination of the size of the room in which the
mezzanine is located. In determining the allowable mezzanine area, the area of the mezzanine
shall not be included in the area of the room.
ZjSo as not to contribute significantly to a building's inherent
fire hazard, a mezzanine is restricted to a maximum
of one-third of the area of the room with which it shares
a common atmosphere. The area may consist of multiple
mezzanines at the same or different floor levels, provided
that the aggregate area does not exceed the
one-third limitation. '� k � , % e�
�� � F� �� , f�� � .a�� N � __*� _.,P .�! .��_. .. . .. ... .. �
i' N =�
� m ,m
In determining the allowable area of the mezzanine,
the enclosed spaces of the room below are not to be included
in calculating the room size. Although the mezzanine
area is included in the calculation of fi�e area
size, it is not included in the area of the room when computing
the allowable mezzanine area. For example, a
room contains 5,000 square feet (465 m2), 500 of which
are enclosed and nvt part of the common atmosphere
with the mezzanine. A mezzanine may be provided in
the room such that the area of the mezzanine is not
more than 1,500 square feet (139 m2). In accordance
with Section 505.4, the space at the mezzanine level
must be open, except that enclosed spaces are permitted
for mezzanines in accordance with the exceptions to
Section 505.4.
505.3 Egress. Each occupant of a mez2anine shafl have access to at least two independent
means of egress where the common path of egress travel exceeds the limitations of Section
1013.3.
Where a stairway provides a means of exit access from a mezzanine, the maximum travel
distance includes the distance traveled on the stairway measured in the plane of the tread nosing.
Exceptions:
�- �w� `.� ����? e �s � ���� �?��#'���=�c�o��" x� ,����e���`���i�4`�
2. Accessible means of egress shall be provided in accordance with Section 1007.
505.4 Openness. A mezzanine shall be open and unobstructed to the room in which such
mezzanine is located except for walls not more than 42 inches (1067 mm) high, columns and
posts.
2. A mezzanine having two or more means of egress is not required to be open to the room in
which the mezzanine is located, if at least one of the means of �gress provides direct access to
an exit from the mezzanine level.
3. Mezzanines or portions thereof are not required to be open to the room in which the
mezzanines are located, provided that the aggregate floor area of the enclosed space does not
exceed 10 percent of the mezzanine area.
ZjA mezzanine presents a unique fire threat to the occupant.
If a mezzanine is closed off from the larger room,
an undetected fire could develop such that it would
jeopardize or eliminate the opportunity for occupant escape.
The exceptions address situations where the hazard
is reduced. A low occupant load, typical of small mezzanines,
would permit a meuanine to be enclosed in accordance
with Exception 1. Occupant load is calculated
in accordance with Section 1004.1 for the use of the
mezzanine space. Similarly, Exception 3 permits the enclosure
of a limited portion of a meuanine.
Exception 2 permits enclosure of the mezzanine
based on the availability of an exit at the mezzanine
level, and the mezzanine has at least two means of
egress. The definition of "exiY' is important for this exception.
"ExiY' is defined in Section 1002.1 as an element
that is separated by fire-resistance-rated construction
and opening protectives, and includes exterior
doors; therefore, the mezzanine must be served by at
least one vertical exit enclosure (Section 1019), a horizontal
exit (Section 1021), an exit passageway (Section
1020), an exterior stair or ramp (Section 1022) or an exterior
door discharging directty at grade. In addition, another
means of egress is required, which may be an
open stair to the room below.
SECTION 1009
STAIRWAYS AND HANDRAILS
1009.1 Stairway width. The width of stairways shall be determined
as specified in Section 1005.1, but such width shall not be
less than 44 inches (1118 mm). See Section 1007.3 for accessible
means of egress stairways.
Exceptions
� �������k�� �� �i���s�, ��i up �`��� ��� �0 ��less�t%aN
ha�Y �t.ruv���a � �� _ _ � . „ �a � . . . :�.�, � ,�,� „��
1009.4 Stairway landings. There shall be a floor or landing at
the top and bottom of each stairway. The width of landings shall
not be less than the width of stairways they serve. Every landing
shall have a minimum dimension measured in the direction of
travel equal to the width of the stairway. Such dimension need
not exceed 48 inches (1219 mm) where the stairway has a
straight run.
Exceptions:
1. Aisle stairs complying with Section 1024.
2. Doors opening onto a landing shall not reduce the landing
to less than one-half the required width. When fully
open, the door shall not project more than 7 inches
(178 mm) into a landing.
1009.11 Handrails. Stairways shall have handrails on each
side.
Exceptions:
1. Aisle stairs complying with Section 1024 provided
with a center handrail need not have additional
handrails.
� �. 3., � d�' 31?��" +�`a�, �„nn„�1 � '^'.�'� a � Fr '�
��� � 6 �.` � �'� �'� a ,. .�.� wC�r �i���1�4�
v
�? ��.. . �,. <� 1-�. � _ � �... .�,�f�i, ;
SECTION 1012
GUARDS
1012.1 Where required. Guards shall be located along
open-sided walking surfaces, mezzanines, industrial equipment
latforms, s`�a s; ram s and landin s which are located
P ,.�!ma� .._ �, , P 9
more than 30 inches (762 mm) above the floor or grade below.
1012.2 Height. Guards shall form a protective barrier not less
than 42 inches (1067 mm) high, measured verticaily above the
leading edge of the tread, adjacent walking surtace or adjacent
seatboard.
Exceptions
1�,u` � F�.����p�����a and within individual
dwelling units in occupancies in Group R-2, both as
applicable in Section 101.2, guards whose top rail also
serves as a handrail shall have a height �� esS ��t3�'
�ficfi,�`�'����� . �-�!� , ��t�ra��38 i"r�` 'e*± (965 _ ,
mm) measured vertically from the leading edge of the
stair tread nosing.
KR M CONSLJLTf+.. rS, INC. 1303) 973-9606
� 6638 WE5T OTTAWA AVENUE �'1 50-2 FAX 973-9847
LITTLETON, COLORAD❑ BO7 BB �
RECORD
TO: Town of Vail
Department of Community Development
75 South Frontage Road
Vail, CO 81657
DATE: 8/23/2006
JOB NUMBER: 0512-05
PROJECT: Maslak Residence - Permit B06-0161
❑ RFI ❑ MEETING NOTES RESPONSE ❑ CLAR/FICATION/CHANGE
The following record is in response to the Town of Vail's plan review comment letter dated 08/13/06. The
following numbered line items directly correspond with the review comment letter's numbering.
Structural Comments:
�G'fhe soil report will be submitted by the architect or contractor and will be referenced on the structural general
'��notes and specifications. As of now, we have assumed very consenrative values for the area which will be
reevaluated once the report is received.
�he tag was mislabelled and has been changed from 12/S6 to 13/S6.
�Detail 2/S8 has been added to clarify the exterior pad footings and columns.
�(. Detail 2/S6 has been modified to show the beam pocket detail.
�The widened footing has been tagged to refer to the spread footing schedule and reinforcement.
1�'31? All of the dome manufacturer's drawings, specifications and details will be provided by the architect or
��ntractor. We have added a detail on sheet S8 to further clarify the dome, wall and elevator shaft interaction.
S/GNED:
�
Loren R. Hill, PE
t; ;-�
� �,^;, �
m ;, J T
N R �=3'c•;
.%.•�.,
,,� �
'110 e COPY TO:
'Al
Architect
Contractor, Town of Vail
file
Rug 24 2006 10:35RM GPS Rrchitects 970a761612 p.l
. FaCSIMlLE TRANSMITTAL
If you have atiy qiuestiorts or problems regarding this fax, please calt our
Administrative Assis�tant at (970) 476-1147.
TO: _„_��."'t�] e. �
COMPA1�tY: �� � t- d + V�S eC..�'O In�
FROM: L,s���� � �S
RE: � � ���-�. � C�,S l �
DATE: � '�, t °�! �.t. u C�
NUMBER OF PAGES (iNCLUDING COVER�: �
MESSAGE: �<��� ►
r
t �
��'` ,�`,r„ v� �C S o-E' o r � �M -�. �' S`
V1rti�a" v'� .+/� ['� 1"I fi_'1t�t-E!" 1C'� ,t�.
�,
z� r -�- �
�
�. a`� �
� Q
t'V� C�tv-t tx� Ci �.-�� n��r .
1h � f� .
r'� r�C��� �� V� u�'C_ i 1r1
`
0
�
�
oc.t ri'1�?�
c �C�.. 1, �2Q�.
.,._ t�c�,� Fax:
Gwathmey Pratt Schultt Archite+cts, p.c.
�1000 :S. Frontage Road West � Sui#e 142 • Vail, CO 8t6:iT
Tefeptione: (970� 478-114T • Fax: (870j 4T6-1612 + Data: (97Q) 476-2383
B<
d Meter 4bserva-Dome
Front view
Clear opening
Side view
v Outside dome diameter Outside wall diameier
Features:
1. Alt aluminum skin construction.
2. Factory tested to ailow easy field assembly.
3. Proven bi-parting shutter design.
4. Fabricated steel base and dome tension rings.
5. Faciory installed computer automation package available
Oburva-Dome Labs. Int Name Dale
371 Commetce Pork Drive
Jackson, MS 34213 Creafed By JJ 6l11/OZ
1-80Q-6�7-5Sd4
nhaerva-dome.com Checked By RC 6/2UU2
Title
Drawiny No.
Approximqte weights tor.063" thick 3003 al�minum skin.
Singie skin rotafing weight 14201bs, 644 kg
Double skin rotating weight 18fl0 Ibs, 816 kg
Base ring weight including caster� 350 Ibs, 159 kg
4 Meter Elevaiion
OBQ 4 106
�
�.,
�
c
aa
N
.A
N
0
0
m
...
0
�
�
�
3
� �
�
n
�
�
0
�
�.
c�
�
0
c�
�
m
�
O
�
�
�
m
N
Date �U�e � �, 2D0Y Scale
L•40 �
Revtsed N
Dome ring splice.
TypiCal 7 pioces.
�ieid assenblyjofnt,
3/16"x 4" Aluminum
3003 alloy boited
with 1/4-20x 1"
stainless sieel bolls
typical 7 pVaces
Top shuttcr track
and tubes
Facterior dome surface is
.p63" thick 3Q03 H14
aluminum. The. eight d5
degree radial sections are
a shop assembly of five 9
degree radiai sections
/
-�-
�
�
/
�
4 Meter Observa-Dome Plan View
--- N 8' -7.987"
Cleor swing radius, shvtiers in
� ._._ ` open position
�„ -�
`•
— — Rnfinm chllffP.f
i_ . _" .-... ^ ---. _ _ __ / \ ,� I k {� i traCk and tubes
� �I ` �, � /
�
'�j�i�; ����� `���.__.`�{�� �'
�I� 1 �
( i Slitframe opening � � �
� � i .,,_�„ ,
� ' I} '
��.-5�� Closed shutterw{dth
(� E� Clearance from zenith � ��`
� ( ��-' -' 2��� to front of track � � i
�
� ���� �_ �_--���,./--1-I��---
C`{-►-•— — — — — _._ _... ..... ._. _... _... -- --- i-�--
��
� k� r( ;! ► .
l a I — — — — : �' ._,_ _ —i; J
`� /
��
�
Shop joint, continuous
fusion weld
..._ Jl _ � "�� '/
R 8'-.27_'a"
Clear swing radius, shuiters in
closed position
�
c
an
�
.�
N
O
O
�
0
m
�
�
3
��
�
:�
�
�
0
s
c►
m
�
c►
N
c�
�
�
a
J
�
m
N
�baerva-Dome Labs. int Ncme Dote T�1e 4 Meter Plan Vl�w pate �v�e � � 2042 Scale
371 Cammerce Pnrk Drive �
Jackscn. MS 39213 Created By JJ 6/17/02 1:30 .
1-800-647-5364 Drawinq No. OBD 4 101 Revisad W
obierva-dome.com Checked 8y RC 6J21/02 _
August 23, 2006
Dear Matt,
The Maslak Residence, at 1979 Sunburst Drive in Vail, Co is going to be completely
sprinklered. Therefore we are permitted to have four levels of wood frame construction.
Please see IBC 504.2.
If you have any further questions or comments don't hesitate to call.
��
�
l � �� �
�v
1 �� b � � ��� � �7
� � ��� �� ���
3 ��,�5 ��s
�o � � �� �
1000 South Frontage Road West, Suite 102 • Vail, Colorado 81657 • Tel: (970) 476-1147 • Pax: (970) 476-1612 • Email: gpsxvail�aol.com
�� �
,... . � .. ..._..... .. .....�
I ` � .
_..... ._..�__. .A ....... ...... _...,_. �
._..... ._ ._
..,..'-.
i ' ...,
�
..T.. ,,.,...,., ,,.,,,..., _r...... ... .,...,. .�.
....o., ...j_,,. ............ ...... ,....... ._ .� . . .... ........
....� . � ......... ........ ..._.... �- ._.., ..
,C����ST�RUCTION INC.
Ta:
Attn:
k'aa� Na:
From:
Date:
Subject:
�~ �� ..
--�^�� � r � ! ��
�1
���� �
�'A� C�VE�.i S��ET'
�'�� � r't�v�+ � �� � �S � �C�r `7
TU'�'AL pages includin� cover
If you xecexve less than the number of pages xndicated abave, please ca�a vax a�ce �vithin
�5 rnin�ttes, atherwise we will assu�mc th7is t'rans�rission is compictc.
T6an1� you.
543 S2nta Fe Drive, C]enver, Colorado 80204 •(3U3) 825-i313 * F�1X (303) $25-3223 +.Ema.il: igfn�l�derinc.com + Website: www. hydCrine.ebm
� w +
.,�`�;}r���',� �
w
�^ r.�
�.�" r+
. ,
�; . , � �r�
r..
�� �•4 � Ii� �.� py��1:
��.r .
k�
1��P��TiO!�V F�EP4�T
Z9G5 SR���11� Sha4icone `�t.
r:�»�i<»�.�I. <.•„�...Na�� rto� rn
347-7K�•O65f�
�-ann-?ai_�szr
Ma� 31#3-761-Rr,c21
P��e _1_ Of..2
Custam�r Koechiefn ��ultina �ngine�,,,r��_.,�. CuStam�c PO #__1l�il - ae Taw�,
1qb# Koech, lg,in # DS-0$� _,_,,,,� Spec/Cade , AWS D1.1,_AWS U'�,3, ASTM A325
Date 8-18-f1� Day af Week _ Fv;da _._...,._w.,....__..
--_ _.. . . . Y
�tours c�f Shift 6_3fl_.____... A�VI fio .1��_ PM Tdt�l Mnairs 7'nclay ��1 _,� M�.�
Mifeage to 3Q0 __�,,,,,Mil���e From , nl� _ Tat.al Miie�g� 10a
_.._ . .� _
O�pera�or _.._,Fiab�tt Fi. Paklock _ ASSistan� ,.,,,M/�... ..
..--�----_.__......_._.... �_...._ ......................_......__,._
. .._�__.---..�._.,..�... ..---_• ,
Pe� C?ie�YY'1 Y�S . NO _,�„$,,,_ {:t,ctnm�r RPpresenR;xtiv� iLerrX#Cgehn,,,.,,� ---
fZEAIiAhKS. "`* Vai9 _ i_rydc,�a 'iawer •••#
.............................. ......... ...............__.._............ ..........._........................__............,....-�-----n--�-\--/-_1_._...
.......... ..........__.........••-----..,........,,.,.,._............._._............_._.....----..._._._...,....�_..--------....._.._._......, ,.........,..
#►*� �QV r�I! �0�� fiRk�h
...... .. . ... ....... ...... „ ...,.,�, ,,. ..,...... ,.......,,., . ., , , ."'""_._....„....._,.. ......._,....._....... `��..��..__..__ .,, .,,,,..... .__.........�...�.._......�.......,.....,._._..... . ,..�.... __
. ..............."�__""_—. .,, . ,
AMW� , /,�'I' V��. t!l�M�le
V 1+
'____—.—...�..«. .,�.««„W..... ....,........,.�'__—_.�_..__.....__. , .
..._._.._....._.........__....,.,.....,,....,,.,_._. _..__,......,._.....,.,.,,,,.� ............._"_--_,,.—�.,..,,.._._.
.............
"1) 7��avel f.� pres�Prt cit+�, 25 request�d,
................. _...._.,__._._. ,. .., ,,.�._.........._.......____......._._...,..�----....,..........,,....,,...,.......,......__......._......_...._...,,.,............_..............__......_.__.................,,_... .....__..__..,.,......,.,.....,.....,...._,—_..__.._.. .,...,......_..�--
2) Cs�nduci visuaf inspecfian af eampleted vreid;n� bn s#ruct��r�i m�mbers erec��d,
_.._... ... ........... ... ......_.__..........................,......----_....._....,....,,.�....----._...._......,,,,.,..,..,.....,._....--�-�----..._.....,.,.,,,..--�----------�..._..,...._...-�-�----�------,.,,. ,,.,..........................__.... ..... .............
3} L'onduct visuai inspectio� and tension verifieation of ASTM .R325 boits insialled.
._....._ ................._............................... .................................., ...._...-----._.......,,..........,,................_......_.--�----�-�,....._�_.._.........__...._.......,,.,,.,.,,..........-------......._.,,,._......_....
. ... . ........
......__....,...------.......,. ...._....__..._,.:,..---.._.—....._..-•---•..,.,.�---._........,..,.,.._.....�al infC?im�tion,
,_4) See attaehed "Structural_Ste�l �recEiari inspaction �2e�rt" fort �cidit'sor+......_._.___._ .............._.......,,.,,.,,------_.,......,�,.,,�„,�,.,..,....,...__..---.
_ __.... _. _ _
. � ......... .... .. .. ... ....... ---._._...__....__.,.,..,�,............
".'" Ft�-Ir�spsctiars_ Tdt�se � x_ hrs., •"«
... .� �WS C1/Vi �91121211 -� (C
._.. ......_ ,_._..,.. .._..----- ... ......................_....._........... ._... _ _._ _ ..T....,_. . ._. _.. . _.. . .......
- E(�L Gert, #oE7$521-�5 � i
.,.,............_-------- ...... . . .........._.—................ _.,,.,
��ifed Wei�i�g insp��tor)
..... .. ....... ._..........
tructur�l Ste�e� & Weldmg}
Sign�ture Fiob�rt H. Palin "�. ,� �
CV�I
�. �,�"�x�
,� ^1
�x �"�..�.
.r.� .. ,i,%y
�. � � �1.�
�..,"'��� ,� �,��u
�.
STRUCTUI�AL ST�EL
EF7E+�'TIC?�1 iN�P��TI(3� ��PC�RT
Customer Kaech{e�n tr�n��►lty��r►qineers,,,,,�.i.rtc,,,,�,,,,,,,�,,.
JoblRepprt �fi Knechlein # p6-Q63
- -_ _ . . _ . _ _ _ .. - -----mm
Dafe „ 8-48-f�8 _ ,......,.......
Na�rs Of Sh'tft_�9: 1� AM to �.� AM
M91eag� ta _pq, � _ Mifeage FPt�m C�p, 1 ,
f�g�er�tvr _._.RL7tsest H. PqIIbCk_ _....�.
Per E]lerri 1!�s �.�. �� ,..,_X.-.-.�-.-_-.--.....-�----�--
2'�6c }tie�i.�il� hhasah��MP>!,
F.:ny�rv��nw}. (:t�lnrcyrlo l�f�l Ik!
311.i-7nt.(M�54
1 �,RIYEI-"•'4�5G7.4
�:,� :ia�_;.�r�i.ar;�
PagB ,� of 1,
Gu�tt�mer Rb # V�il - Latlge Tow�r �,
SpeclCc�de AS�M A325 AVW'S C37.7 AWS D�.3 ^
,}...,.,,...,.....
D�y vf Week _...�;r��...------------�,_......._.,,.....__..�_
rak�� y��� �a��y �. , ..�..�. -
T�t�i Mife�ge . 1 __ .�
Assist�nt nl�
Custamer R�preserttativ�_,,,,�,�rn� l�feehn�_
i trc� �br�+�,r. i;�rn.s havm b�cn ahr:Ckt�d ogairi�t. r�r�ctipn br cngineGring de�vrings and 'are :��i:��t:�ile exr.E:pt Wh�f@ ROT.�d.
,",!f'��r�h T;tr�:�ng�h i�skwn�:r5 wer� ;nSi�flFd �er a�a�ilCShYP �S?Nl �peci�iCatiqn u�leSS otherwiSe c1+�tP,t�,
i^�Ii V.It'{:��ri.;� ti�'•r:� r)�:rFnrm�d 5y r�U�ili�iE�Cf u�c_�Id�:.rs �s�n� �ccept�b9� prvicedr�res 8rsd ��er.#rad�s unfess oth�arw�5e �otr�f�.
�rd4;>I�.l�; c:h��><:;•.�^�:� iay V�;,.:,;:.�i €�r�c! R�,�irags��p�Y ..............,_.!'�Ra�n:tic Partiele . L.�yuid �'er3�trant Ultr�soniCS
_....__......_. _..------- .....,._......_........
t�^,I�f�,�; a�±�:rr c.leaF7rd ��tc;.r�w�;tdisig �s rf•q��is-€�d l:,y t.l�e applir�talc �k'Sl� iNelcEi.rsg Cod�.
".�Si:� se��C le;.k�.�rl�i� �+�s'.�: �iL�:.n ��.sbn�itt��l. (�ki•�.aa;t�.rr�f :ittr�#�'Mes h3a
i;s���r,s. m:,�sk�;r! h:: rt,j��rrr�r► r�r«� Cer hr r.,orr�G#Ed, r��fa.c.wcl, us r�:y�;�i,e�si, urk9e:;G otherWlS� cila��c�S4tionetl b�r th�! �!�aglrtetr.
�;�;� s��:�;ort �r.pre:�c:s,Es. �'�arli�l ....,,X ; Cvrr�ptete,T�,.._.. �re��tlon in�p�ctian tr�r this �rcrj�*c4.
lnsp�ctor �,. Rqb�rtyH,_f?ollo�ic �'�¢�.�yr�;,,.�',��:._. .
..............._..._.._._....,.,,.,.,,.,.._..�. . --�-
(C;tNI / CtC-1)
, , �
f't a:{wi.,er -n :n�c v� s !�•,r.
:�hl.{G�'3f131 5��,.{Sf:ti!J`S9f"u
MENIU�tA,NDUM
r�� ...,.,,,�,_
o � ^��,��
� � ��t����
,�
�....�.�-w.. W..._._.�
nur��owt i�3, 2006
WRI'�iEN �Y: .1�;f(i�ev il�,�Z�a . 1't.ccE��snc �::,17g�f11r4r�
SiJB.,i�CT: F�'i�;l�:l ti���i.di�r� �h�:�ia-t.rah�.
.
.1 i.sc ��ckii,�;+ if�s�G��;rr4r }u►s r�q�.��:sttc.l Si�at E� cicls��� :;l7��tiir tal�h is �2cc+�pE.�h1;,° ir� ti�i; �rl'h,�lt;�i,t,
.iic�r�:z ��ric.l iine�; .1-ti1,�: i 7_:� ; Ci>�• i.hc (.:'F�t 1 l.5 j<�ist�; 1'r,�,�rin�� tc�'It�: ti��si�,•�.. 1'rr}��;i.iecl r«� i.i4�lc?
c:r.��.t.in,� ti� :ltiw�e rt3cs��ii4rv itr �i)ri'Rit:t:tiz�ris E��x� i,alic;al rf,iC�, f ic`E�i ���c(dirt;.>., t{ir: sltc:ttr c.th; titi itf� l,,.�It
�li�l�S;.'S %f'7 [�il:�+i: Iill°Itl�l�l'\ 1\ i%{7 ,?•• {l�il{.t�'1 !7£ ?'e �'1�.�.1'{ :4'{'.�(.� (�4:E l�t��lelL:Cl� `'llit� Iti �.il"L'�Tliil�'3�4.:,
E'�,fl(I (}I lklk'iTl(Yr';.iil{{.ItT�T.
��: �,�•�,,���:� i���
7ilr; re'' _•reet :au�t�' lcirili
ren'vL�r. `:i? Ff??f)'r"
t3�;ti ��'7';.6?51L' ohor��!
t:3i7"� i'r i,''i„C 5 t; i S;#y.
()i�if� ; ,3;�,: �+arFr �fcqk E"slvA k7.."�u
A.va=�, f,:4) �1��'� .... f'.t:? Ct�z �oiJ�
A_17(if `l�t3���?t i Fl:csr�n
c;a; o) �ecs�or-r..� rcax
. .
************************************************�*+*�*********�************�*�**************
TOWN OF VAIL, COLORADO Statement
*********�x**�x*******************************************************************************
Statement Number: R060000853 Amount: $7,916.19 06/22/200602:37 PM
Payment Method: Check Init: JS
Notation: 11730/BECK
BUILDING CO
-----------------------------------------------------------------------------
Permit No: B06-0161 Type: NEW (SFR,P/S,DUP) PERMIT
Parcel No: 2101-091-0300-2
Site Address: 1979 SUNBURST DR VAIL
Location: 1979 SUNBURST DR
Total Fees: $20,097.94
This Payment: $7,916.19 Total ALL Pmts: $7,916.19
Balance: $12,181.75
******+****************************************:�***********�********************************
ACCOUNT ITEM LIST:
Account Code
--------------------
PF 00100003112300
Description Current Pmts
------------------------------ ------------
PLAN CHECK FEES 7,916.19
-----------------------------------------------------------------------------
�
i � �t
Questions? Call the Building Team at 479-2325
Bui/ding Permit Submitta/ Check/ist
Department of Community Development
Project Name: ��C�S lc�� r�s � C�e V�C,-�
Project Address: � v���'i 5 � ���a � �- ��` t-.��'�---
✓ This Check/ist must be comp/eted before a Bui/ding Permit ap�/ication is
accepted,
❑ All pages of application is complete
s��ias DRB approval obtained (if required) Provide a copy of approval form
� Plan Check Fee required at submittal for projects valued over $100,000.00 (see attached fee
schedule)
�o� mplete site plan submitted
blic Way Permit application included if applicable (refer to Public Works checklist)
Staging plan included (refer to Public Works checklist) No dumpster.parkinct or material storaae
allowed on roadwavs and shoulders without written approval
�jAsbestos test and results submitted if demolition is occurring
r� Architect stamp and signature (All Commercial and Multi family)
� Full floor plans including building sections and elevations(3 sets for remodels, 4 sets of plans for SFR
and Duplex, 5 sets of plans for Multi-Family and Commercial Buildings)
�5' Window and door schedul�
0
�� � ����
��� ��
�-�� ( �`
a�Full structural plans, including design criteria (i.e.loads)
�Structural Engineer stamp and signature on structural plans (All Commercial and Multi Family)
(\ ��oils Report must be submitted prior to footing inspection -- o�n.� �w�e- �° �''^'`'� '�•« GO��"�'v'
❑ Fire resistive assemblies specified and penetrations indicated
❑ Smoke detectors shown on plans -- o� �t�q� ��' �`'�'^�` ��� S``'�'
�Types and quantity of fireplaces shown „
Applicant's Signatur�
Date of submittal:
Received By:
F:\cdev\FORMS\Permits\Building\building_permit_4-21-06.DOC Page 2 of 16 04/21/2006
f�May 24 2006 4•49PM GPS qrchitects 9704761612 P•3
M�Y-24-06 03:�6prn Fron-TOWf1 Of� VAII CONI�lI11TY DEVELOPMENT 87D4162A62 T-961 P.001/D01 F-41T
Des�gr� Revie�v Soard �
. ACi'�t?N Fi�RiW
[�'��l/� depattment � GommlenitY Develo¢m�f1c
'�°��—� a 75 Svuth Frontaga Ro�d, Vaft, Cvf�o�ado 516�7
�� �� �� tel: 9?A.4'�.2139 fax: 97a..479.Z452
������ web: www.vai{gov.com
��o
project Nante: MASLAMh R�S18�ENCE DRe Number: DRB050542
Projed Descriptan:
Partkipants:
NEW SINGLE-IFAMJLY
pWl�ER MA':i[AK, `.>AMUEL H. Q LUI.ETA 10/07/20U5
961 HICuH RD
WQODS�IDE
CA 940�6Z
}�ppLICAPIr GV'�rATHMEY, PRATI', SCHULIZ �0/07/�005
Pro)ect Addiess: 1979 SiJryBU�ST DR VAIL Locatlona 2979 SUNBURST DR
Legal Descript�ono Lot: le�, Bloct�c: Subd�vision: VAIL VALLEY 3RD FIUNG
ParcQl Number: 2301-4�!�i-0300•2
Comments: P�C aplProved arth. projectwn 5/B/06
M�tion By: FRTIZLI�N
SeeoRd BY: DUNNI!IVG
Vote: �-0
Condltlons:
soaRO/sr�►FF ac�r�oN
AcGion: APPROVED
Dabe ot Approval: 03j01/200fi
Cond: 13
(PLAN): No cF►anges to these plans may be made without the written consent af Town of
Vail st��ff and/'or the appropriate �eview committee(s).
Con�: Il
(pLAN): DRB �approval daes nat constituhe a permit fvr buiiding. Please cansuR with
7own c��F Vai1 E3�ilding personnei prior to construction activfties.
Cond; ;t01
DRB aEi�prova0 shall not become valid for 20 day5 following the date of appmval.
Cond: ;a02
Approv�ai of t�►is project sltall lapse and become votd one (i) year foli�►rving rhe date
of final appro�val, unless a buliding permit is issued and construction is comm�ced
and is ��iiiigenl�y pursued toward completion, �
Cond:C�ONU007849
Prio� tco application for a building permit, the app4icant shall submlt a More
detalle�:i lands�cape plan ba the �eslgn Review Baard for further review and approvai.
Planner: BiA Gib�son DRB Eee Paid: �650_00
,
3
TOWNQFYA�`''
0
ASBESTOS TESTING REQUIREMENTS
THE TOWN OF VAIL AND STATE OF COLORADO DEPARTMENT OF PUBLIC HEALTH REQUIRE ASBESTOS TESTING
ANY TIME WHEN MORE THAN 160 S.F. OF MATERIAL WILL BE DISTURBED OR REMOVED.
AN ASBESTOS TEST AND REPORT IS REQUIRED TO BE SUBMITTED WITH YOUR BUILDING PERMIT APPLICATION
FOR ALL REMODEL, ADDITION OR OTHER PROJECTS INVOLVING ANY DEMOLITION OR REMOVAL OF BUILDING
MATERIALS THAT MAY CONTAIN ASBESTOS. BUILDINGS CONSTRUCTED AFTER OCTOBER 12, 1988 THAT HAVE
NO ASBESTOS CONTAINING MATERIALS ARE EXEMPT.
A COPY OF THE REPORT MUST BE SUBMITTED WITH YOUR BUILDING PERMIT APPLICATION
. I have included tlZ,e asbestos test and report with my building permit application
date
. I certify my projeci will not disturb or remove more than 160 s.f. of building material. The construction
plans submitted with my application clearly indicate this information. (This will be verified during plan
review, and will delay your project if found to be inaccurate)
applicant signature date
s•
. The building was constructed after October 12, 1988. The date of construction was
original construction date
applicant signature date
F:\cdev\FORMS\Permits\Building\building_permit_4-21-06.DOC Page 4 of 16 04/21/2006
��mity
�tnaly�ieal
�'+' L,abor�tory
S�rv�e�s, In�e.
Ma� 31, 2006
�'amily Bnvironm,ental Compliance Services, Tnc.
Atut: Paula Bowcrs
3G50 Chestnut Place
Denver, CO 30216
Re: 1979 Sunbursf Dr., Vail -- LGN 013 �6 �
bear Ms, Bowers:
Attached are the results ofPoIanzed Light Microsco[�ic anal�sis (T'�,lvn for asbestos contasned in the bull�
sample materials subnutted to this Facility on S/I31'Ob.
Bu1k samples are analyzed in accordance with USEPA tr.st method �i'AI600/R-93/116, which requires that
distinctl�y clifferent rnaterials or layers present wiihin a s�'uriple be anal� and rep°�ted separately.
Somearnes it is not possible ta completety separa�� Thin or strongl� adhering layers, such as paint or
adY►esive, snd a combined resulC is giWen. For some compl�x materials, such as drywalUtape/mud joints, a
composite or overall asbestos contcnt may bc reportecl in acidiuon to indi'viduallayer results, Fanuly
Ana.lytical Laboratory S�rvices, �nc• �s carrr�.r►dY a�cre�ted for b� asbes�os analysis by the National
Voluntary Labora�ory AccrediCation �'rogram (N'��T-A.1') of fhe National Instimte of Standards 2nd
Tecl�ology (NTS'�. Our NV�.AI' taboratary caie numF�er is 200448-0_
The anaryiica] results pz�vided in this report apply only to the s3�nIples actua�ly submitted_ This report is
considered confidential. Details of this report w'i11 nut be discussed w"t1� an� Pe'�son or agency not
associated'vvith �ou or �our organi�aUion. This repott rnust b� reprnd�tced in its entirery and shall not be
copied in parc or used by Che client to claim pmdutt endorsement lry 1�VI,A�' i�an � us. If Fa�i 1 S
Go'vernn2ent. rf �ou have an� questions regarding tlie coYic�a�t of tliis repoit, p Y
AnalyCical ma� be of filrth�.r assis�tae in ofher health and safety areas of concem, please let ns know.
ANALYST
12�sse11 T�. Cox
LABORATORY DIRECTOR
���
lZussell T). Cox
��aQ� 3G50 Ch�stnut Place � benver, Co(oredo 80216 ��Fi/� (PAT)
"v� oo ae 000E: Phone: 303-297-0079 • IFex: 303-292-1451 ��E�moil: �amilylEnviro@aol.com . PROFICIENT .
ihiNRG:(li A(1(1Z '� �un�
FamyYy ���ly�ic�l Lalbo,r�t�ry Ser�►���e, Y�c.
�tepart �f '�est Results
pLM Bull: Asi�estos An�.lysis
CLIE�IT ( PROJECT: FEGSI / 1979 Sunburst Dr.._Vaii
L�B. �D: 013565-1 013585-1 013.�65-2 a�
SAMPLE ID: �� �-� �Y�� 2 sM �-2 �
��.,�..r..� �-.�
�o
Amosite:
Antho h Ilite:
Ch sotile:
Crocidolite�
Tremolite/Act
�OTAL A36
� :ONTENT:
CellUlose:
Fibrous Glass:
Hair.
5ynthetics:
Other (spacify)
NON-ASBEST(
FIBER TOTaL:
AS��STOS CALIBR�
ND ��
�S ( STEREOSCOPIC
TED VI�UAL �1FtEA E�TIIlAATE
°� NORI-ASB
30
3�
�
I�
Page 1 of 15
% N4N-FIBEROUS
TOT6lL NON- 1afl 7� 100 25
FIBROUS:
Gomposite Asbestos
if a licable
ADDTTTOI�AL COMMENTS: All sepatable p�arts or layers ( e�►cept. paint ) wiihin the same samPie aie anal�Z«i u►d
repoxted incii'vidually. Composite asbestos percent is re�orted ii a�Plicable_
ND= None betected
Anal�s�: _,.�,.�
Date:05/23/2006
Russell b. Cox
01358
SM 1
��
,,,� �„ Wb8S�Ol 900Z 'l •un�
1'age 2 of 15
�'�miiy �naiytical I,�boxa�or� Ser�rce, Ync.
Repor� �f T�s� Itesults
P'LNI Butk AsbesCos Ana�ysjs
CLIENi / PROJECT: FECSI � 19�9 Sunburst Dr., Va�l
��8. iD� 013585-3 � d13565-4 0135�5�4 d13565�i 013565-5
SAMPLE !D: I.�YEa z SM 1-4 LAYEF� 2 SM 1-5 LAYER 2
Descri tion; DRYWALL TEXTU62E Di7YW1XLL 1"�.X�'t1RL bRYWALI
i .,.,...�- _r,(t�, 1''E5-h5�9'o �59b YES-309b 70%
ers:
;ONTENT:
FibroUs Glass:
Y�S� td0 YES IJO YES
�p - YES � Nd � r�� � NO
°/o d1SBESTO� ( CALIB�2o4TED VISUAL AR�A �STiM�kTE ) ,
50
°k PIO
ND IVD NO I N
50
NON ASg�5T05 � I � �u I I V�
FIBER TOTAL'
°� NOPI-FIBEROUS
TOTAI NON- 5� ��DO 60 100 50
FlBROUS:
ComposiCe Asbestos
if a licab(e
AbbX'I'XON�AL CONIlv�NTS_ All sepaiable pa�fs or lay�rc ( except �int ) within fhe sarne samplc a� analyzed and
reported indit�idttally. Composiee asLbesios percent is reportai i��ppl'tcable.
NT�= t�one betecteci
'�nalyst: .�-� Date:05/23/2006
�ussell D. Co�
�n�utir.:ni ann7 �I �un�
�'a�nriy AnaYyiic�aY �La�ora�oe-y S�r�ice, xnc.
�e�ort of 'Test ides�i�s
PT.M Bulk AsbesYOS Anal�sis
CLfENT / PROJECT: FECSI ! 1979 Sunburst Dr., Vail.
LAB. {D: n���� Q13565-6 o��s-7 a�
SAMPLE 4D: �� �'8 EAYER 2 SM 1-7 �
7�X'1'URE �RYWA�l.L 1T-_XTURE DR
Description: ___� ___, �r ,,,e,
COIOf: vvn� �
Visible Fibers: _ �, ��
Ch sotile:
Crocidolite:
iremo I'rtelActi nol ite:
TOTAL A�BESTOS
;4NTENT:
Cellulose:
Fibrous Glass:
Hair.
Synthefics:
Other (specity)
fVOM-ASBEST(
FIBER TOTAL:
% ASrBES70S ( G14�1'�RA�TED VI5�1AL AREA ��TIWIATE
ND ND
",6 NOf�-���E�TOS FE�EI
60
1�
70
% NORI-FIBEROt�S
�
�
Page 3 of 15
FIBROUS:
Composite Asbestos
if a licable
AT�DITYONAL COMIv�"NI`S: A!1 separable p�fs or layers �( exc�pt paint ) vvithin the same sample are at�a.lyz�d and
repo�ted i.ndividualT�, Compasite asi�fos percert is reportcd if' appli�able.
ND� None Detected
�lnal�st: .�-� Date:05/23/2006
Russell D. Cox
013565-
SM 2-1
�
50
InldhG�Ol 900Z 'l 'un�
Farngly .r��al��c�[ I��bora�ory �er�ice, Ir�c�
laepo� af '�est I2esulfs
PZM Bull: Asbestos Analysis
CLlEtdT / PROJECT: FE�&I /1979 �e��burst l�r., Vail
R.�►�.ID: 073565-� 0135659 013565-10 013565-1t
S�MPL� ID: sM 2-a l�IYER 2 sr� z-� �YER 2
Descriution: SKIMCIiOT bRY1NalL 7F�CFUfd� bRYVVALI
_ . _ .,..-�.. ...,..r 7rtat
�ei s. , �... �O �� � NO
eous ��
% q�B�STOS ( C�LIBI�ATED V1�U�L AE2EA E�TI�IIATE
Tremolite/Actino�rce: p�p ND
• TOTAL ASBESTOS t�D ND
' :ONTENT:
°� NON-A
Cellulose� 35 60
Fibrous Glass:
Hair,
IFIBER T�TAL:
gp � 50
NOiV-FIBEROUS
page 4 of 15
T�TAL NON- °' "' `"
FIBAOUS:
Composite Asbestos
if a licable
ADDITIONAL COMN�N"CS: A11 s..s�etable p�rts or I2[yets ( except paint j wiChin flt� same sample are analyzed and
reported indi�viduali�. Composite asbestos percent is reported if applicabCe.
�1D= None Detecied
�.nalyst: �`����� nate:5/23/06
Russell D. Cox
013565-11
WHIT
35
�A�ucr.�ni ann7 'I 'un�
���y�i� A�al��icai I.abo��to� �er�r�ce, �nc.
�eport of ies� Results
pLM Bu1C: Asb�as Anal�si.s
�LEEfVT / PRO�iECT: FECSr 119�9 �ur�burst Dr., Vail.
L��.'D: 0135�5-12 013565-i2 0'l3565--13 013565-13
SA�PLE ID: �M 2-� IAYER 2 SM1fl 2-�B LAYER 2
.,....,..,...s.,... SKlMCO�IT QRY�JVR�LL SKiM�GOA7 Df2YWAL.L
r:
de Fibers:
°�o
T rem o I it eJActi n ol it e:
TOTAI ASBEST�
I ',0�1TENT:
Cellulose:
Fibrous Glass:
Hair
Synthetics;
Other (speciPy)
NON AS�ESTOS
FtBER TOTAL.:
��
�
5T
� NO � ��
.TE� VI�U�L A[�EA E$TIMATE
ND
FIBERS
page5of15
% NbN-FIBEi�OUS
TOT�4L NOPI-
25 36 30 15
FBROUS:
Composite Asbestos
if a licable
AbbYTYONAL CON.QvIEi�T'S: At! sepa►able parts or lay�zs ( except �int ) withix► fhe sarcte s�rnpte aze acu�tyzed and
reporte�! ind�viduatly. Compaslte asbestos per�enf is reportcxl if �,pplicabte.
ND� None betected
4nal�st: ��_���� Date_OS/23J2006
Russell b_ Cox
013565-14
SM 2-7
�K{MCOAT
�
ND
70
in�Hh4,(11 9001 '� •unr
Page 6 of. 15
�'ami�y r�naly�c�l L,�b�r�tor�' �e��c�, �n�.
Repo� +��'I'es� �tes�lts
PLM BuIk Asbestos Analysis
CLIEIVi I F'R�JECT: FI�CSI 11979 Sunburst Dr..lfail
:ONTENT:
AbbYTTONA.L COMIvfENI'S: All seParable garts or layers ( excep�t Pai�►t )"u'iihin the s�'�►e sample are analyzed and
reepor�ed inclividi�lly, ComPosite asb�fos perceni is nepo�4ed if �PP����•
ND= NoI►e Detected
4nalyst: �
I Russeil l�. Cox
Date:05/23/2006
InIHhG�OI 900Z 'l 'u��
Pa�e 7 af 15
��rnyly A�al�t�c�� �abo�atory Servi�e, �nc.
ReporE af 'Y'�st �tes�ii�
PLIWI Bulk Asbestos Analysis
CLlENT / PROJECT: FECSI / 1979 Sunburst Dr., Vaii
AbDITFONAL COT�IlVIENTS: All sepa�ble pafts ar layers ( exc�pt paint ) witluri die saxn� sample are analyzed and
rcportcd individually. Compos'rte asbest:os perc�nt i� reported if a�opIicabte•
ND� I�"one betecteci
.nalysi: �.,..�
Russell I�_ Cox
Date:05/24/2006
�n�Htic;ni Qnnl 'l '�n�
Page 8 of 15
ii aYi11.�3' f�i�B.Ij�i1C�.I Y��I�OY'A�O1"y ��F'�'IC�, Inc.
�Zeport �f Test �esuYts
�.r� H�: as�s�os a.�ys�
C�6EN7 !�RO.iECY: FE�SI I 19�9 Sunbursi Dr.. V�il
AbDiTIONAL CONIlv�NTS' All s�arable �� vr layers ( e±tcep[ p�im'C )�ovithin the same sarnple �re anal�'zed and
reporCed individually. ComFosite asix�os �ul is xe�rteci if a�splic�.
ND= None bctccted
�� �
Irussell T�. Cox
13ate:05/24/2006
WH65�O1 900Z 'l '�n�
Page 9 of 15
Fa�iiy An�lyii��l I�����-ator�' Serv�ce, inc.
laepart oi'Y'e�t �esu�ts
PT.M Bullc Asbestos Analysis
CLfEPdi I PROJECi: FECS! I 1979 Sunburst Dr., Vail
AbbTTTONAT. COMMEI3T5: AlI separable parts or layers ( excepR. paiY►t ) tvitldn @ie saxnc s�'�r►�p�c are analyzed and
reportcd indi�idualI�+, Comgasate asl�ios percent is repc�rte� if appliqble.
ND= None betectcd
� ;w.
� • 1/ 'K�� JPI�
Russell D. Co�
Date:05/24/2006
iniHh���l 9�07. 'l 'un�
Famrly A�aiytic�l L�bor��o�y' Ser��c�, Inc.
B.2ep�� o�'�es� R��fl4�
P'LM Bull: Asbes�os Analysis
C�.IEIdi f PRO.DECT: FECS1 ! 1979 Su�bursi Dr., Vail
��8. `D: 013565�-28 013"�'i525 0935f5�-24
SAMPLE iD: sM 5-3 SM B-1 IAYER 2
Oescri ion: DRYWRLL SKtItACOAT ���-I
� .�„erC• NO _. _ _ YES-+70°� �0°�6
p{a�f'ERi�E� ( �TERE�SC�P4C
Color,
Visible Fbers:
Homogeneous
°la �1SBE�TOS ( C
Amosite:
Antho h Ilite:
Ch sotile:
Crocidof'de:
Tremolite/Ad
TOTAL ASI
�O�ITEhIT:
80
FIBER TOTAL:
o�
TED VISU�IL
F(B�R�
135�5�
Sf�( 6-2
ND
pa�e IO of 15
% ��'iV-��������
i'OTAL NON- 20 10D �0 t00
FIBROUS:
Composite Asbestos
if a licable
AbDITiOI�AL COl��IMENTS: Ail sepas�ble P� s r�y rted f�pCir.�able) vaitltin the saine sample are analyzed and
rcportzd individually. Composice asbesCos pc ce t epo �PP
ND= None I�etected
Date:05/24/2006
z�.nal�st:
Itussell b_ Cox
3565-30
4YER 2
NQ
WNOO�II 900Z '� 'un�
1'a�e 11 of 15
�arn��� �n��y�ic�l �.,aborat�� �er�rce, Inc.
'�2�por4 ��'I'e�t I��ults
P`LM Bulk Asbestos An�lysis
CLHEPlT / PROJECi: FECSI I 1979 Sunburst Dr„ Vail
�,�B.ID: p'�3`�`�'�1 013565�1 013565-32 013565�3 013565-;
SANiI�LE ib: s�t s-3 u�YE� 2 Misc T an�sc 2 SV 1-1
sKiMCOaz ORYWALL r� �r� sH��r vi�
Descri tion: Np NO
�irr erto[ R►lal. iV� _
PHY�SOCAL PROPE�T[ES ST�RI�Q��C�P1�
Color. WHITE �I�E B�'CK � N� K � NO
Visible Fibers: YES NO YE�S YES YES
Homo eneous
° a� acR��T[SS ( CALIBRA7ED VISUAL �REA �STtMATE )
Ch
ND ND ND I ND
; CONTEN7:
°r6 PION-ASBE�70� �I�ERS
Cellulose�
Fihrous Glass:
NON-ASBEST(
FIBER TOTAL:
% NON-FIBE�2�U�
TOT/�L, NON- �� �� 100 1b0 �
FIBROUS:
Composite Asbestos
if a licabie
ADDI'TIONAT. COM1�fEAiTS: � Scparable p�.'rrts or layers ( excepf painC )�vitl�in phe �nte sample are analyzed and
reported individually. Compasite agbest4s percent is cEgorted if a�pplicable_
ND= Nonc Dctccted
Analyst:
� Date:05/24/ZOOb
RusseEl D. Co�c
INH00� l l 900Z 'l 'un�
Page 1 Z of 15
�'�rni►y ��al�t�c�l I.�barato�y Ser�YCe, I�c.
Repor� a►ff 7'est 1Ses�l�s
PLM Bu.lk Asbe�tos Analysis
CLIENT /�ROJEGT: FECSI / 1979 Sunbursi Dr.. Vail
ADDITIONAL CONA�iENTS: Al( se�parabl� pazts or Iayecs ( exaept p�it ) within th�e s�mc satnpl� are analyzed and
reportcd individually. Composite as'be��tos percen� is �eporfed if applicable.
ND= None S�ctectecl
Analyst�
Russell D. Cox
bate:05/2412006
���Hnn; i i q��Z '� 'un�
Page 13 of 15
F�mYi� An�lyt�cal ]�,��o��o� Set-�ce, In�.
�epo� of Test �esuits
pLM �ullr Asbestos Anal�s�s
CLfEhlT 1 PROJECT: FECSI 1 1979 Sunburst Dr., Vaif
ADDITIONAL CONIIvIENI'S; %�ll separable pa� or layers ( exaept paint y withixi t�e s�me sampl� az� analyzed and
reported individually. Cornposite aSUestos perc�nt is regorted if applicable-
ND= None Detected
� �',� ^ -
Russell b. Co�
bate:05/24/2006
�n�Hnn: i � qnnZ �� 'u��
1'age I4 of 15
��mity An�lytical L�.�6�atar� �'�Y-v�ce, �nc.
Repor� o� `�e�t �es��s
PLM Bu1k Asbesios Analysis
CLIENT / F'ROJECT: FECS{ / 1979 Sur�burst pr., Vail.
ADDTTIONAL CQMM�NTS: All separ,tble parCS or ]ayers ( es�cept painf )�viit� flie s�arne sample are anal�zed and
reported individua]ly. Composite as�i.os �cent is r�portetl i{' app�icable_
N1�= Nanc Dctecied
Analyst: ,.,r.�
lZusseil b. Cox
Date:05/24/2006
Wd00�l1 900Z '� 'un�
Page 15 of 15
Fapn��� ���flyt�cal Ilaboratory �e�v��e; ����
g2eport of T�st �esul4s
JPT,M IIuik Asbesfas Analysis
CLiENT / PROJECT': FECSI 11979 Sunburst Dr_, Vail
AbbrTIONAT.. COMIv1EI�`I'S: All separabYe Pacts or layers ( e.�c�pt paint ) within ihe same sam�le are analyzed and
reported individually. Cornposite asbestos per�ent is reported if applicable_ .
ND= None Detected
1- - ��� ��.� _ _�
�.
Russell ll. Cox
bate:05/24/2006
�n�Nnn, i i onn7 'I 'un�
1 n��
Chatn a� E.:ustoa�
�on��: S � ��
cuent: �AMtLV ENV�RC�i�t1Q �L —
3650 CHESTnMt1T PL�01�
Address•
�
Y Iiate Sampled:���
TeTephone �: ���-
Bescriptfon of SiteJ�ocation Sa���Iec� 1�� l � �� ���
Specinl �strnc'tions:
Sa�ple Conclition (Acceptl �ec�e)
)24]FY� C )2Day ( 3�'sDay ( )7Day
, DatelTime: '�l� ���Q�'
�'' D ateJ�imxe:
�,2elinc�uished. by:
�ceived i��: 1'l�teJTime:
��'aQ� 365o Chestnut Place ° Denver, Co(orado 80216 Af HA (PAT)
"v' ;o �o °E' Phnne: �03-297-0079 ° 1�ax: 303°292�1451 • � mai1: FamilyEnIRIH��a� � 9OOZ •i PROn �CfENT.
pg. / of �
(;ha�B o� �;�stoc�,y
. � . � � � , � Cantact• � —�-�- S V "" " -
C�e�f: � ���v ��lj���
.�c�dress: . _.,v0 CMESTI�11�`' . . •��
, � _-,� , � . j �� J�'�
Daxe 9ampled.
Telephone #: �� �� �
7Description.af SiteR.ocaxiors S�npYed: l � I
Specisil Instrutc�io�s:
Client i�
0
��
�
Totf►1 Number a�
Requesteci �uin�a
BelYnqv.i�hed by:
Rceceived by:
F�etinquished �y:
I Type of
Samplc bescription �na]ysis
Sample ConctiCion (Pbccep �ct) 7 Day
�� ( ) 2 Day (� �-5 Day � )
---]DateJ'Iy:me: �1����=���
Date/Time:
I9ate/Time:
�.Zecei�c�ed by: b�cfeJ'�ime'
'��dQ�� 3650 Chesfnut Piaee ° Uenver. Colorado 84216 AIHA (PAl�
Nvtaoo e-0ooE: phone: 303-2g7-0�7g ° l�ax: 303-292°1451 ° E ma�l: F�mily�nviro@ao[.com . PROFICfENT.
���Hnn. � � 9��1. 'l 'un�
Pg_ � o%/
�ant�e� � V"��
C3ient: �n aeTN� �P�APd�E�'�� � —
Address• 3650 CHESTNI.ii' PL1�CE _ _
' Dstte
Telephat�e #: Fas #:
�lesciiption of Sitell�ocation Sampleci: �� ��1�� � V ���.I , �-Q
Specfal Jfnstzvcfions:
Total N'um�
Requested Ta arouncl:
pelfn.q�isbed b�':
Rece�i�ved bp:
Re�inq�shed by:
Client ID
�
A�
T�pe of
5�mple Description Analvsis
flm Can�iition (Accep �ect)
) () 2 Day �) 3-S bay () 7 bay
TDatel�`ime: �'' 1��V �
� ]DatelTime: �
�ate/Time:
iLeeeiv0ti hy: T�aielTitne•
�aQ� � 3fi50 Chestnut Plac� m benvef, COiOfaC�b 80�1b �,li-1A (PAT)
Nv�PU+e000e: 0 7 �.E mail: Femil Enviro@aoLeam . PROFICIENT.
zooaae-o Phon�: 3p3-29%�0079 Fax; 303-29�.-1�$51 y
�n�Nln:l i Q(1(17 'I 'un�
�
M.
' tl (I �`��
''���-�' `I � �
��,
.�-.
� I
���
��
� �
IhiHfll ; ( I A(I�T �� �u�� ���
Submit form t0:
oY • CO) Petmit Coordinsoor
'� . - °�, i3Et1��LITION PE�IV611� �,PP�ICATlON FORM �� ��. � ���H��
�. ::�" and Environment
��;�• �`; $ A$55 FEE MUST ACCOMPANY THIS FORM. APGDSSB1
� � INCOMPLETE APPLICATIONS WILL BE RETURNED. a360ChertyCreekDriveSouOi
*�. �" (Permit wi(f be maifed to demolition contractor unfess specified othetwise) ��er' o°se sioo3o
' 187� Fe�c 302�782-0278
r..
Q
�
�
O
U
c
a
0
�
a
Company T3ame
�.a�dAli Nsme
w
� StlooY
�
d City
a
�
Q Telephone Wlth A�a
�
�p
m t'
�aC m
�
�
�
t'
m
V
i.
d
U
�
a
m
C �
�q O
O �
Mfq� U
C> �
N �
� �
T�
m
�.
�
m
U
Building Name
� Type of Buiidinp (I.e. resl4endal wai
y
State Zip Coee � Street
�.
�o �ny St�
�
o CO
ell ('hone Number wtth Area Code Proposed Start Date
Owners Name
IA,A.I.�(.0 � � �.1vw � � .� _
' � � aox__ ��15
� � �/'LQ:(�_ s�t� X�IJ`1'--�7
�cpirafton Dale
� �'
�`1�-Dto �3/�lu���k�v_ -
_, �
•" Whh my si8nsnua bebw, I oertiy Ihat I passess wrrent AM�RA ana ststa of
Cobradd ce�tification as an Asbestos BuilGing In3pectof. I aiso cerdfY d�a► �
have inspeded tht builCing ta De dentoNshed, as Ilsted in t�e Demolifio� Srte
�IOCK aDOVe, sampled sll suspe� meteriels (in accordsn� with AHERA), had
ap 9amp�� analyzed for die preaence of asbeslos by a NVLAP aaxtsdited
labaatory, and have detarmined that (cNack approprlate box arrd slgn 1n
BLUE iNl�:
No AC�A a�dst� anywficsro in the hu�die9.
� 7he oay ACM !ert (n the Dulldinp Is non-(dable VAT and/or tar-imDrcpnatad
roallnp felt enA tneee +Mll remaln non-Mable durin9 demolldon.
All friable nCM, ar ACM Mat msy ne renaerea Meale auNig AemollUon, me� I
found ha: hern ��++p�tey removed nwn Mis Du1ldLig, per my vlsual
in�voction,
L�ta.nf.,�nsl I�=spec.�tion � _ ��—D �
� '�
Printed
Petmit �:
Cnecx �:
� . ��l%�
�.
m �
m
G
O
�m
G m
'C 0
�
'� o
m
� CDf'I
0
� a
� � rrn�i
� c
� U Date
�
� Telel
Q
etc.)
DaOe
t veriy that all refigerants Frvm air coneitioninglrgfrigeraUOn appltances Nave
baen properly recovered in acoordance wilh AQCC Regulation No. 15 (For
►.
inlbmiation on CFC re4uiramentH �II 682-3100).
� CFiECK TME APPf10PRIATE B�X:
U
�
� 8uflding Ownar
O
U
� OR
�
m
e ConVactor
�
O
� DSte
'�
�� Slgh2NR
m
Name
PoslmarK or Hand Delivery DaCe:
Issued:
Rer.3N3, J:V�sbeslos end Load Units�Asbostoa Forms�ASBESTOS AOATEMENT NOTIFICATION.doc
���uni � i i onn� �t �unr
�ernoli�ion �otic� i4pp�ic��ion Forrn Information and lnstructions:
Alf spaces must be fifled in on the application. If the information is not applicable,
please write N1�4. lncomple�e information rr�ay result in a delay in proc�ssing the
application.
2. Vlde must have proposed start and end dates for the demolition.
3. There is a 10 working-day (do not count Saturdays or Sundays) waiting period for
permit processing. For example: If th� app��� �he earpest start date wou d be
d�livered io the D�v�s�on on Apnl 1, 2003, then
April � 5, 2003. lf a demoiition follows an asbestos abatement project within 14
calendar days of the completion of the abatement project, the 10 working-day
waiting period will be waived.
4. The Colorado-certifed asbestos inspector must sign th� form in bfue ink. The
building owner or the contractor must also sign fihe application certifying that all
refrigeran�s have been properly removed from the site. Original signatures must
be submitted.
5. !f there needs to be modifications to the notice after �he application has been
submitted, notify the Asbestos Unit by fax at 303-752-0278 by the end of the next
regular State business d2y �ollowing the modification. Project modifications
include changes in s�cope of work, supervisor, the scheduled �work dates or
scheduled work times.
6. Reeycling of materials, such as concrete or wood, that are bonded or
cantamin�ted with asbestos confaining material (ACM), such as floor tile or
mastic, is NOT permitted.
7. Demolition of a building that has non�friable asbestos confiaining VAT or tar-
impregnated roofing materials remaining must be completed without causing the
asb�stos-containing materials to beCOme friable. Concrete floors covered with
floor tile shall be removed in as farge sections as possible. Operations such as
crushing, pneumatic jacking, etc. of maferials containing asbestos are not
pernnitfed.
8. Supporting pictures may be emailed to: asbestos(cr�state.co.us
9. A(I provisions of laws and ordinances governing this type of work shail be
compl�ed with whether specified herein or not. Permits or approval notices
presuming to give authority to violate or cance! the provisions af the above laws
and ordinanr,e� or p�rrr►its �ssued in error or based on incorrect information
suppfied sh�ll be inva(id.
Rov.3103, J:Llsbeetoe end �ead UNieVuDaslos FomtsV+SBESTOS ABA7EMFNT N071FICATION.doc Inl H n I ;�� ��� 7 I u n r
(, l
STATE �F COLORADO
�s���sTos
���E�'�I�FICATION�
.�. Coloraclo Department of public Health
� � and Eiivixonment
� Air Pollution Control Di�rision � ,
� , T'his certifies that ..
�aula Bowers ,
� Certifi.cation 1oTo: 11051 ` �
�; , . . . ,
;.has met the :requirements :of 25-Z-507, C.R:S. and Air Quality Control
►°Commission.Regulation No::8; Part:B, and is her�by certifed by the
� �
� state of �Colorado .in the follovcring �discipline: ::. �
, :..
.. . .
� . .. .. ..
� ..
; ,
� ::.;:` �ll11C�ldl� YmS�eC�Oi'�` : .
�, issued: 3/2/2006 �: .
Expires on: 3/2/2007
"' This ceraa'frcale is valid onCy w�C1, t{iepossrssron of a currerit Division-approved training course
certificatiorc in t/te �'iscipline specified' above.
�
� �� —
���un� � i i ann� �� 'unr
l—
��°'� ,�.
BUILDING PERMIT ISSUANCE TIME FRAME
If this permit requires a Town of Vail Fire Department Approvai, Engineer's (Public Works) review and approval,
a Planning Department review or Health Department review, and a review by the Building Department, the
estimated time for a total review will take as long as three (3) weeks.
All commercial (large or small) and all multi-family permits will have to follow the above mentioned maximum
requirements. Residential and small projects should take a lesser amount of time. However, if residential or
smaller projects impact the various above mentioned departments with regard to necessary review, these
projects may also take three (3) weeks to review and approve.
Every attempt will be made by this department to expedite this permit as soon as possible.
I, the undersigned, understand the plan check procedure and time frame. I also understand that if the permit
is not picked up by the expiration date, that I must still pay the plan check fee and that if I fail to do so it may
affect future permits that I apply for.
Agreed to by: �_ �uVv�c, _
Print name
Signature
Project Name: M �`QS �4� � , �
Date: ��27 /�
—T
F:\cdev\FORMS\Permits\Building\building_permit_4-21-06.DOC Page 5 of 16 04/21/2006
�'�
[i* �. � � �. � Y�. P�. . ..
Town of Vail Survey
Community Development Department Russell Forrest, Director,
(970) 479-2139
Check all that appiy
Date:
1. Which Department(s) did y contact? Building Environmental Housing
Admin Planning�DRB PEC
2. Was your initial contact with our staff immediate slow or no one available ?
3. If you were required to wait, how long was it before you were helped?
4. Was your project reviewed on a timely basi ? Yes o
If no, why not?
5. Was this your first time to file a DRB a PEC app
Bldg Permit N/A_�
6. Ple se rate the performance of the staff person who assisted you:
5�,3 2 1(5 is high) Name:
responsiveness, availability)
7. Overall effectiveness of the Front Service Counter. �4 3 2 1(5 is high)
8. What is the best time of day for you to use the Front Service Counter?
8. What comments do you have which would allow us to better serve you next time?
Thank you for taking the time to complete this survey. We are committed to improving our service.
0
knowledge,
F:\cdev\FORMS\Permits\Building\building_permit_4-21-06.DOC Page 6 of 16 04/21/2006
�
� � `�
WHEN A��PUBLIC WAY PERMIT" IS REQUIRED
I�I
PLEASE READ AND CHECK OFF EACH OF THE FOLLOWING QUESTIONS REGARDING THE NEED FOR A
°PUBLIC WAY PERMIT":
o Is this a new residence? YES / NO
o Does demolition work being performe�uire the use of the Right-of-Way, easements or
public property? YES � NO
o Is any utility work needed? YES�NO
o Are there any improvements being done to the driveway? YES �NO.
o Is a different access needed to the site other than the existing driveway? YE O
o Is any drainage work b� done that affects the Right-of-Way, easements, or public property?
YES NO
o Is a°Revocable Right-of-Way Permit" required? YES " NO
o Is the Ri Way, easements or public property to be used for staging, parking or fencing?
YES �0
If answer it NO, is a parking, staging or fencing plan required by Public Works?
YES NO
If you have answered YES to any of these questions, a'�Public Way Permit" must be obtained.
°Public Way Permit" applications may be obtained at the Public Works office or at Community Development (a sample is
attached). If you have any questions please call Leonard Sandoval in Public Works at 970-479-2198.
I AVE EAD AND A ER ALL THE ABOVE QUESTIONS.
��� .
Con ractor Signature Company Na
Job or Project Name: M ��aS��t._-
Date Signed: ����/�
F:\cdev\FORMS\Permits\Building\building_permit_4-21-06.DOC Page 7 of 16 04/21/2006
0
��
, PUBLIC WORKS AND THE PUBLIC WAY PERMIT PROCESS
������+ � How it relates to Building Permits:
➢ Fill out the attached check list with the Building Permit Application.
If yes was answered to any of the questions then a"Public Way" permit is required. You can pick up an
application at either Communiry Development, located at 75 South Frontage Road or Public Works, located at
1309 Elkhorn Drive.
➢ Notice sign-offs for utility companies. ALL utilities must field verify (locate) respective utilities prior to signing
application. Some utiliry companies require up to 48 hours notice to schedule a locate.
➢ A construction traffic control/staging p�an must be prepared on a separate sheet of paper. An approved site plan
may also be used. This plan will show locations of all traffic control devices (signs, cones, etc.) and the work
zone, (area of construction, staging, etc.). This plan will expire on November 15t and will need to be resubmitted
for consideration for approval through the winter. Be aware that your resubmission for winter may be denied
depending on the location of construction.
➢ Sketch of work being performed must be submitted indicating dimensions (length, width and depth of work).
This may be drawn on the traffic control plan or a site plan for the job.
➢ Submit completed application to the Public Works office for review. If required, locates will be scheduled for the
Town of Vail electricians and irrigation crew. The locates take place in the morning, but may require up to 48
hours to perform.
➢ The Public Works Construction Inspector will review the application and approve or deny the permit. You will be
contacted as to the status and any requirements that may be needed. Most permits are released 48 hours of
being received, but please allow up to one (1) week to process.
Y As soon as the permit is approved, the Building Department will be notified, allowing the'�Building Permit" to be
released. Please do not confuse the "Public Way Permit" with the °Building Permit".
Y NOTE: The above process is for work in a public way ONLY. Public Way Permits are valid only until
November 15t''. A new Public Way Permit is required each year if work is not complete. Re-
application each November 15t'' does not mean an automatic renewal.
� �2Z�OCo
Date Signed
F:\cdev\FORMS\Permits\Building\building_permit_4-21-06.DOC Page 9 of 16 04/21/2006
I�I
�"�
��� � �J.
DRAINAGE AND CULVERT INSPECTIONS ARE REQUIRED BY PUBLIC WORKS!
Please read and check off each of the items below:
� The Town of Vail Building Department has developed the following procedures to ensure that new construction
sites have adequately established proper drainage from building sites along and adjacent to Town of Vail roads or
streets.
�The Town of Vail Public Works Department will be required to inspect and approve drainage adjacent to Town of
Vail roads or streets and the installation of temporary or permanent culverts at access points from the road or
street onto the construction site. Such approval must be obtained prior to any requests for inspection by the
Town of Vail Building Department for footings, temporary electrical or any other inspection. Please call Leonard
Sandoval at 970-479-2198 to request an inspection from the Public Works Department. Allow minimum of 24
hour notice.
r�Also, the Town of Vail Public Works Department will be approving all final drainage and culvert installation with
resulting road patching as necessary. Such approval must be obtained prior to any Final Certificate of Occupancy
issuance.
Agreed to by: � �
Print Name
S gnature
Project Name: Y IlGt�1o��
Date Signed: 4/2Z'��
F:\cdev\FORMS\Permits\Building\building_permit_4-21-06.DOC Page 10 of 16 04/21/2006
L-
�!+''�
:�� .� '�'
MATERIAL STORAGE AND CONSTRUCTION PARKING
Please read and check off each of the items below.
(Copies of complete te� are available upon request)
CODE 5-2-10: DEPOSITS ON PUBLIC WAYS PROHIBITED
� nlawful deposits: Subject to subsection C thereof, it is unlawful for any person to litter, track or deposit, or cause to
be littered, tracked or deposited, sand, gravel, rocks, mud, dirt, snow, ice, or any other debris or material upon any
street, sidewalk, alley or public place, or any portion thereof.
�Notice; Abatement: The Director of Public Works may notify and require any person who violates or causes another
to violate the provision of subsection A hereof, or who has in the Director's employment a person who violates or
causes another to violate the same, top remove such sand, gravel, rocks, mud, dirt, snow, ice or any other debris or
material within twenty four (Z4) hours after receipt of said notice by the Director of Public Works. In the event the
person so notified does not comply with the notice within the period of time herein specified, the Director of Public
Works, or other authorized agent, may cause any such sand, gravel, rocks, mud, dirt, snow, ice, debris or any other
material to be removed from any street or alley at the expense of the notified.
� Summons and Penalty: As an alternative to the notice for removal provided in subsection B above, any person
who violates or causes another to violate the same, may be issued a summons to appear before the Municipal Court of
the Town for said violations, and upon being found guilty of a violation hereunder be punished as provided in Section
1-4-1 of this code.
❑ Notice and Penalty: It is unlawful for any person to fail or refuse to comply with the notice of the Director of Public
Works as provided in subsection B hereof, and any such person shall, in addition to payment of the expense of removal
incurred by the Director of Public Works, as provided in subsection B hereof, upon being found guilty of a violation
hereunder, be punishable as provided in Section 1-4-1 of this Code. (1997 Code: Ordinance 6(1979).
CODES 7-3A-1 AND 7-3A-3: PARKING OBSTRUCTING TRAFFIC & IMPOUNDMENT AUTHORIZED
� No person shall park any vehicle upon a street or at any other place within this Municipality in such a manner or under
such conditions as to interfere with the free movement of vehicular traffic or proper street or highway maintenance.
(Ord. 2(1968) § 1)
�Whenever any police officer finds a vehicle attended or unattended, standing upon any portion of a street or upon any
place within this Municipality in such a manner as to constitute a violation of any section of this Article, or left
unattended for a period of twenty four (24) hours or more and presumed to be abandoned under the conditions
prescribed by Colorado Revised Statutes section 42-4-1102, as amended, the officer shall require the vehicle to be
removed or cause it to be removed and placed in storage in the nearest garage or other place of safety designated or
maintained by this Municipaliry, and the charges for towing and storage of such vehicle shall be charged to the owner
of the vehicle in addition to a ten dollar ($10) impoundment charge. (Ord. 2(1968) § 3: Ord. 28(1981) § 1)
I have read and will comply with the above code provisions: J� ��
Prin qe`
Signature
Position or Relationship to Project: �t.�.
Date Signed: �f �L�
T
F: /everyone/forms/bldperm7
F:\cdev\FORMS\Permits\Building\building_permit_4-21-06.DOC Page 11 of 16 04/21/2006
�
Vail 2006
Vail Village and LionsHead Village Construction Hours
Information Handout
Problem Statement
The Vail Village and LionsHead Village are invaluable assets to the community. Thousands of people come to Vail each year to
sightsee, recreate, shop and to enjoy everything the Vail Valley has to offer. The community and merchants rely upon our guests to
generate revenue. Our summer/winter guests expect a pleasant experience while in Vail.
To insure that all of the proposed construction has as little negative impact on the community and on our guest as possible, the Town
of Vail finds it imperative to create and implement the Vail Village and LionsHead Village Construction Hours Handout.
It would be irresponsible for the Town of Vail, the construction contractors and the merchants, to not actively participate to minimize
the impact of construction in the Vail and LionsHead Village areas.
The Vail Village Streetscape Project will continue through 2006. Improvements scheduled for
2006 will be concentrated along Gore Creek Drive west of the Children's Fountain, Gore Creek
Promenade and around the frontage of the Mill Creek Court Building. Additional streetscape
improvements are scheduled to begin along East Meadow Drive.
All construction projects and/or remodels within the Vail Village Core Area should contact
Scott Bluhm, Town of Vail Streetscape Coordinator, at 970-477-3418 for further information.
Givens
The following givens are intended to provide the basic foundation by which construction will be completed in
the villages:
❑ The public's health, safety and welfare shall be honored at all times.
❑ Adequate pedestrian, loading/delivery, vehicle, and emergency vehicle access and circulation shall be
maintained.
❑ Roadways and pedestrian walkways shall be kept clean and free of dirt and debris.
❑ All construction deliveries, equipment, tools and materials entering the Vail Village and pedestrian areas
must go through CheckPoint Charlie. All LionsHead construction activity must go to the Vail Police
Department for a parking permit. Do not use delivery zones for construction parking; refer to approved
staging plan or make other arrangements for parking.
❑ The hours of outside construction activity shall be as follows:
- April 15 — June 23 & September 5- November 17, 7:00 a.m. until 7:00 p.m., seven days a week.
June 30 thru September 1, work must end by 4:00 p.m. on Fridays.
November 13 — April 15, 2007 work allowed within daylight hours only.
- Deliveries shall be restricted to the hours of 7:00 a.m. to 11:30 a.m. on Gore Creek Drive and 7:00 a.m.
to 8:30 a.m. on Bridge Street.
F:\cdev\FORMS\Permits\Building\building_permit_4-21-06.DOC Page 12 of 16 04/21/2006
�
- Special construction delivery permits must be requested in advance from Public Works in conjunction
with Code Enforcement at Checkpoint Charlie.
- No construction activity shall occur on Saturday or Sunday between 7une 26 and
September 3.
- No outside construction activity within ROW shall occur on the following dates:
Saturday )anuary 14, Sunday January 15, and Monday January 16 (Martin Luther Kinc1)
Saturday, February 18, Sunday, February 19, and Monday, February 20
(President's Weekend�
Saturday, May 27, Sunday, May 28 and Monday, May 29 (Memorial Dav)
Thursday June 1, Friday June 2, Saturday June 3, Sunday June 4. (Teva Games) Within the Vail
Village area that affect the Teva Games. TOVPublic Works discretion based on schedule and location).
Saturday, July 1, Sunday, July 2, Monday July 3, and Tuesday July 4
(Independence Dav)
Saturday, September 2 Sunday, September 3, and Monday, September 4
LLabor Dav Weekend).
Friday, September 8, Saturday, September 9 and Sunday, September 10 in (LionsHead) Friday,
September 15, Saturday, September 16 and Sunday, September 17. (Vail Villaqe) - October
Fest
Thursday, November 23, (Thanksgiving Davl Friday, November 24, Saturday, November 25 and
Sunday, November 26
No Work allowed the entire week of the Christmas/New Year Holiday within the TOV right
of way.
December 23, 24, 25 (Christmas Day), 26, 27, 28, 29, 30, 31, 2006. January 1, 2007 (New
Year Day)
❑ The Town of Vail Noise Ordinance has been waived by the Town Manager from 7:00 a.m. — 7:00 p.m. for
construction activities from April 15 through June 23, and from September 5 through November 17. The
Noise Ordinance shall be in effect and strictly regulated from June 23 through September 5 and November
17, 2006, to April 15, 2007.
❑ All construction sites will be required to obtain an �proved Construction Staaing and Traffic Control Plan
from the Town of Vail Public Works Department in conjunction with Code Enforcement. (The approved
staging/parking plan is required to be on-site at all times).
❑ The Town of Vail reserves the right to amend the Vail Village and LionsHead Village Construction Hours
regulations at any time should abuses or problems arise.
F:\cdev\FORMS\Permits\Building\building_permit_4-21-06.DOC Page 13 of 16 04/21/2006
u
. ,
❑ The Three-Strike Rule will be enforced. Step 1. (Written warning), Step 2. (Written warning),
Step 3. (Construction site will be Red Tagged until all violations are resolved).
Expectations
The following expectations are established to insure the success of the Vail Village and LionsHead Village
Construction Hours Plan:
❑ Full and complete cooperation and understanding from all parties involved in the construction activity in
regard to this plan.
❑ Strict adherence and compliance with the requirements outlined in the construction plan.
❑ Respect and consideration for the affected interests and parties.
If you have any questions, please contact the Town of Vail Public Works Department
(Leonard Sandoval) or the Vail Dispatch (Construction Team Enforcement Officer)
970-479-2198 970-479-2201
F:�cdev\FORMS\Permits\Building\building�ermit_4-21-06.DOC Page 14 of 16 04/21/2006
�
�� a� � � (
Vail 2006 Staging / Parking Plan Information
-
The Staainq / Parkina Plan Philosophy- Is a very important step in the building process. Striking a balance
between safe public access and giving construction projects room to build is becoming increasingly challenging,
for us to meet all the needs of those who will be impacted by construction projects. The fact is, there is less
room to build in the Town of Vail.
Developing a creative Staging Plan is a must. Staging in the Town of Vail Public Right of Way is a Privilege, not a given
right. We take into account when we review and approve staging / parking plans, impacts on neighborhoods, tourism,
business and the traveling public along with your right to build.
The Genera/ Contractoris responsib/e fora//subcontractors and a// construction activitvre/atin4
to the bui/din4 arojeci: The staging plan will be enforced according to the Approved Set of Building and
Staging Plans. You are required to keep a copy of the Approved Staging Plan on site.
Two staging /parking plans are required, a summer and winter. Summer staging plans expire on November 1,
and winter staging plans expire on April 15. (Note: There is no on street �arkinq in the winter season and all
materials, equipment, etc must be 10' off the edge of asphalt).
Enforcement of all staging / parking plan is as follows.
A) Staging / Parking Plans to scale required.
B) Once the plan is approved, they will be held to complete compliance.
C) We will use a 3 step and you're out, process.
Step One- Verbal and written warnings as to the staging plan violation, then have contractor sign and date
field memo warning.
Step Two- Police Department issue tickets and tows or public works writes second written warning to all
violators who have been notified under step one and who are still in violation of the approved Staging /
Parking Plan. The Town of Vail Chief Building Official will call the contractor and notify them, the next time any
violation happens, the building department will red tag the construction site for 48 hours.
Step Three- If still in violation after step two a 48 hour Red Tag will be issued to the project site.
If you have any Questions, Please contact the Town of Vail Construction Inspector at 970-479-2198
F:\cdev\FORMS\Permits\Building\building_permit_4-21-06.DOC Page 15 of 16 04/21/2006
��
TOWNOFVAI� .
Requirements for an Acceptable Staging Plan
u
It is preferred that and Approved Site Plan is used to draw a staging plan, but a hand drawn plan may be used
as long as it is dawn to scale and is neat and legible.
1.) The Staging Plan must show the following:
(a) Show all parking that is required for the job site. (Including construction equipment).
(b) Show the location of all material that will be staged on site.
(c) Show the location of all dumpsters and port-o-john that are to be on site.
(d) If a fence is required, then show the location of the fence and describe the material used for the fence.
(e) If trees and / or vegetation is required to be protected, then show how this will be done.
(� If this staging plan is for a Demo Permit, then show staging for dump trucks and all related equipment.
If the Town of Vail Right of Way area is needed for staging, then a Traffic Control Plan is required in
conjunction with the staging plan.
�g) Please provide and show an Erosion Control Plan.
(h) No equipment, vehicles, materials are allowed on Town of Vail Right of Way in the Winter Staging Plan.
2.) If work needs to occur in the right of way, then add a TrafFic Control Plan to the staging plan showing the
following:
(a) The work zone (area that is to be performed)
(b) Traffic Control Devices (warning, signs, cones, flaggers, etc.)
(c) Distances that all devices will be set up from the work zone. Also show all dimensions of work being
performed in the right of way. All traffic control plans must conform to the MUTCD manual.(Manual of
Uniform Traffic Control Devices)
2.) This plan will be reviewed by Public Works and if Necessary the Police, Fire, and Community Development
Department. Once the staging plan is approved, it will be registered with the departments listed above and enforced.
3.) The Village and Lionshead area have outside construction restrictions, please become
familiar with the Vail 2006, Vail Village and Lionshead Construction Hours handout.
F:\cdev\FORMS\Permits\Building\building_permit_4-21-06.DOC Page 16 of 16 04/21/2006
0
�� ��� � F � .
PLAN CHECK FEES TABLE
Department of Community Deve%pment
Building Safety and Inspection Services
75 South Frontage Road
�ail, Co%rado 81657
970-479-Z138
FAX 970-479-2452
www. vailgov. com
Plan check fees are required for projects with a valuation over $100,000, at the time of Building permit
submittal. Please use the table below to calculate your plan check fee total.
$100,000-$150,000 Multiply by
$150,001-$250,000 Multiply by
$250,001-$400,000 Multiply by
$401,000-$750,000 Multiply by
0055 of Valuation Total
.005 of Valuation Total
.0045 of Valuation Total
.004 of Valuation Total
$750,001-$1,000,000 Multiply by .0035 of Valuation Total
Valuations over $1,000,000 will be calculated by the Town of Vail Building Department.
If you have any further questions, please contact the Town of Vail Building Department at 970-479-2128.
�
o� � ,'^!, \`"�'�
� �� i ` �fJ , �
F:\cdev\FORMS\Permits\Building\building_permit_4-21-06.DOC Page 3 of 16 04/21/2006
Gwathmev Pratt Schuliz Architects, p.c. PLAN REVIEW COMMENTS
1. Wood framed construction, three stories above grade: Limits given in Table
R602.10.1, Vail falls under the category C for Seismic Design, which allows the
building to be three stories, wood framed construction. The observatory is an
unconditioned, not habitable, space.
2. Correct lower level top of slab is 8249'-5". Correction has been made to outside
IeveL
3. The room outside the mechanical room is a general work space. This room will
be mechanically ventilated with lighting and will comply with all necessary code
requirements for this space. Note has been added to plan.
4. Total area crawlspace= 57.5 ft. Provided on plan, 2x (4"x8") vents on opposite
walls for better ventilation. Total vent opening= 64 sq. inches, as set out in
(R408.1). Note has been added to plan.
5. Will continue same staircase up to observatory level with a 42" high guardrail in
observatory.
6. Correction has been made, all WC's now comply to (R307.1)
7. Correction has been made, all WC's now exceed the minimum 21" as required
(R307.1)
Ewald Els
KRMCONSULTAf� ., INC. (3O3) 973-9B06
6638 WEST ❑TTAWA AVENLJE �'1 50-2 FAX 973-9847
LITTLETON, COLORAD❑ BO1 28
I�� • � �,
TO: Town of Vail
Department of Community Development
75 South Frontage Road
Vail, CO 81657
DATE: 8/23/2006
PROJECT: Maslak Residence - Permit 606-0161
❑ RFI ❑ MEETING NOTES RESPONSE
JOB NUMBER: 0512-05
❑ CLARIFICATION/CHANGE
The following record is in response to the Town of Vail's plan review comment letter dated 08/13/06. The
following numbered line items directly correspond with the review comment letter's numbering.
Structural Comments:
8. The soil report will be submitted by the architect or contractor and will be referenced on the structural general
notes and specifications. As of now, we have assumed very conservative values for the area which will be
reevaluated once the report is received.
9. The tag was misiabelled and has been changed from 12/S6 to 13/S6.
10. Detail 2/S8 has been added to clarify the exterior pad footings and columns.
11. Detail 2/S6 has been modified to show the beam pocket detail.
12. The widened footing has been tagged to refer to the spread footing schedule and reinforcement.
13. All of the dome manufacturer's drawings, specifications and details will be provided by the architect or
contractor. We have added a detai� on sheet S8 to further clarify the dome, wall and elevator shaft interaction.
SIGNED: ,�� �
��
Loren R. Hill, PE
�;�,��
`OH..... � .
ii�v� Q�t� f..
•
� �
.
�i.� ��
COPY TO:
Architect
Contractor, Town of Vail
file
COL_ORADO INSPEGTION AGENCY PLAN REVIEW COMMENTS
TO:
FAXIEMAII:
Contr�ctor
Beck Buflding Co.
Le�
949-4335
NUMBER OF PACiES:
FROM:
DATEc
BUILDINO PERMIT #:
OWNERS NAME:
SITE ADDRESS:
SUBDIVISION:
OCCUPANCY 3ROUP:
TYPE OF CONSTRUCTION:
NUMBER OF STORIES:
Architect
Gwathmey, Pratt, Schultz
476-1612
2
Matthew Royer
08/13/2006
B06-0161
Maslak
1979 Sunburst Lane
Vail Vailley
R-3
V-B
3+Rasem�nt
En4ineer
KRM Consultants
949-1577
The design documents submitted for this project have been reviewed far compliance with the locally
adopted codeg and amendments. The foliowing comments ma�st be addressed before a building
perntit is issued.
For' processing:
Responses such as "will comply with code" are not adequate. Revlsed drawings must
cle�rly show code cvmpliance. .
9, RESPONSE LETTER MUST BE INCLUDED WITH THE R�VI�ED PLAN SUBMITTAL.
Please be sure to Include On the resubmittal the enqineer's or architect's "wet" stama. sianature,
reaistration number and date on the cover aaae of anv st�uctural c�Eculations. all structural details
and structural shPPf� of the nlans. Fo� commercial or multi-familv Proiect6 all BheAt6 of the planS
must be stam�,ed.
Re�submittal shall be made to the Town of Vail Building Dept.
C:�Documsn�r enJ Soa.in�almroyerV��y uecumcntal�tan Review�tu�•I�INi•0161,DOC
�UILDING pEPARTMENT COMMENTS:
Archit�ctursl C_, omments:
-- 1. Provide calculations that state the qr�de plane elevation of the residence, This is used to determine
the number of stories. (R301.2.2.4.1)
2. Please verify the lower level finished floor el�vation. Sheet A2.1 shows the top of slab at 8249'-5"
and the exterior top of stone outside of lha Family r�om at 8249'-B". Please clarify. The doors at this
location swing in th�refore there can not be a step down into the residence.
3. Please clarify, The room outside of the mechanical room appears to be unfinished. Is thls correct? If
the room is finished, provide light, ventilation and all other applicable code required elements.
4. Provide a crawlspace ventilation detail or amend plans to identify the exceptions and specify on the
plans. (R408)
r- 5. It appears that the observatory is accessed by an alternating tr�ad device, This type of stair is not
permitted �n a residence to access a habitable space. Please amend plans to show an approved stair
design to this floor (evel. (R311.5)
6. There shall be 15" clear between the cent8rline of water closet and well and 15" clear between the
centerline of the water closet and the tub. Bath 4 8 5 does not have 30" clear. The tub encroar,hes
into the requi�ed floor space. (R307.1)
7. Amend plano to clearly show 21" o�f clear floor spac� t,etween the front of the water closet and the
opposing wall. (R307.1)
Structural Commenta:
8. Provide soils re�ort fo�� tfds building locetlon for revfew,
9. PleaSe clarify the detail that is referencpd on the foundation plan in the plan lower left corner of th�
building 121S6. This appears to be a misplaced tag.
10. Amend structural plan to show a detafl tor the exterior pad footings and columns.
11. Amend plans to include a baam pocket detail.
12, Please clarify the 6'-5 Y." x 3' widened footing at plan right on the interior. This widened footing is not
labeled for additional reinfor�ement nar tagged to reference the spread footing schedule.
13. Provide dome rnanufacturc'3 approvels, speCificetions, listings and installation iiistru�liuiis fnr
verification of compliance with applicable codes far loading and attachment requirements.
Plsose reter to the covor choot for InFormation and instructiona tor resubmitting plans. The recheck of plans
usUally OeCUPS Within 3-5 werking days of plan resubmittal. I� ordor to avaid dclay� pleaae oheek oll reqvested
inlormation i� included with the reiubmitted plana.
Plan Review CommenEs
M�tthew Roy�rr
Buildln� Officiol
Colorado Inspoction Agency
970-328-179A
C:�Doeumentc ond Sattingc�mroyer�My Uooumene��Plan Re�iewkovbOG•QI(I.DOC
TOWN OF VAIL
75 S. FRONTAGE ROAD
VAIL, CO 81657
970-479-2138
Job Address:
Location.....:
Parcel No...:
OWNER
APPLICANT
DEPARTMENT OF COMMUNITY DEVELOPMENT
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
NEW (SFR,P/S,DUP) PERMIT
1979 SUNBURST DR VAIL
1979 SUNBURST DR
210109103002
MASLAK, SAMUEL
961 HIGH RD
WOODSIDE
CA 94062
BECK BUILDING
P.O. BOX 4030
VAIL
H. & LULETA
COMPANY
CO 81658
License,: 117-A
CONTRACTOR GEORGE SHAEFFER
PO BOX 373
VAIL
CO 81657
License: 302-A
06/22/2006
06/22/2006 Phone
CONSTRUCTION06/26/2007
Desciption: CONSTRUCTION OF A NEW SFR
Occupancy Type
RESIDENT/1 & 2 FAM ( ZONE 3 VB
Totals...
Number of Dwelling Units: 1
"1'own of Vail Adjusted Valuation: 2,800,000.00
Factor
126.96
Permit #
Project #:
Status . . . :
Applied . . :
Issued . . .
Expires.....:
B06-0161
PRJOS-0417
ISSUED
06/22/2006
09/07/2007
02/28/2007
970-949-1800
Phone: 845-5656
Sq Feet Valuation
7,948 $1,009,078.08
7,948 $2,800,000.00*
Revision Valuation: $0.00
+**�**+*���*rs»�*****►***�*�******x**+*s*****+**�►**r******s*+*** FEE SUMMARY *►.***.�s**.���**�•+*r**�*+��*.�+s**s**�.■s*.s***�*:.sr■..s
Building------> $12, 1�8. �s Restuarant Plan Review--> $o. 0o Total Calculated Fees-----> $21, 400. 14
Plan Check---> $ �, 916 . 19 Recreation Fee------------>
$1 , 192 . 2 0 Additional Fees------------> $ 0. o 0
Investigation-> $ o. o o TOTAL FEES-------------> $ 21, 4 0 0. 14 Total Permit Fee----------->
$21,400.14
W ill Call-----> $ 3. o o Payments-------------------> $ z 1, 4 0 0. 14
BALANCE DUE---------> $ o. o 0
+**»*�:�**+*�*+*+�asa****rs++***�*■**�**.a**:*«e.�:*�**.**s**.*r++■+::******+■*�****■*�a**v***�r�*�*t*�*****«*x********�«*�sr�****�*■*+�*+*��**r*�
Approvals:
Item: 05100 BUILDING DEPARTMENT
08/13/2006 MROYER Action: DN Comment letter taxed to contractor, architf
engineer 08/13/2006.
08/24/2006 MROYER Action: AP Review complete. Waiting tor revised plan i
approved by all departments before collating the office copy of plans.
08/23/2007 jplano Action: AP New structural drawings approved, 2 hour o:
review due
Item: 05400 PLANNING DEPARTMENT
06/27/2006 bgibson Action: AP
08/23/2007 bgibson Action: PA structural revisions approved by planning
Item: 05600 FIRE DEPARTMENT
06/26/2006 JJR Action: COND See conditions.
08/24/2006 JJR Action: AP Revision approved.
Item: 05500 PUBLIC WORKS
06/29/2006 gc Action: AP Provide a Revocable Right ot Way permit be:
09/Ol/2006 gc Action: AP Revisions approved 9/1/06
Provide a revocable Right of Way permit.
Item: 05550 ENGINEERING CIVILS
...�+.*«**...*�:.**..*..***.***.**.**..*.:.,*.*.�***+.:.**.�+.*,*+*:+*..�*..*�+*****��.*�..+***..�*+►**«*.*.*.*.*►*.+..+:.+�.***..**.*,�..*.*:*..
See the Conditions section of this Document for any conditions that may apply to this permit.
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan,
and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all
Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review
approved, International Building and Residential Codes and other ordinances of the Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2149 OR AT OUR OFFICE FROM 8:00 AM �
4 PM. !_� �
SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND UWNEK
********************************************************************************************************
CONDITIONS OF APPROVAL •
Permit #: B06-0161 as of 09-07-2007 Status: ISSUED
********************************************************************************************************
Permit Type: NEW (SFR,P/S,DUP) PERMIT
Applicant: BECK BUILDING COMPANY
Job Address: 1979 SLJNBURST DR VAIL
Applied: 06/22/2006
Issued: 09/07/2007
Location: 1979 SLJNBURST DR
Parcel No: 210109103002
*******************************�************************************************************************
CONDITIONS
********************************************************************************************************
Cond: 33
(PLAN) THIS PROJECT WILL REQUIRED A SITE IMPROVEMENT SURVEY. SUCH SURVEY SHALL
BE SUBMITTED AND APPROVED PRIOR TO REQUEST FOR A FRAME 1NSPECTION.
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.
Cond: CON0008206
Fire sprinkler system required and shall comply with NFPAI3R(2002) and VFES
standards.
Cond: CON0008207
Monitored fire alarm system required and shall comply with NFPA 72(2002) and
VFES standards.
���
� � ,�
I�I
APPUCATION WILL l�OT BE ACCEPTED IF INCOMPLETE OR UNSIGN T- ���(
Building Permit # � �
��
�7�����.''�'������!�. `�;}�)
REVI�If�N TO TOWN OF VAIL BUILDING PERMIT
Separate Permits are rec{uired for efectrical, plumbing, mechanical, etc.!
75 S. Frontage Rd.
Vail, Colorado 81657
***All Revision submittals must include the Field Set of approved plans. No further inspections
will be preformed until the revisions are approved. ***
rONTRACTOR INFORMATION
COMPLETE REVISIONS EVALUATIONS FOR BUILDING PERMIT Labor & Materials
REVISED AMOUNT: $ —� ELECTRICAL: $ OTHER: $ �
PLUMBING: $ MECHANICAL: $ REVISED TOTAL: $
For Parcel # Contact Eagle County Assessors Office at 970-328-8640 or visit www. ea�
�° w�:� � 1 � �� � �
0
Job Name: � � � �C� Job Address: � � �v n� �f
Legal Description Lot: Block: Filing: Subdivision: a�
Owners Name: ��,,,1 ��� � Address:�� ��^ � Si � Z Phor
Architect/Designer:���� c Address: J��v S,
l
Engineer: �� _ Address:
REASON FOR RE SIONS:
� �'. �4 r ��
Phone:
�y � f
�
�6 ll7
25`�l�c�G`�ZJ �. � m i� Co g���S ��,. "��
Work Class: New Addition ( ) Remodel ( ) Repair ( ) Demo ( ) Other ( )
Work Type: Interior () Exterior () Bot ) Does an EHU exist at this location: Yes ()
Type of Bldg.: Single-family�l Two-family () Multi-family () Commercial () Restaurant () Other ()
No. of Existing Dwelling Units in this building: No. of Accommodation Units in this building:
No/Type of Fireplaces Existing: Gas Appliances
No/Type of Fireplaces Proposed: Gas Appliances
Does a Fire Alarm Exist: Yes () No ()
Gas Logs () Wood/Pellet () Wood Burnii
Gas Logs () Wood/Pellet () Wood Burni
—� Does a Fire Sprinkler System Exist:
*�'***'��****** '�***�`FOR OFFICE USE ONLY**�
ALLOWED
No ( )
F:\cdev\FORMS\Permits\Building\building_�evision_4-18-2007.doc Page 1 of 1 r�,� 4/18/2007
�
TOWN OF VAIL
75 S. FRONTA(';E ROAD
VAIL, CO •p165'7
970-479-2138
DEPARTMENT OF COMMUNITY DEVELOPMENT
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
NEW (SFR,P/S,DUP) PERMIT
Job Address: 1979 SiJNBURST DR VAIL
Location.....: 1979 SUNBURST DR
Parcel No...: 210109103002
OWNER MASLAK, SAMUEL H. & LULETA 06/22/2006
961 HIGH RD
WOODSIDE
CA 94062
APPLICANT BECK BUILDING COMPANY 06/22/2006
P.O. BOX 4030
VAIL
CO 81658
License: 117-A
CONTRACTOR GEORGE SHAEFFER CONSTRUCTION 06/26/2007
PO BOX 373
VAIL
CO 81657
License: 302-A
Desciption: CONSTRUCTION OF A NEW SFR
Occupancy Type
RESIDENT/1 & 2 FAM ( ZONE 3 VB
Totals...
Number of Dwelling Units: 1
Town of Vail Adjusted Valuation: 2,929,720.00
Factor
126.96
Permit #:
Project #:
Status . . . :
Applied . . :
Issued . . :
Expires.....:
B06-0161
PRJOS-0417
ISSUED
06/22/2006
09/07/2007
02/28/2007
Phone: 970-949-1800
Phone: 845-5656
Sq Feet Valuation
7,948 $1,009,078.08
7,948 $2,929,720.00*
Revision Valuation: $0.00
+�*r*****r��**+***r***********r****a�***+►***r***rr**�r****+s*►�* FEE S UMMARY ►*t*******at*+****►+�*►**�*�+*�►�+*+rr+�*�******++*+*a*+r**
Building------> $12, 653 . 25 Restuarant Plan Review--> $0. 00 Total Calculated Fees-----> $22, 183 . 06
Plan Check---> $ 8, 2 z4 . 61 Recreation Fee------------> $1, 192 . 2 o Additional Fees------------> $ 5 8. 0 0
Investigation-> $0. 0o TOTAL FGES-------------> $22, 183 . 06 Total Permit Fee-----------> $22, 241. 06
Will Call-----> $3 . 00 Payments-------------------> $22, 241 . 06
BALANCE DUF,---------> $0. 00
*++*�+��*r*+�r++�*a�***�*++*+s:»*a«**r*v***«rr�+�***.**�*******+►s»»xrr�**r*s*�*��*r+****+*�**********�►�***a****�*�**»*+*+�*rwv*tr�rrrr***++r�*■
Approvals:
Item: 05100 BUILDING DEPARTMENT
08/13/2006 MROYER Action: DN Comment letter taxed to contractor, architf
engineer 08/13/2006.
08/24/2006 MROYER Action: AP Review complete. Waiting tor revised plan 1
approved by all departments before collating the office copy of plans.
08/23/2007 jplano Action: AP New structural drawings approved, 2 hour o:
review due
11/20/2008 jplano Action: AP REVISONS TO PLANS APPROVED, PLANS DATED OC'
Item: 05400 PLANNING DEPARTMENT
06/27/2006 bgibson Action: AP
�
08/23/2007 bgibson Action: PA structural revisions approved by planning
11/20/2008 bgibson Action: AP 11/07/08 revisions approved by planning. p.
to John Plano.
Item: 05600 FIRE DEPARTMENT
06/26/2006 JJR Action: COND See conditions.
08/24/2006 JJR Action: AP Revision approved.
11/12/2008 drhoades Action: AP Revision approved. (Stamped rec'd on 11-06
Item: 05500 PUBLIC WORKS
06/29/2006 gc Action: AP Provide a Revocable Right ot Way permit be:
09/01/2006 gc Action: AP Revisions approved 9/1/06
Provide a revocable Right of Way permit.
11/13/2008 cdelles Action: AP Approved revisions dated 10/30/08
Item: 05550 ENGINEERING CIVILS
.��.*��:�»**��.*.+.*..***�***...*+*���*.«*.�.*•******►*.*.*.*...�**:.*�*�..*****�**.**..*.*.+�*.**.+***.*.*��+*��..*.�*����►�.�����+���+*+.�«�**�
See the Conditions section of this Document for any conditions that may apply to this permit.
DECLARATIONS
I hereby acknow(edge that I have read this application, filled out in full the information required, completed an accurate plot plan,
and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all
Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review
approved, International Building and Residential Codes and other ordinances of the Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVAN BY TELEPHONE AT 479-2149 OR AT OUR OFFICE FROM 8:00 AM �
4 PM.
! �
SIG�IATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNER
********************************************************************************************************
. � CONDITIONS OF APPROVAL
Permit #: B06-0161 as of 11-26-2008 Status: ISSUED
********************************************************************************************************
Permit Type: NEW (SFR,P/S,DUP) PERMIT
Applicant: BECK BUILDING COMPANY
Job Address: 1979 SLJNBURST DR VAIL
Location: 1979 SUNBURST DR
Applied: 06/22/2006
Issued: 09/07/2007
Parcel No: 210109103002
***************************************************************�****************************************
CONDITIONS
********************************************************************************************************
Cond: 33
(PLAN) THIS PROJECT WILL REQUIRED A SITE IMPROVEMENT SURVEY. SUCH SURVEY SHALL
BE SUBMITTED AND APPROVED PRIOR TO REQUEST FOR A FRAME INSPECTION.
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.
Cond: CON0008206
Fire sprinkler system required and shall comply with NFPAI3R(2002) and VFES
standards.
Cond: CON0008207
Monitored fire alarm system required and shall comply with NFPA 72(2002) and
VFES standards.
Transmittal Form
Revision Submittals:
1. "Field SeY' of approved plans MUST accompany revisions
2. No further inspections will be performed unti� the revisions are approved & the permit is re-issued.
3. Fees for reviewing revisions are $55.00 per hour (2 hour minimum), and are due upon issuance.
(�) Revisions
Permit #(s) information applies to: Attention: () Response to Correction Letter
attached copy of correction letter
#06-0161 Bill Gibson ( ) Deferred Submittal
( ) Other
Project Address:
Maslak Res. 1979 Sunburst Dr., Lot 12, Vail, CO
Contact Information
company: Georqe Shaeffer Construction Company
Company Ph: 970-845-5656 Fax: 970-845-7013
contact Name: Rob Fawcett / Jeff Kissane
Contact Ph: 970-390�1 �4 Cell: 970-376-6184
E-Maii: robf(a�qsconco.com
Town of Vail Contractor Registration No: # 302-A
X � --
Signature (required)
Revised ADDITIONAL Valuations (Labor 8� Materials)
(DO NOT include original valuation)
Building $
Plumbing $
Electrical $
Mechanical $
Fire Sprinkler
rota� s
$110,000.00
$ $�46;�99A:�9� � i Wl � l �' 1 �"`�"
� �,�r��
� ������ ���
�' v�- c
���� � � � ������
�-
� ��� �,� Q3��o
Description / List of Changes:
All revisions have been approved by the TOV
DRB and are indicated within clouds on
(Use additional sheet if necessary)
Date Received:
��
�s�zQ �
��__
�� �� V..c s c� �� U� .�( 3
� ���������
�c��a�� �
D
NOV 0 7 2008
TOWN OF_VAIL
��'� �—ttiw�f- �� � 4G�(o��
********************************************************+***********************************
TOWN OF VAIL, COLORADO Statement
*******�****************************************++******************************************
Statement Number: R080002140 Amount: $308.43 11/07/200801:29 PM
Payment Method:Credit Crd Init: JLE
Notation: ROBERT FAWCETT
-----------------------------------------------------------------------------
Permit No:
Parcel No:
Site Address:
Location:
B06-0161 Type:
2101-091-0300-2
1979 SUNBURST DR VAIL
1979 SUNBURST DR
NEW (SFR,P/S,DUP) PERMIT
Total Fees: $22,183.06
This Payment: $308.43 Total ALL Pmts: $21,708.57
Balance: $474.49
********************************************************************************************
ACCOUNT ITEM LIST:
Account Code
--------------------
BP 00100003111100
PF 00100003112300
Description Current Pmts
------------------------------ ------------
BUILDING PERMIT FEES .O1
PLAN CHECK FEES 308.42
-----------------------------------------------------------------------------
GEORGE SHAEFFER
CONSTRUCTION COMPANY
P.O. Box 373
VAIL, COLORADO 81658
TO: Tow of Community Department
Attn: Bill
WE ARE SENDING YOU ❑Attached
X Shop drawings ❑ Prints
❑ Copy of letter ❑ Change order
LET�TER OF TRANSMIT�T�A1L
llAl � 11.07.Og I JOB NO. OGLL
Re: Maslak Res. Revision application
�Under separate cover via Hand Deliverv the following items:
❑ Samples ❑ Specifications
❑ Plans
❑ Copy of Contracts
COPIES DATE NO.
1 11/07/08 TOV Revision Transmittal Form
1 y 2S Ob Ori inal Maslak Res. Permit "Field Set"
3 (D 2°�� D Maslak Res. Revised Drawin s
THESE ARE TRANSMITTED as checked below:
For approval
� For your use
❑As requested
❑ For review and comment
❑ FOR BIDS DUE
❑ Approved as submitted ❑ Resubmit 3 copies for approval
Approved as Noted ❑ Submit 3 copies for distribution
❑ Returned for corrections ❑ Return 3 corrected prints
Approved, resubmit _ updated copies
❑ PRINTS RETURNED AFTER LOAN TO US
Bill,
Attached is information regarding the revisions at the Maslak Res. Permit #06-0161.
Please review and approve.
Thanks and call with any questions or comments,
Rob Fawcett
COPY TO: Jeff Kissane
SIGNED: ��"—
Rob Fawcett
If enclosures are not as noted, kindly notify us at once. George Shaeffer Construction Company
� � U
1
�ov o � ����
��
�� ����
TOWN OF VAIL FIRE DEPARTMENT
75 S. FRONTAGE ROAD
VAIL, CO 81657
970-479-213 5
VAIL FIRE DEPARTMENT
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES —�S �-(��((�
ALARM PERMIT
Permit #: A08-0056 �� � �« �
Job Address: 1979 SUNBURST DR VAIL Status ...: ISSUED
Location.....: 1979 Si1NBURST DR Applied ..: 07/09/2008
Parcel No...: 210109103002 Issued ... 08/1 ]/2008
Project No : Expires . .: 02/07/2009
OWNER MASLAK, SAMUEL H. & LULETA 07/09/2008
961 HIGH RD
WOODSIDE
CA 94062
APPLICANT THUL ELECTRONIC SYSTEMS 07/09/2008 Phone: 970-949-4638
P O BOX 534
AVON
CO 81620
License: 112-5
CONTRACTOR THUL ELECTRONIC SYSTEMS
P O BOX 534
AVON
CO 81620
License: 112-5
Desciption: FIRE ALARM SYSTEM FOR NEW SFR
Valuation: $1,400.00
07/09/2008 Phone: 970-949-4638
•*x�*****r*s��*��*��:sr��**►�*+***++*�*+****+�+�**�***+�:**+*a►+x�r►r� FEE S UMMARY �***+►*�*�******+*��*+�****+a+*****►+*x*�**�*►**+�*r***r***»
Electrical---------> $ 0. o o Total Calculated Fees--> $ 2 84 . 5 0
DRB Fee---------> $ o. o o Additional Fees----------> $ 0. o 0
Investigation----> $ o. o o Tota) Permit Fee--------> $ 2 84 . 5 0
W ill Call---------> $ o. o o Payments------------------> $ 2 84 . s o
TOTAL FEES--> $ 2 84 . 5 0 BALANCE DUE--------> $ o. 0 0
.++*►.�s****s**■*+�*►*�*+**sr****►s*.**r��*********s*s*sr�*s+s*.r**�.****�**►+*r*r■*«*+�**►*.►s***►�►*s*.�■�e**+*+*x�►+*+**.**�*�►+a***rs*+»�*rss
Approvals:
Item: 05600 FIRE DEPARTMENT
07/14/2008 JJR Action: AP
,*...�.*,*..�*��.*.*+.*�*��.*.�.*.*.���*�..*.*.�..�***�**.*.*..*..*++++.+��s**�+*+*.«+,:+,*.�.*�*+.*.*++*.�.+*��,...+*+**,:+*.,+*+*+«+**..++,+..***
CONDITIONS OF APPROVAL
*.*�,:*.., �.*�.*�.*.,:�.*,*,..*.��»#.*��:**»*.«***�*.*.*.,�.�.....*..�.��.�**....,..�...*.*.*.«�*..*..*.*��*.*.�.***..*.....�.*.***...*,�..*.........
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan,
and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all
Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review
approved, International Building and Residential Codes and other ordinances of the Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE SEVENTY-TWO HOURS IN ADVANC,�'BY 7'ELEPHOD{E AT 970-4�52 FROM 8:00 AM - 5 PM.
;
�� ���1 (.,
--._._.
SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNER
�---�
APP�fCAT10N WiLL NOT BE ACCEPTED IF INCOMPLETE OR UNStGNED
Project #: �145— G Li' �,
Building Permit #: - D t l
Alarm Permit #: 5
� 97f1-479-2135 (Insnections)
����� TOWN OF VAIL FIRE ALARM PERMIT APPLICATI4N
Commercial & Residential Fire Alarm shop drawings are required at time of 75 S.
Frontage Rd. application submittal and must include information tisted on the Vail, Colorado
81657 2"' page of this forrn. Application wilf not be accepied without this
information.
CONTRACTOR iNFORMAT[ON
Fire Alarm Contractor: Town of Vail Reg. No.: Contact and Phone #'s:
� �ui. E ��LT�o N � c_S j J � - 5 I�i � IG� -i"Iti-�.� L - �1 �t o - � �.9 - �F-� 3 8
E-Maii Address: ` E� �� �,� L7' j2� �`,GS. C, o
Contractor Signature:
�
�
COMPLETE VALUATI�NS FQR AlARM PERMlT ��IIl�t�i�lffi��f���/
�p V� � �� LT
Fire Alarm: $ f`��� � � �J L .�
, �%:.�_ .�
, ,.._.__�� � p � -
���: �� o�
Contact Ea le Coun Assessors O�ce at 970-328-8640 or visit www.ea le-count :c
, Parcel # � i 0 i(� I d 3 �o �--
Job Name: y�,� QS��"K t`� rc 5 �.�t: N C.�S Job Addre�s's: si�-y\ t'3t�hS f L�R-. �d� i L� C.O .
,_`
Legal Description Lot: )'2 Block: Filing: �� Subdivision: V/kI L��-LL.�
, � u�Na�pL' N L�rA �/FS�� K- A� ieS � tti {ZA. Wc ec�t��i:c', (.�l- q�fa6 Phone:
' En ineer• Ad res • Phone: C� �
DEggc�-p+N 5hei��,R- �� ��� Co`13 �Rt C.e �o. �'1'D- �O�(- g`Z
Detailed Location of work: (i.e., floor, unit #, bldg. #)
' �r �u �n,o
Detailed description of work: . ��
N c W '� � t. i�i b�'�, s� t�-� N(�-�R- s� s�, ►�--a �it�ct.� rn s S
Work Class: New Addition ( ) Remodel ( ) Repair ( ) Retro-fit ( ) Other ( )
Type of Bldg.: Single-family (�() Two-family ( ) Multi-family ( ) Commercial ( ) Restaurant ( ) Other ( )
No. of Existing Dwelling Units in this building: No. of Accommodation units in this building:
Does a Fire Alarm Exist: Yes O No O Does a Fire Sprinkler System Exist: Yes S�0
********************�r*************�*:**FOR OFFICE USE ONLY*******:************:***********:****
L� C��-
0
Permit Fee� A
Groun::
\1Vail\datalcdev\F(7RMS\PERMiTSWLRMPERM.DOC
,��.�
�.�,._ �' [] � f�� �
JUL 0 9 2008
�
TOWN ��4V�iL
�,_
�
*************************************************************************************�******
TOWN OF VAIL, COLORADO Statement
****************�*********************************+*******+***********+*********************
Statement Number: R080001355 Amount: $284.50 08/11/200801:41 PM
Payment Method: Check Init: LC
Notation: #41845/THUL
ELECTRONICS, INC.
-----------------------------------------------------------------------------
Permit No: A08-0056 Type: ALARM PERMIT
Parcel No: 2101-091-0300-2
Site Address: 1979 SUNBURST DR VAIL
Location: 1979 SUNBURST DR
Total Fees: $284.50
This Payment: $284.50 Total ALL Pmts: $284.50
Balance: $0.00
************++***+*******************+******+***********************************************
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------------- ------------------------------ ------------
BP 00100003111100 FIRE ALARM PERMIT FEES 52.50
PF 00100003112300 PLAN CHECK FEES 232.00
TOWN OF VAIL
75 S. FRONTAGE ROAD
VAIL, CO 81657
970-479-2138
Job Address:
Location.......:
Parcel No....:
DEPARTMENT OF COMMUNITY DEVELOPMENT
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIME5
DEMO. OF PART/ALL BLDG.
1979 SUNBURST DR VAIL
1979 SUNBURST DR
210109103002
..� (Z s C�� 5- C`� �� 1
OWNER MASLAK, SAMUEL H. & LULETA
961 HIGH RD
WOODSIDE
CA 94062
APPLICANT BECK BUILDING COMPANY
P.O. BOX 4030
VAIL
CO 81658
License: 117-A
CONTR.ACTOR BECK BUILDING COMPANY
P.O. BOX 4030
VAIL
CO 81658
License: 117-A
Desciption:
DEMO/REVEG OF A SFR
Occupancy:
Type Construction:
07/24/2006
07/24/2006
07/24/2006
Valuation: $57,660.00 Revision Valuation: ??
Permit # D06-0004
Project # ??
Status . . . .
Applied .. . :
Issued . . . :
Expires..... :
_� C��� - G � �' �
ISSUED
07/24/2006
07/27/2006
O1/23/2007
Phone: 970-949-1800
Phone: 970-949-1800
Add Sq Ft: 0
***********�******************************************************** FEE SUMMARY *****************************************�******************
Building------> $699.75 Restuarant Plan Review--> $0. 00 Total Calculated Fees--> $1, 157. 59
Plan Check---> $ 4 54 . 84 Recreation Fee--------------> $ o. o o Additional Fees----------> $ o. o 0
Investigation-> $ o. o o TOTAL FEES-------------> $1,157 . 5 9 Total Permit Fee---------> $1,15 �. 5 9
W ill Call---- > $ 3. o o Payments------------------- > $1, 15 7. 5 9
BALANCE DUE---------> $0. 00
***********************************************************************�**************************�*******�********************************��**�*
Approvals :
Item: 05100 BUILDING DEPARTMENT
07/27/2006 JRM Action: AP
Item: 05400 PLANNING DEPARTMENT
07/24/2006 bgibson Action: AP
Item: 05600 FIRE DEPARTMENT
07/27/2006 mcgee Action: AP
Item: 05500 PUBLIC WORKS
07/24/2006 gc Action: AP
*************�******�***************�************************�***************************�************�********�*********************************
See the Conditions section of this Document for any conditions that may apply to this permit.
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot
plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply
with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design
review approved, International Building and Residential Codes�an� other ordinances of�e Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOUR$ IN AD�ANCE BY TELE '�O + 9 OR AT OUR OFFICE FROM 8:00
AM - 4 PM. � � d
OR CONTRACTOR FOR HIMSELF AND OWNEF
*�**�****�*��*��*�*�***�**�**�*���**�*�*�*��*���**���*�*�*��***�*�*�***�**���***�*��***�*�*��*�*�**�****
CONDITIONS OF APPROVAL
Permit #: D06-0004 as of 07-27-2006 Status: ISSUED
�:*�x*�:�**�:*:x*�*��:*�:*�x**�:**�x�:*��*�:*:x*��x*�x*x:**�*�*�**�*:x*�x*�:*�*�:*��x�*��*�x*�*�:*�:*�*�:***�:*�x��x�:�*�x*�:*�:**�:*�x**�x
Permit Type: DEMO. OF PART/ALL BLDG.
Applicant: BECK BUILDING COMPANY
970-949-1800
Job Address: 1979 SUNBURST DR VAIL
Location: 1979 SUNBURST DR
Parcel No: 210109103002
Description:
DEMO/REVEG OF A SFR
Applied
To Expire:
07/24/2006
Issued: 07/27/2006
O1/23/2007
�*��x���:*�**�:*�:**�x*�:*��:****�:**�:�x�:x****�*�:*�:*�:**�Conditions:�:*��x��x*���:�x���:*�:**�*�:*�:�x��*�*�:*�:***�:**�*x:*�x*�x*�*
Cond: 38
(BLDG.): THIS PERMIT IS GOOD FOR ASBESTOS ABATEMENT ONLY.
AN ASBESTOS ABATEMENT CERTIFICATE SHOWING THE AREA FREE
FROM ASBESTOS IS REQUIRED PRIOR TO ANY FURTHER WORK
OCCURING ON THIS SITE. IF FURTHER QUESTIONS ARISE, CONTACT
THE VAIL FIRE DEPARTMENT AT 479-2250.
Cond: 1
(FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY
WORK CAN BE STARTED.
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE
COMPLIANCE.
*************+*********�*********�*********************�********�********�******************
TOWN OF VAIL, COLORADO Statement
*****�x****************************************************************************�****�x*�**
Statement Number: R060001096 Amount: $1,157.59 07/27/200602:17 PM
Payment Method: Check Init: DDG
Notation: Beck Building
Company 11897
-----------------------------------------------------------------------------
Permit No: D06-0004 Type: DEMO. OF PART/ALL BLDG.
Parcel No: 2101-091-0300-2
Site Address: 1979 SUNBURST DR VAIL
Location: 1979 SUNBURST DR
Total Fees: $1,157.59
This Payment: $1,157.59 Total ALL Pmts: $1,157.59
Balance: $0.00
********�:x************************************************�x*�x**�+****�**********************
ACCOUNT ITEM LIST:
Account Code
--------------------
BP 00100003111100
PF 00100003112300
WC 00100003112800
Description Current Pmts
------------------------------ ------------
BUILDING PERMIT FEES 699.75
PLAN CHECK FEES ' 454.84
WILL CALL INSPECTION FEE 3.00
-----------------------------------------------------------------------------
.
�.
����� �
75 S. Frontage Rd.
Vail, Colorado 81657
��"7� 0
� �
APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UNSIG �� �� �`�
Project #:
Bu�lding Permit #. -
. O�� 97a-479, 2149 �l�nsprectio ' r O�j(� �
. .. , _ ts �
TOWN OF VAIL BUILDING ERMIT APPLICATION
Separate Permits are required for electrical, plumbing, mechanical, etc.!
:.�i �►.Lc �Gi,t� �-�C��
address: �y,�,,� ,,L
�cto i riature:
CONTRACTOR INFORMATION
Town of Vail Reg. No.: Contact Person
!� � �"-�/�t' � Y v►� �v�
1e�S. ���c..
`: Qu•�3 v
�ne ��s: `�'y`� -/�sJ
�/ �' c.( 'C3 � � (
COMPLETE VALUATIONS FOR BUILDING PERMIT Labor 8� Materials
BUILDING: $ �'"j"� �,�� ---�� ELECTRICAL: $ -- OTHER: $ —
PLUMBING: $ ------ MECHANICAL: $ TOTAL: $ �'.�2 (�(f,�
For Parcel # Contact Ea le Count Assessors Office at 970-328-8640 or visit www.ea le-count .com
Parcel.#
.. _. .. .... . _ . � f Q , �CC G �Lti� �.iCi�...
Job Name: ���� ,�<<��� Job Address:
ii"�`� �'u�.b� /��
Legal Description Lot: �•Z Block: •— Filing: �'^.--�' � Subdivision:0i�� �dzt (l,p,�,�
Owners Name: � y��� Address: �,�� � _ � �� �� �3��5,� � Pho � '
�� -3�s �-�� � r
ArchitecUDesigner: � � Address: Phone:
Engineer: ��,� Address: Phone:
Detai�ed description of work:
i�2.v�-LC� �, �� � .e.f-e " ��-'�v�.
Work Class: New ( ) Addition ( ) Remodel ( ) Repair ( ) Demo Other ( )
Work Type: Interior () Exterior () Both Does an EHU exist at this location: Yes () No
Type of Bldg.: Single-famil ~ Two-family ( ) Multi-family ( ) Commercial ( ) Restaurant ( ) Other ( )
No. of Existing Dwelling Units in this building: � No. of Accommodation Units in this building: y�l'y�l�,.
No/Type of Fireplaces Existing: Gas Appliances () Gas Lo s( ) Wood/Pellet () Wood Burnin (�
No/T e%f Fire laces Pro osed: Gas A liances Gas Lo s Wood/Pellet Wood Burnin NOT ALLOWED
Does a Fire Alarm Exist: Yes () No Does a Fire Sprinkler System Exist: Yes () No
FOR OFFICE USE ONLY
Type'of Construction � Date Received: TM��,�,.,
' Occupancy Group� ,� .-� Accepted ;By:, ' tT,, ;'�� , ;�'f ' � �
1i i
� ; 5
,;�,'` ��1� � Q �Q�� � i
� '.
�.�;
;
� :.,,- ;
F:\cdev\FORMS\Permits\Building\building�ermit.DOC Page 1 of 16 TOV�I�V C�� rIA�L
Questions? Call the Building Team at 479-2325
�
,
�'��' �' ��I, �` Building Permit Submittal Checklist
Department of Community Development
Project Name• �Q,��c� ��`�'"ti-�'�
Project Address: d `�t ��' �u ti (�,� �-a �-
✓ This Checklist must be completed before a Building Permit application is
accepted.
❑ All pages of application is complete
❑ Has DRB approval obtained (if required) Provide a copy of approval form
❑ Plan Check Fee required at submittal for projects valued over $100,000.00 (see attached fee
schedule)
❑ Complete site plan submitted
❑ Public Way Permit application included if applicable (refer to Public Works checklist)
o Staging plan included (refer to Public Works checklist) No dumaster,qarkinq or material storage
�Asbestos test and results submitted if demolition is occurring
Architect stamp and signature (All Commercial and Multi family)
� �Full floor plans including building sections and elevations(� e for re els, 4 sets of plans for SFR
`' and Duplex, 5 sets of plans for Multi-Family and Commercia ngs)
❑ Window and door schedule
o Full structural plans, including design criteria (i.e.loads)
❑ Structural Engineer stamp and signature on structural plans (All Commercial and Mutti Family)
❑ Soils Report must be submitted prior to footing inspection
❑ Fire resistive assemblies specified and penetrations indicated
❑ Smoke detectors shown on plans
o Types and quantity of fireplaces shown
Applicant's Signature:
Date of submittal:
Received By:
[�
F:\cdev\FORMS\Permits\Building\building�ermit.DOC Page 2 of 16 02/09/2005
t
.
T�WN OF YAI� .
-_
ASBESTOS TESTING REQUIREMENTS
THE TOWN OF VAIL AND STATE OF COLORADO DEPARTMENT OF PUBLIC HEALTH REQUIRE ASBESTOS TESTING
ANY TIME WHEN MORE THAN 160 S.F. OF MATERIAL WILL BE DISTURBED OR REMOVED.
AN ASBESTOS TEST AND REPORT IS REQUIRED TO BE SUBMITTED WITH YOUR BUILDING PERMIT APPLICATION
FOR ALL REMODEL, ADDITiON OR OTHER PROJECTS INVOLVING ANY DEMOLITiON OR REMOVAL OF BUILDING
MATERIALS THAT MAY CONTAIN ASBESTOS. BUILDINGS CONSTRUCTED AFfER OCTOBER 12, 1988 THAT HAVE
NO ASBESTOS CONTAINING MATERIALS ARE DCEMPT.
A COPY OF THE REPORT MUST BE SUBMITTED WITH YOUR BUILDING PERMIT APPLICATION
• I.�ave included the,�sbestos test and report with my building permit application
date
�
�
• I certify my project will not disturb or remove more than 160 s.f. of building material. The construction
plans submitted with my application clearly indicate this information. (This will be verified during plan
review, and will delay your project if found to be inaccurate)
applicant signature
�
date
• The building was constructed after October 12, 1988. The date of construction was
applicant signature
date
original construction date
F:\cdev\FORMS.\Permits\Building\building�ermit.DOC Page 4 of 16 02/09/2005
Ju1-20—A6 09:48am From—HECKMAN&OCONNOR 9709265995 T-375 P.02/02 F-911
� : , ; , � . . .. ,
. � , . r , . �. , � . . . . 970-524-1212 �• �:.� . ,
P.Q. Box 1320 . . . � . - (faat) 970-524-1.213 .
Eagle, CO 8163� . ; � . � . . � 970-904-0694� . .
. . ' . . S . . . . . ,
.. . � ' � ' . . ' ' ' . . . , .
, � , . . ; ' . ' ' � ' . � . . �O�iM1'1 4# Vall � .
.. , � . Beck Building Co�pa�Y . ' � � P� � .
� ,. , �. � � . �� . �� ��� � . � �. .� �
� TO: . .. . �� . �
� � �. . .. John Stavz�ey. � , . � . . � . � . . . .
� � � FROM: Ghris �piege� � ; . . � . � � �.
� . .. ��,� � ..
. ,. . .. DATE: �. 7uly 2Q; 2006 . ; � „ � � .. . � - 1 , . . . � . : . .
. . � � . JO�: � . `'. �aslak Residenc`e . � . . . � �. � � . . � ,
. ' � Regracie lot;labor . . ". : , : , �1,30Q I� . . . � : - �
. . . o soil � �1,000 � . ,
� � � Trucking,i�.T P , ', � ; � � . . � �
. � .. � . 12eseecling with low vvate� seed � $2,000 : ; : . . � � _
. � . . . . ' . �1,OOQ , � . � � � . � � � � :
: , � ' Spri�kler systeni' . . ' . . . � � � � � . . . �
. . . . - . . . . �� ����� .
� � . � _ � TOTAL : �5,300.00.. x � � �a� . : . - � . � � :.
� �� r
� � �., a�,����,�r
� ,, � . � :
Y�,
ltlly zo, zoo�
lown of Vail Coinmunity Development
Attn: Bill Gibson, Plaiuler
75 South Frontabe Road
va�l, co sl6s� �
Via: Hand Delivery
Re: 1979 SLlnburst, DRB/Demo Permit Submittal
Dear : Bill
"� .� �..
r_
B U I L D I N G
C 0 M P A N Y
�` �
Per our phone conversation yesterday, attached is the subinittal for DRB with application and for
the Demo Permit for 1979 Sunbtu-st Lane. Also attached is the bond check for 125% of the value
of the regrade/revegitation proposal ($6,625.00). The hydro-seeding will be completed in a seed
mixture approved by the Town of Vail.
In preparation for the Vail Fire Department's exercises, all utilities were disconnected in mid
June. The bas was terminated at the street (meter also removed) by Excell Energy, the phone and
cable disconnected at the pedestal, the electrical meter was removed and the power disconnected
at a nearby ti-ansformer by Holy Cross Energy. According to Eagle River Water and Sanitation,
the water is hard piped to the structure (no curb stop), blrt is turiled off at the old ineter location
by ERWS.
Per otu� discussions in April, the Vail Fire Department has performed extensive exercises on this
property, with enough penetrations through exterior walls, interior walls, the roof that the
structural integrity of the building caizi�ot be assured. The building is also un-securable due to
the exercises, and a public hazard. The building perinit was subinitted on June 21, with an
anticipated issuance of August 30`�, We have a demo crew ready to start JLily 26`�'. For the salce
of public safety, I ur�e vou to facilitate this rec�uest to deino thE structure as soon as possible.
Thanks for your consideratioil.
�ICerely,
Jon Stavney
Pro ect Managei°
�cl< Building Company
Gc: Andy Becl<, Jolu1 Gulicic
M:AWPFII.ES\DOCS\Maslak\COMUMC/�\OTHER\LGTTLRS\DRQ Re��rade-Reseed Ietter.DOC
BUILDING A LEGACY OF 7RUST FOR OVER 30 YEARS
Post Office Box 4030 Vail Colorado 81658 Tel 970 949 1800 Fax 970 949 4335 beckbuilds.com
�
i
��-� `,
_ � "���
`�
.�1�'/r�;�
� � f,
�
1�
��
�,.
r4�
.:.�
��
�
�
�
/,�, .
�-�,
,
;
,l
l '
,
, /
r �
1 `
, ,�
,
/ ;1
r
r
;
.,
�
�
r
�"
`l . �
rjr, � !
f�� � ;
,�% ,�
� �
�
�� !
i:t?.�'i
/ I
/% ;
r
; :
J !
,, ,
1 f
, -
, f
t ,�
�� i
r �
�--r'""
, ,
;_--;
!
,'
/
�
,
f
;
%
;
,f
:
�
� �
i...__�—_ �,..�....�....,.i.,....__..._,......._......
i�'�""'' _.. ,w _._.
f �
I
� '
� ��
�
T �
t
t �
1
� J
� � 4.a'
1
!
t
� ��
i �
t
� �
� �, . ���
8�
�� `
�
�
�
tJ �1.�'J � h!� �
.` ._... .�►,, N L ._ ...�_ �2
4.b' r�
�
(
�
�)
-t�
�
�
�
�.c
�� 1 �� ,
1 ���`
�, �.'�`�� � `�
� r� � �
�p� � 4.0 ,
��G __ r__a
� �
J J =�- � ! � . ���3�. �� £ � �
/� � �,�J � 1 �� ,` „� � I "..,--r''r� \
� � � 1� ��=� �� ��G'�- ��
I ':, �
� � i
i �� � fi � i ,
i �:�. t„ � �� � i �
� �
� � �
� � � ,
1.-�� ���'�� ' ` ' '
,�� ra1}N� � p.G�'� � I C.O' ..� ,....2 � �2.���u � I � P�2�� � i
,� ��Q � ����....__� �•. ,...� �
1 �2� � ` � �, � � 1
�� �� � ���� Np`N�� .j �r ��
� � ��C�- �� : �
ROt7i= j �' � .- _ _ �� �' � .
OV�t�f-�4NG , 1......_,....__.,.�_..... � �; �� `._�__:iL,. �� ------ 'c�
}- bt �> � � �
_ � '"' ""
� � >
� ( Q� 4` � ; 1
,, �..______-,. P��,� i ( � � i � '
�``� ,r . r � � �
tl . � &������� � �� i
/` � �
�� 1
��� f1 �4� � � �
I�J /f �� \ l��
r f J � � ��
� I � � t
r_ % j
� �J���
:./,J� j t/ ' �
f r
. / .�
: �r
/ �'
, � /�F � �'2�� �
1 r ''
\
; �
f �', .
, �
\
�
t / 1
�
`�. �
1
, � �,��a-,
, �
``� ,f
��. �
; �`� t
f �;��r�o.
;
/ �,.-� '�
�` /� , � ti
r''" / ,, � �
.r'.� � /: �
' �� ���-i � �-` ����� �, � ';�1
. i � � � �
,.r�ff ,� 1� _ ��� '1 �l�
�� �, �� '� � �
� ` 1
� ` `� i
��`� � ` i � � 1l f,.
\ i ` .'`
l � �,.� � � � ,,,-•
1` �� t � � `, s .
� '�r; ���-�L�q�� ` \
.1��`t �2r�.,�,� r,,,��,ZS(a. �` �, : 25�,r ` ���
� \ � �'" � ` �� '
� �
• _ _� ���,-, � , tl �,,• � . �-.
` ,.^..
\ � ''� ^ '`J / � /
1� � 2r � �-"�, '`, :
i` 4 / f,,-r �% � �, r
. �\ r f �J' ��/f
� l ,.'' � �,,�,'/ r' ,. V f y,,'
� �..i �.' /' �,
� f � �''li ,,.-' , ��, �,
f �,•' \t �„r �.r�,,•��,,..
� ` / , � f,.
r'rr _ rt. ./'� �f' .,.,. /
.� , - „..
� ����. .. �' \
�...�`�i2�1� '`1 c��
� ,,..—
.. E
`�'`°___________..��'���" ����
, \�'� �
1�� �`� " �'�,
r �, �
� - � �'t . v�,
2
�„''�`� p, -^ .�1��` y ���' �2�i5 —"�`� �Q���`,,
r"^5�! l.+ !�� •� � � �, .+ �"� a
i l�,. ;�'", A\ r r i
!�1 � t� y �
���' �` � f r
}„ r
�' ���
l�� ��'�� k �
� `
� `
��q `
\
��w3"/ ,� �' �, � � \
�./
�� �
, � �, ,
♦♦ �"��,,.,, �
�� � � �
.
.
..�y� ��� ��
. �
t
�
a�.� °`��° t�''
�`r
V��'� M�N� ���� �' `11
�� ���'
�t� � �� �����
\
��
�`
\
C �
� �
fi�R� Nr���r
���� ���VE
��y {
� `
f �
r �
f
r r'
i ,�-,
i �°,� �
� g�' �' �,.
.�x' �1,�'"r ,,,
�ti .r�.�'�;\ lI./�Ff',
/ �
1
�
r '� �
i�
�
.� •�
i
0
��
�
" '/ ` .
. d� �
Or �
) � ��
�^,,��
J
�O-� `'�
�� ��
f �
o`
��
� 1 ,� G 4 ,
��^�� ��`�/
�� I �T I �� �C��l� � �i' i C>1�� �'L.,� �
�
! /I G� " � � � _p��
�
�i
�q.0�
�:"i�
'�,�
•��
`��,
�
�
�
�� �
rn
�
rn
�
�
z
D
� � ��
,°
<U���� ��,
; . ��:
� a � .�.
r
#;Es
p�� � �p�P
���
�o• 2'1 ��,tti��)
� ����� ..
�
;�� �� � Y � � t �
�� �
���'#'�"� s'' � � �^° � F
�. `��°"R � a L�
�� t
�� �� � �i � ,
{
�� � i +G. �*' «+,
�� �� � �
�� ����
�wathmey
Prc�tt
�CiIU�tZ
Architacts, p.c.
3p00 S, Frontage Rd. Wsst
Vail, Cotorado 81557
Teh (970?d76-114?
Ernc: (47Ct) 476-1b12
�
�
----�
—.�
�
�
�
��
�
� �
��� •.
�� � �
� �
�
� �
'1�� � ���
���� �"` �
� �
��
�
�
�
`� �
� �
�'� �
-� � �
� � �
�
�� �
�
��
�
�
�
V
�
�
C�3 Capyrlght
Gwathrnoy/PrattJSchultz
Architects, P.C.
AII Rights Reserved
This documenf, and the ideos
and designs irrcorporated
hereln, as an instrument af
professipnai service, ts trie
properry of GwathmeyJPratt
Schultz Archttects, P.C. and is not
to be ussd, In whole or in part, for
any other praaect wifhout the
written auttrarizotiqn of Ec{ward
M. Gwathmey Jr.. Nenry R, Pratt.
or Sldnay Schultz.
r ��' ,i,;
M � I
�'�s '—
•
• --' t.
� r
�h�et �lumb�r
�. � �
�.
APPLICA IL O E CEP I N OM TE O UNS NED
jec
'j�. uilding Permit #:
�� h I �1 .�'',� Sprinkier Permit #:
�` 970 479-2135�Insnectlons)
� TOWN OF VAIL FIRE SPRINKLER PERMIT APPLICATION
TOWNOFYAIL Fire Sprinkler shop drawings are required at time of permit submittal and
75 S. Frontage Rd. must include the following. Permit application will not be`accepted
Vail, Colorado 81657 without this information:
• A Colorado Registered Engineer's starnp or N.I.C.E.T. Level III (min) stamp.
• Equipment cut sheets of materials.
• Hydraulic calculations.
. A State of Colorado Plan Registration form.
. Plans must be submitted by a Registered Fire Protection Contractor.
CONTRACTOR INFORMATION
Fire Sprinkler Contractor: Town of Vail Reg. No.: Contact and Phone #'s:
• � ,� 7� — � Nl;k.t ki-ze�si'ek 3�_� -Z�� -J��G�
E MailAddress� r,��kc K� allU'i�c�i-P-�rP Grn}P�"t'if�r� �c����'�
Contractor Signature: �
, �� �
��kL�. � L���.S' � � �7 I :
COMPLETE � ALUATIONS FOR ALARM PERMIT (Labor 8� Materials)
Fire Sprinkler: $ 2(0, Z�U� U�
`
�*************�******************,�*****FOR OFFIC �� *� �.
\1V a i I\da talcdev\FORMS\P ERI
Entries for Item:5600 - FIRE DEPARTMENT 16:52 02/08/2008
Action Comments B Date
DN Inadequate and innaccurate submittal. JJR 01/10/2008
Resubmittal rerquired.
AP Approved as noted: JJR 02/08/2008
1. Sprinkler list is empty on all pages of
plans. Number of heads per floor is
required to be shown.
2. Kitchen sprinkler heads FP 3 are 9'
from 2 walls. General note 7 FP 1 states
maximum distance as 8' from wall.
3. Provide coverage beneath garage door
as required by VFES standards. FP 3
4. Provide data sheets for pump shown in
riser detail. FP 1
5. Attic space containing mechanical
equipment shall be sprinklered.
Total Rows: 2
Page 1
Entries for Item:5600 - FIRE DEPARTMENT 16:52 02/08/2008
Action Comments B Date
DN Inadequate and innaccurate submittal. JJR 01/10/2008
Resubmittal rerquired.
AP Approved as noted: JJR 02/08/2008
1. Sprinkler list is empty on all pages of
plans. Number of heads per floor is
required to be shown.
2. Kitchen sprinkler heads FP 3 are 9'
from 2 walls. General note 7 FP 1 states
maximum distance as 8' from wall.
3. Provide coverage beneath garage door
as required by VFES standards. FP 3
4. Provide data sheets for pump shown in
riser detail. FP 1
5. Attic space containing mechanical
equipment shall be sprinklered.
Total Rows: 2
Page 1
***+****************************************************************************************
TOWN OF VAIL; COLORADO Statement
*********+***************+*�***********************************+**************�*************
Statement Number: R080000164 Amount: $1,466.90 02/12/200812:49 PM
Payment Method: Check Init: LC
Notation: #19539/ALL
STATE FIRE PROTECTION INC.
-----------------------------------------------------------------------------
Permit No: F07-0150 Type: SPRINKLER PERMIT
Parcel No: 2101-091-0300-2
Site Address: 1979 SUNBURST DR VAIL
Location: 1979 SUNBURST DR
Total Fees: $1,466.90
This Payment: $1,466.90 Total ALL Pmts: $1,466.90
Balance: $0.00
******************+*******+*************************�*******************+*******************
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------------- ------------------------------ ------------
BP 00100003111100 SPRINKLER PERMIT FEES 1,116.90
PF 0�100003112300 PLAN CHECK FEES 350.00
-----------------------------------------------------------------------------
TOWN OF VAIL
75 S. FRONTAGE ROAD
VAIL, CO 81657
970-479-2138
Job Address:
Location.....:
Parcel No...:
Legal Description:
Project No :
DEPARTMENT OF COMMUNITY DEVELOPMENT
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
MECHANICAL PERMIT
1979 SUNBURST DR VAIL
1979 SUNBURST DR
210109103002
� �iS�C» —�����
OWNER MASLAK, SAMUEL H. & LULETA 10/12/2006
961 HIGH RD
WOODSIDE
CA 94062
APPLICANT STORM KING MECHANICAL
2335 AIRPORT ROAD, BLD 1,
RIFLE
CO 81650
License: 276-M
CONTR.ACTOR STORM KING MECHANICAL
2335 AIRPORT ROAD, BLD 1,
RIFLE
CO 81650
License: 276-M
Permit #
Status . . . .
Applied . . :
Issued . . .
Expires . ..
M06-0291
��,� L U1 ��
ISSUED
10/12/2006
11/O1/2006
04/30/2007
10/12/2006 Phone: (970)625-8551
ST A
10/12/2006 Phone: (970)625-8551
ST A
Desciption: RADIANT FLOOR HEAT, SNOWMELT
Valuation: $120,000.00
Fireplace Information: Restricted: Y H of Gas Appliances: 0 # of Gas Logs: 0 tt of Wood Pellet: 0
********��**********�**********�************************************ FEE SUMMARY ***********�*************�****�*****��**********************
Mechanical---> $2, 400. 00 Restuarant Plan Review--> $o . 00 Total Calculated Fees---> $3 , 003 . 00
Plan Check---> $600. 00 TOTALFEES--------------> $3, 003 . 00 Additional Fees-----------> $0. o0
Investigation-> $0.00 Total Permit Fee----------> $3, 003 .00
Will Call-----> $3 . 00 Payments-------------------> $3 , 003 . 00
BALANCE DUE---------> $0. 00
++****+********************+*+******+****�**+******************�*****+*****+**�********+*�********************�*****�*****�****�****�******�**�**
Item: 05100 BUILDING DEPARTMENT
10/12/2006 cgunion Action: AP
Item: 05600 FIRE DEPARTMENT
CONDITION OF APPROVAL
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.
Cond: 22
(BLDG.): COMBUSTION AIR IS REQUIRED PER CHAPTER 7 OF THE 2003 IMC AND SECTION
304 OF THE 2003 IFGC AS MODIFIED BY TOWN OF VAIL.
Cond: 23
(BLDG.): BOIILER INSTALLATION MUST CONFORM TO MANiJFACTURER'S INSTRUCTIONS AND
CHAPTER 10 OF THE 2003 IMC.
Cond: 25
(BLDG.): GAS APPLIANCES SHALL BE VENTED ACCORDING TO CHAPTER 5 OF THE 2003 IFGC.
Cond: 29
(BLDG.): ACCESS TO MECH�TICAL EQUIPMENT MUST COMPLY WITH CHAPTER 3 OF THE 2003
IMC AND CHAPTER 3 OF THE 2003 IFGC..
Cond: 31
(BLDG.): BOILERS SHALL BE MOUNTED ON FLOORS OF NONCOMBUSTIBLE CONST. UNLESS
LISTED FOR MOUNTING ON COMBUSTIBLE FLOORING.
Cond: 32
(BLDG.): PERMIT,PLANS AND CODE ANALYSIS MUST BE POSTED IN MECHANICAL ROOM PRIOR
TO AN INSPECTION REQUEST.
Cond: 30
(BLDG.): BOILER ROOMS SHALL BE EQUIPPPED WITH A FLOOR DRAIN OR OTHER APPROVED
MEANS FOR DISPOSING OF LIQUID WASTE PER SECTION 1004.6.
***********************************************�********�***�*******************�*****�****�*�*******�*******�*****�******�*******************�**
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot
plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply
with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design
review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2149 OR AT OUR OFFICE FROM 8:00 AM - 4
PM. ��l �. _ _-, .�
SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNEF
***�****+********************�*�***************�*******************�******�*****************
TOWN OF VAIL, COLORADO Statement
�x:��*****************************************************�x******�*�x*******�*******��:*********
Statement Number: R060001863 Amount: $3,003.00 11/O1/200611:07 AM
Payment Method: Check Init: DDG
Notation: Storm King
1226
-----------------------------------------------------------------------------
Permit No: M06-0291 Type: MECHANICAL PERMIT
Parcel No: 2101-091-0300-2
Site Address: 1979 SUNBURST DR VAIL
Location: 1979 SUNBURST DR
Total Fees: $3,003.00
This Payment: $3,003.00 Total ALL Pmts: $3,003.00
Balance: $0.00
*********:x*�:�*************************************�:*****�*********�***************:��****�z***
ACCOUNT ITEM LIST:
Account Code
MP 00100003111100
PF 00100003112300
WC 00100003112800
Description
MECFiANICAL PERMIT FEES
PLAN CHECK FEES
WILL CALL INSPECTION FEE
Current Pmts
2,400.00
600.00
3.00
-----------------------------------------------------------------------------
APPLICATION WILL NOT BE ACCEPTED
i
�� � �l�.` ,
75 S. Frontage Rd.
Yail, Colorado g1657
� a��
�� v � r �
IF INCOMPLETE OR UNSIGNE (�— �� I�
Tov Pro��ect �• v � �. �
Building Permit #. '
Mechanical Permit #: • Z�/
970-479-2149 (inspections)
TOWN OF VAIL MECHANICAL PFR�IIT pppLICATtON
Permit will not be acc�eepted without the following:
Provide Mechanical Room Layout drawn to scale to include:
❑ Mechanical Room Dimensions
❑ Combustion Air Duct S"�ze and Location
❑ Flue, Ve� and Gas Une Size and Location
o Heat Loss Calcs.
❑ Equipment Cut/Spec Sheets
MECHANICAL: $ � �1,.(�, o 0 0
************************FOR OFFICE USE ONLY*****************************
Other Fees: Uate Reoeived:
Ao�ed By:
F:\cdev�FORMS\Permita�Building�mechanical�ermit_l 1-23-2005.DOC
�'�, /
C.�
3
11/23/2005
OCT-02-2006 18�29 RADER ENGINEERING 970 845 7522 P.01�02
,� R1�DER�
ENGINEERING • COMFORT SYSYEMSMI
PO e�c 8610 • AVON, CO 816P0 • ieleplwne 970�15-7910
Fa� 570�845�7522 • E� dredor�roderer�ga�eering.oan
�
_ �
To: Keith Fomey From: Drew Rader
Company: Sto=m Kit�g Mechanical Date: 1012/06
Fax: 970-625-8552 Pages: 2
Job Name: Maslak Job #: 60$0.00
Comme�b:
Keith,
Here is the heat loss and heat gain summary for your submittal. I sent you an email on the boiter
sizes but (2) Weil McLain Ultra 230's would bc sufficicnt.
Tiuinks,
Drew
Privacy Notice: This message is intaqded for the use of the individual or entity to which it is address� and may
eontein information that is privileged, confiderrtisl, or e�nept from disclosure under appticable fiedtrai law. If the
reader of the message is nat the intended recipient or the employee or agent responsible for dativering the mes�age
w tht intteded ceeipitnt, you are hereby noti5ed thst amr dissominetion, dim�'bution, or copying of this
co�un�micaaon is stfictiy prohibited if yau hare receivsd this wmmunication ia error, pfease notiiy the above
im�nodiately by talephone and renun the ariginal messs�e to the above address via U.S. Mail.
_�
--I
O
-�►
D
r
..
►
H�►r �s r►�t a� su�uav
JD8 qAME: MislNt RMida�oa - Vail
.�8 I�MlBEA: o0S0.OD
dATE: 4111ID8
GALC9 BY: JWC
�� RADER� :}
ENGINEENIH6 • COMFORT SYS?EMSM
USER SMALI 1NPUT YEiLO W CELL8 di1tLE0 WA76R DT : 10 .•
SRE EtE ATlON = •� sl � CMILLED WATHi'K P.G. 50
TRANSFER FACTOq � 0.7i CW GLYCAL FACT�OR i.22
COOLING NRFLOW tl7 � ' � : � �F �: � � '• ' ;� HEATlNO WATER DT � � • 20 . .
tMNDdW VALUES S.C. � � 0.3d O.�R:�' �' � � HEA71N0 VMA?ER !6 P_G. ` � ' 30 •. �
11GHTiNG LOJID F. NW G t FACTOR 1.oe
O
n
-a
1
m
N
1
m
m
m
�
�
N
�D
�
Da
m
�
m
z
�
�
m
�
�
c�
m
A
�
�
N
R)
N
�L1
m
N
\
@
N
indoor Models
Water
Gas Conn.z
IBR Net Connection� Size Shipping
tndoor Input' Output' Rating' Size - inches NPT inches Dimensionsz 5- inches (mm) Weight'
Size MBTU/h kW MBTU/h kW MBTU/h kW Naturel° LP° NPT A B C V Ibs. kgs
175 175 51 144 42 125 37 Yz 3/a '/z l Yz 18 457 27 686 23Yz 597 6 752 255 176
250 250 73 205 60 178 52 3/a '/z 1'/1 22'k 572 31Yz 800 24'/a 629 7 178 255 116
325 325 95 267 78 232 68 '/n '/z 1 Y� 26'/a 679 353/a 908 25'/e 657 8 203 325 148
400 399 7 V 327 96 285 83 '/a '/z 1 Yz 31'/a 806 40'/a 1035 26'/e 683 9 229 360 163
500 500 147 410 120 357 704 1 3/a-1 2 333/a 857 45'/a 1749 233/a 603 10 254 612 278
600 600 176 492 144 428 725 1 3/a-1 2 383/a 984 50'/a 1276 223/a 578 12 305 702 319
715 715 210 586 172 510 149 1 '/c-1 2 44Ya %%24 SS3I4 �4%B ZZ3I4 578 12 305 750 340
850 850 249 697 204 606 778 1-1'/a 3/a-1'/a 2 50'/a 1289 62�/a 1581 21'/a 552 14 356 830 377
1010 1010 Z96 828 243 720 211 1'/c 1-1'/a 2Yz 58 1473 69'/: 1765 203/a 527 16 406 945 429
1200 1200 352 984 288 856 251 1'/a 1-1'/a 2Yz 66'/a 1683 77'/a 1975 20'/a 527 16 406 995 451
1430 1430 419 1173 344 1020 299 1'/a 7'/a 2'/� 76 1930 87'h 2223 193/a 502 18 457 1080 490
1670 1670 489 1369 407 1191 349 1'/4 1'/4 2'/z 85'/z 2171 97 2464 19'/a 502 18 457 1175 533
1825 1825 535 1497 438 1301 381 1'/a 7'/a 2'/z 92Ys 2343 1033/s 2635 19'/a 502 18 457 1270 576
2000 2000 586 1640 481 1426 478 1'/z 1'/a-1'/z 4 SSYz 1403 73 1854 24Yz 622 22 559 1815 823
2450 2450 778 2009 589 1747 512 1Yz-2 1Yz 4 65'/z 7664 83 2108 24Yz 622 24 610 1950 885
3050 3050 894 2501 733 2175 637 2 1Yz 4 78 1981 95'/z 2426 24'/z 622 26 660 2100 953
3500 3500 f026 2870 841 2496 731 2 tYz 4 88 2235 105'h 2680 24'h 622 28 711 2237 1016
4050 4050 1186 3321 973 2888 846 2-2'/z 2 4 100'/: 1553 118 2997 24Yz 622 30 762 2555 1160
4500 4500 1318 3690 1081 3209 940 2'h 2 4 710'/: 2807 128 3251 24Y: 622 32 813 2750 1249
5000 5000 1465 4100 1201 3565 1045 2Y, 2 4 123 3124 140'/z 3569 24'/z 622 34 834 3050 1385
Outdoor Models
Water
Gas Conn.z
IBR Net Connectionz Size Shipping
Outdoor Input' Output' Rating' Size - inches NPT inches Dimensions2 - inches (mm) Weight'
Size MBTU/h kW MBTU/h kW MBTU/h kW Natural° LP' NPT A B C V Ibs. kgs
175 175 51 144 42 125 37 Yz 3/a Yz l Yz 18 457 27 686 14'/�s 357 6 752 255 116
250 250 73 205 60 178 52 '/n '/z lYz 22'h 572 31'/a 794 185/e 473 7 178 285 129
325 325 95 267 78 232 68 3/0 '1a l Yz 263/a fi79 353/� - 908 193/�B 487 8 203 325 148
400 399 1ll 327 96 285 83 '/a Yz 1'/a B�3I4 HOG 4O3I9 �O3S ZZSIB 575 9 229 360 763
500
600
715
850
1010
1200
1430
1670
500 147
600 ll6
715 210
850 249
' 1010 296
1200 352
1430 419
1670 489
410 120
492 744
586 172
697 204
828 243
984 288
1173 344
1369 401
357 704
428 125
510 149
606 178
720 211
856 251
1020 299
1191 349
1
�
1
�
1'/a
1'/a
1 Ya
1'/a
3�4
3�q
3�4
3/4
1
1
1'/a
1'/a
2
Z
Z
Z
2'/z
2'/z
2'1z
2'/z
33%a 857
38'/a 984
44Ya 7124
SO3�4 �28>
58 1473
66'/a 1683
76 1930
85'/z 2172
45'/a 7749
50'/a 1276 —
55'/a 1416 —
62'/4 1581 —
69'h 1765 —
77'/a 1975 —
87'k 2223 —
97 2464 —
751 341
821 373
906 411
1000 454
945 429
1185 538
1330 604
1490 676
Indoor/Outdoor
� �
FroM � _ � g
�
11 (279) �
-� � �
Inlet Outlet
Top
•* Cast Iron 5'14, Bronze 2'/<
"* Vent damper required only for U.S.
indoor installations of sizes 175-250
TPump
12Y. '
(311)�
� � �
I Gas
I� Conn.
� � �-�- �
� , ;,� B
�t
� �
10'/.
(260)
Top
'. •#•
c
V (Dia.) ' 13Y<
(337)
���
1:t...; �..;P
FfOflt — l
4O9I16 � � QJ��
3O3I16 �%6%� � I
�
� (673)
Side
��3D
29,
r� (756) C�
' o�c i� ':
58 i� 0 ' Rear
(1473)
h7'/.-h
(197) 29
-� � )
� 28'/.
(432) �-- (718) -•-�
Side
Indoor
Sizes 3000-5000
Outlet When Single Pass
Pump
(PH Models)
i •_
� �
Cast Iron 11'IB(2g9)
B
���
. � .__.
���
� .�'.
� � .�
� � �
��)
Gas
) Inlet
12
(305) �— A
Front
7-
si
(1549)
I� 41'/, --_�' 4If
(1060) (102)
Side
Outdoor
�� Heat Exchanger is Specfied 40 _�
11911 �- ,,..,�� i . I I ��
� ,.
w�th��D PRECISION
HYDRONIC
DATA tCChttOCO
gy�
CONDENSING HIGH EFFICIENCY
GAS BOILER
155 & 230 Max. MBH
with 20-100 % Modulation
!�
?lFLra 155 2l�Lra 230
Part No. Part No.
PACKAGED BOILER - Natural Gas (field convertible to Propane Gas)
With Taco 0011 383-500-000 383-500-010
OPTIONAL EQUIPMENT
Wall Mounting Kit 389-900-180
AM3 Alarm Control Kit 383-500-080
Indirect-Fired Water Heaters Matching ?lfLra PLUS 40, 60 and 80 Water Heaters Available
RATINGS 2l�Lra155 ll�Lr�230
CSA Input (Maximum)
CSA Input (Minimum)
DOE Heating Cap.
Net 1=6=R
DOE AFUE
Weil-McLain Low Temp
Seasonal Efficiency`
155 MBH 230 MBH
31 MBH 46 MBH
139 MBH 207 MBH
121 MBH 180 MBH
93.0% 92.8%
98.0% 98.0%
'Boiler return water temp = 90°F and boiler outlet water temp = 110°F
DATA 2l� 155 2l�ra 230
Vent Size / Material 3 in. PVC/ABS 3 or 4 in. PVC/ABS
Combustion Air Size 3 in. 3 or 4 in.
Water Volume 1.17 Gal 1.57 Gal.
Approx. Ship. Weight 193 Ibs. 204 Ibs.
DIMENSIONS ?,1��r155 21�ra230
Supply Tapping 1 in.
Return Tapping 1 in.
Gas Connection Size �/2 in.
Crate Dimensions 53-1/2" L x 27" W x 23-1/2" H
�....... 1941e '�, � 22'e" . �,� 83/. ►I I Sy�.
� z�,r . r �s��,s. ,� � z,,,. � i �3�
6�„ o
. � rs, � �
--, `- -, -� 1 � ,,
..,.._.
. . ' - s� � .,��5�..
— �+
v
_--- ai��' � Toa
----- 1Q Supply Connection
� I� i,��� �2 RetumConnection
----- � Q Low Voltage Wire Opening
'1"---��-� Q Elecirical Entrance Openings
-�-- .' ,� ���;F' QS Vent Connection
v � _ ____.,°.._ � Q6 Air Connection
__�_ _ . s.. � .
� r"mm. � Q7 GasConnection
Lerr 7' „" max. FnoNr
��v
� � � DOE ��
STANDARD EGIUIPMENT
Factory Tested
Limited 15 Year Heat Exchanger Warranty
%�Homeowner Protection Plan
with 5 years Parts & Labor
Cast Aluminum Block
30 PSI ASME Relief Valve
Drain Valve
Stainless Steel Burner
with woven steel fiber mesh
Direct Spark Ignition
Variable Speed Blower Assembly
Gas/Air Ratio Venturi with Air Silencer
Negative Pressure Regulation Gas Valve
50 VA Transformer
Comb. T&P Guage
Outlet Water Temp. Sensor
Return Water Temp. Sensor
Flue Gas Temp. Sensor
Outdoor Temp. Sensor
�fra Control Module
�With Digital Display
�Ignition Control ;
�Low Water Protection
•High Limit & Modulating Temp Control
�Outdoor Reset
�DHW Priority
.Two Pump Controls
•(Heating & DHW)
Taco 0011 Boiler Circulator
Shipped separately
with 1 " & 1-1/4" flanges
Complete Jacket Assembly with
Fully Removable Front Jacket Cover
Adjustable Boiler Legs
VenUAirTermination Plate
Vent Termination Bird Screen
Line & Low Voltage
Pre-wired Terminal Strips
On/Off Power Switch
Line Vottage Service Receptacle
Condensate Trap
with Drain Tee Assembly
Propane Conversion Orifice
Automaticalfy adapts for high altitude
(derate 4% per 1000 ft. altitude)
In the interest of continual improvemenis in product and performance, Weil-McLain reserves the right to change specifications without notice.
�
�������t ���� Locate our Sales Offices by visiting our website: weii-McLain
www.weil-mclain.cam 500 Blaine Street
Michigan City, IN 46360-2388
c0 2002 Weil-McLain Weil-McLain Ultra Boiler Patents Pending Form No. C-995R1(1202)
�� °� ���.���i
`�-�i\c�"'s _.,... _. ._ i�lr,r�` 24'-6��
�
�
�
I
�
�
�
�
�
,...�
��
W �
Z
m I
UI
�'
�
�
v�
v�
�
�n
�
- GP - � _ �� I
—B I =
DOWN 6" EL 8248'-II" �7 m��
�/�SENI�NT � T.O. FF �
6' -4" --� �-- �
PLOOR DRAIN I
�
�
m I HOUR RATED WALL '
101 -------
PEGBOARD
WORK SPAGE
VGT W GP GP Q'
(MEGHaNIGALLY VENTILATED)
���-�° o„
❑
�
� � I � �
Qol I I
�or��1 �
�� I I i �
�
Q° I I I POWDER ROOM
�� I I I 5T w GP 6P 8' -6'
�,
� EL b24Q' -5"
T.O. GONG.
GARAGE ABO�/E
I HOUR RP.TED WALL --�
�
_ -, -, �7�
�
,_-.�
m
,
4' -O"
123
3'-'I�s" 3��,�
I"
;T � 24
. � , ,, f_'-1 f �
� �1 �� � � � � O r � �v u
i
`�� � �o . � �
� . v� � �
� � �
�
�� �� � O "L�� ��I � _
� � � � � z p
� � � � � �
��� I-��� � � � - � � O - �t
� �� � '- -' Q �
r �
��i5-�9 ��D-,}, �\ � -- -
�.��� ��, �
�.�.��.�� �
�� ���
' �ry � m O panog 6ad - san�ayS � p s
, � � � � O �--- � - san�a'�S � p-
�ry � V � 0 V
� �N
� � u��s -
�
� � �j � . uZ-i�-�"c
� � N ry �
_ �o O �C
O0 F- tn �
� � � �
� ���
� ovo
Q
, � �-
; � �Nz
, �
' � d� � �Q�
-� � o °� _� Q o �oQ
- , �o ry �Uv
/ �
� N�
�
�
.
� r--------- ---
, --� �--- -----� �_
,� -----
�" �� I I I I I
t'' � I i
I � � I I �
\ry ' �? I I o m � � I
;, ; � _� I I �� � � I
9 I�� i � �o I I �
� _ ��, � I I
,
,,,
„
�ry , ,
�
� � N ry l
O
�z-�I
��D-, b ��9-� I ��
��O-,}, ��9-� I
��O- � b
� �
-� �� b/ 8- � �� n
��N Q Ul
o�o Q �
�m°Q oZ
�O� �- �
�
w�w o �
��� �Z �
� ;:. �, �� �
TOWN OF VAIL
75 S. FRONTAGE ROAD
VAIL, CO 81657
970-479-2138
Job Address:
Location.....:
Parcel No...:
Legal Description:
Project No :
DEPARTMENT OF COMMUNITY DEVELOPMENT
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
MECHANICAL PERMIT
292 E MEADOW DR VAIL
MOUNTAIN HAUS #681
210108228068
. �-�-� 1- 6 Z�
Permit #
Status . . . .
Applied . . :
Issued . . .
Expires . .:
M07-0237
-"�o "t _ � � 5�
IS SUED
09/26/2007
09/27/2007
03/25/2008
OWNER MIRAFZALI, HAMID & SHADAN 09/26/2007
1125 COUNTRY CLUB RD
ANN ARBOUR
MI 48105
APPLICANT ALLEN'S HEATING, A/C & SHEET09/26/2007 Phone: 303-421-4020
5545 W. 56TH AVE., UNIT B
ARVADA
CO 80002
License: 151-M
CONTRACTOR ALLEN'S HEATING, A/C & SHEET09/26/2007 Phone: 303-421-4020
5545 W. 56TH AVE., UNIT B
ARVADA
CO 80002
License: 151-M
Desciption: MOtINTAIN HAUS #681-MODIFY EXISTING DUCT OUTLETS (2),
ROUGH-IN NEW DRYER VENT FOR ELECTRIC DRYER
Valuation: $1,500.00
Fireplace Information: Restricted: # of Gas Appliances: 0 # of Gas Logs: 0 # of Wood Pellet: 0
�***�+�*rt�t*►**+►�*+�»*+*++***►*+*�**�rt***+***+++*�►*►*******+**** FEE S UMMARY r**�****ss+►**s*+rr*****�**s***�********r**�*s+*�*rrr�+r****
Mechanical---> $40.00 Restuarant Plan Review--> $0.0o Total Calculated Fees---> $54.00
Plan Check---> $10 . 00 TOTAL FEES--------------> $51 . 00 Additional Fees-----------> $0. 00
Investigation-> $ o. o o Total Permit Fee----------> $ 54 . o 0
Will Call-----> $4 . oo Payments-------------------> $54 . o0
BALANCE DUE---------> $ o. o 0
:*:r:+*�*��+*r*+r*s*+**�+:**�+r*rr.*sr■**.***�***s+*r:*.**��*Mr�::*■r*+��*«*►*s*■*:*«�*�a***+**w*rs:■+«**+**►***r+«**+**�*.*+�:�*+*sr*�****++t**r�
Item: 05100 BUILDING DEPARTMENT
09/26/2007 cgunion Action: AP
Item: 05600 FIRE DEPARTMENT
CONDITION OF APPROVAL
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.
Cond: 22
(BLDG.): COMBUSTION AIR IS REQUIRED PER CHAPTER 7 OF THE 2003 IMC AND SECTION
304 OF THE 2003 IFGC AS MODIFIED BY TOWN OF VAIL.
Cond: 23
(BLDG.): BOIILER INSTALLATION MUST CONFORM TO MANUFACTURER'S INSTRUCTIONS AND
CHAPTER 10 OF THE 2003 IMC.
Cond: 25
(BLDG.): GAS APPLIANCES SHALL BE VENTED ACCORDING TO CHAPTER 5 OF THE 2003 IFGC.
Cond: 29
(BLDG.): ACCESS TO MECHANICAL EQUIPMENT MUST COMPLY WITH CHAPTER 3 OF THE 2003
IMC AND CHAPTER 3 OF THE 2003 IFGC..
Cond: 31
(BLDG.): BOILERS SHALL BE MOUNTED ON FLOORS OF NONCOMBUSTIBLE CONST. UNLESS
LISTED FOR MOUNTING ON COMBUSTIBLE FLOORING.
Cond: 32
(BLDG.): PERMIT,PLANS AND CODE ANALYSIS MUST BE POSTED IN MECHANICAL ROOM PRIOR
TO AN INSPECTION REQUEST.
Cond: 30
(BLDG.): BOILER ROOMS SHALL BE EQUIPPPED WITH A FLOOR DRAIN OR OTHER APPROVED
MEANS FOR DISPOSING OF LIQUID WASTE PER SECTION 1004.6.
...****�****.*.+...****.*...*:...*�,�.*r*.*..:*�.+s.**�**++**.***.*■*.*s*..�.*.�:**.*.*.s*�.:*...,*«.�s+s*.*...*.****.«*«*.**.*.+s+.**.**.+.*+.*.
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan,
and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all
Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review
approved, International Building and Residential Codes and other ordinances of the Town applicable thereta
REQUESTS FOR [NSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPH�NE AT 479-21499R`1T O�JR OFFICE FROM 8:00 AM - 4 PM.
SIGNATURE OF OWNER O�CONTRA-CTOR FOR HIMSELF AND OWNER
+**************+*************+***********+***************+***********************+**********
TOWN OF VAIL, COLORADO Statement
********************************************************************************************
Statement Number: R070002006 Amount: $54.00 09/27/200710:43 AM
Payment Method: Check Init: LT
Notation: Allen's Heating /
ck #6009
-----------------------------------------------------------------------------
Permit No: M07-0237 Type: MECHANICAL PERMIT
Parcel No: 2101-082-2806-8
Site Address: 292 E MEADOW DR VAIL
Location: MOUNTAIN HAUS #681
Total Fees: $54.00
This Payment: $54.00 Total ALL Pmts: $54.00
Balance: $0.00
***************�********************************************�*******************************
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------------- ------------------------------ ------------
MP 00100003111100 MECHANICAL PERMIT FEES 40.00
PF 00100003112300 PLAN CHECK FEES 10.00
WC 00100003112800 WILL CALL INSPECTION FEE 4.00
-----------------------------------------------------------------------------
APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UN D
TOV Projec� � d +7 — � ' �,
Buiiding Perm�t #: �7 `���`S�'�'
, �� � a Mechanical Permit #:
�ry����� � . 970-479-2149 (Inspections)
!ta
75 S. Frontage Rd.
Vail, Colorado 81657
��
TOWN OF VAIL MECHANICAL PERMIT APPLICATION
Permit will not be accepted without the following:
Provide Mechanical Room Layout drawn to scale to include:
❑ Mechanical Room Dimensions
❑ Combustion Air Duct Size and Location
❑ Flue, Vent and Gas Line Size and Location
❑ Heat Loss Calcs.
❑ Equipment Cut/Spec Sheets
CONTRACTOR INFORMATION
COMPLETE VALUATION FOR MECHANICAL PERMIT Labor & Materials
MECHANICAL: $ /,� �i�, � %'
'ontact Eag/e County Assessois O�ce at 970-328-,
Parcel # ,�.�v 3 - / �1-- 1J90 D =
]ob Name �� �� ti�/� ,��> ���i�� ,� �"� � �
Legal Description Lot: Block:
Owners Name: � 1 j � Address:
��/�� 7 � � o �
Engineer: Address:
Filing:
�0 or visit i
)ob Address:
.� �� � .
„j,�„ -,.
�J:..✓—/h-N �%r3
P_
Subdivision:
�' Phone: �
� Phone:
for Pance/ #
�2 �l -� ���
Detailed description of work: Y�,��i,�'�t � �y
/�'� � ��l'� �/ �� 1 J � eYa,� :/K:�..� ����f ��._t'i ( �) ��i�.�l'� �/?-7%� ``��'' ` I
0
Work Class: New ( ) Addition ( ) Alteration (�f Repair ( ) Other ( )
Boiler Location: Interior () Exterior () Other () Does an EHU exist at this location: Yes ()
Type of Bldg: Single-family ( ) Duplex ( ) Multi-family (�j Commercial ( ) Restaurant ( ) Other ( )
No. of Eyisting Dyvelljpg Units ir�,�.yt.iilding;. _/1 No. of Accommodation Units in this building:
No/Type of Fireplaces Proposed: Gas Appliances () Gas Logs ()�
Is this a conversion from a wood burning fireplace to an EPA Phase II
Pellet ( ) Wood Bu
Pellet Wood Bu
? Yes I ���_�
************************FOR OFFICE USE ONLY******
F:\cdev\FORMS\PERMITS\Building\mechanical�ermit 11-23-2005.DOC
**
�'��,����
No ( )
�� u v ��
*:�yl��** **
� �F VAIL
11/23/2005
TOWN OF VAIL
75 S. FRONTAGE ROAD
VAIL, CO 81657
970-479-2138
DEPARTMENT OF COMMUNITY DEVELOPMENT
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
Job Address:
Location.....:
Parcel No...:
Legal Description:
Project No :
MECHANICAL PERMIT
1979 SUNBURST DR VAIL
1979 SUNBURST DR
210109103002
�'i�Sc�S - o �( � �
OWNER MASLAK, SAMUEL H.
961 HIGH RD
WOODSIDE
CA 94062
APPLICANT SKYLINE MECHANICAL
P.O. BOX 1258
GYPSUM
CO 81637
License: 121-M
CONTRACTOR SKYLINE MECHANICAL
P.O. BOX 1258
GYPSUM
CO 81637
License: 121-M
Desciption: MECHANICAL NEW SFR
Valuation: $38,000.00
& LULETA 03/24/2008
Permit #
Status . . . .
Applied . . :
Issued . . :
Expires . .:
M08-0058
��b� o\Ce�
ISSUED
03/24/2008
04/O1/2008
09/28/2008
03/24/2008 Phone: 970-524-6809
03/24/2008 Phone: 970-524-6809
Fireplace Information: Restricted: # of Gas Appliances: 0 # of Gas Logs: 0 # of Wood Pellet: 0
�a+*���****��*�«r*s***►r��*+**��++�+***�s*�**r*��***rr►*ssr���ss�+r+ FEE SU MMARY r�***+s+*****rsr�**s*s****r********►*+rr*+++****s+�►*�***r**
Mechanical---> $ � 6 0. 0 0 Res[uarant Plan Review--> $ 0. o o Total Calculated Fees---> $ 954 . 0 0
Plan Check---> $190.00 TOTAL FEES--------------> $954 .00 Additional Fees-----------> $o. 00
Investigation-> $ 0. o o Total Permit Fee----------> $ 95 a. o 0
W iI I Call-----> $ 4. o o Payments-------------------> $ 9 5 n. o 0
BALANCE DUE---------> $0.00
*r**s�*:***a+*ra*r****r*****+***rr*x+x+*s**�*sr****►*****��+**+**�+r*�*v********+�+r*******t*+*a�*r*rs*�**r***x*:r��+�t�s***r***►r*r*****t**s*****
Item: 05100 BUILDING DEPARTMENT
03/26/2008 cgunion Action: AP
Item: 05600 FIRE DEPARTMENT
CONDITION OF APPROVAL
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.
Cond: 22
(BLDG.): COMBUSTION AIR IS REQUIRED PER CHAPTER 7 OF THE 2003 IMC AND SECTION
304 OF THE 2003 IFGC AS MODIFIED BY TOWN OF VAIL.
Cond: 23
(BLDG.): BOIILER INSTALLATION MUST CONFORM TO MANUFACTURER'S INSTRUCTIONS AND
CHAPTER 10 OF THE 2003 IMC.
Cond: 25
(BLDG.): GAS APPLIANCES SHALL BE VENTED ACCORDING TO CHAPTER 5 OF THE 2003 IFGC.
Cond: 29
(BLDG.): ACCESS TO MECHANICAL EQUIPMENT MUST COMPLY WITH CHAPTER 3 OF THE 2003
IMC AND CHAPTER 3 OF THE 2003 IFGC..
Cond: 31
(BLDG.): BOILERS SHALL BE MOUNTED ON FLOORS OF NONCOMBUSTIBLE CONST. UNLESS
LISTED FOR MOUNTING ON COMBUSTIBLE FLOORING.
Cond: 32
(BLDG.): PERMIT,PLANS AND CODE ANALYSIS MUST BE POSTED IN MECHANICAL ROOM PRIOR
TO AN INSPECTION REQUEST.
Cond: 30
(BLDG.): BOILER ROOMS SHALL BE EQUIPPPED WITH A FLOOR DRAIN OR OTHER APPROVED
MEANS FOR DISPOSING OF LIQUID WASTE PER SECTION 1004.6.
*..***.....***�+.*.*��.*..**+*.�...++++*+**�*+.*.*►*�:.*.«+��.«*.�.*+.*.*.*:*.�****.*.*.*+...*.+*:*.«*s*.*.*.*s...+*.*.*.****�.:.***...+***..*.+*
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan,
and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all
Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review
approved, International Building and Residential Codes and other ordinances of the Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2� OR AT O�t OFFICE FROM 8:00 AM - 4 PM.
ATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNER
*************************************************************************+****++****++***+*+
TOWN OF VAIL, COLORADO Statement
****************************+*******************************+*�***********************�*****
Statement Number: R080000372 Amount: $954.00 04/O1/200801:07 PM
Payment Method: Check Init: LC
Notation: #12522/SKYLINE
MECHANICAL, INC.
-----------------------------------------------------------------------------
Permit No: M08-0058 Type: MECHANICAL PERMIT
Parcel No: 2101-091-0300-2
Site Address: 1979 SUNBURST DR VAIL
Location: 1979 SUNBURST DR
Total Fees: $954.00
This Payment: $954.00 Total ALL Pmts: $954.00
Balance: $0.00
*******�*********+*****************+**************************+********************�**�*****
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------------- ------------------------------ ------------
MP 00100003111100 MECHANICAL PERMIT FEES 760.00
PF 00100003112300 PLAN CHECK FEES 190.00
WC 00100003112800 WILL CALL INSPECTION FEE 4.00
-----------------------------------------------------------------------------
Mar 24 2�08 9:10RM Skyline MechanicaY INC. 970-524-6810
APPLICATION WILL NOT BE ACCEP�D IF INCOMPI.E7� PR�� #: E +
Building Permlt #:
� Mechanical Perm�t #:
�i� t�►i �� � 1�( SG Q- 97Q-479-Z'149 ( Ins �
p.l
:° ���i
�-�
7 q - o�y-�
75 5. Frontage Rd. Perrnit will r�at be aooerybed without'die fb�bwing:
Vail, Cobrado 81657
ProAride Med�ania�l Room t�/out dnwn b� scale m indude=
a Med�N+ral Ra�a�tn Dimenmio�s 1
n Combustla� Alr Duct :Siae and Locstlon �-�- ��' PC.v M!7
o Fk�, Vent and Gs� Lii�e Sf�a and Lodrtlat — Q� �J �-v f"� ��'i�
o��s c�. �— Qy �.� PL,,.�.� b �.�'
� �ipnMnt cutlsPac 5�b �- �'N� A-, t,a-O �ip S'f� 3-� `h �r,� �
S1CYc. r
MECHANICAI: $
r��
U �
�r
Reg. No.:
:t Persan ana Pnone �•s:
� ���: S�'%. L1 r � � �
#
Paroel #
]ob Name: �S ���� K ]obAddress: �aJ% � =�j'v�v�r��
Lsgal De�aipHon Lcrt: Block: Rlin�: Subdivis�lon:
tir r��► r o.�+� � t�.0 � i r� v�v i��j � u.+�, ,� �7r� c q�'�rt,�'
Work Class: New Addition () Albera�ion () Repair () Other ()
Boiier Location: Interior Exterior () Other () Does an EHU exist at this location: Yes () No ()
lype aP Bidg: Single-family ( Duple�c ( ) Mufti-family ( ? Cammerdal ( ) Restaurant ( ) Other ( )
Np, of Exi�Gng Dwelling Urwts in this building: j No. of A000mmodation Units in this building:
No%Tjrpe of Fireplaaes Rroposed: Gas AppNanoes () Gas Logs () Waod/Pellet () Wood Buming (NOT ALLOWED)
Is tt�is a conv�ersion from a wood burning fireptaoe to an EPA Phase II de+rioe? Yes (
****��******************�pR OFFICE USE ONI.Y******�*
���` �'4;`,`',cA,, . F i:s .y}>.<i2+�s.'+,�',...
` 5� 4,r.. d^�. ln�',
FS ii.:�:.:'� '::�:� 1� fs�ei'Y',`i,ref�`�'a'5`,"1S�i:�Fi
,,��,;t:._ C {�i ``:1/'4'�I�:l. Tn.• ,n#. � A:,'
, .�. ..
.. . �rs�s';'{;'..f`t::l; ;: � �`�'�.;; .��;?:;}
....� ..:� .:
.: . � ;. ..:�::..'
:.:: �
.... . ; .� � , , ,:;:'
:!: ,: r
....,. �' . ..;,..�: �:. .�:.;;:. _
:;.
� ..,.. ..
�.'. � .: .
...
. ....s:::�' • .. •.i �•;��
•!
.. .. , � �..! .. �t'�.:'
;:
..,,:: ^.y :.
.. . ,. .. ...... ... �.: ,. _�� ....:�!,,x;:�',.7f:e
: ..��.:..�:•���i
F:11ode+�lFd�151�ns�uNd�1m��I�emJ�11-23-Z005.DOC ,n,� �� �W �
`� �� �
***********�
�y"�� 2 �� ~{����
Pn .. J �
TOWN OF V,
*
Mar 24 2008 9:lORM Skyline Mechanical INC. 970-524-6810 p•�
r
a
��� �� � .
Towrn af Vait Mechanical Codes and Desian Criberia
♦ You must obtain Design Review Board (DRB) approval if any of the mecha�ical work wlll involve
ANY exterior work. This includes and is not Ilmited bo romoval and roplacement of driveway snow
melt �sl�ems. Pi�e contact tl�e Dt�velpptn�nt Rtvi�ew C�AOndinat�r at 479-2126 for �dditlonal
infivrmaittton.
♦ The Town of Vail has adopted the Z003 Infiernational Mechanical Code and the 2003 =nternational
Fuel Qas Code.
♦ All new cor�sd�ucdon within the Town of Vail is co�sider+ed to be of unusually tight construction,
thus all cambustlon air is required to be drawn from autside the struc�re for mechanical
equipment.
� � : ► �l • i� ��, ,-_: � ►� i _ i -_-
In Sep�bsmber of 199i, tl� Vap Town Cow�cil adopbed en ordin�nae wtdch rastricts be aonstivctlon and
u�e of open he�rlfi f�+epM�oe�e witl�in munidpsl bou�ls�es. Sinoe that tlme tl�e onlinaaoe has
und� nunierous changes and �risions, s�irinp forcon�rni�q.11°e't�iven� in addre�a:ir�g
the air quality is�ue. Therefbre the folbwing cYitiaria has been adopted:
♦ Canstructlon of open hearth wood burning fireplaces is no longe� permit�ed witl�in Town of Yail
municipal boundaries.
♦ Dwellina �ni�s — Each new dweiling unit may cantain:
One (i) EPA Phase II ae�titi�d solid fuel6urning devioeand no more than two (2) qas appllanaes
�B rent)
OR
fiNO (2) gas log �neptac�es and no more than two tZ) �aa aRPlianoe fireplaoe� (B bent).
♦ R�tricted Dwellina Units — Each new restricted dwelling unit may can�in:
One (i) gas log flr+eptace and not rnor+e ifian one (i) gas applian�ce firep�e.
♦ Accommodation Units — Each new accornmodatfon unit may a�ntain:
One (i) gas log Arepiace or one (i) gas apptlanae Areplace.
♦ If twa or more separate dwelling units or accommoda�tion units are oornbined to fo�n one larger
unit, the aornbined �nit may retain a�o woodburning fireplaae (if one already exis�) and no nare
t�an Z gaa applianoe �iropiac+�, or may aonvert up t� two exi�stin� flreplaces bo gas.
♦ 3f during the aourse af a re�nodel an existing woodburning tireplace is alfiered or moved, the unit
rnust then oomply with all provisions of the ordi�noe. Thart is, the flreplaae must be cor�vertad to
n�u� ges of replaced by en �PA Plw�se II aertt#ied unit.
�:\�����n9���l..D�k_i1�23-2005.D�C 11/23/2�5
NOTE: TH/S PERMIT MUST BE POSTED ON JOBSITE AT
:
TDWNOFYAlI, '
Town of Vail, Community Development, 75 South Frontage Road, Vaii, Colorado 81657
p. 970-479-2139 f.970.4792452 inspections. 970.479.2149
MECHANICAL PERMIT
ASFR
Job Address: 1979 SUNBURST DR VAIL
Location.....: 1979 SUNBURST DR
Parcel No...: 210109103002
OWNER MASLAK, SAMUEL H. & LULETA 04/18/2008
961 HIGH RD
WOODSIDE
CA 94062
APPLICANT GWATHMEY, PRATT, SCHULTZ 04/18/2008
CONTRACTOR RESORT MOUNTAIN ENTERPRISES 04/18/2008
P.O. BOX 2032
GLENWOOD SPRINGS
CO 81602
License: 268-M
Phone: 970-384-2748
Desciption: INSTALL 2 GAS FIREPLACE APPLIANCES, 1 FIREPLACE WITH GAS LOG
Valuation: $10,000.00
ALL TIMES
Permit #: M08-0075 ��' �� �
Project #: '���b��-v �tl�`l
Status . . . : ISSUED
Applied . . : 04/18/2008
Issued . . . 04/2412008
Expires . .: 10/21/2008
,, ...............*.....�............��..........�..,....�..x».�.....�.............FEE SUMMARY.....»,...«..,..........................,........«..,,�«,,...............�......,.........
Mechanical Permit Fee---> $200.00 Will Call------------> $4.00 Total Calculated Fees---> $254.00
Plan Check-------------------> $50.00 Use Tax Fee------> $0.00 Additional Fees-----------> $0.00
Investigation-----------------> $0.00 TOTAL PERMIT FEE---> $254.00
Total Calculated Fees--> $254.00 Payments-----------------> $254.00
BALANCE DUE---------> $0.00
.....................«................».....�.............,....�........,,...�..,.....«.....,...............,,..�.�...........�...............,.����::.......,......�.......��,................
APPROVALS
Item: 05100 BUILDING DEPARTMENT
04/24/2008 JRM Action: AP
Item: 05600 FIRE DEPARTMENT
.....,. .....................,.........,,......................,�.......,�„:............�.........�,,.,�..............,�,�......,.>..�...»::�,..,.....,.....���......».............,.......,.,,...,.,.
CONDITION OF APPROVAL
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.
Cond: 22
(BLDG.): COMBUSTION AIR IS REQUIRED PER CHAPTER 7 OF THE 2003 IMC AND SECTION
304 OF THE 2003 IFGC AS MODIFIED BY TOWN OF VAIL.
Cond: 23
(BLDG.): BOIILER INSTALLATION MUST CONFORM TO MANUFACTURER'S INSTRUCTIONS AND
CHAPTER 10 OF THE 2003 IMC.
Cond: 25
(BLDG.): GAS APPLIANCES SHALL BE VENTED ACCORDING TO CHAPTER 5 OF THE 2003 IFGC.
Cond: 29
(BLDG.): ACCESS TO MECHANICAL EQUIPMENT MUST COMPLY WITH CHAPTER 3 OF THE 2003
IMC AND CHAPTER 3 OF THE 2003 IFGC..
Cond: 31
(BLDG.): BOILERS SHALL BE MOUNTED ON FLOORS OF NONCOMBUSTIBLE CONST. UNLESS
LISTED FOR MOUNTING ON COMBUSTIBLE FLOORING.
Cond: 32
(BLDG.): PERMIT,PLANS AND CODE ANALYSIS MUST BE POSTED IN MECHANICAL ROOM PRIOR
TO AN INSPECTION REQUEST.
Cond: 30
(BLDG.): BOILER ROOMS SHALL BE EQUIPPPED WITH A FLOOR DRAIN OR OTHER APPROVED
MEANS FOR DISPOSING OF LIQUID WASTE PER SECTION 1004.6.
�......,,,..._....».....,......»......,. ....................»........,........>,......:...........,.............,,�,�,,......,,.....��.,.,,,.......,,,��,...,.........,.,.�.....«.,,.........,,».....
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information
m echcanical_perm it_041908
as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure
according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town
applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:0(
AM - 4 PM. r---�_ n n_
Signature of Owner or Contractor —�` Date
��'e � �° � e`� �'�
Print Name
m echca n ical_perm it_041908
********************************************************************************************
TOWN OF VAIL, COLORADO Statement
********+***********+*+******************+*+***************************+*****+*+************
Statement Number: R080000528 Amount: $254.00 04/24/200812:54 PM
Payment Method: Check Init: LC
Notation: #5297/RESORT
MTN ENTERPRISES
-----------------------------------------------------------------------------
Permit No: M08-0075 Type: MECHANICAL PERMIT
Parcel No: 2101-091-0300-2
Site Address: 1979 SUNBURST DR VAIL
Location: 1979 SUNBURST DR
Total Fees: $254.00
This Payment: $254.00 Total ALL Pmts: $254.00
Balance: $0.00
****************************************�***************************************************
ACCOUNT ITEM LIST: �
Account Code Description Current Pmts
-------------------- ------------------------------ ------------
MP 00100003111100 MECHANICAL PERMIT FEES 200.00
PF 00100003112300 PLAN CHECK FEES 50.00
WC 00100003112800 WILL CALL INSPECTION FEE 4.00
APPI.ICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UNSIGNED ��\ l�j --� 4��-
� TOV Project #: �--.,
Buiiding ��mit #:,..�R o � i� (
: : �+lechanicai Permit #: ,�Q.�_�Q�-.S�
��� �_ 970-479-2149 {In�ons)
75 S. Frontage Rd. .
Vail, Colorado 81657
/ �, X
, �
,;
ntractor:
���v�� �
MECHANICAL: $ � ��
Permit w�n not be aoaeabea w�a�out the
Provide Mechanicai Room l.ayout drawn � scal
o Meidta�Cat R�oom Dintensions �
❑ Combustion Air Duct �e and Location
a Flue, Yeart and Ges Line Size and Location
❑ Heat Loss Caks.
o Equipment Cut/Spec 5heets �
�,
t�,
Ir�
_.------ � _ � �
f�' r ;,� ,� �.
� 1 - � ,
il ��
,, ;� I
� �`� �
�r�a��� �� �q�,��:n..___-._�=
Reg. No.: Contact Person and
. � a� .. c�.�-r'r-. Fa�c#: y�c� �
0
�
0
;��3 �
*********x�**************FOR OFFICE USE ONLY*****************************
� ; ��- -�, r T,.�.�;;
,
��.��,}. �;. � ? ��� - ���:;� �`
_ �-.�- " �� � �. � .
„
. . " 4k . r,� c.� � .-. t":
} . .. .�.•u . i r
X �, r ,. .K� � .. �
� � ... . . n � ., . . :-
'�r ' ' r. . {,. � �,.� y'*
� � ..=-E .,.. .
.,.,,,� .,,,,, 11/23R005
SBV500A
INTERIOR DIMENSIONS
Front opening width - 42"
Front opening height- 21-1 /2"
Rear Wall Width - 26-1/2"
Hearth Depth - 17"
TECHNICAL INFORMATION
Max. Btu Input - 31,500 BTU/HR
Ignition System - Standing Pilot or Electronic
Control - Millivolt
Gas Type - Natural or LP
Flue Type - B Vent
Vent Size - 6" B Vent
Clearance on Flue - Specified by B Vent
Manufacturer
Clearance on Fireplace - 1 /2"
CSA Design Certified
Optional Accessories �
Bi-fold Glass Doors - GD42PBA (polished brass),
GD42BA (black), GD42SSA (stainless)
Single Pane Glass Doors - GDS42PBA (polished
brass), GDS42BA (black), GDS42SSA (stainless)
Outside Combustion Air Kit - OAC4
Remote Controls and Wall Thermostats
PRODUCT SPECIFICATIONS
SBV500A
B Vf NT
Cenier Line
�--saisns^ --.;
s" �� -- -
TOP VIEW
-- ___ _____ _
. ._.. .._._ __ AI
7
71'��'
...__. F �ta!':il���i
1 [7iFArCiSIt7N
21" �
13-7/16" �
— � _ _ "_
Nailing tabs accomodate
1/2" or 5!8" tinishing material.
FRONT VIEW
__.I i
�
40" i
I
. i
� FRJ� �I^JG
oi�;ter��;icr�
vz^ i
_ I
i
-u2°
1/2" or 5/8"
Nailing tabs
?=s!e°
}
`14-1 /4" �"
Electrical/Gas Access
SIDE VIEW
/" 52-1/4"
1 �
13-7/16"
_ �— — :_ �
as-�r�°
73-7/8"
CORNER INSTA TION
To avoid personal injury or property damage, the product described by this brochure must be installed, operated and maintained in strict
compliance with the instructions packaged with the product and all applicoble building or fire codes. Contact local building or fire officials
about restrictions and installation inspection requirements. All photographs and drawings on this brochure are for illustrative purposes only
and are not intended for, nor should they be used as a substitute for the instructions packaged with the unit. Appearance and specifications
of the product are subject to change without notice. b/05
TOWN OF VAIL
75 S. FRONTAGE ROAD
VAIL, CO 81657
970-479-2138
Job Address:
Location.....:
Parcel No...:
Legal Description:
Project No :
DEPARTMENT OF COMMUNITY DEVELOPMENT
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
PLUMBING PERMIT
1979 SUNBURST DR VAIL
1979 SUNBURST DR
210109103002
•�\� SZ-SZ� : � - — � �-� � i
OWNER MASLAK, SAMUEL H. & LULETA
961 HIGH RD
WOODSIDE
CA 94062
APPLICANT STORM KING MECHANICAL
2335 AIRPORT ROAD, BLD
RIFLE
CO 81650
License: 309-P
CONTR.ACTOR STORM KING MECHANICAL
2335 AIRPORT ROAD, BLD
RIFLE
CO 81650
License: 309-P
09/26/2006
09/26/2006
l, ST A
09/26/2006
1, ST A
Desciption: COMPLETE PLUMBING FOR NEW SFR
Valuation: $87,000.00
Permit #:
Status . . . .
�4pplied . . :
Issued . . .
Expires . ..
P06-0114
��o� _. v �� �
ISSUED
09/26/2006
10/10/2006
04/08/2007
Phone: (970)625-8552
Phone: (970)625-8552
Fireplace Information: Restricted: ?? ll of Gas Appliances: ?? k of Gas Logs: ?? # of Wood Pallet: ??
******�:************************************************************** FEE SUMMARY
***************+********************************************
Plumbing---> $1, 305.0o Restuarant Plan Review--> $0.00 Total Calculated Fees---> $1, 634.25
Plan Check---> $326.25 TOTAL FEES--------------> $1, 634.25 Additional Fees-----------> $o. 00
Investigarion-> $ o. 0 o Total Permit Fee----------> $1, 6 3 4. 2 5
Will Call-----> $3 . 00 Payments-------------------> $1, 634.25
BALANCE DUE---------> $0.00
*******�***************************************************�************************************�*******************************�****************
Item: 05100 BUILDING DEPARTMENT
09/26/2006 JS Action: AP
CONDITION OF APPROVAL
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.
*****�*****************************************��*********************************:�*******�******************************************************
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot
plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply
with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design
review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE.�'�ELEPHONE AT� -214 4�l�AT OUR OFFICE FROM 8:00 AM - 4
PM. f'"� ' � /� _>
0
*********************�****************************�*�***�***�*********�*********************
TOWN OF VAIL, COLORADO Statement
************�x*****************�:��****************:��:******�*******************************:���
Statement Number: R060001672 Amount: $1,634.25 10/10/200601:03 PM
Payment Method: Check Init: LC
Notation: #1219/STORM
KING MECHANICAL
-----------------------------------------------------------------------------
Permit No: P06-0114 Type: PLUMBING PERMIT
Parcel No: 2101-091-0300-2
Site Address: 1979 SUNBURST DR VAIL
Location: 1979 SUNBUR.ST DR
Total Fees: $1,634.25
This Payment: $1,634.25 Total ALL Pmts: $1,634.25
Balance: $0.00
*************************�x*******�********�**********�x**�***********************************
ACCOUNT ITEM LIST:
Account Code
PF 00100003112300
PP 00100003111100
WC 00100003112800
Description
PLAN CHECK FEES
PLUMBING PERMIT FEES
WILL CALL INSPECTION FEE
Current Pmts
326.25
1,305.00
3.00
-----------------------------------------------------------------------------
APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UNSIG�(��� ����
Project #• � ' �
Building Permit #: '
�' .. � � � Plumbing Permit #: V i � �
� �� 970-479-2149 (Inspections)
�� �� ��
75 S. Frontage Rd.
Vail, Colorado 81657
TOWN OF VAIL PLUMBING PERMIT APPLICATION
CON�RACTOR INFORMATION
Plumbing Contractor: Town of Vail Reg. No.: Contact Person and Phone #'s:
�. � � .+ �,:�-� ��� 1
� � ���� � � r�
E-Mail Address: .�x;,,� Ku � �; ,B�p � � C:e�•� Fax #: ��' �rs�'�
Contractor Signature:
�.,
COMPLETE VALUATION FOR PLUMBING PERMIT (Labor & Materials)
PLUMBING: $ �; ����
*****�********:�****�***�*****��**�*****FOR OFFICE USE ONLY*�*******************�***************
� ��
��
I
F:\cdev\FORMS\PERMITS\Building\plumbing_permit_11-23-2005.doc Page 1 of 1 11/23/2005
Aug 02 07 01:06p
M�CHAN���►�
;�t���u�t �, ?oo�
p.1
.
.. ..... . ... . .
' STORM K�NG N[ECHAI�ICAL, LLC
� 2335 AIRPORT ROAD, BLDG. l, SUITE A
� RIFLE, COLORADO 81650
; OFFICE: (970}625-8551 FAX: (970�625-8552
�
Town i�f Va�l B�►ildin��� Departrnent
75 South Fronta.ge Rd.
Vail, Colorado 8(}G57 `�Y��
Attn: Ckiarlie Davis!JR �Tondra�,�on y7� 'y�4
Sir,
Storm I�in�; �Zechanical, LLC woulc� like to transfer the folloti�'ing permits to 3ack Sibley
with L�'hite �V�ter Plumhin�.
JOEi T�AM1'�E: NI�SLAK RESIDFNCE
PROJCCT AD�fZC:SS: �979 SL�NBURST DRIVE, VA1L CO�ORADO
PERA�iiTS TO BE TR.�hSFERT�ED
PLli��1B1!�IG: #P06-Ol14
11��EGH��NIC:1L: #�'1U(i-029t
�'hank �r�u
Keith R. ror�iey
,��«���,ni
D
TOWN OF i/AiL
�
����
HEPWORTH - PAWLAK GEOTECHNICAL
August 27, 2006
Beck Building Company
Attn: Lee Dorothy
P.O. Box 4030
Vail, Colorado 81658
Subj ect:
Hepworth-P�wlak Geotechnical, Inc.
5020 Counry Road 154
Gletl�voocl Springs, Colorado 81601
Phone:970-945-7988
Fa�:970-945-8454
email: hpgeo@hp�eotech.com
�{a • ���0 �
_..,__�..__.__,._.�.� F_. _�_._.e _ , .....:...__-�
; =� � � ; - � ;
��}�, �-' � �,, ,. 1
'�U� �� �
'� � ��.,� ��� 0 '%' 2006
irl� ,
L� ,. 4...,
��-� .� . �
i ��...{ b� � t`+ `'� .
Job No.106 0738
Subsoil Study for Foundation Design, Proposed Maslak Residence, Lot 12,
Vail Valley 3`d Filing, 1979 Sunburst Drive, Vail, Colorado.
Dear Mr. Dorothy:
As requested, Hepworth-Pawlak Geotechnical, Inc. performed a subsoil study for design
of foundations at the subj ect site. The study was conducted in accordance with our
agreement for geotechnical engineering services to Beck Building Company dated August
16, 2006. The data obtained and our recommendations based on the proposed
construction and subsurface conditions encountered are presented in this report.
Proposed Construction: The proposed residence will be two story wood frame structure
over a walkout basement level located on the site as shown on Figure 1. The attached
garage and basement floors will be slab-on-grade. Cut depths are expected to range
between about 4 to 8 feet: Foundation loadings for this type of construction are assumed
to be relatively light and typical of the proposed type of construction.
If building conditions or foundation loadings are significantly different from those
described above, we should be notified to re-evaluate the recommendations presented in
this report.
Site Conditions: The site was vacant and the previous building had been razed prior to
our field exploration. There is some fill on the lot from the previous development. The
ground surface in the building area is relatively flat with a gentle slope down to the
northeast. There is about 2 to 4 feet of elevation difference across the proposed building
Parker 303-841-7119 • Colorado Springs 719-633-5562 • Silverthorne 970-468-1989
-2-
area. An existing pond is located to the northeast of the lot on the golf course.
Vegetation consists of weeds.
Subsurface Conditions: The subsurface conditions at the site were evaluated by
observing two exploratory pits at the approximate locations shown on Figure 1. The pits
had been excavated prior to our arrival on-site. The logs of the pits are presented on
Figure 2. The subsoils encountered, below about 6 to7 feet of granular fill materials,
consist of inedium dense to dense, silty sand with scattered gravel to the pit depths of 8
feet. The pits had reportedly been excavated to design bearing levels. Results of swell-
consolidation testing performed on a relatively undisturbed sample of silty sand,
presented on Figure 3, indicate low compressil�ility under �xisting rnoistl�re coriditio�is
and light loading and a low collapse potential (settlement under constant load) when
wetted. The sample showed high compressibility upon increased loading after wetting.
No free water was observed in the pits and the soils were slightly moist.
Foundation Recommendations: Considering the subsoil conditions encountered in the
exploratory pits and the nature of the proposed construction, we recommend spread
footings placed on the undisturbed natural soil designed for an allowable soil bearing
pressure of 1,500 psf for support of the proposed residence. The soils tend to compress
after wetting and there could be some post-construction foundation settlement. Footings
should be a minimum width of 18 inches for continuous walls and 2 feet for columns.
Loose and disturbed soils and existing fill encountered at the foundation bearing level
within the excavation should be removed and the footing bearing level extended down to
the undisturbed natural soils. Exterior footings should be provided with adequate cover
above their bearing elevations for frost protection. Placement of footings at least 42
inches below the exterior grade is typically used in this area. Continuous foundation
walls should be reinforced top and bottom to span local anomalies such as by assuming
an unsupported length of at least 12 feet. Foundation walls acting as retaining structures
should be designed to resist a lateral earth pressure based on an equivalent fluid unit
weight of at least 50 pcf for the on-site soil as backfill.
Job No.106 0738
GeC�teCl"t
-3-
Floor Slabs: The natural on-site soils, exclusive of topsoil, are suitable to support lightly
loaded slab-on-grade construction. The natural sand soils are compressible when wetted
under load which could result in some slab settlement and distress if the bearing soils
become wet. To reduce the effects of some differential movement, floor slabs should be
separated from all bearing walls and columns with expansion joints which allow
unrestrained vertical movement. Floor slab control joints should be used to reduce
damage due to shrinkage cracking. The requirements for joint spacing and slab
reinforcement should be established by the designer based on experience and the intended
slab use. A minimum 4 inch layer of free-draining gravel should be placed beneath
basement level slabs to facilitate drainage. This material should consist of minus 2 inch
aggregate with less than SU°io passing the No. 4 sieve and iess than 2°�o passing the No.
200 sieve.
All fill materials for support of floor slabs should be compacted to at least 95% of
m�imum standard Proctor density at a moisture content near optimutn. Required fill can
consist of the on-site soils devoid of vegetation, topsoil and oversized rock.
Underdrain System: Although free water was not encountered during our exploration, it
has been our experience in mountainous areas that local perched groundwater can develop
during times of heavy precipitation or seasonal runoff. Frozen ground during spring
runoff can create a perched condition. We recommend below-grade construction, such as
retaining walls, crawlspace and basement areas, be protected from wetting and
hydrostatic pressure buildup by an underdrain system.
The drains should consist of drainpipe placed in the bottom of the wall'�ackfill
surrounded above the invert level with free-draining granular material. The drain should
be placed at each level of excavation and at least 1 foot below lowest adjacent finish
grade and sloped at a minimum 1% to a suitable gravity outlet. Free-draining granular
material used in the underdrain system should contain less than 2% passing the No. 200
sieve, less than 50% passing the No. 4 sieve and have a maXimum size of 2 inches. The
drain gravel backfill should be at least 1'/2 feet deep.
Job No.106 0738
Gec�teCh
Q
Surface Drainage: The following drainage precautions should be observed during
construction and maintained at all times after the residence has been completed:
1) Inundation o� the foundation excavations and underslab areas should be
avoided during construction.
2) Exterior backfill should be adjusted to near optimum moisture and
compacted to at least 95% of the maximum standard Proctor density in
pavement and slab areas and to at least 90% of the maximum standard
Proctor density in landscape areas. Free-draining wall backfill should be
capped with about 2 feet of the on-site, finer graded soils to reduce surface
water infiltration.
3) The ground surface surrounding the exterior of the building should be
sloped to drain away from the foundation in all directions. We
recommend a minimum slope of 6 inches in the first 10 feet in unpaved
areas and a minimum slope of 3 inches in the first 10 feet in pavement and
walkway axeas.
4) Roof downspouts and drains should discharge well beyond the limits of all
backfill.
5) Irrigation sprinkler heads and landscaping which requires regular heavy
irrigation, such as sod, should be located at least 5 feet from foundation
walls.
Limitations: This study has been conducted in accordance with generally accepted
geotechnical engineering principles and practices in this area at this time. We make no
warranty either express or implied. The conclusions and recommendati�ns submitted in
this report are based upon the data obtained from the exploratory pits excavated at the
locations indicated on Figure 1 and to the depths shown on Figure 2, the proposed type of
construction, and our experience in the area. Our services do not include determining the
presence, prevention or possibility of mold or other biological contaminants (MOBC)
developing in the future. If the client is concerned about MOBC, then a professional in
this special field of practice should be consulted. Our findings include interpolation and
extrapolation of the subsurface conditions identified at the exploratory pits and variations
in the subsurface conditions may not become evident until excavation is performed. If
Job No.106 0738
GCC��Ch
-5-
conditions encountered during construction appear different from those described in this
report, we should be notified at once so re-evaluation of the recommendations may be
made.
This report has been prepared for the exclusive use by our client for design purposes. We
are not responsible for technical interpretations by others of our information. As the
project evolves, we should provide continued consultation and field services during
construction to review and monitor the implementation of our recommendations, and to
verify that the recommendations have been appropriately interpreted. Significant design
changes may require additional analysis or modifications to the recommendations
p;°esented herein. We recc-rzmend on-si�e observaticn of Pxcavaticns �n�? f�i:rzdat:�r.
bearing strata and testing of structural fill by a representative of the geotechnical
engineer.
If you have any questions or if we may be of further assistance, please let us know.
Respectfully Submitted,
HEPWORTH - PAWLAK GEOTECHNICAL,INC.
o`��`�Q � EGls��'
�� , 2PN AU,� ,,. ��
� o.,'p
Jordy Z. Adamson, Jr., P.E. ti° ��07 �i
�g s .; ��
Reviewed b �o,�•fi ;''�•� .,'I.G� ��''' c�`��
y SS�ONA1. E�
�....._ � ..
Daniel E. Hardin, P.E.
JZA/vad
attachments Figure 1— Location of Exploratory Pits
Figure 2— Logs of Exploratory Pits
Figure 3— Swell-Consolidation Test Results
cc: KRM Consultants - Attn: Kim McGhee
Job No.]06 0738
-., -«
—�
;' :. �r^ � F��!?` ���
El a��[�4�� ��
��t� ! 1_a d'� E 1
_�
— J
PROPOSED
RESIDENCE
j�� \�
6'�� �
S `
o�
^�� R� o
kJ �
� ��F,
'I��
�/
��:; �
�����
`\�
� � ��
L
_, �\ ,.� �
�` \
\ ~� \
� i�� \ g ano�us - :oe.ea�
oe�*n �x•i<•zs'
cMOec - iso.�o
:���,�: � �-�... 1'�� ` �'' \ � BRG - 589'�i2.,..�
�;; J _ , "'-� ,�.` '�. \
✓`' �,�.. ^,� �, � `,,, ,� \ $242
�� ...., � `' v,� `-. �'� __��-.�` 8242 8240
� � � �
�� � '�����..� � � � i !� ;�,
�,.-.,. �=� --.. s g o
� � � � � � � �� ., �
_ `� �� 1 ``� v � ��` �\ '�t g� o �� -��n
\ `
� �
� ° - Y=` ` , �'�, '`� , °�°;� � J
� � �`� � '\ '`' a° "�`� O
� �_ , �� � � � ��\ '� Z
� �., � �y � , A, � \ �� �. �
� `ti ,' s � A ���. w
- , ; � �`� � � � �,,.r
f ', `� � ,� ��, ��%��-
; �;' ,,- � �'� \
� '�` �` . ` ; �� `
I 1� � ��'L_: � .. _. , �!��T�T
< r
f
PIT 1 � ^`�� -�''8246 \
_..� �'• �� ' � =°°"���8248
�� ` � ��`� � �, ,.
""� 00� , � � .� 8250
£
:� . j . Y . �,��;,�����e 8252
� �cRES oR ve .�� � -�„ � / � s
w>l a
�_ �.M
� , �
� � ��
�. F" $
; �� ;
= r�� _. 8258
���8260
� �.
8254
'_ � � 1 3
APPROXIMATE SCALE
1"=40'
106 0738 I ��'t� I LOCATION OF EXPLORATORY BORINGS I FIGURE 1
0
a�
�
�
a
a�
�
.0
_5
10
LEGEND:
PIT 1
ELEV. = 8257'
' '
.
.
♦
/ '
��
PIT 2
ELEV.= 8254'
WC=3.7
DD=104
-200=21
0
a�
a�
5 �
�
a
a�
�
10
�FILL; silty sandy gravel, scattered subangular cobbles and topsoil in upper portion of Pit 1, screened rock in
upper portion of Pit 2, firm, slightly moist, brown.
:�
.•
�
_�
�
_J
SAND (SM); silty, scattered gravel, medium dense, slightly moist, reddish brown.
2" Diameter hand driven liner sample.
Disturbed bulk sample.
NOTES:
1. Exploratory pits were excavated on August 16, 2006 with a Linkbelt trackhoe.
2. Locations of exploratory pits were measured approximately by pacing from features shown on the site plan
provided.
3. Elevations of exploratory pits were obtained by interpolation between contours shown on the site plan provided.
Logs are drawn to depth.
4. The exploratory pit locations and elevations should be considered accurate only to the degree implied by the method
used.
5. The lines between materials shown on the exploratory pit logs represent the approximate boundaries between
material types and transitions may be gradual.
6. No free water was encountered in the pits at the time of excavating. Fluctuation in water level may occur with time.
7. Laboratory Testing Results:
WC = Water Content (%)
DD = Dry Density (pcfl
-200 = Percent passing No. 200 sieve
106 0738 � �=�rQ�Qi,1QCh � LOGS OF EXPLORATORY PITS I Figure 2
Moisture Content = 3.7 percent
Dry Densiry = 104 pcf
-200 = 21 percent
Sampie of: Silry Sand
From: Pit 1 at 7Y2 Feet
0
1
Compression
upon
wetting
0 2
c
0
.�
`� 3
a�
a
E
0
U
4
5
6
7
0.1 1.0 10 100
APPLIED PRESSURE - ksf
106 0738 � �QCh � SWELL-CONSOLIDATION TEST RESULTS � Figure 3
' `^ K R M CONSULTANTS, INC. [303] 973-9B06
• t�63B Weat Ottawe Avenue # 150-2 FAX 973-9647
' Littleton, Coloredo 60126
TO:
RECORD � �U e�
� �-s �-
,� K ,
Lee Dorothy � r � �
Beck Building Company � � ,�
Fax 970-949-4335 �
DA TE: 10/25/2006
PROJECT: Maslak Res.
❑ RFI ❑ MEETING NOTES
� RESPONSE
J09 NUMBER: 0512-05
❑ CLARIFtCATION/CHANGE
I have reviewed the helicai pier installation r�ecord from G-TEC Helical Pier Company for the four piers that were
installed on 10/18/06 undemeath the elevator shaft pad. Based on the information reported, the installation of
the hel'�cal piers meets our de&ign requirements.
SIGNED:
,G� s.�.'�--', l�.r�y-"'__` .
Robinson Usagani A
REVIEWED:
COPY TO:
�� �RN1 CONSULTANTS. INC.
6638 W. Ottawa Ave. Suite 210
Littleton, CO 80128
(303) 973-9806
Fax (3Q3) 973-9847
,� Maslak 0512—Q5
SF�ET NO. � � �
CALWLATED $Y RAU pq� � O�Z3IO�
CHECK BY DATE
�� N.T.S.
�8120/2007 22:21 9703287086 G TEC HELICAL PIER > PAGE 02
Instg��aiion Record �-'I`EC Helical �'ier Comp�ny
AB chm�c tie�icel P�as
Custumer - ShaefiPcr Cans�rac�on �� Y_ o f�1_
Job Add�ess - X979 Su�barst Drive Va�, Co
Re��dence - Maslsk Date $ I 15 I t17'
P�R I�iips � Des�aniptio� 3' S' 7' '�`otal feet Inntall Attac6 Remarits
inst��ed Tora�e 1�ne
� 17 l y:" x'/z" x 8"� 7' ] 3
Z �� � tiz» � rZ�° � �°°x �� �
� 17 1 yn" �%" x$"x 'i' 2
,q, i 7 ��/a" X��x" 7� g"X 7' 1
r� 17 1 I/�" x!z" x 8'�c 7' t
� 1 � 2 y�°� ���z°� � s�yX �° �
7 17 ]'/z" x YZ" x S"� 7'
� 17 1%" x'/z" x 8"x 7' I
g 17 1'/�" x'/z" x 8"x 7' 1
�a �7 ���zM x �isr �$�� �° i
1�
��
��
14
15
16
17
18
�9
20
Z�
2Z T
23
24
as �
x'ot:1.�'o�ol�e - � '/z"
ZS 4pqp xa�xc�
P'ier Cap
� � �CEf1L581 bdc�
r� ca�
17 400Q � 'M�
Picr G1p
12 I�efilsa] � �� R��rc ear
sa] � �
i 2 4000 ►tabat ea�
Rier Csp
�a x���� ��
p�c�
7 4Qp(j wnun �r
��
12 4p00 $��'�
P�ar C�sp
1 � 4000 � �
�� c�
i 2 4ppp x�� �
r� c�
;':�f ' �,sl � '�
��' � � r ��
133
�
AUG 2 2 2001
TOWN OF VAIL
���
J
9
s
r �
sl��a a R�y�p �i���� ���
i ����MMi�7
� �i'� �°"��a i��'��idi�
• -�..�.,..
• � ses,a ews �� t
i MMrmsier--_�1
C
V � • � � r
� ��_} Y ���r
`�Yi��
•
�
I ��
-��: .�.�: r�s�tr
: f.. � . "'+-.
' ��� �.�r.�+""�a — �„�.�+
�.�.�I'..7�'.�i�7.��S�s�r'+�i���.t.i��nsr`...�
!�"a
#��
��
�
�.
�
f�i0��1� ����� �i�O�4!
�'�tO�n o� 0#�S�s �
� i �
� y
� �
U a
�.. ��...� � a�
., �
. � � �
� � ��a
-- �a°', � �
. ' �A�
� �
� � �
� . / P1 �
�'�� �
�._.�.�� r -�-�* �
� *x 9a
wwiee.arr �"`
Ma►
s.tily
r�ig��, �.,
,��,.
r��
�
��
�
�,.-
�
��B
�
�.-- _,
Oct 20 08 02:04p Dauglas Young 970-434-6988 p.1
'�VEST SL�PE TESTI�TG � INSPECTT(�N
31'l7 Glendam Ilr
�rand Junction, CC) 815U�
Ph�ne: 970-434-698�
� ell; 97Q-2�0-2844
Fa� Trans�nittal
����dl��
To: �eff Kissane cr George Sha�ff�� Gonst.
Date: l D-2�-{l8
Fag#: 9�0-'790-18Q3
Fr�m: Doug Young
1'�umber of pages sent inGludiag cover page: 2
1V,tessage; Inspecfiion report fram last 1Vlondays steel inspectiQn.
I will also mail a copy of the repo� along vsri.�h my invoice to P�
Box 373 Vail, CO.
Thank Yau; Daug Young
Oct 20 08 02:04p Dougias Young 970-434-6988 p.2
West Stopc �'csting &. lnspcction
3177 (ilendam Qr_
Grand 3unction} C4 81504
Fhoue: 9'70-43�-6988
Cell: 97i}-�6U-2$44
I.mspection Report
n$t�: � o- i �-as
Project:lVlaslak Residence
A.ddress: � 979 Sunbuxst Dr. Vail, CO
Buildi�cg Permit Na.: OGOl G 1
General Con��raactar: Geor�;e Shaef.Fer Constructian Company
Contractor that Perfo�rmecl Wark:lVEyers & Company
�r��pection of �hop �abricatioa o�- f�d v�ork at �Qb site: Fi�ld
Report #1
Page 1 c�f I
Report: �iisually inspected most of fihe field welding, & high strength bvlting at
the struct:ura� ste�l conx�ec:tac�ns & LVL bucketsfcanneciians. Naie inspeciion vvas
�erformed as best as possible with the wood framing &. p�cking, and exterior
sheathing & stone in place.
The weld.ing & bo�ting inspected above appeared to be in general conformance
with the drawings & details, and appeared to meet the quality requsements of the
AWS D1.1 Structuraj Weld.ing Gode & the A,�SC SFeci.ficatiom far Structural
7oints Using ASTM A32S or A494 Bolts except as nvted below.
1� Noticed 3l4" A325 bolts nee�ed installed p�r pians at the beam to colur�ui
conriections upper floor level along grid line B.
2} Noticed some welding needed complet�d at the calumn tfl beam connectivn �
upper floor level grid B/1.8.
3) Noticed Qartial lengthlsize shirns had been installed between Ehe column to ring
connection grid B!l .8. Need full size shim� with bo�t hales to engage bolts or weld
full size shims.
4} N4ticed �eld welds had not been completed at the bottom side of the LVL
bucket connection roof level grid A.Sf 1.4.
Je�f Kassane with George Shaeffer Constru�tion was mad.e av�ra.�e of these
discrepancies.
�nspeetar(Technician: Douglas E Young
West Slope Testing & Inspection �L tC
3177 Glendam Dr.
Grand Junction, C4 S 15U4
Phone:970-434-6988
Cell: 970-260-2844
�`'l�lal
Project: Maslak Residence
Address: i979 Sunburst �3r. Vaii, GO
Rep4rt #2
�
Page 1 of 1
Bnilding Permit No.: 0601b1
General Contractor: George S}�.effer Construction Company
Ca►ntractor th�t Performed Work; Myers & Cornpany
Inspection of shop fabrication or field work at job sit+e: Fielcl.
Report: Reinspected the i�tems noted. on the 1�` inspecti.on report� Note some of the
beam to colu�nn bearing type connections were welded in lieu Qf bolti�ig.
Tlie welding 8c bo�ting reinspected above appeareci to be in general conformance
with the drawings & details, and appeared to meet the qualitY re9uirements of the
AWS D 1.1 Structural Welding Code & the AISC Specification for Structural
Joints Using ASTM A325 ar A490 Bolts.
To the best of my knowledge this completes the special inspection of the on site
structural field welding 8'c high strength bolting as outline�i in reports # 18z #2.
inspe�tor/Technician: Douglas E Yuung
�;;;; � �
�
��p
.:�3���81� �:
Ps?}F ^'
;'s,: ;; :�;,;-, -:,. > a � - '' •
-�:;r;; `;%»5;.; :�„�v' .
�:i. ': \�� i ��. _ ; ' . . .
, : `!l.' . , . , ' .
, . 1 . ' ,' ' . 1 . , t
. • r� i
, .. � . � - ��Q;�
. . . .I�...-:.: ..��.
� �!y,• - _ �._�,. `.'• :.;s,rw
�;-'< �`� ;t:, `: ;'�;,. ::.,�,:
u',,>:^- .:.,; .';'_•. :�.'%' .`^f" ":i�'�;:,•''•'`•:i,:
' . 'H�' , . J�`^� . . , .,).
: � i . . . . . ' �. '� `' •
� � .1�: . � . . . . .
� ' � .• /,• •r �• `'r�••. • �.�•• ' •• ;.G
i i��5�<�i;
� ° . ��i'�ti�ynlly'�nr �(:i) _���l�'
s� �}.r ;�i�i 4,.. �t � p
� P�� .):'',n. ,E �r k g$
°�'•!"f �7.�i��?�.iui;� ���y,� ���'w•.
' ��:
.. , �.� �C:
' ' � � '�� � . P�ov�t�:
.. , , : � ' �e�
' �� �Q ta.rga�a�
. . hk ' -
,
• m Co¢a��¢t�n4�s:
C�� �'c��d�3�ra�v+e
T�a�'��°, �� �,.�;��I
� R. -+. ��; �
�k�
� �n , , .;��
' � �Be�a�� �mirc€e��ee�'��. � `'�Q 3�b�as� ���0��'
. , .
. . • �� .
� ,� ' ,
�' � . , �
�� � � " \
.� � . ��
, � .� .
�; U� - ,
. ���_' �
.�--�
p ��C��¢s 6t�c�'�de �
.'�;
�� , ' , . ` � ' � , ' .
, . ... ' - � , � ' � '"�t" _ � ���� . � ' .
� ��. � � .:�:���: ���� � � � � � .�
,- . � , :����. , , �. . . .,. , , . : . �� . . . , . . � . .
;,. . : . . . � , . . . � :ti . - � :� , .
, . . . . . ,�-?-�.��;.; , . , , . . , . � .
; -� � . �. . , . � • - �. 4: � . . ... . . .. • '. .; , I,: . , , . . . I , . , , ;. ,''�
.,:., . . , . . . -- � . �, : � . _ �,� . . . .�. ��_,
. . .;. �. . .�� � . v� .
�1 � �:: :; :,,::
�7��;� : ;1�� � �.��-����i� . - . . ..- , . _ � , , � .,- ,� . �.� � �:; r
r. . � . . . :� . . . _ - �:;:. � . , i . . �:.
">= ": `, �� � � �' � . , . .� .. -: . . .;: . . . . , , . . . . .
j�;I. - ;.`p''e : ; , � : �: i f , _ .. :
�. - ' . .. � � . . ' _ �"::. . . � , • . . :
�
:i� .�, �' . • �. .. i`, . ',' i. • .•�� . . ' , -c . • . � ' . '�' ���
_ _ ''- , . . .,�: ��� i :��.1}�.' �;;:�L'(`" - � -.;1 .� �
;. '•>,;� ,; . _ _ . ''(� ';�;�,:?; . ,; . ■ E
�'' - _s' ,.. - �'�: • , .. . - - _ `,� ■
-� -J - - ,.� - ;�<`:',:-'�:'''��;-�'`'_ ,��• . . � . ■ �
';+�; -.��. ._,:, < �;;,- ..,;. _ ,r..;, �*�
: dr=. . - �'• . '�� �
-'�:-:
rf. . - '�: :i� ,�,.:. ;:;.-.
. r � %'n� : �r . :,'t. 0
:.�_ _ 1 �•� , �
(',� -'i. •f :ti�
- . . :.�,.;'"' ' �.:e':�:{;';'�
•" °'
:.'. . M •
, ..�e..•i.:': ' �
u
i'ti � ��
- :�:`: z _ ;;:�, _ :;�;:.,; ,
1' ..1-:�. ��Y�: �f' . � 1� . '��� , `�I:�� '>'-'•� � �:
�- i'✓':h�:� . ••1•'.' 7.�� ' ��.�� . � �
. � _ „ .
�' � . .. . _
..•
., � . .
.• • •
� � ,.:�-:�.�:,•;;•:. , . _� � _ �:. . _ . ,. , . ���.,, . � ... , -... ,. ....,, .. ... _ �.. .. . .- .�A��u � r. . n i � .a n n 7 � I u n � �„-m �
._ , ._ ..,_ ; �... .. :1t�: :s :
Family
�nvironmcnial
�� Cnmplianea
Se�ec}s. (nc.
As6estos-11�Fa�d-T.ead-Industrial H�giene
3650 Chestaut Place
DOnver, Colorado 80216
Phone: 303.296_6022
wo� �.��x��zAT�ar�
Fa�c: 303.292.1451
Email: f.amil e iro aot.com l�`CJ�J
FEC �tep.
Sgmnles �,,n _��
#
PCM �
PLM
Mold Bulk
Mold Air
T.ead ____.—
W'sjzzer
�
�Project #:�
Cost S Total l�ours ��
az �
f� �PM
PD �.—
�
��-- �S� �
— . �cs
_...�--
ii�I
Date: � �� �
�dditi n$! Matet'ials
bescription Cost
_�.--
Soil ��� D
� M ten�Total $ `��--E—
tal
s���e To�i $ �i- Labor To
�stimated 'Total �'roject Charg :
DEsC1tiPTIoN OF w�xx� �
� .� i�s�'���
��
�
1/W"e hereby autiiorize Fa�mrly Environmental Complian,ce Services, inc, to perform �e µ'ork described in
tha,�ahove para�aPh. I agree �vitlx all rates/costs astch ab eV �o �will be o tacted be£ore the final � oic�e s
is based on time and materials and some rates m o eG � on satisfactory completion of work, T/�e agree to
sent if there are RnY add�tl°nal cbarg�g oll th�s g J within 30 days) %r services
pay Family �nvironm:ental Comp�ce Services, Inc. in a timely mann� ed ��St �seCS or property.
rendered_ Non-payment will result in legal action and/or a lien being p
Print
Accepted: e/Date Executed Client Nam-e
Client Si�atur
r _L�___ iniH/G:�l A(llll. 'l 'unf
: �avn�iy
�
En�irmnr�ent�!
�,.. i�orr�pl:i�nc�e
' �rt�:i��s;����ne:
May 30, 2QQ6
Beck Building Company
Andy Beck
P.0.4030
Vail, CO 81658
RE: Asbestos Sampling/demo: 1979 Sunburst Ih_, 'Vail, CO
As requesCed, Famil� En�'ironmental Compliance Services, Ina conducted asbestos sampling and inspection at
the above referenced location. The purpose of ihe sampling was to identiFy and document suspect building
material� that may contain �bestos prior to any scheduled demolition activities. �amily l�nvironmental
Compliance Servi.ces, Inc. reviewed the analytical results to assist the owner in developing an abatement
strategy before any demolitian activities covld commence. 'I'he following table is a summary of our findrngs_
�� 3650 Chesfnut Place • Denver. Calorado �0216 �111-�A (PAT)
NVtAPIABGOOE: nl____ �hZ_�4h-f,(122 • Fax: 303-292-1451 • E meil: �emilyEnvi�SnHl G�. (1 I�'A(1OZ �^� ^� u,n �IT.
Sample
Number
SM1-6
SMI-7
SM2-1
SMZ-2
SM2-3
�MZ-4
SM2-5
SM3-1
SM3-3
SM4-1
SM4-2
5M4-3
SM4-4
TABLET
SUMMARY OF AS�ESTOS COI�TTAINING MA'I'ELtTAT,,S
1979 Stu►burst Dr., Vail CO
�e Description
S/15/06 Surface mate:rial - wsll in garage below' apartment
painCed white sprey o� l�ockdo'�vn �ex�ure
5/15/Ob SuY£ace material— wall at entry ha11 closet to
apartment and gamge in apartQaenC paiuted wh�ite
spray on (cnockdown texture
5/15/06 Surface mater'tal wallpaper - apartment lcitchen wall
5/15/06 Surface material vvallpaper- apartment batiu•oom
wall
5/15/06 Stuface material —wallpaper- apF►rtment closeC
5/15/06 SurEace material wF►llpaper- main house, haliwa�
gteen fabric
5/15/06 5urface matecial �a1lpaPer- main house la�u►dry
room wall
5/15/06 Surface material-smootli textvre, painted white —
apariment ceiling sma]1 roorn
5/1 S/06 Surface material-smooCh te�ctive, pa�x►ted white —
apartxnent �all small room behind d�oor
5/'� S/06 Surface material-smoodi texture, painted white —
aparhnent wall at pipes, small room
5/15/od Surfflce material-deco texture, paiI►ted tan — main
house hallv�ray wall right side cec►ter
�/15/06 5urface material-deco teXture, �aix►ted t3n — m3�n
house hallway vvall right side near'w'indnvc�
5/15/06 Surf�ace �nateriat-deeo te�ture, pa�rited tan — main
house end of haliway lei� corner vvall
5/15/06 Surface material-deco texture, pa�►ted ran — mafn
hous� '�'a11 at sliding glass door overlooking pond
5/15/06 Surface material-deco textw'e, painted tan — main
house Yiving room wall left of fireplace
5/15/06 SurFaca n�aterial-deco te�ture, painted �an — m�
house master bedroou► wa11 between wall lamps
pT_1v1 Results
0
�y
�
�
0
�
�
�
�
�
m
iniHlG��� 9007, 'l 'un�
TAB��T
SUMMARY O� ASB�STOS CONTAINING MAT"���-s
1979 5unburst Dr., Vail CO
�eg��on PLM ResulCs
Samplo Date
Number
SIv14-7 5/15/06 Surface material-deco texttare, painted tan — main
ND
house 2°° i(ovr closet
SM4-8 5/15/Ob Surface material-deco te�cture with canvas li�Ce
ND
maCerial, pain.ted ran — main house kitchen vvall right
side
SMS-1 5/l5/06 Surface material-bmwn canvas texi�urc�; rnain house
ND
2na floor bedroom teft, big �wall
SMS-2 5/15/06 Sur.Face material-brown canvas texture,— main house
ND
2°d floor bedroom left, �w3i1 at mYrrored closet
5M5-3
5/1 S/06 Surface maCerial-browa canvas te?cture,— n�ain ho�use Nn
2"a floor bedroom left, behind doar
Slvtb-1 5/15/06 Surface materi�l — ceiling 2 floor bedroom le�
ND
SM6-2 5/15/06 Surface material— ceiling 2" floor znaster bedroom
ND
SM6-3
5/ 15/06 Surf�ice material — ceiling 2 floor hall�vay �
Mr5G1 S/15/06 Sink undercoating in aPart��nt kitchen
ND
MTSC-2 5/I S/Q6 Su►ic undercoating in nnain t�ot�se kY%�en
1�D
-dark een in ma�► house �
S''�1-1 5/15/Q6 Sheet vinyl flooxing �T
laundry roam
PI1-] 5/15/Ob �'ipe insulation-�hite vdrap on pipe with black
ND
sponge material in a�arement roorn to left of LR
behincl barhroom
pI l_2 S/1 S/06 pipe insulation- white canvfls wrap on pipe in closet
1�Tb
pJ�_3 5/15/06 prpe �sularion-white canvas wrep on pipe in c(oset
Nb
T'T1-4 5/15/Q6 Pipe insulation-main house in fumnce room near
I�TD
ta�mdry
pY1-5 5/15/06 Pipe insulation-main house in fi�unace room near
I�TD
laundry
oint com ound-a �rhm�nt li�ving room vu�all ND
TJ�l 5/1 S/06 TaPe ] P p
oint com ound- ara e'aral l ND
TJ-2 5/15/06 Tapej P g g
oint com ound-main i�ause 2 floor master ND
TJ-3 5/1S/06 T�J p
bedroom
W�85�O1 900Z '� •un�
5ample
Nrlmber
Tr-4
TJ-5
T3-6
BXT-S�-1
EXT-Sp-2
EXT-SP-3
N.D- I�Tone
TA�T�E I
SUMMARY O� AS���TOS CONTAIrTING MATERYAY-S
1979 Sunburst Br,, Vail CO
Date Description
5/15/06 Tape joinC compound- rnain house 2 floor left
beciroom �cvall
5/15/06
5/15/06
S/15/o6
S/15/06
S/15/06
Deteited
Tape joyr►t compound-main house Z°" floor
ceiiing
Tape jonnt compound-mnin house Zn floor
mascer berlroom
surf�sce material painted brick red on post
surface material painted brick red on post
�xterior surf�ce m3tecial painted briek red on past
INS�'�'.C'�'�O� AC'TrV'YTYES
PLM Results
ND
ND
ND
.`—
ND
ND
ND
On May 15, 2006 Fam:ily Environmental conducted an asbcsws Ynsi�tion of the building referenced above.
The inspection was conducted by paula S. �owezs, a trained and acered�ited Fcssbesios Build'uig Inspector. The
inspection was conducted in generdl conforznaT'ce �w'ith rhe sampling protneols established by EPA regulation 40
CFIZ 763.86, the Asbestos �iazacd �m�rgency IZesponse Act (AITERA).
interior and e�terior builciing componenr� we're �r►aPected and homogeneous areas of suspect �sbestos�
containing materials (ACM) were visually identified and documenCed. A homogeneous area consists of
buylding marerials> which appear sun�lar tl�rOUgl�out in terms of coIor, texture wd da#e of applicatian. Althotigh
reasonable effort was made to insped accessible suspecC matezials, additional suspect but un-sampl�d materials
cauld be located in 'w'a11s, in 'voicis or in other concealed areas- Suspect ACM was sampled in genera�
confor[nance with the sampling pxotocols outlined in EpA regularion 40 C�'R 763.86 (Asbestos Hazard
�m2rgenCq Response AcC, A'F�ER/1)• Samples vaere delivered co an accredited laboraxory for analysYS by
polarized light microscopy-
'We understand that this in�Pe��n � requested for the planned demolikon of t�is sfructure. �pA regularion
40 CFR 61, National �mrssion Standards for T-�a.zf►rdous Air �'ollutants (NESHA.P), prohibits rhe release of
asbestos fibers to the atmosphere duri�ng renovation and or demolition activities_ The asbestos NEST�AI'
reauires tl�at potentially regu.lated asbestos-containing buildis►g mate�ials be identified, c[assified and quantifed
pnior to planned di�turbances or demolition ac�ivifies.
Wd85�0� 900Z '� 'un�
N'o bluegrints, floor plans or other buil�ng documentation wrere pm�viiled rn Family Environmeriral preceding
Che inspection. Our inspection acCi�+itres therefore began vVith 'visuel observation of the intetior and e�-u�rior of
the buiiding ro iilentify homogeneous areas of suspect ACM. A homogeneous are� consists of builcling
mat�rials thai appear simil�.r throughout in terms of color, rexrure a�d date of application. Ynterior assessment
�was conducted in the accessible areas of the baildings. Tne a�tterior survey included 'visual observalion of the
roof s�stem, siding and doorway entry canoPies. guilding inaterials 'which were not identiiied as concret�,
�Iass, wood, inasom-Y, me�l or rubber were cansidered suspect ACM.
A}�hysieal assessment of each homogeneous araa of suspect ACM was coz�ductec� to assess the condition of Tlie
n,aterial a3 frisble ar non-friable. The EPA defines a friable rnaterial as one whicl� v�rhen dry> cam be cnunbled,
pul�verized or reduced to powder by hand pressure. Frisbiliry was assessed by physically toucbing suspect
materfals.
Based on results of the visual observarion, bulk samples of suspect ACIvY were collected in generai aonformance
with A�TERA protocols. Random sannples o�� suspect materials were callected in each hamogeneous area. This
inspeetor collected bullc samples using vv�C methods as upplicable to reduce the poteat►al for fiber release.
Samples were plc�ced in sealabla contiainers and labeled with unique sanaple numbers using an indelib[e uiarker.
A tatal of forry-eight (48) bulk samPles were collected of suspee-� ACM 'Wr�� �e homogeneous areas
identified-
Samples of roofing materials were nat collectad from the building exterior; these materials are assumed non-
friable ACM. Only ceramic floar ale� 'wcr� observed and so were not sampled. Homogeneous streas of suspect
ACM identified and sampled during the inspectinn are presented in T�tble I.
SPECiAC� 1`TOTE: Tf any o1�er material �s observed during demolition that has nat been pzev'1oug1� icienwi�ecl,
this matezial should be ptop���y s�Pled and analyzed.
�ullc samples w'ere submYUed under chain of custody procedures to Family Anal�ical Y.ab�rar�y Services, Tne.
(pamYly pnaly�ical) of Denver, Coloredo, for analysis by polarized light m.iczoscopy with dispersion sxaisiing
teclwiques pe`r EPA mathodology (40 CFR 763, Subpart 1F�. A v�sual microscopy estimafion was used in
obtaining the percenta�e of asbestos in bul.(C saniples. �amily P,nalytical rs accredic,ed under the National
Vo�unhary �..aharatory Accreditarian 1'ro� NV�T�/4p (200448-0)-
WVS��OI 900Z '� •un�
The t�.sbestos NESH�' (40 C�TL Part 61) re�ula�es asbestos fiber emissians and asbestos waste disposal
practices. it also requires the ideniification and classification of existing building materials prior to demolition
or renovation activity. Under NESi�, asbestos-comaining building materials are classified as either friable,
Categoty I non-fi-iable or Category TT non-friable ACM. ��b�� materials are those that, 'when dry, may be
crumbled, pulverized or reduced to povc�ldeT b� �d pressure. Category T non $iable ACM includes packings,
gaskets, resilieni floor coverings and asphalt xoof"uig products. Category TY non-friable ACM are any materials
aCher than. Categoty Y materials thaq contain more than 1°/a asbestos_
Filable ACM and Category T and Category II non-�able ACM which is in p�r �ndicion and has become
friable or whic� �rill be aubjected to drilling, sending, grinding, cuttin� ar abcading �d which could be cnsshed
or pulverized during anticipated renovation or demolition acti�vYCies are considered regulated ACM (RACM).
ItACM must be remo�ved prior to demolitian acti�viti�s. Tf the amount of RACM exceecls 260 linear feet of pipe
inaulation or more than 1.6� square feet in other bnilding components, the ovcnier or operator must pro'vide the
EPA, the State of Colorado bepartment of i'ublic Health and Enviro�nen�, Air pollution Control Di�vision wirli
w�ritten notificatio�n of planned removal a��i�+ities at least 10 working days prio� to ehe commencement of
asbestos abatemeIIt. aeti'vi�ies. R�movai of RACM must be eonducCed b� a tr�ned and appropriately licensecl
asbesta9 Rbatement cortractor.
The Occupational Safety and �(ealth Admir►rgu�stron (OSHA) Asbestos standard for rh� construction industry
(29 CFlt 19IO.1101) re�ulates vaarkPYace exposure to asbestos. The OS�-IA sixntidard reqn�res that employee
axposure to airborne asbestos fibers be ma.intained belo'w O.l asbestos fben per cubic centimeter of air (0.1
f/cc). The OSHA standard classifie� construction and maiirtenance activities which could dYSArrb /a.CM, and
speci�ies �euork pracCices and precautions wlxich employers must f.otlow 'when engaging in each class of
regulated work.
SA,NFPLE �E�U�'d'�
Accor+ding to EPA, Colorado Regulation 8, Conirol of �ia�ardnus A�r Pollt�rants, and the OSHA re�uladons> an
ACM is considered an� marerial or product containing more tha'n one percent (>1%) asbestos. State and
�'ederal regulatary ag�ncies require the rem.oval of esbestos if it will be disturbed durin8 building renovation or
demolition activities. In �eneral, asbestos f�alls into Cwo (2) categories.
1)_ �riable asbestos, v✓hich is asbestos t�iat can be easily crumbled under hand pressure. �riable asbestos is
strictly regttlated and must be remo'ved b� a certified asbestos abaCement contsacto'r prior to bnildyng renovation
OL Ci0mO7ihOn.
Friable as�estos was not icientified in the samples collected_
InI�RG�OI 900Z 'l '�n�
ed. These materials are also strictl� regu{aied
2). Nou-Friable asbestos Yhat can easiiy become friable if c►am�g
atid m'�st be remo�ved b� a certified asbesto� abatement contractor prior to building ren.ovation or demolition. .
I�Ton-friable asbestos 'a�as not identified in the samples coilected. Note: any tar i�►Pr��ated roofing matetial is
nsswned ACM.
SPE�IA�• �R�3VY�iQNS
According to the Colora�o Regtilation S, Con2rol of �iazardous Air Pollutants, Section III, Part 3, P�P�
C(i) Roofing Materials:
"Tar impre�nated roofin� felrs, asphalt tiles, asphatts and mastycs that �e non-friable and �wiYl remaiin non-
friable during abaCement are exempt fi•om this regltlation_"
According to the Colorado Department of I'ubYic �Tealth and Environmen�, Au pollu�tYOn Cona'ol Division, it is
not necessary to remove these materials priar to tl�e demolition of the building. Additionally, the buitding
debris need not ba dispas�d as asb�stos-containin� waste mat�al, gs larig ��e ACM remaias non-friable.
�owever, the la�ndfill receiving the asbestos-containing roofing rnaterials, window p�ttS' � non-friable floor
rile, must be �notified of the asbestvs cantenC•
According to the State of Colorado regulatory infor�natYOn, ACM roofin� com,Poneats and floor tiles do not
need to be removed as part of �e as�best°s ab$tem�nt plan prior to demolition/renovatio�n of ttse building.
�Towever the demolition of the buil.ding cannot rnclude explosives, sawing (rotaiy or reciprocating), grindin�,
abrsiding, blasting or intentional buming that �aill reuder the materials friable.
��QMMEI�iDATTnNS
Family Enviranmental Conipliance Sen+i�es, Ync recomm�nds tiie following: based an insPecUon observations
and sample results no f�rrher aceion is necessary. Work safely dw'ing demolitaon anci if any material is
observed Chat has not been outlined in tlus report have the material properly sampled and :inalyz.ed for asbes�o3
canten�
Complete tho attsched bemolition permit Application Porm phis a fee of $55.00 then submit it to the State
(CbpT-il�E) fo� a permit.
iniHR��oI 90oZ �� �u�r
COl+TCY.'�7�TO1�T
Reasonable effort t�vas made b� Fa.mily Environmental Compliance Services, Inc. to locate and sample saspect
materials. However, for any structure, the existence of unique or concealed asbestos co�aining mat��s �d
debris is a possibility. Family Environme�ntal does not warrant, gu�tee, or profess to have the ftbiliry to
locate or identi£y a11 asbestos containing niaterial in this structure•
Should you have any queatrons or require additional information, please feel ftee to tontact me at (303) 296-
6022.
S' erel
Paula S. SoWers
Asbestos Building inspectm' #
Wd8��Ol 900Z 'l •un�
�=�mily
�naly�ieat
�,' Laboratory
S�rv�e�s. In�e.
Ma� 31e Z006
�'amily Environn�ntat Complrance Services, Tnc.
Atut: Paula Bowcrs
3650 Chestnut Place
Denver, CO 30216
Re: 1979 Sunburst Dr., Vail -- LGN 013567
]�ear Ms.l3owers:
Attached are the results ofPolarized Light Microscopic an�sis (PY.M) for asbestos contained In the bullc
sample materials submitted to this Facility on 5/I8/06.
�ulk samples are �y�-� u► accoidance with USE�AA trst meihOd ��1160� a T93/'�e ��t�luires that
distinctlq different materials or layers present wilhln � s��P� ��� �°
Sometimes it is not possibte ta campletely scparate fhin or stxongl� adhering layers, lU a e naiud�oints, a
adhesive, and a combined resalC is given. For som� � aa� ��e o���,��a� ��� �suls . Fanuly
composite or overall asbestos contcnt may bo rcpo
Ana.lytical Laboratory Scrvices, �nc. is c�rren�lq accredYted for bull: asbestos analysis by the Natio�,a1
Voluntary Labora[ory AccrediCaRion 1'rograln (N'��1-A1'� �f � Na[ional Institute of Standards �nd
Teclu�ology (NYS"�- Our N'VT-Ap taboratory code number is 200448-0.
The anaTytical results provided in tl�is report app1Y �Y to thc s�g�es actu,ally submilted. This report is
considered confidential. Details of this repc►rt tvi11 nut be d'se�'ssed 'a''d� �'�' P�'�n or agency not
associated 'vvith �on or �ot� °�`a�O�- T�S rep°tt mus[ b� repr�duced in its enzirery and shall not be
eop�ed in part ar used by the elient to claim producc endorsement 1ry I�TVI-Ap or any agenc� of the U. S.
Go'vernnlent. rf pou ha've any quesUOns regarding tiie concer�t of t�is repoit, please �1 � let� s lrnow.
Analytical ma� be of further 3ssist�nce in other health and sa�'ety areas �of concem, p
ANALYST
Russell b. Cox
LABORATORY DIRECTOR
� �""^"""'�—�
12usse1l T�. Cox
��L�� AIHA (Par)
3650 Chestnut Plaee � benver. Colorado 8021b
Nv�nP �+e cooE: phbne: 303-297-0079 • l�ex: 303-292-1451 °�E-meil: �amily�nvira@ go��l ; O` g 0 0� p` F�� n r T.
2ooaas-a
Page 1 of 15
���Yiy ����ytical I��►bor�tmry Ser�ice, Ync.
itepart �f Test Ites�at�s
P�LM Bull: As�bestos An�.lysis
CLIE�IT / PROJECT: FECSI I 1979 Sunburst Dr. Vail
�n�ITChIT-
�i
ADDTTTOI�Tt1L COM1�tE�iTS: .A11 sepaiable parts or layers � excep�t painf ) wiihin the same samPle ace anal�*za1 and
repoxCed 'uuii�viduaLl�. Composite asbestos percent is reporfsd if agplicable_
N'D=1�Tone betected
Date:05/23/2006
Analys�:
Russell D. Cox
WH8��Ol 900Z '� 'un�
page 2 of 15
�'ami�y �.nal�tic�.1 I.�bo�r�.�or� Se�ice, Ync.
�.tepori a� Tes� lt�sults
P`L1V1 Bulk Ashestos Analysis
CLtENT / PROJECT: FEC�I ! 19�'9 S�nbu�st Dr. Va�l
��8. �D:
013565-3 � d13585-4 013565�4 �13565�i 013565-5
SA�IPLE !D: �YEa z SM 1-4 LAYER 2 SM 1-5 I.AYER 2
TEXTU62E D�iYWJ�LE, Y�X�I[�L bR O AI-�
Descri tion; �R�%'�-�- �,,E�,���,o g5o� yE530% °
La ers:
PHYSICI4L PRf�P'�ft7��� �Y��iEOSCOPrtC } wt-ti� WNITE
��T� �17� YES
Golor. �f� NO
Visible Fibers: YES �(O YES
Homo eneaus
',�p YES Idd YES NO
�Io �SgESTOS CALI61�4'TED VtSUAL diRE�e ESTiM�4TE
Amosite:
Antho h Uite�
Ch sotile: — -
Crocidolite:
7remol'rte/ActinoliKe, Np �p Np ND
rorp� as��s-ros ►�n
;OAITENT:
m,� ���-as��s-ros �teER� 50
5� 40
Cellulose:
Fibrous Glass:
Hair: ""
S nthetics:
Other s cif ,�� 50
NON-ASg�ST05 �
FIBER TOTAL: ,_.,. �
°� NORI-FIBEROUS �� 50
TOTAI. NON- 5� 100 �0
FiBROUS:
ComposiCe Asbestas
if a licable
AbbIT10NAX. CO2vIIvIf�NTS: Atl sepa�abfe pacfs or lay�rs ( except paint ) within fhe samz samplc ai� anal�rzed and
reported i�dividuallY• Composiee asbesios percent is reportecl i�'applrcable.
ND= i�one betected
Date:05/23/2006
�nal�st:
12ussell D. Co�
iniHh4,�l A(1(17. 'l �unr
�'a�niiy �na�y�icai �.a�aora%ot-g� Service, xnc.
�3eport of 'Test �2e��1�
PT.M Bu�[l� As�sYOS Attal�sis
CLiENT / PROJE�T: FECSi J 19i9 Sunba-�rst Dr. Vail
CJ135��-� Q13565-6 Q13565-7 013565
LAB. ID:
SAiUIPLE �D: S� �'e �AYER 2 SM 1-7 �Y��
7�URE DRYWAk.L TEXTi1RE DR�tFNp
Descri tion: ����� 7�� ��3bo�, ��i�d,
ble Fibers:
%
;ONTENT:
Cellulase:
Fibrous Glass:
Hai�
Synthetics:
Other (speciiy)
iVON-ASBEST(
FIBER TOTAt:
I�
1
NO
"lo NdN-�
60
1�
%
70
1'ED VISUAL AREA ��TtRIIATE
1
ND
0
Page 3 of I5
FIBROUS:
Composite Asbest.os
if a licable
ADD7TYONAY. COIvQviENI`S: A11 separable p�s or la�yers ( exc�pt paint ) within che � sample are arial,yzed and
repo�[ed indirriduall�. Compvsite as�es%s petr,eru is repon�d if apptic'able.
NDw None Detected
Date:05/Z3/2006
�inal�st:
�tussell D_ Cox
013565-
SM 2-1
NO
50
ini H ti�.(1 I 4O (1 l. '� ' u n(�
Fa��l�y A�aly�c�l I��bora�ory �er�YCe, Ir�e.
Repo� of '�e�t I�es�lts
PLM Hul�: Asbestos Analyais
CLlEEdT / PROJECT: FECSI /1979 S►anburst C�r.. �iail
�A�. ID:
SAf1APL� ID:
pescription:
� _,,,...
Color:
Visible
�� sONTENT.
Cellulose:
Fibrou-G� ss�
{�IBER TOTAL.:
073:
SM
013565-9 013565-10
IAYER 2 SM 2-3
�� �p NO
LIBR�ITED Vt�U�L AF2EA E�TIIIAATE
a� �o
IFiBERS
% Pd01°J-�IBEROUS
�
�
1'a�e 4 of 15
T�TAL NON- °' "`
F{BRDUS:
ComposiCe Asbestos
if a ficable
ADDITIONAL COMivfE�TS; A11 s-,s:�Cable parts or layces ( exaept paiat ) wifhin t.ltc s�me sample gre analyzed and
reported indi�vidnalI�+. Compasite a�os percent is rcported if ap�plicabYe_
ND= None Detected
'�nalyst: �`���� T)ate:5/23/06
Russell D_ Cox
135�5-11
ND
�
�.��r,i nnn7 �i •unr
page5of15
Farcn�i� A�al��cal L�bo�a�or� �er��ce, �.nc.
Iteport �f 'Tesf T�esui�.s
pLM BuI.C: Asb�as Anal�si.s
�L���� / PRp�iECT: FECSI I 1979 �ur�burst Dr. Va1
+nnITChIT•
.AbDTTTONAL CON1Iv1E3JTS: ATl separable parts crr }�cy�zs ( e.�cept p�t ) withi�► fhe s�icde s�mpte are an�.lyzed and
reported individt�ally. Composite asbestos per�enf is reportc�cT if applicxb(e.
ND� None betected
. 1,1 �:'`
Russell D_ Cox
Date:05/23/2006
�A�ucr.�ni ann7 'I 'u��
Page 6 of, 15
�'�t�i�y Analyi�c�� I,�b���t�r� �er��c�, ��n�.
�.�po� m� Tes� Res�l�s
PLM Bulk Asbestos Analysis
CLIENI' ! PR�J�CT: ��CSI ! 1979 Sunburst Dr. Vail
;ONTENT:
AbbYTTOI�TAY. CONIIv1ENTS: All separable parts or layers ( except Paini ) witlun the s��ne s�'smple are a.nalyzed and
reeported indi�idually. Composite as�sfos p�rceni is repo�4ed if �Splicable.
NII=1�Tor►e DetECted
4nalyst:
Russel� b. Cox
Date:05/23/2006
Wd6��Ol 900Z 'l 'un�
Page 7 of 15
��m�ly A��ly�c�l Lat�o�agory Ser��c�, �nc.
�epart of 'Y'est �tes�Yi�
pl,t�I Bulk Asbestos Analysis
CLlENT / PROJECT: FECSI / 1979 Sunburst Dr_, Vail
AbDTT10NAL COM1VlENTS: All s,ep�rable pans or Iay�rs ( except Paint )`x'ith�n dre sa'm,e s3mple are analyzed and
rcport�d individually. Composite as�stos perc�nt is reporced if a�plicable.
ND= None betecteci
.nalysi: �
Russell D_ Cox
Date:05/2�3/2006
UIHhG�OI 900Z 'l 'un�
Page 8 of 15
�'ainii� Ana�g�tic�l r.aboratory �er�ice, Inc.
�eport �f Tes� �esu�ts
�.M B,� aS�stos a�ys��
CB�6ENi i PROJECi: F��SI 119'�9 Sunburst Dr. Va�l
.. - le 'uts vr layers ( e!rcept P,ai�►t )�ovitlun the same sarnple are anal�zed and
AbDTT'IONt�,�L CONIlv�NTS_ � � �` � i5 � ��plicabie.
regorted individt�ally. Composite aslx�os pe�► �
ND= None bciccted
4nalyst: �
Russell T�. Cox
Date:05/24/2006
WH6S�Ol 9001 'l 'unr
Page 9 of 15
Fami�y Analyiic�l I��e�orat�r�' Ser�v�ce, Ync.
laeport of 'Te�t �tesuYts
PLM Bulk Asbestos Analysis
CLlE.Ni ! pROJEC f: FECS! I 1979 Sunburst Dr., Vail
AbbTTTONAY. COM�fEI3'i5: All sepaiable parts or layers ( excep[ paini )'t�'iiluin f2ie same s��urtplc are analyzed and
reporCed indi�idualI�. Coamposite as�estos percent is repmrted if applicable.
ND= None betecced
1, '�. ,�'.
Russeil D. Co�
Date:05/24/2006
INH6S�Ol 900Z 'l 'un�
Pag,e I O o� 15
F�mYl�y A��.�y��c�11C,�bor�fot�y' ��r�ic�, I�c.
�e��� of 'I'es� IZ�sr���
PLM Bulk Asbestos Analysis
G+L{EIdT i PRQ.DECi: FECS1/9979 �unburst Dr_ Vail
;OIVTEtv I ;
_ ers exc�pt p�tir►f ) vait�tin the slme saniple are analyzed and
Abr3�"I'YOI�TAL CO1r+II�QENTS: AIl sepaca.ble fCpaits u r�y rted if applicable.
reportzd individually. Contposite asbestos p� eP°
ND= None DeCected
� � , _ ,.,%� ' -
Xtussell l�_ Co�
Date:05/24/2006
Wd00 � l l 900Z 'l ��n�
Page 11 of 15
�am�Y� An��ytic�l �aborat�� �er��c�, �nc.
��por� �� �e�t I��s�lts
P'LM Bulk Asbestos Analysis
CL6EPlT / PROJEC'T: FECSI 11979 Sunbu�st Dr, Vail
0135Fi5�31 013565� 1 013565-32
013565-33 013565-:
LAB. tD: �n�sc T �isc z � S�
Stv( 6-3 IAYER 2 .�� SHE�I" VI
SAiIAE'LE iD: SKIWICOAT DRYWALL 7� NO
Descri tion: �� Np NO
� _.._.�. YE5�09�
or.
Croc�doit[e:
TremolitelAct
TOTAL AS�
; CONTENT:
Glass:
h10N-AS13rs i �
FIBER T4T�L:
ERT[ES STE6�IE���0�1�
��E BIACK
:C 1�N0
°lo ASBES�Ti3S C�LIBRAiED ViSUd:L �REA ESTIMQTE
°�6 PiON-AS�ESTOS �t�lE12S
70
% {d�N-F(BERC3l1� 1b0
1 � �a 100
TOTAL NON- -
FIBROUS:
Composite Asbestos __
if a licable
rable '�rts or layers ( except painC )'�viYhin the �me sample are analyzed and
AUDITYOI�TAr. COM1v�NTS; �� P` rted if spplicabte.
reported indivic�ually. Compasi�e asbestAS Perc�►t is cEpo
ND= Nonc Dctccted
(�n „� Date:05/24/2006
Analyst: �,�.�1-'L-�
Russell D. Co�c
�7
1
Wd00 � l l 904Z 'l 'un�
�`�m�ty �nal�t�c�1 I.abar�tory Ser�rYC�, ��c.
Repc�x� a�ff 'X'est ISe�e�l�s
PI.M Bulk Asb�stos Analysis
CLdENT /���J��T: FECSI f 1979 Sunburst Dr. Vaif
LAB. ID:
SAMPL� 6D:
%
TremoirceiACc
i07AL ASI
CONTERlT:
:efiulose:
=ibrous Glass:
-lair.
3ynth etics:
�ther (specffY)
'�pIV-�1SBES'Pt
�tBER i'OTAL:
NO
20
2Q
��
� 1�2 v1 � �� �
���E INSUI�+TtON
S-"10�1'0 �%
bp�iZTIE� ( ��T�RE��'Cop1C
�FtIiE CCF2AY
NO YES
YE5 NO
R��vE�b VI�t7AL AREA ESi
P!-���ESTO� FfBERS
% �
1
35
01 �56�
Pf 1-3
�
��
Page 12 of 15
013565-3 �
LAEYR2
FigROUS:
Compos�te Asbestos
if a licable
P.DDITIONAL COM1vIENTS: All se�trable parts or Iayeis ( exc�pt �lt ) within the s�mc satnplc are analyzed and
repozted individuaIly. Composite asi�estos �seccen�. is reported if �applicable.
ND= None Z3etected
bate:05/24/2006
Analyst:
�ussell I�. Cox
f�►L!7
zo
Wd00�l1 900Z '� 'un�
Page 13 of 15
Fan�Yi� A�alyt�cai Y,�.�bo�to�y Se�ce, In�.
Repo� of Test �esu�ts
pLM Butk Asbe�os Analysis
CL�ENi / PROJECT: FECS� 1 1979 Sunburst D�. Vaii
ADDITIONAL COM[vfENTS; A11 separ�blc Parts or layets ( excePt paint 7 withixi tlie same sampi� ar� analyaed and
reported individuallY. Composite asbestos perc�►t is regorted if aPplicai��e.
ND= None Detected
��
�%�1���'
Russell D_ Co�
Date:05/24/2006
u�d�o��� 9ooz �� ����
�a��iy A�►�ly��cal I.�b�ratarj� S�rvic�, �nc.
�e�opt oi �'e�t ���is
PLM B�ilk Asbesios Analysis
�LIENT / F'ROJEC'�: FECS{ / 1979 Sunburst i7r. Vail
013585-43 013565-44 013565-�5
L�►�. ID' 013565-42 TJ 1�
(.AYER 2 TJ 1-4 YJ 1,5
S/�N{faa..E ID: JQiNT JOtNT JOINT
Description; ���� COMPOUND
C��ppUNp COMPOUND COMPOt1ND NO
ono,� NO _ NO
or.
ible Fibers:
�,oaeneous
°/a
Amosite:
Antho h Ilite:
Ch sa2ile:
Crocidolite:
' ; rem
ITOT�
CaNTENT:
Cellulose�
Fibrous Glass�
Hair.
Synthetics:
Other s�fX)
NON-ASB��ST6
FIBER TOTAL:
pHl�
'H71E
NO
% [�O�I-ASB
�TEREOSCOPIC
D �/lSU�►� AREA ESTIM/�TE
F
35
page 14 of 15
% N01d-FIBER�U� s5
TOTAL NON-
100 100 100
FlBROUS:
Gomposite Asbestos
if a licable
NTS: A11 se�arable parCS or ]�yers (�� P�f )�viihin fize same samplc are analYzed and
ADDTTIONAI. CAMME ent is rted if a�p�icable_
reported individually. Comp�site a�.os �'c �
�= Nonc Dctected
Date:05/z4/2006
Analyst: ..,..�
013565�4e
FXT�SP-1
NO
80
IZussell D. Cox
INH00 � l l 900Z 'l 'un�
Pabe 15 of 15
F�pn��� r����y�cai ��.boratory �e�rvf��; T���
�eport of T�t Resul4s
JPLM IIu1k Asl�stos Analysis
CLiENi ! PF20JECi: FEGSI ! i97� Sunburst Dr_ Vai�
AbbYTIONAI. C4M1v1�I�iTS: All separable pacts or la�ers ( excepf paint ) within the same sample are analyzed and
reported in�v�duarly Composite asbestos pen�ec►t is reported if applicable_ .
ND= I�one Detected
:�� _ �►� �'�:� -=
Russell ll. Cox
Date:05/24/2006
�e�unn: � � A��Z '� 'un�
pg. � n��
C;t��tn �� �.us���� �
S �
Client•
FAMILY �N Con�ac�: �
3650 CHESTf�UT PL�O�
Address� � �
° D�te Ssmpled;��-
Fa� �f:
TeTephone #:
� n-. n �' . ► �.i . � �-- �
Uescription of Site/T�ocation S�npled: �� �`� � AV�--
Speci�l I�stnactions:
s�ple Conclition (Acc
,)7r�]0[� C )2Day
3� Da.y C) 7 Da�y
'ime: ^�i' � ��Q �.a
U . - - • D atelTinn.e:
1�linquished by:
D�teJ`I'ime:
�tecei�ved ��:
Af HA (PA�
C�l'�v'd�� 3650 Chestnut P[ace ° Denver, Colo�ado 80216 , pRpFICIENT.
,� oo� nar_�bE: n�----. aI]2_'aQi-n079 • l�ax: 3Q3�292�14�51 ° E mail: FamilyEnln�H(1�a1 � 900Z ' � 'u n(`
p�. � of �
(;�1S1It oi c.tt�w�_y_
. ntac:t. � (� "' " _
. � .1'q r a`> � , , C�}
(;TiC1�e4:: � ' ?; ° �
TR1��' , :,.
.Address: . �v0 CMES � • r-y � � S�� J 'U
� � •�°
Da�e Sampled-
�� �: �
Telep3aone #: � �
, 1Description.of Sitell.oeatiora S�npTetl: l .
6P��,}� �]ngtTlyCtions:
B eii�nc�s�ed by:
SamP1e Con�iCion (P�ccep ect) 7 Day
IiR () 2 Day (� 3-5 Day �)
� Date!'fln�e- �' ��''� -
iDate/'Time:
Retrnquished �y:
b�.ie/Ti�e'
�CCl`��C(� ��':
��aQ�' AIHA (PA�
3650 Chesfinut Place ° �envEr, Colorado 80216 q , pRpFICIENT.
NVLAP 11+B GODE n�,;,.,,,• �(]�--297-0079 ° l��x: 3��-252°1451 ° E m��f : F�mi(y�nve H�� I[I c 4mfl (1 T' � ' u n(�
Client: �nAanv �'t,��nars�i�A �antxc�
-�-�T7 i741TC G�• �'7-[vTQTVT
A�dress: _ 3650 CHESTf`�!(�'P PlRCE
Pg_ � o%!
/�
��
I:.. � ��
._ _. . . �. -� - _ - — - - Dp.te 5xmplea: � � � v�,�
Teiephoue #: �� �� I
� � 1
Xt2sctiption of SitelLocatinn Sampleci: � ---�----7
Special �nsta-cactions:
Total N'um�
Requested T�ri�
��:�,�S��a b�:
Itecei�veci b}�s
�Leiiaq�r.nsh.e� by:
Client ID
�
0
T�pe of
Saixi�le Description Analysis
flm Candition (Accep }ect)
) � )2Day �)3-5D�3' � )7Day
� ��r�►e: �'�l`�..r� C�
� Y)atelTime: �
�ateJTiffie:
R�eceivetl hy: T)aie/'�'itne•
\
��'�'r'� � 3650 Chestnut Ptae�s m benver, Colo�aclo 80216 d�1�-lA (PAT)
"v zoo�6-0 DE' Phon�: 303-297^0079 ° Fax: 303-29?-1�451 �.E-mail; FamilyEnviro@aol.com . PROFiCIENT.
u,IHlO � l l 900Z 'l 'u�r
�
r.
�
� �� �
��.
� '\,
�
INHOI � l L 900Z 'l 'un�
� I
���
��
��
��
�f • Co)�
�Qi>:t...� '?9Q
� -i'" : b
* �
'�187��
�
�
�
�4-!
C
O
U
c
0
0
E
�
�
m
W
O
a
�
n
4
��
��
�m
O.
'�
G
'�
O
�iV
Gily
b
O
U
�
n
w
C �
D
� �
fq U
a! i�
���Q
'n
�
�
�
U
StYOeY
$udmit f4M1 (V.
Pertnil Coordinator
C3EIIflOLITtOid P��iV611C �PPL1CA7iOf� �OR�IIi �� ��►- � ��'�°"�'�
and Environment
A$55 FEE MUST RCCOMPANY THIS FORM. 43 o°C� ����kDriveSouV�
INCOMPLETE APPLICATIONS WILL BE RETURNED. �,r,er,coso2ae-�s3o
(Permit wi(( E�e mailed to demolition contractor unfess specified ofhetwise) F��303-782-0278 0
Area
11 I \(,,,C.—•J ��_.1+i
�s (�75
� � aox
, Lla. � ,� n n
ion Datn
.� /��
Building Name
m Type of Buitding (I.e. reslaendal, wF
�
�
Zip Coee � Street
riN
� ��, s�
o CO
r vrfth Aree Code Proposed StaR DaLe
OwnersName
Zip
►7
psie(s) of Inspecvon ' "'°�' °
� � 1�-Dl� 3 �Iq- �i�
�� � sess curterd AM�RA and state of
••• Widi mY &8naaue bebw, I oertiN G�
Cobrado ce+tification as an Asbestos Buiiding Inspecto�. I also cerdN tha� I
have inspeUed ths builCln9 m De delnod9�ed, as Ilsted in the Demdifion S�e
b1oCK �DWe, semA� ell suspeet meterials (n accordance witli AHERA), had
ap yamples analyzed for die preaenw of asbesl�os by a C�X at� 9��
{sboratory, and have detettnined that (d1ACk zRProDn=
BLUE iNln:
No ACM e�tist� anywfio*o in the buik��^9-
Yhe ony ACM !ett In �he �ulldinp Ia non-frtable VAT endlor tar-irrsD�aUnatod
� r«mng (e7t ena meee W ll remaln non-Mable durinfl derriolldon.
fo'und h'a heen campletely r m9 ved fro�neM� euf14Li0 pe 9my visual �� �et I
Permil �:
Ch�u �=
5-\5-0
S . P�o��`�
�
m �
m
Q.
O
��
C �
"C 0
�
�� o
m
� CDPI
O
�o
� � r�►
��
� U Date
��
� Telel
Q
etc.)
c«„plebon
1 ver;y that ail refrigeranls (rvm air conaitioninqlrelrigereUon appitances Nave
�� property recovered in acc«dance N^�1i AQCC Regulation No. 15 (For
►.
information on GFC regu�rame�fa �I 682-3100)_
� CHECK TME APPtZOPR�ATE BOX;
U
�
t
O
U
�
O
m
G
3
O
� D3fe
�
�� S19h
m
BuOdfng Owna�
Conbsctor
Postmark or Ha�d Delivery Date:
Issued:
�
Rev.�, J:V�sbeslos and Load UnilsV�sius Forr�sl�SBEST05 ABATEMENT NOIIFIGATION.doc Inl H��,` � n O O 7 � � n�'
7 l�
2.
3.
�ernolition �otic� Aeppiic�tdon Fortt� Inforrn�tion and 1n�tPa�ctions:
Afi sp�ces rnu�st be fifled in on the application. !f the informia n in �o �ssi g the
please write Nl�. incomple�e information may result m a d y p
appfication.
inde rnust have proposed start and end dates for the demolit'ton.
There is a 10 working-day (do nQt count aaturdays or Sunday�� d o'r'hand riod for
permit processing. For example: If the applicafion is po�stma
d�{ivered io the Division on April 1, 2003, then the eariiest s��at d� e� 1°�t��n 14
April 15, 2003. lf a demolition foilow e abatement projectr the 0 working-daY
d s of the completion of th
ealendar ay
waiting period will be waived.
4. The Colorado-certified asbestos inspector must sign th� form in bfue ink.
ust also sign fihe application certify►n9
The
that all
building owner or the contractor m
refrigeranis have been properly removed from the site. Original signatures must
be submitted.
5. !f �here needs to be modifications to the notice af�er Yhe application has been
submitted, notify the Asbestos Unit by fax at 303-752-0278 bY modificationse next
regular State business da�y follovuing the modification. Pro�ect
include changes in scope of work, supervisor, the schedufed vaork dates or
scheduled work iimes.
6. Recycling of ma�terials, such as concrete or wo�odAtCh� asu bh as floor tile or
contaminated with asbestos containing materi ( ),
mastic, is NOT permitted•
7. Demolition of a building that has non-ft'iab�ust bescompleted vtsi hout causang the
impregnated roofing matenafs remairnng
asb�stos-containing materia(s to become friable. Concriee O�e ationsrsu h�{as
floor tile shaH be removed in as farge sections as possib p
crushing, pneumatic jacking, etc. of mai�erials containing asbestos are not
permitted.
8. Supporting pictures may be emailed to: asbestos(ast�te.co.us
9. A[l provisions of law� �nd ordinances governing termits o�a W�oval no�tc es
compl�ed with whether specified herem or not. P pP
presuming to give authority �o vio{ate or cance! the provisions of the above laws
and �rdinances or p�►'�it� �ssued in error or based on ir�correct information
suppiied sh�l{ be invalid.
o,.,� am� .i��nsbeatoa end Lead UN1eVisDestas FafmsW58E5COS ABA7Eb1FM NOTIFICATION.doc �n� H n�� � � � � � Z � � n r
STATE �F COL�RAI�4
�s��s�as
�:E�]l��I��CATIi)l� �
�., Coloracio Department of Public H�alth
� and Eiivironment
Air Pollution Control Di�ision �
. , This certifies �khat ..
� Paula �owers ,
Ceirtification l�o: 11051 ` �
�'has met the :requirements :of 25-7-507, C.R:S. and Air Quality Control
�"Gommission.Regulation No: .8; Part B, and is hereb�' certified by the
� � � � state of Colorado.in the �oliov�irig:�discipline::-.:.
� � . . .
) . � �. �
.. ... .
, .::; °. �uilciin� �mspecto�* _ � . .
�
,
; issued: 3/2/2006 .�
, ...� .-� (�
Expires on: 3/2/2007
'� This cert�'fr.�afe is valid only wltl'i tleepossessron of a craret�t Division-approved tYaining course
certiftcativn in t/re discipline specified' above.
�
�ti�un� : i i ann7 �I 'un�
TOWN OF VAIL
75 S. FRONTAGE ROAD
VAIL, CO 81657
970-479-2138
OWNER
DEPARTMENT OF COMMUNITY DEVELOPMENT
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
ELECTRICAL PERMIT
Job Address: 1979 SUNBURST DR VAIL
Location.....: 1979 SUNBURST DR
Parcel No...: 210109103002
Project No : ,..-��� � � -�;; � ( � �-�
APPLICANT
CONTRACTOR
MASLAK, SAMUEL H. &
961 HIGH RD
WOODSIDE
CA 94062
ELK RIDGE ELECTRIC
PO BOX 2162
EAGLE
COLORADO 81631
License: 369-E
ELK RIDGE ELECTRIC
PO BOX 2162
EAGLE
COLORADO 81631
License: 369-E
LULETA 09/26/2006
INC 09/26/2006
INC 09/26/2006
Desciption: INSTALATION OF TEMPORARY POWER
Valuation: $0.00 Square feet: 50
Permit #: E06-0179
��X,> - b lC� �
Status . . . : ISSUED
Applied . . : 09/26/2006
Issued . . . 09/27/2006
Expires . .: 03/26/2007
Phone: (970) 471-0101
Phone: (970) 471-0101
**************�******�*********************�*********************** FEE SUMMARY ******�***************************�********�***************�
Electrical--------> $51.75 Total Calculated Fees--> $54.75
DRB Fee---------> $0.00 Additional Fees---------> $0. o0
Investigation----> $0. 00 Total Permit Fee--------> $54.75
Will Call--------> $3 . 00 Payments----------------> $54.75
TOTAL FEES--> $54.75 BALANCE DUE--------> $0.00
*****************�******************�*****�****************************�*****�****��*************�************************************�******�***
Approvals:
Item: 06000 ELECTRICAL DEPARTMENT
09/26/2006 shahn Action: AP
Item: 05600 FIRE DEPARTMENT
********************************************��*+**********************************************************�******************�*************�*****
CONDITIONS OF APPROVAL
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.
*��*�***�*****��*****�*****��****************�******�**********************�***************************«****************�***************�*****��*
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot
plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply
with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design
review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHO T 479-2149 OR AT OUR OFFICE FROM 8:00 AM - 4
PM. "� �,�/��
SIGNATURE F ER OR CON ACTOR FOR HIMSELF AND OWNEF
����*****�***************************************************************�****�**���***�****
TOWN OF VAIL, COLORADO Statement
�****�x+**:x***********************�x*�*************************�***��x*:x**�**�x�x�***********�x***
Statement Number: R060001557 Amount: $54.75 09/27/200602:45 PM
Payment Method: Check Init: LT
Notation: Elk Ridge
Electric / ck 1338
------------------------------------------------------------
Permit No: E06-0179 Type: ELECTRICAL PERMIT
Parcel No: 2101-091-0300-2
Site Address: 1979 SUNBURST DR VAIL
Location: 1979 SUNBURST DR
Total Fees: $54.75
This Payment: $54.75 Total ALL Pmts: $54.75
Balance: $0.00
*****�****�:******************�********�x:�****+*�*********************************************
ACCOUNT ITEM LIST:
Account Code
EP 00100003111100
WC 00100003112800
Description
------------------
ELECTRICAL PERMIT FEES
WILL CALL INSPECTION FEE
-------------------------------------------------------------
Current Pmts
51.75
3.00
APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UNSIGNED
Project #: �'�� 05- �'�i�
Building Permit #: D� - U ' /
�� � • O ( � Electrical Permit #: _ 1G.�( �
���;���� ,. 970-479-2149 (Inspections)
75 S. Frontage Rd.
Vail, Colorado 81657
TOWN OF VAIL ELECTRICAL PERMIT APPLICATION
COMP
CONTRACTOR INFORMATION
FOOTAGE FOR AREA OF WORK AND VALUATION OF WORK (Labor & Materials)
AMOUNT OF SQ FT IN STRUCfURE: � �U II ELECTRICAL VALUATION: $
Contact Eag/e County Assessors O�ce at 970-328-8640 or visit www, eaqle-countv. com for Parce/ #
Parcel # 2iD���iO3�Z
-�1 JobAddress: %9)y sy����s�,!,v, I��'���U
, Job Name: ��ys�y �i /�ns � c ,., � � ��63'T
Legal Description � Lot:
Owners Name: Se�,y�� /�qsl4�
Engineer:
Detailed description o� work:
J Block: � Filing: �I Subdivision:
� Address: �dl N,ya /1 . w�'," s���`,�9y�b2 Phone: c� �y- ��DU
Address: Phone:
hj�l/G�f�'ti Gf (f[�QG✓�..i.{ %�<i:..wC� �'6Y r1C CC'�5��..rc.l'�� C�
� r ,
��• �'1'`� �td""+P.�
Work Class: New Addition () Remodel () Repair () Temp Power () Other ()
Work Type: Interior () Exterior Both () Does an EHU exist at this location: Yes () No ()
Type of Bldg.: Single-family �) Duplex ( ) Multi-family ( ) Commercial ( ) Restaurant ( ) Other ( )
No. of Existing Dwelling Units in this building: No. of Accommodation Units in this building:
Is this permit for a hot tub: Yes
Does a Fire Alarm Exis�: Yes (;
No
I�L•7
Does a Fire Sprinkler System Exist: Yes () No
w I� v�
**�� �****�����* *���*��*���*�**�*���FOR OFFICE USE ONLY���,�**�**���*�����**�**��**�����*��**
�7
� � Other Fees: `' ., Y Date Rece��ed:
>D�Bo�eeS . ; . : ACCe ted B .:.
Riannpr SiOri-Aff: :
,•
r 11/23/2005
F:kdev\FORMS\PERMITS\Building\electical�ermit_11-23-2005.DOC Page 1 of 2
TOWN OF VAIL
75 S. FRONTAGE ROAD
VAIL, CO 81657
970-479-2138
NOTE
DEPARTMENT OF COMMUNITY DEVELOPMENT
THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
ELECTRICAL PERMIT
Job Address: 1979 SiJNBURST DR VAIL
Location.....: 1979 SiJNBURST DR
Parcel No...: 210109103002
Legal Description: T � �b5 —� �� ��
Project No :
OWNER MASLAK, SAMUEL
961 HIGH RD
WOODSIDE
CA 94062
APPLICANT SHAW ELECTRIC
P O BOX 1451
AVON CO
CO 81620
License: 106-E
CONTRACTOR SHAW ELECTRIC
P O BOX 1451
AVON CO
CO 81620
License: 106-E
H. & LULETA 09/26/2007
09/26/2007
09/26/2007
Desciption: ELECTRICAL WIRING FOR A NEW RESIDENCE
Valuation: $0.00 Square feet: 9639
Permit #: E07-0242
�6 � - � �� �
Status . . . : ISSUED
Applied . . : 09/26/2007
Issued . . . 09/27/2007
Expires . .: 03/25/2008
Phone: 970-926-3358
Phone: 970-926-3358
*��►�**t****+*r►s***t****s*�********x*+**►***►**�***►****�***�+**+� FEE S UMMARY ***********�*t***r**►******+►*r***r*+***********►**��***�***
Electrical---------> $440.45 Total Calculated Fees--> $444.45
Investigation----> $ o. o o Additional Fees----------> $ 0. 0 0
Will Call---------> $ 4. 0 o Total Permit Fee--------> $ 4 4 4. 4 5
TOTAL FEES--> $ 4 4 4. 4 5 Payments------------------> $ 4 4 4. 4 5
BALANCE DUE--------> $ o. 0 0
�***+****r**s►�r*«*.***�r*s*��*�+**a►****a*+******a***rr*�*�******�***sx***a**r*►►r*►*�«*�***��**+**a�***►**+***+�**+*t*****��***�s**rt**r*+*a****
Approvals:
Item: 06000 ELECTRICAL DEPARTMENT
09/26/2007 shahn Action: AP
Item: 05600 FIRE DEPARTMENT
.**.++*.*...,:+�.*�+...,..+�...*......*,*.+*:*....*.*.,�+�*:**.*�+.*.*..*��**.*.*.....*.***.*..*.+*�+***.*.*...*+*.****..�.*�+*+*�**.*.***...*..+**
CONDITIONS OF APPROVAL
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.
***.*.+**s***.+.*++*►*..**.*�*�*«�*..*..*�*«�*+«.*•***.*.«.*«�**�+.*�:*..,*.+*****��********.***:**s*.s*+..�+«*....,:**.�.+*,*.*�**+�►*.*«�..*..*,:
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan,
and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all
Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review
approved, International Building and Residential Codes and other ordinances of the Town applieable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ApV�CE BY
ri
AT OUR OFFICE FROM 8:00 AM - 4 PM.
� - �`
SIG ATU OF OWNER OR CONTRACTOR FOR HIMSELF AND OV�INER
*****************�*********************+*********+*�*****************+********+*****+*******
TOWN OF VAIL, COLORADO Statement
�+******************************************************************************************
Statement Number: R070002004 Amount: $444.45 09/27/200710:26 AM
Payment Method: Check Init: DDG
Notation: Shaw 15358
---------------------------------------------------------------
Permit No: E07-0242 Type: ELECTRICAL PERMIT
Parcel No: 2101-091-0300-2
Site Address: 1979 SUNBURST DR VAIL
Location: 1979 SUNBURST DR
Total Fees: $444.45
This Payment: $444.45 Total ALL Pmts: $444.45
Balance: $0.00
*********************�**********************************************************************
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------------- ------------------------------ ----
EP 00100003111100 ELECTRICAL PERMIT FEES 440.45
WC 00100003112800 WILL CALL INSPECTION FEE 4.00
---------------------------------------------------------------
FROM :SHAW ELECTRIC FAX N0. :9709263358 Sep. 26 2007 08:12AM P1
. � . , , . . � . . �
! � , � , . . � , .
. . . . ��s ���7
� project #:
. Building Pe it #: C�tQ -- d Ilo �
� �, �Electtical p'ermit #:
� �� � � . , ..)
�� ��� TOW N OF YA� ELECTRICAL. PERMIT APPLICATIOI� .. .
75 S. �'�runtage� Rd. � . � . .
Vail� C�lOtadO S1E57 �.nwr�rns�-rnv YnlF(1RMAT10N � �
a.v,, a ,.�... . ..._ _. -- — -- - --
cal Cont�actor: ( Town of Vail Reg. Na.: Contact and Phone #'s: �t?.C� — 33 S
Y1lLts� ���G'� �('C- %'1�-- ��"� ���0 ��v� hi�v�' SGIQ(�J 37l�- 103"2—
.�
� . _ - - - - __ � � - -- --r_ra ........, n�n/ryrvfluf�l/ lY1R7 �/' p���.�� �
� .....-...._..._
]ob Address: (�7�1 Sunhu.r�r �'= va�.>l .
]ob Name: Ma5 [�Z(v �� �`�`�'��
Legal D�scription Lot: Block: Filing: Subdivision:
�d�; �/o Phone: ,
Owners Name: �aS��(L. � .
� Address: � � Phone: . .
Engineer: �
Detailed des�ription af work: � i�2 � p,�,� {� S icB�2U•�—Q� . ..
work Class: New Addltfon () R�emodel () aepa�� (�) TemP PoW� � i Other ()
Work 7ype: Ynterior O' rlor O Both ( Does an EHU ex�st �t this tocadon: Yes ( j No (�
Type oF Bldg.: Single-famlly ( Duplac () Multt-famlly () Commercfal () RestauranC () 0�� � �
No. of•Existing Dwelling Units in thls bullding:
No. of Accommodation Units.in th�s bufiding:
is this ermit for a hot tub: Yes N� � Does a Fire Sprinlder Syst�m Exist: ' Yes () No ()
Does a Fire Alarm E�st: Yes () No () A- .
. , � . � � ; .� ,
. � � . FOR O�FiCE U5E ONLY*'�!f'k�4M*ttiei�i****Rakfktil�iY***t*#**4f4kfl9r
1kk�tkltRt�ll�lii�MlhR**ik****1e*Wf�f�ft4�tA#i #*** , . , . •
� L: / � �. \'/ � . , . .. 1� • . , . ,
D . � ..4�•.��. :�. �N"� . . . : � .
S�P 2 6 2007 < � . .
,
TOWN OF VAIL �. � � � � . � � :- ' �
� . .= ...
�
TOWN OF VAIL FIRE DEPARTMENT
75 S. FRONTAGE ROAD
VAIL, CO 81657
970-479-2135
VAIL FIRE DEPARTMENT
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
SPRINKLER PERMIT
Job Address: 1979 SLJNBURST DR VAIL
Location.....: 1979 SUNBURST DR
Parcel No...: 210109103002
Project No : �'��--rj5-0 �(11
OWNER MASLAK, SAMUEL H. & LULETA 11/21/2007
961 HIGH RD
WOODSIDE
CA 94062
Permit #
Status . . . :
Applied . . :
Issued . . .
Expires . .:
F07-0150
��, -� ( c� �
ISSUED
11 /21 /2007
02/12/2008
APPLICANT ALL STATE FIRE PROTECTION, I11/21/2007 Phone: 303-288-3901
6045 E 76TH #12
COMMERCE CITY
CO 80022
License: 370-5
CONTRACTOR ALL STATE FIRE PROTECTION, I11/21/2007 Phone: 303-288-3901
6045 E 76TH #12
COMMERCE CITY
CO 80022
License: 370-5
Desciption: INSTALLATION OF A FIRE SPRINKLER SYSTEM
Valuation: $26,280.00
**+«sr**r►r►**�*+*+*�r*�*�«***r*�s+s�*��rr***s***r***�*+r******+*��� FEE S UMMARY *****sr**r*****�*+t**r►**+****►**+*+*******�+*r*++��***t�***
Mechanical---> $ o. 0 o Restuarant Plan Review--> $ o. 0 0 Total Calculated Fees---> $1, 4 6 6. 90
Plan Check---> $ 3 5 0. o o DRB Fee---------------------> $ o. 0 0 Additional Fees-----------> $ o. o 0
lnvestigation-> $ o. o o TOTAL FEES--------------> $1, 4 6 6. 9 o Total Permit Fee----------> $1, 4 6 6. 90
Will Call-----> $ 0. 0 0 Payments-------------------> $ 1, 4 6 6. 9 0
BALANCE DUE---------> $ o. o 0
��*.*+*�+�****r��r�**►�***rr*r*�*�x�sr***a*�*r�*+*�*+**+************r**►r��*r******�**+*�**:r***�***:r***r*�**►►*w+�r�*�***�*�r***�«*�**+�***►.��**
Item: 05100 BUILDING DEPARTMENT
Item: 05600 FIRE DEPARTMENT
O1/10/2008 JJR Action: DN Inadequate and innaccurate submittal'.
Resubmittal rerquired.
02/08/2008 JJR Action: AP Approved as noted:
1. Sprinkler list is empty on all pages ot plans. Number ot heads per tloor is rec
shown.
2. Kitchen sprinkler heads FP 3 are 9' from 2 walls. General note 7 FP 1 states
maximum distance as 8' from wall.
3. Provide coverage beneath garage door as required by VFES standards. FP 3
4. Provide data sheets for pump shown in riser detail. FP 1
5. Attic space containing mechanical equipment shall be sprinklered.
CONDITION OF APPROVAL
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.
*���*.***.*���*�*.+.**»�+**+�...****�«*�..*+*+*+�*+��+.**«*,***+**•*�.*...***:*+*,+*:*.��+*.****�...*«**.*.***.:�**,..*r****::.�*,.**.*�**:.+**.�
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan,
and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all
Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review
approved, International Building and Residential Codes and other ordinances of the Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE SEVENTY-T O URS IN A NCE BY TELEPHONE AT 970-479-2252
FROM 8:00 AM - 5 PM.
� �
SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNER
CONDITIONS FOR MASLAK SINGLE FAMILY RESIDENCE TCO —
EXPIRATION DATE 12-31-09
PERMIT B06-0161
Powder room # 1 to be completed
Main Kitchen air gap to be installed for garbage disposal
Missing 2 dishwashers for prep sink and lower level kitchen
Powder bath #3 to be completed
Permanent glass panel to be installed in stair guard rail
Final inspection of elevator
Screening of generator
Landing at green house door
Obtain final Certificate of Occupancy sign off for all permits related to this project
(PRJOS-0417)
������ ��������
�s�.����s��� i ���
October 30, 2009
Town of Vail
75 South Frontage Rd
Vail, CO 81657
Building Department
RE: Maslak Residence 1979 Sunburst Dr, Vail, CO Bldg Permit #O�r0161.
To Whom It May Concern,
The following is the list of items requested that we foresee inhibiting us from obtaining a
Certificate of Occupancy�in lieu of a Temporary Certificate of Occupancy. All of the
following items below will be completed on or before Deaember 31, 2009.
1.
2.
3.
4.
5.
6.
7.
8.
Powder Room #1: A new sink drain had to be ordered and is on order.
Main Kitchen Sink: Air switch for garbage disposal needs to be installed.
Prep Sink & Lower Level Kitchen: Insta112 dishwashers.
Powder Bath #3 install sink or toilet.
Permanent glass panel to be installed in stair guazd rail.
Elevator final inspection.
Landscape screen material for generator.
Install landing at green house door.
Please feel free to contact me with any questions or concerns.
Sincerely,
GEORGE SHAEFFER CONSTRUCTION COMPANY
'--���� ����
Jeff Kissane
Superintendent
cc: Rob Fawcett
David Hyde
� � "�'�'� � L �` �` �t� L4' E -�
�� � +,
� � � ! ir� ��.���
� �!
���^'��, �`�„- . l.�s� .
��
��� .
.��
� f,., �
�
�
F�eceip� �unds �v.: �
�,� �.� �s����
Narr�e:� �
Mai�in� Addr� s: .�
� �
a
� � �� ,�� .
�
� ��
�
� ���
�
�
rV �
i
�
, �A�� ❑FPDSIT F�RMAT
Legal Descr�p�ion: Lv� ,gl ck
w
Subdi�is�vn: Q.. � . �� �
Addres�: � .
De��lvper. � � . �.. �� �
Perrni� �urnber: � . o � .
Prvjec� Nurnber: ��"-
��pravem�n� �vrr�p�e�ion aa�e: , � -� � --- �
�' � D�V�L.C]p�R ��'IpRt�VF���T' ►����L���VT
� . � �
�H� � A��E���Ni" rr�a and �n�ere irata �his da �f � � �'. �`" �4 �
. _..�.�._�. Y =
� and amfln � �a � ��tia �. �o�� •� ��e "Developer" , and �he To�rtirn of
Y � � �
Va�[ �the "Tvr�rn"}. .
1N��F�EAS, the D��e�n e�, a� a�ondi�ion f ap rovaC of �he T p ra Certifi�c�t� of
���up�n�y fQ� ' �� �. ��.�.�. �c� l.
�addr�ss, Ie��l descri�t��n, a�d pro�ect nurnber} Vvi�h�� �v �n��r intv a De����per . l�pro�err��nt
A�reemen�; and � �
�I�IHE�.�AS, the Deve[oper is ob[�gated �o prnv�de se�ur�ty or ca��a�erai suffcient in the
�udgement vf t�� To�vn tv rr�ake r�as�nable pr���sions fvr c�rr�pletion of c�rt��n �m�pr�ve�ents ����
far�� in the at�ached ��tirr�a�ed ��d�s} in accordar�c� v�r�fih tn� appra�e� plans and specifi�a��on�
fi�ed in �h� off c� of the Cornrnc�nity De►re[opr�en� a��ar���n� of �he� Tavvn af Va�I; and
V11�f���AS, th�e �e�r�[oper �ris��s �o pro�ride c���atera[ �o guarante� p�rforrnance af this
A�r��tr�ent, inc�uding cvrr�p�e���n vf �he a�� irr�proverrYen�� r�ferre� to �n this Agree�men�, by mear�s
�f the fo�lo�ing: . �
The deve�oper �gree� i� e��a��i�h c��h de os�� �ccaun� wi�h �h� T��nrn of Vail, a�
escrorrv �gent, in �he �mount of $ � �- �� as
c�r�npl�tion vf ali �mprovernents referred to �n thi� Agreet�nen�,
def�u�� under �hi� Agreerne�t by the C��velop�r. �
�o�[a�era[ fvr �h�
� n the �W�n� th�ere . is a
�QVlI ��FR�F�.7R�, ir� cons�d�ra�ion of �he f�[�o��ng rnu�u�� ��venants and agre�rnents,
the t�eve�aper �nd the To�nrn �gree as f�[I��s: �
�. The De�e�n�er a�rees, at it� �Qle cost and exp�ns�, �o furn�sh aI� equiprnent and
�a�erials n���ssary t� perf�rm� and cornp�ete ��[ impravemen�� r�ferred ta �n �his �greem���. �he
Deve�op�r agree� �o G mplete ali �[rr� rovemen�s re�erred �� in t��� Agree�en� an �r b�fore the �,
day af iL� �� � � � � ~ , �D-n . Th� Derre�vper ��a[� com��e�e, in a ��ad �rorkm�nl�ke
rnanner, �l� [nnprovernent� r�ferred to �n �his Agreer�ent, �n accordance w�t� a�l �ppraved �lans
and spec�fica�i�ns f�ed �n �he offi�� of �he Comrr�un��y ��rre[vpmen� Departmenfi of the Tovvn of
Vail, and �o d� ��� �rvo�k inc'rdenta[ thereta aGCOrd�ng t� and in carnpfian�� w��h �he f��C��nr�ng:
a. A[i �a�d v�ark sh��� be done under the inspec�i�n of, ar�d �a
�h� �a��sfacfi�on �f, �h� Tvv�rn Planner, �he �own �n�ineer, the Tai�rn Bu��d�r�g
C�f�iGi��, nr other vffi��a� frvrr� �he Tow�n of Vai�, as affec��d by ��ecia� �is�r�c�� or �
servic� d�s�r�c�s, �� �h�eir re�pec��ve �nter��� may app��r, and ��al[ nat be d�er�ned
F:lcdevlF�3RM5lF'ermitslPlanninglAdminis�rative A�tivnsldlA cash fa�-ma� 5-� 5-200?'.do� page 1 v� 5
. ' �y
. ,
, .
' ; :± �� � .
•,i ti � . • � ,•t
� '` �
�F � � � • �,,� � , i` .�.
• , s .
. ,� ; A
� . �.
co�mplete until appr�ved and acc�p��d as completed �y the �ommuni�y �
�e���aprr�en�` �ep��tmen� a�d Publ�c �Iilorks C��partment of �he Tovvn af Vai1. .
�. To se�ure'�nd gu�rantee per�or�anc� of the �bliga��an� a� se� f�rth herein, �he �
__.. . ._.. .. _ _ . . .
Develvper agr�es�tn pr�v�de ca�lafieral as fol�ov�rs:
, „ ,
A cash dep�s�t ac�ount �ri�h the To�nrn of Vai�, �s e�crow agent, �n �h�e annvunt �f
$ � � � �� { � � a� col��t�ra� f�r the comp�etion �f all �m�roverr�en�s
ref�r�ed �o in t�is Agreemen�, in the �ven� ther� �s a defau�t under thi� A�r�emen�
by ��e L7ev�loper. �
. 3. �The Deve�oper imay a� any tim� substitute the �o�la�era[ origina�ly �et fvrt� abnve
for ano�ner form �of se�urity ar co�la�era� a�cep�ab�e �a th� Town �o guarant�e �he fai�hfu�
corr�p���ian vf t�ose innprovernen�s ref�rr�d �� n�rein [n th[� Agreemen� and �he perforrr�ance of
��e �errr�s of th�� Agreemenfi. SuGh accept�nc� by �he To�rn vf �lternative se�ur��y ar Go�l��erai
shal� be at th� Town's s��e d�scre��on. .
� 4. The To�rn �shal[ n�� n�r sha[�� an offc�r �r ern lo ee �h�reof be 1iab�e �r
. � a Y � Y �
re�pvn�i�[e fvr any accident, �o�s flr d�rnage happen�ng vr vccurring fo the work specif�d in �hi�
Agr�er�nen� p�ivr tv the carr�p�etian �r�d acceptance of �he sar�ne, nar sha[� �he Tov�rn, nor �ny
off �er or ennploye� fihereof, �� ��a�l� for any pe�sans vr �r�per�y injured �y reas�n of ��e na�ure
of �aid wo�k, �u� al� �f �aid �i�biC�tie� �ha�i be and a�e hereby a��umred by �h� Developer.
,
Th�e Derr��oper hereby agrees tn indemnify and ho�d harm�ess �he To�n, and any vf it�
offi�ers, a�ents and err�pioyees �g��nst any io�se�, c�ainns, dannages, or 1iab�Ii��es tv which th�
T�r�rn or any of ifis vff �ers, agents o�r �mployees �ay beco�me subjecfi to, in�ofar as any �uch
�os�es, c[ai�rts, dama��s or �iabi�i���s �or a�t�ons in res�ect ���reat] arise ou� of or are b�sed upon
any perfvrnnance by �he QeWe�nper hereund�r; and �he Deve�oper shai� reirnbur�e �he. T'��vn fi�r
any and al� 1eg�� nr v�her expenses reasanably incurred by th� T��rn in can�neG��on v�ri��
�nv�sti�ating or defending any such �a�s, cIairn, da�ma�e, �ia�i��ty or ac�[on. Th�s inde�nn��y
provi�i�n sh��i� �e in aa�diti�n to any a�her ��abi�i�y which �he L7ev��oper r�y h�ave.
�. �� is mutual�y agreed thafi �the De�eloper may app�y for �nd the �To�rn nnay
autnor�ze� a par�ia� re�ea�e of th� cfl[���era� depvsited �ri�h the To�rn for each ca�egory af
im�roverr�ent after t�e �u��e�� irr�provernen� �s ��nstruc�ed in comp�iance rrv�th ��� plans and
�pecif'rcations as referenced hereunder and accep�ed by th� T'own. LSnder nv condi�io� shafl �he
do��ar annvunt�of th� c��I��er�1 �nat ,is �ein� held by t�te Tvv�rn be reduced be�ow �he d�lfar ��aunt
n�ces�ary tv carn��ete a�l unco�p[et�d irr�pr�vemen�s r�ferred �to in th�s Agreer�nent.
5. lf tne Tvwn determ�ine�, at i�� sfl�e discretion, that any of the �mprvWen�ent�
r�f�rred to in t�is A�reerr�ent ar� not cvns�ructed �n compliance v�ri�h �he a��r�ved p�ans �nd
�pecificat�ons f��ed in ��e �ffice vf �he Carr�rnun�ty Deve[�prr�en� C�epartmen� of �he Tov�rn af Va�� ar
nat ac�ep��d �y �he Tov�rn as �arnp�e�e on or before the date set for�h �rt Paragraph �� of t���
�
Agr�erner�t, tn� T��rn �nay, bu� sha�� n�� be requ�red to, dra�r upon �h� securifiy referred �� in this
Agr�ennent a�d c�r�nple�� the �unconnplete� ir�nprav�men�s refierr�d t� in �his A�r�err�ent. Pur�uant
to �e�tion ��-� ��S, Vail To�rn ��de, �he T��parary �ertif c�te af �ccupancy referred �v �n thi�
Agreement may be re�oked un�i� a[� i�mproverr�en�s referred �o herein ar� �orr�p�eted by �he
❑eve�aper �r the T�wn in a�cardar�ce �nrith fihis Agreennent.
F:1�de►rlFC3RlVlSlPermitslPlanninglAdminis�ra�ive AcfionslDlA cash fvrma# 5-'�6-20a?'.dac F'age 2 of 5
1
�f the �o��s of c�mple�ing �he unc�mpleted irnpr�vernen�s r�fe�red to in �hi� A�reennen�
exce�d ��� dollar amount of �he deposit, the �xcess, tog�ther w�fih �n�erest a� t�v�[v� perc�nt
�� �°/o} per annum, sha�1 be a l�en aga�nst �he �r�perty and rr�ay �� c�i�ec�ed �y �ivi� s�uif �r r�nay be
certifed �o �he treas�rer of E�g�e Gounty to he �v��e��ed in �h� s��� m�nner as de��nquent ad
va��re�n taxe� �ev��d ag�inst su�h pro��rty. If �ne ❑evel�per f��[s �r refus�� �o �ompie�e the
innpr��ernen�� ref�rred �o �n �his Agr�ennenf, su�� faiCur� �r refusa� �ha�l be considered a vi���t�an
of Ti��e � 2�Ton�ng 1�egulat�on�}, �f the Vail ��v�rn Code, and t�e deve�oper shaf� be subjec� �o
pena[��es pursuant �o S�c�ion � 2--3�� ��V�o���ions: P�nalt�es} and Chap�er �-4 ��en�ra[ P�n�ity},
of the Va�� Tov�rn ��de.
�'. �he C]eveloper shail v�r�rr�n�y th� r�r�rk and ma�er��ls of �[� �nn�rovem�nts ref�rred
�o �n �his Agr�ement lo�ated �n To�n �rvperty or v�ithin a Towr� r�gh�--�f rr�ay, pur�uan� to Chapter
8--3, vf �h� Vail Tvwn Code, for � p�ri�d of tv�ro ye�r� after the T�wn's. acceptance of �a�d
� m pr�vements. � � � � �
8. The p�rties �ereto m�u�ua�[y a�ree �hat thi� Agreemen� rr�ay be a�nended fram tim�
�o �im�, provid�d th�t such arnend�men�s be in w�ri�in� and execu�ed by ail p�rti�s F�e�eto.
�:lcdevlF�RMSIPermitslPlanninglAdminist�atiW� ActivnslD[A cash farma� 5�'1 fi��fl07.dac Page 3 vf 5
m
L�a�ed �h�e day and .y��r f r�t ��ov� v�r�tt��n.
STAT� C�� CQL4RAC]�
�C3L��VTY C]� �A�L�
Deve��per �
)
� S5.
i
The fiore�o�n� Developer �mpro�rem�ent Agreement rr�ras a�kr�n�rv�edged bef�re rr�e thi�
"�" � Day of C�3 � ��.�" � , �OC� by �t' '� r�..,.
.
� � �w �
IlVit�ess my hand and offtcia� �e�l.
M corr�mis�i�n �x �res � � -- - �� �� :�-�
: � Y �
�,,��� �► � � � � r r rr�►rE�r
��;�:��,'�,��� ��� �� ,�'� ����,rf�r
�� �/r, "! � �;� f'��'.•
► �' '� :
: 4 �DTA � �• � �.
� • s �
r.. q �+�..+�F+�ij�.-*, � ...�
,�i�w"�r � • �."�r
r �� +� � � '"". �� � � ka r �!
� r�.���1 *r* i�• �0;., �
� f����� " • ■ ■ • ■ " � �`�� (i _�
���E��,�,�Q� �"`± ��Q,.�\�����
�j�s��� re� r ii � ���� �e$'��
r� �x�1
�TAY� oF �o�o�Qa
��7UN�TY �� FA� L�
�
..
«.
�a F'ub�i�
� 4
Ta�vn Pl�nner
3
� 5S.
}
The far�gaing C�eve�oper � rr�prv���ren� A�reement was a�knovvledged bef�re me �h��
D�y of ' �1ve-�" , ��� by �1.� i �� �`G4� `r� .
�tne�s my hand and �ff[cia� se�[. .
My car�nr�n���ion expires: � � � �
`� � � �• ►' ► � x ► : � � , � � � , ,,, � �
����°������� �C���''��.
.-�` � � ' Ar� '�.
� �.• •�..�
� r } M ■+
i � ����� �/ � �
� � � � �
,,,,,, a a ,,,,.
� � . „�..,��„ d .'"Mr.
� �
O ,
•
.
���� �� �� � ��� ��#��} '►
► ~�! � � • � '�` r�i �
r LY�� C�
�L J ��f�,� � ., Q • +� ■ a • � �� ' �ti.~~t�rlri�
� ���
��I�'`�'�►�rr�iii �'`''��,��'
����n �� �����
�
, � � �
N� F'ub��c . �
F:lcdevlF�]RM�lPermitslPianninglAdminis�rative Activn�lQ1A cash fvrmat 5�'f 6-�oa7.dvc Page 4�f 5
�
�
ATTAC��C] �C3Pt�� D� i�� ��T�tV1ATFD B�D S
F:lcdevlF�}RMS1F'ermitslpfannin�lAdministrati�e Ac��vnsIDIA �ash fvrmat 5�'� 6���07'.dvc F'age 5 v� �
�
�
�-- �.,. .
�
..
I
.
� , ::
'�t[�! ����� �Ct��# 5���'������
��+or�� �h���"� ��r���ru.���r�► ����a��r
.p..C�. �o� 3�'�
'��� �� � �1 �� �
. F� _ : �Tas t � �.�..��;
�.: 9 �� � ��tn�.urs� ��r��•�
� �T�i�� � ��
���'f,
� . ,r"
�
..
�
,
�
'�� �r��� �`�r ��� ;�n�r�.��r ����a�ure %u��� a� t�.� �.r��,�ix�.�� ����.r �s ����Q.�D. ��in.t�� ax�c�
�'� �h��.
°�'��. F. ��i�=
ti� �
�W���, w Y � Y . . � ' .
�•� � .��r~•.� • �~"�a'��"
1. . �,." � ��'" '
�•
,,,,,:' .� .
x.
� ����� �i���v�� � ��� � R����#���. ����r�� � � ��� � � f �'���� ���3-��Q�
Tc��rn �f �Ia�l
beparfm�nt af �vrr�muni�y �7eve�c�pment
?'� S. Frantage Ra�d
'�ai�, �C� S'� �5�"
Na��: �,t�.���. �c�.� �'l.c�-��� Receip� �o.�,.��_
Add�'ess: c7 � � � t g�� S��s� ��� ��.,,� �
F'roject: �-� r� � ��� � �"� � �.�� � . da�� a 1 �'� I.,�,..�.�._..
, �'f�ase r�ak� check� paya�l� �� �he 7D�N �7� VA�L
A,��ount �1v�
;�
�o. I Code # � Cc�s� Each
oo� o��o ��4 � � � � Addre�s M�ps �
�D � �DDD 3 � �4 � � � �. �anir�g N�aps � �
D�� aQQD 3'� 9 44g� Cu���rr� Maps �
a�� aooa �� 4��� z C.3�he�r �ode B��ks c�
U� � aa�� 3� 4� 2�� Blue F��in�slM �ar �a�y �ee� 8�
�fl� ��D� 3 � �4 � � � � i�era� �opies X�
�a� D�Q� 3'14 ���� �lias�e� l�Ian MS
�D� ��a� 3'�4 ���� 5tudies, M��ter Plan�, e�c. M�
��� �4�� 3� � 3dQ0 Con�rac�ors License �'��� �I�
�D�l ��0� 3�� 3�DD Cnnfi��cfio�s L�cense Fees � R�N�Il1lAL C�L
�C�'� D�iDD �►4� 33�� Develaper �mpr��emen� Agr�emenfi D�po�i� D2-DEF'� 0 A�
aQ� i' - . . . _: � �. � . . : ._ . t�• : � RL
. _ _. . _ .. _ .. ._ ._ _ _. __ _ . _ _.. ..._ . .. _ .---. _.. ._ .._. . _ . .. _ . _ . . . : _ . . _. ,
C3� � 4 _ : � _ : . � . ._. . . - . . SA
�
;�
: .
.. ,
��
. _. .
.. . ......-. �-. .-- _-w:�� .._ � : _. . . _.. ` .. . �._ .. _ . . . ...
._
..
, . . .: , y :
_ . _
, ..� . -���� �r ��. .� � ��
����� . ::. ., : . ; i�S
�.
.. ..
:. ,-
�
. _.. ... __ � :�.: _ _. .... _ �, _� � _ ..�. . . . .
...._._, -:�_ _...�.,� ��,,�.,.�, �
:.
. .: �
_�. � �,
.. .. _. �F _ _ . _ ._ �. . _. _ _ _
. ___
�� �. ,��� � � �� ��
� : �. a� _-_ . � r�.� �.+ m r~ ca�::- �-a �.-� n� � c...,
; -_,r �:�-; �r- -� � �` m � � r,�.�a � �... � � � M S
�,...._.�.. - - . . �_ _ . . . : _.. .. .� . +na _ an r..�. �r. .. r.�►''�� ... . . . . �._._ _ . � �
. . . s r�+ " ri7 �U �« � �� � _ _ . . ._. .
......_.. , _ .
-� . .' ; � "� E,.,' • ,,,�• �x �'""' �.�... �
_. .... .... .. .......... ........_......_. . ... .. F� ... _......... . . .�t..t"Ct...... r-�.... . ...�».,,t.... . �. Z�. ... ....� .. . . � t�+�1 . .. ...,....._ . .... __......._ ..
, I� .. � !: II.. � � � � � � ,.,,.� .. � �
�
.. . .._. . - ---.__._ .... ._.. .. .. ._ . . .._,"�ri .. . . . --.. . ... .. . _ . .. w_ .. ..
'�... . ..r~ .. �"J cr. ,�►.... . .......� r� .. ... . .
� t� � i�'1 R� �-' • r� � � ` ! V! S
: � �i ii� � "'�'� 1"�.� �C.ti ' � � °
. _ �.,. _ .. . . . . . r..� �a► .�. � ... ._ m _ _. _. . . . . . . {
.. ... _ _. _ . ..._ . .... . . . ..
; .
� � nu ��� �v���,
. ... _ ... _ _.. _ . , __... . .. .. _. .._ _ . . _ . . _ _ ..._ . _ . .__..._
. T
� r-�_. . _--�i � !� . .ra .-� �i :
� � � � ' , .. : .�''.i . -- ' , - .. '�' , . �a !� = I �
;
, . �
..... . .. --._. .. __ ....... ._._. .� ..
. :
..
. : - �x
. ... ..._ .. ..... ,.... ,
---�= . r -..�� � � - �""�• � � �
ao� � � �; ;;. �. . . . . . . �- - �; T7
.,
.
� , .;
:..
.
:
. :
.. .
. �
. � .,.�� ,� -�
� � �
._.....�.......�.. . . _ . . . . . _ .. . . _
..� .... ,��
. ..
� : , �- .
�-�
. .
_... ...... _ _. ... , . �.... ...�
. . -�
� �` r � �
_ .. . __. . ...,., . . . .. . ._ . ,,,, . , _
:
r
i
r w�. h++ 'R�'�{„ �ti4' '1�' *'y'!' r" � � �:j �
�
� � �� � � � �
... _ ... . _........_.._..._....._.........__.........._... .__...._......_......._Mw..• •. "►+.� �"r� . __.._., . . .� . ....M.= �..........._.._...... �........._. _ . ...............
N � � R� � R+:r+" � � i� � � �► •
F....�....W.�.....�« .. ...... . . . .. . .. ...... ... .............._.... ....... _ . ... .. ...... ..... ............ � w .. . w ..... ■ . w a . -. �. � . . . .. p .. .. . .. .. .. . - • - _......... .. . ... . _. . .. .......... . . .... ....
i� � *r�-" =�e' � R:� w�.� r.`�. � � .
I � ��� � ��' ��,i�
* a�� i1 . �.. . :
$5.�� *
$�a.�� *
*
�
��.ao *
L��rf...� *
*
*
TC]TA�:
Tairal
�, 7�'�� �
� . �'�`a • •q c�
c�
�
; �omm�n��:
i �
�� �
� Ca�h �vne� 4rder � Check # �I�v �% R���ived � �
�r�d�t ��rd: �1isa I �I1C Last � GC #'s Auth #: �Iame on CC
flcd�vl�vrmsl�dminlsaies ac��c�� fvrm 2��? � 1�l��
. PREPAkE�] a%3a�1❑, l7 :27:�5 . . DEP�SIT REFUND :REP�RT-UPDATE . �_. . PAGE:--.� -.1 . = '=;:�� • ' .
PR�GRAM . �iR4 l5 U � � - . - - -- � ' � = - . . . : . _ _ . _ ' : ' � � _ - _ ,
� • � Tov3i�z of Vail . . - • . . • . . . _ . � .-; :, .. . . .
�, .- � .. . . . .
CUST-- Ii] CUSTUMER NAME TYPE
CHARGE nEPDSIT IJEPdSIT-AD�7' ADJ'USTMENT AFTER-REF[TND
C�DE 17ESCRIPTIC)N T�-i3�iTE A�7'--DATE AM�UNT AMUUNT .AM�UNT ��.MU[7NT
2913 MASL,A�C, L€]`LETA & 5AMUEL DZ _
�EPl� �ep--�eveloper Imp .A.grmts lZ/02/U9 a/la/la 375�.D0 3750.❑d 3?5�,�0-� _�❑
TQTAL FaR CLTSTOMER TYPE : 1:72 3 7 5 Q.[] � 3 7 5❑.❑❑ ��r s a_❑ o- . O D
GRAND TOT.AL: 375❑ . ❑d 375f� , �f� 375� . �0- . ❑❑
DEPCISIT COF.�NT : 1
G/ L BATCH CRE.ATED : B�TCH �- O 1 U 9 8 2 D 1�/� a USERID-- JLQ�TATC� AP HELT3
� CaUNT- . il � .�iMOUNT- 3 , 7 5 (3 . � Q
10-29-2009 Inspection Request Reporting Page 14
4:30 !�m VaiJ, GO - Citv Of
Requested Inspect Date: Friday, October 30, 2009
Inspection Area: cg
Site Address: 1979 SUNBURST DR VAIL
1979 SUNBURST DR
A/P/D Information
Activity: M08-0058 Type: B-MECH
Const Type: Occupancy :
Owner: MASLAK, SAMUEL H. & LULETA
Contractor: SKYLINE MECHANICAL
Description: MECHANICAL NEW SFR
Requested Inspection(s)
Sub Type: NSFR
Use:
Phone: 970-524-6809
Status: ISSUED
Insp Area: cg
Item: 390 MECH-Final Requested Time: 03:30 PM
Requestor: JEFF WITH GEORGE SHAEFFER CONSTRU Phone: 970-376-6184, JEFF
Comments: WIL CALL JEFF 376-6184; REINSPECT
Assigned To: JM [3,R ON Entered By: LCAMPBELL K
Action: Time Exp:
Comment: IN STONE RO R�REA
Comment: 1) BATH FAN IN MASTER ABOVE SHOWER NOT WORKING
2) TAPE DUCT JOINT AT ERV
Inspection Historv
Co ��c `'� �f ��,�
c
C �
� �
Item: 200 MECH-Rough ** Approved *"
12/22/08- Ins� pector: GCD Action: CR CORRECTION REQUIRED
Comment: 1.HAVE ENG REVIEW BASMENT DRYER DUCT AND BOOSTER FAN, TOTAL RUN IS 35 FEET
AND 7 90'S.
2.REFRIGERATION LINES REQ TEST.
3.CHECK OPENING IN STONE FOR REQD AREA FOR OUTSIDE AIR.
12/30/08 Inspector: GCD Action: AP APPROVED
Comment: FAN-TECH BOOSTER FAN ALLOWS 70 FEET AND 6 90'S. CHANGE 2 90'S TO 1 45 AT END
OF RUN.
REFRIGERATION LINES 2 HAVE 250psi2 HAVE 200psi.
ITEM 3 AT FINAL
Item: 310 MECH-Heating
Item: 315 PLMB-Gas Pipin�g
Item: 320 MECH-Exhaust Hoods
Item: 330 MECH-Supply Air
Item: 340 MECH-Misc.
Item: 390 MECH-Final
12/30/08 Inspector: GCD Action: NO NOTIFIED
Comment: CHECK OPENING IN STONE RO REQD OSA AREA
10/29/09 Insp ector: CG Action: CR CORRECTION REQUIRED
Comment: 1 BATH FAN IN MASTER ABOVE SHOWER NOT WORKING
23 TAPE DUCT JOINT AT ERV
REPT131 Run Id: 10529
�
10-29-2009 Inspection Request Reporting Page 15
4:30 pm �/ai(, CO - Citv Of
Requested Inspect Date: Friday, October 30, 2009
Inspection Area: JRM
Site Address: 1979 SUNBURST DR VAIL
1979 SUNBURST DR
A/P/D Information
Activity: M08-0075 Type: B-MECH
Const Type: Occupancy :
Owner: MASLAK, SAMUEL H. & LULETA
Sub Type: ASFR Status: ISSUED
Use: Insp Area: JRM
Contractor: RESORT MOUNTAIN ENTERPRISES Phone: 970-384-2748
Description: INSTALL 2 GAS FIREPLACE APPLIANCES, 1 FIREPLACE WITH GAS LOG
Requested Inspection(s)
Item: 390 MECH-Final Requested Time: 04:00 PM
Requestor: JEFF WITH GEORGE SHAEFFER Phone: 970-376-6184, JEFF
CONSTRUCTION
Comments: WILL CALL JEFF 376-6184; REINSPECT
Assigned To: JMO DRA�ON Entered By: LCAMPBELL K
Action: ��L/ Time Exp:
Comment:
Comment: 1) NE D TO CHECK SHUT-OFF ON MAIN LEVEL FIREPLACES. HAVE KEY AVAILABLE
2, NEED TO HAVE FIREPLACE MANUALS ON SITE TO REVIEW HEARTHS AND MANTLE
c;LEARANCES
Co r��v(�r z��. � /`'l��-�-
�v 3 d �
�
Inspection Historv
Item: 200 MECH-Rough "Approved "*
07/30/08 Inspector: JGG Action: COND APPROVED/CONDITIONS
Comment: Fireplaces installed OK per inst. manuals. Heat shield has large dent, strap to connector not
secured. Upstairs thimble through combustible framin is separated.
09/17/08 Ins ector: JRM Action: AP APP�VED
Comment: FI�EPLACES APPROVED FOR MECH ROUGH
Item: 310 MECH-Heating
Item: 315 PLMB-Gas Pipin�g
Item: 320 MECH-Exhaust Noods
Item: 330 MECH-Supply Air
Item: 340 MECH-Misc.
09/05/08 Inspector: NSC Action: DN DENIED
Comment: no one onsite and no super on site.
Item: 390 MECH-Final
_10/23/09 Inspector: Martin Action: NR NOT READY FOR INSPECTION
Inspector: cg Action: CR CORRECTION REQUIRED
1) NEED TO CHECK SHUT-OFF ON MAIN LEVEL FIREPLACES. HAVE KEY AVAILABLE
2j NEED TO HAVE FIREPLACE MANUALS ON SITE TO REVIEW HEARTHS AND MANTLE
c�LEARANCES
REPT131 Run Id: 10529
.
�
!O�'��5�
10-26-2009 Inspection Request Reporting Pag� 20
4:01 qm Vail, Cp - Ci�pf �
Requested Inspect Date: Tuesday, October 27, 2009
Inspection Area: SH
Site Address: 1979 SUNBURST DR VAIL
1979 SUNBURST DR
A/P/D Information
Activity: E07-0242 Type: B-ELEC
Const Type: Occupancy:
Owner: MASLAK, SAMUEL H. & LULETA
Contractor: SHAW ELECTRIC
Description: ELECTRICAL WIRING FOR A NEW RESIDENCE
Requested Inspection(s)
Item: 190 ELEC-Final
Requestor: SHAW ELECTRIC
Comments: WC 390.8307
Assigned To: JMONDRAGON
Sub Type: NSFR
Use:
Phone: 970-926-3358
Status: ISSUED
Insp Area: SH
Requested Time: 08:00 AM
Phone: 970-926-3358
Entered By: CGUNION K
Action: Time Exp:
Comment: CHED LIGHT IN ATffC-5'PA�E BY OBSERVATION TOWER. 2. PROVIDE IN-USE
�OVERS FOR EXTERIOR RECEPTACLES.
���
Inspection Historv
Item: 110 ELEC-Service "` Approved **
03/12/08 Inspector: SHAHN
Comment:
Action: AP APPROVED
02/10/09 Ins ector: MDENNEY Action: AP APPROVED
Comment: SE�VICE WAS CHANGED FROM SINGLE PHASE TO 400AMP 3PHASE 120/208V.
REINSPECTED.
Item: 120 ELEC-Rough "Approved "`
10/03/08 Insp�ector: shahn Action: PA PARTIAL APPROVAL
Comment: ENTRY SOFFIT BACK LOWER DECK OK.
MAINTAIN 3 INCH CLEARANCE TO INSULATION FOR NON-IC CANS.
12/19/08 Inspector: shahn Action: PA PARTIAL APPROVAL
Comment: ok excluding ara e, storage in basement, and observation.
Com/me/�$ GA�AGE ROUGH� PPROVED. Action: PA PARTIAL APPROVAL
02/10/09 Inspector: MDENNEY Action: AP APPROVED
Comment: STORAGE ROOM IN BASEMENT AND OBSERVATORY.
Item: 130 ELEC-Conduit '* Ap�proved "
09/28/07 In�sp ector: SHAHN Action: AP APPROVED
Comment: OK TO BACKFILL
05/15/09 Inspector: shahn Action: AP APPROVED
Comment: generator trench ok to backfill
05/21/09 fnspector: SHAHN Action: AP APPROVED
Comment: LANDSCAPE CONDUIT OK
Item: 140 ELEC-Misc.
Item: 190 ELEC-Final
10/22/09 Insp ector: MDENNEY Action: CR CORRECTION REQUIRED
Comment: 1. PROVIDE SWITCHED LIGHT IN ATTIC SPACE BY OBSERVATION TOWER. 2. PROVIDE
IN-USE COVERS FOR EXTERIOR RECEPTACLES.
_ _ _ - -_ _ _ _ _
REPT131 Run Id: 10508
B06-0161: Entries for Item:90 - BLDG-Final 09:22 02/14/2013
Action Comments By Date Unique_
Ke
AP Martin 01/27/2010 A000131
261
Total Rows: 1
Page 1
D06-0004: Entries for Item:90 - BLDG-Final 09:22 02/14/2013
Action Comments By Date Unique_
Ke
qp JRM 07/01/2010 A000134
344
Total Rows: 1
Page 1
E06-0179: Entries for Item:190 - ELEC-Final 09:22 02/14/2013
Action Comments By Date Unique_
Ke
AP SHAHN 02/05/2009 A000122
688
Total Rows: 1
Page 1
M06-0291: Entries for Item:390 - MECH-Final 09:23 02/14/2013
Action Comments By Date Unique_
Ke
qp Martin 10/23/2009 A000129
008
Total Rows: 1
Page 1
P06-0114: Entries for Item:290 - PLMB-Final 09:23 02/14/2013
Action Comments By Date Unique_
Ke
DN 1. Missing Toilet in Garage Martin 10/23/2009 A000129
2. Powder room 1 sink drain missing 009
3. Missing air Gap for garbage disposal
4. Missing dishwasher at kitchen & wetbar
downstairs
5. Powder Room 3 not done
AP Chris 01/26/2010 A000131
224
Total Rows: 2
Page 1