HomeMy WebLinkAboutB10-0003 comment letterDepartment of Community Development 5 South Frontage Road Vail, Colorado 81657 970-479-2138 FAX 970-479-2452 www.vailgov.com ______________________________________________________________________ PROJECT REVIEW COMMENTS DATE: 2/01/2010 TO: Col Construction Inc PO Box 4573 Vail, Colorado 81658 r PERMIT APPLICATION #: B10-0003 PROJECT ADDRESS: 2955 Bellflower Drive OCCUPANCY GROUP: R-3 OCCUPANT LOAD: TYPE OF CONSTRUCTION: VB NUMBER OF STORIES: 2 BUILDING AREA: ● Submit 3 complete sets of revised construction documents containing the requested information with all plan revision items clouded or otherwise identified. ● Please respond in writing to each comment with a response letter addressing each comment. Building Team Comments Architectural Comments: Sheet SP Plans do not reflect the required foundation drainage as required by the structural design. Revise plans. Provide positive drainage for 10’ @ 2% from the building prior to the trench drain per section 1804.3 IBC. The proposed termination of the trench drain is less than 3’ from the property line. Show how drainage is to be maintained on the projects property. Annotate on plans a survey of the location of the proposed footings shall be provided or the property monuments shall be located and stringed for footing inspection. Sheet A1 The plans reflect two separate unite with a proposed separation of utilities. Provide documentation that this has been an permitted use and show location of required fire assemblies’ separation. Reference section R302.3. Sheet A2 Indicate the required separation of the garage from the dwelling including materials used to achieve this separation. Indicate on plans the required self-closing solid core door as required by section 302.5.1 IRC. It appears the kitchen is to be remodel in that a waal goes through the counter. Please clarify Sheet A8 Provide complete cross-sections of walls and openings showing how waterproofing is to be achieved. Provide details showing how the R21 insulation is to be achieved. Specifically in areas adjacent to window header locations and rim joist. Structural Comments: Sheet S1 Architectural plans need to reflect how drainage and waterproofing is to be achieved at the wall reflected in Section A. Sheet S2 Please add to structural notes the required special inspections. Plans do not reflect the concentrated loads of the proposed hot tub. Please revise Sheet S3 Upon approval of the joist hangar sizing submit to the Town of Vail Community Development department prior to framing inspection. Please annotate on plans. MEP Comments: Sheet MEP 1 Provide electrical load calculations for proposed work. Provide a CO detector adjacent to the Bedroom per section R315 IRC Show location and size of meter/service location. Sheet MEP 2 Is a new bathroom proposed? Please clarify. Identify the arc fault circuits Indicate exterior lights to be dark sky fixtures. Sheet MEP 3 Provide the required GFCI receptacle at the Hot tub Show required outlets in the bedroom Planning Team Comments The Employee Housing Unit (EHU) located on the lower level must be an independent living unit from the primary residence. There shall be no internal circulation between the two units. Environmental Team Comments NA Fire Department Comments To be addressed separately Public Works Comments To be addressed separately Martin A Haeberle Chief Building Official Town of Vail 970-479-2142 mhaeberle@vailgov.com F:\CDev\BUILDING\2010 draft plan review comments\B10_0003.DOC