Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
DRB080350
Design Review Boardഀ ACTION FORMഀ Department of Community Developmentഀ ogIV V ' 75 South Frontage Road, Vail, Colorado 81657ഀ tel: 970.479.2139 fax: 970.479.2452ഀ well: www.vailgov.comഀ Project Name: ATEFI DUPLEX TO SFR DRB Number: DRB080350ഀ Project Description:ഀ CONVERT DUPLEX TO SFRഀ Participants:ഀ OWNER ATEFI, BAHMAN & HAMILAഀ APPLICANT K.H. WEBB ARCHITECTS PCഀ 710 WEST LIONSHEAD CIR, UNIT Aഀ VAILഀ CO 81657ഀ License: 0000001627ഀ ARCHITECT K.H. WEBB ARCHITECTS PCഀ 710 WEST LIONSHEAD CIR, UNIT Aഀ VAILഀ CO 81657ഀ License: 0000001627ഀ 08/11/2008ഀ 08/11/2008 Phone: 970-477-2990ഀ 08/11/2008 Phone: 970-477-2990ഀ Project Address: 1468 VAIL VALLEY DR VAIL Location:ഀ Legal Description: Lot: 17 Block: 3 Subdivision: VAIL VALLEYഀ Parcel Number: 2101-092-0701-5ഀ 2101-092-0701-6ഀ Comments: SEE CONDITIONSഀ BOARD/STAFF ACTIONഀ Motion By: Action: STAFFAPPഀ Second By:ഀ Vote: Date of Approval: 09/18/2008ഀ Conditions:ഀ Cond: 8ഀ (PLAN): No changes to these plans may be made without the written consent of Town ofഀ Vail staff and/or the appropriate review committee(s).ഀ Cond: 0ഀ (PLAN): DRB approval does not constitute a permit for building. Please consult withഀ Town of Vail Building personnel prior to construction activities.ഀ Cond: 201ഀ (PLAN): DRB approval shall not become valid for 20 days following the date ofഀ approval, pursuant to the Vail Town Code, Chapter 12-3-3: APPEALS.ഀ Cond: 202ഀ (PLAN): Approval of this project shall lapse and become void one (1) year followingഀ the date of final approval, unless a building permit is issued and construction isഀ commenced and is diligently pursued toward completion.ഀ Cond: CON0010264ഀ Fire sprinkler system required and shall comply with NFPA 13R(2002) and WESഀ standards.ഀ Cond: CON0010266ഀ Monitored fire alarm system required and shall comply with NFPA 72(2002) and VFESഀ standards.ഀ Planner: DRB Fee Paid:ഀ $300.00ഀ Additions- Residential or Commercial Yഀ Application for Design Reviewഀ _ Department of ~orrRrltlydt)► revelഀ tel: .070ഀ * `.SF.JY~.:iihil+YJ:it:Ta~Pi11~..A.~i$Sii:'l►iT.'~, 8.;~1~~'y- a4'~,''..? ~ 7.~'~r~.'j~!•~•e ~hഀ General Informadon:ഀ This application is required for all proposals involving the addition of any floor area, Including net floor area and/or grossഀ residential floor area (GRFA). This also Includes proposals for lresidentlal 250 additions' and Interlor conversionsഀ Applicable ValI Town Code sections can be found at wwwmaggg%com under Pall Information - Town Code Online. Allഀ projects requiring design review must receive approval prior to submitting a building permit application. An applicationഀ for Design Review cannot be accepted until all required information Is received by the Community Developmentഀ Deparbnent, as outlined in the subrdttal requirements. The project may also need to be reviewed by the Town Councilഀ and/or the Planning and Environmental Commission. Design review approval eVIres one year from the date of approval,ഀ unless a building permit Is Issued and construction commences.ഀ Fee: $300ഀ Description of the Request:l,CNMe - L)ഀ u[k9.K "M Q SinO►k I L~~ hlonQ_ഀ Addition of sq ft of GRFA (Residential)ഀ Addition of -SeQ cVQa {nap sq ft of net floor area (Commercial/ Office)ഀ Single Family Duplex Multi-F liyഀ Location of the Proposal: Lot: Block: Subdivision: M, 4ഀ Physical Address; y i ~IPU C~V-Pഀ Parcel Number.ഀ Property Owner:ഀ Mailing Address:ഀ o b 2CJ I WE.-f"22" - ru-1Sഀ ( ntact Eagle Co. Assessor at 970-32&8640 for parcel no.)ഀ man d yv-0-Qഀ '1 a 3(04ഀ Owner's Signature:ഀ Primary Contact/ Owner R praseഀ `Mariling Address: W?Iz~- Ljw\S~6 tഀ V Jlt - (n R I (D In7 Phone: Q1i7 ' -9C7ഀ E-mail Address: Q~~ 0 ~ 1 Pn n o .Fax: L - . ~ Q CDഀ aഀ :ഀ Pall: 3`~ . Chet ko.• _ RCvdഀ tiny Hate: 1 DRS Iഀ AUG 1 1 2008ഀ #W 1 2,-Dഀ k h w e b bഀ TRANSMITTALഀ To: Rachel Friede, TOV Planning Dept. Date: 08.11.08ഀ From: Lauren Ford Re: Atefi Residenceഀ CC:ഀ ENCLOSED: (3) copies of DRB submittal including grfa calcs, plans, elevations, site plan, survey,ഀ and photos.ഀ NOTES:ഀ Please let me know if you have any questions or if you need anything else.ഀ Thanks,ഀ Laurenഀ 110 WEST LIONSHEAD CIRCLE, SUITE A VAIL COLORADO 81651ഀ 970.477.2990 970.471.2965 (1) www.khwebb.comഀ 07.14.08ഀ Zoning Analysis:ഀ Lots 17A and I1B, Block 3, Vail Tillage Filing No. 1ഀ 1468 Vail Valley Drive, Vail, Coloradoഀ Lot Size: Lot 17A = 0.268 AC / 11,670 sq. ft,ഀ Lot 17B = 0.204 AC / 8,886 sq. ft.ഀ Total = 0.472 AC / 20,560 sq. ft.ഀ Based on Town of Vail Platഀ Zoning: Two-Family Primary/Secondary Residential Zoningഀ Setbacks: 20' Frontഀ 15' Sidesഀ 15' Rearഀ Heightഀ 33' Sloped Roofs, 30' Flat Roofsഀ Landscapingഀ 12,336 sq. ft. required (60% of total site area)ഀ Site Coverage:ഀ 4,112 sq. ft. (20% of total site area) Allowedഀ Parking.ഀ 5 spaces requiredഀ GRFA (Gross Residential Floor Area):ഀ GRFA (Floor Area): Allowable: for One Dwelling Unitഀ 4,600+ 1,900+722 =1,222 sq. ft. of Gross Living Spaceഀ Deduct -10% for walls, shafts, etc = 6,500 sq. ft of functional living spaceഀ Items not included in above numbers:ഀ 300 sq. ft. per enclosed garage space up to two per dwelling unit.ഀ Attics less than 5' in height, Attics only accessible from the floor belowഀ Basements wholly below grade, if portions above grade, they will count.ഀ Items assumed not included in above numbers:ഀ Vaulted spaces count against square footage above 16' in height.ഀ 1004 Zoning Revisions: The Town of Vail has recently revised GRFA (Floor Area) Regulations. The synopsis is that the Townഀ cW will only count a percentage of below grade and substantially sub-grade spaces in its Square Footage limits provided squareഀ footage is not used up above the basement or lowest level. Vaulted spaces now count as square footage above 16' in heightഀ Site Coverage Limits have not changed.ഀ 3ഀ Please note that the above numbers are subject to verification by the Town of Vail Planning Staff and will vary subject to theഀ individual clients design and decision making process.ഀ 11-1ഀ 710 WEST LIOHSHEAD CIRCLE, SUITE A VAIL COLORADO 81657ഀ 970.477.2990 970.477.2965(FI www.khwebb.comഀ Vife'8t.R 0 i4f 4^"f91CA:+) IMST1[6Tt 0 f 4kCH1ltC1Sഀ ate:ഀ ഀ TOWN OF VAIL, COLORADO Statementഀ Statement Number: R080001366 Amount: $300.00 08/11/200803:32 PMഀ Payment Method: Check Init: JLEഀ Notation: 2626 KH WEBBഀ Permit No: DRB080350 Type: DRB - Addition of GRFAഀ Parcel No: 2101-092-0701-5ഀ Site Address: 1468 VAIL VALLEY DR VAILഀ Location:ഀ Total Fees: $300.00ഀ This Payment: $300.00 Total ALL Pmts: $300.00ഀ Balance: $0.00ഀ ACCOUNT ITEM LIST:ഀ Account Code Description Current Pmtsഀ ഀ DR 00100003112200 DESIGN REVIEW FEES 300.00ഀ Oഀ CPഀ Cഀ Zഀ Qഀ -nഀ aoഀ rr.ഀ Oഀ Allഀ Zഀ y 1ഀ tഀ iഀ 4ഀ tiഀ t Y ~ഀ m v m y ,ഀ F- rnഀ m A ;ഀ I w y y yഀ 4ഀ ~Y.ഀ }ഀ Eഀ ഀ ഀ ~ 'ഀ General Information:ഀ This application is required for all proposals involving the addition of any floor area, including net floor area and/or grossഀ residential floor area (GRFA). This also includes proposals for residential 250 additions' and 'interior conversions'.ഀ Applicable Vail Town Code sections can be found at www.vailaov.com under Vail Information - Town Code Online. Allഀ projects requiring design review must receive approval prior to submitting a building permit application. An applicationഀ for Design Review cannot be accepted until all required information is received by the Community Developmentഀ Department, as outlined in the submittal requirements. The project may also need to be reviewed by the Town Councilഀ and/or the Planning and Environmental Commission. Design review approval expires one year from the date of approval,ഀ unless a building permit is issued and construction commences.ഀ Fee: $300ഀ Description of the Request: L 1Ve~'t- Iv) 0 1 Lഀ Addition of l~ ()Wl La l sq ft of GRFA (Residential)ഀ Addition of '5~J, O> 6 L~ `fD,h sq ft of net floor area (Commercial/ Office)ഀ Single Family z- Duplex Multi-Fa //id~ly \ I Iഀ Location of the Proposal: Lot: 1113 Block: Subdivision:ഀ l,` ` V 1 1~Cഀ Physical Address: ul sl iഀ a colsഀ Parcel Number: a11t~~1©~ ~~tP ( ontact Eagle Co. Assessor at 970-328-8640 for parcel no.)ഀ Property Owner: ~'1~1~1Cv'1 Ma -ayy1 I' 0- A Ae--J(jഀ Mailing Address: CAഀ iഀ -c-ഀ JQI Q , Phone: -10 ~ ~41 a " S(0 qഀ Owner's Signature:ഀ Primary Contact/ Owner Representative: h~AUഀ Mailing Address: - Iz wec:~~-ഀ W- ~ (C) s l cc~ ~ Phone:ഀ E-mail Address: . Feഀ (Ooഀ Office Use Only: Cash:ഀ CC:ഀ Paid: Check No.: Rcvd From:ഀ ig Date: DRB No.:ഀ -U7~-~R CSCഀ ~RP~80~ഀ AUG 15 zoosഀ r IUഀ AILഀ TOWNOFVXff ~ UTILITY APPROVAL & VERIFICATION FORMഀ This form is applicable to any construction within an easement and may be required for any construction if deemed necessaryഀ by Town of Vail Staff. This form serves to verify that the proposed improvements will not impact any existing or proposedഀ utility services, and also to verify service availability and location for new construction and should be used in conjunction withഀ preparing your utility plan and scheduling installations. A site plan, including grading plan, floor plan, and elevations, shall beഀ submitted to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL ORഀ COMMENTS FROM THE UTILITY COMPANIES.ഀ Subject Property Address:t%d V00 VQ~u~ b00- Lot- BlockS Subdivision. %mഀ Va11,C0ഀ Primary Contact/ Owner Representative: Phone:ഀ Primary Contact/ Owner Representative Signature - Date Plans Dated:ഀ Authorized Signatureഀ Commentsഀ Dateഀ QWESTഀ PH: 970.468.6860ഀ rഀ v°~ V fഀ FX: 970.468.0672ഀ Contacts: Samഀ Tooleyഀ samuel.toole west west. comഀ XCEL HIGH PRESSURE GASഀ PH: 970.262.4076ഀ FX: 970.468.1401ഀ Contact: Rich Sisnerosഀ [iEhard.sisneros@gelenergy.comഀ HOLY CROSS ENERGYഀ PH: 970.947.5471ഀ FX: 970.945.4081ഀ Contact: Diana Golisഀ d olis hol cross.comഀ XCEL Energyഀ PH: 970.262.4024ഀ FX: 970.262.4038ഀ Contact: Kit Bogertഀ Kathryn BoaertCa)XCELENERGY comഀ EAGLE RIVER WATER &ഀ SANITATION DISTRICTഀ PH: 970.476.7480ഀ FX: • 970.476.4089ഀ Contact: Fred Hasleeഀ fhaslee erwsd.orഀ COMCAST CABLEഀ PH: 970.930.4713ഀ FX: 970.925.4106ഀ Contact: Michael Johnsonഀ michael 'ohnson cable.comcast,comഀ CDOT (Only in CDOT Right-of-Way)ഀ PH: 970-683-6284ഀ Contact: Dan Roussinഀ daniel.roussin dot.state.co.usഀ LrV1W'ഀ 1. Utility locations must be obtained before digging.ഀ 2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact theഀ Public Works Department for verification 970.479.2198.ഀ 3. It is the responsibility of the utility company and the applicant to resolve problems identified above.ഀ 4. The Primary Contact/ Owner Representative Is required to submit any revised drawings to the above agency's for re-ഀ approval & re-verification if the submitted plans are altered in any way after the authorized signature date.ഀ Z d SOLOOOOOSZ "-N/Lb:6 -1S/eb:6 9oOZ SL Onw(1L3) Z49089V0Z6 aMz10H12l3A71S 153ML',1 W021dഀ SILVERTHORNE HPഀ MWNOF yxഀ Fax:19704681401ഀ Aug 12 2008 13:35ഀ UTILITY APPROVAL & VERIFICATION FORMഀ P. 02ഀ This form Is applicable to any construction within an easement and may be required for any construction If deemed neces:ഀ by Town of Vail Staff. This form serves to verify that the proposed improvements will not Impact any existing or propoഀ utility services, and also to verify service availability and location for new construction and should be used in conjunction %ഀ preparing your utility plan and scheduling Installations. A site plan, including grading plan, floor plan, and elevations, shallഀ submitted to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVALഀ COMMENTS FROM THE UTILITY COMPANIES. , Iഀ Subject Property Address- ~~~g VQ1I uQ~U,i~ ~(~(Q 'tഀ Vai1,C0 Lot BlockSubdivision: ucL~ഀ Primary Contact/ Owner Representative: Phone:ഀ Primary Contact/ Owner Representative Signature - Date Plansഀ Commentsഀ PH: 970.468.6860ഀ FX: 970.468.0672ഀ Contacts: Sam Tooleyഀ PH: 970.262.4076ഀ FX: 970.468,1401ഀ Contact: Rich Sisneഀ HOLY CROSS ENERGYഀ PH: 970.947.5471ഀ FX: 970.945.081ഀ Contact: Diana Gollsഀ L Energyഀ 970.262.4024ഀ 970.262.4038ഀ act: Kit Bogertഀ eAULL RIVER WATER &ഀ SANITATION DISTRICTഀ PH: 970.476.7480ഀ FX: 970.476.4089ഀ Contact: Fred Hasleeഀ PH: 970.930.4713ഀ FX: 970.925.4106ഀ Contact: Michael Johnsonഀ Dan Roussinഀ #0 I /y► PisGTഀ W/rlo dsഀ ao JCCEI~ഀ . O.Wഀ Dateഀ AUG 12ഀ 1. Utility locations must be obtained before digging.ഀ 2. A Revocable Right-of-Way Permit may be required for any Improvements within a street right-of-way, Contact theഀ Public Works Department for verification 970,479,2198.ഀ 3. It is the responsibility of the utility company and the applicant to resolve problems Identified above.ഀ 4. The Primary Contact/ Owner Representative Is required to submit any revised drawings to the above agency's for re-ഀ approval & re-verification if the submitted plans are altered in any way after the authorized signature date.ഀ TOWNOFYAaഀ UTILITY APPROVAL & VERIFICATION FORMഀ This form is applicable to any construction within an easement and may be required for any construction if deemed necessaryഀ by Town of Vail Staff. This form serves to verify that the proposed Improvements will not impact any eAsting or proposedഀ utility services, and also to verify service availability and location for new construction and should be used in conjunction withഀ preparing your utility plan and scheduling installations. A site plan, Including grading plan, floor plan, and elevations, shall beഀ submitted to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL ORഀ COMMENTS FROM THI_ UTILITY COMPANIES.. / \ഀ Subject Property Address: a -l YQ - ~ of Block,-Subdivision: Wഀ Vail,COഀ Primary Contact/ Owner Representative: Phone:ഀ Primary Contact/ Owner Representative Signature - Date Plans Dated:ഀ Authorized Signatureഀ Commentsഀ Dateഀ QWESTഀ PH: 970.468.6860ഀ FX: 970.468.0672ഀ Contacts: Sam Tooleyഀ I,ഀ XCEL HIGH PRESSURE GASഀ PH: 970.262.4076ഀ FX: 970.468.1401ഀ Contact: Rich Sisnerosഀ rf ard.sisneros c l n r mഀ HOLY CROSS ENERGYഀ PH: 970.947.5471ഀ FX:ഀ 970945.4081ഀ Contact; ct; Diana na G olisഀ li I mഀ XCEL Energyഀ PH: 970.262.4024ഀ FX: 970.262.4038ഀ Contact: Kit Bogertഀ Kathryn.Boaert@XCELENERGY cornഀ EAGLE RIVER WATER &ഀ SANITATION DISTRICTഀ PH: 970.476.7480ഀ FX: 970.476.4089ഀ Contact: Fred Hasleeഀ fhaslee erWsd.orഀ COMCAST CABLEഀ PH: 970.930.4713ഀ FX: 970.925.4106ഀ Contact: Michael Johnsonഀ michael iohnson@cable.comosst.comഀ CDOT (Only in CDOT Right-of-Way)ഀ PH: 970-683-6284ഀ Contact: Dan Roussinഀ daniel.roussin@dot.state.co.-ഀ 1. Utility locations must be obtained before digging.ഀ 2. A Revocable Right-of-Way Permit may be required for any Improvements within a street right-of-way. Contact theഀ Public Works Department for verification 970.479.2198.ഀ 3. It is the responsibility of the utility company and the applicant to resolve problems identified above.ഀ 4. The Primary Contact) Owner Representative is required to submit any revised drawings to the above agency's for re-ഀ approval & re-verification if the submitted plans are altered in any way after the authorized signature date.ഀ 2190 'ON WdIE:Z 8002 'Zl '2ndഀ Aug. 12. 2008 10:32AMഀ TOWNoeഀ UTILITY APPROVAL & VERIFICATION FORMഀ No. 4821 P. 1ഀ This form Is applicable to any construction within an easement and may be required for any construction If deemed necessaryഀ by Town of Vail Staff. This form serves to verify that the proposed ImprAvements will not Impact any existing or proposedഀ utility services, and also to verify service availability and location for new construction and should be used In conjunction withഀ preparing your utility plan and scheduling Installations. A site plan, Including grading plan, floor plan, and elevations, shall beഀ submitted to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL ORഀ COMMENTS FROM THE UTILITY COMPANIES.ഀ Subject PropertyAddressi'I~g UaII VQ~1a ~!(L~Q• Lotl-IY Rlock3-Subdlvlsloni lഀ Vibg;ഀ VaII,CO T "ഀ Primary Contact/ Owner Representativet Phone.ഀ Primary Contact/ Owner Representative Signature - Date Plans Dated:ഀ Authorized Signatureഀ Commentsഀ Dateഀ QW ESTഀ PH: 970.468.6660ഀ FX: 970,168,0672ഀ Contacts: Sam Tooleyഀ Mygi,igolevagwest.comഀ XCEL HIGH PRESSURE GASഀ PH; 970.262.4076ഀ FX: 970.468.1401ഀ Contact; Rich 5lsnerosഀ richard-sIsnarogagg coഀ HOLY CROSS ENERGYഀ PH: 970.947.5471ഀ FX; 970.945.4081ഀ Contact: Diana Golfsഀ s5.c6ഀ XCEL Energyഀ PH; 970.262.4024ഀ FX, 970.262.4038ഀ Contact; Kit Bogertഀ Kath!yn,0oggrt®XCELENERGYcomഀ (ഀ g, Ja-Q$fഀ EAGLIH RIVER WATER &ഀ SANITATION DISTRICTഀ PH; .970.476.7480ഀ FX: 970.476.4089ഀ i iIdNit=Lwel WMI-1uഀ COMCAST CABLEഀ PH: 970.930.4713ഀ PX; 970,925,1106ഀ Contact: Michael Johnsonഀ ralOagl siphosonacable.comoaLmഀ CDOT (Only In CDOT Right-of-Way)ഀ PH; 970=693-6284ഀ Contact: Dan Roussinഀ I. ousslnഀ 1. Utility locations must be obtained before digging.ഀ 2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact theഀ Public Works bepartment for veriflcatlon 970.479.2198.ഀ 3. It Is the responsibility of the.utllity company and the applicant to resolve problems Identified above.ഀ 4. The Primary Contact/ Owner Representative Is required to submit any revised drawings to the above agency's for re-ഀ approval & re-verification if the submitted plans are altered In any way after the authorized signature date.ഀ -476-4089 ERWSDഀ 770OFYRa'I,ഀ ERWSDഀ UTILITY APPROVAL & VERIFICATION FORMഀ 08:26:49 12-08-2008 1/1ഀ This form is applicable to any construction within an easement and may be required for any construction if deemed necessaryഀ by Town of Vail Staff. This form serves to verify that the proposed improvements will not impact any existing or proposedഀ utility services, and also to verify service availability and location for new construction and should be used in conjunction withഀ preparing your utility plan and scheduling installations. A site plan, including grading plan, floor plan, and elevations, shall beഀ submitted to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL ORഀ COMMENTS FROM THE UTILITY COMPANIES.ഀ Subject Property Address:1gof Vatt Yk` m brier Lot - 1APഀ Block,3L_Subdivision: I 1ഀ Vall,C0 Iഀ Primary Contact/ Owner Representative: Phone:ഀ Primary Contact/ Owner Representative Signature - Date Plans Dated:ഀ Authorized Signatureഀ Commentsഀ Dateഀ QWESTഀ PH: 970.468.6860ഀ FX: 970.468.0672ഀ Contacts: Sam Tooleyഀ samuel.toole west.comഀ XCEL HIGH PRESSURE GASഀ PH: 970.262.4076ഀ FX: 970.468.1401ഀ Contact: Rich Sisnerosഀ tichard.sia!]eros(@Xgeleoer-gy.c.OMഀ HOLY CROSS ENERGYഀ PH: 970.947.5471ഀ FX: 970.945.4081ഀ Contact: Diana Golisഀ dqolis@)ho-!Lcross.comഀ XCEL Energyഀ PH: 970.262.4024ഀ FX: 970.262.4038ഀ Contact: Kit Bogertഀ Kathrvn.BoaertXCELENER_GY comഀ EAGLE RIVER WATER &ഀ SANITATION DISTRICTഀ PH: 970.476.7480ഀ FX: 970.476.4089ഀ Contact: Fred Hasleeഀ fhaslee erwsd.orഀ COMCAST CABLEഀ PH: 970.930.4713ഀ FX: 970.925.4106ഀ Contact: Michael Johnsonഀ michael iohnson@)cable.comcast.comഀ COOT (Only in CDOT Right-of-Way)ഀ PH: 970-683-6284ഀ Contact: Dan Roussinഀ daniel.roussin dot. state. co. usഀ 1. Utility locations must be obtained before digging.ഀ 2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact theഀ Public Works Department for verification 970.479.2198.ഀ 3. It is the responsibility of the utility company and the applicant to resolve problems identified above.ഀ 4. The Primary Contact/ Owner Representative is required to submit any revised drawings to the above agency's for re-ഀ approval & re-verification if the submitted plans are altered In any way after the authorized signature date.ഀ 08/11/2008 MON 18:37ഀ 'MWNO WAILഀ PAX 9709254106 COMCAST CABLEഀ UTILITY APPROVAL & VERIFICATION FORMഀ This form is applicable to any construction within an easement and may be required for any construction If deemed necessaryഀ by Town of Vail Staff. This form serves to verify that the proposed improvements will not impact any existing or proposedഀ utility services, and also to verify service availability and location for new construction and should be used In conjunction withഀ preparing your utility plan and scheduling Installations. A site plan, Including grading plan, floor plan, and elevations, shall beഀ submitted to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL ORഀ COMMENTS FROM THE UTHM COMPANIES.ഀ Subject Property Address: Mof Vaii VQ Lot.- block;~-Subdivision-~vail,c0ഀ Primary Contact/ Owner Representative: _ Phone:ഀ Primary Contact/ Owner Representative Signature - Date Plans Dated:ഀ Authorized Signatureഀ Commentsഀ Dateഀ QWESTഀ PH: 970.468.6860ഀ FX: 970.468.0672ഀ Contacts: Sam Tooleyഀ samuel.toole west.comഀ XCEL HIGH PRESSURE GASഀ PH: 970.262.4076ഀ FX: 970.468.1401ഀ Contact: Rich Slsnerosഀ rithard sis ero eaec .camഀ HOLY CROSS ENERGYഀ PH: 970.947.5471ഀ FX: 970.945.4081ഀ Contact: Diana Golfsഀ i ash I croഀ XCEL Energyഀ PH: 970.262.4024ഀ FX: 970.262.4038ഀ Contact: Kit Bogertഀ Kathrvn.Bovert@XCELENERGY comഀ EAGLE RIVER WATER &ഀ SANITATION DISTRICTഀ PH: 970.476.7480ഀ FX: 970.476.4089ഀ Contact: Fred Hasleeഀ fhaslee envsd.oഀ COMCASi CABLEഀ PH: 970.930.4713ഀ FX: 970.925.4106ഀ Contact: Michael Johnsonഀ michael •ohnson cable.comcast.comഀ 6!ഀ COOT (Only in CDOT Right-of-Way)ഀ PH: 970-683-6284ഀ Contact: Dan Roussinഀ daniel.rWssin dot.state.co.usഀ unre~.ഀ 1, Utility locations must be obtained before digging.ഀ 2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact theഀ Public Works Department for verification 970.479.2198.ഀ 3. It is the responsibility of the utility company and the applicant to resolve problems Identified above.ഀ 4. The Primary Contact/ Owner Representative is required to submit any revised drawings to the above agency's for re-ഀ approval & re-verification if the submitted plans are altered in any way after the authorized signature date.ഀ ®001/001ഀ i~~uwiu~n~o~isu~oMUOw ps„gqഀ II I1 page: 1 of 2ഀ 11/tli/2004 10:16Rഀ L^'"ഀ Teak ] glroonton Eagle, CC' 432 R 11.00 D 253.75ഀ Filed for record the day of A.D. at O'CLOCK M. RECORDERഀ Reception No: - - By DEPUTY.ഀ WARRANTY DEED ; .ഀ ഀ THIS DEED, made on this day of November 10, 2004 between.ഀ NEAL CRAIG GROFFഀ of the County of and State of COLORADO of the Grantor(s), andഀ 5AH14AN ATEFI AND HAMILA ATEFIഀ whose legal address is :8745 OLD DOMINION DR. MC LEAN, VA 22102ഀ of the County of and State of VIRGINIA of the Grantee(s):ഀ WITNESS, That the Grantor(s), for and in consideration of the sum of ($2,537,500.00 )ഀ Two Million Five Hundred Thirty Seven Thousand Five Hundred and 00/100 *DOLLARSഀ the receipt and sufficiency of which is hereby acknowledged, has granted, bargained, sold and conveyed, and by theseഀ presents does grant, bargain, sell, convey and confirm unto the Grantee(s), their heirs and assigns forever,ഀ not in tenancy in common but in joint tenancy, all the real property, together with improvements, if any, situate,ഀ lying and being in the County of EAGLE and State of Colorado, described as follows:ഀ LOT 17A, A RESUBDIVISION OF LOT 17, BLOCK 3, VAIL VALLEY FIRST FILING ACCORDING TO THEഀ PLAT RECORDED SEPTEMBER 8, 1981 IN BOOK 328 AT PAGE 648, COUNTY OF EAGLE, STATE OFഀ COLORADO.ഀ also known as street number, 1468- VAIL VALLEY DRIVE VAIL CO 81657ഀ TOGETHER with all and singular and hereditaments and appurtenances thereto belonging, or in anywise appertainingഀ and the reversion and reversions,. remainder and remainders, rents, issues and profits thereof; and all the estate, rightഀ title interest, claim and demand whatsoever of the Grantor(s), either in law or equity, of, in and to the above bargainedഀ premises, with the hereditaments and appurtenances;ഀ TO HAVE AND TO HOLD the said premises above bargained and described with appurtenances, unto the Grantee(s),ഀ their heirs and assigns forever. The Grantor(s), for himself, his heirs and personal representatives, does covenant, grantഀ bargain, and agree to and with the Grantee(s), their heirs and assigns, that at the time of the ansealing and deliveryഀ of these presents, he is well seized of the premises above conveyed, has good, sure, perfect, absolute and indefeasibleഀ estate of inheritance, in law, in fee simple, and has good right, full power and lawful authority to grant, bargain,ഀ se1L and convey the same in manner and form as aforesaid, and that the same are free and clear from all former and otherഀ grants, bargains, sales; liens, taxes, assessments, encumbrances and restrictions of whatever kind or nature soever,ഀ EXCEPT GENERAL TAXES AND ASSESSEHHTS FOR THE YEAR 2064 AM SO,ISEQDENT YEARS Ah-D SDEJECT To THOSE STEWS AS SST FORTE Wഀ EXETEIr 'A - ATTACHED' HERETO AND TNCORPORATED HEMS. -ഀ The Grantor(s) shall and will WARRANT AND FOREVER DEFEND the above bargained premises in the quiet and peaceableഀ possession of theGrantee(s), his heirs 'andassigns, against all end every person or persons lawfully -claiming the 'wholeഀ or any part thereof. The ,inguLar lumber shall include the plural, and the plural the singular, and the use of any genderഀ sholl.be applicable:to all.genders..,ഀ IN WITNESS WHEREOF the Grantor(s) has executed this deed on the date set forth above. ar: C r~ഀ HEAL CR,A10 GROFP °ഀ STATE OF COLORADO )ഀ )ss.ഀ County of )ഀ 196 2 0 WISPഀ Teak J Simonton Eeyle, Co 432 R 11.00 D 253.75ഀ EXHIBIT 14- Our Order No. V50007360-6ഀ RIGi IT OF PROPRIETOR OF A VEIN OR LODE TO EXTRACT AND REMOVE HIS OREഀ T14EREFROM SHOULD THE SAME BE FOUND TO PENETRATE OR INTERSECT THEഀ PREN41SES AS RESERVED IN UNITED STATES PATENT RECORDED JUNE 29, 1903,ഀ IN BOOK 48 AT PAGE 495.ഀ RIGI IT OF WAY FOR DTTCHCS OR CANALS CONSTRUCTED BY THE AUTHORITY OF THEഀ UNITED STATES AS RESERVED IN UNITED STATES PATENT RECORDED JUNE 29,ഀ 1903, IN BOOK 48 AT PAGE 495.ഀ RESTRICTIVE COVENANTS WHICH DO NOT CONTAIN A FORFEITURE OR REVERTERഀ CLAUSE, BUT OMITTING ANY COVENANT OR RESTRICTION BASED ON RACE,ഀ COLOR, RELIGION, SEX, HANDICAP, FAMILIAL STATUS OR NATIONAL ORIGINഀ UNLESS AND ONLY TO THE EXTENT THAT SAID COVENANT (a) IS EXEMPT UNDERഀ CHAPTER 42, SECTION 3607 OF THE UNITED STATES CODE OR (b) RELATES TOഀ HANDICAP BUT DOES NOT DISCRIMINATE AGAINST HANDICAP PERSONS, ASഀ CONTAINED IN INSTRUMENT RECORDED April 13, 1970, IN BOOK 317 AT PAGEഀ 406.ഀ EASEMENTS, CONDITIONS, COVENANTS, RESTRICTIONS, RESERVATIONS AND NOTESഀ ON THE RECORDED PLAT OF VAIL VALLEY FILING NO. 1.ഀ EASEMENTS, CONDITIONS, COVENANTS, RESTRICTIONS, RESERVATIONS AND NOTESഀ ON THE PLAT OF A RESUBDIVISION OF LOT 17, BLOCK 3, VAIL VALLEY FIRSTഀ FILING RECORDED SEPTEMBER 8, 1981, UNDER RECEPTION NO. 225009.ഀ TERMS, CONDITIONS AND PROVISIONS OF DECLARATION OF COVENANTS,ഀ CONDITIONS AND RESTRICTIONS, EASEMENTS AND PARTY WALL RECORDED AuguSEഀ 16. 1982 IN BOOK 344 AT PAGE 338.ഀ LAND TITLE IS IN RECEIPT OF A SATISFACTORY IMPROVEMENT LOCATIONഀ CERTIFICATE PREPARED BY EAGLE VALLEY SURVEYING, INC., ON 9/17/91 JOBഀ NO. 1736ഀ EXHIBIT Aഀ Property Address: LOT 17, UNIT B, VAIL VALLEY SUBDIVISION, AKA 1468 VAIL VALLEY DRIVEഀ . , VAIL, CO 81657ഀ RIGHT OF PROPRIETOR OF A VEIN OR LODE TO EXTRACT AND REMOVE HIS OREഀ THEREFROM SHOULD THE SAME BE FOUND TO PENETRATE OR INTERSECT THEഀ PREMISES AS RESERVED IN UNITED STATES PATENT RECORDED NNE 29, 1903,ഀ IN BOOK 48 AT PAGE 495.ഀ RIGHT OF WAY FOR DITCHES OR CANALS CONSTRUCTED BY THE AUTHORITY OF THEഀ UNITED STATES AS RESERVED IN UNITED STATES PATENT RECORDED JUNE 29,ഀ 1903, IN BOOK 48 AT PAGE 495.ഀ RESTRICTIVE COVENANTS WHICH DO NOT CONTAIN A FORFEITURE OR REVERTERഀ CLAUSE, BUT OMITTING ANY COVENANTS OR RESTRICTIONS, IF ANY, BASEDഀ UPON RACE, COLOR, RELIGION, SEX, SEXUAL ORIENTATION, FAMILIAL STATUS,ഀ MARITAL STATUS, DISABILITY, HANDICAP, NATIONAL ORIGIN, ANCESTRY, ORഀ SOURCE OF INCOME, AS SET FORTH IN APPLICABLE STATE OR FEDERAL LAWS,ഀ EXCEPT TO THE EXTENT THAT SAID COVENANT OR RESTRICTION IS PERMITTEDഀ BY APPLICABLE LAW, AS CONTAINED IN INSTRUMENT RECORDED APRIL 13,ഀ 1970, IN BOOK 217 AT PAGE 406.ഀ EASEMENTS, CONDITIONS, COVENANTS, RESTRICTIONS, RESERVATIONS AND NOTESഀ ON THE PLAT OF VAIL VALLEY, FIRST FILING RECORDED MAY 12, 1970 INഀ BOOK 217 AT PAGE 609.ഀ EASEMENTS, CONDITIONS, COVENANTS, RESTRICTIONS, RESERVATIONS AND NOTESഀ ON THE RESUBDIVISION PLAT OF LOT 17, BLOCK 3, VAIL VALLEY FIRSTഀ FILING RECORDED SEPTEMBER 8, 1981 IN BOOK 328 AT PAGE 648.ഀ TERMS, CONDITIONS AND PROVISIONS OF DECLARATION OF COVENANTS,ഀ CONDITIONS, RESTRICTIONS, EASEMENTS AND PARTY WALL BUT OMITTING ANYഀ COVENANTS OR RESTRICTIONS, IF ANY, BASED UPON RACE, COLOR, RELIGION,ഀ SEX, SEXUAL ORIENTATION, FAMILIAL STATUS, MARITAL STATUS, DISABILITY,ഀ HANDICAP, NATIONAL ORIGIN, ANCESTRY, OR SOURCE OF INCOME, AS SETഀ FORTH IN APPLICABLE STATE OR FEDERAL LAWS, EXCEPT TO THE EXTENT THATഀ SAID COVENANT OR RESTRICTION IS PERMITTED BY APPLICABLE LAW ASഀ CONTAINED IN INSTRUMENT RECORDED AUGUST 16, 1982 IN BOOK 344 AT PAGEഀ 338.ഀ (ITEM INTENTIONALLY DELETED)ഀ LAND TITLE GUARANTEE COMPANY IS IN RECEIPT OF AN IMPROVEMENT LOCATIONഀ CERTIFICATE DATED 4/22/06, PREPARED BY LELAND LECHNER, JOB NO. 6193.ഀ