Loading...
HomeMy WebLinkAboutDRB080377Design Review Board ACTION FORM TOWN CC,)- ,%1Jg417Y CCALOPMEN7 Department of Community Development 75 South Frontage Road, Vail', Colorado 81657 tel :970.479.2139 fax: 970.479.2452 web: www.vailgov.com Project Name: FRAMPTON LANDSCAPING DRB Number: DRB080377 Project Description: Participants: LANDSCAPE IMPROVEMENTS OWNER FRAMPTON, SUSAN R.0 /O EAST W 08/21/2008 DRAWER 2770 AVON CO 81620 APPLICANT LAND DESIGNS BY ELLISON 08/21/2008 PO BOX 2134 EAGLE CO 81631 Project Address: 14 BEAVER DAM RD VAIL Location: Legal Description: Lot: 34 Block: 7 Subdivision: VAIL VILLAGE FILING 1 Parcel Number: 2101 - 071 - 1300 -1 Comments: SEE CONDITIONS BOARD /STAFF ACTION Motion By: Action: STAFFAPP Second By: Vote: Date of Approval: 09/19/2008 Conditions: Cond: 8 (PLAN): No changes to these plans may be made without the written consent of Town of Vail staff and /or the appropriate review committee(s). Cond: 0 (PLAN): DRB approval does not constitute a permit for building. Please consult with Town of Vail Building personnel prior to construction activities. Cond: 201 (PLAN): DRB approval shall not become valid for 20 days following the date of approval, pursuant to the Vail Town Code, Chapter 12 -3 -3: APPEALS. Cond: 202 (PLAN): Approval of this project shall lapse and become void one (1) year following the date of final approval, unless a building permit is issued and construction is commenced and is diligently pursued toward completion. Cond: CON0010324 THE APPLICANT SHALL BE HELD TO ALL CONDITIONS LISTED ON THE REVOCABLE RIGHT OF WAY PERMIT THAT IS ASSOCIATED WITH THIS APPROVAL. Planner: RACHEL FRIEDE DRB Fee Paid: $20.00 Development Review Coordinator Community Development Department 75 South Frc _ _ _ -- tel : Application for Design Review V, AUG 21 700B Minor Exterior Alterations �� General Information: �'_ OF VAIL This application is required for all proposals involving minor changes to buildings and site improvements, such as re- roofing, painting, window additions, landscaping, fences, retaining walls, etc. Applicable Vail Town Code sections can be reviewed on -line at www.vailgov.com under Vail Information – Town Code On -line. All projects requiring design review must receive approval prior to submitting a building permit application. An application for Design Review cannot be accepted until all required information is received by the Community Development Department, as outlined in the submittal requirements. Design review approval expires one year from the date of approval, unless a building permit is issued and construction commences. Fee: $250 for Multi - Family /Commercial $20 for Single Family /Duplex Description of the Request: a. e - A. 6�nrLA.b a.►-A I_kS Vpt3 L."A C . _ Single Family I' Duplex Multi - Family r I I Location of the Proposal: Lot: `f Block Subdivision: V I I k e_ Physical Address: 1ESe_0_Q eX Y ak' L- Co Parcel No.: 2.1 C 1 d _�_ 1 1 b U (Contact Eagle Co. Assessor at 970 -328 -8640 for parcel no.) Name(s) of Owner(s): t'1 ay rH 0.h I ra►- +1 ® Mailing Address: Imo Sa ,- �'V0 � CC p 1(0 20 Phone: q 1_6 - H Owner(s) Signature(s): L� Name of Applicant: ► k —{=5t S Mailing Address: 12 6 X 2�3 Phone: O (o E -mail Address: Fax: For Office Use Onlut ,1 i+ ,�// Fee Paid: Check No.: By: �wnl llf� C P�✓`> Meeting Date: DRB No.: Q J� Planner: Project No.: —61 i — i OCIVIfOIO:)'IIVA OVOb WVCl'd3AV39 VT 9DNaGIS3d NOIdWVd=l ro OL D c Ln rn —61 i — i D T> • 1 NIT • • Zp Ej _ � yn .,HIW J��r, v Q- • i ro -r M (U CL RL CL co 0 CL t;m Z< CC) x rn 1-0 C) LL U— U) ud . CL 2 0. Z, a XUJ l3ed�IsdI dH Wdii =B 8002 16 tic From:Land Designs by Ellison 970 328 6084 07131/2008 16:57 #280 P.0021002 s ' P '� UTILITY APPROVAL & VERIFICATION This form serves to verify that the proposed improvements will not impact any existing or ,proposed utility services, and also to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and scheduling installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COMMENTS' FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact The Town of Vail. Address: 10 L tLWM r' - 04m t- fGW Lot S-! Block - Subdivision: i/ft, i1;i0+4t_ `1LiN6 1 Wb l--' C G 1 b , 6 6 -- ) QW EST 970.468.6860(tel) 970.468.0672(fax) Contacts: Sam Tooley samuel.tooley a�gwest com XCEL HIGH PRESSURE GAS 970,262,4076 (tel) 970.468.1401 (fax) Contact: Rich Sisneros richard.sisnerosgxcelenergy com HOLY CROSS ENERGY 970.947.5425 (tel) 970.945.4081 (fax) Contact: Diana Golis dqolis@holycross.com XCEL Energy 970.262.4038 (fax) 970.262.4024 (tei) Contacts: Kit Bogert Kathry,n.Bogert@XCELENERGY.com EAGLE RIVER WATER& SANITATION DISTRICT 970.476.7480 (tel) 970.476.4089 (fax) Contact: Fred Haslee fhaslee @erwsd.org COMCAST CABLE 970.418.8248 (tel) 970.949.9138 (fax)` Contact Michael Johnson michael _johnson @cable.comcast.com Authorized Signature Comments Date Q v�'C!T7 l.V i LL- IJ 0 "7 iE C �Zei P -t rx, 4 t-E Fgf2- A I t' 74f 7 (- A-r6^ - &NT NOTES: 1. If the utility approval `& verification form has signatures from each of the utility companies; and no comments are made directly on the form, or no action is taken within 2 weeks of the Utility's receipt of the form without explanation the Town will presume that there are no problems and the development can proceed. 2. If a utility 'company has concerns with the proposed construction, the utility representative shall note directly on the utility verification form that there is a- problem which needs to be resolved. The issue should then be detailed in an attached letter to the Town of Vail. However, please keep in mind that it is the responsibility of the utility company and the applicant to resolve identified problems: 3. These verifications' do not relieve the contractor of the responsibility to obtain a Public Way Permit from the Department of Public Works at the Town of Vail. _Utility locations must be obtained before digging in any public right -of -way or easement within the Town of Vail. A building permit is not a Public Way permit and must be obtained separate 4. The Developer is required and agrees to submit any revised drawings to the utilities for re- approval &. re- verification if the submitted plans are al eredin anyway after the authorized signature date (unless otherwise specifically noted within the comment area of this form), Developer's Signature Date Z d VOt00000St 'oN /OV : B ' 1S/ Lb : e aooz S L nnV (1 Nd) Z19OSSVOZG ANNOHLMMA1 1 S 1S3Mo NOMA SILVERTHORNE HP Fax:19704681401 Huy 4 2008 6:06 P.02 * V iE TOWN UTILITY APPROVAL & VERIFICATION This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and al to verify service availability and location for new construction and should be used in conjunction with preparing your utility pan and scheduling installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted to the following !,utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COMMENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact The Town of Vail. i Address: I &- - J)V0t DAM 20V Lot �S Block _7 Subdivision: Uft (/tcf-i+e, = �1LIn1� Authorized Signature Comments Date UQWEST 970.468.6860(tel) 970.468.0672(fax) Contacts: Sam Tooley q sa u (.tool y gwest.com XC HIGH PRESSURE GAS t ('p , � AUG 0 :4 2008 9 0.262.4076 (tel) 970.468.1401 (fax) Contact: Rich Sisneros r(o (MPACT -yo lr Gam, (,A 4;�," Vt rd richar . ssneros xcelener .com b2 HO CROSS ENERGY R 97 .947.5425 (tel) 970.945.4081 (fax) Contact: Diana Golis i dqolis@holycross.com >- XCEL Energy 970.262.4038 (fax)''��` 970.262.4024 (tel) Contacts: Kit Bogert Kathryn Bogert(d )XCELENERGY.com — EAGLE RIVER WATER & SANITATION DISTRICT 970.476.7480 (tel) 970.476.4089 (fax) F Contact: Fred Haslee fhaslee erws MCAST CABLE 970.418.8248 (tel) 970.949.9138 (fax) Contact: Michael Johnson michael _johnson@cable.comcast.com NOTES: 1. If the utility approval & verification form has signatures from each of the utility companies, and no comments are made directly on the form, or no action is taken within 2 weeks of the Utility's receipt of the form without explanation the Town will; presume that there are no problems and the development can proceed. 2. If a utility company has concerns with the proposed construction, the utility representative shall note directly on the utility verification form that there is a problem which needs to be resolved. The issue should then be detailed in an attached letter to the Town of Vail. However, please keep in mind that it is the responsibility of the utility company and the applicant to resolve identified problems. 3. These verifications do not relieve the contractor of the responsibility to obtain a Public Way Permit from the Depalrtment of Public Works at the Town of Vail. Utility locations must be obtained before digging in any public right -of -way or 'easement within the Town of Vail. A building permit is not a Public Way permit and must be obtained separately 4. The Developer is required and agrees to submit any revised drawings to the utilities for re- approval & re- verification if the submitted plans are al ered in any way after the authorized signature date (unless otherwise specifically noted within the' °comment area of this form). Developer's Signature ` Date TOWN OF Vk ; UTILITY APPROVAL & VERIFICATION This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and also to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and scheduling installations. A site plan, Including grading plan, floor plan, and elevations, shall be submitted to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COMMENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact The Town of Vail. Address: to GONCt'Z DJhvi 2 01}x} Lot 5`1 Block Subdivision: U ft UiLwgr ,r. OLIN1 , Authortzed Signature Comments Date QW EST 970,468.6860(tel) 970.468.0672(fax) Contacts: Sam Tooley sa muel.tooleyCdgwest.corm XCEL HIGH PRESSURE GAS 970.262.4076 (tel) 970.468.1401 (fax) Contact: Rich Sisneros richa rd.sisnerosPxcelenergy.coLn. HOLY CROSS ENERGY 970.947.5425 (tel) 970.945.4081 (fax) Contact: Diana Golis dgoiisftolycross.com XCEL Energy 970.262.4038 (fax) 970.262.4024 (tel) Contacts: Kit Bogert Kathryn.�B Bert( XCELENERGY.com EAGLE RIVER WATER & SANITATION DISTRICT 970.476.7480 (tel) 970.476.4069 (fax) Contact: Fred Haslee fhaslee00erwsd.ora COMCAST CABLE 970.418.8248 (tel) 970.949.9138 (fax) Contact: Michael Johnson michael- „Johnson @cable.comcast.com NOTES: 1. If the utility approval & verification form has signatures from each of the utility companies, and no comments are made directly on the form, or no action is taken within 2 weeks of the Utility's receipt of the form without explanation the Town will presume that there are no problems and the development can proceed. 2. If a utility company has concerns with the proposed construction, the utility representative shall note directly on the utility verification form that there is a problem which needs to be resolved. The issue should then be detailed in an attached letter to the Town of Vail. However, please keep in mind that It is the responsibility of the utility company and the applicant to resolve identified problems. 3. These verifications do not relieve the contractor of the responsibility to obtain a Public Way Permit from the Department of Public Works at the Town of Vail. Utility locatigns must be obtained before digging in any public right -of -way or easement within the Town of Vail. ,A building permit is not a Public Way permit and must be obtained separately 4. The Developer Is required and agrees to submit any revised drawings to the utilities for re- approval & re- verification if the submitted plans are al eyed in any way after the authorized signature date (unless otherwise specifically noted within the comment area of this form). V _ ! ^ v G Developer's Signature Date TOWN OF *ViAl UTILITY APPROVAL & VERIFICATION This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and also to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and scheduling installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COMMENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact The Town of Vail. Address: 1 1907 VOt Mm 7 OV, Lot �` 1 Block — 7 Subdivision: U; UtLL 0,,,t:7 a l lNh y GU le)i(1 Authorized Signature Comments Date QWEST 970.468.6860(tel) 970.468.0672(fax) Contacts: Sam Tooley sa muel.toolev @awest. com XCEL HIGH PRESSURE GAS 970.262.4076 (tel) 970.468.1401 (fax) Contact: Rich Sisneros ri cha rd. sisn eras @xcel e n ergy.co m HOLY CROSS ENERGY 970.947.5425 (tel) 970.945.4081 (fax) Contact: Diana Golis dgolis@holycross. com XCEL Energy 970.262.4038 (fax) 970.262.4024 (tel) Contacts: Kit Bogert Ka thry BoaertCNXCELEN ERGY. com EAGLE RIVER WATER & SANITATION DISTRICT 970.476.7480 (tel) 970.476.4089 (fax) Contact: Fred Haslee fhaslee@erwsd.org COMCAST CABLE 970.418.8248 (tel) 970.949.9138 (fax) Contact: Michael Johnson michael-johnson@cable.comcast.com � a k c rn:1 NOTES: 1. If the utility approval & verification form has signatures from each of the utility companies, and no comments are made directly on the form, or no action is taken within 2 weeks of the Utility's receipt of the form without explanation the Town will presume that there are no problems and the development can proceed. 2. If a utility company has concerns with the proposed construction, the utility representative shall note directly on the utility verification form that there is a problem which needs to be resolved. The issue should then be detailed in an attached letter to the Town of Vail. However, please keep in mind that it is the responsibility of the utility company and the applicant to resolve identified problems. 3. These verifications do not relieve the contractor of the responsibility to obtain a Public Way Permit from the Department of Public Works at the Town of Vail. Utility locations must be obtained before digging in any public right -of -way or easement within the Town of Vail. A building permit is not a Public Way permit and must be obtained separately. 4. The Developer is required and agrees to submit any revised drawings to the utilities for re- approval & re- verification if the submitted plans are� tere zany way after the authorized signature date (unless otherwise specifically noted within the comment area of this form), \ I Developer's Signature - Date O$ /04/2008 M 16:02 FAX 9709254106 COMCAST GABLE ®001 /002 r t d T Of }((, UTILITY APPROVAL & VERIFICATION This form serves to verify that the proposed improvemcnts will not impact any existing or proposed utility services, and also to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and scheduling Installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted to the following utilities for approval and verification, PLEASE ALLOW UP TO 2 'WEEKS FOR APPROVAL OR COMMENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact The "town of Vail. Address: E 47IVO� DJty, ROD Lot Block 7_ Subdivision: U� -U_i.Lwg6L ::' .-5LiWI f \ 41bL, cd ` lb 1 Authorized Signature Comments DatO QWEST 970.466.6860(tel) 970.468.0672(fax) Contacts: Sam Tooley sarnuei.toaley�west.com XCEL HIGH PRESSURE GAS 970.262.4076 (tel) 970.468.1401 (fax) Contact: Rich Sisnero5 ' ricftard .sisnerasCbl��elencrg�.rom HOLY CROSS ENERGY 970.947.5425 (tel) 970.945,4081 (fax) Contact: Diana Golis dg�Iis,�h� XCEL Energy 470.262.4038 (fax) 970.262.409 (tel) Contacts': Kit Bogert { t n.Boc e XCEI.ENE EAGLE RtVll:k WATER & SANITATION DTSTRICT { 970.476.74$0 (W) 970_476.4U89 (fax) ' Contact: Fred Haslee fljaslaeCaerwsd_org COMCAS°T CABLE 970.41$.8248 (tcl) 970.949.9138 (fax) Contact: Michael Johnson mlchael_ johnson(*oble.comcast.oam NOTES% 1. If the utility approval & verification form has signatures from each of the utility companies, and no comments are made directly on the form, or no action Is taken within 2 weeks of the Utility's receipt of the form without explanation the Town will presume that there are no problems and the development can proceed. 2. If a utility company has concerns with the proposed construction, the utility representative shall note directly on the utility verification form that there Is a problem which needs to be resolved. The issue should then be detailed in an attached letter to the Town of wail. However, please keep in mind that it is the responsibility of the utility company and the applicant to resolve identified problems. 3. These verifications do not relieve the contractor of the responsibility to obtain a Public Way permit from the Department of Public Works at the Town of Vail, utility locations must be_optained before digging in any public right-of -way or easement within the Town of Vail. A building hermit is not a Public Way pormit and must be g tawk senaratel1 4. The Developer is required and agrees to submit any revised drawings to the utilities for re- approval & re- verification if the submitted plans area eyed :n any way after the authorized signature date (unless otherwise specifi - ally noted within the comment area of this form). Developer's Signature - Pate TOWN OF VAIL, COLORADO Statement Statement Number: R080001452 Amount: $20.00 08/21/200803:55 PM Payment Method:Credit Crd Init: JLE Notation: DANIELLE K SELLERS ----------------------------------------------------------------------- - - - - -- Permit No: DRB080377 Type: DRB -Minor Alt,SFR /DUP Parcel No: 2101 - 071 - 1300 -1 Site Address: 14 BEAVER DAM RD VAIL Location: Total Fees: $20.00 This Payment: $20.00 Total ALL Pmts: $20.00 Balance: $0.00 ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------- - - - - -- ------------------------ - - - - -- ------ - - - - -- DR 00100003112200 DESIGN REVIEW FEES 20.00