Loading...
HomeMy WebLinkAboutDRB080616Design Review Board ACTION FORM ~owx~v~ oown~xrn oevE~.a~Kr Department of Community Development 75 South Frontage Road, Vail, Colorado 81657 te1:970.479.2139 fax: 970.479.2452 web: www.vailgov.com Project Name: CORRIGAN RESIDENCE DRB Number: DR6080616 Project Description: Participants: APPROVED NEW SINGLE FAMILY RESIDENCE OWNER 2379 CHAMONIX LOT LLC PO BOX 5050 CAREFREE AZ 85377 APPLICANT BLUELINE ARCHITECTS, P. C. PO BOX 574 MINTURN CO 81645 License: 0000002400 ARCHITECT BLUELINE ARCHITECTS, P. C. PO BOX 574 MINTURN CO 81645 License: 0000002400 12/ 15/2008 12/15/2008 Phone:970-827-5400 12/15/2008 Phone: 970-827-5400 Project Address: 2379 CHAMONIX RD VAIL Location: Legal Description: Lot: 15 Block: A Subdivision: VAIL DAS SCHONE FIL 1 Parcel Number: 2103-114-0101-4 Comments: See conditions below Motion By: Gillette Second By: DuBois Vote: 5-0-0 Conditions: Action: APPROVED Date of Approval: 01/07/2009 Cond: 8 (PLAN): No changes to these plans may be made without the written consent of Town of Vail staff and/or the appropriate review committee(s). Cond: 0 (PLAN): DRB approval does not constitute a permit for building. Please consult with Town of Vail Building personnel prior to construction activities. Cond: 201 (PLAN): DRB approval shall not become valid for 20 days following the date of approval, pursuant to the Vail Town Code, Chapter 12-3-3: APPEALS. Cond: 202 BOARD/STAFF ACTION (PLAN): Approval of this project shall lapse and become void one (1) year following the date of final approval, unless a building permit is issued and construction is commenced and is diligently pursued toward completion. Cond: CON0010526 DRB conditions: 1. The applicant shall submit, for review and approval by staff, a light fixture to replace the non-conforming light fixture referenced as the 'exterior wall sconce,' illustrated on sheet A1.6 of plans date stamped December 15, 2008, with a light fixture that meets Section 1410-7, Vail Town Code, prior to submittal of a Building Permit application. 2. The applicant shall revise the retaining walls within the front setback, as illustrated on sheet A1.1 of plans date stamped December 15, 2008, to not exceed 3 feet in height, within the front setback, per Section 14-6-7, Vail Town Code, to be reviewed and approved by Staff in conjunction with the Building Permit application. Planner: Nicole Peterson DRB Fee Paid: $650.00 'roAIV~Y,l~ PROJECT ORIENTATION MEMBERS PRESENT Mike Dantas Tom DuBois Pete Dunning Brian Gillette Libby Plante DESIGN REVIEW BOARD AGENDA PUBLIC MEETING January 7, 2009 Council Chambers 75 S. Frontage Road -Vail, Colorado, 81657 MEMBERS ABSENT SITE VISITS 1. 2379 Chamonix Lot LLC, 2379 Chamonix Road 1:OOpm 2:OOpm PUBLIC HEARING -TOWN COUNCIL CHAMBERS 3:OOpm Lion Square Lodge North DR6080608 / 5 Minutes Bill Final review of changes to approved plans (third floor windows) 660 Lionshead Place/Part of Lot 8, Vail Lionshead Filing 3 Applicant: Lion Square Lodge North, represented by JL Viele Construction ACTION: Approved MOTION: DuBois SECOND: Dantas VOTE: 5-0-0 2. Corrigan Residence DRB080616 / 20 Minutes Nicole Final review of new construction (single family residence) 2379 Chamonix Road/Lot 15, Block A, Vail Das Schone Filing 1 Applicant: 2379 Chamonix Lot LLC, represented by Blueline Architects ACTION: Approved, with conditions MOTION: Gillette SECOND: DuBois VOTE: 5-0-0 CONDITION(S): 1. The applicant shall submit, for review and approval by staff, a light fixture to replace the non-conforming light fixture referenced as the `exterior wall sconce,' illustrated on sheet A1.6 of plans date stamped December 15, 2008, with a light fixture that meets Section 14-10-7, Vail Town Code, prior to submittal of a Building Permit application. 2. The applicant shall revise the retaining walls within the front setback, as illustrated on sheet A1.1 of plans date stamped December 15, 2008, to not exceed 3 feet in height, within the front setback, per Section 14-6-7, Vail Town Code, to be reviewed and approved by Staff in conjunction with the Building Permit application. 3. North Day Lot DRB080050 / 40 Minutes Warren Conceptual review for new construction (employee housing, skier drop-off) 600 West Lionshead CircleNail Lionshead Filing 3 Applicant: Vail Resorts Development Company, represented by Mauriello Planning Group ACTION: Conceptual, no vote Page 1 PLANNING CHECK SHEET Pro a Information Pro a Address 2379 Chamonix Lane Parcel #s 210311401014 Le al Descri tion Lot 15, Block A Vail Das Schone; Filing 1 Develo ment Site Area Ac .246 S Ft 10,728 Buildable 10,728 Zonin / SDD # Two-Famil Prim /Second Residential (PS) Land Use Desi nation Medium Densit Residential Known Non-Conformities Lot size- can onl build a sin le-famil Previous A royals Vacant lot Hazard Zones Snow Avalanche No Sections 12-12, 12-21, 14-6 & 14-7 Debris Flow No Roc all No Excessive Slopes (Site Disturbance 12-21-14) Yes (~80x~5 = 400sf) -Only affects min. lot size Flood lain No Wetlands Y/N None Creeks, Streams Section 12-14-17 None Setback Na Proposed Na Sidewalks/ Trails None Contact Information Planner/ Date Nicole Peterson/ 12/31/08 Owner Contact Info Tom Corn an (970.331.1602) Primary Contact/ Owner Re resentative Info Ken Bridges, AIA (970.827.5400) Pro'ect Information Pro'ect Descri tion New construction -single family dwelling Land Use A lication s # DRB08-0616 Proposed Uses As defined b Zonin SFD Permitted, Conditional, Prohibited? permitted Date Routed/ DRT Meetin 12/17/08 Commercial Floor Area Existin Na Pro osed Na Gross Residential Floor Area (Cha ter 15) Total Allowed -Existin Na -Pro osed 2995.3 Remain 250 or Interior Conversion? No Zonin District Standards Setbacks (perimeter) Minimum Front 20 Pro osed 20 Projections 14-10-4 Minimum Side 15 Pro osed 15 Minimum Side 15 Pro osed 15 Minimum Rear 15 Pro osed 30 Lot Area/ Width Minimum 15,000/ 30 Pro osed Existin lot -ok Site Covera a Maximum 20% (2145.6) Proposed 19.9%(2141.5) Buildin Hei ht Maximum 33 slo e/ 30 flat Pro osed ~30ft is hei est Landscaping Minimum 60% (6436.8) Pro osed 72.1% (7,731.5) Sections 14-10-8 & 14-10-9 Min. Plant size 6 ft Pro osed 8-12 ft Amount Coniferous trees Pro osed 18 Amount Deciduous Pro osed 57 Retainin Walls Max. Height Proposed ~I Sec. 14-6-7 Min. Setback 2 ft from pl 10 ft from street Proposed Ok Driveway Max. Curb-cuts 1 Proposed 1 Sections 14-3-1 & ~4-3-2 Max-Min Slope Proposed 6.5% Max-Min Width Proposed 28' at pl Heated Y/N N- Drive Material grasscrete Snow Storage % 30%(8256.5)) Proposed 33.8%(289) Parking Min. S aces 3 Proposed 3 Sections 12-10 & 14-5 Min. Loading Na Proposed Na Lighting Section 14-10-7 Allowed 10 Proposed 10 Waste Management Section 5-9 Wildlife Proof/ Resistant Screened Fences/ Screening Sections 14-10-9 & 14-10-10 Required None Proposed Na Roof Material Sections 12-11-3C & 14-10-5 Complies Y/N Gravel - Y Building Separation Section 14-10-6 Complies Y/N SFD - Y Ado ted View Corridors Complies Y/N Na Utilities (Location, easements) Section 14-10-10 Grading (Less than 2:1) Section 14-6 Ok Gas Meters Must be sheltered from snowfall and accessible year round. Development Impact Fees / Employee Housing Na Mitigation Tra ac Im act Na Art In Public Places Na Notes ~~ ~ ~Ss~S C ~ ~ s4,',~-~'" u'~ c~ I ~ ~(i~-~/ ~S~~r~ ~ ~ _ _. J _ __ - '' ~ L~ l I ~V/ I_~ D QEC 15 2008 ,, 4e I TOWN ~~ .`!ra! ,.._._ Development Review Gogcdh~abbr' Commu~tjr Devebpment ~` 75 South Frontage. Road, Val, CoioCBdd •81657' bel; 970.479.2128- fax: •97Q.47g.2452, web: wYrw.v~go~.aom Application for Design Review New Construction General Information: This application is for new construction of a residential or commercial structure. Applicable Vail Town Code sections can be reviewed on-line at www.vailgov.com under Vail Information -Town Code On-line. All projects requiring design review must receive approval prior to submitting a building permit application. An application for Design Review cannot be accepted until all required information is received by the Community Development Department. The project may also need to be reviewed by the Town Council and/or the Planning and Environmental Commission. Design review approval lapses unless a building permit is issued and wnstruction commences within one year of the approval. Fee: X650 Description of the Request: Proposed four-bedroom single-family residence of 3822 sf with an attached two-car garage on an existing vacant lot in West Vail. (see sheet A1.3 for GRFA calculations) X Single Family Duplex Multi-Family Location of the Proposal: Lot: 15 Block: A Subdivision: Vail Das Schone ;Filing 1 Physical Address: 2379 Chamonix l Parcel No.: 210311401014 Zoning: Two-Family Primary/Secondary Residential (P/S) Name(s) of Owner(s): Vail, CO 81658 Mailing Address: PO Box 1823 Owner(s) Signature(s): Name of Applicant: Mailing Address: 2379 Chamonix Lot LLC Blueline Architects p.c. PO Box 574 (Contact Eagle Co. Assessor at 970-328-8640 for parcel no.) Phone• 970.331.1602 (Tom Corrigan) Contact: Ken Bridges, AIA Minturn, CO 81645 Phone: 970.827.5400 E-mail Address: ken@bluelinearchitects.com Fax: 970.827.5401 For Office se Onl I d3~b ~y: ~ Yl g u~~ r~s Fee Paid 1 ,Check No.: Meeting Date: ` ~~ Qg DRB No.: Q (7~ Planner: ~ project No.: ~Y~U ~ ~ V -1 7~ B L U E SINE ARCHITECTS December 15, 2008 Vail Design Review Board 75 S. Frontage Road Vail, CO 87657 Re: Proposed Single-Family Residence 2379 Chamonix Lane v D DEC 1 ~ 2ooa Dear Design Review Board: On behalf of the Owner, 2379 Chamonix Lot LLC (Tom Corrigan and Reid Phillips), I am bringing before you a proposal for a new single-family residence to be constructed at 2379 Chamonix Lane of 3822.2 sf (see sheet A1.3 for GRFA calculations). Currently, this 10,728 sf lot lies vacant, with an average slope of 50% for the first 10 feet closest to Chamonix Lane and 18% for the remainder of the lot. The lot is outside of all rock fall zones, flood plains, or avalanche zones as defined by the Town of Vail. With this grade change, we sought to minimize the impact of large retaining walls by placing the garage close to and facing the street to let the building do the work of retaining the hillside. Additionally, atypical of homes on Chamonix Lane, the front door has been located at the level of the autocourt to provide a more inviting entrance, as well as, a direct connection to tie the residence back to the community. The stairs, traditionally found running along the exterior of the home on Chamonix Lane, have been moved to the interior, allowing landscaping to come tight to the building and, thus, eliminating the headache of maintaining this access in the winter. Similar to how we begin every project, we arrived at the proposed design solution with several important factors in mind: solar orientation, natural light and ventilation, views, snow storage and safety, impact on the land, connection to the site (inside and outside), and, in this particular case, the client's desire to have a level yard set back from the street. The design's narrowness allows all spaces to take advantage of natural light and cross ventilation, while giving the house enough length to step its way up the site, minimizing its visual impact from the street. This has the added benefit of providing space for extensive landscaping around the home, to truly let it sit within the landscape with its natural material palette of predominantly horizontal cedar siding and drystack sandstone veneer. Much to the delight of the client, the "yard" was placed on top of the garage as a roof garden, removing it from the street for safety and capitalizing on views and solar exposure from the main living areas. As our design hopefully reflects, we are excited to bring to Vail another environmentally conscience home similar to that recently completed down the street at 2339 Chamonix Lane. Sincerely, ~~.,. . Ken Bridges, AIA Principal BLU FLINE •RCNITGCTS, D. G. a21 Main St. C1, PO Boa 57a, Mlnturn, CO b1645 970-827-5400 (o) 970-827-5401 (() info@bluelinearchitecks.com °~~'~ * UTILITY APPROVAL & VERIFICATION Comments This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and also to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and scheduling installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COMMENTS FROM THE UTILITY COMPANIES. If you are unable to obt1ain co~ents within that timeframe please contact The Town of Vail. Address: z~7 ~ C N1M'ti0 iJ 1 Lot Block Subdivision: Authorized Sidnature QWEST 970.468.6860(tel) 970.468.0672(fax) ~_ Contacts: Sam Tooley samuel.toolevCa~owest.com XCEL HIGH PRESSURE GAS 970.262.4076 (tel) 970.468.1401 (fax) Contact: Rich Sisneros richardsisnerosCa xcelenerav.com HOLY CROSS ENERGY 970.947.5425 (tel) 970.945.4081 (fax) Contact: Diana Golls dgolisCalholycross.rnm XCEL Energy 970.262.4038 (fax) 970.262.4024 (tel) Contacts: Kit Bogert Kathrvn.BoaertCa XCELENERGY.com EAGLE RIVER WATER & SANITATION DISTRICT 970.476.7480 (tel) 970.476.4089 (fax) Contact: Fred Haslee fhaslee(aennrsd.ora COMCAST CABLE 970.418.8248 (tel) 970.949.9138 (fax) Contact: Michael Johnson michael_johnson@cable.comcast.cpm ~c~~l~~~~~^1~ a ,~1~ DEC 15 2008 ~ ; IE 4; ...i Date o ,~ a~ IyOTES. 1. If the utility approval & verification form has signatures from each of the utility companies, and no comments are made directly on the form, or no action is taken within 2 weeks of the Utility's receipt of the form without explanation the Town will presume that there are no problems and the development can proceed. 2. If a utility company has concerns with the proposed construction, the utility representative shall note directly on the utility verification form that there is a problem which needs to be resolved. The issue should then be detailed in an attached letter to the Town of Vail. However, please keep in mind that it is the responsibility of the utility company and the applicant to resolve identified problems. 3. These verifications do not relieve the contractor of the responsibility to obtain a Public Way Permit from the Department of Public Works at the Town of Vail. Utility locations must be obtained before digging in any public right-of--way or easement within the Town of Vail. A building uermit is not a Public Wav permit and must be obtained separately. 4. The Developer is required and agrees to submit any revised drawings to the utilities for re-approval & re-verification if the submitted plans are altPrP~ ~~ anv way after authorized signature date (unless otherwise sp ifiCdlly noted within the comment area of this form). 1 O Developer's Signature Date Z d EEL 000009t ' ~N/ LO : b L ' 13/ 80 : b L 8002 8 :130 (NOW) ZL8088bO18 3NMOW 1213A7 I S 153M0 W02ld SILVERTHORNE HP Fax~19704681401 Dec 8 2008 13 13 P. 02 ~~VI IAW 1 D UTILITY APPROVAL & VERIFICA' CC~CL\~!1 DEC IQYVI~s This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and also verify service availability and location for new construction and should Ge used in conjunction with preparing your utility plan scheduling installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted to the following uti for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COMMENTS FROM THE UTILITY COMPANIES. If you are unable to obtai/nco~mments within that timeframe please contact The~T/own of`Vail. Address: ~31g Gil tx C./V Lot Block ~ Subdivision•YRIL~ U~Sc~pyJ~ ._yL Authorized Slanature Comments Date QWEST 970.468.6860(tel) 970.468.0672(fax) Contacts: Sam Tooley Samuel toolevCalawest com XCEL HIGH PRESSURE GAS 970.262.4076 (tel) 970.468.1401 (fax) Contact: Rich Sisneros richard.sisnerosCla xcelenerov com HOLY CROSS ENERGY 970.947.5425 (tel) 970.945.4081 (fax) Contact: Diana Golis dgolisCa holvcross com XCEL Energy 970.262.4038 (fax) 970.262.4024 (tel) Contacts: Kit Bogert Kathryn BogertCa~XCELENERGY com EAGLE RIVER WATER & SANITATION DISTRICT 970.476.7480 (tel) 970.476.4089-(fax) Contact: Fred Haslee fhasleeCa erwsd.org COMCAST CABLE 970.418.8248 (tel) 970.949.9138 (fax) Contact: Michael Johnson michael_johnson @cable.comcast.com A'ft. ~~A,/t- , ~~ ~ n~. Pau ~ SRS ~ L~ ?z ~S o ic. Q. p, t, DEC 0 82008 NOTES: 1. If the utility approval & verification form has signatures from each of the utility companies, and no comments are made d on the form, or no action is taken within 2 weeks of the Utility's receipt of the form without explanation the Town will pn that there are no problems and the development can proceed. 2. If a utility company has concerns with the proposed construction, the utility representative shalt note directly on the verification form that there is a problem which needs to be resolved. The issue should then be detailed in an attached letter Town of Vail. However, please keep in mind that it is the responsibility of the utility company and the applicant to n identified problems. 3. These verifications do not relieve the contractor of the responsibility to obtain a Public Way Permit from the Depattm~ Public Works at the Town of Vail. Utility locations must be obtained before digging in any public right-of--way or easE within the Town of Vail. A building permit Is not a Public Wav Hermit and must be obtained senararpl••, 4. The Developer is required and agrees to submit any revised drawings to the utilities for re-approval 8e re-verification submitted plans are altered in any way after the authorized signature date (unless otherwise specifically oted within the Corr area of this form). Developer's Signature D to ~ O 2008 s_ !~ ~~ ~' tyr ~ ~ ~ ~ -.~~!~' _..u... __._._ Usti l the of the TOWIYOFYAd p ~c~~~~~~~~n DEC 15 2008 I J TOWN UF_VAI _,.__; UTILITY APPROVAL. Sc VERIFICATION This form serves to verify that the proposed improvements wlf[ not impact any existing or proposed utility services, and also to verify service availability and location for new construction and should be used in wnjundion with preparing your utility plan and sd~eduling installations. A site plan, inducting grading plan, floor plan, and elevations, shall be subm'dted to the following utilities for approval and veriftcati~. PLEASE ALLOW UP TO 2 WEEKS i~R APPROVAL OR COMMENTS FROM THE UTILITY COMPANIES. If you are unade to obtain comments within that timeframe please contact The Town of Va~7. ~r~Z379 CHAMON1XLot p`-~«~_~ 5 Authorized Sian~~ QWEST 970.468.6860(tel) 970.468.0672(fax) Contacts: Sam Tooley samuei.toolevCcDawest.com XCEL HIGH PRESSURE GAS 970.262.4076 ~ 970.468.1401 (fax) Corrtact: Rich Sisneros rid~ard.sisnerosCalxcelenergy.com HOLY CROSS ENERGY 970.947.5475 (tel) 970.945.4081 (fax) Contact: Diana Golfs rs~noy XCEL Energy 970.262.4038 (fax) 970.262.4024 (tel) Contacts: IGt liogext Kathryn.Boaert~XCFLI]VERGY_cem EAGLE RIVER WATER & SANITATION DISTRICT 970.476.7480 (tel) 970.476.4089 (fax) Cor>tad~ Fred Haslee fhasleeC~erwsd.ora COMCAST CABLE 970.418.8248 (tel) 970.949.9138 (fax) Contactti Michael ]ohrLSOn michaefohnson~cable.oomcast.oom Subdivision. VA I L D A S S C H O N E, FILING 1 Comments aP.~ 1Z-~=ZJ~ 1. If the utility approval & verification form has signatures from eadt of the utility companies, and no wmmer>ts are made directly on the form, or no ad9on is taken within 2 weeks of the Utility's receipt of the form without explanation the Town will presume that there are no problems and tt-e development on proceed. 2 ff a utility company has concerns with the proposed construdtion, the ub']lty represerrtative shall note dired9y on the utility veriftcation form that there is a problem which needs tp be resolved. The issue should then be detailed in an attached letter to the Town of Vail. However, please keep in mind that it is the responsibility of the utility company and the applicant to resolve identified problems. 3. These verifications do not relieve the contractor of the responsibility to obtain a Public Way Permit from the Department of Public Works at the Town of Vail. Utility locations must be ohlained before diaaina in any public right-af-way or easement within the Town of Vail. A building oerrnit is not a Publie Way oeimit asi,~ mugt be obtained selsaeately. 4. The Developer is required and agrees to submit any revised drawings m the utilities for re-apprrnrai & re-verification if the submitted plans aze altered in any way after the authorized signature date (unless otherwise tally noted within the comment area of this form) - /) - DevwJope>'s Signature ~ (~ D Dade l t - Dec. 8. 2008 4:OOPM 7CIWN~Y~' UTILITY APPROVAL & VERIFICATION ~ ~ l~ ~_ ~ n DEC 15 2008 J 70WN OF VAIL This form serves to verify that the proposed improvements will not impact any existing or proposed utlllry services, and also to verify service avallablllry and location for new construction and should be used In conjunction with preparing your utility plan and scheduling installations. A site plan, Including grading plan, floor plan, and elevations, shall be submitted to the following utilities For approval and verification. PLEASE ALLOW UP To 2 WEEKS FOR APPROVAL OR COMMENTS FROM THE UTILm COMPANIES. if you are unable to obtain comments within that timeframe please contact The Town of Vail. Address:~j3~-` ~'+ r~~ ~ Lot ~ ~ Black ~ Subdlvlslon:__'! ~'(<L z I QWES7 970.468.6860(tel) 970.468.0672(fax) Contacts: Sam Tooley XCEL HIGH PRESSURE GA5 970.262.4076 (tel) 970.468.1401 (fax) Contact: Rich 5isneros HOLY CROSS ENERGY 970.947.5425 (tel) 970.945.4081 (fax) Contact: Diana Golls daolisCdtho cross.com XCEL Energy 970.262.4038 (faX) 970.262.4024 (tel) Contacts: Kit Bogert KathLyn. (~OgertCcilXCELEN ERGY.com EAGLE RYVER WATER & SANITATION DISTRICT 970.476.7480 (tel) 970.476.4089 (fax) Contact: Fred Haslee fhaslee erwsd o a COMCAST CABLE Comments p~tg ~ ~a~~.og 970.418.8248 ([el) 970.949.9138 (fax) Contact: Michael Johnson mlchael~ohnson @cable.tomcast.com OTES; 1. Tf the utility approval & verification form has signatures from each of the utility companies, and no comments are made directly on the form, or no action is taken within 2 weeks of the Utility's receipt of the form without explanation the Town will presume that there are no problems and the development can proceed. 2. If a utility company has concerns with the proposed construction, the utility representative shall note directly an the utlllry verification form that there is a problem which needs to be resolved. The Issue should then be detailed In an attached letter to the Town of Vall. However, please keep in mind that it is the responsibility of the utlllry company and the.appllcant to resolve identified problems. 3. These verifications do not relieve the contractor of the responsibility to obtain a Public Way Permit from the Department of Public Works at the Town of Vall. UtlII~Y locations must be obtalrted before digging in any public right-of-Way or easement within the Town of Vail. A buildintr uermltls net a Pghl(e WaY.germtt and must be obtained separately. 4. The Developer Is required and agrees to submit any revised drawings to the utilities for re•approval & re-verification it the submitted fans are altered in any wa er the authorized signature date (unless otherwise specificall noted t~(ithin the comment area of this for I ~~`~~ ',~ /tsyl 0~ Devebper's Signature ~ ~~ , Date 12-08-08; 04: 28PM; TOA'NOFVAd 970 476 4089 # 1/ 1 ~ ~~~~M~~ :~J DEC 15 1008 i! _l ~ ,. UTILITY APPROVAL & VERIFICATION This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and also to verify service availability and location for new construction and should be used In wnjunction with preparing your utility plan and scheduling installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted to the following utilities for approval and verification. PLEASE ALLOW UP TO Z WEEKS FOR APPROVAL OR COMMENTS FROM THE UTILITY COMPANIES. If you are unable to obtain camments within that timeframe please contact Thie/Town of Vail/.~ ~ ~ ~~ ~, ~ ~' Address Lot ~6 Block ~_ Subdivision: y ~~ - ~w.t ~~f~.VU~Vtx~ 'Authorized Slanature Comments ~~ QWEST 970.468.6860(tel) 970.468.0672(fax) Contacts: Sam Tooley samuel.toolevCalawest.com XCEL HIGH PRESSURE GAS 970.262.4076 (tel) 970.466.1401 (fax) Contact: Rich Sisneros richard.sisnerosCNxcelenergy.com HOLY CROSS ENERGY 970.947.5425 (tel) 970.945.4081 (fax) Contact: Diana Golis doolisCla holvcross.com XCEL Energy 970.262.4038 (fax) 970.262.4024 (tel) Contacts: Kit Bogert Kathryn. BoaertCdXCELEN ERGY.rnm EAGLE RIVER WATER & SANITATION DISTRICT 970.476.7480 (tel) 970.476.4089 (fax) Contact: Fred Haslee / '1 ~ ~ _ ~ Cam/ fhasleeC~enNSd.ora / OC Q COMCAST CABLE 970.418.8248 (tel) ' 970.949.9138 (fax) Conta~: Michael Johnson michael~ohnson@cable.comcast.com NOTES; 1. If the utility approval & verification form has signatures from each of the utility companies, and no comments are made directly on the form, or no action is taken within 2 weeks of the Utility's receipt of the form without explanation khe Town will presume that there are no problems and the development can proceed. Z. If a utility company has concerns with the proposed construction, the utility representative shall note directly on the utility verifiption form that there is a problem whkh needs to be resolved. The issue should then be detailed in an attached letter to the Town of Vail. However, please keep in mind that it is the responsibility of the utility company and the applicant to resolve identified problems. 3. These verifications do not relieve the contractor of the responsibility to obtain a Public Way Permit from the Department of Public Works at the Town of Vail. Utility locations must be obtained before diaaina in any public right-of--way or easement within the Town of Vail. w ti~~~~a~^^ ^Prmit is not a Public Wav permit and must be obtained separately. 4. The Developer is required and agrees to submit any revised drawings to the utilities for re-approval & re-verification if the submitted plans are altered in any way after the authorized signature date (unless otherwise specifically n9ted within the comment area of this forme I ~J ~ ~~ /'~ Developers Signaturel~ Dalte 12/12/2008 FRI 10: 2a FAX 970925a106 COi~tCA6T CABLH TC)WNOFi'A!L UTILITY APPROVAL & D ~C~~~Mf~l~~ DEC 15 2008 inor+l"O W r~... ` . ~i)O1/042 This form serves to verify that the proposed improvements will not Impact any existing or proposed utlflty services, and also to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and sd~eduling installations. A site plan, including grading plan, floor plan, and. elevations, sha-I be sutxnittcd to the following utilities for approval and verifimtion. PLEASE ALLOW t1P TO 2 WEEKS FOR APPROVAL OR COMMENTS FROM 7HE U'1'iI.YTY COMPANIES. If you are unable to obtain comments w,thin that timeframe please contact The Town of Vail. Address:a31G C~(I~~tl~j ~ Lot /~ Block ~ Subdivision: V flr I ~~ SC~6Ne Authorized 31 na ur Comments Date QWEST 970.4G8.6860(tel) 970.468.0672(fax) Contacts: Sam Tooley Samuel _ tooley~west_ com XCEL HIGH PRESSURE GAS 970.262.4076 (tel) 970.468.1401 (fax) Contact: Rich Sisneros richard.sisnerosna xcelEr,crgy.com HOLY CROSS ENERGY 970.947.5425 (tel) 970.945~408J. (fax) Contact: Diana Golis doolisnhalvrsoss.com XCEL Energy 970.262.4038 (fax) 970.262.4024 (tel) Contacts: Kit Bogert Kathryn. BooertcBXCEL E!y ERGY. com EAGLE RIVER WATER & SANITATION DISTRICT 970.476.7480 (tel) 970.476.4059 (fax) Contact: Fred Haslee fhasleeCa~erwsd.oro COMCAST CABLIE 970.418.8248 (tel) 970.949.9136 (fax) Contact: Michael Johnson midhael,ohnson @rable.com~stcom ~~D9 i. IF the utility approval & verification form has signatures from eadi of the utility companies, and no comments are made directly on the form, or no action is taken within 2 weeks of the Utility's receipt of the form without explanation the Town will presume that there one no problems and the development can proceed. 2. If a utility company has concerns with the proposed construction, the utility representative shall note directly on the utility verification form that there is a problem which needs to be resolved. The issue should then be detailed in an attached fetter to the Town of Vail. However, please keep in mind that it is the responsibility of the utility company and the applicant to resolve identified problems. 3. These veAflcations do not relieve the contractor of the responsibility to obtain a Public Way Permit from the Department of Public Works at the Town Of Vall. ~~~ lo[ationsJttust be obtained before diaaina in any public right-of-way or easement within the Town of Vail. A building permit is not a Public Wav permit and mtr~ 12~ZtZ1;~in~.,,ggR~r„~- S,],x. 4. The Developer is required and agrees to 5utxnl[ any revised drawings bo the utilities for re-approval & re-verification if the submitted plans are altered ia~nv way aft a authorised signature date (unless otherwise spedfl Ily noted thin the comment area of this form). ~ -' ~~ , -~ ~ , ~.r- ~,~ ~ Developer's Signature "~ v Date ( ~ Page 1 of 1 Nicole Peterson - 2379 Chamonix Lane DRBO8-0616 From: Nicole Peterson To: Ken Bridges Date: 12/26/2008 5:37 PM Subject: 2379 Chamonix Lane DR608-0616 CC: Chris Delles Hello Ken, Thank you for your DRB application for new construction of asingle-family dwelling at 2379 Chamonix Lane. The item is scheduled for the January 7, 2009, Design Review Board hearing. Please plan to attend the meeting, or send a representative to the Council Chambers at 75 South Frontage Road, Vail at 3:00 pm. Prior to the meeting or at the meeting, please address the following comments: 1. Please stake the site prior to the hearing, as best you can, with the snow. 2. Please bring a material sample board, including at a minimum the proposed cement material, cedar siding and stone. 3. Please bring color samples (Include the paint color proposed for the facia and wood beams). 4. Please provide an example of the 'Photovoltaic array' on the roof (Please explain what it will look tike from the homes above). 5. Please note that the exterior gas and electric meters must be sheltered from snowfall and accessible year-round. I've received comments from Public Works that shall be addressed at the time of the building permit review, below: Public Works Comments for 2379 Chamonix Lane 1. Retaining walls within the front setback shall not exceed an exposed face height of 3 feet (Unless approved by DRB - I plan to bring this up at the meeting). 2. Retaining walls over 4', measured from the bottom of the footer to the top of the wall, must be engineered. PE stamped drawings must be included with the plans. 3. Culvert under the driveway must be a minimum of 18" and called out on the plans. 4. Provide a construction staging plan prior to building permit. 5. A revocable permit for improvements within the ROW needs to be executed prior to TCO is obtained. 6. Driveway cannot exceed 24' wide where it meets the edge of asphalt. (Detail 1- Public Works Development Standards) Thank you for your time and consideration. I'll see you on January 7th. Have a Happy New Year! Nicole about:blank 12/31 /2008 ~~~ ~d~.es ~~ ~ ~~s ~ ~ I ~~ ~~ ~- ~ ~ ~ ~ ~ r ~C,~h ~ - 1 S ~ ~~~' ~~ ~~~s _ ~~~~~ _ ~n~ .- ~~ / cif'. ~~7~'~ ~ ~lX ~~ ~ L~ ~ _ ~ ~ G ~~ ~~j,~~i (pd-~~_~~~ S lit ~..(.X 1 ~I~ f `' ' - t~~l ~ ` ~ ~ ~~~ ~~ ~~~ - -~~ a ~ s a~~t~ 'S- o ~.~~~,-~ Comments for 2379 Chamonix Lane Retaining walls within the front setback shall not exceed an exposed face height of 3 feet. Retaining walls over 4', measured from the bottom of the footer to the top of the wall, must be engineered. PE stamped drawings must be included with the plans. Culvert under the driveway must be a minimum of 18" and called out on the plans. Provide a construction staging plan prior to building permit. A revocable permit for improvements within the ROW needs to be executed prior to TCO is obtained. Driveway cannot exceed 24' wide where it meets the edge of asphalt. (Detail 1-Public Works Development Standards) ~, ~~; - ~d~ s-~~~~~ I (,~ - ~,m~ •, f s 2~~~ ~. r- ~}WH 0~' VA1L' ' ~ci ~ n ~ctiS~e~ e irf~ ~ ~ 2~ e. ~s t~~ ~^ ~ +~ S J ~~ hQ~Vo~iLGliG S' ~~f o ~ Y ~~Development Review Team Sz Construction Update (`(~ ~~0~~ Community Development Large Conference Room Wednesday at 9:30AM n / December 17, 2008 * ~CJ AGENDA ~~ 9:30 Development Review Tea ~1~' - " `~ Purpose: Provide coordination and input across Departments on proposed development proposals Staff Item /Topic Description Time WC ~~Planning Department Updates 10 minutes BW i~Code Enforcement Update 5 minutes MH 3. Arrabelle -input from all departments 10 minutes MH 4. Front Door -input from all departments 10 minutes BG 5. Story Residence -Introduction & routing of plans 10 minutes NP 6. 2379 Chamonix Lot LLC -introduction & routing pf plans 10 minutes 10:30 Construction Update Purpose: Provide staff coordination on public and private construction projects 1. Update from Lionshead - LS 10 minutes 2. Update from Village 10 minutes 3. Other ROW/Utility Issues 10 minutes Other - 5 minutes DRB/PEC Updates 5 minutes TOWN OF VAIL, COLORADO Statement ************^**********+***~*r************~+~+~*********************~*++*++*~*************+* Statement Number: 8080002358 Amount: $650.00 12/15/200801:58 PM Payment Method: Check Init: JLE Notation: 1038 PLAN B BUILDERS ----------------------------------------------------------------------------- Permit No: DRB080616 Type: DRB - New Construction Parcel No: 2103-114-0101-4 Site Address: 2379 CHAMONIX RD VAIL Location: Total Fees: $650.00 This Payment: $650.00 Total ALL Pmts: $650.00 Balance: $0.00 ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------------- ------------------------------ ------------ DR 00100003112200 DESIGN REVIEW FEES 650.00