Project Name: CORRIGAN RESIDENCE DRB Number: DR6080616
Project Description:
Participants:
APPROVED NEW SINGLE FAMILY RESIDENCE
OWNER 2379 CHAMONIX LOT LLC
PO BOX 5050
CAREFREE
AZ 85377
APPLICANT BLUELINE ARCHITECTS, P. C.
PO BOX 574
MINTURN
CO 81645
License: 0000002400
ARCHITECT BLUELINE ARCHITECTS, P. C.
PO BOX 574
MINTURN
CO 81645
License: 0000002400
12/ 15/2008
12/15/2008 Phone:970-827-5400
12/15/2008 Phone: 970-827-5400
Project Address: 2379 CHAMONIX RD VAIL Location:
Legal Description: Lot: 15 Block: A Subdivision: VAIL DAS SCHONE FIL 1
Parcel Number: 2103-114-0101-4
Comments: See conditions below
Motion By: Gillette
Second By: DuBois
Vote: 5-0-0
Conditions:
Action: APPROVED
Date of Approval: 01/07/2009
Cond: 8
(PLAN): No changes to these plans may be made without the written consent of Town of
Vail staff and/or the appropriate review committee(s).
Cond: 0
(PLAN): DRB approval does not constitute a permit for building. Please consult with
Town of Vail Building personnel prior to construction activities.
Cond: 201
(PLAN): DRB approval shall not become valid for 20 days following the date of
approval, pursuant to the Vail Town Code, Chapter 12-3-3: APPEALS.
Cond: 202
BOARD/STAFF ACTION
(PLAN): Approval of this project shall lapse and become void one (1) year following
the date of final approval, unless a building permit is issued and construction is
commenced and is diligently pursued toward completion.
Cond: CON0010526
DRB conditions:
1. The applicant shall submit, for review and approval by staff, a light fixture to
replace the non-conforming light fixture referenced as the 'exterior wall sconce,'
illustrated on sheet A1.6 of plans date stamped December 15, 2008, with a light
fixture that meets Section 1410-7, Vail Town Code, prior to submittal of a Building
Permit application.
2. The applicant shall revise the retaining walls within the front setback, as
illustrated on sheet A1.1 of plans date stamped December 15, 2008, to not exceed 3
feet in height, within the front setback, per Section 14-6-7, Vail Town Code, to be
reviewed and approved by Staff in conjunction with the Building Permit
application.
Planner: Nicole Peterson DRB Fee Paid: $650.00
'roAIV~Y,l~
PROJECT ORIENTATION
MEMBERS PRESENT
Mike Dantas
Tom DuBois
Pete Dunning
Brian Gillette
Libby Plante
DESIGN REVIEW BOARD AGENDA
PUBLIC MEETING
January 7, 2009
Council Chambers
75 S. Frontage Road -Vail, Colorado, 81657
MEMBERS ABSENT
SITE VISITS
1. 2379 Chamonix Lot LLC, 2379 Chamonix Road
1:OOpm
2:OOpm
PUBLIC HEARING -TOWN COUNCIL CHAMBERS 3:OOpm
Lion Square Lodge North DR6080608 / 5 Minutes Bill
Final review of changes to approved plans (third floor windows)
660 Lionshead Place/Part of Lot 8, Vail Lionshead Filing 3
Applicant: Lion Square Lodge North, represented by JL Viele Construction
ACTION: Approved
MOTION: DuBois SECOND: Dantas VOTE: 5-0-0
2. Corrigan Residence DRB080616 / 20 Minutes Nicole
Final review of new construction (single family residence)
2379 Chamonix Road/Lot 15, Block A, Vail Das Schone Filing 1
Applicant: 2379 Chamonix Lot LLC, represented by Blueline Architects
ACTION: Approved, with conditions
MOTION: Gillette SECOND: DuBois VOTE: 5-0-0
CONDITION(S):
1. The applicant shall submit, for review and approval by staff, a light fixture to replace the
non-conforming light fixture referenced as the `exterior wall sconce,' illustrated on sheet A1.6
of plans date stamped December 15, 2008, with a light fixture that meets Section 14-10-7, Vail
Town Code, prior to submittal of a Building Permit application.
2. The applicant shall revise the retaining walls within the front setback, as illustrated on
sheet A1.1 of plans date stamped December 15, 2008, to not exceed 3 feet in height, within the
front setback, per Section 14-6-7, Vail Town Code, to be reviewed and approved by Staff in
conjunction with the Building Permit application.
3. North Day Lot DRB080050 / 40 Minutes Warren
Conceptual review for new construction (employee housing, skier drop-off)
600 West Lionshead CircleNail Lionshead Filing 3
Applicant: Vail Resorts Development Company, represented by Mauriello Planning Group
ACTION: Conceptual, no vote
Page 1
PLANNING CHECK SHEET
Pro a Information
Pro a Address 2379 Chamonix Lane
Parcel #s 210311401014
Le al Descri tion Lot 15, Block A Vail Das Schone; Filing 1
Develo ment Site Area Ac .246 S Ft 10,728 Buildable 10,728
Zonin / SDD # Two-Famil Prim /Second Residential (PS)
Land Use Desi nation Medium Densit Residential
Known Non-Conformities Lot size- can onl build a sin le-famil
Previous A royals Vacant lot
Hazard Zones Snow Avalanche No
Sections 12-12, 12-21, 14-6 & 14-7 Debris Flow No
Roc all No
Excessive Slopes
(Site Disturbance 12-21-14) Yes (~80x~5 = 400sf) -Only affects
min. lot size
Flood lain No
Wetlands Y/N None
Creeks, Streams
Section 12-14-17 None Setback Na Proposed Na
Sidewalks/ Trails None
Contact Information
Planner/ Date Nicole Peterson/ 12/31/08
Owner Contact Info Tom Corn an (970.331.1602)
Primary Contact/ Owner
Re resentative Info Ken Bridges, AIA (970.827.5400)
Pro'ect Information
Pro'ect Descri tion New construction -single family dwelling
Land Use A lication s # DRB08-0616
Proposed Uses
As defined b Zonin SFD Permitted, Conditional,
Prohibited? permitted
Date Routed/ DRT Meetin 12/17/08
Commercial Floor Area Existin Na Pro osed Na
Gross Residential Floor Area (Cha ter 15)
Total Allowed -Existin Na -Pro osed 2995.3 Remain
250 or Interior Conversion? No
Zonin District Standards
Setbacks (perimeter) Minimum Front 20 Pro osed 20
Projections 14-10-4 Minimum Side 15 Pro osed 15
Minimum Side 15 Pro osed 15
Minimum Rear 15 Pro osed 30
Lot Area/ Width Minimum 15,000/ 30 Pro osed Existin lot -ok
Site Covera a Maximum 20% (2145.6) Proposed 19.9%(2141.5)
Buildin Hei ht Maximum 33 slo e/ 30 flat Pro osed ~30ft is hei est
Landscaping Minimum 60% (6436.8) Pro osed 72.1% (7,731.5)
Sections 14-10-8 & 14-10-9 Min. Plant size 6 ft Pro osed 8-12 ft
Amount Coniferous trees Pro osed 18
Amount Deciduous Pro osed 57
Retainin Walls Max. Height Proposed
~I
Sec. 14-6-7 Min. Setback 2 ft from pl
10 ft from street Proposed Ok
Driveway Max. Curb-cuts 1 Proposed 1
Sections 14-3-1 & ~4-3-2 Max-Min Slope Proposed 6.5%
Max-Min Width Proposed 28' at pl
Heated Y/N N- Drive Material grasscrete
Snow Storage % 30%(8256.5)) Proposed 33.8%(289)
Parking Min. S aces 3 Proposed 3
Sections 12-10 & 14-5 Min. Loading Na Proposed Na
Lighting
Section 14-10-7 Allowed 10 Proposed 10
Waste Management
Section 5-9 Wildlife Proof/
Resistant Screened
Fences/ Screening
Sections 14-10-9 & 14-10-10 Required None Proposed Na
Roof Material
Sections 12-11-3C & 14-10-5 Complies Y/N Gravel - Y
Building Separation
Section 14-10-6 Complies Y/N SFD - Y
Ado ted View Corridors Complies Y/N Na
Utilities
(Location, easements)
Section 14-10-10
Grading (Less than 2:1)
Section 14-6 Ok
Gas Meters Must be sheltered from snowfall and accessible year round.
Development Impact Fees / Employee Housing Na
Mitigation Tra ac Im act Na
Art In Public Places Na
Notes
~~ ~
~Ss~S
C ~ ~ s4,',~-~'"
u'~ c~ I ~ ~(i~-~/
~S~~r~
~ ~ _ _.
J _ __ -
'' ~ L~
l I ~V/ I_~
D
QEC 15 2008
,,
4e I
TOWN ~~ .`!ra! ,.._._
Development Review Gogcdh~abbr'
Commu~tjr Devebpment ~`
75 South Frontage. Road, Val, CoioCBdd •81657'
bel; 970.479.2128- fax: •97Q.47g.2452,
web: wYrw.v~go~.aom
Application for Design Review
New Construction
General Information:
This application is for new construction of a residential or commercial structure. Applicable Vail Town Code sections can be
reviewed on-line at www.vailgov.com under Vail Information -Town Code On-line. All projects requiring design review must
receive approval prior to submitting a building permit application. An application for Design Review cannot be accepted until all
required information is received by the Community Development Department. The project may also need to be reviewed by the Town
Council and/or the Planning and Environmental Commission. Design review approval lapses unless a building permit is issued and
wnstruction commences within one year of the approval.
Fee: X650
Description of the Request: Proposed four-bedroom single-family residence of 3822 sf with an attached two-car
garage on an existing vacant lot in West Vail. (see sheet A1.3 for GRFA calculations)
X Single Family
Duplex Multi-Family
Location of the Proposal: Lot: 15 Block: A Subdivision: Vail Das Schone ;Filing 1
Physical Address:
2379 Chamonix l
Parcel No.: 210311401014
Zoning:
Two-Family Primary/Secondary Residential (P/S)
Name(s) of Owner(s):
Vail, CO 81658
Mailing Address: PO Box 1823
Owner(s) Signature(s):
Name of Applicant:
Mailing Address:
2379 Chamonix Lot LLC
Blueline Architects p.c.
PO Box 574
(Contact Eagle Co. Assessor at 970-328-8640 for parcel no.)
Phone• 970.331.1602 (Tom Corrigan)
Contact: Ken Bridges, AIA
Minturn, CO 81645
Phone:
970.827.5400
E-mail Address: ken@bluelinearchitects.com Fax: 970.827.5401
For Office se Onl I d3~b ~y: ~ Yl g u~~ r~s
Fee Paid 1 ,Check No.:
Meeting Date: ` ~~ Qg DRB No.: Q (7~
Planner: ~ project No.: ~Y~U ~ ~ V -1 7~
B L U E
SINE
ARCHITECTS
December 15, 2008
Vail Design Review Board
75 S. Frontage Road
Vail, CO 87657
Re: Proposed Single-Family Residence
2379 Chamonix Lane
v
D
DEC 1 ~ 2ooa
Dear Design Review Board:
On behalf of the Owner, 2379 Chamonix Lot LLC (Tom Corrigan and Reid Phillips), I am bringing before you a
proposal for a new single-family residence to be constructed at 2379 Chamonix Lane of 3822.2 sf (see sheet
A1.3 for GRFA calculations).
Currently, this 10,728 sf lot lies vacant, with an average slope of 50% for the first 10 feet closest to
Chamonix Lane and 18% for the remainder of the lot. The lot is outside of all rock fall zones, flood plains, or
avalanche zones as defined by the Town of Vail. With this grade change, we sought to minimize the impact
of large retaining walls by placing the garage close to and facing the street to let the building do the work of
retaining the hillside. Additionally, atypical of homes on Chamonix Lane, the front door has been located at
the level of the autocourt to provide a more inviting entrance, as well as, a direct connection to tie the
residence back to the community. The stairs, traditionally found running along the exterior of the home on
Chamonix Lane, have been moved to the interior, allowing landscaping to come tight to the building and,
thus, eliminating the headache of maintaining this access in the winter.
Similar to how we begin every project, we arrived at the proposed design solution with several important
factors in mind: solar orientation, natural light and ventilation, views, snow storage and safety, impact on the
land, connection to the site (inside and outside), and, in this particular case, the client's desire to have a level
yard set back from the street. The design's narrowness allows all spaces to take advantage of natural light
and cross ventilation, while giving the house enough length to step its way up the site, minimizing its visual
impact from the street. This has the added benefit of providing space for extensive landscaping around the
home, to truly let it sit within the landscape with its natural material palette of predominantly horizontal
cedar siding and drystack sandstone veneer. Much to the delight of the client, the "yard" was placed on top
of the garage as a roof garden, removing it from the street for safety and capitalizing on views and solar
exposure from the main living areas.
As our design hopefully reflects, we are excited to bring to Vail another environmentally conscience home
similar to that recently completed down the street at 2339 Chamonix Lane.
Sincerely,
~~.,. .
Ken Bridges, AIA
Principal
BLU FLINE •RCNITGCTS, D. G.
a21 Main St. C1, PO Boa 57a, Mlnturn, CO b1645
970-827-5400 (o) 970-827-5401 (()
info@bluelinearchitecks.com
°~~'~ * UTILITY APPROVAL & VERIFICATION
Comments
This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and also to
verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and
scheduling installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted to the following utilities
for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COMMENTS FROM THE UTILITY
COMPANIES. If you are unable to obt1ain co~ents within that timeframe please contact The Town of Vail.
Address: z~7 ~ C N1M'ti0 iJ 1 Lot Block Subdivision:
Authorized Sidnature
QWEST
970.468.6860(tel)
970.468.0672(fax) ~_
Contacts: Sam Tooley
samuel.toolevCa~owest.com
XCEL HIGH PRESSURE GAS
970.262.4076 (tel)
970.468.1401 (fax)
Contact: Rich Sisneros
richardsisnerosCa xcelenerav.com
HOLY CROSS ENERGY
970.947.5425 (tel)
970.945.4081 (fax)
Contact: Diana Golls
dgolisCalholycross.rnm
XCEL Energy
970.262.4038 (fax)
970.262.4024 (tel)
Contacts:
Kit Bogert
Kathrvn.BoaertCa XCELENERGY.com
EAGLE RIVER WATER &
SANITATION DISTRICT
970.476.7480 (tel)
970.476.4089 (fax)
Contact: Fred Haslee
fhaslee(aennrsd.ora
COMCAST CABLE
970.418.8248 (tel)
970.949.9138 (fax)
Contact: Michael Johnson
michael_johnson@cable.comcast.cpm
~c~~l~~~~~^1~
a
,~1~
DEC 15 2008 ~ ; IE
4; ...i
Date
o ,~ a~
IyOTES.
1. If the utility approval & verification form has signatures from each of the utility companies, and no comments are made directly
on the form, or no action is taken within 2 weeks of the Utility's receipt of the form without explanation the Town will presume
that there are no problems and the development can proceed.
2. If a utility company has concerns with the proposed construction, the utility representative shall note directly on the utility
verification form that there is a problem which needs to be resolved. The issue should then be detailed in an attached letter to the
Town of Vail. However, please keep in mind that it is the responsibility of the utility company and the applicant to resolve
identified problems.
3. These verifications do not relieve the contractor of the responsibility to obtain a Public Way Permit from the Department of
Public Works at the Town of Vail. Utility locations must be obtained before digging in any public right-of--way or easement
within the Town of Vail. A building uermit is not a Public Wav permit and must be obtained separately.
4. The Developer is required and agrees to submit any revised drawings to the utilities for re-approval & re-verification if the
submitted plans are altPrP~ ~~ anv way after authorized signature date (unless otherwise sp ifiCdlly noted within the comment
area of this form). 1 O
Developer's Signature Date
Z d EEL 000009t ' ~N/ LO : b L ' 13/ 80 : b L 8002 8 :130 (NOW) ZL8088bO18 3NMOW 1213A7 I S 153M0 W02ld
SILVERTHORNE HP Fax~19704681401 Dec 8 2008 13 13 P. 02
~~VI IAW 1
D
UTILITY APPROVAL & VERIFICA'
CC~CL\~!1
DEC
IQYVI~s
This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and also
verify service availability and location for new construction and should Ge used in conjunction with preparing your utility plan
scheduling installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted to the following uti
for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COMMENTS FROM THE UTILITY
COMPANIES. If you are unable to obtai/nco~mments within that timeframe please contact The~T/own of`Vail.
Address: ~31g Gil tx C./V Lot Block ~ Subdivision•YRIL~ U~Sc~pyJ~
._yL
Authorized Slanature Comments Date
QWEST
970.468.6860(tel)
970.468.0672(fax)
Contacts: Sam Tooley
Samuel toolevCalawest com
XCEL HIGH PRESSURE GAS
970.262.4076 (tel)
970.468.1401 (fax)
Contact: Rich Sisneros
richard.sisnerosCla xcelenerov com
HOLY CROSS ENERGY
970.947.5425 (tel)
970.945.4081 (fax)
Contact: Diana Golis
dgolisCa holvcross com
XCEL Energy
970.262.4038 (fax)
970.262.4024 (tel)
Contacts:
Kit Bogert
Kathryn BogertCa~XCELENERGY com
EAGLE RIVER WATER &
SANITATION DISTRICT
970.476.7480 (tel)
970.476.4089-(fax)
Contact: Fred Haslee
fhasleeCa erwsd.org
COMCAST CABLE
970.418.8248 (tel)
970.949.9138 (fax)
Contact: Michael Johnson
michael_johnson @cable.comcast.com
A'ft. ~~A,/t- , ~~ ~ n~. Pau ~
SRS ~ L~ ?z ~S o ic. Q. p, t,
DEC 0 82008
NOTES:
1. If the utility approval & verification form has signatures from each of the utility companies, and no comments are made d
on the form, or no action is taken within 2 weeks of the Utility's receipt of the form without explanation the Town will pn
that there are no problems and the development can proceed.
2. If a utility company has concerns with the proposed construction, the utility representative shalt note directly on the
verification form that there is a problem which needs to be resolved. The issue should then be detailed in an attached letter
Town of Vail. However, please keep in mind that it is the responsibility of the utility company and the applicant to n
identified problems.
3. These verifications do not relieve the contractor of the responsibility to obtain a Public Way Permit from the Depattm~
Public Works at the Town of Vail. Utility locations must be obtained before digging in any public right-of--way or easE
within the Town of Vail. A building permit Is not a Public Wav Hermit and must be obtained senararpl••,
4. The Developer is required and agrees to submit any revised drawings to the utilities for re-approval 8e re-verification
submitted plans are altered in any way after the authorized signature date (unless otherwise specifically oted within the Corr
area of this form).
Developer's Signature D to ~ O
2008
s_
!~
~~ ~' tyr ~ ~ ~ ~ -.~~!~'
_..u... __._._
Usti l
the
of
the
TOWIYOFYAd
p ~c~~~~~~~~n
DEC 15 2008 I J
TOWN UF_VAI _,.__;
UTILITY APPROVAL. Sc VERIFICATION
This form serves to verify that the proposed improvements wlf[ not impact any existing or proposed utility services, and also to
verify service availability and location for new construction and should be used in wnjundion with preparing your utility plan and
sd~eduling installations. A site plan, inducting grading plan, floor plan, and elevations, shall be subm'dted to the following utilities
for approval and veriftcati~. PLEASE ALLOW UP TO 2 WEEKS i~R APPROVAL OR COMMENTS FROM THE UTILITY
COMPANIES. If you are unade to obtain comments within that timeframe please contact The Town of Va~7.
~r~Z379 CHAMON1XLot p`-~«~_~ 5
Authorized Sian~~
QWEST
970.468.6860(tel)
970.468.0672(fax)
Contacts: Sam Tooley
samuei.toolevCcDawest.com
XCEL HIGH PRESSURE GAS
970.262.4076 ~
970.468.1401 (fax)
Corrtact: Rich Sisneros
rid~ard.sisnerosCalxcelenergy.com
HOLY CROSS ENERGY
970.947.5475 (tel)
970.945.4081 (fax)
Contact: Diana Golfs
rs~noy
XCEL Energy
970.262.4038 (fax)
970.262.4024 (tel)
Contacts:
IGt liogext
Kathryn.Boaert~XCFLI]VERGY_cem
EAGLE RIVER WATER &
SANITATION DISTRICT
970.476.7480 (tel)
970.476.4089 (fax)
Cor>tad~ Fred Haslee
fhasleeC~erwsd.ora
COMCAST CABLE
970.418.8248 (tel)
970.949.9138 (fax)
Contactti Michael ]ohrLSOn
michaefohnson~cable.oomcast.oom
Subdivision. VA I L D A S S C H O N E,
FILING 1
Comments aP.~
1Z-~=ZJ~
1. If the utility approval & verification form has signatures from eadt of the utility companies, and no wmmer>ts are made directly
on the form, or no ad9on is taken within 2 weeks of the Utility's receipt of the form without explanation the Town will presume
that there are no problems and tt-e development on proceed.
2 ff a utility company has concerns with the proposed construdtion, the ub']lty represerrtative shall note dired9y on the utility
veriftcation form that there is a problem which needs tp be resolved. The issue should then be detailed in an attached letter to the
Town of Vail. However, please keep in mind that it is the responsibility of the utility company and the applicant to resolve
identified problems.
3. These verifications do not relieve the contractor of the responsibility to obtain a Public Way Permit from the Department of
Public Works at the Town of Vail. Utility locations must be ohlained before diaaina in any public right-af-way or easement
within the Town of Vail. A building oerrnit is not a Publie Way oeimit asi,~ mugt be obtained selsaeately.
4. The Developer is required and agrees to submit any revised drawings m the utilities for re-apprrnrai & re-verification if the
submitted plans aze altered in any way after the authorized signature date (unless otherwise tally noted within the comment
area of this form) - /) -
DevwJope>'s Signature ~ (~ D Dade l t -
Dec. 8. 2008 4:OOPM
7CIWN~Y~'
UTILITY APPROVAL & VERIFICATION
~ ~ l~ ~_ ~ n
DEC 15 2008 J
70WN OF VAIL
This form serves to verify that the proposed improvements will not impact any existing or proposed utlllry services, and also to
verify service avallablllry and location for new construction and should be used In conjunction with preparing your utility plan and
scheduling installations. A site plan, Including grading plan, floor plan, and elevations, shall be submitted to the following utilities
For approval and verification. PLEASE ALLOW UP To 2 WEEKS FOR APPROVAL OR COMMENTS FROM THE UTILm
COMPANIES. if you are unable to obtain comments within that timeframe please contact The Town of Vail.
Address:~j3~-` ~'+ r~~ ~ Lot ~ ~ Black ~ Subdlvlslon:__'! ~'(<L
z I
QWES7
970.468.6860(tel)
970.468.0672(fax)
Contacts: Sam Tooley
XCEL HIGH PRESSURE GA5
970.262.4076 (tel)
970.468.1401 (fax)
Contact: Rich 5isneros
HOLY CROSS ENERGY
970.947.5425 (tel)
970.945.4081 (fax)
Contact: Diana Golls
daolisCdtho cross.com
XCEL Energy
970.262.4038 (faX)
970.262.4024 (tel)
Contacts:
Kit Bogert
KathLyn. (~OgertCcilXCELEN ERGY.com
EAGLE RYVER WATER &
SANITATION DISTRICT
970.476.7480 (tel)
970.476.4089 (fax)
Contact: Fred Haslee
fhaslee erwsd o a
COMCAST CABLE
Comments p~tg
~ ~a~~.og
970.418.8248 ([el)
970.949.9138 (fax)
Contact: Michael Johnson
mlchael~ohnson @cable.tomcast.com
OTES;
1. Tf the utility approval & verification form has signatures from each of the utility companies, and no comments are made directly
on the form, or no action is taken within 2 weeks of the Utility's receipt of the form without explanation the Town will presume
that there are no problems and the development can proceed.
2. If a utility company has concerns with the proposed construction, the utility representative shall note directly an the utlllry
verification form that there is a problem which needs to be resolved. The Issue should then be detailed In an attached letter to the
Town of Vall. However, please keep in mind that it is the responsibility of the utlllry company and the.appllcant to resolve
identified problems.
3. These verifications do not relieve the contractor of the responsibility to obtain a Public Way Permit from the Department of
Public Works at the Town of Vall. UtlII~Y locations must be obtalrted before digging in any public right-of-Way or easement
within the Town of Vail. A buildintr uermltls net a Pghl(e WaY.germtt and must be obtained separately.
4. The Developer Is required and agrees to submit any revised drawings to the utilities for re•approval & re-verification it the
submitted fans are altered in any wa er the authorized signature date (unless otherwise specificall noted t~(ithin the comment
area of this for I ~~`~~ ',~ /tsyl 0~
Devebper's Signature ~ ~~ , Date
12-08-08; 04: 28PM;
TOA'NOFVAd
970 476 4089 # 1/ 1
~ ~~~~M~~
:~J
DEC 15 1008 i!
_l ~ ,.
UTILITY APPROVAL & VERIFICATION
This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and also to
verify service availability and location for new construction and should be used In wnjunction with preparing your utility plan and
scheduling installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted to the following utilities
for approval and verification. PLEASE ALLOW UP TO Z WEEKS FOR APPROVAL OR COMMENTS FROM THE UTILITY
COMPANIES. If you are unable to obtain camments within that timeframe please contact Thie/Town of Vail/.~ ~ ~ ~~ ~, ~ ~'
Address Lot ~6 Block ~_ Subdivision: y ~~ - ~w.t ~~f~.VU~Vtx~
'Authorized Slanature Comments ~~
QWEST
970.468.6860(tel)
970.468.0672(fax)
Contacts: Sam Tooley
samuel.toolevCalawest.com
XCEL HIGH PRESSURE GAS
970.262.4076 (tel)
970.466.1401 (fax)
Contact: Rich Sisneros
richard.sisnerosCNxcelenergy.com
HOLY CROSS ENERGY
970.947.5425 (tel)
970.945.4081 (fax)
Contact: Diana Golis
doolisCla holvcross.com
XCEL Energy
970.262.4038 (fax)
970.262.4024 (tel)
Contacts:
Kit Bogert
Kathryn. BoaertCdXCELEN ERGY.rnm
EAGLE RIVER WATER &
SANITATION DISTRICT
970.476.7480 (tel)
970.476.4089 (fax)
Contact: Fred Haslee / '1 ~ ~ _ ~ Cam/
fhasleeC~enNSd.ora / OC Q
COMCAST CABLE
970.418.8248 (tel) '
970.949.9138 (fax)
Conta~: Michael Johnson
michael~ohnson@cable.comcast.com
NOTES;
1. If the utility approval & verification form has signatures from each of the utility companies, and no comments are made directly
on the form, or no action is taken within 2 weeks of the Utility's receipt of the form without explanation khe Town will presume
that there are no problems and the development can proceed.
Z. If a utility company has concerns with the proposed construction, the utility representative shall note directly on the utility
verifiption form that there is a problem whkh needs to be resolved. The issue should then be detailed in an attached letter to the
Town of Vail. However, please keep in mind that it is the responsibility of the utility company and the applicant to resolve
identified problems.
3. These verifications do not relieve the contractor of the responsibility to obtain a Public Way Permit from the Department of
Public Works at the Town of Vail. Utility locations must be obtained before diaaina in any public right-of--way or easement
within the Town of Vail. w ti~~~~a~^^ ^Prmit is not a Public Wav permit and must be obtained separately.
4. The Developer is required and agrees to submit any revised drawings to the utilities for re-approval & re-verification if the
submitted plans are altered in any way after the authorized signature date (unless otherwise specifically n9ted within the comment
area of this forme I ~J ~ ~~ /'~
Developers Signaturel~ Dalte
12/12/2008 FRI 10: 2a FAX 970925a106 COi~tCA6T CABLH
TC)WNOFi'A!L
UTILITY APPROVAL &
D ~C~~~Mf~l~~
DEC 15 2008
inor+l"O W r~... ` .
~i)O1/042
This form serves to verify that the proposed improvements will not Impact any existing or proposed utlflty services, and also to
verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and
sd~eduling installations. A site plan, including grading plan, floor plan, and. elevations, sha-I be sutxnittcd to the following utilities
for approval and verifimtion. PLEASE ALLOW t1P TO 2 WEEKS FOR APPROVAL OR COMMENTS FROM 7HE U'1'iI.YTY
COMPANIES. If you are unable to obtain comments w,thin that timeframe please contact The Town of Vail.
Address:a31G C~(I~~tl~j ~ Lot /~ Block ~ Subdivision: V flr I ~~ SC~6Ne
Authorized 31 na ur Comments Date
QWEST
970.4G8.6860(tel)
970.468.0672(fax)
Contacts: Sam Tooley
Samuel _ tooley~west_ com
XCEL HIGH PRESSURE GAS
970.262.4076 (tel)
970.468.1401 (fax)
Contact: Rich Sisneros
richard.sisnerosna xcelEr,crgy.com
HOLY CROSS ENERGY
970.947.5425 (tel)
970.945~408J. (fax)
Contact: Diana Golis
doolisnhalvrsoss.com
XCEL Energy
970.262.4038 (fax)
970.262.4024 (tel)
Contacts:
Kit Bogert
Kathryn. BooertcBXCEL E!y ERGY. com
EAGLE RIVER WATER &
SANITATION DISTRICT
970.476.7480 (tel)
970.476.4059 (fax)
Contact: Fred Haslee
fhasleeCa~erwsd.oro
COMCAST CABLIE
970.418.8248 (tel)
970.949.9136 (fax)
Contact: Michael Johnson
midhael,ohnson @rable.com~stcom
~~D9
i. IF the utility approval & verification form has signatures from eadi of the utility companies, and no comments are made directly
on the form, or no action is taken within 2 weeks of the Utility's receipt of the form without explanation the Town will presume
that there one no problems and the development can proceed.
2. If a utility company has concerns with the proposed construction, the utility representative shall note directly on the utility
verification form that there is a problem which needs to be resolved. The issue should then be detailed in an attached fetter to the
Town of Vail. However, please keep in mind that it is the responsibility of the utility company and the applicant to resolve
identified problems.
3. These veAflcations do not relieve the contractor of the responsibility to obtain a Public Way Permit from the Department of
Public Works at the Town Of Vall. ~~~ lo[ationsJttust be obtained before diaaina in any public right-of-way or easement
within the Town of Vail. A building permit is not a Public Wav permit and mtr~ 12~ZtZ1;~in~.,,ggR~r„~- S,],x.
4. The Developer is required and agrees to 5utxnl[ any revised drawings bo the utilities for re-approval & re-verification if the
submitted plans are altered ia~nv way aft a authorised signature date (unless otherwise spedfl Ily noted thin the comment
area of this form). ~ -' ~~ , -~ ~ , ~.r- ~,~ ~
Developer's Signature "~ v Date ( ~
Page 1 of 1
Nicole Peterson - 2379 Chamonix Lane DRBO8-0616
From: Nicole Peterson
To: Ken Bridges
Date: 12/26/2008 5:37 PM
Subject: 2379 Chamonix Lane DR608-0616
CC: Chris Delles
Hello Ken,
Thank you for your DRB application for new construction of asingle-family dwelling at 2379 Chamonix Lane.
The item is scheduled for the January 7, 2009, Design Review Board hearing. Please plan to attend the
meeting, or send a representative to the Council Chambers at 75 South Frontage Road, Vail at 3:00 pm. Prior
to the meeting or at the meeting, please address the following comments:
1. Please stake the site prior to the hearing, as best you can, with the snow.
2. Please bring a material sample board, including at a minimum the proposed cement material, cedar
siding and stone.
3. Please bring color samples (Include the paint color proposed for the facia and wood beams).
4. Please provide an example of the 'Photovoltaic array' on the roof (Please explain what it will look tike
from the homes above).
5. Please note that the exterior gas and electric meters must be sheltered from snowfall and accessible
year-round.
I've received comments from Public Works that shall be addressed at the time of the building permit review,
below:
Public Works Comments for 2379 Chamonix Lane
1. Retaining walls within the front setback shall not exceed an exposed face height of 3 feet (Unless
approved by DRB - I plan to bring this up at the meeting).
2. Retaining walls over 4', measured from the bottom of the footer to the top of the wall, must be
engineered. PE stamped drawings must be included with the plans.
3. Culvert under the driveway must be a minimum of 18" and called out on the plans.
4. Provide a construction staging plan prior to building permit.
5. A revocable permit for improvements within the ROW needs to be executed prior to TCO is obtained.
6. Driveway cannot exceed 24' wide where it meets the edge of asphalt. (Detail 1- Public Works
Development Standards)
Thank you for your time and consideration. I'll see you on January 7th. Have a Happy New Year!
Nicole
about:blank 12/31 /2008
~~~ ~d~.es ~~
~ ~~s ~ ~ I
~~ ~~
~- ~ ~ ~ ~ ~
r
~C,~h ~ - 1 S ~ ~~~'
~~ ~~~s _
~~~~~
_ ~n~ .- ~~ / cif'. ~~7~'~ ~ ~lX
~~ ~ L~ ~ _ ~ ~ G ~~
~~j,~~i (pd-~~_~~~ S lit ~..(.X 1 ~I~
f `' ' - t~~l ~ `
~ ~ ~~~ ~~
~~~ -
-~~ a ~ s a~~t~
'S- o ~.~~~,-~
Comments for 2379 Chamonix Lane
Retaining walls within the front setback shall not exceed an exposed face height of 3 feet.
Retaining walls over 4', measured from the bottom of the footer to the top of the wall,
must be engineered. PE stamped drawings must be included with the plans.
Culvert under the driveway must be a minimum of 18" and called out on the plans.
Provide a construction staging plan prior to building permit.
A revocable permit for improvements within the ROW needs to be executed prior to TCO
is obtained.
Driveway cannot exceed 24' wide where it meets the edge of asphalt. (Detail 1-Public
Works Development Standards)
~, ~~; - ~d~ s-~~~~~ I (,~ - ~,m~ •, f s
2~~~ ~. r-
~}WH 0~' VA1L' ' ~ci ~ n ~ctiS~e~ e irf~
~ ~ 2~ e. ~s t~~ ~^ ~
+~ S J
~~ hQ~Vo~iLGliG S' ~~f
o ~ Y
~~Development Review Team Sz Construction Update
(`(~ ~~0~~ Community Development Large Conference Room
Wednesday at 9:30AM
n / December 17, 2008
* ~CJ AGENDA
~~
9:30 Development Review Tea ~1~' - " `~
Purpose: Provide coordination and input across Departments on proposed development proposals
Staff Item /Topic Description Time
WC ~~Planning Department Updates 10 minutes
BW i~Code Enforcement Update 5 minutes
MH 3. Arrabelle -input from all departments 10 minutes
MH 4. Front Door -input from all departments 10 minutes
BG 5. Story Residence -Introduction & routing of plans 10 minutes
NP 6. 2379 Chamonix Lot LLC -introduction & routing pf plans 10 minutes
10:30 Construction Update
Purpose: Provide staff coordination on public and private construction projects
1. Update from Lionshead - LS 10 minutes
2. Update from Village 10 minutes
3. Other ROW/Utility Issues 10 minutes
Other - 5 minutes
DRB/PEC Updates 5 minutes
TOWN OF VAIL, COLORADO Statement
************^**********+***~*r************~+~+~*********************~*++*++*~*************+*
Statement Number: 8080002358 Amount: $650.00 12/15/200801:58 PM
Payment Method: Check Init: JLE
Notation: 1038 PLAN B
BUILDERS
-----------------------------------------------------------------------------
Permit No: DRB080616 Type: DRB - New Construction
Parcel No: 2103-114-0101-4
Site Address: 2379 CHAMONIX RD VAIL
Location:
Total Fees: $650.00
This Payment: $650.00 Total ALL Pmts: $650.00
Balance: $0.00
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------------- ------------------------------ ------------
DR 00100003112200 DESIGN REVIEW FEES 650.00