HomeMy WebLinkAboutDRB080503Design Review Boardഀ
ACTION FORAഀ
`°y ` ~f Department of Community Developmentഀ
TOWN ALI ~ ' 75 South Frontage Road, Vail, Colorado 81657ഀ
~J te1:970.479.2139 fax: 970.479.2452ഀ
CcYJIAJN17yDEVELCaPsENT web: www.vailgov.comഀ
Project Name: AZCARAGA RES. DRIVEWAY DRB Number: DRB080503ഀ
Project Description:ഀ
REPLACE ASPHALT DRIVEWAY WITH HEATED PAVERSഀ
Participants:ഀ
OWNER EAST VAIL REALTY HOLDING LLC 10/07/2008ഀ
PRIVADA DE HORACIO NO 10ഀ
MEXICO DF MEXICO 11510ഀ
APPLICANT RICHARD CHRISTY 10/07/2008ഀ
EVEN FLOW POOLSഀ
3157 W 26TH AVEഀ
DENVERഀ
CO 80211ഀ
Project Address: 4768 MEADOW DR VAIL Location:ഀ
Legal Description: Lot: 1 Block: 7 Subdivision: BIGHORN 5TH ADDITIONഀ
Parcel Number: 2101-131-0400-1ഀ
Comments: See Conditionsഀ
BOARD/STAFF ACTIONഀ
Motion By: Action: STAFFAPPഀ
Second By:ഀ
Vote: Date of Approval: 10/08/2008ഀ
Conditions:ഀ
Cond: 8ഀ
(PLAN): No changes to these plans may be made without the written consent of Town ofഀ
Vail staff and/or the appropriate review committee(s).ഀ
Cond: 0ഀ
(PLAN): DRB approval does not constitute a permit for building. Please consult withഀ
Town of Vail Building personnel prior to construction activities.ഀ
Cond:201ഀ
(PLAN): DRB approval shall not become valid for 20 days following the date ofഀ
approval, pursuant to the Vail Town Code, Chapter 12-3-3: APPEALS.ഀ
Cond: 202ഀ
(PLAN): Approval of this project shall lapse and become void one (1) year followingഀ
the date of final approval, unless a building permit is issued and construction isഀ
commenced and is diligently pursued toward completion.ഀ
Cond: CON0010365ഀ
The applicant shall install a seperate heat zone within the public right-of-way.ഀ
Cond: CON0010366ഀ
The applicant shall install a two-foot concrete pan where the driveway meets theഀ
paved road in order to provide a seperation between the asphalt road and the paverഀ
driveway. This pan shall conform to all adopted parameters found in Title 14.ഀ
Cond: CON0010367ഀ
The applicant shall contact Chris Delles with the Public Works Department atഀ
970-477-3418 to complete a revocable right-of-way permit for the improvements madeഀ
within the right-of-way. This contact shall occur prior to the start of tubingഀ
layout and paver laying.ഀ
Cond: CON0010368ഀ
The applicant shall replace the existing driveway with the new paver driveway to theഀ
exact configuration and layout of the existing driveway.ഀ
Planner: Warren Campbell DRB Fee Paid: $20.00ഀ
, /ഀ
Development Review Coordinatorഀ
Community Development Departmentഀ
75 South Frontage Road, Vail, Colorado 81657ഀ
tel: 970.479.2128 fax: 970.479.2452ഀ
lweb: www.vailgov.comഀ
TOWN Apഀ
plication for Design Reviewഀ
Minor Exterior Alterationsഀ
General Information:ഀ
This application is required for all proposals involving minor changes to buildings and site improvements, such as re-ഀ
roofing, painting, window additions, landscaping, fences, retaining walls, etc. Applicable Vail Town Code sections can beഀ
reviewed on-line at www.vailgov.com under Vail Information - Town Code On-line. All projects requiring design reviewഀ
must receive approval prior to submitting a building permit application. An application for Design Review cannot beഀ
accepted until all required information is received by the Community Development Department, as outlined in the submittalഀ
requirements. Design review approval e)ires one year from the date of approval, unless a building permit is issued andഀ
construction commences.ഀ
Fee: $250 for Multi-Family/Commercialഀ
$20 for Single Family/Duplexഀ
Description of the Request: S . dഀ
1a N y~1 5 s~" ~>~ytt~.~ S ~ r~ /'i7l~y P~-o ~ -E 11~1u ~a,~l,,$'~-ahi~ ~►~'7.5,ഀ
Y Single Family Duplex Multi-Family Lഀ
Location of the Proposal: Lot: Block: 7 Subdivision:ഀ
Physical Address: w-1 ~t`1 o Co c"6 i >✓~jഀ
Parcel No.: :3 1 Q ff o n j (Contact Eagle Co. Assessor at 970-328-8640 for parcel no.)ഀ
Name(s) of Owner(s): \ C) r P C-11 r- C Cഀ
Mailing Address: L~ ~U-lq U. vJ `cS f eta tRof-A tഀ
JfAഀ
Owner(s) Signature(s):ഀ
Name of Applicant: kC-!:kA jbC ?W.T 'y A EVVIA c~~~ c>l5ഀ
Mailing Address: 315 v( Q,~ b, Nഀ
E-mail Address: 1) ' Fax: >C i- y 5 C} J rഀ
Phone: in - l cij -3 5 lഀ
For Office U my !y' Fy~ jz I O }7ഀ
Fee Paid: Check No.: J 00 Q►,pഀ
~ഀ
Meeting Date: DRB No.:~. rJVG--%Uഀ
Planner: Project No.: T'Ra6no!E51-3ഀ
yഀ
~)(awt-ple-ഀ
Jഀ
IT-ഀ
~r i yeway C- "A)wXt;O^ '&o tE►*tw A AIP SA-%cഀ
TOE N' OF VAILഀ
DESIGN REVIEW,,ഀ
STAFF APPROVALഀ
C'$ഀ
DATE, 0ഀ
Iഀ
I.ഀ
#$*ek####ek#*#~k**~e*~k#*#####*##*#~k ~k ~k ek#*#**~k*###*#ek####ek****#**~#*#****~k*##*~k**~k*~k#*****##***###ഀ
TOWN OF VAIL, COLORADO Statementഀ
Statement Number: R080001876 Amount: $20.00 10/07/200801:43 PMഀ
Payment Method: Check Init: JLEഀ
Notation: 4188 RICHARDഀ
CHRISTYഀ
ഀ
Permit No: DRB080503 Type: DRB-Minor Alt,SFR/DUPഀ
Parcel No: 2101-131-0400-1ഀ
Site Address: 4768 MEADOW DR VAILഀ
Location:ഀ
Total Fees: $20.00ഀ
This Payment: $20.00 Total ALL Pmts: $20.00ഀ
Balance: $0.00ഀ
ACCOUNT ITEM LIST:ഀ
Account Code Description Current Pmtsഀ
ഀ
DR 00100003112200 DESIGN REVIEW FEES 20.00ഀ
Confirmation Report- Memory Sendഀ
Job numberഀ
Dateഀ
Toഀ
Number of Pagesഀ
Start timeഀ
End timeഀ
Pages sentഀ
Statusഀ
849ഀ
Oct-08 08:57amഀ
$913034330507ഀ
002ഀ
Oct-08 08:57amഀ
Oct-08 08:57amഀ
002ഀ
OKഀ
Page : 001ഀ
Date & Time: Oct-08-08 08:57amഀ
Line 1 9704792452ഀ
E-mailഀ
Machine ID TOWN OF VAIL COMMUNITY DEVELOPMENTഀ
Job number 849 SEND SUCCESSFULഀ
DBSFgn R+BViBw Boardഀ
ACS=OEV FARMഀ
3 vapartmant of Cammun/ty Developmentഀ
/~'~~j~,]I' ~JT 75 South FranlmvB Road, Vail, Colored- 51657ഀ
~ L/'~J,'r ~J(- ! taI: 970.479.2139 fax= 970_479.245.Zഀ
ooanun~rv o~..~v.n~w-r I web= www.vallflov.cornഀ
Project Name. AkZC-ARAr_A RE=S- DRIVEWAY ORB Number: DRB080503ഀ
Project Oascription:ഀ
REPLACE ASPHALT DRIVEWAY WSTH HEATED PAVERSഀ
Pa rG ci pa nts:ഀ
OWNER EAST VAIL RFJILTY HOLDING LLC 10/07/2008ഀ
PRIVADA OE HORACIO NO 10ഀ
NNJJt]QCO DF MEXICO 11510ഀ
APPLICAItJT RICHARD CHRISTY 10/07/2008ഀ
EVEN FLOW POOLSഀ
3157 W 26T1-1 AVEഀ
DENVERഀ
CO 80211ഀ
Project Address: 4768 MEADOW DR VAIL Location:ഀ
Legal Oescrlption: Lot: 1 B[oclc: 7 SubdivlSlon: BIGHORN 5TH AMMrrIONഀ
Parcel Number: 2101-131-0400-1ഀ
Comments: See Cionditionsഀ
' BOARD/STAFF ACTIONഀ
STAFFAPPഀ
Motion By: Action-ഀ
Second By:ഀ
Vote: i Oat® oP Approval: 10/08/2008ഀ
Conditionsഀ
Cond: 8ഀ
(PLAN): No changes to these plans may be made without the written consent of Town ofഀ
Vail staff and/or the appropriate review committee(s).ഀ
Cond: Oഀ
(PLAN): DRB approval does not constitute a permit for building. Please consult withഀ
Town of Vail Building personnel prior to construction activities.ഀ
Cond: 201ഀ
(PLAN): DRB approval shall not become valid for 20 days following the date ofഀ
approval, pursuant to the Vail Town Code, Chapter 12-3-3: APPEA S.ഀ
c pnd: 202ഀ
c LAN): Approval of this project shall lapse and become vold one (1) year followingഀ
e date of final approval, unless a building permit is Issued and construction Isഀ
mmenced and is diligently pursued toward completion-ഀ
no: CoN0o1o3fi5ഀ
e applicant shall install a seperate heat zone within the public right-of-way.ഀ
Cond: CON0010366ഀ