Loading...
HomeMy WebLinkAboutMountain Haus Unit 109TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT 75 S. FRONTAGE ROAD VAIL, CO 81657 1 `� 970 - 479 -2138 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ADD /ALT MF BUILD PERMIT Job Address.: 292 E MEADOW DR VAIL Location......: MOUNTAIN HAUS 6TH FLOOR Parcel No....: 210108228009 �142S -0L( '( U OWNER ALLISON MCWHORTER REVOCABLE 04/20/2007 LIVING TRUST 600 SEA DUCK DR DAYTONA BEACH FL 32119 Status.....: ISSUED Applied...: 04/20/2007 Issued ...: 05/04/2007 Expires...: 10/31/2007 CONTRACTOR EAGLE VALLEY CABINET & CONST04 /20/2007 Phone: 390 -5607 PO BOX 1619 AVON COLORADO 81620 License: 579 -B ARCHITECT FRITZLEN PIERCE ARCHITECTS 04/20/2007 Phone: 970 - 476 -6342 1650 EAST VAIL VALLEY DR, #C -1 VAIL CO 81657 License: C000001402 APPLICANT VAIL MANAGEMENT COMPANY 04/20/2007 Phone: 970 - 476 -4262 143 E. MEADOW DR., STE. 395 VAIL CO 81657 License: 147 -B Desciption: CONSTRUCTING 2 MAID CLOSETS ON THE 6TH FLOOR CORRIDOR Occupancy: R -2 Type Construction: I -B Valuation: $6,000.00 Revision Valuation: ?? Total Sq Ft Added: 48 ************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** FEE SUMMARY ***************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Building ------ > $125.25 Restuarant Plan Review - -> $0.00 Total Calculated Fees - -> $257.66 Plan Check - - -> $81.41 Recreation Fee--------- - - - - -> $48. Additional Fees ---------- > $0.00 Investigation -> $0.00 TOTAL FEES ------------- > $257.66 Total Permit Fee --------- > $257.66 Will Call - - - - -> $3.00 Payments ------------------- > $257.66 BALANCE DUE --------- > $0.00 Approvals: Item: 05100 BUILDING DEPARTMENT 05/03/2007 cgunion Action: AP Item: 05400 PLANNING DEPARTMENT 04/20/2007 WARREN C Action: AP PER WARRENS REQUEST Item: 05600 FIRE DEPARTMENT ****************************************************************************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Permit #: B07 -0104 Project #: ?? See Conditions page of this Document for any conditions that may apply to this permit. CONDITIONS OF APPROVAL Permit #: B07 -0104 as of 05 -04 -2007 Status: ISSUED Permit Type: ADD /ALT MF BUILD PERMIT Applicant: VAIL MANAGEMENT COMPANY 05/04/2007 970 - 476 -4262 Job Address: 292 E MEADOW DR VAIL Location: MOUNTAIN HAUS 6TH FLOOR Parcel No: 210108228009 Description: CONSTRUCTING 2 MAID CLOSETS ON THE 6TH FLOOR CORRIDOR Applied: 04/20/2007 Issued: To Expire: 10/31/2007 Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: 14 (BLDG.): ALL PENETRATIONS IN WALLS, CEILINGS, AND FLOORS TO BE SEALED WITH AN APPROVED FIRE MATERIAL. Cond: 1 (FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY WORK CAN BE STARTED. Cond: 40 (BLDG): (MFR /COMM) FIRE ALARM REQUIRED PER NFPA 72. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY -FOUR HOURS D H AjCE BY TELEPH07AT 479 -2149 OR AT OUR OFFICE FROM 8:00 AM - 4 PM. J %/ If MAY 'y o ? SIGNATURt'OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNEF TOM OF VAIL 75 S. Frontage Rd. Vail, Colorado 81657 CONTRACTOR INFORMATION General Contractor: ' Mcixt C,% - G�nrS� Town of Vail Re . No.: Contact Person and Phone #'s: " 7�_ J FFF l (r %(C l S'f o S 60 Email address: Fax #: Contractor Sign e: Engineer: rtt� � c� Address: COMPLETE VALUATIONS FOR BUILDING PER (Lahn R Mnterinkl BUILDING: $ lv���� ELECTRICAL: $ OTHER: $ PLUMBING: $ MECHANICAL: $ TOTAL: $ For Parcel # Contact Eagle Countv Assessors Office at 970 - 328 -864n nr visa www earyla_enr mfii rnm Parcel# - -- - -_-- - Zloio5Z Job Name: MTrj (440_S 6� `+ FL,0Ljz C COQ. Job Address: Legal Description Lot: Block: Filing: Subdivision: Owners Name: Address: Phone: Architect/Designer: Address: Phone: Engineer: rtt� � c� Address: Phone: Detailed description of work: C�L J'�s 1 YZ J LTT N' 0 2- /V\ S C 1­0S 17— - � Sc-o �K_ y ' w x (-I' x H T_ 1+ �2 Work Class: New( Addition ( ) Remodel(i- Repair( ) Demo( ) Other ( ) Work Type: Interior Exterior ( ) Both ( ) Does an EHU exist at this location: Yes ( ) No( ) Type of Bldg.: Single ) Two ) Multi ) Commercial (vj Restaurant( ) Other ( ) No. of Existing Dwelling Units in this building: No. of Accommodation Units in this building: [ No/T y pe of Fireplaces Existing: Gas Appliances Gas Los Wood /Pellet Wood Burnin No/T e of Fireplaces Proposed: Gas Appliances Gas Los Wood /Pellet Wood Burning NOT ALLOWED Does a Fire Alarm Exist: Yes ('0 No( ) Does a Fire Sprinkler System Exist: Yes (K No ( ) FOR OFFICE USE ONL - Type of Construction r Occupancy Group: ( I APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UNSI `�S'..� 1410 Project #: �J (�J Building Permit #: 13t7v 0/ 0 V Q l � 11 970- 479 -2149 (Inspections TOWN OF VAIL BUILDING PERMIT APPLICATION Separate Permits are required for electrical, plumbing, mechanical, etc.! Date Received: D Accepted By: - C) 33 APR 16 2007 TOWN OF VAIL F: \cdev\FORMS\Permits\Building\buildingj)ermit. DOC Page 1 of 16 02/09/2005 Boyle Engineering, Inc. 143 E. Meadow Drive, Suite 390 Vail, Colorado 81657 303/476 -2170 FAX 303/476 -4383 March 21, 2006 Bud O'Halleran O'Halleran Construction P.O. Box 756 Minturn, Colorado 81645 Subject: Maid Closet Extension Framing The Mountain Haus Vail, Colorado Dear Bud: This is to confirm our telephone conversation regarding the two hour assembly requirement for the extensions to the maid closets at the Mountain Haus. Typically, I work through an architect in situations similar to this one, and they research and specify the assembly requirements. I then size the structural members required to support the design loads. I would suggest that you consult an architect to provide you with two hour assembly options since they have the fire assembly manuals in house and work with that subject matter on a daily basis. Please give me a call if ygwhdvaW questions or comments on this matter. C S. cer our 1496:' Co py Tim M. Boyl � ** President APPROVSD c� Community Development Department � �`��l � TO1 Building Safety and Inspection Services sat ;o. Y . ` d 1,1 ^ornational Building Code/International Residential Coda �': ;idity cf permi?. The issuance or granting of a permit shall not be construed to bo a permit for, or an approval of, any violation of any cf tie provisica3 of this code or of any other ordinance of the jurisd:c;:on. f ermits prosuming to give authority to violate or cancel the preti;; : , 3 cf th73 codo or other ordinances of the jurisdiction shall not be va T' izzuance cf a permit based on construction documents and other c-`:, -- "all rct proverf tho buildin3 official from requiring the mr, .,c i Lf crcro h tho ccac d^ oth r d The ;ru ;.o� ocumen.3 and c da ,orizcd to prevent occupancy cr use cf a str c`_ 1 :;;ere i.i v' !_'ica cf th3o cede or of any other ordinances of thi j_ 'c;ion PLANS EXAMINER. DATE: AL -7 Boyle Engineering, Inc. 143 E. Meadow Drive, Suite 390 Vail, Colorado 81657 303/476 -2170 FAX 303/4764383 May 23, 2006 Jeff Armistead O'Halleran Construction P.O. Box 756 Minturn, Colorado 81645 Subject: Maid Closet Extension Framing The Mountain Haus Vail, Colorado Dear Jeff`. This is to confirm that I have reviewed the additional dead load on the above noted framing due to the fire assembly requirements that you have provided to me. Specifically, the assemblies are U.L. Design D906 and Test Reference: WHI- 495 -PSH -0128 per G -P Gypsum. I have used a live load of 100 pounds per square foot and a dead load of 75 pounds per square foot in my calculations. I have determined that the C4 x 5.4 channels at 16" on center specified on the original design are adequate to support these design loads. Please give me a call if y�y questions or comments on this matter. p, O REGI" �Q. �•....� T S' cerel ours, �Or,��y M1CHqF(.° �artr. 5 r ENG • G, INC. • •� rl Timothy . oyle,r `p • '••.... • •' • President At APR 16 2007 TOWN OF VAIL n D m m e i 0 e I 2 Z r Q) Z] C n � C u � ., zlenPierceBriner MOUNTAIN HAUS � 905-0335 wa o�ouis. ARCHITECTURE PLANNING INTERIORS W �� w F 282 E. MEADOW DRIVE VAn_, COLORADO COMMON AREA IMPROVEMENTS 6 «�9� \_- � \ : m. , ��� 42 � !o � D D � � o � � � d)) \/# RRF % / �~ \ 2) $ � ƒ} a , }/ 94 � � � � � - �� }�} MA � 7 ( 2 ° -K • a EK� ;gqk' &�� ■ H N I • ms, E {2777 � if la�a'�»a =lam G225r7� |aa� � � D � '■ . O � � � 1 11 1 m z Q 0 m N C� 3 r m D z m 0 N -i D A z O N z Q) � U O O -n fV O O O r � �j IJ ll ll m z Q 0 m N C� 3 r m D z m 0 N -i D A z O N z Q) v h v ra r � � 3 � O 7u O p v h / 4� 6�/ 05 -24 -2007 Inspection Request Reporting Page 17 4:20 pm Vail, CO - City Of Requested Inspect Date: Friday, May 25, 2007 Inspection Area: CG Site Address: 292 E MEADOW DR VAIL MOUNTAIN HAUS 6TH FLOOR A/P /D Information Activity: B07 -0104 Type: A -MF Sub Type: AMF Status: ISSUED Const Type: Occupancy: Use: I -B Insp Area: CG Owner: ALLISON MCWHORTER REVOCABLE Contractor: EAGLE VALLEY CABINET & CONSTRUCTION Phone: 390 -5607 Architect: FRITZLEN PIERCE ARCHITECTS Phone: 970 - 476 -6342 Applicant: VAIL MANAGEMENT COMPANY Phone: 970 - 476 -4262 Description: CONSTRUCTING 2 MAID CLOSETS ON THE 6TH FLOOR CORRIDOR Requested Inspe Item: Requestor: Comments: Assigned To: Action: Comment: Comment: Comment: ction s 60 BLDG - Sheetrock Nail EAGLE VALLEY CABINET & CONSTRUCTION will call 390 -5607 GDENCKLA Time Exp: H DENS SHIELD 3RD LAYER 1ST LAYER OF ASSEMBLY ONLY Requested Time: 10:00 AM Phone: 390 -5607 Entered By: DGOLDEN K REPT131 Run Id: 6718 O Q BUrdCO May 23, 1991 ENVIRONMENTAL INCORPORATED Asbestos Abatement Experts / //f // Chief of Police 75 South Frontage Road Vail, CO 81657 Chicago 225 Fencl Lane Hillside IL 60162 Re: Asbestos Abatement (708) 449 -0202 FAX (708) 449 -0290 Dear Chief: Denver Denver, Valle 0 80223 De9er,° i tl Burdco Environment w � Inc. ill be doing an asbestos (303) 777 -6009 abatement job at the Mountain Haus Condominiums, 292 E. FAX (303) 777 -6429 Meadows Dr. The job will start on May 29, 1991 and Detroit conclude on June 5, 1991. Our working hours will be from 39201 Schoolcraft Road Suite B12 7.0 0 a . m . to 5. 3 0 p .m. Livonia, MI 48150 FAX (3 3) 4629871 If you have any questions or need any further information, please feel free to contact me at 777 -6009. Grand Rapids 4870 West River Drive Comstock Park, MI 49321 Sincerely, (616) 784-8004 FAX (616) 784 -9010 Burdco Environmental, Inc. Indianapolis 11711 North Meridian Suite 200 ✓ �'-'� w Carmel, 46032 (317) 843 -3- 5506 Kris Hammond FAX (317) 843 -5552 Project Manager Kansas City 4000 N.E. 33rd Terrace Suite 3 Kansas City, MO 64117 (816) 455 -3337 FAX (816) 455 -0837 Traverse City 4225 Cedar Run Road Traverse City, MI 49685 (616) 947 -2573 FAX (616) 947 -0026 Asbestos Abatement Experts / //f // BUILDING: PLUMBING: ❑ FOOTINGS / STEEL ❑ UNDERGROUND PERMIT NUMB R O PROJECT INSPECTION TOWN OF REQUEST VAIL DATE JOB NAME 'T 4 CALLER ❑ POOL / H. TUB ❑ ❑ READY FOR INSPECTION: MON TUES WED THUR FRI AM PM BUILDING: PLUMBING: ❑ FOOTINGS / STEEL ❑ UNDERGROUND ❑ FOUNDATION / STEEL ❑ ROUGH / D.W.V. ❑ FRAMING ❑ ROUGH / WATER ❑ ROOF & SHEER ❑ GAS PIPING PLYWOOD NAILING ❑ INSULATION ❑ POOL / H. TUB ❑ SHEETROCK NAIL ❑ ❑ ❑ INAL ❑ FINAL ELECTRICAL: MECHANICAL: • TEMP. POWER ❑ HEATING • ROUGH ❑ EXHAUST HOODS ❑ CONDUIT ❑ SUPPLY AIR ❑ ❑ ❑ FINAL ❑ FINAL S U, s CNMSHOP ❑ APPROVED ❑ DISAPPROVED ❑ REINSPECTION REQUIRED (.nPPFr.TInNS-