Loading...
HomeMy WebLinkAboutMountain Haus Unit 444NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES TOWN OF VAIL Y ADD /ALT MF BUILD PERMIT Permit #: B95 -0166 75 South Frontage Road Department of Community Developmein Vail, Colorado 81657 Job Address: 292 E MEADOW DR Status ...: ISSUED 303 - 479 - 21381479 -2139 Location...: #444 Applied..: 06/04/1995 FAX 303-479-2452 Parcel No..: 2101 - 082 - 28 - 040 Issued...: 06/04/1995 Project No.: PRJ95 -0108 Expires..: 12/01/1995 APPLICANT RUSTY SPIKE ENTERPRISES , VAIL, CO 81653 CONTRACTOR RUSTY SPIKE ENTERPRISES , VAIL, CO 81658 OWNER WACHS RACHEL A 233 S 6TH ST APT 2109, PHILADELPHIA P 19106 Description: ADD WASHER AND DRYER Occupancy: R1 Multi - Family Type Construction: 11 1 - HR Not in table! Type Occupancy: Valuation: 3,550 Add Sq Ft: Fireplace Information: Restricted: #Of Gas Appliances: #Of Gas Logs Phone: 3034764374 Phone: 3034764374 t10f Wood /Pallet: FEE SUMMARY Building - - - - -> 85.00 Restuarant Plan Review - -> .00 Total Calculated Fees --- > 243.25 Plan Check --- > 55.25 DRB Fee------------ - -- - - > .00 Additional Fees --------- > .00 Investigation> .00 Recreation Fee ---------- > .00 Total Permit Fee--- - - - - -> 243.25 Will Call ---- > 3.00 Clean -Up Deposit--- - - - - -> 100.00 Payments ---------------- > 243.25 TOTAL FEES--------- - -- - 243.25 BALANCE DUE ------------- > .00 Item: 05100 BUILDING DEPARTMENT 06/04/1995 DAN Action: APPR Item: 05400 PLANNING DEPARTMENT 06/04/1995 DAN Action: APPR N/A 06/04/1995 DAN Action: APPR N/A Item: 05600 FIRE DEPARTMENT 06/04/1995 DAN Action: APPR N/A Item: 05500 PUBLIC WORKS 06/04/1995 DAN Action: APPR N/A Dept: BUILDING Division: Dept: PLANNING Division: Dept: FIRE Division: Dept: PUB WORK Division: See Page 2 of this Document for any conditions that may apply to this permit. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information provided as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state Laws, and to build this structure according to the Town's zoning and subdivision codes, design review approved, Uniform Building Code and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTIONS SHALL BE MADE TWENTY -FOUR HOURS IN ADVANCE BY TELEPHONE AT�479 -2 OR T OU OF� CE FROM 8:00 AM 5:00 PM Send Clean -Up Deposit To: RUSTY SPIKE SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNER CONDITIONS Permit #: B95 -0166 as of 06/06/95 Status: ISSUED ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Permit Type: ADD /ALT MF BUILD PERMIT Applicant: RUSTY SPIKE ENTERPRISES 3034764374 Job Address: Location: #444 Parcel No: 2101- 082 -28 -040 Description: ADD WASHER AND DRYER Applied: 06/04/1995 Issued: 06/04/1995 To Expire: 12/01/1995 Conditions: 1. 1. FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY WORK CAN BE STARTED. 2. FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. ********************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** TOWN OF VAIL, COLORADO Statemnt ********************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Statemnt Number: REC -0031 Amount: 243.25 06/06/95 10:47 Payment Method: ---------------------------------------------------------------- CK Notation: Init: MMC Permit No: B95 -0166 Type: A -MF ADD /ALT MF BUILD PER Parcel No: 2101 - 082 -28 -040 Site Address: 292 E MEADOW DR Location: #444 Total Fees: 243.25 This Payment 243.25 Total ALL Pmts: 243.25 Balance: .00 ********************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Account Code Description Amount O1 0000 41310 BUILDING PERMIT FEES 85.00 O1 0000 41332 PLAN CHECK FEES 55.25 O1 0000 22002 CLEANUP DEPOSITS 100.00 O1 0000 41336 ---------------------------------------------------------- WILL CALL INSPECTION FEE 3.00 - - - - -- _ ,� TOWN OF VAIL CONSTRUCTIO ri� - l PARCEL #: p�� l`��j� `c/7 PERMIT APPLICATION FORM D� DATE yy6 L G 2 1995 APPLICATION MUST BE FILLED OUT COMPLETELY OR IT MAY NOT BE ACCEPTED nC1j n1CP7 er * * * * * * * * * * * * * * * * * * * * * * * ** PERMIT INFORMATION * * * * * * * * * * * * * * * * * * * * * * * * ** - BuildinS�g/� 1 �4- Plumbing ] - Electrical [ ]-Mechanical [ ]-Other Job Name: G'v�'� �� 5 �� Job Address: !//�'f / / i7 GAS 11, 4, Legal Description: Lot Bl Owners Name: �i� 4y✓�/ls Architect: General Description: Work Class: [ ] -New <I - Al�erati Number of Dwelling Units: a Block Filing Q SUBDIVISION: Address: �' 0 of� P _aem. a iSa7 7 7 Address: Ph_ [ ]- Additional [ ]- Repair [ 3 %t)er Number of Accommodation Units: N mber and Type of Fireplaces: Gas Appliances Gas Logs Wood /Pellet ** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** VALUATIONS ** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** BUILDING: ELECTRICAL: $ $ - D OTHER: $ PLUMBING: $ 1 MECHANICAL: $ TOTAL: CONT CTOR I FORMATION * * * * * * * * * * * * * * * * * * * * * * * * * ** OXeneral Contractor:' f Town of Vail Reg. NO. �_�.-- Address: ,� s4+ 5 Phone Number: b -� 7 Electrica ontracto 1 Town Address: l 07 e l Phone Plumbing Contracto Town Address: :_,t., _ Phone Mechanical Co Address: - 00 * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** FOR BUILDING PERMIT FEE: ,br�s_ PLUMBING PERMIT FEE: Q , Qc MECHANICAL PERMIT FEE: ELECTRICAL FEE: �.. OTHER TYPE OF FEE : c5c DRB FEE: TYPE GRAUP SQ.FT. VALUATION ALL Comments: of Vail Reg. NO. 177-6 Number: 7V -- ( � 3 of Vail Reg. NO. 133 - p Number: Yo2 Town of Vail Reg. NO. Phone Number: OFFICE USE * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** BUILDING PLAN CHECK FEE: �j ,5_ zf PLUMBING PLAN CHECK FEE: 7,,15 MECHANICAL PLAN CHECK FEE: RECREATION FEE: CLEAN -UP DEPOSIT: TOTAL PERMIT FEES: BUILDING: SIGNATURE: ZONING: SIGNATURE: CLEAN UP DEPOSIT REFUND TO: MEMORANDUM TO: ALL CONTRACTORS FROM: TOWN OF VAIL PUBLIC WORKS DEPARTMENT DATE: MAY 9, 1994 RE: WHEN A "PUBLIC WAY PERMIT' IS REQUIRED Job Name: wa /� 4- Date: ' Please a wer the following questionnaire regarding the need for a "Public Way Permit ": YES 1) Is this a new residence? 2) Is demolition work being performed that requires the use of the right of way, easements or public property? 3) Is any utility work needed? 4) Is the driveway being repaved? 5) Is different access needed to site other than existing driveway? 6) Is any drainage work being done affecting the right of way, easements, or public property? 7) Is a "Revocable Right Of Way Permit" required? 8) A. Is the right of way, easements or public property to be used for staging, parking or fencing? B. If no to 8A, is a parking, staging or fencing plan required by Community Development? RU If you answered yes to any of these questions, a "Public Way Permit" must be obtained. "Public Way Permit" applications may be obtained at the Public Work's office or at Community Development. If you have any questions please call Charlie Davis, the Town of Vail Construction Inspector, at 479 -2158. I have read and answered all the above uestions. Job Name Contractor's Sifnature Date *® town of voi 75 south frontage road vail, colorado 81657 (303) 479 -2138 or 479 -2139 office of community development TO: ALL CONTRACTORS CURRENTLYL REGISTERED WITH THE TOWN OF VAIL FROM: TOWN OF VAIL PUBLIC WORKS /COMMUNITY DEVELOPMENT DATE: MARCH 16, 1988 SUBJECT: CONSTRUCTION PARKING & MATERIAL STORAGE In summary, Ordinance No. 6 states that it is unlawful for any person to litter, track or deposit any soil, rock, sand, debris or material, including trash dumpsters, portable toilets and workmen vehicles upon any street, sidewalk, alley or public place or any portion thereof. The right -of -way on all Town of Vail streets and roads is approximately 5 ft. off pavement. This ordinance will be strictly enforced by the Town of Vail Public Works Department. Persons found violating this ordinance will be given a 24 hour written notice to remove said material. In the event the person so notified does not comply with the notice within the 24 hour time specified, the Public Works Department will remove said material at the expense of person notified. The provisions of this ordinance shall not be applicable to construction, maintenance or repair projects of any street or alley or any utilities in the right -a -way. To review Ordinance No. 6 in full, please stop by the Town of Vail Building Department to obtain a copy. Thank you for your cooperation on this matter. Read a acknowledged by: osition/ elat onship to Project (i.e. contractor, owner) X • town of WOU 75 south frontage road vail, Colorado 81657 (303) 479 -2138 or 479 -2139 office of community development BUILDING PERMIT ISSUANCE TIME FRAME If this permit requires a Town of Vail Fire Department Approval, Engineer's (Public Works) review and approval, a Planning Department review or Health Department review, and a review by the Building Department, the estimated time for a total review may take as long as three weeks. All commercial (large or small) and all multi - family permits will have to follow the above mentioned maximum requirements. Residential and small projects should take a lesser amount of time. However, if residential or smaller projects impact the various above mentioned departments with regard to necessary review, these projects may also take the three week period. Every attempt will be made by this department to expedite this permit as soon as possible. I, the undersigned, understand the plan check procedure and time frame. X A re g _Cd to by. Project Name X D — ate Work Sheet was turned into the Community Development Department. Kaitcy Spihe Cutezpziaea P.O. BOX 1517 VAIL, COLORADO 81658 a I IU'5+A I Irv1. U)AS 1*,2, r 2 I L' Lta ofd f 4 a E A t'C P_ iC,A C LL � A_ lCV(V 'lPAV^_ Er,±P_tf 3 u l (b SoW FAD m. (B&N coop fa ©LUtS w 4 LL o r li4 L oaur, :* o Llb, ' CO v ?. - pA -r 9( L^^-U Iti AQ&6 D tBUDS 'Eff �4bw% e4Ya wilts r3wi'lb L,,P ''lath Y_ &_L'4 ti C44-4 PAAX( U EKA tt oL,�rs I fl je'w a�i✓ ,�DIL oaP�>� Cam,, I_I ti� I 9, 4 11 LjoAgy b R.IEAL t wr4uaii Gummun Develooment ran I th Dire I Validity! of Permit . 303 ( t -t 8 d. A- G. rn,, i -uance or granting of a permit or approval of plans and :c l ifications shall not be construed to be a permit for. or an J�; of, any violation of any of the provisions of thi cods ,ir of any other ordinance of the jurisdication. The issuance of a permit based upon plans, specifications and other data shai` no* prevent the building official from thereafter requiring the . correction of errors in said plans, specifications and othe Jata.'' r)ATE. /. —W - Town of Vag L'tiLi .04 ,N IOu ti h; &d OFFICE CU P.O. BOX 1517 VAIL, COLORADO 81658 PH. (303) 476 -4374 SENT BY: 1110U VTA I N HAUS a 1 L VQfI's �"lounfidsn .H 0—us otthe Covered bridge May 31, 1995 5 -�3 :12 :43PM • Rusty Spike Enterprises 500 S. Frontage Road Vail, Colorado 81657 ATTN: Mike RE: Unit 444, Mountain Haus Dear Mike: MOUNTAIN HAUS VA I �I I am writing to advise you that you have the approval to install a washer /dryer unit in the above referenced conditions: 1. All contraction work must be c4 through the floors or ceilings to 2. The Association specifically pre times the hotel is open to guests work while we are open, I exile east side entrance for azeess, co hours of 9:00 am and 5:00pm of ment to stop work if any tenant! rtained within the unit; no drilling access plumbing or venting. udes construction work during the Since we are allowing you to your full cooperation in using the fining your work between the weekdays only, and your agree - .omplain about noise caused by yolu. -3. The Association approval is coyl' ngent, further, upon your securing all necessary permits from the T�wn of Vail, and proof of insurance•, copies of permits and 1�nsurance to be submitted prior to commencement of work. M 4. Your work must be coordinated through our maintenance engineer, Joe Marquez. Any costs generai�ed by having to disconnect and reconnect the fire alarm system connection with your work, will be born by you. 5. The washer /dryer units will be c q ntained in a lock closet, have a shut -off valve, and metallic hosd +as described by you in our phone conversation today. Sincerely, Sandra F. Gray, General nager cc: Deb Taylor, Joe Marques Mountain Haus 292 East Meadow Drive, Vail, Colorado 81657 & 3W /4 } 6 - For Reservations: $00/237 -0)22 30,'14766307;# 1/ 1 'the Mountain Haus Association irtment subject to the following of NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES TOWN ELECTRICAL PERMIT Permit #: E95 -0123 75 South Frontage Road Vail, Colorado 81657 303-479-21381479-2139 Job Address: 292 E MEADOW DR FAX 303 - 479 -2452 Location...: #444 Parcel No..: 2101 - 082 -28 -040 Project No.: PRJ95 -0108 APPLICANT RUSTY SPIKE ENTERPRISES , VAIL, CO 81658 CONTRACTOR RUSTY SPIKE ENTERPRISES , VAIL, CO 81658 OWNER WACHS RACHEL A Status...: ISSUED Applied..: 06/04/1995 Issued...: 06/04/1995 Expires..: 12/01/1995 Phone: 3034764374 Phone: 3034764374 233 S 6TH ST APT 2109, PHILADELPHIA P 19106 CONTRACTOR RESORT SERVICES Phone: 3039496013 P 0 BOX 1079, AVON CO 81620 Description: Valuation: 350.00 FEE SUMMARY * ** ' Electrical --- > 50.00 Total Calculated Fees --- > 53.00 DRB Fee - - -> .00 Additional Fees --------- > .00 Investigation> 00 Total Permit Fee--- - - - - -> 53.00 Will Call ---- > 3.00 Payments ---------------- > 53.00 TOTAL FEES --- > 53.00 BALANCE DUE ------------- > .00 ***t * ** Item: 05100 BUILDING DEPARTMENT Dept: BUILDING Division: 06/04/1995 DAN Action: APPR ************ * * ******* *** ***** CONDITION OF APPROVAL k*********************************************************** * *** ******** * ****** ************ **** DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information provided as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the Town's zoning and subdivision codes, design review approved, Uniform Building Code and other ordinances of the Town applicable thereto. Department of Community Development REQUESTS FOR INSPECTIONS SHALL BE MADE TWENTY -FOUR HOURS IN ADVANCE BY TELEPHONE AT 479 -2138 OR AT OUR OFFICE FROM 8:00 AM 5:00 PM SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNER ********************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** TOWN OF VAIL, COLORADO Statemnt ********************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Statemnt Number: REC -0032 Amount: 53.00 06/06/95 10:51 Payment Method: ---------------------------------------------------------------- CK Notation: Init: MMC Permit No: E95 -0123 Type: B -ELEC ELECTRICAL PERMIT Parcel No: 2101- 082 -28 -040 Site Address: 292 E MEADOW DR Location: #444 Total Fees: 53.00 This Payment 53.00 Total ALL Pmts: 53.00 Balance: .00 ********************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Account Code Description Amount O1 0000 41313 ELECTRICAL PERMIT FEES 50.00 O1 0000 41336 ---------------------------------------------------------- WILL CALL INSPECTION FEE 3.00 - - - - -- v NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES TOWN OF VAIL % PLUMBING PERMIT Permit #: P95 -0087 75 South Frontage Road *�Fkrt tir *ic icir * *ir** iciric ** FEE SUMMARY ** Department of Community Development Vail, Colorado 81657 Job Address: 292 E MEADOW DR Status ...: ISSUED 303 - 479 - 21381479 -2139 Location...: #444 Applied..: 06/04/1995 FAX 303 - 479 -2452 Parcel No..: 2101 - 082 -28 -040 Issued...: 06/04/1995 Project No.: PRJ95 -0108 Expires..: 12/01/1995 APPLICANT RUSTY SPIKE ENTERPRISES Phone: 3034764374 , VAIL, CO 81658 CONTRACTOR RUSTY SPIKE ENTERPRISES Phone: 3034764374 , VAIL, CO 81658 OWNER WACHS RACHEL A 233 S 6TH ST APT 2109, PHILADELPHIA P 19106 CONTRACTOR JERRY SIBLEY PLUMBING Phone: 3038275736 P 0 BOX 340, MINTURN CO 81645 Description: Valuation: 1,200.00 Item: 05100 BUILDING DEPARTMENT Dept: BUILDING Division: 06/04/1995 DAN Action: APPR CONDITION OF APPROVAL DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information provided as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the Town's zoning and subdivision codes, design review approved, Uniform Building Code and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTIONS SHALL BE MADE TWENTY -FOUR HOURS IN ADVANCE BY TELEPH A 479- 2138,OR 1(T OUX OFF / E FROM 8:00 AM 5:00 PM SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNER / *�Fkrt tir *ic icir * *ir** iciric ** FEE SUMMARY ** Plumbing - - - - -> 30.00 Restuarant Plan Review - -> .00 Total Calculated Fees --- > 40.50 Plan Check --- > 7.50 TOTAL FEES------- -- -- - - -> 40.50 Additional Fees --------- > .00 Investigation> .00 Total Permit Fee--- - - - - -> 40.50 Wilt Call ---- > 3.00 Payments ---------------- > 40.50 BALANCE DUE ------------- > .00 Item: 05100 BUILDING DEPARTMENT Dept: BUILDING Division: 06/04/1995 DAN Action: APPR CONDITION OF APPROVAL DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information provided as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the Town's zoning and subdivision codes, design review approved, Uniform Building Code and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTIONS SHALL BE MADE TWENTY -FOUR HOURS IN ADVANCE BY TELEPH A 479- 2138,OR 1(T OUX OFF / E FROM 8:00 AM 5:00 PM SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNER / e ********************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** TOWN OF VAIL, COLORADO Statemnt ********************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Statemnt Number: REC -0032 Amount: 40.50 06/06/95 10:52 Payment Method: CK Notation: Init: MMC ---------------------------------------------------------------- Permit No: P95 -0087 Type: B -PLMB PLUMBING PERMIT Parcel No: 2101- 082 -28 - 040 Site Address: 292 E MEADOW DR Location: #444 Total Fees: 40.50 This Payment 40.50 Total ALL Pmts: 40.50 Balance: .00 ********************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Account Code Description Amount O1 0000 41311 PLUMBING PERMIT FEES 30.00 O1 0000 41332 PLAN CHECK FEES 7.50 O1 0000 41336 ---------------------------------------------------------- WILL CALL INSPECTION FEE 3.00 - - - - -- L J d� c: ;� r r - REPT131 TOWN OF VAIL, COLORAD PAGE 1 Oi/18/96 06:41 REQUESTS FOR INSPECTION WORK SHEET �: 1/18/96 AREA: EG --------------------------------- - A t t - E95 -0123 1 T e- B -ELEC Status: ISSUED Constr: AAPT c.ivi y. yP - Address: 292 E MEADOW DR Location: #444 Parcel: 2101 - 082 -28 -040 Occ: Use: Description: Applicant: RUSTY SPIKE ENTERPRISES Phone: 3034764374 Owner: WACHS RACHEL A Phone: Contractor: RUSTY SPIKE ENTERPRISES Phone: 3034764374 ------------------------------------------------------------------------------- Inspection Request Information..... Requestor: gary /resort services Phone: 949 -6013 Req Tine: 08:00 Comments: inspect laundry room,managenent has key Items requested to be Inspected..., Action Comments Time Ex 00190 ELEC -F i na 1 X / v Inspectio Item: Item: Item: Item: Item: n History..... 00110 ELEC -Temp. Power 00120 ELEC -Rough 09/18/95 Inspector: EG 00130 ELEC- Conduit 00140 ELEC -Misc. 00190 ELEC -Final Action: APPR APPROVED .. PERMIT NUMBER O PROJECT DATE .- JOB NAME READY FOR INSP CTION: LOCATION: CALLER ON , TUES WED INSPECTION REQUEST TOWN OF VAIL 47A -2138 U FRI BUILDING: PLUMBING: • FOOTINGS / STEEL ❑ UNDERGROUND • FOUNDATION / STEEL ❑ ROUGH / D.W.V. • FRAMING ❑ ROUGH / WATER ROOF & SHEER • PLYWOOD NAILING ❑ GAS PIPING ❑ INSULATION ❑ POOL / H. TUB ❑ SHEETROCK NAIL ❑ F1 X 0 4 7 /1 �� FINAL ❑ FINAL ELECTRICAL: MECHANICAL: • TEMP. POWER ❑ HEATING • ROUGH ❑ EXHAUST HOODS • CONDUIT ❑ SUPPLY AIR ❑ ❑ FINAL ❑ FINAL eAPPROVED , ❑ DISAPPROVED ❑ REINSPECTION REQUIRED CORRECTIONS: DATE f ��` �✓� INSPECTOR PERMIT NUMBER OF PROJECT DATE ./ - � JOB NAME INSPECTION REQUEST TOWN OF VAIL 479 -2138 READY FOR INSPECTION: MO LOCATION: CALLER TU S WED T UR FRI A D A PM BUILDING: • FOOTINGS / STEEL • FOUNDATION / STEEL • FRAMING El ROOF & SHEER PLYWOOD NAILING ❑ INSULATION ❑ SHEETROCK NAIL ❑ FINAL PLUMBING: ❑ UNDERGROUND ❑ ROUGH / D.W.V. ❑ ROUGH / WATER ❑ GAS PIPING ❑ POOL / H. TUB ❑ ❑ FINAL l� ELECTRICAL: • TEMP. POWER • ROUGH • CONDUIT ❑ ❑ FINAL MECHANICAL: ❑ HEATING ❑ EXHAUST HOODS ❑ SUPPLY AIR ❑ ❑ FINAL b "APPROVED ❑ DISAPPROVED CORRECTIONS: ❑ REINSPECTION REQUIRED DATE INSPECTOR M C7 O z > O C) O Z m > n Z O n n O z r n co O C) O m z r- n M C) O z 0 m m D C 7 m O x O D m L m - 1 (n S7 r Z -n C7 O m m D m m r D cn D p S --1 m 0{ D O m x � m r O Z cn = 0 m � m O m 0 I 'iN --I m 0 „ � m � O I-n m O T m O „ n - C) D z D r z CD a 0 - c < `2 (D O� y (D 3 0 Z m 3 m m D --4 m V m { O D C m C r v O { m D Z O Z D Z CrJ D m Z Z D r D Z m O O m O m 'b - 0 a (D 'd 0 a n 00 O m 0 �d p ,may C p �4 O C m D C) { Z t7 �y O O � D > N V m D 7 j �.c .� m < m cn m m O U) >;:o H m > H j7d O a Q n 0 Cn D v Z ^�c I� N t N � -L C) CD H Oa c: CD z m r r m z D r In r _1 O O O m z 7 H - a r �d m r� n D x O 77 D O CD CD m -,J D m Cy" D y '-' O 00 9 m O m O D p m L7 W ON m O n O m O m b r ON ;R C- m O C� -.0 W CO C: c z z z 7C Z O Z z to V 0 0 Z 00 O O m cn (n 0 O c m m a� 3 D W a O Z w 2 C7 v O W w N m m c D A - (� D - O7 a m lTJ = D D C: V G (] C) W r cn m D a- N a D r r m D cn rn 9 v Z I C- v a�osv w W cn ^' 0 0 tv 0 0 C VALI ATION Z (D (D j 0 z LTJ O (n r N m m r r m r 0 z O (�D w Z O Z I p I -{ D m m cn 0 n C Z r L_;129� r m O Z Z � C7 L7 D r T d O r CD C C :E� z o� D z � O O z m O T m x H CL g CD d ° A CD d O 0 ^ � l J 0 7 Z ' ^` CL �, < M O C f9 0 T Z V m D Z H m m o I C") O C) td 0 N 0 v m T M A O W m x m v 0 Z C- 0 CO C/) m J c� Z C7 O m m D m m r D cn D p S --1 m 0{ D O m x � m r O Z cn = 0 m � m -{ < I I 'iN N .. m 0 w O z : O c y m v � m 0 m � 1 r= m � m "7 Z � m 0 v CD a 0 - c < `2 (D O� y (D 3 0 Z Z O -4 D D --4 Z Z V O D C m C r v O (p (D 'O (D D to O O c D CrJ D m C N D O O Q r Z Z m G) C cn n 0 'b - 0 a (D 'd 0 a n m m r- n cn m O C C) { Z t7 �y O O � > O v O O C j7d O a Q n 0 Cn v Z ^�c O (� 2 N_ � -L C) CD H Oa c: CD z m m z D _1 O O O m z 7 H - a m n D O 77 O CD CD m m '-' O p 0 D p 2 D D ;R -.0 W CO C: c 0 7C r O n o O Z D N C O Q) Z 00 > cn m cn (n 0 D m m a� 3 D W O Z w 2 W w N m c D A - (� D - O7 a m ? D D C: V G (] C) W r cn m D a- N a D r r m D O w .a � Z a�osv w ^' 0 0 tv 0 0 C VALI ATION Z (D (D j 0 z Z r-I 7CI O (n r m m m r r m r 0 z O (�D w Z O Z I p I -{ D m m cn 0 n C Z r v m w 2 C 0 0 _. O m 7 7 RO D C�27 O t, D x Z C Z D D Z Oo Z C) m ( 2 C 3 m n 0 D_ O O CD OI I m t) � m m _> 0 0 0 F) D n L7 D Z A Z �m w 3 - c z � m m z D r m n Z c) D c� M - n W a p I >I Z 0 0 W m D r 0 ,� p0 C. Z � I T O 7 -.0 m - (n �� Z 0 A I m m o m _ D �j I N m m ;0 0 CL I I O Q* a CD 1 I 00 I n n L O N T m Z O a� W - ai. a N V I I O I u, m D` (p I O O O O C) - _. 0 >sv�'� O D D O 0 m D 6 C) :0 N iv p� n m O N — O ' p > DI ml 0 �� (n w c m o - (n W _ (D M CD as - I I O C o (D U) I C cn cn m a I c -ir w I 4- I 0 T Z V m D Z H m m o I C") O C) td 0 N 0 v m T M A O W m x m v 0 Z C- 0 CO C/) m J c� TOWN OF VAIL CONSTRUCTION PEP1IIT # PERMIT APPL Z CATION FORM REC - D OCT_ 2 6,1994. DATE: a J� �, �` Z `I Lf ( 7V ff APPLICATION MUST BE FILLED OUT COMPLETELY OR IT MAY NOT BE ACCEPTED * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** PERMIT INFORMATION * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Buildin -Plumbing [ ]-Mechanical [ ] Fther - �gj,.� �J - g [ ]-Electrical �}'� / � Job Name: � x`14 r.tn Zl.•- � Job Address: � � a- � ' " ' - °,q '` 1) ,V, A� Legal Description: Lot s Block Filing � SUBDIVISION: u Owners Name: ?-)A P- A b-A P-A (/fyG S Address: 6;? 90 - / ! �i'fJ� d z.✓ Q� ph . I ��" o� Architect: Address: ph. GeneraD`es� c G ipti / 4y�, Work C ass: [ ]- Neck - Alterat20 [ ] Additional [/I-Repair 3-Other Number of Dwelling Units: Number of Accommodation Units: N mber and Type of Fireplaces: Gas Appliances Gas Logs Wood /Pellet ** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** VALUATIONS BUILDING: $ (�j� b ELECTRICAL: $ y �, yU t I'HER: $ PLUMBING: $ MECHANICAL: $ OTAL: $ - X * CONTRACTOR INFORMATION * * * *; * * * * * * ** * * * * * * * * * * * ** eneral Contractor: Town -)F nail Reg. NO. Address: Phone N.,ber: Electrical So ntractor: e,,' aaf � Address: Plumbing Contractor: Address: /U / Mechanical Contractor: Address: * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** FOR BUILDING PERMIT FEE: ��— PLUMBING PERMIT FEE: / MECHANICAL PERMIT FEE: ELECTRICAL FEE: OTHER TYPE OF FEE: OU 47 7 M7 DRB FEE: TYPE GROUP SQ.FT. VALUATION Comments: OFFICE USE * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** BUILDING PLAN CHECK FEE: PLUMBING PLAN CHECK FEE: G -- MECHANICAL PLAN CHECK FEE: RECREATION FEE: CLEAN -UP DEPOSIT: TOTAL PERMIT FEES: BUILDING: SIGNATURE: ZONING: SIGNATURE: Town of Vail Phone Number: Town o.L Vail Phone Number: R g. G6 %- Reg . NO 1 � �p 8a ,t Town of Vail Reg. NO. Phone Number: r CLEAN UP DEPOSIT REFUND TO: Plan Review Based on the 1991 Uniform Codes NAME: MT. HAUS #444 ADDRESS: 292 E. EADOW DR. VAIL, COLORADO 1 OCCUPANCY: R -1 TYPE OF CONSTRUCTION: 1 1F DATE: 10 -27 -94 �� a:! i CONTRACTOR: RUSTY SPIKE ARCHITECT: NONE ENGINEER: NONE PLANS EXAMINER: DAN STANEK CORRECTIONS REQUIRED The items listed below are not intended to be a complete listing of all possible code requirements in the adopted codes. It is a guide to selected sections of the codes. The following is not to be construed to be an approval of any violation of any of the provisions of the adopted codes or any ordinance of the Town of Vail. 1. FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY WORK CAN BE STARTED. 2. THIS PERMIT IS GOOD FOR AN INTERIOR REMODEL ONLY. 3. FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. 4. A STRUCTUAL ENGINEER MAYBE REQUIRED TO APPROVE ANY STRUCTUAL CHANGES BEFORE A FRAMING INSPECTION IS APPROVED BY TOV. 5. VENTILATION IS REQUIRED AS PER SEC 705 OF THE 1991 UBC. 6. ALL PENTETRATIONS IN WALLS, CEILINGS, AND FLOORS TO BE SEALED WITH AN APPROVED FIRE MATERIAL. 7. SMOKE DETECTORS ARE REQUIRED IN ALL BEDROOMS AND HALLWAYS AS PER SEC 1210 OF THE 1991 UBC. Vil's M&j n t�ain IF f'�& H of the ) Covered Dridge October 27, 1994 To Whom This May Concern: This letter hereby gives permission to Rusty Spike Enterprises to do a complete kitchen remodel and custom woodwork through out unit #444 at the Mountain Haus. This will include smoke alarms to the bedrooms, upgrade GFI outlets in baths & kitchen and change sliding doors in the living room. This permission is given under the pretense that all building and fire codes are adhered to. If there are any questions or concerns regarding their work, please notify us as soon as possible. Sincerely, U- Suzanne Vondrell -Kerr Owner Services Manager Mountain Haus Condominium Association Mountain Haus 292 East Mead Drive, Vail, Colorado 81657 • 303/476 -2434 • 303/476 -3007 For Reservations: 800/237 -0922 PERMIT PERMIT N MBER OF PROJECT DATE JOB NAME PLUMBING: ❑ UNDERGROUND _ ❑ ROUGH / D.W.V. ❑ ROUGH / WATER ❑ GAS PIPING ❑ POOL / H. TUB CALLER READY FOR INSPECTION: MON TUES J <fW- D THUR FRI AM PM LOCATION: BUILDING: ❑ FOOTINGS/ STEEL _ ❑ FOUNDATION / STEEL ❑ FRAMING El ROOF & SHEER PLYWOOD NAILING ❑ INSULATION ❑ SHEETROCK NAIL n ❑ FINAL ELECTRICAL: ❑ TEMP. POWER ❑ ROUGH ❑ CONDUIT ❑ FINAL PP OVED RRECTIONS: ❑ FINAL ❑ DISAPPROVED ❑ REINSPECTION REQUIRED INSPECTION REQUEST TOWN OF VAIL 479 -2138 im El FINAL MECHANICAL: ❑ HEATING — ❑ EXHAUST HOODS ❑ SUPPLY AIR ❑■ DATE INSPECTOR .'"5;��•: "` ^;_�77�^s�T.h '-• 4v ` PERMIT PERMIT N MBER OF PROJECT DATE JOB NAME PLUMBING: ❑ UNDERGROUND _ ❑ ROUGH / D.W.V. ❑ ROUGH / WATER ❑ GAS PIPING ❑ POOL / H. TUB CALLER READY FOR INSPECTION: MON TUES J <fW- D THUR FRI AM PM LOCATION: BUILDING: ❑ FOOTINGS/ STEEL _ ❑ FOUNDATION / STEEL ❑ FRAMING El ROOF & SHEER PLYWOOD NAILING ❑ INSULATION ❑ SHEETROCK NAIL n ❑ FINAL ELECTRICAL: ❑ TEMP. POWER ❑ ROUGH ❑ CONDUIT ❑ FINAL PP OVED RRECTIONS: ❑ FINAL ❑ DISAPPROVED ❑ REINSPECTION REQUIRED INSPECTION REQUEST TOWN OF VAIL 479 -2138 im El FINAL MECHANICAL: ❑ HEATING — ❑ EXHAUST HOODS ❑ SUPPLY AIR ❑■ DATE INSPECTOR .. a 'a";?`- .RS' ter— ' V" .�," . . . T - 1A /. INSPECTION REQUEST TOWN OF VAIL PERMIT NUMBER OF PROJECT / f q, I C ) l(' 479 -2138 DATE I I -�!` ^) 14 JOB NAME 4 4 W u rtr �t i READY FOR INSPECTION LOCATION: i -' BUILDING: ❑ FOOTINGS / STEEL ❑ FOUNDATION / STEEL ❑ FRAMING El ROOF & SHEER PLYWOOD NAILING ❑ INSULATION ❑ SHEETROCK NAIL n ❑ FINAL ELECTRICAL: ❑ TEMP. POWER ❑ ROUGH ❑ CONDUIT ❑ FINAL "APPROVED CORRECTIONS: PM PLUMBING: ❑ UNDERGROUND ❑ ROUGH / D.W.V. ❑ ROUGH / WATER ❑ GAS PIPING ❑ POOL / H. TUB ❑ FINAL MECHANICAL: ❑ HEATING ❑ EXHAUST HOODS ❑ SUPPLY AIR n ❑ FINAL ❑ DISAPPROVED ❑ REINSPECTION REQUIRED CALLER LOEV I h C ` f u v Ctrs W00 t MON TUES WED I THUR FRI Ccn )t r L J AM DATE � - INSPECTOR i