Loading...
HomeMy WebLinkAboutVista Bahn Building Common Area 4FILE COPY PLANNING AND ENVIRONMENTAL COMMISSION Monday, January 11, 1999 FINAL AGENDA Proiect Orientation / LUNCH - Community Development Department MEMBERS PRESENT Greg Moffet John Schofield Galen Aasland Ann Bishop Brian Doyon Tom Weber Site Visits 1. Vail Plaza Hotel —100 E. Meadow Drive 2. Vail Village Club — 333 Bridge Street Driver: George NOTE: If the PEC hearing extends until 6:00 p.m., the board will break for dinner from 6:00 - 6:30 p.m. Public Hearing - Town Council Chambers 11:00 a.m. 12:30 p.m. 2:00 p.m. A request for a Type II Employee Housing Unit at a proposed primary/secondary residence, located at 95 Forest Road / Lot 32, Block 7, Vail Village First Filing. Applicant: Philip Hoversten, represented by Snowdon & Hopkins Architects Planner: Jeff Hunt MOTION: Ann Bishop SECOND: John Schofield VOTE: 6 -0 APPROVED WITH 1 CONDITION: Prior to the issuance of a building permit, the applicant shall submit a Type II EHU deed restriction to the Town of Vail Department of Community Development. This document will be recorded at the Eagle County Clerk and Recorder's Office and will require that the employee housing unit be permanently restricted for employee housing. MEMBERS ABSENT Diane Golden TOR 4VAIL 2. A request for a variance from Section 12- 713-13, Town of Municipal Code, to allow for the conversion of existing floor space to gross residential floor area (GRFA), located at 333 Bridge Street (Vail Village Club)/ A portion of Lot C, Block 2, Vail Village First Filing. Applicant: The Remonov Company, represented by Braun & Associates Planner: Dominic Mauriello MOTION: Galen Aasland SECOND: John Schofield VOTE: 4 -2 DENIED 3. A request for a major amendment to Special Development District #4 (Cascade Village), to allow for a fractional fee club and a change to the approved Development Plan, located at 1325 Westhaven Dr., Westhaven Condominium Cascade Village Area A. Applicant: Gerald L. Wurhmann, represented by Robby Robinson Planner: George Ruther MOTION: John Schofield SECOND: Brian Doyon VOTE: 6 -0 APPROVED FOR RECOMMENDATION TO COUNCIL WITH 11 CONDITIONS: 1. That the applicant submit a detailed contractor's cost estimate identifying the costs necessary to relocate the existing overhead utility line along the applicant's north property line underground, and that the applicant establish a financial bond with the Town of Vail in the sum of 125% of the said relocating costs to insure the undergrounding of the utility line. 2. That the applicant regrade and revegetate the knoll located at the northwest corner of the development site at the time of the final grading of the Westhaven Club & Lodge. Due to the exposure and aspect of the hillside, the knoll shall be regrading to slopes not exceeding 3:1. The regrading shall be reviewed and approved by the Town Engineer. 3. That the applicant provide Type III Employee Housing Unit deed - restrictions , which comply with the Town of Vail Employee Housing Requirements (Title 12, Chapter 13, of the Town of Vail Municipal Code) for each of the 21 employee housing units, and that said deed - restricted housing be made available for occupancy, and that the deed restrictions be recorded at the Office of the Eagle County Clerk & Recorder, prior to requesting a Temporary Certificate of Occupancy for the Westhaven Club & Lodge. 4. That the applicant submit detailed civil engineering drawings of the required off - site improvements (street lights, drainage, curb and gutter, sidewalks, grading, etc.) to the Town of Vail Public Works Department for review and approval prior to the issuance of a building permit. 5. That the applicant record a twenty foot (20') wide pedestrian /bike easement for that portion of pedestrian /bike path traversing the applicant's property and as identified on the Topographic Map prepared by Intermountain Engineering Ltd., dated 12/22/94, and that said easement be recorded at the Office of the Eagle County Clerk & Recorder, prior to the issuance of a building permit. The exact location and language of the easement shall be reviewed and approved by the Town Attorney and Town Engineer prior to recordation. 2 6. That the applicant provide written documentation from the Public Service Company granting approval of the construction of the Westhaven Club & Lodge in the location identified on the site plan relative to the high pressure gas line. Written approval shall be granted prior to the issuance of a building permit. 7. That the applicant record an access easement along the east property line for that portion of the driveway and access and trash enclosure which encroaches upon the adjoining property and that said easement be recorded at the Office of the Eagle County Clerk Recorder. The exact location and language of the easement shall be reviewed and approved by the Town Attorney and Town Engineer prior to recordation. 8. That the applicant pay -in -lieu on spaces not provided on site above the 52 spaces proposed. 9. That the final landscape plan and architectural elevations be reviewed and approved by the Town of Vail Design Review Board. 10. That the approval of this major amendment to Special Development District #4 shall become lapsed and void one year from the date of a second reading of an ordinance amending the district, and that should the approval lapse, the applicant shall be required to remove the "ruins" and restore and revegetate the site by no later than October 31, 1999. A bond providing financial security to ensure that said removal occurs shall be required following second reading of an amending ordinance. It shall be the applicant's responsibility to provide a cost estimate of the removal work. The bond shall be a minimum of 125% of the removal costs. 11. That the applicant revise and submit an amended site plan, landscape plan, and grading plan indicating improvements to the existing boulder retaining wall along the east side of the access driveway. Each of the plans shall be reviewed and approved by the Town staff and the Design Review Board. 4. A worksession to discuss a major amendment to Special Development District #4 (Cascade Village), to revise the Glen Lyon Office Building site (Area D), located at 1000 S. Frontage Road West/Lot 54, Glen Lyon Subdivision. Applicant: Glen Lyon Office Building Partnership, represented by Kurt Segerberg Planner: Dominic Mauriello WORKSESSION — NO VOTE 5. A request for a final review of a major amendment to Special Development District #6, Vail Village Inn, to allow for a hotel redevelopment, located at 100 East Meadow Drive, Lots M and O, Block 5D, Vail Village 1st. Applicant: Daymer Corporation, represented by Jay Peterson Planner: George Ruther MOTION: John Schofield SECOND: Ann Bishop VOTE: 6 -0 APPROVED WITH 10 CONDITIONS: 1. That the applicant submit the following plans to the Department of Community Development, for review and approval, as a part of the building permit application for the hotel: a. An Erosion Control and Sedimentation Plan; b. A Construction Staging and Phasing Plan; C. A Stormwater Management Plan; d. A Site Dewatering Plan; and e. A Traffic Control Plan. 2. That the applicant provide deed - restricted housing, which complies with the Town of Vail Employee Housing requirements (Chapter 12 -13), for a minimum of 160 employees, and that said deed - restricted housing be made available for occupancy, and the deed restrictions recorded with the Eagle County Clerk & Recorder, prior to requesting a Temporary Certificate of Occupancy for the Vail Plaza Hotel. The ratio of units required shall be reduced to 2:1 for units provided in Town versis units provided down valley. 3. That the applicant receive a conditional use permit to allow for the operation of a fractional fee club, in accordance with Chapter 12 -16, prior to the issuance of a building permit. 4 vcard - . MIn fa�ade 6. That the applicant receive final Design Review Board approval for the proposed off -site improvement, prior to application for a building permit. 7. That the applicant submit a complete set of civil engineer drawings of all the off - site improvements, including improvements to the South Frontage Road, for review and Town approval, prior to application for a building permit. 8. That the applicant submit complete set of plans to the Colorado Department of Transportation for review and approval of an access permit, prior to application for a building permit. 9. That the applicant explore alternatives to decreasing the depth of the enclosed main loading /delivery area to reduce the impact of the Vail Plaza Hotel at the ground level of the building on the adjoining property to the east. The final change shall be at the discretion of the DRB. 10. That the applicant meet with the Town Staff to prepare a letter of agreement outlining the requirements of the off -site improvements, prior to second reading of an ordinance approving. 11. That one, on -site employee housing unit be provided as a manager's type of unit. 12. That additional architectural articulation be provided on all north and south levels. M 6. A request for a worksession to discuss a proposed arena expansion at the Dobson Ice Arena, located at 321 East Lionshead Circle / Lot 1, Block 1, Vail Lionshead 2nd Filing. Applicant: Vail Recreation District, represented by Odell Architects Planner: George Ruther TABLED UNTIL JANUARY 25, 1999 7. A request to amend the Town's "Public Accommodation" Zone District, Chapter 7 and amendments to Chapter 15, Gross Residential Floor Area (GRFA), Town of Vail Municipal Code. Applicant: Johannes Faessler, represented by Braun Associates, Inc.. Planner: George Ruther TABLED UNTIL JANUARY 25, 1999 8. Information Update 9. Approval of December 28, 1998 minutes. The applications and information about the proposals are available for public inspection during regular office hours in the project planner's office located at the Town of Vail Community Development Department, 75 South Frontage Road. Sign language interpretation available upon request with 24 hour notification. Please call 479 -2356, Telephone for the Hearing Impaired, for information. Community Development Department MEMORANDUM TO: Planning and Environmental Commission FROM: Community Development Department DATE: January 11, 1999 SUBJECT: A request for a variance from Section 12- 7B -13, Town of Vail Municipal Code, to allow for the conversion of existing floor space to gross residential floor area (GRFA), located at 333 Bridge Street (Vail Village Club)/ A portion of Lot C, Block 2, Vail Village First Filing. Applicant: The Remonov Company, represented by Braun & Associates Planner: Dominic Mauriello DESCRIPTIO OF THE REQUEST AND BACKGROUND The applicant is seeking relief from the density control section of the Commercial Core 1 (CC1) zone district in order to allow GRFA in excess of that permitted. The property is allowed 3,716 sq. ft. of GRFA (80% of buildable area). The applicant is proposing an additional 402 sq. ft. of GRFA in order to convert the 3 and 4`" stories of the building from a private club to a single dwelling unit. The applicant is not proposing to expand any floor area of the building but simply convert the use of the space. The applicant has provided an analysis of the previous approvals for this property, which is attached. The original plan for this building was to have a portion of the 3 floor as office s�ace and the remainder of that floor and the 4 floor as a dwelling unit. Since a portion of the 3` floor was office space, the dwelling unit complied with the GRFA limitations, as there is no limitation on commercial floor area in the CC1 zone district. Subsequent to that approval, the previous owner obtained approval for a quasi - public club on the 3 and 4`" floors, which was constructed. The applicant states that the existing interior building configuration creates an unnecessary physical hardship and a practical difficulty creating the need for this variance (see applicant's statement). CRITERIA AND FINDINGS A. Consideration of Factors Upon review of Section 12 -17 -6 of the Town of Vail Municipal Code, Criteria and Findings, the Community Development Department recommends denial of the requested GRFA variance based on the following factors: The relationship of the requested variance to other existing or potential uses and structures in the vicinity. .h TOWN OF VAIL While the request will have no external or physical impacts on other existing or potential uses in the vicinity, approval of such a variance could be precedent setting, by allowing the interior configuration of floor area to be an argument for GRFA variances on other properties in the area. The applicant contends that other uses allowed by conditional use permit (such as a professional office) are not viable on the 3 floor of the building and the only use which will be successful is a residential dwelling. Staff's concern here is that if this is approved, other properties in Town with 3rd floor office space (i.e., Crossroads) could point to this approval to allow conversion of non - residential spaces to residential uses without regard to GRFA limitations. 2. The degree to which relief from the strict and literal interpretation and enforcement of a specified regulation is necessary to achieve compatibility and uniformity of treatment among sites in the vicinity or to attain the objectives of this title without a grant of special privilege. The applicant is seeking the minimum relief necessary to allow the use of the 3` and 4 I floors of this building, in its existing configuration, as a residential dwelling unit. The applicant points to the existing building as providing a physical hardship. Staff is unaware of any instance where the interior layout of a building has been determined by the PEC to create a physical hardship, thus justifying a GRFA variance. As the applicant points out there are remedies to this situation. An office could be provided in a portion of the space, common storage areas could be created, and floor area could be removed creating "open to below" area on the 4th floor. Existing buildings have been determined to be a physical hardship in other areas justifying the approval of setback variances and site coverage variances. These have tended to be sites that are currently nonconforming, were constructed under Eagle County Zoning, or in areas where zoning requirements changed over the years, creating unique circumstances. This building was constructed over the past several years under the current CC1 regulations. While staff recognizes the "reasonableness" and the minor impact of the applicant's request, staff believes the approval of this variance will be a grant of special privilege as a physical hardship or practical difficulty cannot be found to exist on the property and that any unique circumstances which might exist on the property are self imposed. 3. The effect of the requested variance on light and air, distribution of population, transportation and traffic facilities, public facilities and utilities, and public safety. The proposal will have little, if any, effect on these issues. The proposal will reduce parking and traffic impacts associated with the approved club use. B. Th Planning and Environmental Commission shall m ake the following 2 findings before granting a variance: That the granting of the variance will not constitute a grant of special privilege inconsistent with the limitations on other properties classified in the same district. 2. That the granting of the variance will not be detrimental to the public health, safety or welfare, or materially injurious to properties or improvements in the vicinity. 3. That the variance is warranted for one or more of the following reasons: a. The strict literal interpretation or enforcement of the specified regulation would result in practical difficulty or unnecessary physical hardship inconsistent with the objectives of this title. b. There are exceptions or extraordinary circumstances or conditions applicable to the same site of the variance that do not apply generally to other properties in the same zone. C. The strict interpretation or enforcement of the specified regulation would deprive the applicant of privileges enjoyed by the owners of other properties in the same district. III. STAFF RECOMMENDATION The Community Development Department recommends denial of the proposed variance, subject to the following findings: 1. That the granting of the variance will constitute a grant of special privilege inconsistent with the limitations on other properties classified in the same district. 2. That the strict interpretation or enforcement of the specified regulation will not deprive the applicant of privileges enjoyed by the owners of other properties in the same district. FAEVE RYON E\P EC\M EMOS \99 \vvclub 3 VISTA BAHN BUILDING VARIANCE REQUEST December 14, 1998 (revised 12/21/98) A. Summary of Variance Request The purpose of the requested variance is for the Vista Bahn Building (formerly known as the Vail Village Club Building) located on Lot C, Block 2, Vail Village First Filing, to obtain relief from Section 12- 713-13, Density Control, of the Vail Municipal Code. The applicant is the Remonov Company. This variance request will allow the Vista Bahn Building to exceed the allowable Gross Residential Floor Area (GRFA) permitted by the density control section of the Commercial Core I Zone District. As proposed, the excess GRFA will be established by converting existing "non- residential" square footage on the third and fourth floor of the building to GRFA. The proposed variance does not involve any exterior modifications that will increase the height, size or bulk and mass of the existing building. If approved, this variance request would nullify the existing conditional use permit for a "quasi- public club" on the third and fourth floors of the building. B. History of the Building /Existing Zoning The following summarizes the recent history of the Vista Bahn Building: Spring, 1995 Town Planning and Environmental Commission approves a number of applications that facilitate the re- development of the building. The "building program" approved by the Town included: • Commercial uses in basement level • Retail on first floor • Restaurant on second floor • Office space and residential condominium on third floor • Residential condominium on fourth floor Approvals for this building included a conditional use permit for approximately 695 square feet of office space on the third floor of the building. The residential condominium was within the allowable GRFA for the property. Fall. 1995 Prior to construction of the building, the Planning Commission approved a conditional use permit for a "quasi- public club" to be located on the third and fourth floors of the building. This approval essentially "voided" the previously approved conditional use permit for the third floor office space. With this change in use, the design of the building became a "single -use design ". The implications of this change are discussed in greater detail below. 1996 -1997 Building construction occurs. 1998 The Vail Village Club fails and with it the developers of the project lose ownership of the property. Bob Hernreich and Rick Mueller of the Remonov Company obtain ownership of the property. C. Variance Proposal The Remonov's immediate goal for the property is to establish viable uses for the building that are consistent with the permitted uses in the Commercial Core I zone district (CCI) and the mixed -use character of Vail Village. Remonov intends to maintain commercial uses on the first and second floors of the building and proposes to utilize the third and fourth floors for a residential condominium. Contrary to the objectives of the original developer, Remonov does not believe office space on the third floor is a viable use for the property. The recent failure of the Vail Village Club would indicate that a club -type use is not a viable use for the third and fourth floors. Residential use on the third and fourth floors is also consistent with existing zoning for the property. In fact, the only permitted uses for levels above the second floor of a buildins4 in CCI are lods4es and residential dwelling units Alternative uses for the third and fourth floor are fairly limited by CCI zoning and by the design of the building. Designed as a single -use building, emergency egress to the fourth floor is dependent upon internal access through the third floor. As such, unless a new egress point to and from the fourth floor can be added to the building (a difficult, if not impossible proposition), the internal circulation between the third and fourth floor must be maintained. This egress situation has in large part dictated the applicant's proposal to establish one condominium unit within these two floors of the building. The GRFA variance is necessary because the existing square footage of the third and fourth floors exceeds the GRFA permitted on the property. The following summarizes the allowable and proposed GRFA for the building: Site Area - 4,646 square feet Allowable GRFA (80 %) - 3,716 square feet Existing square footage of 3 rd and 4 th floors - 4.118 square feet Proposed GRFA Excess - 402 square feet While the existing building was constructed as approved by the Town, previously proposed uses for the building and the uses permitted by the CCI zone district have created a dilemma for how the third and fourth floors can be used. By zoning, the only permitted uses for the third and fourth floor are lodges and residential dwelling units. However, converting the third and fourth floors to residential in presently not possible because the existing square footage of these two floors exceeds the allowable GRFA by 529 square feet. Regardless of the fact that the conversion of this existing space will be accomplished with no exterior changes to the building that would increase the height, size or bulk and mass of the existing building, a GRFA variance is technically necessary in order to facilitate this conversion. Prior to submitting this variance request, a variety of other alternatives for resolving this situation were first considered: Reduce GRFA by removing floor area GRFA could be removed by physically removing a portion of the existing building. Given that the bulk and mass of the building has been approved by the Town, this alternative is far too extreme to be considered viable. 2. Propose an SDD The entire building was developed without the need for an SDD. To propose an SDD for a project that will not even involve physical expansion of the existing building does not seem to the be most expeditious alternative. 3. Increase Parcel Size Increasing the parcel size will increase the allowable GRFA. While technically possible, this alternative was eliminated due to potential issues and complications with the obtaining additional property and subdividing and re- zoning the parcels. 4. Reduce the GRFA on the 3 rd /4 Floors by changing uses GRFA could be eliminated by introducing some other use to the third or fourth floors in a manner similar to the third floor office space proposed by the original developer. However, this would require approval of a conditional use permit and Remonov believes third floor office space is not a viable use for the building. Concern over the viability of third floor office space was also raised by the Planning Commission during the 1995 review of the original development proposal. After careful consideration of the alternatives outlined above, the variance process was selected as the most appropriate mechanism for resolving this situation. As outlined in the following section, a variance is an appropriate process given the very unique situation with this property and the extreme hardship and practical difficulty that would result from strict and literal compliance with the zoning regulations. D. Variance Criteria /PEC Findings The following summarizes compliance of the proposal with applicable review criteria and PEC Findings necessary to approve a variance. Consideration of Factors 1. The relationship of the requested variance to other existing or potential uses and structures in the vicinity. The proposed variance will not increase the height, size or bulk and mass of the existing building and as such, will have no affect on existing or potential structures. The proposed use is consistent with permitted uses for the CCI district and is consistent with uses on surrounding properties. 2. The degree to which relief from the strict and literal interpretation and enforcement of a specified regulation is necessary to achieve compatibility and uniformity of treatment among sites in the vicinity or to attain the objectives of this title without grant of special privilege. The "degree of relief' from the GRFA regulations is limited to only the existing square footage in the building — no additional square footage is proposed for the building. Approval of this variance request will allow for resolution of a very unique situation and in doing so further the objectives of the zoning title by establishing a use on the third and fourth floors that is consistent with the permitted uses in the CCI zone district. The existing building in itself presents a significant physical hardship for the applicants. The design of the building which contemplated a single -use further complicates the conversion of this space. Due to other variances that have been approved in and around the Village Core over the years, approval of this variance would not be a grant of special privilege. 3. The effect of the requested variance on light and air, distribution of population, transportation and traffic facilities, public facilities and utilities, and public safety. The proposal will not increase the existing height, size and bulk and mass of the building. As such, the variance request will have no adverse affect on the above considerations. Approval of the variance will facilitate the conversion of this space from a quasi - public club to residential. This change in use will dramatically reduce the parking demand on the Vail Village Parking Structure. PEC Findines 1. That the granting of the variance will not constitute a grant of special privilege inconsistent with the limitations on other properties classified in the same district. The variance request complies with Finding 1. Previously approved variances in and around the vicinity of the subject property is typically considered the "test" for whether approval of a variance would constitute a grant of special privilege. In this case, a site coverage variance approved during the re- development of the adjacent Red Lion Building presents a good example of why this proposal would not be a grant of special privilege. As indicated in the March 13, 1995 staff memo regarding the original review of the Vail Village Club, the Red Lion site coverage variance was "warranted" in part because it was related to conditions associated with an existing building and not new construction — the inference being that conformance with all applicable development standards can be more difficult when dealing with an existing building than it is in dealing with new construction on a vacant site. In the case of this application, the existing Vista Bahn Building constitutes a physical hardship. Because existing floor area on the third and fourth floors exceeds allowable GRFA, this space cannot be used in accordance the permitted uses of the CCI zone district 2. That the granting of the variance will not be detrimental to the public health, safety or welfare, or materially injurious to properties or improvements in the vicinity. The variance request complies with Finding 2. The proposal involves no changes to the existing height, size and bulk and mass of the building and as such will not be detrimental or injurious to properties in the vicinity. 3. That the variance is warranted for one or more of the following reasons: a. The strict or literal interpretation or enforcement of the specified regulation would result in practical difficulty or unnecessary physical hardship inconsistent with the objectives of this title. b. There are exceptions or extraordinary circumstances or conditions applicable to the same site of the variance that do not apply generally to other properties in the same zone. c. The strict interpretation or enforcement of the specified regulation would deprive the applicant of privileges enjoyed by the owners of other properties in the same district. The requested variance complies with Findings 3. A. As outlined above, the GRFA regulation could be complied with by physically removing a portion of the third or fourth floors — an alternative that would present an extreme practical difficulty and an unnecessary physical hardship on the land owner. Another alternative for conforming with the GRFA regulation would be to introduce a different use, such as the previously proposed office use, on a portion of the third or fourth floors. While office use was approved for the third floor by the PEC in 1995, a number of PEC members expressed significant reservations about the viability of third floor office space and the applicant shares these concerns. This concern is further supported by the lack of precedent for third floor office or commercial space within the Village area. To pursue office use or some other conditional use for the third or fourth floors could in theory remedy the GRFA situation. However, this alternative would create a hardship for the applicant by "condemning" the building to a use that is not viable and destine to fail. The requested variance complies with Finding 3. B. The presence of the existing building and the "ill- fated" saga of previously proposed and ultimately failed uses for the property represent a set of extraordinary circumstances or conditions that would not apply generally to other properties in the district. E. Summary The goal of the Remonov Company is to "pick up the pieces" of this project by establishing uses that are both viable and consistent with the development objectives of the CCI zone district. The introduction of residential use on the third and fourth floors is a big step in this effort. The viability of residential uses in the core area is well - established and such a use is also consistent with the "horizontal zoning" and mixed use character desired for the core area. The propose variance will not change the exterior appearance of the building in any material way. It will, however, allow the new owners of the property to move beyond the building's troubled past and establish uses that will work for the building and work for the Town by establishing a mixed use building in the Village Core. Jan -05 -99 11 :35A 970 479 2409 MBA !/ BII,/1 L.Ii N ASS _ I II II S. i1 F'I.Ardriir4! _ i.l c.c*ir ur.ir i (w-vi i or - ri January 5, 1999 I)ominic Mauriello, Director of Planning Town of Vail, I)epartnient of Community Development 75 South Frontage Road Vail, CO 81657 Rh: Vista Bahn Building Dear Dominic: 1 spent sonic time yesterday reviewing staff memos and PEC minutes of other variance requests from the past year. One thin, is clear from this review, and that is the staff and PEC have used a lair amount of latitude in terms of how variance requests are evaluated. I do not say this to be critical, the application of variance criteria inherently involves (as it should) some latitude and room for interpretation. If you cut through the questions of "special privilege ", the "hardship and the "impacts ", bottom line is whether the proposal makes sense Once; this underlying determination is made, (valuation of the variance criteria can he made to "fit" the decision of whether to approve or deny. With regard to the Vista Bahn Building, one thing I assume we agree on is that the proposal will have no negative imp acts on uses or structures to the vicinity. T hat said, the key questions seem to he whether the literal enforcement of the regulation would result in a "practical difficulty or unnecessary physical hardship" inconsistent with the code whether approval of the variance would be a grant of "special privilege ". In order to evaluate these factors, one must understand how the ternis "special privilcbc" and "hardship" have been interpreted_ Special Privag" This was interesting. The site coverage variances for the A &1) Building, (Golden Bear) and the Slifer Building both stated the variances would not he a grant of special privilege because the projects would implement/furlhcr the goals ofthe toaster plan and Urban Design Guide Plan (the correlation of these factors could certainly be debated). On the other hand, setback variances for Willow Place and the l.ionshead hin stated the requests would not he a grant of special privilege because there arc similar encroachments on other properties in the vicinity. In applying the "presence of "similar encroachments in the vicinity" interpretation to the Vista Bahn Building, the CTRFA variance would not be a grant of special privilege because there are examples of properties al the vicinity that exceed GRFA, Bascd Mintuin Irunwc;rk Ruddu., POSt C) I I i� c: Rnx / /!. Mird.rrn. Col rado 8h-15 Phon (:. 9/0107W'37 r:ix ` 7:>.827�50/ �n-w.v.l:ri,iuri,c.:,rn i,�!c••:.rtvr•� P_02 �%, , Jan -05 -99 11:35A 970 479 2409 P.03 on data in the Vail Village Master PIan, the Golden Teak House (prior to the SDD approval and redevelopment.), the Lodge Tower, the S1txmark and the Mill C.rcek Court Building all exceed allowable GRf'A. Just down the street the Tivoli obtained variance approval to exceed allowable GRIA. Physical Hardshiy Physical hardship has been interpreted to mean both existing natural conditions such as a (loodplain (Pepi's) and the presence of existing buildings or improvements. The stall's review of the Golden Bear variance acknowledged "re- design is possible . it is not practical to do so . the design and constniction of the existinz building is not conducive to substantial changes "_ There are many other variances that site the presence of an existing, building as justification for satisfying; hardship criteria. The design and construction of the existing Vista Icahn 1uiIding is a physical hardship. Just as with the Golden Rear, re- design is possible. The third floor of the Vista Balttt Building; could be modified to remove GRFA. However, it is riot the practical thing to do and it would impose an unnecessary physical hardship on the applicant - simply stated, re- design is a solution that just does not make sense. Another consideration I would ask you to keep in mind is that the variance process makes no distinction between the type of"va.rianee. Density, site coverage, setbacks it should not matter. In conversations yesterday, both you and George inli;rrcd that a G R FA variance is somehow different from other types of variances. While I understand what you are saying, there is no basis for this perspective in the variance process. The conformance with criteria is what matters. With few exceptions, i helieve one could evaluate virtually any variance request and interpret criteria such to conclude that the variance is not warranted. There are always other design solutions that could be pursued and there is always the alternative of doing a lesser project or no project at all. The variance process is in place to allow for exceptions to dcvclopment standards when they make sense. We believe this application does make sense and that the staff and PFC have the latitude to approve this request in order to resolve a very unique and difficult situation. in this case, given the consideration of all the factors, the strict interpretation of the code will serve no public: purpose. Thank you again tier your time and consideration in reviewing this application. Sincerely, Thomas A. Braun, AlC T Cc hick Mucllcr E IAA II/ BRAUN ASSOCIATES, IINC. PLANNING and COMMUNITY DEVELOPMENT MEMORANDUM TO: Dominic Mauriello FROM: Tom Braun DATE: December 20, 1998 RE: Vista Balm Building Thank you for the time to meet last week to discuss the variance application for the Vista Bahn Building (formerly the Vail Village Club Building). Enclosed are two copies of our revised narrative which summarizes this proposal. Revisions include a few minor points pertaining to the proposal's compliance with applicable variance criteria. The most substantive change is with respect to the GRFA proposed by this application. Based on your input regarding areas to be excluded from calculation as GRFA, I had the surveyors working on the condominium plat provide me with revised GRFA numbers. The extent of the GRFA variance is now 402 square feet as opposed to the 529 square feet indicated in our original proposal. The numbers break down as follows: 2,941 sq. ft. on the P floor (this number excludes the two common stairwells and the common elevator, mechanical and dumbwaiter shafts) 1,177 sq. ft. on the 4th floor (this number excludes the one common stairwell and the common elevator, mechanical and dumbwaiter shafts) 4,118 sq. ft. of total GRFA 3,716 sq. ft. allowable GRFA 402 sq. ft. excess GFRA I hope this is helpful. I will contact you after the holidays to discuss this application in greater detail. Merry Christmas! Minturn Ironworks Building Phone - 970.827.5797 201 Main Street, 2nd Floor Fax - 970.827.5507 Post Office Box 776 www.braunassociates.com Minturn, Colorado 81645 0 0 BA II/ BRAUN ASSOCIATES, IINC. PLANNING and COMMUNITY DEVELOPMENT December 14, 1998 Mr. George Ruther Senior Planner Town of Vail Department of Community Development 75 South Frontage Road Vail, CO 81657 Re: Vail Village Club Building Dear George: Enclosed you will find a variance application for the Vail Village Club Building. This application includes the following information: 1. Variance application form, 2. Filing fee, 3. Written statement summarizing the proposed variance (two copies). 4. Building floor plans (two copies), 5. Title report, and 6. List of adjacent property owners. Based on the Town's Planning and Environmental Commission schedule, this item will be considered by the Commission at their January 11 meeting. Please lei..: me know if there is anything else I can provide for you in order to facilitate the review of this application. I look forward to working with you on this project. Sincerely, I Thomas A. Braun, AICP CC: Rick Mueller Encl. Minturn Ironworks Building Phone - 970.827.5797 201 Main Street, 2nd Floor Fax - 970.827.5507 Post Office Box 776 www.braunassociates.com Minturn, Colorado 81645 Dec -09 -9B 01:27P 970 479 2409 P.02 MOV -24 -$9 00.41 FKU" KUV -VU YtV - uca- a. ■v oir.rac,- ^"� ' °' ' APPLICA'T'ION FOR PL..ANNING AND ENVIRONMENTAL COMMISSION APPROVAL. d . TOD wN OF V 11L This application is for my pmjea rapud approwd by the P loing and Enmmnmend CmwT iision. For tpociftc infotzntaio& see the sibmittat taluimneats for the puUCWV appmvai that is requcstod. Tbc application czm z6 be amepwd until all rcgWttd mfomwdon is subrcntted. The project aW also need to be mviewed by the Town Council andtor the Design Review Board. A: TYPE OF APPLICATION: [Z Addibonal GRFA (250) CI Amendment to an ApproVed Development Plan O Bed and Brcalfast O Ernploym Housing Unit (Types __J O Conditional Use Pc=t ❑ Major or 0 Mkm CCI Exterior Alteration O Major or O Minor Subdivision O M� 0 Rezoning Q Major a ExtaiorAlt�stiott 0 Sign variance (Liansheud) 19 Vatimce 0 Special Develop District O Zoning Code Amendment 0 Major or 0 Minor Ammdmcnt to an SDD B. DESCRIPTION OF THE REQUEST: kj p, t (. G.- -0 � 2 -1 �1 -1} 1J e m.'1 - �1 CJkC Ca nyen'c 11 2y S�inq �1aar C. LOCATION OF PROPOSAL' LOT - FILING �1 U 1 St- ADDRESS BUILDING NAME: y e y k1A', C" D- ZONING: C C- E. NAME OF 0NER(5): v� �+�� , r Cw- .►.�i VJ MAILING ADDRESS Q o \�Z i& S A , - J N 5 C O P14(WF; 92Co (9 2 1 l.v i t F. O WNE G. NAME OF REPRBSENTATIYE. '\ — ' + J MAIL INO ADDRESS: \ - n u - — - �, c -&1 �o K S PHONE: i� - 5 '1 °C� H- FEE - SEE THE SUBMITTAL REQUIREMENTS FOR THE APPROPRIATE FEE, SUIRMIT THIS APPLICATION, ALL SUBMITTAL REQUIRItiMM AND THE FEE TO TAB DEPARTMEM' OF CONDK MTY DEVELOPMErr1r, 75 SOUTH FRONTAGE ROAD, VAIL, COLORADO $1657. Fm Paid. D . 6 D Cid> , (o� g ,e,al�J Lam.. Application Dace f 2 � I PEC Mee ft Dat a n r� l 77 g trviwds6 VISTA BAHN BUILDING VARIANCE REQUEST December 14, 1998 (revised 12/21/98) A. Summary of Variance Request The purpose of the requested variance is for the Vista Bahn Building (formerly known as the Vail Village Club Building) located on Lot C, Block 2, Vail Village First Filing, to obtain relief from Section 12- 713-13, Density Control, of the Vail Municipal Code. The applicant is the Remonov Company. This variance request will allow the Vista Bahn Building to exceed the allowable Gross Residential Floor Area (GRFA) permitted by the density control section of the Commercial Core I Zone District. As proposed, the excess GRFA will be established by converting existing "non- residential" square footage on the third and fourth floor of the building to GRFA. The proposed variance does not involve any exterior modifications that will increase the height, size or bulk and mass of the existing building. If approved, this variance request would nullify the existing conditional use permit for a "quasi- public club" on the third and fourth floors of the building. B. History of the Building /Existing Zoning The following summarizes the recent history of the Vista Bahn Building: Spring 1995 Town Planning and Environmental Commission approves a number of applications that facilitate the re- development of the building. The "building program" approved by the Town included: • Commercial uses in basement level • Retail on first floor • Restaurant on second floor • Office space and residential condominium on third floor • Residential condominium on fourth floor Approvals for this building included a conditional use permit for approximately 695 square feet of office space on the third floor of the building. The residential condominium was within the allowable GRFA for the property. Fall, 1995 Prior to construction of the building, the Planning Commission approved a conditional use permit for a "quasi- public club" to be located on the third and fourth floors of the building. This approval essentially "voided" the previously approved conditional use permit for the third floor office space. With this change in use, the design of the building became a "single -use design ". The implications of this change are discussed in greater detail below. 1996 -1997 Building construction occurs. 1998 The Vail Village Club fails and with it the developers of the project lose ownership of the property. Bob Hernreich and Rick Mueller of the Remonov Company obtain ownership of the property. C. Variance Proposal The Remonov's immediate goal for the property is to establish viable uses for the building that are consistent with the permitted uses in the Commercial Core I zone district (CCI) and the mixed -use character of Vail Village. Remonov intends to maintain commercial uses on the first and second floors of the building and proposes to utilize the third and fourth floors for a residential condominium. Contrary to the objectives of the original developer, Remonov does not believe office space on the third floor is a viable use for the property. The recent failure of the Vail Village Club would indicate that a club -type use is not a viable use for the third and fourth floors. Residential use on the third and fourth floors is also consistent with existing zoning for the property. In fact, the only permitted uses for levels above the second floor of a buildine in CCI are lods4es and residential dwelliw4 units Alternative uses for the third and fourth floor are fairly limited by CCI zoning and by the design of the building. Designed as a single -use building, emergency egress to the fourth floor is dependent upon internal access through the third floor. As such, unless a new egress point to and from the fourth floor can be added to the building (a difficult, if not impossible proposition), the internal circulation between the third and fourth floor must be maintained. This egress situation has in large part dictated the applicant's proposal to establish one condominium unit within these two floors of the building. The GRFA variance is necessary because the existing square footage of the third and fourth floors exceeds the GRFA permitted on the property. The following summarizes the allowable and proposed GRFA for the building: Site Area - 4,646 square feet Allowable GRFA (80 %) - 3,716 square feet Existing square footage of 3 rd and 4 th floors - 4,118 square feet Proposed GRFA Excess - 402 square feet While the existing building was constructed as approved by the Town, previously proposed uses for the building and the uses permitted by the CCI zone district have created a dilemma for how the third and fourth floors can be used. By zoning, the only permitted uses for the third and fourth floor are lodges and residential dwelling units. However, converting the third and fourth floors to residential in presently not possible because the existing square footage of these two floors exceeds the allowable GRFA by 529 square feet. Regardless of the fact that the conversion of this existing space will be accomplished with no exterior changes to the building that would increase the height, size or bulk and mass of the existing building, a GRFA variance is technically necessary in order to facilitate this conversion. Prior to submitting this variance request, a variety of other alternatives for resolving this situation were first considered: Reduce GRFA by removing floor area GRFA could be removed by physically removing a portion of the existing building. Given that the bulk and mass of the building has been approved by the Town, this alternative is far too extreme to be considered viable. 2. Propose an SDD The entire building was developed without the need for an SDD. To propose an SDD for a project that will not even involve physical expansion of the existing building does not seem to the be most expeditious alternative. 3. Increase Parcel Size Increasing the parcel size will increase the allowable GRFA. While technically possible, this alternative was eliminated due to potential issues and complications with the obtaining additional property and subdividing and re- zoning the parcels. 4. Reduce the GRFA on the 3 `' /4 Floors by changing uses GRFA could be eliminated by introducing some other use to the third or fourth floors in a manner similar to the third floor office space proposed by the original developer. However, this would require approval of a conditional use permit and Remonov believes third floor office space is not a viable use for the building. Concern over the viability of third floor office space was also raised by the Planning Commission during the 1995 review of the original development proposal. After careful consideration of the alternatives outlined above, the variance process was selected as the most appropriate mechanism for resolving this situation. As outlined in the following section, a variance is an appropriate process given the very unique situation with this property and the extreme hardship and practical difficulty that would result from strict and literal compliance with the zoning regulations. D. Variance Criteria /PEC Findings The following summarizes compliance of the proposal with applicable review criteria and PEC Findings necessary to approve a variance. Consideration of Factors 1. The relationship of the requested variance to other existing or potential uses and structures in the vicinity. The proposed variance will not increase the height, size or bulk and mass of the existing building and as such, will have no affect on existing or potential structures. The proposed use is consistent with permitted uses for the CCI district and is consistent with uses on surrounding properties. 2. The degree to which relief from the strict and literal interpretation and enforcement of a specified regulation is necessary to achieve compatibility and uniformity of treatment among sites in the vicinity or to attain the objectives of this title without grant of special privilege. The "degree of relief' from the GRFA regulations is limited to only the existing square footage in the building — no additional square footage is proposed for the building. Approval of this variance request will allow for resolution of a very unique situation and in doing so further the objectives of the zoning title by establishing a use on the third and fourth floors that is consistent with the permitted uses in the CCI zone district. The existing building in itself presents a significant physical hardship for the applicants. The design of the building which contemplated a single -use further complicates the conversion of this space. Due to other variances that have been approved in and around the Village Core over the years, approval of this variance would not be a grant of special privilege. 3. The effect of the requested variance on light and air, distribution of population, transportation and traffic facilities, public facilities and utilities, and public safety. The proposal will not increase the existing height, size and bulk and mass of the building. As such, the variance request will have no adverse affect on the above considerations. Approval of the variance will facilitate the conversion of this space from a quasi - public club to residential. This change in use will dramatically reduce the parking demand on the Vail Village Parking Structure. PEC Findings 1. That the granting of the variance will not constitute a grant of special privilege inconsistent with the limitations on other properties classified in the same district. The variance request complies with Finding 1. Previously approved variances in and around the vicinity of the subject property is typically considered the "test" for whether approval of a variance would constitute a grant of special privilege. In this case, a site coverage variance approved during the re- development of the adjacent Red Lion Building presents a good example of why this proposal would not be a grant of special privilege. As indicated in the March 13, 1995 staff memo regarding the original review of the Vail Village Club, the Red Lion site coverage variance was "warranted" in part because it was related to conditions associated with an existing building and not new construction — the inference being that conformance with all applicable development standards can be more difficult when dealing with an existing building than it is in dealing with new construction on a vacant site. In the case of this application, the existing Vista Bahn Building constitutes a physical hardship. Because existing floor area on the third and fourth floors exceeds allowable GRFA, this space cannot be used in accordance the permitted uses of the CCI zone district 2. That the granting of the variance will not be detrimental to the public health, safety or welfare, or materially injurious to properties or improvements in the vicinity. The variance request complies with Finding 2. The proposal involves no changes to the existing height, size and bulk and mass of the building and as such will not be detrimental or injurious to properties in the vicinity. 3. That the variance is warranted for one or more of the following reasons: a. The strict or literal interpretation or enforcement of the specified regulation would result in practical difficulty or unnecessary physical hardship inconsistent with the objectives of this title. b. There are exceptions or extraordinary circumstances or conditions applicable to the same site of the variance that do not apply generally to other properties in the same zone. c. The strict interpretation or enforcement of the specified regulation would deprive the applicant of privileges enjoyed by the owners of other properties in the same district. The requested variance complies with Findings 3. A. As outlined above, the GRFA regulation could be complied with by physically removing a portion of the third or fourth floors — an alternative that would present an extreme practical difficulty and an unnecessary physical hardship on the land owner. Another alternative for conforming with the GRFA regulation would be to introduce a different use, such as the previously proposed office use, on a portion of the third or fourth floors. While office use was approved for the third floor by the PEC in 1995, a number of PEC members expressed significant reservations about the viability of third floor office space and the applicant shares these concerns. This concern is further supported by the lack of precedent for third floor office or commercial space within the Village area. To pursue office use or some other conditional use for the third or fourth floors could in theory remedy the GRFA situation. However, this alternative would create a hardship for the applicant by "condemning" the building to a use that is not viable and destine to fail. The requested variance complies with Finding 3. B. The presence of the existing building and the "ill- fated" saga of previously proposed and ultimately failed uses for the property represent a set of extraordinary circumstances or conditions that would not apply generally to other properties in the district. E. Summary The goal of the Remonov Company is to "pick up the pieces" of this project by establishing uses that are both viable and consistent with the development objectives of the CCI zone district. The introduction of residential use on the third and fourth floors is a big step in this effort. The viability of residential uses in the core area is well - established and such a use is also consistent with the "horizontal zoning" and mixed use character desired for the core area. The propose variance will not change the exterior appearance of the building in any material way. It will, however, allow the new owners of the property to move beyond the building's troubled past and establish uses that will work for the building and work for the Town by establishing a mixed use building in the Village Core. VAIL VILLAGE CLUB BUILDING VARIANCE REQUEST ADJACENT PROPERTY OWNERS LIST December 14, 1998 Bridge Street Lodge Condo Association 281 Bridge Street Vail, CO 81657 Linda Malaby 610 West Lionshead Circle Suite 100 Vail, CO 81657 Town of Vail 75 South Frontage Road Vail, CO 81657 Vail Corporation P.O. Box 7 Vail, CO 81657 DEC -10 -98 15 =06 FROM -LAND TITLE GUARANTEE ID= 19704764534 PAGE 2/15 s , Cjj- „ �AGO TITLE INSURANCE COMPANI A L T A C 0 M M I T M E N T SCHEDULE A Our Order # V262883 -8 For Information Only LOT C, BLOCK 2 VAIL VILLAGE 1ST - Charges - Alta Owner Policy $6,793.00 Alta Lender Policy $120.00 Tax Report $20.00 - - TOTAL - - $6,933.00 * ** THIS IS NOT AN INVOICE, BUT AN ESTIMATE OF FEES. WHEN REFERRING TO THIS ORDER, PLEASE REFERENCE OUR ORDER NO. V262883 -8 MAKE CHECKS PAYABLE TO LAND TITLE GUARANTEE COMPANY * ** 1. Effective Date: November 06, 1998 at 5:00 P.M. 2. Policies to be issued, and proposed Insured: "ALTA” Owner's Policy 10 -17 -92 $8,900,000.00 Proposed Insured: REMONOV & COMPANY, INC., A COLORADO CORPORATION "ALTA" Loan Policy 10 -17 -92 $6,900,000.00 Proposed Insured: ROBIN E_ HERNREICH 3_ The estate or interest in the land described or referred to in this Commitment and covered herein is: A Fee Simple 4. Title to the estate or interest covered herein is at the effective date hereof vested in: REMONOV & COMPANY, INC., A COLORADO CORPORATION PAGE 1 DEC -10 -98 15 :06 FROM :LAND TITLE GUARANTEE ID =19704764534 PACE 3/15 Ch -,:AGO TITLE INSURANCE COMPANY A L T A C O M M I T M E N T SCHEDULE A Our Order # V262883 -8 5. The land referred to in this Commitment is described as follows: LOT C, BLOCK 2, VAIL VILLAGE, FIRST FILING, ACCORDING TO THE RECORDED PLAT THEREOF, COUNTY OF EAGLE, STATE OF COLORADO_ PAGE 2 DEC -10 -96 15:06 FROM =LAND TITLE GUARANTEE ID:19704764534 PAGE 4/15 _AICAGO TITLE INSURANCE COMPI_ A L T A C O M M I T M E N T SCHEDULE B - SECTION 1 (Requirements) Our order ## V262883 -8 The following are the requirements to be complied with: Item (a) Payment to or for the account of the grantors or mortgagors of the full consideration for the estate or interest to be insured. Item (b) Proper instrument(s) creating the estate or interest to be insured must be executed and duly filed for record, to- wit: Item (c) Payment of all taxes, charges or assessments levied and assessed against the subject premises which are due and payable. Item (d) Additional requirements, if any disclosed below: 1. CERTIFICATE OF DISMISSAL ISSUED BY THE CLERK OF THE DISTRICT COURT IN AND FOR THE COUNTY OF EAGLE OF CIVIL ACTION NO. 98CV282 ENTITLED J.L_ VIELE CONSTRUCTION, INC., A COLORADO CORPORATION, PLAINTIFF (S), VS_ REMONOV & COMPANY, INC., A COLORADO CORPORATION, ET AL, DEFENDANT (S). NOTICE OF LIS PENDENS RECORDED June 05, 1998, UNDER RECEPTION N0. 658836. 2. CERTIFICATE OF DISMISSAL ISSUED BY THE CLERK OF THE DISTRICT COURT IN AND FOR THE COUNTY OF EAGLE OF CIVIL ACTION NO. n/a ENTITLED SEMPLE BROWN ROBERTS, P.C., PLAINTIFF (S), VS. MARGRETTA B. PARKS, RIVA RIDGE PARTNERS, LLC, REMONOV & COMPANY, INC., J L. VIELE CONSTRUCTION KAREN SHEAFFER PUBLIC TRUSTEE, DEFENDANT (S). NOTICE OF LIS PENDENS RECORDED September 21, 1998, UNDER RECEPTION NO. 669906. IF 'THERE IS A CHANGE IN OWNERSHIP OF THE PROPERTY TO BE INSURED HEREIN FROM THE VESTED OWNER SET FORTH IN ITEM 4 OF SCHEDULE A HEREIN, THE TERMS, PROVISIONS AND CONDITIONS OF THE TOWN OF VAIL TRANSFER TAX MAY BE APPLICABLE. SENATE BILL 98 -045 STATES THAT EFFECTIVE JUNE 1, 1998 THE FEE FOR REQUESTS FOR RELEASES OF DEEDS OF TRUST WILL BE $16.00. NOTE: EFFECTIVE JANUARY 1, 1993, CORPORATIONS THAT DO NOT MAINTAIN A PERMANENT PLACE OF BUSINESS IN COLORADO, AND NONRESIDENT INDIVIDUALS, ESTATES AND TRUSTS WILL BE SUBJECT TO A COLORADO WITHHOLDING TAX FROM THE SALES OF COLORADO REAL ESTATE IN EXCESS OF $100,000.00. THE WITHHOLDING TAX PAGE 3 DEC -10 -98 15 =07 FROM =LAND TITLE GUARANTEE ID =19704764534 PAGE 5 /15 ,dICAGO TITLE INSURANCE COMPi- A L T A C O M M I T M E N T SCHEDULE B - SECTION 1 (Requirements) Our Order # V262883 -8 WILL BE THE SMALLER OF TWO PERCENT OF THE SALES PRICE OR THE NET PROCEEDS FROM THE SALES OF THE REAL ESTATE. THE TAX WILL BE WITHHELD BY THE TITLE INSURANCE COMPANY OR ITS AGENT AND SUBMITTED TO THE DEPARTMENT OF REVENUE, WHERE IT WILL BE CREDITED TO THE SELLER'S INCOME TAX ACCOUNT AS AN ESTIMATED TAX PAYMENT, THE SELLER CAN CLAIM CREDIT FOR THE ESTIMATED PAYMENT AGAINST THE INCOME TAX LIABILITY WHEN HE OR SHE FILES A COLORADO RETURN FOR THE YEAR OF THE SALE. PAGE 4 DEC -10 -98 15 =07 FROM =LAND TITLE GUARANTEE ID- 19704764534 PAGE 6/15 sCAGO TITLE INSURANCE COMPAP, A L T A C O M M I T M E N T SCHEDULE B - SECTION 2 (Exceptions) Our Order # V262983 -8 The policy or policies to be issued will contain exceptions to the following matters unless the same are disposed of to the satisfaction of the Company: I. Rights or claims of parties in possession not shown by the public records. 2_ Easements, or claims of easements, not shown by the public records. 3_ Discrepancies, conflicts in boundary lines, shortage in area, encroachments, and any facts which a correct survey inspection of the premises would disclose and which are not shown by the public records. 4. Any lien, or right to a lien, for services, labor or material heretofore or hereafter furnished, imposed by law and not shown by the public records. 5. Defects, liens, encumbrances, adverse claims or other matters, if any, created, first appearing in the public records or attaching subsequent to the effective date hereof but prior to the date the proposed insured acquires of record for value the estate or interest or mortgage thereon covered by this Commitment. 6. Taxes or special assessments which are not shown as existing liens by the public records_ 7_ Liens for unpaid water and sewer charges, if any. 8. In addition, the owner's policy will be subject to the lien of the new mortgage, if any, noted under Section 1 of Schedule B hereof. 9. RIGHT OF PROPRIETOR OF A VEIN OR LODE TO EXTRACT AND REMOVE HIS ORE THEREFROM SHOULD THE SAME BE FOUND TO PENETRATE OR INTERSECT THE PREMISES AS RESERVED IN UNITED STATES PATENT RECORDED July 13, 1899, IN BOOK 48 AT PAGE 475. 10. RIGHT OF WAY FOR DITCHES OR CANALS CONSTRUCTED BY THE AUTHORITY OF THE UNITED STATES AS RESERVED IN UNITED STATES PATENT RECORDED July 13, 1899, IN BOOK 48 AT PAGE 475. PAGE 5 DEC -10 -98 15 =08 FROM =LAND TITLE GUARANTEE I13=19704764534 PAGE 7/15 L.._.ICAGO TITLE INSURANCE COMPAI._. A L T A C O M M I T M E N T SCHEDULE B - SECTION 2 (Exceptions) Our Order # V262883 -8 11, RESTRICTIVE COVENANTS WHICH DO NOT CONTAIN A FORFEITURE OR REVERTER CLAUSE, BUT OMITTING RESTRICTIONS, IF ANY, BASED ON RACE, COLOR, RELIGION, OR NATIONAL ORIGIN, AS CONTAINED IN INSTRUMENT RECORDED August 10, 1962, IN BOOK 174 AT PAGE 179_ 12. EXISTING UNRECORDED LEASES AND TENANCIES 13_ EASEMENTS, RESERVATIONS AND RESTRICTIONS AS SHOWN OR RESERVED ON THE RECORDED PLAT OF VAIL VILLAGE, FIRST FILING. 14_ TERMS, CONDITIONS AND PROVISIONS OF EASEMENT AGREEMENT RECORDED July 09, 1996 IN BOOR 699 AT PAGE 454_ 15_ ANY LOSS OR DAMAGE THE INSURED SHALL SUSTAIN DUE TO ORDER RE: MOTION TO STAY JUDGMENT PENDING APPEAL AND FOR APPROVAL OF THE SUPERSEDEAS BOND, CIVIL ACTION NO. 96 CV 120, DIVISION J, DISTRICT COURT, COUNTY OF EAGLE, STATE OF COLORADO, RECORDED JUNE 30, 1997 IN BOOK 730 AT PAGE 807. 16. A DEED OF TRUST DATED August 05, 1998 FROM REMONOV & COMPANY, INC., A COLORADO CORPORATION TO THE PUBLIC TRUSTEE OF EAGLE COUNTY FOR THE USE OF ROBIN E. HERNREICH TO SECURE THE SUM OF $6,900,000.00, AND ANY OTHER. AMOUNTS PAYABLE UNDER THE TERMS THEREOF, RECORDED August 12, 1998, UNDER RECEPTION NO. 665668. 17, LIEN EVIDENCED BY STATEMENT OF SEMPLE BROWN ROBERTS, P-C. IN THE AMOUNT OF $101,575.74 RECORDED January 16, 1998, UNDER RECEPTION NO. 644857. 18_ LIEN EVIDENCED BY STATEMENT OF J.L. VIELE CONSTRUCTION, INC., A COLORADO CORPORATION IN THE AMOUNT OF $49,932.97 RECORDED February 25, 1998, UNDER RECEPTION NO. 648107. NOTE: AMENDED STATEMENT OF LIEN RECORDED MARCH 26, 1998 RECEPTION NO. 650689 AND RERECORDED JUNE 5, 1998 RECEPTION NO. 658835. 19. LIEN EVIDENCED BY STATEMENT OF VAIL ELECTRONICS LTD. IN THE AMOUNT OF $10,083.15 RECORDED July 23, 1998, UNDER RECEPTION NO. 663623. 20. LIEN EVIDENCED BY STATEMENT OF VAIL ELECTRONICS LTD., A COLORADO CORPORATION IN THE AMOUNT OF $10,083.15 RECORDED August 27, 1998, 'UNDER RECEPTION NO. 667554. 21. LIEN AS EVIDENCED BY THE STATEMENT OF DIETER MENZEL D /B /A MENZEL FURNITURE IN THE AMOUNT OF $78,Q00-00 RECORDED NOVEMBER 6 1998 UNDER RECEPTION NO. 675368. PAGE 6 DEC -10 -96 15 06 FROM =LAND TITLE GUARANTEE I13- 19704764534 PAGE 8/15 L A N D T_ r L E G U A R A N T E E C 0 M P A N Y DISCLOSURE STATEMENT Required by Senate Bill 91 -14 A) The subject real property may be located in a special taxing district. B) A Certificate of Taxes Due listing each taxing jurisdiction may be obtained from the County Treasurer or the County Treasurer's authorized agent. C) The information regarding special districts and the boundaries of such districts may be obtained from the Board of County Commissioners, the County Clerk and Recorder, or the County Assessor_ Required by Senate Bill 92 -143 A> A Certificate of Taxes Due listing each taxing jurisdiction shall be obtained from the County Treasurer or the County Treasurer's authorized agent. DEC -10-96 15:08 FROM:LAND TJ GUARANTEE ID= 19704764V34 PAGE 9/15 c , � CHICAGO TITLE INSURANCE COMPANY A L T A C O M M I T M E N T SCHEDULE A Our Order # VTF263841-2 For Information Only LOT C, BLK 2, VAIL VILLAGE FIRST FL - Charges - Alta Lender Policy $5,113.00 (REISSUE RATE) Tax Report $ 20.00 - - TOTAL - - $5,133.00 * ** THIS IS NOT AN INVOICE, BUT AN ESTIMATE OF FEES_ WHEN REFERRING TO THIS ORDER, PLEASE REFERENCE OUR ORDER NO. VTF263841 -2 MAKE CHECKS PAYABLE TO LAND TITLE GUARANTEE COMPANY * ** 1. Effective Date: November 0� 1998 at 5:00 P.M. 2. Policy to be issued, and proposed Insured: "ALTA" Loan Policy 10 - 17 - 92 $6,500,000.00 Proposed Insured: FIRST AMERICAN NATIONAL BANK OPERATING AS DEPOSIT GUARANTY NATIONAL BANK 3. The estate or interest in the land described or referred to in this Commitment and covered herein is: A Fee Simple 4. Title to the estate or interest covered herein is at the effective date hereof vested in: REMONOV & COMPANY, INC., A COLORADO CORPORATION 5. The land referred to in this Commitment is described as follows: LOT C, BLOCK 2, VAIL VILLAGE, FIRST FILING, ACCORDING TO THE RECORDED PLAT THEREOF, COUNTY OF EAGLE, STATE OF COLORADO. PAGE 1 DEC -10 -90 1509 FROM =LAND TITLE GUARANTEE ID-19704764534 CHICAGO TITLE INSURANCE COMPANY A L T A C O M M I T M E N T SCHEDULE B - SECTION 1 PAGE 10/15 (Requirements) Our Order # VTF263841 -2 The following are the requirements to be complied with: Item (a) Payment to or for the account of the grantors or mortgagors of the full consideration for the estate or interest to be insured. Item (b) Proper instrument(s) creating the estate or interest to be insured must be executed and duly filed for record, to- wit: Item (c) Payment of all taxes, charges or assessments levied and assessed against the subject premises which are due and payable. Item (d) Additional requirements, if any disclosed below: 1. CERTIFICATE OF OCCUPANCY TO BE GIVEN TO LAND TITLE GUARANTEE COMPANY. 2. INDEMNITY AGREEMENT FROM BORROWER /DEVELOPER, ACCEPTABLE TO THE COMPANY, REGARDING THE DELETION OF ITEM NO. 4 OF THE STANDARD EXCEPTIONS. 3. THE EXAMINATION BY LAND TITLE GUARANTEE COMPANY OF CIVIL CASE FILE 96 CV 120 REFERENCED IN ITEM NO. 15 OF SCHEDULE B - SECTION 2 TO ASCERTAIN STATUS OF APPEAL. - NOTE: LAND TITLE GUARANTEE COMPANY RESERVES THE RIGHT TO MAKE FURTHER REQUIREMENTS AND EXCEPTIONS UPON COMPLETION OF SAID EXAMINATION. 4. CERTIFICATE OF DISMISSAL ISSUED BY THE CLERK OF THE DISTRICT COURT IN AND FOR THE COUNTY OF EAGLE OF CIVIL ACTION NO. 98CV282 ENTITLED J.L. VIELE CONSTRUCTION, INC., A COLORADO CORPORATION, PLAINTIFF (S), VS. REMONOV & COMPANY, INC., A COLORADO CORPORATION, ET AL, DEFENDANT (S). NOTICE OF LIS PENDENS RECORDED June 05, 1998, UNDER RECEPTION NO. 658836. 5. CERTIFICATE OF DISMISSAL ISSUED BY THE CLERK OF THE DISTRICT COURT IN AND FOR THE COUNTY OF EAGLE OF CIVIL ACTION NO. n/a ENTITLED SEMPLE BROWN ROBERTS, p_C_, PLAINTIFF (S), VS. MARGRETTA B. PARKS, RIVA RIDGE PARTNERS, LLC, REMONOV & COMPANY, INC., J L. VIELE CONSTRUCTION KAREN SHEAFFER PUBLIC TRUSTEE, DEFENDANT (S). NOTICE OF LIS PENDENS RECORDED September 21, 1998, UNDER RECEPTION NO. 669906. 6. RELEASE OF LIEN AS EVIDENCED BY THE STATEMENT OF SEMPLE BROWN ROBERTS, F.C. IN THE AMOUNT OF $101,575.74 RECORDED January 16, 1998, UNDER RECEPTION NO. 644857. PAGE 2 DEC -10 -96 15 =09 FROM =LAND TITLE GUARANTEE ID:19704764534 PAGE 11/15 CHICAGO TITLE INSURANCE COMPANY A L T A C O M M I T M E N T SCHEDULE B - SECTION 1 (Requirements) Our Order # VTF263841 -2 7. RELEASE.; OF LIEN AS EVIDENCED BY THE STATEMENT OF J_L_ VIELE CONSTRUCTION, INC., A COLORADO CORPORATION IN THE AMOUNT OF $49,932.97 RECORDED February 25, 1998, UNDER RECEPTION NO. 648107_ NOTE: AMENDED STATEMENT OF LIEN RECORDED MARCH 26, 1998 RECEPTION NO. 650689 AND RERECORDED JUNE 5, 1998 RECEPTION NO. 658835. 8. RELEASE OF LIEN AS EVIDENCED BY THE STATEMENT OF VAIL ELECTRONICS LTD. IN THE AMOUNT OF $10,083.15 RECORDED July 23, 1998, UNDER RECEPTION NO. 663623. 9. RELEASE OF DEED OF TRUST DATED August 05, 1998 FROM REMONOV & COMPANY, INC_, A COLORADO CORPORATION TO THE PUBLIC TRUSTEE OF EAGLE COUNTY FOR THE USE OF ROBIN E. HERNREICH TO SECURE THE SUM OF $6,900,000.00 RECORDED August 12, 1998, UNDER RECEPTION NO. 665668. 10. RELEASE OF LIEN AS EVIDENCED BY THE STATEMENT OF VAIL ELECTRONICS LTD., A COLORADO CORPORATION IN THE AMOUNT OF $10,083.15 RECORDED August 27, 1998, UNDER RECEPTION NO. 667554. 11. RELEASE OF LIEN AS EVIDENCED BY THE STATEMENT OF DIETER MENZEL D /B /A MENZEL FURNITURE IN THE AMOUNT OF $338,000.00 RECORDED November 06, 1998, UNDER RECEPTION NO. 675368. 12. DEED OF TRUST FROM REMONOV k COMPANY, INC., A COLORADO CORPORATION TO THE PUBLIC TRUSTEE OF EAGLE COUNTY FOR THE USE OF FIRST AMERICAN NATIONAL BANK OPERATING AS DEPOSIT GUARANTY NATIONAL BANK TO SECURE THE SUM OF $6,500,000.00_ NOTE: SAID DOCUMENT MUST BE EXECUTED BY THE PRESIDENT, VICE - PRESIDENT OR SECRETARY OF THE CORPORATION. IF AN ASSISTANT VICE - PRESIDENT OR ASSISTANT SECRETARY EXECUTES SAID DOCUMENT, A CORPORATE RESOLUTION MUST BE PROVIDED TO LAND TITLE GIVING SAID ASSISTANT AUTHORIZATION. IF THERE IS A CHANGE IN OWNERSHIP OF THE PROPERTY TO BE INSURED HEREIN FROM THE VESTED OWNER SET FORTH IN ITEM 4 OF SCHEDULE A HEREIN, THE TERMS, PROVISIONS AND CONDITIONS OF THE TOWN OF VAIL TRANSFER TAX MAY BE APPLICABLE. NOTE: UPON RECEIPT OF A SATISFACTORY IMPROVEMENT LOCATION CERTIFICATE, ITEM NOS. 1 -3 OF THE STANDARD EXCEPTIONS WILL BE DELETED FROM THE MORTGAGEES POLICY WHEN ISSUED_ NOTE: ITEM NO. 4 WILL BE DELETED FROM THE MORTGAGEES POLICY UPON RECEIPT OF A SATISFACTORY INDEMNITY AGREEMENT. PAGE 3 DEC -10 -90 I5 =10 FROM -LAND TITLE GUARANTEE I13= 19704764534 PACE 12/15 ` CHICAGO TITLE INSURANCE COMPANY A L T A C O M M I T M E N T SCHEDULE B - SECTION 1 (Requirements) Our Order # VTF263841 -2 NOTE: I'T'EM 5 OF THE GENERAL EXCEPTIONS WILL BE DELETED IF LAND TITLE RECORDS THE DOCUMENTS REQUIRED UNDER SCHEDULE B -1_ NOTE: UPON PROOF OF PAYMENT OF ALL TAXES, ITEM 6 WILL BE AMENDED TO READ: TAXES AND ASSESSMENTS FOR THE YEAR 1998, AND SUBSEQUENT YEARS, NOT YET DUE OR PAYABLE. ITEM 7 UNDER SCHEDULE B -2 WILL BE DELETED UPON PROOF THAT THE WATER AND SEWER CHARGES ARE PAID UP TO DATE. SENATE BILL 98 -045 STATES THAT EFFECTIVE JUNE 1, 1998 THE FEE FOR REQUESTS FOR RELEASES OF DEEDS OF TRUST WILL BE $16.00_ NOTE: EFFECTIVE JANUARY 1, 1993, CORPORATIONS THAT DO NOT MAINTAIN A PERMANENT PLACE OF BUSINESS IN COLORADO, AND NONRESIDENT INDIVIDUALS, ESTATES AND TRUSTS WILL BE SUBJECT TO A COLORADO WITHHOLDING TAX FROM THE,SALES OF COLORADO REAL ESTATE IN EXCESS OF $100,000.00. THE WITHHOLDING TAX WILL BE THE SMALLER OF TWO PERCENT OF THE SALES PRICE OR THE NET PROCEEDS FROM THE SALES OF THE REAL ESTATE. THE TAX WILL BE WITHHELD BY THE TITLE INSURANCE COMPANY OR ITS AGENT AND SUBMITTED TO THE DEPARTMENT OF REVENUE, WHERE IT WILL BE CREDITED TO THE SELLER'S INCOME TAX ACCOUNT AS AN ESTIMATED TAX PAYMENT - THE SELLER CAN CLAIM CREDIT FOR THE ESTIMATED PAYMENT AGAINST THE INCOME TAX LIABILITY WHEN HE OR SHE FILES A COLORADO RETURN FOR THE YEAR OF THE SALE. PAGE 4 DEC -10 -9 e 15:10 FROM: LAND T1' ".E GUARANTEE ID:19704764F34 CHICAGO TITLE INSURANCE COMPANY A L T A C O M M I T M E N T SCHEDULE B - SECTION 2 (E PAGE 13/15 Our Order # VTF263841 -2 The policy or policies to be issue will contain exceptions to the to following matters unless e satisfaction of the Company- 1. Rights or claims of parties in possession not shown by the public records. of easements, not shown by the public 2. Easements, or Claims records - 3. Discrepancies, and any a correct s survey e inspection encroachments of the premises would disclose and which are not shown by t e public records - 4_ Any lien, or right to a lien, for services, labor or material imposed by Yaw and not shown heretofore or hereafter furnished, by the public records - 5. Defects, liens, encumbrances, adverse claimlicrrecords matters, if any, created, first appearing in the pub attaching subsequent to the effective date hereof but prior to the date the proposed insured acquires of record for value the estate or interest or mortgage thereon covered by this Commitment. 6. Taxes or special assessments which are not shown as existing liens by the public records. 7. Liens for unpaid water and sewer charges, it any. 8. In addition, the owner's policy will be subject to the lien of the new mortgage, if any, noted under Section 1 Of Schedule B hereof. g. RIGHT OF PROPRIETOR OF A V EIN BE FOUND LO O PENETRATETOR DINT REMOVE RS CT THE PREMISES THEREFROM. SHOULD THE SAME 48 AT AS RESERVED IN UNITED STATES PATENT RECORDED July 13, 1899. IN BOOK PAGE 475- 10.. RIGHT OF WAY FOR DITCHES OC STATES PATE _ NT RECORDED Y 0 13, T 1899, CANALS UNITED STATES AS RESERVED IN UN IN BOOK 48 AT PAGE 475, PAGE 5 DEC -10 -98 15 711 FROM =LAND T -LE GUARANTEE ID7197047GO-34 PAGE 14/15 CHICAGO TITLE INSURANCE COMPANY A L T A C 0 M M I T M B N T SCHEDULE B - SECTION 2 (Exceptions) Our Order ## VTF263841 -2 COVENANTS 11_ RESTRICTIVE WHICH DO NOT CONTAIN A FORFEITURE OR REVERTER BUT OMITTING RESTRICTIONS, IF ANY, BASED ON RACE, COLOR, RELIGION, NATIONAL ORIGIN, AS CONTAINED IN INSTRUMENT RECORDED August 10, 1962, IN BOOK 174 AT PAGE 179_ 12. EXISTING UNRECORDED LEASES AND TENANCIES 13. EASEMENTS, RESERVATIONS AND RESTRICTIONS AS SHOWN OR RESERVED ON THE RECORDED PLAT OF VAIL VILLAGE, FIRST FILING_ 14. TERMS, CONDITIONS AND PROVISIONS OF EASEMENT AGREEMENT RECORDED July 09, 1996 IN BOOK 699 AT PAGE 454. 15. ANY LOSS OR DAMAGE THE INSURED SHALL SUSTAIN DUE TO ORDER RE: MOTION TO STAY JUDGMENT PENDING APPEAL AND FOR APPROVAL OF THE SUPERSEDERS BOND, CIVIL ACTION NO. 96 CV 120, DIVISION J, DISTRICT COURT, COUNTY OF EAGLE, STATE OF COLORADO, RECORDED JUNE 30, 1997 IN BOOK 730 AT PAGE 807. 16. PAGE 6 DEC -10 -98 15-11 FROM -LAND TITLE GUARANTEE ID =19704754534 PACE 15/15 . L A N D T I T L E G U A R A N T E E C O M P A N Y DISCLOSURE STATEMENT Required by Senate Bill 91 -14 A) The subject real property may be located in a special taxing district. B) A Certificate listing each or may Treasurer's authorized agent. C) The information regarding special districts and the boundaries of such districts may be obtained from the Board of County Commissioners, the County Clerk and Recorder, or the County Assessor. Required by Senate Bill 92 -143 A) A Certificate of Taxes Due listing each taxing jurisdiction shall be obtained from the County Treasurer or the County Treasurer's authorized agent. 11/24/1998 18:02 970 - 242 -7634 LUNSFORD MECHANICAL PAGE 01 LUNSFORD.R... MECHANICAL CONTRACTORS INCORPORATED Plumbing " Heating' Air Conditioning' Refrigeration FAX COVER SHEET DATE: 11/24/98 TRANSMISSION TO: ATTN: CHARLIE T.O.V. INSPECTIONS PAGES TRANSMITTED (including Cover Sheet) 30 SUBJECT: TEST & BAL ANCE REPORT VAIL VILLAGE C LUB FAX # : 970 -479 -2452 COMMENTS: FOR YOUR USE AND REVIEW. FROM: FAX: (970) 242 -7634 2481 COMMERCE BLVD. - GRAND JUNCTION, CO 81505 (970) 242 -5790 FAX (970) 242 -7634 11/24/1998 18:02 970 - 242 -7634 LUNSFORD MECHANICAL PAGE 06 NE. BB PROJECT SYSTEM AIR OUTLET TEST REPORT VAIL VILLAGE CLUB RTU -1 Area ut et Design Prel. Final Serve it TvnR Ai7w ( 1 *rm r _;:KA C'FIU of 4TH FLOOR LOUNGEI 1 P9-1 1 2' X 1SLOT 180 236 219 122% 4TH FLOOR LOUNGE 21 PS -1 2' X 1SLOT 180 2231 189i 105% 4TH FLOOR LOUNGE; 3 PS -1 2' X 1SLOT 180 1681 184 102% 4TH FLOOR LOUNGE 4 PS -1 2' X ISLOT 180 1821 181i 101% ! 4TH FLOOR LOUNGE; 5 PS -1 2' X 1SLOT 3.80 2211 202 112% i 4TH FLOOR LOUNGE a PS -1 2' X 1SLOT 1801 247 129 1 4TH FLOOR LOUNGE 7 PS -1 2' X 1SLOT 1801 243` 225; 125% 1 4TH FLOOR LOUNGE 81 PS -1 2' X ISLOTI 1801 221. 220; 122% 4TH FLOOR LOUNGE! 9 PS -1 2' X 1SLOT 180 2041 212 118% ! 4TH FLOOR LOUNGE, 10. PS -1 2' X 1SLOT 1$0 1881 204. 113% I BAR 11 L -$ 12X12 1501 585 149! 9 9% i I i 1 1 I i ' I TOTAL 1950 271$ 2217 114% READINGS WITH LOW MOOD AND ARt CORRECTED TO ALTITUDE_ REMARKS: TEST DATE: FILE NAME: tab hoodl DIRECT DRIVE MOTOR ON LOWEST SPEEp. NO DAMPERS ON SLOT DIFFUSERS TO REDUCE AIR FLOW. 8/12/97 READINGS BY:G. GORMAN 97VVCH1 r NE. BB PROJECT: LOCATION: VAIL VILLAGE CLUB SYSTEM /UNIT: BASEMENT AIR APPARATUS TEST REPORT" MUA -1 I UNIT DATA MOTOR DATA MakeNOW No_ M MAGIC AIRE MakwFrame L LEESON TypdStze 9 90 BHW -4 H.P. 1 1.5 f TEST DATA DESIGN I ACTUAL TEST DATA DESIGN ACT_UA_L_ ! Total CFM 2900 F.xt Discharge S.P. -22 Register Total 2900 2 7 3 7 Ext Suctlon S.P. 5 0 Fen RPM 850 : Extemat S. P. 1.25 7 7 Motor RPM 1751 1 FAN SUCTION S.P. . 8 8 _ - -- Heating i _....... __. Motor Volta 208 210 ! LAT 90 142 Motor volts 208 2 0 7 EAT -15 58 Motor Volts 208 210 i Temp. ddf. 105 84 Motor Amps 5.6 3 . 1 'GPM 14 _ Motor Amps 5.6 3.6 EWT 190 167 Motor Amps 5.6 3.9 i LWT 150 141 Temp. OR. 40 1 26 _ CFIA f BHP 1 Oubgde Air CFM 100% OSA Damper Poe. _ Retum Air CFM RA Damper Poa_ ; REMARKS: TEST DATE: 9/8-12/97 READINGS BY: C. GORMAN FILE NAME: 97VVCA tab 438 REMARKS: TEST DATE: 9/8-12/97 READINGS BY: C. GORMAN FILE NAME: 97VVCA tab 438 THOML6 XVMOO 'O:JlBS`JNIW3N L 6 /OT /6 0004 qet - :3WVN 3113 :31VO 1531 S)WVW3M hlil UOO �► ONV OOOH MOIJ HUM 2fd SJNlQ4f3a %96 L£ LZ L6U 006Z Tdl I I I i I I %Z6 i STT i T81 SZT 90ZT sovs9vw WPM , 8L 1013 SL 9OZT b -Z OL ! SO 6 %56 : EVT I tLt OST 90ZT U - 6 i $NaWOMI %SOL i8ST IM 109T 90ZT S %LLL :0 16TTr 00 ZTbZ S -rI 1 SHRXDo'I %OLL , 0vti 1999 00v ZTbZ S - 'I 9 Sx3x�0'I' r %OLL TSTi I VL9 loov zTVZ I 5 -'i %LLL Z6 IgEs 00TF ZT j S -'I ti S2I3?i %96 i LEZ i TQZ 05Z 8ovz OT - Z £ EWUOIS .LOOS i %b6 !9U jTTZ OSZ 80bZ OT l i SJYHO,I.S ,LOOS 9/aD 0 10 00£ QS'17YI.SNI ION L I `JNIIIZNI].L W30 W30 W30 aZ!S sal # paivas Isu!=l qa }d U6!s2q 3a13no eaif T -VrIW W31SAS — SMD 2OV7 CIA 'I IVA 103r08d 88 3N laod3H lssi aiv _ J AIR APPARATUS NE: TEST REPORT PROJECT VAIL VILLAGE CLUB SYSTEM /UNIT: MUA -2 OCATION: 2ND FLOOR / KITCHEN - -_... UNIT DATA I MO' DATA rFrame BALDOR ulakdMOdelNo. !. DLJNHAI"i'BUSH Make 2 I 02LF890401 K.P. rypelSi�e HD i RPM 1725 ^_.... _.. _ �SerialNumbar 88088401A 200 HW /MUA !Volts 3/60 Arr./Ctass I PhoseHertZ -- - -- Discharge I UP FLOW 7.1 _.._ .._ . i BROWNING F t Make Sheave 5 �� 1.2 - - -- Sheave DWmISOre 7" X i 3.75 " X 7/8 - -- _ -. 1 -A47 i Sheave piprNBare NO. 8elmlmskefs¢e 3 .7 - -- 2 - 16X2 0X2 ( Shaave °per• Diam -1 Na. F'�tae , 2 _ 16X2 5X2 I Sheave C!L p�tanca - -- TEST DATV: FILE NAME: tab 438 9/8-12/97 READINGS BY: C . G ORMAN 97VVCA 16 44 60 .73 142 69 73 17 166 144 22 REMARKS AIR FLOW, SLIGHTLY NEGITXVE IN TO K 11/24/1998 18:02 970 - 242 -7634 LUNSFORD MECHANICAL PAGE 10 NL. r� PROJECT SYSTEM AIR OUTLET TEST REPORT VAIL VILLAGE CLUB MUA -2 ea 3 ut et ign Prel. Final c mA 4 Tar%m Sao C FM CF CFM % CORRIDOR 1 L -3 1208 350 1 350 1 348: 99% KITCHEN 1 21 DO -2 36X12 1325 14231 1405: 106% KITCHEN 31 DO -2 36X12 1325 1563 1 1435 108% ! KITCHEN 1 41 CHANGED L -3 1812 600 4721 559' 93% SEVICE 5 L-2 1208 250 230! 237: 95% ;CE ILING SPACE 6 SEE NOTE 8 RD. 1501 1501 150; 1000, i { I I I f I i i I ' TO TAL. 4000 4188 4134 103% RFAIIINAR ARE WITH FLOW HOOD AND ARE CO RRECIVO TO ALTITUDE. REMARKS: TEST DATE: FILE NAME: tab hoods NO ACCESS TO 8" ROUND DAMPER 150 CFM + -. 9/10/97 READINGS BY: C. GORMAN 97VVCH1 NE. BB PROJECT: VAIL VILLAGE CLUB SYSTEM/UNIT: LOCATION: BASEMENT AIR APPARATUS TEST REPORT FC -1 UNIT DATA MOTOR DATA MakelMCKW No. MAGIC AIFtE Make/Frame GE ' -- TEST DATA DES IGN I ACTUAL TEST DATA TypalS4v DHW - 4 0 0 i H. P. 1/10 Serial Num 970189799 : RPM 955 Arr. /Clam HW FA COIL ' Vofts 115 Discharge HORIZONTAL : PheaelHerft _ 1/60 Make Sheave DIRECT DRIVE F.I..Amps _ 2.1 Sheave DianUBore J S.l.Amps _._.. . 1 NO. Bette/makoA&o I Sheave DlamlBore DIRECT DRIVE 1 No. FimrR_ypelsim 1 1- 2 4 X 12 X 1 ? Sheave o pen. Diam 3 SPD Sheave C!L morAALr 115 TEST DATA DES IGN I ACTUAL TEST DATA I DESIGN 1 ACTUAL Total CFM 4 fwd Discharge S.P. .1 Register Total 4 00 4 61 : 6d Suction S.P. . Fan RPM 726 i Extemal S.P. . 5 0 " i .16 Motor RPM LOW SPD I FAN SUCTION S.P. _ .20 603 ON HIGH SPD I Heating Motor Volts 115 119 1 LAT 90 15 4 Motor Voft ' EAT -15 71 Motor Volta I Temp. di f. 105 8 3 Motor Amps 2.1 .9 Motor Ampe GPM 2.5 2 . 7 -- Motor Amps EWT 190 173 lwT 150 _ 151 CFI.A I Temp. dif1. 40 _ 22 BHP I �— __, Outside Air CFM 100% OSA Damper Pos. Retum Air CFM RA Dam Pos, REMARKS ONE REGISTER IN ELEVATOR LOBBY, SMOKE DAMPER MANUALLY OPENED FOR TESTING. TEST DATE: 9/ 8 - 12 / 97 READINGS BY: C. GO RMAN FILE NAME: 97VVCA tab 438 TT ggVA 7ti0INVH03W CHOASNn VC9L- ZbZ -0L6 ZB :8Z 8662 /bZ /ZZ 11/24/1998 18:02 970 - 242 -7634 LUNSFORD MECHANICAL PAGE 12 _ r AIR APPARATUS TEST REPORT PROJECT: VAIL VILLAGE CLUB SYSTEM /UNIT: FC -2 LOCATION: 1ST FLOOR RETAIL AREA #3 UNIT DATA I MOTOR DATA Make/Model No. MAGIC AIRE ' MakelFrame GE i Type/Site DHW -4 0 0 H. P. 1/10 _ Serial Number 970189800 I RPM 955 _ i Arr.lClass HW FAN COIL lvoft 115 Discharge HORIZONTAL PhaaeMortx 1/60 Make Sheave '; DIRECT DRIVE F- L.Amps 2.1 w- i Sheave DWPUBare Motor RPM S.L.Amps LOW SPD ! NO. BeWmake/s¢e Sheave Olammore DIRECT DRIVE No.FilterAype%ae 1- 24X12X1 i Shameoper- Diem 3 SPD ! ' Sheave C/L Dietance Motor Voft TEST DATA DESIGN ACTUAL PEST DATA DESIGN ACTUAL Total CFM 400 Ext Discharge S.P. 1 -22 Register Total 400 4 3 7 Ext Suction S.P. .07 _ Fen RPM 710 1 External S -P. .50 .29 Motor RPM LOW SPD FAN SUCTION S.P. .22 Heating Motor Voft 115 119 tAT 90 14 5 Motor Vob EAT —15 71 Motor Volts Temp. diR. 10 5 74 Motor Amps 2.1 .9 ~ Motor Ampe GPM 2.5 2 . 5 Motor Amps EWT 190 164 t_wT 150 143 CF.A Temp- ddT. 40 21 BHP Outside Air CFM 100% 08A Damper Poe. Return Air CFM RA Damper Pos- REMARKS: 2 REGISTERS RETAIL #3 209 CFM HALLWAY 228 CFM TEST DATE: 9/8-12/97 READINGS BY: C. GORMAN FILE NAME: 97VVCA - tab 438 NE. �B PROJECT: VAIL VILLAGE CLUB SYSTEM/UNIT: LOCATION: 1ST FLOOR BAR AIR APPARATUS TEST REPORT F'C -3 UNIT r3ATA MOTOR DATA - Make/Model No. MAGIC AIRE MakelFrame GE - - TyperS¢e DHW - 4 0 0 H.P. 1110 Serial Number 970189808 RPM 955 Arr./Clan RW FAN COIL Volt 115 Discharge HORIZONTAL ' Phase/Heft 1/60 Make Sheave DIRECT DRIVE F.LAmps 2.1 — Sheave OWndSors S.L.Ampa _- NO. Bdts/makelkize Sheave DismMore DIRECT DRIVE No. FilteutypeAes 1- 2 4 X 12 X 1 Sheave oper. Diam 1 3 S PD I FAN SUCTION S.P. i She ave CAL Distance _ .4 • TEST DATA DESIGN ACTUAL, TEST DATA DESIGN ACT Total GFM 400 5 21 F xt Discharge S.P. .0 3 Register Told ' Ext SucWn S.P. .12 ._ Fan RPM 967 ; Extemd S.P. .50" . 15 i Motor RPM LOW S PD I FAN SUCTION S.P. _ .4 Heating _ Motor Volts 115 119 LAT 90 i 1 -- _.._ L Motor Vob FAT -15 i 80 i Motor Vohs ; Temp. diff. 10 5 7 5 Motor Amps 2.1 1. Motor Amps GPM 2.5 3 . 0 _ Motor Amps EWT 190 1- 165 �Lwr 150 131 _ CFLA 1 Temp. dta. 40 34 BHP { i Outside Air CFM 100% OSA pamper Pos. _ Retum Air CFM FtA Damper Poe. REMARKS: FLY SCREEN ON LOUVER WILL NEED TO BE KEEP CLEAN. TEST DATE: 9/8-12/97 READINGS BY: C. GORMAN F NAME: 9 7VVC A tab 4-38 11/24/1998 18:02 970 - 242 -7634 LUNSFORD MECHANICAL PAGE 14 NE: BB PROJECT: LOCATION: MakefMadel No. Type/S¢e Serial Number Arr, /Chas Docharge Make Sheave Sheave DiamfBore NO. BeWmake►s¢e -" i No.Filterrtype/s ¢ e Total CFM Register Total Fan RPM M otor RPM Motor Volts Motor Volts rf-4:ol:0r:V:oj:::: Motor Amps Motor Amps Motor Amps j C FLA rBHP P I Outside Air CFM Retum Air CFM REMARKS: TEST DATE: FILE NAME: tab 438 VAIL VILLAGE CLUB SYSTEM /UNIT: 1ST FLOOR BAR DATA Ml MAGIC AIRE MakelFnune DHX -10 0 0 H.P. 970188695 'RPM DX/ ELEC HEAT Vob HORIZONTAL Phasemo"z DIRECT DRIVE F.LAmps S.LAM Sheave Di AMOre 1- 3 4 X 14 X 1 Sheave open. Diam Shaava CA. DO DESIGN 110 0 1050 ACTUAL 13 2 7 $13 TEST DATA Ext Discharge S.P. Ext Suction S P External S. P. LOW SPD 119 i FAN SUCTION S -P. i Hem4ng lAT EAT 115 4.3 ! Temn . cliff" i Kw (AMPS Cooling EAT !LAT Temp. d ff. 6,9 j OSA Damper Poa. I RA Damper Pos. _ AIR APPARATUS TEST REPORT FC -4 1/3 1000 115 1/60 6.9 DIRECT DRIVE 3 SPD 10 N .12 .05 17 .42 133 69 64 15.1 70 53 17 ELECTRIC HEAT SET UP FOR ALL STAGES TO COME ON AT SAME TIME. DUCT HEATER INSTALLED BACKWARDS TO ARROWS, CONTROL CONTRACTOR CHANGED AIR FLOW CONTROL SO HEATER WILL WORK. 9/8-12/97 READINGS BY: C. GORMAN 97VVCA N BB . AIR OUTLET TEST REPORT PROJECT VAIL VILLAGE CLUB - SYSTEM FC -4, 5, 6 AND 8 Outlet Design rel_ anal Served # Type Size CFM CFM CFM % REMARKS_ TEST DATE: - FILE NAME: tab hoodl I r �P "A 9/9-10/97 READINGS BY : C . GORMAN 97WCH1 7hgTKMWngw amn -GNm vc9L- ZbZ - 0L6 Z0 :8Z 8661/bZ/11 FC -4 BAR 1 I CB -1 18X6 150 278 187 125% BAR 21 C9 - 18X6 150 232 197 i 131% BAR 3 CB -1 18X6 150 1 180: 120°x° BAR 4 CS -1 18X 150 221 18 7 ; : 125 BAR F5 CB -1 18X6 150 255 165 BAR 6 CB - 1 18X6 150 209 194 1 29% gpR 7 CS - 1 18X6 150 149 197 131% TOTAL 1050 1523 1327 126% FAN ON LOWEST SPEED. _ —.... , MBAR 1 L_11 400 629 436 109 °�° BAR 1 21 L -11 150 269 178 119% BAR I 3 L -11 400 511 4411 110% BAR 41 150 219 182 121% TOTAL 1050 16281 1237 118 FAN ON LOWEST SPEED. FC -6 DINING 1 DO -5 12X6 200 254 - 292! 146 DIMING 2 DO -5 18X6 350 405 391 112% DINING 31 DO -5 18X6 350 383 342 98 °i °' TOTAL 900 1042 10251 1140/9. FAN ON LOWEST SPEED. FC -8 CLOSING REGIS ER OBD ONLY INCREA ED NOI E LEVEL. MENS 1 DO -8 12X6 150 283 164. 109°x PLC 2 NO ACCESS 450 550 490 109% DININ 3 DO -8 12X6 100 184 X11 111 %; TOTAL 700 1017 765 10 9 °A 1 FAN ON LOWEST PEED w e g ARF I. R D TO ALTITUDE. REMARKS_ TEST DATE: - FILE NAME: tab hoodl I r �P "A 9/9-10/97 READINGS BY : C . GORMAN 97WCH1 7hgTKMWngw amn -GNm vc9L- ZbZ - 0L6 Z0 :8Z 8661/bZ/11 11/24/1998 18:02 970 - 242 -7634 LUNSFORD MECHANICAL PAGE 16 AIR APPARATUS N E . BB TEST REPORT PROJECT: VAIL VILLAGE CLUB SYSTEM /UNIT: FC -5 LOCATION: 2ND FLOOR UNIT DATA MOTOR DATA Make/Model No_ I MAGIC AIRE ! MakalFrame GE _ TypW$ize DHX -100 0 N.P. 1/3 Sena/ Number iRPM 1000 _ Ar r./Class DX FAN COIL i Vohs 115 _ Discharge HORIZONTAL PhaaeMaltz 10.0166667 Make Sheave DIRECT DRIVE ; F.LAmps 6.9 Sheave D iam/Bore (Heating NO. SeWmake/nize ! SheavaDiam/Bore DIRECT DRIVE No. Fikernypeh¢e 1- 3 4 X 1Xl I Sheave oper_ Diam I Sheave CA- Distance 3 S PD _ TEST DATA Total CFM 1 DESIGN I ACTUAL TEST DATA 1100 i Ext Discharge S.P. I DESIGN 1 ACTUA I .2 2 Register Total 1050 1237 i Fxt Suction S_ P. I -03 i Fan RPM 799 Extemal S.P. .25 _ Motor RPM LOW SPD i FAN SUCTION S.P. 1 -40 _ (Heating _ Motor Voft 115 120 lAT N/A i Motor Volta j EAT Motor Volts Temp. dilf. MSH I Motor Amps 6.9 4.7 'Motor Amps Cog Motor Amps EAT 68 LAT 45 CFLA Temp. diff. 23 BHP _ Outside Air CFM OSA Damper Poe. Retum Alr CFM RA Damper Poe_ REMARKS: TEST DATE: FILE NAME: tab 438 9/8-12/97 READINGS BY: C. GORMAN 97VVCA m f- AIR APPARATUS NE. BB TEST REPORT PROJECT. VAIL VILLAGE CLUB SYSTEMIUNIT: FC-6 LOCATION: 2ND FLOOR "NIT B ATA MOTOR DATA i M**Mww No. MAGIC AIRE Make/Frww GE Typerode i DKX-800 H.P. 1/4 Serial Number 97187454 iRPM 1070 Arr,/Clan DX FAN COIL I voles 115 Discharge HORIZONTAL i phnwHwtz 1/60 Make Sheave DIRECT DRIVE TF. �p$ 4-1 Sheave D*nffiwe 5.1-Amps NO, BdWmaketsize I Sheave DiarwBore DIRECT DRIVE No-Fifte►Mpalsks 1-27X14X1 shame oper. Diem 3 SPD Motor Volts 1 Sheave CIL Distance I TEST DATA Total CFM DESIGN ACTUAL I goo - 7 TEST DATA DESIGN — 1 AL; I UAL Ext Discharge S.P. .08 Register TOW 900 1025 Ext Suction S-P_ . 02 Fan RPM 830 E)demmd S.P. .10 Motor RPM LOW SPD FAN SUCTION S.P. .38 Heating Motor Volts 115 119 LAT Motor Volts EAT Motor Volts Temp. cflff- M13H Motor Amps 4.1 2.7 Motor Amps Cooling Motor Amps EAT 72 LAT 54 CFLA Temp. diff. 18 BHP Outride Air CFM OSA Damper Pos. Datum Air CFM RA Damper Pas. — REMARKS: TEST DATE: FILE NAME: tab" 9/8-12/97 97VVCA READINGS BY: C. GORMAN ) T - jn"-i - IW')TKMPnqW amnARNn VE9L-ZVZ-0L6 Z0 :8T 8662 /VZ/TT 11/24/1998 18:02 970 - 242 -7634 LUNSFORD MECHANICAL PAGE 18 r AIR APPARATUS N E r� TE REPORT — PROJECT: VAIL VILLAGE CLUB SYSTEWUNIT: FC--7 LOCATION_ 2ND FLOOR I HI SPD UNIT DATA MOTOR DATA MakelModal No. I MAGIC AIRE MakelFrame GE - - - -• TyowSize :-7�—� 600 ' H.P. 1/6 Sepal Number 1 'RPM 1005 Arr./Cless I DX FAN COIL Vohs 115 Di harye I PhawMeftx 1/60 3 • 7 Make Sheave DIRECT DIVE F.LAmps Sheave Diarn/8ors 3.5 I S.L.Ampe — - -" NO. BaWmakehize Motor Amps : Sheave owwuore DIRECT DRIVE No, Filted yPW%ize I- 2 4 X12 X 1 I Sheave oper. Diam 3 S PD Sheave CA- Distance _ - F-q7 DATA I DESIGN ACTUAL ? TEST DATA I DESIGN ' ACTUAL - Total CFM R eg �terTotal i Fa n RPM 450 ! Ext Discharge S.P. 513 F�ctSuction 1003 1 Extemal S.P. _ 0? .57 Motor RPM I HI SPD FAN SUCTION S.P. ( 22 i Motor volts 115 119 1 Nesting LAT N/A M Motor Volts EAT I Motor Vob Temp• dAT. MBH Motor Amps 3.7 3.5 Motor Amps i Cooling Motor Amps � FAT tAT 6 7 i 48 I Temp. drR. 1 9 CFLA BHP 03A Dam Outside Air CFM RA Damp Return Air CFM REMARKS: TEST DATE: FILE NAME: -' tab 438 CONTROL CONTRACTOR STATED THIS UNIT NEEDED TO BE HIGH SPEED FOR CORRECT OPERATION OF CONDENSING UNIT. WOOD REGISTER CAUSING STAIGHT DOWN DRAFT OF AIR: 9/8 READINGS BY: C • GORMAN 97VVCA C AIR A PPARAT U S NE BB TEST REPORT PROJECT VAIL VILLAGE CLUB SYSTEMIUNIT: FC -8 LOCATION: .....� rti eTA UnTnR DATA MakelModel No. MAGIC AIRE MakelFn ne GE TypWsae 030- DUX -A -2HW : H.P. 1/3 _� - - -• Serial Number 970290761 -RPM 1000 1 Arr.lClaes HW /DX FAN COIL ' Volts 115 I Discharge UP FLOW 1 PhaaWHOU 1/60 Make Sheave F.L Ampu 2.0 Sheave DiamlBore DIRECT DRIVE S - LAmps Motor v oRs NO- Belm/mstalaize SheareQiammom DIRECT DRIVE No.FilW ypals¢e 1- 24X18X1 i Shame oper. Diem 3 SPD 1 EAT She*ft CA- DWAnce 74 TEST DATA I DESIGN I ACTUAL 1 TE ST DATA DESIGN ' ACTUAL_ Totes CFM A 700 Ext Discharge S -P- 24 Register Total 700 7 6 5 ! Ext -- -- S.P- . 2 0 - -- Fen RPM 837 Exdemal S.P. S " 44 _._ —.. Motor RPM FAN SUCTION S.P. .3 1 Heating Motor v oRs 115 119 L AT 60 124 _ Motor Volt 1 EAT -15 1 74 Motor Voft Temp- dil[- 75 50 Motor Amps 6.9 4.5 ! ^— Motor Amps GPM 3.5 Motor Amps EAT 1 7 3 LAT I 154 CFLA Temp- cN. ! 19 - BHP Outside Air CFM OSA Damper Pos. Ratum Air CFM RA Damper Poe. REMARKS: TEST DATE: FILE NAME: tab 438 9/8 -12/97 97VVCA READINGS BY: C. GQRMAN CT 3m"-j 1HITMk -)" qW eNnanNm VE9L- ZVZ -0L6 Z0 :81 8662 /VZ /Zt 11/24/1998 18:02 970 - 242 -7634 LUNSFORD MECHANICAL T B PROJECT: VAIL VILLAGE CLUB SYSTEM /UNIT: LOCATION: 3RD FLOOR _. UNIT DATA MOTC Make/ No MAGIC AIRE Make/Frame ~ Typ"ze ' 024 -CCX -A H.P. - Serial Nurnbw 970290762 ! RPM Arr./Claea DX FAN COIL V oft Discharge HORIZONTAL I Phase/Heft Make Sheave DIRECT DRIVE i:.LAmpe Sheave OMMMOre 6.1,-Amps No. aelte/makGhQ@ Sheave pianflBore No.FiRerAypahlze I 1- 38X9X1 sheaveoper. Diem Sheonm C/L Ch t nce _ TEST pATA DESIGN ACTUAL TEST DATA i Total CFM 160 7 Ext Discharge S• P. Register Total 600 5 31 Ext Suction S.P. Fan RPM 1163 External S -P_ I Motor RPM I HIGH SPD I FAN SUCTION S.P. I 1 Heating ! Motor Vans 115 119 ' LAT Motor Vob EAT Motor Volts 1 Temp. W. MSH Motor Amps 1.8 1 . 0 Motor Amps CoaBn I Motor Amps EAT LAT CFtA Temp. dfff. BHP Outside Air CFM OSA Oemper Poe Return Au CFM RA Damper POs- REMARKS: PAGE 20 AIR APPARATUS TEST REPORT FC -9 )ATA GE 1/8 1120 115 1/60 _... 1.8 _..... DIRECT DRIVE . .3 ACTUAL .04 .26 .22 N/A 72 55 17 TEST DATE: 9/8-12/97 READINGS BY: C. GORMAN FILE NAME: 97VVCA - tab 4 -38 NE:BB PROJECT: LOCATION: _ U MakelModd N0. Typeosm 1 Serial Number Arr.IC>ass DW:hwp Make Sheave i Sheave Di em/Bor e NO. BellZakstiZe No- FiUerRypeft aze i 'Total CFM _ Register Total Fen RPM i Motor RPM Motor Volts Motor Valts Motor Volta _ I Mawr Ampe Motor Amps Motor Amps CFLA !_BHP I 1 Outside Air CFM Return Alr CFM REMARKS: _ TEST DATE: FILE NAME: tab 4-38 T7 7C1HJ VAIL VILLAGE CLUB SYSTEM /UNIT: BOILER ROOM DATA 1 M' MAGIC AIRE MskelFreme DHW -400 H.P. 970292227 IRPM HW FAN COIL 7 Volts HOR I ZONTAL PheeelHertz DIRECT DRIVE F.I -Amps S.LAmpe Temp. dift. Sheave Diem/Bore 1- 24X12X1 Sheave Dim► Sheave CA. Dietar►oe DESIGN { ACTUAL TEST _DA i i 400 400 1 EA Discharge S.P. 485 Ext Suction S.P. 837 I External S.P. LOW SPD FAN SUCTION S.P. Heating 115 119 I..AT EAT I Temp. dift. 2.1 1 .9 GPM EVNT LWT Temp. dff. 100 �RA SA Damper Pos. Damper Pos_ 9/8 -12/9 97VVCA 1WnTNHH»W amn -1SNn1 READINGS BY: AIR APPARATUS TEST REPORT FC--12 DATA GE -- - -. 1 /10 955 115 �_ _..... 1/ 2.1 DIRECT DRIVE 3 SPD DESIGN AC_ TUAL. 0�O FEE M .10 _ . _....._. _. - .50" .10 _.. I .27 90 140 -15 73 105 67 1.5 1 - 190 169 150 148 40 21 wMjcTW f l VE9L- ZVZ -0L6 Z0 =81 8661 /VZ /11 11/24/1998 18:02 970 - 242 - 7634 LUNSFORD MECHANICAL PAGE 22 - r FAN TEST REPORT NE BB PROJECT VAIL VILLAGE CLUB FAN DATA FAN NO. ! FAN NO. FAN NO. Fan Number EF -1 EF -2 EF -3 t ROOF ROOF ROOF * BASEMENT ! KITCHEN RESTROOMS - MarmAncOxer E ACME ACME RCME Model Number PNN2 0 0 QBR161 PNN 1 3 Serial Number PV3960391 i Pv136505 7777 4PVB . 396503 Typ Klass DOME UTILTIY DOME Motor Mskefiype I MARATHON I MAGNETEK MAGNETEK MaW HP 1 1 3 3/4 'RPM 1 1725 i 1745 . 11725 voks ! 115/208/230 1 2081230/460 ,208/230/115 PhaeNNertr. 1/60 3/60 1/60 FLA Amps 12.8/6.4 i9.8/ 4.5 5.4/5.5/11 Motor Sheew 0wdBore 4.25" X 5/8" 6 X 1 1/8# 4.25 X 5/8' Fan 3heays Di ffiors 5. 7 5" X 1" 5 X 1• 3.75" X 3/4' No- 9e1t9/Make/Size { 1-A30 1-A37 1-3L260 Sheave CL Distance 8 ^ 9 . 5 - 7- 1 TEST DATA DESIGN ACTUALI DESIGN I ACTUAL DESIGN 1 ACTUAL ci=M 2800 2897 1 3600 3758 1600 1 1511 Fen RPM 1204 2008 2227 1553 1645 i Motor RPM 1711 1763 1743 S.P.Inbe -1.0 ', -2.3 S.P.DFsc 0 ToW S. P 1-13 1.0 1.75 2.3 J. 1.05 vottar 208 206 208 209 208 209 A mps 5.4 9.8 6.0 5.4 4.2 Amps 6.3 Amps 6.3 GFLA I attp REMARKS: EF--1 MOTOR AT MAXIMUM, MOTOR SLOW IF AMPS INCREASED - EF-1 REGISTER TOTAL HIGHER THAN FAN DESIGN. EF -3 REGISTER TOTAL LOWER THAN FAN ORSIGN- TEST DATE: 9/11/97 READINGS BY: C . GORMAN FILE NAME: 97VVCF _ tab 8-89 AIR CUTLET TEST REPORT NE_ BB PROJECT VAIL VILLAGE CLUB -- SYSTEM EF -1 AND EF -3 u et Design Prel. Final Area �_, es�e r.Fitu r-FM CFM % 5ervea n I TWO - - - i EF -1 � TUNNING E1 LOCKERS E2 ': LOCKERS I E3 MENS SHOWER E4 WOMENS SHOWER E5! MENS E6 WOMENS I E7 (JANITOR E8 ! BR -3 BR -2 BR -4 BR -1 BR - 1 DR -1 BR -1 BR -1 BR - I TOTAL 3001 231' 197: 66 550 $65 591 91 % 1450 885: 1211 B4 °k 100 115; 99 99% 100! 88' 9 9 1001 8 S 9 6 96% 10 0 ! 103 10 0 00 °6 50 I 65 ! 50 : 1oa °� 500 ! 85 i 461 92% ' 3350 2523' 2897 a6 % (ELECTRICAL 1 i E9 I I i . EF -3 i ;ELEV. EQ. RM. ICOMPACTOR F S — TOR 10 8 I HALLWAY RETAIL #3 MENS 113 WOMENS 115 MENS 2ND FL WOMENS 2ND FL MENS 3RD FL WOMENS 3RD FL I E1 E2 E3 E4 E5 E8 E7 E8 ES Flo E17 BR -1 BR -1 BR -1 BR -1 BR -6 BR BR-3 BR--1 BR - 1 BR -1 BR -1 TOTAL 150 250 100 100 200 50 50 150 200 150 100 1500 - 170' 148' 99% 197 2341 94 % : 1521 103! 103% 110` 1071 107% 257 204 , 102°,6 59 531 106% 62 5 6 i 1 12 %.. 152 1661 111% 162 184+ 9296 145 160 t079�° 1081 96 1 96% 1574 15111 101 %: i i i _ w.�rn T/•, AI TIT( If1G' { READINGS ARE VWH FLOW muuu AND ARE vvRncv i r-w 1 v REMARKS: REGISTER TOTAL HIGHER THAN FAN DESIGN TOTAL CFM. EF - OPERATING AT MAXIMUM ON MOTOR. TEST DATE: 9/9/97 READINGS BY: C. GORMAN FILE NAME: 97wcH1 tab hoods ._, --- - 1H - :1W rrt )4n4cz VE9L- 6V6 -0L6 Z0 =8T 866106/TT 11/24/1998 18:02 970 - 242 -7634 NE BB LUNSFORD MECHANICAL PAGE 24 FAN TEST REPORT PROJECT VAIL VILLAGE CLUB i=LA Amps k 2.3 1 2.3 Mot or Sheave DiaJBore I DIRECT DRIVE DIRECT DRIVE Fan Sheave Dia./Bore I I - - -- FAN DATA i FAN NO. I FAN NO. I FAN NO. _ Fan N umber EV -4 EF -5 EF -6 Loc ation DINING 3 DINING 2 DINING 1 Serwe SAME SAME i SAME _.. -- Manufac ' ACME ACME I ACME 1 V -300 Model N umbe r I V -300 V -300 _ Sena/ Number N/A N/A N/A CEILING EXHAUSTER! CEILING EXHAUSTER; CEILING EXHAUS TypeiClass Motor MakelType 1 ENCLOSED I ENCLOSED !ENCLOSED MototHP 1 165 WATTS 165 WATTS !165 WATTS RPM _Volts 1 120 120 1 Phase/Hertz 1 1/60 ; 1/60 __ .... 120 _ .._.. . 1/60 __ - -- i=LA Amps k 2.3 1 2.3 Mot or Sheave DiaJBore I DIRECT DRIVE DIRECT DRIVE Fan Sheave Dia./Bore I I DIRECT DRIVE -- No. Belte/Make/size Sheave CL Oistance TES DATA CFM Fen RPM DESIGN ACTUAL. 300 224 HIGHEST DESIGN 300 ACTUAL 236 1 HIGHEST DESIGN ! ACTUAL_ 300 195 _ I HIGHEST i I NO NO NO J' S.P.Inle t S.P.Diecharge rotalS.P .125 ACCESS ABOVE .125 ACCESS ABOVE .125 ACCESS__ ABOVE I Voltage 115 12 0 115 12 0 115 120 r 2.3 1.4 2.3 1.4 2.3 1.4 i Amps Amps r I Amps CFLA _ BHP REMARKS: No SPEED CONTROLLERS INSTALLED. NO ACCESS IN ATTIC SPACE, EDD ARE OPENING- TEST DATE: 9/11/97 READINGS BY: C - GORMAN FILE NAME: 97WCF tab 8-83 - NE BB PROJECT PUMP TEST REPORT VAIL VILLAGE CLUB PUMP DATA PUMP NO. PUMP NO. PUMP NO. Pump Number I P -1 U,. I BOILER ROOM P-2 BOILER ROOM —! 8arvioe I MAIN BOILER LOOP MAIN SOILER M,uiufoetunr B &G I B &G Modal Number ; 60 SERIES 2A -6PF 1 60 SERIES 2A -6PF SeriN Number 2042924 2 042925 Gp;M i 80/30 80/30 Rpq, NPSH Pump RPM I 1800 IrnpeNer Die ; 6" Mew MfrdF i MAGNETEK jyowHPJRPM 1 1.5/1725 1800 6 " MAGNETEK 1.5/1725 ;vim 208/230/115 208/230/115 PhaWHortz 1/60 1/60 ;p ! 7.8/7.5/15 7.8/7.5/15 i Seat Type I 1 TEST DATA MECH ACTUAL MECH ACTUAL ACTUAL =. Off 4Nvo s. I velve Shut Diff. 20 PSI 19 PSI 16.8 PSI / 38.8' 16.8 PSI / 38.8 Act. impeller Diem_ Val" om01". ve Open GPM nts Final Dindw. Prow. Final Suction Prow 69 6" 12.5 PSI/ 29' 12.5 PSI/ 29' 9 0 9 0 3 0. 5 PSI 30.5 PS I 17.5 PSI 17.5 PSI i Final Dlff, Pros, 13 PSI/ 30. 13 PSI / 30' Friel GPM 85 85 vi M" 209 209 5.2 5 . 2 RPM 1750 1754 REMARKS: _ TEST DATE: FILE NAME: tob 18.83 9/10 -12/97 READINGS BY: C. GORMAN 97VVCP /bZ /ZZ 11/24/1998 18:02 970 - 242 -7634 LUNSFORD MECHANICAL PAGE 26 SERIES fa PUMP PERFORMANCE CURVES PERFCRUANCE CHARACTEPISTIC CURVE 70 C K ENIPIFUG FVW SHRUM 60 bpr-p.d Clog* 9-7 -A7 20-, Wi5` SO art 1 I i W 1 a J z 9 20 a 0 5 p I I 440Z I { 10 I } •.o �y 40 r I C I I I I I o � ' C 20 4 4 60 80 100 120 140 1 60 I CAPACITY IN U.S. NS PER MINUTE {. a 5 1a 1s 20 25 30 35 40 CAPAC)'TY IN CUBIC METIVISMR I I i NOTE: Maximum Suction Pressure an Single Phase Units Qniy 112HP — 65 PSI 3 /4HP — 105 PSI i I For kditr Inkm adon, aMIW ITT M 8 Gossett, 8200 N. Austin Avenue, Marton Grow IL 60053, i Phone, (708) 966- 3700 -- ftmimft (700) 965 - 9052. 1 i Bell & Gossett powf£oitU.S.A.6 -" I TT IYT Fluid Tachnojogy Coromtion NE:BB PROJECT PUN Pump Number _ ! Location service - i Manufacturer Model Number i Send Number GP -- M lead Rsq- NPSH_ Pump RPM lmoeiler Dia. Motor HP/RPM unft AmpWS.F- Seal TyPe _ TEST DATA - 1 Pump, Orr- Press. V alve Shut pill Act. lrnPdw Dism. valve open DiK. Valve Open GPM Final Olec - Press• Final Suction Press- - Final Diff . Press. Finial GPM T REMARKS; TEST DATE: FILE NAME: tab 1"3 PUMP TEST REPORT VAIL VILLAGE CLUB — - TA PUMP NO. I PUMP NO. - PUMP NO - P- 3 P -4 l P-5 -- i BOILER ROOM i BOILER ROOM BOILER ROOM HEATING LOOP FMATING LOOP SNOWMELT _ B &G ! B &G B &G _ -- - ! SERIES 60 1.5A iSERIES 60 1.5A iSERIES 60 1 . 5A 1 172543 172543 ; 2044669 40/45 40145 30/40 1800 1180Q 1800 �. 6.8 6.8 1 6.375 -- ._.._. ITT / B &G I ITT / B &G Mp,GNETEFC 1.5/1725 1.5/1725 :1/1725 115/230 115/230 1208/230/115 _ 1/60 , 1/60 1 1/60 - - -- 18/9 1 I 18/9 1 7.216,5/13 I MECH I MECH I MECH ACTUAL ACTUAL ACTUAL 1 18.75 PSI 18.75 PSI 20 PSI 25 PSI/ 57.8' 25 PSI/ 57.8' 20.5PSI/47.4' 6.8 6.8 6.4" 16 PSI/ 37' 16 PSI/ 37' 18 PSI/ 41.6' _ 57 57 33 42 PSI 42 PSI 37.5 PSI 23 PSI 23 PSI 19.5 PSI 19 PS11 44' 19 PSI/ 44' 18 PSI /41.6' 45 210 45 33 } 211 211 6.4 5.4 5.0 —� 1745 1747 1747 9/10-12/97 READINGS BY: C. GORMAN 97VVCP 17 - 1H:)TNVH7 - �W GNOASNn - 1 b69L- ZbZ -0L6 Z0 :8T 8662 /bZ /TT 11/24/1998 18:02 970 - 242 -7634 LUNSFORD MECHANICAL PAGE 28 L/ - - SERIES 60 PUMP PERFORMANCE CURVES ci[,v* MALA . PLAW so+ LES 60 A..r.w.d A+.s 5 -20-92 is . M 7 Q 1Q F o: t y N i s � I 0 a0 i i Fa fimoMW W*MM WL caatrcs m ed & CpmotL &MG N- AVOW Avorms. Maa Grows. L =3& t ITT Bell $Gossett Nwrr�q .w u ax sus fTT Fluid Tedv,olo4v Coeporatlon 4�.41ry M N.7.4KL0�� � �t 0 y 10 1s car.cm w cum mWowwe 11/24/1998 18:02 970 - 242 -7634 LUNSFORD MECHANICAL PAGE 29 vo!l-oduoa �>yOl l p° L!1 �ass�J'8 lfaa �� xQOb s� (gad •aw�•� -�- ooct -aoe acv •mod 'ESD� 'p `MaD �W 'www+/ glsnr/ 'N OOii 'J 4 poB 11J F>� ' JD +a� us vn oo osurw I � mm I ry � "�� Vii . �'�?�!1��1 r � x f � � Fi 11/24/1998 18:02 970 - 242 -7634 NE: BB PROJECT _. LOCATION SERVICE - -i OR DESIGNATION P -1 OR P -2 P -3 OR P -4 MAU - 1 ;MAU -2 Fc - 1 IF -2 FC -3 FC -8 jFC - L.� jP -5 SNOWMI i RRMATT. FRC ; tiAL( -ur4 % Gttlil r i, - BALCON 4TH FL REAR PATIO EAST BALCONY_ 4' - I SO. BALCONY 4 VAIL VILAGE CLUB LUNSFORD MECHANICAL PAGE 30 BALANCING VALVE /FLOW METER TEST REPORT SYSTEM REMARKS: TEST DATE ACTUAL NOTES GPM CAN'T 9/10 -12/9 READING_ BY C. GOR'N i4 Vail Corporation P.O. Box 7 Vail, CO 81657 Linda Malaby 610 West Lionshead Circle Suite 100 Vail, CO 81657 Bridge Street Condo Association 281 Bridge Street Vail, CO 81657 THIS ITEM MAY AFFECT YOUR PROPERTY PUBLIC NOTICE NOTICE IS HEREBY GIVEN that the Planning and Environmental Commission of the Town of Vail will hold a public hearing in accordance with Section 12 -3 -6 of the Municipal Code of the Town of Vail on January 11, 1999, at 2:00 P.M. in the Town of Vail Municipal Building. In consideration of: A worksession to discuss an amendment to Special Development District No. 4 (Glen Lyon), revising the Glen Lyon Office Building site (Area D), located at 1000 S. Frontage Road West /Lot 54, Glen Lyon Subdivision. Applicant: Glen Lyon Office Building Partnership, represented by Kurt Segerberg Planner: Dominic Mauriello A request cur a Type II Employee Housing Unit at a proposed primary/secondary residence, located at 95 Forest Road / Lot 32, Block 7, Vail Village First Filing. Applicant: Philip Hoversten, represented by Snowdon & Hopkins Architects Planner: Jeff Hunt A request for a vgrianr.P from Section 12- 713-13, Town of Municipal Code, to allow for the conversion of existing floor space to gross residential floor area (GRFA), located at 333 Bridge treet / A portion of Lot C, Block 2, Vail Village First Filing. Applicant: The Remonov Company, represented by Braun & Associates Planner: Dominic Mauriello The applications and information about the proposals are available for public inspection during regular office hours in the project planner's office located at the Town of Vail Community Development Department, 75 South Frontage Road. , u , ;yti u y � ,,,,.., available upon request with 24 hour notification. Please call 47a- 2356, Telephone for the Hearing Impaired, for information. Community Development Department Published December 25, 1998 in the Vail Trail. IRsi g n Review AdAn Form TOWN OF VAIL '' TOWN OF VAIL Project Name: Vail Village Club Project Description: Rooftop mechanical screening Owner, Address and Phone: Architect /Contact, Address and Phone: Gies Architects, Edwards Village Center, D21, Edwards, Co., 81623 Project Street Address: Legal Description: Lot C, Block 2, Vail Village First Filing Parcel Number: Comments: Building Name: Vail Village Club Board / Staff Action Motion by: Pierce Action: Approved Seconded by: Woldrich Vote: 5 -0 Conditions: No new mechanical equipment shall be added, all existing equipment shall be painted the same color as the existing chimneys. No new building permits shall be issued until the painting is completed. Town Planner: George Ruther Date: 9/2/98 DRB Fee Pre -Paid $20.00 TOWN O W AIL , Project Name: Vail Village Club Front Entry Remodel Project Description: New Front Entry Owner, Address and Phone- Architect/Contact, Address and Phone: Gies Architects, Inc., P.O. Box 807, Edwards, Colorado 81632 926 -9280 Project Street Address: 333 Bridge Street Legal Description: lot c, block 2, Vail Village #1 Parcel Number: Building Name: Vail Village Club Comments: Design Review Action Form TOWN OF VAIL Board / Staff Action Motion by: Seconded by: Vote: 5 -0 Conditions: Woldrich Pierce Action: approved approved as submitted with the condition that all the roof top mechanical equipment be screened. Town Planner: George Ruther Date: 8/26/98 DRB Fee Pre -Paid: $50.00 F:\ EVERYONE \DRB\APPROVAL\98 \WCLUB.826 Questions? II the Planning Staff at 479 -2128 Toly, APPLICATION FOR DESIGN REVIEW APPROVAL 0 l T� u GENERAL INFORMATION This application is for any project requiring Design Rcvicw approval. Any project requiring design review must information, sec the submittal receive Design Rcvicw approval prior to submitting for a building permit. For specific requirements for the particular approval that is requested. The application cannot he accepted until all the required information is submitted. The project may also need to be reviewed by the "Town Council and /or the planning and Environmental Commission. Design Review Board approval expires one year after final approval unless a building; permit is issued and construction is started. A. DESCRIPTION OF' 'I I REQUEST: l I3, LOCATION OF PROPOSAL: LOT: C I3LOCK: PILING: Vai Vi LLaLL XD i _ ' PHYSICAL ADDRI?SS: C. PARCEL it. 210108242001 _ (Contact Eagle Co. Assessors Office at 970 - 328 -8640 for parcel #) D. ZONING: — _A3_, R2 — I NAME OF OWNER(S): ppmnnml�, Inc MAILING ADDRESS: PQ Bnx 188 \ wardG , 81632 PIIONE: 970 - 926 -622 — F. 0 W N E 11 (S) SIGNA'TUR[i.(S): _ ____�— G. NAME OF AI'I'LICANT:_ G ies Arc MAILING ADDRESS:—P Box 807 Edwards, CO X31632 PHONE: 970-926-928 — I I. TYPE OF REVIEW AND FEE: ❑ New C oll sh•uctioil - $200 Construction of a new building. [2 Addition - S50 Includes any addition where square footage is added to any residential or commercial building. El Minor Alteration - $20 includes minor changes to buildings and site improvements, such as, reroofing, painting, window additions, landscaping, fences and retaining Willis, ctc. DRB fees are to be paid at the time of submittal. Later, when applying fora building permit, please identify the accurate valuation of the project. The Town of Vail will adjust the fee according to the project valuation. PLEASE SUBMIT THIS APPLICATION, ALL SUBMITTAL P.LQUIREMENTS AND THE FEE TO THE DEPARTMENT OF COMMUNITY DEVELOPMENT, 75 SOUTH FRONTAGE ROAD, VAIL, COLORADO 81657. 2 F r ffk Use Only � C � � S 'cc Paid: ° ° ('K#: Hy: — Applicntien C).3te: DR13 Meeting Date: _� ? 5 — Pre- Application Meting Date: --- m J AST OF PROPOSED MATERIALS BU11 DING MATERIALS TYPE OF MATERIAL Roof Co bbe?' Standing Pam Siding u S. Cedar Other Wall Materials _ E I F S _l SL Fascia R . S . Cedar Soffits T & G R S Cedar Windows Metal Clad Window Trim Mnqq Pork Doors Glass Storefront Door Trim Moss Rock land or Deck Rails N/A — Flues - Flashings Copper Chimneys N/A Trash Enclosures N/ A Greenhouses N/A — Retaining Walls Moss Rock Exterior Lighting * Other N/A COLOR M tr•h RYi Qtincl Match E -t i nrr Match Exis ina Match Fxi ct i nn Forest (nrPex-)- N/A N/A N/A * Please specify the manufacturer's color, number and attach a small color chip ** All exterior lighting must meet the Town's Lighting Ordinance 18.54.0500). If exterior lighting is proposed, please indicate the number of fixtures and locations on a separate lighting plan. Identify each fixture type and provide the height above grade, lumens output, luminous area, and attach a cut sheet of the lighting fixtures. 2 Updated 6/97 PPO POSED LANDSCAPING Bot anical Nanlc _Common Name lan i X ii PROPOSED TREES N/A AND SHRUBS: EXISTING TREES TO BE REMOVED: Picea Punaens __ s r_uc-e — 7 r, * M111111111111 regUil C1llCI1tS for landscaping: deciduous trees - 2 inch caliper coniferous trees - 6 feet in height shrubs - 5 gallons Tnic S� uarc Foota:>_ GROUND COVER N/A SOD SEED IRRIGATION TYPE OR METHOD OF EROSION CONTROL OTHER LANDSCAPE FEATURES (retaining walls, fences, swimming pools, etc.) Please specify. Indicate top and bottom elevations of retaining walls. Max imurn height of walls within the front setback is 3 feet. Maximum height of walls elsewhere on the property is 6 feet. 3 Updated 6/97 A pre- aprplication conference with Town been completed. It Is the applic a ppl ic a t io n t ti�r ponsibility to�tclaedulesthihe mandatory pre- appbc,ation mcctmg hash { meeting by calling 970- 479 -2128. II. TIME RE UfREMf: F The Design Rcvicw Board meets on the 1st and 3 pted We d n esdays e m onth. A ent ent form and all accompanying material must be i c p Y niininnim of three and a half (3 1/2) weeks prior to the date of the DRB public hearing. Ill. RFViE CRITERIA nce with the Design Guidelines as set forth in Section 18.54 of the Your proposal will be reviewed for complia Municipal CoCIC. IV, NOTE TO ALL APPLICANTS: A. if a property is located in a mapped hazard area (i.e. snow avalanche, rockfall, floodplain, debris flow, wetland, etc), a hazard study must be submitted and the owner must sign an affidavit recognizing the hazard report prior to the issuance of a building permit. Applicants are encouraged to check with the planning staff prior to submittal of a DRB application to determine the relationship of the property to all mapped hazards. Basic Plan Shect Format. For all surveys, site plans, landscape plans and other site improvements plans, all of the following must be shown. 1. Plan sheet size must be 24 "x 36 ". For large projects, larger plan size may be allowed. 2. Scale. Thr, mininuim scale is 1 " =20'. All plans must be at the same scale. 3. Graphic bar scale. 4. North arrow. 5. Titie block, prv_ject name, Project address and legal description. 6. indication of plan preparer, address and phone number. 7. Dates of original plan preparation and all revision dates. 8. Vicinity map or location 111,11) at a scale of I"= 1,000' or larger. 9. Shect labels and numbers. 10 , A border with a mininuun left side margin of 1.5 ". 11. Names of all adjacent roadways. 12. Plan legend. C. For new construction and additions, the applicant must stake and tape the project site to indicate property lines, proposed buildings and building corners. All trees to be removed must be taped. The applicant must ensure that staking done during the winter is not buried by snow. All site tapings and staking must be completed prior to the day of the DRB meeting. D. Applicants who fail to appear before the Design Review Board on their scheduled meeting date and who have not asked in advance that discussion on their item be postponed, will have their items removed from the DRB agenda until such time as the item has been republished. E. if the DRB approves the application with conditions or modifications, all conditions of approval must be resolved prior to the issuance of a building permit. t C Updated 6/97 TiL1T ' " OCATiON VERIFICATION This form is to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and scheduling installations. The location and availability of utilities, whether they be main trunk lines or proposed lines, must be approved and verified by the following utilities for the accompanying site plan. U.S. West Conununications 1 -800 -922 -1997 468 -6860 or 949 -4530 Public Service Company 949 -5781 Gary Hall Iloly Cross Electric Assoc. 949 -5892 Ted Flunky /John Boyd T.C.1. 949 -5530 Floyd Salazar Eagle River Water & Sanitation District 476 -7480 Fred I laslec Authorized Si i iture Date * Please bring a site plan, floor plan, and elevations when obtaining Upper Eagle Valley Water & Sanitation signatures. Fire flow needs must be addressed. NOTES: if the utility verification form has signatures from each of the utility companies, wid no comments arc made directly on the form, the Town will presume that there arc no problems and the development can proceed. 2. if a utility company has concerns with the proposed construction, the utility representative shall note directly on the utility verification form that there is a problem which needs to be resolved. The issue should then be detailed in an attached letter to the Town of Vail. However, please keep in mind that it is the responsibility of khp utility company and the applicant to resolve identified problems. These verifications do not relieve the contractor of the responsibility to obtain a Public Way Permit from the Department of Public Works at the Town of Vail. Utility locations must be obtained before diegin in any public right -of -way or casement within the Town of Vail. A building permit is not a Public Way permit and must be obtained separately 1. PRE - APPLICATION CONFERENCE f ! 4 Updated 6/97 V. STAFF APPROVAL The Administrator may review and approve Dsign Review a n Re , app for with deci sion . rt liAllnod nations, staff deny the application, or may refer the applicatio approvals are subject to final approval by the DRB. "file following types of Design Review applications may be staff approved: A. Any application for an addition to al, nd app been r c onsistent w ' aluthori�ed ►member of desi gn, materials and colors of the burldrng, a pp oval h condominium association, if applicable; B. Any application to modify an existing building that does not significantly change the existing planes of the building and is generally consistent with the architectural design, materials and colors of the building, including, but not limited to exterior building finish materials ( e.g. stonework, siding, roof materials, paint or stain,), exterior lighting, canoeres or awnings, fences, antennas, satellite dishes, windows, skylights, siding, minor commercial facade improvements, and other similar modifications; C Any application for site improvements or modifications including, but not limited to, driveway modifications, site grading, site walls removal or modifications to existing l andscaping, installation of accessory stnrctures or recreational facilities. VI. ADDITIONAL REVIEW AND FEES A. If this application requires a separate review by `ii bb200�QO c � ► l'a$mpleS of other y Town of Vail, the application fee shall be y include, but are not limited to: Colorado Department of 1- Iighway Access permits, Army Corps of Engineers 404, ctc. B. The applicant shall be responsible for paying any publishing fees which are in excess of 50% of the application fee. If, at the applicant's request, any matter is postponed for hearing, causing the matter to be re- published, then the entire fee for such re- publication shall be paid by the applicant. C Applications deemed by the Conumunity Development Department to have design, land use or other issues which may have a significant impact on the community may require review by consulta.11ts in addition to Town staff. Should a determination be made by the Town staff that an outside consultant is needed, the Community Development Department may hire the consultant. The Department shall estiniatc the amount of money necessary to pay the consultant and this amount shall be forwarded to the Town by the applicant at the time of filing an application. Expenses incurred by the Town in excess of the amount forwarded by the application shall be paid to the Town by the applicant within 30 days of notification by the Town. Any excess funds will be returned to the applicant upon review completion. 6 Updated 6/97 CONCEPTUAL DESIGN REVIEW TOWS GENERAL INFORMATION The conceptual review is intended to give the applicant a basic understanding of the compatibility of the proposal with the Town's Design Guidelines. The DRB does not vote on conceptual reviews. Complete, applications must be submitted two (2) weeks prior to a scheduled DRB meeting. II. SUBMITTAL REQUIREMENTS ❑ A conceptual site and landscape plan at a minimum scale of 1 " =20' or larger; ❑ Conceptual elevations showing exterior materials and a description of the character of the proposed structure or structures; ❑ Completed DRB application form. ❑ Condominium Association approval (if applicable) 111. PROCEDURE Upon receipt of an application for conceptual design review, the Department of Community Development shall review the submitted materials for general compliance with the appropriate requirements of the zoning code. If the proposal is in basic compliance with the zoning code requirements, the project shall be forwarded to the DRB for conceptual review. If the application is not generally in compliance with zoning code requirements, the application and submittal materials shall be returned to the applicant with a written explanation as to why the Community Development Department staff has found the project not to be in compliance with zoning code requirements. Once a complete application has been received, the DRB shall review the submitted conceptual review application and supporting material in order to determine whether or not the project generally complies with the design guidelines. The DRB does not vote on conceptual reviews. The property owner or a representative abAU be present at the DRB hearing. Questions? Call the Planning Staff at 479 -2138 TOW] , LPPLICATION FOR PLANNING A J ENVIRONMENTAL COMMISSION APPROVAL FAT � '6 - , 6 1 )- I GENE AL INFORMATION This application is for any project requiring approval by the Planning and Environmental Commission. For specific information, see the submittal requirements for the particular apa- sted. The application can not be accepted until all required information is submitted. The project reviewed by the Town Council and/or the Design Review Board. a JM A: TYPE OF APPLICATION: ❑ Additional GRFA (250) ❑ Bed and Breakfast ❑ Conditional Use Permit ❑ Major or ❑ Minor Subdivision ❑ Rezoning ❑ Sign Variance . E� Variance ❑ Zoning Code Amendment w WrbrM -�Iisnor p evelopment Plan nit (Type: ) CCI Exterior Alteration (Vail Village) • Major or ❑ Minor CCII Exterior Alteration (Lionshead) • Special Development District • Major or ❑ Minor Amendment to an SDD B. DESCRIPTION OF THE REQUEST: A c ed ; n - >c s .✓ l� V IE V C C L A A ti C. LOCATION OF PROPOSAL: LOT C BLOCK L FILING I ADDRESS: 3 � � 150 o yE S r • BUILDING NAME: t L- V I L' c.. ^ Cr a - — ( D. ZONING: GC `r E. NAME OF OWNER(S): - I' G P- C) r , ::F I` J C MAILING ADDRESS: C- 0�✓R -�.o S Go _ _8 16 3 2.- PHONE: r'I Z 6 F G OWNER(S) SIGNATURE(S): NAME OF REPRESENTATIVE: A a2 $ A P / - -I c5 A/SC H iC S� MAILING ADDRESS: _ P� Q ° k 6 7 ? C- 6 wg NO r 60 S t 3 L PHONE: 5 z 2 8 v H. FEE - SEE THE SUBMITTAL REQUIREMENTS FOR THE APPROPRIATE FEE. SUBMIT THIS APPLICATION, ALL SUBMITTAL REQUIREMENTS AND THE FEE TO THE DEPARTMENT OF COMMUNITY DEVELOPMENT, 75 SOUTH FRONTAGE ROAD, VAIL, COLORADO 81657. For Office Use Only: ,k - - Fee Paid: z r'p ' ° ° Ck#: � L By: Application Date: 6 '" Z 2 -9 PEC Meeting 21450 l) - c1-i J-05 -`7 $ VeC� // to ; ,3./ 6 S Revixd 6/96 SUBMITTAL REQUIREMENTS FOR A VARIANCE PRE - APPLICATION CONFERENCE A pre- application conference with a planning staff member is strongly encouraged. No application can be accepted unless it is complete. It is the applicant's responsibility to make an appointment with the staff to determine additional submittal requirements. II. SUBMITTAL REQUIREMENTS ❑ FEE: $250.00. The fee must be paid at the time of submittal. ❑ Stamped, addressed envelopes and a list of the names and mailing addresses of all property owners adjacent to the subject property, including properties behind and across streets. The applicant is responsible for correct names and mailing addresses. This information is available from the Eagle County Assessor's office. ❑ A written statement of the precise nature of the variance requested and the specific regulation involved. ❑ A written statement addressing the following: • The relationship of the requested variance to other existing or potential uses and structures in the vicinity. • The degree to which relief from the strict or literal interpretation and enforcement of a specified regulation is necessary to achieve compatibility and uniformity of treatment among sites in the vicinity or to attain the objectives of this title without grant of special privilege. • The effect of the variance on light and air, distribution of population, transportation, traffic facilities, utilities, and public safety. • How your request complies with Vail's Comprehensive Plan. ❑ A preliminary title report, including schedules A and B, to verify ownership and casements. ❑ Condominium Association approval (if applicable). ❑ Any additional material necessary for the review of the application as determined by the Administrator. Four (4) copies of the following ❑ A topographic and/or improvement survey at a scale of at least V = 20' stamped by a Colorado licensed surveyor including locations of all existing improvements, including grades and elevations. Other elements which must be shown are parking and loading areas, ingress and egress, landscaped areas and utility and drainage features. 13 A site plan at a scale of at least 1" = 20' showing existing and proposed buildings. Page 1 of 2 ❑ Building elevations and floor plans sufficient to indicate the dimensions, general appearance, scale and use of all buildings and spaces existing and proposed on the site. * For interior modifications, an improvement survey and site plan may be waived by the Administrator III. PLEASE NOTE THAT ONLY COMPLETE APPLICATIONS CAN BE ACCEPTED. ALL OF THE REQUIRED INFORMATION MUST BE SUBMITTED IN ORDER FOR THiS APPLICATION TO BE DEEMED COMPLETE. iV. TIME REQUIREMENTS A. The Planning and Environmental Commission meets on the 2nd and 4th Mondays of each month. A complete application form and all accompanying material (as described above) must be accepted by the Community Development Department by the appropriate submittal date, which is a mininuun of four (4) weeks prior to the date of the PEC public hearing. Incomplete applications (as determined by the planning staff) will not be accepted. B. All PEC approved variances shall lapse if construction is not commenced within one year of the date of approval and diligently pursued to completion, or if the use for which the approval is granted is not commenced within one year. V. ADDITIONAL REVIEW AND FEES A. If this application requires a separate review by any local, State or Federal agency other than the Town of Vail, the application fee shall be increased by $200.00. Examples of such review, may include, but arc not limited to: Colorado Department of Highway Access Permits, Army Corps of Engineers 404, etc. B. The applicant shall be responsible'for paying any publishing fees which are in excess of 50% of the application fee. If, at the applicant's request, any matter is postponed for hearing, causing the matter to be re- published, then, the entire fee for such re- publication shall be paid by the applicant. C. Applications deemed by the Community Development Department to have design, land use or other issues which may have a significant impact on the community may require review by consultants in addition to Town staff. Should a determination be made by the Town staff that an outside consultant is needed, the Community Development Department may hire the consultant. The Department shall estimate the amount of money necessary to pay the consultant and this amount shall be forwarded to the Town by the applicant at the time of filing an application. Expenses incurred by the Town in excess of the amount forwarded by the applicant shall be paid to the Town by the applicant within 30 days of notification by the Town. Any excess funds will be returned to the applicant upon review completion. Page 2 of 2 MEMORANDUM TO: Planning and Environmental Commission FROM: Community Development Department DATE: August 24, 1998 SUBJECT: A request for a minor CC1 Exterior Alteration and site coverage variance for a proposed entryway at the Vail Village Club, located at 333 Bridge Street/ Lot C, Block 2, Vail Village 1st. Applicant: Remonov, Inc., represented by Geis Architects Planner: George Ruther /Christie Barton I. DESCRIPTION OF THE REQUEST The applicant is requesting approval for a new entryway for the Vail Village Club. The building was constructed in 1 and the owners are interested in improving the visibility of the access. The alteration will be two stories in height and includes a display window on the ground level. The proposal will add 75 square feet of commercial floor area to the building. The proposal increases the site coverage by 53.5 sq. ft., which exceeds the 80% allowable by 543 sq. ft. In 1994, the PEC approved a variance for 489.5 sq. ft. (90.5 %) of site coverage. No additional parking is required by this application. A modification to the existing easement agreement will be completed as the second floor of the entryway extends over Town property by 24 sq. ft. The addition is on the north side and therefore has no impact on the 50' Gore Creek centerline setback and the 100 -year floodplain, as currently mapped. The design maintains the existing color and texture of the existing building. The application received a conceptual review by the Design Review Board on August 19, 1998. The Board requested the roof pitch be shallower to match existing roof line and that the truss element be simplified. The Board directed Staff to approve the application if approved by the PEC. il. ZONING ANALYSIS Zoning: Commercial Core 1 (CC1) Lot size: 4,646 sq. ft. Commercial Floor area: Allowed Existing Proposed no limit on floor area 9,405 sq. ft. 9,480 sq. ft. Site coverage 80% of site 90.5% of site 3,717 sq. ft. 4,205 sq. ft. 91.6% of site 4,258.5 sq. ft. f TOWN vnr v r 0 III. REVIEW CRITERIA FOR THIS REQUEST The code criteria for review of such a request are provided for your information. Staff has included the purpose statement from the zoning code, as we believe this will help the PEC in its evaluation of the request. The Vail Village Club is located in the Commercial Core 1 (CC1) zone district. According to Title 12, Chapter 7B of the Zoning Regulations, the purpose of the CC1 district is: The Commercial Core 1 District is intended to provide sites and to maintain the unique character of the Vail Village commercial area, with its mixture of lodges and commercial establishments in a predominantly pedestrian environment. The Commercial Core 1 District is intended to ensure adequate light, air, open space, and other amenities appropriate to the permitted types of buildings and uses. The District regulations in accordance with the Vail Village Urban Design Guide Plan and Design Considerations prescribe site development standards that are intended to ensure the maintenance and preservation of the tightly clustered arrangements of buildings fronting on pedestrianways and public green ways, and to ensure continuation of the building scale and architectural qualities that distinguish the Village. (Ord. 21(1980) § 1) Any exterior alterations are required to prove the proposal is in compliance with the purposes of the CC1 Zone District as specified in Section 12 -78-1 of this Article; that the proposal is consistent with applicable elements of the Vail Village Master Plan, the Town of Vail Streetscape Master Plan, and the Vail Comprehensive Plan; and that the proposal does not otherwise negatively alter the character of the neighborhood. Further, that the proposal substantially complies with the Vail Village Urban Design Guide Plan and the Vail Village Design Considerations, to include, but not be limited to the following urban design considerations: pedestrianization, vehicular penetration, streetscape framework. street enclosure, street edge, building height, views, service /delivery and sun /shade analysis; and that the proposal substantially complies with all other elements of the Vail Comprehensive Plan. The approval of an exterior alteration shall constitute approval of the basic form and location of improvements including siting, building setbacks, height, building bulk and mass, site improvements and landscaping. IV. ISSUES FOR DISCUSSION 1. Vail Village Master Plan The Vail Village Club is in the Seibert Circle Study Area. This plan will remove one tree in a small landscape planter. The planter was not designed for an evergreen tree to grow to full size. The proposal will not change any of the existing sun exposure areas and will maintain the existing access and circulation patterns. The addition of the entry vestibule and display case will enhance the pedestrian experience. The creation of the new entry vestibule will assist in drawing the public to continuing their walking to the open space along Mill Creek and to Mill Creek Court. 2. Town of Vail Streetscape Master Plan The Streetscape Master Plan identifies the following issues to be addressed: 1) Existing pedestrian character to be maintained and enhanced 2) Enhance an already exciting walking experience This proposal improves the pedestrian experience by adding a display window and improving the visibility of the entrance to the Vail Village Club. 3. Vail Comprehensive Plan The quality of development should be maintained and upgraded whenever possible. Although this is a new building, the existing entryway is subtle and difficult to find. Improving the entryway will make it easier for people to find the entrance to the building. 4. Character of the Neighborhood The alteration of the entrance to the building by adding a new entry vestibule and display case with the integration of the existing landscape planter will increase visibility and connection to the street and in return enhance the pedestrian environment. The proposal will not effectively reduce the volume of space along the two pedestrian streets or the square, and the addition of the vestibule and display case will articulate the space and create focal points at the pedestrian level. 5. Vail Village Urban Design Guide Plan This proposal conforms to Sub -Area Concepts #9, 11, 15 and 18 by improving the pedestrian scale of the building. The transparency of the fagade is increased with the addition of the display case, which in turn strengthens the pedestrian activity. The new entryway continues to be oriented to the pedestrian access areas and has increased visibility for ease of access. 6. Vail Village Design Considerations The quality of the pedestrian way is increased through the addition of a more central architectural focal point. Landscaping has been reduced minimally to introduce a display case that replaced a void on the fagade. This also enhances the framework, and articulation is added to the building to create additional visual interest and activity. The general characteristics of the 'outdoor room' are unchanged. An entry vestibule and display case have been added to create a pedestrian focus and divert attention from upper building heights. The proposed shape of the building has additional articulation to create greater visual interest. The new entry vestibule and display case will create welcome protection from rain or snow when 'window shopping' or simply pausing while walking through the Village. The proposal will not adversely affect views or shadow patterns. V. VARIANCE CRITERIA AND FINDINGS Upon review of Title 12, Chapter 17 -6, Criteria and Findings, of the Town of Vail Municipal Code, the Community Development Department recommends approval of the requested site coverage variance. The recommendation for approval is based upon on the following factors: A. Consideration of Factors: 1. The relationship of the requested variance to other existing or potential uses and structures in the vicinity. Staff believes the variance request will have no negative impacts on the relationship to other existing or potential uses and structures in the vicinity of The Vail Village Club or Seibert Circle. The request for the additional 53.5 square feet of site coverage will result in an improved streetscape and pedestrian experience along Hansons Ranch Road and will not interfere with the operation of the existing businesses on adjacent properties. 2. The degree to which relief from the strict and literal interpretation and enforcement of a specified regulation is necessary to achieve compatibility and uniformity of treatment among sites in the vicinity or to attain the objectives of the title without grant of special privilege. Staff believes the applicant is requesting the minimum amount of relief from the site coverage limitation to obtain compatibility and uniformity amongst the sites in the vicinity of the Vail Village Club. Staff does not believe that the granting of the variance request will result in a grant of special privilege since the intent of the development standards is being met. The site coverage limitation of 80% was intended, in part, to ensure that an adequate amount of the site was left undeveloped to permit areas for landscaping and streetscape. The applicants request to increase the site coverage percentage by 1.1 % has few negative impacts on the landscape area of the Vail Village Club. The planter was not designed to accommodate a full grown tree in the planter. Staff further believes that the request does not constitute a grant of special privilege since the addition proposed by the applicant furthers the goals and objectives of the master plans of the Town of Vail without resulting in negative impacts on adjacent properties or uses. As discussed previously in this memorandum, the applicant's proposal implements many of the recommendations proposed in the Towns Master Plans. As stated in the Vail Village Master Plan, "Vail Village has not escaped the aging process. There is a need to encourage the continued upgrading and enhancement of existing lodging and commercial facilities within the Village in order to maintain the unique character that is its main attraction.' Lastly, staff believes that while it is always possible to design and construct a building that is in full compliance with the Zoning Code, it is not always practical or reasonable to do so. 3. The effect of the requested variance on light and air, distribution of population, transportation and traffic facilities, public facilities and utilities, and public safety. Staff believes the variance request will have no negative impacts on light and air, distribution of population, transportation and traffic facilities, public facilities and utilities, and public safety. B. The Planning and Environmental Commission shall make the followin findings before granting a variance: That the granting of the variance will not constitute a grant of special privilege inconsistent with the limitation on other properties classified in the same district. 2. That the granting of the variance will not be detrimental to the public health, safety or welfare, or materially injurious to properties or improvements in the vicinity. 3. That the variance is warranted for one or more of the following reasons: a. The strict and literal interpretation or enforcement of the specified regulation would result in practical difficulty or unnecessary physical hardship inconsistent with the objectives of this title. b. There are exceptional or extraordinary circumstances or conditions applicable to the site of the variance that does not apply generally to other properties in the same zone. C. The strict interpretation or enforcement of the specified regulation would deprive the applicant of privileges enjoyed by the owners of other properties in the same district. VI. STAFF RECOMMENDATION Minor Exterior Alteration The Community Development Department recommends approval of the request for a minor exterior alteration in Commercial Core I to the Vail Village Club. The recommendation for approval is based upon the staffs review of the minor exterior alteration criteria outlined in Sections III through VI of this memorandum. Staff believes the applicant has met each of the criteria. Site Coverage Variance The Community Development Department recommends - approval of the applicants request for a site coverage variance subject to the following findings: 1. That the granting of the site coverage variance allowing for an increase in site coverage by 1.1 % does not result in a grant of special privilege inconsistent with the limitation on other properties in the Commercial Core I Zone District. 2. That the granting of the variance will not be detrimental to the public health, safety or welfare, nor will it be materially injurious to the adjacent properties or uses in the vicinity of the Vail Village Club. 3. That the strict and literal interpretation or enforcement of the 80% site coverage limitation would result in a practical difficulty inconsistent with the objectives of the Commercial Core I Zone District development standards and the goals and objectives of the Master Plan documents of the Town of Vail. f:\everyone\peclmemos \wc.824 REMOVE OVERP4NG 4-ND 3R--1G<Z-T& REMOVE WINDOW — "ND P;:LCCA7—= ON NEW ELEVATION SHORTEN, AN SUPPORT ROCK F-,4C OF COLU`,N, I LEAVING STRUCTURAL STEEL NIT,4CT =Xl5TfNr-- PLANTER RIE",OVE STORE FRONT DOOR ,-»ND WINDOW E3,-t.C—< EXIST' L;! e = E l k, - FR-=^-,OV4 51: eE Is IL FAGS i7) 61, 42 I f M j \G GUTTERS { ( I uTS b; r r7 ��., ���•" { ii/ ' � ;li I � I � ( SID V CLAD U J[NDetU THE aIL VII LAGS CI B ; y A2 C= EX(ST = \ ) STGN�I�lCs S � . TOP 0 El- 5TCRE =RCN- GL455 fR 4 7 I ON F l oS —, 3 t 1AA to I - - L� - - I- - - - - -- ! -_7 r te/ ) / = I s•1 � -1-._� i « F^'..'c Cc : �r _ _ _E '_ C _ �Q.. _R'Y l',`:c �__. _ � G 9 _ `�'p.,� - �.., 8 .. � c. � ;• cam. . �I � I / ^\ iT'1 2c GEPr:.CL2 IJ�1 - • — �-/ s, cl - - -- -- 1� ev— e- �e*l Ll A ev*� , Updated 8/14 4pm PLANNING AND ENVIRONMENTAL COMMISSION Monday, August 24, 1998 FINAL AGENDA Project Orientation / LUNCH - Community Development Depa rtment MEMBERS PRESENT MEMBERS ABSENT Greg Moffet John Schofield Galen Aasland Diane Golden Ann Bishop Brian Doyon Tom Weber Site Visits: 1. RAD Five — 4469 Timber Falls Court 2. Vail Village Club — 298 Hanson Ranch Road 3. Vail Cascade Hotel — 1300 Westhaven Drive Driver: Dominic 12:00 p.m. STAFF PRESENT Dominic Mauriello George Ruther Jeff Hunt Judy Rodriguez 12:45 p.m. 6- NOTE: If the PEC hearing extends until 6:00 p.m., the board will break for dinner from 6:00 - 6:30 p.m. Public Hearing - Town Council Chambers 2:00 p.m. 1. A final review of a conditional use permit for a proposed addition to the Vail Interfaith Chapel, located at 19 Vail Road/ Tract J, Block 7, Vail Village 1 st. Applicant: Vail Interfaith Chapel, represented by Gwathmey /Pratt Architects Planner: Dominic Mauriello MOTION: John Schofield SECOND: Diane Golden VOTE: 6 -0 -1 (Brian Doyon recused) APPROVED WITH 5 CONDITIONS: 1. The approval is subject to Town Council approval of encroachments on the Town -owned stream tract . 2. The applicant shall enter into an encroachment agreement with the Town of Vail for all new and existing encroachments on Town -owned property. 3. No grading shall occur in the flood plain and all grading issues shall be worked out with staff prior to DRB approval. 6 1 TOWN OF Updated 8/14 4pm 4. That there be a provision to provide access to a streamwalk. 5. That parking be added if the basement is finished. 2. A request for an amendment to a previously approved development plan for the Timber Falls Development, located at 4469 Timber Falls Court/unplatted. Applicant: RAD Five L.L.C., represented by Greg Amsden Planner: Dominic Mauriello MOTION: Galen Aasland SECOND: Brian Doyon VOTE: 6 -1 (Greg Moffet opposed) DENIED 3. A request for a major amendment to SDD #4, to allow for a fractional fee club and a change to the approved Development Plan, located at 1325 Westhaven Dr., Westhaven Condominiums/ Cascade Village Area A. Applicant: Gerald L. Wurhmann, represented by Robby Robinson Planner: George Ruther MOTION: Galen Aasland SECOND: Brian Doyon VOTE: 6 -1 (John Schofield opposed) APPROVED WITH 14 CONDITIONS: That the applicant appear before the Town of Vail Design Review Board for a conceptual review of the proposed major amendment prior to appearing before the Vail Town Council for final consideration of the request. Any and all issues identified by the Design Review Board at the time of the conceptual review shall be addressed prior to appearing before the Town Council. 2. That the applicant submit a detailed contractor =s cost estimate identifying the costs necessary to relocate the existing overhead utility line along the applicant =s north property line underground, and that the applicant establish a financial bond with the Town of Vail in the sum of 125% of the said relocating costs to insure the undergrounding of the utility line. 3. That the applicant regrade and revegetate the knoll located at the northwest corner of the development site at the time of the final grading of the Westhaven Club & Lodge. Due to the exposure and aspect of the hillside, the knoll shall be regrading to slopes not exceeding 3:1. The regrading shall be reviewed and approved by the Town Engineer. 4. That the applicant provide Type III Employee Housing Unit deed - restrictions , which comply with the Town of Vail Employee Housing Requirements (Title 12, Chapter 13, of the Town of Vail Municipal Code) for each of the 21 employee housing units, and that said deed - restricted housing be made available for occupancy, and that the deed restrictions be recorded at the Office of the Eagle County Clerk & Recorder, prior to requesting a Temporary Certificate of Occupancy for the Westhaven Club & Lodge. 5. That the applicant submit detailed civil engineering drawings of the required off - site improvements (street lights, drainage, curb and gutter, sidewalks, grading, etc.) to the Town of Vail Public Works Department for review and approval prior to the issuance of a building permit. 2 �A bw Updated 8/14 4pm 6. That the applicant record a twenty foot (20') wide pedestrian /bike easement for that portion of pedestrian /bike path traversing the applicant =s property and as identified on the Topographic Map prepared by Intermountain Engineering Ltd., dated 12/22/94, and that said easement be recorded at the Office of the Eagle County Clerk & Recorder, prior to the issuance of a building permit. The exact location and language of the easement shall be reviewed and approved by the Town Attorney and Town Engineer prior to recordation. 7. That the applicant provide written documentation from the Public Service Company granting approval of the construction of the Westhaven Club & Lodge in the location identified on the site plan relative to the high pressure gas line. Written approval shall be granted prior to the issuance of a building permit. 8. That the applicant record an access easement along the east property line for that portion of the driveway and access and trash enclosure which encroaches upon the adjoining property and that said easement be recorded at the Office of the Eagle County Clerk Recorder. The exact location and language of the easement shall be reviewed and approved by the Town Attorney and Town Engineer prior to recordation. 9. That the applicant explore alternatives to the proposed parking plan and provide all of the required parking spaces (58) on -site as requested by the Vail Town Council. 10. That the final landscape plan and architectural elevations be reviewed and approved by the Town of Vail Design Review Board. 11. That the approval of this major amendment to Special Development District #4 shall become lapsed and void one year from the date of a second reading of an ordinance amending the district, and that should the approval lapse, the applicant shall be required to remove the Aruins@ and restore and revegetate the site by no later than October 31, 1999. A bond providing financial security to ensure that said removal occurs shall be required following second reading of an amending ordinance. It shall be the applicant =s responsibility to provide a cost estimate of the removal work. The bond shall be a minimum of 125% of the removal costs. 12. That the applicant revise and submit an amended site plan, landscape plan, and grading plan indicating improvements to the existing boulder retaining wall along the east side of the access driveway. Each of the plans shall be reviewed and approved by the Town staff and the Design Review Board. 13. That the surface parking lot be heated. 14. That the applicant pay -in -lieu for 10 parking spaces. 4. A request for a CC1 minor exterior alteration and site coverage variance to the Vail Village Club, located at 298 Hanson Ranch Road /Lot C, Block 2, Vail Village 1 st. Applicant: Remonov, Inc., represented by Gies Architects Planner: George Ruther MOTION: John Schofield SECOND: Ann Bishop VOTE: 7 -0 Updated 8114 4pm APPROVED WITH 1 CONDITION: 1. That the existing roof -top mechanical equipment be screened to staff's satisfaction. 5. A request for a worksession to discuss a major amendment to SDD #4, to allow for the use of the tennis facility for special events and conference facilities, located at 1300 Westhaven Drd Cascade Village Area A. Applicant: Vail Cascade Hotel and Club, represented by Chris Hanen Planner: George Ruther WORKSESSION — NO VOTE 6. Information Update 7. Approval of August 10, 1998 minutes. The applications and information about the proposals are available for public inspection during regular office hours in the project planner's office located at the Town of Vail Community Development Department, 75 South Frontage Road. Sign language interpretation available upon request with 24 hour notification. Please call 479- 2356, Telephone for the Hearing Impaired, for information. Community Development Department Ll Community Development Plan Routing Form Routed To: Greg Hall, Public Works Todd Oppenheimer, Public Works Mike McGee, Fire Gary Goodell, Building Return To: Christie Barton Date Routed: 7/16/98 Return By: 7/27/98 Project Name: Vail Village Club Project Address: 333 Bridge Street Project Legal: Lot C, Block 2, Vail Village l st Project Description: Front entry addition. These plans show location of the fire alarm system. If you have major comments, please let George know since I'm going to be on vacation July 20 - 24th. Thanks! Approved Denied (cite detailed reasons) Approved with conditions � � Z 135 /k � � Z 135 . 1. Form AO /CHI Oder No. V261623 policy No. CTEU261623 SCHEDULE B SUBORDINATION AGREEMENT IN CONNECTION WITH SAID DEED OF TRUST WAS RECORDED June 27, 1996, IN BOOK 698 AT PAGE 434. 12. TERMS, CONDITIONS AND PROVISIONS OF EASEMENT AGREEMENT RECORDED July 09, 1996 IN BOOK 699 AT PAGE 454. 13. ANY LOSS OR DAMAGE THE INSURED SHALL SUSTAIN DUE TO ORDER RE: MOTION TO STAY JUDGMENT PENDING APPEAL AND FOR APPROVAL OF THE SUPERSEDEAS BOND, CIVIL ACTION NO. 96 CV 120, DIVISION J, DISTRICT COURT, COUNTY OF EAGLE, STATE OF COLORADO, RECORDED JUNE 30, 1997 IN BOOK 730 AT PAGE 807. 14. A DEED OF TRUST DATED May 03, 1996 FROM RIVA RIDGE PARTNERS LLC AND MARGRETTA B. PARKS TO THE PUBLIC TRUSTEE OF EAGLE COUNTY FOR THE USE OF FIRSTBANK OF AVON TO SECURE THE SUM OF $4,256,539.51, AND ANY OTHER AMOUNTS PAYABLE UNDER THE TERMS THEREOF, RECORDED May 22, 1996, IN BOOK 695 AT PAGE 195. DISBURSER'S NOTICE IN CONNECTION WITH SAID DEED OF TRUST WAS RECORDED May 22, 1996, IN BOOK 695 AT PAGE 196. SUBORDINATION AGREEMENT IN CONNECTION WITH SAID DEED OF TRUST WAS RECORDED June 27, 1996, IN BOOK 698 AT PAGE 434. EXTENSION AND MODIFICATION AGREEMENT IN CONNECTION WITH SAID DEED OF TRUST WAS RECORDED July 17, 1997, IN BOOK 732 AT PAGE 276. EXTENSION AND MODIFICATION AGREEMENT IN CONNECTION WITH SAID DEED OF TRUST WAS RECORDED December 26, 1997, IN BOOK 747 AT PAGE 388 RECEPTION NO. 643331. 15. A DEED OF TRUST DATED May 02, 1997 FROM RIVA RIDGE PARTNERS, LLC AND MARGRETTA B. PARKS TO THE PUBLIC TRUSTEE OF EAGLE COUNTY FOR THE USE OF FIRSTBANK OF AVON TO SECURE THE SUM OF $2,500,000.00, AND ANY OTHER AMOUNTS PAYABLE UNDER THE TERMS THEREOF, RECORDED May 29, 1997, IN BOOK 727 AT PAGE 907. 16. FINANCING STATEMENT FROM RIVA RIDGE PARTNERS, LLC AND MARGRETTA B. PARKS, WITH FIRSTBANK OF AVON, THE SECURED PARTY, RECORDED JUNE 2, 1997 IN BOOK 728 AT PAGE 150. 17. LIEN AS EVIDENCED BY THE STATEMENT OF SEMPLE BROWN ROBERTS, P.C. IN THE AMOUNT OF $101,575.74 RECORDED JANUARY 16, 1998 RECEPTION NO. 644857. 18. LIEN AS EVIDENCED BY THE STATEMENT OF J.L. VIELE CONSTRUCTION, INC, A COLORADO CORPORATION IN THE AMOUNT OF $49,932.97 RECORDED FEBRUARY 25, 1998 RECEPTION NO. 648107. Page 3 a � Form AO /CHI Order No. V261623 Policy No. CTEU261623 SCHEDULE B This policy does not insure against loss or damage (and the Company will not pay costs, attorneys' fees or expenses) which arise by reason of: General Exceptions: 1. Rights or claims of parties in possession not shown by the public records. 2. Encroachments, overlaps, boundary line disputes, or other matters which would be disclosed by an accurate survey and inspection of the premises. 3. Easements, or claims of easements, not shown by the public records. 4. Any lien, or right to a lien, for services, labor, or material heretofore or hereafter furnished, imposed by law and not shown by the public records. 5. 1998 TAXES NOT YET DUE OR PAYABLE AND ASSESSMENTS NOT YET CERTIFIED TO THE TREASURERS OFFICE. 6. RIGHT OF PROPRIETOR OF A VEIN OR LODE TO EXTRACT AND REMOVE HIS ORE THEREFROM SHOULD THE SAME BE FOUND TO PENETRATE OR INTERSECT THE PREMISES AS RESERVED IN UNITED STATES PATENT RECORDED July 13, 1899, IN BOOK 48 AT PAGE 475. 7. RIGHT OF WAY FOR DITCHES OR CANALS CONSTRUCTED BY THE AUTHORITY OF THE UNITED STATES AS RESERVED IN UNITED STATES PATENT RECORDED July 13, 1899, IN BOOK 48 AT PAGE 475. 8. RESTRICTIVE COVENANTS WHICH DO NOT CONTAIN A FORFEITURE OR REVERTER CLAUSE, BUT OMITTING RESTRICTIONS, IF ANY, BASED ON RACE, COLOR, RELIGION, OR NATIONAL ORIGIN, AS CONTAINED IN INSTRUMENT RECORDED August 10, 1962, IN BOOK 174 AT PAGE 179. 9. EXISTING LEASES AND TENANCIES. 10. EASEMENTS, RESERVATIONS AND RESTRICTIONS AS SHOWN OR RESERVED ON THE RECORDED PLAT OF VAIL VILLAGE, FIRST FILING. 11. TERMS, CONDITIONS AND PROVISIONS OF LEASE BETWEEN MARGRETTA B. PARKS AND RIVA RIDGE PARTNERS LLC RECORDED February 13, 1996 IN BOOK 687 AT PAGE 953. Page 2 Form AO /CHI Order No. V261623 Policy ivo. CTEU261623 Amount $1,500,000.00 SCHEDULE A Address LOT C BK 2 VAIL VILLAGE FLG 1 1. Policy Date: 2. Name of Insured: May 13, 1998 at 5:00 P.M. REMONOV & COMPANY, INC., A COLORADO CORPORATION 3. The estate or interest in the land described in this Schedule and which is covered by this policy is: A Fee Simple - 4. Title to the estate or interest covered by this policy at the date hereof is vested in: REMONOV & COMPANY, INC., A COLORADO CORPORATION 5. The land referred to in this policy is situated in EAGLE County, Colorado, and is described as follows: LOT C, BLOCK 2, VAIL VILLAGE, FIRST FILING, ACCORDING TO THE RECORDED PLAT THEREOF, COUNTY OF EAGLE, STATE OF COLORADO. LAND TITLE GUARANTEE COMPANY Page 1 This Policy valid only if Schedule B is attached. L•A N D T I T L E G U A R A N T E E C 0 M P A N Y THANK YOU FOR YOUR ORDER July 14, 1998 Our Order No.: V261623 -2 OWNER: REMONOV & COMPANY, INC., A COLORADO CORPORATION ADDRESS: LOT C BK 2 VAIL VILLAGE FLG 1 ----------------------------------------------- FOR ANY FOLLOW -UP PLEASE REFER TO OUR ORDER NUMBER : V261623 -2 ----------------------------------------- ----- _REMONOV & CO. MARGRETTA PARKS BOX 1888 303 E. 17TH STREET EDWARDS, CO 81632 DENVER, CO 80202 Attn: RICK MUELLER Attn: C/O MICHAEL SMITH FAX 303 861 -2400 Copies: 1 via US Postal Service Copies: 1 CLOSER Attn: JIM HOOD WEAR, TRAVERS & DAVIS (W. VAIL RUNS) Copies: 1 1000 S. FRONTAGE RD. #200 VAIL, CO 81657 Attn: JIM WEAR 970 476 -7646 Copies: 1 Form AO /CHI Omar No. V261623 t ,)licy No. CTEU261623 SCHEDULE B AMENDED STATEMENT OF LIEN RECORDED MARCH 26, 1998 RECEPTION NO. 650689. ITEM NO. 4 OF THE GENERAL EXCEPTIONS IS DELETED AS TO ANY LIENS RESULTING FROM WORK OR MATERIAL CONTRACTED FOR OR FURNISHED AT THE REQUEST OF MARGRETTA B. PARKS. CHICAGO TITLE INSURANCE COMPANY SHALL HAVE NO LIABILITY FOR ANY LIENS ARISING FROM WORK OR MATERIAL FURNISHED AT THE REQUEST OF REMONOV & COMPANY, INC., A COLORADO CORPORATION. Page 4 LIES ARCHITECTS, INC. A PROFESSIONAL CORPORATION Bridge Street Condo Asociation 281 Bridge St. Vail, CO 81657 Linda Malaby 610 West Lionshead Circle Ste. 100 Vail, CO 81657 Town of Vail 75 S. Frontage Rd. Vail, CO 81657 Town of Vail % Finance Dept. 75 S. Frontage Rd. Vail, CO 81657 Vail Corp PO Box 7 Vail, CO 81657 0105 EDWARDS VILLAGE BLVD • SUITE D2 -1 • P.O. BOX 807 • EDWARDS, CO 81632 970- 926 -9280 •970 -926- 9281 Fax E -mail • GiesArch @compuserve.com THIS ITEM MAY AFFECT YOUR PROPERTY PUBLIC NOTICE NOTICE IS HEREBY GIVEN that the Planning and Environmental Commission of the Town of Vail will hold a public hearing in accordance with Section 12 -3 -6 of the Municipal Code of the Town of Vail on August 24, 1998, at 2:00 P.M. in the Town of Vail Municipal Building. In consideration of: A final review to discuss the remodeled entryway with additional GRFA and site coverage variance, located at 333 Bridge Street /Lot C, Block 2, Vail Village 1 st. Applicant: Vail Village Club Planner: Christie Barton The applications and information about the proposals are available for public inspection during regular office hours in the project planner's office located at the Town of Vail Community Development Department, 75 South Frontage Road. Sign language interpretation available upon request with 24 hour notification. Please call 479- 2356, Telephone for the Hearing Impaired, for information. Community Development Department Published August 10, 1998 in the Daily Trail. *VAIL TOWN O l NW H Department of Community Development 75 South Frontage Road Vail, Colorado 81657 970 -479 -2138 FAX 970 - 479 -2452 July 9, 1998 Mr. Brandt Vanderbosh Gies Architects PO Box 807 Edwards, CO 81632 Re: The Vail Village Club Dear Mr. Vanderbosh, I am in receipt of your application for both Design Review Board (DRB) and Planning & Environmental Commission (PEC) approval of the proposed entryway addition to the Vail Village Club. Although we have attempted to expedite your review process by placing you on an early (July 13, 1998) Planning and Environmental Commission agenda, we will be unable to do so until additional application items are submitted. Please refer to the attached checklist which details the submittal requirements. Your request will remain on the August 5, 1998 Design Review Board agenda for conceptual review but it can not go before the Planning & Environmental Commission until the additional submittal requirements are received. If you would like to discuss this project in more detail, please call me at (970) 479 -2454. Sincerely, Christie Barton Town Planner TM ~� RECYCLEDPAPER EXTERIOR ALTERATIONS OR MODIFICATIONS IN COMMERCIAL CORE I (CC 1) (VAIL VILLAGE) existing Planning and Environmental Commission (PEC) review is required for the alteration of n mo which adds or removes any enclosed floor area, the alteration of an existing building exerior roof lines, the addition of a new outdoor dining deck or the modification of an exisitng outdoor dining deck, or for the replacement of an existing building located in the CCI District. Following PEC approval, the project must be reviewed by the Design Review Board. 1. P RE-AP LICATION CONFERENCE A pre - application conference with a planning staff member is strongly encouraged. No application ibility to make an appointment can be accepted unless it is complete. It is the applicant's respons with the staff to determine additional submittal requirements. II. S UBMITTAL REQUIREMENTS ❑ FEE: $200.00 - Minor Exterior Alteration (Less than 100 sq. ft.) $500.00 - Major Exterior Alteration (More than 100 sq. ft.) The fee must be paid at the time of submittal. ❑ Stamped, addressed envelopes Wi a list of the names and mailing addresses of all property owners adjacent to the subject property, including properties behind and across streets. The applicant is responsible for correct names and mailing addresses. This information is available from the Eagle County Assessor's office, Fo�L (.4.1- �R?�'s of the follawina: ❑ A survey stamped by a licensed surveyor indicating existing conditions on the property including the location of improvements, topography, and natural features. ❑ A vicinity plan showing the project location in relationship to the surrounding area. d A site plan at a scale of 1" = 10' showing existing and proposed improvements to the site. The date, north arrow, scale and name of the proposed development with its legal description shall be shown on the site plan. ❑ A landscape plan, at a scale of I " = 10% showing existing and proposed landscaping. Existing and proposed building elevations and sections, at a scale not smaller than one - eighth inch equals one foot, to determine the general scale and appearance of the proposed development. p� Existing and proposed floor plans at a scale of one- fourth inch equals one foot and a square footage analysis of all existing and proposed uses in sufficient detail to determine floor area, gross residential floor area, interior circulation, and locations of uses within buildings. A roof height plan at a minimum scale of one- eighth inch equals one foot. ( Sun /shade analysis, unless the Administrator determines that the proposed addition has no impact on the existing sun /shade pattern. Page 1 of 3 A preliminary title report, including schedules A and B. to verify ownership and casements. Condominium Association approval (if applicable). Architectural or massing model scale to be determined by the Administrator. A description of the precise nature of the proposal. The description must address: Conformance with the purposes of the CCI District as specified in Section 18.24.010: "The commercial core I district is intended to provide sites and to maintain the unique character of the Vail Village commercial area, with its mixture of lodges and commercial establishments in a predominantly pedestrian environment. The commercial core I district is intended to ensure adequate light, air, open space, and other amenities appropriate to the permitted types of buildings and uses. The district regulations in accordance with the Vail Village urban design guide plan and design considerations prescribe site development standards that are intended to ensure the maintenance and preservation of the tightly clustered arrangements of buildings fronting on pedestrianways and public greenways, and to ensure continuation of the building scale and architectural qualities that distinguish the village." 2 1. Service and Delivery J. Roofs K. Facades L. Decks and Patios M. Balconies N. Accent Elements 0. Landscape Elements Many of the above items should be addressed by graphic means, such as sketches, models (including neighboring buildings), photos, ctc. 3 4. The proposal substantially complies with the Vail Village Urban Design Guide Plan regarding: A. Pedestrianization B. Vehicle Penetration C. Streetscape Framework D. Street Enclosure E. Street Edge F, Building Height G. Views H. Sun Shade Analysis Compatibility with the character of the neighborhood. Compliance with the Vail Village Master Plan, Streetscapc Master Plan and other relevant documents of the Vail Comprehensive Plan. The Administrator may determine that additional material is necessary for the review of the application. III. PLEASE NOTE THAT ONLY COMPLETE APPLICATIONS CAN BE ACCEPTED. ALL OF THE REQUIRED INFORMATION MUST BE SUBMITTED IN ORDER FOR THIS APPLICATION TO BE DEEMED COMPLETE. Page 2 of 3 IV. TIME REOUIREMENITS nr modifications in CCI involving more than 100 A. Applications for �naior� cxt�n alt erations --- -- iewed semi- annually. They need to be submitted on or � square feet of floor area are only rev before the 4th Monday of February or September. A complete application form and all accompanying material (as described above) must be accepted by the Community Development Department by the appropriate submittal date. B. Applications for Iii eriur - 1` rations or modi fication of an existing building, involving no more than 100 square feet may be submitted a t the required time cation form for Planning and Environmental Commission (PEC) review. A complete app and all accompanying material (as described above) must be accepted by the Community Development Department by the appropriate submittal date, which is a minimum of four (4) weeks prior to the date of the PEC public hearing. Incomplete applications (as determined by the planning staff) can not be accepted. V. ?A DDITIONAL REVIEW AND FEES local, State or Federal agency other than A. If this application requires a separate review by any the Town of Vail, the applican �� fmc b y limited to Colorado Department Highway Acces h Access review, may include, but are Permits, Army Corps of Engineers 404, etc. B. The applicant shall be responsible for paying any publishing fees which are in excess of 50% of the application fee. If, at the applicant's request, any matter is postponed for hearing, causing the matter to be re- published, then, the entire fee for such re- publication shall be paid by the applicant. C. Applications deemed by the Community Development Department to have design, land use or other issues which may have a significant impact on the community may require review by consultants in addition to Town staf£Comm Shou una de te rm inati o n cmtDcpartmnthmayohire th�c that an outside consultant is needed, the n' Dlopen e a the consultant. The Department shall estimate the amount of money neces consultant and this amount shall be forwarded to the Town by the app at the time of filing an application. Expenses incurred by the Town in excess of the amount forwarded by the applicant shall be paid to the Town by o t} e plict w upon review of notification by the Town. Any excess funds will be returned appli P 9RP 3 of 3 0 DIES ARCHITECTS, INC. A PROFESSIONAL CORPORATION AM Building Vail, Colorado The following is the response required in conjunction with our application for the minor exterior alterations in the commercial core of the Vail Village. Commercial Core I (CCI) District R� ((� (Z C ,f kly �15 The attached drawings clearly demonstrate the proposal's conformance with the purposes of the CCI. Pedestrian Environment The alteration of the entrance to the street by adding a new entry vestibule and display case with the integration of the existing landscape planter will increase visibility and connection to the street and in return enhance the pedestrian environment. Light Air and Open Spaces The proposal will not effectively reduce the volume of space along the two pedestrian streets or the square, and the addition of the Entry vestibule and display case will articulate the space and create focal points at the pedestrian level. Urban Design Guide Plan Sub -Area Concepts #9 Transparency increased and pedestrian scale #11 Limited building expansion -- facade Transparency increased to strengthen pedestrian activity #15 Entry oriented to intersection #18 Increased ground floor transparency Pedestrianization The quality of the pedestrian way is increased through the addition of a more central architectural focal point. Vehicle Penetration N/A 0105 EDWARDS VILLAGE BLVD • SUITE 132 -1 • P.O. BOX 807 • EDWARDS, CO 81632 970 - 926 - 9280.970 -926- 9281 Fax E -mail • GiesArch @compuserve.com 0 0 DIES ARCHITECTS, INC. A PROFESSIONAL CORPORATION Streetscape Framework Landscaping has been reduced minimally to introduce a display case that replaced a void on the facade, which enhances the framework, and articulation is added to the building to create additional visual interest and activity. Street Enclosure The general characteristics of the "outdoor room" are unchanged. Entry vestibule and display case has been added to create a pedestrian focus and divert attention from upper building heights. Street Edge The shape of the building now has additional articulation to create greater visual interest. The new entry vestibule and display case will create welcome protection from rain and snow when "window shopping" or simply pausing while walking through the Village. Views The addition will not adversely affect the long views down Hanson Ranch Road and Bridge Street. From a distance, the eye will be directed down the street, and while closer, the Entry Vestibule and articulated windows create focal points. Sun/Shade Due to the existing height and orientation, as well as the northern exposure of the building, the addition will not extend existing shadow patterns. Facades Material/Color The design maintains the existing color and texture of the existing building. Windows and Doors Forest green windows and storefront is to be used to match existing manufacturer and style. Accent Elements A wood truss with brackets; hanging signage, plant hanging brackets and accent lighting are all utilized to create visual interest and texture. 0105 EDWARDS VILLAGE BLVD • SUITE D2 -1 • P.O. BOX 807 • EDWARDS, CO 81632 970 - 926 - 9280.970 -926- 9281 Fax E -mail • GiesArch @compuserve.com 0 • DIES ARCHITECTS, INC. A PROFESSIONAL CORPORATION Streetscape Master Plan In addition to the issues raised in the Urban Design Guide Plan and the Village Master Plan, the Streetscape Master Plan identifies the following issues to be addressed: Existing pedestrian character to be maintained and enhanced. e_-vC.'_6­ Enhance an already exiting walking experience. Vail Village Master Plan Introduction - Upgrading buildings Encourage continued upgrading and enhancement of existing commercial facilities to maintain unique character of the Village. Goal # 3 The walking experience is enhanced by the orientation of the entry to Siebert Circle, the addition of the entry vestibule and display case, and the greater transparency and articulation of the windows and doors. Goal # 4 All current green space & open space shall be maintained. The creation of the new entry vestibule will assist in drawing the public from Siebert Circle towards the east, introducing them to the open space along mill Creek as well as the area along the south of the property. 0105 EDWARDS VILLAGE BLVD - SUITE D24 - P.O. BOX 807 - EDWARDS, CO 81632 970 - 926 - 9280.970 -926- 9281 Fax E -mail - GiesArch @compuserve.com ` --� � REPT131 TOWN OF VAIL, COLORADO ' 12/19/97 08:28 REQUESTS FOR INSPECTION WORK SHEETS FOR:12/19/97 Activity: Address: Location: Parcel: Description: Applicant: Owner: Contractor: AREA: .B#96-0033 12/19/97 Type: COMBUILD Status: ISSUED Constr: NCOM 298 HANSON RANCH RD SERRONO'S, 2101-082-42-001 DEMO/REBUILD J.L. VIELE CONSTRUCTION VAIL VILLAGE CLUB J.L. VIELE CONSTRUCTION ----------------------------------- Inspection Request Information..... Occ: A3 Use: II 1-HR Phone: 970-476-3082 Phone: Phone: 970-476-3082 Rwquestor: TONY Phone: 401-0203 Req Time: 01:00 Comments: ~~ rm-0203 Items req Inspected... Action Comments --- Time Exp 005369 _ -------------------------------------------�~��~� ---------- Inspection History~.... - r -- Item: 00503 PW-Final driveway grade 08/25/97 Inspector: LP Action: APPR APPROVED Item: 00010 BLDG-Footings/Steel U 09/13/96 Inspector: CF Action: PA PARTIAL APPROVAL 10/03/96 Inspector: CF Action: NO NOTIFIED Notes: received eng special inspection report for mat placemnet at grid 1-1 to 4-4 and 1 to 3 Inspector: CF 05/19/97 Inspector: DS Action: PA S.E. RETAINING AND STAIR Item: 00020 BLDG-Foundation/Steel 10/28/96 Inspector: CF Action: DN 09/27/96, Inspector: CF Action: PA doesn't include west wal motes: remove ice and snow prior to pour concrete must be protected from the weather 10/02/96 Inspector: CF Action: PA BEAM POCKET SUIr 3/S3.1 10/05/96 Inspector: CD Action: APCR STAIR#1 STAIR#2 ` Notes: INSTALL 2 36 BARS IN STAIR #1 NORTH CORNER ` COMPLETE BOND BEAM 2 #5 BAR IN STAIR # 2 INSTALL VERTS AND BOND BEAM IS ELEVATOR SHAFT $80.00 HAS BEEN PAID FOR SPECIAL SATURDAY INSPECTION CHECK # 1581 10/14/96 Inspector: DS Action: PA 10/15/96 Inspector: CD Action: DN 10/18/96 Inspector: CF Action: APPR 10/24/96 Inspector: CF Action: PA 10/25/96 Inspector: EG Action: APPR 10/28/96 Inspector: CF Action: DN 11/14/96 Inspector: CF Action: APPR Notes: WINTER PROTECTION REQUIRED STAIR WELLS 2ND FLOOR CONTRACTOR CANCELLED FOR GROUTING ONLY ELAVATOR SHAFT-MASONARY APPROVED NOT READY 2ND FLOOR SLAB 12/02/96 Inspector: CF Action: PA forth floor slab Notes: almost done-winter protection required 12/05/96 Inspector: CF Action: PA 1ST LVL PERIMETER APRO Notes: WINTER PROTECTION REQUIRED 12/12/96 Inspector: CF Action: PA top off layer 06/02/97 Inspector: DS Action: PA SITE WALL SOUTHEAST Item: 00520 PLAN-ILC Site Plan mo/cm/a-I r...._�__' rn "-�'--' ^." ,., REPT131 TOWN OF VAIL, COLORADO PAGE 15 12/19/97 08:28 REQUESTS FOR INSPECTION WORK SHEETS FOR:12/19/97 AREA: CF ================================================================================ Item: 00030 BLDG-Framing 03/25/97 Inspector: CF Action: NO NOTIFIED Notes: received special fireproofing inspectors report deficienc were noted and must be corrected and followed with anothe report 04/15/97 Inspector: DS Action: PA PARTIAL APPROVAL Notes: 1. SHAFTS 2 HR CONST. 2. ALL FLOOR/CEILING PENETRATION SEALED, 3.LETTER FROM STRUCTUAL ENGINEER APPROVING FRAMIN 04/16/97 Inspector: CF Action: PA EAST HALF OF BASEMENT Notes: FIREPROOFING ENG NEEDS TO WRITE LETTER STATING ALTERNATIV METHODS AND MATERIALS WERE USED FOR COLUMNS IN EXTERIOR W AND IS EQUIVALENT TO UL LISTING Item: 00050 BLDG-Insulation 03/18/97 Inspector: DS Action: PA BASEMENT ONLY 04/24/97 Inspector: CF Action: PA 1st floor lounge 04/30/97 Inspector: CF Action: PA 3RD FLOOR Notes: 3RD FLOOR ROOF AND 4TH FLOOR WALL MUST BE A 4HR WALL 05/12/97 Inspector: DS Action: APPR 4TH AND 5TH FLOOR Item: 00060 BLDG-Sheetrock Nail 03/18/97 Inspector: DS Action: PA EXTERIOR DRYWALL ONLY 04/30/97 Inspector: CF Action: PA BASEMENT 05/05/97 Inspector: DS Action: APPR 2ND FLOOR ONLY 05/19/97 Inspector: DS Action: PA 3&4 STORY STAIR SHAFTS Item: 00080 * * Not On File * * 06/16/9'7 Inspector: D8 Action: PA WALK THROUGH Item: 00070 BLDG-Misc. 09/26/96 Inspector: CF Action: NO NOTIFIED Notes: received eng letter ob r I t! N equire an stamped/signed 1 96 Inspector: CD !A�D���#n��)TO �R��V�WA 1`1/06/96 Inspector: CF �� 8 E�~ N SLAB 11/21/96 Inspector: CF R 3rd level slab Notes: tie rebar to proper h��ghtl syr��n winter protection required 04/21/97 Inspector: CF Action: PA check floor penetrations Notes: penetrations at dumbwaiter must be reinspected 08/09/97 Inspector: CD Action: NO 1ST LEVEL KITCHEN . Notes: HEAD HEIGHT IN 1ST LEVEL FOOD PREP HAND SINK MUST BE A MI OF 7' BE AWARE THAT ELEC. FRYER PROPOSED IS REDID TO BE LOCATED UNDER A TYPE I HOOD Item: 00090 BLDG-Final Item: 00530 BLDG-Temp. C/O 08/29/97 Inspector: CD Action: DN 1ST NAD SECOND LEVEL Notes: PER PLANNING MIKE MOLLICA A TCO CAN NOT BE ISSUED BECAUSE PARKING PAY IN LIEU FEES HAVE NOT BEEN COLLECTED 10/22/97 Inspector: CD Action: DN 3RD AND 4TH LEVELS Notes: ADDRESS #S REQUIRED PARKING PAY IN LIEU MUST BE RESOLVED PRIOR TO TCO | | 11/25/97 Inspector: CD Action: APPR EXCEPT BASEMENT LEVEL Notes: PARKING PAY IN LEIU HAS BEEN RESOVLED Item: 00531 FIRE-TEMP. C/O | . | Item: 00532 PW-TEMP /O 1 08/25/97 Insp���or: LP Action: APP*APPROVED � .. ~~_- - ~=^` ��kd" ,`'" . REPT131 TOWN OF VAIL, COLORADO PAGE 16 12/19/97 08:28 REQUESTS FOR INSPECTION WORK SHEETS FOR :12/19/97 AREA: CF Item: 00538 FIRE—FINAL C/O Item: 00539 PW—FINAL C/O Item: 00540 BLDG —Final C/O _r 0 REPT131 12/19/97 08:28= TS FORTOWm OF VAIL" F COLORADO A ctivity- -- g b-0 = ^ ~ I N SPECTION W ORM -~"�u Address ^ P96-0091 SHEETS OR : 12 /19/9� PAGE . Location: 298 HAN�ON RANCH TYpe: B �- ================= AREA: CF parcel : 298 HANGON'RAr* RD �'-L/n�� Statu FINAL Descriptio : 2101-0�2-42_0w�� RD Constr: NCOM = Appli n: PLUMBING FOR mz Owner- LUNS�ORD BROTNEW COMMERCIAL VAIL VIL U Contra-''~' � «HIL VILLAG� ^Eno MECH. CONST LAGE CLUB se: ctor: LUNSpORD BROTCLU8 ^ Pho»e; 30324257g0 Ins�ecti-------------_�� BROTHERS CLUB CONST Phone: Requeson�: Request Infor---_----------____^_ Phone: 30324257g0 t TONY '''��zon ---____ IteR�qrTime: �91 :00 Comment ^ ^ ^ ^ ^ -----------' -----------__ 002-~ �q«ested to b I s: BASEMENT W Phone: 4�1 ---- Action comments Tim E Insp --4. ion Hi Item: 002S tory. �C L - 2 tz �� 09 / 11 /96 I nspect nd Item OOP-20 PLMB--Ro Or: CF Action APP Notes. nsp CF Action PA 04/2,�, 97 Ac tion" APP balance m ' 0022 FIR-_ ec tOr - : DS bar sinks Plmb exopt 3rd 02 / 25 /97 1 RI KLER ROUGH Action AP PR 2'ND FLOOR 15 Item 0 0230 nspect CF 03/14/9 Inspector,: "On APPR 74psi Not CF air bsmnt/ flr Action: APPR street Pressure Item.* everYthing but 3rd floor- kit 00240 PLMB_Gas 03/14/97 PiPing and 4th Item: Inspe Action Ap Item 00at-jo PL_MB_p000tOr: DS Act* PR -' 00260 PL-MB-Misl/HOt Tub ' APPR Sop" "aOft & boil Item: 0029 . 0. FINAL GA 06 / 25 /97 I nspector: CD Notes: COMPLETE GROUT Action: DN GRAB BARS REQUI IN ALL AREAS IST,2ND,3RD LEVEL RED IN ALL ACCESSIBLE STALLS ADA SIGNS 'RED IN ACCES REQUIRED ON BA-FHROOMSSIBLE c WOO DOORS MUST BE SEALED SHOWERS I NSTALL TRAPS ON POP SANITARY REASONS CAP DRAIN LINE IN 2 GARBAGE DISPOSALS ADD STRAINERS AND B AR 1ST FL OOR AREA IN MAIN RITHCEN COMPLETE COVERS T PIPING CONDENSATE WASTE WASTE D 2ND LEVEL WOMEN'S RESTROOM FO R COOLERS 1SCHARGE 08/26/9 WALL STAELS MUST Notes.. 7 i nspector: CD BE MIN OF 30,, R DOES NOT COMPLY WITH MIN 15"F DOORS MSU - WITH STOOL LOCATED IN MIDD Action: PA 'ND 2ND LEVEL ONLY BE SEALED By TCO I ST A B GRAB BARS M UST BE- INSTALLED ASED ON OC IN MEN'S BA COPANT LOAD ON 2ND THRC)OM REPT131 - L, COLORADO . TOWN OF VAI 12 / 19 / 97 = 08 :28 = REQUESTS FOR INSPECTION WORK SHEETS FOR:12/19/97 AREA: PAGE CF 18 OWNERS OF VAIL VILLAGE CLUB.MUST SUBMIT A LETTER ACKNOW THIS AND WILL NOT HOLD THE | NLIABLE �OR ANY OCCURANC BECAUSE OF THAT FACT =o 10/22/97 Inspector: CD Action: APPR 3RD AND 4TH LEVELS � " � � - -^ r ice' �� REP°T 131 � 11/25/97 13 :09 REQUESTS TOWIy OF VAIL, COLORADO i�C� r` -F FOROR INSPECTION WORK SHEETS FO R _ SHE AREA: 14 ` t Y : B96 -0033 11 / 2 5/9 7 - __ - - -- ---- _ . 1 1 /`r 5/97 AREA : CF Act i i ess: 298 HANSON RANCH TYPe:` C OMBUILD�Statu s :_y Locati SSUED G�`_______�___� ion: ERRONO S nstr: NCOM�� Parcel: 2101- 082_42_001 D`- 'sc�r'i pt i on : DEMO /REBUILD Occ: A3 Use: II 1 -HR Applicant: J,L•. VIELE CONSTRUCTION Owner: VAIL VILLAGE CLUB Phone: �,` 08` Contractor ; 970 476 - J, L, VIELE CONSTRUCTION Phone: ____ _ Phone; 970- 476 - 082 Inspect Request Information. -------.---'-_."- Requestor: .... ---------------------------------- q Time: 01;00 Comments; Phone; - - -__ Items request 01:00 to be Inspected... 00330 LLnG - Temp. C/O Action Comme is T' ----------- _ InspectionMHistory....,_� _____ -- _�_� _ __..._- _�__ Item : 00303 PW -Final dri v ewa 08/25/9 7 I Y gr ~ade pector: LP Item: 00010 BLDG- - Footings /Steel Action: AP°P°R APPROVED 09/13/96 Inspector: CF 10/03/96 Inspector: CF Action; PA PARTIAL AP'P'ROVAL. Notes; received en Action: NO NOTIFIED at grid 1 -1 to inspectio 0x/19 n report for mat plar_emnet, %97 Inspector: 4�4 and 1 to 3 Item: 000:0 BLDG - Foundation /Steel Action: PEA S. E. RETAINING AND ST'' R Notes: Inspector: CF Notes: remove ic Action: PA doesnit and snow prior to include west wal• concrete must be protected from�� the 10/0:/96 Inspector: CF weather Action : PA 10/03/96 Inspector; BEAM POCKET r Notes: INSTALL 36 CD APCR C SEE /,,�,. 1 BEAM STAI R STAT R#k2 COMPLETE BARS STAIR #1 NORTH CORNER VERTS `= #5 PAR IN STAIR # 2 X80.00 HAS' BEE 'NNF°APDNFCIRESPjECTAELSATURD SHAFT CHECK # 1381 AY INSPECTION 10/14/96 Inspector: DS 10/13/96 Inspector: Action: PA STAIR WELLS 10/18/96 Inspector; CF D Action: ON AND FLOOR AP PR CONTRACTOR CANCELLED Action: 10/24/96 Inspector: CF APPR FOR GROUTING ONLY 10/25/96 Inspector: FG Action: Pp EI_AVATOR SHAFT - 1 0/28/96 Ins Action: AP°P°R APPROVED MASONARY Inspector : CF Action: ON Inspector: CF NOT READY Notes: WINTER PROTECTION REG Action : APPR 2ND FLOOR SLAB 1 2/02/96 Inspe U IRED Notes: i almost Action: PA ost done- winter protection forth floor 1 `-/ 03 /96 Inspector: CF slab Notes: WINTER PROTECTION REQUIRED PA 1ST L.VL PERIMETER APRO 12/12/96 Inspector; CF 06/02/97 Inspector: DS Action: PA top off layer Item; 00520 PLAN -ILC Site Plan Action: Pp SITE WALL SOUTHEAST 02/20/97 Inane,- ,x...._ _ ...... REPT131 11/25/97 15:09 REOUESTS FORTOWN OF VAIL, COLORADO IN8PECTION WORK SHEETS FOR: PAGE pAGE 15 ---~^ 00030 B LDG - Framing -----=================== AREA: CF 03/25/97 Inspector: CF ======================== ' Notes: received special fireproofing NO NOTIFIED = were»oted and must be report deficienc ' 04/15/97 -r~sr"ector: DS ---' c orrected and followed with anothe / Notes: I- S 2 HR CONST Action: PA PARTIAL APPROVAL 04/16/gc`EIALED' 3^LETTER FRO^ 2~ ��LLFLOOR/CEILING PENETRATION _ Notes: ' CF �' ~'R�/U�LENGINEER APPROVING pRAMIN ' ENG NEEDS — `` ^"o: �' A EAST HALF OF BASEMENT It AN 'ODS E °�wuyMATERIALS TO WRITE LETTER STATING ALTERNATIV em: @0050 BLD�_-- OUI ALENT TO UL LIS7IN~ COLUMNS IN EXTERIOR W Insul 03/18/97 " �� 04/24/g7 Inspector: DS Action: PA 04/30/97 ^ Inspector, Action: pp BASEMENT ONLY Notes: 3R CF Action; st floor loun 05/12/97 u FLOOR ROOF AND 4TH FLOOR PA 3RD FLOOR ge Item: 00060 BLD � n spector: DG ActiuM WALL MUST BE A 4HR WALL ^ ` 03/18/97 u-Sheetrock Nail on: APPR 4TH AND 5TH FLOOR 04/30/97 Inspect Action: DS ^os Action: PA x 05 / 0 5/97 Inspector: CF Action: PA EXTERIOR DRYWALL ONLY Inspector: DS It 05 /19/97 Action: AppR BASEMENT �m: 0 0080 * * Vv� -�^^^u': u� Action: PA �m� FLOOR ONLY It 06/16/97 I=^seeun File 3&4 STORY STAIR SHAFTS * * em: BLDG-Mlse. DS Action: PA WALK THROUGH 09/26/96 Inspector: require an i c 10 ' 1 1/96 I -,-~'�^y"e PPR Actl Notes: ADD VERTS TO NORTH W LL Q 11/06/96 Inspector: CF "21/96 Inspector: CF ktion: APPO-IST" kT Nates: IN E SLAB inter Protecti Not � Inspector: CF Action: � -- `�08/es: Inspector: at dumb PA check fl m�/9� Inspector� CD waiter must �e reinspected oor penetrations Notes: HEAD HEIGHT IN 1ST LEyAction: mO" 1SKITCH �F 7' �� FOOD PREP HAN ��,=� EN BE D A WARE T THAT ELEC. FRYER PROPOSED W SINK MUST E A MI Item: 00090 BLDG BLDG-Temp. YPE I HOOD IS REQ'D TO BE LOCATED Item: 00530 B 08y2g/g, C/O Notes: 08/29/97 Ins p e ctor: CD A ction: DN 1ST NAD SECOND 10/22/gp RKING PAY IN LIEU FEES HA CAN NOT BE ISSUEDBLEVEL Notes: / D 1 nspector: CD Action: E NOT BEEN COLLECTED E�CAUSE ADDRESS #G~REQUIRED on: DN 3RD AND 4TH LEVELS Item: 00531 F , An^ImG PAY IN LIEU MUST Item: 00532 pIRf-TEMP. C/O BE RESOLVED PRIOR TO TCO W C/O 08/25/97 Ins ^ "Item: 005 pec LP Action Item: 6905`7 �'~"-'c/ C�O ��� Item: 005� PLAN-F1111 C/O �d FIRE-FIN-- [/n IV. 1 mq . . - ~~. � REPT131 11/2s/97 15:09 REQUES S FORTOWN OF VAIL,�-COLORADO INSPECTION WORK SHEETS FOR PAGE It em: 00540 BLDG C==========================:11/25/97 AREA: CF ` ' � � ` ^ 04 / 1679-7— f - nspectOF! LAUREI`T­�Ction: APPN HPPHUVED N REPT131 TOWN OF VAIL, COLORADO PAGE 11/25/97 15:09 REQUEltSTS FOR INSPECTION WORK SHEETS FOR:11/25/97 AREA: CF Item: 00030 BLDG-Framing 03/25/97 Inspector: CF Action: NO NOTIFIED Notes: received special fireproofin inspectors report deficienc - were noted and must be corrected and followed with anothe report 04/15/97 Inspector: DS Action: PA PARTIAL APPROVAL Notes: 1. SHAFTS 2 HR CONST. 2. ALL FLOOR/CEILING PENETRATION SEALED, 3-LETTER FROM STRUCTUAL ENGINEER APPROVING FRAMIN 04/16/97 Inspector: CF Action: PA EAST HALF OF BASEMENT Notes: FIREPROOFING ENG NEEDS TO WRITE LETTER STATING ALTERNATIV METHODS AND MATERIALS WERE USED FOR COLUMNS IN EXTERIOR W AND IS EQUIVALENT TO UL LISTING Item: 00050 BLDG-Insulatio 0 3/18/97 Inspector DS Action: VIA BASEMENT ONLY 041"24/97 Inspector: CF Action: PA Ist floor lounge 0 4/30/97 Inspector-. CF Action: PA 3RD FLOOR Notes: 3RD FLOOR ROOF AND 4TH FLOOR WAI.J.- MUST BE A 4HR WALL 05/12/97 Inspector: DS Action: APPR 4TH AND 5TH FLOOR Item: 00060 BLDG� Nail 0 3/18/97 Inspector: DS Action. PA EXTERIOR DRYWALL ONLY 0 4/30/97 Inspector: CF Action: PA BASEMENT 0 5/05/97 Inspector: DS Action: APPR 2ND FLOOR ONLY 05/19/97 Inspector: DS Action: PA �&Iq- STORY STAIR SHAFTS Item: 00080 * * Not On File * * 0 6/16/97 Inspector: DS Action: PA WALK THROUGH Item: 00070 BLDG-Misc. 09/26/96 Inspector: CF Action: NO NOTIFIED Notes: received eng letter observing reinforcement in footer require an stamped/signed letter from eng. 10 Inspector: CD Action: APPIR MAS. Notes: ann "cp-rq WALL ILI 11 Inspector: NORTH WALL CF Action: APPR 11/21/96 Inspector: CF Action: APPR Notes. tie rebar to proper heightas shown winter protection required 0 4/21/97 Inspector: CF Action: PA Notes. penetrations at dumbwaiter Must be 08/09/97 Inspector: CD Action: NO Notes: HEAD HEIGHT IN IST LEVEL FOOD PREP ur- 7 BE AWARE THAT ELEC. UNDER A TYPE I HOOD Item: 00090 BLDG-Final Item: 0033 BLDG-Temp. C/o 171r, IST LEVEL CONCRETE GLAB 3rd level slab check floor penetration reinspected IST LEVEL KITCHEN HAND SINK MUST BE A MI FRYER PROPOSED IS REPID TO BE LOCATED /a Inspector: CD Action: DN 1ST Notes: PIER PLANNING MIKE MOLLICA A TCO CAN NOT PARKING PAY IN LIEU FEES HAVE NOT BEEN 10/22/97 Inspector: CD Action: DN 3RD Notec nnm RF-C ffb REQUIRED Item: 00, PARKING PAY IN LIEU ,j31 FIRE-TEMP. C/o Item: 00532 PW C/o 08/25/97 Inspector: LP Item: 00533 PLAN-TEftn C/o It f-� R : 00537 PLAN-FINW C/o Item: 00538 FTRP-PTKhn1 (1/n NAD SECOND LEVEL BE ISSUED BECAUSE COLLECTED AND 4TH LEVELS MUST BE RESOLVED PRIOR TO TCO Action: APPR APPROVED Y . � � ' REPT131 TS FOR OF VAIL, COLORADO 10/14/97 07:17 R � =opE Ac���[ION WORK SHEETS FOR:10/14/9 PAGE 16 Add.--/^ c��-ml30 10/14/g7== 7 AREA Lo Address: 298 HANGON RANCH Type: B-ELEC St =================== : EG / cation: 298 HA RD atus: ISSUED ========== ' l �ON RANCH RD Constr: ACO i Des��riptPar ce : 2101-�982-42_001 --M Aoplic^on: ELECTRICAL FOR NEW COMMERCIAL yAIL VILLAGE Use: Owner: VAIL-''^ `� ELECTRIC CLUB COT) AIL WHITE VILLAGE CLUB Phone: 30394g1403 --------_________ RIVER ELECTRIC Phone: I nspection Requ es --------------- --__-___ Phone: 3039491403 R «estor: CHAD^ /nror mation,,,,, -------___________________ Item .«eq Time: 08:00 CO ~ -------------- Action COmmeLnts Time Exp Insp 04/16/97 Inspector: EG APPR j Inspector: EG Action: APP 2nd fl 05/05/97 Inspector: EG 03/09/9 Act i or): APP 3rd fl Actio APPR north st a i r - wall Inspector, EG Action: APPR ' It em: 001 0 ELEC-Con Action: AppR 4th fl oor SOL(th S 03/05/97 -it Ins p e ctor ., EG Action: Notes; Action. Walls cei pr . ion on I APPROVED "Or' to E.G. Of switch Gear,. 2 ,3 1 4 and 5 elec. 08 / 2 2/97 Inspe APPROVED 11 PRE-CHECK AL RE INSPECTION ONLY. OUIREMENTS; EXIT LIGHTING, FUTURE HEAT TAPE J-BOX5 SLEEVE SJ CORDS, ADD LIGHTS IN HALL. GF I By WET SINKS,13LANK OFF Item: 00190 ELEC-Final 08 / 28 /97 Inspe Note Or: LPV Actio APPR APPROVED FIRST LEVEL NEEDS BLANK COVER IN CLOSET Ar, PANEL SCHEDULE BOX OUT FOR ODD J_BOX J FLEX CABLE UNDER SPRINKLER SYSTEM. SECOND F LOOR NEED TO INSPECT ROOMS THl' RD FLOOR NO UNI jjjTOWN OF VAIL, COLORADO PAGE 1 4 11/17/9b 08:07 REQUESTS INSPECTION WORK SHEETS AREA: CF Activity: M96-0074 11/17498 Type: B-MECH Status: ISSUED Constr: NCON Address: 296 HANSON RANCH RD Location: 298 HANSON RANCH RD. Parcel; 2101-082-42-001 Occ. Use. Description: MECH FOR NEW COMMERCIAL VAIL VILLAGE CLUB Applicant: LUNSFORD BROTHERS MECH. CONST. Owner; VAIL VILLAGE CLUB Phone- Contractor: LUNSFORD BROTHERS MECH. CONST. Phone: 3Q3Q425790 Inspection Request Information ..... %HQ0 Requestors Crai 326 61W Req time: 01:00 Comments: ird & 4th levels Phone: 243-6790 be Inspected Action Comments Tife Exy Items requested to 00390 MECH-Final InsPectfon History... Item: 00200 MECH-Rough 02/28/97 Inspector: DS �03/04/97 Inspector: CD Notes: ADJUST EXHAUST DUCT SHAFT ENCLOSURE AND 24/08/97 Inspector: CF Item: 00240 PLMB-5as Piping Q/19/97.jqspector: CD Action: DN Action: APPR AT TOP FLOOR TO OBTAIN 2 HR RAT Action: APPR -. . APPR - - _-_� 04/22/97 motes: 20 PSl,60 PSI,- PSI Item: 00310 METH-Heating ~ ' 06/23/97 08/14/97 Inspector: CF Item: 00320 MECH-0haust Hoods DS 03/04/97 Inspector: CD' Item: 00330 ` MECH Air ` x Item: 0Q340 MFrw-w�=, - - _-_� 04/22/97 .-~^. Inspector: DS 696/19/97 Inspector: CD 06/23/97 Inspector: DS 07/01/97 Inspector: DS 07/02/91 Inspector: DS 07/15/97 Inspector: DS 07/16/97 Inspector: DS 07/17/97 Inspector: DS 07/18/97 Inspector: LPV 07/22/97 Inspector: DS Item: 00390 MECH-Final Item: 00538 C/O Action: APPR Action: APPR - Action: APPR Action: APPR Action: PA Action: DN Action: ^A Actibn: DN Action: DN Action: DN Action: APPR -_-__-_�� _ . ��_-_________. NOT READY TONY NOT THERE KIT.DUCT + B-VENT ALLOW COMPLETION OF ING APPROVED UNDERGROUND snomelt and heat K�TCHEN DUCT APPROVED � SNOW M FLOOR 600 � SmowmE|2ND�FL 30PGI SNOWMELT SOUK STAIR8 NOT READY SNOWMELT FRONT' - 60P�I �c SNOW,. =LT NOT READY � NOT READY NOT REAe� APPROVED PARTIAL EAST SIDE _ ` 08/29/97 Inspector: JG -- Action: APPR SYSTEM ON FLOORS Notes: 3RD AND 4TH ILL ' '�~~ UhfDtR CONSTRUCTION. SPR SYSTEM I UN-LINE AND MONITORED INTHESE AREAS. - TOWN OF VAIL Office of the Town Attorney 75 South Frontage Road Vail, Colorado 81657 970 - 479 - 2107 /Fax 970 - 479 -2157 December 11, 1997 Mr. Bob Hernreich Mr. Glenn Heelan Mr. Charlie Davison Post Office Box 5770 Avon, Co 81620 Gentlemen: VIA HAND DELIVERY Enclosed is a fully executed original copy of the Settlement Agreement resolving all issues concerning the parking pay -in -lieu. As you know we have received the original letter of credit. I will be reviewing that document to make certain that it fulfills all of our needs. If I have any questions I will first contact you prior to talking to the Deposit Guaranty National Bank. Also enclosed are two checks payable to the Town of Vail in the amounts of $57,341.63 and $49,468.86, and the original of a Promissory Note dated November 19, 1997 executed by Glenn Heelan and Charlie Davison. If you have any questions or comments please feel free to contact either myself or Bob McLaurin directly. Very truly yours, TOWNAF VAIL �`�; R. Thomas Moorhea Town Attorney RTM/aw Enclosure xc: Robert W. McLaurin, Town Manager Lorelei Donaldson, Town Clerk (w /originals) Mike Mollica, Assistant Community Development Director to ~) RECYCLED PAPER TM