Loading...
HomeMy WebLinkAboutVAIL INTERMOUNTAIN BLOCK 5 LOT 4 INTERLOCHEN CONDOMINIUMS LEGAL FILE.pdfTOWN OF VAIL. DEPARTMENT OF COMMUNITY DEVELOPMENT 75 S. FRONTAGE ROAD r-.,,\.3 .r' i VAIL,CO 81657 , | { \g7o-47g-2138 \)"^\ )t\ -''-"..t^ ' J*\ - \ o .L,.- (,'r,tr c' --, NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES _, C ADD/ALT MF BUILD PERMIT Permit #: 806-0312 Job Address.: 2958 S FRONTACE RD W VAIL Status.....: ISSUED Location......: 2958 S. FRONTAGE RD. W. Applied...: l0l0f,l2C[l6 Parcel No....: 210314308010 Issued...: 1012012006 l,egal Description: 1, li\(.)(, -bi(: 7 Expires...: O4ll8l2C07 Project No. ..: owNER DOWr_,rNG, PATRICK EDWARD &. CAL0/06/2006 r-0912 TOSCAIIA SANDS SA}1 AI\TTONIO TX 78249 APPIJICANI BENCHMARK CUSTOM BUIIJDERS, II0/06/2006 Phone: 970-926-73Q9 P.O. BOX 427 34323 H''4y. 5, Edwards co 81632 License:715-B CONrRACTOR BENCHMARK CUSTOM BUII-,DERS, f1-0/06/2005 Phone ; 970-926-7309 P.O. BOX 427 34323 H!v{y. 6, Edwards co 8r-632 License: 715 -B Desciption: INTERLOCHEN 8.6-COMPLETE INTERIOR REMODEL Occupancy: R-2 Type Construction: VA Valuation: $140,812.00 Revision Valuation: Add Sq Ft: 0 Fireplace Information: Restricted; # of Cas Applianc€s: 0 # of Gas Logs: 0 *r(**i(**:t:f +*:t*it:**,t***+i*+**+*******+)t+,f :f :i:t:*:t:t:t:|*:***:*t:*:!+3,t'f ,a*a***,t:t r.:irr FEE suMMARy Building---> 57,223 .35 Restuarant Plan Review--> Plan Check--> S795. rg Recrearion Fee----,------> $0 - 00 Total calculated Fees- > s2 , o2t .53 $0 - 00 Additional Fees---------- > # of Wood Pcllct: I Investigadon- > Will Call--- > $0.00 TOTAL FEES------------- > s3 .00 90.00 $2,021.53 Total Permit Fee..''-- :> $2, 021.53 PAymeffs***-----'* > 12,02L.53 BALANCE DUE-.-----.- >$0.00 Approvals: Item: 05100 BUILDING DEPARTMEMI 1,0/12/2006 jplano Action; DN Need more information, Fireplace unclear, need egress window and existing floor plan IO/L3/2OO6 jplano Action: DN corunent letter sent 10/13/06 - bin e-3 p: \cdev\CnRrs\pERMrT. CoMMENTS\Bo5 - o3 i-2 . Doc LO/20/2006 jplano Action3 Ap ITeM: O54OO PI,ANNING DEPARTMENT 10/06/2006 Js Action: AP ITEn: O55OO FIRE DEPARTMEIIT 10/05/2005 ,uR Action: AP Fire sprinkler system recommended. t*lt*lt*{.***+**{al See page 2 of this Document for any conditions that may apply to this permit. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ANCE BY TELEPHONE AT 479-2149 OR AT OIJR OFFICE FROM 8:00 AM - 4 PM. SIGNATURE O OWNER OR CONTRACTOR FOR HIMSELF AND OWNEF PAGE 2 ,t *.:1.{r***************************,*******************:F*,**'***'}**********t *t *t **+*:r*+{.*:r:r*:t:f !t:f ****t *i.*****{.*{< CONDITIONS OF APPROVAL Permit #: 806-0312 as of 10-20-2006 Status: ISSUED *:f *+++**:f 't 't 'f rt*'f ***:F:f {.:t ,F***:i,F:r*****+********r!*r*{.t!!!!l!.t******i<r(**1.d.**************{.***********,}************* Permit Type: ADD/ALT MF BUILD PERMIT Applied: L0lO6l2C[l6 Applicant: BENCHMARK CUSTOM BUILDERS, INC Issued: tot20/2w 970-926-7309 To Expire: 04ll8DW Job Address: 2958 S FRONTAGE RD W VAIL Location: 2958 S. FRONTAGE RD. W. Parcel No: 210314308010 Description: INTERLOCHEN B-6-COMPLETE INTERIOR REMODEL ***'********:*****:k*rt**:f *{r{r'tr*,1**,1*rl.{.*,***'*'ft**:t 'F * * 'FCOnditiOnS. * * * * ** * * * * ** * *** * * * * * * ** ** * *** ** * * {. {i ** ** * *:* * * Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: 14 (BLDG.): ALL PENETRATIONS IN WALLS, CEILINGS, AND FLOORS TO BE SEALED WITH AN APPROVED FIRE MATERIAL. Cond: I (FIRE): FIRE DEPARTMENT APPROVAL IS REQI.NRED BEFORE ANY WORKCAN BE STARTED. Cond: 40 (BLDG): (MFR/COMM) FIRE ALARM REQUIRED PER NFPA 72. *'t***1.************'l*{.********t**'}*'}***********{{,t ++*l+++++*+*+****t************+**'i't**'i**+++ TOWNOFVAIL, COLORADO Statement ******+*************************+*{'+++f**********+f++*++++++++**+*+i***i*'*'t *+**** *******'}* ** Statement Nunber: R060001772 Amount t $L,247.0G Palment Method3 Check Custom 323 2 to /20 / 200603 r5o PM Init: DDG Notation: Benchrnark B05-0312 Il|pe: ****************+****************+***ff++*+********l+**++++*++*+*++****+:i+****************** ACCOTJNT ITEM LIST: Accounts code Descript ion Current Pmts Permit No: Parcel No: Si-te Address : L,ocation: This Payment: BP 00100003111r-00 PF 0 0100 0031123 00 wc 00100003112800 2103-143-0801-0 2958 S FROTiEAGE RD W 2958 S. FRONTAGE RD. sL,241 .06 ADD/AI,T MF BUII,D PERMIT VAIIJ w. ToLal Fees: $2, 021.53 Tot.al Al,L, Pmt6: $2, 021.53 BaLance: $0.00 BUITDING PERMIT FEES PIJAN CHECK FEES VIILL CALL ]NSPECTION FEE L , 223 .35 20.7L 3.00 APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR U G- o,{s7 606- O3 R T VAI P Separate are required for electrical, plu ? PPLIC ON 75 S. Frontaqe Rd. Vail, Colorado- 81eSZ tr9' Project #: CONTRACTOR INFORMATION L t4"n &tl/*'ttfiY/6-L/qn l** 3Sl -tL(Z{ coMpLETE VAIUAT|ONS FOR BU|LD|NG pE RMIT Labor & Materials BUILpTNG: $ /4 4zo, w ELECTRICAL: $ 4,N{ OO orrjen: s lI l,?.{l.rp PLUMBfNG:$ b,4-?O,fqO MECHANICAL: $ O TorAL: $ l{0 ,ItZ.oo For Parcel # Contact Cou Assessors Office at 970-328-8640 or visit '"0 *"'"' Kc4$t,. [24,*&\JobAddress: ZqgV 4,fu\, P*l_ Lesat pescription ll Lor: ll erocr: ll ritins:Subdivision: *cntect€)esiter r /hpe,,, l ooo"", Po. rr*,'r3,10 u^il co (l6t{'non"t r/76-zr, engin.r,(izrl ( ;t=,Add"""'P.o. Pu- L/<7z ii| a;4EF 'n^"' q'/q'. 1gu IJstatteu Oescrtplton OT WOrKt _z / t r> , ,'Lpt"'f llrloJufafi,( Ee r.o t-tl WorkC|ass:New()ruRemode|QQRepair()Demo()other() Work Type: Interior (f,) Exterior ( )Both ( )Does an EHU exist at this location: yes ( ) Uo t0 v- Type of Bldg.: singre-famiry ( ) Two-famiry ( ) Murti-famiry 6q coro'"r.irr 1 I R".taurant ( ) other ( ) No. of Existing Dwelling Units in this buildino: Z "Yl No. of Accommodation Units in this building: b N"ffyp" "f Fit"pl"". t wooo/pelet( ) Wood errni;fNormm],Does a Fire Atarm Exisr- yesl-J--1.16ffi DoesaFireSprinrle@ *rhrrrffi*******drrir********r**FoR oFFICE USE ON Ly F:\cdev\FoRMS\PermiB\Building\buitding_.Jrermit. DOC Page I of 16 & Qq^ t" 0u09/200s ocT.13,ZAB5 |At46A11 tE pa dms'tt d Comn w, W D*doiln st Suildw Safety eNt It qQctlon gv@t lsSotth FtotEgERatt Vail, Calffido8t65, 9m47921fi FN97&479-24s2 wtw,vallgtov,am NO.5el P.I TO; FAX/Emril #: NUMBEROF PAGESI FROMI DATE: BUILDI]IG PERMIT #: owt{lRs trAME: SITC ADDNESE: O€CUPAITGY GROUPT TYPE OF COf{STRUCf,ION: NUITIBER OF 9lORlESt BUTLDING AREA: contmctor/Apglicant Archltect Senctrmaik Builders Snowden and ilopkins benchmark@centrorytel.net (97 0)47 6'7 49I (9701e26-7Tt09 2 John Plano, Bulldlng Plans Examiner 10/13/2006 s06-0312 Kesier 2958 S. Frontage Road R,2 VA unkno^,n unknown The documents submitted lbr thls proJect have been reviewed for compliance with the 2003 Intematlonal Butldlng Code, 2003 intdmrUonal ResidentlslCode, 2003 Inbrnational Mechanical Code, 2003 Intermdonal Frrel Gas ftde, 2003 htematlonal Plumblng Code, 2003 Internatlonal in.rifiConsenitfon Code and 2002 Nauonal Electdcal Code as modiflbd and adopted by the Tov'rn ' Vail. lln Nlowtttg ffirn t 8'tf' witt na€d ao h addrc'fpd prlor b isuance of a building pernit turprcesing:r 'ihase sribmlt ftur omplete seb of revtsed goFstrt&tion docuoenF-qontalnino the requEsted iibffiiffi wlttl ail pllnia,ision lEms cloude{gr otherwlse ldentifieo' Please resoond In writEg to each comnent byJnalklno the AttEh€d list or qfeatlno a response peOitcaUott . or "aloJtation sho*t $e feo'"tt'"P ihe Flans examiner with the. building ocr.l?.2w6 1@:46Ar"l I 172 Ardritectural.lom mentg: The records on flle ln the Vall Bulldhg Depanment indicate thls buildlng was orlglnaily constructed ,,:.. a Type V t hour bullding. That ls c Type VA in the new IBC, Provlde dehlls tur the floor/cciling and the wallassemblles. lnclude the asociabd listing for tire required fi-re ralinq a,nd the fire stoppinq derans ror the new peneuarions. (rBCrabte uoi OywrlMrf,Jffi",,^#"#FO.W" Provide details as how Ore rcquired fire-partiilon is maintained between dwelling unib, washer bgx and penetratlons need to be oddressed. It ls unqlear if there is another dwelling unit below this one, Prwlde r floor flan showing exbting layout. l/j^U,e foW WUotW 4++DWd DPertgb Indicab rlse and run of the new statr€, CIBc 1009) W? A 1'(fi't bf @ lo" 4ee NafV 9]!!n99 q.€ winders to malntain mlnimum tread deoth of 5', they are not allowed to come h a poirii (IBc 100e) t WWa* WT ADpaD Tl9 ne_w powder room-upstElrs requlr€s an exhaust fan. Please indicate how this is to be ducted withoutwt'8fl fory'FPbw|iw,wfllgw1"EffilwlrlW^)kto, The pfans indlcate that trrerc b an exisllng wood fireplace that is behg replaced with a new EpA f4€ wr. wood stors. The paperwork submlfred reflects a Heat & Glo Exclalm-3-6. ttris ts a non.epa wood burnlngfreplace not a wood stove. please address one of the optlons listed below.A. Change the plans to accommodate thls fireplace and indicate that a gis L9 set be instalted. Indicate how the fireplace ls to beenclosed, if there ls stone have thi engineer address the floor sysbm' Prwlde an exterlor elevatlon to show the flue termlnation oitside to velifo coce compllance. B. Ppvidg make, modef and installation instructions for the EpA wood stove. provlde an exteriur elevaUon to shov the flue terminaUon oubide to verifo code comptiun.u. w6 ppe wtNa A NAA tvo?trtila/D btPNblatrEEAAAEl ufu6u r75s191116pt , oPa palNb +'44rawf I'ww Pleage retor t0 tlte cover chcrt lor Infonrndon on rriubmlttlng plsm. tn otdor to avoid dcreyi in ksuonc€ of ? rynniq.praec drect afr nqucrcd inrorndon t, rnoui"Jt"iififi;;il;-ii; iLis, neose suomrt rwb€d platt .r ! omDbb IGL Dilt'|l plan |t$uruurrc wu ||ot be rryisrxed, ' John Plano l.c.c. PlanE &aminer Town of Vall Bullding Safety and Inspectton Services 970.479,2369 cAunlon@vallgov,com F!\cd6ACHR[$p€R rUT.mMMEr{lTi\806.03 12.00c NO.521 3 4 5 LOPT WOOD INSERTS ANSWER C LEARANCES I() UNPROTECTED COM6USTIgLES u9E TtiE6E rLLr' itR^ttoNg lx coNluNcrloN wtrF ii' rxioeF^r,oH !': rrq in6 'c|-(..r^dc€' & 'A|ICOVE' ,r€ADrN63 AEOV: T!.E OECL^tlAY!li'N MUgt HAVE A itoNcrJ|r6ugt,t, !: HEAFTH F/.D ltr l EXlExDg ^ r'rNrMtJM OF l7lr.r r|] r9of, ar''rHsL()Pl tNtsQt ailo grr To Yg€ alg€g SIZING YOUR FIREPLACE FOR AN INgEF'T u3E rnEaE tLllratt^tlo{e lx coxl!'Nctlor wrTx rF5 rxtoQia'lloN ulv9€l rnt 'FI]|EFLACE 5 rarirc. HEl.olNoE a5ovl. F!'^'E UEE THE PROVID.O CH R.I oN THE Rr6rt t6 Lapl( oowx wouE F IREPLAEI olMEN9|OXF Tirt wllL a5!r3r You lN oETERtalNlr'lc irlE Rr6xr LoPl INEERT tot irouil _ .._!8,,'13J2t iE 1.3:48 197632A1591 CALLICRATE COI"IPANY ar/81 OE.IF .h HeARi. DeFr n rNY6 Fr..El, A..A coxsrRuc-rioN ", - HEr'f I irtr cAFAcr' ' Hc^a ()u rpu_ ,,::.. d.a,1i Errrcri:\cv aac r,tax, MUM BVe{ I .,.: .,|.ri-,r. I-16 5r,t. r: fliaFd! rc |n(r. _L ! \|v,+ l'l^Nrai < eLD B! Ftrt6ot io ro2 .4rdc : WITF MANTEL I rl,O C= FrRE6or 5ro€ i O: ti rct.r.lor stotr | E: VrElruF Eri. t P F: U {lrcr-., FnoNl 4,irr! C: Mr{!r.!rq BAcr,,'trB H: {lt!'uue HE16' 8"rs" 12" r !:" ALL I Nt6'rrt _dc.LA Err' o N !otscouaLr€rr:r!€ aG^FTr PIO \-Li AT ExtEND3 A MrNnaUH oF lGr rN tFcNt O. tF . .Ns€Ft aNO €' rO IHE:rOE5. 23 6rtr Zo a/A' t6 tt6, 3' t3 t2d e' 3/l en To s/l ar am lDl ?so ro I raoo €.. Fr. 66,0OO rru,r/nr, 70% rJP lo g Hoult r.€ cuErc Fr, 18" rlrrori- urr.,. ticr trel.Lrca 7'crFL^cE l5 | /?. 24. N/A N/A t2. t2. N/A N/ r,.t.!.c! t,Di.\.cr l3 rt2t 1a l,zn 23 5,4' 25 6A' 23 56" z8 3.!" 20 !rl' 20 3t1. 2g t,rd. H r 4cl l/e,, w 30 !/Atr H x an I/Br w Y0uc Fri€PLAC€ iIEASUFEI,,ENT5 E- o€PT l{ 9ACK WIOTI{ H. HlroxT ,ttBlL^cE. *'+** ****** * ** **+ *+ *+*+****** * * * *'* ** ** ****** * * *+ + + +**+***** *+***** ** * * **** *** * * + 'rt *r *** ***+* * * TOWN OF VAIL, COLORADO Statement ++***f*+*****1.**************ffff*++**************t**************+***t*+**+++**************** St.at.emene Number: R050001532 Amount: 9774.47 L0/06/2OO6t0:30 AIvl Palment Method: Check Init, : iIS Notation: 3194/BETiICHMARK CTISTOM BUIIJDERS, INC. Permi! No: 806-0312 rype: ADD/ALT MF BUIIJD PERMIT Parcel No: 2103 - 143 - 08 01- 0 Site Address: 2958 S FRONTAGE RD W VAIL Locatl-on: 2958 S . F'RON|AGE RD. W. Total Feea: $2,02L.53 This Paltment: $7'14.47 Total AlIr Pmts: $774.47 BaLance: $L,247.06 'l'3******'l********f**+**********+************************+t*+*+*+***************************i ACCOUNT ITEM LIST: Account Code Description Current pmts PF OO1OOOO31123OO PIJAN CHECK FEES 77 4 .47 BUILDING PERMIT ISSUANCE TIME FRAME If this permit requires a Town of Vail Fire Department Approval, Engineer's (Public Works) review and approval, a Planning Department review or Health Department review, and a review by the Building Department, the estimated time for a total review will take as long as three (3) weeks. All commercial (large or small) and all multi-family permits will have to follow the above mentioned maximum requirements. Residential and small projects should take a lesser amount of time. However, if residential or smaller projects impact the various above mentioned departments with regard to necessary review, these projects may also take three (3) weeks to review and approve. Every attempt will be made by this department to expedite this permit as soon as possible. I, the undersigned, understand the plan check procedure and time frame. I also understand that if the permit is not picked up by the expiration date, that I must still pay the plan check fee and that if I fail to do so it may affect future permits that I apply for. Agreed to by: tltq 5tonature Project Name:K+*W lLu*J*'l -/ / Dare: Yzolla( Print name F:\cdev\FORMS\Permits\Building\buildingjermit. DOC Page 5 of 16 021091200s ASBESTOS TESTING REQUTREM NTS THE TOWN OF VAIL AND STATE OF COLOMDO DEPARTMENT OF PUBUC HEALTH ASBESTOS TESNNG ANY TIME WHEN MORE THAN 160 S.F. OF MATERIAL WILL BE DISTURBED OR AN ASBESTOS TEST AND REPORT IS REQUIRED TO BE SUBMITTED WITH YOUR ING PERMIT APPUCATION FOR ALL REMODEL, ADDmON OR OTHER PROJECTS INVOLVTNG ANy DEMOLITION OR REMOVAL OF BUILDING MATERIALS THAT MAY CONTAIN ASBESTOS. BUILDINGS CONSTRUCTED AFTER NO ASBESTOS CONTAINING MATERTAE ARE E(EMPT. 12, 1988THATHAVE I have included the asbestos test and report with my building permit application applicant signafure sB date o I certify my project will not disturb or remove more than 160 s.f. of building material. The construction plans submitted with my application clearly indicate this information. (This will be verified during ptan review, and will delay your proJect if found to be inaccurate) anVr 4/ro,/, applicant OR r The building was constructed after October 12, 1988. The date of construction was origlnal construction date applicant signature F:\cdev\FORMS\Permits\Building\building-permit. DOC date Page 4 of 16 0u09/200s TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT 75 S. FRONTAGEROAD VAIL, CO 81657 970-479-2138 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ELECTRICAL PERMIT Permit #: E07-0004 YdJ G - 631 Z Job Address: 2958 S FRONTAGE RD W VAIL Stanrs . . . : ISSUED Location.....: 2958 S. FRONTAGE RD. W. Applied . . : 0111812007 Parcel No...: 210314308010 lssued. . : 0l/1812U)7 ProiectNo, ,rtt-!O6-O\t? Expires..: 0711712007 orirNER DOWLING, pATRreK EDWARD & CAOL/L8/2007 10912 TOSEANA SANDS SAN AIiTTONIO TX 78249 APPr-,ICAlirr SCOTT ETTECTRIC SERVICE, LLC 0t/L8/2001 phone: (720\ 436-L567 5892 S. QUATAR CTRCLE CENTENNIAL cor.,oRADo I0015 License: 385-E CONTRACTOR SCOTT ELECTRIC SERVICE, LIJC 0!/L8/2007 Phone: (720) 436-a667 5892 S. QUATAR CTRCLE CEM|ENNIAI-, COIJORADO 80015 License: 385-E Desciption: DOWLING REMODEL-RELOCATING RECEPTACLES, INSTALLSMOKE DETECTORS AND FLOOR HEATING CIRCUITS Valuation: $0.00 Souare feet: 700 *:t :B:tr.*:i8*l.r.lt t(,ir(t ,t r.r*r(:*,t**)*:t)krtr*:*:a**a*i.:t:il.++*rtot*:&tt *****'****:*:t*:|:i:*:t :f:t FEE suMMARy Electrical----- > DRB Fee - -_'-- > lnvestigation---- ) Will Call TOTAL FEES-- > Total Calculated Fses- > Additional Fees--..--- > 'Iotal Permit Iiee---- > Payments-------..---- > BALANCE DUE-------- > $0.00 $0.00 $0.00 $s4.7s $0.00 Approvals: Item: 06000 EL,ECTRICAL DEPARTMENT 01-/L8/2007 shahn IIEM: O55OO FIRE DEPARTMENT Action: AP CONDITIONS OF APPROVAL Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPITIANCE. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUES'IS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2149 OR AT OIJR OFFICE FROM 8:00 AM - 4 PM.76( lll : r E 'ili :"ilii llli i;iai: Elll 9lll ra*l'i Fili : : isge O E5 (L .Y\ (D E< E Q at -Y -r a€q v, 0.> o (0 z ul Y o J t lrJ F ZR b1 JO rrt J -o 6o =J tl E (0"j0 , :&P Lt It r.tG] ^, 3^|rrn tt\v lUtfl K I -\-'V ''.',,' IF BI,/S, ARE FLUSH USE A -'SIMPSON LU526_ 2 CONNECTION TO EXSTG. BEAN/ PLAN NORTH LIVI NG KITCHEN STAIRWAY SCALE: PLAN NOTES FOR NEW FRAMING: POSTS BELOW (ORTGTNATTNG FROM THrS TEVEL OR ABOVE) ARE TNDTCATED: a ALL COLUMNS ARE LABELLED AT THE TOP, ALL BEAMS AND STRINGERS SHALL BE DOUGLAS TIR LARCH #2 OR BETTER. 1. 2. J. SII/PSON LSSU 28 (2)-2x6 t (,z e. LN N N v. ()z E F U) N N 'l frr,_ _o(i f,t ** *+ * *!t 'i * 't *** * *r< *. *. ". *:f **:t** * {. * ** * * ** * * ** * * * ****** * * ***+*+* * *** +*,1.* ****** * * * * *:} * * rr*** r< ** 't * **,t( * TOWNOFVAIL, COLORADO Statement * 'f '* *. 't i( * * *'l* * * ** *r+ 't*:t * *:f * * * * '* * *** * * * * * * ** **** * * * * *** * * ** **ti * * ** + * ** * * * * ***:t:f * *:f *** * 't *,i f,f * r('*** statement Number: R070000053 Amount: $54.75 07/L8/2007Ot:19 pM Payment Method: Check ck #416 5 In.it: LT NotaEion; Scott E]ectric / PermiE No: Parce1 No: slte Address : tocation : This Payment: EP 0 010 0 0 0311110 0 wc 00100003112800 E07-0004 Type: 2t-03-l-43-0801-0 2958 S FRONTAGE R.D W 2958 S. FRONTAGE RD. $s4.75 ELECTRICAL PERMIT VAIL w. Total Fees: ToIaI AIJIJ PmTs : Balance : +f +, /f, $s4.75 $0.00 ****'1.***,1.*'*,***,t****i..t i!************+****x*****:t:r!***************+*****+***'t *,tl.'*d.,t**t!t****.'r.'r*:i* ACCOUNT ITEM LIST: Account Code Descript ion Current Pmts EIJECTRICAIJ PERMIT FEES WILI, CAI.,L TNSPECTION FEE 5L. /5 3.00 APPUCATION WIIL NOT BE ACCEPTED IF INCOMPLETE OR 75 S. Frontage Rd. Vail, Colorado 81657 (- o vJ'7 97 O-47 9 -2L49 (Inspections)€p7- cc:bV CONTRACTOR INFORMATION Electrical Contractor: S,zt r tr/,t117/ /(' 5 lC " Town of Vail Req. No.: " --1 -.'\,-r,1 _ /- Contact Person and Phone #'s: fr€r'AN =,,OrELl '7tDLl3(' tLbi Contractor Signature: 4=' , -=:-- /1, )^-l- ;x-;r,.t.t- ;--iy- I -//t"/r ---" y COMPLETE SO. FOOTAGE FOR AREA OF WORK AND VATUATION OF WORK (LabOr & MAteria|s sQ AMOUNT OF SQ FT rN STRUCTURE: -7 O() ll er-eCrruCer- VALUATTON: $ rj )r1). "'-' Contad Assessorc Office at 970-328-8&10 or visit for Parcel # Parcel #-';- [ .') 7, t./ .7, O t ) / / lob Name: -,-'ttDi / t/('. {gr{,oDl, /-JobAddress: i:'-l5E j, fi,,,allrr1' {rl, Subdivisionr,.-7-V/-h'r/ct' l.t- Detailed description of work: r s'az/-<'<'/4,r:'1' , f-t.r,'<r'+,.n. L1:. ,, , r-.- 7t ,i y'_! t I tJSl.r-,/,/ 5r'1.'y'( - WorkClass: New() Addition( ) Remodel $4) Repair( ) TempPower( ) Other( ) Does an EHU exist at this location: Yes ( ) No (>I-Work Type: Interior (><) Exterior ( ) Both ( ) Type of Bldg.: Single.family ( ) Duplex ( ) Multi-family-.6Q Commercial ( ) Restaurant ( ) Other ( ) No. of Accommodation Units in this building:No. of Existing Dwelling Units in this building: for a hot tub: Yes ( ) No Does a Fire Sprinkler System Exist: Yes (Does a Fire Alarm Exist: Yes ( ) No 94 I F:\cdev\FORMS\PERMm\Building\electicalj€rmit-1 1-23-2005.DOC USe OrutY**********************************t(** Page 1 of 2 ru23l200s o o ,*m ! Amendment to the 2002 N.E.C. Town of Vail Ordinance 4, Series of 2005 Overhead services are not allowed in the Town of Vail. Underground services shall be in conduit (PVC) from the utility transformer to the electric meter, main disconnect switch, and to the first electrical distribution circuit breaker panel. The main disconnect switch shall be readily accessible, andlocated next to the meter on the exterior wall of the structure. All underground conduits are required to be inspected before back-filling the trench. In mulU-family dwelling units, no electrical wiring or feeder cables shall pass from one unit to another. Common wafls and spaces are exempt NM Cable (Romex) can h ured only in single and mufti-family dwelllngs net ex@eding 3 stories. Typ IIM cannot be ad in any building mixed with fype $B,EEH,I,M &5 occupancies. Aluminam anduttorcsmaller than size #8 are not permitted with the Town of Vail. TOWN OF VAIL ELECTRICAL PERMIT GUIDELINES All installations of e)derior hot tubs or spa's require a DRB approval from planning. This application will not be accepted without a copy of the DRB approval form attached (if applicable). If this permit is for installation of an exterior hot tub or spa on a new elevated platform or deck over 30" above grade, you must also obtain a building permit. If this permit is for installation of an exterior hot tub or spa on any existing deck or elevated platform, a structural engineer must review the existing condition and veriry that it will support the added concentrated load. Please provide a copy of the structural engineers wet stamped letter or drawing with this application. If this is a remodel in a multFfamily building with a homeowners association, a letter of permission from the association is required. If this permit is for a commercial space, two (2) sets of stamped drawings are required. Eledrial one-line and panel schedules are required if load is added or distribution is altered. I have read and u Signature f " 7/o7 Date Signed above. If you have any questions rding the above information or have additional questions, please contact the Town of Vail Electrical Inspector at97O-479-2L47. The inspector can be reached on Monday thru Friday mornings between the hours of 8am and 9am. You may also leave a voice mail and the inspector will call you back. F:\cdEv\FORJvIS\PERJ"UTS\Building\electicalJ'ermlt-l 1 -23-2005. DOC Page 2 of 2 LU23l2cn5 Dec 19 2OO8 ?r16P1{ Benchnarh Cussom Builders S?Oga6?3Og p.1 p.l -\-o B.^'. \ A.^ 1 C.' J. s \,-O* ' -Toc-rl o {- t-}a,'r L.-?5 S' F'^cr1\tog R'L ,_-ia.L crr.BtGSl i u'' o nz'- Fc Bex { f,-l 3t{ }\-3 tJ(-T G EA *-: c-o'As ' C-o 8t [3 r- t--i c-.€; l\ ce- 7( S B n k e^s{s'v" B*;\f, .'' f "r^.^l* a S BeraL u*a t v'c.,rr = {e-u- B*.. \A,. *.q?e" '^,.t+ t! -b DG' o 3l f,- ]-o Lo wn. t- o 4 Ke T3 t-t>-"atn".''{'ot^- lo -3o ( t. (i, t."'*o"- b" dle.^{ La (< e u*, Do J CD gDS L? '/\zrtf ?.;;;f.*"a' k C-.^s*f,^ B*' i J',ons L-c-nc*.'cl- F totf B ?-d'*d-,W *i/;7'2s,,* ko re.p,viltfir ..,- l*ltlit W ^F ,p*.L "*"WA 6- ,egi&.a< 1 '/r;ty;$ V;L@ p*vZ ;*w D^fat^#?"5.3(. EcEilv=Iill sEs 2 ,) 2006 |U TOWN OF VAIL - h) [l1 TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT 75 S. FRONTAGEROAD VAIL, CO 81657 970-479-2138 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES MECHANICAL PERMIT Permit #: M07-0019 3oC -63 t L Job Address: 29-s8 S FRONTAGE RD W VAIL Location.....: INTERLOCHEN CONDOS UNIT 8-6 ParcelNo...: 210314308010 Status...: ISSUED Applied..: 0211312007 Issued. . : 02ll3l2W7 Expires . .: 08lI2l2N7 OWNER DOWI,ING, PATRICK EDWARD &. CAO2/L3/2OO'7 10912 TOSCANA SANDS SAN A]qTONIO TX 78249 APPLICANT C & C PIJIJMBTNG 6. MECIANICAL,02/L3/2007 phone: 827-9443 PO BOX 731_4 AVON COIJORADO A762O License:328-M coIvrRAcToR C &C PLUMBING &MECHANTCAL,02/L3/2O07 phone: 827-9443 PO BOX 731,4 AVON coL,oRADO 8152 0 L,icense: 328-M Desciption: DOWLING REMODEL-BATH FAN AND DRYER VENT INSTALLATION Valuation: $500.00 Fireolace Information: Restricted:# ofGas Appliances: 0 # ofGas Logs: 0 # of Wood Pellet: 0 x:F:ti*****i<***i<r.***r.r(r.*'*'1.*r(*****+*:6:!:B*'B***d<***:*d.****rot,t j*'***{.*****,f :f :t:B* FEE SUMMARY hgal Description: Project No : -?R:-oo -o'(tl $20.00 Resnrarant Plan Review- ) $s.00 TOTAI-FEES-------------> $0-00 s3.00 Mechanical-- > Plan Check-- > InYestigation- > Will Ca.ll--- -> $o - 00 Total Calculated Fees--> S28.00 AdditionalFe€s------> Total Permit Fe€-*-:-> Payments------------------ > BALANCE DUE------.-- > s28.00 s0 - 00 $28.00 s28.00 $0.00 fTEm: O51OO BUITDING DEPARTMENT 02/L3/2O07 JRM Action: AP ItCm: O55OO FIRE DEPARTI,IENT CONDITION OF APPROVAL Cond: 12 (BLDG.): FIELD INSPECTTONS ARE REQUIRED TO CHECK FoR CODE COMPLIANCE. Cond: 22 (BI-,DG.): COMBUSTIONAIR IS REQUIRED PER CHAPTER 7 OF THE 2003 IMC AND SECTTON 304 OF THE 2OO3 IFGC AS MODIFIED BY TOVIN OF VAII,. Cond: 23 (BLDG.): BOIILER INSTAILATIoN MUST coNFoRM To MANUFACTTIRER'S INSTRUCTIoNS AND CHAPTER 1.0 OF THE 2OO3 IMC. Cond: 25 (BLDG.): GAS APPI-,IANCES SHALIJ BE VENTED ACCORDING TO CHAPTER 5 OF THE 2003 IFGC. Cond: 29 (BI-,DG.): ACCESS TO MECHANICAL EQUIPMENI MUST COMPLY WITH CHAPTER 3 OF THE 2003 IMC A}ID CHAPTER 3 OF THE 2OO3 IFGC.. Cond: 31 (BLDG. ) : BOILERS SHALL, BE MOUI\|IfED ON FLOORS OF NONCOMBUSTIBL,E CONST. UNIJESS IJTSTED FOR MOT'NTING ON COMBUSTTBLE FI-,OORING. Cond: 32 (BI-,DG.): PERMTT,PLANS AIID CODE ANALYSIS MUST BE POSTED IN MECIIANICAI-, ROOM PRIOR TO AN INSPECTION REQT'EST. Cond: 30 (BI-,DG. ) : BOfLER ROOMS SHALI-, BE EQUIPPPED WITH A FLOOR DRAIN OR OTHER APPROVED MEANS FOR DISPOSING OF LTOUTD WASTE PER SECTTON 1004.6. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct.I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this review approved, International Building and Residential C according to the towns zoning and subdivision codes, design of the Toy4r applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR PM. TELEPHO 49 0R AT OLrIR OFFICE FROM 8:00 AM - 4 F OWNER R CONTRACTOR FOR HIMSELF AND OWNEF other *******'t +* ****1.* *f t************'1.**,1*******'ltttt**************** **f ******* + +*** +'|**+** * ******** TOWNOFVAIL. COLORADO Statement *****************f+*+*******************+*f***************+'f***************+*******1.******:I* Statement Nudber: R070000171 Palmenc Method: Check Plumbinq & MEch Amount: $2S.00 02/L3/200704:09 PM ih.i F. T /'r Notation: #e247/C&C Permit No: M07-0019 TIT)e: MECI{AI{ICAI PERMIT Parcel No: 2103 - 143 - 08 01- 0 SiTe AddTess: 2958 S FRONTAGE RD W VAII, I,ocAtion: INTERLOCHEN CONDOS I,NIT B-5 Total Fees: This Payment :$28.00 Tota1 ALL Pmts : Balance:******* ***+*++++t********* ***** +**'i'i**++{.+* **$'t***'1. * *************+** **'1.***.}****{.******* *{r * * + $28.00 $28.00 $0.00 Current Prnts ACCOI.INT ITEM LIST: Account Code MP 00100003111t 00 PF 0 0100 0 0311_23 00 wc 0 0100 0 03112I00 Description MECHANI CAL PERMIT FEES PLAN CHECK FEES WItt CA],I, INSPECTION FEE 20.00 5 - 00 3 .00 AppucAnon uflLL Nor BE AccEprED rF rNcoupLErE.oR uNsc$g? - \O t -I Proiect#: \ l\t-$l hazos(? ,,,i9;19ifi -lr/l TtffillwYilLly I TowN oF vArL MEcHANTcAL pERMrr AppLrcATroN - 75S. Frontage Rd. Vail, Colorado 81657 Permit wlll not be accepled without the bllowing: Provide ilcchanical Room Layout drawn to scale to include:. techantnl Roorn Dimensions . Combustlon Air Duct SIze and Locatlon . Flue, Vent and Gas Line Size and Location . lleat Loss Calcs.. EqulpmentCuUSpecSheets CONTRACTOR INFOR]IIATI ON Contact Assessors ffi******fifrffi*FoR oFFICE USE ONlY**ffiffiffi** forParcel# TOW"N Parcel# LlD3 t+ .loo Name:K{-S5\c-r '+ \ol,-:Lw-fS f2es . .215s' S' trrr Pd Untt 6 Detaiteddescriptionof vrork: Ba\tfrn t Frqer \On\-, WorkClass: New() Additionfi Alteration( ) Repair( ) CIher( ) Does an EHU exist at lhie local'lon: Yes ( ) No ( )Boiler Location: Interior ( ) Exterior ( ) CIher ( ) TypeofBldg: Slngb-family( ) Duplex ( ) Multi-family ( ) comm€rcid ( ) Restaurant ( ) Ot|€r( ) No. of Accommodation Units in this building:No. of Existing [lrelling Units in this building: GasLoos( ) Wood/Pell€t( ) Wood No/Type of Fireplaces Proposed: Gas Appliances ( ) Gas LoSs ( ) Wood/Pellet ( ) Wood Buming (NOT ALLOWED) ls this a a wood buming fireplace b an EPA Phase ll device? Yes ( ) No ( ) \W8iI\dEIA\CdEV$ORMS\PERMITS\IVIECHPER}VTDOC 2007 Taruo dJall!,lethanlqalga. es and Peslsn grilera o You must obtain Design Review Board (DRB) approval if any of lhe mechanical work will involve ANY exterior work. Thisin-"tuO." and is noi fl',,ii"iio removal-and replacement of driveway snow melt systems. Please ""ni""i " pl"nner at 479'2128 before submitting your mechanical permit application' o The Town of vait has adopted the 1998 International Mechanical Code (lMC) with the 1997 Uniform Mechanical Cod€ (UMC) as an aceeptable allernative' rA||newconstructionwithintheTownofVai|isconsideredtobeofunusua||ytightconstruction,thusa|| combustion air is requlreJlo u" ar"*n from outside the struc{ure for mechanical equipment' Reference the 1997 UMG Sec. 701-2. Town of Vail Fireplace ordinarse In September of 19t11, the Vail Town Gouncil adopted an ordinan-ce which restricts te eonstruction and use of open hearth fircplaces within municlpat boundaiies. since thattime the ordinance has undergone numerous changes and revisions, striving foi compromise, yet effectiveness in addressing the air quality issue' There-fore the following criteria has been adopted: r construction of open hearth wood buming fireplaces is no longer permitted wlthin Town of vail municipal boundaries. o Dwelling Unitg - Each new dwelling unit may contain: one (1) EpA pnase ll certifted r"lio t r"iluming device and no more than two (2) gas appliances (B vent) OR Two(2)gas|o9fir€p|acesandnomorethantwo(2}gasapp||ancefirep|aces(Bbent). o EeqgicFd ltltellilrS-UXitg - Each new restricted dwelling unit may contain: one (1) gas Ogfrieplace and not morc than one (1) gas appliance fircplace. o Accommodallsn-U4lle - Each n€w accommodation unlt may contain: -on" (r) gas log-ftreplace or one (1) gas appliance fireplace' a lf two or more separate dwelling units or accornmodation units are cornHned to fotrn one larger unit' the combined unit may ret"in "nt-*"oouu.ing nt"poo qt one already exists) and no more than 2 gas apptiancefirep|ace-s,ormayconverluptotwoexistingftreplacestogas. I lf during the course of a remodel an exlstlng wooaUrmfp lm{ace is altered or nroved' the unit must then comply with all provisions of ttre ordinanfl fn"t ls, tli firepace mu'st be co{rvertod to natural gas or repticeO by an EPA Phase ll certifted unit \Wait\data\cdevu ORMS\PERMITS\I\{ICIIPERM'DOC 0112412002 TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT 75 S.FRONTAGEROAD vArL, co 81657 970-479-2t38 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES PLUMBING PERMIT PErMit #: PO7-OOO8 3oG o3\7 Job Address: 2958 S FRONTAGE RD W VAIL Status . . . : ISSUED Location.....: INTERLOCHEN UNIT 8-6 Applied . . : 0ll30l2W7 Parcel No...: 210314308010 Issued . . : 0113112007 lrgal Description: VR3.OG - O L{5-l Expires. .: 0713012007 Project No : o$INER DOWLING, PATRICK EDWARD & CA0L/3O/20O7 10912 TOSCANA SANDS SAN ANTONIO TX 78249 APPITICANT C 6. C PIJ{'MBING & MECIIANICAL,Ol/30/2007 Phone: 827-9443 PO BOX 7314 AVON coLoRADO 81_620 IJicense:339-P COIflTRACTOR C & C PLIIMBING & MECI{ANTCAI-,, 0L/30 / 2007 Phone: 827 -9443 PO BOX 7314 AVON coL,oRADO 8]-620 License:339-P Desciption: DOWLING REMODEL-INSTALL FIXTURES AND ROUGH PLUMBING FOR UPSTAIRS BATH AND LAUNDRY. INSTAL FIXTURES IN MAIN LEVEL BATH AND KITCHEN Valuation: $2.200.00 Fireplace Information: Restricted: ?1 # ofGas Appliances: ?? # ofGas Logs: ?"! # of Wood Pallet: ?? t<**,i*dr*L****'*,*:**'******r**!r*)****)r***********:*d.**'*:t****+:t:f ,*,*+*:f :i:t:*r<{.{<d<r<* FEE SUMMARY *t+1.**{.**r(r.**r(***********{.81**+:}**t*+*:r{r:tf,{.*r(*d<*d!*:i*****trr*,i't Plumbing-- > S45.00 Restuarant Plan Review: > $0.00 Total Calculated Fees--> $59.25 Plan Check--> $11.2s TOTAL FEES-------------> Ss9.25 Additional Fees------> 50.00 Investigation- > WiU CaU--: > $0.00 $3.00 Total Permit Fee----------> 959 .25 Paymenr---------------- ) $59.25 BALANCE DUE-.-.-..-- >$0.00 Item: O5]-OO BUIIIDING DEPARTMEMT oa/3O/20O7 JRM Action: AP IIEMI 05600 FIRE DEPARTMENT CONDITION OF APPROVAL Cond: l-2 (BLDG.): FIELTD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPI-,IANCE. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information urd plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOI,IRS IN PM. 2149 OR AT OIJR FROM 8:00 AM - 4 OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNET *******t******************,1*******t * ** * * ***,1'|l,t** * * * 't *** t'1.*** * *****:f *r,* **:**** **,t* * * ***** * * **** Statement TOWNOFVAIL, COLORADO +*****{.*,1.,1*t++*+**,{.*******,1.,t **,**'t******************x++*rF*++*******'F+*.F*****{.***++***'h****+** Statement Number: R070000108 Anount: $59.25 OLl3I/200710:06 AIvl Payment Method: Check Init: DDG Notation: C & C Pl-umbinq 8220 Permit No: P07-0008 Tl4)e: PLIIMBfNG PERMIT Parcel No: 2103-l-43-080L-0 Si.te Address: 2958 S FRONTAGE RD W VAIL IJOC T1On : INTERIJOCHEN I,NTT B- 6 Total Fee6: S59.25 ThiE Palment: $59.25 ToEaf ALL Pmts: $59.25 Bafance: S0.00 * * * * ** **** * 't * * *** * * * ** * * d. * *,t * **,** 'k* *,t *+*+***'***** *********+*tl**********f **'l********'l**+**:t ** ACCOL]NT ITEM LIST: Account Code Description Current Pmts PF 0 0 l- 0 0 0 0 3 r. 1 2 3 0 0 PLAN cHEcK FEES LL.25 PP O O 1 O O O O 3 1 ]- ]- 1. O O PI,UMBING PERMIT FEES 45.00 WC OO1OOOO31128OO WIIJL CAIJIJ INSPECTTON FEE 3.OO APPLICA TION WILL NOT BE ACCEPTED IF INCOMPLETE OR UNSIG lTi,ssHlWz Building Pemiit #:Bo(, - 03 lz- ,,,:l',1?ll1,li*'lli;,Fr-so 0 Fo; 'c ooB NVNWVAIL 75 S. Frontage Rd. Vail. Golorado 81657 TOWN OF VAIL PLUMBING PERMIT APPLICATION CONTRACTOR INFORTIATION COMPLETE VALUATION FOR PLUMBING PERMIT (Labor & Materials) Plumbing Contractor:Town of Vail Reg. No.:and Phone #'s: - z. a) I - vaLzLa- | v, tt t - a.\ ,, PLUMBTNG:$ a,ADo.9g Contact ****+*******n*!F*,1****:a***!tt**!t*** **tt t*FOR OFFICE USE ONLY***!k***tt**t:.!t:r*******!t!tt*!t!.trt*'t!t**!t* llrto Rr,eived; #sq'' County Assessors Office at 97G328-8610 or visit 'for Parcel # Parcel# 7-103 \4ec)qOlO Job Name:--kJ--",{t er * f\otoltng ks.demtr Job Address:Untt B'-6 lfnter loctT en t-ondr.,aqs( 3. frontaae f.t. WaE*'t/ail Legal Description Lot:Block:Filing:Subdivision: Owners Name: -U r'tlf,c.'- .ii i)b\^Jl l r'\D< Address:Phone: Engineer:Address:Phone: Detiailed description of work:. P\ u r^b. nq to ptrf wrUirq Qo c \)rp+tatc5 rog111--zt'n6 '!(r\rlnr-,vr -- !f!clsd..- ff\O|]r€.I.d <{^d Lo,u n Ar-.tr, t[3t4-r\ff;;;*"*rff-J-*,.Hl;^* ruu.gt r ,t+.cl - WorkClass: New() Addifron( ) Alterationl( Repair( ) CIher( ) Type of Bldg.: Single-family ( ) Duplex ( ) Multi-family |Q Commercial ( ) Restaurant ( ) Other( ) No. of Existing Dwelling Units in this building:No. of Accommodation Units in this building: ls this a conversion from a wood buming freplace to an EPA Phase lldevice? yes ( ) No ( ) 1 la1 i \\Vait\databdev\FORMS\PERMITS\PLMBPERM.mC o'7 t24t2002 ,'4/ .a t'. .-l- 1.-k- t:. / !,?t,j"t)l- i I t'- i:o- ./i o o e C o r C g =c a i-1,/^ :?.1\y''5:-l: l.... ( Rg .!t 5S si ,<9 c)cl Y -i6 rL> }r 'r ,1r2I''y'.r-yi' t. ,.)?G-t,-t"'.f':.'i v -/ fu:.:'-:'';' FLY-t4'-'\-1t1.:-. I , , ..t ,,1:; ?2*',.t',.' 2 et'a:.' ';-i)-':,'\'i ? ,;.'- "-! ?r-:'i>e ?',<'4';?*1,pgt- 7: . ':. /;,1-:'. Ly.:( (2'n";.t/,.t ' 't tv* 6r" -'"''--/;' 1'"' ilVr' /'J-',/.' t2't' \.i/. f-/r2/ir7 ?a'r"'/' " !'.2'.'.?-'/? + O'.'/-/i, " ffi ?tt'?"'*{7' '/ '. /r 'z' v-- -:? t tri?'t' o o E o J o o j z IJJ Y o J t lrJ F z lt o J IIJ o o =UJ t tsF..ot '-'.jt 'v.." z','. ,(.--', -,r/r //.),r. t- -. ,r<' ,r,-7.,.'. [,,|t 2^ . ;.L. / t/)..f2> 4./-r, . " ?/,+ l*.\ .' ".) /< r' .. "..,,,.- l-r7j..'t-*1'. i-.-*-r.tl _ 4 i,t ,^z '.> t-- |-'a, . ,L, J-t a r..:,:.,i,5l ,r;4:.(r;.,: t)', Zi!\V? -&-'-lnternational Buildlng Codetlntemrtlonat Residential Code Val:-ily cf permit The issuanc€ ot gnnting of a permit shall not bc 1r:. . L -d to be a permit tor, or an apprcval of, any violation ol any cf t' ::cvisions ol this code orotany otrsr odinance of the lurisdic..:n. Pc mits presuming to give auhodty to violato or cancel th€ provisl::: cf . ,,; code or other ordinances of the lurlsdiction shall not b€ valid. Th: i.:u3nce of a permit based on constructon documentB and other data r..1ril not prevent the building offrjal fiom rcquiring the conecticn cf crrors in th€ @nstruclion docunontB and oth6r data. Tho -bVbv a$ t74:iDr--l @- Sxo\<rnet<rae-.- ur.,l ; 2000 Tgtutjit - { ff,j, '' MAIN >bvbv {,9 |.r)(o I m a z Y (L o I d+ 3"\ \eo APPROVED Community Developmoflt O€9ailmenl Building Safety and lnspection Services 6ec{lon rc5,1 hrilding officiat is also authorized to pt€vent @tpancy or use of a Eitucture where in vioF$eAef this code or of ary ornr odinances d lhlslurisdiction. \ \--. PT.ANSOGMINER gt$e /6-"s '6 UN|T O U NareTi{ OF A1 ' .'l P.r+ \ J .''rlt..*!.rri t; ds; jl q=() oX o \< E (_) c o - . VV , 1'1 ':,.-" fu: ."- r'' '-;1 ;t tl PEMOLITION l.lOTE9, I. AT JOB 5I1E VERIFY ALL EXISTINo CONDITIONg EEFORE 6oMl"lEtltl6 ANr hORK. CPNTACT e COORIDINATE ^/ARCHITEcI AND STRIJCI1JRAL EN6INEER RE6ARDII.I6 ANT DI:TREPANCIEg FROM T}IFE PTAN9. 2. @NTRACTOR TO VERIFT ALL EXISTING UTILITY LOcATIONS ANP T,NDITIONS ON T1IE JOB gITE PRIOR O COYT4EI]r.1N6 ANY I^IORK. ". GoNIRACTOR TO PREPARE, PAINT, PAT6H 4 RtrAIR ALL EXI9TIN6 OOIJE'IPJr-TIOTI (INCLUDIN6 EUT NOT LIMITED TO DEMOLITION OF EXI9TIN6 FINI9H MATERIAL' 10 A('EP| NE}^I COI'IsTRIJCTION hEERE APPLICAE-E. 4. VERIFY I,I/O}^INER OEFORE DIaPOaN. OF ANT NINDO}"I OR ITEMS THAT CA)LD BE STLVAaED FOR REIJ5E. OENERAL OOT{9TR'JOTION I{OTE9, I a?v?fIp 2. ALL I^IORK I^IILL EE COI4PLEIED IN AC6ORDAN6E '^IITH THE LATEST AD@IEO EDITIONS OF n{E 2OO3 INTERNATIONAL A)ILOINO OODE, 2OO3 IN1ERNATIONAL REIDENTIA,J- (NOa 2OO3 INTERNATIONAL MECHANTCAL CODE,2OO3 INTERNATIONAL FIEL 645 OODE,2OO3 IN1ERNATIONAL PLLMBII.{6 CNDE, 2OO3 INIERNATIONAL ENERoY CONgERVATION CODE AW 2OO2 NATIONAL ELEOIRICAJ- (NOE AND TOI^IN OF VAIL BIJILDIN6 AND ZONINo DEPARTMENT CODF AND REoULATIONS. 3. VERIFT EXISTII.{6 DII.4ENgIONg IN FIELD, NOTIFY ARCHITECT OF ANY DISCREPAN6|ES. 4. AFTER EXCAVATION AND BEFORE A}|r CONCRETE I^IORK VERIFT ALL EXISTINo FOIADATION C'oNDITIOI.IS, AA-L 5IZE AND FOOTINo ELEVATIONg - vERlFr v{/9TRLJCTLr?AL EN6INEER THAT ALL C,oNNECTIONS OF NEI"I CONgTRUCTION TO OLD hIILL I"IORK A9 t)E I t\L-EL/. 5. TIIE CON-IRAoTR I5 10 VERIFY ALL DIMEN5IONS AND NOTIFI THE ARCHITECT OT N.If DI*.RtrANCIE9 EET'^EEN THE ARCHITECTURAL, STRIJCTI,RAL AND EXISTINo PLA}.I9. 6. AREAg OF OONFLICT OR DI9CREPANCIF Mj5T tsE FJLLY RESOLVED BEFORE C,oN9TRIJOTION @NTII.IIJES IN TIIO# AREA5. 1, ALL PLAN DII'4EI.I5ION5 ARE TO FAciE OF TJOOD OR (,I{6REIE UNLFS OTHER}"IIgE I'IOTED. A. ALL EATHROOMS ARE TO BE VENTED TO THE EXTERIOR }"IIT1] A FAN AND DIJCT 5Y51ffi TO trFOVIOE 5 AIR CHAN6E9 PER ITOUR/PER coDE (MtNlt [.J]O. q. ALL INTERIOR OOOR OPENIN@g ARE TO EE CENTERED IN I{ALL FArlE OR 6'(T4II.{) FROM },{ALL FACE, IJNLF6 NOIED OTHER}^IIgE. IO. VERIFT ALL PLUHEIT'I6 FIXTI-,RE LOcATION PRIOR TO II'IgTALLATION. '- ,r.4, I / t.' :4'-) \- 744,s4xsf, ffia--'Lh\E> C-o-TSTYUPc'nhJ- l^J (T1t us>4- Y(l€ '..'/-'--.'. t- L 1' ,n ,,..17n:-/ ,; ; ,' /' ,- )., .-' y', /,, : - ' a.v'- '.y' l: Y:t-,-" .. > a Ui| l': " t:t l{'l )'. L-l/\a1 , :,. ., .- "..)-' €:I)t .//-.. .4 i',). - t.'. r .' ,)r- / t' fru u ?t l-.'-' t\ n -l;,. ''.."t t'Li'' i:-' ) 4t:j (l;t" / 'ti' r' ' '""1i ,'/ i.; .\{ ,', .ri,' /.!- ., . lt- , -', ": r]' 'r''2' o G'z lrJ v o J t l,t l F z lt o J IJJ o o =l!E o o t o J o o j €I)t ,'-,-tt2 Ut'. . '" , r'- - l-r-11. ': ?-3_ ,)'u'- ?:i, '"?r', ,,'- -' \t a'' l/' t :", )w3? >VVo> cruNi1' k0 .+ I @- 1r^o,.e-gq-ta6< z ? o-o 'r 1/41t- ',i r^" NpLiii ffi- €rsx.'sr6+r-A2 :lli i=iuS illi s;ie3i illiilsisg o55 dsx i Y.*() ox 0) h< () a .E 'r nt EP c o?c s;O i'J E Y Xi 5 ;x'\ c oE (') o-J o (o z IJJ Y o J t ut F.ZR b-fi JO rrr J '-to 6o =j HS \t )- zxo IF BMS. ARE FLUSH USE A SIMPSON LUS26-2 CONNECTION TO EXSTG. BEAM EE LI UJ zz EE FF aa N C'J XX NN SIMPSON LSSU28 1. 2. 3. IL $ e.i Y? (o o C\I v c;3 2 =o o 6 E.(u Ir jt o o :< <'-l' I o o LIVI NG PoSTS BELoW (ORIGINATING FRoM THIS LEVEL OR ABOVE) ARE INDICATED: I ALL COLUMNS ARE LABELTED AT THE TOP. ALL BEAMS AND STRINGERS SHALL BE DOUGLAS FIR LARCH #2 OR BETTER. KITCHEN STAIRWAY PLAN NORTH >UALL: I 4"-j' PI.AN CHECK FEES TABLE Depatunent of Community Development Building Safety and Inspection Servies 75 South Frontage Road Vail, Calondo 81657 970479-2138 FM 970479-2452 www.vailgov.com Plan check fees are required for projects with a valuation over $100,000, at the time of Building permit submittal. Please use the table below to calculate your plan check fee total. $100,000-$150,000 Multiply by $ 150,001-$250,000 Multiply by $250,00 1-$400,000 Multiply by $401,000-$750,000 Multiply by $750,001-$1,000,000 Multiply by .0055 of Valuation Total .005 of Valuation Total .0045 of Valuation Total .004 of Valuation Total .0035 of Valuation Total Valuations over $1,000,000 will be calculated by the Town of Vail Building Depatment. If you have any further questions, please contact the Town of Vail Building Department at970-479-2128. F:\adev\FORMS\Permits\Building\buildingJrermit.DOC Page 3 of 16 0u09l20os Questions? Call the Building T at479-2325 Depaftment of Community Development Project Name:Lo Project Address: acepfud, tr All pages of application is complete F Has DRB approval obtained (if required) Provide a copy of approval form o Plan Check fue required at submittal for projects valued over $100,000.00 (see schedule) o o o o D o a Complete site plan submitted Public Way Permit application included if applicable (refer to Public Works checklist) Staging plan included (refer to Public Work checklist) No 4umpster,parkino or material storaqe allowed on roadwavs and shoulders without written aoproval Asbestos test and results submitted if demolition is occurring Architect stamp and signature (All Commercial and Multi family) Full floor plans incNuding building sections and elevations(3 sets for remodels, 4 sets of plans for SFR and Duplex, 5 sets of plans for MultFFamily and Commercial Buildings) Window and door schedule Full structural plans, including design criteria (i.e.loads) Structural Engineer stamp and signature on structural plans (All Commercial and Multi Family) Soils Repoft must be submitted prior to footing inspection Fire resistive assemblies specified and penetrations indicated Smoke detectors shown on plans Types and quantity of fireplaces shown tr tr o n U n Received By: r) Appficant's Sisnature: 1^'t-*- ,O l-\* ",/, Date of submittal: F: \cdev\FORMS\Permits\Building\bulldingjermit.DOC Page 2 of 16 0210912005 ffi APPLTCATTON WILL NOT BE ACCEPTEDJF INCOM $sG-oz 6 to PLETE OR UNS Project #: WN Separate P are required for electrical, Plu , mechanical, etc.l CONTRACTOR INFORMATION o('-633 z 60 75 S. Frontage Rd. Vail, Colorado 81657 contact Person ano Pnone 't c' r-""*-' "-' --; ;"- "'-i61'slt 8 f 811 LCn n,o HoDDo Co nstr.t.*r o n& COMPLETE VALUATIONS FOR BUILDING PERMIT (Labor & Materials BUILDING:$ 4qSe€ELECTRICAL:$OTHER: $ PLUMBING: $MECHANICAL:$rorAL:$ 4q SJ,.€ For Parcel # Contact Assessors Office at 970-328-8640 or visit FOR OFFICE USE ONL SFP I.J J TOWN OF 2i,!ii0 VAIL ,rr9 N WorkClass: New( ) Additionl! Remodel ( ) Repair( ) Demo( ) Other( ) Does an EHU exist at this location: Yes ( ) No ( ) Type of Bldg.: single-family ( ) Two-family ( ) Multi-familyff commercial ( ) Restaurant ( ) other( ) No. of Accommodation Units in this building:No. of Existing Dwelling Units in this building: : GasAppliances( ) GasLoss( ) WoodiPellet( )Wood GasLoqs( ) Wood/Pellet( ) Wood F:\cdev\FORMS\Permits\Building\buildingiermit. DOC Page 1 of 16 02/091200s *:N(,* * *,t * *:*,** * * *,1,* * * * * * * * * *,! *{. * * *:} * *:1. * * * * * ** '} * * * 't '} * '}*:1.:*:* *:1. * * *,t* * * {. * *,1. * * * * * * * * ** it * * * * ** * * * * * * * * TOWNOFVAIL, COLORADO Statement **********+*******t<****************:****,1.:1.***{.:***r(*x*,*,},1.,1.'1.**,1.**r<,1.*t '1. {. * * * *** **X. *** * **r. * ** *+ * * * Statement Number: R050001451 Amount: $26I .56 09/14/200611:54 AM Pavment Method:check rnLE: LI Notation: KCB ConstructiorL / ck #493:- Permit No: Parcel No: Sit.e Address : I-,ocaLion: This Payment; 806-0266 2103-143-0800-9 2958 S FRONTAGE INTERLOCHEN #5B T]TPC : ADD/AI,T MF BUII.,D PERMIT RD WEST VAII, Total Fees: Totaf ALL Pmts : $261. s5 )zor. f,o $251. s5 Bafance: 90.00 ********{.:}*********************{.**r.****{.*,}**r.,t:t,****{<**,t {. {. *:**r. ** * ** * ** * * * * * * **** ** * ** * * * * * * * * ACCOL]NT ITEM LIST: Account Code Desc ript ion Current Pmts BP 00100003111100 cL 00r_00003123000 PF 00100003r.12300 wc 00l-00003L12I00 BUII.,DING PERMIT FEES CONTRACTOR I,ICENSES PIJAN CHECK FEES WILIJ CAIJIJ INSPECTION FEE 111 .25 75.00 72.3! 3 .00 I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQI]ESTS FOR INSPECTION SHALL BE MADE TWENTY-FOI-IR HOURS IN AD PM. BY TELEPHONE AT 479 2149 OR AT OUR OFFICE mOM 8:00 AM - 4 HIMSELF AND OWNEF PAGE 2 *<*****r.***r.r.*r(*t(t(***t **r({<*{.t({.d.***r.****rc******* **r.********** *{<{<********* *,* *** * ********x*******d.*t<*.*,,<,,<*,1.d. t CONDITIONS OF APPROVAL Permit#: 806-0266 asof09-14-2006 Status: ISSUED * {.* * *rk**t *,F** * *{< {<*** *'t** {. {<****:i ** ** **** * t **t ******************,t r!**t t<i.tr{.*+*** * *******{.**** {. {< {. {. d< d. d. {.***** * * Permit Type: ADD/ALT MF BUILD PERMIT Applied: 0910812W6 Applicant: KCB Construction Inc. Issued: 0911412006 (303) 548-5877 To Expire: 0311312007 Job Address: 2958 S FRONTAGE RD WEST VAIL Location: INTERLOCHEN#58 Parcel No: 210314308009 Description: RESTORE DECK TO ORIGINAL SIZE :*,*d.d.* r.** * *. *. i( *. **** ******** ir* ***** ****** *r< {. **<*** rrconditiOnS:* +***ri.*tt* * *t<*** ti **i.*** ** *i({r* * * * ** * t( **** *{.*** Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: 14 (BLDG.): ALL PENETRATIONS IN WALLS, CEILINGS, AND FLOORS TO BE SEALED WITH AN APPROVED FIRE MATERIAL. Cond: I (FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY WORK CAN BE STARTED. Cond: 40 (BLDG): (MFR/COMM) FIRE ALARM REQUIRED PER NFPA 72. TOWN OF VAIL DEPARTMENT OF COMMUNII'Y DEVELOPMENT 75 S. FRONTACE ROAD vAlL' co 816'57 ' :)\") ) \ > 97}-479-2138 L,c,-^\ !o \ t--,n \ ,''t (' .\'-^-\.-, .\r-,'"--NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ; I tt-;B ADD/ALT MF BUILD PERMIT PCrMit #: 806-0266 ( Lfo b -oaE'L Job Address.: 2958 S FRONTAGE RD WEST VAIL Status.....: ISSUED Location......: INTERLOCHEN #5B Applied...: 09/08/2006 Parcel No....: 210314308009 lssued...: 0911412006 Legal Description: Expires...: 03ll3l2007 Project No... : owNER cHRrsropHER, BARBARA K. -KEE09/08/2006 2550 BALD MT RD VAIL co 81657 APPLICAIIT KCB Construction Inc. 09/08/2006 Phone: (303) 548-5877 2606 S. MII.,I,ER DRIVE, APT 2O7 I,AKEWOOD eo 80227 License: 804-B CONTRACTOR KCB Construction Inc. 09/08/2006 Phone: (303) 548-5877 2606 S. MII_.,I_,ER DRIVE, APT 2O7 I,AKEWOOD co 40227 License: 804-B Desciption: RESTORE DECK TO ORIGINAL SIZE Occupancy: R2 Type Construction: V A Valuation: $4,452.00 Revision Valuation: Add Sq Ft: 0 I)ireplace lnformation: Restricted: # of Gas Appliances: 0 # of Gas Logs: 0 # of Wood Pellet: 0 FEE S(IMMARY Building > $111- 25 Restuarant Plan Review-->$0.00 Total Calculated Fees-> $186 - 56 S0.00 A(l(lilionalFccs----------)Plan Check-- > Investigation- > Will Call $?2.31 Recreationliee------------> so . oo ToTAL FEES------------- > s3 .00 s?s.00 $1ti6.56 Total Permit Fee - - -> $261. s6 Payme|rts------------------- > 12 6 1 . 5 6 BALANCE DUE So. oo Approvals: Item: 05100 BUII-,DING DEPARTMENT O9/L3/20O6 JRM Action: AP Item: 05400 PLANNING DEPARTMENT 09/77/2006 bgibson Action: AP Item: 05600 FIRE DEPARTMENT Item: 05500 PUBITIC WORKS See page 2 of this Document for any conditions that may apply to this permit. DECLARATIONS ?t=-l?#o' 'n"o"t:,'l,F?$yF?,'ffpon'nn '"'o Requested Inspect Date: Friday, February 16,2007 Inspeclion Area: JF Site Address: 2958 S FRONTAGE RD W VAL 2958 S. FRONTAGE RD. W. Ai/P/D lnformation Contractor: Description: Nbtice: Comment: Comment: Requested Insoection(s) Item: Requestor: Coniments: Assiqned To:- Action: Comment: BUILDERS. INC Phone: 970-926-7309 A-MF *"o tlBB: $Xt Status: ISSUED Insp Area: JP BENCHMARK CUSTOM BUILDERS AND KCB CONSTRUCTION NAMING KCB RECORD OF 1211312006. LETTER PLACED IN FILE.. JSUTHER ON Requested Time: 10:00 AM ' Phone: (303) 548-5877 Sf*iru Aa'r-L d'a+r-- Activitv: 806-0312 Const Tvo6l Owiien DOWLING. PA CAROLCUNNII Applicant: BENCHMARK i JMONDRAGON Entered Bv: LTILLMAN K Time Exo: e0Afr6Svlno-5EEt-ron. Contact strucluraTEh-o ab6Ut notchino beam to achieve 80 inch head room on new stairs..Mairitain separ?tion wall rating. Fire-damper in batF exhaust fans. Drywall behind tub/shower to extend floor to deik. Clothes drver td exhaust td exterior. C;;"_i; S-l-y+J / l./ REPT131 Run Id: 6381- ?L-i3?#ot In"p""$:,tF?$yF",! nrPo'trng t"n" t' Requested Inspect pate: Frig-ay, August 03,2007 ' lnspeclion Area: JRM - - Sit€ Address: 2958 S FRONTAGE RD W VAIL INTERLOCHEN UNIT 8.6 A/P/D Information Contractor: Description: Activitv: P07-0008 Const Tvo6: OWrier: DOWLIN( SubTgne: AMF Phone: 827-9443 Status: ISSUED lnso Area: JRM DOWLING REMODEL-INSTALL FIXTURES AND ROUGH PLUMBING FOR UPSTAIRS BATH AND LAUNDRY. INSTAL FIXTURES IN MAIN LEVEL BATH AND KITCHEN Requested Inspectlon(s) Inspection Historv llem: 230 Item: 240 Item: 250 Item: 260 Item: 290 5877, Unit 8-6 Time Exp: ** Approved *. shahn test. Requested Time: 10:30 AM ' Phone: (303) 548-5877 Entered By: DGOLDEN K Ii ') o/' p N'i \il tl r)\ \._- \\ 'i\ Item: 210 PlMB-Undemround Item: 220 PLMB-Rouoh7D.W.V. 02116/07 Inspect,Action: AP APPROVED ater REPT131 Run Id: 6957 ?L-13?#o' '""0""{i:,1 F"dyF?ffiPon'nn '"n" to Requested lnspect Dat€: Friday, August 03,2007 - Inspection Area: JRM - - Site Address: 2958 S FRONTAGE RD W VAIL INTERLOCHEN CONDOS UNIT B-O A/P/D Information Activitv: M074019 Const Tvp6: Ow;rier: DOWLINC SubTgoe: AMF Phone: 827-9443 Status: ISSUED Inso Area: JRM Descliption: DOWLING REMODEL.BATH FAN AND DRYER VENT INSTALLATION Reouested InsDection(s) Contractor: Ingoection Historv Item: 200 MECH-Rouoh o2l',t6loT Comment: o3lo2t07 Item: Requestor: Coniments: Assioned To:- Action: 5877, Unit 86 Time Exp: '* Aooroved ** shahn Action: CR CORRECTION REQUIRED r vent exceeds 25ft max. deduct sft for each 90 elbow. gir'{t"^.:: , Requested Time: l0:00 AM - Phone: (303) 548-5877 Entered By: DGOLDEN K ['l \) \-,' ^ in,u UqY Item: 3l0 Item: 3'15 Item: 320 Item: 330 Item: 340 Item: 390 REPTI31 Run Id: 59 3L,3?#ot 'n"e""$:,T F"dyF?ffip"ning t"n"ru Requestgd Inspect Date: fqiday, August 03,2007 Inspeciion Area: SH Site Address: 2958 S FRONTAGE RD W VAIL 2958 S. FRONTAGE RD. W. A/P/D Information Roquested Inspection(s) Sub Tvpe: AMF Status: ISSUED U'se: lnso Area; SH Phone: (720)436-1667 RECEPTACLES. INSTALL SI4OKE DETECTORS AND FLOOR Requested Time: 08:00 AM - Phone: (303) 548-5877 Entered By: DGOLDEN K Item: 190 ELEC-Final Requestor: KCB - Lonnie Cordmeds: rvill call (303) 548- 5877, Unit 8-6 Assiqned To: SHAHN'- Action: Time Exp: ,| Inspection Historv Item: 1 10 ELEC-Service Item: 120 ELEC-Rouoh *" Aooroved *' 01119107 Insoector: shahi' Action: NO NOTIFIED Comment: codtesv insoection. Nail orotection reouired for tvoe NM run on surface. 02116107 Insoector: 'shahn Aition: AP APPROVED Comment: reloqate the Upstairs smoke detector out of beam pocket to south side of beam. Arc faults at fihal inspection.Item: 130 ELEC-Conduit Item: 140 ELEC-Misc.Item: 190 ELEC-Final REPT131 Run Id: 5957 ?t-.l?#ot In'p""$:ll+"3yF",lffPon'ng t"n* tu Requested Inspect Date: Friday, August 17,2007 - Inspedtion Area: JF Site Address: 2958 S FRONTAGE RD W VAIL 2958 S. FRONTAGE RD. W. Reouested Insoection(s) Item: 90 BLDG-Final Reouestor: KCB Construction lnc. Coriments: door is open Assioned To: GDENCKLA A-MF Sub Tvpe: AMF Status: ISSUED U'se: VA Insp Area: JP t Phone: (303) 54&5877 INTERIOR REMODEL Requested Time: 02:00 PM - Phone: (303) 548-5877 Fxp: - Entered BY: DGOLDEN K A/P/D Information lnspectlon Hlstory \.. Y \,-'-t- /4 S-r/n,""" so inch he. 8!l'f,bo-*",.*"r.['t ,/' 1 ,1 (M "( i \ i/\""- \r'(\'' [-..' r 1ty'' 1) \.J ''JY \ Item: 501 PW-Item: 226 FIRE Item: 30 BLDG Comment:Item: 70 BLDG-Misc.Item: 90 BLDG-Final 02r16rc7 Comment: 08/16/07 Comment: REPT131 Run Id: 5992 furrv.?to ql_C,r a2\6,' xlO,'u4?- +r 9A+1 nQ. aq, Vt6e E rJ.il6Trr.lGffi+v Ktr'rhN q E F w *Fl 6x6 @ ?art SlPrfgoil ttt*O" oF Afrp{a wu*L (<4 $xb a46 W+s wr u4.. llJ"lLu' he$El+-*S enr, 4'*Swua.s {o" lv1rN,.# {40nr{2 @D iL6\xZ!6ttr<.lO"utlb-+, ffi fX+ tiN We 0( grEnrqo W+ to (e$hd MAIN DECK FRAMING ION PLAN 'U4" - '[$r+';irrt Vail iii*}.'l :','*'iT{,}'1fl -0" i 1' .-I oF4 | rr/f' C' .E d (, L o E J E '--tr e J SECTION A N/FTH Su' Abb _l t lr +,1 I' I I I J I I I lLrf' I ' )rf t6" '-t4" +' ll' fr .]I I I \, G I 14avylX.{t"(.9 rZ-2*o tfXte&gl tlg"Q t6" ta6wt/15 A 14! o,c. +w I I " l\ \ x s{ 0t ,t,i #I J \ #__\ -t-"'t'fAI RS -\ 2, v "10 T e 2.,1 ot I \*bx , I lo t ]",E;. r ,#rffi #t,n / HE P'sl b0 Ytt fig x9 oo 9(,,xi i9 o .E ct (, -u o f E .F tr g a STRUCTURAL SPECI FI CATIONS l) Foundation design based upon assumcd maximum soils bearing capacity of I 500 psf to be verificd by a soils cnginecr at the timc ofcxcava(ion. All footings arc to bcar upon natural uldisturbcd soil or compacted structural fill as approved by the soils cnginecr. Submit copy of reporl to Btmctural cnginoer. 2) All foundation around pcrimctcr ofsl'ucture shall havc minimum fiost protection of48" to bonom offooting. All foundation walls ard columns to hc ccntcrcd on concrete footings unless shown otherwisc on plans. l) All cast in place concrctc must bc msde with Potlland ccment and sttain minimum comprcssive strcngth of30O0 psi aftor 28 days (minimum comprcsstvc strength of 4000 psi after 28 days for concrclc uscd in slabs). Design based upon BUII,DING CODE REQLIJREMENTS FOR REINFORCED CONCRETE (ACI 3l 8), 1999. Concrcte placement to confonn with "Construction Requircmcnts" ss defincd in ACI 318. AII exposed alges ofconcrctc shall havc %"chsnfcr 4) Rcinforcing steel is ASTM Grad€ 40. Rcinforcement placcmcnt shall conform to MANUAL OF STANDARD PRACTICE, 2001 as prcpared by CRSL AII lap spliccs to be milimum 36 bat diamctcrs, sll ho.izontal rcinforccmcnt to bc continuous around comers and at wall intcrsections. Minimum rcinforcement protcction- -concretc poured against carth -concrete poured in forms -concretc slabs 5) AII lunrber shall bc Doug-Fir#2 S4S orbetlcr, all wolrnanized lumbcr shall be Hcrn-Fir #2 S4S or bcncr (all lumbcr within 18" of linish gradc must be wolnranized). All timbcrs are Doug-Fir #l or better. All columns to be continuous bcaring to foundation. 6) Covcr dccks with 2x6 Redwood, or approved equal, with 2 screws pcr bearing point. 7) Live loads used for design- -Roof-80 psfsnow. -Floor-50 psf rcsidential. -Dcck-100 psf. -Wind-90 nph (3 second gust), Exposure B. -Earthquake-Z,one C-IBC. E) All construction must comply with the 2003 lntcmational Building Codc as adoptcd by thc Town ofVail Building Dcpedment and thc "Ccncrgl Conditions of thc Contract for Construction" (AlA Documcnt A20l). All construction must be completql within the tolerances describcd in the "Rcsidcntial CoNtruction Pcrformancc Guidelines" as prcparcd by the NATIONAL ASSOCIATION OF HOME BUILDERS. 9) All bcorns, joists, and raftcrs are to bcar upon walls or bcamt, or bc hung with SIMPSON Strong-Tic hangcrs or approvc cqurls. l0) All slructural members sre shown in their final positions propcrly braced and supportcd; during construction it may bc ncca$ary to tcmporarily rhore ponions ofthc structurc while othcr portions arc bcin8 constructcd. Coltcct thc cnginccr for consultation ss rcquircd. I l) Gcncr&l Contrsctor is rcsponsiblc for all non-spccified conncctions, cont&ct cngineqr for detsils ss rcquircd. Thc enginccr is to lpprovc lll ltructur&l substitutiorl!. 12) Gcncral Contractor is to coordinat? all diaphr.gm penctrstions (i,c., chimncye, plumbing, sewers, ctc.) through floors, walls, roofs and foundation walk with alrpropriatc sub-contractors. Gcncral Contractor is responsiblc for thc marnr, methods, techniques, scquences, procedurcs, workmanship, scasonrl schcduling andjob-site safety associatcd with lhis project. The Gcneral Conrsctor is to verify lll diDcnsions and clcvations with thc rrchitcctual drswings. Notify cnginccr ofall con{licts and omissions bctwcq various clcmertts ofthc working druwings and thc cxisting conditions prior to commcncing with that portion oftho projcct. Gcncral Contractor is to inspcct rcmodel projects and verify prior usc and propcr disposEl of cxisting matcrials (i.c., asbcstos, ctc.) ss rcAuircd by code. ldcntity ofoll existing hidden structurul plens bqsed upon plans by visual inspcction. ll) All matcrials cxposed to cxterior and or nioistuc conditions 6h8ll bc trcaled for thcse conditions (i.e., chcmical restment, staining, painting damproofing, mcmbrancs, flashing, ctc.) rs requircd by codc. All material$ to be treatcd for fire resishnce rs required by codc- rx*. oF Ex\9TrH6 w*. tu 9e Fe+aeleo r-&E E4 q ) 2" 1" C. (o o o sl II z 3 1 @ r- I \_ ,*, *ffi)( P WR^gWW (rNFecnoNs T"MA{oH fitrDFlG Nrvl<L f]$11tJo PFT4ftH UPPER DECK FRAMIT.IG uH4) A ryg$kLw NtD W/+q'v|ttY 06 ffi oF4 )t W+tp r'lfrlr !ltpTit oF M4 ggt191o" 0tttT 96. 114" = 1'- 0" b\l{'.n$G E&te 0( ?oo? Er|9n{6 FkttED 6xlZ Id 9e ebAovED ROOF FRAMING 1f4" - 1'- 0" S3 oF4 ?Fosve y+'' Nfie Wvlw doPffr(.'fiort To r1lfi4t A.lsn$G Ttnc^L ?&rL EHE ctt (, L.o =o I ;FE LX5 rr! 88 5ed {+?.,".T',".-i)"-""1i:ilff l.Llra fiia e=E deq gF3 flq off F z o 6 I (\l UJ z f ? (o o .s o CI L -g o J E .F c o ?a FA !! ro -q{ (o 6@ \t \o Ni x .:3 .oo ^i Eg tt6*t 6ylQ- Wha ft&?t*ar lrTjLT,N*niE i | ?+'+^o\t@ N q, NettJ 6x6 (oLr4!|'tJ (o o o (Y llJ z f ? (o Wt57t"16 b*6 &Luf4l.l I0 F'trrArl I WEST ELEVATION . *rkwo A+9A wtr6te6 911B.tqod o( W$aN6 WtIo *n,n^| UrFrH -1 i'+l-1-_F +-+54 oF4 Ex\5Trrl6 fiA{t^yt W*|4 19 OF- W*1o't?D l '1rO c0 t=z=lllo =E llJto r rE(vz2,E 100 JOI o-=H UJHY s.Z?v9> O6 rrtO t.\G F z trtT I I Ol EXITTING rl SOUTH EI.].EVATION +- --+ 114" = 1'- 0"114',t---a4 Q"ir +-- {.2t pm Vail_ CO'- Cirv Orl - Requ$ted Inspect Date: Monday, October 09, 2006 - Inspectlon Area: JRll Site Address: 2958 S FRONTAGE RD WESTVAIL INTERLOCHEN #58 A/P/D lnformation t'otyB3: 0f Status: ISSUED lnsp Area: JRM Phone: (303) 54&5877 Phone: (303) 548-5877 Entered By: DGOLDEN K Requested lnsoec{ion(sl ltam: Requestor Coniments: Assioned To:- Action: Inspoctlon Hlstorv Item: 501 PW-Item: 226 FlRt Item: 10 BLDG Item: 20 Item: 30 Item: 50 Item: 60 Item: 70 RM N SITE Action: DN DENIED InsDector: JEC INSPECT PIERS NOT PADS INST,Item: 90 BLDG-Final REPTl31 Run Id: 5745 '/r"l'-u'ao',A'- C.s'tufllFf EEl,El.rCFttENT Design Review Board ACTION FOR}I Department of Community Development 75 South Frontage Road, Vail, colorado 81657 tel:, 97o.419.2139 fax: 970-479.2452 web: www.vailgoucom Project Name: CHRISTOPI'IER RESIDENCE Project Description: DECK DRB Number: DR8060392 Partlcipants: owNER CHRTSTOPHE& BARBARA K. -KEE08/28/2006 2550 BALD MT RD VAIL co 81657 APPLICANT CHRISTOPHER, BARBAM K. .KEEO8/28/2006 Project Address: Legal Description: Parcel Number: Comments: Motion By: Second By: Vote: Conditions: 2550 BALD MT RD VAIL co 81657 2958 S FRONTAGE RD WEST VAIL Location: INTERLOCHEN 85 Lot: 3,4, Block 5 Subdivision: INTERLOCHEN CONDO 2103-143-0800-9 BOARD/STAFF ACTION Action: STAFFAPR Date of Approval: 08/31/2006 Cond: 8 (PLAN): No changes to these plans may be made without the written consent of Town of Vail staff and/or the appropriate review committee(s). Cond: 0 (PLAN)I DRB approval does not constitute a permit for building. Please consult with Town of Vail Building personnel prior to construction activities. Cond: 201 DRB approval shall not become valid for 20 days following the date of approval. Cond: 202 Approval of this project shall lapse and become void one (1) year following the date of final approval, unless a building permit is issued and construction is commenced and ls diligently pursued toward completion. Cond: CON0008414 All exterior materials and colors are to match the previously approved decks. Planner: Bill Gibson DRB Fee Paid: $250.00 O Minor Exterior AlteraOns Application for Design Review Department of Community Development 75 South Frontage Road, Vail, Colorado 81657 tel: 970.479.2128 tax:. 970.479.2452 web: www.vailgov.com General Information: All projects requiring design review must receive approval prior to submitting a building permit application. Please refer to the submittal requirements for the particular approval that is requested. An application for Design Review cannot be accepted until all required information is received by the Community Development Department. The project may also need to be reviewed by the Town Council and/or the Planning and Environmental Commission. Design review approval lapses unless a building permit is issued and construction commences within one year of the approval. Description of the Request:l(L'trart,r--:<,'llc:r- ici ()ft tc!,taA.- 5, Z; Location of the proposar : r-ot2{|a wrxt,{ subdivision: fis ra< r.-, c't t -t) n {8 Physicaf Address: ;laSF' 5. fna,,.tracc, Zm USs'>'r +56 -.- parejlt no.z Q-l O 3 ) 4 3a & u,>Q (Contact Eagle co. Assessor at 970-328-8640 for parcel no.) Zonins: RC Name(s) of Owner(s): Mailing Address: Owner(s) Signature(s): Name of Applicant: Mailinq Address: 2 - V c'JI E-mail Address:9ta- q1q 9-*<- $50 Plus $1.00 per square foot of total sign area. No Fee $650 For construction of a new building or demo/rebuild. $300 For an addition where square footage is added to any residential or commercial building (includes 250 additions & interior conversions). .9# For minor changes to buildings and site improvements, such as,cF3ft re-roofing, painting, window additions, landscaping, fences and retaining walls, etc. $20 For minor changes to buildings and site improvements, such as, re-roofing, painting, window additions, landscaping, fences and retaining walls, etc. $20 For revisions to plans already approved by Planning Staff or the Design Review Board. No Fee v c @ D r O \Al ^0 -\\ Type of Review and Fee: tr Signs tl Conceptual Review D New Construction Ll Additlon B* Minor Alteration i (multi-family/commercial) fl' Minor Alteration (sin gle-family/duplex) tr Changes to Approved Plans tr Separation Request phone: c( 1L't 4 -l t" .3--79'U v\-{.-r o o *m .'trITTROPETTYOUIIIR UIIfTEIAPPROYATTSTER fts,oorr oF I, (prlnt acscrtdon) pwmu*gUrlswrEf apPrc$tlofdlcpb|rdlEl th J'/,^JP- oC' " $lfiClhrue bccn st|!rn|&xlbdrcTh{0 oavbf Orrilttty Dctt*PilttOcpltnrnth' ttc Fof$d fnF|!l'r|ttet6 I fudrc' undcrsnd tnatotrrnroddru ||rly bettta&b tht ph|rtouettEaptlcof t'rc ttyleo' FoG$b efflta s|r|p|lnewlut tETonrt aedobh E€ mat ngubnsE' * tlrrlou PFlil13 F@Tffi oucornpleEd*$Gdll! rd TTITfl. P.A1 Lf t'I f6 .\ -0 P s 9 \ \ .T' ith ,EE i$ LA S e \.|P 1 .l V o n F-1 b -,1 0"1 t\ l-o c! Nr r* c1 h *t*ft******++**f************t*****t+*+*******f************+*+*t******+**+*+*++++*t+*f+++++*+ TOWNOFVAIL, COLORADO Statement *******a*******************i+f*******+++t+++++**t*tt+*++++t****t***+*+********************** statement Nurnber: R0G0001302 Arnounts: $50.00 0g/Ze/2OO6LL:11 AM Palments Method: Check CIIRISTOPHER Init: iIS Notation: 149/BARBAR;A Permit No: Parcel. No: Site Address: Location: This Palmenb: DR8050392 2103-143-0800-9 2958 S FRONTAGE INTERLOCHEN #58 T14re: DRB -Minor A1t, Conm/Mult.l RD WEST \TAII, Tot,a1 Feea: Tota]. AIJIJ PmTg : Balance : $s0.00 ***++f*+++++***++++*++*++**+l*+t***++++***+******+*++++*+**t*t*****t****+***+****t+*f+++++++ ACCOIJNT ITEM LIST: Account Code Descript ion DR 001000031t2200 DESIGN REVIEW FEES 50.00 $s0.00 $s0.00 s0.00 Current Pmts @ir'utlllY EEYELOFiEfII 0esfrsn Review Board J|ETIOI{ FORF{ Departmer,t of Ccmrnu nrty Development 75 South Frr.r'tage Road t':t ;, Coloredo 81657 tei:97C..1;'9.2139 fax:970,479.2452 w,gb: wwrry. vail0 o t. coft Protect Name: Project Description: PafticipanB! DOWUNG WINDOMIS/DGOJ.:ORB Numberi DR8060469 RNAL APPROVAL FOR A MIN(Jd, ALTEMTION FOR REPLACING 6 WINDOWS AND 1 DOOR SAME FOR SAME OWNER DOWUNG, PATRIaK gD'^,\i:D 8r CAIC/":,t2t0u 10912 TOSCANA SANDS SAN ANTONIO 'lx 78249 APPUCANT BENCHMARK CUSTOtvt pi ii,-DERS, I j (l/(lij/'2r106 Phoner 970-926-7309 P.O.BOX427 34323 HwY. 6, F:dwards co 81632 License: 715-B CONTRACTOR BENCHMARK €l.lsT()t\/ 9'.IILDEFS, :11/C5,/?'106 Phone: 970-925-7309 P.O. BOX 427 34323 Hwy. 6, Fdvrar:l:; co 81532 License: 715-B i,ltation: Y^'t J'-Li,'/h-ga' Legal Descrlptlon: loh 3,4, Block: 5 Subdivisirrn' INI'F-'{ r)cHFs'r roNDo Parcel Number: 2103-143-0801{) Comments: Moffon By: Second Byl Vote: Condltions! $:r)f1r'x 1'x 751tF ACTIOn i Artion: STAFFAPR .i i.rte of Approval: 10/06/2006 Cond: 8 (PI-AN): No chan-oes'-o lhese pi',ts may b* liade rvithout the written consent of Town of Vall staff and/o!'tl': 3:;':c:!'r:.':'r :9vler^' :'r l r: 'iflr,lr'.:)- Cond:0 (PLAN): DRB approue! 't,-)?i ::t canstii:lte i ?:rf r ii' fcr building. Please consult with Town of Vail Builciirg personr)::l prior to ccns:rucur-rn activities. Cond: 201 DRB approval shall ^.of .)er.cI'r, t,:rli':1 i'r ,:ri {'a'i f,r,'rrwing the date of approval. Planner: Joe Suther !"rPB Fee Paid: f25O.O0 Minor Exterior Alterations Application for Design Review Department of Community Development 75 South Frontage Road, Vail, Colorado 81657 teli 970.479.2L28 fax:. 970.479.2452 web: www.railgorr.com General Information: All projects requiring design review must receive approval prior to submitting a building permit application. Please refer to the submittal requirements for the particular approval that is requested. An application for Design Review cannot be accepted until all required information is received by the Community Development Department. The project may also need to be reviewed by the Town Council and/or the Planning and Environmental Commission. Design review approval lapses unless a building permit is issued and construction commences within one year of the approval. Description of,the Request:v r)$,o o o r -.O Location ofthe Proposal: Lot:_ Physical Address: (Contact Eagle Zoning: Name(s) of Owner(s): Mailing Address: Owner(s) Signature(s):/2f th"; Ll re Name of Applicant: Mailing Address: E-mail Address: Type of Review and Fee: tr Signs E Conceptual Review E New Construction D Addition F- Minor Alteration (multi-family/commercial) E Minor Alteration (single-family/d u plex) tr Changes to Approved Plans tr Separation Request Fax: $50 Plus $1.00 per square foot of total sign area. No Fee $650 For construction ofa new building or demo/rebuild. $300 For an addition where square footage is added to any residential or commercial building (includes 250 additions & interior conversions). $250 For minor changes to buildings and site improvements, such as, re-roofing, paintlng, window additions, landscaping, fences and retaining walls, etc. $20 For minor changes to buildings and site improvements, such as, re-roofing, painting, window additions, landscaping, fences and retaining walls, etc. $20 For revisions to plans already approved by Planning Staff or the Design Review Board. No Fee Oot OS OG 07: 35a 1a l||a?F l ott dt Lo/0[/os trtD 1lrlt FAtr, Zt{3Tt{?14 f,ESSIAR oct O4 zoOG 3:56€11 BEnchoeFk Guston Btrl ldeFs Art-l:fl -'fi{ lrlinor Exterior Alterations (?13J613-OZgl & COLLINS 3?Il9e5?3(rs p- r ld oo2 P. r st? eln,\."Efr gZo.4iT.:L?B nx: s70.179,Z1rz web: wwtu,vallgpn-com c:nenl hrgniadon: ru prolects legutring desrEn ivtaw must rtcelve appor.dl prior to Eubmltln9 a. bulldlng p€tnlt €FPl|crUon. -Plq$rghr 6 ttrc suLmlttct requr-rnnrelG rvr tlie tgdd.ll.r appovtl Erat is ruEucstEd, An rnslkrdon tor DEs{gn REvl€tr annot br rctrpud urtti dl Gguir€d nroinretor'p raiiYld by the clntmunlly psrdogmrrt DePrtgnettt'- The projeEt may rhi need o ae feiieHld !y tlre Torvn 6undt ind/nr tre Plannlr|g and Envlroirnrrrbl Commlsalon. beiign rrileu rnpronel lqFrr* salcaE e bllldlng D€rmlt ls bruid a||d GottFtluFion om||sarEg Pld n qrb tcerdtl€.Flr!}rlj Lncstion gf the Fmpulr [.ot-Eloct:- SuDdlvlsllni- Phyiicrl AdCtrr.: 7lo\t4WdLo (Contact Eagle Co. Asse$Dr tt 970.328.8640 for Pan:el no.)Fitel lro.: lonllg: Name(6) of ownct(!): MEilIng Addrers: ;>>owner(e) signEturG(3): TYpe of Rovlew erid Fee:o sj"r tr ConsEphtsl Rcvletr, tr ilerd Confu€tton o Adcntoh F- Mirrarrltenuon (multHrnri lY/comnetrctal) O Mlnpr Ahretion (9nrle$mik/dUplex) O ChroBrs b APPtwed Plrns o Separrdon RFqu$t *50 . llUE tr,o0 Fcr qu|rs hot of bbl sign are!- No Fec t6so fui tonrtructiurr of ! new butldhg 6r demo/r€bulld. ifoo rcr tn addltlon whctE quar€ tDoagc ls added F. rnv rtrsldentiel or ' ' emmerdrl bulldiltg (lrrcluder 2!tu dCl(ons & inltiid cont,Etlhhs). i25O Fof nlnor dBnEEs to hlldlhgt alld Cte imPnwrjnenb, sucl |9' tr+'ttlhg, pltrrtinE, wi t&' rddlttons, hndscrphg. fqncef rnd rttrNng $rtlls, Ftr. f fO r'or r|ft6or dlrntEs F bullfilt9s lhd ctc lmp|EvE neots, sJdt e5, .retloflngr paintlngr wtrrdow rddltilns, lan(hoPlng, igncs and rgbidng w8lls, ctr. $lo ror auit{ons b drrc alrcady approved by Pbnnlng saff or the . Drdgn trarl6r, gortd' tao Fee Phcnc! ,d{-:J'Jr'[tn l'lll llrl h/itEl rrvl Frr lrr.r ErtDtrr.r ,Ff Applicatiol fio.t Design Revlew ^.,/r*/f.,'"'Deprftsreft of orilnunEy DerploPn$ht . ..r.t € Lt' I , 7E SolrBl FulE96 holq. vrl, Qlqrft Blt57 D Xrcx'-' trfr 970.4E.lLlB firx:970.179,21r2 F-' Oercrlptiun qf liE Rcqulstl ilrrre of lpplicant: Community Development Department Town of Vail 75 S. Frontage Road West Vail, CO 81657 Re: Interlochen Unit 8-6 To whom it may concern: The purpose of this letter is to convey the approval of the lnterlochen Condominium Association Board of Directors (the "Board") for Pat and Carol Dowling (the "Owners") to undertake certain refurbishments to their condominium, Interlochen Unit 8-6 (the "Unif'). Specifically, the Dowling's have the Board's authorization to replace the current 33-year-old windows and sky light in the same identical size, style, and exterior color as present, so as to maintain the aesthetic integrity of the complex. The Dowling's further have approval to proceed with other proposed renovations as set forth in the drawings they provided to the Board for its September 23, 2006 meeting. No structural changes to the Unit are to be made without further consent of the Board. Construction debris will be handled via existing on-site dumpsters managed by the HOA, in accordance with Interlochen Homeowner's Association policies. Please call 303-666-4435 if you have further questions. Elizabeth B. Lane Secretary lnterlochen HOA Cc: Pat & Carol Dowling o o @iill't$alTY C€ryRnP||]|EHt Design Review Board ACTIOI{ FOR]4 Department of Community Development 75 South Frontage Road, Vail, Colorado 81657 tel: 970.479.2139 faxi970.479.2452 web: www.vailgov.com Project Name: INTERLOCHEN C& D RAIUNGS Proiect Description: DRB Number: DRB050409 INTERLOCHEN CONDOS COMMON ELEMENT-FINALAPPROVALTO REPLACE UPPER RAIUNG ON BUILDINGS C & D; SAME MATERIAL, SAME COLOR REDUCE SPACING TO 4, AND MISE HEIGHT TO 42" Participants: OWNER ROSS, JEFFREY A. 509 BOLIVAR ST 09/0s/2006 BELI.AIRE \X 7740r APPUCANT KCB Construction Inc. 0910512006 Phone: (303) 548-5877 2606 S. MILLER DRIVE, APT 207 LAKEWOOD co 80227 License: 804-8 ProJectAddress: 2958 S FRONIAGE RD WESTVAIL Location3 INTERLOCHEN CONDOS BUILDINGS C & D \/l-\\---uu^kr,.ru4r...- Legal DescripUon: Lot:3,4, Block:5 Subdivision: INTERLOCHEN CONDO Parcel Number: 2103-143-0801-3 Comments: Motion By: Second By: Vote: Conditions: BOARD/STAFF ACTION Action: STAFFAPR Date of Approval: 09/05/2006 Cond:8 (PLAN): No changes to these plans may be made without the written consent of Town of Vail staff and/or the appropriate review committee(s), Cond:0 (PLAN): DRB approval does not constitute a permit for building. Please consult with Town of Vail Building personnel prior to construction activities. Cond: 201 DRB approval shall not become valid for 20 days following the date of approval. Cond: 202 Approval of this project shall lapse and become void one (1) year following the date of final approval, unless a building permit is issued and construction is commenced and is diligently pursued toward completion. Planner: Joe Suther DRB Fee Paid: $250.00 ffi ^ # i ::""'.':ffi ''T flff l"l'$: * I0t4nrOTTAfrffi ^'i:i:i%:lB:i'}?";x?!ii"i;doi1657 web: www.vailoov.com General Information: All projects requiring design review must receive approval prior to submitting a building permit application. please refer to the submittal requirements for the particular approval that is requested. An application for Design Review cannot be accepted until all required information is received by the Community Development Department. The project may also need to be reviewed by the Town Council and/or the Planning and Environmental Commission. Design review approval lapses unless a building permit is issued and construction commences within one year of the approval. LocationoftheProposal: Lot:B-t{ Block: 5 Subdivision: Physical Address: Parcel No.: Zoning: Name(s) orownerlsy:-fn{CrLo cL,^ fo". .ln . 45 soc rt'{-?oil Mailing :3O3- Owner(s) Signature(s): Name of Applicant: 4"uc^v F w a o o \o $50 Plus $1.00 per square foot of total sign area. No Fee $650 Construction of a new building or demo/rebuild. $300 An addition where square footage is added to any residential or commercial building (includes 250 additions & interior conversions). $250 Minor changes to buildings and site improvements, such as, re-roofing, painting, window additions, landscaping, fences and retaining walls, etc. $20 Minor changes to buildings and site improvements, such as, re-roofing, painting, window additions, landscaping, fences and retaining walls, etc. $20 Revisions to plans already approved by Planning Staff or the Design Review Board. No Fee (Contact Eagle Co. Assessor at 970-328-8640 for parcel no.) E-mail Address: Type of Review and Fee, tr Signs E Conceptual Review E New Construction tr Addition I Minor Alteration ( multFfamily/commercial) E Minor Alteration (single-family/duplex) tr Changes to Approved Plans tr Separation Request roromceERlv?n".,.*o., (f?( ,r. /'(Lo La".i' u..rinso"r", /O'V66 o*rro., QZ r0r4n'm I, (print name) ]OINT PROPERTY OWNER WRITTEN APPROVAL LETTER P".sl&;* o4 D"'{ttto"[^'e,. co"'Jo '4sso"' description) provide this letter as written approval of the plans dated which have been submitted to the Town of Vail Community Development Department for the proposed improvements to be completed at the address noted above. I understand that the proposed improvements include: I fufther understand that minor modifications may be made to the plans over the course of the review process to ensure compliance with the Town's applicable codes and regulations. ?joinM€r€f property locatedrat $ddf r{le9{ r.b J.u,"-* ,n_.[ .1,',',1 f.., 9tr,{f gk/.?' T^ \.l.Lor[*", ,u,."i gLlo toL Page 2 of I3lI2l02/04 MINOR EXTERIOR ALTERATIONS TO BUILDINGS AND SITE IMPROVEMENTS SUBMITTAL REQUIREMENTS General Information: This application is required for proposals involving minor exterior alterations and/or site improvements. Proposals to add landscaping do not require DRB approval unless they involve the addition of patios, water features, grading, or the addition of retaining walls, I. SUBMITTAL REOUIREMENTS** o Stamped Topographic Surueyx tr Site and Grading Plan*o Landscaoe Plan*u ArchitecturalElevations*D E)derior color and material samples and specifications,tr Architectural Floor Plansx D Lighting Plan* and Cut-sheet(s) for proposed fixtures o Tltle report, including Schedules A & B to veriry ownership and easements* S- Photos of the existing site and adjacent stntctures, where applicable, $ Written approval from a condominium association, landlord, and joint owner, if applicable D Site-specific Geological Hazard Repoft, if applicable*o The Administrator and/or DRB may require the submission of additional plans, drawings, specifications, samples and other materials (including a model) if deemed necessary to determine whether a project will compty with Design Guidelines or if the intent of the proposal is not clearly indicated. Please suhmit three (3) copies of the materials noled with sn astefisk (*). xxFor interior conversions with no exterior changes, the submittal requirements include a complete.set of existing and proposed floor plans, a title report, and written approval from a condominium association, landlord, and joint owner, if applicable, I have read and understand the above listed submittal requirements: c^ Contractor Date Page 3 of t3ll2l02l04 ****'i+++**+*****************+++++*++++++*+*****************+*f+*+++**********+********+*ff,*+ TOWNOFVAIL. COLORADO Statement *'!*****'l**:*****tf t+******1.***** ************ +t+*+*+********** *****+****+*+* + *t**********,***** SEatement Nurnber: R0500013?0 Amount: $250.00 09/OS/2OO6OL:55 pM Palment Method: Check Init: iIS Notat.ion: 4922IKCB CoNsT Permit No: Parcel No: Site Addrese: Location: Thie Payment: $2s0.00 $2s0.00 $0.00 DRBo50409 Type: DRB-Minor AIt, Conun/Multi 2103 -143 - 08 01- 3 2958 S FROIITAGE RD V{EST VAIL IIiIIIERL,OCHEII CONDOS BUf ITDINGS C & D Tot,al Fees: ToIaI ALL PmIe: Balance : $2s0.00 **llt+******ti+******+++*+*t*t+**++++++******************+****f*ff+**********+**f************ ACCOIJNT ITEM LIST: Account Code Description Current Pmts DR 00100003LL2200 DESIGN REVIEVI FEES 250.00 F.P 2'P 2 *r * \-)(r-.\ ., rn \ .- '-u'' ' f'' ,'\- j't j- \> \ h 't j1\ .--. \r.-L'-'v'- # I a DEPARTMENT oF COMMTITY DEVELOPMENT TOWN OF VAIL 75 S. FRONTAGEROAD VAIL, CO 81657 970-4'79-2138 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ADD/ALT MF BUILD PERMIT Permit #: 805-0303 Job Address.: 2958 S FRONTAGE RD WEST VAIL Starus.....: ISSUED l,ocation......: INTERLOCHEN CONDOS, UNIT A-2 Applied...: 09t29t2005 Parcel No....: 210314308002 Issued...: 01/2312006 l.egal Description: i !{ -,r.) t O ((61; Expires...: 0712212CfJl6 Project No. ..: owNER SUSAII L. KAEMMERLEN rJrVrNG T09/29/2OO5 2958 S. FRON|AGE ROAD, T]NIT A-4 VATL co 81657 CONIRACTOR KAEMMERLEN, SUSAN L. 09/29/2O0s Phone: (203) a56-9a2s 2958 S. FROI{TAGE RD. W A-4 VAII, coLoRADO 81557 License:368-L APPIJICANT SUSAN L. KAEMMERLEN IJIVING TO9/29/2OO5 2958 S. FRO}ITAGE ROAD, T'NIT A-4 VAIIJ co 816s7 Desciption: INTERLOCHEN CONDOS-ADD TO LOFT: REPLACE BEAM AT STAIRWAT BY MAIN DOOR; INSULATE AND SHEETROCK UNDER STAIRWAY: INSTALL NEW WINDOW IN LOFT AREA. Occupancy: R2 Type Construction: V A Type Occupancy: ?? Valuation: '$z,OOO.O0 Add Sq Ft: 0 Firepface Information: Restricted: Y t ofcas Appliances: 0 # ofGas Logs: 0 /of Wood Pellet: 0 !*,t ri **:t***,**{.* *,t,t * Building---- > $69.25 Restuarant Plan Review-> 90.00 Total Calculated Fees-> $186.51 Plan Check--> S4s.01 DRB Fee----> go.oo Additional Fees -*---> $0.00 Investigation-> $59.25 Recreation Fee--------) $0.00 Total Permit Fee----*-> $185.51 Will Call---- > $3.00 Clean up Deposit----> $0.00 Payments----.-------- > S185.51 TOTAL FEES----------- > $186.51 BALANCE DUE---------> $0.00 Approvals: Item: 05100 BUILDING DEPARTMENT oL/23/2oo6 cdavis Action: AP Subject to field inspection See condition Item: 05400 PI-,ANNING DEPARTMEIfl| t2/ 05/2005 warren Action: DN Project denied as the condominium association withdrew its approval . ol/23 /2006 warren Actionr AP The condominiun association has submitted approval on afanuary 23, 2006. Item: 05500 PIjBLIC WORKS ltem: 05500 FIRE DEPARTMENT PAGE 2 *** ** *:tr * *( ** * * * * * * ** ** * * ** t * {cx.** ** d( {< tt* * * ** * {< * * * * * * * * * * * * * ** * * * * ** * * * * * ** * d. i< * * * * * * * * * * * * t *trx**,rx*** *{<{<*:* ** CONDITIONS OF APPROVAL Permit #: 805-0303 as of 01-23-2006 Staus: ISSUED ******************:******!i'*'r4.*:t,t*,f :F:F{.{.*.***:F:F*****,t !t {< * *. *** * ** *** * * *r. * ** * * * * * * * * * * * +:} {. * * * * * * * {.,r d.,r.,F{<,F * ** * * * * Permit Type: ADD/ALT MF BUILD PERMIT Applied: Ogt2gt}C/Jis Applicant: SUSAN L. KAEMMERLEN LIVING TRUST Issued: oun/2m6 To Expire: 0712212006 Job Address: 2958 S FRONTAGE RD WEST VAIL Location: INTERLOCHEN CONDOS, UNIT A-2 Parcel No: 210314308M2 Description: INTERLOCHEN CONDOS-ADD TO LOFT; REPLACE BEAM AT STAIRWAT BY MAIN DOOR; INSULATE AND SHEETROCK UNDER STAIRWAY; INSTALL NEW WINDOW IN LOFT AREA. Conditions: Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: 14 (BLDG.): ALL PENETRATIONS IN WALLS, CEILINGS, AND FLOORS TO BE SEALED WITH AN APPROVED FIRE MATERIAL. Cond: I (FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY WORK CAN BE STARTED. Cond: 40 (BLDG): (MFR/COMM) FIRE ALARM REQUIRED PER NFPA 72. Cond: CONfi)07799 This project was issued a stop-work order prior to a pennit being issued. The owner shall comply to the requirements of the inspector to remove any materials that may conceal elements of building construction to deterimine code compliance. l See page 2 of this Document for any conditions that may apply to this permit. DECLARATIONS I hereby acknowledge ttrat I have read this application, filled out in firll the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and suMivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOI R HOURS IN ADVANCE BY TELEPHONE AT 479-2149 OR AT OIJR OffiCE FROM 8:00 AM - 4 PM. Q..- A. SIGNATURE OF OWNER OR CTOR FOR HIMSELF AND OWNEF ********'**tf*l*****'l'f+********t+t+*+ff+**+********+***t*********t**+++*+****+*************** TOWNOFVAIL, COLORADO Statement ****++*********l*****+*'i'*f***t+*++l*+*++**++************++**+*++*fa*++*+*+++**************** Stalement Number: R0600000G2 Amount: g1g5.St O]-/23/200604:46 pM Pa)rment Method: Check fnit: DDG Kaer nerlen 1540 Notation: Susam $186. s1 *******************+{'+*l*+++t**+*'tr******{.*********+**+*********************+i*++************ ACCOI,JNT ITEM LIST: Account Code DescriDtion Current Pmts Fermit No: Parce1 No: Site Addrese : I-,ocation: This Palment: BP 00100003111100 PF 0010 00 031123 0 0 PN 00100003153000 wc 00100003112800 B05 - 0303 2103-143-0800-2 2958 S FROIqIAGE R-D trlEST VAIL IIITERLOCHEN CONDOS, I'NIT A-2 rype I ADD/ALT MF BUII.,D PERMIT Tolal Fees: Total ALL, Pmts: Bal-ance : 9185. s1 s186. s1 $0.00 BUIIJDING PERMIT FEES PI..AN CITECK FEES INVESTIGATION FEE (BIJDG) !{ILI, CALL INSPECTION FEE 69 .25 45.01 59 .25 3.00 etc.! CoNTRAC-IOR tN FORMATTON General Contrtct,ci i. n p,.- ljtrl€r',t,r1 ; 1;t LE N t-:<r3 - {'{ L 'i | 'l i Email address:I L:> ll / t't( >tlu Q- <: l v? re: { \,--);' ,- ,-\ CoMPLETE ULUATION R BUILDING PERM :BUILDING:$ , j-ao IT Labor & Mafcriale : ELECTRICAL: $ <-<tct ----- Pr-UtutgtNC,$:MECHANICAL: $TOTAL: g F_'olfarcel # Contact le Cou Assessors Otrrce af 920 -32g_g640 or visit **lii*t.ltri*rt*ttltrrr***t.*r'r**t**FOR OFFICE USE oN Ly+.-!*rr***f,rr**r*.* * * i rr *r* rr*rrrrr^'r Fari,..Lf;a/Os143o goo&- Job Name: / 1 Job Address: uu rT 4 2_ a r{E 5", Fnd^/TA Ca Ro Subdivision: /- / a/ r/ 6 -//t,:- ^ /ft't-/44 zTsP S. F,<"-7a44 R4 '/Rm CorsuLT*^....J ISS: | ^.E "ar, / fl!:4d. f{1L vqrL yr6 t&: -9(?- ?3?r Work Class: New ( ) Addition ( )Remodel (y, ) Repair ( 2<) Demo ( )WorkType: Interior(11 erGr-f J-ffi Does an EHU exist "t thi" to."tion--y"rflffi Type of Btdg.: Singte-famity ( ) Two-famity ( )Multi-family ( ) Commercial ( )Restaurant ( ) Other ( ) No. of Existing Dwelling Units in this buildinq:No. of Accommodation Units in tnis buitOing; Wood/Pellet( ) WoodBu Wood Burning (NOT ALLOWED a Fire Sprinkter StstemE;Gt--Tes Document2 05/20/2005 fi ,:,f"- t, ,:F,1.{ I0hh,m Project Name: Depaftment of Community Development Project Address:FR ?^r-r-t+ I z / This checklist must be ampleted before a Building permit aopliation is acceoEd. o All pages of application is complete { nut DRB approval obtained (if required) Provide a copy of approval form n Condominium Association letter of approval attached if project is a Multi-Family complex o Plan Check Fee required at submittal for projects valued over $100,000.00 (See attached Construction Fee Schedule for calculations) o Complete site plan submitted o Public Way Permit application included if applicable (refer to Public Works checklist) o Staging plan included (refer to Public Works checklist) No dumoster,oarkino or material storaoe allowed on roadwavs and shoulders without written aporoval o Asbestos test and results submitted if demolition is occurring o Architect stamp and signature (All Commercial and Multi family) o Full floor plans including building sections and elevations(3 sets of plans for remodel/additions, 4 sets of plans for new SFR and Duple:<, 5 sets of plans for MulU-Family and Commercial Buildings) t:t,' Window and door schedule o Full structural plans, including design criteria (i.e.loads) D Structural Engineer stamp and signature on structural plans (All Commercial and Multi Family) o Soils Report must be submitted prior to footing inspection o Fire resistive assemblies specifred and penetrations indicated o Smoke detectors shown on plans o Types and quantity offireplaces shown I have read and underctand the above listed submittal requirements: Applicant's Signature:'i'^->tZr^*--L Date of submittal: Document2 Received By: 05/20/2005 tt BUILDING PERMIT ISSUANCE TIME FRAME If this permit requires a Town of Vail Fire Department Approval, Enginee/s (Public Works) review and approval, a Planning Department review or Health Department review, and a review by the Building Depaftment, the estimated time for a total review may take up to six (6) weeks. All commercial (large or small) and all multi-family permits will have to follow the above mentioned maximum requirements. Residential and small projects should take a lesser amount of time. However, if residential or smaller projects impact the various above mentoned depaftmenb with regard to necessary review, these projects may take up to six (6) weeks to review and approve. Every attempt will be made by this department to expedite this permit as soon as possible. I, the undersigned, understand the plan check procedure and time frame, I also understand that if the permit is not picked up by the expiration date, that I must still pay the plan check fee and that if I fail to do so it may affect future permits that I apply for. Agreed to by: Print name Signature Project Name: Date: ,- n^^||mant2 051201?005 O [dltlDOlt) LISa PROPOSED MATERIALS Buildinq Materials Tvoe of Material Color Roof Siding Other Wall Materials Fascia Soffits (ry,::::-) Window Trim Doors Door Trim Hand or Deck Rails Flues Flashing Chimneys Trash Enclosures Greenhouses Retaining Walls Exterior Lighting Other Notes: Please specifu the manufacturer's name, the color name and number and attach a color chip(Bu+rr) @ etr."". J€vt -WeN Vuvc Srr q- Hv^tA ?*tu<et gLAct< +- 6La"t iOtn, Page 6 of 13/06/06/05 TOI4'NM Design Review Board ACTION FORM Department of Conrmunity Development 75 South Frontage Road, Vail, Colorado 81657 tel: 970.479.2139 fax: 970.479.2452 web: www.ci.vail.co,us Project Name:KAEltr{ERLEN RXS. trll{DorJ ADDITION DRB Numbefi DRBO5O474 Project Descrlptlon: FINAL APPROVAL FOR A WINDOW ADDITION Pafticipants: OWNER SUSAN L. KAEMMERLEN LIVING T09/05/2005 2958 S, FROI{TAGE ROAD, UNIT A-4 VAIL co 81557 APPUCANT SUSAN L. KAEMMERLEN LIVING T09/06/2005 2958 S. FRONTAGE ROAD, UNIT A.4 VAIL co 81657 Project Addressl 2958 S FRONTAGE RD WEST VAIL Location: INTERLOCHEN CONDOS, UNIT A.2 Legal Descrlption: Lot: 3,4, Block! 5 Subdivision: Vail Intermountain Parcel Number: 2103-143-0800-2 Comments: See Conditions BOARD/STAFF ACTION Motion By: Actlonr STAFFAPR Second By:Vote: Date ofApprovalt 09/0712005 Conditions: Cond:8 (PLAN): No changes to these plans may be made without the written consent of Town of Vail staff and/or the appropriate review committee(s). Cond: 0 (PLAN): DRB approval does not constitute a permit for building. Please consult with Town of Vail Building personnel prior to construc{on activities. Cond: 201 DRB approval shall not become valid for 20 days following the date of approval, Cond: 202 Approval of this project shall lapse and become void one (1) year following the date of final approval, unless a building permit is issued and const;uction is commenced and is diligently pursued toward completion. Cond: CON0007508 The applicant shall match the trim dimensions and color to that wlrich exists on the buiding currently. Planner: Warren Camobell DRB Fee Paid: $250.00 ,i',,. 5rngle-Huno srngle-hunq i:ol lo any i-_j yJlnCorls Are rdeAl w rr d o\'r's iealure a homP Iolrew nome c0nrtructlon and aS replacemenl wtndows. lEtD-WFN'alurntnurr stalronary top sash and a bottom sash thai slrdeS vertrcally, provrdrng a classrc (r '^-l-..1 .^.1 -^.,^^-l +)L.r,r!jJI tl JllU .JfrLlUlldl l Cdltlte5 . \turdy. e d \ y - I o - r-r a I n I d n rxlruded.lurn rrum alloy lr.i|l]e dnd 5Allr, \!r1h :!:rpw,rl.1 -'rrn,lr! j1d !el1-!aCprng !teel :(reYJ! . ,\v.rlable rr Wl' le Bronre,')rtd Almonai . ll ra h -qu a lrt y, full-penmeter wea t h erstr pp rn g . :tylrSh, lrcavy-duty s.tshlocL provtdcs serurr,iy and r; we:lhcrtrqhi Standard sizes raeL lrtAsuArr,r:Nr! rf{ rNihEs) Optronal cuslom srz in g Optronal low-E glass lor year-rouno comtorr Optronal internal grids creale the look of drvrded lites wrthout the upkeep J Optrondl ||lsect s(reens wtth heavy-duty Clrarcoal frberg la 5s lrarnes Horizontal cross r,f h ll l-'' =j'rr;j'd''-'-l 1 -.-F.-; ,r't'..- - {l-'.1''."''''.1.I I ."_. ) .__)n L. I E [f tl -t TITI EC r.-] H L:tl H H il5'l----i r-f [:f r.-'!lif tr Ll-.!It h"{ lL: I It t-J tl * iHil . tTt t l -in t .-lln -ln Ei iiln 1.'i ll 1 ^rn il Ve rt I ltrll 'iililtHffiH ',il[]THHH tlolt st.t.1.,t,t!r'. -""' "n,"rr,no,,,," \ t1\.^ts tn no\t at.d. 'aud f,t.'ct.s rr.ltr, . vatr ltoh ,ltastttg i section d-l -_-1.(J...-. J: ica I cross section llri l.ii 'Eiii lu, I Piease 'pe<'ly tough opemng stze n |l1' /]'ctements, wth wtdth measwement hsted l/:jt. wi\dow w ! be <ralted u2.narro|9er and thorter tllan lie roogh open,ng s,ze yo! Specly. ' /are(t 5(reeoJ are tntended ta allow an and lqht /n. whrle teeprng rhlecas out rhe/ ,ap n ot ntended to stop ah drcn lrc'nt lelhng out .n opcn wndow for salelf sareens and other securiy dev,ces, <ontaat lout to<al bu ding supply rctalet Page I ofl J"nr"rrl. 2ooo -A Mr. Charlie Davis, Chief Building Official 75 South Frontage Road Vail. CT 81657 INTERLOCHEN CONDOMINIUM ASSOCIATION P. O. Box 3678 Vail, CO 81658 RECEIVEO UAN 2 3 zmb Dear Mr. Davis: The Board of Directors of the Interlochen Homeowners Association hereby approves the interior renovations and alterations already made or required to be made to complete the work already started to unitA-2, plus any additional electrical renovations or upgrades desired by the owner, or other remedial work of any nature required by the TOV. In addition, we approve the installation of an egress window in the exterior wall of the lofi of said unit, in accordance with the approval already granted by the TOV DRB, or any amendment to that approval should the specific window approved no longer be available, or an alternative be required by the TOV building department in order to comply with cunent building code. Uu,,ttt- Pnno ol"*\ !pbJt"l*,r".t o atLt (ud ot fe ///1r '12-21/fr'zacffin 5.2, Kleatzzzz-Etj zr//,ya fVr€C azr'at €f< - by order of the Board Thursday, January 19, 2006 America Online: SKaemmerle a-ffi ffi l" $*',i F',i Q+r:u.'i [,,l]ti-'.: !t"AFi ffiuir-.' Fil *JF:!- 'Ji ftrffi€n w tfi .o d\o t 1A o B :d K r E :l;[t d 1r , llll.]{ E litil tE .8 t-g il{H E irlt tdt a r::l lg liil E t Iili*F F liliEt { tr 6\ld,ll :r l'l;tr$i rCltr E\Fi !riEi lrric lffi$ffiffiHffiffi n \?1 l--r h/ts z \ A l'-z U -t .\.t Oo \t --\ \t ? q J k\ z ri |-r x \, {tv x El F..r z \ lr. z z I : 7z F.z >r 3 t1 (J F L. F I z ! rt fFc s.Elr'l ! rFr l; !!E!E't'.6. I 8t6!E 5!iel "6:t-'.1r f, !iil!l 8-;tt ttit! c..t.-l). f,-.{J .--, '. I <l I t-l -l 2l )\!t Jt ,F VED ,. 101fi{nrr ii1r"l \',, t', t; iti!!3L!c ;i'i . i:!;l -::1, !iri:ii!ii :; Community Development Depaim€.nt e;1,iino S6tety ano Inspcrticn serviceg Y K['lh {** tflr*lYi I ix--,ts''-;1 r:: oTa--l-q . , 'nrnces ol l. , f J */"4'f' l r \\?-j------'i N,' -t -" r/,:liA | ->-l r z vJ | ''/ t/ €=- .t1 t-r fir a.\i tD, :,''. 1 ''. rl c-t* KRM P.O.Box4572 Vail, Colonedo 8165E} CONSULTANTS, INC.[s70] 949-9391 FA')( 949-1577 RECORD TO: DATE: PROJECT: Paul Chapman Susan Kaemmerlen 9t22t2005 lnterlochen A-2 JOB NUMBER: 0509-14 Enn I neennalrorEs n nesporsr fi cteruncanoN/cHANaE We were notified that some remodeling had been completed in this unit, and the following items were verbally relayed to us by Paul Chapman in addition to supplemental sections, dimensions, and pictures of these areas. The existing loft was added on to with a strip of floor approximately 3 -7" wide. This floor consists of 2x6 joists spaced 16" on center and hangs on a 2x6 rim with pre-manufactured hangers. The rim is supported by vertical 2x4 tension studs spaced at 16" on center, which hang from the roof timber beam (approximately 6x18). These 2x4's are attached to the rim and the timber beam with 1/4" diamter lag screws. The 2x6 floor rim on the other end of the joists is aftached to the cantilevered2ll2" decking with 1/4" lag screws as well. A beam was replaced next to the stairuell spanning approximately g'€" and supports a floor purlin and the staimay header. The replacement beam consists of a (2)-2x12 beam. Although we were not able to view the items listed above during construction and the loft is now drywalled, the framing members and connections indicated above are structurally adequate to support the design loads imposed. Also, we were informed that an egress window will be added at one end of the loft between the roof purlins. The top of the window opening shall be no closer than 12" to the ceiling at any point (assuming the window is not in line with any roof purlins). Please call with any questions. KRM Consultants. lnc. :!,i:..".".".:'-r:l \iJ,i, '1 1''\\,,/ COPYTO: o sn6t.a . At A|ts+ (ry Bai 3 g(T{6^J -rl,tev A-Z L"o!:,u q 5o r 1n1 ,-New 2- zFtL l3c,tm -''' - ?ogt 6t (, I'rcs"L q' q '' sPalJ EArn ,a__ErdE ._ OF Sfe trc urte.c ) R g &aet^J_h_,S E t q_ I e t, m n( ,l .r-li \ c.r Yls .r tI t\ o .')'0o :x \s O: 3 \-r N ',t (t'; l \\ .:' T vl '/{> , bd 4 Zopt 944+r44 . r*t a /( J:. I I u,v DEr{ J/r't7Er 1o crvtnl Cbuoo.rt, ,rr, ,r.t.t J . Uttrz 4:1 .rr} rt6 F,, .tc- YE,,Tf 4 . .t-/1 Y6 14 f rz '/t ,b" 6Et ra (r /s,) -,,€17--Drrnl, :. s F€ glzt,nt ,-L y B 4.)nl t:_t) As Eutzr ryry.J, lg:zzyt-J.-: - -a^J E49t{_-\L{ _ Perpprlro1 .d_!s9^s1< ._ _- =r: '- z!t-{e-lct<- - I fi.P,ot;t .41r Or,,//6 " crsg /cft6'* 6,,F{z,vt BF.tn1 f2r'/.tt{S.' h7/(-x € z.r1 S.jea, 74Fu.2tt tatTo €A.4 e}i vc -= Fe*-1 zx6, J,,,st s Pce D<,.r- r C/s,*z )-/6r o.) - 9-l/6 ''. c7iS - 4 n, V to,"; 4^..tt6f/S ff t4D o -1 I I I i i 1,3 Jusrl o* /j t' I I --- .J .\ .t '\ F. v.,l [\ 2 Sf.tctED l9,iS )Co,a p2pnl w uLL I - -l -.-'. " _L ___ I I L74, i v F ,{ ;, li I' -l { 5 t : o I 'I -- -l l L I i I LaFr DFI, _ * FRAnttlK __ i t f""3 h gfrcn."t- 3a'l ar6l' ._ Aetv.puQet*tr,E (y6qps Sast) 5rB frY .l I \ \ i-s -\r- t-- I ,l rl lvuhmum lxtt F a\ \9 x \9 i' l' I 'l r' O [V!r,LD ow) L l.S -t la PROPOSED MATERIALS Buildinq Materials Tvoe of Material Roof Siding Other Wall Materials Fascia Soffits Color <-y!i-.---, Window Trim Doors Door Trim Hand or Deck Rails Flues Flashing Chimneys Trash Enclosures Greenhouses Retaining Walls b(terior Lighting Other Notes: Please specify the manufacturer's name, the color name and number and attach a color chipf Br+cr) yll.oo jL q-qLgft) EtreAo<l.Jevt -WeN VNvL St^rcLL Hv^4 ?*tw:.et $uaer- + 9tecifer *,. Pase 6 of 13/06/06/05 ?rrr ropy TOWNOEUAIL Vail Building Safety and Inspection Services75 S. Frontage Rd. Vail, Colorado 81657 970-479-2142 Memorandum October 13. 2005 To: Ms. Pat Needham. Vice President. Interlocken Condominium Association From: Charlie Davis, Chief Building Official, Town of Vail Subject: Interlochen Condominium Unit A-2 Building Permit # 805-0303 Ms. Needman. We have received a letter dated October 10,2005 rescinding Condominium Association approval for work proposed in the above stated condominium. It has been requested of us to document actions we have taken regarding this matter. Listed below is the action we have taken: We have discontinued the review of building permit 805-0303 until such timc we receive condominium approval for this project. This is being done due to the fact that we do not have a complete application at this time. It is our policy to require proof the Condomium Association has approved the proposed work. With the current letter in our possession, Condominiun approval is not obtained. Thank you for your attention to this matter. Best Regards, Charlie Davis Chief Building Official Town of Vail Cc:File,Town Attomey Oct 11 O5 O1:34p To: From: Subject: Date; Gentlhrhtn: This letter is being directed to the Town of Vail on behalf of the Interlochen Condorninium Association, with reference to an application for a building permit related to the above property and a letter sent to the Town of Vail by the Secretary of the Association which indicated that the Board of Directors of the Association had approved the project to which the building permit application is related. Please be advised of the following: l. The project whrch is the subject of the application for building permit referred to above has not beer reviewed or approved by the Board ofDirectors ofthe Interlochen Condominium Association; 2. The letter refened to above was not authorized by the Board of Directors, the President, or the Vice-President of the Interlochen Condominium Association. Based upon the foregoing, the Interlochen Condominium Association requests that the Town of Vail cease consideration of the building permit application referred to above until such time hs'the Town receives a letter from the President or the Vice-President of the Interlochen Condoninium Association advising the Town that the project has, in fact, been approved by the Board of Directors of the Association. Yonr confumation of the fact that no fuither action will be takeu by the Town of Vail with reference to the application referred to above without confirmation of Board approval by the President or Vice-President, by faxed rnessage directed to 476.9092, would be appreciated. If you have any questions, you may contact me at 476.9092. Thank you for yow assistance in this matter. Interloohen Condominium Association XC: Matt Mire, Town Attomey b \-., FtLt c0Pyo, p.1 ',il q ,) MEMORANDUM Charlie Davis, Chief Building Inspector, Town of Vail Russell Forrest, Director, Departrnent of Community Development, Town of Vail Pat Needham, Vice-President, Interlochen Condominiurn Association Interlochen Condominium Unit A-2 10 October2005 e Susan L. Kaemmerlen FAX 203-454-5741(please use for response) Phone 203 895-9507 TO: Charlie Davis, Chief Building Inspector, Town of Vail Russell Forrest, Director, Department of Community Development TOV Matt Mire. Town Attorney Subj: Interlochen Condominium Unit A-2 DD tru?r- PEsann-tu ' ^ C,"ri fAs-\a6'. Pfl ltl-IV) €u, DF-trc €' oF.ffiPtc'-ftc Date: l3 October,2005 Gentlemen: purporting to be sent on behalf of the Interlochen Condominium Association and tolrqr4- / maif olT october. U)Mt I disagree in part with her letter, as I believe it is misleading and not ."\'-t.A; factual. Please be advised of the following: l. I CONFIRM, with the exception oJ"the egress window, the renovation pro.iect which is the sub.iect of my application for building permit was not reviewed or approved by the Board of Directors of the Interlochen Condominium Association. This is because it was from the outset, and continues to be, my trelief that, with the exception of the new window, none of the renovations require approval of the Board of Directors. Our bylaws only require a prior approv al of "structursl modifications or alterations ". None of my renovations involve General Common Elements, nor modifrcation of any structural element of this building. 'fhe window penetrates an exterior wall, which is not a structural wall, although it is a General Common Element. 2. My renovations began on or before August 13. At least 4, but possibly all 5, of our directors were aware of the renovations from the outset (2 of them, including Ms. Needham and Mr Sellers, walk past my door in getting to their units !). Furthermore, there was a formal board meeting on August 21, at which all Board Members were present, plus the 2 local residents hired as our new managers. The subject ofmy renovation was not on the agenda, and was not even raised by anyone before, during or after the Meeting. I believe that was entirely in keeping with the Association's historical lack of interest in interior renovations ofany sort, apparently even including replacement of exterior windows and doon. To emphasize the depth of lack of interest, a number of such replacements now in place may violate our own written rules (and perhaps DRB guidelines for conformity within a project) requiring the exterior windows and doors and their trim to be painted black (now, windows /doors may also be vamished natural wood). wE*t:!"^YAv%{<, ,i R This letter is in response to a fcttei dafe-d I 0 October from Patricia Needham %,,9,*t2&&Aqm b/r7,,,8 o o !ri' To my knowledge, the Board/Association has not even written any letters to request remcdy by the offending owners. 3. I was also not aware that certain aspocts of my renovations (as they progressed, the work expanded) crme to be in violation of the requirement for a building permit. As a consequence, my project came to be red-tagged on 8129/05. At that point, I immediately visited the Building Department, discussed the project, and began the process of satisling the pre-filing requirements to obtain a permit. During my meeting with Mr Suther, he strongly suggested ( which I took to mean a polite way of saying it would be required) that I also apply for the installation of an egress window in my loft for safety reasons. I entirely agree with his suggestion ! My loft ( the A building, the first of the complex, was built in 1970 or so) is the ONLY loft touching an exterior wall in the entire project without such a window. If an egress window is installed, I may have the ONLY current-code-conforming egress window in a loft in the entire complex. In facl many of the existing windows in bedrooms throughout the complex do not conform with current code either, but that is another matter. 4. AT TTIIS POINT, I was firlly aware of the necessity of obtaining Board Approval for the window in the exterior wall, as requircd by DRB regulation, if not by the limited provisions of our own bylaws. (A window in a nonJoadbearing wall might not be a struclurol modification). To that end on September 2, I emailed a request to each of the Board Members to seek their approval of the egress window, a procedure in conformity with our Board's agreed (albeit not written) procedures for consultation wilh each other between formal Board Meetings. After discussion with and approval of the window by, Ms Needham and Ms l^ane, Ms lame, our duly elected Secretary of the Association, wrote the letter, having the approval of 3 (the 3'o being my S. Kaemmerlen Living frust which holds a seat on the Board) of 5 Board Members, confimring approval of the window installation which I submitted to the DRB and subsequently with my application. The other 2 Board Members received my email but did not respond to me -- although Mr Sellers stated to Ms Needham that he had no problem with the window. The 5b Board Membcr to my knowledge only responded Oct 14, after the fact. Accordingly, the lettcr from the Association Sccretary Liz Lane, Esq., dated Sept 6 appears to have been validly issued in good faith with appropriate support of a majority of the Board Members, infact with the support by Ms Needham, the Vice President of the Associution. I therefore request that my application be given due consideration in the time sequence of it's submittal. If you have any further questions you may contact me at 203 895-9507 (cellphone), or respond via email at:k.ruqtnrqrl,-'{r i1( ) L er)rI. Susan L. Kaemmerlen 11-29-05t 12:01 PM T0 9?04?92452 Susen Kaemmerlen 2 Ulbridt Lane \,\btsort, cT 06E8o 203-256-6446 or 203€86-9825 ( Pau | ) P0l il,fn/"s FR0l\,I I(AETfll[EUN Basao o^J I really want to be finis\ed with this matter, wen though two of f|a Board Members ar€ inl€nt on persisting to not p6rmit tho window flr capriciotts and plnitive reasons. lwould greatly eppreciate your issuirg my permit to l6t me complyyvifi code s8fety regulalions' Othenriie, tr6roiin be a protraAed and expensivs legal battle whictr will eventually polarize and upsei th€ entire community, in addition lo tho cunent upsol among Board members i I I was totalry ulArare of the nesd for TOV pernits prior to beirg "red-tagged." lt rias aleo my hli€t that the 4(l. square fooi bft bxtension in no way changes, let Elone imP€irs, the structural integrity of the building (see eriginedr KRM Conaultsrt lalter in my 4plicetim), Sinca finding this out, I have lri€d in every way lo do exacily the-right thing - get a conlraqto/s licenee, clarify issues with Joe, get a DRE permlt, a1_e1Uin9_ef.s Jetter of . aoordval. ani ttrj guitCinE p€fmit, and awaited fre lnt€rloch€n Bosrd meeting of Nov. 12 tor official aPProval. Sirice Usins "red-tagged"iri Argust, I requosted on several occasione to have a special "10day notic6" Board meeting to-oUtain thiS approval, but wae denied thie. So, I waitod th€se 3 monthc. i plsas€ l(|1ow, also, that I was not given the opportunity to present to the Board my ideaa for r€novations in Auoust at th€ Arrgust 21 Board Meetirg. (l had nol extend€d the loft ihen, but had removed the loft's rid<ety 12- ind picfet railirql not fnbrring that ev6n I roplacement would require a permit end also an Sregs window), Vrf,rili l,am a Director, I was not consuhed abod th€ Agerda, told not to approadt Presldent Teresa Day beforetland because ihe was "sicK', and not given the Agenda until anlval at the meeting. At thal point, I was toE U14t eittrer my Truet agent (Psul Chapman) or I had to leave becauae tho m€eting waE a_ closod, ',execuiive" session (!), rrd only me of ug wes sllory€d to stay, I len becsuso Paul has much greater knowbboe ot maintdriinCe issrbs facing the cornplax, ard lhss€ Were of great€r importance lo Interlochen nan myl2 renovation. 5o, I wae not g-iven the eiance to present to the Boad. (Thl3 is conoborated by the Aususi 21 Manutee). 1 Addilionalty, 75% of th€ ovfnerslof my A br.rilding approve my 19 lovatione and the windorl (document witn signatures submitted to TOV about two we€ks ego). Al"so, I have in writing, the approval of the miorfty of all (39 in totral) Intorlocfien hotpeowners for lhe window- Page I ofz- how wE might get on with lhis. Ill tty to get in touctt wllh you let€r today. Thanks for your - ---',t'fu-------i-. T0 9?04?92452 Follow uo io mlnutes 11/1fffr512:51:29 A.M, Eastam Standard Tlmc lizlane2(acomqgst.net ildfrr xii, fsejlers7T4Dhslasil.cQn mothert@on€imace.€m' pattvn@vailne!' 1r-2e-05 r2:02 PM tiTjl:yryt fiTil) " rz*, 4(/ntr I \ su$: Date: From:To: I .9Kse Doar Fallqrv Board Mehbers: In r€flectins onlha minutes I ju6t sfft vou-and l!:.fT11q 1T:PH[:l:1fT ;ru;#ir"f,##Tffi ;Hi-if #^sf'-.t*otbiry*t*.g.lllvY'-Ar-5q.T11*:q??':*::J- ffi;ih;ililr;ii,tt fra;r".i^iiuv ttr" g"iitv tt';.!-ia9ry Ghrietian Ghurcrr appeara to Exclude him, not bsing an zn,nar nf record. ffim o"i- " iroii.i m'gnoer, ano trua invali@bs his voie. The future compGition of the Board would apperently o<clufle Fred and Induo€ ue person wno talr wlru gul rrrE I rn^{ rrrsrrsJ' However. thet is a segarets igd; "nrirJy tnom ihe vote on A'2 whlctr, l.n.qy op-'lt9l'.sts$s :t:,lorl ^1^against and However, thet F a s@arate i ;1iil'il;ppddiot ue arir-nees in thoir unit and are entltled to th€ir letter lrom lhe Liz Lane Pagcl.ofl- P02 inJation ,--- -_ O_ _:: _ c;s; i l From: To: Date: Subject: <SKaem merle@aol.com > <CDavis@vailgov.com> 11/08/2005 7:06:57 AM Interlochen - request for information Dear Mr Davis: As your Department knows, I have submitted an application for a building permit to the Building Department regarding renovation work in my unit A-2 at Interlochen Condominiums. You presently have that application on hold pending a letter from the Association (Board) giving their consent to our application. In our meetings with Joe Suther regarding the various requirements to be met, he has stated that TOV requires a current-code compliant egress windovv to be installed in the loft exterior wall in order to approve the application for any work to the loft, including replacement of the weak and non-compliant railing (which we have already replaced with a partial wall of sheet rock). We are entirely in agreement with the TOV to install the egress window, both as a safety issue, and because the A building was originally built (1971 ) with no window in the lofts at all. All subsequent buildings and lofts in the complex were built with windows in their lofts (10 in B building, and 4 each in C and D buildings, 18 in total). As far as we know, all the lofts in all the buildings have been used for sleeping at one time or another. We are currently working with the Association to obtain approval for our renovations including the egress window. We are having a Board meeting Nov 12 on which the subject is on the agenda. However, because there is no definitive literature (no TOV hand outs), we are having some difficulty in getting the message across (and being believed without supporting documentation) that a) the TOV requires the window b) the current building code requires it ( we do have your copy of the code specifications for a window itself) c) just replacing the old railing with a code compliant railing ( or, our choice, sheet rock partial wall) in the loft would require a building permit, which in turn requires the window to be installed d) removing our partial wall and replacing it with a railing - even the original railing ( which now does not exist) would not remove the necessity for an egress window. e) merely replacing an existing exterior window or sliding door requires a building permit. Accordingly, I request an explanatory email or fax (203454-5741) from the Building Department to this effect: a) b) c) d) e) above are all required. Perhaps the most simple end effective reply would be to copy this email in it's entirety and send it back to me with your comment in BOLD/RED such as : I CONFIRM A B C D E of your email are required by TOV. s/ C. Davis My phone number is 203-255-6446 in case of need to discuss. Page 2 Best Regards, Susan L. Kaemmerlen, Trustee Susan L- Kaemmerlen Living Trust (recorded Owner of the unit) Charlie Davis - Re:Page 1 ] From: To: Date: Subject: <SKaemmerle@aol.com> <CDavis@vailgov.com > 1111012005 9:11:04 AM Re: Interlochen - request for information Dear Mr. Davis, Thank you very much for your speedy response to and inclusive answers to questions posed in our e-mail to you on 111812005. I greatly appreciate your help in our attempts to install an egress window in Interlochen A2. Sincerely, Susan Kaemmerlen ln a message dated 1 1/8/2005 4:14:23 P.M. Eastern Standard Time, CDavis@vailgov.com writes: Ms. Kammerlen, I have received your email> listed below are the responses to your questions: A) "the TOV Requires The Window" lf the loft area in question is used for sleeping purposes and is located below the 4th story of the building the 2003 International Building Code (lBC) requires a window to be installed in that room that has direct access to the exterior intended for use as an emergency escape and rescue opening. This can be found in the 2003 lBC, Section 1025.1 states: "ln addition to the means of egress system required by this chapter, provisions shall be made for emergency escape and rescue in Group R applicable in Section 101.2 and in Group l-1 occupancies. Basements and sleeping rooms below the fourth story above grade shall have at least one exterior emergency egress and rescue opening in accordance to this section." Section 1 01 .2 is defining whether or not the unit located in the Interlocken Condo building is regulated by the lBC. There are more than three units in this building, this is considered an R-2 occupancy and is then regulated by the lBC. It's not the Town that requires the window but the code in which we have adopted requires the window in this area if used for sleeping purposes. I believe you are eluding to the fact that the existing situation and space does not have a window that can be used for emergency escape and rescue. lt may have been that when the original construction of the Interlocken Building was completed, these lofts may not have been identified or used for sleeping purposes. Now that we have discovered this the 2003 lBC, Section 3403.1 "Existing Buildings or Structures" must be employed lo provide some guidance. This section states" Additions or alterations of a building or structure shall conform with requirements of this code for new construclion. Additions or alterations shall not be made which will cause the existing building or structure to be in violation of any provisions of this code. ..." Again the code is requiring lhis window and the Town is under legal obligation to enforce the code. B)"The Current Building Code Requires it" See Response to ltem A. C) " just replacing the old railing with a code compliant railing ( or, our choice, sheet rock partial wall) in the loft would require a building permit, which in turn requires the window to be installed" Yes, again see response in item A D) "removing our partial wall and replacing it with a railing - even the original railing ( which now does not exist) would not remove the necessity for an egress window." Again, yes, once we discover a code violation we must act upon that discovery and require the minimum code compliance in accordance the 2003 lBC. Again see the response to item A. E) "merely replacing an existing exterior windot or sliding door requlres a building permit." The answer is yes. This is supported by the 2003 lBC, Section 105.2," Work Exempt form permit." this section has a list of specific work that is exempt from obtaining a building permit. That list ts: 1 ) One story detached accessory structures used as tool and storage sheds, playhouses and similar uses, provided that the floor area does not exceed 120 square feet. 2) Fences not over 6 feet high. 3) Oil denicks. 4) Retaining walls.... 5) Water tanks.... 6) Sidewalks and drivewa)E not more than 30 inches above grade and not over any story or basement. 7) Painting, papering, tiling, carpeting, cabinets, counter tops, and similar finish work. 8) Temporary motion picture, television and theater stages... 9) Prefabricated swimming pools accessory to Group R3 occupancies.... 10) Shade cloth structures constructed for nursery operations... 1 1) Swings and other playground equipment... 12) Window awnings supported by an exterior wall..., 13) Movable cases, counters and partitions not over 5'9" in height. As you may notice, window replacements and sliding glass doors etc.. are not mentioned on this list. That is how we got to the requirement. I hope this answers your questions. We are still waiting for the Condo Association approval, I hope that this explanation above helps you in your attempts. Charlie Davis Chief Building Official Town of Vail >>> <SKaemmerle@aol.com> 'l1l08l2005 7:06:07 AM >>> Dear Mr Davis: As your Department knows, I have submitted an application for a building permit to the Building Department regarding renovation work in my unit A-2al Interlochen Condominiums. You presently have that application on hold pending a letter from the Association (Board) giving their consent to our application. ln our meetings with Joe Suther regarding the various requirements to be met, he has stated that TOV requires a curentcode compliant egress windour to be installed in the loft exterior wall in order to approve the application for any work to the loft, including replacement of the weak and non+ompliant railing (which we have already replaced with a partial wall of sheet rock). We are entirely in agreement with the TOV to install the egress window. both as a safety issue, and because the A building was originally built (1971',, with no window in the lofts at all. All subsequent buildings and lofts in the complex were built with windows in their lofts (10 in B building, and 4 each in C and D buildings, 18 in total). As far as we know, all the lofts in all the buildings have been used for sleeping at one time or another. We are cunently working with the Association to obtain approval for our renovations including the egress windon/. We are having a Board meeting Nov 12 on which the subject is on the agenda. However, because there is no definitive literature (no TOV hand outs), we are having some difficulty in getting the message across (and being believed without supporting documentation) that a) the TOV requires the window b) the curent building code requires it ( we do have your copy of the code specifications for a window itself) c) just replacing the old railing with a code compliant railing ( or, our choice, sheet rock partial wall) in the lofr would require a building permit, which in turn requires the window to be installed d) removing our partial wall and replacing it with a railing - even the original railingi ( which now does not exist) would not remove the necessity for an egress window. e) merely replacing an existing exterior window or sliding door r€qurres a building permit. Accordfngly, I request an explanatory email or fax (203454-5741)from the Building Department to this effect: a) b) c) d) e) above are all required. Perhaps the most simple end effective reply would be to copy this email in it's entirety and send it back to me with your comment in BOLD/RED such I CONFIRM A B C D E of your email are required byTOV. s/ C. Davis My phone number is 203-255-6446 in case of need to discuss. Best Regards, Susan L. Kaemmerlen, Trustee Susan L. Kaemmerlen Living Trust (recorded Owner of the unit) o A2 Page I ofl David Rhoades - Interlochen From: David Rhoades To: ComDev; Mike McGee; Mike Vaughan Date: 8129105 4:52 PM Subject Interlochen A2 was red tagged today for working without permits. They have enclosed the loft area as well as extended it out about 3 feet. There are new can lights and new wiring. I did not go up into the loft as I didn't think the extension looked very safe. There is also a new beam (removed a wall?) along the left side of the lower lwel stairway. The bathroom downstairs has been redone but I could not tell if anything was done that was not cosmetic, Kitchen also (neur cabinets, countertops, etc). The owner is a Christine Bryce Thomas. David Rhoades Town of Vail Code Enforcement Officer 970-477-34L7 970-479-2452 Fax drhoades@vailgov.com fi le ://C :\windows\TEMP\GW ) 00002.HTM I l/8/05 David Rhoades - Re:o Pibe I l From: To: Date: Subject: "fred sellers" <fsellers777@hotmail.com> <DRhoades@vailgov. com> 1010512005 11:20:59 AM Re: >From: "David Rhoades" <DRhoades@vailgov.com> >To: <fsellers777@hotmail.com> >Subject: Re: >Date: Tue, 04 Oct 2005 10:17:45 -0600 >Mr. Sellers, the Town did receive an association sign off letter from >your Board. I was told the approval was done by an informal phone poll >of members of the Board. This issue is now a civil one between you, as a >Board, and the owner of the unit. You may, as a Board, ask the Chief >Building Official (Charlie Davis) to not release the building permit >until this has been resolved but I cannot guarantee that he will do >that. The owners of A2 have or will be submitting stamped drawings >(engineer stamped to assure structural integrety) for the loft extension >and new proposed window. Thank you. >David Rhoades >Town of Vail >Code Enforcement Officer >970-477-3417 >970-479-2452 Fax >drhoades@vailgov.com > >>> "fred sellers" <fsellers777@hotmail.com> 1Q10412005 10:00 AM >>> >Mr. Rhoades, I am the treasurer and one ofthe five on the board of >directors of lnterlochen Condo Association. lt has come to my >attention >recently that someone has stipulated to your office that board approval >has >been given to certain structural changes in unit A-2. This is not >correct. >Not only has the board not given such approval, it has never even been >brought up for consideration at any of our board meetings. Our board >president, Teresa Day, told me that she had informed you of this by >onone. >but I thought that you might prefer it in writing. Thank you. > Fred Sellers >Mr. Rhoades, Thank you for responding to my email. I regret the >contention regarding this matter. My copy of the letter that stipulated >that our board had approved the addition of a window to A-2 made no mention >of the other extensive structural changes that are being done-the >expansion and enclosing of the loft, and possibly more. All of this is >being done without board approval. I appreciate your assistance in this >matter. Fred Sellers David Rhoades - Interto"t "n go"r? Page I of I From: "PatNeedham"<paftyn@vail.net>To: <DRhoades@vailgov.com> Date: 1Onl05 6:25 PM Subject: Interlochen Board Hi David, I am writing this to say contrary to what may have been communicated the Board of Directors for the Interlochen Condominium Association never gave approval for any structural changes for unitA2. Norwas it ever brought up at a board meeting. Thanks, Pat Needham V.P. Interlochen Condo Association fi le://C :\windows\TEMP\GW ) 00002.HTM 1l/8/05 David Rhoades - A2 Structeral Cf,?g", Page I ofl From: "TeresaDay"<mothert@oneimage.com>To: <drhoades@vailgov.com> Date: lO/8/O5 6:57 AM Subject: A2 Structeral Changes David, Please read the attached letter regarding Interlochen 42 structeral changes. Would you please do a quick reply to let me know you received this, my email is not always working well. Teresa Day mothert@oneimage.com EarthLink Revolves Around You. fi le ://C :\windows\TEMP\GW ) 00002.HTM 1l/8/0s o Structeral Page 1 ofl David Rhoades - Ret A2 Changes From: David Rhoades To: Teresa Day Date: I0lILl051:51 PM Subjeqt: Re: A2 Structeral Changes I have received your letter and a couple more from other Board members. I spoke with the Town Attorney about this and we will hold up the building permit until they get a different association sign off letter. I believe that Art A. (attorney hired by the HOA) is also supposed to be drafting a letter officially asking us to withhold the permit until this is straightened out. The owner of the unit happened to come in to check on the progress of the permit and was advised that it was on hold and that she needed to contact the Board to straighten this out. Warren Campbell, the Planner on the window addition has gone back into the system and denied the approval as he was unaware of the scope of interior changes and wanted to speak with another Pfanner (Elisabeth) as she had spoken with the owners regarding the interior changes. It is possible that no interior changes are truly "structural" in nature but they must now get the HOA to sign off on the entire job. Thanks for your patience and please contact me if you have any additional questions, comments or concerns, David Rhoades Town of Vail Code Enforcement Officer 970-477-3417 970-479-2452Fax drhoades@vailgov.com >>> 'Teresa Day" <motheft@oneimage.com> 1010812Q05 6;56:26 AM >>> David, Please read the attached letter regarding Interlochen A2 structeral changes. Would you please do a quick reply to let me know you received this, my email is not always working well. Teresa Day mothert@oneimage,com EafthLink Revolves Around You. fi le ://C :\windows\TEMP\GW ) 00002.HTM 1ll8/05 fBo pa_SE D (N tppov) _-:,-:'<- ir|'Pot t &.cuf Loq, - Eg.-€v4tto ^J U6J..:X-A?- =tat^-ll^.t-A tYrs?rPq {- rrl E u-l . .- -.\ llN Oor^J 1- O - ?QoPoseo - ,r'4 rl t--e,::{-4C::,:r z?.ur' * Y_' /njk:y_Lr-*O l.t f) lLI s' - e' I J: - ^ ) Z " B t *ez.'T-tt r r*- 5"_qC 9::!ry4 Q,@r@Exre:rt';.a, ilo^r Oprer.lrr.J6 g, nta"c- Pc., I n ", G. .r4 2 " B.e.cTu,^ /-\ ,l (>/ @@ -€rrgr*r4 48xrl& f?o,.te q0Pe,trt'tq (4st's nser ,. AeTua- D P€rutNG Z2'* *tl -L!..tt - U1't-'i- A-l MtePs(L.-LNtra^6e Roarse D W,poo.r fLlr,o- w-al 5" w,-nrr 96oo serrPJ S r.rc,,a rl.r^16 Ro"q^ gdk xf9'/2--' *A:;;- '---t^e1v;i;"/4 (88( so Fi) ,rA 6D Er- A qZl8O Elo,*} D2tu., Sro.r * A z? I -qoB ( rt' L fai--Lt oF rt-z (sxow*) 1t'= g' .-bf D"]7' 1/c/o( o I urn - W Err)Svrur rT 9z*, ns 3t e4a-.t/urr.l4,W t l.t 0ow t,,r'r,,v I tvYr- 6" r;' o^-u Moon, A- qzqgo I NS/L- (5 4 r+5 t F__ _35t/z_ (Rouca oter,t I I 4J -T-- I I +- A..:uo- ' O?eN tN h zsV,( s'L" Roror &e-,n r I j I I I I J-r /t-f\' OFgN (Acronc) DIME^ls,o^rJ f.eE3!.JtLF4 aN Acrru^L- Vo.r,Dot,!' cr l,{p,n a Dcer * vep, Fr Fo Bv rrFa' lClI:€_ Tg g? + Ft^J t:+{ IED Nor- -lE S"*rz- P1glo B.ar*- o^1 Ans'oeSy_z€AcEs w/ B ",4aa tt2 oa3,'TQ- ' a,.-PDC s/L/"r (-t;:€*eo) ILvtxtoow 321/v" E rl LIJ E r--r !.-i I f:l L:.i]n t1 tl t-l F_-tt IJ -iU rf-l ? if-l ! ngle Huno yrrndo..vs srnqte-nunq w n00\,,/5 l:ok to ,rny horne -: :-' ..' are rdeal lor .ew home conslructron and as replacement wrndouJs. lEl.D-wFN' dlur.r.rInur- iedlure a statronary top sash and a bortcm sash that slrdes vertrcally, provrcirng a classLc , 5t.rndrrd ancj optrona I features . i:urdy. e d ) y - I o - | ' r a r n 1 .l n erlruded alurn,rrurn a lloy lf;nte dnd 5.t!lt, !v'.lt :,:rpw-rl(.t .6,1gr< 1;1il :ell-iapprrrq 5teet :(re'JJ\ . ,\v. l,'lltle rn WltLte Bron:e .' t d Alntond . ltrgh-clualrly, iull-perrmeter weathersinpprng . !lylr\h, heavy-duty sashlocl providcs sc(uniy and r! wc;ihcrlrqhl St:ndard sizes,orL Oplronrl Luslom siTin g Oplrondl low-E glass lor year-rouno comtorr Optronal rnternal grids cre,Ie the lool oi drvrded lltes wrlhoul lhe upkeep J Optronal rns€(t s(reens wrlh heavy-duty Charroal f rber glass fra m es 16' 4.?. f-f r-t,-i ts---t | _-t t_ i VtASURtMINIS lN lNihFS) _i:'-f; i _,t 'd'-""-3Gr'b' H ffi ffi H Horizontal cross tl I'r.i . ll section l:- - /5 su*tpc -.'- i.\rl i.-,*--.- .: r H H H ffi H t Pleate tpe.tfy lough openng l.l2e tn | 11. firraments. wtth w,dth measurement hsted l$1. Wnctotlv w t be (tatted l/2-narrpvrer ano tho et thln the rough openng 'ze lou ,peoly ' ln5e(l rc.eeni .te rnlended to allaw an end l ght n. whl. keeptng nseats out They are not tntendad to stop chttdrcn llon lall t<) out an oppn w,ndow For sa/ety s(teens and orhp/ ,"rul,ty,Jer,res, aantact !ou( lo]i]t bu dng supply rctatlet l- =+'r'l''-F i Jtr).{ - -r -, ,-,t'. ^ + I , .. -.'' l'{ Vertical cross section I tiJl l lpl [,ii , ri: 'ilffi ttt)lt 5h,1,1.d !tntt. m^ct eqre\: teaun. ti 12-0?-05 oz:{: ru lnou runmunSu T0 910419245' a l *r.,"rto' I To: Chdrtic Davis From: Suean Kaemmarlen (203) 65A902-5 (pzutChapmafc ceil)Re: lntorlociGn 42 Dalo: December7,2w Fu.: W0-4,79-2452 Pagse indudim oover_3- Dear Mr. Davis, I am faxinE to you lhc letter ihat I receivcd Deceinber 6, 2d)5 from the tntododten Board. I rster to this letter in my c+nail I em sending lo you immedietely. flP-fax* iFt h€ lottet I dropled. off at u|€ Building Departmen[ on November 14 0g the ownership of th€ A tuildirp In fq-Yog oj! not see it.. Vlhile a. oopy dag.desisnatid for fiii y;,; and Mr. Mire, upon-crrecrins, it w€s not in l{r. irirc's Rbe, eo maybe you did riot see it eittLr. Thank you for your consid€ration,-l I -r' Ll /,/ t/-- ../'L/.,'a4-a f.-',Gt+r-,-,.-.-.2_' Susgn Ksmm€rbn I I II I l( t ,t ,l'" oJ;o u.=o ii: Jl" rnoia xrrr'mu^r T0 9?04.l92452 t /Tl, t' 0captltt \*lts INTERLOCHEN CONDOl[INIUM ASSOCTATION P.O. BOX 36?8 vAlL, coLoRADO t165E l Deceobcr 51 2005 ( Sucro K.qrn&dcoTflst 2 Uhrick lene Wcsport, CT08688 Dar$sro, Aftcr coaadenbtc &crrrcion, rc rould lile to cod this strlcore ovu thc rcnovrdtrns of Unit A2. lt ir infomm thst 6is bc hsdhd crmfirlly ee lbcte are sudr srong &elings oa bgth side*. Io ordcr to setb$ dl cooemcd aod to prrreve dc iatqgdty of dc boed tlrc fcillorwingitems aeed to be me Thc Sussr Kamrmer{cn Tmrt muctpruvidc r con Dlcb listof all rtnovtrtione in unitA2, both 6ore 6rt are finirr'ed rd 6osc drt rtill aocd to bc dooc A bttcr of epologl for not following rhe Dy-Lcwr of trc Associrtiotr aeeds to be seot to the board end ownem will be Lcpt oo filc for qrrs ycars Iartly, vrc vould [Lc you to vicatc your $e.t on the borrd rnd refuin from reckiag r board positfrm forrvo yeera If dl of &{ sriprrlationr ale rgrscd to in uniting and the lettcr of apology reccivcd, dtm r leru of alprcrnt foc tpoovrtiotrs fot Uait .12 ril be &lrsered t<r tbe Toun of Veil irmlcdirely a&sir ctcphone conEorrion crll vith ell boa'rd mcmberc Sincerdy, i ttln f'-*V( t4/it/1 Tcresc Dlv V Patsidcot, Bod.d of Directora Iotedocbcn Coado 4srccietbo P02 ffiro3 l' t \ l ';;' :#:J,"j:T's,' I Sulldllg uepnrtment Town pf Yell VrIlcO T0 9?04?92452 BUILDI'|G A lnterlochct Condomiliuor 2gtttSo FrolttSc nd VrllCO P03 Paee 4 6 3 NOVEMEEn. ta,2OO5 RFI: Urlt A-z Rlnovrrions I r'it nry conccrn: ( Lc'J do Cor-oo propcrty of 6r a utrit otyncr'i (rr terrtrt! in cornmor) of lla uaitr ow[c.i ot onltl Al, /l:l lrd A{ ell glvc tielr rnsprdlllonrl tppro['d tor rn |||t.t{or ;i; ; ; .g.- wincow ir tl+ nn :rtiriolvrtt o{!{t *.4 pt*F$*ry of ttc Torri of Vtil Bdldhg DcFdrctt' Coduudty Dlvcbpucdt Otncr' rPp|lrtblc Cods, rrd rhc Vtil Drrigp kvhv Borrd rrt.orplfud tith' Thr of thcrc oru sflocrr of A b{lLnD3 rritr ron pnlourly conFtllErt d-!"_ lb" B*-.1 .r irrihr-- iitr" rrrJcor lor tlc cofirc lrtorto"L" p"oi.te ( Thc Arocbder ONLY owrc thc |g to ttc CofltoEiD|ID ltcclrr*ilod drtcd lrcc lq. t?!, tL G.Isnl CoEtroo Elsfldrlr ri-J"r." ot tlor ullr rnd roof ctc ) erd rtc nndcrlviry hod ot EuinitrC A.tt-lXTi!T5" .?rojcrt coEDor ctclcngr., mt re ottt! bolldirgF itr Do.m sr:rfg Nov t& f (of 5 tofrl) dlrtctor! vot d !*liEt rPprovt[ iglotll3 ttc .!pF Gd d||lftt of tbc lndcf|$cd rrrorlty J ol { ,r-i- rfff t ilif6fn* i iXnctirr wta U frvor a'tr o* rbrtrhrd. I of lic erort votrt tlr ;il';iL-g.d ; ilLld *.itnn orroot, Mr Frsd sclcr;; rls lot &r wrcr of rtcord lr tt' Erglt C;.ty-t *rd; oile br ttc ['17 rnlt ltrt lc occrpi* TLrllot! ht tl rot I Yrlid D'rbtr of ttc eJociAoo raA b tlonforc nJkiUo to *. ot u afu6 19 ray offca 2 l;nclo6 v6136 in frgor of rfprovrf Accordid!.r pu rry Lrrtrlly rerlve r 5. of rPp.'ovd_ftrr ttc A.socr.Ootr ID tbc -r'&nfftr|., Vro rnoold ti gltCGi fy tf hftcr. Ir tu oor bdlcf trf' u Oc uldcrriipcd 3 owucrs of A -oiloi"g urltr conprbc r irlorrry orftc kgrl owocrrhip of l[h buiHin6 tht tb. f.novrtionr to unlt i A-2 rDonld bc ptrctttrd lo prooocd irrcdlrtrly' I \t )Sluccrcly, I ,7u*'*+*2a64eqhF MiiqToroof VdlAttoruY I \ lCharlie Davis - Re: A-2 Interlochen, From: To: Date: Subject: Kaemmerlen Charlie Davis SKaemmerle@aol.com 1210912005 1 1:31:11 AM Re: A-2 Interlochen, recent letter to Kaemmerlen Page 4l 'l Ms.Kammerlen, I have received your email and the faxed correspondence that is associated with the email. Upon review of the latest information, it appears that you are actively pursuing the Condo Association approval for your project. At this time, I am still unable to release your permit until we receive a lefter of approval from the Condo Association board. The letter must be on the Association letterhead and signed by the board president stating that your project is approved for construction. The latest correspondence only states conditions in which the approval will be granted. I apologize for the inconvenience, but must stick with the facts and detail of approval only. Sincerely, Charlie Davis Chief Building Official Town of Vail >>> <SKaemmerle@aol.com> 1210712005 12:,22:37 PM >>> To: Mr. Charlie Davis From: Susan Kaemmerlen Re: Interlochen A-2 renovations Date: December 6. 2005 cc: Mr. Matt Mire By f ax: 1215105 letter from Teresa Day 11114105letter re A building ownership Dear Mr. Davis, I sending to you by fax copy of a letter I received December 5 from Interlochen's President Teresa Day. Her letter says that if I vacate my seat on the Board and refrain from seeking a Board position for two years, then they will send a letter of approval, etc. This seems like blackmail to me, but I certainly don't represent myself as an attorney. Nevertheless, is not President Teresa Day therefore saying in her letter that the renovations really are okay with the Board? That is, her issue is not the renovations/window of A2, but rather her issue is that I satisfy the punitive demands in her letter in order to win approval. Will you please consider Ms. Day's letter as the needed letter of approval from the Board?? lf not, please note, that even if I agree to the conditions in the letter, Teresa Day states that lwould only get the approval lefter "immediately after a telephone confirmation call with all board members." At our November 12 Charlie Davis - Re: A-2 Interlochen,to Kaemmerlen Board meeting, it was agreed by all that we would have a Board meeting by telephone mid-December to discuss Fred Seller's position on the Board (see * below). Yet, President Day ( mothert@oneimaqe.com (mailto:mothert@oneimaqe.com) ) writes below that a December meeting is impossible (and, therefore, even if I met their conditions of punishment, I might never get a letter of approval from them) : Forwarded Message: Subj: Dec/Jan Board Meetings Date: 11129120[5 12:24:28 A.M. Eastern Standard Time From: mothert@oneimaqe.com (mailto:mothert@oneimaqe.com) To: AlCships@aol.com (mailto:AlCshios@aol.com), fsellersTTT@hotmail.com (mailto:fsellers777@hotmail.com) , lizlane2@comcast.net (mailto:lizlane2(Ocomcast.net) , pattvn@vail.net (mailto:oattvn@vail.net) CC: SKaemmerle@aol.com (mailto:SKaemmerle@aol.com) Sent from the Internet _(Details)_ (aolmsg://071 66c30/inethdr/2) A meeting in December, even by phone, will not be possible for at least three of the five board members. Since we have received a letter from a lawyer regarding the main issues to be resolved (the elegibility of Fred Sellers to vote as a board member and the A2 window), unfortuantely the lawyers will now have to resolve the matter. On the subject of lawyers, neither Ross Davis, Jr., my counsel, nor our Secretary Liz Lane, nor I have received notice of appointment of attorney by the Association, or stated correspondence, or opinion re Fred Seller's status, and so forth. While a Director, I have been inappropriately excluded from much correspondence, as has our Board Secretary Liz Lane, who also specifically requested the aforementioned information by e-mail on November 30, but received nothing. (l don't know what "lawyer" Ms. Day is referring to in her letter, but if the lawyer is Mr. Alpenlof, Fred Seller's lawyer, he is a very inappropriate choice.) Ross Davis writes to me December 5: Susan: I have not yet received any response from Teresa Dayto my letter of November 21 , 2005, copy attached. I cannot understand why she has failed to act on this matter of immediate fire and safety concern to the association, as the association and potentially the individual board members could be liable for failure to remedy the situation after notice of the fire and safety deficiencies. No matter what disputes the individual on the board may have, all members have a fiduciary duty to insure the complex is in compliance with fire and building codes. Ross Davis, Jr. Attorney at Law" Pd;-r l Charlie Davis - Re: A-2 lnterlochen. I simply do not know what to do. Within the past few years, at least 10 Interlochen owners have made imorovements in their units which lacked the necessary Board approval. lt's clear that I am being unfairly targeted. Paul Chapman and I have pushed for safety improvements for everyone in the complex, and while it appears that a very few members prefer to have things rot, this is certainly not the case with majority of all residents, who have expressed in writing their support for my unit's safety egress window required by code. While dealing with the aforementioned Board members is a humongous pain in the neck, I do not want to give up my Board directorship, because I feel it is my duty and responsibility to represent the owners who elected me. These owners do not want to shoulder the burden of a lawsuit caused by inesponsible (or lack of) action re safety on the part of the Board. In reviewing Interlochen's finances, this association does not have money to sue or engage i;r a lawsuit. In fact, I don't know how Interlochen will get through the winter without their tapping their small emergency reserve fund, and that would be in violation of the new CO law 05-100. Already in my opinion (and I believe Liz Lane would stand beside me on this), the other three members on this Board have violated and continue to violate several rules regarding condominium directorship. Please consider the issues involved. Please help me, or if you really feel that your hands are tied, please advise me as to what you would do. Sincerely, Susan L. Kaemmerlen *To explain in brief - because Fred Sellers ran for Directorship under the name "Fred Sellers" and not under the name Victory Christian Church (name of record as registered with Eagle County assessor's office as owner of the unit he occupies), he would not be a member of our Association, according lo our By Laws, not eligible to be a Director, and therefore his "negative" vote was challenged at the Nov. 12 Board meeting). The vote at the meeting was 2 in favor, 1 againsl, 1 abstention, and 1 challenged vote (Fred Seller's). Pqge 3 l GC:Matt Mire From: To: Date: Subject: Teresa/Pat <SKaemmerle@aol.com> <mothert@oneimage.com>, <paftyn@vail. net> 121'l612CfS 5:48:49 AM Interlochen A2 renovations On December 7, I sent to you the following questions concerning the "agreement" lefter you sent to me regarding stipulations required by me in order to get the necessary Board letter of approval required for the TOV permit. To date, I have not received an answer. Would you please respond? Susan Forwarded Message: Subj: Re: Fw: Interlochen letter Date: 1217120052:02:24P.M. Eastern Standard Time From: _SKaemmerle_ (mailto:SKaemmerle) To: _pattyn@vail.net_ (mailto:paftyn@vail.net), _mothert@oneimage.com_ (mailto:mothert@oneimage.com) Hi PaUTeresa, ls Fred Sellers on board with regard to Teresa's agreement letter? | ask because at the end of Teresa's signed letter which you faxed to me, she omitted the word "tomorroW' and inserted "immediately after a telephone confirmation call with all board members," and I'm guessing you include Fred in that group? Would everyone be available for an immediate Board meeting by phone, or sign off on a resolution by acclamation? Susan CC:<lizlane2@comcast.net> 9!ClE !q:E: xE 4potosy alTll! From: To: Date: Subject: To the President of the Board of Interlochen. to the Board Members and to Susan Skaemmerle: I am the owner of Unit C-8 and would like to briefly comment on the request to have Susan resign from the Board of Directors in exchange for "permission" to have changes made to her Unit, as well as requesting this apology before "permission" is given. It appears that the changes made to 42 were reasonable, will be done to code, and will benefit Interlochen as a whole by renovating and upgrading this unit, and that the board is willing to give permission afier a review of these renovations. I find it offensive, unrelated, and irrelevant and totally without merit to tie-in this request for Susan to resign from the Board in exchange for a letter from the Board to comolete renovations to Unit 42. lfeel that we should consider ourselves fortunate to have good people on our Board who are willing to help Interlochen in positive, productive ways, and it would be a loss to the Association to force Susan & Paul (Trust) to resign. Please give permission for the appropriate renovations and retract this ridiculous request to resign. Sally Fontana >From : SKaemmerle@aol.com >To: mothert@oneimage.com, fsellersTTT@hotmail.com, lizlane2@comcast.net,> pattyn@vail.net, RoseVail@aol"com, cfenton8305@nsm.com, >rocnbarb@comcast.net, DowlingPC@aol.com, c_attwood@msn.com, >JPeeteJ@aol.com, JRoss67785@aol.com, jecspezia@yahoo.com, >onepasta@earthin k. net, jim.hood@worldnet.att.net, >gabreplay2000@yahoo.com, pwhitmore@sah.com, ST2958@aol.com, >jenpinkieT4@hotmail.com, GNordicnate@aol.com, fontanasally@hotmail.com,> bhcartwright@hotmail.com, sandor.falk@UCHSC.edu, >arthur.alberts@ubs.com, jackthomasl 929@nsm.com, tereelle@vail.net, >cgraham43@hotmail.com, chrishicksT4@yahoo.com, livnnow@yahoo.com, >elizabeth@whitmores.org, sterlin groad@comcast. net, >fred.will iams@agedwards.com, hanaosaki@qwest. net, >BarkerLynne@comcast.net, sgoxman@gmail.com >CC: CDavis@vailgov.com, MMire@vailgov.net >Subject: Apology and A2 update >Date: Tue, 20 Dec 2005 19:16:09 EST <lizlane2@comcast.net>, <pattyn@vail.net>, <RoseVail@aol.com>, <cfenton8305@nsm.com>, <rocnbarb@comcast.net>, <DowlingPC@aol.com>, <c_attwood@msn.com>, <JPeeteJ@aol.com>, <JRoss67785@ad.com>, <jecspezia@yahoo.com>, <onepasta@earthink.net>, <jim.hood@worldnet.att.net>, <gabreplaf2000@yahoo.com>, <pwhitmore@sah.com>, <ST2958@aol.com>, <jenpinkieT4@hotmail.com>, <GNordicnate@aol.com>, <bhcartwright@hotmail.com>, <sandor.falk@UCHSC.edu>, <arthur.alberts@ubs.com>, <jackthomas1929@nsm.com>, <tereelle@vail.net>, <cgraham43@hotmail.com>, <chrishicksT4@yahoo.com>, <livnnow@yahoo.com>, <elizabeth@whitmores.org>, <sterlingroad@comcast.net>, <fred.williams@agedwards.com>, <hanaosaki@qwest.net>, <Barkerlynne@comcast.net>, <sgoxman@gmail.com > "Sally Fontana" <fontanasally@hotmail.com > <SKaemmerle@aol.com>, <mothert@oneimage.com>, <fsellers777@hotmail.com>, 1213012005 12:56:37 AM RE: Apology and A2 update , Charlie Davis - RE: Apology and A2 u L-.___ ' _.: _ __ >Dear Interlochen Neighbor, >Bringing you up to date.....my A2 unit is still red{agged. The Town of >Vail (TOV) requires a letter of approval from President Teresa Day in >order to >obtain a permit to allow me to complete my interior renovation and the >installation of the TOV mandated safety egress window, that was approved >by the >Design Review Board and also by the majority of you last summer. After >the >November Board meeting, on December 5, Teresa faxed me the following >stioulations >for obtaining Board approval: > The Susan Kaemmerlen Trust must provide a complete list of all >renovations in unit A2, both those that are finished and those that still >need to be >done. Aletterof apologyfor not following the By-Laws of the >Association >needs to be sent to the board and owners will be kept on file for two >years. >Lastly, we would like you to vacate your seat on the board and refrain >from >seeking a board position for two years. >lf all of these stipulations are agreed to in writing, and a letter of >apology received, then a letter of approval for renovations for Unit A2 >will be >delivered to the Town of Vail immediately after a telephone confirmation >call >with all board members. >APOLOGY First, I apologize to all of you for not following the By Laws >of >the Association in unit A2 in making renovations. This was a result of >both >ignorance and naivete on my part, in addition to circumstances of the >moment. > My desire was simply to upgrade the unit and make it more safe, just as >many of you have done in order to make your private interior space a >happier >place to be. I did not know, nor did anyone else know at that time, >that any >physical change at all in a loft (e.9., replacing the loft railing) >reouires >by TOV code a safety egress window. Nevertheless, I do apologize. >RENOVATIONS Renovations I have made which require a Building Permit are >as >follows: removal of the dangerous loft railing which was rickety and had >pickets spaced 12" apart, expansion of the loft by about 3 1/2 feet to >match >the existing loft in 44, installing sheet rock wall in the loft, replacing >"like for like" a rotten beam under the staircase, and adding some can >lights and Page 2 icGirie Dili.-nE: Aporogv ano nz Jpo"f ease j i >electrical outlets. These renovations are finished and await inspection >by >the TOV. The DRB approved safety egress window still needs to be >inslalled. > The Permit for this work requires a letter of approval from the >Association >President. >RESIGNATION FROM THE BOARD AND REFMIN FROM SEEKING A BOARD POSITION FOR >TWO >YEARS In order to obtain the required letter of permission to get the >building permits for the above work, President Teresa has asked for the >resignation of the Trust from the Board and agreement to not serve again >for two more >years. lf you agree with that position, you need not vote for the Trust >ever >again, ..if the Trust ever runs again. >Please understand that within the last couple of years at least ten other >owners at Interlochen have made changes in their units which require a >oermit >from the TOV, and therefore BOD approval. The BOD has not batted an eye >about >these "transgressors," but rather chooses to target me with "a Board >memDer >should have higher standards." Well, whatever you think, l'm human and I >certainly neither meant nor caused any harm. >Both my Trust "agent" Paul Chapman and I feel very strongly about >fulfilling >our fiduciary responsibility and commitment vis-a-vis our Directorship >position. As you know, we do not take it lightly. lt is not an ego >trio. We do >not make capricious and punitive decisions. We love Interlochen and >consider ourselves very fortunate to have residence here, and strive to >have it be a > pleasant and safe place of residency not only for ourselves, but for >everyone. Obviously, however, at some point, if the only way to have >President >Teresa write the letter of approval is for the Trust to resign its Board >position, is there any other choice? >What would you like? I'd like to know. >As many of you know, Paul and I and only one other Board member have been >and are available 2417 to listen to your concerns via telephone (others >choose >not to have their phone numbers made public). Also, we have very happily >aided many of you with "on site" consultations this summer. Below follows >a >list of things of some of the things Paul has enthusiastically done for >lnterlochen, without any compensation and without touting these actions in >periodic >reports. I hope that after reading the list, you will send him your >thanks. >Sincerely, >The Susan L Kaemmerlen Trust (Susan and Paul) >203-856-9825, _Skaemmerle@aol.com_ (mailto:Skaemmerle@aol.com ), >_aicships@aol.com_ (mailto:aicships@aol.com) I Ch"il'" Davis - RE: Apology and 42 >Paul has contributed in no small measure to the management of the >Association. to wit: >-Flood/boiler replacement: made recommendations for replacement boiler, >inspected the new boiler, plumbing, and electrical renovations after the >flood, >identifying deficiencies in the workmanship, identified additional >elements of >insurance claim, processed and recovered same for the benefit of the >association, >-ldentified additional repairs required for leaking and potentially soon >leaking joints in the domestic water and heating systems in B building >-ldentified the source of bad odor coming from B building crawl space and >fixed same at very minimal expense. Despite their 2 extra visits at >considerable expense and all their supposed expertise, Steam Master did not >find the >simple source of the actual problem. Paul did. >-ldentified required repairs to boardwalks, decks, stairwala, supporting >columns and oversaw such repairs saving the Association considerable >exoense In >the process. >-ldentified (first in 2004 and reminded this Board in 2005) real >structural >problems which were deemed by persons on the prior Board to be >"cosmetic.", >and he pushed successfully for correction of these hazards. >-lnstigated and then oversaw cable upgrades in A and B buildings, saving >expense for same from prior management company >-Recommended further study of deteriorating fire escape /deck platform and >staircase for C/D building (which this Board has not yet initiated) >-Drafted such important letters as the "Dear Homeowner" letter >-Was the only Board member up until this point to aid with editing all the >Minutes for accuracy. >-Surveyed condition of roofs and fascias and recommended immediate >reparrs, >surveyed gutters and identified needed repairs to same, recommending that >the >appropriate time for these repairs was summer, not winter. Cleaned and >adjusted the gutter on lhe west side of A building. eage + I >-ldentified errors in marking of electrical breakers in B building. Aided >renters in remedying laundry shutdown. >-Discovered malfunctioning shutoff valves in hoUcold water system in BIC|D >building and recommended they be gradually overhauledheplaced each time a >building is shut down. (eventually, if such work is done, it will not be >necessary to shut off an entire building just to work in one unit) >-Helped a unit owner to prevent a leak from causing damage to other units >-Advised property managers to examine terms of warranty on new B boiler to >prevent accidentally voiding of same. >-Was available throughout the summer and fall, and continues to be >available >for consultation on short notice. , t . , ,. >-Consulted numerous times with prior and present managers re various >issues >at lnterlochen >-Helped an owner to resolve transfer of owneiship involving a partnership >-He is, at present, the only person associated with the Association able >and >willing to contribute time and expertise in technical aspects of our >management without fee. There is considerable work to be done for the >Association/board now to prepare new guidelines for future renovations, >possibly amendment >to our Bylaws, and/or condo Declarations (to resolve the Falk question, or >prepare for a vote by the Association at the next annual meeting). CC: <CDavis@vailgov.com>, <MMire@vailgov.net> I cqa'19 e![; - Apgr"gJ, ildj? ,iqt"_-| From: To: <pattyn@vail.net>, <RoseVail@aol.com>, <cfentonB305@nsm.com>, <rocnbarb@comcast.net>, <DowlingPC@aol.com>, <c_attwood@msn.com>, <JPeeteJ@aol.com>, <JRoss67785@aol.com>, <jecspezia@yahoo.com>, <onepasta@earthink.net>, <jim.hood@worldnet.att.net>, <gabreplay2OO0@yahoo.com>, <pwhitmore@sah.com>, <ST29SB@aol.com>, <jenpinkieT4@hotmail.com>, <GNordicnate@aol.com>, <fontanasally@hotmail.com>, <bhcartwright@hotmail.com>, <sandor.falk@UCHSC.edu>, <arthur.alberts@ubs.com>, <jackthomas1929@nsm.com>, <tereelle@vail.net>, <cgraham43@hotmail.com>, <chrishicksT4@yahoo.com>, <livnnow@yahoo.com>, <elizabeth@whitmores.org>, <sterlingroad@comcast.net>, <fred.williams@agedwards.com>, <hanaosaki@qwest.net>, <BarkerLynne@comcast.net>, <sgoxman@gmail.com > lqg" t t Date: Subject: <SKaemmerle@aol.com> <mothert@oneimage.com>, <fsellers777@hotmail.com>, <lizlane2@comcast.net>, 1212012005 5:18:50 PM Apology and 42 update Dear Interlochen Neighbor, Bringing you up to date.....myA2 unit is still red-tagged. The Town of Vail (TOV) requires a letter of approval from President Teresa Day in order to obtain a permit to allow me to complete my interior renovation and the installation of the TOV mandated safety egress window, that was approved by the Design Review Board and also by the majority of you last summer. After the November Board meeting, on December 5, Teresa faxed me the following stipulations for obtaining Board approval: The Susan Kaemmerlen Trust must provide a complete list of all renovations in unit 42, both those that are finished and those that still need to be done. A letter of apologyfor not following the By-Laws of the Association needs to be sent to the board and owners will be kept on file for two years. Lastly, we would like you to vacate your seat on the board and refrain from seeking a board position for two years. lf all of these stipulations are agreed to in writing, and a letter of apology received, then a letter of approval for renovations for Unit A2 will be delivered to the Town of Vail immediately after a telephone confirmation call with all board members. APOLOGY First, I apologize to all of you for not following the By Laws of the Association in unit 42 in making renovations. This was a result of both ignorance and naivete on my part, in addition to circumstances of the moment. My desire was simply to upgrade the unit and make it more safe, just as many of you have done in order to make your private interior space a happier place to be. I did not know, nor did anyone else know at that time, that any physical change at all in a loft (e.9., replacing the loft railing) requires by TOV code a safety egress window. Nevertheless, I do apologize. RENOVATIONS Renovations I have made which require a Building Permit are as follows: removal of the dangerous loft railing which was rickety and had pickets spaced 12" apaft, expansion of the loft by about 3 l12feel to match the existing loft in 44, installing sheet rock wall in the loft, replacing "like for like" a rotten beam under the staircase, and adding some can lights and electrical outlets. These renovations are finished and await inspection by the TOV. The DRB approved safety egress window still needs lo be installed. The Permit for this work requires a letter of approval from the Association President. RESIGNATION FROM THE BOARD AND REFMIN FROM SEEKING A BOARD POSITION FOR TWO I cnarllg oqtis - Ap_9-log1l and A2 updatg YEARS In order to obtain the required letter of permission to get the building permits for the above work, President Teresa has asked for the resignation of the Trust from the Board and agreement to not serye again for two more years. lf you agree with that position, you need not vote for the Trust ever again, ..if the Trust ever runs again. Please understand that within the last couple of years at least ten other owners at Interlochen have made changes in their units which require a permit from the TOV, and therefore BOD approval. The BOD has not batted an eye about these "transgressors, " but rather chooses to target me with "a Board member should have higher standards." Well, whatever you think, I'm human and I certainly neither meant nor caused any harm. Both my Trust "agent" Paul Chapman and I feel very strongly about fulfilling our fiduciary responsibility and commitment vis-a-vis our Directorship position. As you know, we do not take it lightly. lt is not an ego trip. We do not make capricious and punitive decisions. We love Interlochen and consider ourselves very fortunate to have residence here, and strive to have it be a pleasant and safe place of residency not only for ourselves, but for everyone. Obviously, however, at some point, if the only way to have President Teresa write the letter of approval is for the Trust to resign its Board position, is there any other choice? What would you like? l'd like to know. As many of you know, Paul and I and only one other Board member have been and are available 2417 to lislen to your concerns via telephone (others choose not to have their phone numbers made public). Also, we have very happily aided many of you with "on site" consultations this summer. Below follows a list of things of some of the things Paul has enthusiastically done for Interlochen, without any compensation and without touting these actions in periodic reports. I hope that after reading the list, you will send him your thanks. Sincerely, The Susan L Kaemmerlen Trust (Susan and Paul) 203-856-9825, _Skaemmerle@aol"com_ (mailto:Skaemmerle@aol.com), _aicships@aol.com_ (mailto:aicships@aol.com ) Paul has contributed in no small measure to the management of the Association, to wit: -Flood/boiler replacement: made recommendations for replacement boiler, inspected the new boiler, plumbing, and electrical renovations after the flood, identifying deficiencies in the workmanship, identified additional elements of insurance claim, processed and recovered same for the benefit of the association. -ldentified additional repairs required for leaking and potentially soon leaking joints in the domestic water and heating systems in B building -ldentified the source of bad odor coming from B building crawl space and fixed same at very minimal expense. Despite their 2 extra visits at considerable expense and all their supposed expertise, Steam Master did not find the simple source of the actual problem. Paul did. -ldentified required repairs to boardwalks, decks, stairways, supporting Page2 columns and oversaw such repairs saving the Association considerable expense in the process. -ldentified (first in 2004 and reminded this Board in 2005) real structural problems which were deemed by persons on the prior Board to be "cosmetic.", and he pushed successfully for correction of these hazards. -lnstigated and then oversaw cable upgrades in A and B buildings, saving expense for same from prior management company -Recommended further study of deteriorating fire escape /deck platform and staircase for C/D building (which this Board has not yet initiated) -Drafted such important letters as the "Dear Homeowner" letter -Was the only Board member up until this point to aid with editing all the Minutes for accuracy. -Surveyed condition of roofs and fascias and recommended immediate repairs, surveyed gutters and identified needed repairs to same, recommending that the appropriate time for these repairs was summer, not winter. Cleaned and adjusted the gutter on the west side of A building. Jdentified errors in marking of electrical breakers in B building. Aided renters in remedying laundry shutdown. -Discovered malfunctioning shutoff valves in hoVcold water system in B/C/D building and recommended they be gradually overhauled/replaced each time a building is shut down. (eventually, if such work is done, it will not be necessary to shut off an entire building just to work in one unit) -Helped a unit owner to prevent a leak from causing damage to other units -Advised property manager$ to examine terms of wananty on new B boiler to prevent accidentally voiding of same. -Was available throughout the summer and fall, and continues to be available for consultation on short notice. -Consulted numerous times with prior and present managers re various issues at Interlochen -Helped an owner lo resolve transfer of ownership involving a partnership -He is, at present, the only person associated with the Association able and willing to contribute time and expertise in technical aspects of our management without fee. There is considerable work to be done for the Association/board now to prepare new guidelines for future renovations, possibly amendment to our Bylaws, and/or condo Declarations (to resolve the Falk question, or prepare for a vote by the Association at the next annual meeting). CC:<CDavis@vailgov.com >, <MMire@vailgov.net> From: <jackthomas1929@comcast.net> To: <cdavis@vailgov.com> Date: 1?/2?J2@5 1:31:01 PM Subject: Interlochen Condo matter Mr. Davis: I write you with a concern regarding the on going controversy about the 'window' issue in the A Bldg of the lnterlochen Condominium complex. My name is John Thomas, and I have been a resident of Interlochen since 1975. Since the matter of modifying the exterior of the A bldg with a windo4 which is directly across from my unit, D-4, I have been determinedly opposed to any such modification. Fortunately, our Board has recently gone on record as being against any such approval of a window in the A Bldg. It is apparent that the owners have recently seen fit to allow residency in the unit in question, and it has been my understanding that any occupancy was not appropriate until the Interlochen board gave approval to the'windovt/. lt would appear that the unit is being occupied, and thd owners have'refused'to abide by the decision of your office[ no occupancy until safe] and have chosen to ignore the denial of the window by the Interlochen Board. There may be something totally legal happening here, and I am simply asking you for some answers if the occupancy is approprite under existing circumstances. ls it appropriate for your office to 'check out' occupancy? The lights are on and there is activity in the unit!!!!! Thank you for your attention to this matter. lf one of your staff people is the principal in this matter, I would respectfully ask that they send me a response at the appropriate time. JOHN THOMAS I Charlie Davis - RE: Apology and 42 From: "Sally Fontana" <fontanasally@hotmail.com> To: <SKaemmerle@aol.com>, <mothert@oneimage.com>, <fsellers777@hotmail.com>, <lizlane2@comcast.net>, <pattyn@vail.net>, <RoseVail@aol.com>, <cfenton8305@nsm.com>, <rocnbarb@comcast.net>, <DowlingPC@aol.com>, <c_attwood@msn.com>, <JPeeteJ@aol.com>, <JRoss67785@aol.com>, <jecspezia@yahoo.com>, <onepasta@earthink.net>, <jim.hood@worldnet.att.net>, <gabreplaf2000@yahoo.com>, <pwhitmore@sah.com>, <ST2958@aol.com>, <jenpinkieT4@hotmail.com>, <GNordicnate@aol.com>, <bhcartwright@hotmail.com>, <sandor.falk@UCHSC.edu>, <arthur.alberts@ubs.com>, <jackthomas1929@nsm.com>, <tereelle@vail.net>, <cgraham43@hotmail.com>, <chrishicksT4@yahoo.com>, <livnnow@yahoo.com>, <elizabeth@whitmores.org>, <sterlingroad@comcast.net>, <fred.williams@agedwards.com>, <hanaosaki@qwest.net>, <BarkerLynne@comcast. nel>, <sgoxman@gmail.com > Date: 1213012005 12:56:37 AM Subject: RE: Apology and A2 update To the President of the Board of Interlochen, to the Board Members and to Susan Skaemmerle: I am the owner of Unit C-8 and would like to briefly comment on the request to have Susan resign from the Board of Directors in exchange for "permission" to have changes made to her Unit, as well as requesting this apology before "permission" is given. It appears that the changes made to A2 were reasonable, will be done to code, and will benefit Interlochen as a whole by renovating and upgrading this unit, and that the board is willing to give permission after a review of these renovations. I find it offensive, unrelated, and irrelevant and totally without merit to tie-in this request for Susan to resign from the Board in exchange for a letter from the Board to complete renovations to Unit A2. I feel that we should consider ourselves fortunate to have good people on our Board who are willing to help Interlochen in positive, productive ways, and it would be a loss to the Association to force Susan & Paul (Trust) to resign. Please give permission for the appropriate renovations and retract this ridiculous request to resign. Sally Fontana >From : SKaemmerle@aol.com >To: mothert@oneimage.com, fsellersTTT@hotmail.com, lizlane2@comcast.net,> pattyn@vail.net, RoseVail@aol.com, cfenton8305@nsm.com, >rocnbarb@comcast.net, DowlingPC@aol.com, c_attwood@msn.com, >JPeeteJ@aol.com, JRoss67785@aol.com, jecspezia@yahoo.com, >onepasta@earthink. net, jim. hood@worldnet.att. net, >gabreplay2O00@yahoo.com, pwhitmore@sah.com, ST2958@aol.com, >jenpinkieT4@hotmail.com, GNordicnate@aol.com, fontanasally@hotmail.com,> bhcartwright@hotmail.com, sandor.falk@UCHSC.edu, >arthur.alberts@ubs.com, jackthomasl 929@nsm.com, tereelle@vail.net, >cgraham43@hotmail.com, chrishicksT4@yahoo.com, livnnow@yahoo.com, >elizabeth@whitmores.org, sterlingroad@comcast. net, >fred.williams@agedwards.com, hanaosa ki@qwest. net, >Barkerlynne@comcast.net, sgoxman@gmail.com >CC: CDavis@vailgov.com, MMire@vailgov.net >Subject: Apology and A2 update >Date: Tue, 20 Dec 2005 19:16:09 EST Page 1l ljh;ils Qt!s- Ei' Apebsy il@,pdao-- >Dear Interlochen Neighbor, >Bringing you up to date.....my A2 unit is still red{agged. The Town of >Vail (TOV) requires a letter of approval from President Teresa Day in >order to >obtain a permit to allow me to complete my interior renovation and the >installation of the TOV mandated safety egress window, that was approved >by the >Design Review Board and also by the majority of you last summer. After >the >November Board meeting, on December 5, Teresa faxed me the following >stioulations >for obtaining Board approval: > The Susan Kaemmerlen Trust must provide a complete list of all >renovations in unit 42, both those that are finished and those that still >need to be >done. A letter of apologyfor not following the By-Laws of the >Association >needs to be sent to the board and owners will be kept on file for two >years. >Lastly, we would like you to vacate your seat on the board and refrain >from >seeking a board position for two years. >lf all of these stipulations are agreed to in writing, and a letter of >apology received, then a letter of approval for renovations for Unit 42 >will be >delivered to the Town of Vail immediately after a telephone confirmation >call >with all board members. >APOLOGY First, I apologize to all of you for not following the By Laws >of >the Association in unit A2 in making renovations. This was a result of >both >ignorance and naivete on my part, in addition to circumstances of the >moment. > My desire was simply to upgrade the unit and make it more safe, just as >many of you have done in order to make your private interior space a >happier >place to be. I did not know, nor did anyone else know at that time, >that any >physical change at all in a loft (e.9., replacing the loft railing) >requrres >by TOV code a safety egress window. Nevertheless, I do apologize, >RENOVATIONS Renovations I have made which require a Building Permit are >as >follows: removal of the dangerous loft railing which was rickety and had >pickets spaced 12" apart, expansion of the loft by about 3 1/2 feet to >m atch >the existing loft in ,A4, installing sheet rock wall in the loft, replacing >"like for like" a rotten beam under the staircase, and adding some can >liohts and Page 2 I >electrical outlets. These renovations are finished and await inspection >by >the TOV. The DRB approved safety egress window still needs to be >installed. > The Permit for this work requires a lefter of approval from the >Association >President. >RESIGNATION FROM THE BOARD AND REFMIN FROM SEEKING A BOARD POSITION FOR >TWO >YEARS In order to obtain the required letter of permission to get the >building permits for the above work, President Teresa has asked for the >resignation of the Trust from the Board and agreement to not serve again >for two more >years. lf you agree with that position, you need not vote for the Trust >ever >again, ..if the Trust ever runs again. >Please understand that within the last couple of years at least ten other >owners at Interlochen have made changes in their units which require a >oermit >from the TOV, and therefore BOD approval. The BOD has not batled an eye >about >these "transgressors," but rather chooses to target >member >should have higher standards." Well, whatever you >certainly neither meant nor caused any harm. >Both my Trust "agent" Paul Chapmanandlfeel very strongly about >fulfilling >our fiduciary responsibility and commitment vis-a-vis our Directorship >position. As you know, we do not take it lightly. lt is not an ego >trip. We do >not make capricious and punitive decisions. We love Interlochen and >consider ourselves very fortunate to have residence here, and strive to >have it be a > pleasant and safe place of residency not only for ourselves, but for >everyone. Obviously, however, at some point, if the only way to have >President >Teresa write the letter of approval is for the Trust to resign its Board >position, is there any other choice? >What would you like? I'd like to know. >As many of you know, Paul and I and only one other Board member have been >and are available 2417 to listen to your concerns via telephone (others >cnoose >not to have their phone numbers made public). Also, we have very happily >aided many of you with "on site" consultations this summer. Below follows >a >list of things of some of the things Paul has enthusiastically done for >lnterlochen, without any compensation and without touting these actions in >periodic >reports. I hope that after reading the list, you will send him your >thanks. >Sincerely, >The Susan L Kaemmerlen Trust (Susan and Paul) >203-856-9825, _Skaemmerle@aol.com_ (mailto:Skaemmerle@aol.com), >_aicships@ad.com_ (mailto:aicships@aol.com ) me with "a Board think, l'm human and I >Paul has contributed in no small measure to the management of the >Association. to wit: >-Flood/boiler replacement: made recommendations for replacement boiler, >inspected the new boiler, plumbing, and electrical renovations after the >flood, >identifying deficiencies in the workmanship, identified additional >elements of >insurance claim, processed and recovered same for the benefit of the >association, >-ldentified additional repairs required for leaking and potentially soon >leaking joints in the domestic water and heating systems in B building >Jdentified the source of bad odor coming from B building crawl space and >fixed same at very minimal expense. Despite their 2 extra visits at >considerable expense and all their supposed expertise, Steam Master did not >find the >simple source of the actual problem. Paul did. >-ldentifled required repairs to boardwalks, decks, stairways, supporting >columns and oversaw such repairs saving the Association considerable >expense In >the process. >-ldentified (first in 2004 and reminded this Board in 2005) real >structural >problems which were deemed by persons on the prior Board to be >"cosmelic.". >and he pushed successfully for correction of these hazards. >-lnstigated and then oversaw cable upgrades in A and B buildings, saving >expense for same from prior management company >-Recommended further study of deteriorating fire escape /deck platform and >staircase for C/D building (which this Board has not yet initiated) >-Drafted such important lefters as the "Dear Homeowner" letter >-Was the only Board member up until this point to aid with editing all the >Minutes for accuracy. >-Surveyed condition of roofs and fascias and recommended immediate >repatrs, >surveyed gutlers and identified needed repairs to same, recommending that >the >appropriate time for these repairs was summer, not winter, Cleaned and >adjusted the gutter on the west side of A building. >-ldentified errors in marking of electrical breakers in B building. Aided >renters in remedying laundry shutdown. >-Discovered malfunctioning shutoff valves in hoUcold water syslem in B/CiD >building and recommended they be gradually overhauled/replaced each time a >building is shut down. (eventually, if such work is done, it will not be >necessary to shut off an entire building just to work in one unit) >-Helped a unit owner to prevent a leak from causing damage to other units >-Advised property managers to examine terms of warranty on new B boiler to >prevent accidentally voiding of same. >-Was available throughout the summer and fall, and continues to be >available >for consultation on short notice. >-Consulted numerous times with prior and present managers re various >lssues >at lnterlochen >-Helped an owner to resolve transfer of ownership involving a partnership >-He is, at present, the only person associated with the Association able >ano >willing to contribute time and expertise in technical aspects of our >management without fee. There is considerable work to be done for the >Association/board now to prepare new guidelines for future renovations, >possibly amendment >to our Bylaws, and/or condo Declarations (to resolve the Falk question, or >prepare for a vote by the Association at the next annual meeting). GC:<CDavis@vailgov.com>, <MMire@vailgov. net> Lgejle oey'9rdpgnglqlo & ,ogG | From: To: <pattyn@vail.net>, <RoseVail@aol.com>, <cfenton8305@nsm.com>, <rocnbarb@comcast.net>, <DowlingPC@aol.com>, <c_attwood@msn.com>, <JPeeteJ@aol.com>, <JRoss67785@aol.com>, <jecspezia@yahoo.com>, <onepasta@earthink.net>, <jim.hood@worldnet.att.net>, <gabreplay2000@yahoo.com>, <pwhitmore@sah.com>, <ST2958@aol.com>, <jenpinkieT4@hotmail.com>, <GNordicnate@aol.com>, <fontanasally@holmail.com>, <bhcartwright@hotmail.com>, <sandor.falk@UCHSC.edu>, <arthur.alberts@ubs.com>, <jackthomas1929@nsm.com>, <tereelle@vail.net>, <cgraham43@hotmail.com>, <chrishicksT4@yahoo.com>, <livnnow@yahoo.com>, <elizabeth@whitmores.org>, <sterlingroad@comcast.net>, <fred.williams@agedwards.com>, <hanaosaki@qwest.net>, <Barkerlynne@comcast.net>, <sgoxman@gmail.com> Date: Subject: <SKaemmerle@aol.com> <mothert@oneimage.com>, <fsellers777@hotmail.com>, <lizlane2@comcast.net>, 1212012005 5:18:50 PM Apology and A2 update Dear Interlochen Neighbor, Bringing you up to date.....my A2 unit is still redtagged. The Town of Vail (TOV) requires a letter of approval from President Teresa Day in order to obtain a permit to allow me to complete my interior renovation and the installation of the TOV mandated safety egress window, that was approved by the Design Review Board and also by the majority of you last summer. After the November Board meeting, on December 5, Teresa faxed me the following stipulations for obtaining Board approval: The Susan Kaemmerlen Trust must provide a complete list of all renovations in unit A2, both those that are finished and those that still need to be done. A letter of apology for not following the By-Laws of the Association needs to be sent to the board and owners will be kept on file for two years. Lastly, we would like you to vacate your seat on the board and refrain from seeking a board position for two years. lf all of these stipulations are agreed to in writing, and a letter of apology received, then a letter of approval for renovations for Unit A2 will be delivered to the Town of Vail immediately after. a telephone confirmation call with all board members. APOLOGY First, I apologize to all of you for not following the By Laws of the Association in unit 42 in making renovations. This was a result of both ignorance and naivete on my part, in addition to circumstances of the moment. My desire was simply lo upgrade the unit and make it more safe, just as many of you have done in order to make your private interior space a happier place to be. I did not know, nor did anyone else know at that time, that any physical change at all in a loft (e.9., replacing the loft railing) requires by TOV code a safety egress window. Nevertheless, I do apologize. RENOVATIONS Renovations I have made which require a Building Permit are as follows: removal of the dangerous lofi railing which was rickety and had pickets spaced 12" apart, expansion of the loft by about 3 l12feet to match the existing loft in A4, installing sheet rock wall in the loft, replacing "like for like" a rotten beam under the slaircase, and adding some can lights and electrical outlets. These renovations are finished and await inspection by the TOV. The DRB approved safety egress window still needs to be installed. The Permit for this work requires a letter of approval from the Association President. RESIGNATION FROM THE BOARD AND REFRAIN FROM SEEKING A BOARD POSITION FOR TWO | 11rie qevis jri!"sv "ry & qpdt{ l YEARS In order to obtain the required letter of permission to get the building permits for the above work, President Teresa has asked for the resignation of the Trust from the Board and agreement to not serve again for two more years. lf you agree with that position, you need not vote for the Trust ever again, ..if the Trust ever runs again. Please understand that within the last couple of years at least ten other owners at Interlochen have made changes in their units which require a permit from the TOV, and therefore BOD approval. The BOD has not batted an eye about these "transgressors," but rather chooses to target me with "a Board member should have higher standards." Well, whatever you think, I'm human and I certainly neither meant nor caused any harm. Both my Trust "agent" Paul Chapman and I feel very strongly about fulfilling our fiduciary responsibility and commitment vis-a-vis our Directorship position. As you know, we do not take it lightly. lt is not an ego trip. We do not make capricious and punitive decisions. We love Interlochen and consider ourselves very fortunate to have residence here, and strive to have it be a pleasant and safe place of residency not only for ourselves, but for everyone. Obviously, however, at some point, if the only way to have President Teresa write the letter of approval is for the Trust to resign its Board position, is there any other choice? What would you like? l'd like to know. As many of you know, Paul and I and only one other Board member have been and are available 2417 to listen to your concerns via telephone (others choose not to have their phone numbers made public). Also, we have very happily aided many of you with "on sile" consultations this summer. Below follows a list of things of some of the things Paul has enthusiastically done for Interlochen, wilhout any compensation and without touting these actions in periodic reports. I hope that after reading the list, you will send him your thanks. Sincerely, The Susan L Kaemmerlen Trust (Susan and Paul) 203-856-9825, _Skaemmerle@aol.com_ (mailto:Skaemmerle@aol.com), _aicships@aol.com_ (mailto:aicships@aol.com) Paul has contributed in no small measure to the management of the Association, to wit: -Flood/boiler replacement: made recommendations for replacement boiler, inspected the new boiler, plumbing, and electrical renovations after the flood, identifying deficiencies in the workmanship, identified additional elements of insurance claim, processed and recovered same for the benefit of the association, -ldentified additional repairs required for leaking and potentially soon leaking joints in the domestic water and heating systems in B building -ldentified the source of bad odor coming from B building crawl space and fixed same at very minimal expense. Despile their 2 extra visits at considerable expense and all their supposed expertise, Steam Master did not find simple source of the actual problem. Paul did. -ldentified required repairs to boardwalks, decks, slairways, supporting Faezi the [c n ;!l1ogyl9 - npqgqt-a nd &- 31'iap.-O P.gei I columns and oversaw such repairs saving the Association considerable expense in the process. -ldentified (first in 2004 and reminded this Board in 2005) real structural problems which were deemed by persons on the prior Board to be "cosmetic.", and he pushed successfully for correction of these hazards. -lnstigated and then oversaw cable upgrades in A and B buildings, saving expense for same from prior management company -Recommended further study of deteriorating fire escape /deck platform and staircase for CiD building (which this Board has not yet initiated) -Drafted such imoortant letters as the "Dear Homeowner" letter -Was the only Board member up until this point to aid with editing all the Minutes for accuracy. -Surveyed condition of roofs and fascias and recommended immediate repairs, surveyed gutters and identified needed repairs to same, recommending that the appropriate time for these repairs was summer, not winter. Cleaned and adjusted the gutter on the west side of A building. -ldentified errors in marking of electrical breakers in B building. Aided renters in remedying laundry shutdown. -Discovered malfunctioning shutoff valves in hoUcold water system in B/C/D building and recommended they be gradually overhauled/replaced each time a building is shut down. (eventually, if such work is done, it will not be necessary to shut off an entire building just to work in one unit) -Helped a unit owner to prevent a leak from causing damage to other units -Advised property managers to examine terms of warranty on new B boiler to prevent accidentally voiding of same. -Was available throughout the summer and fall, and continues to be available for consultalion on short notice. -Consulted numerous times with prior and present managers re various issues at Interlochen -Helped an owner to resolve transfer of ownership involving a partnership -He is, at present, the only person associated with the Association able and willing to contribute time and expertise in technical aspects of our management without fee. There is considerable work to be done for the Association/board now to prepare new guidelines for future renovations, possibly amendment to or Bylaurs, and/or condo Declarations (to resolve the Falk question, or prepare for a vote by the Association at the next annual meeting). GC: <CDavis@vailgw.com>, <MMire@vailgov.net> Froml To: "Teresa Day'' <mothert@oneimage.com> "Sally Fontana" <fontanasally@hotmail.com>, <SKaemmerle@aol.com>, <fsellers777@hotmail.com>, <lizlane2@comcast.net>, <pattyn@vail.net>, <RoseVail@aol.com>, <cfenton830S@nsm.com>, <rocnbarb@comcast.net>, <DowlingPC@aol.com>, <c_attwood@msn.com>, <JPeeteJ@aol.com>, <JRoss67785@aol.com>, <jecspezia@yahoo.com>, <onepasta@earthink.net>, <jim.hood@worldnet.att.net>, <gabreplaf2000@yahoo.com>, <pwhitmore@sah.com>, <ST2958@aol.com>, <jenpinkieT4@hotmail.com>, <GNordicnate@aol.com>, <bhcartwright@hotmail.com>, <sandor.falk@UCHSC.edu>, <arthur.alberts@ubs.com>, <jackthomas1929@nsm.com>, <tereelle@vail.net>, <cgraham43@hotmail.com>, <chrishicksT4@yahoo.com>, <livnnow@yahoo.com>, <elizabeth@whitmores.org>, <sterlingroad@comcast.net>, <fred.williams@agedwards.com>, <hanaosaki@qwest.net>, <BarkerLynne@comcast.net>, <sgoxman@gmail.com> Date: Subjectr 0110312006 5:56:'t6 PM RE: Apology and A2 update > [Original Message] > From: Sally Fontana <fontanasally@hotmail.com> > To: <SKaemmerle@aol.com>; <mothert@oneimage.com>; <fsellers777@hotmail.com>; <lizlane2@comcast.net>; <pattyn@vail.net>; <RoseVail@aol.com>; <cfenton8305@nsm.com>; <rocnbarb@comcast.net>; <DowlingPC@aol.com>; <c_attwood@msn.com>; <JPeeteJ@aol.com>; <JRoss67785@aol.com>; <jecspezia@yahoo.com>; <onepasta@earthink.net>; <jim.hood@worldnet.att.net>; <gabreplay2000@yahoo.com>; <pwhitmore@sah.com>; <ST29SB@aol.com>; <jenpinkieT4@hotmail.com>; <GNordicnate@aol.com>; <bhcartwright@hotmail.com>; <sandor.falk@UCHSC.edu>; <arthur.alberts@ubs.com>; <jackthomas1929@nsm.com>; <tereelle@vail.net>; <cgraham43@hotmail.com>; <chrishicksT4@yahoo.com>; <livnnow@yahoo.com>; <elizabeth@whitmores.org>; <sterlingroad@comcast. net>; <fred.williams@agedwards.com>; <hanaosaki@qwest.net>; <BarkerLynne@comcast,net>; <sgoxman@gmail.com> > Cc: <CDavis@vailgov.com>; <MMire@vailgov.net> > Date: 1 213012005 1 2:55:49 AM > Subject: RE: Apology and A2.upda:te > To the President of the Board of Interlochen. to the Board Members and to > Susan Skaemmerle; > | am the owner of Unit C-8 and would like to briefly comment on the request > to have Susan resign from the Board of Directors in exchange for > "permission" to have changes made to her Unit, as well as requesting this > apology before "permission" is given. > lt appears that the changes made to A2 were reasonable, Wll be done to > code, and will benefit Interlochen as a whole by renovating and upgrading > this unit, and that the board is willing to give permission after a review > of these renovations. > | find it offensive, unrelated, and irrelevant and totally without merit to > tie-in this request for Susan to resign from the Board in exchange for a > letter from the Board to complete renovations to Unit 42. > I feel that we should consider ourselves fortunate to have good people on > our Board who are willing to help Interlochen in positive, productive ways, > and it would be a loss to the Association to force > Susan & Paul (Trust) to resign. > Please give permission for the appropriate renovations and retract this > ridiculous request to resign. > Sally Fontana > >From: SKaemmerle@aol.com > >To: mothert@oneimage.com, fsellersTTT@hotmail.com, lizlane2@comcast.net, > >rocnbarb@comcast.net, DowlingPC@aol.com, c_attwood@msn.com, > >JPeeteJ@aol.com, JRoss67785@aol.com, jecspezia@yahoo.com, > >onepasta@earthink.net, jim.hood@worldnet.att.net, > >gabrepla12000@yahoo.com, pwhitmore@sah.com, ST2958@aol.com, > >jenpinkieT4@hotmail.com, GNordicnate@aol.com, fontanasally@hotmail.com, > >arthur.alberts@ubs.com, jackthomasl 929@nsm.com, tereelle@vail.net, > >cgraham43@hotmail.com, chrishicksT4@yahoo.com, livnnow@yahoo.com, > >elizabeth@whilmores.org, sterlingroad@comcast.net, > >fred.williams@agedwards.com, hanaosaki@qwest.net, > >BarkerLynne@comcast.net, sgoxman@gmail.com > >CC: CDavis@vailgov.com, MMire@vailgov.net > >Subject: Apology and A2 update > >Date: Tue, 20 Dec 2005 19:16:09 EST > >Dear lnterlochen Neighbor, > >Bringing you up to date.....my A2 unit is still red-tagged. The Town of > >Vail (TOV) requires a letter of approval from President Teresa Day in > >order to > >obtain a permit to allow me to complete my interior renovation and the > >installation of the TOV mandated safety egress window, that was approveo > >by the > >Design Review Board and also by the majority of you last summer. After > >the > >November Board meeting, on December 5, Teresa faxed me the following > >stipulations > >for obtaining Board approval: > >renovations in unit 42, both those that are finished and those that still > >need to be > >done. A letter of apology for not following the By-Laws of the > >Association > >needs to be sent to the board and owners will be kept on file for two > >years. > >Lastly, we would like you to vacate your seat on the board and refrain > >from > >seeking a board position for two years. > >lf all of these stipulations are agreed to in writing, and a letter.of > >apology received, then a letter of approval for renovations for Unit A2 > >will be > >delivered to the Town of Vail immediately after a telephone confirmation > >call > >with all board members. > >APOLOGY First, I apologize to all of you tor not following the By Laws > >of > >the Association in unit A2 in making renovations. This was a result of > >both > >ignorance and naivete on my part, in addition to circumstances of the > >moment. > > My desire was simply to upgrade the unit and make it more safe, just > >many of you have done in order to make your private interior space a > >happier > >place to be. I did not know, nor did anyone else know at that time, > >that any > >physical change at all in a loft (e.9., replacing the loft railing) > >reouires > >by TOV code a safety egress window. Nevertheless, I do apologize. > >RENOVATIONS Renovations I have made which require a Building Permit are > >as > >follows: removal of the dangerous loft railing which was rickety and had > >pickets spaced 12" apart, expansion of the loft by about 3 l12teetto > >match > >the existing loft in 44, installing sheet rock wall in the loft, replacing > >"like for like" a rotten beam under the staircase, and adding some can > >lights and > >electrical outlets. These renovations are finished and await inspection > >by > >the TOV. The DRB approved safety egress window still needs to be > >installed. >> The Permit for this work requires a letter of approval from the > >Association > >President. > >RESIGNATION FROM THE BOARD AND REFRAIN FROM SEEKING A BOARD POSITION FOR > >TWO > >YEARS In order to obtain the required letter of permission to get the > >building permits for the above work, President Teresa has asked for the > >resignation of the Trust from the Board and agreement to not serve again > >for two more > >years. lf you agree with that position, you need not vote for the Trust > >ever