Loading...
HomeMy WebLinkAboutVAIL VILLAGE FILING 1 BLOCK 7 LOT 9A LEGAL.pdfVo'zVllq' fr hf14aF7 Design ACTIOITI FOR}T Department of Cornmllniry Development 75 South Frontage Road, Vail, Colorado S1657 tet:970.r+79.2139 fax:$70-479.2'152 web: www.uailgov'corn rd t Review Boa c{iti*-ft,IY cEt€LffilEXt BEER TREES DRB Number: DR8060186 Proiect Name: Project DescriPtion: FINALAPPRoVALFoRTHEREMoVALoF2ASPENTREES.BoTHTREESAREDEAD. Participants: OWNER FMNCIS A. BEER PERS RES TRUO5I26I2OO6 FMNCIS A. BEER TRUSTEE 115 HAWK LN BOULDER co 80304 APPLICANT ERIC LEIBFRIED 05 126 | 2006 Phone: 476-1450 projectAddress: 167 ROCKLEDGE RD VAIL Location: 167 ROCKLEDGE ROAD Legal Description: Lot: 10A Block: SuMivisionl VAIL VILLAGE 1 Parcel Numberl 2101-071-2000-3 Comments: SEE CONDffiONS Motion By: Second By: Vote: Conditions: BOARD/STAFF ACTION ACtiON: STAFFAPR Date of APProval: 06/0U2006 Cond: 8 G-rnrUi No changes to these plans may be made without the written consent of Town of Vail staff and/or the appropriate review committee(s)' Cond: 0 ipLnru, DRB approval does not constitute a permit for building. please consult with iown bt Vail euilding personnel prior to construction activities' Cond: 201 DRBapprova|sha||notbecomevalidfor20daysfo||owingthedateofapprova|. Cond: 202 npp.".l "f tf'tis project shall lapse and become vo.id one (1) year following the date offinuf ippto*t, untess a building permit is issued and construction is commenced and is diligently pursued toward completion' Joe Suther DRB Fee Paid: $2O'OO Planner: I Minor Exterior Alteratils Application for Design Review Department of Community Development 75 South Frontage Road, Vail, Colorado 81657 teli 970.479.2128 fax: 97O.479.2452 web: www,vailgov.com General Information: All projects requiring design review must receive approval prior to submitting a building permit application. Please refer to the submittal requirements for the particular approlral that is requested. An appliotion for Design Review cannot be accepted untii all required information is received by the Community Development Departrnent. The project may also need to be reviewed by the Town Council and/or the Planning and Environmental Commission' beiign review approval lapses unless a building permit is issued and construction commences within one year of the approval. Location ofthe Proposal: Lot: Physical Address: Parcel l Zoning: Name(s) of Owner(s): Mailing Address: Owner(s) Signature(s): I 7\)gt o o -\ @ r 2tol ht-t )oc>o< (contact.ut!ffg, ?ts Name of Applicant:1. ZJ)z':;4 Subdivision STAFF APPROVAL are7i*for parcel no.) Mailing Address: Q.rr t€.,c E-mail Address: Type of Review and Fee: tr Signs E ConceDtual Review n New Construction tr Addition Minor Alteration (multi-fami lylcommercial) Minor Alteration (single.family/d u plex) Changes to Approved Plans Separation Request tr X tr tr Ph Fax: $50 Plus $1.00 per square foot of total sign area. No Fee $650 For construction of a new building or demo/rebuild. $300 For an addition where square footage is added to any residential or commercial building (includes 250 additions & interior conversions). $250 For minor changes to buildings and site improvements, such as, re-roofing, painting, window additions, landscaping, fences and retaining walls, etc. +F For minor changes to buildings and site improvements, such as, re-roofing, painting, window additions, landscaping, fences and retaining walls, etc. $20 For revisions to plans already approved by Planning Staff or the Design Review Board. No Fee ]OINT PROPERTY OWNER WRITTEN APPROVAL LETTER Tui{ff0r r, (print nu ") 6i. lu b{ ,'.L ,"ffi{*erty tocated at (address/legal I / '-1 -j--? '7 I description) /b / Eect lcc};z Ktj' provide this letter as written approval of the plans aatea 05 - I K- O Q which have been submitted to the Town of Vail community Development Department for the proposed improvements to be completed at the address noted above. I understand that the proposed improvements include: I further understand that minor modifications may be made to the plans over the course of the review Drocess to ensure compliance with the Town's applicable codes and regulations' F: \cdev\FORM5\PERMITS\Planni ng\drb-minor-alt-1 1-23: ?99?:9:9 ttl23l2o0s (Date) Page 2 of 13 PROPOSED LANDSCAPING Botanical Name Common Name Ouantitv Size PROPOSED TREES AND SHRUBS EXIfiNG TREES TO BE REMOVED A.H-'*' (+ Minimum Requirements for Landscaping: Deciduous Trees - 2" Caliper Coniferous Trees - 6'in height Shrubs - 5 Gal. Tvpe Square Footage GROUND COVER SOD SEED IRRIGATION TYPE OF EROSiON CONTROL Please specify other landscape features (i.e, retaining walls, fences, swimming pools' etc.) F:\cdev\FoRMs\PERMlTs\Planning\drb-minor-alt-11-23-2005'doc Page 7 of 13 Lr/731200s a l}2 c)o z 2 fr c () {o z !ln F ={ o (D m Ia ,_o .Lt,l-r=O I<X A t! )J t lm: 6 l9s I l!: q lmP o l.u in O 13 I 3 l=i! 3 '<c o.< dE -o 60 ctt >l 63 m*o _n ! m = <trq mi_(- 2== !2 > l- t-lftr-l RI! ,^ Z=5oo c1 >= F F r'' E> P z IT FI tr1 tct F F z o=ubi o>'r- 2a -{m frz >m C)I' --.t > o Oa Z. t- T< 1Z 4; zi -lo o> m -r z o z,o n+ ar r 'Tl =2 t= t:lFl IH trr t> l-lP lca lFl I I o B,E lPE ts,F EI EIE IE gF E tt I o lcorJ O lu'Dr,ulol>- lu'Ed Itt c) | trt lf'l PI^F' \rlidl \OlC)l l,.)liEl tt>l L,., lFl WIVI (rl I @l I B D F b p m w r IX I | (rl l\o l* I I I I f H F z E .\t I & s.{ I Lrl { l+ lI lO l!l€ 13 l3L l'n l.r l< lt t> tt4 I- tP l- tl lfi lrd le lE lz^ lz lv lx ttx ll'tl lPl lFl | (rl trl t>l rl lci F t€F lzl EI lsl tzl I'l tl II lo li l€ l= FI lFl trl tml leI tzl l'l tl tl II lt l.'l to l{ lz li t<t> lF It IA ti f, 13 lo t:l>l- lm lo li I' I I nEE q,z 40 = -.1 m 1., I t>lzo l'o t- 1,lo<ro lr- a \O!B$ =-{ @ m x m 1'-{ o z C-o @ a =m (f, C: L,.1 t..' il: tsrue ile E iE q+ .tr'i=EE i if3=--;=Hs ',t" L.'' 3 o 693 ;,r,rE'll'l= t,9,29o,96. of :=lgt='2.1 \, cL * o ;i st / /'\ ^ O*=E ielj5:;E Hqt *rai*"?l 3 i = 9 P zl -:(o +- -$l , Fs*01 il;'eii:g ;l'lr =ia*g ;l 1g**;t -nl 3 o --* IO q€ at! m 4i-z6 .z : z (t c r- -t z n r I m -l € t-t-(h m t-m -l o<1T m =z l-t m =a z m m m l< lz 2 t= t> 1r- o m 'tt t z t- a =z -.{ c -t X X X X z m € |- -"1 m 4 ^e --l m P -tl t-c -x z lo !-. xi XT =^D _!r 2o QO -<z ovl rrx,s=c,-.{65 z2 No= Nm= q, I v< = o '*fr H!EZ E]_t,H Er) v!z1 ^z s; E5 F*2..c)l I :l EI el *l HI rdl FI El al Frl 'l (nl dl rdl ol HI FI I =z l- an l€{l cno Hl rllF tlF4- tll'z=zlo=Irl\.,Pl ldz Nl cno 1^z otza '-ll. .rd trc(,)HIF''ut>l cDtzl rdt I l?'l ot I 'l5l zt<l gl'l lu,l ot Fl <t >l flrlol tdlFtl >tol ztcl 6)tHl .tl ,€' =z =2 6 i v o --.1 m @' ol 2',c)l l8i: *'>t. .d to <F 3lH >,al)zl t- IF tz mr6 I l\o l\o -{ -1 t- E m n =i '11 m m Q' c a m -l x m z c m L i rn I z m m € m tTt --l z 'n m m 3 m 2 o a- |-c q z m m i ^f- r' 2 I ttl o x c t- = m u = m n = =-n m m at) VALUATION T m v = =z o H H rr 3 m o 2 t- t- = z m r-m -.t - E z O O |.J 5 u# tB3?7 #K o Proiect Application Project Name: Project Description: Contacl Person and ,""^" BoA Q,:Dc K l )AJ' D (.L-d. f r:16?: Architect, Address and Phone: Legal Descriptionr lot 14 , atocr .,. I t^1 ritlno VV l)t . zone - Comments: Design Review Board Date Motion by: Seaonded by: APPROVAL DISAPPROVAL Sumrnary: X .on Approval o o 3 J,*ry %b{; #",ry arL w =pz.rx_Cfir'L- afr /757 t/,V fJJ4'Col pru,,ar< ,foft -07yfu'g'1 ,4 vb fr<- 2tat-hnl tro-'ga , #* p4_ H*q {F44fr (lzo{ ra a/U 4,L rd -*/"ly^ -r{hEL 'hfu,r - 1144 /6{.-4po ,a7--'{*4,47, '/-'/L. EEo11.cFL I ]>tr'@rt,o)), ,1. ,:.::' ,.- ,-+.-/ -tert=:*tp EA\re , ;A^fc,{-t bqsf. 7, ? E*fi:Alat4?'-Fs-rAU-t i Cc\,.,,vr^; /- S,. g.*.)j i I I I -.-,i ,o i\'r.- r :t .Y d --+/ t-t,r-{. J$1 U.t vi ,3A it - -+' ,L o lP -z \ri 4.J I {t'I tr; $/ { 1l *| c\ I i I iri $\l .l i t I tr t {l $ ,i vt It --* .. -l-=* =.,t .--= l\F -k--'- FqF 1!4-/tt { F-- - i1 -r- I \i z {-{t s r:|. \T z o I 51....-€fl +\€Crtr-6 t,il-..L. e-- :,.L* TIL -4xlo --f- \-?n,f I a\f--.r-.r. \ | --{*.--r >'F.. --.Wrt+i \L/ALJ;.-: df \i .--.-_+, I t I I 6LWa"r€ -':_ ::-- u, F --+ I E.:€(E iryr V I ilj =**,'**q ii4--' i.i nve4a+iAfik? ,/ 4--r-]F. / t-r N2 q F,/au - o -l v c EUx-AJdq -\^hDo €I Ocz \^-t ''**:_ ::Tnf BJ:ffisn; i \__4' I I - .----+ tgr--tsroil 'ts-lor--l -:4>< a --wJ<-vPf -L><ca W-t<EE-f =t4Jrye, . or,.{ \A/Af ' o o z CN {7 c o {o z T lfl F ={ 3 - { m I.q !-o hE :i xi ;o !l inO IT m=i=!5 o.<Tc de ag ano ct >e AE iri : "tl m lqrX E< D<xl mo t-t FE Ifr != le i" l; l=l=FIF D<l bd f, 3P z= 22 oG)z 6,) 9z tq m; lol lE8 l'.\ !lco <l-o tTl tt m o3 =f m -.1 o-q(D -Jm (rX ..\ m ('r!'\ -l 3o z 8,O,34 my..7 (t/ ////a cY: l'.-r '' -.- // l},' "r" t-O .---- t.///f 4>€F o z,O an I' R<ZA {>62.io Y> Oa zt--lc 3= =lz 96)u 8il z'^-{x 3i d9 >or 2n -lm vz >m -r> c)I =m -1 €z m n (- (!z =m m in r- t_Hm oA o>'r F<r D<l =m f z r- ! /. _n l-.- -,,: 3l F I tl l=l l(D IF * JF I { l-{ fllg 'lz lo l.lr t<l> IF lm lc)t'tz le I I I I I l c -z o rrl C) g m +l-i|n FIEI='t=l t" e.l< i-r II Ffi lr- f-)Ir F{lm tr,lo Fr kr tl tl tl |l II l{ t€ lz lo lI t> lF lI tm lP lz I 3 = 2 m m l.-.1 lo l{F I - m z l{to l€lz lo l'r1 t<lI t; lF t7 lv lrJ tHl tq)I]f t-!IH to t@ ti rl -{I n {t) I t t'tl t3 I lp =rrl T rrl =m 7 m = I -t !I il Ettr Plt rl<rt pl EI tr 1o Ir| nrr PH r F r I I I : =€ c = ! ur (t)-{(tr I ro F o x B D F I>l0 ED m frH3a 'ogd 3gfrr 6'5sl Y=!)O . :.- R {'o{ E it i= J Pr' @ O :a :t tc f *+ OTE_ ;s i.3- g ^' 4o o ,i s ad =D-O-'cf : qt *- *o f (cIE-q, *O i qt o*=! -E otE B.g=F i63.o' 3.s 3'l U,3l= dE4e i'= 9 P 6 .:.e EgFf <o-l 0:d P d e iE: 3as+ B ui a'5 .33q8 9odE.,;0, =(D 't q) t = 3 tD =' o 0t o ,o -l € 0) +-c -s €\. .ft. \ F l= atl ol z o {'r m =z m ID r I z 4 :\t+- 2 7 .-..\] -n .rl tl N I tq oo o z T ?-4 re FI ><i<' -lz = lz ti t> ll;o< ll="* 11,,."ilI5 It o ,ML t<tt-It- ll 5l*l"l lll=ll lo lo I l I ]- I z a, l- -t z m {I x z m (tt l--c m m€ 1i- 2'a -z /'---{s\f -t-/ I\E \z!.-9R 'n Li I<t= >o ol m=(oo z c z I lH tl z m € |- m P 1 2 u m F,/ . 5 -t i m _n { =2 F w r ro F b F ','ltNF *- o --r r= at _<ij a*F io a>'t B OU o'\z nc).t Io 64 6= E b zu,06 6 'nz= 5 x 6\r \7 - <- rao = >".) N V 7-,/ /,//l , I (JJ ft '2 tz --2. = (-t ?' ?z ?)L' 1 =I ) 4 ,, N) r 2.v N)r\)\l ='=zt o Xi=e 3tc)Y 2'^i s? | -o :-i *;=P dr="l= I t_l Or lt ;l -rl z 2 F - z z m U) =c e =, Ot -l o -r m =-.1 'Tl m m U' q) m x o t-m z m i m I z m s m € @ u til o m =z 'n m m m I 2 t- l- = m m I A t- |- z -tTl x @ l- z m !m ;o =-n m m <n VALUATION =m o - 2 D |- t- z m r m a 7 o t- z f\)N)\ tr F C^ D' !m T =z o F , tl l l ) (tl o (tr x q) o! tl l\)lo s t\l o F O r:Kr t3g 5D/es36 r&qi c) -: ; I c C 2 I ;I C ! c z T ll 7^ = = '.. ril | ,: vt l- r/l-r o li -t_: =tr I t> r 14; 3 '<c _o --r o-<rl.--r ;^- ao Of mi -D m :D 7 J -i-. '-_. .TT -D z< c]co >,- z z o o s.- f.*l o n $ls 6.\ o o x N N { o n r.:'--:-! !trm J : \ a ---l o-<n-D m I m J c)c 1 L) -i I c S.r\J .l' $ x o l-< ;ii -t> t- tn I.l> t:t; lc lo I I I I I =(D o q l I (D (O co = =qJ (D (D l -o 9 o' =- _l = (!o c ; I J - =.o l l_a s o o o 3 9 6 o_ l r)o c CD 9 9 q) -l l o (D J I =(D ;' o rc CD c)o l 9 =J = 5 d 3 9i =_o f :l c, 9 9 -l o {v OJ f o- o CI g. o l c o a .D 9)o o I'(o J o --1 o lq i's. f. K.' h I I () o { D)!D (D t l o 3 tD c. e l c) o- f o- J (D --l l D 9 o g (D J I o . a !_ - il ri 1':l: t?t'l<I' IT lm l^Y t- I I I I I I I I I >a z- i> rnC i) o I o o :)' C) I o : = t\ m f fA s2 -D m =z o P:-o --{ X-o c)o '<z Avl n7E <cx oo C n I ,\ I UJ J N f\) ! e\a< o lt'j ll ': IK il" > ll--'. II T >ll -3 o llz it^ l- llo ll o lt a ll =llo ti : ti >ll- ti^ll.-ll-l l'-ol ilxl li "l il-l o a C i t.I\.J I o o o 7 c :c --:- fn T =-n m m a ? :a l I { I :! -tt c l 4 o ), l, oir -{ ll otl ztl >-ll -tl sll =tl ill -ll zll sti oti Eil 'lr li tl ti I li li li lx l=la t:lt :_ .' .:' e) --{ C) ;D ta lo l-n t< l> IF I i= l^,t"t_ lar m lo K/:Fg t;^ >lJ t-Oo o '1--D v2 fn l=*o VAIUAI'ON c o c m c) o { t- \o m =-n m m a C) f-'r nlt f' -l x -D c P oA e I ^ tA o 1Q lf,) \\ m o - = a o 2 z o ). o o m a 0 o \! --l \4 q e tO ln i G o t, r;' C 7 f) 7 C) '=. l 'o o o- (D o- o) o .o E ,' o al I { J = -i .l 5 f Er l o. ; J ? f (o q, f c o o =!. J () o (] (l o (! ;-- J ..'12.ay,\o t : \* Q,A."' /t 6.{ t/t("r*,nv Q'*Lh"*s o{ olPro,,,o\ W Gr.-*L-l fer,&*,^c-< bp,\{,1 [*..,,*,t ," ] \ Qto{r1 F"L,*r q\,^ec\ b- lwoyi.*,.'".) i F+,"/d--.r' **..ott^.t e,.-c-roqrL-."t b"y-J ro' ';| 3j- rctL.'k nnod- Lq, o^r frade .-.,,1\ q be""*J; unt(- rnurrf 6/,e* cczJ,ho13 of DUb "1fo'.xJ fu*r t .6t.'c.*u- "'f c.o. ?* ?,.,^, \-o\[ ^nxr re\..r'\ [.trU.f- h te- p6> tLqur'(rt,. J PETER LOOMS . 4269 NUGGET LANE 1986 AIA . ARCHITECTURE . PLANNING . vAtL, coloRADO 81658 . (303) 476-3122 May 1, TO: FROM: Gary Murrain Chlef Building Official Town of Vai 1 This nenorandun and investigaLion, are dale. 1. netaining wa 11s de bails - A, 2. tJindow weIls are to be slnple corrugated netal - !rindoi{s are not eSress, 3. Door from garage to house HlI1 be I hour rated, furnished sith closer, 4. Any electrical outlets lnstalled wlIt be 18tr above garage floor, 5. Utllity roon w111 be provided sith an exhaust fan per code t 6. Fireplacel to be deta1led, will be zero clearance and ui11 be lnstalled in fu11 compllance wlth appl-icable codes, 7. There are to be no cablnets above the cook top insballation, 8. Deck support plersp as sboln, go to bed rock, 9. Egress windows are as shoun in Bedroon #3, Library and Master Bedroom, '| 0. Fireplace chlnney cap w11l be deLail.ed making provi.sion for f 1ue cl.€aring, 11. Metal cap for stair handrail wilI be no nore than 1 'l/2n in nidth, 12. An exit ladder conpl.ylng lrlth UBC SLandarcl 33-3 will be furnished for the egress wlndou in the Master Bedrooro, 13. Foundation venfs not requlred, there being no crarl space, ltl . Finish 1n Garage will be one hour fire - rated, Peter Loomsr(1 ArchitecE ( l/l-,,V" Re:Craebel House - nockledge Road - Va11 the acconpanying detai)-s, sketch plans and soil 1n response to your plan reviex coomenbs of thls (of wood) will be bullt in accordance wlth the PETER LOOMS . 4269 NUGGET LANE Gary Hurraln - Graebel May'1 , 1986 Page 2 AIA . ARCHITECTURE . PLANNING . vAlL, coLoRADO 816s8 . (303) 476-3122 15. Snoke detectors wI11 be relocated, and added per wl11 be lnberconnected wired in serles I 16. Mechanlcal space is !o be in a loft 1n. the Garage conbustlon alr and a1l detalls 1n ful. l code conpllance c, 17. Foundatlon has been engineered 1n accordance wlbh Investlgatlon - #ll-111-84 - B acconpanying, d1scusslon, and - Cons truc t lon t - see sketches - Chen Assocla bes Peter Loons, Architect, May 1, 1986 cc: Ruder-neinecke Construction Stnrcfural Gonsrdtants hrcorporated .r'uritre 6lLLtiTf f-loUSEJ RE]TAT wrru6 rwALL rornr. 84r4L 252 CL'.!d St...l OrEr. Cob..ao TRl=ICHER HEAPER STEP TOPOF V{ATL AS RtliAJlRriD ul { 3',SEoan?&FEs WovtDf= I" GA1- AT SfRi'=TCHr-=R HI=AD -Jot^.7-5 * 7u Albrnz '--()K - DRAtpA4.f= ffi'r { fort ) Structrral consrdtants O ., -t da"dilflffiL? r.u r-,,,. (-tLL t=JT H aursf= R Ffrr r ,'v r tv A rarA LL 'r.u .,". 84 t +e- 2S2 CL7lar St..l D.rr,.r. Co5..do *.-ffi ct ient 3tl = t\\-: lll ilt-\-'| | | -l tl D"r"8-31-84 sn"et L"B I l/-- t{EAD=ts -: llll ilt_ = F STRECHER- F'-t--UI a-va"Qx tz S,PrKl=S EACH E^Jp*712 AEovE 3-vg.q vrz', S.mKf=S EX)1 , =t.rP-'rYP f${ t Ley€L l Bg uour l-udor rz'37IK/E EAAI .EtD oFAIL s]-RE7C.HRs "'lffi CoURSE IF T+SS lB'Lr-= -fBAztFF rvcfl\\ sHo"vvN / =|il ltl 6Lo +5 REtsAR X 3lo Lo ^rt>@'3lD o.c.f U/ FtLL Btir--r rnrD c0uRse , FwE FRoNf FACE wtrH coMPAc@ p@At r..,,N6 MATEIZ\ AL "f L Strarcfural Gonsr.ttants O I hrc-66driaieiJ r,uritr" GtLtEff HottSl-= Rt=TRtr..rrnrl' vvAt(.r.u'i.64142 '%$ ",,.* Put=R L-,o M s "rJS K o,,.4-=l-"4"n"., 3 ' .,3 /A\ PLAN ry /} PLA N r 'l -J r---li J ",. r.r"l J r Car&1rl@4 Att-Ag,av* kr*t* ftffi.. El }Vettar ftg- l.,,aWge ft4* fl-1^/ . N., #/{B <' , sr'es* L 6EMFFL Hrut<E o ^=,4 ,4r^ a/,lguffto4 AlE LtEW 4fa -/.ryA e,4ft\ a,,se Jrrc @ /atl SufrepV reA /o,g al,€F.lAY @e. 6uttsur,4 ffirra( n $"#tE l*& .. '"*#6 ,sle&+' Io : lo# o r,pftnEL -y'|771/<E Project APPlication rl o='" t{lzl6u proiecr Name: [t{7 ?r*Y, *Ocf Pro.iect DescriPtion: Contact Person and Phone Owner, Address and Phone: Architect. Address and Phone: 1L - Brock 1 ririns ilJ lf ' zone Legal DescriPtion: Lot Com menls: Design Review Board Ir o.'" \frlK- Molion by: /\ tt t Secondedov: (.>L-rqfl^"^Y o""*ouo,- {DISAPPROVAL 5->--- Summary: 'r-' lr1 c-h.trtn own Plan ner (r\ E Statt Approval {r.u"^"-ry Project Application Project Name: Proiect Description: Contacl Person and Phone Owner, Address and Phone: Architect. Address and Phone: Legal Description: Lot Block Filing Zone Com ments: Design Review Board Motion by: Seconded by: APPROVAL DISAPPROVAL Summary: Town Plan ner E statr Aooroval lrrrr't ZONE CHECK FOR SFR, R, R P/S ZONE DISTRICTS t/oerc 1,/3.,/1G LEGAL DESCRIPTI0N: Lot ADDRESS: O1l|NER ARCHI TECT Bl ock rting V( y'-Sl' Phon Phone ZONE DISTRIC PROPOSED USE LOT SIZE He'ight Tota] GRFA Primary GRFA Secondary GRFA Setbacks: Front Si des Rear Water Course Site Coverage Landscapi ng ,FenqglRetai ni ng Wa1 1 Parki ng Credi ts : Garage Heights Aval anche Al I owed (30 )!33), ,€49,/g ft-@,ffia 6t-6*2 tu 44* 4A"4 5@qAl 4w Mechani ca I Ai rl ock Storage Solar Heat Drive: Slope Permitted Envi ronmental /Hazards : Comments: Geologic Hazards -- Dt^ 50 fu. Slope Actual 7rg/o ,\/,A, Flood Plain Sl ope Wetl ands 4aeaft" ffi33frz /6-€sn* 20' 15' 15' (30)(50) (300) (600) (eoo)(1200) (so) (100) /28\fEn\ (200)(400) Proposed ?t rEl Qpt 4u, ffi 4Tz frz -n 'l'" ,i , t'-l Zoning: Approved/Disap roved \r>\'.e- \t F^J ! .,\ -'\T ":' "; -ll.:*t ;lt [r' f t ,t .f APPLICATIOII DATE:b_/* DATE oF DRB MErTr rr, _Q1/7_/Ae__ L'RB AP PL I CAT I ON *****THJS APPLICATlON l.lILL NOT BE ACC'PTED UNTIL ALL INFORI'IAIION IS SITBI1ITTED***** I . PRE-APPL I CAT I0N 14E ET I i{G I A pre-application meeting rvith a planning staff member is strongly suggested to determine if any additional informatjon is needed. No application will be accepted unless it is coiirolete (must inc)ude all items required by the zoning aC;r:inistrator).It is tlre applicant's rcsponsibility to make an appointment with i\! staff to find out about additional subnrittal requirements. Please note that a C0iIPLETE applica-t'ion wi ll streaml ine the approval process for your project by decreasing thb number of conditjons of approval that the DRB may stipulate. ALL conditions oi approval must be resolved before a buildjng permit is issued. A. PROJECT DESCRI PTION: -J.fle-SLt'E B.LOCATION OF PROPOSAL: Add res s Legai Descripti on rct 74 ilock 7 Filine /.V -/=- Zoning R A/= c. NAME 0F AppLrcANT, RcreZ YAf/fr-kE (a/s/f\qc,fto4 Address {4qa e. .ff APaUlW, '_lephone(76-5/eJ D. NAME 0F APPLTCANT,S REPRESENTATTVE,RAFW w, vCn--^, 44qG e. Affiow' gR, tetepnonefi-g-s/Q OI,INERS: Address _Z { Ll F. DRB FEE: The fee will be paid at the time a buildjng permit is requested. VALUAT ] ON FEE F Address NAME OF Si gnature tel ephone 176,'r4{O $o $ 10,001 $ 50,001 $ 150,001 $500,001 $ 0ver $ 1o, ooo q qn nnn ( lqn nnn v r Jv t vvv q qnn nnn $ 1 ,000,000 $ 1 ,000,000 $ 10.00 $ 25.00 $ 50.oo $100.00 $200.00 $3C0.00 TO THE DRB: 1. In addition to meeting submittal requirements, the appiicant must stake the site to indicate property lines and building corners. Trees that will be renroved should also be marfred. This rrork must be compieted before the DRB visits the si te. II.JPORTANT NOTICE REGARDING ALL SUBI.1]SSIONS The review process for Ntl.J BUILDINGS of the Design Rev'i erv Board, so plan Peopie who fail to appear before the meeting and who have not asked for a republ j shed. rvill nonially involve tr.ro separate meetings on at I east tr^ro meeti ngs for thei r approval . Design Review Board at their scheduled postponerflent v|i II be required to be 3. LIST OF I'IATERIALS NAME OF PROJECT: LEGAL DESCRIPTION STREET ADDRESS: DESCRIPTION OF PR The following information is required for submitial by the applicant to the Design Review Board before a final approvai can be fjven: A. BUILDING MATERIALS: TYPE OF MATERIAL COLOR Roof Si di ng 0ther l,lall Materials stz/r*- wlilte Fasci a Soffi ts Wi ndows Window Trim Doors Door Trim Hand or Deck Fl ues Fl ash'ings Ch'imneys Trash Enclosu Greenhouses 0ther Kar Is res B.LANDSCAPING: Name of PLANT MATERIALS: PROPOSED TREES Botanical Name EXISTING TREES BE REMOVED TO Common Name Quani ty Si ze* for conifers. (over) Des'i g ner : phone: *Ind'i cate caliper for deciducious trees.Indicate height Si ze gAL, €e*r, 56H-, Quani ty 5 4 4 Ssuare Footaqe : Botanical Name Common Name PLANT IIATER (con't) SHRUBS EXISTiNG SHRUBS TO BE REMOVED GROUND COVERS @443 rffi-Ifu- IALS (^ I I /-- Type -t<#ry',A? SOD SEED TYPE OF I RRIGATION TYPE OR METHOD OF EROSION CONTROL C. 0THER: LANDSCAPE FEATURES (retaining walls, fences, swimming poo'l s, etc.) Please specify. UTI LITY LOCATION VERIFICATION SUBDIVISION JOB NAME rcr -t/--nl ocK--Z-r r I r n c ADDRESS The location 1ines, nust. acconrp any ing of utilities, whether they be approved and verified by be main trunk the following lines or propos ed utilit.ies for the site plan. Authorized Si ature Date x Mountain Be'l I Lpue (.ulJ+fu I -634--3778 t , ., lt .( <,-^n l-tl{.5 ./2.!} l^Iestern Slope Gas Harry Moyes Public Service Company Gary Hal i rz&b J-s 7-"4F J )4.F,F Holy Cross Electric Assoc. .Ted Husky/Michael Laverty 4+-, kq-a-Vail Cabl'e T.V. , * For riew con 2/24-fIPlease fill o ' / atiachecl shee 2_:2-23( e:?Z:7( "'.i. :';:';;.;'- t, . Q{?->53o Upper Eagle Val1ey Water and Sanitat'ion Discrict David Krenek NOTE: These verifications do not relieve the contractor of his responsibility to obtain a street cut permit from the Town of Vail, Department of Public l{orks and to obtain utilj.ty locations before digging in any public right- of-way or easement in the Torvn of Vai1. A buitding pernit is not a street cut perrnit. A street cut pernit must be obtaj-ned separately. This form is to veri.fy service availablity and location. Thi.s should be used in conjunction with preparing your utility plan and scheduling installations. INTER.DEPARTMENTAL REV I EI.I PR0JECT: 7 '11 ?>.x-ueocF DATE SUBI4ITTED: COMMENTS NEEDEO BY: BRIEF DESCRIPTION OF THE PROPOSAL: PUBLIC WORKS - Reviewed by: DATE OF PUBLIC HEARING )b - nc,.^) fe:rd.e-^,\\-{- Comments: (C fuk,t€r? / @ 6e4o,-e tu4,-, 1o tc s Ttsz Fu,uo 87ta^tI f14o,- &f56aea7, (o4ofoc-t L3 - P1,4,n 4<e-ft..+^-' N FIRE DEPARTMENT - AJ€t*) €>t(' r * 6E)4€)o </tz€b / qt Date Trzc€,<+zartz t/2, *t3/ /f Reviewed by: Comments: POLICE DEPARTMENT Reviewed by: Comments: Date Reviewed by: Comments: RECREATION DEPARTMENT Date --,'" COMMITMENT TO INSURE This commitment was Produced and issued through the office of LAND TITLE GUARANTEE COMPANY 1OB South Frontage Road P'O Box 357 Vail, CO 81658 (3O3) 476-2251 Representtng: J rrr-e I r.rsu nau c e [o rvr enr'rv o r ffi r r'r r''r EsorA ALTA COHIIITHENT SCHENULE A Arrllcstlon Na. VS7O2 For tnfonnrtlon Only * Chrrmr -&onrr Pol icv PRELIH FIEPORT 176. OO **TOTAL-- i?S,OO l.llth vour rrrrittrnsc rlcrrr Ftfrr. to V€7O2, t. Ef fccttvc Srter Frbrurrv ?4, 19€6 rt S|OO A,f,l, 2. Follcv ta be lrsu*dr rnd propoacd l*runcdr "ALTA, Ounrr'c Follev For,n B-1?7O (Ancndcd 1O-t7-7Ol Fropo:cd I n! urod I HAftK A. HOGAH S. Thc crtrtr or. lntcntrt ln tht lrnd dc*crlbcd or rcf*rned to th thir Csnrnltncnt lnd covarrd h;rsln l*r A Fce 4. Tttl* to thc crtrtr or lntcrcrt covrrtd her*in tt at thc tffrctlvr drto bsrcof vrrtcd lnr IIARK A. I*OSAH S. Thr lrnd rcfrrrod to in thlr Conrritmcnt lr drrcrlbcd rr f ol I osrrt LOT 9A' B|.OCE 7' VAIL VILLM FIF$T FILINfrT ACCffiOINS TO Tl€ RECO*NEN PLAT T}€REOF, COUHTY OF EASLF, $TftT6 f"IF COI-OR$DO, TSSETHER lllTH Al{ EAggltEHT uPt0Hr SfRSA€ S}lD s/gn A PORTItrl fdF TI{E I€STERI.V FIVS (6I FEET Orr LOT EA, BLSCK 7, VAIL VILLACE FIR$T FILIHA MOFE PARTICULARI.Y OfiECRIBED IN EAS€I,IEiIT RECOftBgO DECEilffiR EI 1969 IN EOOK ZI$ AT PASE ;$S. rtt- ElA iLTA gOftiltTiltNT trl€Hn-E B-l tRnulr.rnrntr) Aprllcrtton No. lr870a Thr follorinr rr.c thr mulrcnlntr to br esilpllrd rtthr l. P*vtrnt to ar fer thr lt€curt of thr lr.tntorl or ;ortntarr ol thr fsl I conrldrrrtlon for thr rttrtr or lntrlrrt to be lDtt,r'cd. i, Frop:r lnrtruntnt{t} cr.mtiru thr tftrtt or intrnrrt to br lnrur*d rurt hr erercutrd rnd dulv fllrd frt recordr to-eltr tfr T}E firuf{TY gLgN* SF RTSOnM?!B FFILIE FON,'ING8 ffiTI.IH{fi3lR€ffi* (}f EOfirnilTS SHT Fm frgGOiDIr'fAl I l:- FAtr 2 7. 6. ,r i.: i.l , ALTA CSHT,IITII€NT SCHENULE F-2 { Except i on r )Applic*tlon Ho. Vff7Ql Thc rollct an roliclet tc bo lssu{'d uill conttln Gxc€Ftlrna to thc folloplar unlcrs the sanf, *ra dirrsg*d of to thc srtirfection of thc Comprnvr l. Standrrd Excsptlon* I throurh $ rrint*d on th* covcr rhtrt. 6. Trxer ind i;rcrsrnlntt nst vct dur ar rtyeblr rnd cprclrl ellerrmentt *ot vct crrtificd to tha Tr.ceauFrr'! officc. Anv unpatd texcs or. lir€srf,rcntr reeintt **l<l t*rnd. Llcrrr for unpeld tgf,t*r tnd seulr €hlr!r!' lf anv. 3, RIOHT OF FROPRI€TI}N OF A VEIN CIN LCINE TN EXTRACT AIiTD FEI{OVE HIS OR€ THEftEFFry{ gHOU-T THE S6'tE 8E FSTIND TO PENSTFATE Oft INTERSEST THE PNT€I,II8GS AS RES€R\ED lN LF{ITES 6TATE8 PATEHT RgCORtrED Srptcmber O4' l9?A' tN SOOK 93 AT PAOS 9A. IO. RIOHT OF I4AY FOft DITCHE$ Sft CAHALS CTIN6TRUqTEF FY T}fi AUTHORITY OF Tt€ UNITES STATES AS RE$€mlED lN UNITED $TATES FAT€NT RECORIIED $eptcobcr O4r 1?2gr Il{ BOOK 93 AT FASE 98. lt. RSSTRICTTVE COVET{tr{tg' t{HIqH Dfi NOT CONTAIN A FffiFEITIJftE oft figVERTER CLAtJS€I BUT SI{ITTI}A RESTRICTIONS. IF *NY, FA$EF T}I.'I FIACiE, C{X-OR, R€LIOION,m nnTIOt{AL t{llCrIH' AS COI{TAtNgn Il{ IilSTRUilEilT F€CSRSES Aupirst 1O' tf62r tN BO6K 174 AT PAAE 179 ANn A$ AHSNDEII IH Il'l*TftUllEHT RECORffiA Auturt 30' t971'tN BOS|( 3Al AT PAffi {f4. 1?" UTILITY SASEITEIITT 10 FSET If{ NIDTH ALCINO THE I\NRTH AS'B EAST LOT LII.IES OF SUB*JECT ffiOPERTY A$ $H€l4a{ ON THE RECOfiD€O PLAT DF vAlL VILLA6E' FIRST FIL.IHA. 13. RCIAO EABEHENT 15 FEET It{ tdtnTH ALOrtB THg SSLITH LOT LlhE [tf $UFJECT pR0P€RTy AS SHOHN ON THE RECSftffiD PLAT NF VAIL VILLAO€, FIRST FILTT{g. 14. EhETOACHI{ENT OF EASEIIET{T 6T.ITGI UTILITY €ASEI.IEHT ALONS THE FEST LOT LII{€ OF LOT gA' FLOCX 7' VAIL VILLASE FtftST FII*INA AS SHOIIN ON THE RECORSSD PLAT OF VAIL VILLA$E FIR1DT FILINO. lU. SEED Of TRU$T DATED l*lev 1$' t984' FR&,| IIARK A. HOGAH TO THE FUBLXC TRU8TES OF EASLE COLWTY FOR T}€ U$g OF HARfi.N Y. EAHFSOH TCI $ECURE THE $UT NF I?&O'CIOO.O0 RECORFE0 Hly 17' l*84' lN SOOK 3&3 AT PASE A3p. FAS€ 3 - I i. ;,jrri..+:rF,1 c::ar't*!.il6i*,i -!a' k-i...t.!.;i'r3r*..l.*{-t}'-9 rtr:rdl*,*t ;ffi ches! auad associnfes CONSULTING GEOTECHNICAL ENGI NEEFS 50E0 aD 15r GLENWOOD SPFTNGS. COLORADO 81601 303/94s-7{s8 Job No. 4 flf 8,i SOIL AND FOUNDATION INVESTIGATION, PITOI)OSED ADDITION TO EXISl'INC RESIDENCE, LOT 9A, BLOCK 7, FrRST FlLrNG, VAIL VILLAT,F., I47 ROCK Llll)CIj ROAD \IAIL, coLoMDO Prepared For: flr. irnd llrs, Ilarold Siiiitpsort 3966 South Pinchurst Cir:cle Denver, CO 802 35 February 9, 1984 RECE|VE0DEC30ISS OFFICES: CASPEF. COTORAOO SPRINGS. OE:]\,IR..TALT LAKE CITY TABLE OF CONTENTS CONCLUSIONS SCOPE OF WORK PROPOSED CONSTRUCTION ; SITE CONDITIONS SUBSURFACE CONDITIONS FOUNDATION RECOMI'IENDATIONS FLOOR SLABS UNDERDMIN SYSTEI'I SURFACE DITAINAGE LIMITAT1ONS FIGURE 1 FIGURE 2 FIGURE 3 I I ') 2 J 4 5 5 6 LOCATION OF EXPLOMTORY HOLES LOGS OF EXPLOMTORY ITOLES LEGEND & NOTES OF EXPI,OMTORY HOLES CONCLUSIONS The proposed add{tion should be founded on conventional spread footings placed on Ehe undisturbed bedrock materlal and destgned for a maxl-mum soil bearing pressure of 4r000 psf. Geotechnical design and consEruction conslderatlons for the proposed resldence addltlon are presenled in the body of thls report. SCOPE OF WORK Thls reporc presents che resulEs of a sol-l and foundation investi- gation for rhe proposed rcsidence addition to be located on Lot 9A, Block 7, First Filing, Vail Village, I47 Rock Ledge Road, Town of Val1 , Eagle County, Colorado. This report has been prepared to summarize the data obtalned and to present our concluslons and recommendaElons based on the proposed con- struction and the subsurface condltj-ons encountered, Deslgn paranet.ers and a discussion of geotechnical engineering considerations related to construct.ion of the proposed facility are inchrded. PROPOSED CONSTRUCTION At the Lime of rhis report preparation, specific design and con- strucEion plans for Ehe building addirion had not been developed. Generally, the proposed structure ls assumed to be a I to 2 story wood frame structure witlr concrete slab-on-grade lower floor or sLructural floor ovcr crawl sp;rcc and typlcally f.ight f orrrrrlation loadings. TotaI floor arca is cxpccLcd to be less clran 2,000 srlrrare fect. Considerlng Ehe rypical slrallow bcdrocl< depth, maximum cut depths are assumed to be about3Eo4feet, 1F loads or condltions are slgnlflcantly dlfferent from those des- scribed above, we should be nocifled for review and re-evaluation of the recommendaLlons conLai.ned irerein, -2- SITE CONDITIONS At Lhe tlme of our fleld investlgatlon, Ehe slEe was occupled by a 2 story uood frame resldence contalnlng parElal walkout lower 1eve1s wlth slab-on-grade floors. The ground surface slopes moderately d or*'n from Rock Ledge Road to the proposed addition area where che grade becomes gently sloplng at abouc 52, Further north, slopes become moderately sEeep dovn to the northi'rest. Elevacion differentlal across the proposed buildlng area is abouE 3 to 5 feet. A small man-made dralnage dltch f10ws west across the site into a sma1l decoratlve pond l0cated south of the west end of the existlng residence. A mound of apparent fill nas noted in the $/esc central portion of Lhe lot (see Figure 1). Vege- tation aE the site consisted of scartered aspen and evergreens wiEh some willows and shrubs locatcd 1n the vicinlry of che drainage. Exlsclng snow cover at the site, about 3 feet deep, limlEed visual observatlon of ground surface conditions. site access for a1f wheel drive rubber clre dri1l equipment was provided by the owner. SUBSURFACE CONDITIONS The subsurface conditions were evaluatcd by drilling 3 exploratory holes at the approximate locations shown on Figure 1. Graphlc logs of the profiles enc'Juntcrcd are presenccti or Figure 2. As indlcated by rhe logs, tlre subsurfacc proflles encounlered are rel-atively trnlf orm and consist of hard limestone bedrock below a 2 to 3 foot layer of topsoil , The maxinrum depth explored was 10 feet 1n Hole 1. practical refusal to power auger drilllng equipment was encountered ln each tesE hole due to rhe cemenred condition of the naterial. Based on the dril11ng, condltions, Ehe upper portion of the rock appears to be joinfed or broken and -J- parElally wealhered. Undisturbed sampling or coring of the rock was not perforrned. Drive sample techniques were used to obtaln samples of the natural material for visual classlfications. No free waEer ltas encountered in che exploraEory holes at the tlme of drl1llng and nolsture conEenc of the materlals encountered was des- crlbed as only slighcly moist. FOUNDAT ION RECOM]'1I'NDAT IONS The subsurface materials encountered in Ehe exploratory holes conslst of a topsoil layer overlying hard llmestone bedrock. Consldering the proposed type conscructlon, subsurface and topographic condltlons, we believe spread footings placed on undisEurbed bedrock material can be used for support of the structure. The following design and consErucEion criteria should be observed: 1) FooEings placed on the undisturbed rock below topsoil and dis- turbed material may be deslgned for a maxlmum bearlng pressure of 4,000 psf. Settlements are expected to be minor and essentlally occur during construction. Spread footings should lrave a minlnum wldth of 12 lnches for wal,ls and 18 inches for columns, ContirruoLre l-oundaLion r.'a1l s .shr,irl j [rc adecluately rcinforced top and bortom to span an unsupportcd length of at least 10 feet. Foundation walls acEing as retaining structures should also be designed to resist a lateral earLh pressure correspondlng to an equivalent. Fluid weight of 45 pcf. Backf111 placed outslde foundallon walls should consist of a non-expansive granular maLerlal free of oversize rock and compacted Lo a mlnlmum 907 of standard Proctor denslty. The 2) J) -4- backflll surface should be graded to slope d or+n and away from the strucEure. 4) ExEerior footings sho-uld be provrded wirh adequate soil cover above thelr bearing elevatlon for frost protection. Frost deprh may be reduced where sound undisturbed rock is encountered. 5) Areas of loose or soft maEerlal encountered wiLhin Ehe foundation excavatlon shourd be removed and the footings extended down to the natural hard bedrock. Open joints or fractures exposed aE the bedrock surface wilrrin Ehe excavatron should be firled wrth grout or a comparable sealer or the materlal removed, Excavatlon ext.endrng inEo the bedrock and berow the upper broken zone wrrl be difflcult and may require blasting, 6) A representative of the soil engineer should observe the excavations prlor ro concrete placement. FLOOR SLABS The overburden soils encountered 1n the borlngs consl-st prlmarily of low denslty organic toPsoil, not sultable for support of concreEe floor sIabs. Lower floors may consist of concrete slabs constructed on bedrock and/or compacted structural fi1I, or a structural fl.oor constructed above a crawl spacc, Slabs placed on-grade should be provided with control jolnts Eo reduce damage due to shrinkage cracking and the slabs shourd be adequacely reinforced. we suggest that trre contror joints be provlded on the order of 15 feet on center' To reduce the effects of sorne differentiar- movement, f100r slabs should be separated from bearing warrs and colurnns $rith an expansion joint which a110ws unresErained vertical movemenL. A mlnrnun 4lnch free dralning granular layer should be placed beneath floor slabs to lrelp dlstrlbute loadings and provide a unlform surface for concrete placemenE, This material passlng Ehe No. 200 sieve Fill placed benearh material approved by the solls engj"neer and compacted to at least 952 of the maximum standard ProcEor density at a moisture content near optimum. Prlor to Iil1 placcmcnt' vegetation, tor)soi1, cxlsr-irrg fill and debrls should be removed from above the bedrock surface. UNDERDMIN SYSTEM Although free water was not encountered 1n the test borings at rhe time of our. investigaclon' lt has been our experience i-n mounlainous areas such as thls, that loca1 perched groundwater may develop during tlmes of heavy preclpit.acion or seasonal runoff, Therefore, the lower leve1 should be protccted from wetting by installation of an underdrain sysEem, The underdrain system should consj.st of a perforated pipe surrounded witl-r gravel and placed at least 1 foot below adjacent floor slab or crawl space grade. Drains should be sJoped on a rnlnumum lii grade to suitabre outlet. Free drainlng granuJ ar material placed below floor slabs should be connecEed to the unde::<iraln system. The granurar drain matcrial slrould cont.ain less than 571 passing the No. 200 sieve and more Ehan 502 retained on the No. 4 sieve. SURFACE DMINAGE The f o1lor^ring d ra inage constructlon and malnEained 5hou1d conslsr of aggregate wlth less than 52 and more than 502 retained on the No. 4 sieve. floor slabs should be a non-expanslve granular precautions should be observed during at all tlmes afrer tlte facllity has been -6- comPleted: 1) I'liscellaneous exterlor backf111 around the bulldlne should be com- pacted to at least 907" of the maximun srandard proctor density at near optimum moisture, The ground surface surrounding Ehe exterior be sloped to draln away from the foundation prevent pondlng wichln at. least 10 feec of recommend a minimum slope of 6 inches in the flrsc 10 feec. 3) Roof dor^'nspouts and drains should discharge well beyond the limits of all backf111, LI}IITATI ONS This report has been prepared in accordance with generally accepted geotechnical englneering practices in this area for use by the clienE for design purposes. The conclusions and recommendations submitted in this reporr are based upon the data obtained from the exploratory holes drilled at tlre locatlons indicated on the exploraEory hole p1an. The nature and extent of variations bet\.,een tlre become evident unEil excavation is performcd existing IiI1, soil, rock or water conditions fron tlrose describcd lrcrein, tltis of f j.-,. sn,rul th;]t re-cvaluation of tlre r.ecommendations nay sitc observation of excavations and foundation engineer. CHEN AI.{D ASSOCIATES, INC. <;l-- - 4/ '.IV\\+)'1^. By viewed By s Lc"cr;t: lh;J;k, -i:E. of 1n the bulldlng should dlrectlons and the st.rucEure. We cxploratory holes may not If during cons E ruc E ion , appear to be dlfferenE d be advised at. once so be made. We recommend on- bearing sErata by a soll -''/{':- z S t e irlien A. Down tiar r: ccrhcrctc l,ot r('r) I ,l) No . I ot Assoc. I 25,446, I ll l0 l,ot 9 I I r.o. I -. -. Approximate i Il xtc nt of ,' Existing Iii I I,/ Lot 9A Lot 9A Existing Residence G5, 9g Ilo Ie Lot 8A Approximatc Scalc lr'=30 1 rBcn ch N I t,- rr op of ,Shb- Drainage Ditch ,t"t",\r,/ llole 5 3 / 3' llrrlc c I C ock l,cdge Road il84 chcn rld tccoclrtcs, Inc.LOCATION OIf EXPLORATOIIY IIOLIJS llole I Ul='I00.0' 115 ]l0 t-(l/7 A^/|v\l|.', .U/ ' 105 lo0/l t00 IloIc 2 IiI=103.5' U I - 62/12 ln 84 chcn gnd sssociates, ir!c.l,0CS Ol l:\l l.(ll{A f0ltY llOl.l;S Ilolc .J Iil=104.5' JJ/ r i I15 1r0 i05 P q{ I ..{ t:] LIci:NlJ h 2', I.t). Catifornirr Lincr Drivc Sumple.t' t-, I i l)isturbcd Bu)k Srrnplc. ll t-- n W lopsorl, organrc, somc possiblc fill m;rtcrial. rT-t F{ Linrcstorc Bcd'ock, hard, gray, jointcd, weathered and broken upper zone.u_l t Drive srmplc, stan<.rard pentration Tcst (spr), As'fL D-r586, l5l8 inch t.D.E split spoon s rrrplc. I 62/12 Drivc srtmplc blotv count, indicates tlrat 62 blows of a 140 lb. harnmcr falling 50 rnchcs wcrc rcqtri rcd to tlI.ive thc (llrl ifornia or Sp'l samplcr l2 inches, I)ract-icui rcfusrrl to augcr drilling. lvhcn sho|n abovc the bottom of holc,indicutcs multiplc rttentl)ts werc nradc to advance the hole, NOTES I) Test holcs tvcre driIicd on l:cbruary 2, I984 wi.th a 4 inch diamctcr continuous fl ight power augcr' . 2) Locations of test holes werc determinecl by thc client and mcasurcd approxint:rtel1, by taping from features on the sitc. 3) Elcv.rtiolls of tcst lto.lcs wcrc nrcasurcrl by instl'unlcnt Icvcl antl rcfcr to thc bcnch nalk on lrigure l. 4) 'l hc tcst lrolc locat-iotts and clcvatiorrs shoulcl bc considcrcd accuratc only to tlrc dt'glc.c irulllied by thc method uscd. 5) 'rlre I inc-s bctrvccn matcr.ials slrown on thc test lroic loiis f cl)1.escnt thc irpproxilniltc botttttlitl'ics bctwccn fil:ttcriill typcs altd tilc tril]lsitiops rnlv bc g lad urr | . llt 84 chan rnd sssocirtes, inc.LIGLNI) G NO'|LS 0l: IXl)].01l4T0Ry ll0l.t,S FINAL INSPECTION'S COMPLETED The below items need to be comp'l ete before giving a permit a fjnal C of 0' Please check off in the box provided. FINAL PLUMBING DATE: MECHANI CAL DATE: FINAL ELECTRICAL FINAL BUILDING CERTIFICATE OF OCCUPANCY TEMP0MRY C of 0 OATE: \ \,-.s_r\x."-1.r5 DATE: l1:.INS o PE cTloN REOI.IEST. TOWN OF VAIL PERMIT NUMBER OF PROJECT DATE JOB NAME MON CALLER TUES WED THUR FRI AM PM READY FOR LOCATION: INSPECTION: I tr REINSPECTION REQUIRED tr DISAPPROVED BUILDING: tr FOOTINGS / STEEL PLUMBING: tr UNDERGROUND D ROUGH / D.W.V. tr BOUGH i WATER O FOUNDATION / STEEL C FRAMING - ROOF & SHEER " PLYWOOD NAILING tr GAS PIPING tr INSULATION tr POOL / H. TUB O SHEETROCK NAIL fI FINAL tr FINAL ELECTRICAL: N TEMP. POWER MECHANICAL: tr HEATING D ROUGH tr EXHAUST HOODS tr CONDUIT D SUPPLY AIR tr FINAL tr FINAL tr APPROVED CORRECTIONS: DATE INSPECTOR I PE INS CTION REQUEST TOWN OF VAIL PERMIT NUMBER OF PROJECT DATE JOB NAME MON CALLER TUES WED THUB FRI PM AM READY FOR LOCATION: INSPECTION: BUILDING: tr FOOTINGS i STEEL PLUMBING: tr UNDERGROUND tr ROUGH i D.W"V. tr ROUGH / WATER tr FOUNDATION i STEEL tr FRAMING - ROOF & SHEER " PLYWOOD NAILING N GAS PIPING tr INSULATION tr POOL / H. TUB tr SHEETROCK NAIL tr FINAL tr FINAL ELECTRICAL: tr TEMP. POWER MECHANICAL: tr HEATING tr ROUGH tr EXHAUST HOODS tr CONDUIT tr SUPPLY AIR tr FINAL D FINAL tr DISAPPROVED tr REINSPECTION REQUIRED I] APPROVED CORRECTIONS: DATE INSPECTOR rNs#c'oN PERMIT NUMBER OF DATE PROJECT REQUEST TOWN OF VAIL NAME INSPECTION:MON WED THUR FRI : i: JOB CALLER TUES PM READY FOR LOCATION: AM BUILDING: D FOOTINGS / STEEL PL tr tr tr tr tr tr tr UMBING: tr FOUNDATION / STEEL UNDERGROUND ROUGH / D.W.V. ROUGH / WATER tr FRAMING _ ROOF & SHEER " PLYWOOD NAILING GAS PIPING O INSULATION POOL / H. TUB tr SHEETROCK NAIL tr tr FINAL D FINAL ELECTRICAL: tr TEMP. POWER MECHANICAL: tr HEATING tr EI E ROUGH O EXHAUST HOODS CONDUIT tr SUPPLY AIR tr tr FINAL tr FINAL tr APPROVED CORRECTIONS: tr DISAPPROVED D BEINSPECTION REQUIRED DATE INSPECTOR tl,_l L t!! f - -INSP-ECTION REQUEST PERMIT NUMBER OF PROJECT READY FOR INSPECTION: TOWN OF VAIL CALLER i MON TUES WED THUB FRI - AM-.... PM LOCATION: BUILDING: tr FOOTINGS / STEEL PLUMBING: D FOUNDATION / STEEL O UNDERGROUND tr ROUGH / D.W.V. O ROUGH / WATER tr FRAMING n ROOF & SHEEH - PLYWOOD NAILING O GAS PIPING tr INSULATION E}-SHEETROCK tr POOL / H. TUB NAIL D a tr FINAL tr D FINAL ELEGTRICAL: tr TEMP. POWER MECHANIGAL: tr HEATING tr ROUGH O EXHAUST HOODS D CONDUIT tr SUPPLY AIR E tr E|NAL tr FINAL VED tr DISAPPROVED tr REINSPECTION REOUIRED (-F/dPPRovED / CORRECTIONS: DATE INSPECTOh T / '! --) '/'.,,' /' PERMIT NUMBER OF PROJECT lt t'g41g I , r i ;{ \z JOB NAME READY FOR INSPECTION: LOCATION: CALLER MON .TUES THUR BUILDING: tr FOOTINGS / STEEL PLUMBING: tr UNDERGROUND tr ROUGH / D.W.V. tr ROUGH / WATER tr FOUNDATION / STEEL tr FRAMING r-, BOOF & SHEEH - PLYWOOD NAILING tr GAS PIPING tr INSULATION E POOL / H. TUB OCK NAIL ELECTRIGAL: tr TEMP. POWER MECHANICAL: tr HEATING tr EXHAUST HOODS tr CONDUIT tr SUPPLY AIR tr FINAL tr DISAPPROVED tr REINSPECTION REQUIRED INSPECTOB PERMIT NUMBER OF PROJECT ) //r I INSPECTION TOWN OF '/ ,1 L oLJ REOUFST VAIL . r. ,/ ,o"NAME DATE READY FOR LOCATION: CALLER INSPECTION: BUILDING: tr FOOTINGS / STEEL PLUMBING: tr UNDERGROUND tr FOUNDATION / STEEL tr ROUGH / D.W.V. tr ROUGH / WATER n ROOF & SHEER " PLYWOOD NAILING O GAS PIPING tr INSULATION tr POOL / H. TUB n SHEETROqK NA|L '.]J /,, +/,,'a ' ELECTRICAL: tr TEMP. POWER tr HEATING ROUGH tr EXHAUST HOODS CONDUIT tr SUPPLY AIR tr FINAL APPROVED CORRECTIONS: tr DISAPPROVED tr REINSPECTION REQUIRED oor. co\. b ?(p rNSpEcroF r^rs#g;*o5. gfguFsr PERMIT NUMBER OF PROJECT DATE READY FOR INSPECTION: LOCATION: ,) g"1 / I ':rt' 't i i I JoB NAME L o /) CALLER L,--. ( :-- tr=. ,'--y.lf-..,:: BUILDING: tr FOOTINGS / STEEL PLUMBING: tr UNDERGROUND tr ROUGH / D.W.V.tr FOUNDATION / STEEL E FBAMING EI ROUGH / WATER - ROOF & SHEER t PLYWooD NAILING tr GAS PIPING tr INSULATION tr POOL / H. TUB Isneernocr v'_NAIL tr tr FINAL tr FINAL ELECTRICAL: D TEMP. POWER MECHANICAL: tr HEATING tr ROUGH tr EXHAUST HOODS tr CONDUIT tr SUPPLY AIR tr tr o,,Firunl tr FINAL ffa"".ou=o O DISAPPROVED tr REINSPFCTION RF'JI IIRtrN joh*="r,o*.' rruspecrori DATE T NUMBER OF PROJECT tNSPECTTON REQUFST TOWN OF VAIL PERMI DATE JOB NAME READY FOR LOCATION: INSPECTION: CALLER MON TUES WED THUR FRI AM PM BU trl DI trl I Dl trl hl tr ILDING:PLUMBING: O UNDERGROUND tr ROUGH / D.W.V. FOOTINGS / STEEL FOUNDATION / STEEL FRAMING tr ROUGH / WATER ROOF & SHEER D GAS PIPING PLYWOOD NAILING INSULATION tr POOL / H. TUB SHEETROCK NAIL tr E FINAL tr FINAL - ELECTRICALI tr TEMP. POWER MECHANICAL: tr HEATING tr tr o BOUGH O EXHAUST HOODS CONDUIT tr SUPPLY AIR tr tr FINAL tr FINAL tr APPROVED CORRECTIONS: t-l )4,ISAPPROVED EINSPECTION REQUIRED DATE INSPECTOR /t INSPECTION TOWN OF REOT,EST VAIL PERMIT NUMBER OF PROJECT "' "d JoB NAME DATE READY FOR LOCATION: INSPECTION: CALLER MON TUES WED BUILDING: tr FOOTINGS / STEEL PLUMBING: tr UNDERGROUND tr ROUGH / D.W.V. D ROUGH / WATER tr FOUNDATION / STEEL tr FRAMING n ROOF & SHEER - PLYWOOD NAILING EI GAS PIPING T- tr INSULATION tr SHEETROCK tr POOL / H. TUB NAIL tr D O FINAL FINAL ELECTBICAL: tr TEMP. POWER MECHANICAL: tr HEATING tr ROUGH tr EXHAUST HOODS tr CONDUIT tr SUPPLY AIB tr EI tr FrN4d tr FINAL -4PFROVED O DISAPPROVED tr REINSPECTION REQUIRED CORRECTIONS: INSPECTOR'. .1 /'' .+_.DATE 'f.,1' ', ', \/V'f ._Y / ''I INSPECTION REQUEST TOWN OF VAIL .PERMIT NUMBER OF PROJECT JOB NAME READY FOR LOCATION: INSPECTION:MoN,. @ wED ."r,n, FRI AM PM '\ | / t^ ' \--'/ t ' i -=r-v--rr+- t w. ) l(.or h l-c ./, . oor= 7i/ t .t /i L BUILDING: tr FOOTINGS / STEEL PLUMBING: tr UNDERGROUND tr ROUGH / D.W.V. tr ROUGH / WATER tr FOUNDATION / STEEL tr FRAMING n ROOF & SHEER - PLYWOOD NAILING gi cns PTPTNG tr INSULATION tr POOL / H. TUB tr SHEETROCK NAIL tr tr tr tr FINAL tr FINAL ELECTRICAL: tr TEMP. POWER MECHANICAL: tr HEATING tr tr tr ROUGH tr EXHAUST HOODS CONDUIT D SUPPLY AIR tr FINAL tr FINAL tr APPROVED CORRECTIONS: tr DISAPPROVED INSPECTION REQUIRED --1-;\,,t,.t/ 9 DATE INSPECTOR ,1 ,/i/g PERMIT NUMBER OF PROJECT TNSPECT*O$. $F9U.E.Sr ....'.,iJ DATE READY FOR LOCATION: '6 ,soe NAME INSPECTION: BUILDING: D FOOTINGS / STEEL PLUMBING: tr UNDERGROUND O ROUGH / D.W.V. O ROUGH / WATER D FOUNDATION / STEEL tr FRAMING n 19.95^LSiSFl E GAS PIPING YWOOD NAILING,, TNSULATToN i' ll tr POOL / H. TUB SHEETROCK NAIL FINAL ELECTRICAL: tr TEMP. POWER MECHANICAL: tr HEATING tr ROUGH g'exF{Rusr HooDS tr CONDUIT tr SUPPLY AIR tr FINAL PROVED COBRECTIONS: tr DISAPPROVED tr REINSPECTION REQUIRED DATE INSPECTOR PERMIT NUMBER OF PROJECT DATE rNsSctoN , 'OWN OF REOUEST,VAIL G a -\1x JOB NAME t -_- il READY FOR LOCATION: INSPECTION: CALLER MON TUES I {-,WED TFIUR I FRI|\,/PM BUILDING:PLUMBING: tr FOOTINGS / STEEL ..tr UNDERGROUND tr ROUGH / D.W.V. tr ROUGH / WATER tr FOUNDATION / STEEL g FRAMING - ROOF & SHEER " PLYWooo NATL|NG tr GAS PIPING tr INSULATION tr POOL / H. TUB tr SHEETROCK NAIL tr_ tr tr FINAL tr FINAL ELECTRICAL: tr TEMP. POWER MEGHANIGAL: tr HEATING tr ROUGH tr EXHAUST HOODS r] CONDUIT tr T] FINAL FINAL tr SUPPLY AIR PROVED tr DISAPPROVED tr REINSPECTION REQUIRED COBRECTIONS: INSPECTOR PERMIT NUMBER OF PROJECT DATE READY FOR LOCATION: INSPECTION: |NSPECTTON REQUEST TOWN OF VAIL , \, .\cl .-]. .,\a', ,: -'\_\'\\\ ., ]\L JOB NAME FRI MON \CALLER \ ruEs ,clED__.' rHUR '.,, i'. .' *tr.. BUILDING: tr FOOTINGS / STEEL PLUMBING: tr UNDERGROUND tr FOUNDATION / STEEL tr ROUGH / D.W.V. tr ROUGH / WATER tr FRAMING ,- ROOF & SHEER " PLYWooD NAtLtNG tr GAS PIPING tr INSULATION O POOL / H. TUB tr SHEETROCK NAIL tr tr tr FINAL tr FINAL ELECTRICAL: tr TEMP. POWER MEGHANICAL: tr HEATING ROUGH tr EXHAUST HOODS tr EI CONDUIT tr SUPPLY AIR O FINAL tr FINAL APPROVED i'z\ Z,CORRECTIONS: tr DISAPPROVED tr REINSPECTION REQUIRED \ DATE INSPECTOR 2 I +'/, 5'I INSPECTION TOWN OF REOUFST VAIL }. at PERMIT NUMBER OF PROJECT DATE READY FOR LOCATION: INSPECTION: r fi /3,J tJ rHUR (y NAME AM , {.rl i (oh WED t^,</ ct-e- '/ a PM l1 /-rT Li,+ .-'') NS c s j: ir( ,o, BUILDING: tr FOOTINGS / STEEL PLUMBING: tr UNDERGROUND fr noucH / D.w.v. E-BOUGH / WATER tr FOUNDATION / STEEL tr FRAMING - ROOF & SHEER " PLYWooD NAtL|NG {o oo" PTPTNG tr INSULATION tr SHEETROCK tr POOL/ H. TUB NAIL tr tr tr tr tr FINAL FINAL ELE trl trF trC tr- GTRICAL:MECHANIGAL: TEMP. POWER O HEATING ROUGH tr EXHAUST HOODS CONDUIT tr SUPPLY AIR tr A /Frr.rar-tr FINAL \PPROVED RRECTIONS: tr DISAPPROVED tr REINSPECTION HEQUIRED DATE INSPECTOR- '.' ) '-,/1 \/' I TNSPECTION REQUFST TOWN OF VAIL PERMIT NUMBER OF PROJECT -'. r " i.> (..DAIE ./ :- ( /' " JoB NAME ',/i READY FOR LOCATION: INSPECTION: MON ----}---y--'-*,--- THUR FRI BUILDING: tr FOOTINGS / STEEL PLUMBING: tr UNDERGROUND tr BOUGH / D,W.V.tr FOUNDATION / STEEL O FRAMING tr ROUGH / WATER ROOF & SHEER PLYWOOD NAILING tr GAS PIPING INSULATION SHEETROCK tr POOL / H. TUB FINAL O FINAL ELECTRICAL: tr TEMP. POWER MECHANICAL: D HEATING tr ROUGH tr EXHAUST HOODS tr CONDUIT tr SUPPLY AIR tr FINAL tr REINSPECTION REOUIRED tr DISAPPROVED APPROVED ORRECTIONS: DATE .--i I.t-1 -,* f-) lNSpEcToR tNsPEcn*oN, $F9uFsr DATE READY FOB LOCATION: INSPECTION: ' t- i-,r -f)t', ,o"NAME l' ^.'it\ ..- CALLER ,, ', i ' TUES PERMIT NLIMBER OF PROJECT BUILDING: tr FOOTINGS / STEEL PLUMBING: tr FOUNDATION / STEEL tr UNDERGROUND tr ROUGH i D.W.V. tr ROUGH / WATER tr FRAMING n ROOF & SHEER " PLYWOOD NAILING tr GAS PIPING tr INSULATION O POOL / H. TUB tr SHEETROCK NAIL o o O FINAL tr FINAL ELECTRICAL: O TEMP. POWER MECHANICAL: tr HEATING tr ROUGH tr EXHAUST HOODS tr CONDUIT tr SUPPLY AIR I E- OF tr INAL tr FINAL -tr APPROVED CORRECTIONS: T] DISAPPROVED tr REINSPECTION REQUIRED DATE INSPECTOR \ -\.\ F\i i \\ t_ * INSPECTION REOUEST VAIL PERMIT NUMBER OF PROJECT \ , .--ir \ _1....1. .,DATE .=:'- - * ' \'.. JOB NAME --1. \i ., t. \. TOWN OF '.-.lr i... i r '. \' \r!-\,\ tr_.* .. ..'... CALLER & AM READY FOR LOCATION: INSPECTION:TUES WED THUR " ! '''., BUILDING: tr FOOTINGS / STEEL tr FOUNDATION i STEEL tr FRAMING D ROUGH / WATER n ROOF & SHEER ' PLYWOOD NAILING tr GAS PIPING tr INSULATION tr POOL / H, TUB - tr SHEETROCK NAIL tr FINAL ELEGTRICAL: tr TEMP. POWER tr HEATING tr ROUGH tr EXHAUST HOODS tr CONDUIT tr SUPPLY AIR FINAL tr FINAL /'\/t \-J- I APPROVED , CORRECTIONS: tr DISAPPROVED tr REINSPECTION BEOUIRED DATE INSPECTOR ,"r#"rroN REeuEsr TOWN OF VAIL I DATE , JOB NAME CALLER PERMIT NUMBER OF PROJECT INSPECTION: MON TUES WED THUR - FRI READY FOR LOCATION: AM PM BUILDING: O FOOTINGS / STEEL PLUMBING: tr UNDERGROUND O ROUGH / D.W.V, tr ROUGH / WATER tr FOUNDATION / STEEL tr FRAMING n ROOF & SHEER " PLYWOOD NAILING tr GAS PIPING tr INSULATION tr tr tr POOI / H. TUB tr SHEETROCK NAIL tr FINAL tr FINAL ELECTRICAL: tr TEMP. POWEB MECHANICAL: tr HEATING tr ROUGH tr EXHAUST HOODS tr CONDUIT tr SUPPLY AIR D FINAL tr FINAL O APPROVED CORRECTIONS: tr DISAPPROVED tr REINSPECTION REOUIRED DATE - INSPECTOR I rNs#cnoN REduEsr TOWN OF VAIL PERMIT NUMBER OF PROJECT DATE : JOB NAME INSPECTION:MON WED THUR FRI CALLER TUES AM READY FOR LOCATION: BUILDING: b roorrruos / srEEL PLUMBING: EI UNDERGROUND tr ROUGH / D.W.V. tr ROUGH / WATER tr FOUNDATION / STEEL D FRAMING - ROOF & SHEER - PLYWOOD NAILING tr GAS PIPING tr INSULATION tr POOL / H. TUB tr SHEETROCK NAIL tr tr tr tr FINAL D FINAL ELECTRICAL: tr TEMP. POWER MECHANICAL: tr HEATING D tr U ROUGH tr EXHAUST HOODS CONDUIT O SUPPLY AIR tr tr FINAL tr FINAL /tr APPROVED CORRECTIONS: tr DISAPPROVED tr REINSPECTION REOUIRED DATE INSPECTOR 75 south lrontage road - Yail, colorado 81657 (303) 476-7000 November 27, t985 Curt Cegarburg % Gordon Pierce Architect 'l 000 South Frontage Road Va iI , Col orado 8'l 657 Re: Lot 9A, Block 7, Vail Village 1st Filing Dear Curt: I discussed your questions with the staff concerning Lot 9A's breakdown of GRFA to create a primary and secondary unit. Our opinion was that it would be necessary to reduce the square footage of the existing unit down to the alIowed square footage of a secondary unit. As I recal 1, the allowed square footage for a secondary unit was 1,856 square feet. The 250 square foot credit for upgrading of structures cou'l d not be applied to the existing unit to make the square footage come under the secondary unit GRFA allotment- The intent of the 250 square foot credit is to al low for upgrading of exist'ing structures. The staff felt that it would be pushing the intent of the 250 square feet to allow you to use that square footage to come under the secondary GRFA requirement for your secondary unit. Another option would be to utiljze the exjstjng un'i t as your prjmary unit. As I remember, the owner did not particularly like th'i s idea. However, it is an alternative if you do not want to take square footage away from your existing unit. Please remember that I was also concerned about the site coverage on this lot. From your site p1an, it appeared as though this might be a problem for you if you try to add another unit to the property. Please let me know if you have any further questions. S'incerel y, r/ I fll K\i+n^ Y"+l [\r lJ [.^I \ lll lT Kristan Pritz Town Planner KP: br ,r#o Qna &PPk 44, o&+ l6,w ,2; -.---e''4 2r'7 fo + OAYI ,lo bAh.'?' 4q3b { aW+ot & . 0oft 4o!, 4ezu ,@ _=--a a Q?oe,u , tlh 6a.o ; faw**n Ml 4,141 .uf qFyA = o{ta}t'wllwaog @tn-Idt;k 4'Wr^(" I -t40t (e(w* I i'J',uf l'a r,<t A-'; ii.i'tr)tn^,lnrc1,::tktfi (r,.o,t*otre J,tt:t:,nk .t*-* tvt.: ) !., j : ! t.r- i o 75 louth tronlrga road u.ll, colorado 81657 (303) 476-7000 December'15, 1983 A'lbert Fellinger Dear Mr. Fellinger, Development of this property will and bui1ding codes at the time of Si ncerely,M THOMAS A BMUN Town Planner TAB: bpr Lot 9A, Block 7, Vai'l Village lst is zoned primary/Secondary and according to our records contains 23,885 square fLet. AccoiOing to the present method of figuring GRFA, the allowable GRFA would be 4,638 square feet based on 23;BB5 square feet for the size of the'lot. offlce ol communlltr development Re: Lot 9A, Block 7, Vail Village lst have to follow the current zoning construction. ntrtr CL o tt o 3 o I o o o 3 3 tr t CL E g o tt 3 o 2 EF= l;ti> lq 69" ln pr- lA l=l-r nnN -nL\or \ z=9(D z= o6)z z I- t m n =z o F \a ()o z a {v c C){o z !m v ={ z,o 4'T 8=ZA *;6z 9X 9p ic 3=<G' 1Z O6)n o #>= o>io- C) 2o -im nz >m c):o -{>or-n u I =m --l I m D z IT \ N-- 5-\\I I N \ {'! - 9f,cii A o>'r Tl l- r !,1 zl ol t{ .-N NI KI l@ l=l\l th tt tl rl = ! 'n = l< t= l> IB .n = o -=F l'l u m (t lt, .tl L=t N F N itt FI I l- m o .n F o p m t" .t] 3 a ! l- !m vt n 3 - S F =t- p n D Y f\ S\' { N' tr. x h a b F h N l* N h N n !7 o (- m o i z o NF x<.iE ;o > .Tl zo -z g2 62 i9 6 z @ m - I' l9 t\2 $.$ NP FDO N$ NJ =llz2 J -az t\=t\e J\ X I ll I N Nt & f t I 1l tl tl ozrooo fi;E trE ;;=i C =" 3 -d (!>mc) o<q=so vro =z c z c.z(Dro 7e l3 qdl; HI E 3 o@9.= -TOtn t = I ^+{z.z oo z m € t- m 7 -l 6 z =z t- m T t- € -.t m F <J) z 6 - -Tt m m 45P H;g 6 z <n t- i z m m ^z .tl m m g t- 2 T m n . m n ='Tl m m (/, >=EF t \f * O > Fr.l /''- s ! - oA- li : iE:g :9fil: t :zttro>", Q>c tro-tlx sI>o=.'=zzY 92tr>:i;i;H 9uEi:d>'. Ir :=o.l :"^r-dool-l:<'rr :;!s; 6fr- -? _r A -{ > ;o .-.-I >= E F t \{io> -r' z c) -n I ;t- =z =z 6 I =z z --t m <, i r m = =fI m m U) rNsr=.tt FIEOUEST 1l VAIL l--8"t,.'i( ,riui L- . o- €pr TOWN OF E orsen ! pnnrtnl LOCATION READY FOR INSPECTION THUR r-{ .Lp AP PROVED r n uporu rgr CORRECTIONS florsnpPRovED FOLLOWING CORRECTIONS: fl n e rNsPEcr ,17 ,'' , ,i 7f'DArE +# rNs"=.fr*FIEOUEST a, r'' .,-i -,t DATE '/ / (: ?'.t :,,:t1 JOB NAME .-r.-,./; .- I a:,/ /' 1 ' ,4rt ..i1)13 - MON TUE TOWN OF VAIL t--- . ./ --/^ ^j,-.,'\ .d f- 1 TIME RECEIVED- AM PM CALLER florxen *-/t READY FOR INSPECTION ?*":1Y'--- -!sd'rao *iY.:- 7.'-r- .-:', ,:I /(e! El-npp Rov E D D orsnppRovED ! netuS?ecr ! uporu THE FoLLowrNG coRRECTToNS: CORRECTIONS INSPECTO R o ta INsiPECTIclN - ., TOWN OF FIEOUEsiT VA{ L 4"*.-\TE JOB NAME MER EIVED- AM PM CALLER I ornen E plnrrnl LOCATION / ir{-.ta MON NTS: AM PM ,,;FRI TUE READY FOR INSPECTION -. wED i THuR -' APPROVED n uporv rHE FoLLowrNG coRRECTToNS: IECTIONS n orseppRovED fl nerNsPEcr DATE (t.t". ':4. z 7'27 DATE LOCATION: ,o JOB NAME *"urrurc( ,lJ+.,n-'// \-- q4q-5bl READY FOR INSPECTION:THUR FRI TOWN OF BUILDING:PLUMBING: tr UNDERGROUND tr ROUGH / D.W.V. tr ROUGH / WATER tr FOOTINGS / STEEL tr FOUNDATION / STEEL tr FRAMING tr INSULATION tr GAS PIPING E SHEETB€EK NAIL tr POOL / H. TUB ioa ( .u ELECTRICAL: E TEMP, POWER tr HEATING tr EXHAUST HOODS tr CONDUIT tr DISAPPROVED O REINSPECTION REQUIRED tr APPROVED CORRECTIONS: n 2 --'-7Q DATE J'-' k- ./',/ rNSPEcroR o o z (n {n c o {o z T lrl 7 =+ E -!!tt q lEll € rnEE 3 =-lv I-r ,+iv= 14 o c!" li d ?', l: 3 l=3 l.rc lnq "EE- ;>= a o@ o >= tt J: 3 o" E z--o z t- -{m !F o (- m c)-t z Irl ta)It a T m a = =z o =to ct 1\'ct ,fl Hf,aA o>'t- m _'t_ z z I o F Oa z.f 3= 1z 9c)v o dm -t dg vr o 2A {m FZ >m of,,-l> n () 2 \,f n 'Tl tr z i 3 \ h\a 4 N !ll \ l' o m F l> t;lo Ni x<x -rt io >-n zo ?g o at, o62 = Eb i 66 2Z o m z m t- m = ^z "n € ^ 4 =z oz-ooo 3sE 3*F =*i t>-9P=E A tniE ==- 3 A oi = z z --l c,z@r@ 6q=us 20)vt !EF T 9 out9.=ul E gfl i B3 zz t-i m =z =2 t- m z U' t- J o z t-m 2 m <1, -l m g z m m = ,o - z m = T m n = ='Tl m m U> FN N N lQs I z z o =z 6 I -'t o z.z z --t m i i t- '(t m =i 'n m m U' r- 3 @ z a€ > ?!>=Frt €+3>l/,- <o lo -:]3Fa;i > o>:g:Eii :zEo>., Q>o t!cr-!X SI t5^=a'YZzY 9zo>:Eiesg rufi$Fi i- E3+ Iz.i : > d."dr-ii=lI =;TH5 tr r vr INSOTION REQUES TOWN VAIL DATE READY FOR LOCATION: JOB NAME CALLER INSPECTION: MON TUES WED THUR FRI AM PM /7 2 a-t /1". /- /./: " ,4/ BU trl trl trl trl EII tr ILDII{G:PL tr tr tr tr EI tr UMBING: FOOTINGS / STEEL UNDERGROUND ROUGH / D.W.V. ROUGH / WATER FOUNDATION / STEEL FRAMING INSULATION GAS PIPING SHEETROCK NAIL POOL / H. TUB 7 FrNAL tr FINAL EL tr tr tr tr ECTRICAL: TEMP. POWER MECHANICAL: tr HEATING ROUGH tr EXHAUST HOODS CONDUIT E SUPPLY AIR N/FINAL tr FINAL APPROVED )RRECTIONS: tr DISAPPROVED tr REINSPECTION BEQUIRED INSPECTOR D 1.,ilI,,dJ' , _ PROJ ECI ov/ri ! R/0 suB'r lrT ENTITITS PRE L II.I !I.IARY STAFF REViEW oE s I G!,t cHEcK ENV IRONI.,IIIITAL I t'tPAcT RIV Ie W ENV I RONI'IEI{TAL I$PACT RE PO RT tvfr_0FtR ,nropE 3-rf'7f et DATE PROCESsIIlG OAT E IiECi. IVT.J OiADLI:I' C3I.lPLETED SIG:iATURE RTt'ARK5 It ,\ r; \- --r -l +, KUU I I.SL IP [|ASTfR PLAI{ , L A:{ D SCAP t NG RE CRE AT I CI.I . .Ar.lErtTtES ENGR. CHLCT. - zol{ | NG cHEcK PLANN . COt'lr'1. _VAR I Ar,rCE _COND I T I ONAL .US€ ^/44/ DES IGN REVIE|./ F INAL ZON ING REV IE}i Ai/a;./4'a 6.r--e'A 5''- d't-a/.'/.(-14-:U ' BUILDING DEPT. , ELECTRICAL PUAL IC WORK5. f IR€ OEPT . lH PLAN CHEC K MECH/PLBG. PUBL IC AT IOi.I OATE HEAR ING DATE DATE PA I D Ri I.!ARKS FEES: "TYPE VAR I ANCE A 1.10 uit T -:- cor{D, usE ENVIR. II.IPACT PLAN CHECK PE Rr.fl T , Bt-DG . PLUI'!A I r{G tlEC lrAii I cA L ELECTRICAL . RECREAT IOII @ d4rR'; ar-F*s--=--f :a-JiJ*.---Jll-l*>.-__ - a--ltt) L y.u t^ t - * s" T E'* = vA'f i€ i*"i pLLf MEllNGi./ M ECHAI\IICAL PEFIMIT TOWN OF VAIL OF BUILDING:ttut LutNlt: , oF woRK: ! nrew E I r-l REMODEL IJ REPAIR IPTION OF WORK: t PLUMBING: NUMBER MECHANICAL: NUMBER VALUATION $VALUATION $ REMARKS:REMARKS: PERMIT FEE PERMIT FEE fl neenoveo TOTAL FEES: $ f] prsnppnoveo DATE _rr lNsPEhoN EEeu;;; TOWN OF VAIL onre 3'- $-7f JoBNAME {V1q K l,&ul- TIME RECEIVED AM PM CALLER i . : I orxen MON COMMENTS: TUE WED ! panrral LOCATION READY FOR INSPECTION THUB AM PM QQ oo E appRovED E upon rHE FoLLowrNG coRREcnoNS: CORRECTIONS flotsnppRovED D nerNsPEcr 3.3 -j+DATE .tost^H G, Hottl||o STEFHEI{ I'. HAFT JOHII 1..'. HART wttrta{ D. EtSREe,,Ji- JAMES L, WHIiE PATFICK I', WEEIFEI.DI cl lrDE ta. SAEF, JF, ROBEFT R D VISON JOHII FLEI'IIIC (ELLY FMI|I H. trodsorl tvlLua[ c- t{cclElRrl JOHII A|.I.EN NOOFE PHIUP A,OANIlLsON EEN E.CHTO! rV .,ATEg E. HEOARIY L.ruLlrat scH |o.l' JF, tlt|F€{cE R. REilo JaMEs P, L|I'IOSAY EOEEFI L NOFTIS JOHII !. CAgTELIANO IDWIN S. KAH N 3A{UEI P. Ot YlOt{ oENr{rs ta. J ct€ora NOEIRT E.EENSON ooNAtD o.r(||rol|c|l Rtctt R0 .lrcoN CHARLIS T. AhAIOT iroRRlS E- HECOX,.TF. RICHASD A. FFANCI3 FOBEFI T. CONNEFY FTELO C.SEltlON DAVID BWLER .,, HEHTEL FAhLIY w tFEtl L.torruitsoN BRUCE T. EUELL OON D. ET'ER (EIII{ETH O. HUBEAFD FOEIRT I,VTR SCHURE ooFoo! 0. cFErNta owroHl i. gHELtftA{, JR. FOEES' H, DURt U,JR.tftuta|. E.||UF {E m€otetci a. HE rH H.GFEqOFY AIJSIII{ wtlu^t{,,,. G{FNEt,,JF. GEBALD G. CUN'III{GH |. HTRAOON BIAITI I.^I,REIICE W. TREECE JON|{ u Ogg c^Rtsol{ ARTIIIJF C,DAILY 'IEF'REY C. POND WILLJAI' O, PFAKiEII S. BLAIR OAI FOEEiT }|.I.GNANUg Hor,r-,eJrn ATTORN EY S s He.nr 5OO EOUITABLE tsUILOING OENVEF' COLOFIAOO SOEO? TELEPHONE 292'9"OO ARtA COOE 303 CAtsLE ADDRESS HOLHART' DENVER November 5, f969 Town of Vail Vail Colorado ATTENTION: Charlene Re: Harold Sampson's Property Gentlemen: Enclosed are copies of the items sent to Mr. Bynum last Friday. Don D. Etter of HOLLAND & IIART DDE: nce Enclosures 2 cc: Mr. Harold Y. Sanpson Sincerely, o LOVE, COLE, JOHN A, LOVE MURPHY. HERBERT. HECOX &T()LLEY ATTO R N EYS AT LAW 3 SOUTH TE.,JON STREET COLOFADO S PR IN GS, COLORADO October 31, l-969 PLEASE ADDRESS REPLY TO P. O. BOX 997 coLoRADO SPRtNGS, COLO- eO90l IAREA CODE 3O3 473.4444 PH ILIP 6. COLE JOHN J. MURPHY GARY N. HERBERT LAWRENCE A. HECOX GERALD G. TOLLEY DANIEL P. EDWARDS ANDREW W, H ERO THOMAS E. BERG I'Ir. Charles c. Bynum Vail Colorado Dear Mr. Bynum: I am forwarding to attorneys, an executed ment necessa.ry for l"Ir. you as requested by l4r. Sampsonrs letter with respect to the ease- Sampson I s construction. Encl . aVery tru \h,t^ l. bohr- 6. For the P',$F 0ctober 30, 1969 Mr. Harold Y. Sampson c/o Holland & Hart 500 Equi tabl e Bu'i 1di ng Denver, Colorado Dear Mr. Sanpson: Subject to the terms of a wri tten agreerrent between us 'provis'ions of which have been discussed by 9ur attorneys by us, we will grant to you an easement with respect to i; Vail more paiticularly described as Lot 8A, Block 7, First Filing, Eag'le County, Colorado. the general and approved our property Vail Village This easement will be sufficient to allow the construction present'ly planned by you. Yours very tru1y, JJM: am \ a October 23, l96tl l[r. Errold.Y. Scmpon {il SedgwlcE Drlva Englcwood, Colondo Dear Mr. Sampeon: , Tbe Boerd of Zonlng AdJustment net on thts drts ra{ tabtrsC your coee 1*ndlng recctpt of a lrtter trom l&. .Ercntler atattng tbst h. dtd not oppose your proposed ad&tloa" lbey soutd be wtllng to hold rmther meetLng lf ysu could obtaln cuoh a lettcr and eend lt to Ee lt your earlleet con- venience. Stncerely, TtrE TOWN OF VAE, Clrarles G. Bynue, P. E. Bu[dlng Offtclal CGB,/car Enelosurel cc of Mtnutee ccr) 't 1" i i. I i SPECIAL MEETING BOARD OF ZONINC ADJUSTMENT ocroBER 22, 1969 The Meeting was called to order in the Town municipal offiee at 3:0C p. m. Uy Chairman KnoX, with members Young and Clark presenl. Upon motion by Mr. Clark, seconded by Mrr Young, the minutes of the meeting of Arrgust 14, i9691 were approved as submitted. CASE NO. 2.3 Mr. Sampson requests variance from the requirements -of Article II, Section l, Paragraph b, l, (c) of the Zoning Ordinance, in order to construct an addition to his house which wiII extend to the property line of Lot 9A, Btock ?, Ist Filing, Town of Vail, CoIorado. A discussion followed as to whether a letter from the adjoining neighbor, Mr. Krenller, had been received' No such letter had been submrtted to the secretary. Mr. Young moved and it was seconcled by Mr. Clark tlat lle matter be tabled until such a letter had been received' AII members voted aye arrd the motion carried. Mr. Young stated that he would vote by proxy in favor of the variance provided that Mr. Krentler did not object. There being no further business to come before the Board, upon motion by Mr. Clark, seconded by Mr. Young, the meeting was adjourned at 3:20 p. m. Respectfully submitted' Charles G. Bynum Secretary to the Board SPECIAL MEETING BOARD OF ZONING ADJUSTMENT ocroBER 22, 1969 The Meeting was caled to order in the Town municipal office at 3:0C p. m. by Chairman Knox, with members Young and Clark presenl. Upn motion by Mr. Clark, seconded by Mr. Young, the minutes of the meeting of August 14, 1969, were approved as submitted. CASE NO. Z-3 Mr, Sampson requests variance Article II, Section 1, ParagraPh Jrom the requirements of b, l, (c) of the Zoning Ordinance' in order to construct an ich will extend to the property line Colorado. Town of VaiI, A discussion followed as to whether a letter from the adjoining neighbor, Mr. Krentler, had been received. No such letter had been submrLted to the secretary. Mr. Young moved and it was seconded by Mr. Clark that the matter be tabled until such a letter had been received. AII members voted aye and the motion carried. Mr. Young stated that he would vole by proxy in favor of the variance provided that Mr. Krentler did not object. There being no further business to come before the Board, upon motion by Mr. Clark, seconded by Mr. Young, the meeting was adjourned at 3:20 p. m. R espectfully submitted' Charles G. Bynum Secretary to the Board e*i.o HAn0n Y. SAMPS2II lPrcsident P.0. Bqx 123/ I 'NGLEW170, |0L0BA00 | 801t0 October 7, L969 !lr. Charles Byman Buil<ling Inspector City of Vail Vail, Colorado Dear }tr . Bynan: This letter is to request a variance from Article 2, Section 1 Par agr aph b, 1, (c) of the Zoning Ordinance. This variance is to alloTt me to build closer to the property line than the required ten feet. En- cl"osed is a check for $1.5.00 to cover this application. In the hopes of speeding up the time e leurent before I can con-tinue construction I am glad to say I have verbal approval from lik. and ltrs. Jame s A. Krentler and am in the process of having the easement pre- pared and signed. Your s very truly, Enc. Ck. No. 2104 O VAIL BOARD OF ZONING ADJUSTMENT il rS--<: -\, \ STATE OF COLORADO ) ) COU}fTY OF EAGLE ) L II' NOTICE OF MEETING TO THE BOARD OF ZONING ADJUSTMENT, TOWN OF VArL, COLORADO, AND TO ALL OTHER PERSONS WHOM IT MAY CONCERN: NOTiCE is hereby given that a meeting of the Board of Zoning Adjustment for the Town of Vail will be held on October 22' L969, at 3:00 p. m., in lhe Town oJ Vail Municipal Office, to consider applieaLlon for variance to the Vail Zoning Ordinance and any other matters ccming before the Board. (SEAL) /s/ Charles G. Bynum Secretary AGENDA (aell ta orrier ro11 eall, and approval of previous minutes.vrsvst +v:!v Mr. Sampson requests variance from the requirements of Article II, Section 1, paragraph b, l, (c), of the VaiI zoning Ord.inance, in order to build an addition to his house which will extend to the east property line of Lot 9A, Block 7, Isl Filing, next Lo the last house on Rock Ledge Road. I1I.Adiournment. .r.o APPLICATION FOR BUILDING PERMI1 THE TOWN OF. VAIL Pd 7'a7:b? i t JL-so 6 Dze< cA ect-L (e,ce)tf 4- t vt(7rl Building Date of Narne Addregs dress,4o ppligati Applicant fill in this section onl Tel. No. Tel. No. 2t-s--zo!q Tel. No. BUILDING INFORMATION Wet" Addition z'' Alteration- RePairs Type of occuPancyfKgtl (A11 parte of building) BUILDTNG DIMENSrq.rys r7o-qfr totaf ff""t area (sq ft) No. of water 6ieetaJ\- N". ;Fram ilie s --1!---- Total floor area (sq rtrygffi.-'b?0 N:.":;:".H"i=*:ffi {;nr ESTIMATED CCST o',{ 7aa cF coNsT*vcTroffiraor2-(Materitls 8f Labor) i ,.i Ft -- //) 2 '/o o (d *r c u City Name Address City "/)e*z ue"* Narne Addre s s City (Circle correct classification) ^-1. Type of construction I. II. W.f;ffi . Occupancy group A. B. C. D. t.l'. c. H@ J. Sigaed ,Fy',.e =/,;f ,t Approval by planning and architectural control committee to obtain building permit. Date Signature Date Amount of Perrnit F." $ Z/,*a* zo.r? P"idz Cash $check $u@ Amount of Glean up Fee $ 7t. "t _ Paid: Caetr $=-Gheck $ Tap fee paid Amount Date perrnit iesued FinaL inepection - BUILDINC INSPECTICN Receipt ot Vtans afuy_3j1$=1 '- approval of Plane (2 sets reouired) ' Dzte fAa c/t- y' -2 6-6f 7;rt / //,y'tl<.5a Certificate of occupancy & compliance Construction clean-uP ,aa't:i t -- : -, .:.,. ,I/ir)J'lllIJ!'i;;: :4.)p.'4., ."rodFJ X il' ;i.:tFitl 'f 7, -.r'-) !'I'-{ T rt r riITA'rI Oi/l}tfil':i.ai ,tfA -17" 1,r ?,1 i.4\t!r,-il l,10IT.43I.J.t"r A 'j -1 r :-- '.1., ' '-Et' 'I rl' TiMilAC'. t6h.T.:t:E-i ' n"lit ri{qqh r'o sir(i i I ririrlcr:JF ,;11,;161 11f ... i .i_ _-..*...--{:il Dli r9'r: r.'oil f . ta'I' .oi'l .I l. r.' :€:::--.::::-?:-:::: :=- - *-. -:=::'-+.*.. .- -*Frii:r.:' lo..qll .v :t .' gtri:rlirrd fli rttlr.' o* seJSim'rto:, Iotlnog fu "rrrl-,,rjiri:rr hrls lr.rrnn.r{4 r-.j ot$t,sfl:t.ii :rJsf1 ir t' I i4 /^rrtr\.!'cT-r ttfi la!.at f'| fi l.t _ :j.rr r.J.jt-t. ,t :t u{l!,' , .j:;-- .'n;Ji ltr Irr','.;trJ9A : ..Fr:.6iri 1c' ig!srs,3 :;is(i .rJ:,1.t {h:rr irrng-r ,:loa,S} l.{r, - *-*?j -"'"r'i l-;4 riaslt :bing ::: . l[__-:t:';i Jirr:":. 'i ]c Jr:r.'o.'rrA , i. ;l'.*r!i) t rle G:) : i:lr I 1. es 4 tit aselJ lc lr:r.rr-.' . '.+-+- ir:$..rtA i;ricq ..,. I e;r'Il i'.naeei tirnrsq rJs(l rl,rit'j':rqefii IsniT .,:r11Girr;,:t.:,'-, ii 1:rtr:t1rrryr,, iO glr;filiJ:6C I 'rvr,1g(t a .li rrt s(i qrr - i:Ji 9i:.1 noilgl J i., r'rA APPLICATION TI{E licant FOR BUILDING PERMIT TOWN Or. VAIL fill in this section onl BUTLDTNG TNFORMATIOU New Addition Alteration Repairs-- Type of oc cuPancy-Iggijlgnce- (A1l parte of building)t Q' B o Lgcge u lr u (t h tr o u Tfrtl flo"" ;;i lao ftl-oz+ -No of stori"s-!-Ht'.._ No. of rooms- No' bathe I Name _ Don Anderson No. of water closets 1 Addres s City oillon. coloradoTel.No. Lot Block , Subdivision No, of Families ESTIMATED COST 9A oF GoNSTRUCTTON-- 87OO :- (Materiels & Labor)d u0 !)r "l (Circle correct classification) l. Type of construction I. II. ru. I V {'\D. . Occupancy group A. B.C. D.t. F. C.H@,,1. Sigaed Approval by planning and architectural control committee to obtain building permit. Date Signature Building Date of Application 9 / 23169 Addrese 42 Sedgwick Ilrive citylq Name Wn. L, Coppock City Denver Tel. No, 255-2039 ppioxinately I- Receipt of Plans 7-2 /-tl (2 sets reouired) Amount of Permit Fee $ Amount of Clean up Fee Date permit issued Final inepection BUILDING INSPECTICN Date Approval of Plans Date Check $Paid: Gastr $ Paid: Gash $Gheck $ Tap fee paid Amount Certificate of occupancy & cornpliance Gonstruction clean- up STATT OF'COLORADO COIINTY CF EAGLE DECLARAtr'ION CF LAND. ALLOCATION duly eubecribed and Y, Sampson __' this )I ss. ) I, IlaroLd Y. Sampson , DEftrg first duly 6worn upon oath' depose and say that the following statemente ate true and cotrect accorCing to my best knowledge, information aad belief, to wit: 1. That thig etatement ig made ln conjunction with the filing of an application for a building pettnit to the Town of ,Vail and to cornply with the requiremente of Article VII, Sectlon 3, Ordinance Number 7 (Seriea of 1969) Zoning Ordinance for the Town of Vail. Z. The deactiption of the building site for the propoaed building ie as follows: Lot 94. Block 7. Vail VilLaee First Filinq . (Description rrray be attaehed or 6urveyorre rnap rnay be uged to ehow dee- cription. ) 3. The propoeed buildiqg site containe feet, and the proposeA €SHfficontaine - ApproxirnateLy 23,880 sguare 624 square feet of area ae defined in the aforesaid T.on|ng Ordinance. 4. The propoeed building, aB it relates to the building site ar€a, col-rlplies to the Floor Area Rgrtio for the zoning rvhich applies to the building aite, aa defined in the aforesaid Z.oning Ordinance. The foregoing affidavit and declaratlon wag before tne, a notary public, by Itarold swotn to 23rd ila,'y of September _, 1959. I; Cmnricslon srpires rfanuary 10, lg?0 lr lv \i.--'-'t/ ?, .t "l \. + ';'\n ( t\!r>'.: -'J' \ rai Fl,. ll lr+i-3l ll Y ll ll" 1l\ E| il\lr fl/l Y l/t.i vi i, ; [i: t, -n r ._'1 ) ll :t- 1r -ll l"l' .::. .lt ll r lt la tiri t I (,k I 'r'it) i' BUILDING PERMIT Vail, Colorado Pe rrnit t Date 24 7 -t' rg /? - Permission is hereby gr^fted da- &l/-tn '.-u ^" Ahz-.*t-- to '<---f-t-.-zJ-a zra-Z-story a,r/A.f',-. t-2 2 "2 t ddtut" /oo4 /-& /r-4 /1 Contta.tot d*u- 4,*tZz-+a*- .ay' ,.2 A !2 t pptou"d fu'44b 4 5.2-.,*.v"iteoitffi In accordance with the C ornrnittee, subject to Pr ote ctive Covenants, Type of C onstruction Z provisions set forth by the Vail the rules and regulations as set and in cornpliance with the 1954 .A' r chitectural Control forth in the Vail Village Uniforrn Building Code. Group .r ffi (For Departrnental use Only) INSPECTION FR.4 MING FINAL ROUGH ,\ PPROV! L COMMENTS DATE & SIGN/TURE fizO. b0 g r1 g] u CJ t4 FIN/ L ROUGH u0 ; F,FINI L ROUGH d o A U) FIN} L a o SPECIAL MEETING doaeb or zoNlrqc ADJU.5fMENT NoVpMsrR ll, 1969 The Meeting was called to order in the Town Municipal bffice at 2:00p.m. by Chairman Knox, with membere J. Robert Young, Robert Ctark, and Mitchell Hoyt preeent. Mr. Ted Poliac was abeent. Miautes of the prevlous meeting of october 22, 1969, were unanimouely approved aa aubmitted. CASE NO z-3 Refetence previoue rninutes,Mr. Young, aeconded by roved. OTHER BUSINESS Robert Ctark made a motion, seconded by Robert young, that the following auggeeted zoning ordinance amendrnent be submitted to the Trueteeg for consideration in the forthcoming redraft: sornething to the effect that: Adjacent property ownera will be notified by rnail of a particular variance requeet, the time and place of hearing, and the addregs to which they can direct their comments, if any. At preeent the Zoning ordinance doee not require that notification be rnade to adjacent reeidents. The Board unanirnouely approved thie motion. Thie auggeetion will be preeented to the Trusteee at their next meeting. There being no further buieneee to corne before the Board, upon motion by Mr. Hoyt, eeconded by Mr. Young, the rneeting was adjourned at . . 2:30 p. rn. Respectfully submitted, Acting Secretary /