Loading...
HomeMy WebLinkAboutSundial Unit D3 Legal.pdf Design Review Board ACTION FORM Department of Community Development TOWN OF VAIL 75 South Frontage Road, Vail, Colorado 81657 tel: 970.479.2139 fax: 970.479.2452 web: www.ci.vail.co.us Project Name: DRB Number: DRB040142 Project Description: ADDITION OF BASEMENT WINDOW, INTERIOR REMODEL Participants: OWNER REYNARD, KENNETH B. 04/23/2004 Phone: 5505 S KRAMERIA ST GREENWOOD VILLAGE CO 80111 License: APPLICANT WAYNE HASKINS CONSTRUCTION I04/23/2004 Phone: 970-328-8000 P.O. BOX 1913 EAGLE, CO 81631 License: 593-B CONTRACTOR WAYNE HASKINS CONSTRUCTION I04/23/2004 Phone: 970-328-8000 P.O. BOX 1913 EAGLE, CO 81631 License: 593-B Project Address: 5040 MAIN GORE PL VAIL Location: 5040 MAIN GORE PLACE, UNIT D-3 Legal Description: Lot: Block: Subdivision: SUNDIAL Parcel Number: 210113105021 Comments: SEE CONDITIONS BOARD/STAFF ACTION Motion By: Action: STAFFAPR Second By: Vote: Date of Approval: 04/23/2004 Conditions: Cond: 8 (PLAN): No changes to these plans may be made without the written consent of Town of Vail staff and/or the appropriate review committee(s). Cond: 0 (PLAN): DRB approval does not constitute a permit for building. Please consult with Town of Vail Building personnel prior to construction activities. Cond: 201 DRB approval shall not become valid for 20 days following the date of approval. Cond: 202 Approval of this project shall lapse and become void one (1)year following the date of final approval, unless a building permit is issued and construction is commenced and is diligently pursued toward completion. Planner: Joe Suther DRB Fee Paid: $250.00 /Application for Design Review Department of Community Development 3 r 8 75 South Frontage Road,Vail, Colorado 81657 TOXIN OF VA IL - , tel: 970.479.2139 fax: 970.479.2452 j ( web: www.ci.vail.co.us General Information: All projects requiring design review must receive approval prior to submitting a building permit application. Please refer to the submittal requirements for the particular approval that is requested. An application for Design Review cannot be accepted until all required information is received by the Community Development Department. The project may also need to be reviewed by the Town Council and/or the Planning and Environmental Commission. Design review approval lapses unless a building permit is issued and construction commences within one year of the approval. Description of the Request: ,A,©, 720 1 1 0/ Location of the Proposal: Lot: Block: Subdivision: .S SO kJ A—7 444 Physical Address: Oct() ,v)/vcr ( ��- Parcel No.: t l - /_` f , c:-.--0021 (Contact Eagle Co. Assessor at 970-328-8640 for parcel no.) Zoning: Name(s) of Owner(s): Mailin Address: 5Y 5 £r e �U r � ° Uct - CO 9 Phone: al( Owner(s) Signature(s): t cz /t Name of Applicant: t'0e Mailing Address: 0 . 604 /','s �- � mac: q/6 3 7 t:P'hone: q 7© .3 cr)c>,f) E-mail Address: Fax: Type of of Review and Fee: ❑ Signs $50 Plus$1.00 per square f o c l a`: 1 ?L. ❑ Conceptual Review No Fee DES. G\ REVS BM '' V ❑ New Construction $650 For construction of Tir5uldirig75r dery 'd. ❑ Addition $300 For an addition where squ re footage is added to an residential or commerci ' 'n_g (incl .252ad3ti•. ,,. .terior conversions). Minor Alteration $250 For minor eSto boil gs—a•,i site iraa 9 -u i _� ,as,.. 1 (multi-family/commercial) reroofing, ..i. •pg, win••w •;h ns, landscaping, fences and retaining W.` �er, - ❑ Minor Alteration $20 For minor changes to buildi gs and site improvements, suc as, (single-family/duplex) reroofing, painting, windo, additions, landscaping, fences and retaining walls, etc. ❑ Changes to Approved Plans $20 For revisions to plans already approved by Planning Staff or the Design Review Board. ❑ Separation Request No Fee For Office Use Only: Fee Paid: 2,,S-6 Check No.: 3S 7 By: s L Lo Application Da . �"` �°- ®° DRB No.: —0604 Oitta, Planner: _ (7 Project No.: 4--0124, Page 1 of 13/11/17/03 04/22/2004 11:31 476-2523 - SLIFER MGT PAGE 02 Slifer Management Company Property Management & Leasing April 22, 2004 To Whom It May Concern, The Sundial Townhorne Association hereby gives approval for the installation of a basement window on the South facing side of unit D-3, the Renard's residence. The new window will meet all building codes and requirements that apply. Please allow this letter to serve as an official approval by the Sundial. Townhorne Association. IL w L Date 4/�7/ / d\.. Pen Slifer. Management Company Agent for the Sundial Townhorne Association 143 East Meaklow Drive.Suite 360,Vail, Colorado 81657 Telephone:(970)476-1063 Fax:(970)476-2523 ******************************************************************************************** TOWN OF VAIL, COLORADO Statement ******************************************************************************************** Statement Number: R040005667 Amount: $250.00 04/23/200409:26 AM Payment Method: Check Init: JS Notation: Permit No: DRB040142 Type: DRB-Minor Alt,Comm/Multi Parcel No: 210113105021 Site Address: 5040 MAIN GORE PL VAIL Location: 5040 MAIN GORE PLACE, UNIT D-3 Total Fees: $250.00 This Payment: $250.00 Total ALL Pmts: $250.00 Balance: $0.00 ******************************************************************************************** ACCOUNT ITEM LIST: Account Code Description Current Pmts DR 00100003112200 DESIGN REVIEW FEES 250.00 Slifer INTERIOR ARCHITECTURE & HOSPITALITY 216 Main Street • Suite C-100 • Edwards, Colorado 81632 • t:970.926.8200 • x:970.569.3221 • web:sliferdesigns.com TRANSMITTAL To: Wayne Haskins Date: April 22, 2004 Firm: Wayne Haskins Construction, Inc Project Name: Reynard Residence Pick-up Project No.: 8220 File No.: We are sending the below listed items via: For your: ❑US Mail DE-Mail 111 Review ❑Overnight ®Other Pick up at Desk' ❑ Approval ❑Fax Fax No ® Information Pages: -'•s .1'1• Please reply by: fe as /0.3 k Quantity Date Description 1 April 22, 2004 Letter from Condo Assn. 4 sheets April 21, 2004 8 1/2x 11-Dwgs for Town of Vail Bldg. Dept. Smoke De 1 sheet April 22, 2004 Composit Photos of Basement Windows-TOV- DRB 2 sheets April 22, 2004 Cut Sheets for Basement Wdw. Well & Cover. 2 sheets April 22, 2004 Copies from Uniform Building Code, 1997 Remarks: Wayne, Attached are all the additional materials that Joe with the Town has requested.Just fill out the forms and add a Check to the Town of Vail in the amount of$250. Exterior Minor Change Fee. I have also attached a copy of the smoke detector portion of the UBC which calls for the new smoke detector locations & type. Note that they don't have to be hard wired by the electrician (the code allows battery units which, are much cheaper) unless the inspector requires it Let me know how that goes. I was at D-3 this morning to take the pictures,and I saw that Marc and the men are moving right along. Because the basement was already 6'to 10'deep there will be no issue with the additional space requirements.' Cheers, Tom cc: Ken & Kathy Reynard by fx 303.221.7613 Marilyn Smith Heaney-SD by hand By: Thomas E. Counter AIA Document2 If this material has been faxed and all pages are not received,please call 970.926.8200. 1 I .a.. ir li.:441 . - i 'L.. f Al i _ %bit 41 ' . 116., . I. • ■ \141, .L ., , _ „... ,.. .i. ... • • . ... i .7.4*4,...:. ti -P tir '„: k , .. . _ , . .,,,,,„,„.,,,,,,,,k - , . . , . ,..._ \,...t , : , r __ utar Wimoin6 _.,.. , 4 / ___..._ _, ..7. - ... ,_,..._ ,-Asi,_ ., , _ _ - -.e. .. .... _. 'tom fr. '.'"' r r Page 1 of 1 WINDOW SYSTEM Use the "Sytem Selector to V 4 find the right system for you. SYSTEM'S COMPONENTS Easy-Buck Easy Well 2. , l Vinyl Window s �� Safety Grate � u_ Ilk lokmmenno pa,3, Cover 7 Ladder To find a distributor near you, click here. http://www.boman-kemp.com/sysresult.mv?submitbutton=&egress=&buck=&projection=&depth=&thickness=&opening= 4/22/04 Boman Kemp Basement Window Systems Page 1 of 2 P. !BOMAN HOME INDUSTRIES PRODUCTS DIS1kIBUTORS SALES REPS EGRESS CONTACT US K Industries 1. WINDOW SYSTEM I. COMPONENTS __...._... • Builders Remodelers Concrete Contrators Easy Well • Architects rNV-4 .* . i.,, , , The Boman Kemp Easy-Well (or 3 basement area well) is used to r keep"earth away from basement Resources " windows. It is designed to bolt 4 directly to the Boman Kemp Easy- l'' "How to Video,, CAD Drawings ii- 4,R,,.z Buck or can be bolted to the wall 9 ,1' during a remodel application. ►' Egress Presentation r All Resources ,....-:/ ,,i-.1„.: q` • Contact Us ai E , 4 l4 E i . t.. e.4 a Click on an image to enlarge. Cl - http://www.boman-kemp.com/search systems.mv 4/21/04 TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT 75 S. FRONTAGE ROAD VAIL, CO 81657 ice\ 970-479-2138 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ADD/ALT MF BUILD PERMIT Permit #: B04-0076 Job Address.: 5040 MAIN GORE PL VAIL Status • ISSUED Location • 5040 MAIN GORE PLACE, UNIT D-3 Applied...: 04/23/2004 Parcel No • 210113105021 Issued ...: 05/11/2004 Project No...: (� — Expires...: 11/07/2004 OWNER REYNARD, KENNETH B. 04/23/2004 Phone: 5505 S KRAMERIA ST GREENWOOD VILLAGE CO 80111 License: CONTRACTOR WAYNE HASKINS CONSTRUCTION I04/23/2004 Phone: 970-328-8000 P.O. BOX 1913 EAGLE, CO 81631 License: 593-B APPLICANT WAYNE HASKINS CONSTRUCTION I04/23/2004 Phone: 970-328-8000 P.O. BOX 1913 EAGLE, CO 81631 License: 593-B Desciption: ADDITION OF BASEMENT WINDOW, INTERIOR REMODEL Occupancy: R1 Multi-Family Type Construction: V 1-HR Type V 1-Hour Type Occupancy: ?? Valuation: $60,800.00 Add Sq Ft: 0 Fireplace Information:Restricted:Y #of Gas Appliances: 0 #of Gas Logs: 0 #of Wood Pellet: 0 *k******************************************************************* FEE SUMMARY ************************************************************ Building > $720.75 Restuarant Nan Review--> $0.00 Total Calculated Fees--> $1,912.99 Plan Check > $468.49 DRB Fee > $0.00 Additional Fees > $0.00 Investigation-> $720.75 Recreation Fee > $0.00 Total Permit Fee > $1,912.99 Will Call > $3.00 Clean-up Deposit > $0.00 Payments > $1,912.99 TOTAL FEES > $1,912.99 BALANCE DUE > $0.00 ********,***Y,************************************************************************************************************************************* Approvals: Item: 05100 BUILDING DEPARTMENT 05/10/2004 GCD Action: AP Item: 05400 PLANNING DEPARTMENT Item: 05600 FIRE DEPARTMENT Item: 05500 PUBLIC WORKS ************************************************************************************************************************************************* See page 2 of this Document for any conditions that may apply to this permit. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan,to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, Uniform Building Code and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2149 OR AT OUR OFFICE FROM 8:00 AM-4 PM. SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNEF PAGE 2 CONDITIONS OF APPROVAL Permit#: B04-0076 as of 05-11-2004 Status: ISSUED ******************************************************************************************************** Permit Type: ADD/ALT MF BUILD PERMIT Applied: 04/23/2004 Applicant: WAYNE HASKINS CONSTRUCTION INC. Issued: 05/11/2004 970-328-8000 To Expire: 11/07/2004 Job Address: 5040 MAIN GORE PL VAIL Location: 5040 MAIN GORE PLACE, UNIT D-3 Parcel No: 210113105021 Description: ADDITION OF BASEMENT WINDOW, INTERIOR REMODEL Conditions: Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: 14 (BLDG.): ALL PENETRATIONS IN WALLS,CEILINGS,AND FLOORS TO BE SEALED WITH AN APPROVED FIRE MATERIAL. Cond: 16 (BLDG.): SMOKE DETECTORS ARE REQUIRED IN ALL BEDROOMS AND EVERY STORY AS PER SEC.310.9.1 OF THE 1997 UBC. Cond: 1 (FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY WORK CAN BE STARTED. ******************************************************************************************** TOWN OF VAIL, COLORADO Statement ******************************************************************************************** Statement Number: B04000580I Amount: $1,912.99 05/II/200408:57 AM Payment Method: Check Init: DDG Notation: Haskins/M&M Const. Permit No: B04-0076 Type: ADD/ALT MF BUILD PERMIT Parcel No: 210113105021 Site Address: 5040 MAIN GORE PL VAIL Location: 5040 MAIN GORE PLACE, UNIT D-3 Total Fees: $1' 912'99 This Payment: $1, 912.99 Total ALL Pmts: $1' 912'99 Balance: $0.00 ******************************************************************************************** ACC0UNTlTBNILlST: Account Code Description Current Pmts BP 00100002111100 BUILDING PERMIT FEES 720.75 PF 00100002112200 PLAN CHECK FEES 468.49 PN 00100002152000 INVESTIGATION FEE (BLDG) 720.75 WC 00100002112800 WILL CALL INSPECTION FEE 2.00 . APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UNSINED (C..<Project#: lP-304� , ''' Building Permit# ®f° 00 ? k s Insp ions) T�OWNOFPA ` OF `A LD G P-; , ' PLT `ON '"'�'�"are =quired f° 71117- ng « -tc.! 75 S. Frontage Rd. _ �« °� ' Vail, Colorado 81657 CONTRACTOR INFORMATION General Contractor: Town of Vail Reg. No.: Contact and Phone#'s: 5,,cio -1_03.S Col._ 1 ,� , y�/ //AS cc� 2 "/ 5 - , 9 �o -.3d -goa o -cv /,. it Email address: d Contractor Signature \ G COMPLETE VALUATIONS FOR BUILDING PERMIT (Labor & Materials) BUILDING: $ ..s—loo,ELECTRICAL: $ 'o ' �. OTHER: $ PLUMBING: $ ,r-000` ec' MECHANICAL: $ / TOTAL: $ (.12.0, B'0(--.) I For Parcel# Contact Eagle County Assessors Office at 970-328-8640 or visit www.eagle-county.com Y Parcel# rR101 - 13/ 0, = o,eJ Job Name: Job Address: - -3 d 4 . /0,44.0 19 j� , �0.�/07,GAi 60r- ,ups Legal Description t Lot: Block: i Filing:S 14►4j4 /. Subdivision: ,/////,&2_11_-.-.___77L Ow rs Pam7647771/ Address: ,� Phone: . J /�la" f /fic�r;c ,4, r-, ii Z. ,5-c). x,44' 1- /_303 )7�`ibi Architect/Des)gner -. Acdc�dre s: Phone: SA. 1/-/=/ fl/ /''dJQ �1 /�. %r4,as J1'/�,&rSu,id--c:., ,, r)4 i `7Q2C - 2oc. Engineer: ivigi Addr s: Phone: Hw p d o X 4/„5,.,? 7 I y 3�, 9 i Detailed description of work: 14 - f'�.�/s%/ arc) 4 c,: 4o0,'i / E/ OD,,L k,7E7/ ,o, /14/I z ,6,71-;JP. Work Class: New( ) Addition ( ) Remodel (i4 Repair( ) Demo (14 Other ( ) Work Type: Interior(ifi Exterior( ) Both ( ) Does an EHU exist at this location: Yes ( ) No (i1 Type of Bldg.: Single-family ( ) Two-family ( ) Multi-family ( Commercial ( ) Restaurant( ) Other( ) No. of Existing Dwelling Units in this building: "! • No. of Accommodation Units in this building: No/Type of Fireplaces Existing: Gas Appliances ( ) Gas Logs ( ) Wood/Pellet( ) Wood Burning ( No/Type of Fireplaces Proposed: Gas Appliances ( ) Gas Logs ( ) Wood/Pellet( ) Wood Burning (NOT ALLOWED) I Does a Fire Alarm Exist: Yes ( ) No (A) Does a Fire Sprinkler System Exist: Yes ( ) No (N I **************************************FOR OFFICE USE ON LY************************************** 1 Other Fees: Type of Construction: Acce+te.g DRB Fees: Occupancy Group: Planner MeM11111111 Public Way Permit Fee: Date Received: IP REC'D_APR 20 2004 07/26/2002 \\Vail\data\cdev\FORMS\PERMITS\BLDGPERM.DOC 0 76, 04/22/2004 11: 31 476-2523 SLIFER MGT PAGE 02 Slifer Management Company Property Management & Leasing April 22, 2004 To Whom It May Concern., The Sundial Townhorne Association hereby gives approval for the installation of a basement window on the South facing side of unit D-3, the Renard's residence. The new window will meet all building codes and requirements that apply. Please allow this letter to serve as an official approval by the Sundial Townhorne Association. J l Date 4/2-2/0` � d w �enl�nd Slifer Management Company Agent for the Sundial Townhome Association 143 East Meal tow Drive,Suite 360,Vail, Colorado 81657 Tcicphonc:(970)476-1063 Fax:(970)47G-2523 • BOMAN-KEMP"EASY AE._:AINDOA YELL SYSTEM-57"%36'x46' CODE APPROVED 30-5 35"AL/M.CLAD CASEMENT VNIN 7O1-MIN.74'CLEAR ACE X 36"CLEAR HIGH-151NDOA AE LL TO BE MAX.44'DEEP X MIN.36"CLEAR AIDE x MIN.36-CLEAR FROJECTION-ADC 6"GRAVEL AT BOTTOM e CLEAR COVER AT TOP. STEP TO PRO_IE.T INTO YE-MAX.b'AT Ib"HIGH.STEP S 38'-I I" NOT TO INTERFERE■KITH(5DOA AT / PULL OPEN. 3.•O- • - O RUP E TO TAIN®�' BASEMENT LEVEL m �� ' 518 5F +/- ••• �xb CAP RAIL �. X% i - �- NEA INSULATED ST.iFD A L5-7X6 T 74'OC. }��� ADD 12-DEEP X 36'AIDE STEP IF OVER�`CROP AT DOOR , 117"GYP.BOARD FINbHED I FAINTED G?�RPET 1 b' EXISTING GR/ YVL OBESE EC - - — SPACE v NALL ail . -_ - CABINETS • 1511 DRYS¢VENT TO OUTSIDE • ACID AASFI, , ' GONG'F AOD 6'INSULATION BLANKET TO HA HEATER MAX.SILL HEIGHT=44-AFF ADC CONCRETE BASE PAD 36"COUNTER • TOP-LAMINATE = ® EDGE OF FOOTING NA11 l•-�., • D2'-11 f i' Y 5Cii3°v"W�"'L, . 4 LOFT LINE ABOVE 24'-4g" V - \ ‘[ 1 -9 1- EXISTING SMOKE DETECTOR _ I I p I� \ LEVEL 2 UP ' ADP _ �� WALL MOUNTED O Mb'AFF jLIVING ROOM T 1■ 1 -0SD ADD NE+"SMOKE DETECTOR FLOOR fi T AT CEILING PER CODE i LEVEL 1 j on ' REI.--I BEDROOM K TGHE ! r E1N I 0 o I f}` 1 F} I 1 ZgOw ' ' .11 , ..:... r 0 i t NEiV ADD NEW IV+LL / HEARTH NEN COINTER CARNETS ADD ADD ADD STONE CARPET TOPS NEn CHAT NFYi SHELVNG PEGS CARPET NEW CARPET k EXISTNG SMOKE DETECTOR e /� Aria, / \� 7 rjD 1 /® ADD NEW SMOKE DETECTOR /t‘"/--- �N/� AT CEILING PER CODE UP \� p f so \\:-- A I DN--- — UP GL. r LOFT {1 ( BEDROOM L.LEVEL 4 GL �P / LEVEL 3 REVISE BATH 7---- CLOSET SHELVES. BEHOVE SALISTERS AND ADO ADD NEW SMOKE DETECTOR TO WALL/HARDWIRE PER CODE NEW 2X4 WALL TO 36'HT. (C7 ENGINEER. TO FIELD VERIFY 51110 NEW ADD NETS SMOKE DETECTOR AT FLOOR CARFET CEILING-135'AFF OF LEVEL RVE ,:GISTS e SUPPORT BEAM AND ENHANCE IF REQUIRED. 24'-4g" r t I = ROSE MOM E j LOFT \t� LINE ma.ee.,oroc LEVEL 5 NALL j E LOFT BEDROOM BELOW NEIN N LEVEL 4 r J o BATH j REMOVE \\ BALUSTERS E X4D YiA,LL REVISE SAUNA LNEN NE x4 `iAV.NG< WALL TO GARNETS 36'HT. BE`OA • ( . i Questions? Call the Building Team at 479-2325 Vin. TOWN a4ii Building Permit Submittal Checklist Department of Community Development Project Name: 6 /y iiiiired /7_"S/ Q k)c.i; Project Address: C 90 44),I r Co/.ii: ,I/vim c(r, 4.ti/ ,d-3 UAii. e), ✓ ;ibis Checklist must be completed before a Building Permit application is accepted. ❑ All pages of application is complete Has DRB approval obtained (if required) Provide a copy of approval form Condominium Association letter of approval attached if project is a Multi-Family complex ❑ Complete site plan submitted .Public Way Permit application included if applicable (refer to Public Works checklist) 't 1 Staging plan included (refer to Public Works checklist) No dumpster,parkinq or material storage allowed on roadways and shoulders without written approval VkkAsbestos test and results submitted if demolition is occurring Architect stamp and signature (All Commercial and Multi family) —Full floor plans including building sections and elevations(5 sets of plans for Multi-Family and Commercial Buildings) Window and door schedule Ea— Full structural plans, including design criteria (i.e.loads) o' Structural Engineer stamp and signature on structural plans (All Commercial and Multi Family) oils Report must be submitted prior to footing inspection ❑ Fire resistive assemblies specified and penetrations indicated Bmoke detectors shown on plans -- 4,----c4- 5 t,--ci-t.,,--_ ❑ Types and quantity of fireplaces shown Applicant's signature: W ,, _ Date of submittal: Received By: \\Vail\data\cdev\FORMS\PERMITS\BLDGPERM.DOC - 04/02/2003 ---- ..:,..?,:„.„,;,.:,„.,.,,.:,. 4* ...,.00,,,,... iiii, ...to TOWN OF VAS BUILDING PERMIT ISSUANCE TIME FRAME If this permit requires a Town of Vail Fire Department Approval, Engineer's (Public Works) review and approval, a Planning Department review or Health Department review, and a review by the Building Department, the estimated time for a total review will take as long as three (3) weeks. All commercial (large or small) and all multi-family permits will have to follow the above mentioned maximum requirements. Residential and small projects should take a lesser amount of time. However, if residential or smaller projects impact the various above mentioned departments with regard to necessary review, these projects may also take three (3) weeks to review and approve. Every attempt will be made by this department to expedite this permit as soon as possible. I, the undersigned, understand the plan check procedure and time frame. I also understand that if the permit is not picked up by the expiration date, that I must still pay the plan check fee and that if I fail to do so it may affect future permits that I apply for. Agreed to by: lb'y , eC /4S j,,0-.S Pf int name A I .e...„, � Si. :ture Project Name: _ /1),6.:1 VA/AV /'S, Date: 4/ OZ CJ c3 y F:everyone/forms/bldperm3 TOWN OF RAIL HOW DID WE RATE WITH YOU? Town of Vail Survey Community Development Department Russell Forrest, Director, (970)479-2139 Check all that applies. 1. Which Department(s) did you contact? Building Environmental Housing Admin Planning DRB PEC 2. Was your initial contact with our staff immediate slow or no one available ? - 3. If you were required to wait, how long was it before you were helped? 4. Was your project reviewed on a timely basis? Yes/No If no, why not? 5. Was this your first time to file a DRB app PEC app Bldg Permit N/A 6. Please rate the performance of the staff person who assisted you: 5 4 32 1 Name: (knowledge, responsiveness, availability) 7. Overall effectiveness of the Front Service Counter. 5 4 3 2 1 8. What is the best time of day for you to use the Front Service Counter? 9. Any comments you have which would allow us to better serve you next time? Thank you for taking the time to complete this survey. We are committed to improving our service. ,. :fir? tr i+ :i.4001 ..1- ...AP iWFA , WHEN A "PUBLIC WAY PERMIT" IS REQUIRED PLEASE READ AND CHECK OFF EACH OF THE FOLLOWING QUES I IONS REGARDING THE NEED FOR A "PUBLIC WAY PERMIT": ❑ Is this a new residence? YES NO !O ❑ Does demolition work being performed require the se the Right-of-Way, easements or public property? YES NO ❑ Is any utility work needed? YES NO__ ❑ Is the driveway being repaved? YES_ NO 4/------ ❑ Is a different access needed to the site other than the existing driveway? YES NO ❑ Is any drainage work [wing done that affects the Right-of-Way, easements, or public property? YES NO t/ /� ❑ Is a "Revocable Right-of-Way Permit" required? YES NO /* ❑ Is the Right-of-Way, eas nts or public property to be used for staging, parking or fencing? YES NO If answer is NO, is a, a g, staging or fencing plan required by Public Works? YES NO vv If you answered YES to any of these questions, a "Public Way Permit" must be obtained. "Public Way Permit"applications may be obtained at the Public Work's office or at Community Development (a sample is attached). If you have any questions please call Leonard Sandoval in Public Works at 479-2198. I HAVE READ AND ANSWERED ALL THE ABOVE QUES I IONS. 01 e;04:14 4."0-(i:2-4 C.-1 ‘ . / •ntractor Signature Company Name Job or Project Name: 4• yv,�- Date Signed: ii o cl F:/everyone/forms/bldperm4 PW#: LI - APPLICATION Parcel #: - I - FOR TOWN OF VAIL I Q PUBLIC WAY PERMIT 19 Bldg. Permit#: B TOWN OF VAIL 1' Job Name Street Address (If unknown call 479-2138 ext.0) 2' Excavating Contractor Name Mailing Address TOv Contractor's License Number REQUIRED City State Zip Phone# 3' Start Date Completion Date (Permit Expiration Date) 4. Work is for(circle one) Water Sewer Gas Electric Telephone CATV Landscaping Temp. Site Access Other 5. Trench-width Length Depth (min. 4') Total SF $ Total LF $ Bond Amount $ Permit Fee ' Total Permit Fee $ 6. ALL MATERIAL, EQUIPMENT, AND TRAFFIC CO •t ti ' ST BE ON THE JOBSITE BEFORE THE JOB IS STARTED. 7. Rubber out-riggers are required on excav- og : t en working on asphalt. . Asphalt surfaces underneath the buc t a g• I rotected at all times. 8. A signature below indicates a revie h: utility locations and approvals. Once all utility company signatures are obtained, permittee t > :' +uting application through the Public Works office to obtain the necessary Town of Vail signatures. ow up to one week to process. Public Service Company (1-800-922 Public Service Natural Gas Group (1-800-922-1987) U.S. West (1-800-922-1987) TCI Cablevision of the Rockies (1-800-922-1987) Eagle River Water & Sanitation District (970-476-7480, ext. 114) Holy Cross Electric Company (1-800-922-1987) Town of Vail Electricians (970-479-2158) Town of Vail Irrigation (970-479-2158) Town of Vail Public Works Construction Inspector(970-479-2198) 9. THERE WILL BE NO TOTAL STREET CLOSURES! A construction traffic control plan must be approved by the Public Works Department prior to issuance of the permit. 10. All excavation must be done by hand within 18" of utilities—(Senate Bill 172), 11. Permittee must contact Public Works Department at 479-2198 24 hours prior to commencing of work. Failure to notify the Town will result in forfeiture of bond money. Scheduled inspections which are not ready may result in the Town charging the contractor a reinspection fee. 12. I certify that I have read all chapters of Title 8— Public Ways and Property, of the Vail Municipal Code and all utility company agreements, signed by me, and will abide by the same, and that all utilities have been notified as required. Contractor's Signature of Agreement Print name clearly Date of Signature ATTACH PLAN OF WORK, INCLUDING CONSTRUCTION TRAFFIC CONTROL_PLAN White—Public Works Show streets with names, buildings, and location of cuts. USE DASH LINES FOR CUT. Yellow—Contractor TOWN 5F via PUBLIC WORKS AND THE PUBLIC WAY PERMIT PROCESS How it relates to Building Permits: > Fill out the attached check list with the Building Permit Application. If yes was answered to any of the questions then a "Public Way" permit is required. You can pick up an application at either Community Development, located at 75 South Frontage Road or Public Works, located at 1309 Elkhorn Drive. > Notice sign-offs for utility companies. ALL utilities must field verify (locate) respective utilities prior to signing application. Some utility companies require up to 48 hours notice to schedule a locate. > A construction traffic control/staging plan must be prepared on a separate sheet of paper. An approved site plan may also be used. This plan will show locations of all traffic control devices (signs, cones, etc.) and the work zone, (area of construction, staging, etc.). This plan will expire on November 1st and will need to be resubmitted for consideration for approval through the winter. Be aware that your resubmission for winter may be denied depending on the location of construction. > Sketch of work being performed must be submitted indicating dimensions (length, width and depth of work). This may be drawn on the traffic control plan or a site plan for the job. > Submit completed application to the Public Work's office for review. If required, locates will be scheduled for the Town of Vail electricians and irrigation crew. The locates take place in the morning, but may require up to 48 hours to perform. > The Public Work's Construction Inspector will review the application and approve or deny the permit. You will be contacted as to the status and any requirements that may be needed. Most permits are released within 48 hours of being received, but please allow up to one (1) week to process. > As soon as the permit is approved, the Building Department will be notified, allowing the "Building Permit" to be released. Please do not confuse the "Public Way Permit" with a "Building Permit". • NOTE: The above process is for work in a public way ONLY. Public Way Permits are valid only until November 15th. A new Public Way Permit is required each year if work is not complete. Re-application each November 15th does not mean an automatic renewal. I have read and understand the above. `/L1 a(ad /a Si ature i Date Signed F:/everyone/forms/bldperm5 ....c.r. :;(:.::,.,.. ..!. .:i.1::;:41 .4,...k.. iv. w•- TOWN OF SAIL DRAINAGE AND CULVERT INSPECTIONS ARE REQUIRED BY PUBLIC WORKS! Please read and check off each of the items below: ❑ The Town of Vail Building Department has developed the following procedures to ensure that new construction sites have adequately established proper drainage from building sites along and adjacent to Town of Vail roads or streets. ❑ The Town of Vail Public Works Department will be required to inspect and approve drainage adjacent to Town of Vail roads or streets and the installation of temporary or permanent culverts at access points from the road or street onto the construction site. Such approval must be obtained prior to any requests for inspection by the Town of Vail Building Department for footings, temporary electrical or any other inspection. Please call Leonard Sandoval at 479-2198 to request an inspection from the Public Works Department. Allow a minimum of 24 hour notice. a Also, the Town of Vail Public Works Department will be approving all final drainage and culvert installation with resulting road patching as necessary. Such approval must be obtained prior to any Final Certificate of Occupancy issuance. VA Agreed to by: /J/,v, / k '42u . Print`Name 1/4- 4-"--tJ Sig, ture Project Name: Date Signed: F:/everyone/forms/bldperm6 ask TOWN OF VAIL MATERIAL STORAGE AND CONSTRUCTION PARKING Please read and check off each of the items below. (Copies of complete text are available upon request) CODE 5-2-10: DEPOSITS ON PUBLIC WAYS PROHIBITED ❑ Unlawful deposits: Subject to subsection C thereof, it is unlawful for any person to litter, track or deposit, or cause to be littered, tracked or deposited, sand, gravel, rocks, mud, dirt, snow, ice, or any other debris or material upon any street, sidewalk, alley or public place, or any portion thereof. ❑ Notice; Abatement: The Director of Public Works may notify and require any person who violates or causes another to violate the provision of subsection A hereof, or who has in the Director's employment a person who violates or causes another to violate the same, top remove such sand, gravel, rocks, mud, dirt, snow, ice or any other debris or material within twenty four (24) hours after receipt of said notice by the Director of Public Works. In the event the person so notified does not comply with the notice within the period of time herein specified, the Director of Public Works, or other authorized agent, may cause any such sand, gravel, rocks, mud, dirt, snow, ice, debris or any other material to be removed . from any street or alley at the expense of the notified. ❑ Summons and Penalty: As an alternative to the notice for removal provided in subsection B above, any person who violates or causes another to violate the same, may be issued a summons to appear before the Municipal Court of the Town for said violations, and upon being found guilty of a violation hereunder be punished as provided in Section 1-4-1 of this code. ❑ Notice and Penalty: It is unlawful for any person to fail or refuse to comply with the notice of the Director of Public Works as provided in subsection B hereof, and any such person shall, in addition to payment of the expense of removal incurred by the Director of Public Works, as provided in subsection B hereof, upon being found guilty of a violation hereunder, be punishable as provided in Section 1-4-1 of this Code. (1997 Code: Ordinance 6 (1979). CODES 7-3A-1 AND 7-3A-3: PARKING OBSTRUCTING TRAFFIC &IMPOUNDMENT AUTHORIZED ❑ No person shall park any vehicle upon a street or at any other place within this Municipality in such a manner or under such conditions as to interfere with the free movement of vehicular traffic or proper street or highway maintenance. (Ord. 2(1968) § 1) ❑ Whenever any police officer finds a vehicle attended or unattended, standing upon any portion of a street or upon any place within this Municipality in such a manner as to constitute a violation of any section of this Article, or left unattended for a period of twenty four (24) hours or more and presumed to be abandoned under the conditions prescribed by Colorado Revised Statutes section 42-4-1102, as amended, the officer shall require the vehicle to be removed or cause it to be removed and placed in storage in the nearest garage or other place of safety designated or maintained by this Municipality, and the charges for towing and storage of such vehicle shall be charged to the owner of the vehicle in addition to a ten dollar ($10) impoundment charge. (Ord. 2(1968) § 3: Ord. 28(1981) § 1) I have read and will comply with the above code provisions: (OA�Ipul' /15 tcht,i S Print Nai .----- Signature Position or Relationship to Project: ���- Date Signed: et—,,?0,—C3/' F:/everyone/orms/bidperm7 Vail 2004 Vail Village and Lionshead Village Construction Hours Information Handout Problem Statement The Vail Village and Lionshead Village are invaluable assets to the community. Thousands of people come to Vail each year to sightsee, recreate, shop and to enjoy everything the Vail Valley has to offer. The community and merchants rely upon our guest to generate revenue. Our summer/winter guests expect a pleasant experience while in Vail. To insure that all of the proposed construction has as little negative impact on the community and on our guest as possible, the Town of Vail finds it imperative to create and implement the Vail Village and Lionshead Village Construction Hours Handout. It would be irresponsible for the Town of Vail, the Construction Contractors and the Merchants, to not actively participate to minimize the impact of construction in the Vail and Lionshead Village areas. New for 2004-2006 will be the Vail Village Streetscape Improvement Project. Work to include all utility related improvements, streetscape, drainage,snowmelt systems and landscaping. All Construction projects and/or remodels within the.Vail Village Core Area should contact Scott Bluhm Town of Vail Streetscape Coordinator at 970-477-3418 for further information. Givens The following givens are intended to provide the basic foundation by which construction will be completed in the Villages: • The public's health, safety and welfare shall be honored at all times, • Adequate pedestrian, loading/delivery, vehicle, and emergency vehicle access and circulation shall be maintained. • Roadways and pedestrian walkways shall be kept clean and,free of dirt and debris. • 'All"construction deliveries, equipment, tools and materials entering the Vail Village and Pedestrian areas must go through Check Point Charlie. All Lionshead construction activity must go`to the Vail Police Department for a parking permit.Do not use delivery zones for construction parking, refer to approved staging plan or make other arrangements for parking • The hours of Outside Construction Activity shall be as follows: - April 15—June 18 & September 7 - November 19, 7 a.m. until 7 p.m., seven days a week. June 18 thru September 10,work must end by 4:00 p.m. on Fridays. November 13—April 15, 2005 work allowed within daylight hours only. - Deliveries shall be restricted to the hours of 7 a.m. to 11:30 a.m. on Gore Creek Drive and 7 a.m. to 8:30 a.m. on Bridge Street. - Special Construction delivery permits must be requested in advance, from Public Works in conjunction with Code Enforcement at Checkpoint Charlie. - No construction activity shall occur on Saturday or Sunday between June 19 and September 5. s�rys Design Review Board 1 z � ACTION FORM Department of Community Development TOWN OF VAIL 75 South Frontage Road,Vail, Colorado 81657 tel: 970.479.2139 fax: 970.479.2452 web: www.ci.vail.co.us Project Name: DRB Number: DRB040142 Project Description: ADDITION OF BASEMENT WINDOW, INTERIOR REMODEL Participants: OWNER REYNARD, KENNETH B. 04/23/2004 Phone: 5505 S KRAMERIA ST GREENWOOD VILLAGE CO 80111 License: APPLICANT WAYNE HASKINS CONSTRUCTION I04/23/2004 Phone: 970-328-8000 P.O. BOX 1913 EAGLE, CO 81631 License: 593-B CONTRACTOR WAYNE HASKINS CONSTRUCTION I04/23/2004 Phone: 970-328-8000 P.O. BOX 1913 EAGLE, CO 81631 License: 593-B Project Address: 5040 MAIN GORE PL VAIL Location: 5040 MAIN GORE PLACE, UNIT D-3 Legal Description: Lot: Block: Subdivision: SUNDIAL Parcel Number: 210113105021 Comments: SEE CONDITIONS BOARD/STAFF ACTION Motion By: Action: STAFFAPR Second By: Vote: Date of Approval: 04/23/2004 Conditions: Cond: 8 (PLAN): No changes to these plans may be made without the written consent of Town of Vail staff and/or the appropriate review committee(s). Cond: 0 (PLAN): DRB approval does not constitute a permit for building. Please consult with Town of Vail Building personnel prior to construction activities. Cond: 201 DRB approval shall not become valid for 20 days following the date of approval. Cond: 202 Approval of this project shall lapse and become void one (1)year following the date of final approval, unless a building permit is issued and construction is commenced and is diligently pursued toward completion. Planner: Joe Suther DRB Fee Paid: $250.00 TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT 75 S. FRONTAGE ROAD VAIL, CO 81657 970-479-2138 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ELECTRICAL PERMIT Permit #: E04-0082 o1.( —C)GiG Job Address: 5040 MAIN GORE PL VAIL Status . . . : ISSUED Location • 5040 MAIN GORE PLACE Applied . . : 05/26/2004 Parcel No...: 210113105021 Issued . . : 06/03/2004 Project No : p>1ZT0 L(-G i(Z Expires . .: 11/30/2004 OWNER REYNARD, KENNETH B. 05/26/2004 Phone: 5505 S KRAMERIA ST GREENWOOD VILLAGE CO 80111 License: CONTRACTOR WAGNER ELECTRIC, INC. 05/26/2004 Phone: 970-949-6161 P.O. BOX 1620 AVON, CO 81620 License: 223-E APPLICANT WAGNER ELECTRIC, INC. 05/26/2004 Phone: 970-949-6161 P.O. BOX 1620 AVON, CO 81620 License: 223-E Desciption: COMPLETE ELEC 1'RICAL Valuation: $2,000.00 ********************************************************************* FEE SUMMARY ************************************************************ Electrical > $50.00 Total Calculated Fees--> $53.00 DRB Fee > $0.00 Additional Fees > $0.00 Investigation----> $0.00 Total Permit Fee > $53.00 Will Call- > $3.00 Payments > $53.00 TOTAL FEES--> $53.00 BALANCE DUE —> $0.00 Approvals: Item: 06000 ELECTRICAL DEPARTMENT 05/26/2004 JS Action: AP Item: 05600 FIRE DEPARTMENT CONDITIONS OF APPROVAL Cond: 12 (BLDG. ) : FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. ************************************************************************************************************************************************* DECLARATIONS I hereby acknowledge that I have read this application,filled out in full the information required,completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan,to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, Uniform Building Code and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADWANCF,>BY TELE IB,NE AT 479;2149 OR AT OUR OFFICE FROM 8:00 AM- 4 PM. s SIGNATURE OF OWNER OR I' RACTOR FOR HIMSELF AND OWNEF APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR uNsmeigia. Project#: les3C:rt lc 6-•,_AA. Building Permit #: • Electrical Permit #: 970-479-2149 (Inspections) TOWN Wig -- • - P - T P • 75 S.Frontage Rd. 1--"11W •T ir a , Vail, Colorado 516 , , Contact Ea,le County Assessors Office at 970-328-8640 or visit ww .ea -co , . m for Parcel# Parcel # (Required if no bldg. permit# is provided above) _ 0 41, . _ Job Name: ec- Job Address:,_ 119 "Ndo • _ I Legal Description Lot: Block: Filing: Subdivision: – gok. 3 Owners Name: • Address: I Phone: — • Engineer: Address: I Phone: Detailed description of work: Cocrq 4,q C Work Class: New ( ) Addition , ) Remodel .4. Repair ( ) Temp Power ( ) Other ( ) Work Type: Interio Exterior( ) Both ( ) Does an EHU exist at this location: Yes ( ) No ( ) Type or Ellcig.: Single-family ( ) Duplex( ) Multi-famlly)(Commercial ( ) Restaurant( ) Other( ) 41111171•111==iteM■1=1 No' of Existing Dwelling Units in this building: No. of Accommodation Units In this budding: -Azion•m=romi.ce Is this •errnit for a hot tub: Yes No Does a Fire Alarm Exist: Yes ( ) No ( Does a Fire Sprinkler System Exist: Yes ( ) No ( ) _ . COMPLETE SQ. FEET FOR NEW BUILDS and VALUATIONS FOR ALL OTHERS (Labor &Materials) AMOUNT OF SQ FT IN STRUCTURE. ao.a...=mmmmammgi. Z.QOCA c2 00 I CONTRACTOR INFORMATION Electrical Contractor: Town of Vail Reg. No.: Contact and Phone tes: _ • (-6 - IL' • _ _1k. q Lfq-Ce ( Contractor Signature,MMIniall AAik 111.` Maw Mr 11.111MMIRA.reli• ****** rtA-ei•n*anneR311***08111111**mnimkat*a*O1**FOR OFFICE USE oNLyAAA,AAA.A AA•AAAAAA******A*********** )?, 107,2r:ErrItTA..'n triirlet . v'; "1 "iffinKtiftigraffl GMerrIP:r.rer32.V BennettOrtgatiffittMathettigigdall 0 6-3 "pak F:feyeryonelfarmsielecparm .oui coi-moaT3 Jau2em Wd121 .000e 9e Rew 2 -d 66E176.1780LS TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT • 75 S. FRONTAGE ROAD VAIL, CO 81657 970-479-2138 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES PLUMBING PERMIT Permit #: PO4-0053 Job Address: 5040 MAIN GORE PL VAIL Status . . . : ISSUED Location • SUNDIAL UNIT D3 Applied . . : 05/14/2004 Parcel No...: 210113105021 Issued . . : 05/14/2004 Project No : ` nb — 227 Expires . .: 11/10/2004 OWNER REYNARD, KENNETH B. 05/14/2004 Phone: 5505 S KRAMERIA ST GREENWOOD VILLAGE CO 80111 License: CONTRACTOR SMITH MECHANICAL 05/14/2004 Phone: 970-328-1677 P.O. BOX 1125 EAGLE, CO 81631 License: 234-P APPLICANT SMITH MECHANICAL 05/14/2004 Phone: 970-328-1677 P.O. BOX 1125 EAGLE, CO 81631 License: 234-P Desciption: MOVE WATER HEATER AND LAUNDRY INTO BASEMENT ADD ONE BATH Valuation: $4,500.00 Fireplace Information:Restricted:?? #of Gas Appliances: ?? #of Gas Logs: ?? #of Wood Pallet: ?? ********************************************************************* FEE SUMMARY ************************************************************ Plumbing---> $75.00 Restuarant Plan Review—> $0.00 Total Calculated Fees---> $96.75 Plan Clieck---> $18.75 DRB Fee--------------> $0.00 Additional Fees—------> $0.00 Investigation-> $0.00 TOTAL FEES ---> $96.75 Total Permit Fee--------> $96.75 Will Call----> $3.00 Payments-----------> $96.75 BALANCE DUE----> $0.00 ************************************************************************************************************************************************* Item: 05100 BUILDING DEPARTMENT 05/14/2004 CDAVIS Action: APPR Item: 05600 FIRE DEPARTMENT CONDITION OF APPROVAL Cond: 12 (BLDG. ) : FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. ************************************************************************************************************************************************* DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan,to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, Uniform Building Code and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEP ONE AT 479-2149 OR AT OUR OFFICE FROM 8:00 AM-4 PM. SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNEF • TOWN OF VAIL, COLORADO Statement ******************************************************************************************** Statement Number: R040005832 Amount: $96.75 05/14/200402:40 PM Payment Method: Check Init: KF Notation: Permit No: PO4-0053 Type: PLUMBING PERMIT Parcel No: 210113105021 Site Address: 5040 MAIN GORE PL VAIL Location: SUNDIAL UNIT D3 Total Fees: $96.75 This Payment: $96.75 Total ALL Pmts: $96.75 Balance: $0.00 ******************************************************************************************** ACCOUNT ITEM LIST: Account Code Description Current Pmts PF 00100003112300 PLAN CHECK FEES 18.75 PP 00100003111100 PLUMBING PERMIT FEES 75.00 WC 00100003112800 WILL CALL INSPECTION FEE 3.00 APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UNS D ::- Project #: 0 �dl o2-c)--- 7 y Building Permit #: `' 0'/ CO 76 Plumbing Permit #:'p(\ / \1 5 3 ►� ,__f 970-479-2149 (Inspections) TOWN OF VAIL TOWN OF VAIL PLUMBING PERMIT APPLICATION 75 S. Frontage Rd. Vail, Colorado 81657 CONTRACTOR INFORMATION Plumbing Contractor: Town of Vail Reg. No.: Contact and Phone #'s: Si,irig Ale-c te-,/.77((4L .:/ : -/ g ( /5"-pc, D %7/ /783/ X677 E-Mail Address: j Contractor Signature: COMPLETE VALUATION FOR PLUMBING PERMIT (Labor & Materials) PLUMBING: $ / �'�� Contact Ea le County Assessors Office at 970-328-8640 or visit www.eagle-county.com for Parcel# Parcel # /' o1L 31o5o021 Job Name: '_ Job Address: ,? _ r i`z i �-t e 7�,1 t ',l7 �'�"ij z o di-xv1- '.�1 f cr>, /='L. 1 . Legal Description Lot: Block: Filing: Subdivision: Owners Name: , / Address: Phone: Engineer: Address: Phone: • ..t Detailed description of,work: `4z6,1,,'c_ i ilz- z ,- Vie' G `"°1-r L"1 rs: 73 /4-9/) 424 r-4 1- 1 Work Class: New ( ) Addition (° ) Alteration ((} Repair ( ) Other ( ) Type of Bldg.: Single-family(v) Duplex( ) Multi-family( ) Commercial ( ) Restaurant( ) Other( ) No. of Existing Dwelling Units in this building: 6 No. of Accommodation Units in this building: Is this a conversion from a wood burning fireplace to an EPA Phase II device? Yes ( ) No ( ****XY 3:7Y 71YX*YY*XY.X,1XXY.XY.Y.XXX**YXYYYYYFOR OFFICE USE ONLY*Y :*Y]CXYYYY Y'**YXY.XY.XY.Y.**YX*YY:*::Y]FYYYY Other Fees: Date Rec: -•: DRB Fees: Acc- . ; Planner Sign-off: 4 \\Vail\data\cdcv\FORMS\PERMITS\PLMBPERM.DOC 07/26/2002 4.4.4 ,4444444444,444,ttot -44,4 *fl 4.44,144 3,t'a.4C4 PEI6,6 666, 5640, 61,„. 6'64_6\1 D1EEIIIIL REFAILTE, Er.3 .4411v4).f. 46446 64.40 04)4_ .444.4414- 4,54.44144.14S, Vt,444ti, .,!f.t.Sp.#4444 444.4.:44, H.4,S441.0,4.S fg,,,076 ef;ritractor, C01,\ISITIt"Ri,„,i1,01,1aN Pflonf,,,r Descriptn: ,A012,IfflON eASEMENT R.O.TIIIM TO SS7 Itzu-i; '30 M.. LID-1.16.inDi Tim,D; Aug IIILA3101LE,L.I3*-.116611I13.11617,131,::. Pc6-66,E: 637461763 it4UC A..0siwTt,,,,,i0 DriiIE013 :item Comuneoi4,4 ',414i,,i064,,i 0-4(6.4NI.,;;6IIkhiIIITRII,i1:',v1I'EL 0(5E6', DOE ,CIthiiER 4,-tt-tt .4440 ttot'tt'tE4.,,, 444-444.1,4 itiNS 44qt Rent RFT DEPT: Ofa?2'!210,4 APPIRCR:IED "TO DE LIFTED TED PRIE64'ILI7.C4_,ILARAIT,CIIII ICNIERAGE 06116104 60 aLo-G-irv6oitior, c6.08,704 Action: OP APP.ROVEC 444 44444444,4444t4V"". 424,..t4t4; o,.:5';;PPOVELt eti)1.3-Misf...'6 f”.„0113,Ft:n711 77,7 rrr 77777.777,77 7.7,7 r77.7',7,771,77_7v77,77,77(7:77777 77(7,7 22 RE,:E:'T 1 31 Run : 2 2'7 17,71