HomeMy WebLinkAboutLIONS RIDGE FILING 3 BLOCK 3 LOT 1 LEGALTOWN OF VAIL
75 S. FRONTAGE ROAD
VAIL, CO 81657
970-479-2138
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES Cpmr*of\
DEPARTMENT OF COMMUNITY DEVELOPMENT
r*rrf \ 3\k 3
L-^..r,ra.-%3::\
S0.00 Total Calculated F€es-> S2,Oa2-29
$0.00 TOTAL FEES------------- > i2,0r2.29 Total Permit Fee-----> $2,oL2.29
ADD/ALT COMM BUILD PERMT Permit # 806-0162
Project # PRI064204
Job Address: 1881 LIONS RIDGE LP VAIL Status . . . : ISSUED
Location.......: VAI POINT TOWNHOMES POOL Applied .. . : Ml23l2N6
ParcelNo....: 210312207W1 Issued. . . : 0810212006
Expires.....: 0ll29l2CfJ7
OIiINER O HARA, THOMAS W. & LAIIRA K.O6/23/2006
22674 ANASAZI WAY
GOLDEN
co 80401
AppLrcAlirr DEIWER Pools & sPAs 06/23/2006 Phone: (303) 435-3436
PO BOX 881
LAFAYETTE
coLoRADO 80026
License: 851-B
CoNTRACTOR DENyER POOTTS & SPAS 06/23/2006 Phone: (303) 435-3435
PO BOX 88r_
I,AFAYETTE
coLoRADO 80025
I-,icense: 8 51-B
Desciption:
COMMON ELEMENT-REPLACE CONCRETE, RETAINING WALLS, FENCE AND
REPLASTER POOL
Occupancy:
Type Construction:
Valuation: $139,365.00 Revision Valuation: $0.00 Add Sq Ft:
Building---> $L,211 .75 Restuannt Plan Review- >
Plan Check-- > 3791.54 Recreation Fee-------->go. oo Additional Fees------ >
Investigation- >
Will Call--- >$3.00
BAI-ANCE DUE--------- >
Approvals:
ftems 051-00 BUIITDING DEPARTMENI
o7 /L9/2oo6 cgunion Action: AP
ftem: 05400 PI-^ANNING DEPARTMENr
06/23/2006 warren Action: AP A bond for $3,000
has been recieved which will be good for a period of five
years for possible installation of a landscape drainge
catch basin connection to the storm sewer system if the
Tovrn Engineer finds it to be necessary.
Item: 05600 FIRE DEPARTMENT
o7 /1-8/2006 JJF. Action: AP Gate must comply
with IBC 3109.4.L.7 (2oo2) .
Item: 05500 PUBLIC WORKS
s0.00
$2 , OL2 .29
90. 00
06/27/2006 gc Action: AP
++*****|it+t++**!t**tli+***+*{***t *|l*ifiir**i+t****,r.i.a+t*****+tt*i.t *iti ttd'ir.*:}i!*+trt++ili.*i*,1,}**
See the Conditions section of this Document for any conditions that may apply to this permit.
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot
plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply
with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design
review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto.
REQI-TESTS TOR INSPECIION SIIALL BE MADE TWENTY.FOT,'R HOIJRS IN N)VANCE AT OLIR OFIICE FROM 8:00
AM-4PM.
SIGNATURE OF O oR co CTOR FOR HIMSELF AND OWNET
*!*,t***:**i!*****:rt*r<*****.***!*.{.*x.**'t!****trtr***i{*i(****!*i(**t **t!*t(*t(**.********************t3*rl****s*********,k{.t ***
CONDITIONS OF APPROVAL
Permit #: 806-0162 as of 08-02-2006 Status: ISSUED
*,F'l,|c*****'|tt***,f,ttt***:******:t******,F*:**:'t******{t****'(**********,It*,F,f{.i.**,t*,******,**4(*{.*{.****.:|t{.:ti*dl{.*:l.
Permit Type: ADD/ALT COMM BUILD PERMT Applied: 0612312006
Applicant: DENVER POOLS & SPAS Issued: 08/02/2N6
(303) 435-3436 To Expire: 0ll29l200'l
Job Address: 1881 LIONS RIDGE LP VAIL
Location: VAI POINT TOWNHOMES POOL
Parcel No: 210312207W1
Description:
COMMON ELEMENT-REPLACE CONCRETE. RETAINING WALLS. FENCE AND
REPLASTER POOL
**** **********t<:t(*****{<****!t*****+*!*{.***:rt*,t :}*+{.!&COnditions. **t!*.****<********,k*******{.:t****4c*4c'*********d<*t< *{< *
Cond: I
(FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY
WORK CAN BE STARTED.
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FoR CODE
COMPLIANCE.
Cond: CON0008285
SWIMMING POOL ENCLOSURE FENCE SHALL COMPLY WITH IBC 3IO9
** * ** {. '* * * * * ***{.********{.* * * * * + * * * * + + * * * * * *t}**************'N.**********r. {. * *****{.**:r* *** * * * *+** *
TOWNOF VAIL, COLORADO Statement
* * * * ** * * * * * + + * * * * * + * * * * * + * * * * * * + * *****+** * * * * * * ** * * *:t'*,i,1**** * 't 't +:t :1.:1.****{. {.* *1.:1.:1.:1.:1.:1.:1.{.*****,1.**{.
i2,0L2.29 08/02/200503:56 PM
Init: DDG
Nolation: VaiI Point TH
Statement Number: R050001137 Amounts r
Pa)menE. Method: Check
Assoc 1-3 24
s2 , oa2 .29
*********************************'i***********:i**********:t:t.t****.1.'1.{t,1.**{.*:1.t * * *:i *:1.
'lt '1.
{. * *,1. {. d. {. * * * t
Perrnit No:
Parcel No:
Site Address :
L,Ocation:
This Payment:
ACCOUNT ITEM LIST:
Account Code
BP 0010000311r.100
PF 00r.00003 r-123 00
wc 001_00003112800
BUTLDING PERMIT FEES
PI,,AN CHECK FEES
WILL CAII, TNSPECTION FEE
fiz , OL2 .29
#2 , 0L2 .29
$0.00
Current Pmts
L,2!7 .75
t>L.5+
3 .00
805-0r_62 T\pe: ADD/ALT COMM BUITD PERMT
2103-122-0700-1-
1881 LIONS RIDGE LP VAIIJ
VAT POIN:T TOWNHOMES POOL
TotaL Fees:
Total ALL, Pmts :
Balance :
DescriDtion
iiCi:'o7eK zov. _,:db4 MPLETE OR U
Project #:
TOWN
Separate Permits are required for electrical, plumbing, mechanical, etc,l
75 S. Frontage Rd.
Vail, Colorado 81657
CONTRACTOR INFORMATION
o[ ofti,ro 7 oshlt 7 \71
COMPLETE VALUATIONS FOR BUILDING PERMIT Labor & Materials
BUILDING: $ELECTRICAL: $OTHER: $
PLUMBING:$MECHANICAL:$rorAL:$ | 3q jb5,0l
\
\t
For Parcel # C
** TffiFoR oFFIcE USE oNLY
\
\I
i
\
\t
I
i
JUN 2006
tror Parcel # Contact Ea,q,E CounU Assessors
Parc,pl,#I l03 llI 01 co \
Job Name:fAi ftin+Tc,*,.,ho,"trr JobAddress: lryt L io'r sridtt'p Lrtp
Legal Description Lot:Block:Filing:Subdivision:
Owners Name:Address:Phone:
ArchitecUDesigner:Address:Phone:
Ensineer: l( [ n Address: f,, f\., Lqu lr,u\ l tbsi;ll Phone611o q\q T)11
DetailFd descrip{ion of worf:*ri"'fr"
dli"|i" "' ?)no.*r, f?.tc,,".., t-a I l g, kn"._. f?*(lq l*- fo, I
ileu
Wcf.f Type: Interior( ) Exterior \y' aotnl 1 Does an EHU exist at this location: Yes ( ) No ( )
Typl,eofBldg.: Single-family( ) Two-family( ) Multi-family( ) Commercial ( ) Restaurant( ) Other( lnytU llrVSOf
No,. of Existing Dwelling Units in this building:No. of Accommodation Units in this buildino:
No/ fype of Fireplaces Existing: Gas Appliances ( ) Gas Loqs ( ) Wood/Pellet ( ) Wood Burninq (
ruoflvp" of Fireplaces Proposed: Gas Appliances ( ) Gas Loos ( ) Wood/Pellet ( ) Wood Burninq (NOT ALLOWED)
Does a Fire Alarm Exist: Yes ( ) No (Does a Fire Sprinkler System Exist: Yes ( ) No (
02109/200s F:\cdev\FORMS\Permits\Building\buildingJrermit. DOC Page 1 of 16
cca,nft ,f{lY c€t E LoFr€r{I
Design Review $oard
ACTTOI{ FORlrt
Department of community Development
75 South Frontage Road, tlaif, Colorado 81657
tef: 970.479.2139 fax. 970.479.2452
web: wwrv.vailgov"com
ProjectName: VAIL POINTTH POOL
Project Description:
Project Address: 1881 LIONS RIDGE LP VAIL
VAI POINT TOWNHOMES POOL
DRB Number: DR8060183
Location:
RNAL APPROVAL FOR A COMMON ELEMENT-ALTEMTIONS TO POOL AREA. INCREASE PATIO
AREA, IMPROVE PERIMETER FENCE; IMPROVE DRAINAGE AND ADD LANDSCAPE
Pafticipants:
owNER O HAM, THOMAS W. & LAUM K.Os/23/2006
22674 ANASAZI WAY
@tDEN
co 80401
APPUCANT NEILS-LUNCEFORD INC. 0512312006 Phone: (970) 468-034t)
PO BOX ZL30 | 740 BLUE RIVER PKtll/Y.
SILVERTHORNE
co 80498
License: 297-A
Legal ltesc]iption: Lot: l Block: 3 Subdivision: VAIL POINTTOWNHOMES
ParcelNumber: 2103-122-0700-1
Comments! See Conditions
Motaon By:
S€cond By:
Vote:
Conditions:
BOARD/STAFF ACIION
ACtiON: STAFFAPR
Date of Approvall' 06/2L12006
Cond: 8
(P|-AN): No changes to these plans may be made without the written consent of Town of
Vail staff and/or the appropriate review committee(s).
Cond: 0
(PIIN): DRB approval does not constitute a permit for building. Please consult with
Town of Vail Building personnel prior to construction activities.
Cond: 201
DRB approval shall not become valid for 20 days following the date of approval.
Cond: 202
Approval of this project shall lapse and become void one (1) year following the date
of final approval, unless a building permit is issued and construction is commenced
and is diligently pursued toward completion,
Cond: CON0008158
The applicant shall provide a Developer Improvement Agreement Bond in the amount of
$3,000 for a period of 5 years from the date ofsubmital ofthe bond in conjunction
with building permits submittals. The bond shall serve to provide for a new
landscape drain to @nnect into the existing Type 13C inlet in the event it is
determined by the Town Engineer that an unacceptable quantity of water is running
over the curb into the street to enter the stormwater system, After a period of fle
years if the Town Engineer determines there is no need for the new landscape drain
the $3,000 fee will be refunded.
Planner: Warren Campbell DRB Fee Paid: $250.00
h3 0 i _:4I I F;BC;
?:;;E E
S:E:iE
Pi;Fi I
J
o q)
U)
o
CL
o
.=
U)
=o
I
tl
=
ai
o o
U)
-'o
TL
(o
u\
3;.!d fi€
1rd
^i{
rf;g$
;u
o
c
q)
I e E=.= F:ET9;ij E >od 0 =Is €o","e oE;j 8iI F
=oO l-
Ei H $s ao.= 6 > o 'rJ _o
M
v 14
Ea
o)L
'=o .= '-a5 aA
=b 8g
6 -8' ,E
fre* H=,EE F 5 Fi+9o
r.E E f S gt
I € B F E-'E e
o o)E o at a: o)
9E EA ao
FF
'=
t-
L o
o
E
Q)o-
a
o _c
:l
o
!-
+j
o)
a
q)
o
.=
3
!o oE >.=
Q}
6o
=o
'FY
6E
8B
Y o o o
!o a o o-o t-
o_
b
=o
o o
O.|r\ o
5o Ocr,(- .c Ffr icx O I.U
o o (o+,
ocP€P.oob AJH.(l-L ri;\/'v lt,coo Xfo-o-\t, :_-tn ,y tL 0-o14 -r 96sg o_zoo
!
o)
at\
o
t-
t,'
I x
t:
iE
4_g
N Lo i F'-'
Hg
F6e
ffis ff^E:3'*=o
E&E>-r*
€E€eY3
=Et a==L tr-
o.i"dj}
u*$$9
+
J t-'l 8l c (!r 3l
=o
o q)
6
E z (l)
U)c
.9 o o)
CL o C
a o,
,(6 a
CD
.g TI '5 gl
., c.i
q)!cq)o= q)>i: o
(,_o w
t..t xtro -= c /t\ \J ;+. o o >";-\- (tr ;(old_;oo ii 9l u)E EE't 9 3E€\., /.\
_ \1,/ a\E PEO g FEP O FdH
o-
'o
!-
q)
(!
o
o
o u
e E g r
o)-
=o o
o
o 6?
s'F Nt E9
!r-oo Eo Uo)oE
8H
Ec o'-
>g ON t€
o
-o
o
tz
o o
o
(L
_#K
a-
=)oo
(t z
5 L
6urplrnq 6urlsrxe
.o @+'cE sn o o o ii .^
''|l\\Y ; cn'G ;'o.q P (gi; o ?p ie.= x e;T .9 E "' I +'i2to
-(oPO a 9.^! o kE-9iio*, :O'o F; c l?5 x
P'A* g E E T 'E o 5E o'E d q o)c! E c .o (u=q: Ero0 (L E<e <E--o
t-q)E
o
-o
cT)
.c
.E
G 6>
-3 aio
i5 .>
EE !Pa r.r c ()G
-oE .E=
o o ,o
t=
o o 3
o
o c
o*
EO oo EE .i;O
=g O-r -od e8 I &l
6 as IIEE
E o.9 ggr
o
o_o {) *-.a+
f r.,O
!s v, o)9'o l-T o=
Er
Eb)
;i=n3
!
_9 (!
a
.c
c)
-o o
o o c o IL
(5
0)
o
C)Ior o-.E U)C 9fl.6 8*
€ b!x! E
*FB *aPP
:(o(tr
i-a-n+
.f '. a,Cl
.i'l*4+
Ojil,t
,rtg,ra+
.arq/-q
.a)O-alq
a€
l!,P- ;.o a= c E qA Sq + fi9c 2a Er -0,
3 Es {eF #H $3 E#
P E5 EN E5 EA E:g g* F?.'. gs $+ a+UICL(LTLIL0.
l-tso oo tto Ct-
=€P,A c(E of
9$
E-3
Nq);x y!o
I'
I
I
-,l cl ol ol ol rl
ol o.l
GI ol al 1)l si
_51
i'3 e E :3{ !
_€;ds€F:;'$E
;EFelH
PpgFi i
c!
J
o o
a
c (It
TL
o o-
(U o a o.^c+(uP
Jui
b
tl €
id
o o
@
+,c
o
o-
(u
liIFr
cf)
J
o c o
€c o
O
o)
'.=oB '=t
LU ,o
+,c
o (L
$
al.a rrr (ar\) ar9.--ara (rY.t)
dtd Jo 'rllt'run n-6ra (oaa)
z-sl :tlrrs eg.at oJ .iY
f\v Ytvuo | *ac a.E' lot !.a
OJ 'TIVA
d00'I uculu sNon I88I
STTV,td )NINIVJUU JNIOd TIVA
|l l l|t d
HEI I d
,ilf ol
$il: H
9 6 .o
Fe
#E
F lrl
Fe
HH
EP
PP
oo.fiq
frr
<9
6?
AE @vl
9ut F z<
frfr o5
1{
3e
oE
2n
FE lrl fi
ld";Er3
;3F E2=ooo zcro
= =
E E r E
=
Ei i
=ee
: E a -$ E pE E F EE il B fr F ; ; ; H g e rH - p p E E E E g i E 3 - r 3 f : r s : e>s
x
.;.?-.*Ef d.i ..}-.r - .<)z;6 ,.i.: s.tr>g + a r .ti
l i r d ? + E s g t B k 3 H 3 ; 3E 3.,5 d g g 6 6 $ i d E 3 * X ; ; gE dB*es E r F r E r s d g ; t H Efr=zi _4,
C. --.)Fr lrl ffI .' E i
== t i . I av o u E E i, r,z I F ! E* ,- =E E i. "'io: ,. z z E 4- =gE*2_* Els 3 f.lreh - H E
=!gEli=EEi=,sE;E=:ss;sEFFc$Hug;Ef;
s3*s:ig""'isEuEgE;EEE,,c
=s5ie i6 F r,.r o
'FF ; i zQ =h-t 2 E 8
gEEgsE;u=u-guxE**c=Es=gEEEEssrix;*E;s$;ss*gH3g;FsisiFrs
5*,E
g*
?-.* "....-.,- !l
{, +1+... * r+*+ f,l
r.l
d q
;l trl
H u
F
2
z.
tr
t!
(v:
rn
cn
iri'i'i!iiiili
iiiii:iiiiiiii
isiiiiiiiiiii!
i:ii;*triiiiii,
5 &..9o
3,i cnl *;t + ase
E si: rl+
::i i;Ef
-c r; F i3!
E ;; E Eg;-E
i €;:i Eiii
i ::;i t;ie
; :eil ii;;
: -u:i; r;: Et;
. :J ; i .i r 5 r i " ".- 5 .iH;rjl;eli;
i,'1;"'.r1t! i::l g
!'1 ".t: j a. lr'r-.o .,ll .. I ,:.' -i.i.;-
. t..'.i. : ; >' I :-ii ,
rliilrE; !*i!
ii il
''I
()
.rl
Itt ttl
:*9
i ;i* lii;+i s',r i i;;Ee'+riii;ii; I
;Eg;Eii:;:: iii; i
iii iiiEii iiii; iii:i g,
;;i ifiiff e;!if is:Ei I:
s iiuiiiiiiiffi;s,iilii H ii
f*******a*
d!d-
.i
:ci
o..R
a!N
''' - ?'. )'-
:#E dol
3;
$ s;
>r,. . 5 ?i r:El .E u [b E:
EE
' u!*
a:ElEa:
; lE'r; f i iiiS:''f iis,Ri;g
sF _l
d(5 < (ad < o
q
I q
I
(_,
4
E
a
€5
s
.o !-gE :i€!
-09 --€*!g 5 Ei€
e€E
FB aB
:;E;
; !Et E- d9 ;s58
.t. d'
.9d I B'.t:
! 9.r 9E
E E<
'bR P
E€;
*.;+
9H i 6- a
FX;
'g: r *ol-
;E*
i:3-
EEE i ;43 ;*: li
.!= ic
6'-tE !E=r &azt EFc;
ESrS e! 6g (')Poi
.E
5
b
.
I
.s
3.
b.
&.
a.
e.
6:
at
?:
RB xt
tE
58
3b
iE
-!5
lE 9o
>2
€E
Ri
2Z
9E
=5
i6
t8
E.E
i€
EE
dd
I
I
e
.o
<)o
o
.9
o
(,
I
=
-l /t
ol
ad ol
l
arl it
4,
5 a d
"l
1 {
E
a .l
zt (.'d lrl ct -ci
ir-{ra (rc) trrr{'. cr])
aroa ('c tortlrn 6al-ata (oat)a-oir:UfE t6e|a Oo .|vA
f\Y Ylvllo | 6.|t zzst to€ !d
uot..p puo 6u|{.uttE tdnr.tui.
'cNr srNvl'rns|{c)c uftDl
OJ .TIVA
dool acqlu sNoI'I I88I
STTYI,I CNINIVTSU JNIOd IIVA
J=lld
idi' f,
fti*
t(r) E
6a
fr,882
n=#=n6rA
gFF;
Etaa jrHo
:FfrF
=42:f;E=I
IE*E ILco F a lrJ trl ..< g 9E
lrJ trl = f 5ff9fr z.a.nE
)
(
a'
o J
!J
,,,m\
/t--\
I tFl
I 'rl tT,)\. ,-\ ./'\trl/\., Y_ -2',
-I zl-4rv
_LJ u-Z
I
I
o-l
il
J
=
zl
l_-
l)
X Ltl i
\:
Lt-
. LIJ
..4
tl
IJ I
O n =LrJ z.
F
a E trl
Ll-
trJ E
z.
,-i'
z
tr O l E F a z.o oa
(j)()z.Z F=a
=E rJo
I t'l
<AO E. U)trl l.! F rIJO Ez
z 9b
o01-z l oa t!()z
E5 o l.r-
=(n o
trz
LU7 zd HO a\HZ
H *' xH fi
==O FO'
trJ u b-
ta t,i V. ^. u6 <f,i E=i2A H o trJ 1z-
= P* ts
tHe6)
trF t- );r oo [ =2. 9E aUa5=JaO t qg u-b
= Q= *t'E =; P-k tr:j ox () Z4 z\)e 8* 8E
o
UJ
E.
<t2
1Nt J- UJ(,m-=. 16 d ;E
= -t?\.., < O
=X E g.-,-
F UJ-6 oo5
22t e2ffi fr t.2
14 \)Z
r! o*t! t_6 ??
F rrr r_1-A
= trx 3i O< .^ .t!= t-
lrJ ul Y o-
PF 3ts (J (-) I!F 6a d+
(JO C)-
Lr- r, Z. j-
t,'.t oO F<
-'l 2b Y2
,,'\l \r l-zl s* 3a
<l HF p8
dl - c,j
Z
J
rL
J J
=O Z
Z
F
hJ t
I
o8
dN
=
IL
I
t!
I I | '--,,c ,il-_.:-_$::
ro+
ar!-.at &vl)
&t-t.a (6r) aalr-nra odl,clo Gl Lt:nun 5a-ata (caat
t-Gr lrn3 tl|tr 0o in tw ttvllo I F,a ztt taa ud
ral-p po lurr.'aCr, tDeFrut.
"cM 'au{vr1iEroc rol
oc "Irva
doo'I scqru sNoIT rsSr
STTVII. CNINIVIIU INIOd IIVA #J, $
co*
t(J);
r,0
ui
O a
v.
LrJ tL
z <tr xil -z (r(-,Pz.I r.!
>a e-J Lro o_a
F.i
=I i"=I
@..
= ;A 66 2 6
oGl { o
*.d E *16 a I
SF R O
xci
n,O
3.o(o
Ro
@
@
N
e.o -
z
o
+
!(o
@
#
I
io rh
a rtr
FF -o J i-km
*d td -o ?\r z \o o ffiVt^"
YA
X^V,'W^V,
'Ntn ,,9-,c l(Yfi .0-.9
a *N
@
-at I ()z
o-x
trJ
t x e
@
rJ)
5
$
x $x *J
F z o
IY lrl (L
z <tr
62
ao lrz Irr >a EJ
trJ O (L(,
N
E o T
F z
XF
o(D
RdE
ftF
:(o
@
F E
trJ
o io :E
a
@
Nl
e.
I
#z o ()
o io +
a
!L L]J
J i-
*d
UJ
?\z \R
E
UJ
lrJ z_:96 E lrl <z O(r F LrJ (/')o-
9-.2
--li"xd
ato
E.AN -t)
So
:rr N
@
-o -o z
o-x
lrJ
s x o
@
lO
=+
x +x j
F z o
C)
u lrJ t!z-:9d E r!<z O(r FUJ (/l(L
'Ntn ,.9-.t 1(vn p-.c
9OS5-ar6 (fof) /lsr-6|6 (xvr)
gZrO! Ot rortun (6f6-6t6 (016)
a-Ogr frns AE9r3 Of, ]yA
l^v Yivrro i 3f99 aagr xo€ o d
v6'..p puo 6u'r.r!'6u. tornl5nir.
cN' s.lNv.l]nsNor nu>l
OJ "IIVA
dOO'I UCOIU SNOI] ISBI
S'I'IVI,I CNINIVIUU TNIOd 'IIVA
It .l
:lrl I S -l>l I
a l- ol
EiE ; Fl
+I
o
rO o
ID o
O
c!
z,n>-I
JJE r.*.+ :n,ljf,
#_,
t-z tE< F <H> c: 7, L ii 3= K = F E , -: ; P Z .. 4 ur o
J, fo' o o i !g ' = i C
E-
^C:'',1: l5 *; i -S 1 .o - -<22axu1 = u: E:UaE
EIEE=E;EE!=,=s;c::x!;EEffi Fig;r;;F;;**E3EIE;silgli:irEsE',E
cl
4l
;1-,s,r,.DF.@or:=il*+++*+++*I|(ll
1l
El::sss**ss g
s_*******_ gl
LI gl
d I fl
2 )x
*"S
[u*up eilc;F a =. --5 .; a o 5 = ;=l oF i ^- z=ZZz4 t ! 3
=
aE : g a "F ; ; ; p F F p p e * s ; ; ; H aF,iE -3 F ! : g i : i E E * i ! s ; ; i : e >S
@
I cn >ci
o
.9
€
.9
o,
I
t
3
a oi
d s
J J
-l
z
zl <l
'l
zl ol 'l J -l
1
dl
!,-l
=l EI
..1
zl q 4
$
\,
a
a
8
CJO
*Y F
= qH =- a a, 8? >- tr LIJ 1q E :: -_, .4 z i H a -F? : * ,V A.-' 6 - F ;m :;6- i" - o> -aY*) * --zi dzzi, 1r. .- [ g9i ;u -6iEHi i= =z = tQ E >.i, sfi o a "--s-"i?,' e2 ,1.2idi'_.";==t5:;;-- 3 e 3956iee35F= ?\ =' vo)
i : :'s ? E i C 6 I =
F F 4 ; q g 6 ? ! e 3 g ? ; I F F H ; 6 e 5, ? ! E d ;e iz"=r,Eit7; - q g i i E F i ; E E :,(Joo=o(Io<J.)<F
? ? ? o- i i r c a ; u s H f; 3 g 5 E I E : d g g 6 6 E E E E 3 E E 3 * ; E H i t $ 3 ; : F 3 E p 3 3 E ; I + g IEZZ=A
ozF\A ,^ < q>g 2 o > !
5 d 6 5 6 g 3 : E E x E E I ; H E d d$o$ i : F : E F s d 6 ; I H H 4=22.4
liii fii I iiliilili
lii ;iii
s,
oq
xAqo
>- E o :i'2 ' 3 ::E $ lrE =! i 6.; -,U
:! i Be"s: : i;!a &s ob =
a
=
b" 6 ; -. ':sB ! E50..
- 9 !o P; T ;.:P
9t oFUo !e:^5 :;:.-E
Eaei :e:;
P'l ls 1., c ioa,; .leY!€3:: Ei.g
o,g!6 !3-o_
'^r'"-::ilpiiE:i
itg=^--! o-6ur E o:l3;E;sii"*s Ju:g*;;o*€ $
dEiesE;steF
H:€i srE s;rl
''1 !Ei l.;g!il qii:I-E9e._3 _J=!oi.ei y- 8.,
El $liaEis!:!g,i-'X:3i.s;Xi
d
t
.g
{,
.€
e
€
6
E
a
L-t a !.{ .o ae i.
zlc d=qn
Zt-tr
' ;o - 9 a
iiiiiiliii;iiiiillii.
ilE'gi ii!!ilii;[ ;iili !:'.,*=
iii iilEii iiiii iriii i ;lii i i i,
iii iiilii iiiii iliii il!;ii ii i* !i
s i;; ii;i#t:ji;; ;*ir g afial;iil,iii;Fii;
H'i'*sE;a;igftiiCa;i:r; fl !ffig!!j:ll!:::::i:do. d_ fl.-::--
3 6 .U'
Fz
e-F
p LtJ
He
_O- g
A-6
?a_o=eg
oo'fia
frr
<9
zu,Op
n5 ix o-tq 6di
9w
z.<oz.
AF o5
-1
(
*e
otr
7-n < lrl FZ
u9 -ftg Er6
;3E Fz2 ooo zoc)
1l\d L9:t0:9 gOOZtOZtg '6irnp ClaS-lS-91.669616u;4oM-S\lleM l€U ld llen OL-SOS6\HOftCA ot'f
rras-ta6 (rYJ)
9OO6-fa6 (COa) atCr-6r6 (rYt)
g,lm or 'r€rr]rr1 r6c5-5t5 (016)
Z-OCI lnaE Algra Of, 'tr
IAY YrYuo f 9fl9 zlsr ro€ od
u6'.cp puo 6utr..!!6u. roinr5^)I.
'.Nr 'srNvrlnsNoc wux
OJ .'IIVA
dOO'I SCOIU SNOI'I I88I
S'ITVil CNINIVJSU JNIOd -IIVA
Il J
'lsl I H .' t; .l
FiE; Fl
n) i \tg\3
Th I , \J) I
6(n
f;TF3
fi2?;=a6+7
=;86
fr=r-=,A jr-Hg
<E <=
;flFF z=-u
==?"ie f,'?i-
XBoe r*o:o F rr LrJ lrJ ..=gE lrjl!=l 5trgs zauE
l
o_
F
j
__J
=(,z
a t
t.
L!I
O a
Z
0_
_l I
=
O Z
Z
F
hJ E
[]
E
z
F
a v
L!
t
z
.-i
z.
F
f a F ln z
o ..:
(.) (J
=z F=a
=E rJO
a) L!
AO ta
h5 tz
i1 0 3o
3z^E:ro o2 k ,,r zY, o M rYP z <A* r
LlJ a o q
Cn- L! (J z
az x I r,t) :l F<{9 U
=t-11 llJ
^t! ii F z
=>\ a') trl 7 zo Z"HO On' n zfioZ
|; Ltr *z-
=- H Xfi \)z z ^r-,.l rrr r]LJ (J t-U tr.l F [J ?? H bF c)F z *'t 0."3 3a tc
=
= 2! E Qr+ )'o= = 9* lcn H trfi 6 *b >a
g.t So E tr^ z\3 ,i--7 J< (v t- .,'
= L!- :-i ala\ <-\J .r- llJ == ,-\ LrJ O (J- O_ z-.2. jO -7L .^ Y,^ ==h =k \ "i; 6
A iz = dz LrN
',' L- i L! i -t'l
*
=ob2=2bv =x=a=iF'": 93 9 3i 3E
a l I F
z
_l L
z
F
O .z
a F z
:
z
F
o z l o
L!F
u (J z
L!-
il a
\JI F ZI l>
-l
l.!z.-l J <l r-!
rl
o-l r.)st (o f-
--!z- l-4u I r-r nz
o
o-
I
Ld
Wd 0z:90:9 goozt}zlg '6,up'Nvta-zs-91,g69g16ur1roM-s\leM lou ld llen o l-eogdtHoJ-ie^ ct'l
9oa6-ta6 (foa) 4lr-616 (rv,
iatoa ot rro!3I!t 1616-516 (0r5)
a-oal lr/E agtn oa nv
lAY YIVUO L 4t99 atlt rce od
Y9!:!-!:9-!:!:!4::-l9j1]:3]]:'.Nr 'slNvrlnsNoc wuy
oJ "IM
dOO'I SCOIU SNOI'I I88I
S'I'IVrt[ CNINIVIUU INIOd 'IIVA
It .l
*l=l I d -l'l I ;l
AiE ; FI
ffii t'Jrt \o@3
7h, I
" A) I !")
t LI
z
r".z
a J
a
u
L!
o_
z a t o
v
LI
e
o_
F o z o _l
F z o
O
@
'u-,
u-)
/,.V
-@
@
a z
u F
UI
io
N u
I
z Ri
(/)m
Vrd In
(\ lJ
vF
O
GT
z.::)
n- +,",,o
-----l i^I q/
X,i
ao
F.r'\ c\'l
-rr)
A.\l-
="o(o
rn^:h g)
a u
UJ I F
G]
co
J v)
ri z
o- |
x /i
ao )
=.-c\$^+(9
(o
tz-,
',,/,\,,
z.t 7i
@
ul3 ,,t
k c!
@)
I
z
o-
><
$
e
()
3
$
)
;z o ()
u
Z;
>(J v Lil <z
Ft!(no_
=,-
F
mI
=P a
-i (y
FL
I a)
E
E
LJ
o-
u
c_
z <g
^
t-!-z u. <l lrz r- Ld LJ >a d_)L/O o-a
l
io
@
i t
UI
io
N a o
I
F z
R+
^=c{v
I
(n u
I
m
I
I
I
I o- |
xli
ao _l
=..
+(gJ
(o
-t
Ro
I
m
6
.:.
z o
I
I
1l L
I
I Ilm
El1 :t'
tllY *l ?
'xvv\ .,0-,f
-r \-
=>
x><
JLJ x
Ig
. e:.
z€N o\^(Jtr)(9
l
I
u.t!
Z;
>O E uJ<z
ao-
I O
E.
E
o_
\C\
\\\J
io
@
N.i u
I
t-z
O
tr)
(o
€)
F
E.t!
l,l
io +
LU
-J
(J
U)
L!I
O a
U\d 99:90:9 gOOZtOZtg '6,rr,p'tt=O-tS-eS-Ot0090\6utIroM-SVleM lau ld llen Ot-eOgO\HO1-\CMO\:t
r||a-tat {rrJ)
9dc-flt (noc) aaer-art (rtj)
azrd oa tolttrm u6a-art (otc,
l-Gr tuE tgtn Gt "lY
1r nvuo I ttte zrqt lot o d
OJ .'IIVA
dOO'I SCOIU SNOI'I ISBI
ST'IVil CNINIVISU INIOd TIVA
.*t+'\
It J
xlFl I d 'l'l | ;l
-b li: ol
$ii ; Fl
t.
-
'l'\3 7t7 e
o VJ I
io
@
N,i
E.o
(o
o_
F
J
F o-.t. o
o
<\l
z,
-
,F N rr E.-z o@o TI
;@F
E
o_
z <c
M Lt)*z
v.o Vz l-: trJ
>a
o
$
Ar'. A "Q z o@ { a
R.a E g
l^ o I
OP R 0
o-
><td
c{
I
;z
o
a
io +
@
F
E.
Ld
-a |r)+
ll t'-x ri
?)o 3"o(o
Ro
I
{W
Ar 2:t
lrY'
,,0-.I
Wd 1,0:90:9 goozloztg'6r,np'1l:lo-ls-€s-01€090\6uDuoM-s\lleM lau ld llen ol-€09b\Hol\eMo\:f
a E
t.|I F o
u
E.
trJ (L
i@ ;!"* -, rn j;g ;
;)'o .,
6>*x e
E t!
Z;9d E
LrJ <z o(r F trJ u) o_
tu J
o a
TOWN OF VAIL
75 S. FRONTACE ROAD
vArL, co 81657
970-4'19-2138
Job Address:
Location.....:
Parcel No...:
Project No :
NOTE: THIS PERMIT MUST BE POSTED
ELECTRICAL PERMIT
1881 LIONS RIDGE LP VAIL
VAI POINT TOWNHOMES POOL
210312207mI
tL{U'e-ozrL(
ON JOBSITE AT ALL TIMES
Permit #: E06-0171
Status...:
Applied . . :
Issued . . :
Expires . . :
09/20/2006 Phone: 97O-827-57'72
09/20/2006 Phone: 970-82'7-5772
ISSUED
09t20t20p,6
09tzu2006
Q3t20t2N7
{<**r.*x(,t,ir*+ :}:F+ i(*t*{<*x**+ x*,*x(i<****r( i<**
$60.50
$0.00
960.50
$50.50
90-00
DEPARTMENT OF COMMUNITY DEVELOPMENT
OWNER
APPI-,ICAIII| E,AGLE VALLEY EI-,ECTRIC
P O BOX 1l_16
VAIL
co 81658
License: 156-E
CONTRACTOR EAGI-,E VAI.,LEY ELECTRIC
P O BOX 1116
VAII-,
co 81658
License:155-E
o HARA, TI{OMAS W. & tArrRA K.09/20/2006
22574 ANASAZI WAY
C,OI-,DEN
co 80401
Desciption: COMMON ELEMENT-VAIL POINT TH-ELECTRICAL BONDING OF REBUILT
SPA AND REWIRING OF NEW CIRCULATING PUMP MOTORS
Valuation:$ 1,200.00 Square feet: 0
Electrical-------- >
DRB Fee-..----- >
Investigation---- >
Will Call----- >
TOTAL FEES.. >
$0.00 ,
s60. so
FEE SUMMARY
Total Calculated Fees-- >
Additional Fees---------- >
Total Permit Fe€---- >
Payments--------- >
BALANCE DUE--._.... >
Approvals:
Item: 06000 ELECTRICAIT DEPARTMENT
09/20/2006 shahn
Item: 05600 FIRE DEPARTMENI
Cond: 12
(BLDG. ) : FIELD
Action: AP
{<*,* * lr*tl.
'*
t(r( {({.* *,ir ++:l+ * i( *** *1.* )* **x. )**:* {.+,f:t:*:ttri +** **,* r( ** {. {.** {.i,* r( {r:t,* ** t **r( *l.
CONDITIONS OF APPROVAL
INSPECTIONS ARE REQUTRED TO CHECK FOR CODE COMPLIANCE.
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot
plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply
with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design
review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY.FOUR HOURS IN ADV
PM.
479-2149 OR AT OUR OFFICE FROM 8:00 AM - 4
{. **:1.{. {. * {. {.:1. *
'1. '&
{.** ** * * * * * * * * * * ********** * * * * * * * * * * * + * * * * {. * * * * * * * * * * * * * * * * * * * ** * * * * * * * **++:} * * * *
TOWNOFVAIL. COLORADO Statement
*,1.******'1. * *,t * 'i*d.*d.{.:N.{r {.
'N. 'N. 'N. '1.********+* ** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *:}:}*** ******,t** *{.,i**:},i
Statement Number: R050001493 Amount: $60.50 09/2I/200609:32 AM
Payment Method: Check
VALLEY ELECTRIC INC.
Inits: tC
Notation: # 1910 8 /EAGL,E
Permit No:
Parcel No:
Site Address :
Location:
This Payment:
ACCOUNT ITEM LIST:
Account Code
EP 0 0 1 0 0 0 0 3 1 r. 1 r. 0 0
wc 001-00003112800
*:t * * * +*{. * ***** * ** * ******** * * + + + * * * * * * * * * * * * * * * * * * * * * * * *:} * * * * * * {.*'t******* * * * * '} * * * *,r *,}:* * * *,},} * {.
E05-0171 T)4)e: EL,ECTRICAL PERMIT
2LO3-L22-0700-L
1881 IJIONS RIDGE LP VAIL
VAI POINT TOWNHOMES POOL
TotaI Fees:
$6o. so Totaf Af,L Pmts:
Balance:
Description
ELECTRICAI PERMTT FEES
WILL CALL TNSPECTfON FEE
$60. s0
$60. s0
$0.00
current PmEs
57.50
3 .00
APPUCATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UNSIGNED
Project #: PRJ06-0204
Building Permit #: BP--06_-0162
Electrical Permit #:
97 O- 47 9-2149 (Inspections)
75 S. Frontage Rd.
Vail, Colorado 81657
CONTRACTOR INFORMATION
AMOUNT OF SQ FT IN STRUCTURE:ELECTRICAL VALUATION: $ 1'200.00
Contact Eagle CounVAssessrc Office at g7O-328-8640 or visit for Parcel #
Parcef # 210312207001
Job Name: Vail Point Tcwnhornes Pool Job Address: 1881 l-oins Ridge Loop
Legal Description Lot:Block:Filing:Subdivision:'
Owners.Name:O'Hara. Tl S*{9f,'or,.="zi vtav - Golden. co lbBhtrl"'
Engineer:Address:Phone:
Detailed description of work:
' PwnD Motors
E1ectrical Bondi-ng of rebuitr t Spa and rewiring of new circulating
WorkClass: New(,) Addition( ) Remodel ( ) Repair(x) TempPower( ) Other( )
Work Type: Interior ( ) Exterior (X ) Both ( )Does an EHU exist at this location: Yes ( ) No ( )
Type of Bldg.: Single.family ( ) Duplex ( ) Multi-family fi ) Commercial ( ) Restaurant ( ) Other ( )
No. of Existing Dwelling Units in this building:No. of Accommodation Units in this building:
Is this permit for a hot tub: Yes (x ) No ( )
Does a Fire Alarm Exist: Yes ( ) No (Does a Fire Spri$\r )Fftm Exist: Yes ( ) No ( )
/6 V
*************************i*************FOR OFFICE USE ONLy*************rt********tr***************Lf 1e 2006
SEog,-ot1 (
rcwNhFvAILly .F,Ar'r, ,AF 'rir Fr F-F,Fr.,^.
Electrica I Contractor:
Eagle VaIIey Electric, Inc
Town of Vail Reg. No.:
156 E
Contact Person and Phone #'s: cel 904-5844
Sam Bishop 821-57'72
E-Mail Address:Fax#: BZj-9036
-\=- --_ -
COMPLETE SQ. FOOTAGE FOR AREA OF WORK AND VALUATION OF WORK (Labor & Materials)
F:tcdev\FORMSWERMlTSuO05\electical Dermit 2005.DOC
12-14-2OOO lnspection Request Reporting Page 21
4:27 pm vail co'- ciry of -
Requested Inspect Date: lriday, December 15, 2006
Insoection Area: CG
Site Address: 1881 LIONS RIDGE LP VAIL
VAI POINT TOWNHOMES POOL
A/P/D lnformation
Sub Tvpe
[J se
ACOM Status: ISSUED
Insp Area: CG
7665
7665
AND REPLASTER POOL
TO WARREN CMAPBELL AND
Y WITH
contractor.-up. - CGUNION
a new hot
A
Requested Insoection{sl
Item: 90 BLDG-Final
Reouestor: DENVER POOLS & SPAS
Assiqned To: GDENCKLA - Action: Time Exo:
Requested_Time: 02:00 PM
Pnone:
Entered Bv: DGOLDEN K
Insoection Historv
Item: 501 PW-Temo.access/drainaoe Item: 10 BlDG-Footinos/Steel - *' Aooroved *"
08/08/06- InsDector: nsc Action: DN DENIED
Comment: oprbvide clearence from all steel to earth. 3" from boftom bar to earth.
remove all mud and loose debds.
get eng. letter on length of verticals leqs 10" to 1?"
aet sta-moed eno. letfer showino added wall and footino.
08/11/06 Insoectoi: NSC - Action: AP APPROVED
Qqnunent: remqve rocks and sJones supportinfg rebar.hang off nails with wire Item: 20 BlDG-Foundation/Steel ". Aooroved '*08/17106 lnsoector: JEC Action: AP APPROVED
Comment: OKwalls.Item: 90 BLDG-Final Item: 532 PW-TEMP. C/O Item: 539 PW-FINAL C/O Item: 538 FIRE-FINAL C/O
Description:
Cominent:
Comment:
Comment:
Comment:
Comment:
Comment:
Comment:
REPT131 Run Id: 6L28
lD'tla
13r-1?#06 rn"p"$3,lF"f yF',LtPo'ting e"g" ++
Requested Insp_ect Date: W.ednesday, December 13,2006
lnsoedtion Area: SH
Site Address: 1881 LIONS RIDGE LP VAIL
VAI POINT TOWNHOMES POOL
Activitv: E06-0171
Const Tvp6:
Owrier: O HARA-
Applicant:
Cohtractor:
Description:
Notice:
Reouested Insoection(s)
Item: 190 ELEC-Final
Requestor: EAGLE VALLEY ELECTRIC
Coriments: will call 904-7788
Assioned To: SHAHN - Action: Time Exp:
equesied Time: 08:30 AM ' Phone: 904-7788
Entered By: DGOLDEN K
AiPi D lnformation
lnspection Historv
TV
U
t:,urft-94rrt '{-l '
Item: 1 10 ELEC€ervice Item: 120 ELEC-Rouoh
09/22i06 |Comment: I
Action: COND APPROVED/CONDITIONS
N sFT OF POOL/TUB,
\RDS PER NEC 680.
|RED PER NEC 2002 680.41.Item: 130
Item:140
Item: 190
ELEC-Conduit ELEC-Misc. ** Aooroved *"
10111106 Insoector: SHAI{N Action: APAPPROVED
Comment: POOL REBAR BONDING AT POOL APPRVED
ELEC-Final
REPT131 Run Id: 6097
Tltrty Rda.€f s
/ot /, tp/k^s
C'$ond^
cc*it-}{lY c€\GloPr€||t
Design Review Board
ACTIOFI FORH
Department of Community Development
75 South Frontage Road, Vail. Colorado 81657
tel: 970.479.2139 fdx:, 970,479.2452
web: www.vailgov.com
Projectl{ame:vArl pornr rorNHouES RE-RooF oF DRBNumber: DR8060203
ENTIRE PR(UECT
Project Description:
FINAL APPROVAL TO REROOF ALL BUILDINGS OVER A THREE YEAR PERIOD.
Participants:
OWNER VAIL POINTTOWNHOME ASSOC O6/OU2OO6
C/O DARYL BMDY
70 SANIA FE DR
DENVER
co 80223
APPUCANT MCNEILL PROPERTY MANAGEMENT 06/01/2006 Phone: 479-8273
LOREN SMITH, SECRETARY
2077 N, FRONTAGE ROAD, #3OO
VAIL
co 81657
Project Addrcss: 1881 UONS RIDGE LP VAIL
VAIL POINTTOWNHOMES
Location:
Legal Description: Lot: 1 Block: 3 Subdivision: VAIL POINT TOWNHOMES
Parcef Numbert 2103-122-0702-L
Comments: See Conditions
Motion By:
Second By:
Votei
Gonditions:
BOARD/sTAFF ACTION
Action: STAFFAPR
Date of ApprovaL Q6lQ7 12006
Cond: 8
(PLAN): No changes to these plans may be made without the written consent of Town of
Vail staff and/or the appropriate review committee(s),
Cond: 0
(PLAN): DRB approval does not constitute a permit for building. Please consult with
Town of Vail Building personnel prior to construction activities.
Cond: 201
DRB approval shall not become valid for 20 days following the date of approval.
Cond: 202
Approval of this project shall lapse and become void one (1) year following the date
of final approval, unless a building permit is issued and construction is commenced
and is diligently pursued toward completion.
Cond: CON0008111
The applicant shall install the roofs within the time frames elaborated within the
application. Completion of the re-roofing of all structures within the complex shall
occur by no latter than October 31, 2008.
Planner: Warren Campbell DRB Fee Paid: $25O.OO
General Information:
Department of Communily Development
75 South Frontage Road, Vail, Colorado 81657
tel: 970.479 .21 39 fax: 97 O.479.2452
web: www.vailgov.com
General Information:
All projects requiring design review must receive approval prior to submitting a building permit application. Please
refer to the submittal requirements for the particular approval that is requested. An application for Design Review
cannot be accepted until all required information is received by the Community Development Department. The
project may also need to be reviewed by the Town Council and/or the Planning and Environmental Commission.
Dosign roview approval lapses unless a building permit is issued and construction commences within
one year of ths approval.
Description of the Requesl: _Re-roof att buildings over a three-year period. See below and picture # 7. The complex
was built in 2 phases in 1982 and 1992. The eartier phase has cement tite roofs, while the /" phase has asphalt shingles.
A Denver roof consultant (Roof fech) concluded that both roofs have reached the end of their seryice lives. The tile rcofs
experience avalanches dropping snow, ice, and tites 3 slories orto pedestrian areas, leak, and are subject to ice dams- The
asphatt roofs are plagued by ice dams, leaks, and are substantially damaged by various efforts to combat the ice dams.
After much research and consultation, our Association has setlred on a super-insulated asphalt roof. We obtained TOV
approval and have 'pitoted' this expensive concept through the cource of the 2005 - 2006 winter on I unit from each of the
2 types of buildings. The attached picture t ? shows the pitoted roof. We witl apply this approach uniformly to alt
buildings in the complex as noted below and show in site photo #1. ln addition to corecting the safety and maintenance
problems, this rc-roofing project would result in a more unitorm appearance by eliminating the tile roof surtace, creating a
common asphalt roofrng surtace and color throughout the complex, and improve energy efficiency
Application for Design Review
Summer - #
o[: lYPe units
o F
6t I
o
N o
vt
12
Units Reason
'| 11
t-4
l0
8-40
r -36
.JU
I l-14
26
l5- 16
t9-20
Fulfill obligation to TOV 2006
Leaks. slides & #2 truss orob 2006
leaks 2006
4
6
J
6
4
+
.'
2
2
I
T
T
A
T
T
A
I
A
A
A
Huge ice dams (39 & 49)
Slides & leaks
Slides
#14 & l3 requested delay
Slides
Heat loss / condensation?
Heat loss / condensation?
2007
2007
2007
2008
2008
IJ
t2
2008
2008
2008 No lems
Location of the Proposal: Lot: 1 Block: 3 Subdivision:_Lionsridge filing 3
Physicaf Address: 1881 Lions Ridge Loop, Vail, CO 81657
Parcel No.: (Contact Eagle Co. Assessor at 970-328-8640 for parcel no.)
Zoning: _Medium density
Name(s) of Owner(s): Vall
, multiple family
Point Townhomes
Mailing Address: _Vail Point Townhomes, c/o McNeill Property Management, 2077 North
Frontage Rd. #300, Vail, CO 81657 Phone: _970-479-6047.
Owner(s) Signature(s): _
C:\DOCUML-lUSulher\LOCALS*l \Temp\DRB application 2006.doc
7
Dets o 60zd3
Ac-PizJof-ovo{
Page I of
Name of Appficanti Jim Kearney, Board Member Mailing Address:
-
c/o McNeill Property
Management,2077 North Frontage Rd.#300,Vail, CO 81657 Phone: 970'479'6047
E-maif Address: _LorenSl 034@aol.com _F ax'.
Type of Review and Fee:
. Signs $50 Plus $1.00 per square foot of total sign area.
. Conceptual Review No Fee
. New Construction $650 For construction of a new building or demo/rebuild.
. Addition $300 For an addition where square footage is added to any residential or
commercial building (includes 250 additions & interior conversions).
. Minor Alteration $!!Q For minor changes to buildings and site improvements, such as,
(multi-family/commercial) reroofinq, painting, window additions, landscaping, fences and
retaining walls, etc.
. Minor Alteration $20 For minor changes to buildings and site improvements, such as,
(single-family/duplex) reroofing, painting, window additions, landscaping, fences and
retaining walls, etc.
. Changes to Approved Plans $20 For revisions to plans already approved by Planning Sbaff or the
Design Review Board.
. Separation Request No Fee
For Office Use Only:
Fee Paid: _ Check No.: By:
Meeting Date: DRB No.:
Planner:Project No.:
C;\DOCUM E-lUSuther\LOCAI-S- I \Temp\DRB application 2006.doc Page 2 of
I
. SUBMITTAL REQUIREMENTS
0 Stamped topographic survey', if applicable
e Site and Gradinq Plan, if applicable- (lmage #1 below)
o Landscape Plan, if applicable'
e Photos or drawinqs which clearlv convev existinq conditions* (lmage #2)
0 Photos or drawings which clearly convey the proposed building or
e Exterior color and material samples and soecifications. (See below)
o Lighting Plan* and Cut-sheet(s) for proposed fixtures, if applicable
e Written approval from a condominium association or joint owner, (See below)
e The Administrator and/or DRB may require the submission of
specifications, samples and other materials (including a model)
determine whether a project will comply with Design Guidelines
proposal is not clearly indicated.
Please submit three (il cooies of the materials noted with an asterisk (*).
C:\DOCUME-lUSuther\LOCALS-1\Ternp\DRB application 2006.doc
7
Page 3 of
PROPOSED iIATERIALS
Buildino Materlale Tvoe of Material Golor Roof llalarkey "Lqacy !iA" *Natunl Wood" (Sample attached)
Siding
OtherWall Materials Fascia Nochange Nochange
Sofftts Nochange Nochange
Windows
WindowTrim
Doors
Door Trim
Hand or Deck Rails
Flues
Flashing
Chimneys
Trash Enclosures
Greenhouses
Retaining Wdls
Exterior Lighting
Other
Notes:
Please speciff the manufucturer's name, the color name and number and attach a color chip.
(Pagr 6 of l2)
C:\DOCUME-lUSuther\L.OCALS-l \TerD\DRB application 2006.doc
7
Page 4 of
JOINT PROPERTY OWNER
WRITTEN APPROVAL LETTER
I, Jim Kearney, Vice president, Board of Trustees of Vail Point Townhomes, a joint owner of
property located at (address/legal description) Vail Point Townhomes, 1881 Lions Ridge Loop, Vail,
CO, provide this letter as written approval of the plans daled 5/01/06which have been submitted to the
Town of Vail Community Development Department for the proposed improvements to be completed at
the address noted above. I understand that the proposed improvements include:
Re-roofing all unils over three years with Malarkey asphalt shingles,
I further understand that minor modifications may be made to the plans over the course of the review
process to ensure compliance with the Town's applicable codes and regulations.
(Signature) (Date)
C:\DOCUME-l VSulher\LOCAIS-l \T€mp\DRB application 2006.doc
7
Page 5 of
\
c!l!t t!h lit a
i.r r. E|nF!td lr :!6
Irt bts !!r! lr ]!lj
8ua lr :'lEI ." ",.- -5tl
Vril Point Re-roofing Plen
''rlti
Units #23 (left with new asphalt roof) & #22 (right with cement tile roof)
(':\DOCtJML-l USuther\l.OCAl S.'l VIemp\DRI] application 2006.dm
7
tF 1-
\=-,==
Mey,2006
, {,ii,;
I'agc 6 of
1:4.
rqt
,1.
t Jlrits # | -4 (culrortly tilc rootcd) lionr [.ions liiduc Loolr
:
I'rrrts 5-ll)lrrrr tht'right & tlllkcr) litrrn []ul'lthrCrcck Rii.
C:\l)O( t.MI:-llSuthcr\l.O('AI S-l\'Iemp\l)llt:l applicalion 2006.doc
'l
F.
l'agc 7 ot'
From:
To:
Date:
Subject:
"Jim Kearney'' <jldkearney@hotmail.com>
"Warren Cam pbell" <WCampbell@vailgov.com>
06/05/2006 12:59:55 PM
Re: Fw: Vail Point's DRB application for re+oofing project
Warren, Thanks!
The Board of Directors of the Vail Point Townhome Association has voted
unanimously to proceed with this project. lt has also been approved by 30 of
38 homeowners (approval by 26 required).
Regards,
Jim Kearney
978.745.8428
Vice President
Vail Point Townhome Association
1881 Lions Ridge Loop
Vail, CO 81657
--- Original Message ---
From: "Warren Campbell" <WCampbell@vailgov.com>
To: <jldkearney@hotmail.com >
Sent: Monday, June 05, 2006 10:55 AM
Subject: Re: Fw: Vail Point's DRB application for re-roofing project
>l have spoken to the powers thal be and we have agreed to waive the fee.
> | do need something from your HOA stating that this is approved.
> Please email or fax me and breif statement that this has been approved
> by the appropriate authorities and then I will staff aprove.
> Thanks
> Warren
>>>> "Jim Kearney''<jldkearney@hotmail.com> 05/23 11:52 AM >>>
> Folks,
> I've been on the road for the last week, but haven't seen anything on
> this - did I miss it?
> Many thanks, Jim
> --- Original Message ---> From: Jim Kearney
> To: Russ Forrest
> Cc: Davis, Charlie Chief building offic-id, TOV ; Campbell, Warren ;
> Bohanon, Tom & Lana VP ; Antonius, Jeff VP #7 ; McNeill, Dan ; O'Hara,
> Tom & Laura VP #1 ; Smith, Loren VP 29 ; Bay, Bill ; Audiss, Michael VP
> 31 : Hess. Frederick VP lf2
> Sent: Thursday, May 04, 2006 5:55 PM
> Subject: Vail Point's DRB application for re-roofing project
> Russ.
W-arren Camobell - Re: Fw: Vail Point's for 2
> Attached is Vail Point's DRB application to complete our re-roofing
> project started last fall (when we 'proto{yped' 2 units). Our plan is
> to complete the rest of the complex (39 units tolal) in 3 years (2006 -
> 2008).
> Warren thought this application could be 'staff approved' and I'm
> hoping that we could get the application fee waived since it is just an
> extension of last year's approval (the plan has always been to re-roof
> the entire complex) for which we already paid the application fee last
> fall.
> My understanding is that it will not be necessary for VP to submit
> further applications for the remainder of the project (just building
> permits for each year).
> Regards,
> Jim Kearney
> Vice President
> Vail Poinl Townhomes Association
GG:"Bohanon, Tom & Lana VP" <Tom.Bohanon@quebeconruorld.com>, 'Antonius, Jeff VP
#7" <Vail1881 @Comcast.net>, "McNeill, Dan" <mcneill@vail.net>, "O'Hara, Tom & Laura VP #1"
<tohara@afg-co.com>, "Smith, Loren VP 29" <LorenS1034@aol.com>
;nbKQ.fti'79
/* t,'bl& 3'
Common
Cfr.filrtrlit tf '4Et Oa.l.€t{'
Design Revieru Board
ACTION FORM
Departnrent of Cornmunity Developrnent
75 South Frontage Road, Vail. colorado 81657
tef : 970.479.2139 fan 97O.479.2452
web: www,vailgov,corn
Project Name: VAIL POINT TH POOL
Project Description:
DRB Number: 0R8060183
FINAL APPROVAL FOR A COMMON ELEMENT-ALTEMTIONS TO POOL AREA. INCREASE PANO
AREA, IMPROVE PERIMETER FENCE; IMPROVE DRAINAGE AND ADD LANDSCAPE
Participants:
OWNER O HAM, THOMAS W. & LAUM K.O5I23I2OO6
22674 ANASAZI WAY
GOLDEN
co 80401
APPUCANT NEILS-LUNCEFORD INC. 05123/2006 Phone: (970) 468-0340
PO BOX 2L3O I 740 BLUE RIVER PI$fY,
SILVERTHORNE
co 80498
License: 297-4
Project Addressr 1881 LIONS RIDGE Lp VAIL
VAI POINT TOWNHOMES POOL
Location:
Legal Description: Lot: 1 Block 3 Subdivision: VAIL POINT TOWNHOMES
Parcel Numbert 2L03-L22-0700-1
Comments: See Conditions
Motion By:
Second By:
. Vote:
Conditions:
BOARD/STAFF ACTION
Action: STAFFAPR
Date of Approvah 06/2L12006
Cond; I
(PLAN): No changes to these plans may be made without the written consent of Town of
Vail staff andlor the appropriate review committee(s).
Condl 0
(PLAN): DRB approval does not constitute a permit for building. Please consult with
Town of Vail Building personnel prior to construction activities,
Cond: 201
DRB approval shall not become valid for 20 days following the date of approval.
Cond: 202
Approval of this project shall lapse and become void one (1) year following the date
of final approval, unless a building pemit is issued and construction is commenced
and is diligently pursued toward completion.
Cond: CON0008158
M inor Exterior AlteraUons
*m Departsnent of Commtlf|l,iy Dselop.nent
75 South Frodage Roa4 Vaif Colorado 81657
tf'li 9m.479.2128 taxt 970.479.2452
web: www.vailgw,com
General Inforrnadon:
All projects rEqulrirE deign rs/iew must recelve apgmval prlor to submlulng a building permit apdkation. Pl€as€
refer to the subrnittal requkements for the parthrlar appro\/al that b requesbd. An application for Dedgn Reriev,
cannot be acc€pted untll all nquicd lnfocnation ls rcceived by the Community Devebpment Department The
project may also ne€d b be rwierved by th€ Torvn Council and/or the Planning and Environmental Commlsslon.
Doslgh ravlew apprwal lapoer unlerg a bulldlng permlt b lssued and oonslnrtion cornmcncs3 wlthln
one yea r of tfic approval.
Locadonof the Propoeat: toe / glock:k Po/r'rtT-
Physlcal Addrrss:lJoi/s 6e LooP (ommoru 4rref
p.rc.f t{o.: tt03'l-ZZ -A7qg I (Contact Eagte Co. Assessor at 970-328-8640 for parcet no.)
Zonlng:- Pfipantulnnn-amnl
Name(3) of Owner(s)!
llalling Address:
Phon€:
Ownds) Signebre(s):
tlarne of Apglicant:
l.lalllng Mdrsss:
ApplicaUon for Design
U
n)
@ o r o
\
@
w
,i,,
Type of Rcvlew and Fcc:
tr Slgns
tr Concepual Revlew
tr llew Con*ruction D Addition
V Mtnor Atteration / - (muld-famiV/commercbl)
O Minor Alteration
(singk-fam ilyld uplex)
Oranges to Appored Plans
S€paratton Request
tr
D
$50 E!$ $1.00 per square foot of total sign area.
No Fee
$550 For consbuctloh of a rrttr buildlng or derno/retuild.
$300 For an addltjon where square footage ls added b any resid€ntlal or
comrnerclal bulldlng (lncludes 250 addiUons & Inbrlor convergons).
$250 For minor changes to bulldlngs and ste lmFovements, s{.rch as,
re-roofirtg, paindnq window additbns, landscaping, fences aM
retainlng walls, etc.
$20 For mimr dranges b buildings and $te lmFovements, sudl as,
re-rooting, palnttng, windov additbns, landscaprng, fences and
retalning walls, etc.
$20 For rerrigons to dans already approved
Deslgn Rerier{ Board.
No Fee
il
vt
Jrl
r= ,/.\' l -:1 t., ,,
MAyz3
TOWN OF VAIL
r\
ili
U
,f/t-vePrHa*are, co 6o+4 8
Hinor btbrior Alterdons
AppllcaUon frr D6bn Review
oqmnctdcmnlVDrlrFnr'i
75 Sodr fulfrge Rd, l/I, 6rab E16f/
H: 9t0.{79.2118 id,, Cm...Tr2,'E2
wcfirrr.vrtw.qn
errrlJtrfrrnrtc:
Al FoFctr rlefilng rlcJtt tlJty, rust rcdt,l ryunl p.lor b $0nshg. hfrE pcnft Oilclon. PIE
ntlr b ilrc $fnllJ tqtrnrnE fu tnc Arthfr m|ord t ut b tql*d. h ebo tr D!!|!n nlvicn
cdmt ba .@d uil|.l rufJllld f'urutllt b rElt,Cd by ttr Oflrrrft Oatrbw* IEFnnt Tll pdd nrf & nd b bo lqid by lhc Tornccadpn(lcttr Plrmlp.rd ftvh.m.ttd em$c
Hir d.rA|!nllrpr ribr hltf 05il b hrdddrdilonnErill*l o||f,rdurrtrd.
Lqdor ddr FfognF r-*J---gds- $ndh,ttru 3.Hf;lT
P|tiltrllfr-uoxs G UOP
Frrd ror tlo?-f72-!1e;A I (Anrbd EaJ|c Co Ascsrat 9D32&86O brgarcd m.)
ilrnr(ildOrnc$,t:cIo LL
rr*e rddtur tg ca
Tommoru /fut
o*t lSr,.ur.frlt
lrm|.drpd|..ft
ilr[|cL|t*
T'Fdfr|ourril*
tr ggns
tr Cott4dn!|,bv
g tl€ilCofisfuctbl E rdilh
XilhorAflndon ' -(multHfdy/drfldl)
tr llFDr^hrluon
(sftdFfrtl*t/dtDl€x)
tr O Tr5 b AF|otrd Plils
E ScDcrenRgfEt
\
PIUI.:
c l-
lAoa/1.8 LIaITCDftfr
91fu {fl-(ePftfu^tat co Oan
Pt(ot
150 EtE $1.(x, 0.r squr€ flot of btal ign trE.
No F!.
t5$ Forcrcfirldtda tHhldhgord.mCEtdd.#m fuf|&rrlEtqgelbober b.ru b.r|' |eC&fi| o.
onn:rrld hfitg (Hdcs 2504ffir i hEtr carctdsts),
t250 Fo?|laprdsIcsbhldr{6dlbfrftGn G sdtc,
t}|rdt|O p.mtlg|. *rht a.fffiq ffi, BG .ft
nLhhtdb,cE
$20 Frr$ordrilGsb bddng6md ttt hfEntctt$ grdl6'
|}|!dftg, FH.tgb nffivt affid|* ldtdsph& frnoes ild
nbhfrgm[$.r.
$20 ftr rsftEts b F||3 *€dy mvDd !y Plrt'*lg Stdl a t'l
DcllsnRrv|ewer{
lb Fc!
,t'f *'**** * * ******,1,i****** * ********+*********** * **** * **** * * * * * * * ******** * * ******,f*+**** * * * 't * *:**
TOWNOFVAIL, COLORADO Statement
+*'! +**** * * **** ******'itlti'i *****,F***** ******* * * *l*** {.{.** * * * * * * * *'},}'},},t+** * * *******:***,},}* * * * *****
Statements Nudber: RO5OOOO661 Amount: $250.00 05/23/200601 :50 PM
Pa)rment. Method: Check
r,I'NCEFOFD, rNC .
IniE : .fS
Notation: 10647/NEIL,S
Permit No:
Parce1 No:
Site Address :
L,ocation :
This Payments:
$250.00
$2so.00
$0.00
DRBO6O183 q4)e: DRB-Minor AIt, Comm/Mutti
2to3-r22-0700-L
1881 IJIONS RIDGE I'P VAII.'
VAI POINT TOI{NHOMES POOL
$2so. oo
Total Fees:
TOt l ALL PMUS :
Balance:
,N.:t 't {.*:l.,l.t
'tr
* * **{i * **********+********* * ****** *
'tr
{ri.:1.:1.{. +
'1.
* * + * **'t***rt:}***,},}'}**,1.:1.i.:1.********* t+*+:1.:1.{.{.
ACCOUNT ITEM LIST:
AccounE Code Descript ion Current Pmts
DR 00100003LL2200 DESIGN REVIEW FEES 250.00
f/^/vs nui o F/,{vs/nu6o lYlu t Ptve5 ,fV6.4c.
ffiffifr:&ws rtsPetrs
Ou|ntlty
4 l:'
t,
O(ISNNG TREES
TO BE REMOVED
PROPOSEO TREES
AND SHRUBS
Botanlcal ilanrc p/84 prir6eNs
Pofut,uS
PROPOSED LANDcCAPING
Slze
8' -/o'
z' - 2,26 "
(ot aattca Et iryelpFyc4L
Mlnimum Requirements for landscaping:Dedduous Trees - 2" Caliper
Conlhrous Trees - 6' in height
Shn$s - 5 Gal.
TVoe Squars Footaq€
GROUND COVER
500
SEED
IRRIGATION
TYPE OF EROSION CONTROL
@- D$w\*firy-+(zoos-)
DetP /PP/64/7o4
Please specfi other landscape features (i.e. r€talnlrE walls, fences, s/vimmlng pools, etc')
Common l{amc
Cou
F:\daAFORlrs\Pemls\Planning\DR8\drb-.trinor-alll l-23-2005.d0c Page 7 of 13 1V23200s
Bulldlno l.labdals
Rmf
Sidlng
Other Wall Materlals
Fasda
Sofnts
Windou6
Wlndorv Trim
Doors
DoorTrim
Hand or Deck Ralls
Flues
Flasfilng
Chlmneys
Tra$ Enclosures
Greenhouses
RetainirE walls
Exterlor Ughdng
Oth€r
ot€s:
PROPOSED }IATERIAUS
Tvpc of Hatrd.l Color
Pleas€ sp€dry the manufiacturer's narne, the color name and number and attadl a color chip.
f ere*2v6g. mO'E?t+L s,flher L' {.
F:\cdery\F0RMsu€rmlE\t'lamh9\DR8v6-mirpr-all1l-E-2005.fu P4e6of 13 LVnn005
f .44 zu7 5>Y ., tl'lt [.! tf t]-l-t r! 6
\'' lJ'"z<3(5u .) FRK t t^ 7,1_/ o t-l (t)lc /'6 / -=/ a E-c I .E EX / H -E 9;t tEi'"0 / F r*s ,. E "*i €/ B9 G'a E16 s ,t? g?€E
g
b,a '= .e
EA o .:?
Yco 5'o P o oii
Olr--o6c)aJ O F=,-:tuo gEH
r(!E
- - l\6 e:E;E .
,a
.Y (J
q)o
E o o o o-o L
o-
o
o
d 3
\$l
\Ji f-I C\I
ii \9 o
c
.o o o
oiz r) o
5o Oo)
=(ua
(l)'=
O TIJ
l=8 l(E.-t=N i->h lglEPt lP.ooo l,pE s s
lE El e=8.8.tri g6E-fl ol 6 rr Rl 8'*'F;qJl Y O r- !-Jl (Lzoo
Ea
'FO
(El-66
3b 2g
'..i'*q*ffi
,\
-Y ol
I
ol ol
o)
E
0)
E8 ;a o!t PO EA ao .:. o-
QY
'o
q)
o
E
o
o
U'
o
-o f E
(D
C /r1 lC o - 6 a.9
fste=€E
= FE<Q FE
E EfiFBE#
:
(/)N o)p X co =n\ .- a\ \J .:=g 6P 'E.e 6 s'F RsE c.r€;6 c E o >'ts9 aI F )o o o o)
. *[r* tflE x{ d q-! " x o -yr;r_(.rOXO 6 trD'; (D E sn t : Ua -:< E -'n 6o; H E.=E' ;EH 6tE
=atl-E FEp sSg o Fdd d60
'(g
!-E
E
o)
o
*
_(!E}39
.gE .co s6 90-so o(,Ss
RE E=
tL+
>Kt;
6u1plrnq 6urlsrxa
ll Al 'l-\'i
/",jt'* |
(\ll
N blN
o
o a s *.
N
i'E o F
'1X
d
P $?gHE
F€gFiE
r
J
+,o o
-c @
c o
(L
OE Es U) ,h
c
o
TL
(It
I r
tl
r
o
a
-Ji
i8t xJl I c6l
t -51 fls bi t.rl!'9,
94,-lr &aa
EE
tp
aE E(6 <E_
riJ
r,\ LL
. -,7-
q: r,i
0X r_J
(U
a Cl-.-o oE J-] (J
(1+,.{= C oO
G=_t t_--o a- r-<€
r ,?.L l?
f, c^) l,
a ..a\+
.-.Q-/ )al
d303
/.r.tot
.a_\:t_a) c:
1l
,lll{
lllrllr
iil,lll
Ir'llilll lll ril,, ll
iir., r'T :
::l],]i
I : I]I ';F
q
:' o)ac E n.'r -o+(a) 8ts \v"o
9 HO O X=o- 69 +3+
fi
W
@
-o (l)O_>a g(E
oE :o Xa xo
g)'=
.Eo ccD (of,
o-E
q)()
3or OC @'=gE-
m 3:9xU
xEE
5 Ff;_< 6 6PP
=(oN
o;!o oq)EE
E8 .= O_
Ozr -o6 sg
E 8l
6 as IrEE
E o.9 gflr
o o-o
A--E+
Rro
-E-(/)E;
EE
E#
Eb,
t- .r-:+,n3
E
_0)
G a
.c
o
o
o o c
0)
TL
G
o)
a
o l c
tr c
o t-o (L
o a o o-o L
o_
r€k,o
|
,;/|\i
I
tq)
BBa=
-el ? Eg
Hf ; c;$*E€€t s E; gi 3fr 5l # F.L o-
l-
0)
=
o)
.E -'o x>,YO -B aio a-r )
.-E 9c r-r c OO
-O15 e3
E
c)
r0)
l3
g
E o -c a o
=o
a c
L 3o oo E()
I- t-'=€
pA
C'f
t- t-o(!
E_=:a (5q);X
:_o
e3. E
$5EcE
r; dP3!
J::?fiE oe€.Eli
'
c\
J
o o
-c U)
$
o_
c)o-(u
C)
Cn E.^c+GP J ,!5
b
tl
hi
o o a
'o
TL
$
B
P €I
_a
'a
Y
E ggF-
; ii;r9 ;{dEix : P:;;i
cc
J
a c
=c
(-
'.=aS XP LU ,n
c
o (L
$
ar..{4a (rvr)
c{la Coa) r4r-iata (rvl)
Elot @ Lgurn rat-tt (qaa)
l.cr llfE iE.l. 6 .r
:t\Y irvllo t -aa aalr toa !.d
uotDp po aur-.'aCo to.Fn4i rrl| Errvr.|rl8.os ftDl
03 .TIVA
dooT scCIu sNon I88r
STTYII| SNINIVJUU JNIOd TIV
j=lld
i;i' H
3 6 .o
Fz
rn
Fe
frH
:E
pa
oG fie
frp
<9
63
EF @dl
9u
-<0z iBE
tsH
-t{
3=
oE
7-n
FH lrl ti lda
:PE 666 zo('
e_trr t!ci * I Ei>9zo-Ul 5= 5 H a ;* ii : I 5 r*. =E H EYE - Z e E 4
-:=E;5-dH oi F-8.^= i4=rglgFCE i-*$ '= *
=;Eg*E=EcE=*E;*igs;sEFEc3Hrs;Hr;**HE;BETEEEEEEEEEfi;EEF'=c
=E5ia .;6 s r 5
=gg.a = =E -6Ei 5 E a
saaisEg*=u-gHF:g*f3Es3g;EgHssris;*g$sg3ssEgH3gFF:=*iFsE 5*rEE*
=
r E E : r
=
EE ?
==s,
6 a -F g p e p EE p p p Efr.*ai€aetH, p p E ! s E s I E E * r 3 F : * i i e>s
F
Q---t
z_o tr
UJ
E.
co
co
6
a
.9
o g
t
rltatE*eg$;nHsE;=sg,sg366Er:eEE*E;;$;eiHe**rFrEesie;ssgH===,a
f**oo***a.
H'tuinliilruslliifuiff*
=i;i,g iii:is
i;,i Iirl L.-- *r ig .;;: !(o4.
BFF 3 "=r.I "€ x -- 3'b 5 sai; !E:s o .' gcr C O o-
iEl " 9E E€
ii$€iiitii
i; i;;: ;EE ;
!il:I:5€€l
:!B='rEq!!-
$!slE.:siii u (tE< lf< .g u -dI
iiil! i;;iii ii=i isiii i , *=
(I
]
b
;
a
9
P
o
a
c
t
-.
ll
g(
939 3SR R$g ttttrttrta.-
fl q (,4 qt
E
a g
q
I
>ci
o..R
5
<)llt
I
5
I
=
q
T ct g
I j
I g
f,
.d
it H
arl
zt (rl
07 lrl ct
ars-lla fivt)F{aa (rG) 4ar-iara CYI)
Srot @ lor:nun |fH|. (oar)
t_.01r :llrll llD|. @ .tr
lv nvlo I Fat aa9t rcg lc.d
uot..p Fu! Cq.-qO{ |ornr..ul.
'cNr ErNvJ.r,rsr.|oc xF{Y
OJ .'IIYA
d00T seolu sNon r88r
STTVI,I CNINIVIUU INIOd 'IIVA
J=lld
iii: f,
N?*
t(J);
6e
f;EF3
#=?;E adrA
gFF;
Ef,aa jrHo
;EEk
t22=-
IE=E E*co F a lrJ lrJ ..<gs
lrJ trJ = f 5tr99 z.a bt E
)
(
)
,Jt 3
Ei
__f-
:s \9
- lti .>:r>Y ,. LLI l.
\/ LL ',zZ <
i:("OtL
i_- r.._r S
\
)
\
N
fl
' '
=[4t Jn o,>
o-l
j
.J
=(,z. l F
v)x
]d (
\t
I
!r6
(or-
:o
-l
tl
Ltl
-J
O a =Ld z
F
a E trl
tlJ E
z
z
tr o
E F a z.
O.;
c|(,Z. Z.tr=a
=t t!o
o14 F.J <ao E@
Lrl l-L F trl O Ez
z :no
r'\ =z l a(n
ur=F=u5
z
o -rf Fz.
trl 7 =a 6r2
HZ
H g y r.i t c)a fi ==O FM trl H bE
sU *e 5 == q5 U otr -tz
=P**a U td z-,
(Y EF Ef F 22 $x a Uo 5=--.1 a o i q5 L-b
= q< H'ts 2; P"k tr:j ox 9 =i =e.: U= Ur-'
o td E
r.' l .. >9.AFH ? a*J- U) tn co-
d aZ
= *t?<O lX tr 9'"*F L!-6 ?:
22+ezffi
=
n.2
t4 \)Z
d ou
trJ F 6 ??F (nF
I ER 3i P* 9t
!.J tr = o--F -UJ
^*-.t So z2
=k 90 \., O (JF
[L r, Zl-
t^t od F<til eo- [ o
FI A9 IJ- A
^l
vl-\-./1 = || Lr- -zl s* ?e
1l H3 pE
:l - c.i rrl
....-:
a-- --l z
J
tL
-J J
O z
z
F
ht E
t_____l
F
I
I
trl
^o (L
I
td
r)+
ar-{at (xvt)
E -a4 (!C) aaal.ara (rYi
Ela Gr n:rurn r6l-tr! (oaat
!-€l llfE i..r. oo .tV
av trvllo | 61'. ztit toa tra
(at..t po. aqr.qaD td.loDt.
rN| ErNvr.l.rsitoe Hl)l
0c 'TIVA
doo'I ucqlu sNon r88r
STTV.[I'. CNINIVJUU JNIOd TIVA
J,lld
iei' H
n-l :\a..,, 3 t(n;
tl
$
E
LrJ (L
z <g tY tu
-z tcr u)7
Ll->a i-J r!O o-a
Ni
=E.Y 3 s9
@..
fi, '- 6."oz_"o(D { o g.a F R f ^ o I
OP s O
x..i
26 3"o(o
Ro
(o
@
Ni
I
#z.o o
o
rr)*
a (o
@
F E
LrJ
o
tt):h
a -,E *+r-F
i-k(D
*d
UJ -()?\t z \o o ;
\-l j o; \'t . r*,/
ct, 3 rl .o'
:ot
-l
F:r
F:td tr
x
I
|o
+N
@
^o I
z
o-x
Ld
t x g
@
rO
=\r
X +x s J
F z
tts td (L
z.ag xil -z ao ltz Frd >a EJ UJO (L(,r)
N
v.o -
F z o,.o5
o(D
l( dd
In a0
:
@
@
F E td
o
iro rh
:
@
N
E o _r
F z
o
|r):h
a
E.!L lrJ .I
J 1-km
*d
Lrl
?\ z.\R
xvn .o-.9
9-,2 --_-lio
xd
t40
==a'r C\
- tv:)
9o
(o
+c{
@
-o -(J z
o-x
LJ
x g
@
|r)
=+
x ti x
J
F z o
> u..)
:SS
rr') lI
-t
::" t 7\,
('(.o
. : J.J
TY'| .0-.c
Ln+ ( RL(-3
Design Review Board (>'nns (LLJK3
oot/t*.x,ltw EEIEtroPuEnT
ACTION FORM
Department of Cornmunity Development
75 South Ftontage Road, Vail, Colorado 81657
t€l: 970.479.2139 faxz 97O.479.2452
web: www.vailgoY.com
Project Name:
Proiect DescripUon:
VAIL POINTTH HOTTUB DRB Number: DRB060412
RNAL APPROVAL FOR A CHANGE TO THE APPROVED PI-ANS TO INSI-ALL A NEW HOT TUB
Participants:
Project Address: 1881 UONS RIDGE LP VAIL
VAI POINT TOWNHOMES POOL
Legal Descrlption: Loe 1 Bbdc 3 Subdivlsion: VAIL PoINT TOWNHOMES
Parcel Number: 2103-122-0700-1
Comments:
Motion By:
Second By:
Vote:
CondiHons:
OWNER O HAM, THOMAS W. & LAUM K.O9/O5i2OO6
22674 ANASAZI WAY
GOLDEN
co 80401
APPUCANT DENVER POOLS & SPAS 09/05/2006 Phone: (303) 435-3435
PO BOX 881
I.AFAYETTE
coLoMDo 80026
License: 851-B
coNTRAcToR DENVER POOLS & SPAS 0910512006 Phone: (303) 435-3436
PO BOX 881
LAFAYETTE
coLoMDo 80026
License: 851-8
Location:
BOARD/STAFF ACTIOT{
Action: SIAFFAPR
Date of APProval: 09/05/2005
C.ond: I
(PI-AN): No changes to these plans may be made without the written consent of Town of
Vail staff and/or the appropriate review committee(s).
C.ond:0
(PLAN): DRB approval does not constitute a permit for building. Please consult with
Town of Vail Building personnel prior to construction activities'
Cond: 201
DRB approval shall not become valid for 20 days following the date of approval.
Cond: 202
Approval of this proJect shall lapse and become void one (1) year folloring dl" d;
of flnal approval, unless a bulldlng permit is lssued and @nstruction is ommenced
and is dillgently pursued bward completion.
Planner: Wan€n Gmpbell DRB Fee Pald: S2O.OO
Changes To The Approved Plans
Application for Design Review
Department of Community Development
75 South Frontage Road, Vail, Colorado 81657
tel: 970.479.2128 fax: 970.479.2452
web: www.vailgov.com
General Information:
All projects requiring design review must receive approval prior to submitting a building permit application. Please
refer to the submittal requirements for the particular approval that is requested. An application for Design Review
cannot be accepted until all required information is received by the Community Development Department. The
project may also need to be reviewed by the Town Council and/or the Planning and Environmental Commission.
Design review approval lapses unless a building permit is issued and construction commences within
one year of the approval.
Physicaf Address: ltf t L'ons Rrdl- Loaf - l' 'l
v
vl
vl o o
o
\
^
parcef No,l A l0 Z i) A 0 + Oo I (Contact Eagle Co. Assessor at 970-328-8640 for parcel no.)
Name(s) of Owner(s):
Mailing Addressr
Owner(s) Signature(
Name of Applicant:
Tvoe of Review and Fee:'7
M/ Changes to Approved Plans $20 For revisions to plans already approved by Planning Staff or the
Design Review Board.
Submittal Requarements:
3 Sets of Plans Addressing Project Changes
Signature of Homeowner(s) or Association
For Office Use Onlv:
Feepaid: Z.-d= ct.crruo., Z/OZay' derav^c,- rt!/.gt' '+---'-----;re
p136ns1. l'(J L_ projgct
€t+rf(n f.g( g+
Flcdev\FORMS\Permits\Planning\DRB\drb_change_to-approvedjlans-lJDage-05-1 1-2006.doc
I
I
I
't
JOINT PROPERW OWNER
WRITTEN APPROVAL LETTER
a joint owner of property located at (address/legal
description)
a:
.l
provide this letter as written approval of the plans dated which have
been submitted to the Town of Vail Community Development Department for the proposed improvements
to be completed at the address noted above. I undentand that the proposed improvements include:
I further understand that minor modifications may be made to the plans over the course of the review
process to ensure compliance with the Town's applicable codes and regulations.
(Signature)(Date)
Flcde!^FORMS\Permib\Planning\DRB\drb_change_to_app.ovedJrlans_1_rage_o$1 1-2006.doc
*,** **+t* * ***+* +***************+* *** ******* * {.{.{.'1.** {.,1.** * * * * * * * +***+** * * ***i'N.*,}* * * * * * * **d.** * {.* *
TOWNOFVAIL, COLORADO Statement
****** +*f**** **** *** * +++*f,*********** *******+++ * *++* * + * * * * *** * * * ******+****************:1.'1.,1.**
Statement Nudber: RO5OOO1374 Amount: $2O.OO 09/05/200604:08 PM
Palment Method: Check
POOIJ AND SPAS
Ini t : ,fS
Notation: 2102/DENVER
Permit No:
Parcel No:
Site Address :
Location:
This Payment:
DR8060412 I!4>e: DRB-chg to Appr Plans
2LO3-L22-O700-r
18 8 1 I,IONS RIDGE I,P VAII.,
VAI POIT\IT TOWNHOMES POOL
Total Fees:
$20.00 Total Al,L Pmts :
Balance:
$20.00
$2o. oo
$0.00 *****rt++*******************************+++**:t*'l't'll.'t '1.*{.*:1.{t**** * * * * * * * * * * * ********************
ACCOUNT ITEM LIST:
Account Code Deseriptsion Currents Pmt.s
DR 0 010 00 0 3 L]-2200 DESIGN REVIEW PEEE 20.00
Vail Point Towu llome Association
1881 Lions Ridge Loop
Vail, CO 81657
August 29,2006
Warren Campbell, AICP
Town of Vail
75 S. Frontage Rd
Vail, CO 81657
Re: Vail Point Pool Renovation
DearWaren:
with this letter, I am confinning that the Vail Point Board of Directors has approved the
new "halfmoon" shaped hot tub (engineering plans to follow). We appreciate your help
facilitating this change, which is necessary due to the soil issues around the current hot
tub and its uuforfunate stale of disrepair. we look forward to providing our community
with a safer, commercial-grade spa.
Thank you for yourprompt attention to our improved plans. we are hoping to finish this
project before the weather gets too cold.
Sincerely,
flwr*-"J "0i(**
Thomas W. O'Hara
President
Vail Point Town Home Association
coitu{TY rrl,EtoFt€r{t
Vr*?;"t-
Design Review Board /r* lr dPs
ACTIOil FORM
Depertment of Community Development
75 South Frontage Road. Vai[, Colorado 81657
t€l: 970.479.2139 far; 97A.479.2452
web: www.vailgov.(om
Project Name: VAIL POINT TH POOL CHANGE
Project Description:
Pafticipants:
DRB ilumber: DR8060356
FINAL APPROVAL FOR A CHANGE TO THE APPROVED PLANS FOR AN ADDMON OF A
RETAINING WALL
owNER O HARA THOMAS W, & LAURA K.08lrtl2m6
22674 ANASMI WAY
GOLDEN
co 80401
APPUCANT NEILS-LUNCEFORD INC. 0811112006 Phone: (970) 468-0340
PO BOX z13A I74O BLUE RIVER PKWY,
SILVERTHORNE
co 80498
License: 297-A
Prcject Address: 1881 UONS RIDGE LP VAIL
VAI POINT TOWNHOMES POOL
Location:
Legal Descriptioni Lot: 1 Block: 3 Subdivision: VAIL POINT TOWNHOMES
Parcel Number: 2103-122-0700-1
Comments: SeeConditions
Motion Byi
Second By:
Vote:
Conditions:
BOARD/STAFF ACTION
ACtiON: STAFFAPR
Date of Approval: 08/16/2006
Cond: 8
(P|-AN): No changes to ttrese plans may be made without the written consent of Town of
Vail staff and/or the appropriate review committee(s).
Cond:0
(PLAN): DRB approval does not constitute a permit for building. Please consult with
Town of Vail Building personnel prior to construction activities.
Cond: 201
DRB approval shall not become valid for 20 days following the date of approval.
Cond: 202
Approval of this project shall lapse and become void one (1) year following the date
of final approval, unless a building permit is issued and construction is commenced
and is dil'rgently pursued toward completion.
Planner: Wanen Campbell DRB Fee Paid: $20.00
*;l!'if'Y'Uii"ir Vl 4yo A'(toPE FPorn 3 5' rv &z-?oe ) : I
Location of the Proposaf r Lot: / Block: J ,t ! "{\)
physicaf Address: / BF / C/Ops Freae toof (Connap 4pe**/ Ard
Parcef No.: Ll03 'lZZ ' O7W (Contact Eagle Co. Assessor at 970-328-8640 for parcel no.) V
f gstpgrtl1'Zoninsr F EsrRe*'{ttu / nu-n - F4rnrt-Y
o
Nameof Appri."n1, Pttn tftnf4'vSoN, NE2tus ttzltt'EfOea
Zoninsr FesrRef'r{r(t'/nuun-r+rnru\-. - - n n"'"L, t*Fq,
MairinsAddress: ltl\\ l-^t O* s Rrra G q- [ Oo P VtAr t-, Cq Sftlrj
Changes To The Approved Plans
Application for Design Review
Department of Crmmunity Development
75 South Frontage Road, vail, Colorado 81657
tel: 970.47 9,2728 f axi 970.419.2452
web: www.vailgov.com
General Information:
All projects requiring design review must receive approval prior to submitting a building permit application. Please
refer to the submifral requirements for the particular approval that is requested. An application for Design Review
cannot be accepted until all required information is received by the Communify Development Department. The
project may also need to be reviewed by the Town Council and/or the Planning and Environmental Commission.
Design review approval lapses unless a building permit as issued and construction commences within
one year of the approval.
Nameof Apptiganr lzllrl v Wn/v>u/w/ N?/L'> L'vtlwLb4 ur-t)
t a I
MairinsAddress: Po 6ox L|SO tfiuveplHogNe Cq w
1 TypeofReviewand Fee: ,S
f, Cnanges to Approved Plans $20 For revisions to plans already approved by Planning Staff or the V
Design Review Board.
Submittal Requirements:
3 Sets of Plans Addressing Project Changes
Signature of Homeowner(s) or Association
For Officg,Us-e Onlv: Zl 6/
Fee Paid: a-\ Check No.: - By:
Flcde\TAFORMS\Permits\Planning\DRB\drb_change_to_approved_plans_1jage_0Sl 1-2006.doc
Vail Point
1881 Lionsridge Loop
Vail, CO 81657
August 10,2006
Mr. Waren Campbell, AICP
Senior Planner
75 South Frontage Road
Vail. CO 81657
Re; Vail Pool & Spa Re-Decking Project Revision Approval
Dear Warren:
Please use this letter as confirmation of Vail Point's desire to amend slightly the plans
submitted to the TOV in May 2006. The May 2006 schematic is attached for you
review. We are approving the Vail Point's Pool Committee recommendation to add a
verv similar dirt retaininq wall on the East side of the existinq Clubhouse identical in
looks and similar in size to the one planned and approved on the West side of the
Clubhouse.
There are now planned and approved, two (2) wall(s) on the Clubhouse West side.
one runs East East-west approximately I feet with an adjoining wall running North-
South for about 15 feet following the contour of the land. This new request approved by
us, is the add of an East Wall beside the Clubhouse. lt will be similar to the West Wall
with the exceplion that the East-West Wall portion will be approximately 15 feet and the
North-South-Wall part will be approximate 6 feet, again following the contour of the land.
All walls will be faced with the same rock veneer-Moss Rock. Both east-west section
of the wall(s) will be the same height. The north-south runs will vary according to the
land topography-which are reasonably similar.
lf you need any additional information, please contact me (303-820-0018), Jennifer
Kronenberg (Pool chair) (303-5174194), or Jeff Antonius (vait point Board Member
and Pool Committee member) (479-51 7g).
Thanks you very much for your help in the matter,
"+ffiPYyVr*
Tom O'Hara-
President
Vail Point Board of Directors
Attachments: Original Request - "One Wall,'Schematic
PS: Our Pool Contracto/s engineer will submit new drawing show the add of the ,'East
Walt" which witl be very similarto the existing 'West wall"
** *********'a***** * *** * * ************* *+***+{.**d.d.+ * * * * * ***+* **** * {r * {. r.J.*** ************ * * * * * + * * *
TOWNOFVAIL, COLORADO Statement
*+'l*** * *++*,t****,i*************+,Nr * ** ***+* * * + * * * **rl.*,1{.**,i* * *** * ******+ +* * * * + * * * * * * * * * *** ****+*
Statement Number: R060001,204 Amount: $20.00 0e/11/20061L:42 AM
Palment. Method:
ANTONIUS
check fnit: ,JS
Notation: 2167 /JEFE
Permit No:
Parcel No:
Site Address :
L,ocati-on:
This Payment:
DRBo50356
2LO3-L22-0700-t
1881 LIONS RTDGE LP VAIL
VAI POINT TOWNHOMES POOL
Tl4)e: DRB-Chg to Appr Plans
$20.00
**'1.**********+*****************,*******+*******{.*********'},}****,N.*!N.'}{.*:t 't ******:1.l.**:1.'1.***i.{.+****
ACCOUNT ITEMLIST:
Account Code Description Current Pmts
DR 00100003 rI2200 DESTGN REVIEW FEES 20.00
Total Fees:
Total ALL Pmts :
Balance:
s20,00
$20.00
$0.00
Ea or=
'F()
ITI L
Es)
=t QM c=
o o)
q)
-:z o q)!
E o o o o.I o-
E -8' -E
frsi H='EE E 3 F€+Ec
='E
!gsE,t
9€ $FE-*e
'68
L.L
aE
(l)F eA
bE
/I a /
sie cO )+C=g 6e 'aEo :S'o PeE o,ti
'E: E9
-'- .lJ ! L \u >\rn o o o)
fi ig fiflE i4 EE'-- iE=€ 5=E Bf,A 2 cIE x E;nrlr:\.r^.=P EstE AEo E gHa ">g g FEP PE8 o Fah de6
/
f o
q)
()
//
//
g
g
o,o '=o
2.9 EE
>.= x oox o oii (Dlr-a6q
E= *:'"Q oETi 3-g F
.=oo H;O .
=!q /QoH /
a
'o
!
E o
E o o-
x XE 60 OE PE .=o E*3
TIJ IL
Orittdj;)
C
o
o
c o
o o
o O
:)o
c $o
O
e*rst$g
<
:lf,<ug
aqp€P.9Eo AJH tr)tL ri ;i
=Eoq)Xlo-o-6,9iLir
--o.
YOi:!-0-ZOO
€o
=!
qro)oo
..Y (U
oo o. _c o.=6=
+
io
+
F
.i--=r+F=oF Er-
o a
o
=o
t-
o
6
o
o-
F
:
3
'=
'o
o t
o
o
E
o)
o)
-o o
o o
6urplnq 6urlsrxe
i9g 5
F:EUE
e t r IH E :, i9A.:
F€iFEE
tr
6
=(o
=
(o o
o)
@ z I (t)
IIJ
E.
o o
-c a
(U
o-
o
.=a
=
tl
@
ai
o
C)
U)
'o
o-
o
\$a
:-.,;\J a !bb3 cE 9-O O O ii^nl ,-r
-; tn-o ';'E.o
g (ob 6 ?P f,p-s b 9;!ts h q6 -n'19
Q,,,! o h!-3geE t3x
P E* g E F E-'E o 5 F oE o E o)c! E c .o (U=q: qcscl o- E<JJ <E-.
t-
0)
=o
-o
o,
.c
.g
N 6>
-3 aio 6.>
..rcl Og J-r c oo
56 ,p3
0)
rO l3
l\.
l>IY lo
E o
_c a (u
3
a c
6.2
!()oc)
=E -?8 .=o
9a r-r 0).98 g 3l
5 h3 l!bE
o o.9t x cto 585
0)
o_o 6.-.a+
:|o
t1 -F
(/)E;
EE
Et
;3
c)
a
a
_o
0)O c o
LL
0)
q)
3or Oc o'.gE-
6 3:9xU
P; E ;88
:gH iipp
:G(!o *o iiE /r O
nc)
8q
O- =.o\r fi
o,€()=
=- c o a= c F QA Sc->d €6 Po
E Ef E= 5E oe
=.
8E t-? 6E 8e;CD cZ a-ro o t T a P Ee, E: oo o=.= Rr Ri g: g='
I b'eo o N b'# b"r rrJ o- L 0- 0_
Bo
!- L-'=€
pA
of
i:c ON
-t-
o-3
(oC)6x
$O a E
$
:BE 5 dceHf
i s€55 P:e:i 6* e5::;ifs
o{
J
c)(D=-c;aE
rE $f
o-g
o6 o-g (UF
()*a-9.r-9 (UP J,6
i:
r6
lo
O
_tl
ai
a
'o
o_
(U
ea-aa (fot) allr{ra hYt)
alre 6ldliUn |dtr'ra)a (qal)
l-.aat tlft lsatt oo rt^
w trvuo I nle aEt Ic od
ult..r poo lulr.vtOo tor.t.tut.
?Nr :rNvrlnaNoo lTrDl
oc "IIVA
d00T fieolu sNon r88r
ST'IYnl. CNINIYTUU JNIOd TIVA
J=lld
i;i: f,
o 3
>i{\-)
_a
\6'o
1 E_g= s;; z
glEE
===fi
eE=,*E;E=tsB;Hr;;slcu*;fr fr ;3*s=F*"'["sE'iE#EEE,,i
F sH7"-5*.Hf;
.FE ; 3 zQ =.ri i
gegisEE*:u-gEFH***;EE=EEEgessrE**i;g*3*gfi
eges;ss=*iFrcEssEg*
r
=
E E * q
=
E! ?
==e
s t e -3 sgs p E.EE a s B F ; ; ; Hse * H. p s 3 !E E s i EE - E ? g : * * i e>S 2
z.o tr
LrJ
E.
co
m
rrtetEE*nH;gis3;=r;,sdHE6ss:esS*x;;i;Hifier;rFsEr63sar+gsr=z-q
f*******e.
is'i$iiiiiii
i r:
=; : i !h: ' g 5
;E € Bg€
E: : Eb*
;ii;gs
ff,t iiir '.;*. J'..Ei
iiiiisit
ffiigiiiii
iiiiiiigii
E iii; iiiiii i i,i Iglii i, *=EiEs;rEiEi
:
E
-
!
'5
-9
6
rJi
i4-
dd 4S gE d6 Ho
ET do
I P 99 SRR$.lt|trttrcrD!\
.Jatd-
d!d
I
:ct
I
I
I
I
I
I
I
I
I
I
5
ID
E
()
.9
o
.9
E
i
I
I
E
I
:
ol
T cl ct
{(:t zt z
5
2 d I
1
tr
@ I zt (,
ot rl|ct
9 6 .o
Eg gr?
F lrl
He
HH
=E PP
oE fie
frp
<9
e?
AE @i6
Q,W
z<9z aE f,i lrl 65
-1
(
3=
oE
?n fE ]dfi
Lda
:FE
=o66 -a)<)
,da-aza (r0() r.il-an (rv,
erd € lornun lra-na G1|)
a-{ar Iru .Ea|. OO .tr
fv vf,vuo 'r sll z{tr r!8 !!
!Ot..P Puo Out-.utiu. ru.l.turr
'cNr srr|l/r.lnsNoe SftDl
OJ .'IffA
dooT ucolu sNon I88I
STTYrtt CNINIYJUU INIOd TIYA
J=lld
i;ir f,
NT*
t(r);
6e
f;EF3
fi
=,i=lo6-A
HFF;
E#ae jrHo
:ffrF z,= alJ'J
-n!;1
XBoB Erco F a. LrJ lrJ ..<gs
l-d lrl = l 5K9s z,atnE
)
(
)
A
t^
| .,u
..-.-__
=s, I s,l
{,\ )/" -:- j-< I
"ilAs/--'c
l
\
\
)
, lJ-
r..1 ;'j
E
E.td
o
E
-I z_a 4,V :o u-z =
=
z.tr a
=TIJ
I
=td z
a E td u-ul E
z
z.I
o l
E.
z.
o(n
c|(9 ZZ tr=a
=E l-rJ O
O L,-l
F
ao Ea
Ld tLF Lrl O Ez
z 9b AP z l
LL()z
:H6
OLL z v)
o +=
26 HC)
',1 HZ
H P xH fr ;=o t-E
trJ *- bE
S-,2 5 n 5 == qb
*'qF jz
= Y* =E Y r,l t He 6=.v Etr Ef,
o-n 22 -E s ada5=Jao < q5 'b
= -o< trrN
r, I ir-r x E =2 5x () ZJ, z\)g 8i* 8E
o
trJ E
.. >9.
IVM
=+- ua co-i)6 r' 6=
= H?\J <(J
=X E gE 6 ?E 2 2-+?2n 3"2
==a r.,-{ \r Z
LrJ 6-
trJ F 622 F (nF
o Ho 3= ko 95 9x
!.J L^l =cr r-F F t,l Hp so o- UJF 6a d+
v(jr (J-
[L r, Zl-(^t od F<
i'11 a^ Xtn xl 5F ;.6
\Jl tr ll *F-'l i= :,zt:9 0Q <l LrJ F FL)
dl - c.i
Li-l
a
z
0_
J
=O Z
z
F
hJ
E.
f --l
_lr
g8
(ol-
o I
I
td
(L
I
L!
|f).f
Fr<aa hctt &ar-.ra 0(v,:ot @ toln|/l rd!-tx (o{a)
l-{lr :llfil t9ata @'ir/\lf nvuo | 6.l aat' ,oa ! t
uot-p Puo Oul-.{lr td6r.or.'5N|arrwrrrE oc llt:Dl
0c "IIVA
dOO'I UCOIU SNOIT IESI
STTYrtl, CNINIVJIU INIOd TIY
J=lld
iiir f,
n-:\...,,
E tU) X
tl
t
E ld (L
z <u n I'rJ 62
rO ltz Iur >a
Ed o_a
u ,9 ? eq
@..
6a 76 o(D { o ** F R l^ o I op k o
xd
2o 3.o(o
Ro
!(o
@
N
IY o 't-
F z
o
rO :h
io
@
F tv
td
(n
rO *
{n e+r-F -o .;
km
*d
trJ -o i..t Z.:8 \DI si -t.
---][]b.-'
I
L-.
t:
.i
t'-
o)
I
F:-
F td E
x
.
t,
'Nrn ,,9-,c
'utc ,,8
xYil .0-.9
a -t N
@
I
z
o.x
UJ
s x e
=+
x +x s J
F z o
UJ
lrJ z_:lrl -J->()E
trJ <z.O(E F l.d
E.trl (L
z <tr xti -z sO !z Iur
=a eJ ulo tL (,
N
E o -
F z
o=
-o cl
Ra In
.{' O i;F
:
@
F
E.
trJ
at
:h
:(o
@
Ni
d.
-
F z o (J
o io rb
a ,tY trtr
-J i-k(D
*d
LiJ -o ?! z.\R
o-7
--] i^
xcj
<4o
E.r'\ (\I
- f.)
Ro
:
@
I
a rr N
@
-o _r
z.
o-x td
*x q
@
|r)
=s
x +x l
F z o ()
'Ntlt,,9-.f l(Yi .0-.c
hnn's ft,4o4irrq
/of I ur-t t
3
ooa*tnflv tEtjELmS|'
Design Review Board
ACTIOI| FORlrl
Depertmefl t of communaty Development
75 South Frontage Road, Vail. Colotado 81657
tel: 970.479.2139 far:970.479.2452
web: www,vailgov,com
ProiectName:U,\il B^+ TH Re-(*
Project Descripton:
Participants:
OWNER VAILPOINTTOWNHOMEASSOC O9l12l2005
CyO DARYL BMDY
70 SANTA FE DR
DENVER
co 80223
APPUCAT{T MCNEILL PROPERTY MANAGEMENT 091 t2l2005 Phone: 479-8273
LOREN SMITH, SECRETARY
2077 N, FRONTAGE ROAD, #3OO
VAIL
co 81657
DRB Number: DRB0504B3
FINAL APPROVAL TO RE-ROOF THE ENTIRE COMPLFX. CHANGING FORM TILE ROOFING TO
ASPHALT SHINGLES. UNITS 23 &37 WILL BE DONE RRST. STAFF HAS OBf,AINED A LETTER OF
CREDIT, ON RLE IN ]OE SUTHER'S OFRCE, TO ENSURE THE PROJECT IS FULLY UNDERWAY
BY AUGUST
ProJect Address: 1881 UONS RIDGE LP VAIL
VAIL POOINTTOWNHOMES
Location:
Legal Description: [o$ 1 Block 3 Subdivision: VAIL POINTTOWNHOMES
Parcel Number: 2103-122-0702-1
Comments: SeeConditions
Motion By:
Second By:
Vote:
Conditions:
BOARD/STAFF ACTION
ACtiON: STAFFAPR
Date of Approval= 091 19/2005
Cond:8
(PLAN): No changes to these plans may be made without the written consent of Town of
Vail staff and/or the appropriate review committee(s).
Cond:0
(PLAN): DRB approval does not constitute a permit for building. Please consult with
Town of Vail Building personnel prior to construction activities.
Cond: 201
DRB approval shall not become valid for 20 days following the date of approval.
Cond: 202
Approval of this project shall lapse and become void one (1) year following the date
of final approval, unless a building permit is issued and construction is commenced
and is diligently pursued toward completion,
Cond: CON0007539
THE APPUCANT SHALL HAVE A LETTER OF CREDITON RLE WTTH THE TOWN OF VAIL PRIORTO
SUBMITNNG FOR A BUILDING PERMIT.
Cond: CON0007540
THE APPUCANT SHALL BEGIN RE-ROORNG THE ENNRE PRO]ECT BY AUGUST 1, 2006, VyITH THE
APPROVED ASPHALT SHINGLE. IF RE.ROOFING HAS NOT BEGUN THE UNIT WHICH HAD TILE
ROOFING REPIACED VI/ILL BE PUT BACK TO TILE TO MATCH THE REST OF THE
@MPLEXIBUILDING.
Planner: Wanen Campbell DRB Fee Paid: 1250.00
General lnformation:
Application for Design Review
Department of Community Development
75 South Frontage Road, Vail, Colorado 81657 ,4
lel:970.479.2139 fax:971.479.2452 f I
web: www.vailgov.com
!L._-t
-General fnformation: tlJ
Alf projects requiring design review must receive approval prior to submitting a building permit application. Please 7
refer to the submittal requirements for the particular approval thal is requested. An application for Design Review ; I
cannot be accepted until all required information is received by the Community Development Department. The I f I
projecl may also need to be reviewed by the Town Council and/or the Planning and Environmental Commission. L r{
Design review approval lapses unless a building permit is issued and construction commences within V
one year of the approval. ,-,Description of the Request: Re-roof 1 unit in each of 2 buildings. The complex was buitt in 2 phases in 1982 and f n tggZ. fie earlier phase hai cemenltite roofs, while the ld phase has asphatt shingles. A Denver roof consultant (Roof l/Tech) concluded that both roofs have reached the end oftheir service lives. The tile roofs experience avalanches dropping
snow, ice, and tiles 3 slories onto pedestrian areas, leak, and are subject to ice dams. The asphalt roofs are plagued by ice j
dams, leaks, and are substantia y damaged by various efforts to combat the ice dams- After much research and |
^consultation, our Association has sett ed on a super-insulated asphatt roof. We wish to'pilot' this expensive concept Y t through the course of a winter on 1 unit from each of the 2 twes of buildings. Consequently, for 1 year, 1 building would I havel units with the existing tile roofs and 1 unit with the new asphalt roof. Similarly, another building would have 3 units
with the existing asphalt shingles and 1 unit with a slightly different color asphalt roof. Once proven, we would apply the ,*{approach uniformly to all buildings in the complex. ln addition to correcting the safety and maintenance problems, this re. f -'
roofing project would result in a more unifom appearance by eliminating the tile roof surlace, creating a common asphalt \l|l7 roofing surface and color throughout the complex, and improve energy efficiency. One of the roofs (unit 37) is not visible
from outside the complex until the viewer is 1/3 mile frcm the complex (image #3). Unit 23's roof is visible only from the
property entrance from Lions Ridge Loop (image lU).
-\
Name(s) of Owner(s): Vail Point Tdwnhomes
Maif ing Address: _Vail Point Townhomes, c/o McNeill Property Management, 2077 North
Frontage Rd.#300, Vail, CO 87652 Phone: 970-479-6047
d'0D Owner(s) Signature(s): _
Name of Appficant: _ Loren Smith, Secretary Mailing Address: _c/o McNeill Property
Management,2077 North Frontage Rd.#300, Vail, CO 81657 Phone: 970-479-6047
E-maif Address: _LorenST 034@aol.com_F ax.
Type of Review and Fee:
. Signs $50 Plus $1 .00 per square foot of total sign area.. Conceotual Review No Fee
. New Construction $650 For construclion of a new building or demo/rebuild.
. Addition $300 For an addition where square footage is added to any residential or
commercial building (includes 250 additions & interior conversions).. Minor Alteration $250 For minor changes to buildings and sile improvements, such as,
(multi-family/commercial) reroofinq, painting, window additions, landscaping, fences and
retaining walls, etc.. Minor Alteration $20 For minor changes to buildings and site improvements, such as,
(single-family/duplex) reroofing, painting, window additions, landscaping, fences and
retaining walls, etc.
lChanges to Approved Plans $20 For revisions to plans already approved by Planning Staff or the
Design Review Board.
. Separation Request No Fee
I
F:J 3fJli,ix"*?tll:,k113 [1, lJ r, r t
Meeting Date: _ DRB No.:
Lo,r,-S^''l'
qr- (;1,
ClVail Point AssocV)RB application.doc ?U-lo< 'or+.O:l
!r?"isa eB3
Planner:Project No.:
G:Wail Point Assoc\DRB application.doc Page 2 of9
I
. SUBMITTAL REQUIREMENTS
0 Stamped topographic survey*, if applicable
e Site and Gradinq Plan, if applicable- (lmage #1 below)
e Landscape Plan, if applicable-
o Photos or drawinqs which clearlv convev existinq conditaons. (lmage #2 and 3 below)
e Photos or drawings which cleady convey the proposed building or eExteriorcolorand@. (See below)
e Lighting Plan'and Cut-sheet(s) for proposed fixtures, if applicable
e Written approval from a condominium association or joint owner, (See below)
e The Administrator and/or DRB may require the submission of
specifications, samples and other materials (including a model)
determine whether a projectwill comply with Design Guidelines
proposal is not clearly indicated.
Please suhmit three (3) copies of the materials noted with an asterisk (*).
G:Wail Point Assoc\DRB application.doc Page 3 of9
Hand or Deck Rails
Flues
Flashing
Chimneys
Trash Enclosures
Greenhouses
Retaining Walls
Exterior Lighting
Other
Notes:
Please specify the manuf;acturer's name, the color name and number and attach a olor chip.
(Page 6 of l2)
PROPOSED MATERIALS
Buildinq Materials
Roof
Siding
OtherWall Materials
Fascia
Soffits
Windows
WndowTrim
Doors
Door Trim
Tvpe of Material
Malarkey "Legacy 50"
No change
No change
"Natural Wood" (Sample attached)
No change
No change
G:Wail Point Assoc\DRB applicarion. doc Pagc 4 of9
JOINT PROPERW OWNER
WRITTEN APPROVAL LETTER
l, Loren Smith, Secreta ry of the Board of lrustees of Vail Point Townhomes, a joint owner of
property located at (address/legal description) Vail Point Townhomes, 1881 Lions Ridge Loop, Vail,
CO, provide this letter as wriften approval of the plans dated 9/06/05 which have been submitted to the
Town of Vail Community Development Department for the proposed improvements to be completed at
the address noted above. I understand that the proposed improvements include:
Re-roofing units 23 and 37 with Malarkey asphalt shingles.
I further understand that minor modifications mav be made to the plans over the course of the review
process to
(Signatu
':''"rypy'"*i';"i';?:?'resu'ations
C:Wail Point Assoc\DRB application.doc Page 5 of 9
Vail Point Layout of
cement tile. #37's is
lmaqe #1
pilot units to be re-roofed. #23's existing roof is
asphalt shingle.
r*a1
,\F:rt-€l
t)
C:\Vail Point Assoc\DRB application.doc Page 6 of9
lmaqe #2
The 2 pilot roofs are not visible from any point on this plot other than
from the area designated by the red triangle where #23's roof is
visible (see image 4). (Excluding the area within the Vail Point property and
the uninhabited hillside north of the Vail Point property.)
From no poil
on lhir mlF
loulride of lhe
wil Poinl
propeo| fln
lhe Z roofr be
teen olher
lhlnlhe !re!
ofthe re3l
trilngle [here
fl?l cln be kz
Clvail Point Assoc\DRB application.ooc Pag€ ? of9
(lmage #3)
In the area between City Market and Vail Point, neither #23 nor #37 is
visible from any public road except where #23 is visible from the
entrance to Vail Point on Lions Ridge Loop (as shown in image #4).
When seen from City Market, #37's roof is difficult to distinguish (it is
1,700 feet (1/3 mile) as the crow flies from where this picture was
taken to unit 37):
*87 (in bak .qw
behind the lighter
colored lJrritsl
Glvail Point Assoc\DRB application.doc Page 8 of 9
lmage #4
Unit #23 from Lions Ridge Loop:
G 'Vail Porllr Assoc\DRB applrcation.duc Pagc 9 oi9
****+*+**{'***+***+'ft**++**t!t***t+***++****+++***t}'}*i+*'}***++*****++++**{.***+++***++*:t+++++**
TOWNOFVAIL. COLORADO Statement
***** * * * + * * ** * * * * *+**++t** ** * *** + +* * t + + *****+*+*****+********t*****{. + + * * * * *:} * * * * * * *** ** ** * * *
SCatement Number: R050001492 Amor:nts: $250.00 09/12/200501:29 PM
Pa)ment Method: Check
PROPERTY MGI,IT
fniE.: .IS
Notation: 5158/MqNEILL
Permit Nol
Parce1 No:
Site Address :
Location:
This Payment:
DR8050483 qT)e: DRB-Minor Alt, Comm/Multi
2LO3 - L22 - 07 02 -L
18 8 1 I,IONS RIDGE LP VAII.,
VAIIJ POOTMT TOWNHOMES
S250. oo
DeEcriDt.ion
ACCOUNT ITEM LIST:
Account. Code
DR 00r.00003tL2200 DESIGN REVIEW FEES
Total Fees:
Total AIrL Pmts :
Balance:
$2s0.00
$2so. o0
$0.00
Current Pmts
250.00
Ff t"'w
., & '. lr,(fr ttl l
?
Y rl
,/^*}i
I
rl
I ll
63/87/2A85 l-2:38 3439389642
B & M ROORilG
oF coLoRADO, ttrc.
Sl31 North TEth Street
BOUI.DER, COLORADO 80301 phonc
'103.5843
BMROOFING PAGE BL|6L
Jar l/a-( ft 'al
"^nu,.oo", C,(&^ y'A
CHECTED gY DAte-
aa4a-
Warren Campbell - Re: Vail 1
From:
To:
Date:
Subjec't:
'Jim Kearney'' <jldkearney@comcast.net>
'Wanen Campbell" <WCampbell@vailgov.com>
09/13/20051:03:58 PM
Re: Vail Point roofing
Warren,
I apologize for the confusion.
The reason for tests on both roof types (tile and asphalt) is because the
structure under the 2 different roofs are quite different as well. They were
buill 10 years apart, by different builders, and we know they have different
problems. For instance, the tile roofs have safely issues (avalanching) as
well as condensation and ice dam problems. The asphalt roofs' problem is
mainly ice damming, but the venting and insulation are quite different from
the tiled structures. We want to ensure that the new roof solution solves
the tile roofs' avalanching as well as the other problems - so it's critical
to do a tile roof in the test. lf both tests are successful, the other / old
roofs in each of the 2 buildings would be re-roofed the following suftmer and
would then all have the same appearance.
l'll call you to explain in more detai|.........
Thanks, Jim
--- Original Message ---
From : "Warren Campbell" <WCampbell@vailgov.com>
To: <jldkearney@comcast.net>
Sent: Tuesday, September 13, 2005 12:11 PM
Subject Vail Point roofing
> Mr. Kearney,
> | have recieved your DRB application. I can staff approve the
> installation of the roof on the buildign which already has asphalt
> shingles but your proposal to remove the tile roofing on one unit and
> replace with asphalt shingles needs to go to the DRB meeting. What is
> different about the tile roof buildings that require them to be a test
> case as well? | can almost guarantee that you can hit your September 26
> installation dat if you modify your aplication to do one f lwo options:
> 1 ) Only replace the roof on the current building with asphalt and not
> do the building with tiles.
> 2) Select another building with asphalt to do a test case on so you
> would still have two case studies.
> lf you decide not to change your application I can schedule 1ou on the
> September 21 DRB meeting. A representative would need to be present at
> that hearing.
> Thanks
Warren Camobell - Re:
> Warren
DATE:
TO:
FROM:
SUBJEGT:
MEMORANDUM
July 29,2004
Community Development Planners
Clare Sloan
Vail Point Condominiums GRFA Interpretation
The Vail Point Condominiums, located at 1881 Lions Ridge Loop, is a development of 40
townhome style residential dwelling units. The property was annexed into the Town of Vail in
1979 and the condominium project began in 1981 and abruptly stopped in 1984 for unknown
reasons. The project was finished in 1991-1992.
The site was developed under the Medium Density Multi-family (MDMF) regulations and
proposed to be 860 square feet of GRFA less than the maximum allowable GRFA by MDMF
standards. However, two of the owners have indicated that they believe some of the buildings
may have a larger building footprint than shown on the development plans. A development of
40 condo units could have easily utilized the excess GRFA (860 sq. ft. according to the file).
Two condominium owners are proposing to convert the upper portion of their garage, which has
a 20 foot high ceiling, into a bedroom and bathroom. Under Section 12-154 Interior
Conversions, the conversion of existing floor space is only allowable if the GRFA for the entire
site has been exhausted. The units are eligible for the 250 addition and interior conversions
because the GRFA is at its maximum allowable under MDMF regulations.
Design Review Board
ACTION FORM
Departnent of Cornmunity Development
75 South Frontage Road, Vail, Colorado 81657
tel: 970.479.2139 fax: 970.479.2452
web: www.ci.vail.co.us
Project Name: Vail PointTownhomes DRB Number: DR8010111
Project Description:
Revision to original DRB approval for repaint
Participants:
OWNER VAILPOINTTOWNHOMEASSOC 05/03/2001 Phone:
o/o DARYL BMDY
70 SANTA FE DR
DENVER CO 80223
License:
APPLICANT JAMES KEARNEY 05/03/2001 Phone:476-2003
1881-37 Lions Ridge Loop
Vail, CO
81657
License:
Project Address: 1881 LIONS RIDGE LP VAIL Location: Vail Point Townhomes
l-egal Description: Lot: 1 Block: 3 Subdivision: Lion's Ridge 3rd Filing
Parcel Number: 210312207@1
Comments:
J
t
BOARD/STAFF ACTION
Motion By: Andy Blumetti Action: APPROVED
Second By: Charles Acevedo
Vote: 4-0 (Pierce abstained) Date of Approval: 05/03/2001
Conditionsr
Cond: 8
(PLAN): No changes to these plans may be made without the written consent of Town of
Vail staff and/or the Design Review Board.
Cond: 0
(PIAN): DRB approval does not constitute a permit for building. Please consult with
Town of Vail Building personnel prior to construction activities.
Cond: CON0004687
DRB approved option 'A color scheme with sand and almond body colors and green trim
(some buildings to be painted sand and some buildings to be painted almond; eavg
soffit and deck rails to be painted green; faux panels and exposed foundations to be
painted off-white).
Planner: Ann Kjerulf DRB Fee Paid: $0.00
Project Name:
Proiect Description:
Participants:
Vail Point Townhomes
Repaint 11 buildings within complo<
OWNER VAILPOINTTOWNHOMEASSOC 03/2612001 Phone:
o/o DARYL BMDY
70 SANTA FE DR
DENVER CO 80223
License:
APPLICANT JAMES KEARNEY 03/26/2001 Phone: 476-2003
1881-37 Lions Ridge Loop
Vail, CO
81657
License:
1881 UONS RIDGE LP VAIL
Design Review Board
ACTION FORM
Departnent of Cornmunity Development
75 South Frontage Road, Vail, Colorado 81657
tel: 970,479.2L39 fax: 970.479.2452
web: www.ci.vail.co.uS
DRB Number: DR8010054
location:Prciect Addr€ss:
legal Description:
Parcel Number:
Comments:
Loft 1 Block 3 Subdivision: Lion's Ridge 3rd Filing
2r03t2207041
BOARD/STAFF ACTION
Motion By:
Second By:
Vote:
Conditions:
Hans Woldrich
Charles Acevedo
+0
Action: APPROVED
Date of Approval= M{IS/200L
Cond: C0N0004647
That the colors be as discussed on-site. (Scheme 1: Porter paints no. 31049-2 (Gray
Cedar) for siding with 69,18-2 (Dark Lichen) as eave, soffltt and deck rail trim;
Scheme 2: Porter paints no, 31155-1 (Cottage Beige) for siding with 6953-3
(Sourwood) as eave, soffit and deck rail trim. 1824, 1924 (Autumn Red) is to be used
for doors and off-white shall be used where there are faux stucco panels or exposed
foundations.)
Planner: Ann Kjerutf DRB Fee Paid: $20.00
r
Questions? th. Planning Staff at 47g-2L38
I0t1,\APPLICATION FOR DESIGN REVIEW APPROVAL
GENERAL INFCRMATION
This application is for any project requiring Design Rerriew approval. Any project requiring design review must
receive Design Review approval prior to submitting for a building permit, For specific information, see the submittal
requirements for the pafticular approval that is requested. The application cannot be accepted until all the req uired
information js submitted. i]le project may also need to be reviewed by the Town Council and/or the Planning and
Environmental Commission. Design Review Board approval expires one year after final approval unless
a building permit is issued and construction is started.
DESCRIPTION
B.
c.
D,
E.
F.
PHYSICAL ADDRESS: /8A/ .1,--, iC.L,e L.,p - r. ) tL ,ti tt-\t'i z/A3 l
PARCEL #z zro< rzz- o? tsi / (Contact Eagle Co. Assessors Office at 970-328-8640 for parcel #)
ZONING: t -. .
LOCANON OF PROPOSAL:LoT. ^///t BLO1K: t,'/,t FILING: ^'/4
NAME OF OWNER(S):'or--/J J-,,.t'
MAIUNG aoOAeSS: 9r{/ la-/.-./t,.- he /e2er.a,l,,,f - aa gotbj ?HONE: t.z>_ zlV. 3(/6
owNER(S) STGNATURE(S):c r'r
NAME OF APPLICANT: J;
IYAIUNG ADDRESS:y'o..' ro Z r"; t
OF REVIEW AND FEE:
New Construction - 9200 Construction of a new building.
Addition -$5O includes any addition where square footage is added to any
residential or commercial buiidinq.
Minor Alteration - $20 Inciudes minor changes to buildings and site improvements, such
as, reroofing, painting, window additions, landscaping, fences and
retaining walls, etc.
DRB fees are to be paid at the time of submittal. Later, when applying for a building permit, please identify
the accurate valuation of the project. TheTown of Vail will adjust the fee according to the project vaiuation.
PLEASE SUBMIT THIS APPLICATION, ALL SUBMITTAL REQUIREMENTS
AND THE FEE TO THE DEPARTMENT OF COMMUNITY DEVELOPMENT,
75 SOUTH FRCNTAGE ROAD, VAIL, COLORADO 8L657.
(i4
PHONE:
TYPE
D
n
{
rt.
Jilbto1 11 * 2€utk1) .
l'
Vail Point Townhouse Association
Cio PRM Realty, Inc.
P.O.Box 2183
Avon, CO 81620
970-845-8582
&-
vl24/01
To: TOV Design Review Board
Subject: Petition to paint Vail Point Townhouse condominium complex
Our condo complex is badly in need of paint and the association is proposing to paint all buildings in the
complex this summer. The color scheme is as indicated in the attached application. The Board of Directors
has approved this application.
Regards,
N*UUI-- =l-1
Harold Buxton
President- Vail Point Townhouse Association
anlt , n^^,-l'.\\/.il\p-t'ti- r^ ^.:n1 IrE rltA ,^^
$' I,
$i $;:oE
\()
\
(\ -".:z>$ffi
;v'
d:\\
i\t-'o
, trl
i {N q\J
E -Z_xc
fl=lr.=n
qw;
$w€
t
@
I -tl
-\v 0 z ':d rrJ
=s '::
O
f 0
,\
t
\I
'.)\-f.-,\__-)
J
-s
t ,.:
\
o
+>-o!q
cD(,
q)
'6
6
FF . (-)
-2
.a
€
_?Erl i *Z
fr *ts
<--- '-aitv- /,1r'd t.,-.,'f O
r(e/
TOWNOFVAIL. COLORADO Statement
** * * * * * * ** **,* ** *** * * *** * * +* + + +* + ** l.{t * 'i* * {. * * * * ** t * * **** * * * + + + + +****** * * ** * * '1.,1.*:t* *'* * * * * * * * * ** *
Statement Number: R000000535 Amount: $20.00 03/26/2OOLO3:41 pM
Payment Method:Caeh Init: JAR
Notation;
Permit No:
Parcel No:
Site Addreos:
Lrocation:
This Payment :
DR8010054 Tj4)e: DRB - Minor Alteration
2L0342207 04L
1881 LIONS RIDGE IJP VAII'
Tota1 Fees:
Total ALL Pmts :
Balance :
$20.00
$20 .00
$o.oo
$20.00
++*********'l,t*'***'l * * * * * + + +++ + * ** * *** ** **,1*** * * {. * *** * * +i + + * * *** *:t * * * {.'t:*:t*,t,t *,} '} * ** * * * + + + + * + +*:*
ACCOUNT ITEM LIST:
Account Code Descri pti on Current Pmts
DR 00100003i12200 DESIGN REV]Elll FEES 20.00
/*Ol ' AWW6 Or r,o,t A'r,il qtm\ flh v
C"r*A,cie
'/ - o (, houn,ttD^p,a-)
I
Design Review Board
ACTION FORM
Deparfnent of Community Development
75 South Frcntage Road, Vail, Colorado 81557
tel: 970.479.2139 fax: 970.479.2452
web: www.ci.vail.co.us
Proicct Name: Vail Point DRB Number: DR8010242
Project Description:
Revised paint color for foundation
Partlclpants:
OWNER VAILPOINTTOWNHOMEASSOC 08/022001 Phone:
% DARYL BMDY
70 SANTA FE DR
DENVER CO 80223
License:
APPUCANT Jim Poppleton 08/0U2001 Phone: 569-3460
PRM Realty
Box 2183
Avon, CO 81620
License:
ProjectAddress: 1881 LIONS RIDGE LP VAIL tocation: Vail PointTownhomes
Legal Description: [ot: 1 Block: 3 Subdivision: Lion's Ridge 3rd Filing
Parcef Numberz 2L031220704L
Comments:
BOARD/STAFF ACTION
Motion By: Action: STAFFAPR
Second By:Vote: DateofApprovalz 081L71200L
Conditions:
Cond: 8
(PLAN): No changes to these plans may be made without the written consent of Town of
Vail staff and/or the appropriate review committee(s).
Cond: CON00049,I4
Stucco foundation shall be off white and concrete/cement foundations shall match
corresponding building body colors
Planner: Ann Kjerulf DRB Fee Paid: I2O.OO
,
f-10.131 P,L/a nuc,6.26A1 10:3ARI'|
Plrcel ilo.l
', rrtt (
4)-
l.(1
Q7,
Appllcation for Deslgn R'eview
Deplnment of CommudtY Dwcloptttcttt
75 Souut Fontage Roo4 vall @loft(h 81657
tcl: 970,479,2139 hx: 970.f9.2452
w€bi w$^|r.d.vall.P.ut
Generel lnfiormtflon!
rtrC ippttcaUon E for any pro;6 requirhg Dcsl$ tte/terw approya; AnJ qroilEt qqp dt3lgn rwen- mu.$
.ecend bpprc"al prrr r sirimrfrrn jti"rurie penitt apdrruoh. ptersc rdU a rE a/bmltal rcqgHH"jg,L'
prrtcubi ipprovit 0rat ts rcquet-e( rn -ripllcaton |U D€slon Rfilay cmnot bo accr4ted unul a[ r€quheo
ftibil;udf;|liraby udibffiluntry ocft'hpmot ocprrtnent, llEptrJcctrnry rbo_need b bs rwpwed by
UiC ftwn Councll rnd/oe ttr. plailiit oiO arvtrdnmentrl brrniss'ron, ocrlcn Rad.rY Board rpprovrl lepra
unlc5r a Dultdlng pormlt Ir lrrura-rnd con:tnrcdon aommcnctE wlthin onc Flr of thc rPproval.
De6cripgon olthe Rrquat -,'lE E* bq)ttF< t'^&on/ cat
ft
location of tte Pmpo6rll lot-dock- SubdMslonl
Phystcol Address:ffl LrcNstu
(Contaa E4lt Co, Assc$or at 970-328'8640 for Parccl no')
lonlng:
l{ame(s) of Ouuner(s):
llalling Addressr
Ournrr(r) Signa$rr(3)!
l{rme of ApDllcantt
mrlllng Addmsr:
Phon0:
Type of Rcvlry Ind Fae:
tr New conrt1ruon tr Addiudt
O l''llnff AlEratlcn
{ ar'.ne.. m Approvd Ptdnr
1200
s50
t20
f20
Fo? corEtrudton of r new trulldlng or derno/Gbulld.
Fr an addltlon wha! EqurrE fEoEge b ndded to lny lcsldential of
corr|I|lqrbl bullding (lnchd€s 250 l4tltJon6 & inerlor conwrsirrr).
For mlnor *rangci'b bulldlngt !|d dE inPtDYGtne(lE, nrdl a8,
r€mfrng, patnting, window Eddttldrs, hn&crphg, tsrices End
Gtainhg wBlFr etr
For re'lri6lons b thil ahcady apprcred by Plannlng sttff or hQ
De$En Farlew Boad
PLEA5E sUBl'lIT THIS APPtlOAllON, ALt SusMmAL REQIJTREMENTIi
ANO THE FEE TO fiE DEPARTT1ENT OF COMMUNITY DEVH.OPT''IENT,
?5 SOUfi RONTACE ROAD, VilL COLORAoo 4657.vE0
?001
i ,j, t"'
I
rnnT 'n .onu tuuo J ,"v
Eoxzlgs
z'd^ t0t9 0N. ,/\llvlu lrud l{d tz : 0
.,
JPEG inrrgc 6tl0$ilr Pixdr
'irl-h H-frrHl
ffi
D.fitrffltlorf Erilfiofu
.fl--lEfI-
= IrrErtE l!- lG h '|/.'rr' Etlril :Frl|l{r|||
flEr6lHr Dlbbr ilst$
trtlrrtofirrJDf,ilillb#
ffi naru{tIarflcrff G/wls h tullrtrw l.lrrrln DIIIIS O[t tln F|Irtrf iltG|f,r GnU i;fi.s
fi.ltLuQrlf h|.ao als,l&x '- :.l{-rtn rairrdlFuu|!. . ..... ..'-,... lrrt rrF:r*fiil1"
:-ffi ti dl*-ldriiir,'riirriirii: j'- ."" r
hrdh* rfufi,o.l
ffi
ln|ntrrn|llil
11- gar- +!dIE
cId Ffi;Eno ts.t.fr Eutror
*drf ilrri r O]u | !r F|r iltI dH 0E ilr t!|rtd hl I .drarr-F-b
gnr0 Eff f pr' r.rc-.lr -tb rft; thctt -'EI'QT't'T|r!'EElTl_iEE.cJ*ffi.|t ffin:
f-t
tfraCl*ttr
r.t*,[fr*, $r
o6vt/An I t:tl Al
ild lz:0 t00z '9 env
lofl
0'd l08g'0t'l AIIV]U NUd
!O t r lllt
A16rCOU6re lt}la}|lo(ol
t.tt0{49r96[,
VailPointTorvnhomes
Arryrut6,200l
Torlva of Vail Dgigr Roview Boud
Dsp6rfi fi t of ComoualtY DweloPment
75 South Fr,ontacc Road
Vril, Colcrdo t1557
RE: Cbruor to ApPmvcd Plaru - Painting prcjoct
Darr Sir or lvledan:
It ir our rrndcrrrnding thrt rll thc foundadoru of i,he TowDhfficr have bcen
"ppmvcc
for rn offwblu oolor, Tbc owncn radrrchitcctunl ocmnltbo of vril
Poiut would liko tho Towu b coqridar cbangiag rtrc rpptovcd color for thom , .
fouudrtionr to tho epprwcdbody color of croh rcrptctivo btlildlry, Thil woutd
*irrr *tcn the fo'nbtio' rrclihcr (l) csmoil block rnd/or (2) coacrcto' - _
Foundrflm rnu which rrc cwercd with rtusso would still rc|lgitr tho offwhitc
oolor, u rpprovod,
Ttc thinking hcrc il tlut tbc body oolor in thore two dh|tgo0l would do'cn:pbarire
tbs lcr thrn ectitrttc aDpcrtlncc of the c€otntblo* ald concccto'
TWrlopl
l0[q oN.i-. r r I
Slnoctly,
I'do.ll'lvl|l nlld |t{dze:t lf|0Z I tnv
P.O. au 2ltt
AYon CO El&10
I {20{6t{tlt0 lo}
l{70.tt0\taatt (0
Fax
Fu 87V479-2452 Page3t 4dcovar
?lnn 870-47F2139 Det:: 08/06/01
Rn Attadlad Inappro\nd phns hcr rnd
tr urgent tr Fc fudcw E llrrr Commrnt trPlrlrRrgly trPterrlrcydr
O Ccr||rnO||tr.
Plcere flnd thc atlrcmd per our dbcurrbne. I wllt etop by tomorow wlth thc 340.00. Thsnl5.
nl li
1'
/--'T:--- ------'h-
\.J
I 'd lOtq'0N l]lvlu nud ndlZ:t l00Z'9'env
(
TOWN OF VAIL
75 S. FRONTAGE ROAD
vArL, co 81657
97 0-47 9-2138
E Lect r i ca L--->
DRB Fee
Investigation>
1,, i tl. Cal.l,---->
Job Address
Location. . .Parce] No. .Project No.
5/i.00
.00
.00
3.00
Phone: 30394
I SSUED
407/03/ree'7
0r/03/7ee7
07 /02/7ee7
91403
DEPARTMENT OF COMMUNITY DEVELOPMENT
NOTE: THIS PERMIT MUST BE POSTED oN JOBSITE AT ALL TIMES
ELECTRICAL PERMIT Permit #: E97-0001
1BB1 LIONS RIDGE LP Status...utll. TPINT=c9\?9s uNrs #1App1ied..zTvs- IZZ-U l-02I fssued,..
Expi-res . .
APPLICANT WHITE RIVER ELECTRIC
P O BOX 1118, AVON CO 81620
CONTRACTOR WHITE RIVER ELECTRIC Phone : 3 0 3 9 4 9 1 4 0 3
OWNER
P O BOX 1118, AVON CO 81620
VAIL POINT TOWNIIOME ASSOC
t CHARLES ROSS ESQ, pO BOX 548, DAYTON OH 45402
Description: ADD CIRCUT FOR HEAT TAPE Valuation:2,975.OO
*****************************i*******t****************1**** FEE SUt'll.lARy ****i*******rr**i****t*******r**i****i*i**i********t******
TotaI Ca I cutated Fees--->
Additional. tees--------->
TotaI Permit Fee-------->
Payment s
57.00
.00
57.00 > 57.00
.00
*************************i********************************************************************************************************
ToTAL FEES---> 57.00 BALANCE OUE._--_
Dept: BUILDING Division:ERNST Dept: FIRE Divis ion :
*********t*********************************************************tr***************i***********t**t****i**i**t*****************i**
CONDITION OF APPROVAL
1. FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.
**i******************i************i1**********************************************************************************************
DECLARATIONS
I hereby acknowtedge that I have read this appl'ication, fi(Led out in fuLL the information required, completeo an accurate ptot ptan, and state that atI the information provided as required.is correct. I agree to compl,y with the informatron and ptot ptan/to compty with al't Town ordinances and state taws, and to buiLd this structure according io the Town,s zoning and subdivision codes, design review approved, 'Jniform Buil.ding Code and other ordinances of the Town appl.icabl.e thereto-
REOUESTS FOR INSPECTIONS SHALL BE MADE TI.IENTY-FOUR HOURS IN ADVANCE BY TELEPHONE A1 179-2138 OR AT.OUR OFFICE FROI.I E:OO AI4 5:OO PH
Item:,O6OOO ELECTRICAL DEPARTMENT oI/03/1997 CHARLIE Action: AppR FOR It'em:. O56OO FIRE DEPARTMENT 0I / 03 / 19 9 7 CHARLIE Action : AppR N,/A
ATURE OF OI.INER OR CONTRACTOR FOR
.HII'ISELF
AND OI.INER
.^
t--****************************************************************
TOWN OF VAIL, COLORADO Statemnt ****************************************************************
Statemnt Number: REC-0241 Amount: 57.00 0I/06/Sl OS:SS
Payment Method: CHECK Notation: #16911 Init: CD
Permit No
Parcel No Site Address
01 OOOO 41313 ELECTRICAL PERMIT FEES
01 0000 4t336 WILL CALL INSPECTION FEE
E97-0001 Type: B-ELEC ELECTRICAL PERMIT
2103-r22-0"1-o2I
1881 LIONS RTDGE LP Location: VAIL POINT CONDOS UNTS #1 ,2,i-6t23,24,2J,29,30,
- Total Fees:57.00 Tota1 ALL Pmts:
Balance:
57.00
57.00
.00
This Payment
****************************************************************
Account Code Description Amount
s4.00
3.00
fAf, 970 949 E74S WEITE RI}IER ELEC @ oo1
PEn-|lrr #---
DATET r- e-9?:
, AFPLTCATTON MUSr BE FTLLED oLflr coMFr.srEl,y oR rT fiAy HOT BE ACCEPTED
I** *** ********* * ***rt* ********** EERI{Ir INFORUArION * * ****t **t i*i* *r r********r r r*at I l*Buirding | ]'Plu'ibibE lK]-Erectriqar I J-]techanibal I J-other
Job Narne! - Ug;L F-'^ *7.. ,\*r"+Job Addreeat .l..EB t L,,,. * Q.*. L"*r= _
Legal nescriptionr Lot BIock
offn€rs Hare: V^,L ta",'"{':ftt-rf"^,- tgt
^ddress:W,-ft"f",.+,q Architect; d/c ' Addressl Ph.
General Description:
work class: [ ]-NeH [ ]-tlteration 1vy'-eaditional [ ]-Repair [ ]-other
, +'l !.rJtut a3,r-f , e.1 ,Number of DwclljnE Units:. _L,+ - +i,*,:a,iel|usber of Accomrrodation UnitE:A?+ A1
, tA/03/97 1l;21
?lroFsit Eagl: Counry itincpsit Eagl: Coun lf ac ir,l-:28-8640 fo
f,-=.t'.tt
ttLt4\-_1,
_al: N:_E,l!:!% Tror-ph. +7{'- 3e41
Electricalcontractor'fu.Townofvsi1Beq,No.l4s9
Addrese1 tt tt A^- rt t?,W ;i;;"-N*ii!i,'-'_o";--r'o-
Flunbing Contraetor:
Addrese i
Mechanical Contractor :
Address:
**************:r******* ********** FOR
BUTLDT}TG FERITT FEE:
PLUI''BIN6 FER}IIT FEE:
}fECTI.A.NICEIJ PERMI! FEE:
EI,ECTRTCAL FEE!
o?HEn TYPE oF FEEI
DRB FEE:
Town of VaiI
Phone Numberl
lovrn of Vail
Phohe Nunber:
Reg. NO.
Reg. NO.
OfFf CE USE ***r* r * ***!trt * ****** ****** * I *** *
BUII,DTNG PI.AN CITECK FEE:
PLUHBTNG PIAN CHECK FEE:
MECI|ANICAIJ PI.AN CIIECK TEE:
RECREASTO}T FEE:
CI,EAN.UP DEPOSITT
TOTAIJ PERI.II! FEE$:
BUILDINGI
SISNATURE!
AONTNGi
SIGNAT'IIRE !
0'1.'03/97 11:21 FAX S70 9.19 B71S I{EITE RIIER ELEC
O MEMoRANo_uM
@ ooe
70:
FROM:
DATE:
RE:
ALL CONTRACTORS
TOWN OF VAIL PUBLIC VJORKS DEPARTMENT
MAY 9, 1994
WHEN A ''PUBLIC WAY PEHMIT'IS HEOUIRED
Job Name; Un, I t?o,'n L To-^L;-'
Date: t-t -9 T
Please answerthe following questionnaire regarding the need fora'PublicWay Permit':
YE9.NO
\2 ls this a new residence?
ls demolilion work being performed
that requires the use of lhe right
of way, €asements or public property?
ls any ulility work needed?
ls the driveway being repaved?
ls different access needed to sile
cther then existing Crivaway?
ls any drainage wort being done
aflecling the right ol way. easements,
0r public property?
ls a 'Revccable Right Of Way Permit'
required?
A. ls the right of way, easements or
public property 10 be used for sraging,
panting or fencing?
B. lf no to 8A, is a parking, staging
or lqn6169 plan required by Gommunity
Development?
lf you answered yes tc any of these questions. a "Public Way Permit'must be obtained.'Public Way Permit" applimtions niay be obtairred at the Public Wort's ofiice or at
Community Development. ll you have any questions please call Charlie Davis, the Town ol Vail Construction tnspector, at 479-2'i58.
I have read and answ€red all the above questions.
\/d"-& E**-t--F rfzlt+
1)
t)
v
3)
c)
s)
6)
7l
E)
tr
\-p
Y
Y
Y
Job Name Conlractor's S Date
0.1/03/9? 11;21 FAI 970 6710 9.t g
o
75 roulh trodttgc rord
vrll, colorudo El657 (303) 479-2I38 or 479-2 139
I1EITE RIVER ELEC El oor
cttlcc of aommunlty dry.lcF|mfltl
UILDING PERNIT ISSUANCE TIME FRAAIE
lf this pennrlt requj,res a Town of Vail Fire Departflent Approvaj,Engineer's (pur1i. l:lf l.review unJ aop"or.r,'a if u-r.i'^6'b!pu.*.nt review or Hearth Departlnirrt.revier,-ani'a.review by the Buirding
SSril$;r,l;ethe esrimated timi ror'a-to."ar revlew may *,aiJ ai rong
f]] c9nn9r9ia'l (targe or srna') and a.' multi-family perrnits wi1.l have tu foilow the above rnenti6ned miximum reguirements, Residentiar anc smal I proJects shou'r d take a
-ieiiei"ut'ornt.of time. Hcweyer, if resicen+-ial or smai-'er,Drojectr irpiit the various above nentioned giil.lT:lt: wiih regard. to necessary review, these projects fitay a lsc :at(e ihe three week per.iocl , -
Every attempt will b:-Tf: by rhis deparL,neni to expedite this permit as soon as possible.
J:-Ilu undersigned, understand the p)an check pr"ocedure and time lrame _
COrunu ni ty Develoom"nt Department.
olt03/57 11:11 FA-X 970
TO:
FROH:
DATE:
67 4S
75 roulh tronlrgr rord
v|il. scaorrcc 81857
(30!) 479-2138 or 679-2139
WSITE RIYER ELEC @oot
olflc. of communlly dry.loFfi|.nl
ALL CONTR.ACTORS CURRETTTIYL REGISTERED w:[T?I tHE TOWN OF VAIL
TOWN OF VAIL PUBLIC WORK.S/COMMUNITY DEVETOPMENT
UaRCH 15, 1988
SU&7ECT; GONSTRUCTIoN PARKING & MATERIAIT STORAGE
rn sunna'y, ordinance No^ 6 stateE that it_iE,.rnrar+ful for any Ferscn -*o ::rrer,..:Il:k-:l deposit. .ny -"oif
,
-r;;;;' sand., Cebris er tra*-eEial, ineluiting rrash iunpsteri, poriablt i"ii;* ii-d---!.ori<rren vehictes .11fon.3"v streerl siaewaii, -ifi"v-o, public pl?i"-::_il{ fo1ion theieof. rne rrshr-of-ryay on alt rown of vair srraers and lgags is approxinateiy E fg.--6fi'p..,r"**nt,rhis ordinance wirr ue striiiri--inro=""d by the roirn of Vail Publ-ic liorks Deoartnent. persons tounJ-"Iiliii"i-ini= ordinance wirr be given a 24 hcur wrirten--notrce to le$ove Eaid rnateriar,rn the event the person so nosifiea.ao=i-noi-;;;pil wirh rhe notice vithin rhe 24 hour.tiae-=peci;i;;,' ii*-iiltr^ic r,rorks Depart:flent will rerrove said rrateiiat -at the erpenEe of Ferson nocif ied. The nrovisioni ot-t'ri=-ord,:-nance sharr nqt be appl'icabre to ctnstruction, srain--enance or repair projects of any street or alley ar any util,iries in the right_i_vay.
To.review ordinance No. 6 in fuII,vail Burlding Depannent ro obtain cgcperation on this .-flatF_er.
please stop by the ToHn ot a coFy. trhEnk you for your
(i.e. contractor, gwnerJ
Read and acknowl
Cron+t-.-+trt ositionlFEliffiiffig
REI-,-f 1"t I TOWN OF VPIL. CCILORRDN
0l. 1WA/97 O6:51 RHGLfESTS FOR II'JSFECTION l,lORK S|IEETS FORt L/ 8/97
F'A6E 5
OREff: Eti
=::==E=====:;;:====:::=====-::r======:==a;==::'===E===========-==============-::===========:i]:
flctivity: E97-tBrZtt2tl t/ 8/97 Type: B-ELEC ..5tatrrs: I$SUED lonstr': AAFT
Acjdr.ees: 1881 LIONS RIDGE L.f' / ,,t .' / , ,r' ?< J
Locat i on r VAIL trnINT CONDDS IJNT5 {+1, gf 16r 93, A4r 87, 19r 3rtrr 3et 36r 3?
--.r'F,ar.cel: 31raJ_1.:E_er7_rzre1 Oce; Use:
Description: ADD CIRCU1- FOR HERT TAF'H
flpplicant: WHITE RIUER ELECTRIE
Owner*: UAIL F,OINI TtJWNHOITIE A55OC
Corrtractor! t^IHITE RIUER ELECTRIC
F,hone : JtZt3g49 14OJ
Fhone:
Fhone : 3123949 14tZr3
Irrslreet ion Reqr"rest Inf ormat
Fleqrrest or": LORET,/t^JHITE RI
Req T.ime: EtB:0ttZt Comments:
Items r^eqr-rest ed trr be Inspect
fitzr1c)ur ELEC-F-inaI .
Fhone: 949-140f,
Inspection History, . ..'
,Item:
Item:
Item:
Itern l
Ite"rn:
Itern:
ltem:
tZlOl lA ELEC*Temp. F ower'
'aUlUta ELFC-Ro'-rqh
OrZ'1 JrA HL.EC-Conduit
Eral4rZ' F-LEC-Mi sc,
rzrflrl9rzr ELEC-.F i na I
TIOEE4 FIRE-ALARM RT]UfiH
IZIE538 FIRE-FINF{L C/N
t-TBAIK
OF SILVERTHORNE
IRREVOCABLE LETTER OF CREDIT
Town of Vail
ettn: Andy Knudtsen
75 S. Frontage Road West
Vall, Co. 8L657
Gentlemen:
We hereby open our Irrevocable Letter of Credit in you favor by your draft drawn
at sight on FirstBank of Silverthorne, N.A., 160 U.S. Highway 6, P.O. Box 347,
Silverthorne, Colorado, for any sum or sums uP to the aggregate amount of
$38,800.00, for the account of Parkwood Realty, Inc., 5299 DTC Blvd., Suite 500,
Englewood, Colorado 80111.
Each draft rnust bear upon its face the clause "Drawn under Letter of Credit No.
805-4479, dated June 30, 1993, of FirstBank of Silverthorne, N.A.". Each draft
must be accompanied by a statement by a duly authorized officer of Town of Vail
stating that this draw is in connection with funds needed for the account of
Parkwood Realty Inc., The Vail Point Project.
The amount of each draft v/hich is negotiatsed pursuant to this credit, cogether
with the dace of negotiatlon, must be endorsed on the reverse side of the Letter
of Gredit.
We hereby agree that drafts drawn under and in compliance with the terrns of the
Letter of Credit',ri11 be dul-y h^oncred if presented to FirstBank of Silverthorne,
N.A, on or before September I, 1993,
Except as otherwise provided, this Letter of Credit shall be governed by the
Unlforn Commercial Code of the State of Colorado as then enacted and the Uniforn
Customs and Practice for Documentary Credit (I97 4 Revision) Internatlonal Chamber
of Commerce (Publication No. 400).
PA4^
160 US HIGHWAY 6 PO. BOX 347 SILVERTHORNE, COLORADO 80498 303-468-8000
June 30, 1993
Date :
Amount:
Number:
Expiration Date:
June 30, L993
938 ,800.00
80s-4479
September I, L993
S incerely
ffrey P. Campeau
Vice PresidenE
F--.-L ': i99A
I
Applicant:
Planner:
I. DESCR|PNON OF THE REOUEST
Pir)-'o^, 4 oec-'
./ -lrLs-o-,rA- ;'f aF ,* tr
I'EMORANDUM 6tr^-1.".X P"',*, l- --l^"^-t
b.- ni*[ % w, "Z
1o'l - 4 3 z,r f{-,-'Ir'-*
Lo)li cosh ,.- I. dkr -./- rre,t./.
t-/\kr - ri' t,, l;l 3L*o\ b-'-
Planning and Environmental Commission
A request for a modification to PEC conditiond of'aSifirovfl for-the *r*Hg,#fi"rhn?d &*!urk'7-a
revisid development plan for Vail PoinU1881 Uonsridge Loo/Lot I'
Block 3, Lionsridge Filing No. 3.@-rn: '4,::"-? PI! ):i!
TO:
FROM:
DATE:
SUBJECT:
Steve Crensler
Ardy Knudtsen
Steve Gensler is requesting to amend two conditions of approval relating to the Vail Point
development. Thes6 condi-tions were part ol approvals made by the Planning an9- -
EnvironmsntalCommission (PEC) and'Deslgn-Review Board (DRB) In June of 1992. The first
part of the request would dl6rr Sieve Gensler to provide funds to he..Town of Vail for
instailation ot h tot tot in Butfehr Greek Park. This would be done in lieu of providing a tot lot
on-site at Vail Point. The second part ol the request involves a delay in a requirement for
regrading and revegetating Lot 27, Btock 2, Uonsridge Filing No. 3. Lot 27 ls to fie south'
dirictly icross Uonlri<ige-toop from Vail Point. lt has been a staging area for the
development at Vail Point and nas been disturbed during construction.. The applicant was
required to regrade and revegetate this lot; however, he has requested an extension to lhe
deiOtine of this condition as he plans to develop the lot in the near future.
II. BACKGROUND
Statf has provided the specific conditions of approvalfrom the PEC and DRB hearings below.
In addition, details regaiding the amenities package as well as the letter of credit are
discussed.
The June 8, 1992 PEC approval included the follorving conditions:
1. The applicant regrade and revegetate Lot 27 in conformance with the December 31'
1990 b'esign Reiiew Board (DRE) appoval. This regrading and revegetation w-orf
.
must be dmpleted prior to tire fown'i release ol any tuilding permits (for Vail Point).
or the developer musl enter into a Development Agreement with the Town and provide
tunding suflicient to @ver the cost of regrading and revegetating Lot 27. The
devebler must submit a copy of tre bkJ to regrade and reveOgtaje Lot 27 to the Tot^'n
in order for the Town to det6rmine the amount of funding which is sufficient to cover
the cost of this work. lf the Development Agreement option is utilized, the revegetation
work must be completed before any Tempoiary Certiftcate of Occupancy for Buildings
June 14, 1993
,I
2, 4 or 5 will be released by the Town.
2. Recrsation amenities package must receive a Final Certificate of Occupancy prior to
the issuancs of any Tempoary or Final Certificates of Occupancy for any of the units
associated with Buildings 2,4 andlor 5.
3. Applicant modify landscape plan at he time of DRB review to provide seating, shade
trees, and grass in association with the totlot; to place trees and/or shrubs south ol
the pool deck and the access drive; and, to place additional plant material in the area
west of Building 4 and east of Building 5.
On June 17, 1992, the DRB rsviewed and approved the proposal, and added a condition to
these. The DFIB required that the applicanb provide a bench in conjunction with the tot lot.
The amenities package which is discussed In the conditions of approval includes the following
elements:
1. A two-story clubhouse having a total square footage ot 1,226 square feet.2. A swimming pool area of approximately 1,470 square feet.
3. A swimming pool of 363 square feet.
4. A tot-lot area of 770 square feet. The tot-lot equipment includes 'a fireman's centef,
wooden metal climbing feature and two tire swings.5. A hot tub.
Please note that the club house, the swimming pool and hot tub have been completed. The
tot lot and the deck around the pool have not been done at this time.
On February 26, 1993, the applicant provided a Letter of Credit for $55,000. This money
covers all of the costs involved with these conditions of approval and some additional paving
requirements. Because he Town secured the Letter of Credit, stafi has been issuing
Temporary Certificate of Occupancy's (TCO's) for some of the units in his last phase of
development. We told the applicant hat we would not be issuing Gertificates of Occupancy
for any unils or TCO's for the last units in the development until these conditions had been
complied with.
The request to change the location of the tot lot was initiated by he homeowner's association.
This past winter, when snow storage was at a premium, the homeowner's association leamed
that the tot lot would be located in an area where they were storing snow. They do not want
to see the current areas reduced in size. A letter attached to this memo from the
homeowner's association documents this concem.
Todd Oppenheimer, he Town's landscape architecl, has reviewed the drawings for the tot lot
to be installed at Vail Point. He has worked with the Town's carpenters to determine the cost
of constructing the approved equipment in Buffehr Creek Park. Town statf believes that this
work will cost $8,000. This is significantly higher than the bid Steve Gensler provided the
staff, which was $1,200. After reviewing the Vail Point site, statf believes that the tot lot would
actually cost more to build on-site than what it will cost to build at Buffehr Creek Park. The
amount of site work including additional fill, retaining walls, and drainage improvements, would
all be requhed at vail Point Staff believes that the bid the applicant submitted is not inclusive
of all aspects involved witr the tot lot construction. The bid from Todd Oppenheimer is
attached at the end ol this memo and documents €ach component of the construction. Stafl
believes hat this figure is more accurate and that the full amount should be requked from he
developer.
III. STAFF RECOMMENDANON
Staff belie\res that ths conditions of approval from the June 8, 1992 PEC approval shou6 be
amended so that the applicant provides S9,000 to the Town for the tot lot. We believe that a
tot lot located at Buffehr Creek Park will get more use as it is available to the public, not Just rssldenb of Vail Point. Though located in a public park, he tot tot is in the viiinity of ttra
development and can be accessed by Vail polnt residents.
Conceming the second condition of apprwal, he staff believes that he applicant should be
Peuirsg to regrade and revegetate the lot by this fall. Statf has been reviewing ptans with
Steve Gensler's architect lor this slte and understands that a tormal application will be
submitled soon. Staff will require that a lstter of credit be provHed to insure that this work will
be done. Neighbors have called Town statf ln the past regarding the us€ of this site for
staging, and staff believes that there has been a commitment reiayed to the neighbors about
revegetation. As a result, staff believes that this work should be completed no later than
september 1, 1993 unless a buibing permit for one residence has b6en issued and
construction has started. The Town staff will not be issuing any final certificates of occupancy
for vail Point until the regrading is comptsted or construction his started.
clpaclnf, noavallpoln.At 4
\
\
'f EJTH 4 A?,k^r€AAw ?4ol o?e ,@.?r)tt-{)lJd re.*:ffiJ-fivp<a+,
6 3& Afr?'Atr-
,/4 v
s..l
\s
e
$
H
\
-R
'r$(N\
-n-n t+-c= 5st -F
$Ar tt-r --Ru:{l\t iF$is:(^\i*Nr
\\-// \ sJr
zv#,vt& tu'ot l?'\ Zvvavant 1
/
r
t=Itr | ='>| .9o t*l t .fo t/2i 4F!I is I Xlt ' E=I FE lgE I eP I Eg + _E!I o=I oi:,l ;t l2E r As
il=ir!o)
=Eo-so iD 'F
F ()
3
(ts
(n
2 o
Sgig
;'I5
o z
E
o
ul
o
o z o
J o
an
og ZE
.g<," Gl zr g:-
3g -;
l
l
l
L
IU
c)oi -al
&r/
Fo'E *5r ,.9..9 €!r.cr.a :E3 :.rs6g Tltr - g.Jd-O lgE, :6UfH [;ig 1r 3t I *., qr- 3. "tr g d
i{;E E3$;:
Il;$ Iglsf
.q l*s Eaf;nH : lcE €I'19
*=$ '*f€ {.*.s,E [' S,[a
,JL-t \r<G
@
(=
)=a 5 6
@ p
@
H
.9
TOTLOT.XLS O
'dti^t -*3''
(.,-
''u!i
VAIL POINT TOTLOT COST ESTIMATE
MATERIALS QUANTITY UNIT TOTAL
PI.AY EOUIPMENT
TIRE SWING 1 378.62 378.62
ARCH CLIMBER 1 207.48 207.68
SLIDING POLE 1 1E5 185
STEERING WHEEL 1 133.3 133.3
RUNG CLIMBER 1 86.68 80.66
SAFETY HANDLES 10 41.99 419.9
SWING FRAME
6X6 TIMBER (LD 60 3 180
SONOTUBE & CONCRETE LS LS 100
HARDWARE LS LS 20
PI.AY STRUCTURE
6X6 TIMBER (LR 80 3 240
2X10 LUMBER (LF)80 2 160
2X6 LUMBER (LR 80 1.75 140
1X6 LUMBER (LD 60 I 60
SONOTUBE &CONCRETE LS LS 200
HARDWARE LS LS 50
LABOR 85 20 1700
SUBTOTAL 426',t.18
SITE WORK
EXCAVATION (C\')34 4 136
TIMBER EDGING (EACH)75 14.E6 1114.5
I-ABOR (MANHOURS)40 20 800
FIBAR SURFACE (SR 1225 2.2 2695
SUBTOTAL 4745.5
TOTAL 9006.68
Page I
!tr2!t9s ltrll , |l lal {?6ltl!
J|(t
hlx REPRo ?.62
{f-ffi RIBqildgslnc.
ryA Q;rrIltU C.rslofl.lhtncr'FlncstOq/rerilnrhlp r Rg'.''pdcl lAddltiotts
)'I
n it BUIIDERST INc.'propoE6a to lurnlsh labor, natsriclerequtpnent
snd EuDervlslon aa necsaaary to cooPleto the sl'te vork and
il;diffi i.;-; ;r"[:;;G;-e'euipnent- | Flrenanr center, lrlre sulng
aad Benchl eB P€r plane excopt-as gual.lfled"ln thle proPo.eal'
l. Equlpnsntt
Penchl FlrenEire Centcr Btrd :!lre
2. lnetalatlon of above
3. Slte uork gnd gratlelng
l{ay 261 1993
Parkwood ReaIitY, rnc.
5299 DtC Ehdl. 9utte 500
Englovoodlr oo 801 11
PROIOSAITs
rhank you for the opportunlty
very fruly Yourat
L J Builders, Inc.
Randy L. Johnron
Preglclent
r 1.
,a
Swlng
Total Bld Prlce
rubmtt thla ProPodal .
$7?8.00
$225, bo
$280.00
$t ,283.00
:
to
2077 H. Frontage Rd,, $its I 12 r \hll, Colorado 8165? ' (303) 179.9144 \lbdr r 1303!476:1129 Rcoldence
SNT BY:r21-93 ; l5:12 ;
VAIL POII{T TOWHHOME ASSOCIATION
12 WEST MO}IUMENT AVENUE
P.O. Eox StlE
DAYTON, ol{lo 45.02
O-,TOflN
0F VAIL COM-DEV;# 1/ I
May 21, 1903
Andy lGudtsen
Planner - Town of Vail
Dear Mr. Knudtsen:
The Board of Direc{orc of Vail Point Townhome Association on Jenuary 3, 1993
voted unenimously to urge the dEveloper Steve Gensler not to build thc *Tot Lot". lt
wilt intsrfere with the snow ploring end removal. lt is planned for thE only area where
snow can be plowed from our road.
Sincerely,
(qtn.-
Cherles D. Rosg
Secretary
I
t
I
PLANNTNG AND ENVIRONMENTAL COMMISSION
June 14, 1993
AGENDA
Discussion with Mayor Peggy Osterfoss and
Town Council regarding: PEC & Council Roles
in the Review Process
Prolect Orlentatlon/Lunch
Slte Vlslts
Cornice Building
Lionshead Center
Enzian
Fauland
Beals
Vail Point
Drivers: AndY, Tim and ShellY
11:00 - 11:30 a.m.
11:30 - 12:15 P.m.
12:15 p.m.
L'Ostello ShellY Mello
Lionshead Center AndY Knudtsen
Enzian Shelly Mello
Lifthouse Lodge Jim Curnutte
(Pizza Bakery)
Sunbird Lodge
Gondola Buibing
Cyrano's
Publlc Hearlnq 2:00 p.m.
l. A determination for the review periods of the Exterior Alteration requests in the CCI
and CGll zone districts:
60 day review period
60 day review Period
90 day review Period
90 day review Period
90 day review period
90 day review Period
90 day review period
Applicant:
Planner:
Carl Fauland
Tim Devlin
Tim Devlin
Andy Knudtsen
Mike Mollica
2. A request for a setback variance to allow for the construction of a residence located on
the nbrth hall of Lot 5, Matterhom Village, 1711 A Geneva Drive'
I
!
I e A request for a major CCll exterior alteration and a setback variance to allow for the
construction of an elevator tower located at the Enzian at Vail Condominiums, 705
West Lionshead Circleipart of Enzian Condominium Association, Lot 1, Block 2, Vail
Lionshead 3rd Filing.
4.
5.
A request for a modification to PEC conditions of approval for the revised development
plan for Vail PoinU1881 Lionsridge Loop/Lot 1, Block 3, Lionsridge Filing No.3.
Applicant:
Planner:
Applicant:
Planner:
Applicant:
Planner:
Applicant:
Planner:
Applicant:
Planner:
Enzian Condominium Association
Shelly Mello
Steve Gensler/Parkwood Realty
Andy Knudtsen
David Smith
Jim Curnutte
Oscar Tang
Andy Knudtsen
Jack Beals
Mike Mollica
A request for a joint worksesslon with the Design Review Board and Planning and
Environmental Commission for the establishment of an SDD to allow the
redevelopment of the Cornice Building and a request for a mnditional use permit to
allow the construction of three Type lV employee housing units, located at 362 Vail
Valley Drive and more specifically described as follows:
A part of Tracl'B'and a pan of Mill Cre€k Road, Vail Village, First Filing, Counly of Eagle, Stal€ ol
Colorado, more particularly doscrib€d as follors:
Commencing at the Northeasil corner ol Vail Village, Firsl Filing; thenco Norlh 79"46'00'West along the
Southerly line of U.S. Highway No. 6 a distanc€ of 367.06 feet lo the Nonh€ast corner of said Tracl'B';
lhencs Sorrth 10'14'00'West along the Easterly line of said Tract'B'; a distance of 198.31 loel to lhe
Southeasterly corner ol said Tract '8"; thence North 79"46'00' West along th€ Soulherly line of said Tract
'B' a distance of 100.00 feet lo the truE point of beginning lhence Norlh 09"10'07'West a dislance of 41.67
tsef; thence South 88'27'11' Wesl a distance ol 75.21 feet; thence South 27'13'37' East a distance of
77.37 leeli thenc€ Norlh 57"24'OO' East a dislance of 55.11 feet, more or less lo lhe true point of beginning.
6.A request lor a joint worksesslon with the Design Beview Board and Planning and
Environmental Commission for an exterior alteration for Lionshead Center to allow an
addition on the southwest corner of Lionshead Center, located at Lot 5, Block 1,
Lionshead 1st Filing/520 Lionshead Circle.
7.Eagle County Referral: A resubdivision of Lot 33, Highland Meadows, and Lots 34 and
35, Highland Park Filing No. 1, and a request for setback variances for two building
sites.
I
l t
1
8. A request lo amend Section 18.58.020 of the Zoning Code to clarify the height allowed
for retaining walls in setbacks.
Applicant: Town ol Vail
Planner: Tim Devlin
9. Update on Sweet Basil's deck construclion located at 193 Gore Creek Drive/part of
Block 58, Vail Village 1st Filing.
Applicant: Ned Gwathmey Planner: Shelly Mello
tO. Update on the Smail/Connely variance located at Lot 5, Bighorn Estates/4238 Nugget
Lane.
Applicant: Michaeland Sally Connely
Planner: Shelly Mello
1 1. Discussion with Greg Hall regarding traffic studies for Vail Road.
12. A request for a major amendment to SDD #5 to allow for the development of the
remaining portion of the Simba Run SDD, Savoy Villas, located at 1100 North Frontage
Road, more specifically described as follows:
That part ot the Flrst Supplemontal Map tor Simba Run Condominium, according 10 lh€ map ther€ot
recorded in the otlice of the Eagle County, Colorado, Clerk and Fecorder, described as tollows:
Beginning at th€ most sodhwEsl€rly corner of said map, lh€nce the tollowing thr€€ cours€s along lhe
wsslorly lines ol said map; 1) NO3'33'01'E 160.79 feet; 2) N12"5033"E 144.72 feer; 3) N17'56'03'70.60
t€sl; lhencs, departing said west€rly line, Sl3'16'08"W 157.26 l€et, lh€nc€ S76o43't"E 91.50 l€€l; thenc€
Nl3.16'03'E 35.00 feer; thsnc€ S76'43'5TE 72.31 teel to the easlerly line of sald map; lhsnc€ the folk 'ving two coursss along the Easterly and sot theasr€rly lines ol said map; 1) S24"44'57'E 52.38 ls€l; 2)
s52"5029',w 272.50 leel to the Polnt ol Beginning, containing 0.6134 acres, mors or less; and
That part of Simba Run, according to the map lhErsof, record€d In Book 312 al Page 763 In lhe O{lice of . th€ Eagle County, Colorado, Clerk and R€cord€r, described as tollofls:
Beginning at tho mosl soulherly corner of said Simba Run, lhence the follot,ving lour courses along the
sorrthw€sterly and nonhw€sterly lines of said Simba Run; 1) N37o09'31'W 233.28 teet; 2) 334.57 feet along
the arc ol a cury€ to lh€ lEft, having a radius of 1Zl1.95 lset, a cenlral angle of 10e49'06', and a chord thal
bears N42"13'20'E 334.07 fe€t; 3) N36'48'48' E 201.36 feet; a) 15.96 feet along the arc ot a curve lo the
rigtrt, having a radius of 428.02 f€st, a cenlral angle of 02'08'12', and a chord lhat b€ars N37o52'54' E
15.96 foet lo a comer on lhe westerly boundary of the Firsl supplemental Map lor simba Run
Condominlum, according to lhe map thersof record€d In th€ offic€ of rhe Eagle County, Colorado, Clerk and
Recorder; thonce the follo'rring four courses along sald westerly boundary; 1) S21'51'28nV 69.90 feet; 2)
s17"56'O3w 181.17 feer; 3) S12"5033nV M4.72leet;4) S03033',01',14/ 160.79 feet lo lhs southeast€rly llne
of sald Simba Run; lhence, alorp sald southsasterly ling, S5f50'291 / 113.08 t€€t to thg Point of
Beginnlng, conlaining 1.560 acres, more or less.
Applicant: Simba Land CorporationMalid Said
Planner: Mike Mollica TABLED TO JUNE 28' 1993
3
13. A request for a proposed SDD and minor suMivision to allow for the development of
single lamily homes located on Tracts A and B, The Valley, Phase ll/1480 Butfer Creek
Rd.
Applicant:
Planner:
Steve Gensler/Parkwood Realty
Andy Knudtsen TABLED TO JUNE 28, 19Sl
A request to review the Management Plan and Master Plan for the Vail Cemetery to be
located in the upper bench of Donovan Park generally located west of the Glen Lyon
suMivision and southeast of the Matterhorn neighborhood.
14.
Applicant:
Planner:
Town of Vail
Andy Knudtsen TABLED TO JUNE 28, 1993
15.
16.
't7.
Appoint PEC Chairperson.
Approve minutes from May 24, 1993 PEC meeting.
Council follow-up:
.Kandell deck appeal - June 15, 't993, 7:30 p.m., Town Council
.AIPP Terre Haute placement at Mayor's Park
.Jack Varga l-70 Underground Concepl, June 17, 1993,7:00 p.m., Council
Chambers.
.Discussion of possible future presentation regarding the Vail Valley Performing
Arts Center.
June 22, 1993 - Joint worksession with PEC, Town Council, DRB discussions on:
.Parking policy for exempt areas and for parking variances.
.Zoning and Building Code Enforcement Policy
A reminder to the PEC regarding the representatives to DRB - 1993 Schedule 18.
Jan. - March 1993 Kathy Langenwalter
Diana Donovan (alternate)
April- June 1993 Dalton Williams
Diana Donovan (alternate)
July - Sept. 1993 Jeff Bowen
Diana Donovan (alternate)
Oct. - Dec. 1993 Greg Amsden
Diana Donovan (altemale)
Aur,rt, '^ tI {r<-
0 oy-.-"*---d q PEZ
ft ovr".t tn Au
'fk {
.['+ lri. o{ ,t'L,t /,w<- *,:ti
b<- v
,, , i a 'or.t r-- JtJl
d=,6t'l rv r{e4
S !..n ..;,r L.** Ltrs 7''*l'
, k-u.z< /-l-- nn--'". /"-,.t on/
(rMk b* ,l ;/' pt;sl/.
I
ri.s".-z / d*-
t, 14z{ I
vr^ +
.ly'zkl.n z4
,..,-- J '{" t^--
0.!fir<- t/ak'|-o {-4
p*Lt\'74
Y a.- I L't'-- \
From the desk of..,
frft,
A" 4r'<
Andv Knudtsen
c-L
:,{.-,-
7,-..s k_._
/1,,.<.., -, /nr--
fu.rtr'.-. 1 d-&r /z-'r'...,-
-Z-/ -u-t-.,- {<^ <-'z-<4? .-r--<'c,
t/'*
l --s-
D'^/'
,4" /l
Postlt'' b'"nd fti"n*#</\--.4 | Y
URIL PUBLIC IJORKS ID:3034792166 I JUN
5e3
16:30 No .005 P .01
TOI,YNOFVAIL
?f $orti Ftonttgt Road
Vail, Colortlo 8/,657
tor -4?9 -2 L 8t FtX r0r-41 9.2 t {6
D cptnn ctt of Ptb lic Wosl tlllla q onfi ion
rrx Pgo.NE TBru.8ilTqF,N,, .F,Fr!
PUBLIC I{ORKS/TR,Ar,ISPORTATTON FN{ PTIONE
FAX PHONE NUMEERI
FROM:
SENT BYI
vewt hup- J ,l,714 rrME!-
. t-/
NO. OF PAGES IN DOCUMENT (NOT INCI.JUDING COVER SHEET)
ft r.
REEPoNSE REQOIRED?r- l\U,O
TOWN OF VAIL DEPAh,TMENI
MJMBERT (303) {79-2166
Y.Y, I
tiUA U,4 ell,-untS ^+ ;{* 4+
OF
$+ruY - F;DD -%**P*o
COMPATiIY NAME:
VR]L PUBLIC IJORKS 13034792166 ID o ruN
5e3
1l :21 No .004 P .01
75 Sotttb Froanr Roai
Ve il, Cotordo t!6J?
t0 t-17 9 -Z I t 8 | FtlX tLt -41 I - t r 66
Departmcat of Pfilic VothtfTrmryo nion
FAlt PHONE IRltgllIErAl. gryEl
COMPANY NAME!
FAX PHONE NUMBER:
FROM:
oarY, h*nz-'? ,ll114 rrME:\-/
NO. oF PAGES IN DOCIJI.|ENT (NOT INCLUDING COVER SHEETI I
RDSPONSE REQU]RED?;
SENT BYr
IOV|I'I OF VAIIJ
NUMBER! {303)
DEPART}IENT
479-2t66
OF FUBIJIC WORKS/TRAN$PORTATION FAt( PHONE
?.Y, l.
rrUe c^ala J'rorutts A;ll* q+
t,
tii..d lCtl2/C
Fsiition Dare .\--lt- 2J
F.DQUEST .:0I{ AN /u\1END}1INT T0 A ?ITEVICUSLY AI?F.OI/ED DIVELOI}IIi'IT ?L,iN
PETI?OIi FORF.{ F(.:i AMEND?"'!E}iT T0 THE ZOh{iNc f ::ttt'tANCE
OR
REOUEST FON
A Cl''li':'lcE lN DISTRICT AOUSIDAHIES
This procodure is requii'od for any amsndmen'l to the :cning orclrance o;' fcr :: :gqurst
for a district bour':dary change.
A.NA[41= GF PEI-lTir-rj',lER Paa
+ s.=t PHoNE 713-- Sty'f
*o
ADDFESS
D. LOCAT:CN OF FF.CPOSAL:
PAID al)Er v !+
Rezonings: $20C.00
DATE
il.
F. StarnpcJ, address;C envei;pes and l;:l cf the nan':es ci cr.inei's cf all pr.cperirT
adjacer., +c tf e cLr:lject proporty.
Four (4) copic; rf the loll:vi:ng infcrmaiicn:
A. The pc. r;cn shaii .nclude a sunr,r,ry cf the oroposed revtsicn cf the
regulal: . -s, or a ccnlplete Cescription of ihe pi'iposed chaiges in disc'rrlct
boundanss and a riap 'ndicating the exisllnE and propcsc j dtsctrict bcunoa;,:s.
Applic?ni must submit writte n ancl/oi'graphlc mai,erials sta'.iiig the reasono fcr
request.
Time Requirerncnls
The Planning aid Enyiionmental Ccrnissicn meets en the znd anC l.th Mcnd:;,s of
each month. f, petiiion lvith the necessary acocmpanyinE maieriai must be submili:C
four vreeks prici to tne date of the meeting. Fcliowing ihe PlanninE and Env;J'onne:;tal
Commission mcetir-rg, aii amendrnenls tc tne zoning ordinance cr Cistrict bcun jary
change must go tot the Toy/n Council for final action.
Your proposal will be revievred for ccmpiainace wiih Vail's Con-;prehensive Plan.
lf this application requires a separate review by any local, State or Federal aEency
other than the Tow;-, cf Vail, the appiicatio;r fc: shall be increased by $200.00.
Examples of such review, may include, but a:'e not lirnited tc: Colorado Depadment c:
Highwai'Access P€rmits, A;'my Ccrps ol ;ngineers 404, etc.
The applicant shaii b€ responsible for pa;,ing any publishing fees which are in excess
of 50% of the appiication fsJ. lf, at ihe appiict,-.t's request, any rnaiter is posponed lor
hearing, causir'. :re matter to be re-pubiishei;, ihen the entire fee for such re-
||l flt,
tv.
€al le-'ct,d G do/tr
NAfu4E C,.. P E;i, :I..:ii ER'S REPR ESEI.ITATIVE Skz^t /1./ {a" tn^
ADDRESS V^-c- ,,a) a tg=s-_D U/.1\l tr
NAME CF Of/NEl:.or b'p€)
SIGNATUIiE
fi bre JLJ *p. F".[/"-,J_rHONE
.n^
ADDRESS_ 188 t t--"^Sgr{+_t,
LEGAL L.ESCRIF. :CN: I.OT I gLOCI<3 FILING 3
FEE: Z.*nlng i..i- :ndments: $25i,r ,iu
2?3 -J'r/g
\
hearing, causing the matter to be re-published, then tl-: entire fee for such re-
publication shal, ;:e paid 'oy the 4oplicant.
Applications ce:ned by the ccnirnunity )evelopment Departmeni lo have significant
design, land usl cr other issues which i:.ay have s 3ignificant inl.:act on the
ccrnmunity ma';; :squire revievr by ccnsLiiliiits other than town siaff. Should a
deterrnination b: nace by the tc',vn staif thai an outside consultant is needec tc :,eview
any acplicaticr, ;i:e Ccr,rmui:i! Develc:reni Departrnent may hi:e an outside
ccnsul'rant, it sl"li estimate the anouni rf money necessary tc pay hini or her enc this
amolint shail bo lcrwarded to ihe Tovrn by the appiicant at ihe time he files his
appiication wll"h :rs Comrnuniiy Developr-rrent Department. Upon completion oi the
review of the ai:;lication by the crnsi.ili.eit, any cf the funds fcrvvarded by the oppiicant
for payment cf lhe consuliant which havc nol been pald io ihe ccnsultant shall be
returned to 'r!:e :,:olicant. Expensee inc,-'-reC by the Tc,.vn in excess of the amcunt
forvrarded by tl j a.opiicaiion shaii be pa.iri l: ire Town by the appilcant vrithin 30 days
oi nciificaticn b', :,'le Tolvn.
v
PLnlcwooo Rna:-,tv,
5299 DIC BLVD., ST'ITE 5OO
ENGIJWOODrcOI,O. 40111
1303) 793-5e49
INc.
May 28, 1993
Mr. Andy Knudtsen
Town Planner
TOWN OF VAIL
75 South Frontage Road
Vail, C0 81657
Dear Andy,
I have read the application for an amendment to the approved development
plan and feel this application form is not relevant to my situation at
Vail Point. Andy, as we discussed and I believe, by now, you have a fax
showing the Vail Point Board of Directors indjcated the maiority of the
homeowners of Vail Point, do not want a tot lot and would remove said tot
lot after the developer, which in this case is Parkwood Realty, finishes
the projectl
I am told by you, that if I agree to provide the funds I would be spending
on the tot lot to the Town 0f Vail, these funds would be used to improve
the Buffent Creek Public Park. This shall serve as my acceptance to provide
the funds to the Town 0f VaiI for improvements to Buffent Creek Public Park. A copy of my contract for completion of the tot lot at Vail Point is attached. I would like this agreement to include a timetable in which
the Town 0f Vail will make improvements to Buffent Creek Public Park and
acknowledge on record that Parkwood Realty, Inc. provided funds for said
improvements.
Concerning the development of Lot #27 Lionsridge Loop, I am currently trying
to finish the last couple units in Vail Point. I must point out that due to the long delay this past summer because qf the A.D.A. ru1 ing and your
position that I couldn't begin construction on the residential units until a wheelchair lift and access ramp was redesigned into the clubhouse' has
cost me many thousands of dollars. The delay, in my opinion, was unwarranted
because I agreed to provide the access requested and the Town 0f Vail has
the abil'ity not to grant TCO's and,/or C0's if the clubhouse redesign and
contruction thereof was not completed prior to resjdential unit completion.I lost a full ejght (8) weeks of summer construction weather which equates
to twelve (12) weeks or more of wjnter construction time.
However to answer your question as to when I would proceed to develop
Lot #27? I intend to start the submittal process as soon as possible.
Currently, I have contacted Kent Rose for civil engineering work and Pete
Kol iopoulos has been working on architectural design/floorplan. I have
spoken with Jay Petersen on my plan to build five (5) duplexes, which is
a reduction by 33 of the density that currently exists on the property.
Penxwooo Rnar,tv, Ircc.
5299 DTC BL\/D., SttrTE 500
€o3) 793-5e49
Page 2
I would I ike to proceed on a plan to subdivide the site for five (5)
duplexes. I fu'l ly intend on proceeding through the submittal process and
infrastructure concurrently with at least one (1) duplex start this year.I intend on building at least three (3) more duplexes throughout 1994,
with the project finished by September of 1995. Obviously the market will
dictate the demand for my product and i fully anticipate a favorable
response.
Andy, I do not feel I am being treated fairly when you tell me I will not
be granted any more TCO's and C0's until Lot #27 is negotiated into the
process. I have previously agreed to regrade and revegetate the property
should I not irunediately move forward with development of said site.
Furthermore, I have provided a Letter of Credit to the Town 0f Vail
guarantee'ing the funds needed to do the work. I implore that some common
sense be used concerning the aforementioned items.
SMG/eah
attachements:Vail Point Homeowner's Addresses J. R. Builders Tot Lot Contract Bid
Preliminary Design of Lot #27
i)
2)
3)
Si ncerel y,
nsler
Pat Dauphanais Richard and Jane Hart John Cogswell
P.O. Box 1515 1401 Lionsridge Loop Rick Mueller
Vail, CO 81658 Vail, CO 81657 1475 Lionsridge Loop
Vail, CO 81657
Patti Rickman Bruce and Mary Canton Lee Rimel
950 Red Sandstone 1853 Lionsridge Loop 1817 Meadow Ridge Road, #2
Vail, CO 81657 Vail, CO 8'1657 Vail, CO 81657
Bruce Chapman Bob Boymer Don and Pam White
1817 Meadow Ridge Road, #1 1817 Meadow Ridge Road 304 Bridge Streel
Vail, CO 81657 Vail, CO 81657 Vail, CO 81657
John Nadler Jennifer Henise Ron and Doris Metzger
'1817 Meadow Ridge Road, #3 1817 Meadow Ridge Road, #4 1817 Meadow Ridge Road, #5
Vail, CO 81657 Vail, CO 81657 Vail, CO 81657
U.S. Forest Service
Holy Cross Ranger Dist.
P.O. Box 190
Minturn. CO 81645
\-:.'i.,rr lrt.s -.-,rlt r\1,rtnt.l- ti/.J
{)i.j(C/'l.f'--\tLH Utll L((r /'"
THIS ITEM MAY EFFECT YOUR PROPERTY
PUBLIC NOTICE
NOTICE lS HEREBY GIVEN that the Planning and Environmental Commission of the Town of
Vail will hold apublic hearing in accordance with Section 18.66.060 of the Municipal Code of
the Town of Vail on June 14, 1993, at 2:00 P.M. in the Town of Vail Municipal Building'
Consideration of:
1. A determination for the review periods oi the Exterior Alteration requests in the CCI
and CCll zone districts:
60 day review period L'Ostello Shelly Mello
60 day review period Lionshead Center Andy Knudtsen
90 day review period Enzian Shelly Mello
90 day review period Lifthouse Lodge Jim Curnutte
(Pizza Bakery)
90 day review period Sunbird Lodge Tim Devlin
90 day review period Gondola Building Andy Knudtsen
90 day review period Cyrano's Mike Mollica
2. A request for a major CCll exterior alteration, a setback variance and a site coverage
variance to allow for the construction of an elevator tower located at the Enzian at Vail
Condominiums, 705 West Lionshead Circle/part of Enzian Condominium Association,
Lot 1, Block 2, Vail Lionshead 3rd Filing.
Applicant: Enzian Condominium Association Planner: Shelly Mello
3. A request for an exterior alteration for Lionshead Center to allow an addition on the
southwest corner ol Lionshead Center, located at Lot 5, Block 1, Lionshead 1st
Filing/520 Lionshead Circle.
Applicant: Oscar Tang Planner: Andy Knudtsen
4. A request for a modification to PEC conditions of approval for the revised development
plan for Vail PoinV1881 Lionsridge Loop/Lot 1, Block3, Lionsridge Filing No.3.
Applicant: Steve GensleriParkwood Realty Planner: Andy Knudtsen
5. A request to review the Management Plan and Master Plan for the Vail Cemetery to be
located in the upper bench of Donovan Park generally located west of the Glen Lyon
subdivision and southeast of the Matterhorn neighborhood.
Applicant: Town of Vail Planner: Andy Knudtsen
o.
7.
8.
v.
A request for a proposed SDD and minor subdivision to allow for the development of
single family homes located on Tracts A and B, The Valley, Phase ll/1480 Buffer Creek
Rd.
A request for the establishment of an SDD to allow the redevelopment of the Cornice
Building and a request for a conditional use permit io allow the construction of three
Type lV employee housing units, located at 362 Vail Valley Drive and more specifically
described as follows:
A parr ol Tract "B" and a part of Mill Creek Road, Vail Village, First Filing, County of Eagle, State of
Colorado, more particularly described as follows:
Commencing at lhe Nonheast corner of Vail Village, First Filing; lhence North 79"46'00" West along the
Soulherly line ol U.S. Hjghv/ay No. 6 a dislance of 367.06 feet to the Northeast corner of said Tracl "B';
lhence South 10"14'00" West along the Easterly line of said Tracl "8"; a distance of 198.31 feet to the
Southeasterly corner of said Tract "B"; thence Nonh 79'46'00" Wesl along lhe Southerly line ol said Tract
"B" a dislance ol 100.00 feet 10 the true point ol beginning thence Nonh 09"10'07'Wesl a distance of 41.67
feet; thence South 88'27'11" Wesl a distance of 75.21 feet; thence South 27"13'37" East a dislance of
77.37 leeti thence North 57'24'a0 Easl a distance ol 55.1 1 feet, more or less to the true poinl of beginning.
Applicant:
Planner:
Applicant:
Planner:
Applicant:
Planner:
Steve Gensler/Parkwood Realty
Andv Knudtsen
David Smith
Jim Curnutte
Carl Fauland
Tim Devlin
A request for a setback variance to allow for the construction of a residence located on
the north half of Lot 5, Matterhorn Village, 1711 A Geneva Drive.
A request for a major amendment to SDD #5 to allow for the development of the
remaining portion of the Simba Run SDD, Savoy Villas, located at 1100 North Frontage
Road, more specifically described as follows:
Thal part of the First Supplemental l,4ap for Simba Run Condominium, according to the map thereol
recorded in the olJice ol the Eagle County, Colorado, Clerk and Recorder, described as tollows:
Beginning al the most soulhweslerly corner ol said map, lhence the following three courses along lhe
wesrerly lines ol said map; 1) N03"33'01"E 160.79 teel; 2) N12"50'33"E 144.72 feet; 3) N17'56'03" 70.60
feet; thence, departing said weslerly line, S13"1 6'03"W 157.26 leet, lhence 576'43'57"E 91 .50 teet; thenco
N13'16'03"E 35.00 feet: thence S76'43'57"E 72.31 feet lo lhe easterly line ol said map; thence the following
two courses along the easterly and southeasterly lines of said map; 1) S24'44'57"E 52.38 leel; 2)
S52'50'29'W 272.50 leet ro the Point of Beginning, conlaining 0.6134 acres, more or less; and
That part of Simba Run, according to lhe map thereot, recorded in Book 312 al Page 763 in the Otlice of
the Eagle County, Colorado, Clerk and Recorder, described as lollows:
Beginning at the mosl southerly corner ot said Simba Run, lhence lhe lollowing iour courses along lh€
soulhwesterly and norlhwesterly lines ot saic Simba Run; 1) N37'09'31"W 233.28 teeti 2) 334.57 leet along
the arc ol a curve 10 lhe lell, having a radius ol 1771.95 teet, a central angle of 10'49'06", and a chord that
bears N42"13'20"e 334.07 leet; 3) N36"48'48" E 201.36teet; 4) 15.96 feel along lhe arc of acurvetothe
righl, having a radius of 428.02leet, a cenlral angle ot 02"08'12", and a chofd lhat bears N37"52'54" E
15.96 teet 10 a corner on the westerly boundary of lhe First Supplemental Map for Simba Run
Condominium, according to the map thereol recorded in lhe office ol the Eagls County, Colorado, Clerk and
Recorder; lhenco the tollowing four courses along said weslerly boundary; 1) 521"5t'28'W 69.90 teel; 2)
s17056'03"W 181.17 feer; 3) S12"50'33"w 144.72lee\ 4) s03"33'01"w 160.79 feet lo th€ southeasterly ling
ol said Simba Run; thence, along said soulheasterly line, 552"50'29''W .|13.09 feet to the Point of
Beginning, containing 1 .560 acres, more or less.
Applicant: Simba Land Corporation/Walid Said
Planner: Mike Mollica
10. A request to amend Section 18.58.020 of the Zoning Code io clarify the height allowed
for retaining walls in setbacks.
Applicant: Town of Vail
Planner: Tim Devlin
11. Update on Sweet Basil's deck construction located at 193 Gore Creek Drive/part of
Block 58, Vail Village lst Filing.
Applicant: Ned Gwathmey Planner: Shelly Mello
12. Update on the Smail/Connely variance located at Lot 5, Bighorn Estates/4238 Nugget
Lane.
Applicant: Michael and Sally Connely Planner: Shelly Mello
13. Discussion with Greg Hall regarding traflic studies for Vail Road.
14. Appoint PEC Chairperson.
f.F'{. t cOP y
TOTI/N OFVAIL
7.5 Soutlt I;rontuge lloud
Vail, Colorado 81657
303 -479-2 I 38 / 479-2 I 39
FAX 303-479-2452
I)(p t ttnatII ttf Ctt trrtuttity Dt've lolttrtt,ttt
May 21, 1993
Steve Gensler
Parkwood Realty
5299 DTO Pirrkway, Suite #500
Englewood, Or) B0 11
Conditions of Approval at Vall Point RE: PEC Hcview of Chanqes to
Dear Steve:
I discussed the idea of modifying tlie conditions of approval for Vail Point vvith other planning
staff and they were generally receptive to the idea, p;rrticularly regarding the tot lot. Flowever,
before we can schedule this on a PEC agenda, we will need the following items:
'l . A completed application for thr,' arnendrnent of the developmcnt plan (see attached
lorm).
An application fee of $250.
A specific 1',r<lposal for locatinq the tot lot at Birffr:hr Creek ;:ark. Pleasc docunrent thc
arnount of money required for each component of the toi lot and site work attd provide
this to the Town. The Town will then takr: tlre funds and provide the equipment in the
park, possibly including othcr improvernents, at a time wh{rn the Town crews can
a^rnrrl.)ll: lho rrr'n :rnt
Provide documentation regarding LoI 27, spccifically identifying the time for PEC, Town
Council and DRB reviews; the tinre for building permit reviews; the time for initial
construction of the first house; arrd the time for completion of the project. Stafl will
consider this time line to determinc if regrading the lot and revegetating it vrill be
required. We would prefer not to have the lot left disturbed over the summer.
After the staff has reviewed your proposal, we will schcdule you for a PEC hearing. lf you can
provide this information to staJf no later than June 1, 1993, we will schedule you for the June
14, 1993 meeting. We are unable to issue T.C.O.'s or C.O.'s for the remaining units at Vail
Point until we have wrapoed uo these details.
z.
A
\
Mr. Gensler
May 21, 1993
Page 2
"l lic staii r..,anis to rvorl< witir you anrJ the honteowner's assooii.rtion to achieve the best
solution. -l-hank you 1or your attention to these details, and I look forward to working with you
in wrapping up and completing the first two phases of Vail Point.
Sincerely,
A / .r,/ t'/,rl---'-Y A.-. y'./a,4
Andy KnudtSen '
{
lt-l,,'./rl i 'iat,tiicr L
,
rrri.d ltylz,€
Pstition Date
RIQUIST .'CR AN n*\lINDliEl(T !10 A ?REViCUSLY .).P?1i.0T,/Ell DI LCTIII)IT PL.r.lI
PETINO,': FORM F(.I A,MEI{DT-{ENT TCI TI-iE ZO*iNG
':.}:I'.IANCE OR
REOUEST FOR
A Ci-I. :{GE IN DISTRICT BOI,INDANIES
l. This procsdure ls required for any amsndn')Bnt to ihe zoning cli;iance oi i:i .' :sq;;.st
for a district bcu,-,1ary change.
A. NAil,iE Cr PEI-lTi:-rt'lER
ADDNA;S PHONE
B. NAil4E C." P;-i:T:i;IiER,S REPRESENTATIVE
ADDRESS PHON:
C. NAME CF C',:iti[: , iprint or type)
SiGNATURE
ADDHESS " PHoNE
D. LOCATICN Or- Pi.IPOSAL:
ADDRESS
LEGAL a'=SCR!F' fN: LOT BLCCK FILING
E. FEE: Z*nlng Ar :ndments: $25C rt Rezonings: 920C.00 PAID CHECK # IATE
F. Stampei, addi'ess:C envel;pes ard iisi of ihe narnes cl ali;iers of all prcplr!
adjacei.i io the su,:ject property.
ll. Four (4) ccpi:: ;f the icli:r+,ng infcrmaiicn:
A. The pe "rl':n shali .rciude a summary of ihe proposed re'.,l:i:n of the
reguia:'. s, or a clmpl€te descr,ption of the p:':,.csed ci;;,ges in Clsc'rrict
boundaries and a rnap rndicating the exist'ng anJ propcsl: disctrlct brunsa:,:;.
Applicanl must submit writtcn anc,or Eraph:c na:vrials sla.,ilE :he reascis f::
request.
lll. Time Requirenlrls
The Planning i,',d Enviionrnental Ccmissjcn meets cn tla 2nd en. 4th Moi:d-'.ys oi
each month. L petiiion with the necessary accompanyinE maieriai must ce submili.td
four weeks prioi to the date of the mesting. Fcliovring ihe Planning and Envircnr,;.-.:.rl
Commission meetii-rg, ajl amendmenls to the zoning ordinance cr sistrict ccLrtcary
change must go tot the Tourn Council for final acticn.
lV. Your proposal will be reviewed for complainace wiih Vail's Con-,prehenslve Plan.
V. lf this application requires a separaie review by any local, State or Federal agency
other than the Tovn of Vail, the appiicalioir f:: shail be increased cy $200.00.
Examples of such re'tiew, may include, bui are not iinrited tc: Colorado Depaitrnei,i c;
Highway'Access Permits, A;'my Ccrps ol =ngineers 404, etc.
The applicant shali be respcnsible fcr p:,;,ing :ny publishing fees which are in excess
0{ 50% of the ap:iication fsi. lf, ai ihe applic; l's request, any rneiler is postponed for
hearing, causll. 're maiter to be re-p'jbi shei., then the entire lee ior such re-
..\
hearing, causing the matterto be re-published, then ti: entire {e: forsuch re-
publication shai, l.;e paid by the applicant.
Appiications de:,:red by the Cor:inuniiy )evelopment Department lo have significant
design, land us: c:' other issues which ray have s significant incaot on the
connrnunity mar' ::quire revievr by consliiants other than town s'ia:f. Should a
deier:'ninaticn b: nade by the tcwn staft that an oubide consulta''lt is needed tc review
any applicaticr, l::e Conirrnuni! Develc:Ten! Depadment may h!:e an outside
ccnsultant, !t sr--'i estimate the arnount .f money necessary to pay him or her and this
amorint shail be lcn.rarded to ihe Town by the applicant at the tine he files his
appiication rvilh ..re Conmunity Develop'nent Department. Upon completion of the
review of the a^-:ilcation by the consultr.rt, any of the funds fonrvarded by the applicant
for payment cf .!.e consultant whlch have not been paid to the consultant shall be
returned to the .pplicant. Expenses lnc'-'red by the Torvn in excess of the amount
fonvai'ded b,v t.,r agpiication shaii be pa.:r; i: the Town by the app:lcani within 30 days
of notificaticn b'' ihe Town.
rli-tIOI2,P
J
.(,\ 1 j, ,)4)ii It\ ,ll \\( | / ' i[\
L"
Date Receivsd by the Community Dsveloprnent
Deparfne
APPUCANON FOR
CONDOMIMUM/TOIYN}IOUSE PLAT RB/IEW
(Chapter 17.22 Yail Municipal Code)
(please print or typ€)
-f,.-,A. APPLICANT
PHON
B.APPLICANT'S HEPRESENTAT
MA|LING eooness fu f I }.T( 'n loJ + Sa ' ,ar.z
ADDRESS Jal+ PHONE h^-.t.
C. PROPERW OWN
:'t lf't f3lf OWNER'S SIGNA
MAILING ADDRESS G'*--
D. L@ATION OF PROPOSAL:
MATERIALS TO BE SUBMITTED:
Two mylar copies and one paper copy of the subdivision plat shall be submitted
to the Department of Community Development. The plat shall include a site
map with the following requiremenb:
The final plat shall be drawn by a registered surveyor in India ink, or
other substjantial solution, on a reproducible medium (preferably mylar)
wih dimension ol twenty-four by thirty-six inches and shall be at a scale
of one hundred feet to one inch or larger with margins of one and one-
half to two inches on the left and one-half inch on all other sides.
Accurate dimensions to the nearest one-hundredth of a foot for all lines,
angles and curves used to describe boundaries, streeb, setbacks,
alleys, easements, structures, arears lo be reserved or dedicated for
public or common uses and other important features. All curv€s shall be
circular arcs and shall be defined by he radius, @ntral angle, arc
scored distances and bearing. All dimensions, bott linear and angular,
are to be determined by an accurate contol survey in he field which
must balance and close within a limil of one in len thousand.
North anow and graphic scale.
A systematic identification ol all existing and proposed buildings, units,
lots, blocks, and names for all streets.
:^tRFETnooness ll'fl t,.r^la,Jle Gf
r l'to..[ y'
/-l rurrue 3 LOT' J'- BLOCK_L_ SUBD|VTSTONI
APPLICATION FEE $1OO.OO PA\D /oo t-cHEcK #JlJ-D^rE/"{ 'rJ E.
F.
1.
b.
c.
d.
e. An kJentification of the streeb, alleys, parks, and other public areas or
facilities as shown on the plat, and a dedication thereof to the puHic
use. An kJentilication of the easemenb as shown on the plat and a
grant thereof to the public use. Areas reserved for future public
acquisition shall also be shown on the plat.
f. A written survey description of the area Includirq tho total acrsage to thg
nearest appropriate signiftcant fQure. The acreage of aach lot or parcel
shall be shown in his manner as well.
S. A description of allsurvey monuments, both lound and set, which mark
the boundaries of the subdivision, and a description ol all monuments
used in conducting the survey. Monument perimeter per Colorado
statutes. Two perimeter monuments shall be estaHished as major
control monuments, the materials which shall be c,etermined by the town
engineer.
h. A statement by the land surveyor explaining how bearing base was
determined.
i. A certificate by the registered land surveyor as outined In Chapter 17.32
of this title as to the accuracy of the survey and plat, and hat the survey
was performed by him in accordance with Colorado Revissd Statutes
1973, Tifle 38, Article 51.
j. A certificate by an attomey admitted to practice in the State of Colorado,
or corporate title insurer, hat the owner(s) of record dedicating to the
public the public right-of-way, areas or facilities as shown thereon are
lhe owners thereof in fee simple, free and clear of all liens and
encumbrances except as noted.
k. The proper form for filing of the plat with he Eagle Gounty Clerk and
Recorder.
l. Certificate of dedication and ownership. Should the certiftcate ol
dedication and ownership provide for a dedication ol land or
improvements to the public, all beneficiaries of deeds ot trust and
mortgage holders on said real property will be required to slgn the
certificate of dedication and ownership in addition to the fee simple
owner thereot.
m. All cunent taxes must be paid prior lo the Town's approval of plat. This
includes laxes which have been billed but are not yet due. The
certificate of taxes paid must be signed on the plat or a statement lrom
the Eagle County Assessor's Office must be provirJed with the submittal
information stating that all taxes have been paid.
n. Signature of owner.
The condominium or townhouse plat shall also include floor plans, elevations
and cross-seclions as necessary to accurately determine individual air spaces
and/or other ownerships and if the project was built substantially the same as
the approved plans.
A copy of the condominium documents for stafl review to assurs that there are
maintenance provisions included for all commonly owned areas.
APPROVAL PROCESS, REVIEW CRITERIA
Upon receiving two copies of a complete submittal along with payment of he
appropriate fee, the zoning administrator shall route one copy of the site map to the
town engineer for his review. The zoning dministrator shall then conduct this review
concurrently. The town engineer shall review the submittal and return commenls and
2.
3.
G.
notifications to the zoning administrator who shall fansmit the approval, disapproval or
approval with modifications of the plat wihin fourteen days to he eplicant. The
zonlng dministrator shall sign the plat if approved or require modificatons on th€ plat
for approval or deny approval dua to inconsistencies with he originally approved plan
or failure to make oher requlred modificailons of the plat.
H. FILING AND RECORDING
The zoning administrator shall be he final sbnature required on the plat so that he
Department of Community Development will be responsiUe for promptly recording the
approved plat with the Eagle County Clerk and Recorder. Fees for recoding shall be
paid by the applicant. The Community Developm€nt Dsparfrnent will retain one mylar
copy of the plat for their records and will record the remaining mylar copy.
l. lf this application requires a separate review by any local, State or Federal agency
oher than the Town ol Vail, the application fee shall be increased by S200.00.
Examples ol sucft review, may include, but are not limitad to: Colorado Departm€nt of
Highway Access Permits, Army Corps of Engineers 404, etc.
The applicant shall be responsible for paying any publishing fees which are In excess
ol 50% ol the application fee. ll, at tho applicants requost, any maner b posFoned for
hearing, causing the matter to be re-published, then the entire fee for such rs-
publication shall be paid by the applicant.
Applications deemed by the Community Developrnent Department to have significant
design, land use or other issues which may have a significant imp".rct on lhe
community may require review by consultants other than town stafl. Should a
determination be made by the town staff that an oubide consultant is needed to review
any application, the Community Development Department may hire an outside
consultant, it shall estimate the amount of money necessary to pay him or her and his
amount shall be forwarded to he Town by the applicant al lhe lime he files his
application with the Community Development Department. Upon compeUon of the
review of lhe application by lhe consultant, any of the funds fonraded by the applicant
for payment of the consultant which have not been paid to the consultant shall be
retumed to the applicant. Expenses incuned by the Tonn in excess of the amount
fonrrtarded by the application shall be paid to the Town by the applicant within 30 days
of notification by the Town.
tl
I
a DEVELOPER IMPROVEMENT AGREEMENT
THIS AGREEMENT, made and entered into this 24lh day of February, 1993, by and
among Steve Gensler (hereinafter called the "Developer"), and the TOWN OF VAIL
(hereinafter called the 'Town").
WITNESSETH:
WHEREAS, the Developer, as a condition of approval of the temporary certificate of
occupancy granted by the Town of Vail for the Vail Point Development, located at 1881
Lionsridge Loop, in the Town of Vail, Eagle County, Colorado, is obligated to provide security
or collateral sufficient in the judgment of the Town to make reasonable provisions lor
completion of certain improvements set forth below; and
WHEREAS, the Developer wishes to enter into a Development Agreement with the
Town thereby providing security to the Town that the improvements set forth below will be
completed; and
WHEREAS, the Developer wishes to provide collateral to guarantee performance of
this Agreement, including construction of the above-referenced improvements by means of the
following:
An irrevocable letter of credit in the amount of $55,000.00 which shall provide the
security for the following:
IMPROVEMENT COST
CLUB HOUSE
1. Elevator $12,500.00
2. Pool (plaster pool and spa) $ 1,500.00
3. Pool (concrete deck and fence) $ 1,800.00
GENERAL IMPROVEMENTS
1. Landscaping/Tot LoVlrrigation $25,000.00
2. Paving $20.00.00
LESS AMOUNT PREVIOUSLY PROVIDED FOR . $ 5,8OO.OO
$55,000.00
NOW THEREFORE, in consideration of the following mutual covenants and
agreements, the Developer and the Town agree as tollows:
1. The Developer hereby agrees, at its sole cost and expenses, to furnish all equipment and
material necessary to perform and complete said improvements, on or before July 1, 1993.
The Developer shall complete, in a good workmanlike manner, all improvements as shown on
the approved building permit plans, approved Design Review Board plans, and approved
Planning and Environmental Commission plans for the project and in accordance with all
plans and specifications for the project filed in the office of the Community Development
Department, the Town of Vail, and to do all work incidental thereto according to and in
compliance with the following:
a. All laws of the United States of America, State of Colorado, or Town of Vail and its
respective agencies, affected special districts and/or service district.
b. Such other designs, drawings, maps, specifications, sketches, and other matter
submitted by the developer to be approved by any of the above-referenced
governmental entities. All said work shall be done under the inspection of, and to the
satisfaction of the Town Building Official, or other official from the Town of Vail, and
shall not be deemed complete until approved and accepted as completed by the Town
of Vail Community Development Department.
2. The estimated cost of said work and improvements is the sum of $55,000.00
3. The Developer may at any time substitute the collateral originally set forth above for
another form of collateral acceptable to the Town to guarantee the faithtul completion
of those improvements referred to herein and the performance of the terms of this
Agreement. Such acceptance by the Town of alternative collateral shall be at the
Town's sole discretion.
4. The Town shall not, nor shall any officer or employee thereof, be liable or responsible
for any accident, loss or damage happening or occurring to the work specified in this
Agreement, nor shall the Town, nor any officer or employee thereof, be liable for any
persons or property injured by reason of the nature of said work, but all of said
liabilities shall and are hereby assumed by the Developer.
The Developer hereby agrees to indemnify and hold harmless the Town, and any of its
officers, agents and employees against any losses, claims, damages, or liabilities to
which the Town or any of its officers, agents or employees may become subject to,
insofar as any such losses, claims, damages or liabilities (or actions in respect thereof)
that arise out of or are based upon any performance by the Developer hereunder; and
the Developer shall reimburse the Town for any and all legal or other expenses
reasonably incurred by the Town in connection with investigating or defending any
such loss, claim, damage, liability or action. This indemnity provision shall be in
addition to any other liability which the Developer may have.
5.
b.
It is mutually agreed that the Developer may apply to the Town for release of lhe
collateral deposited with the Town upon completion of said improvements at such time
as referenced hereunder and approved by the Town. By the way of example, upon
completion and approval by the Town of the elevator, the sum ol $12,500 dollars shall
be released.
lf the Developer fails to complete the improvements in accordance with all the
specilications set forth herein no later than July 1, 1993, the Town may withdraw and
employ from the letter of credit or from the cash escrow such funds as may be
necessary to complete the unfinished improvements.
7. The parties hereto mutually agree that this Agreement may be amended from time to
time, provided that such amendmenls be in writing and executed by all parties hereto.
8. This Agreement shall be enforceable against the Developer provided, however, that in
the event the Developer sells or transfers the property, the obligations of the Developer
under this Agreement may be assumed by the purchaser of the property and
Developer shall have no further obligations hereunder. lt is agreed, however, that no
such assumption of these obligations shall be effective unless the Town gives its prior
approval to such assumption, following an investigation of the financial condition of the
purcnaser.
STATE OF COLORADO
COUNTY OF EAGLE
55.
The foregoing Developer lmprovement Agreement was acknowledged before me this
26th day cf -_Februarv , 1993by Steve GenSleI, as PresidenE of Parkwood Realty, Inc.,
a Colorado Corpora t ion.
Witness my hand and official seal.
My commission expires on:_M1y
Nancv,'L. EsEes
P. O. Box 89
cypsum, CO B1637
BY; \y'(*1-
TOWN OF VAIL
STATE OF COLORADO
COUNTY OF EAGLE
Town Manager
qbndy\admln\Ellpoll.dov
g rt o:lz;", X:';n"] ", ","r:l JUfi "T : ll f;ff [:"j was ackn owr eds ed bero re m e th is
;:.:J::Til::::"
*""ffi
4'"r"'z t' -
Notary Public
v.:
160 US HIGHWAY 6 P.O. BOX 347 SILV€RTHORNE. COLORAOO 80498 303'468'8000
February 26, L993
Date:
Amount:
Nurnber:
Explration Dace:
February 26, L993
55,000. oo
880-1657
July 1, 1993
f-TBAltl(
OF SILVERTHORNE
IRREVOCABLE LETTER OF CREDIT
JPC/ce
cc: lnfr/clr
Town of Vail
Attn: Andy Knudtsen
75 S. Frontage Road West
Vall , Co. 81657
Gentlemen:
We hereby open our Irrevocable LecEer of Credit in you favor by your drafc drawn
at sighc on FlrscBank of Silverchorne, 150 U.S. Highway 6, P.O' Box 347,
Sllveithorne, Colorado, for any sum or surns up to the aggregaEe anoun! of
55,OOO.OO, for the accoun! of Parkwood RalEy, lnc,, 5299 DTC Blvd., Sulce 500,
Englewood, Colorado.
Each drafc must bear upon lcs face the clause "Drawn under Letter of Credic No.
880-1657, dated February 26, L993, of FirstBank of Sllverthorne". Each drafc
nust be acconpanled by a sCatemenE by a duly authorlzed officer of Town of Vall
staclng that this draw is in conneccion wlth funds needed for the accounE of
Parkwood Realcy, Inc., The Vail Point ProjecE.
The amounc of each draft whlch ls negotiaced pursuant to Ehls credic, together
wlth the date of negotiation, musE be endorsed on the reverse side of the Letter
of Credic.
We hereby agree that drafcs drawn under and in compllance with the terms of the
Letter of Credit wtll be duly honored if presenced Eo FirscBank of Sllverthorne
on or before July 1, 1993.
Exeept as otherwlse provlded, Chls LeCCer of Credlt shall be governed by the
Unlform Commerclal Code of the Srate of Colorado as then enacted and che Unlform
Cus cons and Pracclce for Documencary Credlt (1974 Revislon) Incernaclonal Chamber
of Comrnerce (Publlcatlon No. 400).
Slncerely, ,.1
A//* lt,
Vice Pres ldent
o
uJ F
z
z
o J
f
.a
I
I rd
IY c,le
zti z'z
'll>tuto
Zlz
tr a-
z
a
UJ
uJ l,!t
=
t]-J
J ul
u)
=I
(r
o IL
(r
F z
(I
UJ z
B occ
ILu oz ;3
:r t!FI <F Z^
YZ @<
'=oLa;(O d!pnE 9Ubac
F 9 R3!*rge*s=9c!!
;exg*.= .^ v.a ;effsE;!3 6 7 i r
=pt--; 5 ; it;e \'- o-c ^' J
E x E.E't v^1
".: r c (, 'rFSoa)
s E 3) P v
Ei;g:N F! c ^: \.Y- (d; Y -aEa=i
(!: O!r3 .(/,*o?:.- 0)- L "EEEtg
o! ! x\J 'c.9 X ^o(o:'-:'2;H9i i 6 i:l -a€E;
.c= o o c -*-c--:3; -;=:,!s:= c
-q:;EJ 3 U >.= E
c-Y->XFFqg d:6oR
EE:F!
EE$8fi
a
UJ l!
l!
ts
uJ
J
F
F
F
=E
o-
z
J
l
o z
o
E f
)
9 z
-
UJ
=
LIJ
t!IL z o tr
llJ E
g.
o
-g
TIJ E z o
uJ
-o
o
o-
f
z
LU
--)Q
z
o
=f,
z
co
=f
o-
NOtrvnlvA
HI Fll
HI BI
2l -l
FI \,I >I (.l
I :l
EI <l
^l c.l I ll.
c.r lu)
IF..T F Ir-{JIF
EIE (/)lo
H
Fl tll z
z
F
E
El
Fl
Fl
z H
Y
o 3 2Zw
i o- 6z X r ZY i9 0i
aoG z>-o oir?.<)zX (!<oq i u.r ;'i :T 2
i (v a,l
z
tr
l
u-
E
o
o-:
G
o-
&
;
z
E o o
tr
E
F
;
UJ z
o
uJ o
uJ
{lJ z
(J)
F
(r
tu (L )
z
E o o
l
ci
u)
z
I F
n
F
z o
F
5 a z
b z tr z Oa F ^r!o<
>cr
3o <7
it z rI >=_F
tro
3 lrl OI
ol t!l
1I
<l il ol
=l 9l
I
I
I
I
I ol zl
EI
TI
<l >l
bl zt .,;3t :ol r!FI F
LN
I r\(\
I
T]ql
1l
>l
ol ull c(l
JI
<l il ol
zl ;l
9l
H
3
F]
F-l
F-l
=tr
I
^l 2l
uJl
1I
<l >l
rrt ol
zl
3l pl
-l
I
Fl H
I
Q
(,
H
z
H
Fl
@
@
F-]
F
F1
E 3
z
i
I t-l.
I
I
d
ct
{>-<F
=()
?l
uJl
:l
<l >l
rrl
;l
9l FI
H z H
A
Ff H z
>Y
>d ]F )z r!o
F
e.F z
z
r
LIJ
E ir
=
\JZ
F
LU
=-
E
t
<F (rO l,! <ZE t!F z
J
(J
F
LrJ
J
UJ
E t!z
=
<-o (n U)Ltl rr/JO
o z
=e.
uJ (l-
F1
ZA --o d zee
>zd
@ ttftIrp
J ."i5
=8ft
--1 -i l,!6;>_ l<- .--.tb<l
F
(r
uJ
o-
IL
u,J o z
l o o
o
I (r
().
-F_i>
O- IJJ >(L
\J LL On
5 uj 6O-:>fiF
-J J
ut
ID
o F
o
o
o
o E
.=
E o (,
Ao
arE o
-F EE sE
-!f =f
@ O
@
LO O O z cn
Fl A
z
c\l
(\
ts (J
z H
u,
o
ts
=E.
lrJ
o-z o
F ()
E F a z o (J
ITJ F
a (I)
z
t-
ul Y
lrJ o
o F
F
(l
lrJ
lJ-
0-
I
uJ F
z
o z
E
=E l!c
I
I
!*t<t6
I
I
I
-'-oc t+o- G.Y', |u,
ilE;E l=
iiiii*li
;iFiENllr
EEiff'€:iEF q
E;; E{
:i; it 60'-:--c= o ,) c
g: i:; I
63i;E E
i*E:AE
6s.i F. i e
iE$iEE
rt
,ll 4l:, : flr
= I i..ilct :: :rl;
Ei tv Z Z tr- ^o o os vt zl
3 B 3 F.
5; Hd
: = 6'o q ir H 5 g+
= 8 =r .:uJ -N(J
zl
.. >l
UJ
ut
uJ 2
@
=
uJ
z
E o
t..
\ixJ
(\x l.-\\fl
Llj F
IJJ
F.o
@ o -z o
F c
u.l Y
UJ
@
o F
tr
u,
tt.
o-
I
ul F
z
z
z_e
=z
dP
)
z-E
@uJ
F
E
llJ c II
llJ
z
o I
F
=
JT uj -h=dil :o-
9o .u,xo-x>
gt
J
!tt
lrJ .o
o F
E o
E cl
-9 o
B
=t
'E
3
E
E
8
0
ts
=E l!
o-z '9 F
c)
=)E F a z o O
DN
I
=-
I 't
I
I
E
F z
u-
tt
r{
lL
frC J
v)
+' ,(.
rl
,:q
ui
=z
-|
a
t
,:
.-t
I
t
(
3
J
{\l
tu
o o
I
-
uJ
z
o-
E
v,
UJ
J
=
T
t!
G \l
{
-i )l *l
tl
r{I I E d
I
z.l
ol u4
5l
<l z
-o r
\
tu
I
I
)E
tJ
I
5
o z
0
UJ trl
J
<l >l
t!l q
zl
Bl I FI
I
!)
V)
I
IT
r{
0o
u,J
uJ F
l ol 4 d l4 El
J
>l
4l q
A 3 c FI
z
o gJ
J
i o
zl ;l
9i
-=tr
I
I
I
I
dl z.l
ol sJl
rEl
JI
al >l |rl ol
Pl E
a
E
"\
-\. {.)
-.i
J <-9S
*
(J
IJJ
=.":!U z 3
I
F
uJ F <F
IIJ <zE IIJ F
o o
-J
F
u,J
UJ
;
3a
z
6
=)rd
f
)
J
))
<=:<F ,a)z<
=rY
Y,Z
=g
Oz
<(J
Eg
:.1 )<
\v
!E
\
75 loulh lronleg. road
ueil. colorado 81657
(303) 479-2L38 or 479-2\39 oltlce of oommunlty dev.lopmonl
BUILDING PERI.IIT ISSUANCE TIME FMME
If this peryit requires a Town of Vail Fire Department Approval ,Engineer''s (Public Works) review and approval , a planning'Department
review or Health Department review, and a review by the 6uililing
Department, the estimated time for a total review mav take as lono as three weel(s.
All commercial (1arge or small) and all multi-family permits wi'll
have to follow the above mentioned maximum requirements. Residential
and small projects should take a lesser amount of tjme. However, if residential or smal'l er projects impact the various above mentioned
departments with regard to necessary review, these projects may also taRe the three week period.
Every attempt will be nnde by this department to expedite this permit as s,qon as possible.
I,. the undersigned, understand the plan check procedure and time
frame..
A,-L -9+
lo- 23 - 1s
Date tlork Sheet was turned into the
Communi ty Development Department.
I po,"T
Name
75 soulh lrontage road
vail, colorado 81657
(303) 479-2138 or 479-2L39
TO:
FROM:
DATE:
SUBJECT:
oftlce of communliy development
ALL CONTRACTORS CURRENTLYL REGISTERED WITH THE
TOhIN OF VAIL
TOWN OF VAIL PUBLIC WORKS/COMMUNITY DEVELOPMENT
MARCH 16, 1988
CONSTRUCTION PARKING & MATERIAL STORAGE
rn sunmary, ordinance No. G states that it is unlawful for anv person to litter, track or deposit any soil, rock, sand, debris or naterial, including trash durnpsteri, portable ioilets and workmen vehicles upon any street, sidewalk, alley or pub).ic p1?9. or any portion theieof. The right-oi-way 6n all Town of Vail streets and roads is approximateiy 5 ft. 6ff pavement.This ordinance wirl be striltry enforcld by the Town of Vail PYPIi-c works Departrnent. persons found vi6rating this ordinu.,""!/rrr be gr-ven a 24 hour written notice to rernove said materiar.rn the event the person so notified does not comply with the notice h'ithin the 24 hour time specified, the pullic works Department will remove said rnateiial at the expense of person notified. The provisions of this ordinance snatf not be applicable to construction, mainlenance or repair projects of any street or alley or any utilities in the right-a-way.
To review ordinance No. 6 in full,vail Building Department to obtain cooperation on this rnatter.
Read and acknowledged by:'B-S'1"-
please stop by the Town of a copy. Thank you for your
Position/Ret@(i.e.
Date
/o 'z-o -f L
contractor, owner)
t
INSPECTION
PERMIT
DATE
READY FOR
LOCATION:
NUMBER OF PROJECT
tt\
\.. -,-- ) . -.- .., -, JOB NAME ,,) ' . _
REQUEST
uolr,
INSPECTIO MON WED THUR
BUILDING:
O FOOTINGS
O FOUNDATI
O FRAMING
/ STEEL
PLUMBING:
O UNDERGROUND
tr ROUGH / D.W.V.
D ROUGH / WATER
ON / STEEL
r_r ROOF & SHEER " PLYWOOD NAILING O GAS PIPING
B INSULATION O POOL / H. TUB
tr SHEETROCK NAIL tr
!n
tr FINAL tr FINAL
ELECTRICAL:
O TEMP. POWER
MECHANICAL:
O HEATING
O ROUGH D EXHAUST HOODS
D CONDUIT tr SUPPLY AIR
FINAL
tr
tr FINAL
p APPROVED
CORRECTIONS:
O DISAPPROVED O REINSPECTION REQUIRED
DATE INSPECTOR
Geologlo Harsrd Bevlew
August 19, 1992
Lot 1, Block 3, Llons Fldge $ubdlvlslon/
Vall Po|nt Butldlngs 1, 2,3 and 4
rhe unclersigned has read the Flockfall.Hazard.Ropo(,.dal* Ji16-9t-191]fl"fillli-l
Nl;;ias"ffitr'it. TrnJ*,tt#o lrom the concrusions.that th.*.I:'9??::1lllliiqll]llated In
J-'iiiriilrri?iI;A;;;; ;;d i[sr. ru i potentlal hazard or ruckfall reachins ths trtoposed
house, oausing Oarnagel We arg proparoO to accept lhese facts and request tho T6wn 0f Vail
Buildlng Dspartment lo grant us a permit.
STATE OF COLOBADO
Counly of .Arog.hegJ
3|A3??EE5?5 TIFFILIT1TED EliEC. S'lE
f,u
"*6rut"d
the samg for the purposes and ognslderatlon thereln qxprsssed'
My commlsslon exph'es:
-Qr--^ l\-t.qrc .-. --
/t/L-/
ss.
F-?E? T-.r58 F-EE3''ErIE FUri:4'9! 14:17
be tho
me that
./\ The forogoing instrument y.as acknpwle dgef,*elof lne this 44day of
0, q :;F.-- lrssa, av 4&tteast..7!J,-;&^a,l*.=-, -.S.9*n
to me to
per$ro$s€
"artto
ia aubsiribed to the fgrigoin{,instrument and acknowledged to
303??EES?E RFFILII]TEIT E:iEf,. 5Y5 F-Tra? T-458 F'n42"F,fr2 Hl-lG !4 '92 1.1:1?
Qv qaoea
pse
Geologlo Harerd Revlew
August 18, 199e
Lot 1, Block 3, Llons Fldge $ubdlvlslotv
Vall Poht Butldlngs 1, 2,3 und 4
TheunrleraignedhasreadtheFlockfallHazardHopol.dqtsdJurt66.l?91:,91-tPlllll-Y
Ni;;6"d;iirris. TrnJ;,srand rrom the concrusions. thar rh.s, qloqos:g, byl!iiq^':]::ated In
a rockla[ hazard rone, and th{tr6 ie a potential hazard of rockfall reaching thcJ Pfoposed
house, causing damage. We arS prepared to accepi lhese facts and request th€ Town 0f VAjl
Buildlng Dspartment to grant us a permit.
STATE OF COLONADO
ss.
County ot 1[-aeee&C-)
My commlsslon explres;
zB'd rtdJjH ltIH '\lJ0U ErrreJn !al &Lt tt!l d6. nl'sfl
t-
C)
I r-1
O O
I zr9lo tt E,& | =^xi- tla | :zt+ 5.= | I <'x zt> | *
HIE vl? | :r= >1l(, | ;>.tO .11 z | =
t= >.{l(, I t z'q olz | =3r5 ?rE | 5
P=:n O)o*bi! N
iirc F !O F{-c.Yx^ +o)(E=-':'iaE95 ,;I (!: j= -t)
:-':3d E (! o--; -g;o(,E A ies si ; 3 9!E5! - H &
I ? Bt:J r-r rd
EEa;EEpH rE5e9fiH6 (!€O-=O}Ja4 >PoEF^ Hr'.
!r, oo _ - H - H
IE$ia=-s
FIF4N
.:X;o; la +:i3E l=
Egc;iIg
:sfr;e li
i.EE'E
;laF$-s E+:.-
l.9Rsi
3F; s+
=iaps
NO[VnlVA
=ct ^z ;9 z z tLia
F-lnzA
Y:>YPr g E " dr.,,2: 50 Pe 3':;i os 3i 3A 9U sft FoAe
<aJo
\J U)
:* F 3 * u F i= x - o o-LL<l2 i i P io"
z
F
o Za r=
9H
J l
il
.Ja
"l q e H 4 Ul z
H
Fl
z
LL
(ft
Y J
F
c!
lz IH
I r-.IH
lca l-lz IH
l*lFl IH t<t>
I IuJ l>t<lz lrn
I
I
z Hlo
F+H Fl .<la t4r>
aan
O\g
;^<
a
7
=z
Or \'
Or rn
I
c7)o\
F
I
o-
4
IIJ
z
F
O
F-)
g
F
X
t!(r o o
=
.--t F
I
-T.T
z
Fl
FJ
=(J
z H
v)
Fl H
F)
E
=E
tr
I
cn
z
tu
>1
u-ol
zl
3l
.ir .ir
I
F .s
t!
J
llJ F
E
tr
z
z
UJ
J
?
o z 3 o F E tr
o
o
uJ i
q
z
=I
z
=tr
"l --l =l
l
I
I ol
=.1 (rl
tul
cEl
JI
<l >I
LL]ol
=l t-l =e
(L
z
li
uJ (r )
a
z 3
F
uJ
6 F
J
o.
F
LIJ J
LLI
<z
Z.t
^d L!*
=-
1u.
E
UJ z
E
F O
UJ F
I
<F
uJ<ze
L]J F (rz
)E <o (JF
-<
;F
r3
E.
4- t--
;#
]F !z Lro
<x
:lF z()
=<
-t /r F Y,z
=3
E
tv l-
=.L (Y
(JZ
O
<c)(1 U't
z
Fl
z
uJ t
-)z
F
UJ Y
u.l
F
F
<N
ro\
LIJ ,--.{
x.t "ol > c'.)l
a\ Fl
,.-r ::l
rl
UJ F!!oE zo
z
6
l )
u
(9 z
o )
f
f
F
(r
UJ
o-
LL
:!!E2 E<
o9)o-a9 vcc
=>FJF
= tr, :-5 b=o o-- E o ^-*
E oo E 5p r x>o::'iF cL "i qri tt;
uJ
F
ts
=E,
UJ o-z o
F ()
E F a z o ()
G
-€t
-
t
lei;;t:giagF
=*:€s :o*oo iEo F RO iF!;s
E6 i5E :3i 3d
.c= o'' (,2 C
E*i: € ri !Bi=t,r
E !A:E E iESegH
aEi;fE
ig$sa
=d
: iE,3:
'=oo;<o
gEE:E
c.g c9!
ErEe*EiE:3
E gEg=$
:Eiie : OE FP
EEAg E!Eo > o o:i
I
I l-
I n'r > 16'> s lq ;-<'lF -r|nl;{l! l-N 1,, ,
=@orlE
;9
ov = =i'F ^ /\ .\ ,.l
= = -a\6 26
: f zY E I o'f,H 66 5- 3*3 = Ex
E i 3H iSl,,]d ioa rNO llJ
JI
<1 :-l
z_l
zl
.. >l
lu
ut
UJ z
aD F
E ul IL
a z
E o
z
=e
=z
dP
J
-: ir
JJ co[!
!t
I
I
I
I
I i.. I 'l
,,.a1
Y \l
I
o z
ts
=
Lt c
(-'T)gl
i)
I Nl o'l ..\|
-l col \
l'- |
I
IJJ F
lrl
ts a
@ o ?z o
F c
lrJ Y
uJ
a\
F
F
tf
uj
l|.
I
uJ
t-
z
F
tu
x
:!!
E<
60
to
v(r
5E
=>.
=uJi-5 b=oi;
o A:E 66 F 5u EX(L t x>F=r-
o-tt;
IJJ
F
b
=E tu
o-z o
F o
F a z o (J
,r(---\/ _\=r\I .*'AF-\'-,-i lls \\'.//,--<'J2r
-r-
+J ..{
-t
....1 \
-.lK.r T(
-{
\s 6--
UJ
=ii
FT -&
-.i
o .Ft
.fi x
a
o)
o -.{
l.r o
o ...1
z
=u-
I .l
I -l
r='
I
I
-l
F o
r.
N :h
ti
E
z H
X,
F:H
s
Ln
l--
B
I
=
I
.l ot
'l .l x +Jl .
-{ llJ (Ut>
11lt.J ;Jl4i
!lt2
glE
.r4 I O\l{lol
filn
14 E
4
X
I >l
l!l
t_lr-
lco lLn ll lco
ts F-l :C otl a
NI -la
XI 8l;tq
fr=
EA
l><tr -()
ll tl l"l ,ilJl ql14 l 'l-l ,'l ^l ul :l
.-l | ;l sl
..-l I ;l s
6t fl b.,l<l I
"l ilR pll ol .+lzl
=31 ul E9l tr IJ.J FI F
.;l zl
u,tl lrl
JI
<l >l
ol
zl
3I ol FI
z
=tr
ll tl
II
l?l
tq
t<t 4>l \.1 hl 4q
dfle
ol
=.1
uJl
5t
al >l
t!l ol
zl
Bl q
H
z
=
tr =E
I
I
I
I
dl
=,1
tlJl
:l
<l >l
u-l ol
zl ..1 a;FI F.
=
d)o -)
IIJ z 3
F
UJ
=1-
c)
<F
ur<ZE
(^Z
<o OF ;<):<
;F
urO
-
E !20 ZF ;o
=f JZ 4O
x6 YF 7()
=<+E
Y<
=3
E.
='^lrz
)<o a?.:o
-
:(.
!l
,*rl"toN
PERMIT NUMBER OF
DATE
PROJECT
; JOB NAME
READY FOR
LOCATION:
INSPECTION:MON
CALLER
TUES WED THUR AM FRI
REQUEST.,
TOWN OF VAIL
479-2138
EUILDING:
tr FOOTINGS i STEEL
PL
o
o
tr
tr
D
o
UMBING
tr FOUNDATION / STEEL
UNDERGROUND
ROUGH / D.W.V.
ROUGH / WATER tr FRAMING
,r ROOF & SHEER " PLYWOOD NAILING GAS PIPING
D INSULATION POOL / H, TUB
D SHEETROCK NAIL
tr
O FINAL tr FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
O ROUGH O EXHAUST HOODS
O CONDUIT
n
tr SUPPLY AIR
n
O FINAL D FINAL
tr OVED
CORRECTIONS:
D DISAPPROVED O REINSPECTION REOUIRED
DATE INSPECTOR
"J 'f
$ 10. oo $ 25. OO $ 50. oo
$100.oo
$200. oo
$3OO. OO
APPLICATION
DATE OF DRB
DRB APPLICATION C g.2!(i.tEETI I{G :
*****THIS APPLICA-TION WILL NOT BE ACCEPTED UNTIL ALL INFORM JS SUBIIITTED***r*
I. PIiE-APPLICATION MEETING:
A pre-appl ication meetJng with a plann'in9 staff member {s strongly suggested to determine if any additional Jnformation is needed. No appllcatlon wJll be accepted un'less lt is complete (must include al1 i tems requi red by the zoning administrator).It is the applicant's responsibility to make an appointrnent with the staff to find out about additional submi ttal requirements. Please note that a COMPLETE applica-tlon will streaml ine the approval process for your project by decreasing the number of conditions of approval that the DRB may stipulate. ALL conditions of approva l must be resolved before a building per-mit Js issued.r ./ /r / 'l A. PROJECT DESCRIPTION:
///,-
Add,res s_1494. | | r,rJz. etai. 1..*o, :-,t*t t zz-t-t'te ^ v^--
Lega 1 Description Lo t-l-- Block A. Ftting z-tt | *V1vU,€
Zoning F/4F=.'rt t\F4 L.1FJ 4rT<i t-,4r\L:n =p,l-4il_1 c.
D.
NAME OF APPLI CANT:
Add res s
NAI',IE OF APPL I CANT 'S REPRESENTATIVE:1 Addr e s s
NAME OF
S i gna tur
Address
DRB FEE:The fee will be paid at the time a building perrnit is requested.
VALUAT ION FEE
IMPORTANT NOTICE REGARDING ALL SUBMISSIONS TO THE DRB:
1. In addition to meeting submJttal requlrements, the appllcant must stake the s'lte to indicate property lines and buJlding corners. Trees that wlll be removed should also be marked. This work must be comol eted before the DRB visits the si te.
2. The review process for NEW BUILDINGS will normal'ly involve two separate meetings of the Design Review Board, so plan on at least two meetings for thelr aPproval -
3. People who fail to appear before the Deslgn Review Board at theJr schedu'led meeting and who have not asked for a postponement will be required to be
reDu b l i shed.
$ o-$ 10,ooo $ lO,0O1 -$ so,Ooo $ 5O,OO1 -$ 15O,OOo
$150,O01 - $ .5OO , O0O 5500,0o1 - $1, OOO, OO0 $ Over $1,Ooo,OOO
/'
.l,tt)
\'j,, '(
) ,..
LOCATION OF PROPOSAL:
te l ephone
te l ephone
4Alr--telephone #J2r
,-) .
MATERIALS
i'.nr,re oi PRoJEcr:
L:GAL DESCRIPTION S REET AODRESS:
i)tSCIII PTION OF PR aFI
The fo] 1o_wing information is required for submitta'l by the applicant to the Design Review Board before a flnal approval can be flven:
A. BUTLDTNG r4ArERrALs: - Waghl* "t Roof -TA<f,rt>\aEp .Tffi^= +i9,Slding €Eltry-yz- l
-r-tAF-r F-.1 EiL- ALy-51 a-Other Wa'l I Materials a*n1 , €Jrry&
'Fa s c'f a .-:EPrg-
Soffi ts p-,4,&e p>:-ft-l(),
Wl ndows 4LN2 l/JaaA
I'll ndow frim CZVAV-
Doors lFl€'\)L, 9T\
Door Trim ZM
Hand or Deck Rai l s ltw)=.
FJ ues fu-le-@e -tewLr\4L>,Flashinqs zl^>J,4q |4*++'Cbimneys @E-,C#- -lzel2v^ee Trash Enc l o s ures FlA-1lE lUll ',?4r\#
,6FA'(
VAJt:
a9
lae
ee
LjlchTle W coQ *,\{*:>
dlo
(^-w (&
llAr"f
[*t/.\rAlO .t^J tt-t2
TrtJE'.le' t+t*r2.4 x? AzwJf >tLo-F'n 'at-
Gr:een hou s es fa#.E, /
Other 4e4e_wg
B. LANDSCAPING: Name of DesJgner:
Phone:
PLANT MATERIALS: BotanJ caI Name
PRoPosED IRE*EW.a-E
elAV<- AA-tec+X L-'Afl- t4lJA-:-------
VaPDLLY2 112€r-4t \t c7 fqe-
vPtsLa.<-ffit'flrv^|6f'
Z?=)F{La9 r..zt!z4r_E .aEJ-a_
FIrgIrlG ,^r*wffi_
BE REMOV E D |-D\-JE- SAur-< \,rfr.. I r,_la
Common Name
aV+<=v-w'-WSJ
EZtt \ U ',' - Fltz-
!{lr ' I
Qua n I t.y
,/1
ae-.--------1+
F.
rl
I
for con I fers -
(over)
?-..4i - 44/^ -
*Indlcate calJper for declducious trees Indi cate heJght
PLANT IIBTERIALS:(con't) |
SHRUBS
EXISTING SHRU
Corrnon Name Quanl tv Sl ze -
_ E 't.t,,
? 'ifr|"-l='44+t?'=
fr.4^r:i-" 4'.244t;i'
F;?A:;;
Tq BE. REMOVED F.TAFJE
GROUND COVERS/rcf2.r2.tr1l.r{.3
500
Square Footase
*.;A?) 4€
SEED -4!.1 Ia LJll]r-2A--..24l'a.')--'--'
TYPE OF
I RR I GATI ON
TYPE OR METHOD OF
EROSION CONTROL
C. .OTHER' LANDSCAPE FEATURES (retalnlng wa1ls, fences, sw{mn{n9 pools,etc.) Please spec{fy.
4l?bt l-1 &'4 ld. ?lzt a l+t. z 16'. A .?at I .zat i ' 4L,A| e'bLct a-at-td 1 -l2t l---a 4.1 e TAI-
T3,[2' -1 2\ li 2A'4€?:'. tq art 4 4)t. z _atL
o
lrnlE:
IIGNL
ZONL CIILLK Fr\D
SFR. R. R P,/S ZONE DISTRICTS
Block Fi1lns4lt l)A1itatry€
Phone /ztz . -':q7 - e-144
l'hone 2a-2a- - 44,t2, -v'?i'l I
Proposed
zLl -att - z2eb'-at
h-,"4 l_ 6ZW -r, €ffifrEu4z
/r r) , . -t --2rl%,2
Aac2 4€aa6b b,q 1#9 ea aezS 1,t
z.2t-dl 5 nzb sf,
/-,,)L.il
14aLatl
+oetq+
@64,q 6zev=*>
nr)oREss:
( rW ltt tt nl(ctltTEcT /UNt rJIST
I,ITOI'OS EO USE IOT 5I ZE
ri,.l(Jlrt
|,, t-u I GRFA
l' ,'r rrrn ry--(il{ F A
',t' co ndar5r--GRF+- ---
"(:tbacks: Front
Sides
Rea r
lJ-+€r---€€tJrE€€-
sl te coverag e C6l--Wt>
La nds ca pl ng Fence,/Reta_i ni ng wEl1 Heights Parklng /,/ ?A\-'l lt J4
Cred J ts : Garage
MechanJ cal
Ai r] ock
S tora 9e
So] ar Hea t
Drl ve: S lope Permltted
Envl ronmenta l./Hazards :
Al l owed '/;4,t--;r
- (joit:sl ,
. ,::.. .l: l:.
20'
15',
lf,
(30)(so)
(3oo)(600)(eoo)(1200)
(so) ( loo)
(2s) ( so)
(2oo) (4oo)
6 /11'' -'
6i,1.1 4
t:j " '..-
-13j/
4 lt.'
li ,i. "/7/,"
Sl ope Actua'l
Ava l anche
Fl ood P'laIn
S l ope
l,Jetl a nds
Geologic Hazards
,4 ?va
Corments:
Zonlng: Approved/D'lsapproved
Date 3 /\ l't '
(,| .
7.72_
t j l/.:':
11 t,t-t ( 34t/
'5 it
/'l ' jt
l/: .:
. q:.:2
L".l ..)
i3l Staff 5l gnature
It't'.''
t)z_ z- t!
2,i:,' ,.' /:qii :'
Pl,'\ ':i.1 /tttl
PP, :.,,
2 ', /,.
? {(l
P_l -l
UTILITY LOCATION'?ERlFICATION
suBDrvrsroN lJ.r>F-l:Q_lt,-6E:
^ llotrrttat-rr Be].1
-4@-6Ae-
JO3 NATE
Lor-L__ BLo cx_=_FrLrNG_=
n'oDp.Ess ./88/ ./a- / o4:.> .2t OAE /-ul,P Ur+/C-t CE
The ]-ocatl-ort of uti]'l-ttes, r'hether they be rlaj.rl trutrk f-1ne8 or prol'oEed L1De€,0r.16t be aPProved and werlfl-ed by the foL]-or.rj.lrg utl.].ltl.es for the accoBpanyl.rrg al'ce l,1alr.
Arrthor'.zad Sltnature Datq
q- /_a- 7A Aba - bgoo WeEterrr SJ-ope Gas Co.I aoo 922-19a7 Harry Moyes
-Pub]-l.c| Se-vl-ee Cobl>atry 949-574L Gary llal-].
-llgf.y Croa6 Eleccarc Aaaoc.
949 -5492 Tcd Husky/M1cha€1 Leverty
.lleELClge Cabf,evl,al.orr T.V.949-533A Gary J o:incon
-Upper Eag!.e Va1Ley W6ter &SrnLtatl.orr Dtatrl.ct
47 6-7 4aO
Fred Hae]-ee
Th18 forE 1€ !o werLfy aerw1ce rwa11ab'.l-1ty arrd ]-ocatl-on.
Ttrl's atrou].d be uaed 1rr conJurrcEt,on rrl,th praparl-ng you!
uc11l,ty I'1a,D srrd achedrr.I.Lng l''tat.a]-].atLone,
* (P]"es.Ec blt--lg a aLt. t']-ert trhet:t obta1.t!l.ng Uppe! E6|g]'e Va11ey Vtatcr & Sarr'.tatl.or! s Lgnaturee )
t()4tu
6=-/a. €b
-ffio
f&.o.or)'l-lc",.r 0"ffi
NoTE! Th.ae verl-f tcstlgn8 do arot ref.l..v. chc conirqcgot o! trta !.sporrrl,bl'ltGy to obE61n a aE!€et crrt t'.rrnl't floln ttr€ Town 6f v.L1 , D.D'.rtolnc o! Pr.rblLc Wolks aDd to obral-D urLf-1ty .Loc.,t!.ofla before dtggj.Dg I.n arly pub1ac rlghg-of-uay or easement Lrr ttre Toen ('f vs11- a bul:.Jinc perrll't 18 not . aBt:c.r cr.rt Detm1t. A €cre€t crrt t>erurt-t. euEt be
,*
a
TO:
FROM:
DATE:
SUBJECT:
MEMORANDUM
Planning and Environmental Commission,
Review Board Files, Vail Point File
Andy Knudtsen
October 12, 1992
Transferable GRFA to Phase lll
Design
On September 15, 1992, the staff
"pprou.dfiterior
modification to
the Katz dwelling unit in Vail Point Phase ll. Steve Gensler has
approved the changes which increased the GRFA of the unit by 96
square feet. The site plan for Phase ll approved by PEC in June of
1992, had an excess of 1 13 square feet which was to be transferred
to Phase lll. With the approval of these interior modification, there is
a remaining 17 square feet which can be transferred.
\
(,
.A t[u1-t ?'1:
t/\
,) (,* -t'
l"
[,,-\t'
\,,,1
q)
)fu|
4/ \ ,' ,0t'
fr'(t',.1 trqlqs
1,- t '',f a'r I"r'
dot""
o
160 US HIGHWAY 6 PO, BOX 347 SILVERTHORNE, COLORADO 8049B 303.468.A000
September 30, L992
Date :
Amount:
Numbe r :
Expiration Date:
SepEember 30, 1992
$8 ,900 .00
863-318s
July 1, L993
f,TBAIrl(
OF SILVERTHORNE
IRREVOCABLE LETTER OF CREDIT
Except as otherwise provided, this
Uniform Commercial Code of the Scace
Customs and Practice for Documentary
of Cornmerce (Publication No. 400).
KLP/j ms
cc: Inf/cir
Town of Vail
Attn: Kristen Pritz
75 S. Frontage Rd. Llest
Vail, CO 8L657
Kristen:
We hereby open our Irrevocable Letter of Credit in your favor by your drafc drawn at sighc on FirscBank of Silverthorne, 160 U.S. Highway 6, P.O. Box 347,
Silverthorne, Colorado, for any sum or sums up to the aggregaEe amount of Eight
Thousand Nine Hundered Dollars and 00/100 ($8,900.00), for the accounE of
Parkwood Realty, Inc., 5299 DTC Blvd., Suite 500, Englewood, Colorado, the Vail
Point Proj ecc.
Each draft must bear upon its face the clause "Drawn under Letter of Credit No.
863-31-85, dated September 30, 1992, of FirstBank of Silverthorne, N,A.". Each
draft must be acconpanied by a statemenc by a duly authorized officer of
September 30, L992 sCating that this draw is in connection wich funds needed for
the accounE of Parkwood Realty, Inc., che VaiI Point Project.
The amount of each draft which is negoEiaced pursuanc to this credit, together
with the daEe of negotiation, musc be endorsed on the reverse side of Ehe Letter of Credit.
We hereby agree that drafts drawn under and in compliance with che terms of the
Letter of Credit wiII be duly honored if presented to FirstBank of Silverthorne
on or before JuIy 1, 1993.
Letter of Credic sha1l be governed by the
of Colorado as then enacted and the Uniform
Credit (1974 Revision) Incernational Chamber
Sincerely,
Koger Props t
Pres ident
3@37?@8578 RFFILIATED D€C. 5Y5 I
Afflliated Executive $ystemc
F-'7e,6 r-43?a AUG 24 '9.2 L4tt4
{**6
# PAGE$ (rNcLUDrNcTt{rs PAGE}:
T|ME: ?of , . mounrnln nue
L
F-.2,/- 9L
IF YOU DO NOT FECEIVE LEGIBLE COPIES OF ALL THE PACES PLEASE CALL BACKAS SOON AS POSSIBLE.
Telcphon€; (g0g) Z7&o7tl FAX NUMBER: (303) ZTtrobZB
nr\ ,
\,., ,lr{, u ,41",
6\z'rr
FAG$IMILE TRANS IUIIS$ION
FAxNUMBesrt 3:,J , | {7F -Urz
TO:
FROM;
DATE:
g377EA5?E
c/-.'. '4
LIRTED EXEC. SYS NFFI
O
F-78E T-45?o RUG 24 '.92 L4. L4
Geotogfc lfezard Hevlew
August rg, 1gg3
Lot I, Elock 8, Lton$ Hldge SuMtvte|oil
Vafl Poh Bultdtngn t; t,3 a|d 4
The unders[ned hes r€ad thc Rocldail Hazard Fepo4.dalodJuno 6, rEgr, pmpared by Ntchofao Lanptrb. r urdarehnd hom te id;iduli6ns ihn'iti" fiHffi-oriri,,rs h tocared h anocktetl haaqfir_rong, andrhero tc a poienilainazara or roqkrtr fi;aiiiiih; propo€ecf
Bffiieffifi:ffi.#l,T",o#ffiffo to accept
'nese
racr' and rsqi;;i f,e ?iffior yar
STATE OF COLONADO
County of S"*fsioe-. )
fne this a(4-aay ot
known tc me b bc ths
f::EJ,g"namo rs.stb"i,'r ;#j;"ffii,,l h€ €xedubd fre same ror ne prrpo*ee ano #.iifiet"tfi ril;r'r;;-"il;#;:
)) ss.
lvly oommlt6lon explos:
\Je, ' ' t4#3 il
?8 'd 0ud3r NrI AXsOX glrr9tr ror t 2Z 3Ar Z6,,tZ,,eA
SENT BY:The fesrln Horel
ruTNt}F
3034792157;# 1
fiuir , 8 19gl
D cptail.r, qt fft:rtirt IItn kPzrr,l,
hoffrr rrd rn'€gEB dl d
'flnilthg
t0urldotx
P00l ulf|ft Elt rsr€gtEfiott
ilm{ls Ffrl!'Elrfimo:
L'llHr hDttUutt€ttts, lndudiq rro #H
etrwEG[r li+ rFU od. il tEffi8aty' lrm! |h||g
Lhnrdg. t oa, rtd dlno d rL tJttl{tstnl
IUTA
?J Srrtl frre|rgc lcrd
Vtll, Cobttlo fl6f7
90r-179-7rrl I lIt-zt l,
AEt8t t2,l*
It Smrleffi
PilqoodFdV, Ino,
5AS DfCElu|.tddt
Emlaoo4Goheth 80111
Hs: lffd GrsdrhYclFolnt
DesgEve:
Bdow b nc und€Elrndh! lle hl has ragarfiO tF l'tEttEcffi h&trol EDfi fof
vdt Fohl -rhe
at'run uer ot ftct ot ito,oo0.00 h Yrill url StFbnbs il' i902- h "'s
ncra1 on e btfrtii li, lg91 ltEf 1rsn ltlshn Pdtr ofi6ig ftb kIF!'vEnnF lo Ec
dcna. rh!!t r|l rsfrllorxE
$"7m.00
3S.m
rF00.m
t100.00
lI!9,!0
0t0tr00.D
At thb u||li, r, rnrtthd ff trr dnoShrr rlu ruregcuen 9l !r tnffi - .
rornd1trori h ;aiomr rn-tin ftrf f Ucs 1qt l|t h deCltB rllh fttt. .'HF rill
0n *tftfloo-d-hfiEne 14 gym $H drrtra'cs. 16 Tffrn 111il hu tf tlstt b
urr ts rmr b hqD fu U|| Pts l[ tl un !r nl@ d tutwtilttt tlu nilE
Frplt6dr Ud-ltotl Qt6t$ AnCcfrrfr ddtq|' fnz erhg Ont aD i,nuttr C
-nromy qlrl I GqrL rd ilrffi illh tb tr $.Gm.o.'
tu ho firtEil hils ol cd b ffi oaf, rfl Sguqqr 30. I W. drrc porHa'fr
forn rlftr i nir tinrd cnn Alqrr:,|bn-oomntr|p. Ttls nfi, I€frid oildf oan bo
prauaa lor |8,100.00 sro rnarg -tr rnr urelry l, t99l, Thb innfl c ro|rt r
iEqulmdb cd|flE tslbft ffi:
BY:The festln Hotel ar91r a t ira- tf,rll v.t |t
; 8-18-92 ; 1:52PM ;
u
ril {drt rr^ ru. tutntJ
U
nrgdho ild rF,tgllalm d Phas lI
Foiol Utreilry slb rcnEellnfll
mnf,esEl|r
Pill,$g iilPr0t ElttEtlli
l|l*.# hlFrBlfg|tetb, hilfiE lF stl[otd
EveErosn lne+ rw rOd, il nGo€3|rty, Erodf€ dorE
tlorutdge t-ooe dtd |liftg 4 fii tuftrurd.
TqTIL
Elrumly,
i4e#*r
Anay rnrrfrEsn I
Toun Ftrner '
Sb"il ltfrnghr. Resffiom
Pahrud Frrlfi, tr.
89a4792L67i# 2
1., u3
st.6@00
r00,00
l,c00,m
rF00.0o
_!.losrg
lg.e00Jo
Pl6E 0 npF Uilfib agDg[fi]ndnet Fmriqlt t|tGltsfdt tbEl EsEnter tt'
t 0gl 5nd .lqnr 1,[, 199r. I yur |irw rq guardona &qlt il[ uild.tsten{lE ol ||'e
ouEuntt ffi fE D dr [|b Fds* r*f,l eel mr il 4794138. u you tslbta &t [|h
lnhlnder-tdrb to||r undE dhnilt{; Fhags rbn ott fre 3ps pmyil'ded brlorr. By rlFitlg
f|f rgnansil youmsFralflbhrer srdlbm g|d Gtill'lllErm.
I't ssrtB Gansbl
A|{rS t!,tme
PTe 3
Agr*db*
SEM BY:The fesrln Hotel ; 8-18-92 ; l:52FM ;'%""3034792157;# 3 I tul l!|rr sr,irl I t
U
fft. Sftr Ocnrbr
tuglJt le,loEe
P|gs I
silATEOFCSLomDO io.
COUHTYOFEAGI-E I
Tlrr fqugeing lgreetrrnt t ,"- 1Tg
E dqtd E
WF ttr mf hs$ ard olfidcl 6sC,
t/.te-yc'
TflnoFUd I
ttrrEoFcoLffiADo lu*.
ocuilTYOF EIOLE I
ftt fbs3gelng AgtBtntnttuB rrtstwlsdged tcil0tE rrfqfr t a'! y1 U
, nriiii--'--- -.wn+ E =&e'tv+4!--4''
rtt'ct! /-'**'.--'tr ffi- ni I m*rtn ct R-,of lro Tfl$ 9t Vdl.
ffi*c**"ffi
Ey:\\
ffiW ffi
O
nltn
t,ih t6t'(
i:,r+;Tttt;'f
75 Sottb Ftottage Road
Vail, Colortdo 81657
t 0)-479-2r t I / 479-2r t9
August 12,1992
Mr. Steve Gensler
Parlarood Realty, Inc.
5299 DTC Blvd., #500
Englewood, Colorado 80111
Re: Letter of Credlt for Vall Polnt
Dear Steve:
Below is he understianding the Town has regarding the irrevocable letter of credit for
Vail Point. The current letter ot credit of $10,000.00 is valid until September 30, 1992. lt is
based on a September 11, 1991 letter lrom Kristan Pritz outlining live improvements to be
done. These are as follows:
$2,700.00
800.00
1,500.00
3,s00.00
1.500.00
$10,000.00
Demolition and revegelation of remaining foundations
Pool amenity site revegetiation
Drainage swale
Paving improvements
Landscape lmprovements, including two additional
evergreen trees, new sod, if necessary, seeding along
Lionsridge Loop, and railing at the lurn-around.
TOTAL
At this time, we understand that the demolition and revegelation of the remaining
foundations is no longer an issue. This is because you will be dealing with these issues with
the construction of building #2. Given these circumstances, fie Town shall have the right to
use this money to insure that the Phase lll site will be regraded and revegetated. You have
provided a bid from Colorado First Construction dated June 8, 1992 stating that the amount of
money required to regrade and revegetate this site is $1,600.00.
As the current letter of credit is valid only until September 30, 1992, please provide the
Town with a new letter of credit at your earliest convenience. The new letter of credit can be
provided for $9,100.00 and should be valid untilJuly 1, 1993. This amount of money is
required to cover the following costs:
TOWN OF VAIL
D cp artmc nt of C ommttity D ca e lo pm cn t
Mr. Steve Gensler
August 12, 1992
Page 2
$1,600.00 - Regrading and revegetiation of Phase lll
800.00 - Pool amenity site revegetation
1,500.00 - Drainage swate
3,500.00 - Paving improvemenb
1.500.00 - Landscape lmprovemsnts, including two additional
evergreen trees, nsw sod, if necessary, seeding along
Lionsridge Loop, and railing at the turn-around.
$8,900.00 - ToTAL
Please note that this agreement modifies previous agreements dated September 11,
1991 and June 14, 1991. lf you have any questions about my understanding of the
outstanding work items on this project, please call me al479-2138. lf you believe that this
information reflects your understanding, please sign on the space provided below. By signing
this agreement, you are agreeing to these conditions and requirements.
Sincerely,
// / /) /t /t- / .// //,ry? f-u.dds+-l
Andy Khudtsen I
Town Planner i
Agreed to by:
Steven M. Gensler, President
Parkwood Realty, Inc.
By;
Mr. Steve Gensler
August 12, 1992
Page 3
srATE OF COLORADO )
) ss.
couNTYoF EAGLE )
The foregoing Agreemenl was acknowledged before me this
-
day of
1992, by
of Parlcwood Realty, Inc.
Witness my hand and officialseal.
My commission expires on:
Notary Public
Agreed to by:
Town of Vail
STATE OF COLORADO )
) SS.couNwoFEAGLE )
The foregoing Agreement was acknowledged before me this
-
day of
1992, by
of the Town of Vail.
Witness my hand and official seal.
My commission expires on:
Bvl
Notary Public
- J-lI--34-79y2 LA=34 FRT]M BFI.IK SILUERTHffiNE Tu a
To be attached to end becone a Part of that LeEteE Agreaent
between Parkmod Rgalry, Iuc. a-Colorldo Cotporatl'oa.and FlrstBank
of Sllverthone, il.A' cp,ted 915191 iR.the amouat of $101000'00
4792t5? P.AL
B
RECEIVNG F
ffi
OF SILYEFITEFT{E
IXBEVOEAT.DB LETTER. Otr CBDIT
*
Al{0lllff r
TIIIUBER:
AGEs;
flo,oo0-00
863-3185
U(tJI
SoAces-B3a
l|o usl rl$filAY 6 P.O 6d l.? glvgfiffi|e COIORADO SlDg m'/FS&
Septenber 61 1991
DATE: Septeobcr 6' 199t
$(PIRI|JIION: SePteober 30' 1992
fmro of Vetl
75 Eoutb Prontage Rdad I{€Et
YEllr Colorado E1657
AD[tl; KrL3ten lt{tt
Deer f,rLstdnl
Uc hereby opeo our Irrqvogsblo !€,Etct of Crgdlt ln yout fevor by your dratt st Elght
on Elrstilanis of Slt1lettbqnrcr X.A.r 160 U.S. Etgtrrey 6, P, O. lox 347' Ellvertboruer
Colorcdo, 8049Sr for eny sug qr orps up to tha iggregale 6uoltsE of 1Bl TITOUSAIID DOLLARE
ruu noifOOr --*(ffqr0gb.00)-for rbe iccounc of-Farkood Brrltyr ltc. 5299 utc ElYd.,
Sulto 500, Eaglrloodl Coloradol the Val'I Potut Btoject.
ESch drnEt rust bear upon 1tr flcti the claste fhranq Undet Letler of Credlt Wgober
863-3lEF, ilated ScpCcnier 6, 1991r of tbc Flret5aDk of gllverthorne. N.A.". Each
draft Er;t bc sccmPaderl by e atttEEett by a duly aurthorlaed -offlccr of the Town
oi v*1l trartog thei thlg diav te ln conoectiou wlrh fusdg nacded for tbe acceutrt
of Prrknn'rxl Reelry, Inc. the Yall Polnt Prolect.
The ernorrnr of each draf,E r'blch l.s B.gotlated purcuanr co thl-a credl't r togethet tllth
che dste ol nrgoll*tlstr, urtt be eartotgcd on ihe reversa sldl oE the Lettsr of 6rs'llt'
ge hereby agrcc that drefts itrdra trailer o[d lt cooPlteuca ltLth rhe tercs of .Eha L€tter
of crcc{i sirr bc duly bouorril lf preeancad ro FLrgtBsnh of, s:llversho1a8. l{'A' ou
ot before septeuber 30, 1992.
:; H:;H :lli'.:Tltl,li'E fr:::"::i :: ;fl:1ffi";;*,lffi .'ii:eol."€'f
or before Septenber 30, 1992,
xLPlcJh
col td/clr
TOTHL P.A1
f,oger Etopst
o z
E
=E
uJ o-
@ .<r
\o c.t c{F
e.l
tn
UJ lu
LL
E
=E
uJ
m/rffi p/,La/ tt)
N
c!
IJ
E
H
z
c.t
uJ or
.if
N
z
sX
+z 6v
2A cz !<
(l.l F
o
F
F U'z
o
z z o
o
UJ F
z
z
J
cl
.6
o z
z
z
3
{
-.t a {
>.i
z
l
J)
h
z H
H
Fct
ts H E &
A
Fl
z
E
z
IE
l:e t<
IH l-lrq
(L
J
lll o
='r
l!
o F
cr
z
E
lll
2A
\o
(a(n€g!n
tsl u')
Q'n I
l-l X trO r
H ho<Etrr>
H
z
Fl
(g
o o o
O
==o
E
=c l
-i
o
=.9
o
o)'6
o o
o)o
o
.9
.2 .:o .o
o
g)
'-
o o (E
o
l
o
aD
'=
=l o
o
3
o
(!
at,
c
o
=o
3
F
(!
.c .;
6
o
E
o
i
E
o
c)o
E EE
fg o:E3
c.2
F'3
EB cL
o(!5t
=t €t c9
66
;
=
o
a
(5
o"
OJ
(o
o o (6
o
q)
E
o
o
c
.9
o.(!
.2
(!
o
.E,
;
c I (J
(E
-o o
q)
D
.-l
ln \o o\
\o
O.l
C')
\t
@
rn \t
e.l
)
C
ln
\j
I I
,1
?
T
.Y
\o
F
+
E
e.!!(L
z
6 )
d)
x
T
z )
o
F
u.t
z
(L
z
I ()
uJ
=
LU lu u-z o
F
IJJ
G
o
(D
B lu
uJ
z
6
UJ
I
F
UJ
l z
uJ J
X
F
ul
at)l
o
lrJ t!lJ-
E
t!o
J
F o t-
z
6 i f (D
J
uJ J ut
z
(o
=
o-
J
C)z Fl
F.{
H
NOIIVN']VA
I
I
I
I =l >El
-r-l+i r.r.r .t 1.,= co * lE
;;
=F ;E ZZtL P ?2F 9 : t o-AF6E=a o (rF z > (JF-g? s:oqdF
H 5 g..t -r 26,
a(\t
.A
H H v
(\
z
tr
l
LT
G.
l
uJ
F
t\
C\
g.
G
z
E o o
z
tr
uJ F )
X 4 rc
=z
a z l z Aa
<o o<
>tr >(!
R,!5o <z
F z.
9z
-F do 3uJ OI
-l
il l-i | -'r I I tl n tl tl
I
I
[T ItsI Itsl | <F t'l
-T tl tc(l tol tql tdl
l
ci
z
i F
(I
F'
z
F
5 a z
-l.lii ,--{ c'lll I I rlxl & dl xl
--l+l l"I ll 3te tl
_l_ii--tl ttl | | tcc
F ll qt:
I l'r'---T----l el I i *ll *-t iiP,l ioH
I
-*l
--l
rl
:l 6l
?l Fl
zl
zl
o
UJ
uJ
uJ z a F
llJ
z
E o o
i;{
a lt)
1Z EB
\l H -l€t #
.{ rq z-d
rl trl F1 FI
I
I
I
I
I
I ol zl
Yi
(!l
-l
F4 l frl
B
F-l r -<,](J]xl zl -41
El
FI z
o
N f\
.k
z
tr
dl
I
z
I
u)
Lf)
O
a*l
\' |,l
(.1 "l
I
I H'-
.A
z
ttt a 1
uJ F o o
-)z
F o-
UJ Y
u,l @-
Fq
F-
=s ut 0>rr- it 6El
o- 4l
Oal
rHl rl
ul
F.g oE zo
Fl
lrl
H
CA z
t--l
Fl
TP
z (,9
=2.(Do
=z
dP
F
ul
UJ o z
o o
F
I E I
JF lu-h=', e.duJ >o-Ou-9o
-UJ 6(r :>IJ F.t!
=tr
IJJ
F
c o
E
CI o
6t
o t
,e
3
E
E o t)
o
ts
=E lrl
o-z 9 F (J f
E,F o z o o
F{IFI
XTD4I
:E?
coil>
f\
I r')
-if
o z
o
uJ
J
lr
z
=F
.if,rn (\r\
I \'c{
=l rl (\l (ol
I ol z)
ol
uJl
TI
sl
bl
zl
3l
9l FI
I
I
I
I
I
cil
..1
HI :l
al >l
|ll ol
3l c ol ur FI F
lr'l I tt I lo\ |l-l l-l tl Hl ol ll =l iil lll co Ell Hl -t
al slI
Fll u-l N ol ol @ tzl
=;l qol
z H
F Fl
&
B x
UJ
=z
ln rh
o
=a
!f
EI
H z Fl o
F'|
H
a z
z_
:
LL
UJ
z
--)
\t
I
cn
c r\
-(}
R Ltt
F-l
z
IIJ
F
H
Fl
FT
c or
F
I
\o .f-
o
z
F-l
F.]H
=O
E](J
F)
=g.
tr
\'\f
o\
I o\|-\\f
I
I
<l tl
cnl -l
I ;l
zl .l
url El
Jl
<(l >l
s-i ol
sl ol
F-l
z H
IA
Fl H
F)
H
=tr
z
r
Lr.J
IY
F O
F z o (J
o L-t ir g !n b=
<o OF
FS
XF
--- Z
2?
=<2E
d6 o
F
UJ F
()
<F
r.! <zE
(nZ
J <O
;i|'l.J :o
FtFlft X-X--
)
luwn u llal
75 south fronlage road
vail. colorado 81657
(303) 479-2I.38 or 479-2139
TO:
FROM:
DATE:
Cl lEl TFrrm .
off lce of communltY develoPment
ALL CONTRACTORS CURRENTLYL REGISTERED WITH THE
TOWN OF VAIL
TOI^]N OF VATL PUBLIC WORKS,/COMMUNITY DEVELOPMENT
MARCH L6, L98B
CONSTRUCTION PARKING & MATERIAL STORAGE
fn sumrnary, Ordinance No. 6 states that it is unlawful for any
Person to litter, track or deposit any soi1, rock, sand, debris or material, including trash dumpsters, portable toi.tets and
workmen vehicles upon any street, sidewalk, alley or public place or any portion thereof. The right-of-way on all- Town of VaiL streets and roads is approximately 5 ft. off pavement.This ordinance will be strillfy enforcld by the toirn of Vail PubIic l{orks Department. Persons found wiolating thi.s ordinance will- be given a 24 hour written notice to rernove said naterial.fn the event the person so nolified does not comply with the notice vrithin the 24 hour time specified, the public Works Department will remove said material at the expense of person notified. The provisions of this ordinance shaI1 not be applicable to construcLion, naintenance or repair projects of any street or alley or any utilities in the right-a-way.
To review Ordinance No. 6 in fuII, please stop by the Town of Vail Building Department to obtain a copy. Thank you for your cooperation on this matter.
cknowledged
ta*.u\
Pos t-_
Date
- i5 *'1)-
ect (i.e. contractor, owner)
o
l|tl
75 soulh fronlage road
vail, colorado 81657
(303) 479-2138 or 479-2\39
BUILDING PERI'iIT ISSUANCE TIME FMME
If this perml:t requires a Town of Va'i I Fire Department Approval ,
Engineel''s (.Pub1 ic l,lorks) reyiew and approval , a Planning Department
review or Health Department review, and a review by the Building
Departnent, the estirnated tjme for a total review may take as long
as three weeks.
All commerc'ial (1arge or small) and al'l multi-famjly permits will
haVe ta follow the above mentjoned maximum requirements. Residential
and small projects should take a lesser amount of time. However, 'if
fesidential or smaller projects impact the various above mentioned
departments wlith regard to necessary review, these projects may
also take the three week period.
Every attempt wrill be made by this department to expedite this
permtlt as sgon as possrible.
I, the undersigned, understand the p1 an check procedure and t'ime
frame.
offlce of communlly developmellt
tuwn u
I , .-"\
= Vn, \ r-c,'-ir
r! oJect Name
)-.:.-t'.,
Date Work Sheet was turned into the
Communj ty Devel opment Department.
Town of vail
25 South Frontage Road vail, Colorado 81657 (303) 479-2738
Plan analysis based on the 1991 uniform Building code
Project Numberz 080792
Address: 1881 LIONSRIDGE LOOP
Contractor: RJ BUILDERS
Architect : R. HODGES
Engineer:
NOTE:The code items listed in this report
listing of all possible code requirements
selected sections of the code.
Nane: VAIL POINT #5-B Date: August 7, 1992
Occupancy: R3rM1
Type of Const: V-N
Plans Examiner :DAN STANEK
are not intended to be a complete in the 199L UBC. It is a guide to
FL AREA MTN.LTGHT MIN.VENT NO.EXITS EGRESS
2 Bedroom
2 Bath roon
2 Master bedroom 2 Master bath 2 Hal1s, closetsr etc.
TOTAL FOR FLOOR 1 Living roorn 1- Dining room L Kitchen 1 Bedroom
1 Bath room 1 Hal1s, closets, etc.
TOTAL FOR FLOOR B Garage B MechanicaL room B Ha11s, cLosets, etc.
TOTAL FOR FLOOR
BUILDING TOTAL
L27
46
244
53
29s
765
405
L5?
83
L2L
44
318
Ltz8
481
62
150
693
1893
t2.70
0.00
24 .40
0 .00
40 .50
15.?0
10.00
72.L0
0.00
0.00
0.00
0.00
6.3s
2.30
L2.20
z-oJ
0.00
20.25
7 .85
5. 00
6.05
2.20
0.00
0.00
0.00
0.00
Yes
No
Yes
No
No
No
No
No
Yes
No
No
No
No
No
Yes
1
l-
1
l_
1
I
1
1
L
1
1
L
1
1
1
1 I
I
FOOTNOTES:
1) EGRESS - An operable windo\.e or door that opens directly to the exterior is required from this room. The minimum clear openable area must meet the following. -- Sec. 1204.
1) The ninimum clear height is 24 inches 2) The ninimum clear width is 20 inches
3) The minimum clear area is 5.7 square
4') The maximum siII height is 44 inches
The number of exits is based on lable 33-A
A mechanical ventilat.ion system nay be used
openings for ventilation. -- Sec. 1205. (c)
The requirement for an egress window in the
Sec. 12Q4.
2)
3)
feet
(Dwellings )in in lieu of exterior
basenent is based on 4)
Page 2
ROOM DIMENSIONS:
Habitable space shall have a ceiling height of not less than 7 feet 5
inches. Kitchens, haIls, bathrooms and toilet compartments may have a
ceiling height of 7 feet measured to the lowest projection. ff the ceiling
is sloping, then the minimum height is required in onJ-y L/2 of the area.
--Sec. 1207 . (a)
Every dwelling unit shall have at least one room which has not fess than 120
square feet of floor area. Other habitable rooms except kitchens sha1l have
an area of not less than ?0 square feet. -- Sec. L207.(b')
Habitable rooms other than a kit.chen shall not be fess than 7 feet in any
dimension. -- Sec. 1207. (c)
GLAZING REQUIREMENTS:
A11 glazing j.n hazardous locations is required to be of safety
glazing material . -- Sec. 5406. (d)
1) Glazing in ingress and egress doors except jalousies.
2) Glazing in fixed and sLiding panels of sliding door assemblies and
panels in swinging doors other than wardrobe doors.
3) Glazing in storm doors.
4) Glazing in all unframed swinging doors.
5) Glazing in doors and encl-osures for hot tubs, whirlpools, saunas, steam
rooms, bathtubs and showers. Glazing in any portion of a buj.Iding wal1
enclosing these conpartments where the bottom exposed edge of the
glazing is less than 60 inches above a standing surface and drain inlet.
5) Glazing in fixed or operable panels adjacent to a door where the nearest
exposed edge of the gJ-azxing is within a 24-inch arc of either vertical
edge of the door in a closed position and where the bottom exposed edge
of the glazing is less than 60 inches above the walking'surface.'7) Glazing in an individual fixed or operable panel, other than those
locations described in items 5 and 6 above, than meets a1l of the
following conditions:A. Exposed area of an individual pane greater than 9 square feet.
B. Exposed bottom edge less than 18 inches above the floor.
C. Exposed top edge greater than 35 inches above the floor.
D. One or nore walking surfaces within 36 inches horizontally of the plane of the glazing.
SMOKE DETECTOR REQUIREMENTS :
A smoke detector is required on the ceiling or waI1 at a point cenLrally
located in the corridor or area giving access to each sleeping area.
-- Sec. 1210. (a) 4.
A smoke detector is required on the ceiLing or wall in each sleeping area. -- Sec. 1210. (a) 4.
A smoke detector is required in Lhe basement. -- Sec. f2L0.(a) 4.
A smoke detector is required on all stories. -- Sec. 1210.(a) 4.
If the upper level contains sleeping room(s), a smoke detector is required
in the ceiling of the upper leveL close to the stairway;-
-- Sec. 1210. (a) 4
Smoke detectors are required to be wired to the building's power source and shall be equipped with a battery backup. -- Sec. 1210.(a) 3.
Detectors shall sound an alarm audible in all sleeping area of the dwelling
in which they are located. -- Sec. 1210. (a) 4.
Page 3
OCCUPANCY SEPARATION:
Between the garage and the residence, materials approved for thr fire
construction are required on the garage side only and any doors between
the garage and the residence are to be a self-closing L 3/8 inch solid
core door or a 20 minute fire door. -- Tabte 5-B & Sec.503.(d) exc. #3
STAIR REQUIREMENTS:
A stairway in a dwelling must be at least 36 inches wide. -- Sec. 3305.(b)
The maximum rise of a step is 8 inches and the minirnum run is 9 inches.
-- Sec. 3306. (c) exc. #1 Provide a handrail on one side a stairway 34 to 38 inches above the nosing if
there is 4 or more risers. -- Sec. 3305. (i)
Provide a guard raiL where drop off is greater than 30 inches. Minimun height
= 36 inches, maximum opening size = 4 inches. -- Sec, L712.(al exc. #1
The minimum headroom is 6 ft.- 8 inches. -- Sec. 3306.(o)
Enclosed usabl-e space under the stairs is required to be prot.ected as required
for thr fire-resistive construction. -- Sec. 3306. (1)
SHAFT ENCLOSURES:l-) Chutes and dumbwaiter shafts with a cross-sectional area of not more than
9 square feet may tined on the inside with not fess than 26 gage
galvanized sheet metal with all joints locklapped. The outside must be
t hr construction. AlL openings into any such enclosure shall be protected
by not Less t.han a self-closi-ng solid wood door 1-3/8 inches thick or
equivalent. -- Sec. 1?06. (f)
2', Gas vents and noncombustible piping installed in walls passing through
3 floors or less do not need to be in t hour shafts.
-- Sec. 1-705. (c)
3) Shafts for gas vents, factory-buiLt chimneys, piping, or ducts that do
not extend through not more than 2 floors need not be in t hour shafts.
-- Sec. 1706. (c)
4) A11 oLher shafts are required to be enclosed in a t hour assembly.
-- Sec. 1?06. (a)
CRAWLSPACE REQUIREMENTS :1) Provide ventilation either by mechanical means or by openings in exterior walls. Opening shall provide a net area of not less than 1 square foot for
each 150 square feet of area in crawl space. Openings sha11 be distributed
on two opposite sides and be located as close to corners as pract.ical .
-- Sec. 2516.(c) 6. Note: vent openings may be reduced to 10t of the above if ground surface area is covered with an approved vapor barrier and the building officiaL approves.For a 372.0 sq.ft. crawlspace area:Ratio Minirnum sq.ft. of vent 1/150 2.48 2') Provide 18-inch by 24-inch access opening to the crawl-space area. Note:
opening may be required to be larger if mechanical equipment is l-ocated in the crawl space. -- Sec. 2515. (c) 2.3) Unless the wood is listed as an approved wood of natural resistance to
decay or treated wood, the minimum clearance between exposed earth and floor joist is 18 inches. The minimum clearance to beams and girders is is 12 inches. -- Sec. 25L5. (c) 2.
Page 4
Additional requirements :
for R3 occupancy
this project will reguire a site improvement survey. Such survey
shall be submit,ted and approved prior to request for frame
inspection.
All crawl spaces within the tor.rn of vail are lirnited to a earth to
structural floor ceiling height of 5', be earth floor onIy, be
ventilated as per ubc 2515(c)6 with minirnum access as per ubc
2516(cl2 and maximum access of 9 sg. Ft.
Any building site with a slope of 30 degrees or more shall reguJ-re an
engineer design. Such design shall address drainage, soil retainaget
and structural design.
Excavation below slabs on grade shall not. be permitted wiLhout prior
approval .
Address numbers shall be posted plainly visible and legibfe from the
street.
For M1 occupancy
slope garage floor to allow for drainage to outside or provide a
floor drain with with sand and oil interceptor to dry well or to
sewer. Any garage floor drain connected to sewer must be appproved
by upper eagle valley water & sanitation district.
rn garages with living area above, the walls of the garage which are
bearing the area above shall be protected with one hour fire
resistive construction. UBC 503(b) .
Town of Vail
25 South Front.age Road Vail, Colorado 81657 (303) 4'19-2L38
Plan anafysis based on the 1991 Uniform Buildinq Code
Project Number: 080792
Address: 1881 LIONSRIDGE LOOP
Contractor: RJ BUILDERS
Arctritect : R. HODGES
Engineer:
Name: VAIL POINT #5-A
Date: August 7' 1992
Occupancy: R3rM1
Type of Const: V-N
Plans Examiner:DAN STANEK
NOTE:The code items listed in this report are not intended to be a complete
listing of all possible code requirements in the 1991- UBC. It is a guide to
selected sections of the code.
NAME AREA MIN.LIGHT MIN.VENT NO.EXITS EGRESS FL
2 Bedroom
2 Bath room
2 Master bedroom
2 Master bath 2 Ha1Is, closets, etc.
TOTAL FOR FLOOR 1 Living room 1 Dining room 1 Kitchen 1 Bedroom L Bath room L Ha1ls, closets, etc.
TOTAI, FOR FLOOR B Garage B Mechanical room B HaIIs, closets, etc.
TOTAL FOR FLOOR
BUTLDING TOTAL
FOOTNOTES:
1) EGRESS - An operable window or door that opens directly to the exterior is required from this room. The minimum cfear openable area must meet the following. -- Sec. 1204.l.) rhe minimum clear height is 24 inches 2) The minimum clear width is 20 inches 3) Ttre minirnum clear area is 5.? square 4) The rnaximum sill height is 44 inches
The number of exits is based on Table 33-A
A mechanical ventilation system may be used
openings for ventilat.ion. -- Sec. 1205. (c)
The requirement for an egress window in the
Sec. 1204.
L27
46
244
53
295
755
405
L57
83
L2t
44
318
Lt28
481
62
r_50
693
18 93
L2.'10
0.00
24 .40
0.00
0 .00
40 .50
15.70
10.00 t2.t0
0.00
0.00
0.00
0 .00
0.00
b . J5
2.30
t2.20
2 .65
0.00
20.2s
7.85
s.00
6.05
2.20
0.00
0.00
0 .00
0 .00
Yes
No
Yes
No
No
No
No
No
YeS
NO
No
No
No
No
Yes
1_
1
L
1
1
1
t
1
1
1
1
1
1
'1 I
L
1
1
2l
3)
feet
.i
(Dwellings)
in in lieu of exterior
basement is based on 4l
Page 2
ROOM DIMENSIONS:
Habitable space shall have a ceiling height of not less than 7 feet. 6
inches. Kitchens, halIs, bathrooms and toilet compartments may have a
ceiling height of ? feet measured to the lowest projection. If the ceiling
is sloping, then the minimum height is required in onLy 1/2 of the area.
--Sec. 1207 . (al
Every dwelling unit sha1l have at least one room which has not less than 120
square feet of floor area. Other habitable rooms except kitchens shaIl have
an area of not fess than ?0 square feet. -- Sec. 1207.(b)
Habitable rooms other than a kitchen shall not be less than 7 feet in any
dimension. -- Sec. 120? . (c)
GLAZING REQUIREMENTS:
A11 glazing in hazardous locations is
glazing material . -- Sec. 5406. (d)
required to be of safety
1) Glazing in ingress and egress doors 2) Glazing in fixed and sliding panels
panels in swinging doors other than
except jalousles.
of sliding door assernblies and
wardrobe doors.
3) Glazing in storm doors.
4) Glazing in all unframed swinging doors.
5) Glazing in doors and encl,osures'for hot tubs, whirlpools, saunas, steam
rooms, bathtubs and showers. Glazing in any portion of a building wall
enclosing these compartments where the bottom exposed edge of the
glazing is less than 60 inches above a standing surface and drain inlet.
5) Glazing in fixed or operable panels adjacent Lo a door where the nearest
exposed edge of the glazxing is within a 24-inch arc of either vertical
edge of the door in a closed position and where the bottom exposed edge
of the glazing is less than 60 inches above the wafking surface.
7) Glazing in an individual fixed or operable panel, other t.han those
locations described in items 5 and 5 above' than meets aII of the
following conditions:A. Exposed area of an individual pane greater than 9 sguare feet.
B. Exposed bottom edge less than 18 inches above the floor.
C. Exposed top edge greater than 36 inches above the floor.
D. One or more walking surfaces within 36 inches horizontally of the
plane of the glazing.
SMOKE DETECTOR REOUIREMENTS:
A smoke detector is required on the ceilingr or wall at a point centrally
located in the corridor or area giving access to each sleeping area.
-- Sec. 1210. (a) 4.
A smoke detector is required on the ceiling or wall in each sleeping
area. -- Sec. 121-0 . (a) 4 .
A smoke detector is required in the basenent. -- Sec. 1210.(a) 4.
A smoke detect.or is required on all stories. -- Sec. 1210.(a) 4.
ff the upper level contains sleeping room(s), a smoke detector is required
in the ceiling of the upper level close to the stairwayu.
-- Sec. 1210. (a) 4
Smoke detectors are required to be wired to the building's power source and
shal1 be equipped with a battery backup. -- Sec. 1210.(a) 3.
Detectors shall sound an alarm audible in all sleeping area of the dwelling
in which they are located. -- Sec. f210. (a) 4.
Page 3
OCCUPANCY SEPARATTON:
Between the garage and the residence, materials approved for thr fire
construction are required on the garage side only and any doors between
the garage and the residence are to be a seLf-closing L 3/8 inch solid
core door or a 20 minute fire door. -- Table 5-B & Sec. 503.(d) exc. #3
STAIR REQUIREMENTS:
A stairway in a dwelling must be at least 36 inches wide. -- Sec. 3306.(b)
The maximum rise of a step is 8 inches and the minimum run is 9 inches.
-- Sec. 3306. (c) exc. #1
Provide a handrail on one side a stairway 34 to 38 inches above the nosing if
there is 4 or more risers. -- Sec. 3305. (i)
Provide a guard rail where drop off is greater than 30 inches. Minimum height
= 36 inches, maximum opening size = 4 inches. -- Sec. L712.(a) exc. #1
The minimum headroom is 5 ft.- 8 inches. -- Sec. 3306.(o)
Enclosed usable space under the stairs is required to be protected as required
for Lhr fire-resistive construction. -- Sec. 3306. (1)
SHAFT ENCLOSURES:1) Chutes and dumbwaiter shafts with a cross-sectional area of not more than
9 sguare feet may lined on the inside with not. less than 26 gage
gal-vanized sheet metal with all joints locklapped. The outside must. be
t hr construction. All openings into any such enclosure shall be protected
by not ]ess than a self-closing solid wood door L 3/8 inches thick or
equivalent. -- Sec. 1705. (f)
2) cas vents and noncombustible piping installed in waIIs passing through
3 floors or less do not need to be in t hour shafts.
-- Sec. 1706- (c)
3) shafts for gas vents, factory-builL chinneys, piping, or ducts that do not extend through not more than 2 floors need not be in L hour shafts.
-- Sec. 1706. (c)
4) A11 other shafts are required to be enclosed in a L hour assembly.
-- Sec. 1706. (a)
CRAWLSPACE REOUIREMENTS :1) Provide ventilation either by mechanical rneans or by openings in exterior walls. Opening shall provide a net area of not fess than 1 square foot for
each 150 square feet of area in crawl space. Openings shall be distributed
on two opposite sides and be located as close to corners as practical.
-- Sec. 2515.(c) 6. Note: vent openings nay be reduced to 10t of the above if ground surface area is covered wj-th an approved vapor barrier and t.he building official approves.For a 372.0 sq.ft. crawlspace area:Ratio Minimum sq.ft. of vent 1/150 2.48 2l Provide 18-inch by 24-inch access opening to the crawl .space area. Note:
opening may be required to be larger if mechanical equipment is located in the crawl space. -- Sec. 251-5. (c) 2.3) Unless the wood is listed as an approved wood of natural resistance to
decay or treated wood, the ninimum clearance between exposed earth and floor joist is 18 inches. The minj-mum cfearance to beams and girders is is 12 inches. -- Sec. 25L6. (c) 2.
Page 4
Additional requirements :for R3 occupancy this project will reguire a site improvement survey. Such survey
shall be submitted and approved prior to request for frame
inspection.
All crawl spaces within the town of vail are limited to a earth to structural floor ceiling height of 5', be earth fLoor only' be ventilated as per ubc 2516(c)5 with minimum access as per ubc
25L6(c)2 and maximum access of 9 sq. Ft.
Any building site with a slope of 30 degrees or more shal1 require an
engineer design. Such design shaLl address drainage, soif retainage,
and sLructural design.
Excavation below slabs on grade shall not be permitted without prior
approval .
Address numbers shall be posted plainly visible and legible from the
street.
For M1 occupancy
slope garage floor to a11ow for drainage to outside or provide a floor drain $rith $rith sand and oi1 inLerceptor to dry well or to
sewer. Any garage floor drain connected to sewer must be appproved by upper eagle valley water e sanitation district.
In garages with living area above, the walls of the garage which are
bearing the area above sha11 be protected with one hour fire resistive construction. UBC 503 (b) .
Town of Vail
25 South Frontage Road
VaiI, Colorado 81657 (303) 4'79-2t38
Plan review based on
the 1991 Uniform Buifding Code
Project Number: 080?92 Name: VAIL POINT #4-5
addiess: 1881 LIONSRIDGE LOOP Date: August ?' 1992
Contractor: RJ BUILDERS Occupancy: R3,ML
Archltect:R.HODGES Type of Const: v-N
Engineer; P1ans Examiner: DAN STANEK
# SHEET IDENTIFICATION CORRECTION REQUIRED
This exterior waLf is required to be a thr fire
assembly. -- Table 5-A
Exterior surfaces with stucco shaIl be provided with
exterior metal lath as per UBC 4706 with 2 layers of
paper. windows and doors are required to be
adequately flashed(not with iust screed metal). A
lath inspection is required prior stucco
application.
A bathroom is required to have an openable window or
a mechanical ventilation system. -- Sec. 1205. (c)
In bathrooms with a tub or shower and in laundry
rooms a mechanical ventilation system connected
directly to the outside shall be provided. Bathrms
which contain only a water closet or lav. may be
ventilated with a recirculating fan. UBC f205 (c) .
Provide a minimum LBX24" underfloor access. UBC
25L6 (cl2 .
rn buildings of unusually tight. construction (aI1
new construction within the Town of Vail),
combustion air shall be obtained from the outside.
Such combustion air openings shall be as per UMC Ch.
6.
Furnaces not listed for closet or alcove
installation shall be installed'in a room or space
having a volume at least l-2 times the volume of the
furnace. A boiler unit will require a space 16
times larqer than the boifer. UMC 504 (b)
10
11
I2
14
15
Page 2
Supply a mechanical drawing indicating design of
system, size (BTU and volurne) of equipment, vent
location and termination, and combustion air to be
supplied prior to any instalLation.
Gas piping shatl not be installed in or on the
ground under any building or structure and exposed
gas piping shall be kept at least 5" above grade.
uMc 2213 (b)
The garage must be separated from the dwelling by
thr fire-resj-stive construction on the garage side.
-- Tab1e 5-B & 503. (d) exc.#3
The door between the garage and the dwelLing is
required to be a t 3/8 inch thick solid core or 20
minuLe self closing door. -- Sec. 503, (d) exc.#3
The stair (s) indicated does not provide the required
minimum width of 36 inches. -- Sec. 3306. (b)
The maximum rise of a step is 8 inches and the
minimum run is 9 inches. -- sec. 3306. (c) exc #1
The minimurn headroom vertically from nosing line is
5 feet 8 inches. -- Sec. 3306. (o)
A handrail j-s required along a stairway. It is
required to be 34 to 38 inches above the nosing of
the steps and if t.he side is open, the maximum size
of an opening in the railing at the stairway is 4
inches. -- sec. 3306. (i) & 17L2.
A 36 inch high guardrail with a maximum opening of 4
inches is requied where step is great.er than 30
inches to fLoor or grade below. -- Sec.l'172.
The enclosed usable space under the stairs is
required to be protected by thr fire-resistive
construction. -- 3306. (f)
The open side of all decks, porches, stairs, etc.
which are more than 30r' above grade shall be protected wj.th a guardraj-1. Openings can not exceed
6". Within R-1 occ. and all R-3, height. min. is
36"-outside R-1 occ. heiqht min. is 42". UBC 1711.
16
1,7
18
The crawl space area is reguired to
either an approved mechanical means
the exerior walls. -- Sec. 2516. (c)
be ventilated by
or by opening in
5.
19
Page 3
20 The structure is required to be anchored to the
foundataion with L/2 Lnch anchor bolts. The bolts
must be into the concrete or masonry ? inches and
spaced a maximum of 6 feet aPart. See code for
additional requirements. -- sec. 2907. (f)
2L Include a copy of the soils report for the site to
be built on. -- Sec. 2905.
22 This beam is not supported to the foundation.
23 This bearing waII is not. supported to the
foundation.
24 This bearn is inadequate to support the loading on ir.
ZS This header is inadequate to support the loading on
These raftsers are over the maximum allowed span. --
Sec. 2517 . (h) 2 .
A11 party walls to be independent of each other from
foundation to the underside of the roof sheathing
with each waII thr fire resistive const.
26
27
PERMIT NUMBER OF PROJECT
o
INSPECTION REQUEST /1 TOWN OF VAIL
H taf 47s-21s8 /./ u tt.v tt r e
DATE
READY FOR
LOCATION:
-, JOB NAME
INSPECTION:MON
CALLER
r1J...............ES AM WED THUR FRI
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
O UNDEBGROUND
tr ROUGH / D.W.V.
O ROUGH / WATER
O FOUNDATION / STEEI-
tr FRAMING
r-r ROOF & SHEER ' PLYWOOD NAILING tr GAS PIPING
O INSULATION o
tr
D
POOL / H. TUB
tr SHEETROCK NAIL
cl
I rtrual t' ! ''O FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
tr
tr
o
ROUGH tr
o
tr
EXHAUST HOODS
CONDUIT SUPPLY AIR
O FINAL O FINAL
tr APPROVED
CORRECTIONS:
b orsRppnoveo tr REINSPECTION REQUIRED
DATE INSPECTOR
Sl,'fl, - SL'>L,
PERMIT NUMBER OF PROJECT
/-'i
,*r#,"JJ..oN,REOUEST
VAIL
DATE JOB
i,
CALLER / III !
NAME - ,l /('-
READY FOR
LOCATION:
INSPECTION:
[<t
TUES WED
.'l
THUR FRI ti I A A' DN/|
BUILDING:
tr FOOTINGS
tr FOUNDATI
D FRAMING
i STEEL
ON / STEEL
PLUMBING:
D UNDERGROUND
D ROUGH / D.W.V.
D ROUGH / WATER D ROUGH / WATER
D GAS PIPING
tr POOL / H. TUB
-
r-l
tr FINAL
MECHANICAL:
tr HEATING
tr EXHAUST HOODS
tr SUPPLY AIR
-
r'l
O FINAL
D GAS PIPING
tr POOL / H. TUB
- ROOF & SHEER
" PLvwooD NATLTNG
tr INSULATION
tr SHEETROCK
hj
tr
tr
tr FINAL
ELECTRICAL:
tr TEMP. POWER
o
o
tr
ROUGH
CONDUIT
O FINAL
D APPROVED
CORRECTIONS:
D DISAPPROVED O REINSPECTION REQUIRED
l,\ t,. l:,.f1 ;,:a ,L,)\lI i., I'i'i,)t-,t\"t.,Jt .,',, \..,.,;' /.,i-
. i r , .i i t/i - i,.-, i'. l^DATE !i.;tl''. ;NSpECTORI-, r'''.. .' '
rNslfctoN REeuEsr
'\ \,\, \\\r
DATE \.- \{- '\ \ JOB NAME \:'ti",\ \sr..\
PERMIT NUMBER OF PROJECT
READY FOR
LOCATION:
INSPECTION:
TOWN OF VAIL \\E
CALLER
MoN TUES GD-,,\\A \--...\-.
THUR FRI PM AM
BUILDING:
poo-'*cs / srEEL
PL
tr
tr
tr
tr
tr
o
D
UMBING:
tr FOUNDATION / STEEL
UNDERGROUND
ROUGH / D.W.V.
ROUGH / WATER O FRAMING
- ROOF & SHEEB " PLYWOOD NAILING GAS PIPING
tr INSULATION POOL / H. TUB
tr SHEETROCK NAIL
tr FINAL tr FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
tr ROUGH D EXHAUST HOODS
tr CONDUIT O SUPPLY AIR
tr FINAL tr FINAL
PPROVED tr DISAPPROVED O REINSPECTION REOUIRED
CORRECTIONS:
INSPECTOR
I
JOB NAME
INSPECTION , TOWN OF
REQUEST VAIL Z\
.) ).. t i'
PERMIT EUI
DATE
READY FOR INSPECTION:
LOCATION:
i CALLER ({ , /.,
'Jlll{Jr'
,-i4.
{-'AM,WED THUR FRI
!.
'+.
fi,"i
NUMBER OF PRO
BUILDING:PL
tr
tr
tr
tr
tr
D
UMBING:
o
M
FOOTINGS / STEEL UNDERGROUND
ROUGH i D.W.V.
ROUGH i WATER
FOUNDATION / STEEL
E] FRAMING
n ROOF & SHEEB " PLYWOOD NAILING GAS PIPING
O INSULATION
tr SHEETROCK
POOL / H. TUB
NAIL
tr
tr FINAL
D
D FINAL
ELECTBICAL:
tr TEMP. POWER
MECHANICAL:
O HEATING
c
tr
D
ROUGH tr
o
tr
EXHAUST HOODS
CONDUIT SUPPLY AIR
D FINAL tr FINAL
bffioveo tr DISAPPROVED D REINSPECTION REQUIRED
CORRECTIONS:
' |-tz/=, / '/:
.r/ /'
DATE INSPECTOR
- J(/_/( >u
NAME ',J {1,,I
INSPECTION REQUEST
,T , IJ,Lrt I
F7 VAtL
-'i
L, l
-.tog
PROJE r BEB O UM
L., l
N
l I
READY FOR
LOCATION:
CTION:MON WED THUR
L' r_i /
{
BUILDING:..., PLUMBING:
tr FOOTINGS / STEEL X,0r.roencRouND
tr FOUNDATION / STEEL tr ROUGH / D,W,V.
tr FRAMING - tr ROUGH/WATER
r_r ROOF & SHEER " PLYWOOD NAILING tr GAS PIPING
tr INSULATION O POOL / H. TUB
tr SHEETROCK NAIL
E FINAL tr FINAL
ELECTRICAL:
tr TEMP. POWER
MEGHANICAL:
O HEATING
ROUGH D EXHAUST HOODS
CONDUIT D SUPPLY AIR
tr FINAL O FINAL
PPBOVED
CORRECTIONS:
O DISAPPROVED tr REINSPECTION REOUIRED
/,1
f
cALLER \.")..''
TUES WED THUR
INSPECTION REQUEST
TOWN OF VAIL
,'\ \ rl -.t!;\(
PERMI
DATE
T NUMBER OF PROJEC]
NAIVE
INSPECTION:'\l-'\\|\/ON AM .Pil,READY FOR
LOCATION:
fr.neenoveo
CORRECTIONS:
D DISAPPROVED D REINSPECTION BEOUIRED
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V,
tr ROUGH / WATER
tr FOUNDATION / STEEL
tr FRAMING
_ ROOF & SHEER " PLYWOOD NAILING tr GAS PIPING
tr INSULATION tr POOL / H, TU8
D SHEETROCK NAIL
O FINAL tr FINAL
MECHANICAL:
tr HEATING
ROUGH tr EXHAUST HOODS
tr CONDUIT O SUPPLY AIR
D FINAL
DATE INSPECTOR
5/, {e
PERMIT NUMBER OF PROJECT
aalE /) / 1r:JOB NAME
READY FOR INSPECTION:MON
LOCATION:
' ,i7
r^r#ctoN XLSrttt
ll , o/'
rowN oF vArL
(. )CALLER
TUES @ THUR FRI AM
i, or^ a ,.1 u' /.o'a;,/
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
D UNDERGROUND
tr FOUNDATION / STEEL ,d ^ouon
/ D,w.v.
fnoucn / wArER tr
o
FRAMING
ROOF & SHEER
PLYWOOD NAILING O GAS PIPING
tr INSULATION tr POOL / H. TUB
tr SHEETROCK NAIL tr
D tr
tr FINAL tr FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
O HEATING
D ROUGH tr EXHAUST HOODS
tr CONDUIT D SUPPLY AIR
tr D
tr FINAL tr FINAL
tr APPROVED
CORRECTIONS:
O DISAPPROVED O REINSPECTION REQUIRED
--4-L/6-,(1-
...--?
.22--L
* (-;
) c../-t' rla--/ F /;b= c'u/tz'zl
rE INSPECTOR -/)/,/72,/f z_
PERMIT NUMBER OF PROJECT
DATE JOB NAME
IVON
CALLER
l. I ?
READY FOR
LOCATION:
INSPECTION:b E WED THUR AM PIV
fl 1 ; i-1,
BUILDING:
D FOOTINGS / STEEL
PLUMBING:
N UNDERGROUND
tr ROUGH i D.W,V.
dnoucH / wATER
D FOUNDATION / STEEL
tr FRAMING
n ROOF & SHEER " PLYWOOD NAILING tr
o
o
!
o
GAS PIPING
tr INSULATION POOL i H. TUB
F(
tr
D
SHEETROCK NAIL
FINAL FINAL
ELECTRICAL:
D TEMP. POWER
MECHANICAL:
pqtenrtruc
tr
o
E]
ROUGH
"
tr
tr
o
o
EXHAUST HOODS
CONDUIT SUPPLY AIR
B'FINAL FINAL
- -.t.
OVED
CORRECTIONS:
tr DISAPPROVED O REINSPECTION REQUIRED
DATE INSPECTOR
I
<\-(,, '' ,,
PERMIT NUMBER OF PROJECT
a ,1 p415 -.
"rJ
JoB NAME
TOWN OF
INSPECTION:
CATLER
TUES WED MON
INSPECTION REQUEST
VAIL
READY FOR
LOCATION:
BUILDING:
tr FOOTINGS i STEEL
PL
tr
tr
n
D
o
tr
D
UMBING:
D FOUNDATION / STEE-
UNDERGROUND
ROUGH i D.W.V.
ROUGH / WATER tr FRAMING
n
B
ROOF & SHEER
PLYWOOD NAILING GAS PIPING
INSULATION POOL / H. TUB
tr SHEETROCK NAIL
O FINAL tr FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
D HEATING
g
tr
tr
ROUGH tr
D
tr
EXHAUST HOODS
CONDUIT SUPPLY AIR
O FINAL tr FINAL
APPROVED D DISAPPROVED tr REINSPECTION REQUIRED
CORRECTIONS:
a ll (t Z DATE -/ . 1 (. ( .=.) TNSPECTOR
PERMIT NUMBER OF PROJECT
I
INSPECTION REQUEST
TOWN OF VAIL
"--,."lr . .1g3 i t\Arvrtr
--__
L'AIT
CALLER 1, )-. 1 .'
READY FOR
LOCATION:
INSPECTION:
'ik t
TUES WED MON A[,4 PM,
BUILDING:
D FOOTINGS / STEEL
PLUMBING:
N UNDERGROUND
O ROUGH / D.W.V.
D ROUGH / WATER
tr FOUNDATION i STEEL
d FRAMING
D
tr
ROOF & SHEER
PLYWOOD NAILING tr GAS PIPING
INSULATION tr POOL / H, TUB
fI SHEETROCK NAIL D
tr tr
tr FINAL D FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
D
tr
B
ROUGH tr EXHAUST HOODS
CONDUIT tr SUPPLY AIR
o
tr FINAL tr FINAL
/ g#aoveo
CORRECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
7i'
'' .' ,/j
DATE INSPECTOR
o
INSPECTION REQUEST
.VAIL PERMIT NUMBER OF PROJECT OF
, ) .\
WN
i
TO I ,:,,JOB NAME
MON
CALLER
TUES I THUR FRI READY FOR INSPECTION:
LOCATION:
;) //<_ / '"
BUILDING:
D FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH i D.W,V,
tr ROUGH / WATER
tr FOUNDATION / STEEL
D FRAMING
- ROOF & SHEEF " PLYWOOD NAILING tr GAS PIPING
tr INSULATION N POOL i H, TUB
tr SHEETROCK NAIL o
tr o
tr FINAL O FINAL
ELECTRICAL:
E TEMP. POWER
MECHANICAL:
O HEATING
ROUGH D EXHAUST HOODS
tr
o
CONDUIT tr SUPPLY AIR
E FINAL tr FINAL
$eeeaoveo
CORRECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
DATE 2-,l Qtq
INSPECTOR
--/-'+
..'J!
PERMIT NUMBFR OF PROJECT
INS CTION REQUEST
TOWN OF VAIL
o
PE
DATE
READY FOR
LOCATION:
INSPECTION:
i
I J\JD NAME
MON
CALLER
TUES THUR FRI
l rl
AM]PM
t,
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D,W.V.
tr ROUGH / WATER
tr FOUNDATION / STEEL
.tr FRA[/ING
i
ti ,
_ ROOF & SHEEB " PLYWOOD NAILING tr GAS PIPING
tr INSULATION D POOL i H. TUB
E SHEETROCK NAIL tr
D tr
O FINAL tr FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
tr
tr
tr
ROUGH tr EXHAUST HOODS
CONDUIT O SUPPLY AIR
o
tr FINAL N FINAL
! Aeenovro
CORRECTIONS:
tr DISAPPROVED tr REINSPECTION REOUIRED
L'AIE INSPECTOR
PERMIT NUMBER OF PROJECT
INS
t
PE CTION TOWN OF
REQUEST
VAIL
)
:- )AM,/ PM
BUILDING:
D FOOTINGS / STEEL
PLUMBING:
O FOUNDATION / STEE-
D UNDERGROUND
tr ROUGH i D.W.V.
O ROUGH i WATER tr FRAMING
_ ROOF & SHEER " PLYWOOD NAILINQ . .,:--?.
-,\,^, ffiE{-
O GAS PIPING
F.r a-|nn | /u'rtto { ..||.|!..E-n r -,tl!{ i-.-L +t -.-.- LJ T\J\JL | |r. |\Jt);.-\-.-..g'bueernocK NAIL .' ;', l'- i ) O/(- tr
-
otr
tr FINAL O FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
tr
tr
tr
ROUGH tr
tr
tr
EXHAUST HOODS
CONDUIT SUPPLY AIR
E FINAL tr FINAL
#6aoveo tr DISAPPROVED tr REINSPECTION REQUIRED (
CORRECTIONS:
(7?
niirsrop
,/?
INSPECTOR a'/.: ,- i"
I o
PE INS CTION REQUEST
TOWN OF VAIL PERMIT NUMBER OF PROJECT
,))DATE JOB NA[/E
READY FOR INSPECTION:MON TUES WED THUR \ F8L'
CALLER ' ' tt'
AM l- -' l lPMI
LOCATION:
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
- UNDERGROUND
tr FIOUGH i D.W.V.
tr BOUGH / WATER
tr FOUNDATION / STEEL
D FRAMING
,__ ROOF & SHEER
" PLYWOOD NAILING D GAS PIPING
D INSULATION O POOL / H. TUB
SHEETROCK NAIL o
!tr
D FINAL O FINAL
ELECTRICAL:
fI TEMP. POWER
MECHANICAL:
tr HEATING
tr
tr
tr
ROUGH O EXHAUST HOODS
CONDUIT D SUPPLY AIR
o
tr FINAL tr FINAL
\ nrenoveo
CORRECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
DATE INSPECTOR
o
PERMIT NUMBER PROJECT
DATE
INSPECTION:MON
L--.. !.,
o
PE rNs CTION REQUEST
TOWN OF VAIL
CALLER ' ''
TUES WED ITHU&
i L. lr -,
FRI READY FOR
LOCATION:
BUILDING:
D FOOTINGS / STEEL
PLUMBING:
N UNDERGROUND
tr ROUGH / D,W,V,
tr ROUGH / WATER
O FOUNDATION / STEEL
tr FRAIVING
r_.r ROOF & SHEER " PLYWOOD NAILING D GAS PIPING
,pd-qlsulartor.t tr POOL / H, TUB
tr SHEETROCK NAIL
D FINAL tr FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
D HEATING
ROUGH D EXHAUST HOODS
CONDUIT tr SUPPLY AIR
D FINAL tr FINAL
PPROVED
CORRECTIONS:
D DISAPPROVED tr REINSPECTION REOUIRED
., /,.-- t- -DA1E J///\//) tNSpEcroR
.r. ," '1. ,'.'
_.1 \ i. _) .,{- t
o
PE
PERMIT NUMBER O
DATE
READY FOR
LOCATION:
PROJECT
lNs CTION REOUEST
TOWN OF VAIL
_./ JOB NAME
BUILDING:
O FOOTINGS
tr FOUNDATI
tr FRAMING
/ STEEL
PLUMBING:
tr UNDERGROUND
O ROUGH i D.W.V,
O ROUGH / WATER
ON / STEEL
- ROOF & SHEER " PLYWOOD NAILING tr GAS PIPING
D INSULATION tr POOL / H. TUB
D SHEETROCK NAIL o
tr
o
tr
D FINAL FINAL
\
ELECTRICAL:MECHANICAL:
-:--'-'--'- -'
tr TEMP. POWER D HEATING
tr ROUGH tr EXHAUST HOODS
O CONDUIT tr SUPPLY AIR
D
tr FINAL
F APPROVED
CORRECTIONS:
tr DISAPPROVED O REINSPECTION REQUIRED
DATE INSPECTOR
o
PE CTION REQUEST
PERMIT
DATE
READY FOR
LOCATION:
OJECT FPR n
INSPECTION:
JOB NAME
MON
CALLER
TUFS WED THUR
'/ r.',t n -'.--) ,..,,- I
AM i, PM,
NUMBER O
,BUILDING:PL
tr
tr
D
tr
o
tr
UMBING:
S / STEEL UNDERGROUND
ROUGH / D.W.V.
ROUGH / WATER
O FOUNDATION / STEE-
tr FRAMING
GAS PIPING
POOL i H. TUB
tr SHEETROCK NAIL
D
tr O FINAL FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr
tr
o
E
HEATING
tr
tr
tr
ROUGH EXHAUST HOODS
CONDUIT SUPPLY AIR
tr FINAL O FINAL
PPROVED tr DISAPPROVED O REINSPECTION REQUIRED
CORRECTIONS:
ome TfZi;/?3 rNSPEcroR
o
PE CTION REQUEST
PERMIT NUMBER OF RROJECT
rNs TOWN OF VAIL
-, I i | ---,
'-.', 1 I --JOB NAME
/i
tt DATE
READY FOR
LOCATION:
INSPECTION:i'"1 MON
CALLER
TUES- ,,
" :_- l \
WED AMIPM
ii
BUILDING: PLUMBING:
tr FOOTINGS / STEEL tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATER
D FOUNDATION / STEEI.
tr FRAMING
- ROOF & SHEER " PLYWOOD NAILING tr GAS PIPING
D INSULATION tr POOL / H. TUB
tr SHEETROCK NAIL tr
D tr
D FINAL tr FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
ilrrenrrruc
tr ROUGH D EXHAUST HOODS
tr
o
CONDUIT . tr SUPPLY AIR
o
O FINAL tr FINAL
D APPROVED
CORRECTIONS:
EI\DISAPPROVED EFREINSPECTION REQUIRED
"- , ),-/ ",
DATE INSPECTOR
PERMIT NUMBER OF PROJECT
t
PE -_-/ u ( .^.
WED THUR
l
CTION REQUEST
TOWN OF VAIL
- { 'i.,i t 't ; (r
DATE
READY FOR INSPE TION:
--, JOB NAME
( vpr.r ,
CALLER
.,TUES
LOCATION:
24'eeeaoveo '.
CORRECTIONS:
O DISAPPROVED tr REINSPECTION REQUIRED
BUILDING:
D FOOTINGS / STEEL
PLUMBING:
D UNDERGROUND
D ROUGH / D.W.V.
tr ROUGH / WATER
tr FOUNDATION / STEEL
FRAMING
ROOF & SHEER
PLYWOOD NAILING tr GAS PIPING
INSULATION D POOL i H, TUB
D SHEETROCK NAIL
tr FINAL tr FINAL
ELECTR!CAL:
O TEMP. POWER
MECHANICAL:
tr HEATING
tr EXHAUST HOODS
CONDUIT O SUPPLY AIR
tr FINAL
-/, - ,\-DATE .,,',) f,l INSPECTOR
\ ,'\' j.
.\1 (INS
o
PE CTION REQUEST
TOWN OF VAIL
t: I I
PERMIT NUMBER OF PROJECT
DATE
READY FOR I
LOCATION:
JOB NAME
CALLER
SPECTION:
i: \
MON TUES WED
\i '(r
THUR I,
BUILDING:
t] FOOTINGS / STEEL
PLUMBING:
D UNPERGROUND
tr RQUGH i D.W.V.
ci RoucH / wArER
tr FOUNDATION / STEEL
tr FRAMING
_ ROOF & SHEER " PLYWoOD NAILING ' tr cAS PTPTNG
O INSULATION tr POOL i H. TUB
tr
tr
SHEETROCK NAIL
b)
D FINAL tr FINAL
ELECTRICAL:MECHANICAL:
tr
D
tr
tr
TEMP. POWER tr HEATING
ROUGH tr EXHAUST HOODS
CONDUIT E SUPPLY AIR
FINAL D FINAL
tr APPROVED
CORRECTIONS:
;{ nerruseecrroN REoUTRED
, /" .1 ]oot= ''i ' - '-l j) tNSpEcroR
o
PE
PERMIT NUMBER OF PROJECT
I JoB
CTION REQUEST
TOWN OF VAIL
:i l
tNs
ri
DATE
READY FOR
LOCATION:
rN'iPEcrrflN
i
CALLER
MON
,trtt
THUR . '*'WED
BUILDING:
O FOOTINGS
D FOUNDATI
tr FRAMING
/ STEEL
PLUMBING:
O UNDERGROUND
N ROUGH i D.W.V.
O ROUGH / WATER
ON / STEEL
tr
C
o
tr
ROOF & SHEER O GAS PIPING PLYWOOD NA
INSULATION
ILING
O POOL / H. TUB
SHEETROCK NAIL tr
!
D FINAL tr FINAL
ELECTRICAL:MECHANICAL:
C TEMP. PO WER D HEATING
D ROUGH O EXHAUST HOODS
tr CONDUIT o supplv ntn
E FINAL D FINAL
I neenoveo
CORRECTIONS:
D DISAPPROVED D
i
REINSPECTION REQUIRED
; ',
DATE INSPECTOR
PERMIT NUMPER OF PROJECT
DATE
|,,r,, lrli -,., 1t-/ JOB
o
INSPECTION REQUEST
TOWN OF VAIL
:, ,,i I I r l' .' , ,,:l .a\NAME t', "- ; - | | t. / ; '-.'' \
l . tr, ( ,r
INSPECTION:
CALLER
MON .wqD THUR FR.l
,1 ,a'
READY FOR
LOCATION:
tr APPROVED
coRRfcroNS:
E DISAPPROVED .b nerruspecroN REeuTRED
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
O UNDERGROUND
tr ROUGH / D.W.V.
D ROUGH / WATER
tr FOUNDATION / STEEL
tr FRAMING
rr ROOF & SHEER " PLYWOOD NAILING D GAS PIPING
tr INSULATION tr POOL / H. TUB
D SHEETROCK NAIL
ELECTRlCAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
ROUGH D EXHAUST HOODS
CONDUIT D SUPPLY AIR
D FINAL tr FINAL
INS
o
PE CTION REQUEST
PERMIT NUMBER
,) rl
OF PROJECT
INSPECTION:i"l
I NAME I
TOWN OF VAIL
iii DATE
READY FOF
LOCATION:
, JO8
1l
MON
I . l'
CALLER
TUES WED ITHUR PM AM
I
BUILDING:
tr FOOTINGS / STEEL
PL
tr
o
tr
tr
tr
tr
tr
UMBING:
tr FOUNDATION / STEEL
UNDERGROUND
ROUGH,/ D.W.V.
ROUGH i WATEF tr FRAMING
!
tr
ROOF & SHEER
PLYWOOD NAILING GAS PIPING
INSULATION POOL / H, TUB
O SHEETROCK NAIL
E ir' ti-'r
O FINAL tr FINAL
ELECTRICAL:
tr TEMP. POI#ER
MECHANICAL:
D
D
tr
D
HEATING
tr ROUGH EXHAUST HOODS
'{
tr SUPPLY AIR
El _
T'l trtNAl
-.{r
PROVED tr DISAPPROVED O REINSPECTION REQUIRED
. CORRECTIONS:
DATE INSPECTOR
INSPECTION REQUEST
TOWN OF VAIL PERMIT NUMBER
UAIt
OF PROJECT
INSPECTION:
JOB NAME
MON
CALLER
TUES .WED PM READY FOR
LOCATION:
THUR
PLUMBING:
tr UNDERGROUND
tr ROUGH / D,W.V.
O ROUGH / WATER
O GAS PIPING
O POOL / H. TUB
o
!
tr FINAL
MECHANICAL:
D HEATING
tr EXHAUST HOODS
tr SUPPLY AIR
D FINAL
[aeenoveo
CORRECTIONS:
O DISAPPROVED tr REINSPECTION REQUIRED
DATE tl .t il '/i INSPECTOR
- :.- --.--:-:'-..: .. -, .., ,
-,1i ; .,f.; i -:.-:i - -
INSPECTION REQUEST
TOWN OF VAIL
t/frtt-:\ .-r-POltt-t t
READY FoR INSPECTIoN: MoN ffi-
LocArloN: lgf I ul'N' Q ^r Looe
*.sri1' EGsb
PERMIT NUMBER OF PROJECT
L'AIL JOB NAME
BUILDING:
O FOOTINGS / STEEL
PL
tr
tr
tr
o
c
tr
UMBING:
O FOUNDATION / STEEL
UNDERGROUND
ROUGH / D.W.V.
ROUGH / WATER O FRAMING
rr ROOF & SHEER " PLYWOOD NAILING GAS PIPING
O INSULATION POOL / H. TUB
tr SHEETROCK NAIL
D FINAL
D
tr FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
tr ROUGH tr
tr
o
EXHAUST HOODS
O CONDUIT SUPPLY AIR
tr
O FINAL tr FINAL
f, neenoveo
CORRECTIONS:
O DISAPPROVED O REINSPECTION REQUIBED
-) 1= - Q2 DATE ./-.// | > INSPECTOR
|lAr rNsPEcTroN's
The ltens belor oeed to be conplete
givlog a perml.t a final C of 0.
Pleaee check off la the box provlded.
FINAL PLNEING
COUPLETEX)
before
DATE:
tl
n I'INAL UECEANICAI.,
DATE:\.l.trti+ a O \oo \.\qi t)'a -\3
FINAL BI'ILDING EAST SIDE:WXST SIDE:
TEI'IPORARY C OF O -3-q3
DATE:
CERTIFICATE OF OCCI'PANCY
DATE!
LN{DSCA?ING DUE
DATEI
FILE NAME:;w
o z
tr
=t
UJ L
o\\T c!rn
cn
(n
UJ
r.lJ
LL
F
=E
riJ
r6tffi \*rr**
I (\
Ch ttu Ch 9:i 1 'lo
rr)l \t N, c'l
I gr g
{r
I
lz ,14 |,u)v=H Zl^ A
4l+ z !r r= V i^ rv -'->
eta 2 al= <
uJ F
E
F I z
=o
z.z
F
z
ts H E
I''l t<lo IH tz t<
lrd .:E
lu
z4
OF1 ZFa
Jft.
Jr.l.ucn
.o
F 2,a a1:i
F.
E
Fl
H z
rd E
"a
o ?
F
I-r M
F
TC r
a
P
H D
F lr K P
iE:e; lg
l9;sc LJr
iEH9fi d5
E r-.E 6.9 -l 5
E iE:9:e dE
tieiF+: i; Fe {;
;'#Ljr,I€ffi eee;Wf
EiEE#^Z cL= - o "(!:O-!
€ligi
:o'"oo iio E !'i O i F.! E o €o
:lEi; HN5
gt;;€ ig:
: ei-:e je 3
EsFei "6H oc d E $tiii e
IE$'ra n
!r!
N
N
\'
F\-ir
+r
ro
\'
ca
.it
C')
rn
c(l rn
(\
\
rn
s \-q t{rn
F
E
uJ
o z
J
f
Y ()ul
o z
.)(L
9 (r
F <)
UJ
6
z
6
=
J
2
I
uJ
=
UJ
H z o
tr
UJ
UJ
o
i
LlJ 5 tu
z
6 llJ o
6
(L
uJ
o-
z
UJ
o
F
LU
o)
uJ
UJ
LL
=
=E
IJJ (L
J
F
z
=
F
UJ J
uJ
z
l
J
z
I o
IJJ :
Fr
ts
ts
NOtrvnlvA
I
I
I
I -lS !t t: t(J .-lz
ilH
-'e
==z u--
:= v rrJ t!, za;
aFz
3r @:l
uJ \./
<F gu)
z7 !!Y ov
=>(r
-r
z o
t/> o z>-89 lr-<oo-ur?o- !a -5
dN
tn ts H z
\T
z o tr
l J
1 t!
CE .;
uJ
$
z
E
o
z o
k g
llJ
X t<;llJ z
;t z l z ou)trr!<O o<
>ar
8o <z
-jl
a L z
Az
-F do Btr OI
O\ O\TT &H
--t--
I il t-T-
I FI HI <t:'l r-t-ta IJ
I t<(l5l=t3t;
ul l
6.
z
(J
T F
F
z
F )l o z
(fl
.!)
P (r
o o o 3
X X
o
I
-l
X
-l
'.l ql
-Jl
-l
zl
zl
uJ o
uJ
uJ z a
h
tr
tlJ
o-)
z
E o o
:
z
'Tir
o(rri +l-
z H
o
@
-'L
I M
z
I
-t
to
O
z
t-o-
u,l Y
IJJ
dt oil Fol
F E.:
fi-Ipr
AHI "bl
o- zl ool uzl
tHl 'l guJ bE zo
Fl
(J
z')
-- \J A e= z
=< 9.coo -
=z-
O- tL co
tFilft ft
9<r L_r r r
).-i5 \J\J=zdft
- ii r
--r -'i ul 6il=
F
tr
uJ
rL o
UJ o z
3 o I o F tr I
CE
JF uJ-h=
duJ >(!Ot!9o \UJ
:>rJ t-u.l J J
UJ
@ o F
c o
E o
-g o
o E
.E
E
E o (,
o
ts
=E,lrl
o-z I F
C)f E
6 z o o
z
Fl
UJ
E
U)o o -)
I
I
I
I
I
cil
=.1
uJt'qll
<t I >l.n l.!l\t ol6
zl
FI
.ir
rn
N F
I .ir (\
Lr)
I
I EI tl Nl .il -l
"l =l
uJl
5l
al >l
l!l
vl
zl
il
I
I
I
I
I
I
.l ol
il
l!l El
Jl
<l >l
u-l ol
Zl ,,i ;t :ol ru Ft f-
I
I
i
I
?l
"$ls :15 <l l >lo''
ll-lF ol-i
zl
3l
PI
z
a E
Fl H
F)
6
I F.
C\
@
,,l
o, l
F{ |-.1
zl
ol
rl
;l
F-l
rq
Fl
=t
tr
s
rn
I cn
Or
I e
B
Fl o z
=(J
ro
H H
an
F.l
FA
F-r
ov,dt (r*,'E
=
F
ln
I
\o .if, I
z
Fl
Fl H
F
C)
<n
14
Ff
=E
N *
(,z
a
Fjl
Er z H
ii
z
'-)
il
FI
v
H
F-l
z,
J
dl
I
I
'-'l
6
E ir
=4lY r-F o2
F
z
o
z
t
C)
tlJ
=
E C'o zt-
=#!z r!o
J
9
F
uJ )
uJ
E,
<F
r!<zE
L!F o6
F
uJ
=I O E
Lll z
=
ETitl EE*
.?
".t , J\"
t!
75 south lronlage road
Yail, colorado 81657
(303) 479-21.38 ot 479-2L39
TO:
FROM:
DATE:
QTTEI TFr'\m .
offlce of communliy develoPment
ALL CONTRACTORS CURRENTLYL REGISTERED WITH THE
TOWN OF VAIL
TOWN OF VAIL PUBLIC WORKS/COMMUNITY DEVELOPMENT
MARCH L6, 1.988
CONSTRUCTION PARKING & MATERIAL STORAGE
fn summary, ordinance No. 6 states that it is unlawful for any
Person to litter, track or deposit any soi1, rock, sand, debris or material, including trash dumpsters, portable toilets and
workmen vehicLes upon any street, sidewalk, alLey or public place or any portion thereof. The right-of-way on all Town of Vail streets and roads is approximately 5 ft. off pavement.This ordinance will- be strictlv enforced bv the Town of Vail Publ-ic Works Department. Pers-ons found vi6lati.ng thj-s ordinance will be given a 24 hour written notice to remove said rnaterial .fn tbe event the person so notified does not comply with the notice r+ithin the 24 hour tj-me specified, the Public Works Department, will remove said naterial at the expense of person notified. The provisions of this ordinance shall not be applj.cable to construction, maintenance or repair projects of any street or alley or any utilities in the right-a-way.
To review Ordinance No. 6 in fu}l, please stop by the Town of Vail Building Department to obtaj.n a copy. Thank you for your cooperation on this matter.
r (i.e. contractor, owner)
? * i) *1>
lll 1r
cknowledged
onlRe onship to Project
Date
75 south tronlage road
vail, colorado 81657
(303) 479-2138 or 479-2\39 otllce of comtnunlty developmettt
EUILDING PERI'IIT ISSUANCE TIME FRAME
If- thi.s permi.t requ'l:res a Town of Va'i I ['ire Department Approva],
Engineep''s (Publ ic liorks) reyiew and approval , a Planning Department
revi'ew or Health Department review, and a review by the Building
Department, the estimated tjme for a total revjew may take as long
as three weeks:.
AlI commercjal ('large or smalI) and alI multi-famiiy permits r"r'ilI
have to follow the above mentioned maximum reouirements. Residential
and small projects should take a lesser amount of t'ime. However,'if
residential or smaller projects impact the various above mentioned
departments with regard to necessary review, these projects may
also take the three week period.
Every attempt wi1 I be made by this department to expedite this
permrlt as sqon as possible.
I^,- tne undersigned, understand the pl an check procedure and time
Trame.
| ' -.\
= Vn, \ Po.-T-
H!"OJect Name
\,f-rA-\')
Date Work Sheet was turned into the
Communi ty Devel opment Department.
r'r
Town of Vail
25 South Frontage Road VaiI, Colorado 8L65?(303) 479-2L38
Plan review based on the 1991 Uniform Building Code
Pro;ect Numberz 080792 Name: VAIL POINT #2-C&D Address: 188L LIONRIDGE LOOP Date: August 7,L992
Contractor: RJ BUILDERS Occupancy: R3rM1 Architect: R.HODGES Type of Const: V-N
Engineer: DAVIS Plans Examiner: DAN STANEK
# SHEET IDENTIFICATION CORRECTION REQUIRED
Exterior surfaces with stucco sha1I be provided with
exterior metaL lath as per UBC 4706 with 2 layers of paper. Windows and doors are required to be
adequately flashed(not with just screed metal). A lath inspection is required prior stucco
applicat j-on.
A bathroom is requj-red to have an openable window or a mechanical ventilation system. -- Sec. 1205. (c)
rn bathrooms with a tub or shower and in laundry
rooms a mechanical ventilation system connected
directly to the outside shall be provided. Bathrms
which contain only a water closet or l"av. nay be ventilated with a recirculating fan. UBC 1205(c) .
Heating and cooling equipment located in t.he garage
shall be inst.alled with the pilots and burners or
heating elements and switches at least 18" above the floor leve1 of the garage. UMC 508.
A bedroom, bathroom, closet or any encl-osed space wj.th access through such room shall not be utilized for fuel burning applicances. A closet or alcove
shal-l not be less than L2"wider than furnace with a
minimum 3" space on all sides. UMC 704.
In buildings of unusually tight construction (al1
new construction within the Town of VaiI),
combust.ion air shal] be obtained from the outside.
Such cornbustj-on air openj-ngs sha11 be as per UMC Ch.
6.
1n
11
Page 2
Furnaces not listed for closet or alcove
installation shal1 be installed in a room or space
having a voLurne at l-east 12 times the volume of the
furnace. A boiler unit will require a space 16
times larger than the boiler. UMC 504 (b)
Supply a mechanical drawing indicating design of
system, size (BTU and volume) of equipment, vent
location and terminatj-on, and combustion air t.o be
supplied prior to any installation.
Gas piping shall not be instaffed in or on the
ground under any building or sLrucLure and exposeq
gas piping sha11 be kept at least 5" above grade.
uMc 2213 (b)
The garage must be separated from the dwelling by l-hr fire-resistive construction on the garage side.
-- Table 5-B & 503. (d) exc.#3
The door between the garage and the dwefling is
required to be a L 3/8 inch thick solid core or 20
minute self closing door. -- Sec. 503. (d) exc.#3
The st.air (s) indicated does not provide the required
minimum widt.h of 36 inches. -- Sec. 3306. (b)
The maximum rise of a step is 8 inches and the
minj-mum run is 9 inches. -- Sec. 3306. (c) exc #1
The minimum headroorn vertically from nosing line is 6 feet 8 inches. -- Sec. 3306. (o)
A handrail is reguired along a stairway. It is required to be 34 to 38 inches above the nosing of the steps and if the side is open, the maximum size of an opening in the railing at the stairway is 4 inches. -- Sec. 3306. (i) & L7L2.
A 36 inch high guardrail with a maximum opening of 4
inches is requied where step is greater than 30 inches to floor or grade beIow. -- Sec. L7L2.
The enclosed usable space under the stairs is required to be protected by thr fire-resistive construction. -- 3306. (1)
The open side of all decks, porches, stairs, etc.
which are more than 30rr above grade shall be protected with a guardrail. Openings can not exceed 6". Within R-l occ. and all R-3, height. min. is 36"-outside R-1 occ. heiqht min. is 42". UBC 171-1.
1,2
r.3
15
L7
18
r-9
Page 3 At eaves and valleys an adequate underlayment shall
be provided to protect a structure from ice buildup
and water damage. Two layers of felt. solid mopped to sheathing and between layers or a commercial
water & ice shield may be used as per Table 3281 .
In addition to a minimum reinforcement, not Less
t.han t.wo #5 bars shall be provided around all window
and door openings. Such bars shall be extended
beyond the corners of the openings not less than 24". uBc 2614 (d)7 .
Any building site wit.h a slope greater than 30
degrees shall require engineer designed drawings.
Avalanche areas shaIl require such engineered
drawings a1so. Drainage and structural integrity
shal-1 be addressed by such drawings.
Because of Lhis project's location, the foundation is required Lo be darnpproofed Lo prevent. damage to
areas below finished grade. UBC l-707(d).
The structure is required to be anchored to the
foundataion with L/2 inch anchor bolts. The bolts
must. be into the concrete or masonry 7 inches and
spaced a maximum of 6 feeL apart. See code for
additional requirements. -- Sec . 2907 . (t')
Provide a complete foundation design for this
building based on the soil for this site. --2907. (e)
Include a copy of the soils report. for the site to
be built on. -- Sec. 2905.
Provide t.russ details by the truss manufacturer's
engineer. (reg in this state)
This beam is not supported to the foundation.
This beari-ng wall is not supported to the
foundation.
A11 party walLs to be independent of each other,
from the foundation to the underside of the roof
sheathing and each waLl thr fire resistive const.
20
2t
zz
ZJ
24
25
26
27
z6
ZY
Town of Vail
25 South Front.age Road Vail, Colorado 81657 (303) 479-2t38
Plan analysis based on the l99L Uniform Buildinq Code
Project Number: 080792
Address: 1881 LIONRIDGE LOOP
Contractor: R.I BUILDERS Architect: R.HODGES
Enqi.neer: DAVIS
Name: VAIL POINI #2-C
Date : August '7 | L992
Occupancy: R3,ML
Type of Const: V-N
Plans Examiner: DAN STANEK
NOTE:The code items listed in this report are not intended to be a complete listing of aLl possible code requirements in the 1991 UBC. It is a guide to selected sections of the code.
NAME AREA MIN-LIGHT MIN.VENT NO.EXITS EGRESS rL
2 Master bedroom 2 Master bath 2 HaIls, closetsl etc.
TOTAL FOR FLOOR 1 Living room L Dining room L Garage 1 Kitchen l- Powder room I Entry I Halls, cLosets, etc.
TOTAL FOR FLOOR B Bedroom #l-B Bath room
B Bedroom #2 B Bath room B Halls, closets, etc.
TOTAL FOR FLOOR
BUILDING TOTAL
FOOTNOTES:
244
322
643
266
T5J
390
J.TJ
z6
1-45
r,0 6
1,203
1-73
42
L24
41.
265
645
184 6
24 .40
0.00
0.00
26.60
r.5.30
0.00
1 1 qn
0.00
0.00
0.00
r_?.30
0.00
L2 .40
0.00
0.00
L2.20
3.8s
0.00
1_3.30
1AE,
0.00
5 .75
1 En
0.00
0.00
8.65 2.t0
o.zu
z -ua
0.00
Yes
NO
No
No
No
No
No
No
No
No
Yes
No
YeS
No
No
YeS
1
1
1
-L
1
1
L
l_
l_
l_
I
1_
1_
1
l_
L
1
1_
L
1) EGRESS - An operable window or door that opens directly to the exterior is required from lhis room. The mj-ninum clear openable area must meet the following. -- Sec. L204.1) The minimum clear height is 24 inches 2) The minimum clear width is 20 inches 3) The minimum clear area is 5.7 square 4) The maximum siII height is 44 inches 2l The number of exits is based on Table 33-A 3) A mechanical ventilation sysLem may be used
openings for ventilation. -- Sec. l-205. (c)
4) The requirement. for an egress window in the Sec. L204.
feet
(Dwe]lings)
in in lieu of exLerior
basement is based on
Page 2
ROOM DIMENSIONS:
Habitable space shall have a ceilj-ng height of not fess than 7 feet 6
inches. Ki-tchens, halls, bathrooms and toil-et. compartments may have a
ceiling height of 7 feet measured to the lowest projection. If the ceiling
is sloping, then the minimum height is required in only I/2 of the area.
--Sec. 1207. (a)
Every dwelling unit shall have at least one room which has not. Iess than 120
square feet of floor area. Other habitable rooms except kitchens shall have
an area of not less than 70 square feet. -- Sec. 1207.(b)
Habi-table rooms other than a kitchen shal1 not be less than 7 feet in any
dimensj-on. -- Sec . ]-201 . (c)
GLAZING REQUIREMENTS:
A1I glazing in hazardous locations is required to be of safety glazing material . -- Sec. 5406. (d)
1) Glazing in ingress and egress doors except jalousies.
2) Glazing in fixed and slidi-ng panels of sliding door assembli-es and panels in swinglng doors other than wardrobe doors.3) Glazing in storm doors.4) Glazing in all unframed swi-nging doors.5) Glazing in doors and enclosures for hot tubs, whirlpools, saunas, steam
rooms, bathtubs and showers. Glazing in any portion of a building waII
enclosing these compartments where the bottom exposed edge of the glazing is less than 60 inches above a standingi surface and drain inlet.6) Glazing in fixed or operable panels adjacent to a door where the nearest
exposed edge of the glazxing is within a 24-inch arc of either vertical
edge of the door j-n a closed position and where the bottom exposed edge of the glazing is Iess than 60 inches above the walking surface.'7) Glazing in an individual fixed or operable pane1, other than those locations described j-n items 5 and 6 above, than meets all of the following conditions:A. Exposed area of an individual pane greater than 9 square feet.B. Exposed bottom edge less Lhan 18 inches above the floor.
C. Exposed top edge greater than 36 inches above the f1oor.D. One or more walking surfaces within 36 inches horizontally of the plane of the glazing.
8) Glazing in rail-ings regardless of height above a walking surface.Included are structural baluster panels and nonstructural in-f i-11 panels.
SMOKE DETECTOR REQUIREMENTS :
A smoke detector is required on the ceiling or walL at a point centrally located in the corridor or area giving access to each sleeping area.
-- Sec. l-210.(a) 4.
A smoke detector is required on the ceilj-ng or wa11 in each sleeping area. -- Sec. l-210 . (a) 4.
A smoke detector is required in the basement. -- Sec. 1210.(a) 4.A smoke detector is required on all stories- -- Sec. 1210. (a) 4.If the upper level- contains sleeping room(s), a smoke detector is required in the ceiling of the upper level close to the stairway.
-- Sec. 1-210 . (a) 4
Page 3
Smoke detectors are required to be wired to the buildingt s power source and
shafl be equipped with a battery backup. -- Sec. 1210.(a) 3.
Detectors shall sound an alarm audibfe in all sleeping area of the dwelling
in which they are located. -- Sec. 1210. (a) 4.
OCCUPANCY SEPARATION:
Between the garage and the residence, materials approved for thr fire
construction are required on the garage side only and any doors between the garage and the residence are to be a self-cfosing 13/8 inch solid
core door or a 20 minute fire door. -- Table 5-B e Sec.503.(d) exc. #3
STAIR REQUIREMENTS:
A stairway in a dwelling must be at least 36 inches wide. -- Sec. 3305.(b)
The maximum rise of a step is 8 inches and the minimum run is 9 inches.
-- Sec. 3306. (c) exc. #1
Provide a handrail- on one side a stairway 34 to 38 inches above the nosing if
there is 4 or more risers. -- Sec. 3306. (i)
Provj-de a guard rail where drop off is greater than 30 inches. Minimum height
= 36 inches, maxi-mum opening size:4 inches. -- Sec. L712.(a) exc. #1
The minimum headroom is 6 ft.- 8 inches. -- Sec. 3306.(o)
Enclosed usable space under the stairs is required to be protected as required for lhr fire-resistive construction. -- Sec. 3305. (I)
SHAFT ENCLOSURES:1) Chutes and dumbwaiter shafts with a cross-sectional area of not more than
9 square feet may lined on the inside with not less than 26 gage
galvanized sheet metal with all joints locklapped. The out.side must be t hr construction. All openings into any such enclosure shall be protected
by not less than a self-closing sofid wood door L 3/8 inches thick or equivalent. -- Sec. 1705. (f)
2) Gas vents and noncombustible piping installed in wal]s passing through 3 fLoors or less do not need to be in t hour shafts.
-- Sec. 1-?06. (c)
3) Shafts for gas vents, factory-built chimneys, piping, or ducts that do not extend through not more than 2 floors need not be in l- hour shafts.
-- Sec. 1705. (c)
4) All other shafts are required to be enclosed in a t hour assembly.
-- Sec. 1706. (a)
Additional requirements :
For R3 occupancy this project will require a site improvement survey. Such survey shall be submitt.ed and approved prior to request for frame
inspection.
AlI crawl spaces within the town of vail are limited to a earth to structural floor ceiling height of 5,, be earth floor on1y, be ventilated as per ubc 2516 (c) 6 with minimum access as per ubc
2516(c)2 and maximum access of 9 sq. Ft..
Any building site with a slope of 30 degrees or nore shall require an
engineer design. Such design shal1 address drainage, soil retainage,
and struct.ural design.
page 5
Excavation below stabs on grade shall not be permitted without prior
approval .
Address numbers shalL be posted plainly visible and legible from the
street.
For M1 occupancy
slope garage floor to allow for drainage to outside or provide a fl-oor drain with with sand and oi1 interceptor to dry well or to
sewer. Any garage floor drain connected to sewer must be appproved by Upper Eag}e VaIIey r^rater c sanitation district.
In garages with living area above, the walls of the garage which are bearing the area above shall be protected with one hour fire resistive construction. UBC 503(b) .
Town of Vail-
25 South Frontage Road VaiI, Colorado 81657 (303) 479-2L38
PIan analysis based on
the 1-991 Uniform Building Code
Pro ject Nurnber: 081992
Address: 1881 LIONS RIDGE LOOP
ContracLor: RJ BUILDERS Architect: R HODGES
Engineer: R DAVIS
NOTE:The code it.ems listed in this report Ij-sting of all possible code requj-rements
selected sections of the code.
Name: VAIL POINT #2_D
Date: August 19, L992
Occupancy: R3, M1-
Type of Const: V-N
Plans Examiner: DAN STANEK
are not intended to be a complete in the 1991 UBC. It is a quide to
FL NAME AREA MIN.LIGHT M]N.VENT NO.EXITS EGRESS
1 Bedroom 1 Bath room 1 Garage
1 r .i 'ri
1 n.i n i nn -aan 1 Kitchen 1 Ha11s, closets, etc.
TOTAL FOR FLOOR
B Bedroom B Bath room B Master bedroom B Master bath B Halls, closets, etc.
TOTAL EOR FLOOR
BUILDING TOTAL
FOOTNOTES:
L25
4L
398
295
r_09
79
l- 55
LT82
L33
42
218
4t
222
6s6
11,82
12 .50
0.00
0.00
29.50
1_0.90
r.0.00
0.00
13.30
0.00
2r_.80
0 .00
0.00
6.25
2.0s
0.00
1,4.75
5.45
5.00
0.00
5. 55
z . Lv
r_0.90
2.05
0.00
Yes
No
No
No
No
NO
No
Yes
NO
Yes
No
No
Yes
1
1
1
1
L
1
t_
L
1
t_
1
L
l_
1_
1
1) EGRESS - An operable window or door that opens directly to the exterior is required from this room. The minimum clear openable area must meet the following. -- Sec. 1204.1) The minimum clear height is 24 inches 2) The minimum clear width is 20 inches 3) The minimum clear area is 5.7 sguare
4') The maximum siII height is 44 inches 2, The number of exits is based on Table 33-A 3) A mechanical ventilation system may be used
openings for ventilation. -- Sec. 1205. (c)4) The requirement for an egress window in the Sec. 1,204.
feet
(Dwellings)
in in lieu of exterior
basement is based on
Page 2
ROOM DIMENSIONS:
Habitable space shall have a ceiling height of not less than 7 feet 5
inches, Kitchens, halls, bathrooms and toilet compartments may have a
ceiling height of 7 feet measured to the lowest projection. If the ceiling
is sloping, then the minimum height is requi-red in only 1/2 of the area.
--Sec. 1207. (a)
Every dwel1j-ng unit shall have at least one room which has not less than 120
square feet of floor area. Other habitable rooms except kitchens shall have
an area of not less than 70 square feet. -- Sec. 1207. (b)
Habitable rooms other than a kitchen shall not be fess than 7 feet in anv
dimension. -- Sec. 120?. (c)
GLAZING REQUIREMENTS:
All glazi-ng j-n hazardous locations is required to be of safety glazing material. -- Sec. 5405. (d)
1) Glazing in ingress and egress doors except jalousies.
2) Glazing in fixed and sl-iding panels of sliding door assemblies and panels in swinging doors other than wardrobe doors.3) Glazing in storm doors.4) Glazing in all unframed swinging doors.5) Glazing in doors and enclosures for hot tubs, whirlpools, saunas, steam
rooms, bathtubs and showers. Glazj-ng in any portion of a building wal1
enclosing these conpartments where the bottom exposed edge of the glazing is less than 60 inches above a standing surface and drain inlet.
6) Glazing in fixed or operable panels adjacent to a door where the nearest
exposed edge of the glazxing is wit.hin a 24-inch arc of either vertical
edge of the door in a closed position and where the bottom exposed edge of the glazing is less than 60 inches above the walking surface.7) Glazing in an individual fixed or operable pane1, other than those locations described in items 5 and 6 above, than meets all of the
folJ-owing conditions :A. Exposed area of an individual pane greater than 9 square feet.B. Exposed bottom edge less than 18 inches above the floor.C. Exposed top edge greater than 35 inches above the floor.D. One or more walking surfaces within 36 inches horj-zontalJ-y of the plane of the gLazing.
8) Glazing in railings regardless of height above a walking surface.
Incl-uded are structural- baluster panels and nonstructuraf in-filI
panels.
SMOKE DETECTOR REQUIREMENTS:
A smoke detector is required on the ceiling or wal-l- at a point centrally located in the corridor or area giving access to each sleeping area.
-- Sec. 1210. (a) 4.
A smoke detector is required on the ceiling or walI 1n each sleeping area. -- Sec. 1210. (a) 4 -A smoke detector is required in the basement. -- Sec. 1210.(a) 4.
Smoke detectors are required to be wired to the buildingt s power source and sha1l be equipped with a battery backup. -- Sec. 1210.(a) 3.
Det.ectors shal1 sound an alarm audible in aII sleepinq area of the dwellinq in which they are located. -- Sec. 1210. (a) 4.
Page 3
OCCUPANCY SEPARATION:
Between the garage and the residence, materials approved for Lhr fire
consLruction are reguired on the garage side only and any doors between
the garage and the residence are to be a self-closing 1 3/8 inch solid
core door or a 20 minute fire door. -- Table 5-B & Sec. 503.(d) exc. #3
STAIR REQUIREMENTS:
A stairway in a dwelling must be at least 36 inches wide. -- Sec. 3306.(b)
The maximum rise of a step is 8 inches and the minimum run is 9 inches.
-- Sec. 3306. (c) exc. #L Provide a handrail on one side a stairway 34 to 38 inches above the nosing if
there is 4 or more risers. -- Sec. 3305. (i)
Provide a guard rail where drop off is greater than 30 inches. Minimum height
= 36 inches, maximum opening size = 4 inches. -- Sec. L7L2.(a) exc. #L
The minimum headroom is 6 ft.- 8 inches. -- Sec. 3305.(o)
Enclosed usabl-e space under the stairs is required to be protected as required for lhr fire-resistive construction. -- Sec. 3306. (I)
SHAFT ENCLOSURES:
1) Chutes and dumbwaiter shafts with a cross-sectional area of not more than
9 square feet may lined on the inside with not less than 25 gage
galvanized sheet metal with all joints locklapped. The outside must be
l- hr construction. A11 openings into any such enclosure shall be protect.ed
by not l-ess than a self-closing solid wood door L 3/8 inches thick or equivalent. -- Sec. 1705. (f)
2) Gas vent.s and noncombustible piping installed in walls passing through 3 floors or less do not need to be in t hour shafts.
-- Sec. 1706. (c)
3) Shafts for gas vents, factory-built chimneys, piping, or ducts that do not exLend through not. more than 2 floors need not be in t hour shafts.
-- Sec. 1705. (c)
4) AII other shafts are required to be enclosed in a t hour assembly.
-- Sec. l-706. (a)
Additional requirements :
For R3 occupancy this project will require a site improvement survey. Such survey shall be submitted and approved prior to request for frame
inspection.
AII crawl spaces within the town of vall are limited to a earth to structural floor ceiling height of 5t, be earth floor onIy, be ventilated as per ubc 251.5(c)6 wlth minimum access as per ubc
2515(c)2 and maximum access of 9 sq. Ft.
Any building site with a slope of 30 degrees or more shall require an
engineer design. Such design shal1 address drainage, soil retainage,
and structural design.
Excavation below slabs on grade shal1 not be permit.t.ed wj-thout prior
approval .
Paqe 4
Address numbers sha1l be posted plainly visible and legible from the
ef raaf
For ML occupancy
slope garage floor to a1low for drainage to outside or provide a
fLoor drain $rith with sand and oil interceptor to dry wefl or to sewer. Any garage floor drai.n connected to sewer must be appproved
by Upper Eagle Valley water & sanitation district.
In garages with living area above, the wal1s of the garage which are
bearing the area above shall be protected with one hour fire
resistive consLruction. UBC 503 (b) .
o o
MI.]LTI-FAMILY
DATE: 7-22-92 LEGAL: 1 BLOCI ADDRESS: 1881 LIONSRIDGE#2
OWNER: PARKWOOD
ARCHITECIHODCES
ENGINEER:
LOTSTTF:
GRFA ALI,OWEDON SME
ALI,OWED SITECOVERAGE
SITE COVERAGEUSED
SITE COVERAGE REMAINING
LANDSCAP COVERAGE
GRFA USED ON SITE
GRFA REMANING ON SITE
FI.OOR
BASEMENT SQ.FT.
lST. FLTOOR SQ.FI.
2ND. FLOOR SQ.rT.
3RD. FT,OOR SQ.FI.
IOFTFIJOOR SQ.FL
TOTALS
CREDITTOTALS
GRFA ALLOWED
TOTALCREDITS
GRFA USED
GRFAREMAINING
CREDITS REMANING
FI,oOR
BASEMENT SQ.FT.
lsT. Fr.,ooR SQ.FT.
2ND. FLOOR SQ.FT.
3RD. FLOOR SQ.FT.
LOFTFT..OOR SQ.FT.
TOTALS
FLOOR
BASEMENT SQ.FI.
lsT. FLOOR SQ.FT.
2ND. FLOOR SQ.FI.
3RD. FIOOR SQ.FT.
LOFTFLOOR SQ.FT.
TOTALS
UNIT ONE
TOTAL
ffis
t203
&3
0
0
2491
3 SUBDIVISII
ZONE DIST
PHONENU
PHONENU
PROPOSED
O COMMEM
0
0
0
0
0
7082
-7082
GARAGE MECH.00 390 0 00 00 00 390 0
TOTAL
0
390
0
0
0
390
TOTAL
390
#GAR.spaces 0 390 0
0
390
2tol
-2r0r
N/A N/A
UNIT TWO TOTAL GARAGB MECH.
&5
1203
&3
0
0
2491
N/A N/A
0
0
0
0
0
0
0 CREDITTOTALS flGAR.spaces 0
GF.FA ALLOWED -2IOI
TOTAL CREDITS 390 GRJAUSED 2IOI GRFAREMAINING .4202
CREDITS REMANING
UNIT THREE
TOTAL
6s6
1182
0
0
0
1838
GARAGE MECH.00 398 0 00 00 00 398 0
TOTAL
J rr ''
CREDITTOTALS
GRFAALLOWED
TOTALCREDITS
GRFAUSED
GRFAREMAINING
CREDITS REMANING
FIOOR
BASEMENT SQ.IT.
1ST. FL,TOOR SQ.FT.
2ND.FT.OORSQ.FT.
3RD. FrOOR SQ.r{.
LTOITFIJOOR SQ.FT.
TOTALS
CREDITTOTAIJ
GRFAALLO}VED
TOTALCREDITS
GRSAUSED
GRFA REMAINING
CREDITS REMANING
#GAR.spaces 0 398
-4202
39E IM
-5&2
0
UNIT FOUR
TOTTAL
656
lrSz
0
0
0
1838
#GAR.spaces 0
-5&2
398 tw
-7082
N/A N/A
GARAGE MECTI.00 398 0 00 00 00 398 0
TOTAL 398 0
N/A N/A
/rP
V*L
b?o
/4-t o
Ctu 6 ,/oos r'
TlTt?/
5ToK\ ToTnL
At* Tor'4t
o z
=
E,Iu o-
$
E q E >$tt C\
U)
uJ uj IL
=E llJ c
dK f6/re/e ru^eQt *dt
Nr N o\l c'r
Or ,,,, o\
16\t
c..t I N
41
tz t!lv)
Ei ,< >-zr0 5 f tF g
(, t-
=i2- E <to z arJ<
IJJ F
o F
I
=
o
=z o
lrq
lo tz
ln trr lH
tz
l(J
I
lFq l&
I
I r,r
lA
i;t-t
o zEj
o9 zEa
=
d)-
.dFl
o<zr-t
ZO oz Nrtl
rr1 E
rrl
trl z
F H E
A
H
H
H
H B
a
H
F
z
Er
tr r F]
H
E r H |<
FJ H a H
FJ Id
F
F
<t-. g : 15 o;('.:' tuj
r;*;E I3
EigEI Ie
: 9E,3 E 'lE :iFiE g!
g >=: -- cgl v
.sRIEE-Sff
=t-*#s
EE*'ffi 3sE;si io.e;d9F ,/
H:€EE]I
siE€ frp ." E
E!E"E!; nn--E 6':5: ! ,^ I i5aP'. EN-
HgEii5 :;s
H;ia;i r
i'"iE; s
eF$*; 3 --.---'-1 IJ
\a
F\
r\
.f
\t \t
F.{
\t (.t
CN
\T
6
&
(
\o
fr
\3
\\-
Y J
s fl
^.
ca
+
ts
ul (l
z
!
l
co
!
I
z
9
F
tu
uJ
z 6
=f
d
J
2
I
UJ
UJ
IJJ
z
tr
t].l
uJ
o
=_uJ
2
6 ul o
F 6
(L
uJ o
o-
z
x
uJ o
o
UJ
uJ u-
=
LU
J
F o F
z o
l
co
J
E
6
UJ J llJ
z 6
=J c
.
UJ
Fl
H
t-{
NOr]-VnlV
2
V.
2
F
F
2
v
;zze-
f. o. Q=X: >!l tr I of,66 E 2>-()Oar9.ezX lr.<9q i lu-c :LXL!aXz
iN(,
>E
-I
7 H
H
Fl H
z 9 F
f
tL (r
o
o-l
g.
UJ
f-
N
-
g
J
z
E o o
z
tr
F
{5 -
LIJ z
t z l z Oa ;: UJ <o o<
> iii >E R ',-5d <z
L 1;9=
d6 Itr OI
-l TI *l
l--T
I
I
i-
i-r l<
lFa rT tl tacl tol tol t.'-l
l -
(I
z
i F
F
z
F
5 o z
I
3
F
llJ
I e
--
l
o
o
3
X
'<
I
I
;l
F l
F
tr
2
2
o
UJ o
LU
UJ z a F
cc
UJ
a z o
E o o
F
&
Pr
o z H B
o
N N
x
(\
I
z
I
.-l t. I
f *l ,,Y.'
U 1 | /'\I q/
=Lo ao
3o
z
A.
IIJ
E a
dt
-)z
F
uJ Y
UJ dlN oR F-:
F
=";lu o>J tl- Hl v-l i<l o"l ozl
'Hl rl gLu
i-F \J zo
F.]
rr1
H z&,"9 9
=<;coo J
=z -'1 X o d-f co
ti(trr rr txrLl L l
ts
uJ
o-
r|-
uJ o z
o L o F
=
lll -h>
duJ >o-OL 9o \ul
^a!x>iF
f tr
ru
@
F
t o
E cl o
at
!,tt
'E
5 F
E o o
AO
a-o >F
=E rE
=l+=i
E
=E,lrl
o-z I F ()
-t E F Q z o ()
dfi an a \ =
=81 d;=
I
I o. l rl \Ol
=l I
^l zl
Ol r*lul ,--r cl r_Jt o\al r >l ln u-ls
ol to
zl
3l ol FI
\'rn c\F
I .ir (\
rn
I
I tl rl Nl all
I
ol
=.1
IJJI
TI
<l >l
ttl ol
zl
3l
9'l
I
I
I
I
I
.l
il
url ql
<l >l
u-l ol
il s Ol uJ FIF
I
F
fr t
fr .ir .ir
o\
I o\
F -t
I
I <l rl
c.t I -'r I
I
3l
1l
<l >l
rr-l ol
zl
3l
9l FI
z H
aJ)
Fl
F)
=
(L
co
I l.-
C.l
r'l I tl orl
-l -l
I
.l ol
=.1
utl
TI
<l >l
ttl ol
zl ;l
9l
H
ts
Fl
F-l
=
FI
6l z
H
Ff
z
tr
@
F o
I
oI
B
F-l
z
F
HI
.l
>l
t{t Fct I
I (-)I
E-r I ol
I o\l o\_ |c{l
UI ru q
CI q
J g
z
F
'.t
E X
uJ
z
f{
u,
F -
z H
ui
z
-)
E (,c)
1t-
=#fF )z u-o
z
T
O
uJ
=
Eir
*E F Oz
<F
L!<ZE,rrrF <t3
<o ()F
l-<lia ;F -, z.ilo
F
uJ
T t c-:a?.trJ
=.J TJ
FNFN|FTI ww94
ill trl
i:
\
75 south lronlage road
vail, colorado 81557
(303) 479-2I38 or 479-2L39
FROM:
DATE:
SUBJECT:
ottlce ol communllY develoPment
ALL CONTRACTORS CURRENTLYL REGISTERED WITH THE
TOIfN OF VAIL
TOWN OF VAIL PUBLIC WORKS/COMMUNITY DEVELOPMENT
MARCH 16, l_9BB
CONSTRUCTION PARKING & MATERIAL STORAGE
In surTumary, Ordinance No. 6 states that it is unlawful for any person to litter, track or deposit any soil, rock, sand, debris or nateriaL, including trash dunrpsters, portable toilets and
workmen vehicles upon any street, sidewalk, aLley or public place or any portion thereof. The right-of-way on all Town of Vail streets and roads is approximately 5 ft. off pavement.This ordinance will be strictly enforced by the Tov,/n of Va j-I
Public Works Department. Persons found violating this ordinance will be given a 24 hour wr.itten notice to remove said material .fn the event the person so notified does not comply with the notice within the 24 hour time specified, the Public Works Department wj.Il remove said materj-al at the expense of person notified. The provisions of this ordinance shaLl not be applicable to constructi-on, maintenance or repair projects of any street or alley or any utilities in the right-a-way.
To review Ordinance No. 5 in ful1, please stop by the Town of Vail Building Departrnent to obtain a copy. Thank you for your cooperation on this matter.
cknowledged
Pos
2 - i5--\)-
Date
contractor, owner)
BUILDiNG PERI.IIT ISSUANCE TIME FMME
If this permr'.t requires a Town of Vail Fire Department Approval ,
Engineep''s (Public Works) review and approval , a Pianning Department
review or Health Department review, and a review by the Building
Departnent, the estirnated time for a total review may take as long
as three weeks.
All commercial ('1arge or small)and all multi-family permits will
have to follow the above mentioned maximum requirements. Residential
and small projects should take a lesser amount of time. However, if
lesi.dential or smaller projects impact the various above mentioned
departments with regard to necessany rev'iew, these projects may
also take the three week period.
Every attempt wri'l I be made by this department to expedite this
Permit as s,qon as possibi e.
I, the undersigned, understand the p1 an check procedure and time
T rame .
75 soulh lrontage road
Yail, colorado 81657
(303) 479-2138 or 479-2\39
t
ottlce of communlty develoPmettt
t,
= Vn, \ Pc.'r-
ProJect Name
\.r*;\-\.)
Date I'lork Sheet was turned into the
Community Development Oepartment'
I
'*#"toN REeuEsr
TOWN OF VAIL PROJECT
4u,o,
READY FOR INSPECTION:MON
*or= L'rl /( t'rtrti'{ td'/^.;>-
oALLER ,lttl J
WED THUR FRI ---------ftYl PM -,-TUES.'
LT
(/I
CORRECTIONS:
LOCATION:
t04,
BUILDING:
tr FOOTINGS / STEEL
PLI
Erl
trl
trl
trl
trl
D
UMBING:
UNDERGBOUND
O FOUNDATION / STEEL ROUGH / D.W.V.
O FRAMING ROUGH / WATER
tr
tr
ROOF & SHEER
PLYWOOD NAILING GAS PIPING
INSULATION POOL / H. TUB
tr SHEETROCK NAIL
tr FINAL tr FINAL
ELEGTRICAL:
tr TEMP. POWER
MEGHANICAL:
tr HEATING
tr
o
D
ROUGH D
tr
tr
EXHAUST HOODS
CONDUIT SUPPLY AIR
O FINAL tr FINAL
6lpnoveo tr DISAPPROVED tr REINSPECTION REQUIRED
-" . ,/'> ,./t//DAIE 7
"'
'- INSPECTOR ,/
INSPECTION REQUEST
PERMIT NU
DATE
READY FOR INSPECTIO
LOCATION:
MON
CALLER
UES THUR
BUILDlNG:
O FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATER
tr FOUNDATION / STEEL
tr FRAMING
ROOF & SHEER
PLYWOOD NAILING tr GAS PIPING
INSULATION D POOL / H, TUB
tr SHEETROCK NAIL
tr FINAL O FINAL
ELECTRICAL:MECHANICAL:
EMP, POWER tr HEATING
O ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
D FINAL O FINAL
PROVED
RRECTIONS:
D DISAPPROVED tr REINSPECTION REQUIRED
INSPECTOR
-/
411
,*#"toN REeuEsr ! t TOWN OF VAIL
I't i,-f j n A
CATLER
N/ON ,t6*''',t--------
- L tr,c.'
BUILDING:
O FOOTINGS / STEEL
PLUMBIN6
O FOUNDATION / STEEL
tr FRAMING
,_ ROOF & SHEER " PLYWooD NAILING D GAS PIPING
D INSULATION
tr SHEETROCK
tr POOL / H. TUB
FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
D CONDUIT tr SUPPLY AIR
tr FINAL
PROVED
. CORRECTIONS:
O DISAPPROVED tr REINSPECTION REQUIBED
INSPECTOR
SfrE\ I
PERMIT NUMBER OF PROJECT
\\--DATE \\
r^r#ctoN TOWN OF
REQUEST
VAIL
NAME
READY FOR INSPECTION:MON
CALLEFI
TUES WED THUR
\LOCATION:
ROVED
CORRECTIONS:
D DISAPPROVED tr REINSPECTION REQUIRED
BUILDING:
O FOOTINGS i STEEL
PLUMBING:
tr UNDERGROUND
E FOUNDATION / STEEL ouGH / o.w.v. LJ&-
O FRAMING GH / WATER
rr ROOF & SHEER " PLYWOOD NAILING D GAS PIPING
tr INSULATION
tr SHEETROCK
O POOL / H. TUB
NAIL o
D
tr
tr
tr FINAL FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
o
o
tr
ROUGH O EXHAUST HOODS
CONDUIT tr SUPPLY AIR
tr FINAL
T'l
o FINAL
/ / r-D^rE ./ / /J2/ / -- rNSpEcroR
:.
-
PERMIT NUMBER OF PROJECT
t' ) I-z- lQ-\ -r, I -2 | | L-- JOB NAME DATE
READY FOR INSPECTION:MON
' -- l, "-- (/
--r' | _j /rrusilcnoN REeuEsr
FHI
CALLER
TUES WED THUR
(t. \,
I
ocATloN: l? ?. | '-.t r t , ,l \,<-r.-,'c , ;' { ,. ...,
BUTLDING:
D FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W,V.
tr ROUGH / WATER
D FOUNDATION / STEEL
tr FRAMING
- ROOF & SHEER " PLYWOOD NAILING tr GAS PIPING
D INSULATION tr POOL / H. TUB
tr SHEETROCK NAIL
tr FINAL tr FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr
tr
tr
tr
HEATING
(
tr
tr
ROUGH EXHAUST HOODS
CONDUIT SUPPLY AIR
tr FINAL tr FINAL
APPROVED
CORRECTIONS:
tr DISAPPROVED D REINSPECTION REQUIRED
DATE ,U -Q ,l )
INSPECTOR
nlFsrop
; ,.a.-,D t f
li=', {}
PERMIT NUMBER OF PROJECT
oot. \)-I"',-C$ JoB NAME
rru#cnoN TOWN OF
ES U
r.'
REQ
VAIL
CALLER
INSPECTION:MON TUES WED READY FOR
LOCATION:
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr fOUNDATION / STEEL
, - rt''
oucH / wArFn"A
ROOF & SHEER
PLYWOOD NAILING
7
INSULATION
SHEETROCK
tr POOL / H. TUB
O FINAL
ELECTRICAL:
O TEMP. POWER tr HEATING
ROUGH tr EXHAUST HOODS
CONDUIT D SUPPLY AIR
O FINAL tr FINAL
PROVED
CORRECTIONS:
O DISAPPROVED tr REINSPECTION REQUIRED
oor, ryla/q L rNSpEcroR T ^ ,: l-'--
,*rt"toN REeuEsr
TOWN OF VAIL
READY FOR INSPECTION: MON TUES ,WED\ THUR FRI .-.'..\
- ,'. i\.
PERMIT NUMBER OF PROJECT
AM PM
BUILDING:
D FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
O ROUGH / WATER
O FOUNDATION / STEEL
D FRAMING
,_ ROOF & SHEER " PLYWOOD NAILING tr GAS PIPING
O INSULATION O POOL / H. TUB
tr SHEETROCK NAIL tr
o D
O FINAL tr FINAL
ELECTRICAL:
O TEMP. POWER
MECHANICAL:
O HEATING
'ROUGH D EXHAUST HOODS
tr
tr
CONDUIT U SUPPLY AIR
D
tr FINAL tr FINAL
APPROVED O DISAPPROVED tr REINSPECTION REQUIRED
.z CORRECTIONS:
DATE INSPECTOR
t-\ Lt ''l
PERMIT NUMBER OF PROJECT
DATE tsqT JOB NAME l.\, ^t T tt \ /)' ^t:
CALLER
TOWN OF VAIL
,tuLS '1 AM rPM READY FOR
LOCATION:
INSPECTION:MON
*9
WED THUR FRI
\
('
I BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V,
tr lloucH / WATER
D FOUNDATION / STEEL
u4nnutrue
D
tr
ROOF & SHEER
PLYWOOD NAILING tr GAS PIPING
INSULATION tr POOL / H. TUB
tr SHEETROCK NAIL tr
o
D FINAL O FINAL
ELECTRICAL:MECHANICAL:
u
tr
tr
tr
TEMP. POWER tr HEATING
ROUGH D
B
o
EXHAUST HOODS
CONDUIT SUPPLY AIR
O FINAL tr FINAL
PROVED ^.-,' O DISAPPROVED E REINSPECTION REQUIRED
CORRECTIONS:
./.*/-D^rE ,//,/7{/2- rNSPEcroR za.{a
(,
rC,s,q
PERMIT OF PROJECT
?--2 JOB NAME
INSPECTION:MON
DATE -I
CALLER
READY FOR
LOCATION:
TUES ,@ pM
ll >-:,
APPROVED
CORRECTIONS:
D DISAPPROVED O REINSPECTION REQUIRED
REQUEST
-ol.i €0
THUR FRI
BUILDING:
tr FOOTINGS / STEEL
PL
o
tr
tr
tr
tr
o
-
UMBING:
O FOUNDATION / STEEL
UNDERGROUND
ROUGH / D,W.V,
ROUGH / WATEB O FRAMING
tr
tr
ROOF & SHEER
PLYWOOD NAILING GAS PIPING
INSULATION POOL / H, TUB
tr SHEETROCK NAIL
tr
tr FINAL D FINAL
ELECTRICAL:
D TEMP. POWER
MECHANICAL:
tr HEATING
R
tr
tr
ROUGH tr
D
o
EXHAUST HOODS
CONDUIT SUPPLY AIR
tr FINAL O FINAL
, ''',/
DATE /'' 1-'- 9J INSPECTOR
PERMIT NUMBER OF,PROJECT
,-rtf,i,o* REeuEsr
TOWN OF VAI Th:DATE 0 3 ,o,NAME (>f5'o-t-
CALLER
READY FOR INSPECTION:4ON z \TUFS WED THUR FRI .
------<
1I\'I J PM
,/) , r^-r.-tt-r>0 * ,.f ,tt t //, "/.--' O-f )< /LOCATION: lu/U | ,'/| ' u/-<al
BUILDING:
D FOOTINGS / STEEL
PLUMBING:
tr FOUNDATION / STEEL
tr UNDERGROUND
O ROUGH i D.W.V.
tr BOUGH / WATER D FRAMING
ROOF & SHEER tr GAS PIPING
XTNSULATToN
tr SHEETBOCK
tr POOL / H. TUB
NAIL tr
tr FINAL
tr
tr FINAL
ELECTRICAL:
D TEMP. POWER
MECHANICAL:
tKTEATNG
tr
tr
tr
tr
ROUGH D EXHAUST HOODS
CONDUIT D SUPPLY AIR
FINAL FINAL
tr APPROVED
CORRECTIONS:
EI DISAPPROVED tr REINSPECTION REQUIRED
_{i
fx..tt-,/ /--*.4-t,V\K, L-',
lt l: "rN#cnoN REeuEsr
PERMIT NUMBER OF PROJECT
DATE JOB NAME
MON ,
cALl=ER
rues j
TOWN OF VAIL
READY FOR
LOCATION:
WED THUR FRI
BUILDING:
O FOOTINGS
tr FOUNDATI
O FRAMING
I
/ STEEL
ON / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATER
- ROOF & SHEER D pLywo'bo rrrnilrr.rc D GAS PIPING
tr INSULATION tr POOL / H. TUB
tr SHEETROCK NAIL tr
tr E i\iV vri'li '',t-\ti ':-,
tr FINAL tr FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
D. HEATING
D
tr
tr
ROUGH tr
D
tr
EXHAUST HOODS
CONDUIT SUPPLY AIR
D FINAL O FINAL
flSeenoveo
CORRECTIONS:
E DISAPPROVED O REINSPECTION BEOUIRED
INSPECTOR
v I _a.
rNstcnoN TOWN OF
' ,-i . l REQUEST
VAIL
READY FOR
LOCATION:
INSPECTION:
, i 'i-
I NAME
MON
CALLER
TUES WED THUR FRI
PEBMIT NUMBER OF PROJECT
on.e ll''-l'i-.- Joe
i r , ill ,.\t ,l- I rr1 ' \i. .
BUILDING:
D FOOTINGS
D FOUNDATI
tr FRAMING
/ STEEL
PLUMBING:
tr UNDERGROUND
D ROUGH / D.W.V.
tr ROUGH / WATER
ON / STEEL
r_r ROOF & SHEEB " PLYWOOD NAILING D GAS PIPING
ETNSULATON tr
D
tr
o
POOL / H. TUB
tr SHEETROCK NAIL
n
D FINAL FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
o
tr
tr
ROUGH tr EXHAUST HOODS
CONDUIT D SUPPLY AIR
EI FINAL
o
tr FINAL
fLAPPRovE
'
CORRECTIONS:
tr DISAPPROVED tr REINSPECTION REOUIRED
INSPECTOR
-lN
r-(
REQUEST
PERMIT NUM ER OF PR
I
DATE I
READY FOR
LOCATION:
ECT VAIL
',/(t4 /-- JOB
INSPECT N:('
,}
r9
NAME
woN--/
,,1.
CALLER
TUES WED
3)(,/ L
BUILDING:
tr FOOTINGS / STEEL
D FOUNDATION i STEEL
tr FRAMING
- ROOF & SHEER LI ^, .,...^^^
PL
tr
tr
tr
tr
tr
tr
UMBING:
UNDERGROUND
ROUGH / D.W.V.
ROUGH / WATER
: PLYWOOD NAILING t;;;;;,i''"'l i,,. ( r =-
fol*.=r*o"K NAIL / t^-t (,1)
GAS PIPING
/ 2-,
POOL / H. TUB
r'l tr
D D FINAL FINAL
ELEGTRIGAL:
E TEMP. POWER
MECHANICAL:
o
D
tr
tr
HEATING
Fl
tr
tr
ROUGH EXHAUST HOODS
CONDUIT SUPPLY AIR
tr FINAL tr FINAL
OVED tr DISAPPROVED O REINSPECTION REQUIRED
COBRECTIONS:
DATE INSPECTOR
) --s'
,/{.-t to,
o
i'.INSPECTION TOWN OF
1:i
REQUEST
VAIL PERMIT NUMBER OF PROJECT
DATE
INSPECTION:
JOB NAME
MON
CALLER
TUES FRI . AM PMJ
I
READY FOR
LOCATION:
BUILDING:
tr FOOTINGS / STEEL
D FOUNDATION / STEEL
D FRAMING
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V,
O ROUGH i WATER
n
tr
tr
tr
ROOF & SHEER
PLYWOOD NAILING tr GAS PIPING
INSULATION D POOL i H. TUB
SHEETBOCK NAIL
-
O
-tr
D FINAL tr FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
tr ROUGH
-
tr EXHAUST HOODS
tr CONDUIT
-
tr SUPPLY AIR
fi'l L-d
FINAL D FINAL
tr APPROVED
CORRECTIONS:
O DISAPPROVED tr REINSPECTION REQUIRED
tJf\ I E INSPECTOR
INSPECTION REQUEST
TOWN OF VAIL
INSPECTION:
CALLER
TUES READY FOR
LOCATION:
MON ,i t(
I neenqveo
CORRECTIONS:
,a ii^..'l
DISAPPROVED _-F RE!NSPFCTTON REOUTRED
t--'----
BUILDING:
tr FOOTINGS / STEEL
tr FOUNDATION / STEEL
tr FRAMING
,- ROOF & SHEER " PLYWOOD NAILING tr GAS PIPING
tr INSULATION
tr SHEETROCK
O POOL / H. TUB
tr FINAL tr FINAL
ELECTRlQAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
tr EXHAUST HOODS
tr SUPPLY AIR
tr FINAL
,A
DALE 4t r t' ' ', INSPECToR
-,tr/
-
PERMIT NUMBER OF PROJECT
INSPECTION REQUEST
TOWN OF VAIL .-{
oorr '')\fu\qh JoB NAME i i'^l
-f '. .. a
cALLER fau! - ()L,'-v, tl*{r;-rur-l
READv FoR TNSPECIoN: [@ ruES wED rHUR FRr i'5rlP id PM
LOCATION:
"t*
tr DISAPPROVED O REINSPECTION REQUIRED
BUILDING:
O FOOTINGS / STEEL
PLUMBING:
D UNDERGROUND
D ROUGH / D.W.V.
tr ROUGH / WATER
tr FOUNDATION / STEEL
O FRAMING
_ ROOF & SHEER .- PLYWOOD NAILING tr GAS PIPING
tr POOL / H, TUB
tr FINAL -"tr FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
ROUGH tr EXHAUST HOODS
CONDUIT tr SUPPLY AIR
D FINAL
APPROVED
CORRECTIONS:
DATE
') -, -'-/'q?t .t - / -t INSPECTOR
],
INSPECTION TOWN OF
\; .rr
REQUEST
VAIL PERMIT NUMBER OF PROJECT
DATE
READY FOR
LOCATION:
INSPECTION:
JOB NAME
CALLER
TUES WED ELI THUR FRI AM
'i)
BUILDING:
O FOOTINGS
tr FOUNDATI.
tr FRAMING
/ STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
O ROUGH / WATER
ON / STEEL
- ROOF & SHEER
" PLYWooD NAtLtNG D GAS PIPING
O INSULATION tr POOL / H. TUB
tr SHEETROCK NAIL tr
tr lrr- -fl n '. \,,,,-f \\ d- \ 2
D FINAL ,\/rrrunr-
ELEGTRICAL:
tr TEMP. POWER
MECHANICAL:
O HEATING
D
tr
tr
ROUGH tr EXHAUST HOODS
CONDUIT E SUPPLY AIR
* X-e : -tr'
E FINAL tr FINAL
ffiPRovED
&&*r"r,o".,
tr DISAPPROVED &enseecroN REeuTRED
y /E lZ e4,/ () t/'r- )^,^ aF{ .6 (.o.<V* o,/r-/2-
o/LQ /n)K-
lhvtcfrptp? t ffr/.ft)p? vb " /a,/E ry /-/-f3
INSPECTOR
.-- ir: r)Li O
1
REQUEST
VAIL PERMIT NUMBER OF PROJECT
DATE JOB NAME
f'neenoveo
CORRECTIONS:
O DISAPPROVED tr REINSPECTION REQUIRED
BUILDING:
tr FOOTINGS / STEEL
PL
o
tr
tr
tr
tr
tr
tr
UMBING:
tr FOUNDATION / STEEL
UNDERGROUND
ROUGH i D.W.V.
ROUGH i WATER tr FRAMING
E
tr
ROOF & SHEER
PLYWOOD NAILING GAS PIPING
INSULATION POOt / H. TUB
tr SHEETROCK NAIL
tr
D FINAL tr FINAL
ELE
o'i
v,trC
Y
GTRICAL: "'MECHANICAL:'r"':=----'
TEMP. POWER O HEATING
ROUGH
! 1
''.
/. I \-'( r--<--- \-D
E
tr
tr
EXHAUST HOODS
CONDUIT SUPPLY AIR
tr FINAL FINAL
DATE INSPECTOR
,
INSPECTION REQUEST
,., i, ,ln9**
oF vAlL
READY FOR
LOCATION:l; ':-
PECTION:MON TUES ED THU
PERMIT NUMBER
.-(
BUILDING:
E FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH i D.W,V,
D ROUGH / WATER
tr FOUNDATION / STEE-
tr FRAMING
- ROOF & SHEER " PLYWOOD NAILING tr GAS PIPING
D INSULATION tr POOL / H, TUB
E} SHEETROGK NAIL
E FINAL
ELECTRICAL:MECHANICAL:
tr
n
tr
#
E]
O HEATING
ROUGH tr EXHAUST HOODS
O SUPPLY AIR
APPROVED
CORRECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
DATE " ,''7- ,?-S INSPECTOR
_{iir^lr-t ._'il .-,J I
;
PERMIT NUMBEB OF PROJECT
INSPECTION REQUEST
TOWN OF VAIL
,|zJ-DATE I NAME
READY FOR
LOCATION:
INSPECTION:MON
CALLER
TUES
._!l ,- ?". \l,/-:\ \
BUILDING:
tr FOOTINGS / STEEL
tr FOUNDATION / STEEL
tr FRAMING VA
IG
TU
_ ROOF & SHEEB
" PLYWooD NAILIfiG
O INSULATION
tr SHEETROCK NAIL
tr FINAL tr FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
ROUGH tr EXHAUST HOODS
CONDULT D SUPPLY AIR . f,.,
O FINAL tr FINAL
OVED
CORRECTIONS:
O DISAPPROVED tr REINSPECTION REQUIRED
J
'1./ \.f 1 '.(
,1
DATE c'tJ4" .l'-
''t',
t.. 1<-l