Loading...
HomeMy WebLinkAboutHOLY CROSS LOT UNPLATTED PART 1 LEGAL,-ffi Design ReView Board 6ha t'7rt Qrb ACTION FORM Deparbnent of Community DeVelopment 75 South Frontage Road, Vailr Colorado 81657 tel 970.479.2139 faxt 970.479.2452 webr www,ci.vail,co.us Project Name: Vail Resorts Maintenance Lot DRB Number: DRB050174 Project DescripUon: CHANGE TO APPROVED PLANS FOR PROPOSED PARKING LOT IMPROVEMENTS Participants: owNER VAIL CORP O4l2sl200s PO BOX 7 VAIL co 81658 APPLICANT MAURIELLO PLANNING GROUP, LL04 | 25 | 2005 Phone: 970-748-0920 PO BOX 1127 AVON co 81620 License: C000001697 ProjectAddress: 953 S FRONTAGE RD WESTVAIL Location: 923 S, FRONTAGE RD Legal Description: Lot: Ta&b Block; Subdivision: S. Frontage Road Sub. Parcel Number: 2103-121-2400-1 Commentsi Seeconditions hGoccl-tt (,npt"/f"Q BOARD/STAFF ACTION Motion Byr Action: STAFFAPR Second By:Vote: Date of Approval= 0412712005 CondiUons: Cond: I (P|-AN): No changes to these plans may be made without the written consent of Town of Vail staff and/or the appropriate review committee(s). Cond:0 (PLAN): DRB approval does not constitute a permit for building. Please consult with Town of Vail Building personnel prior to construction activities, Cond: 201 DRB approval shall not become valid for 20 days following the date of approval. Cond: 202 Approval of this project shall lapse and become void one (1) year following the date of final approval, unless a building permit is issued and construction is commenced and is diligently pursued toward completion. Planner: Matt Gennett DRB Fee Paid: S2O.OO IOI4N\Iffi vIPfifoq o - \, Application for Design Review Elepartrnent of Community Development 75 Soufr Bontage Road, Vail, Colorado 81657 tel: 970.479,2139 fax; 970.479.2452 web: www.ci,vall,co.us General Information: All projects requiring design r€view mr6t receive approval prior to submitting a buildlng permit appllcation. Please reftr to the submittal requirements for the particular approval that is requested. An application fur Design Review cannot be accepted until all required information is rcceived by the Community Development Departsnent. The project may also need to be reviewed by the Town Courril and/or the Planning and Environmental Commission. Design review approval lapses unless a building permit ic issued and construction commences within one year of the approval, Description of the Request: Minor Chanoes to aporoved olans Locataon ofthe Proposal: Lot: Tract b Block:_ Subdivision: South Frontaoe Road Sub. Physical Address: 923 S. Frontaoe Road Parcel No.: 210312124001 ( Eagle Co. Assessor at 970-328-8640 for parcel no.) Zoni Name(s) of Owner(s):Vail Resorts, Inc Mailing Addressr Owner(s) Signature(s): Name of Applicant: Mailing Address: PO Box 1127. Avon. CO 81620 Phone: E-mail Address: Type of Review and Fee: tr Signs .$50 Plus $1.00 per squar€ foot of total sign area. No Fee $6s0 $300 D C tr tr H tr Conceptual Review New Construction Addition Minor Alteration (multj-family/commercial) Minor Alteration (single-family/duplex) Changes to Approved Plans Separation Request For construction of a new building or demo/rebuild. For an addition where square footage is added to any commercial building (includes 250 additions & interior conversions). $250 For minor changes to buildings and site improvements, such as, reroofing, painting, window additionE landscaping, fences and retaining walls, etc. $20 For minor charEes to buildlngs and site lmprovements, such as, reroofing, painting, window additions, landscaping, bnces and r€taining rvallE etc. $20 For revislons b plans already approved by Planning Staff or the Design Review Board. No Fee APR 2 5 2005 TOq-cilM.DEv. a llJ z j gi I lt) (\ c; = s a E Eo o TD a g '6 3 N o l/r *{r*{'***tff+++***********'''t*f***+ft++********!tf**t*r++***+*rttt+++lt't*+***r+*fr.r.**tt+++***+* TOWNOFVAIL, COIORADO Statement St.atement Number: R050000487 Anount: $20.00 04/25/200504:55 pM Paltment Method: Check Init: iIS Notation: 1103/MAURrEIr,o PIAI{NING GROUP Pertl|jit No: DR8050174 TIE)e: DRB-Chg to Appr Plang Parcel No: 2IO3-]-2L-240O-I Site Addregs: 953 S FRONTAGE RD WEST VAIL Location: 923 S. FROI$TAGE RD Total FeeE: 920.00This Payment: $20.00 Total AJJIJ Pmts: $20.00Balance: $0.00 ACCOI.JNT ITEM LIST: Account Code De6cription DR OO1OOOO37122OO DESIGN REVIEW FEES Current Pmts 20.00 Planning and Environmental Commission ACTION FORM DeparbTent of Community Development 75 South Frontage Road, Vail, Colorado 81657 tel: 970.479.2139 faxl 970.479.2452 web: www.ci.vail.co,us ProjectName: HOLYCROSSPARKINGLOTVARIA PECNumber: PEC040030 Project Description: CONDMONAL USE PERMIT AND VARIANCES FOR PROPOSED PARKING LOT IMPROVEMENTS Pafticipants: OWNER VAILCORP 05/2512004 Phone: PO BOX 7 VAiL co 81658 License: APPLICANT MAURIELLO PLANNING GROUP, LL05/25l2004 Phone: PO BOX 1127 AVON co 81620 License: Project Address: 953 S FRONTAGE RD WEST VAIL LocaUon: 923 SOUTH FRONTAGE ROAD WEST Legal DescripUon: Lot: Block Subdivision: Parcel Number: 210312124001 Comments: Seeconditions BOARD/STAFF ACTION Motion Byr Kjesbo A€tion: APPROVED Second By: Lamb Vote: 4-0 DateofApproval= O7ll2l2OO4 Gonditions: C,ond: 8 (PLAN): No changes to these plans may be made without the written consent of Town of Vail staff and/or the appropriate review committee(s). Cond:300 PEC approval shall not be not become valld for 20 days following the date of approval. Cond: CON0006556 1. That the proposed location of the temporary parking facility is in accordance with the purposes of the Town of Vail Zoning Regulations and the purposes of the Lionshead Mixed Use 2 zone district. 2. That the proposed location of the temporary parking area and the conditions under which it will be operated and maintained will not be detrimental to the public health, safety, or welfare, or materially injurious to properties or improvements in I 3. That tte temporary parldng facility wlll aomply wlth edt of $e applicable prwlslorc of the Toryn of Vall Zoning Reguhtions Planner: MattGennett PEC F€e Pald: $500.00 r0ilirvm n Rezoning $1300! Major Subdivision $1500tr Minor SuMivision $650! Exemption Plat $650n Minor Amendment to an SDD $1000D New Special Development District $6000tr Major Amendment to an SDD $6000fl Major Amendment to an SDD $1250 (no exterior mdifications) Application for Review by the RECEIVED Planning and Environmental Commissionaar 2 a "'::;: Depaftment of Community Development 75 South Fronbage Road, Vail, Colorado 81657 tel: 970.479.2139 fax: 970.479.2452 web: www.ci.vail.co.us General Information: All projects requiring Planning and Environmental Commission review must receive approval prior to submitting a building permit application. Please refer to the submittal requirements for the particular approval that is requested. An application for Planning and Environmental Commission review cannot be accepted until all required information is received by the C-ommunity Development Department. The project may also need to be reviewed by the Town Council and/or the Design Review Board. Type ofApplication and Fee: Description of the Request: (Holy Cross) A conditional use oermit to allow for oarking and variances for interior landscaping and snow storaoe at the Holv Cross/Maintenance Site./c^- I va(xrCA V", L;tta Location of the Proposal: Lot: Tracts A and B Block:_ SuMivisio-n: South Frontage Road SuMivision Physical Address: 923 South Frontaoe Road Parcel No;-f1Q3!l!2t[Q01_( Eagle Co. Assessor at 970-328-8640 for parcel no.) Zoning: Lionshead Mixed Use 2 Name(s) of Owner(s):Vail Coro. Owner(s) Signature(s): Name of Applicant: Mailing Address: PO Box 1127. Avon CO 81620 Phone: 748-0920 E-maif Addressl__neuiello@comcast.d Fax: 748-0377 For Office Use Only: FeePaid: ll<b ' Cqe*ruo.: /OD ey: ileeffif6n Date: t . Lt - 6c1 PEr Planner: (o Phq. X Conditional Use Permit I FloodolainModification D Minor Exterior Alterauon tr Major Exterior Alteration fl Development Plan E Amendment to a Development Plan ! Zoning Code Amendment X Variance tr Sign Variance $6s0 $400 $650 $800 $1s00 $2s0 $1300 $s00 $200 Mailing Address: PO Box 7. Vail. CO 81658 05/t4t04 ?Acoq @36' Uqr'brzc o lfi Mauriello June 17, 2OO4 Mall GenneLt, AICF Town ol Val 75 9ovLh Frontaqe Road Val, Colorado 6l 657 Re' floly Cross - Tarktnq lmprovemenls Dear MaLL: Included wrth thrE letter are the applrcaLrons reqared lo rmTrove parktnq and congLruct Trontaqe ?oad tmprovementg at the lloly CroEg ?arcel rn Varl. As you are aware the Plannnq and Enuronmental commtsSton a??roved vanances Lo allow thts parktnq lot to be unpaved and wfthovt nlenor landscaVrnq n october of 2oo3. A condtron ol avTroval requres thalvail Resorls oblarn avproval Ior and consfruct lhe vermanent vaved tmprovemenls by November of 2oo4. rheTown ol val gLaII has requested that we noL pave the parkrnq thr, year and geek an apTroval lo allow Lhe parktnq to remarn vnpaved untrl November 2OO5. The extensron wrll allow ample oVVortunrty for nvesttqaLon and drscussron wfth theTown about lhe potenttal for structured varktnq on the sfte. Varl ResortE s therelore seektnq to make tmprovements Lhe stte and adlacent roadway and e seekrnq vanance to allow the lot to remarn vnpaved lor another Year. The maLenals submftLed wth lhe avvlcatton should be Eulhcrent lo allow lor the ?EC and DRD revrew and approval of thts prolect. ll there E addfttonal nformabon you wovld lke, Vlease do nol hesttate lo call me. Po Box 1127'Avon, co 81620.office: 970-748-0920.F ax 970-748-0377.Cett: 970-376-331B.maurie o@comcast.net Thankyov n advance lor your help wfth lhs appltcaLton. Srncerely, PJtt -"t* Domtnc F. Maurrello, AICP TlnaVal oI Chicago Title Insurance Company ALTA COMMITMENT Schedule A Property Address: SOUTH FRONTAGE ROAD SUBDIVISION l. Effective Date: June 19,2002 at 5:00 P.M. 2, Policy to be ksued, and Proposed Insured: Information Binder Proposed ksured: THE VAIL CORPORATION. A COLORADO CORPORATION Our Order No. VC273511.ls Cust. Ref.: 3. The eslate or interest in the land described or referred to in this Commitment and covered herein is: A Fee Simple 4. Title to the estate or lnterest covercd herein is at the effective date hereof vcted in: THE VAIL CORPORATION. A COLORADO CORPOP.ATION 5. The land referred to in this Commitmmt is dccribed as follows; TRACTS A AND B, SOUTH FRONTAGE ROAD SUBDIVISION, ACCORDING TO THE PLAT RECORDED NOVEMBER 6, 2OOO, RECEPTION NO. 743424, COUNTY OF EACLE, STATE OF COLORADO. oo ALTA COMMITMENT Schedule B - Section I (Requirements) Our Order No' VC2735l l. 15 The following are the requiremenls to be complied with: Iteln (a) Payment to or for the accouot of the grantors or mortgagors of the full consideration for fte estate or interest to be insured. Item (b) Proper irstrument(s) creadng the estate or interest to be insured must be executed and duly filed for record, to-wit: Item (c) Payment of all taxes, charges or assessments levied and assesse<t against tbe subject premises which are due and payablc. Item (d) Additional requirements, if any disclosed below: THIS COMMITMENT IS FOR INFORMATION ONLY, AND NO POLICY WILL BE ISSUED PURSUANT HERETO. Oo ALTA COMMITMENT Schedule B -Section2 (Exceptions) Our Order No. Vc2735ll.l5 The policy or policies to be issued will contain exceptions to the following unless the same are disposed of to the satisfaction of the Company: 1. Rights or claims of parties in possession not shown by the public records. 2. Easenrents, or claims of easenrents, not shown by tlre public records. 3. Discreparrcies, conflicts in boundary lines, shortage in area, encroaclmrents, and any facts whioh a conect survey and inspection of tlre premises would disclose and which are not sbown by the public records. 4. Any lien, or right to a lien, for services, labor or material theretofore or hereaft,er furnished, imposed by law and not shown hy the public records. 5. Defects, liens, encumbrances, aclverse clai:ns or other mafters, ifany, created, first appearing in dre public records or attaching subsequent to the etfective date hereof but prior to tlre date fte proposed insured acquires of record for value dre estate or interest or mortgage thereon covered by this Commitment. 6. Taxes or special assessments which are not shown as existing liens by the public records.o the Treasurer's office. 7. Liens for unpaid water and sewer charges, ifany.. 8. In addition, the owner's policy will be subject rr thc mongage, if any, noted in Section 1 of Schedule B hereof. 9. RIGHT OF PROPRIETOR OFA VEIN OR LODETO EXTRACTAND REMOVE HIS ORE THEREFROM SHOULD THE SAME BE FOUND TO PENETRATE OR INTERSECT THE PREMISES AS RESERVED IN UNITED STATES PATENT RECORDED DECEMBER29, 1920, IN BOOK 93 AT PAGE 42 AND RECORDED SEPTEMBER 4, I923 IN BOOK 93 AT PAGE 98. IO, RICHT OF WAY FOR DITCHES OR CANALS CONSTRUCTED BY THE AUTHORITY OF T}TE UNITED STATES AS RESERVED IN UNITED STATES PATENT RECORDED DECEMBER 29, 1920, IN BOOK 93 AT PACE 42 AND RECORDED SEPTEMBER4, 1923 IN BOOK 93 AT PACE 98. I I. WATER AND WATER RIGHTS, DITCH AND DITCH RIGHTS. 12. EASEMENT AND RIGHT OF WAY FOR RED SANDSTONE CREEK. t 3. RIGHT OF WAY EASEMENT AS GRANTED TO VAIL WATER AND SANITATION DISTRICT IN INSTRUMENT RECORDED JULY 05, I980, IN BOOK 20.5 AT PACE 3I- 14. EASEMENTS, CONDITIONS, COVENANTS, RESTRICT'IONS, RESERVATIONS AND NOTES ON THE RECORDED PLAT OF SOUTH FRONTACE ROAD SUBDIVISION. *mTHIS ITEM MAY AFFECT YOUR PROPERTY PUBLIC NOTICE NOTICE lS HEREBY GIVEN that the Planning and Environmental Commission of the Town of Vail will hold a public hearing in accordance with Section 12-3-6, Vail Town Code, iln June 28, 2004, at 2:00 PM in the Town of Vail Municipal Building, in consideration of: A request for.a conditional use permit, pursuant to Section 12-71-5, Conditional Uses; Generally (On All Levels of a Building or Outside of a Building), Vail Town Code, and a variance from Title 14, Chapter 5, Parking Lot and Parking Structure Design Standards for All Uses, Vail Town Code, to allow for the construction of an unpaved private parking lot, located at 923 South Frontage Road WesUunplatted. (A complete metes and bounds legal description is available for review at the Town of Vail Community Development Department). Applicant Vail Resorts,'represented by Mauriello Planning Group, LLC Planner: Matt Gennett A recommendation to the Vail Town Council of a major amendment to a Special Development District (SDD), pursuantto Section 12-9A-10, Amendment Procedures, Vail Town Code, to allow for an amendment to the recorded conditions of approval prohibiting the operation of restaurants within Special Development District No. 35, Austria Haus, located al242East Meadow Drive/Part of Tract B, Block 58, Vail Village Filing 1, and setting forth details in regard thereto. Applicant: Sonnenalp Properties, Inc., represented by Johannes Faessler Planner: George Ruther A final review of a conditional use permit, pursuant to Section 12-7H-5, Conditional Uses; Generally (On All Levels of a Building or Outside of a Building), Vail Town Code, to allow for eight two-family residential structures (Gore Creek Place), located at 730, 724, and 714 West Lionshead Circle/Tracts A, B, C, & D, Morcus Subdivision, and Lot 7, Marriott Subdivision, and setting forth details in regard thereto. Applicant: Vail Resorts, represented by Braun Associates, Inc. Planner: WarrenCampbell A final review of a conditional use permit, pursuant to Section 12-98-3, Private Or Public Off- Street Vehicle Parking Structures, to allow for an amendment to an existing conditional use permit for private parking, located at 364 Gore Creek Drive/Lot P-3, Block 5A, Vail Village Filing 5, and setting forth details in regard thereto. Applicant Vail Resorts Planner: ElisabethEckel A request for a conditional use permit, pursuant to Section 12-6H-3, Conditional Uses; High Density Multiple Family, Vail Town Code, to allow for a public utility and public services use, located at 501 North Frontage Road (Solar Vail Condominiums)/ Lot 8, Block 2, Vail Potato Patch Filing 1, and setting forth details in regard to. Applicant Verizon Wireless, represented by Kelley Hanison, Closser Consulting Planner: Clare Sloan A request for a floodplain modification, pursuant to Chapter 14-6, Grading Standards, Vail Town Code, to allow for snowmaking system improvements within the Gore Creek floodplain located at an unplatted parcel adjacent to the Eagle River Water and Sanitation facilities, 646 West Forest Road, (a complete meies and bounds legal description is availabb for review at the Town of Vail Community Development Department), and setting for details in regard thereto. Applicant: Vail Resorts, represented by Braun Associates, Inc. Planner: Bill Gibson The applications and information about the proposals are available for public inspection during regular office hours at the Town of Vail Community Development Department, 75 South Frontage Road. The public is invited to attend project orientation and the site visits that precede the public hearing in the Town of Vail Community Development Department. Please call (970) 479-2138 for additional information. Sign language interpretration is avaihbb upon request with 24-hour notificetion. Ptease call (970) 479-2356, Telephone forthe Hearing lmpaired, for information. Published June 1 1 , 20C/, in the Vail Daily. TOWNOFVAJL, COLORADO Staternent Statement Nuriber: R040005889 Amount: $500.00 05/25/2OO4O8:45 AM Palment Method: Check Init: iIS Notation: #1028/MAURIEI,I,O PI,ANNING GROUP Permit No: P8C040030 Type: PEC - Variance Parcel No: 2LO3L2t24OOL SitE Address: 953 S FRONTAGE RD VIEST VAIIJ L,ocation: 923 SOIIIH FRONTAGE ROAD VIEST Total Fees: $500. O0 This Payment: $500.00 Total ALL Pmts: $500.00 Balance: $0. O0 * * **:* ** * {rr.*'}:}* *drd!******'}'r*'}****** ** **** t't * *'}* '} *{r* *'t *'}***** * **'l*!t**** +******* *** ****** * ** *** * ACCOI.JNT ITEM LIST: Account Code Description Current Pmts PV OO1OOOO31125OO PEC APPLICATION FEES 500.00 TOWNOFVAIL, COLORADO Statement |}ll. f t*********** +f*+'l t+**+t'l++l' *'l'l'i't*******{r* * * **'l**'lr****'r* *r****,1****:*,}****:lt'}'l*'| *+++++++* * Statement Nunber: R040005888 Anount: $550.00 05/25/2OO4O8:43 AM Palment Method: Check Init: JS Notation: #1028/!rAIrRrBr,rO Pr,Al{NrrrG GROttP Permit No: P8c040029 Type 3 PEC - conditional Use Parcel No: 2IO3L2L24OOL Site Address: 953 S FROIITAGE RD WEST VAIL L,ocation: 923 SOIIIH FRONTAGE ROAD WEST Total Fees: S650.00 This Payment: $650.00 Total AIJIJ Pmts: $650.00 Balance: $0.00 r**rtrttrt *,i * r.,rr.r.:r *:tr.* * *:r* *r:* r.,r.**!r* **{rl * +++++ * ****'t * {r {r **** ***!r* * * **** 'l * ***** *,}'td.*l.rl.**l f,d.*+{. *+ + i'l 't ACCOI.JNTITEM LIST: Account Code Description Current Pmts PV OO1OOOO31125OO PEC APPLICATION FEES 650. 00 *****r.***i.********'t{.t 't'}'i{.tt 't*****************'ttr**********:r,r:r**,r,*r.rr TOWNOFVAIL, COLORADO Statement |.l.|.ir*1.|*t *tl***rrr.*rl:l*t{.1l.l*f t *r.'t.i*****:*:tt '}**t r}trt**l.*t:}:t '}*,t:t:tr:}***r****tf t *ttt*tt I ****t *** ** +* i Statement Number: R040005890 Anount: $250.00 05/25/2OO4O8:50 AM Palment Method: Check Init: iIS Notation: #1028/MAURIELI,O PI,AIINING GROIIP Permit No: DRB040204 fl4re: DRB-Minor Att, Comm/Mu1ei Parce1 No: 2LO3L2L24OOL Site Address: 953 S FROIIrAGE RD WEST VAIL Location: 923 SOurfi FROI{TTAGE ROAD WEST Ttris Payment: $250.00 Total PeeE: $250.00 Total AIIJ PtrtE: $250.00 Balance:$0.00 *** *'t** *:*d.* ***'r**,1** *****'l*l****** 'r*** ***'r*,i'|.*****'t*'t**'t******* ** *'| * ACCOI,JNT ITEM LIST: Account Code Descr.i pti on DR OO1OOOO31122OO DESIGN REVIEW FEES Cunrent Pmts 250.00 nv/l{ct Mauriello Planning GroupVarl Resorts - floly Cross 1fte Adlacent Property Owners Ltsl May 2OO4 TOWN OF VAIL FINANCE DEPARTMENT 75 S. FRONTAGE ROAD VAIL CO 81657 @ COLORADO DEPT OF TRANSPORTATION 4201 E ARKANSAS AVE DENVER CO 80222 @ VAIL SPA CONDOMINITIM ASSOC 7IO W LIONSHEAD CIR VAIL CO 8I657 @ VAIL SPA CONDOMINruM ASSOC DANNPETER PO BOX 5480 AVON, CO 81620 @ L-O VAIL HOLDING INC C/O DELOITTE & TOUCHE LLP 555 ITTH ST STE 3600 DENVER CO 80202 @ GLEN LYON OFFICE BUILDING % ANDREW D. NORRIS 1OOO S FRONTAGE W VAIL CO 81657 @ H &KMANAGEMENTLLC 953 S FRONTAGE RD W 230 VAIL CO 81657 @ G. LOVEN LLC 934 S FRONTAGE RD VAIL CO 81657 @ VAIL CORP PO BOX 7 VAIL CO 81658 @ EAGLE RTVER WATER & SANITATION DISTRICT 846 FOREST ROAD VAIL CO 816s7 @ MAURIELLO PLANNING GROUP. LLC PO BOX 1127 AVON, CO 81620 @ DEPARTM ENT OF TRANSPCIRTATION R.glon 3 Trafil( Sccdon 222 South 6th Srrcct. Room l0O G..nd Jlnctlon. CO 8l 501 970-248-7230 oftlcc 97O-218-7294 lax March22,2Q04 To: Bill Kennedy Vail Resorts Development Company PO Box 7 Vail. CO 81658 a.>-pofr Dear Bill Kennedy: Please review the aftached State Highway Access Permit (Form #l0l) and all enclosed attachments. lf you choose NOT to act on the permit, please retum the permit unsigned. If you wish to APPEAL the Terms and Conditions of the permit, please refer to the attach€d Form l0l pages 2 & 3 for an explanation of the appeal procedures. If you ACCEPT the permit and its Terms and Conditions, please sign and date the Access Permit form on the line marked "PERMTTEE '. Your signature confirms your agreement to all tbe listed Terms and Conditions. - Provide a check or money order made out to the jurisdiction named on the next linc for the amount due. Colorado Department of Transportation Mako chcck or moncy ordcr paylblc lo - Retum all copies and attachments of the Access Permit along with your payment back to the Colorado Departrnent of Transportation at the address notcd below. The Department will process and retum to you a validated (sigred and rccorded) copy ofyour State Highway Access Permit. If you fail to sign and return the attached Access Permit within 60 days of the date of this transmittal letter, Colorado Department of Transportation will consider this permit Void. You must obtain a Notice to Proceed. DO NOT begin any work within the State Right-of-Way without a validated Access Permit and Notice To Proceed. Use of this permit without Transportation Department's validation shall be considered a violation of State Law. ff you have any questions, please call: Mike Smith at 910-248-7230 Retum Access Permit and attachments to: Region 3 Traflic Section 222 Soutb 6th Street, Room 100 Grand Junction, CO 81501 The transmittal to you ofthe Access Permit form for your approval constitutes final action by the Colorado Department of Transportation pursuant to section 43-2'147 C' R. S.' as amended CDoT Fom #122 | t/99 $ 300.00 Arnou Du€ COLORADO DEPARTMEIIT OF TRAN STATE HIGHWAY ACCESS PERMIT COOT P6mit No. 304034 Stat6 Hbhw8y No/Mp/Side 070Nt75.rffitL 300.00 Date of transmitlal 0t/2u2004 Region/Soction/Patol 03/02/20 Local Jurlsdiction Vail The Permittee(s); Vail Corporation PO Box 7 Vail, CO 81658 970-845-2564 Bill Kennedy Vail Resorts Development Company PO Box 7 Vail, CO 81658 970-845-2564 b hereby grentEd permission to havo an acc€ss |o th€ strals highway at ths locatlon noted belovr. The sccess she be conslructod, malntrained and u3od inaccotdance with thb psmit' including the stats Highway Acceas code and any attachments. tenns, conditims and exhtbls. This pe-ir o|ai uJ re"oreoby lhe lssuing authority if at any tima tho permllted access and ils us6 vidate any parls of this p€rmit The issuing auhorlty, th€ Depart nent and their dutyapPolnted a9.nl8 and employees shall b€ h6ld hatmtss ageinst arry aalon tor peisonal Iniurybr property damage sustatrico by reison of the exerciee ofthe oermit- Location: Locatcd on the north side ofI-70 Frontage, a distance of550 east ofRp 175. ACCeSS IO ]'rOUOe tjervtce tO: M.intenance Actlvltieg Porktng Lot DHV 15 VPH Outbound 99 VPH Inbound other terms and conditions: r See Attached Pages 2 and 3 and Other Enclosues for Additional Terms and Conditions. MUNICIPALITY OR COUNTY APPROVAL Required only when the appropriate local authority rotains issuing authority. By (x) Title Upon the signing of this permit the permittee agrees lo the terms and conditions ind referenceO attactrnrents coneined herein. All construction shall be completed in an expeditious and safe manner and shatl be finished within 45 days from Initiation. The permltted access shall be completed in accordance with the terms and conditlons of the permit prior to being used. The permlttee shall notlfy Mark Baclalli wlth the Golorado Dopartmont of Tnnsportatlon In Dowd Jct at 970-845- 7347 at least 48 hours prlor to commenclng construction wlthln the State Hlghway rlght of.way, Tho pcrson slgnlng 6s thc Pcrmittso must bs $g ownor or t€gd reprosentativo of tho propady serwd by th6 permitted accosg and have full authority to accept tha permit €nd ils t6rms and condlllom. P.rmlltss (x) Date This permil is nol valid until slgned by a duly authorized representatlve of lhe Deparlment. COLORADO DEPARTMENT OF TRANSPORTATION By (x) Date (of issue)ri € Access Manager Requir€d: 1.R€gion 2.Applkxnl 3.S18fi Accasr S.c,tio.| Mak€ copies as necossary tot:LocalArrlrF.ily lnip€qlor Preylour sdltlonE alt obroletg rnd may not ba utad COOT Fonn ll0l 8/9t Copy Oistrlbullon: MTCE Potrol Tralric Engln€or STATE HIGHWAYACCESS PERM|T304034 Mareh22,20O4 Located on State Highway l-70 Frontage near RP 175.1 Lefi lssued to Vail Corporation TERMS AND CONDITIONS 1. The Permittee shall have designed and install a left tum deceleration lane in conformance with section 4 of the State Highway Access Code, 2CCR 601-1. 2. The access shall be constructed 25 feet wide with radii to accommodate the minimum turning radius of the largest vehicle or 2S-foot, whichever is greater. This design shall be in conformance with section 4 of the State Highway Access Code, 2CCR 601-1 . 3. The access shall be surfaced in accordance with Section 4.7 of the Access Code immediately upon completion of earthwork construction and prior to use. This access shall be hard surfaced in accordance with Section 4.7 of the Access Code a minimum distance of 50 feet from the traveled way. Where the hard surface is to abut existing pavement, the existing pavement shall be saw cut and removed a minimum of one foot back from the existing edge for bituminous, or until an acceptable existing cross slope is achieved. Surfacing shall meet the Department's speclfications with minimum surfacing to be equal to or greater than existing highway conditions. 4. A 18-inch minimum culvert with protective end treatments shall be required for this access. The culvert shall be kept free of blockage to maintain proper flow and drainage. 5. This permitted access is only for the use and purpose stated in the Application and Permit. This Permit is issued in accordance with the State Highway Access Code (2 CCR 601-1 ), and is based in part upon the information submitted by the Permittee. Any subsequent relocation, reconstruction, or modifications to the access or changes in the lraffic volume or traffic nature using the access shall be requested for by means of a new application. Any changes causing non-compliance with the Access Code may render this permit void, requiring a new permit. 6. The Permittee is responsible for obtaining any necessary additional Federal, State and/or City/County permits or clearances required for construction of the access. Approval of this access permit does not constitute verification of this action bythe Permittee. Permitlee is also responsible for obtaining all necessary utility permits in addition to this access permit. 7. A Notlce to Proceed, CDOT Form 1265 is required before beginning the construction of the access or any activity within the highway right-of-way. (a) Certificate of Insurance Liability as per Section 2.3(1 1Xi) of the State Highway Access Code. (b) Traffic Control Plan in accordance with Section 2.4(6) of the Access Code. (c) Slxcopiesof ConstructionPlansStamped (11"x17" withaminlmumscaleof 1"=50) by a Colorado Registered Professional Engineer in full compliance with the State Highway Access Code. 8. No drainage from this site shall enter onto the State Highway travel lanes. The Permittee is required to maintain all drainage in excess of historical flows and time of concentration on site. All existing drainage structures shall be extended, modifled or upgraded, as applicable' to accommodate all new construction and safety standards, in accordance with the Department's standard specifications. 9. Nothing in this permit shall prohibit the chief engineer from exercising the right granted in CRS 43-3-lO2lncluding but not limited to restricting left hand turns by construction of physical medial separations. STATE HIGHWAY ACCESS PERMTT 304034 Located on State Highway !70 Frontage nesr Rp 175.j Lefi lssued to Vail Corporation March22,2004 TERMS AND CONDTTTONS (cont.) 10' Any damage to present highway facilities Inctuding haffic control devices shall be repaired immediately at no cost to the Departm€nt and prior to continuing other work. Any mud or other material tracked or otherwise deposited on the roadway shall be removed daily or as ordered by the Department inspector. Restoration shall meet th€ Department's standaid specifications for topsoil, fertilization, mulching, and re-seeding. 1 1 . A fully executed complete copy of this permit must be on the job site with the contractor at all times during the construction. Failure to comply with this or any other construction requirement may result in the immediate suspension of work by order of the Department inspector or the issuing authority. 12. All construction work must be under the direction of a Colorado Registered professional Engineer. 13. Prior to any use as allowed by this permit, the applicant shall contact the Region 3 Access Manager in writing to request a final inspection. This request shall include c6rtification that all materials and conslruction have been completed in accordance with all applicable Department Standards and Specifications; and that the access is constructed in conformance with the state Highway Access code, 2 ccR 601 -1, including this permit. The engineer of record as indicated on the construction plans, shall be present for this inspection. The access serviced by_this permit may not be opened to traffic until written approvai has been given from the CDOT Access Manager. DEPARTM ENT OF TRANSKIRTATTON RcAlon 3 Traftlc Sccdon 222 South 5th StrcaL Roqm 100 Crand Juncrlon, CO El 501 970-248-7130 ofRc! 970-248-7294 fax March22,2004 To: Bill Kennedy Vail Resors Development Company PO Box 7 Vail, CO 81658 Ifyou have aoy questiorur, please call: Retum Access Permit and attachments to: Mike Smith at 97 0 -248-7 230 Region 3 Traffic Section 222 South 6th Street" Room 100 Grand Junction. CO 81501 a.I,roT Dear Bill Kennedy: Please review the atlached State Highway Access Permit (Form #l0l) and all enclosed attachments. If you choose NOT to act on the permit, please r€tum tbe permit unsigned. If you wish to APPEAL the Terms and Conditions of the permit, please refer to the attacbed Form l0l pages 2 & 3 for an explanation of the appeal procedures. If you ACCEPT the permit and its Terms and Conditions, please sigr and date the Access Permit form on the line marked "PERMITTEE'. Your signature confinns your agreement to all the listed Terms and Conditions. - Provide a check or money order made out to thejurisdiction named on the next line for the amount due. Colorado Departrnent of Transportation Makc chcck or moncy ordcr payrblc io - Return all copics and attachmenls of the Access Permit along with your payment back to the Colorado Departrnent of Transportation at the address noted below. The Departmcnt will process and return to you a validated (signed and recordeQ copy ofyour State Highway Access Permit. If you fail to sign and return the attached Access Permit within 60 days of the date of this transmittal letter, Colorado Department of Transportation will consider this permit Void. You must obtain a Notice to Proceed. DO NOT begin any work witbin the State Right-oFWay without a validated Access Permit and Notice'fo Proceed. Use of this pennit without Transportation Department's validation shall be considered a violation of State Law. $ 100.00 Amount DUE The transmittal to you of the Access Permit form for your approval constitutes final action by the Colorado Departm€nt ofTransportation pursuant to scction 43-2-147 C. R. S., as amendcd. CDOT Form#122 | l/99 STATE HIGHWAY ACCESS PERMIT Stats Highway No/Mp/Stde 070A/175.050/L The Permlttee(s);Applicant; Ref No. O+O19 Vail Corporation PO Box 7 vail, CO 81658 970-845-2s6/- Bill Kennedy Vail Resorts Development Company PO Box 7 Vail, CO 81658 910-8/.5-2564 I ls hel9by granted-Psmlaslon lo have sn access.to the stato highway at tho lo€atlon noted b€tow. Tho access shafl ba @nstructsd, maintaln€d and used |neccordanco wlth lhb permit' induding lh€ state Highwsy Accoas c&e and.any attaar-lnG, r"-rll-nuiiliJ "no "rniurc. nb pemtt mey b€ revok.dby the issulng authotlty lf at any time tho permitreoicceis ano its use vlolate iny part" or $tlg permiiirre issuing "rthorily, rre Departmont and ihatr dutyappointed 69ents and emptoloes shall bo held harml€$ against any action tor peisonrr rOrrv?" p.p.rti dJiage sustaineo uy r.ason ot th€ axerciso ofth6 o€rmit. LOCaUOn: Locatcd on the north side ofl-70 Frontage, a distance of24l feet east ofRp l25. ACCeSS tO PrOVtde Sorvlce to: Parklng Lot....... f00.00 Zo DHV 6t VPH Outbound Other terms and conditions: + see Attached Pages 2 and 3 and other Enclosures for Additional rerms and conditions. MUNICIPALITY OR COUNTY APPROVAL !9rylgO gnty when the appropriate local authorlty retains issuing authority. Ey (x) Date Ti0e Upon the signing of this permit the permttteelg h€rein. All construction shall be completed in an expeditious and safe manner and shall be finished within 45 days from Initiation. The permitted access shall be completed In accordance with the terms and conditions of the permit pribr to being used. The permlttee shatl notlfy Matk Bacialll wlth the Colorado Dopartment of Transportatlon In Oowd Jct at g1620 at loast 48 hours prlor to commencing constructlon wlthln the State Highway rlght-of.way. Ths Psrson signing as the permittes m$tb€ th6 owner or legal reprasenl,ativs of the property o€rv€d by the permltted accass and havs full aulhority to accepl the p€rmit snd its terms and condilions. OaleP.rmittos (x) This permil is not valid until signed by a duly authorized representalive of ihe Department. COLORADO DEPARTMENT OF TRANSPORTATION By (x) Date (of issue)Iitl€ Access Manager R€quir€d: l.Regiql 2,Applic6nt 3.St8[ Ac€sss S€€tioo Mdke copi€s aE necsssary to.: Loc€l A^|hoaily lnlp€ctqr Prsvlou! gdltlons ar. obtolet! lnd may not ba ulad COOT Fo|ttl'to1 tgt Copy Olrtrlbutlon: MTCE Patrol Trsffrc Enghsea STATE HIGHWAY ACCESS PERMIT 304033 Located on State Highway l-70 Frontage near Rp .l7E.0S Left lssued to Vail Corporation TERMS AND CONDITIONS March22,2004 /-'\ 1 . The access shall be constructgd 16 -1 8/eet wide with radii to accommodate the minimum turning radius of the largest vehhle,or20-foot, whichever is greater. This design shall be in conformance with section 4 of the state Highway Access code, 2ccR 601-1. 2. This is an Exit Only Access. 3. The access shall be surfaced in accordance with Section 4.7 of the Access Code immediatelyupon completion of earthwork construction and priorto use. This access shall be hard surfaced in accordance with Section 4.7 of the Access Code a minimum distance of S0 feetfrom the trayelgd way. Where the hard surface is to abut exisling pavement, the existingpavement shall be saw cut and removed a minimum of one foot back from the existing eidgefor bituminous, or until .an acceptable existing cross slope is achieved. Surfacing snaii meit the. Department's specifications with minimum surfacing to be equal to or greatei than existinghighway conditions. 4. A 24-inch minimum culvert with protective end treatments shall be required for this access. The culvert shall be kept free of blockage to maintain proper flow and drainage. 5' This permitted access is only for the use and purpose stated in the Application and permit. This Permit is issued in accordance with the state Highway Access iode (2 ccR 601-1), and is based in part upon the information submitted by the Permittee. Any subsequent relocation, reconstruction, or modifications to the access or changes in the traffic volume or traffic natufe using the access shall be requested for by means of a new application. Any changes causing non-compliance with the Access Code may render this permit void, requiring a new permit. 6. The Permittee is responsible for obtaining any necessary additional Federal, State and/or City/County permits or clearances required for construclion of the access. Approval of this access permit does not constitute verification of this action by the Permittee. Permittee is also responsible for obtaining all necessary utility permits in addition to this access permit. 7. A Notice to Proceed, CDOT Form 1265 is required before beginning the construction of the access or any activity within the highway rightotway. (a) Certificate of Insurance Liability as per Section 2.3(1 1Xi) of the State Highway Access Code. (b) Traffic Control Plan in accordance with Section 2.4(6) of the Access Code. (c) Three coples of Conshuction Plans Stamped (11"x17,'with a minlmum scale of 1" =50) by a Colorado Registered Professional Engineer in full compliance with the State Highway Access Code. 8. No drainage from this site shall enter onto the State Highway travel lanes. The Permittee is required to maintain all drainage in excess of historical flows and time of concentration on site. All existing drainage structures shall be extended, modified or upgraded, as applicable, to accommodate all new construction and safety standards, in accordance with the Department's standard specifi cations. 9. Nothing in this permit shall prohibit the chief engineer from exercising the right granted in GRS 43-3-102 lncluding but not limited to reshicting left hand tums by construction of physical medial separations. STATE HIGHWAY ACCESS PERMIT 304033 Located on Slate Highway l-70 Frontage near Rp 17S.OS Lefrlssu€d to Vail CorDorafion March 22,2004 TERMS AND CONDTTTONS (cont.) 10' Any damage to present highway facilities including trafiic control devices shall be repairedimmediatety at no cost to the Department and prio-r to continuing olher work. Any mud or othermaterial tracked or otherwise deposited on the roadway snart ui removeJ o"ity o1, as orcteredby the Department inspector' Restoration shall meet the Department's standard specificationsfor topsoil, fertilization, mulching, and re-seeding. 1 1 ' A fully executed complete.copy of this pormit must be on the job site with the contractor at alltimes during the conskuction. Failure io comply with ihis or any other constiuctionrequirement may result in the immediate suspension of work by order otthe Departmentinspector or the issuing authority 12' Prior to any use as allowed by this permit, the applicant shall contact the Region 3 AccessManager in writing to requesla final inspection.'ihis request shall include iErtification that atlmaterials and construction have been completed in accoidance with all applicable Department !tand9(s and Speciflcations; and thal the access is constructed in conformance with thestale Highway Access code, 2 ccR 601-1, Including this permit. The enginler of record asindicated on the construction plans, shalt be present-for this inspection. tlie access servlcedby this permit may not be opened to traffic until written approvai has been given from theCDOT Access Manager. tlac l3 04 O{: 2?p O"rNE ElrcrlrEERrNG "O.."..o €-= ALPINE ENGINEERING, INC. p.2 May 13,2004 Mr. Dan Roussin Co lorado Departnrent of Transportalion 222 South 6'" St.. Room 100 Grand Junction, CO 81501 RE: State Highway Access Permit 3040J3 Dear Mr. Roussin, We rvould like to negatc ottr earlier appeal for a 25 foot access width tbr tlre exit only (lvesterly) acccss point. The access will be conslructed at an l8 foor width, with 4 foot pavcd slrouldcrs, pcr our discussion and as the condition had requested. Please contacl me should you have any questions or comrnents. Sincerely, :/"--1!E.tz Jcnn ifer Babcock enc losures cc: Bill Kennedy, Vail Resorts Dcvelopment Cornpauy; Dominic Mauriello, Mauriello &. Associates; Kent Kriehn, AEI; Deb DeCrausaz, Vail Resorrs Development Cornpany fdwards Business (enter ' P0. Box 97 . Edward:, (olorado 816]2 . (970] 926-3371 ' Fax (970) 926-J390 uJ o =t .:: q!I e I d uJ TL ID - '6 I 5 I I! \c( I A FIITAI PUT la3AtA,Ct\t t \ _ SOUTH FRONTAGE ROAD SUBDIVISION PAET OT SECTION 12, ':Or IISEIP 5 SOATH, RANCE 81 fi8ST OF TIIR S|XTE PRINCIPAL UARTDAN AND ?ART OF SACTIOTVS 6 t 7, ruJNSEIP 5 SoUTll, PdNCE AO 'XST OF rtfi SE It PRTNCIPAL AERTD/IN' lvrN OF VAIL, COANTY OF ZICT'8. STATE OF COLORA.DO &*'o;'* @--'rF, \B';r': \q7/ :tF----,--- - --JE-6. --$'-h. *.a- _4. -.htqt. '-q.-b14_1- i6ts+H.?EJF5ra4tr!.,^. :tl r -g-. .4b. {.dr-!gFaf#.-.rr{J.r3+. ..r zflr-tL b+t-. .dt rrr rlrE'pta.t r,rt- ..E-Lr,tr.l*-4--uw*Lggl- IItll t"#l ' tl # N $ l; I i ; P - 1" = 150' I*rr.pvJ..c'r.ldbytE'osi0|vdo|sW.(h.o(fbnq*oddb.|br!€iddA'po!.!or*y.TheTortno'v!i&..nolvJarrantt,0!ca.r.cyof0|odor'r|dolico.|tdn6dh. TO: FROM: DATE: SUBJECT: FILE /'r,PI MEMORANDUM Planning and Environmental Commission Community Development Department July 12,2004 A request for a conditional use permit, to allow for employee parking at the.Hofy Cross Site", located at 923 and 862 South Frontage Road WesVTract A, Tract B, l-70 R.OW. Parcel 268, and Red Sandstone Rd Parcel., in accordance with Section 12-71-5, Vail Town Code and variances from the landscaping requirement associated with Section 12-71-15 and the paved surface requirement associated with Section 14-5, Vail Town Code. Applicant: Vail Resorts, represented by Mauriello Planning Group, LLC Co-Applicant: The Town of Vail Planner: Matt Gennett SUMMARY The applicant, Vail Resorts, represented by the Mauriello Planning Group, is requesting a conditional use permit to allow employee parking at the "Holy Cross" Lot, 923 and 862 South Frontage Road West, and is requesting two variances: a deviation from the minimum landscaping requirement associated with Off-Street Parking and Loading areas and a deviation from the paving requirement associated with Off-Street Parking and Loading areas. Pending approval from the Planning and Environmental Commission, the lot will continue in its use as a parking lot until mid- November, 2005. Staff is recommending approval of these requests subject to the findings and conditions outlined in Section lX of this memorandum. DESCRIPTION OF REQUEST The applicant, Vail Resorts, represented by the Mauriello Planning Group, is requesting a conditional use permit in accordance with Section 12-71-5, Vail Town Code, to allow for a private parking lot on the Holy Cross site. Additionally, the applicant is requesting the following: a variance from Title 14, Section 5 of the Development Standards Handbook, to allow for a deviation from the minimum interior landscaped area of 10% that is required for an unenclosed off-street parking area containing 15 or more spaces; and a variance from Title 14, Section 5 of the Development Standards Handbook, to allow for the construction of an unimproved, gravel parking surface at the site located at 923 South Frontage Road WesUTract A. The site on which the parking lot is proposed is complicated for several reasons. A portion of the proposed parking lot is being developed within the Town's Red Sandstone right-of-way parcel which divides Tract A and B as well as on a parcel ;km*$ln',T""Tf:.,ff j38i:x"riJffi;;i,HTfr,,:il:;;:J-r, property. The cunent request will allow the operation of an unpaved parking area for the 2004- 2005 ski season as the first of two phases of a larger, more permanent paved solution. The reason for the request to allow the parking to be unpaved for one additional year is to provide adequate time for the Town of Vail to explore the development of a parking structure on this land. lf it is decided that a parking structure is not feasible, Vail Resorts will complete the paving of this lot according to the proposed plan by November 2005. The conditional use and variance requests apply to the area of the maintenance site directly west of the buildings that currently store Vail Resorls' equipment and vehicles (Tract A). Vail Resorts has completed a clean-up of the Holy Cross parcel by removingiThoperable vehibles "stored" on the site, improving the visual apsects of the site remarkably. Phase 1 of the project will provide a total of 291 parking spaces and will be open to Vail Resorts' employees only. Phase 2 of the project will also accommodate approximately 291 employee spaces and therefore replace all of the West Day Lot parking and a portion of the North Day Lot employee parking. Phase 1 will also complete the required Frontage Road improvement for which Vail Resorts has a permit from CDOT to complete. All of the drainage and landscape improvements will also be completed. A new snowcat route is provided at the west end of the site, thus removing snowcats from Forest Road, a long-standing goal of the Town and th'e neighborhood Vehicle access will be from the South Frontage Road entrance to the Maintenance Center. The entrance will be controlled by a card-reading gate on the east side of the lot, to the northwest of the maintenance site entrance that is opposite Forest Road. According to the applicant, "pedestrian access and circulation will occur internal to the site and cross the South Frontage Road at the intersection with Forest Road to the existing pedestrian path located on the south side of the South Frontage Road. A painted crosswalk and signage will be provided at this location to alert the motorist to the presence of pedestrians. This will allow employees to have a safe and protected route to Lionshead.' Grading has occurred on the site to facilitate improved drainage on the site so that runoff will not drain directly into the adjacent Red Sandstone Creek. New drainage inlets and a soil/sand separator are being provided. Limits of disturbance fencing will be placed around the area to be graded in order to protect the existing vegetation near the creek. Snow storage has been designated on the site plan and will exist largely on the north side of the lot and in temporary locations within the parking lot. Directional signage has been proposed by the applicant and will be discussed further should a conditional use permit be approved. The construction of the proposed unpaved parking lot requires the review of two applications. The first application includes two variance requests: to construct the |il. parking lot with an unpaved, gravel surface and without the landscapin$ required under Parking Structure Design Standards. The second application is for a conditional use permit to construcl the parking lot under the Lionshead Mixed Use ll zone district requirements. Additionally, the landscape variance will allow for the permanent, paved parking lot if a parking structure is not pursued by the Town or Vail Resorts. BACKGROUND Holy Cross Parcel (Tract A) Prior to Vail Resorts' 1995 purchase of Tract A, the parcel proposed to be used as a parking area for Phase 1, the lot was used by Vail Resorts and Holy Cross Electric for vehicle and equipment storage. The use of the lot as a storage site, as well as the creation of 101 unpaved parking spaces, was approved by the Town of Vail through a conditional use permit and related variances in 1990. However, after the approval expired in 2001, a conditional use permit for an unpaved parking area was again applied for and approval was granted by the Town. The site was used for landscape equipment and material storage for Fitz and Gaylord landscaping and vehicle storage for Vail Resorts (70 unpaved spaces). The approval lapsed in July of 2003 and a new conditional use permit, identical to the one contemplated herein, was approved by the PEC in October, 2003 and is due to expire in October, 2004, which is why the applicant is applying for this new conditional use permit and associated variances. A historical concern about the use of this lot has been the storage of abandoned vehicles and junk on the site. To mitigate this concern a landscaped berm was required to buffer the site from the Frontage Road. Last year, the site was cleared of abandoned vehicles and assorted junk. In addition, drainage has been improved to prevent direc{ run-off to Red Sandstone Maintenance Center (Tract B) In 1993 the Town of Vail approved a conditional use permit allowing an expansion of the Vail Resorts Maintenance Center. That expansion allowed a building addition which contained offices, meeting areas, locker rooms, and storage. Along with that approval, the Town required 57 employee parking and snowcat parking spaces for the uses onsite. ROLES OF THE REVIEWING BOARDS Gonditional Use Order of Review: Generally, applications will be reviewed first by the PEC for acceptability of use and then by the DRB for compliance of proposed buildings and site planning. Planning and Environmental Commission: Action: The PEC is responsible for final approval/denial of Conditional Use Permits The PEC is responsible for evaluating a proposal for: tv. 1. Relationship and impact of the use on development objectives of the Town. 2. Effect of the use on light and air, distribution of population, transportation facilities, utilities, schools, parks and recreation facilities, and other public facilities and public facilities needs. 3. Effect upon traffic, with particular reference to congestion, automotive and pedestrian safety and convenience, traffic flow and control, access, maneuverability, and removal of snow from the streets and parking areas. 4. Effect upon the character of the area in which the proposed use is to be located, including the scale and bulk of the proposed use in relation to sunounding uses. 5. Such other factors and criteria as the Commission deems applicable to the proposed use. 6. The environmental impact report concerning the proposed use, if an environmental impact report is required by Chapter 12 of this Title. 7. Conformance with development standards of the applicable zone district and proposed use include:- Lot area- Site Dimensions- Site coverage- Landscape area- Parking and loading- Mitigation of development impacts Desiqn Review Board: Action: The DRB has NO review authority on a Conditional Use Permit, but must review any accompanying DRB application. The DRB is responsible for evaluating the DRB proposal for: - Architectural compatibility with other structures, the land and surroundings- Fitting buildings into landscape- .Configuration of building and grading of a site which respects the topography- Removal/Preservation of trees and native vegetation- Adequate provision for snow storage on-site- Acceptability of building materials and colors- Acceptability of roof elements, eaves, overhangs, and other building forms- Provision of landscape and drainage- Provision of fencing, walls, and accessory structures- Circulation and access to a site including parking, and site distances- Location and design of satellite dishes- Provision of outdoor lighting- The design of parks Staff: The staff is responsible for ensuring that all submittal requirements are provided and plans conform to the technical requirements of the Zoning Regulations. The staff also advises the applicant as to compliance with the design guidelines. Staff provides a staff memo containing background on the property and provides a staff evaluation of the project with respect to the required criteria and findings, and a recommendation on approval, approval with conditions, or denial. Staff also facilitates the review process. Town Council: Actions of DRB or PEC may be appealed to the Town Council or by the Town Council. Town Council evaluates whether or not the PEC or DRB erred with approvals or denials and can uphold, uphold with modifications, or overturn the board's decision. Variance Order of Review: Generally, applications will be reviewed first by the PEC for impacts of the proposed vaiance and then by the DRB for compliance of proposed buildings and site planning. Planninq and Environmental Commission: Action: The PEC is responsrb/e for final approvalldenial of a vaiance. The PEC is responsible for evaluating a proposal for: 1. The relationship of the requested variance to other existing or potential uses and structures in the vicinity. 2. The degree to which relief from the strict or literal interpretation and enforcement of a specified regulation is necessary to achieve compatibility and uniformity of treatment among sites in the vicinity, or to attain the objectives of this Title without grant of special privilege. 3. The effect of the requested variance on light and air, distribution of population, transportation and traffic facilities, public facilities and utilities, and public safety. 4. Such other factors and criteria as the Commission deems applicable to the proposed variance. Desiqn Review Board: Action: The DRB has NO review authority on a variance, but must review any accompanying DRB application. ' The DRB is responsible for evaluating the DRB proposal for: Architectural compatibility with other structures, the land and surroundings Fitting buildings into landscape Configuration of building and grading of a site which respects the topography Removal/Preservation of trees and native vegetation Adequate provision for snow storage on-site Acceptability of building materials and colors Acceptability of roof elements, eaves, overhangs, and other building forms Provision of landscape and drainage Provision of fencing, walls, and accessory structures Circulation and access to a site including parking, and site distances Location and design of satellite dishes Provision of outdoor lighting The design of parks Staff: The staff is responsible for ensuring that all submittal requirements are provided and plans conform to the technical requirements of the Zoning Regulations. The staff also advises the applicant as to compliance with the design guidelines. Staff provides a staff memo containing background on the property and provides a staff evaluation of the project with respect to the required criteria and findings, and a recommendation on approval, approval with conditions, or denial. Staff also facilitates the review process. Town Council: Actions of DRB or PEC may be appealed to Council. Town Council evaluates whether or approvals or denials and can uphold, uphold board's decision. the Town Council or by the Town not the PEC or DRB erred with with modifications. or overturn the V.APPLICABLE PLANNING DOCUMENTS Town of Vail Zoninq Requlations 12-7 Lionshead Mixed Use 2 (LMU-Z) District: 12-71-1: PURPOSE: The Lionshead Mixed Use 2 District is intended to provide sites for a midure of multiple-family dwellings, lodges, hotels, fractional fee clubs, time shares, lodge dwelling units, restaurants, offices, skier services, light industrial activities, and commercial establishments in a clustered, unified development. Lionshead Mixed Use 2 District, in accordance with the Lionshead Redevelopment Master Plan, is intended to ensure adequate light, air, open space and other amenities appropriate to the permitted types of buildings and uses and to maintain the desirable qualities of the District by establishing appropriate site development standards. This District is meant to encourage and provide incentives for redevelopment in accordance with the Lionshead Redevelopment Master Plan. This Zone District was specifically developed to provide incentives for properties to redevelop. The ultimate goal of these incentives is to create an economically vibrant lodging, housing, and commercial core area. The incentives in this Zone District include increases in allowable gross residential floor area, building height, and density over the previously established zoning in the Lionshead Redevelopment Master Plan study area. The primary goal of the incentives is to create economic conditions favorable to inducing private redevelopment consistent with the Lionshead Redevelopment Master Plan. Additionally, the incentives are created to help finance public, off-site, improvements adjacent to redevelopment projects. Public amenities which will be evaluated with redevelopment proposals taking advantage of the incentives created herein may include: streetscape improvements, pedestrian/bicycle access, public plaza redevelopment, public art, roadway improvements, and similar improvements. (Ord. 3(1999) S 2) 12-71-5: CONDTTIONAL USES; GENERALLY (ON ALL LEVELS OF A BUtLDtNG OR OUTSTDE OF A BUtLDtNG): The following conditional uses shall be permitted, subject to issuance of a conditional use permit in accordance with the provisions of chaoter 16 of this title: Bed and breakfast as further regulated by section 1 2-14-1 8 of this title. Brew pubs. Child daycare center. Coin operated laundries. Commercial storage. Gasoline and service stations. Private outdoor recreation facilities, as a primary use. Public buildings, grounds, and facilities. Public or private parking lots. Public park and recreation facilities. Public utility and public service uses. Ski lifts and tows. Television stations. Vehicle maintenance, service, repair, storage, and fueling. Warehousing. Additional uses determined to be similar to conditional uses described in this section, in accordance with the provisions of section 12-34 of this title. (Ord. 17(2001\ $ 2: ord. 3(1999) S 2) 12-16 Conditional Use Permit (in part) 1 2-1 6-1 : PU RPOSE; LIMITATIONS: ln order to provide the flexibility necessary to achieve the objectives of this title, specified uses are permitted in ceftain disfricfs subject to the granting of a conditional use permit. Eecause of their unusual or special characteistics, conditional uses require review and evaluation so that they may be located propefly with respect to the purposes of this title and with respect to their effects on sunounding properties. The review process prescribed in this chapter is intended to assure compatibility and harmonious development between conditional uses and sunounding properties and the town at large. Uses /isted as conditional uses ln the various drstncfs may be permifted subject to such conditions and limitations as lhe town may prescibe to ensure that the location and operation of the conditional uses will be in accordance with development objectives of the town and will not be detrimental to other uses or properties. Where conditions cannot be devised to achieve these objectives, applications for conditional use permits shall be denied. (Ord. 8(1973) S 18.100) 12-17 Variances (in paft) 12-17-1: PURPOSE:A. Reasons For Seeking Vaiance: ln order to prevent or to /essen such practical difficulties and unnecessary physical hardships inconsistent with the objectives of this title as would result from strict or literal interpretation and enforcement, variances from ceftain regulations may be granted. A practical difficulty or unnecessary physical hardship may result from the size, shape, or dimensions of a slfe or the location of existing strucfures thereon; from topographic or physical conditions on the site or in the immediate vicinity; or from other physical limitations, street locations or conditions in the immediate vicinity. Cost or inconvenience to the applicant of strict or literal compliance with a regulation shall not be a reason for granting a variance. 12-17-7: PERMIT APPROVAL AND EFFECT: Approval of the variance shall lapse and become void if a building permit is not obtained and construction not commenced and diligently pursued toward completion within two (2) years from when the approval becomes final. (Ord. 48 (1991) $ 2: ord. 16(1e78) S 5(c)) 12-17-8: RELATED PERMITS AND REQUIREMENTS: ln addition to the conditions which may be prescribed pursuant to this chapter, any site or use subject to a variance permit shall also be subject to all other procedures, permits, and requirements of this and other applicable chapters and regulations of the town. In event of any conflict between the provisions of a variance permit and other permit or requirement, the more restrictive provision shall prevail. (Ord. 8(1973) S 19.900) Title 14 Development Standards Handbook Chapter 5 Parking Lot and Parking Structure Design Standards For All Uses (in part) Surfacing: All patuing areas shall be an improved paved suiace Landscaping: Nof /ess than 10o/o of the inteior suiace area of unenclosed off-street parking areas containing 15 or more parking spaces shall be devoted to landscaping. ln addition, landscape borders nof /ess than 10 feet in depth shall be provided at all edges of parking lots containing 30 or more parking spaces. A landscape berm, wall, or fence of not /ess than 4 feet in height, of the same architectural sty/e as the building, in combination with Iandscaping may be substituted for the landscape border. In developments with cross-access or shared parking facilities, the landscape border between the development shall not be required. Lionshead Master Plan The Lionshead Master Plan, adopted December 1 5, 1998, references the proposed use and specifically the Holy Cross site in the following sections: Section 3.9: "The ground rules of the Lionshead master plan state that future redevelopment will not cause a net loss of parking. Section 3.2.5.3: Vail Associates Service Yard The Vail Associates seruice yard, bordered by the South Frontage Road on fhe easf and south and Red Sandslone Creek on the west, cunently contains a wide variety of mountai,in operation functions such as snowcaf service and fueling, warehouse storage, and maintenance shops. While the seruice yard is critical to Vail Associates' mountain operations there is a strong interest on the paft of the Town of Vail to see the majority of these facilities relocated on-mountain. According to Vail Associates it may be possib/e to relocate many of the facilities, but the snow cat seruice and fueling operations must remain at or near its current location. Secfrbn 3.9.4Yail Associates Employee Paking Vail Associates cunently utilizes two large surface parking lots within the study area for its employee parking needs. The nofth day lot (see figure 3-15), with a capacity of approximately 105 cars, is located behind the Landmark tower and is the site proposed for a transpoftation center. The west day lot, located just west of the Manioft parking structure, has an approximate capacity of 160 cars and represents a significant development oppoftunity. Parking' displaced by redevelopment of these sifes musf be replaced within the Lionshead study area to satisfy the ground rule requiring no net /oss of parking. vt. Section 4.8.3.3 Potential New Parking Sites West LionsheadNail Resorts Maintenance Site The construction a second public parking structure at the west end of Lionshead has been a planning consideration since the completion of the Vail Transpoftation Master plan in 1991 . Ihis sle is currently undeveloped (except for the Vail Assocr,afes maintenance yard) and is large enough to meet projected parking demand. lt is well located in relation to the potential new eastbound I-70 access ramps. Potential Iogistical'hurdles to the use of this sffe are as follows: SURROUNDING LAND USES AND ZONING North: South: East: West: Land Use Roadway Residential Mixed Use Roadway ZONING ANALYSIS Legal Description: Zoning: Land Use Plan Designation: Current Land Use: Lot Size: Parking Area Landscape Area Zonino no zoning Medium Density Multi-Family and SDD #5 Lionshead Mixed Use 1 (LMU-1) no zoning Holy Cross Site, 923 South Frontage Road WesUTract A Lionshead Mixes Use 2 (LMU-2) Lionshead Master Plan Parking and equipment storage vil. Tract B Tract A Red Sandstone Road Parcel(TOV) l-70 R.O.W Parcel 268 - Area of the proposed parking area: Area left undisturbed (Tract B) Area left undisturbed (Tract A) Area left undisturbed (TOV parcel) Area left undisturbed (l-70 pacel) % landscaped on Tract A, l-70, & TOV % landscaped on all parcels 141,744 s.f. 53,143 s.f. 14,418 s.f . 13.242 s.f . 222,547 s.I. 72,757 s.l. 5,336 s.f (4%) 23,637 s.l. (44o/o)0 s.f. (0%) 8,404 s.f. (63%) 40o/o 17o/o VIII. CRITERIA AND FINDINGS FOR REVIEW Conditional Use Permit 10 In order to provide the flexibility necessary to achieve the objectives of the Zoning Regulations, specified uses are permitted in certain districts subject to the granting of a conditional use permit. Because of their unusual or special characteristics, conditional uses require review and evaluation so that they may be located properly with respect to the purposes of this title and with respect to their effects on surrounding properties. The review process prescribed in this chapter is intended to assure compatibility and harmonious development between conditional uses and surrounding properties and the Town at large. Uses listed as conditional uses in the various districts may be permitted subject to such conditions and limitations as the Town may prescribe to ensure that the location and operation of the conditional uses will be in accordance with development objectives of the Town and will not be detrimental to other uses or properties. Where conditions cannot be devised to achieve these objectives, applications for conditional use permits shall be denied. Before acting on a conditional use permit application, the Planning and Environmental Commission shall consider the following factors with respect to the proposed use: 1. Relationship and impact of the use on development objectives of the town, Staff believes that the proposed parking area, though unpaved and not landscaped, will still have a positive impact on the development objectives of the Town. The previous three conditional use permit approvals by the PEC (1990, 2001 and 2003) demonstrate that the site is well-suited as a parking area in addition to providing temporary relief of the existing parking problem in the winter and a more attractive alternative to the current use of the site for equipment and vehicle storage. The Lionshead Master Plan also states in Section 3.9.4 that Parking displaced by redevelopment on the West Day Lot and North Day lot "musf be replaced within the Lionshead study area to satisf the ground rule requiing no net /oss of parking." Effect of the use on light and air, distribution of population, transportation facilities, utilities, schools, parks and recreation facilities, and other public facilities and public facilities needs. Staff believes the proposed parking area meets the purpose and intent of the above criteria. The proposed parking area will provide an improved parking situation for Vail Resorts employees and create safer conditions for visitors on the South Frontage Road. The functionality of the South Frontage Road will be improved during peak winter days. Effect upon traffic, with particular reference to congestion, automotive and pedestrian safety and convenience, traffic flow and control, access, maneuverability, and removal of snow from the streets and parking areas. 2- 3. ll Staff believes that the proposed parking area is a positive improvement in terms of the above criteria. The anticipated reduction of parking on the South Frontage Road, due to increased parking availability for Vail Resorts employees, will result in reduced congestion, increased safety for employees and skiers, and improved traffic flow. 4. Effect upon the character of the area in which the proposed use is to be located, including the scale and bulk of the proposed use in relation to surrounding uses. The above criterion is not relevant to the proposed parking area as there are no buildings associated with this proposal. The Planning and Environmental Commission shall make the following findings before granting a conditional use permit: 1. That the proposed location of the use is in accordance with the purposes of this Title and the purposes of the district in which the site is located. 2. That the proposed location of the use and the conditions under which it would be operated or maintained will not be detrimental to the public health, safety, or welfare, or materially injurious to properties or improvements in the vicinity. 3. That the proposed use will comply with each of the applicable provisions of this Title. Variance In order to prevent or to lessen such practical difflculties and unnecessary physical hardships inconsistent with the objectives of this title as would result from strict or literal interpretation and enforcement, variances from certain regulations may be granted. A practical difficulty or unnecessary physical hardship may result from the size, shape, or dimensions of a site or the location of existing structures thereon; from topographic or physical conditions on the site or in the immediate vicinity; or from other physical limitations, street locations or conditions in the immediate vicinity. Cost or inconvenience to the applicant of strict or literal compliance with a regulation shall not be a reason for granting a variance. The applicant has requested a variance from Title 14 Chapter 5 of the Development Standards Handbook, Parking Lot and Parking Structure Design Standards For All Uses. According to Title 14 Chapter 5 "All parking areas shall be an improved sufface." Furthermore, it states; "Not /ess than 10% of the interior suiace area of unenclosed off-street parking areas containing 15 or more parking spaces shall be devoted to landscaping. ln addition, landscape borders nol /ess than 10 feet in depth shall be provided at all edges of parking lots containing 30 or more parking spaces. A landscape berm, wall, or fence of not /ess than 4 feet in height, of t2 1. the same architectural sfy/e as the building, in combination with landscaping may be substituted for the landscape border. ln developmenfs wifh cross- access or shared parking facilities, the landscape border between the development shall not be required." The applicant is requesting a variance to allow for the continued use of a gravel surfaced parking facility with no interior landscaping. Section 12-17-6, Criteria and Findings, of the Vail Town Code, prescribes the criteria to be used by the Planning and Environmental Commission when considering a request for a variance. According to Section 12-17-6, Criteria and Findings, Before acting on a variance application, the Planning and Environmental Commission shall consider the following factors with respect to the requested variance: The relationship of the requested variance to other existing or potential uses and structures in the vicinity. The proposed parking area will have little to no negative affect on uses and structures in the vicinity. The proposal will allow the Town of Vail and Vail Resorts more time to develop additional parking for the public. Allowing an unpaved surface makes the public parking solution less urgent. Additionally, the use of this property, "in this quasi-industrial area of Vail,' has historically been for vehicle and equipment storage. Therefore, the continuance of this site as a parking area should not be problematic. The degree to which relief from the strict or literal interpretation and enforcement of a specified regulation is necessary to achieve compatibility and uniformity of treatment among sites in the vicinity, or to attain the objectives of this title without grant of special privilege. Staff believes that the proposed parking area will be a major benefit to the community in providing a larger parking area for the employees of Vail Resorts. A requirement to immediately install an improved paved surface would not permit this proposal to work in the short time frame that exists to help address the skier parking problem yet this year. Additionally, the parking area is proposed to be paved as a part of Phase 2 of the project. Because these variances are sought to help provide a solution to the public parking condition throughout the Town, their approval should not be seen as granting a special privilege. The circumstances of the proposed uses and the variances required to make them happen are very unique and common only to very few sites within the Town of Vail. To reduce the degree of relief asked for in this request, staff would recommend that the conditional use permit only be allowed for one year from the date of this approval. Staff has also considered that 40% of Tract A, l-70 property, and the TOV Right of Way will remain undisturbed and landscaped. The effect of the requested variance on light and air, distribution of population, transportation and traffic facilities, public facilities and utilities, and public safety. 2. 3. IJ o tx. The proposed variances include the clean-up of one of the Town's least attractive sites. The proposed parking area will greatly improve transportation, traffic, and public safety. The maintenance of the berm and maintaining the riparian area of Red Sandstone creek is critical in buffering the site from adjacent land uses. 4. Such other factors and criteria as the Commission deems applicable to the proposed variance. The planning and environmental commission shall make the following findings before granting a variance: 1. That the granting of the variance will not constitute a grant of special privilege inconsistent with the limitations on other properties classified in the same district. 2. That the granting of the variance will not be detrimental to the public health, safety, or welfare, or materially injurious to properties or improvements in the vicinity. 3. That the variance is warranted for one or more of the following reasons: a. The strict or literal interpretation and enforcement of the specified regulation would result in practical difficulty or unnecessary physical hardship inconsistent with the objectives of this title. b. There are exceptional or extraordinary circumstances or conditions applicable to the site of the variance that do not apply generally to other properties in the same zone. c. The strict or literal interpretation and enforcement of the specified regulation would deprive the applicant of privileges enjoyed by the owners of other properties in the same district. STAFF RECOMMENDATION The Community Development Department recommends that the Planning and Environmental Commission approves with conditions the request for a final review of a variance from Title 14, Chapter 5, Parking Lot and Parking Structure Design Standards for All Uses, to allow for a deviation from the minimum landscape area requirement and to construct an unpaved, gravel parking surface, and a request for a conditional use permit to allow the construction of a private parking lot at the Holy Cross Site, located at 923 and 862 South Frontage Road West/Tract A, Tract B, l-70 R.OW. Parcel 268. and Red Sandstone Rd Parce 1. 1. The conditional use permit shall expire on November 1, 2005,unless the parcel is paved according to the approved plan, in which case the conditional use permit will not expire. t4 3. The applicant shall maintain and operate the proposed parking lot at an appropriate level of cleanliness by providing trash receptacles on the site for use by Vail Resorts' employees. Parking delineation within the site shall be through simple ropes and flags, communicating the appropriate spaces and efficiently maximizing the site. Should the Planning and Environmental Commission choose to approve with conditions the applicant's requests, staff recommends that the following findings be made as part of the motion: Conditional Use Permit The Planning and Environmental Commission shall make the following findings before granting a conditional use permit: 1. That the proposed location of the temporary parking facility is in accordance with the purposes of the Town of Vail Zoning Regulations and the purposes of the Lionshead Mixed Use 2 zone district. 2. That the proposed location of the temporary parking area and the conditions under which it will be operated and maintained will not be detrimental to the public health, safety, or welfare, or materially injurious to properties or improvements in the vicinity. 3. That the temporary parking facility will comply with each of the applicable provisions of the Town of Vail Zoning Regulations Variance The planning and environmental commission shall make the following findings before granting a variance: 1. That the granting of the parking lot surtace and landscape variance will not constitute a grant of special privilege inconsistent with the limitations on other properties in the General lJse zone distict as the applicant is proposing compliance with the applicable elements of the Town's planning documents. 2. That the granting of the parking lot sufface and landscape variance will not be detrimental to the public health, safety, or welfare, or materially injurious to properties or improvements in the vicinity. 3. That the vaiance is wananted for the following reason: The strict or literal interpretation and enforcement of the pa*ing lot, surface and landscape area regulation would deprive the applicant of privileges enjoyed by the owners of other propefties in the General Use zone district given the amount of hardscape area required on the l5 development slte to compty with the appticable planning documen5 of the Tam of Vail. X. ATTACHTENTS A. Mcinity Map B. Letterfrom the applicant with reduced copy of proposed plans D. fublic notice l6 O 200 Foet 1" = 150' ET!,o5 3oIrl Itlt i?6..dd byhlfliarvi OF lr?.trrt t,r of !| tq ddrS b. b. Fard F pn.rt Th. Tosr of Vl &.. rd rrrr{ tr s'lcyot h. |||fonndd| cd|t*rd hrdn. o ,cotrc(,o x5;€ hrt8. -:g .-rEA >-! I F.$I \$ q.i u Q.F RS F S E .t$'H fis Na 5s{$qr S N.s Ntr B Ft\J G() ?1tsr{ cr) ?1Eo.- Fl GI.HEgboGtrt'\. .F{lrl LaF{ct) t{cnGl9F{*tf ) a.) -7 q)hhF{ l,\\J\J, F{E*tst{ Fq u) tso ct)q & - .F{ IB 1.Intr.oduction Summaryof Prcposal Last fall the Town of Vail Planning and Environmental Commission approved a proposal to create additional parking on the Holy Goss parcel locared q/est of rhe Vail Resons maintenance facfity. The approval dlovied the parking surface to be unpaved and granted a variance from rhe interior landscaping requirement of the Town's development standards. One of the conditions of approval of that application requires the ownerio obtain approval for and complete construction of permanent paved parking byNovember 2004. The-Town of Vail staff has requested thar Vail Resorts postpone paving the parking lot unril investigation and discussion can occur about the potefiial for a joint-vennrre parking strucrure on this parcel. Vail Resorts it ,pply.g for a conditional use permit and variance to allow all required improvements except the paving of the parking area. This application will allovr the owner ro provide atotA of.297 parking spaces on both the Holy Cross and maintenance sites. If the conclusion of the Town of Vail and Vail Resoru is not to Dursue a parking strarcture at this location, then the FtrolyCross Lor will be paved according to the proposed plan byNovember of 2005. In order to facilitate the construction of this parking area, two minor variances musr also be approved. A variance from the interior landscape riquireme nt Q lIO sq. ft. required , 4,828 sq. ft. proposed) wil again be necessary and a snow storage variance Q2,231sq. ft. required, 17,922 sq. ft. (plus 9,554 sq. ft. temponry) proposed) will be required in order to maximize the amount of emplope parking being provided. Along with the parking improvements, Vail Resons is also proposing laneage improvemenu to the South Frontage Road that will improve traffic flow and reduce vehicular conJlicts in this area. These roadwayimprovements also include a 10'wide separated bicple path on the south side of the road. CDOT has approved the proposed improvements and has issued permits to begin this work Extensive landscape and drainage improvements around the perimeter of both the ltroly Cross and maintenance site. The proposed landscaping will screen the new and existrng uses. The proposed parking area is proposed to offset the "no net loss" of parking as required by the Lionshead Redevelopment Master Plan. Only minor cosmetic changes are proposed to the ldaintenance Gnter uses as part of this parking proposal and therefore tJrose improvements will generallyremain as theyexist today. The Town of Vail is a coapplicant on this project as a portion of the land being used for parking is an old remaining piece of the Red Sandstone right-of-waythat was abandoned vfien I-70 was constructed in the 1970's. This right-of-wayused to connect llghway6 to Potato Patch prior to the existence of Interstate 70. This right of-wayparcel has been used Varl Resorts - lloly Cross Parhnq Mavlello ?lannnq Group, LLC byvail SroS an{ HolyGoss Elearic forparking and storage forthe past 25 pan or more. The Touin;s in the process of transferring ownership of this parcel to V"il fu.ons. Subject Property IGyElements of the Prcposal Keyelements of the plan include: . Improved saferyand function of the South Fronrage Road. Improved parking capacityfor skien and emplopeso Improved organizarion and function of emplope parking facilfuy o Second step in a long-term redevelopment of properry and replacement of employee parking in Lionshead Varl Resorts - Y,oly Cro=s Parhnq Maurrello Plannnq Group, LLC 2.Description of the Proiect Backgrcund ltrolyCross Parcel (Iraa A) vail fusora obtained title p_ $9 lloly Goss parcel in 1995. prior to obtaining ownenhip of the parcel, Vail Resons and Holy-Goss Electric used the site for storage of ve"hicles and' eguipqent' In 1990 the Town of Vail approved a conditional *e p.ttiit and variances to allowthe site ro be udlized for parking and storage of FlolyGoss Ehcrric equipment. That "pptju.d allowed for 101 unpaved paddng spaces to be criated. This approval hCI since e4pired. In 2001, the Town of Vail.approved a conditional lse permit for the site to be used again for vehigle storage as q/ell as the storage of landscape equipment and materials for Fitz arid G.)iord Landscaping. This approval allovzed use of the same area of land as the 1990 approval but this approval limited the number of stored vehicles to Z0 (drese vehicles are no longer stored gnsfie). The approval allowed the parking surface to be unpaved. This approval has since expired. Last fall the PEC approved an unpaved employee parking area on this site with a condition that the owner return with a permanent paved parking solution by November 2004. Maintenance Gnter (ftact B) In 1993 the Town of Vail approved a conditional use permit allowing an e4pansion of the vail Resoru Maintenance Gnter. That expansion allowed a buildingaddftion, which contained offices,_ meeting areas, locker rooffis, and storage. The parking requirement for the uses proposed on-siJe was 57 parking spaces. Thjs was based upon iL. r-cu"l emplope cowrt on tJre largest shift for the site. \I?hile there have been changes ro the operatio" of the maintenance center over the last 13 yean (i.e., more snowcars stored on the mountain) rhe number of employees generated bytie uses on the site remains at 52. Prcjecthmponent fu stated above, the projea includes a general cleanup and improvement of the Fl,cly Goss parcel and maintenance center. lvlanyof the overall projea components do not require PEC approval as they are maintenance items. The proposed plan re-organizes and provides additional parking spaces on the Holy Goss parcelfor 234 additional parkingipaces (291 proposed for both sites, 57 required for existing uses). This provides parking for all of the emplope spaces found on the \flest Daylot (160 spaces) and a porrion of the parking proposed to be displaced from dre Nonh Daylot (105 spaces existing). The proposed parking area will be accessed from within the lvfaintenance Crnter from tlre existing entmnce on the Souh Frontage Road. The parking area will be further controlled Varl Resorts - lloly Cross ? arhnq Mavnello Tlannnq GrouV, LLC J wi.tJr i gaq to-prevenr trespass and to monitor the use of the lot. A left rum lane is being added to the South Frontage Road to allow efficient access to the ste. CDOT is requiring drainage improvements around the entire site as pan of the access permit. Those improvements include creating a swale and installing i culven on the nonh side of the properry (along I-70) to divert drainage towards the ned Sandstone Creek and making impryvelnents to swales along most of the frontage of the south Frontage Road. See the s1t9 plan for a depiction of these improvements. The applicant is also proposing a separated bicple path adjacent to the ER\{ED site on the south side of the roid. -cDor has issued a permit for this path as well. CDOT has approved a new driveway for snowcats to cross the South Frontage Road and to allow an additional exit for cars. This new snowcat access will improve the function and general conditions of Forest Road, which has been a goal of the Town for some time. Pedesrian access and circuladon vdll occur intemal to the site and cross the Souh Frontage Road at the intenecdon vdth Vest Lioruhead Circle to the exisring sidewalk located on the south side of \flest Lionshead Circle and the west side of the South Frontage Road. A painted crosswalk and signage will be provided at this locarion to alert the motorisr rc the Presence of pedestrians. This will allow emplopes to have a safe and protecred roure !o Lionshead. A ponion of the proposed parking lot is being developed within the Town's Red Sandstone right-of-way parcel, which divides Tract A and B as well as on a parcel owned by CDOT. In order to facilitate this project, the Tou'n is coapplicant and is allbwing the use of this parcel. Vail Resoru is in the process of obtaining ownenhip of both of these parcels. Inte ri o r L a nds c ape Va ri a n c e As stated previously, the applicant is seeking a variance from the interior landscape requirement for this parking area. A variance was granted for unpaved parking with the November 2003 approval but it was unclear as to whether this variance transferred to the permanent improvements. The interior landscape requirement requires that l0% of the paved area include "islands" oflandscape to help beautiff parking areas. The current proposal provides 4,828 sq. tt. (6.5%) of internal landscaping whereas 7,410 sq. ft. (10%) is required. Internal landscaping is an important need in commercial developments that invite the general public. This type oflandscaping helps reduce the impact oflarge expanses of pavement and generally helps to screen parking within a parking lot. Most commercial parking lots are very open to the view of passing motorists as customers are being attracted to the site. In this case an employee parking area is being provided for ski mountain operation. The lot is not available to the general public and is located in a rnore industrial area of Vail. The site is proposed to have extensive perimeter screening with Varl Resorts - I'oly Cross P arktnq Maurrello ?lannnq Group, LLC ..f new and mature plant materials. So the effect of the variance is minimized due to location, the use ofthe lot, and the extensive landscape screening that is occurring. Additionally, internal landscaping reduces the number of parking spaces that can be provided. Employee and guest parking has been an issue in Vail for the last 10 or more years. The goal of the Town to provide adequate parking would seem to out weigh the necessity for intemal landscaping. Snow Storage The Town ofVail development standards require that an area equal to 30yo ofpaved parking areas be provided as snow storage. The proposed plan provides 17,922 sq. ft. (24%) of snow storage, which is 4,309 sq. ft. short of the required storage area. This site is unique in that owner is in the business of plowing, shaping, and moving snow and therefore the owner has the ability to remove snow from the site soon after a storm event. In addition to providing 17,922 sq. ft. of permanent snow storage, the owner is providing a temporary snow storage area(9,554 sq. ft.) where snow can be piled until it can be removed by a truck. This area along with the permanent snow storage areas is 5,245 sq. ft. in excess of the amount of storage required by the Town's development standards. This applicant is requesting a variance to allow for partial snow removal rather than storing 100% on-site and has demonstrated a unique ability to perform this removal. Unpaved Parking The Town of Vail staff has requested that we not mover forward with paving the parking area until there has been ample time to explore the opportunity to provide structured parking on this site. Pursuant to the Town's request, Vail Resorts is requesting a variance to allow the parking to be unpaved until November 2005. If over the next year it is concluded that a parking structure is not feasible at this location, Vail Resorts agrees to pave the parking lot according to the approved plan without further action necessary by the Planning and Environmental Commission. Varl ResorLs - tloly Cross ParAnq Maunello Plannnq GrouV, LLC 5 o 4r', i iiil\i {e !rl: ooo*B t${ti{l 'gg$l$ tiEl.! ---<lz,-i o s-, E qU ILJ o (JYjx(} Os, ,-rca! 9b -li> Ei F.o!!F FpEX9g ;'ia .g -\J!'tlruo;3'E $P ;'E q., IHf F.Ei tPF BE6. 'ods 8'F-E c)JF ?*n -ciIA P .HE OF..E 66e Xo.-t F()l<.=qg -''1.F ea 5E .Es .s ril,5 E= E tly, 3A E *\l5 :H 9 AI E ib^E \rlr 5'EE H.A dE HF5 *Fu do 4. thd allaru qtsin ci:tolationn a ousualk laatdat ttxfutersaimdtlx Sanh F wug: Rud ard lVc t L isrlmd Me Effectupon the character of the area in which the proposed use is to be located, including the scale and bulk of the proporid rse in relation to surrounding uses, A'nArulpis: 74, qrq a pr* ", g .ry y! It* ra.inpn orr th abrE crirEri4 as tlnrc arc rp tuildag; assriatdaith this pryaal Variance Criteria Before acting on a variance application, the Planning and Environmemal Commission shall consider the following facton vdth respect to the requested variance: a- The relationship of the requested variance to other existing or potendal wes and structures in the viciniry. Our Analpis: Tlx ptry d urinrc aill dlar!) tlre V ail Ro qB n potide as nany p& i4 sprc as are rusoruily pasilf" * ly site aith littte zisr4dl ix?ba6 n th piia pUic' Th sia ain h ddqlat$' sowd. fiorn pHic rldrt - frq od r*t*"A" at"rrwi* for sraa swrag: ard twrntal lau Mr pruddd, Tlx prpad uriarrc uill luze linle'inpn n a isttg ard Nstial wa in tlx ata- b. The degree to v,'hich relief from the strict or literal iruerpretation and enforcement of a-specified regulation is necessaryto ..hi.r,. compatibiliry and uniformby of Eeatment among sites in the viciniry or ro attain the objectives of this dde without grant of specid privilege. Our Anabris: Rdi{fwn th s*ia ad liural irtapnaian { tlx ryfaiart ?quirirg pilhug a?v6 to @rtain iNtETml ldrdscapiry ard a rdud anaat { sraa storagg is hirg ?qa6td ds W {rhit in?Mmst plan ru g&ltiry{thne uriarw will rn grart-a spia) prhilqz as th rc e as *ry\ry Wk ag is wiqte n this farility in tlx Tow { V ail nd nw iniziry tlat prkt g it gl rfr only far th ouw b.c ako for tlx Tow. Rus orulle alanwizr arc hiqptryd, ahth ir&tde atetnilEpiirfrEr lads@pagdrdth rcrowl { srnufu th site &riry a latg: srnu ewx TIx ciroan ufu ( tlx prrya aAIry pd,hrg aru. ad tlx uriarrc ryutd n detfu tltae inpotzraxs on * iq* ad orwm wly to wry fait s ita within ir Tow { V ail ru pW d wridrw will Varl Resorts - Loly Cross P arhnq Maunello Plannnq Grovp, LLC I alhw tlx qf,i@t qd tlx Tqy, n frain tlx objdir* { iln Tun's dedqlrpt stddds aitlna a grnt {sryial pruke The effect of the requested variance on light and air, distribution of pogulaJfn' transportarion and uaffic facilities, public facilities and utilities, and public safety. OurAnabris: TIr pry d uriarc ain allm this pd ph "e f*lity n Wra" in at {ttietnwvw atd. inpmc tlx otnall s {ay ad ciM for rt" "rp t"p p* {g, A U farilia .ru pryd wierc ail l*u l.tuh if dry' in?pdd ; tl" *i*irA,i 6 tl* abuqitein Varl Resorts - lloly Cross Parhnq Mavnello Plannnq Grovp, LLC ro Attachment C THIS ITEM MAY AFFECT YOUR PROPERTY PUBLIC NOTICE NOTICE lS HEREBY GIVEN that the Planning and Environmental Commission of the Town of Vail will hold a public hearing in accordance with Section 12-3-6, Vail Town Code, on June 28, 2004, at 2:00 PM in the Town of Vail Municipal Building, in consideration of: A request for a conditional use permit, pursuant to Section 12-71-5,Conditional Uses; Generally (On All Levels of a Building or Outside of a Building), Vail Town Code, and a variance from Title 14, Chapter 5, Parking Lot and Parking Structure Design Standards forAll Uses, Vail Town Code, to allow for the construction of an unpaved private parking lot, located at 923 South Frontage Road WesUunplatted. (A complete metes and bounds legal description is available for review at the Town of Vail Community Development Department). Applicant: Vail Resorts, represented by Mauriello Planning Group, LLC Planner: Matt Gennett A recommendation to the Vail Town Council of a major amendment to a Special Development District (SDD), pursuant to Section 12-9A-10, Amendment Procedures, Vail Town Code, to allow for an amendment to the recorded conditions of approval prohibiting the operation of restaurants within Special Development District No. 35, Austria Haus, located at242East Meadow Drive/Part of Tract B, Block 58, Vail Village Filing 1, and setting forth details in regard thereto. Applicant Sonnenalp Properties, Inc., represented by Johannes Faessler Planner: George Ruther A final review of a conditional use permit, pursuant to Section 12-7H-5, Conditional Uses, Generally (On All Levels of a Building or Outside of a Building), Vail Town Code, to allow for eight two-family residential structures (Gore Creek Place), located at 730, 724, and 714 West Lionshead Gircle/Tracts A, B, C, & D, Morcus Subdivision, and Lot 7, Marriott Subdivision, and setting forth details in regard thereto. Applicant Vail Resorts, represented by Braun Associates, Inc. Planner: WarrenCampbell A final review of a conditional use permit, pursuant to Section 12-98-3, Private Or Public Off- Street Vehicle Parking Structures, to allow for an amendment to an existing conditional use permit for private parking, located at 364 Gore Creek Drive/Lot P-3, Block 5A, Vail Village Filing 5, and setting forth details in regard thereto. Applicant Vail Resorts Planner: ElisabethEckel A request for a conditional use permit, pursuant to Section 12-6H-3, Conditional Uses; High Density Multiple Family, Vail Town Code, to allow for a public utilig and public services use, located at 501 North Frontage Road (Solar Vail Condominiums)/ Lot 8, Block 2, Vail Potato Patch Filing 1, and setting forth details in regard to. Applicant Verizon Wireless, represented by Kelley Harrison, Closser Consulting Planner: Clare Sloan A request for a floodplain modification, pursuant to Chapter 14-6, Grading Standards, Vail Town Code, to allow for snowmaking system improvements within the Gore Creek floodplain located at an unplatted parcel adjacent to the Eagle River Water and Sanitation facilities, 646 West Forest Road, (a complete metes and bounds legal description is available for review at the Town of Vail Community Development Department), and setting for details in regard thereto. Applicant Vail Resorts, represented by Braun Associates, Inc. Planner: Bill Gibson The applications and information about the proposals are available for public inspection during regular office hours at the Town of Vail Communig Development Department, 75 South Frontage Road. The public is invited to attend project orientation and the site visits that precede the public hearing in the Town of Vail Community Development Department. Please call (970) 479-2138 for additional "l information. Sign language interpretation is available upon request with 24-hour notification. Please call (970) 479-2356, Telephone for the Hearing lmpaired, for information. Published June 11, 20O4, in theVail Daily. a f. dv :uotpv t:t :^s Eooz/o€/ol :tulul VOOZ'LZ laqopo uo arld)€ lleqs ilrured esn leuorlrpuof, ettl s029000Nof,:puof, Jj :is €OOZ/O€/OT :tu1u3 ol^oEddv :uollrv dv:uolpv '6upped aeloldue pasodord rcJ eils aqt Jo asn aql ol .rol.rd qruuad ssaf,f,e parnber ^uepue Mor Ol.-I eql Jo esn aql rcJ AOI ol qenordde lOOf, epnod lleqs gueqpde eql t029000Nof,:puof, '(s)aag1u.rr.r.roc anaraar aleudo.rdde atll lo/pue gels 11e1 Jo uMoI Jo luasuof, UaIUM aql iloqIM apeur aq Aeu sueld asaql ol sa6ueqr oN :(N\nd) B:puof, EOOZILZIO| :lenorddv Jo aleo I-0-9 Ia;l;qg uoqlr3 oqsa$ ailpu NOr.UtV JjVrS/OUVO8 :suolllpuoJ :elo^ :Ig puoas rAg uolloN eare doqs qroseu llen :uollecol 01,0080f,3d :requnN ffd sn'of,'lle 'rf,'MMM :qaM zsbz' 6Lb'0t6 :xeJ 6tlz'6zt'0l6 :tal /S9I8 operolog t;e1 'peo6 a6eluoq q$os 9l paudopraq ArunuJuroo Jo luauryedog HUOI NOII:)V suolllpuol €s :slueruurof, 200002/010Iz :raqunN lefred paleldun :uo!s!^!pqns ilrolg :lo'l :uogd;rcsaq 1e6a-1 'lIV JSIM Ot tgVtNOUJ S 298 :sserppv peford ulNA o :slued!c!Ued : esuaf,Il 8S9I8 moo'suoserlle^oqJar qqes Jer of, lIV z xos od 800b-6lb:auoqd €00220/0T duof, rIV lNbDnddv :esuef,!'l BS9IB of,'lIV L XOS 0d :euoqd €00220/0I duoJ tIV lqun asn leuot1rpuo] e se OuDped aaloldua e1el[]eJ ol s6eg pue sado.r .roulur pue 'sapeldarar qseJl Jo uo4ppe 'a1e6 alue4ua Jo uollellslsur 'saug1 pue salod auoqdapl Jo le ouar '6urpa6 af,ueualureur lpeop a6e1uo.r1 qlnos €ZO le p1 ssoll {pH *- :uopd;rraq pafo'rd gNDtUVd ll^O']dt{l SSOUf, A]OH :aurep pa[o6 uolsslururo) lelueuruoJl^uf pue 6u;uuq4 ry Cond: CON0005206 The applicant shall continue to have unobstructed fire department access to the lot through the berm opening on the south side of the site opposite the Eagle River Water and Sanitation District gas station. This access point shall be allowed pending CDOT approval of more than one entrance for the site. Entry: 10/30/2003 By: EE Action: AP Cond: CON0006207 The applicant shall maintain and operate the proposed parking lot at an appropriate level of cleanliness by providing trash receptacles on the site for use by Vail Resorts' employees, Entry: 10/30/2003 By: EE Action: AP Cond: CON0006208 The applicant shall maintain and operate the proposed parking lot at an appropriate level of safety by ensuring the removal of snow from the lot. Snow storage shall not occur within the berm opening that is to remain for the purpose of fire department access. Snow storage may occur within the areas designated on the site plan or through an opening in the north side of the limits of disturbance fence required by the Town to protect existing vegebation. Entry: t013012003 By: EE Action: AP Cond: CON0006209 Parking delineation on the site shall be through simple ropes and flags Entry: 10/30/2003 By: EE Action: AP Cond: CON0006210 Vail Resorts shall provide the West Day Lot to the TOV for the 2003-04 ski season for public parking Entry: 10/30/2003 By: EE Action: AP Planner: Elisabeth Eckel PEC Fee Paid: $650.00 PLANNING AND ENVIRONMENTAL COMMISSION PUBLIC MEETING Final Meeting Results Monday, October 27, 2003 PROJECT ORIENTATION / - Gommunity Development Dept. PUBLIC WELCOME MEMBERS PRESENT All Members Present Site Visits: MEMBERS ABSENT 1. Bogart's- 143 East Meadow Dr. Unit # 165 2. Yail Mountain Lodge- 352 East Meadow Drive 3. Kendrick Residence- 2965 & 2975 Mann's Ranch Road 4. Red Sandstone School- 545 North Frontage 5. Solar Vail - 501 North Frontage Road 6. Eagle River Water & Sanitation- 846 West Forest 7. Tennis Court Site- 615 Forest Road Driver: 12:00 pm Wanen KEH NOTE: lf the PEC hearing extends until 6:00 p.m., the board may break for dinner from 6:00 - 6:30 Public Hearinq - Town Gouncil Ghambers 2:00 pm 1 . A request for a conditional use permit, pursuant to Section 12-6H-3, Conditional Uses, Vail Town Code, to allow for a public utility and public services use, located at 501 North Frontage Road (Solar Vail Condominiums)/ Lot 8, Block2, Vail Potato Patch 1s' Filing. Applicant Nextel, represented by Glen Klocke Planner: Wanen Campbell Motion: Chas Bernhardt Approved with Gonditions Second: Rollie Kjesbo Vote: 7-0 Gonditions: 1. The applicant removes all illegal outdoor light fixtures and submits cut-sheets for fixtures which meet the lighting standards which will be reviewed in conjunction with the applicant's Design Review Board application for the proposal. 2. The applicant uses only non-combustible materials in the construction of the screen wall and ladder enclosure. Revised plans for review by the Design Review Board shall be submifted no later than November 3, 2003. 2. A request for a conditional use permit, pursuant to Section 12-9C-3, Conditional Uses, Vail Town Code, to allow for a Public Utilities installation, located at 545 North Frontage Road (Red Sandstone Elementary School), Part of Lot 8, Block 2, Vail Potato Patch 1st Filing. Applicant: AT&T Wireless Services, Inc. Planner: Wanen Campbell Motion: Rollie Kiesbo Approved Second: George Lamb Vote: 7-O 3. A request for approval of an exemption plat, pursuant to Chapter 1 3-12, Exemption Plat Review Procedures, Vail Town Code, to allow for the platting of property boundary amendments, located at 2965 & 2975 Manns Ranch Road, Lots 5 & 6, Block 1, Vail Village 13s Filing. Applicant: Clinton J. Kendrick, represented by Segerberg, Mayhew, and Associates Planner: Bill Gibson Motion: Doug Cahill Approved Second: Gary Hartman 4. A request for a sign variance pursuant to Section 1148-20, Window Signs, and Section 114A-1 , Signs Permitted in Zone District, Vail Town Code, to allow for additional signage for Bogart's Bar and Bistro, located at 143 East Meadow Drive, Unit 165 (Crossroads)/Lot P, Block 5D, VailVillage 1"'Filing. Vote: 7-O Vote: 7-0 Applicant: A.Luc Pols Planner: Matt Gennett Motion: Rollie Kjesbo Second: George Lamb Tabled to November 10, 2003 5. A request for conditional use permit, pursuant to Section 12-715, Vail Town Code, and a variance from Title 14, Chapter 5, Parking Lot and Parking Structure Design Standards for All Uses, Vail Town Code, to allow for the construclion of an unpaved private parking lot, located at 923 South Frontage Road WesUUnplafted. (A complete metes and bounds legal description is available for review at the Town of Vail Community Development Department). Applicant: Vail Resorts Planner: ElisabethEckel Gonditional Use Permit Motion: Rollie Kjesbo Approved with Conditions Second: Erickson Shirley Vote:6-0-1 (Gahill) Conditions: 1. The applicant shall provide CDOT approvals to the Town of Vail for the use of l-70 R.OW. and any required access permits prior to use of the site for the proposed employee parking. 2. The conditional use permit shall expire on October 27,2004. 3. The applicant shall continue to have unobstructed fire department access to the lot through the berm opening on the south side of the site opposite the Eagle River and Water Sanitation District gas station. This access point shall be allowed pending CDOT approval of more than one entrance for the site. Appropriate signage and a "dummy gate" have been proposed by the applicant to clarify the purpose of the lot as a private, not public parking area. 4. The applicant shall maintain and operate the proposed parking lot at an appropriate level of cleanliness by providing trash receptacles on the site for use by Vail Resorts' employees. o 6. 5. The applicant shall maintain and operate the proposed parking lot at an appropriate level of safety by ensuring the removal of snow from the loL Snow storage shall not occur within the berm opening that is to remain for the purpose of fire department access snow storage may occur according to the following; a) within the areas designated on the site plan submitted with the application, or b) through an opening in the north side of the limits of disturbance fence required by the Town to protect existing vegetation. 6. Parking delineation within the site shall be through simple ropes and flags, communicating the appropriate spaces and efficiently maximizing the site. 7. Vail Resorts shall provide the West Day lot to the Town of Vail for the 200312004 ski season for public parking. Variance Motion: Rollie Kjesbo Approved Second: Erickson Shirley Vote:6-0-1 (Cahill) A request for a major subdivision pursuant to Chapter 13-3, Major Subdivision, Vail Town Code, to allow for the platting of the ski-way tract and four lots at the Lionshead tennis court site and a rezoning pursuant to Section 12-3-7, Administration, Vail Town Code, from Agriculture and Open Space zone district to Primary/Secondary Two-Family Residential zone district to allow for the construction of residential dwelling units on the four proposed lots and from Agriculture and Open Space zone district to Outdoor Recreation zone district to allow for the ski lifts, tows. and runs located at 615 West Forest Road/Unplatted (A complete metes and bounds legal description is available for review at the Town of Vail Community Development Department). Applicant: Vail Resorts, represented by Braun Associates, Inc.Planner: Wanen Campbell Major Subdivsion Motion: Doug Cahill Second: Gary Hartman Approved with Conditions Conditions:1. That the applicant submit a final drainage study, erosion control plan, and plan and profile with cross-sections for the new curb and cutter along Forrest Road for review by staff prior to scheduling on a Planning and Environmental Commission agenda for review of the final plat. 2. That the applicant place a note on the final plat that states that no improvements other than landscaping be permitted in the "no build zones".3. That the applicant pays for the cost of new traffic control signs and the installation of the signs at the approved cul-du-sac location on West Forest Road after receiving approval for design and location by the Public Works Department.4. That the applicant removes the snowcat access from West Forest Road, if an alternative route is reviewed and approved by the Town of Vail. The alternate route shall be proposed by the applicant and reviewed by the Town of Vail prior to the closing of the sale of any one of the four new residential lots approved on the tennis court site. Rezoning Motion: Doug Cahill Second: Gary Hartman Vote:7-0 Recommendation of Approval Vote:7-0 7. A request for a minor subdivision pursuant to Chapter 13-4, Minor Subdivision, Vail Town Code, to allow for the replatting of Lot 31 and Tracts C & D, Vail Village 2no Filing; a request to rezone Lot 31 and Tracts C & D, Vail Village 2no Filing from Outdoor Recreation (OR) and Lionshead Mixed Use 2 (LMU-2) zone districts to the General Use (GU) zone district; and a request for a conditional use permit pursuant to Section 12-9C- 3, Conditional Uses, Vail Town Code, to allow for the operation of a water and sewage treatment plant and a public parking facility and structure, located at 846 West Forest Road/Lot 31 and Tracts C & D, VailVillage 2no Filing. Applicant: Eagle River Water and Sanitation District, represented by Braun Associates, Inc. Planner: Bill Gibson Gonditional Use Permit Motion: Doug Cahill Second: Chas Bernhardt Approved with Conditions Conditions:1. Approval of the conditional use permits for both the water and sewage treatment plant and the public parking facility and structure shall be contingent upon the Vail Town Council's adoption, by ordinance, of the proposed amendments to the Official Zoning Map of the Town of Vail. 2. Approval of the conditional use permits for both the water and sewage treatnent plant and the public parking facility and structure shall be contingent upon the Design Review Board's approval of the related design review applications. 3. The applicant shall submit a public parking managemenUoperations plan for review and approval to the Gommunity Development Departmenq prior to the issuance of building permits. Vote:7-0 Minor Subdivision Motion: Doug Cahill Approved with Gonditions Conditions: 1. Approval of the final plat for the minor subdivision shall be contingent upon the Vail Town Gouncil's adoption, by ordinance, of the proposed amendments to the Official Zoning Map of the Town of Vail. The final plat shall not be recorded prior to the Vail Town Council's adoption, by ordinance, of the proposed amendments to the Official Zoning Map of the Town of Vail. Second: Chas Bernhardt Vote:7-0 8. A request for major exterior alteration pursuant to Section 12-7H-7, Vail Town Code, to allow for the construction of new dwelling units and accommodation units at Vail Marriott Mountain Resort, located at 715 West Lionshead Circle/Lots C and D, Morcus Subdivision, and Lot 7, Marriott Subdivision Applicant: Vail Mountain Marriott Resort, represented by Gwathmey, Pratt, SchultzPlanner: George Ruther Rezoning Motion: Doug Cahill Second: Chas Bernhardt Recommendation of Approval Motion: Ghas Bernhardt Tabled to November 10, 2003 Vote:7-0 Second: Rollie Kjesbo Vote:7-0 9. A request for a conditional use permit pursuant to Section 12-74-3, Vail Town Code; a major exterior alteration pursuant lo 12-7A-12, Vail Town Code, to allow for modifications to the existing fractional fee club and a restaurant addition; and a request for a building height variance pursuant to Chapter 17, Vail Town Code, to allow for dormer additions, at the Vail Mountain Lodge and Spa, located at 352 E. Meadow Drive / Tract B, VailVillage 1"t Filing. Applicant: Vail Mountain Lodge LLC, represented by Braun Associates, Inc.Planner: George Ruther Building Height Withdrawn by Applicant Conditional Use Permit Approved Motion: Erickson Shirley Second: George Lamb Vote: 6-0-1 (Hartman) Major Exterior Alteration Tabled to November 10, 2003 Motion: Rollie Kjesbo Second: George Lamb Vote:6-0-1 (Hartman) 10. A request for a setback variance pursuant to Section 12-6D-6 Setbacks, Vail Town Code, to allow for a garage addition, located at 1956 West Gore Creek Drive/Lot 45, Vail Village West 2no Filing. Applicant David Inrvin Planner: Matt Gennett Motion: Chas Bernhardt Second: Doug Cahill Vote: 7-0 Tabled to November 10, 2003 11. Approval of September 22,2003 minutes Motion: Doug Cahill Second: Chas Bernhardt Vote:7-0 Approved 12. Information Update The applications and information about the proposals are available for public inspection during regular office hours in the project planner's office located at the Town of Vail Community Development Department, 75 South Frontage Road. Please call479-2138 for information. Sign language interpretation available upon request with 24 hour notification. Please call 479-2356, Telephone for the Hearing lmpaired, for information. Communig Development Department Published October 24, 2003, in the Vail Daily TO: FROM: DATE: SUBJECT: MEMORANDUM Planning and Environmental Commission Community Development Department October 27,2003 A request for a conditional use permit, to allow for employee parking at the "Holy Cross Site", located at 923 and 862 South Frontage Road WesVTract A, Tract B, l-70 R.OW. Parcel 268, and Red Sandstone Rd Parcel., in accordance with Section 12-71-5. Vail Town Code and variances from the landscaping requirement associated with Section 12-71-15 and the paved surface requirement associated with Section 14-5, Vail Town Code. Applicant: Vail Resorts, represented by Braun and Associates Co-Applicant: Town of VailPlanner: Elisabeth Eckel lt. SUMMARY The applicant, Vail Resorts, represented by Braun and Associates, is requesting a conditional use permit to allow employee parking at the "Holy Cross' Lot, 923 and 862 South Frontage Road West, and is requesting two variances: a deviation from the minimum landscaping requirement associated with Off-Street Parking and Loading areas and a deviation from the paving requirement associated with Off- Street Parking and Loading areas. Pending approval from the Planning and Environmental Commission, the lot will begin in its use as a parking lot in mid- November, 2003. Staff is recommending approval of these requests subject to the findings and conditions outlined in Section lX of this memorandum. DESCRIPTION OF REQUEST The applicant, Vail Resorts, represented by Braun and Associates, is requesting a conditional use permit in accordance with Section 12-71-5, Vail Town Code, to allow for a private parking lot on the Holy Cross site. Additionally, the applicant is requesting the following: a variance from Title 14, Section 5 of the Development Standards Handbook, to allow for a deviation from the minimum interior landscaped area of 10% that is required for an unenclosed off-street parking area containing 15 or more spaces; and a variance from Title 14, Section 5 of the Development Standards Handbook, to allow for the construction of an unpaved, gravel parking surface at the site located at 923 South Frontage Road WesUTract A. The site on which the parking lot is proposed is complicated for several reasons. A portion of the proposed parking lot is being developed within the Town's Red Sandstone right-of-way parcel which divides Tract A and B as well as on a parcel owned by CDOT. Vail Resorts will be working with CDOT to obtain their permission to use the portion of the parcel that is owned by CDOT. The current request will allow this unpaved parking area for the 2003-2004 ski season as the frrsf of two phases of a larger, more permanent project, eventually leading to necessary roadside improvements, the paving of both Tract A and Tract B, and up to 295 additional parking spaces for Vail Resorts. The benefit of the relocation of employee parking spaces from the West Day Lot to the Holy Cross site would be the relocation of day skier vehicle traffic from along the South Frontage Road lo the West Day Lot, which is directly to the South of the Frontage Road. The applicant believes that the use of this site as a parking area for Vail Resorts' employees results in eventually providing increased parking options to the Town of Vail for public parking. The conditional use and variance requests apply to the area of the maintenance site directly west of the buildings that currently store Vail Resorts' equipment and vehicles (Tract A). Vail Resorts has begun to facilitate the clean-up of the Holy Cross parcel by removing vehicles'stored'on the site, improving the visual apsects of the site remarkably. Phase 1 of the project, if approved, will provide 140 parking spaces (only 20 spaces less than currently exist at the West day lot), and will be open to Vail Resorts' employees only. Phase 2 of the project will accommodate approximately 166 employee spaces depending on final layout, and therefore replace all of the West Day Lot parking. Vehicle access will be from the South Frontage Road entrance to the Maintenance Center. The entrance will be controlled by a card-reading gate on the east side of the lot, to the northwest of the maintenance site entrance that is opposite Forest Road. According to the applicant, 'pedestrian access and circulation will occur internal to the site and cross the South Frontage Road at the intersection with Forest Road to the existing pedestrian path located on the south side of the South Frontage Road. A painted crosswalk and signage will be provided at this location to alert the motorist to the presence of pedestrians. This will allow employees to have a safe and protected route to Lionshead.' Grading has occurred on the site to facilitate improved drainage on the site so that runoff will not drain directly into the adjacent Redsandstone Creek. Fire truck access will be from the South Frontage Road, through the cut in the existing berm, which was a result of one of the conditions of approval from the previous Planning and Environmental Commission hearing concerning parking as a conditional use at this location. Limits of disturbance fencing will be placed around the area to be graded in order to protect the existing vegetation near the creek. Snow storage has been designated on the site plan and will exist largely on the north side of the lot. The applicant has been advised to provide breaks in the permanent silt fencing, or the temporary limits of disturbance fence, if necessary, to accommodate large amounts of snow without damaging the protective fencing. ilt. Directional signage has been proposed by the applicant and will be discussed further should a conditional use permit be approved. Therefore, the construction of the proposed unpaved parking lot requires the review of two applications. The first application includes two variance requests: to construct the parking lot with an unpaved, gravel surface, and without the landscaping required under Parking Structure Design Standards. The second application is for a conditional use permit to construct the parking lot under the Lionshead Mixed Use ll zone district requirements. BACKGROUND Holy Cross Parcel (Tract A) Prior to Vail Resorts' 1995 purchase of Tract A, the parcel proposed to be used as a parking area for Phase 1, the lot was used by Vail Resorts and Holy Cross Electric for vehicle and equipment storage. The use of the lot as a storage site, as well as the creation of 101 unpaved parking spaces, was approved by the Town of Vail through a conditional use permit and related variances in 1990. However, afterthe approval expired in 2001, a conditional use permitforan unpaved parking area was again applied for and approval was granted by the Town. The site was used for landscape equipment and material storage for Fitz and Gaylord landscaping and vehicle storage for Vail Resorts (70 unpaved spaces). This approval lapsed in July of 2003. A historical concern about the use of this lot has beens the storage of abandoned vehicles and junk on the site. To mitigate this concern a landscaped berm was required to buffer the site from the Frontage Road. Recently the site has been cleared of abondoned vehicles and junk. ln addition, drainage has been improved to prevent direct run-off to Red Sandstone Maintenance Center (Tract B) In 1993 the Town of Vail approved a conditional use permit allowing an expansion of the Vail Resorts Maintenance Center. That expansion allowed a building addition which contained offices, meeting areas, locker rooms, and storage. Along with that approval the Town allowed 129 employee parking/snowcat parking spaces. This conditional use permit is still valid for the operation there today. These 129 spaces allowed by the 1993 approval are provided in the proposed plan for the site. ROLES OF THE REVIEWING BOARDS Conditional Use Order of Review: Generally, applications will be reviewed first by the PEC for acceptability of use and then by the DRB for compliance of proposed buildings and site planning. Planning and Environmental Commission: Action: The PEC is responsible for final approval/denial of Conditional Use Permits The PEC is responsible for evaluating a proposal for: tv. 1. Relationship and impact of the use on development objectives of the Town. 2. Effect of the use on light and air, distribution of population, transportation facilities, utilities, schools, parks and recreation facilities, and other public facilities and public facilities needs. 3. Effect upon traffic, with particular reference to congestion, automotive and pedestrian safety and convenience, traffic flow and control, access, maneuverability, and removal of snowfrom the streets and parking areas. 4. Effect upon the character of the area in which the proposed use is to be located, including the scale and bulk of the proposed use in relation to surrounding uses. 5. Such other factors and criteria as the Commission deems applicable to the proposed use. 6. The environmental impact report concerning the proposed use, if an environmental impact report is required by Chapter 12 of this Title. 7. Conformance with development standards of the applicable zone district and proposed use include:- Lot area- Site Dimensions- Site coverage- Landscape area- Parking and loading- Mitigation of development impacts Desiqn Review Board: Action: The DRB has NO review authority on a Conditional Use Permit, but must review any accompanying DRB application. The DRB is responsible for evaluating the DRB proposal for: - Architectural compatibility with other structures, the land and surroundings- Fitting buildings into landscape- Configuration of building and grading of a site which respects the topography- Removal/Preservalion of trees and native vegetation- Adequate provision for snow storage on-site- Acceptability of building materials and colors- Acceptability of roof elements, eaves, overhangs, and other building forms- Provision of landscape and drainage- Provision of fencing, walls, and accessory structures- Circulation and access to a site including parking, and site distances- Location and design of satellite dishes- Provision of outdoor lighting- The design of parks Staff: The staff is responsible for ensuring that all submittal requirements are provided and plans conform to the technical requirements of the Zoning Regulations. The staff also advises the applicant as to compliance with the design guidelines. Staff provides a staff memo containing background on the property and provides a staff evaluation of the project with respect to the required criteria and findings, and a recommendation on approval, approval with conditions, or denial. Staff also facilitates the review process. Town Council: Actions of DRB or PEC may be appealed to the Town Council or by the Town Council. Town Council evaluates whether or not the PEC or DRB erred with approvals or denials and can uphold, uphold with modifications, or overturn the board's decision. Variance Order of Review: Generally, applications will be reviewed first by the PEC for impacts of the proposed variance and then by the DRB for compliance of proposed buildings and site planning. Planninq and Environmental Commission: Action: The PEC is responsrb/e for final approval/denial of a variance. The PEC is responsible for evaluating a proposal for: 1. The relationship of the requested variance to other existing or potential uses and structures in the vicinity. 2. The degree to which relief from the strict or literal interpretation and enforcement of a specified regulation is necessary to achieve compatibility and uniformity of treatment among sites in the vicinity, or to attain the objectives of this Title without grant of special privilege. 3. The effect of the requested variance on light and air, distribution of population, transportation and traffic facilities, public facilities and utilities, and public safety. 4. Such other factors and criteria as the Commission deems applicable to the proposed variance. Desiqn Review Board: Action: The DRB has IVO review authority on a vaiance, but must review any accom pany i ng D RB ap pl ication. The DRB is responsible for evaluating the DRB proposal for: - Architectural compatibility with other structures, the land and surroundings- Fitting buildings into landscape- Configuration of building and grading of a site which respects the topography- Removal/Preservation of trees and native vegetation- Adequate provision for snow storage on-site- Acceptability of building materials and colors- Acceptability of roof elements, eaves, overhangs, and other building forms- Provision of landscape and drainage- Provision of fencing, walls, and accessory structures- Circulation and access to a site including parking, and site distances- Location and design of satellite dishes- Provision of outdoor lighting- The design of parks Staff: The staff is responsible for ensuring that all submittal requirements are provided and plans conform to the technical requirements of the Zoning Regulations. The staff also advises the applicant as to compliance with the design guidelines. Staff provides a staff memo containing background on the property and provides a staff evaluation of the project with respect to the required criteria and findings, and a recommendation on approval, approval with conditions, or denial. Staff also facilitates the review process. Town Council: Actions of DRB or PEC may be appealed to the Town Council or by the Town Council. Town Council evaluates whether or not the PEC or DRB erred with approvals or denials and can uphold, uphold with modifications, or overturn the board's decision. V. APPLICABLE PLANNING DOCUMENTS Town of Vail Zoninq Regulations 12-7 Lionshead Mixed Use 2 (LMU-2) District: 12-71-1: PURPOSE: The Lionshead Mixed Use 2 District is intended to provide sites for a mixture of multiple-family dwellings, lodges, hotels, fractional fee clubs, time shares, lodge dwelling units, restaurants, offices, skier services, light industrial activities, and commercial establishments in a clustered, unified development. Lionshead Mixed Use 2 District, in accordance with the Lionshead Redevelopment Master Plan, is intended to ensure adequate light, air, open space and other amenities appropriate to the permitted types of buildings and uses and to maintain the desirable qualities of the District by establishing appropriate site development standards. This District is meant to encourage and provide incentives for redevelopment in accordance with the Lionshead Redevelopment Master Plan. This Zone District was specifically developed to provide incentives for properties to redevelop. The ultimate goal of these incentives is to create an economically vibrant lodging, housing, and commercial core area. The incentives in this Zone District include increases in allowable gross residential floor area, building height, and density over the previously established zoning in the Lionshead Redevelopment Master Plan study area. The primary goal of the incentives is to create economic conditions favorable to inducing private redevelopment consistent with the Lionshead Redevelopment Master Plan. Additionally, the incentives are created to help finance public, off-site, improvements adjacent to redevelopment projects. Public amenities which will be evaluated with redevelopment proposals taking advantage of the incentives created herein may include: streetscape improvements, pedestrian/bicycle access, public plaza redevelopment, public art, roadway improvements, and similar improvements. (Ord. 3(1999) g 2) 12-71-5: CONDITIONAL USES; GENERALLY (ON ALL LEVELS OF A BUtLD|NG OR OUTSTDE OF A BU|LD|NG): The following conditional uses shall be permitted, subject to issuance of a conditional use permit in accordance with the provisions of chapter 16 of this title: Bed and breakfast as further regulated by section 12-14-18 of this title. Brew pubs. Child daycare center. Coin operated laundries. Commercial storage. Gasoline and service stations. Private outdoor recreation facilities, as a primary use. Public buildings, grounds, and facilities. Public or private parking lots. Public park and recreation facilities. Public utility and public service uses. Ski lifts and tows. Television stations. Vehicle maintenance, service, repair, storage, and fueling. Warehousing. Additional uses determined to be similar to conditional uses described in this section, in accordance with the provisions of section '12-3-4 of this title. (Ord. 17(2001) $ 2: ord. 3(1e99) S 2) 12-16 Conditional Use Permit (in part) 1 2-1 6-1 : PURPOSE: Ll MITATIONS: In order to provide the flexibility necessary to achieve the objectives of this title, specified uses are permifted in certain disfricls subject to the granting of a conditional use permit. Because of their unusual or special characteistics, conditional uses require review and evaluation so that they may be located properly with respect to the purposes of this title and with respect to their effects on surrounding properties. The review process prescribed in this chapter is intended to assure compatibility and harmonious development between conditional uses and sunounding properties and the town at large. Uses lsfed as conditional uses in the various districfs may be permifted subject to such conditions and limitations as the town may prescribe to ensure that the location and operation of the conditional uses will be in accordance with development objectives of the town and will not be detrimental to other uses or propefties. Where conditions cannot be devised to achieve these objectives, applications for conditional use permits shall be denied. (Ord. 8(1973) S 18.100) 12-17 Variances (in paft) 12-17-1: PURPOSE:A. Reasons For Seeking Variance: ln order to prevent or fo /essen such practical difficulties and unnecessary physical hardships inconsistent with the objectives of this title as would result from strict or literal interpretation and enforcement, variances from certain regulations may be granted. A practical difficulty or unnecessary physical hardship may result from the size, shape, or dimensions of a site or the location of existing structures thereon; from topographic or physical conditions on the site or in the immediate vicinity; or from other physical limitations, street locations or conditions in the immediate vicinity. Cost or inconvenience to the applicant of strict or literal compliance with a regulation shall not be a reason for granting a variance. 12-17-7: PERMIT APPROVAL AND EFFECT: Approval of the variance shall lapse and become void if a building permit is not obtained and construction not commenced and diligently pursued toward completion within two (2) years from when the approval becomes final. (Ord. 48 (1991) $ 2: Ord. 16(1978) 5 5(c)) 12-17-8: RELATED PERMITS AND REQUIREMENTS: ln addition to the conditions which may be prescribed pursuant to this chapter, any site or use subject to a variance permit shall also be subject to all other procedures, permits, and requirements of this and other applicable chapters and regulations of the town. In event of any conflict between the provisions of a variance permit and other permit or requirement, the more restrictive provision shall prevail. (Ord. 8(1973) S 19.900) Title 14 Development Standards Handbook Chapter 5 Parking Lot and Parking Structure Design Standards For All Uses (in part) Surfacing: All parking areas shall be an improved paved surface Landscaping: Nof /ess than 10% of the interior surface area of unenclosed off-street parking areas containing 15 or more parking spaces shall be devoted to landscaping. ln addition, landscape borders nof /ess than 10 feet in depth shall be provided at all edges of parking lots containing 30 or more parking spaces. A landscape berm, wall, or fence of not less than 4 feet in height, of the same architectural sty/e as the building, in combination with landscaping may be substrtufed for the landscape border. ln developments with cross-access or shared parking facilities, the landscape border between the development shall not be required. Lionshead Master Plan The Lionshead Master Plan, adopted December 15, 1998, references the proposed use and specifically the Holy Cross site in the following sections: Section 3.9: "The ground rules of the Lionshead master plan state that future redevelopment will not cause a net loss of parking. Section 3.2.5.3: Vail Associates Service Yard The Vail Associates service yard, bordered by the South Frontage Road on the east and south and Red Sandstone Creek on the west, currently contains a wide variety of mountain operation functions such as snowcat sewice and fueling, warehouse storage, and maintenance shops. l4/hile the service yard is critical to Vail Associates' mountain operations there is a strong interest on the part of the Town of Vail to see the majority of thesefacilities relocated on-mountain. According to Vail Associates it may be possible to relocate many of the facilities, but the snow cqt service and fueling operations must remain at or near its current location. Seclion 3.9. 4 Vail Associates Employee Parking Vail Associates cunently utilizes two large surface parking lots within the study area for its employee parking needs. The north day lot (see figure 3-15), with a capacity of approximately 105 cars, is located behind the Landmark tower and is the site proposed for a transportation center. The west day lot, located just west of the Mariott parking structure, has an approximate capacity of 160 cars and represents a significant development oppoftunity. Pa*ing vt. displaced by redevelopment of these sifes must be replaced within the Lionshead study area to satisfy the ground rule requiring no nef /oss of parking. Section 4.8.3.3 Potential New Parkine Sites a. Ll/est Lionshead/Vail Resorts Maintenance Site The construction a second public parking structure at the west end of Lionshead has been a planning consideration since the completion of the Vail Transportalion Master plan in I991 . This site is currently undeveloped (exceptfor the Vail Associates maintenonce yard) and is large enough to meet projected parking demand. It is well located in relation to the potential new eastbound I-70 access ramps. Potential logistical hurdles to the use of this site are asfollows: SURROUNDING LAND USES AND ZONING North: South: East: West: Land Use Roadway Residential Mixed Use Roadway ZONING ANALYSIS Legal Description: Zoning: Land Use Plan Designation: Current Land Use: Lot Size: Parking Area Landscape Area Zoninq no zoning Medium Density Multi-Family and SDD #5 Lionshead Mixed Use 1 (LMU-1) no zoning Holy Cross Site, 923 South Frontage Road WesUTract A Lionshead Mixes Use 2 (LMU-2) Lionshead Master Plan Parking and equipment storage vlt. Tract B Tract A Red Sandstone Road Parcel (TOV) l-70 R.O.W Parcel268 - Area of the proposed parking area: Area left undisturbed (Tract B) Area left undisturbed (Tract A) Area left undisturbed (TOV parcel) Area left undisturbed (l-70 pacel) % landscaped on Tract A, l-70, & TOV % landscaped on all parcels 141,744 s.f . 53,143 s.f. 14,418 s.f. 13.242 s.t. 222,547 s.f. 72,757 s.I. 5,336 s.f (4%) 23,637 s.f . (44o/o)0 s.f. (0%) 8,40a s.f. (63%) 40% 17o/o l0 I V!II. CRITERIA AND FINDINGS FOR REVIEW Conditional Use Permit In order to provide the flexibility necessary to achieve the objectives of the Zoning Regulations, specified uses are permitted in certain districts subject to the granting of a conditional use permit. Because of their unusual or special characteristics, conditional uses require review and evaluation so that they may be located properly with respect to the purposes of this title and with respect to their effects on surrounding properties. The review process prescribed in this chapter is intended to assure compatibility and harmonious development between conditional uses and surrounding properties and the Town at large. Uses listed as conditional uses in the various districts may be permitted subject to such conditions and limitations as the Town may prescribe to ensure that the location and operation of the conditional uses will be in accordance with development objectives of the Town and will not be detrimental to other uses or properties. Where conditions cannot be devised to achieve these objectives, applications for conditional use permits shall be denied. Before acting on a conditional use permit application, the Planning and Environmental Commission shall consider the following factors with respect to the proposed use: 1. Relationship and impact of the use on development objectives of the town. Staff believes that the proposed parking area, though unpaved and not landscaped, will still have a positive impact on the development objectives of the Town. The previous two conditional use permit approvals by the PEC (1990 and 2001) demonstrate that the site is well-suited as a parking area in addition to providing temporary relief of the existing parking problem in the winter and a more attractive alternative to the current use of the site for equipment and vehicle storage. The Lionshead Master Plan also states in Section 3.9.4 that Parking displaced by redevelopment on the West Day Lot and North Day lot'must be replaced within the Lionshead study area to satisfr the ground rule requiring no nel /oss of parking." Effect of the use on light and air, distribution of population, transportation facilities, utilities, schools, parks and recreation facilities, and other public facilities and public facilities needs. Staff believes the proposed parking area will have a positive impact on the above criteria. The proposed parking area will provide a safer parking opportunity for visitors who have previously parked on the South Frontage Road. The functionality of the South Frontage Road will therefore be improved during peak winter days. Effect upon traffic, with particular reference to congestion, automotive and pedestrian safety and convenience, traffic flow and control, access, 2. 3. ll maneuverability, and removal of snow from the streets and parking areas. Staff believes that the proposed parking area will have a positive impact on the above criteria. Because this parking lot will be used by employees who have previously parked at the West Day Lot, the West Day Lot will then be available to accomodate public parking that would have otherwise occurred on the South Frontage Road. With the reduction of parking on the South Frontage Road will come reduced congestion, increased safety for employees and skiers, and improved traffic flow. 4. Effect upon the character of the area in which the proposed use is to be located, including the scale and bulk of the proposed use in relation to surrounding uses. The above criteria are not relevant to the proposed parking area as there are no buildings associated with this proposal. The Planning and Environmental Commission shall make the following findings before granting a conditional use permit: 1. That the proposed location of the use is in accordance with the purposes of this Title and the purposes of the district in which the site is located. 2. That the proposed location of the use and the conditions under which it would be operated or maintained will not be detrimental to the public health, safety, or welfare, or materially injurious to properties or improvements in the vicinity. 3. That the proposed use will comply with each of the applicable provisions of this Title. Variance In order to prevent or to lessen such practical difficulties and unnecessary physical hardships inconsistent with the objectives of this title as would result from strict or literal interpretation and enforcement, variances from certain regulations may be granted. A practical difficulty or unnecessary physical hardship may result from the size, shape, or dimensions of a site or the location of existing structures thereon; from topographic or physical conditions on the site or in the immediate vicinity; or. from other physical limitations, street locations or conditions in the immediate vicinity. Cost or inconvenience to the applicant of strict or literal compliance with a regulation shall not be a reason for granting a variance. The applicant has requested a variance from Title 14 Chapter 5 of the Development Standards Handbook, Parking Lot and Parking Structure Design Standards For All Uses. According to Title 14 Chapter 5 "All parking areas shall be an improved suiace." l2 o Furthermore, it states; "Nof /ess than 10% of the interior surface area of unenclosed off-street parking areas containing 15 or more parking spaces shall be devoted to landscaping. In addition, landscape borders not /ess than 10 feet in depth shall be provided at all edges of parking lots containing 30 or more parking spaces. A landscape berm, wal[ or fence of not /ess than 4 feet in height, of the same architectural sfy/e as the building, in combination with landscaping may be substituted for the landscape border. ln developments wifh cross- access or shared parking facilities, the landscape border between the development shall not be required." The applicant is requesting a variance to allow for the continued use of a gravel surfaced parking facility with no interior landscaping. Section 12-17-6, Criteria and Findings, of the Vail Town Code, prescribes the criteria to be used by the Planning and Environmental Commission when considering a request for a variance. According to Section 12-17-6, Criteria and Findings, Before acting on a variance application, the Planning and Environmental Commission shall consider the following factors with respect to the requested variance: 1. The relationship of the requested variance to other existing or potential uses and structures in the vicinity. Generally speaking, the proposed parking area will have little to no negative affect on uses and structures in the vicinity. The proposal will allow the Town of Vail and Vail Resorts more time to develop additional parking for the public. Allowing an unpaved surface makes the public parking solution less urgent, as the West Day Lot would be available for public parking. Additionally, the use of this property, "in this quasi-industrial area of Vail', has historically been for vehicle and equipment storage. Therefore, the continuance of this site as a parking area should not be problematic. 2. The degree to which relief from the strict or literal interpretation and enforcement of a specified regulation is necessary to achieve compatibility and uniformity of treatment among sites in the vicinity, or to attain the objectives of this title without grant of special privilege. Staff believes that the proposed parking area will be a major benefit to the community in providing a safer experience for visitors by reducing the number of days and the number of vehicles parked on the Frontage Road. A requirement to immediately install an improved paved surface would not permit this proposal to work in the short time frame that exists to help address the skier parking problem yet this year. Additionally, the parking area is proposed to be paved as a part of Phase 2 of the project. Because these variances are sought to help provide a solution to the public parking condition throughout the Town, their approval should not be seen as granting a special privilege. The circumstances of the proposed uses and the variances required to make them happen are very unique and common only to very few l-f sites within the Town of Vail. To reduce the degree of relief asked for in this request, staff would recommend that the conditional use permit only be allowed for one year from the date of this approval. Staff has also considered thal40o/o of Tract A, l-70 property, and the TOV Right of Way will remain undisturbed and landscaoed. 3. The effect of the requested variance on light and air, distribution of population, transportation and traffic facilities, public facilities and utilities, and public safety. The proposed variances will allow parking facilities on private property (i.e. the West Day Lot) to become available to the public, thereby reducing parking on the South Frontage Road and improving the function of the South Frontage Road during peak days. Additionally, the proposed variances include the clean-up of one of the Town's least attractive sites. The proposed parking area will have little, if any, on the remainder of the above criteria. The maintenance of the berm and maintaining the riparian area of Red Sandstone creek is critical in buffering the site from adjacent land uses. 4. Such other factors and criteria as the Gommission deems applicable to the proposed variance. The planning and environmental commission shall make the following findings before granting a variance: 1. That the granting of the variance will not constitute a grant of special privilege inconsistent with the limitations on other properties classified in the same district. 2. That the granting of the variance will not be detrimental to the public health, safety, or welfare, or materially injurious to properties or improvements in the vicinity. 3. That the variance is warranted for one or more of the followino reasons: a. The strict or literal interpretation and enforcement of the specified regulation would result in practical difficulty or unnecessary physical hardship inconsistent with the objectives of this title. b. There are exceptional or extraordinary circumstances or conditions applicable to the site of the variance that do not apply generally to other properties in the same zone. c. The strict or literal interpretation and enforcement of the specified regulation would deprive the applicant of privileges enjoyed by the owners of other properties in the same district. t4 tx.STAFF RECOMMENDATION The Community Development Department recommends that the Planning and Environmental Commission approves with conditions the request for a final review of a variance from Title 14, Chapter 5, Parking Lot and Parking Structure Design Standards for All Uses, to allow for a deviation from the minimum landscape area requirement and to construct an unpaved, gravel parking surface, and a request for a conditional use permit to allow the construction of a private parking lot at the Holy Cross Site, located at 923 and 862 South Frontage Road WesUTract A, Tract B, l-70 R.OW. Parcel 268, and Red Sandstone Rd Parce 1. 1. The applicant shall provide CDOT approvals to the Town of Vail for the use of l- 70 R.OW. and any required access permits prior to use of the site for the proposed employee parking. 2. The conditional use permit shall expire on October 27,2004. 3. The applicant shall continue to have unobstructed fire department access to the lot through the berm opening on the south side of the site opposite the Eagle River and Water Sanitation District gas station. This access point shall be allowed pending CDOT approval of more than one entrance for the site. Appropriate signage and a "dummy gate' have been proposed by the applicant to clarify the purpose of the lot as a private, not public parking area. The applicant shall maintain and operate the proposed parking lot at an appropriate level of cleanliness by providing trash receptacles on the site for use by Vail Resorts' employees. The applicant shall maintain and operate the proposed parking lot at an appropriate level of safety by ensuring the removal of snow from the lot. Snow storage shall not occur within the berm opening that is to remain for the purpose of fire department access Snow storage may occur according to the following; 4. 5. a) within the areas designated on the site plan application, or b) through an opening in the north side of the limits required by the Town to protect existing vegetation. submitted with the of disturbance fence 6. Parking delineation within the site shall be through simple ropes and flags, communicating the appropriate spaces and efficiently maximizing the site. l5 Should the Planning and Environmental Commission choose to approve with conditions the applicant's requests, staff recommends that the following findings be made as part of the motion: Conditional Use Permit The Planning and Environmental Commission shall make the following findings before granting a conditional use permit: 1. That the proposed location of the temporary parking facility is in accordance with the purposes of the Town of Vail Zoning Regulations and the purposes of the Lionshead Mixed Use 2 zone district. 2. That the proposed location of the temporary parking area and the conditions under which it will be operated and maintained will not be detrimental to the public health, safety, or welfare, or materially injurious to properties or improvements in the vicinity. 3. That the temporary parking facility will comply with each of the applicable provisions of the Town of Vail Zoning Regulations Variance The planning and environmental commission shall make the following findings before granting a variance: That the granting of the parking lot suiace and landscape variance will not constitute a grant of special privilege inconsistent with the Iimitations on other propefties in the General Use zone district as the applicant is proposing compliance with the applicable elements of the Town's planning documents. That the granting of the parking lot surface and landscape variance will not be detrimental to the public health, safety, or welfare, or materially injurious to properties or improvements in the vicinity. That the variance is warranted for the following reason: The strict or literal interpretation and enforcement of the parking lot suiace and landscape area regulation would deprive the applicant of pivileges enjoyed by the owners of other propefties in the General Use zone district given the amount of hardscape area required on the development site to comply with the applicable planning documents of the Town of Vail. 1. 2. 3. t6 VI. ATTACHMENTS A. Vicinity Map & B. October 17,2003,letter from the applicant & Reduced copy of proposed plans C. Public notice t7 ATTACHI.IENT B l. r--r Introduction Summary of Proposal Vail Resorts, working in cooperation with the Town of Vail and the Parking Taskfotce, has developed several recommendations for both short-term and long-term solutions to reduce the amount of skier parking occuring on the Soutl Frontage Road. One of the shott-term solutions recommended for this ski season is to relocate the employee parking that occurs on the !7est Day Lot to the Holy Cross parcel across the street. In tum, Vail Resorts is making the West Day Lot available to the Town of Vail for public parking. Thc West Day I-othas tneTUfnty to park f6Oletietesth-atrnzyordinardy be parked along th. South Frontage Road. In order to facilitate the use of the West Day Lot for public patking, Vail Resorts is submitting a conditional use and vaitnce applications to fzcil-itate the clcan-up of the Holy Cross parcel by removing vehicles "stored" on the site and providing an efficient patking lot capable of parking 140 additional vehicles Q69 totil for site). l-tre new gain in pafting replaces t}le employce parking spaces previously located on the West Day Lot. 2. The current request (a conditional use permit for parking and a variance request for unpaved parking with no interior landscaping) will allow this unpaved parking zae^ fot the 2003-2004 ski season as phase 1 of a larger, mote petmanent ptoiect. No changes are proposed to the Maintenance Center uses as patt of this parking proposal. The existing vehicle storage and landscape equipment stotage have been removed from the site. Phase 2 of the project will ptovide approximately 166 additional parking spaces (295 total) depending on 6nal layout. The proposal will also pave the parking area and address any roadway improvements necessary for the site. Prior to May 2004 an application for a complete redevelopment of the parking on this site will be submitted to the Town for review and approval. The current schedule is to have the permanent solution (phase 2) completed by November 2004. The Town of Vail is a co-applicaot on this project as a portion of the land being used for parking is an old remaining piece of the Red Sandstone right-of-way which used to connect Highway 6 to Potato Patch priot to the existence of Interstate 70. This right-of-way parcel has been used by VaiI Resorts and Holy Ctoss Electric for parking and storage for the past 15 yeats or more. I{ey Elements of the Ptoposal Key elements of the plan include: . Improved safety and function of the South Frontage Road . Improved parking capacity for skiers r Improved organization and function of existing employee parking facility e First step in a long-term redevelopment of propety and replacement of employee parking in Lionshead Description of the Project Baclcgtound Holy Cross Parcel ffract A) Vail Resorts obtained tide to the Holy Cross parcel in 1995. Prior to obtaining ownetship of the parcel, Vail Resorts and Holy Cross Electric used the site for storage of vehicles and equipment. In 1990 the Town of Vail approved a conditional use permit and variances to allow the site to be utilizsd for parking and storage of Holy Cross Electric equipment. That approval aliowed for 101 unpaved parking spaces to be created. This approval has since expired. In 2001, the Town of Vail approved a conditional use permit for the site to be used again for vehicle storage as well as the storage of landscape equipment and materials for Fitz and Gaylord Landscaping. This approval allowed use of the same area of land as the 1990 approval but this approval limited the number of stored vehicles to 70 (these vehicles are no Ionger stored onsite). The approval allowed the parking swface to be unpaved. This approval has since expired. Maintenance Center flract B) in 1993 the Town of Vail approved a conditional use permit allowing an expansion of the Vail Resots Maintenance Center. That expansion allowed a building addition which contained offices, meeting areas, Iocker rooms, and storage. Along with that approval the Town allowed 129 employee parking/snowcat parking spaces. This conditional use permit - are provided in the proposed plan for the site. Project Components As stated above, the project includes a genetal clean-up of the Holy Ctoss parcel and maintenance center. Many of the overall project components do not require PEC approval as they are maintenance items and therefore some of this wotk is currently being performed on the site. The proposed plaln re-organizes and provides additional parking spaces on the Holy Cross parcel sitc for 140 additional parking spaces (269 total). This provides parking fot 140 of the 160 employee spaces found on the West Day Lot and therefore there will be a temporary shortage of 20 parking spaces. The Phase 2 proiect will accommodate approximate\ 166 employee spaces depending on final layout, and therefore teplace all of the rWest Day Lot parking. Thc proposed parking area rvill be accessed from within the Maintenance Center from the existing entrance on the South Frontage Road. fhe parking area will be further controlled with a gate to prevent trespass and to monitor the use of the lot. The parking lot is proposed to be unpaved and the applicant is seeking relief ftom the interiot parking lot landscape requirement in order to maxjtrnize the number of parking spaces. Phase 2 of the project is to pave all of the parking, provide additional parking spaces, and make any flecessary roadway imProvements. Pedestrian access and circulation will occur internal to the site and ctoss the South Frontage Road at the intersection with Forest Road to the existing pedestrian path located on the south side of the South Frontage Road. A painted ctossrvalk and signage will be ptovided at this location to alert the motorist to the presence of pedestdans. This will allow employees to have a safe and protected route to Lionshead. A potion of the proposed parking lot is being developed within the Town's Red Sandstone right-of-way parcel which divides Tract A and B as well as on a parcel owned by CDOT. In order to facilitate this project, the Town is co-applicant and is allowing the use of this parcel. Vail Resorts will be working with CDOT to obtain their petmission to use a portion of the parcel owned by CDOT. v) q) (.) li o0 +1 CB {.)aa E i sfu$*S tu$$$S ss ,g sSs E,$ ss$ s ,E :c NiS,s si $tr:sR$t st $tss3{i S$3tEi* t**sst si$S $${$ tl Sg {$ nEs $:s. fs E x:$,t}} F$i$stSE ;! Rt$R ilii IINR ii i sl{ERS ti;j E XsE,y$. :i Fr - sis$$ $ st c eu + ueis ti$. Sit €i € \|Ss*\ss$ $i5 rH E srs$t$!$S SsOA /'.Na a.511v {J .=:E HE <i -o o tFl .' l.1x xF v ;i a'lu do .O 4. Road. lt/ith thit ndtction in parkiag on the Sonh Fmntage Road, congestion wi// bc ndand and safeg, mane uue rabilifit, clnaenience, trafic fnw, and now nmoual nill all be inpmaed. Addilional!, the pmpwed parking lot will allowJor a safe, conuenient, and congution fne area for emplolus to park. d. Effect upon the chatacter of the area in which the proposed use is to be located, including the scale and bulk of the proposed use in relation to surounding uses. OarAnalyis: Tbe pmposed parkixg tot atill haue no impact on the aboac riteia as tbere an no baildingt a$odated ulilh this bmbosal. Variance Criteria Before acting on a vadance application, the Planning and Environmental Commission shall considet the following factors with respect to the tequested vadance: ^. The relationship of ttre requested vatiance to other existing or potential uses aod sffuctures in the vicinity. Out Analysis: The pmpond uaiance aill allow the Vail Renns and the Town to phase-in parking impmuements u,itbin the Town of Vail. Allowing the parking to be unpaued will allou the Town to pmuide additional parking to the public and redan congestion and ufeg clncerTt.f on the South Fmntage Roadyt thisyar. A mon pennanent nl ion wi// be prcsented in tbe following nonths. If this wriance is not @pmud, the Town of Vail will be anabb to acbieue nme of ils short-tem pmkinggoals- As the lYest Da1 L,ot atill not be aaailable for pablic pn'king. The an of this pmpefl1, in tht quai-indastial ana of Vail, bas birtlicail] beenfor aebich and equipment storage. b. The degtee to which relief ftom the strict or litetal intelpretation and enforcement of a specified regulation is necessary to achieve compatibility and uniformity of Eeatment among sites in the vicinity, or to attain the obiectives of this tide without gtant of special privilege. Out Analvsis: Rdieffnn the $ict and lileral interpntation of tbe rcgulations requiingparking to be paaed and parking anas to contain kndtc@ing it being nquuted as part of a two phand plan to inpmae the pnpertJ. The nlief is ako sought to altow the Town of Vail to achiew itt shot't-temt goal of ndtcing eongestion and inpmving tafeE of the Soatb Fmntage Road. The granting of tbey aariances will not grant a special pivilege as these impmaements an a bcingpmud h odcr to inpnw tln pfilic poking nndition thnagbwt thc Toptt Tbe cimtnstanns of tbcpmpond tw and tbc wcrionds nqrind to aab tbca h@pat an acry miq* and nmmor on! to wryfcu sitcs yithia thTovn oJVail The effect of the tequested vadance sa lighl 6d air, distribution of population, transportation and traffic facilities, public facilities and utilities, and public safety. OrltAnalysis: Thpnpond wianas n'ill albuparkiagfadhtics onpriaahpnpa! n bcoac auilabh to tbc Pblic ail nfun parking on tbe So$b Fnntagt Road, thmfon iapnoiag tba findioa of tbc Sotb Fmntage Road furiagpak dgs, Thc pnpondpmkigana pill haw litth, if aay on the nnoirder of tbc abou ctibria ATTACHMENT C - or- THIS ITEM MAYAFFECT YOUR PROPERTY PUBLIC NOTICE NOTICE lS HEREBY GIVEN that the Planning and Environmental Commission of the Town of Vail will hold a public hearing in accordance with Section 12-3-6 of the Vail Town Code on, October 27,2003, at 2:00 P.M. in the Town of Vail Municipal Building. In consideration of: A request for a setback variance pursuant to Section 12-6D-6 Setbacks, Vail Town Code, to allow for a garage addition, located at 1956 West Gore Creek Drive/Lot 45, Vail Village West 2nd Filing. Applicant: David lrwin Planner: Matt Gennett A request for a sign variance pursuant to Section 11-48.20, Window Signs, and Section 11-4A- 1, Signs Permitted in Zone District, Vail Town Code, to allow for additional signage for Bogart's Bar and Bistro, located at 143 East Meadow Drive, Unit 165 (Crossroads)/Lot P, Block 5D, Vail Village l"tFiling. Applicant: A. Luc Pols Planner: Matt Gennett A request for a conditional use permit, pursuant to Section 12-6H-3, Conditional Uses, Vail Town Code, to allow for a public utility and public services use, located at 501 North Frontage Road (Solar Vail Condominiums)/ Lot 8, Block2, Vail Potato Patch 'lst Filing. Applicant Nextel, represented by Glen Klocke Planner: WarrenCampbell A request for a conditional use permit, pursuant to Section 12-9C-3, Conditional Uses, Vail Town Code, to allow for a public utilities installation, located at 545 North Frontage Road (Red Sandstone Elementary School)/Part of Lot 8, Block 2, Vail Potato Patch 'lst Filing. Applicant: AT&T Wireless Services, Inc. Planner: WarrenCampbell A request for a minor subdivision pursuant to Chapter 134, Minor Subdivision, Vail Town Code, to allow for the replatting of property boundary amendments, located at 2965 & 2975 Manns Ranch Road, Lots 5 & 6, Block 1, Vail Village 13' Filing. Applicant Clinton J. Kendrick, represented by Segerberg, Mayhew, and Associates Planner: Bill Gibson A request for conditional use permit, pursuant to Section 12-71-5, Vail Town Code, and a variance from Title 14, Chapter 5, Parking Lot and Parking Structure Design Standards for All Uses, Vail Town Code, to allow for the construction of an unpaved private parking lot, located at 862 South Frontage Road WesVUnplatted. (A complete metes and bounds legal description is available for review at the Town of Vail Community Development Department). Applicant: Vail Resorts Planner: ElisabethEckel Vail Resorts Holy Cross/lVlaintenance Site October 2003 TOWN OF VAIL FINANCE DEPARTMENT 75 S. FRONTAGE ROAD VAIL CO 81657 @ COLORADO DEPT OF TRANSPORTATION 4201 E ARKANSAS AVE DEI.WER CO80222 @ VAIL SPA CONDOMINIUM ASSOC 710 W LIONSHEAD CIR VAIL CO 81657 @ L-O VAIL HOLDING INC C/O DELOITTE & TOUCHE LLP 555 ITTII ST STE 3600 DEi.WER CO 80202 @ GLEN LYON OFFICE BUILDING % ANDREW D. NORRIS / 1OOOSFRONTAGEW V VAIL CO 81657 (4. ila r ueNecEMENT LLG,/ 953 S FRONTAGE RD W 23il VAIL CO 81657 @ G. LOVENLLC 934 S FRONTAGE RD VAIL CO 81657 @ vArL coRP ./ PO BOX 7 ''l vArL co 81658 @ EAGLE RTVERWATER & SANITATION DISTRICT 846FORESTROAD,/ vArL co 81657 v @ BRAI-]N ASSOCI,ATES, INC. PO BOX 2658 EDWARDS CO 81632 @ o Application for Review by the Planning and Environmental Commission Department of Community Derelopment 75 South Frontage Road, Vail, Colorado 81657 tel: 970.479.2L39 tax: 970.4A.2452 . web: wwwci.vail.co.us General Information: All projects requiring Planning and Environmental Commission review must receive approval prior to submitting a building permit appliotion. Please refer to the submitbl requirements for the particular approval that is requested. An application for Planning and Environmenbl Commission review cannot be.acceded until all required information is received by the Community Development DeparttnenL The project may also need to be reviewed by the Town Council and/or the Design Review 8oard. Type of Application and Fee: E1 Conditional Use Permittr FloodplainModificationtr Minor Exterior Alterationtr Major gxterior Alterationtr Development Plantr Amendment to a Development Plantr Zoning Code Amendmenttr Variancetr Sign Variance $6s0 $400 $6s0 $800 $1s00 $2s0 $1300 $s00 $200 I0t4h,# Physical Address: Zoning: tr Rezoning $1300tr Major Subdivision $1500tr Minor Subdivi$on $650tr Exemption Plat $650E MinorAmendmenttoanSDD $1000tr New Special Development District $6000tr Major Amendment to an SDD $6000tr MajorAmendmentto an SDD $1250 (no exterior modillations) Description of the Request: Parcel No.: S;.e- dlaplezt (Conact Eagle Co.328-8&40 for parcel no.) Name(s) of Owner(s):Vat n*'-* I :-oV e\ I*I*JMailing Address: Owner(s) Signature(s): Name of Applicant: -l MailinsAddress: --Ko^+ :t floi.\ Cs BttSA Phone: +Lq - 46el E-matf Addresst Ln c-\c $-rgrsLft rat 471-107o ?col otzo For Office Use Only: Fee Paid: Check No,:_ By: Date: Planner: Page I of5-01/18/02 t\ I, (print name)J a joint owner of property located at (address/legal description) provide this letter as written approval of the plans dated which have been submitted to the Town of Vail Community Development Department for the proposed improvements to be completed at the address noted above. I understand that the proposed improvements include: I further understand that minor modifications may be made to the plans over the course of the review process to ensure compliance with the Town's applicable codes and regulations. (Signature)(Date) J\tY Page 2 of5-01/18/02 TOI4'NM Conditional Use Permit Submittal Req uirements GENERAL INFORMATION A conditional use permit is required for any use classified as being "conditional" in any of the Town's zone districts. All applications for conditional use permits are reviewed by the Planning and Environmental Commission. Uses listed as conditional uses in the various districts may be permitted subject to such conditions and limitations as the Town may prescribe to ensure that the location and operation of the conditional uses will be in accordance with development objectives of the Town and will not be detrimental to other uses or properties. B Fee: $650.00 There is no fee required for conditional use permits for Employee Housing Units (EHU's), however, Design Review fees are required. o Stamped, addressed envelopes and a list of the property owners adjacent to the subject property, including properties behind and across streets. The list of property owners shall include the owners'name(s), corresponding mailing address, and the physical address and legal description of the property owned by each. The applicant is responsible for correct names and mailing addresses. This information is available from the Eagle County Assessot"s office. o Title Report, including Schedules A & B. o Written approval from a condominium association, landlord, and joint owner, if applicable. o A written statement addressing the following: a. Describe the precise nature of the proposed use and measures proposed to make the use compatible with other properties in the vicinity. b. The relationship and impact of the use on development objectives of the Town. c. The effect of the use on light and air, distribution of population, transportation facilities, utilities, schools, parks and recreation facilities, and other public facilities and public facilities neeos. d. The effect upon traffic, with particular reference to congestion, automotive and pedestrian safety and convenience, traffic flow and control, access, maneuverability, and removal of snow from the streets and parking area. e. The effect upon the character of the area in which the proposed use is to be located, including the scale and bulk of the proposed use in relation to surrounding uses. o Existing and Proposed Site and Grading Plans (Four complete sets of plans). o Existing and Proposed Architectural Elevations (Four complete sets of plans). o Existing and Proposed Architecturat Floor Plans (Four complete sets of plans). o All ptans must also be submitted in 8.5" x 11" reduced format. These are required for the Planning and Environmental Commission members' information packets, o Additional Material: The Administrator and/or PEC may require the submission of additional plans, drawings, specifications, samples and other materials if deemed necessary to properly evaluate the proposal. Pase 3 of5-01/18/02 II. DETAILEDSUBMITTALREOUIREMENTS Site and Grading Plan:o Scale of !"=20'or largertr Property and setback lineso Existing and proposed easementstr Existing and proposed gradesD Existing and proposed layout of buildings and other structures including decks, patios, fences and walls. Indicate the foundation with a dashed line and the roof edge with a solid line.o All proposed roof ridge lines with proposed ridge elevations. Indicate existing and proposed grades shown underneath all roof lines. This will be used to calculate building height.o Proposed driveways, including percent slope and spot elevations at the property line, garage slab and as necessary along the centerline ofthe driveway to accurately reflect grade.o A 4' wide unheated concrete pan at the edge of asphalt for driveways that exit the street in an uphill clirection.tr Locations of all utilities including existing sources and proposed service lines from sources to the structures.tr Proposed surface drainage on and off-site,tr Location of landscaped areas.o Location of limits of disturbance fencingo Location of all required parking spaceso Snow storage areas,o Proposed dumpster location and detail of dumpster enclosure.o Retaining walls with proposed elevations at top and bottom of walls. A detailed cross-section and elevation drawings shall be provided on the plan or separate sheet. Stamped engineering drawings are required for walls between 4' and 6'feet in height.o Delineate areas to be phased and appropriate timing, if applicable Architectural Floor Plans:u Scale of 1/8" = 1'or larger; 1/4" is preferred o Floor plans of the proposed development drawn to scale and fully dimensioned. Floor plans and building elevations must be drawn at the same scale.o Clearly indicate on the floor plans the inside face of the exterior structural walls of the building.tr Label floor plans to indicate the proposed floor area use (i.e. bedroom, kitchen, etc.).tr One set of floor plans must be "red-lined" indicating how the gross residential floor area (GRFA) was calculated. See Title 12, Chapter 15 - Gross Residential Floor Area for regulations.o Provide dimensions of all roof eaves and overhangs, Architectural Elevations:u Scale of 1/8" = 1'or larger; 1/4" is preferred s All elevations of the proposed development drawn to scale and fully dimensioned. The elevation drawings must show both existing and finished grades. Floor plans and building elevations must be drawn at the same scale,o If building faces are proposed at angles not represented well on the normal building elevations, show these faces also.n Elevations shall show proposed finished elevation of floors and roofs on all levels.o All exterior materials and colors shall be specified on the elevations.a The following shall be shown graphically and fully dimensioned: fascia, trim, railings, chimney caps, meter locations, and window details,a Show all proposed exterior lighting fixtures on the building.o Illustrate all decks, porches and balconies,o Indicate the roof and building drainage system (i.e. gutters and downspouts).o Indicate all rooftop mechanical systems and all other roof structures, if applicable.o Illustrate proposed building height elevation on roof lines and ridges, These elevations should coordinate with the finished floor elevations and the datum used for the survey. Paee 4 of 5-01/ l8/02 o Exterior color and material samples shall be submitted to staff and presented at the Design Review Board meeting. PRE.APPLICATION CONFERENCE A pre-application conference with a planning staff member is strongly encouraged. No application will be accepted unless it is complete. It is the applicant's responsibility to make an appointment with the staff to determine submittal requirements. TIME REOUIREMENTS The Planning and Environmental Commission meets on the 2nd and 4th Mondays of each month. A complete application form and all accompanying material (as described above) must be accepted by the Community Development Department by the appropriate submittal date, which is a minimum of four (4) weeks prior to the date of the PEC public hearing. All PEC approved conditional use permits shall lapse if construction is not commenced within one year of the date of approval and diligently pursued to completion, or if the use for which the approval is granted is not commenced within one year. ADDMONAL REVIEW A. If this application requires separate review by any local, State or Federal agency other than the Town of Vail, the application fee shall be increased by $200.00. Examples of such review, may include, but are not limited to: Colorado Department of Highway Access Permits, Army Corps of Engineers 404, etc. B. The applicant shall be responsible for paying any publishing fees which are in excess of 500/o of the application fee. If, at the applicant's request, any matter is postponed for hearing, causing the matter to be re-published, then, the entire fee for such re-publication shall be paid by the applicant. C. Applications deemed by the Community Development Department to have design, land use or other issues which may have a significant impact on the community may require review by consultants in addition to Town staff. Should a determination be made by the Town staff that an outside consultant is needed, the Community Development Department may hire the consultant. The Department shall estimate the amount of money necessary to pay the consultant and this amount shall be forwarded to the Town by the applicant at the time of filing an application. Expenses incurred by the Town in excess of the amount forwarded by the applicant shall be paid to the Town by the applicant within 30 days of notification by the Town. Any excess funds will be returned to the applicant upon review completion. Please note that only complete applications will be accepted All of the required information must be submitted in orderfor the application to be deemed complete. Page 5 of 5-01/ 1 8/02 From: To: Date: Subject: Elisabeth Eckel Dominic Mauriello 101141200311:43:34 AM Re: Holy Cross Applications Thanks Dominic: I just left you a message about some of the things we discussed this morning: 1)limits of disturbance noted on the site plan 2)existing vs. proposed grade, not just proposed 3)change in gate location 4)berm change on soulhem side of lot 5)location of proposed snow storage That's all I can think of now, though I have scheduled the application for DRT tomorrow morning and will let you know the resulls of that meeting once it occurs. Discussion of grading, etc. will ensue with Charlie Davis directly. I also had a couple of questions, though not urgent ones, about the parking numbers. I am either doing my math wrong or misunderstanding the allocation of spots between Tracts A and B. Thanks much! Elisabeth >>> "Dominic Mauriello" <dominic@braunasso > 1011412003 11:29:38 AM >>> Hi Elizabeth: It sounds like our plan might change a little based on Russ' meeting with Brian McCartney. So I will not bring the plans over today. I will get you revised plans if they change. --- Original Message --- From: Elisabeth Eckel To: dominic@braunassociales.com Sent: Tuesday, October 14,2003 8:50 AM Subject Re: Holy Cross Applications Thanks Dominic: I am printing the plans now and will get back with you once I review them and get comments at our Stafi meeting. Elisabeth >>> "Dominic Mauriello" <dominic,@braunassociates.com> 10/13/2003 5:48:46 PM >>> Hi Elisabeth: Attached are PDF files of the written submittal and the proposed phase 1 and 2 plans for the Holy Cross site. I have also faxed to you the signed application forms and title report. Greg Hall will be delivering signed applications on behalf of the Town. The plans can be printed at 11 x 17 . I will deliver full-size plans tomonow. Thanks for your help on this. Let me know if you need additional materials. I am happy to meet with you to review the plans. Dominic F. Mauriello, AICP Braun Associates, lnc. PO Box 2658 Edwards, CO 81632 Phone: 970.926.7575 Fax 970.926.7576 Email: dominic@braunassociates.com CC: Russ Fonest From: Warren CampbellTo: Dominic Mauriello; eeckel@ci.vail.co.usDate: 1Ol'lOl2O03 11'.47:12 AM Subject: Re: Holy Cross Parking Dominic I think Elisabeth is gone for the day. I believe we have the front cover of a conditional use application and maybe the fee for that but that is all. Wanen PS We don't know how but the wrong agenda was published in the newspaper. Regardless if you look at the notices you will see I advertised your changed application for the 27th so I think we are OK. >>> "Dominic Mauriello" <dominic@braunassociates.com> 1011012003 1 1 :29:1 9 AM >>> Hi Elisabeth: I left you a voicemail. I want to make sure you have all of the materials required for this conditional use and variance application. Has an application of any kind been submitted or any fee? I would like to submit whatever is missing on Monday. That includes (l think): Variance Application forms and fees (if conditional use is missing, submit that too) Title report Plan showing phase 1 (temporary unpaved parking) Plan showing future phase 2 (permanent solution and improvements. This will be submitted for review by March of next year with an anticipated construction stiart next summer) Survey of property Written document explaining the project and addressing criteria (l might need until Tuesday on this).That should be everything you need. Let me know if there is something else you need. Will my schedule work for you? Thanks, Dominic F. Mauriello. AIGP Braun Associates, Inc. PO Box 2658 Edwards. CO 81632 Phone: 970.926.7575 Fax: 970.926.7576Email:@ From: "Dominic Mauriello" <dominic@braunassociates.com> To: "Elisabeth Eckel" <EEckel@vailgov.com> Date: 1011012003 1 1:29:26 AM Subject: Holy Cross Parking Hi Elisabeth: I left you a voicemail. I want to make sure you have all of the materials required for this conditional use and variance application. Has an application of any kind been submifted or any fee? I would like to submit whatever is missing on Monday. That includes (l think): a.. Variance Application forms and fees (if conditional use is missing, submit that ioo) b.. Title report c.. Plan showing phase 1 (temporary unpaved parking) d.. Plan showing future phase 2 (permanent solution and improvements. This will be submitted for review by March of next year with an anticipated construction start next summer) e.. Survey of property f.. Written document explaining the project and addressing criteria (l might need until Tuesday on this). That should be eve$hing you need. Let me knor if there is something else you need. Will my schedule work for you? Thanks, Dominic F. Mauriello, AICP Braun Associates, Inc. PO Box 2658 Edwards, CO 81632 Phone: 970.926.7575 Fax 970.926.7576 Email: dominic@braunassociates.com CC: 'Wanen Campbell" <WOampbell@vailgov.com> October 30, 2003 Mr. Dominic Mauriello Braun Associates, Inc. PO Box 2658 Edwards, CO 81632 Re: Holy Cross Parking Lot 923 South Frontage Road PEC03-0070 Dear Dominic, Thank you for attending the Planning and Environmental Commission on Monday, October 27, 2003, regarding the application for a conditional use permit to use the Holy Cross site as a parking lot for Vail Resorts' employees throughout the upcoming ski season. As you know, the PEC approved the application with seven conditions, which I have listed on the approval form enclosed and which have already been communicated to you through the final agenda that Warren sent earlier. Please do not hesitate to contact mqlegarding any remaining concerns you might have.""",,ff, ,il,{cfupy Elisabeth Eckel 970.479.2454 enclosure l.* + +t +* * * * * ** ++ **** * ******* * ** ** *+*{.*** *f *t ** * ** ** +* * * *,} * * ** *a* * * * * t ++ * ********+ ** **f***t * t * TOWNOFVAIL, COLORADO Statemeot * ***+ ** * * * ***l +*+* ** * + + *** ** *t + l*+** * * f*l* * * * *** *+ ** +*** +*+ * * *** *{' + + ** *** * *l ** * * * * ** t* t * * * * * Statement Nuniber: R030004855 Amount: $550.00 LO/07/2OO3Oa:27 Attl Palment Method: Check Init: DF Notation: CHECK # 6852 Permit No: PEC030070 114)e: PEC - Conditional Use , Parcel No: 2LOLO72OOOO2 r r \ Site Address: 852 S FRONTAGE RD hIEST VAIL \ !4\ ,^ / I'ocat j.on: vail Resorts shop area ,n |l f / ?2 roral- Fees: g6so. oo \\' ,1fi7 t This Pa)ment: gdso.oo rotal Atr, pmts: g6so. oo'/ X\y Balance: go.oo I /' ***+*********+**{.** ******'r********,r,}'**'}*** r.******'r{.*********************+*'}*,}**'t++**********- ACCOI,JNT ITEM LIST: Account Code Description Cunrent Pmts PV OO1OOOO31125OO PEC APPLICATION FEES 650.00 Ls/L3l2a6l 65:44 978-9 { I 26-75o BRAUN ASSOCIA TESa PAGE A2 , Name of Applicant: f Maltng Addr€e3:t- \L G.enstEl fnforrnaUon: ffi f Hffi"-m'ffiftffiffi,nT"ffi;#,ffi,"ffi t'trlry,TffiJ':Y.1ffi*,TJlFlgq ot or i;"i ffiil:l_"." the.prannrni ana-erivrtimentar @mmrsron.-oneyrarotorriTiil"ll''* u,'lert r bulHlng pcmh It Irrueo ano'o-rnffiiiion-comrmncer '"tttrln ofltra Rcqusct; PhyrlcdAddrc$: 923 s. Fronboe Road r Parorl f{o.: 2703711)&r.rrr I E--r^ ^-Eagle Co. Assssor at 9ZI.32B_8840 for parel rn.) Nrh€(3) of Orunrr(r)r Itlalllng Addrerc: Owne(r) Sgnaturc(r): E.mallAddrur: TYpe of Revfcw and Fco: Slgns ' Conceptual Revlcw tfcw QnstrucUon Addfuoll I Mlnor Alhiadon (multl+Tfly/commercbt) t'lhtorAdntbni (slngile.rtml[/dupter) lI0_ Hsr +t.00 per squar€ tuot of bbt Can ar€a.No F€e l3i3 fr ils,ffi_fi aiH,L',5$,[i3:/#'* .ny,o,o",,tu o,$zio ffiffiYlT,lH[t1ilffiil.:ff*;;iffiw#;''r€rtlonng, Fptnuns, wtndd addHoni,-T.-n6;]i;, tcrces andffiahhg walls, etc,v4u ror mlmr chans€, b Hglf :8.*E tmplpvemelrb, eudl Es,ltrootilrs, pltnum, wrraof aaaiufr;; H',fffiffi, ftnces andretthhg relb,.E.+zr, _ror rllflslom b dana atready appnrrcd bf Flannfrrg St|fr or the**" W naacyveoirO. tr l'l A|ang€s b AFrcved p,ans S€pantton REqu€st | 'J A7l ,n rl TESo\,r,,r,rrr3 os:47 t. 978-926-7t78 Type ofAppflcadon and Fee: BRAUN ASSOCIA PAGE E3 rfjw# p ra n n f,?pilli'Hl,[l*Tiili llll","",o n "$",ffi'lffi iltrlllJilHl#ill" web: tw,r,v. cl,\rdll.co,us l*mi,*m'roWm tr Rezonlno I tr MgJorsribdtvtstorl ( u Miorsu&MCon LJ E+mpuon plat , ! Mitbr Amerrdment to an SDD'fiil#mm:i#" \ qoffitunMtfi@tbns) $1300 $1500 $6s0 $650 $1000 $5000 $6000 $12s0 (mu;y,,mg* U Mlnof Btterlor Afterauon ! lalorEterlorAlterdonu Dev€bpment planu Amendment b a Dwelopmont plan *Tyne Codenrnen<tmeniur vaflanetr Slgn Vadanae $6s0 $100 $650 $8oo f1s00 $250 $um $roo $200 Ptryclcal {!drcsr: LocaUon ofthe prupocah tot.l&cE3-Ad!_Block!- Subdlvlslon, soutfr frontage Road Subdlvlston I Parcef No;_.2I0giLZ124IlgL( Eagte co. Assessor ar e7o_328_8640 Zoning: Name(c) of Oymcr{r): Malllng Addrerr: Ownar(c) Stgnatun(r): l{ame of Appthart: ilr|llryAddrarr: \ Dercrifion of the E-mattAdr|Iet.: PhonGr l) 2) 3) 4)5)T coryleting our mov€ enables winter, wc of'04. any Vice Vail w)c) 331- cc. Jack Bill please give me a call. Qvail. Russell Forrest TOV Plenning and Development 1,2003 to clarif VRI's plan for the Holy Cross parking lot. year and the eventual approvals required to conplete the project plans that you have the project into two phases. necessary maintenance and light constnrction to use the lot again this wintet to park required to organize the lot and power #2 below. to cotrtol and monitor lot use. minor modifications and redirect surface water into existing system. - select materials (tack or chip). connecting to the Marriott sidewalk. our corporate vchicles to the Mintun 6cility, we will be ablc to total vehicles) that previously parked in the West Day lot. As you know, TOV to utilize the West Day lot for guest parking and veekend our planning and submit Phase II for approvals hopefirlly to begin in Norah America's #t Resott ..^/\/\,- VarL RrtoitfPost Offics JeffBabb 658 . 970-845-2500 . www.vall.oom g PAGE A4TESoBRAUN ASSOCIA Chicago Title Instrance Corrpany ALTA COMMITMENT ( Our Order No. VC273511.15 Cnst. Ref.:I Schedule A hoperty Addresst SOUTH FRONTACB ROAD STJBDIVISION I I Effrpive Date June 19, 2002 at 5100 p.M. \ Policy to bb Issued, and Proposed lruurcdl Inforfnation Binder I Prop[sed Insured: THE IVArL CORPORAfiON, A COLORADO CORPORATTON l \ I II 3' The estate 01 tnterlil in the land rtescribed or referred to ln this Commitment and covered herein is: I , A Fee Simple tl (1. na} to the ."tatf or intertst covercd herein is at tbe effective dale hereof vetted in: I THE VArL CORPORATION, A COLORADO CORPORATION I I tl rl t 5.\ The landreferred to in thls Commltment ls descrlbed a foltows: I I IIITSS.4 AND B, SOUTH FRONTAGE ROAD SUBDIVISION, ACCORDING TO THE PLAT RECORDED INOVEMBER 6, 20q,RECBprrON No. 743424, COUNTy OF riAcLE, Siari or coLoRADo. \ I I I I 6 tt lilrctzaas BE:48 976-928-7578o BRATJN ASSOCIA TE5o ALTA COMMITMENT ScheituleB-Sectionl . (Requirernents)Our OrderNo. Ven35l1.l5 The following arc the r€quirem€nts to be complied wlth: Item (a) Payment to or for the account of the grantors or mortgagors of the ftrll consideration for the estate or ipterest to be insured. I IS FOR INFORMATION ONLY, AND NO POUCY W1LL BE ISSUED PAGE A5 I '\{ l I'LEl13/2AA3 85.49 978-926-7576I BRAUN ASSOCIA TE5o PAGE g6 I ALTA COMMITMBNT ScheduleB -Section2 (Exceptions)Our OrderNo. y0n3ill.ls Taxes o{snecial asses$nents which are not shown as existing liens by the public records.o the Tieasurer,s ofEce. Liens for'unpaid water snd sewer cbargas, if any. . In addition, the owuer's policy will be subject to the mo$gage, if any, noted in Section I of schedule B hereof. lf ryltcr f-p"lld* to be Issued wlll contaln exceptions to the following unlcs the same are dtsposedoI to the satlsfaction of the Company: t \Rights or claims of parties in possession not shown by the public records. Easemelts, or claims of easements, not shown by the public records, l]s-c^|Jyle} :?$i.S 1" bounda.ry lines, shortage in area, encroacbmeors, and any facrs which a correcr survey aadinspection of the would disclose and which are not showu by the public records, Any lien, or to a lien, for services, labor or material theretofore or hereafter furnisrred.imposed by law andnot shpwn by thf public records, Defec$, lieru,, adverse clainrs or other matters, ifany, creatal, first appearing in the public rccords orattacbi{g !o the effective date hereof but prior to the date the proposed insured a-c4uires of recorrl forvalue tE estate or mortgage thereon covered by this Cornmitnrenf. 6. 1 8. e.i RICHT OF PROPRIETOR OF A VEIN OR LODE TO DffRACT AND REMOVE HIS ORETHERIFROM SHOULD THE SAME BB FOUND TO PENETRATE ORINTERSECT TIIE PREMISES \ AS RESERVED IN I,JNITBD STATES PATENT RECORDED DECEMBBR i9,IrlO,IN BOOK 93AT PACE 42 AND RECORDED SEPTEMBER 4, Ic,]S IN BOOK 93 AT PAGE 98, I0.GHT OF WAY FOR DITCHES OR CANALS CONSTRUCTED BY TT{E AUTHORITT OF TI{EIIEPIIIIB! AS RESERVED IN UMTED STATES PATBNT RECORDED DECEMBBR 29, PO' {.I-BOOK 93 AT PAGE 42 AND RECORDED SEPTEMBER 4, 1%3 IN BOOK 93 ATAGE 98. EAIEMEI$ AND NGHT OF WAy FOR RED SANDSTONB CXABK. EASEtrVIENT AS GRANTED TO VAIL WATER AND SAMTATION DISTRICT INUMENT RECORDED JULY 05, 1980, IN BOOK 205 AT PAGE 3I. CONDIT'IONS, COVENANTS, RESTRICTIONS, RISERVATIONS AND NOTES ONTHE RFCORDED PLAT OF SOUTH FRONTIGE ROAD SUBDIVISION. I 4?/4.fu ^ Gr) 'f,* ''l/ Vail Resorts/Town of Frontage Road Patking Reduction Proiect Lionshead Application for Conditional Use Petrnit, Vatiance, and Design Reuiew October 2003 'ffi* ;fufu,ta,l /22' \-/ Io Vail Resorts/Town of Vail Frontage Road Parking Reduction Proiect Lionshead Prepared For: Vail Resorts, Inc. PO Box 7 Vail, CO 81658 & Town ofVail Prepared by: Braun Associates, Inc. PO Box 2658 Edwards, CO 81632 1.Introduction Sununaty of Proposal Vail Resorts, working in cooperation with the Town of Vail and the Parking Taskforce, has developed several recommendations for both short-term and long-term solutions to reduce the amount of skier parking occuring on the South Frontage Road. One of the short-term solutions tecommended for this ski season is to relocate the employee parking that occuts on the@1p4y Lot to the Holy Cross Patcel actoss the steet. Iri tum, Vail Resorts is making the West Day Lot available to the Town of Vail for public parking. The West Day Lot has the ability to park 160 vehicles that may ordinarily be pa*ed along the South Frontage Road. In order to facilitate tte use of the \West Day Lot for public parking, Vail Resorts is submitting a conditional use and vaganlg,_alptigeflons to facilitate the clean-up of the Holy Cross patcel and the Nlaintenance Center by removrg&*€kictgs-^btq$ed" on the site and providing an efhcient parking lot capable of parld4g277 vehicles. 'Dhe new gain in patking replaces the employee parking spaces previously locaFcl6fiFe $7est Day Lot. The current reouest /a conditionaLr:se-sermit for parking anC a-variancc reouest for unpaved parking with no interior landscaping) will allow thiFunpaved parking area for the 2003-2004 ski season as phase 7 of a larger, more permanent proiect. 4ll existing Maintenance Center uses are being maintain.d *i4:hit p:qpqt"]. The edsdng@ e@prnent storage arc being removed from the site.eqwpment storage are bemg removed trom the stte. _ ,. L11 Phase 2 of the project will provide additional parking ,r^rr@I$]!r. tt't" p".Li'g area, improve parking surface on the remainder of the site @bream'ce Center), and address zny road.wzy improvements necessary for the site. Prior to Mry 2004 an application for a complete tedevelopment of the parking on this site will be submitted to the Town for review and approval. The current schedule is to have the permanent solution (phase 2) completed by November 2004. The Town of Vail is a co-applicant on this project as a portion of the land being used for parking is an old remaining piece of the Red Sandstone right-of-way which used to connect Highway 6 to Potato Patch prior to the existence of Interstate 70. This right-of-way parcel has been used by Vail Resorts and Holy Cross Electric for parking and storage for the past 1 5 years or more . Key Elements of the Prcposal Key elements of the plan include: . Improved safery and function of the South Frontage Road 1o Improved parking capacity for skiers t n Wasr nt Li) . Improved organization and function of existing employee parking facility r First step in a long-term redevelopment of property and replacement of employee parking in Lionshead 2.Description of the Proiect 'ail Resorts ob-tained tide to the Holy Cross parcel in 1995. Prior to obtaining ownership of the parcel, Vail Resons and Holy Cross Electric used the site for storage of vehicles and equipment. In 1990 the Town of Vail approved a conditional use permit and variances to allow the site to be utilized for parking and storage of Holy Cross Electric equipment. That approval allowed for 101 unpaved parking spaces to be cteated. This approval has since exoired. In 2001, the Town of Vail approved a conditional use permit for the site to be used again for veh-icle storage as well as the storage of landscape equipment and materials for Fitz and Gaylord Landscaping. This approval allowed use of the same area of land as the 1990 approval but this approval limited the number of stored vehicles to 70 (these vehicles are no longer stored onsite). The approval allowed the parking sutface to be unpaved. This approval has since expired. In 1993 the Town ofW approved a conditional use permit allowing an expansion of the Vail Resorts Maintenance Center. That expansion allowed a buildine addition whicha rry^h{" W il*d,%q contained offices, meeting areas, locker rooms, and storage. Along with that approval the Town allowed 129 employee parking/snowcat parking spaces. This conditional use permit is still valid for the operation there today. These 129 spaces allowed by the 1993 approval are provided in the proposed plan for the site. Ptoject Components As stated above, the project includes a general clean-up of the Holy Cross parcel and malntenance center.of the overall proi ts do not PEC val as they are maintenanle items and therefote some of this work is - ed on the site. The proposed plan re-organizes and provides additional parking spaces on the Holy Cross parcel and Maintenance Center site for a total of 277 pall<tng spaces. This provides parking for 148 of the 160 employee spaces found on the West Day Lot. The Phase 2 project will accommodate 166 employee spaces, and therefore there will be a temporary shortage of 12 parking spaces. The proposed parking area will be accessed from the South Frontage Road and controlled with a gate. The Maintenance Center will continue to be acqss from the South Fronage Road opposite the intersection of Forest Road. The easter{/iost access to the Maintenance Center will be closed as part of the cleanup work being donE to tLis site. The pa*ing lot is proposed to be unpaved and the applicant is seeking relief from the interior parking lot landscape requirement in order to maximize the number of parking spaces. Phase 2 of the project is to pave all of the parking, provide additional parking spaces Q94 total spaces), and !nu-u- f'lo LhlF4Afits[4- 4 Pedestrian access and circulation will occur internal to the site and cross the South tA '-_../Frontage Road at the intersection with Forest Road to the existing pedestrian path located T0' - on the south side of the South Frontage Road. This will allow employees to have a safe and protected route to Lionshead. A portion of the proposed parking lot is being developed within the Town's Red Sandstone right-of-way parcel which divides Tract A and B as well as on a parcel owned by CDOT. In order to facilitate this project, the Town is co-applicant and is allowing the use of this parcel. Vail Resorts will be working with CDOT to obtain their permission to use a portion of the oarcel owned bv CDOT. I 2:7 Phase I - Temporary Parking Plan oo L?-;\','--.- \r alt\ t !u. *:i /., '--':"1i1;/7+Ya Hl,l,., l{;} i ir:,i./;F.t ,.t_ .&o"f iilta'I V'I {rt , ft.{#,*-*? .! 1 |:\ !4 ,W/Y,2 {:/fr --:l'ti'f' l/ffi|$\i ili)f t t!'t,tltt,'lltll t tllt $i Ir,4;t .--i ,- Phase 2 - Permanent Parking Improvements 3. Conditional Use Criteria Before acting on a conditional use permit application, the Planning and Environmental Commission @EC) shall consider the factors with respect to the proposed use: ^. Relationship and impact of the use on development objectives of the Town. OurAnahsit: Tbe Planning and Enuimnmertal Commisiott bas @pnued a condirtonal ue pemtit ott this prn?ert on two pior occasions (in | 990 and 2001). In 1 990 the PEC eondiiional use to allow tbis barcel to be urcd for tbe ichs. Tlsat area to be unpaued and not eontain interior landscaping. pat abbmued to dll t)ehicle rtordse 0f rb to 70 b. Tbe pnposed e@k1u parking lot on thit pnperry it pat of an ouerall agreement vtitb tbe Town of Vail to tenporai! rcdace tlte amount ofparking oecrrring on the Soutb Fmntage fuad. Tbe pnpovl inclsda allowing the Toan to operate a pfulic parking area on tbe IYe$ Da1 Lnt tbas shfting tbe e@lo1u parkingfmn tbat site to tbe Hofi Cmst ite. This is an interim solution jor this ski season. A nore pemtanent parkingplanfor tbis site uill be @pliedfor ear! rcxtyar and,f @pnuey'nnpleted b1 Noaenber 2004. Tbe pmposed conditiotal ase aitl allow the Tou'z to rcdace parking inpactr to the Soutb Frontage Road, a long+tanding nmmuniry goal. Tberefore, the pmposal is alkwing tbe Toun to aehieae ih deaelopment objectiues. The effect of the use on light and air, distribution of population, transportation facilities, utiJities, schools, parks and recreation facilities, and other public facilities needs. OarAna!"rsis: Tbe pmposed conditional an pemit will allow parkingfacilities on priaate pn?edl t0 buome aaailable to tbe pablie and reduce parking on the \'outb Frontage Road, therefore inpnuing the fanction of tbe So*th Fmntage Btad dringpeak day. Tbe pnporcd parking arca will baae little, f ary4 on .lhe nmainder of the aboae criteria. Effect upon tnffic vdth particular reference to congestion, automotive and pedestrian safety and convenience, traffic flow and control, access, maneuverability, and removal of snow from the street and parking areas. OurAnahsis: The proposed parking area is pai of ar ouerall plan to redace the anoant ofparking oecarring on the South Frontage Road. Thh parking lot will be urcd b1 emplo1ees who urmnt! perk acms tbe street on the lVest Da1 l-.ot. The ll/ut Da1 l-.ot will tben be auailable to park the public that uoald baue otberuin parked on the Soath lrontage M{',u 4. a$nt*"'" Road. I%itb tltis nductiott in parkingon tbe Soilh Fmntage Road, ndaced and safej, maneuuerabilig, conwnience, trafic fow, andt eongestionfwe areafor enplolus to park Effect upon the character of the area in which the proposed use is to be located, induding the scale and bulk of the proposed use in relation to surrounding uses. OurAnahdt: Tbe pnpued parkirg lot will baae rc inpaet on tbe aboae criteria as tbere an no bdldirgt atsociated witb lhis pmposal. Variance Criteria Before acting on a vanance application, the Planning and Environmental Commission shall consider the following factors with respect to the requested variance: ^. The relationship of the requested variance to other existing or potential uses and structures in the vicinity. Our Analysis: The pmposed aaiance uill allop the Vail Rtsons and the Toun to phase-in parking inpmueamts witbin tbe Tou'n oJ VaiL Allowing the parking to be unpaaed till alkw the Touz to pmdde additional parking to the ptblh and ndue congestion and nfeq concens on tbe Sodb Fmntage Roadyt tbityar. A monpemtanent solstion uill bepnsented in theJollowing months. If tbis uarianrc is nnt dPpmaed, the Toa,n of Vail uill be mable to achieae some of itt rbort-hm Parkinggoals, As the lVut DEt l-at yill rot be auailable forpubke parking. Tbe ue of tbh pmpafi, in this qrci-indrctrial arca of Vail, bas bhkdmlb beenfor uehieb and eqilpmeil storage. b. The degree to which relief from the strict or literal interpretation and enforcement of a specified regulation is necessary to achieve compatibiliry and uniformity of treatrnent among sites in the vicinity, or to atain the obiectives of this tide without grant of special privilege. Our Analvsis: / RelieJfnn the $rict and literal interpretatiott of tbe rcgrktions nqilingparkingto be paued and pmking arcas to contain kndscaping is being rcqrcsted ar part of a ato pband phn to i@mae tbe pnpeQ. The nlief is alto sorgbt to alloa the Town oJ Vail to acbieue its shot+erm goal of redncing congution ad inpnuing safegt of the Sortb Fmntage Road. Tbe granrtng of tbue aaianns will not grart a special piuilege at these impmuements anw beingpmed k oder to i@mw tbe pfilic pmking cordiiion tbmryboat tbe Topz. Tln circumstanas of tlte prypoted rns and the aariances nqdnd to make tbea halpn an wry niqrc and coamon on! n aalfeu tites pithin the Towv of VaiL The effect of the requested vadance on light and arr, distribution of populadon, Eansportation and traffic facilities, public facilities and utilities, and public safety. Our Analvsis: Tbe pmpond aariances uill allow parkingfacilities on piuate pmpetll to become auailable to tbe pfulic and ndrce parkirg or tbe Sofih Fmntage Road, tbmfore inpnuing the function of tbe Soilb Fmntage Paad dringpeak dql Tbe pnpwed parking ana pill haue liltle, tf ry, f t? nmainder of the aboac criteria. tlf'/lt rHs rrEM "itattsftlYouR PRoPER NOTICE lS HEREBY GIVEN that the Planning and Environmenial Commission of the Town of Vail will hold a public hearing in accordance with Section 12-3-6 of the Municipal Code of the Town of Vail ori .tuty 23,2001, at 2:00 P.M. in the Town of Vail Municipal Building. ln consideration of: A request for a conditional use permit, to allow for a Type ll Employee Housing Unit, located at 84 Beaver Dam Road/Loi 28, Block 7, Vail Village 1" Filing. Applicant: Petrus Financial Management, LTD' Planner: Bill Gibson A request for a conditional use permit, to allow for vehicle storage in accordance with Section e-7i-4.Vail Town Code, located at 923 South Frontage Road West / Unplatted. Applicant: Fitz & Gaylord Landscaping Planner: Brent Wilson A request for a recommendation to the Town Council to amend Sections 12-7H'3C' 12'7H'48' 1,.-7i4C, and 12-71-4F., Vail Town Code, to allow for commercial ski storage as a conditional use on the first and second floors of buildings in the Lionshead Mixed Use 1 and Lionshead Mixed Use 2zone districts, and to amend Slction 12-2-2, Vail Town Code to add a definition of "pedestrian way." Applicant: Town of VailPlanner: Allison Ochs A request for a recommendation io lhe Town Council to allow for an amendment to Section 12- 6l-2 (Housing zone district - Permitted Uses), Vail Town Code, to allow for the addition of ,,employee h6using" as a permitted use in the Housing Zone District, and to amend Section 12- 2-2,'Vaiil Town Code lo amend the definition of "employee housing'" Applicant: Town of Vail Planner: Allison Ochs A request for a recommendation io the Town Council for the adoptio! 9f two view conidors *iit ii f-ion.fread, as iOenti6eA within the Lionshead Redevelopment Master Plan. View Conidor i ii io""teO approximately at the main pedestrian exit looking southwest towards the Gondola lift line. View Cdrhaor Z is tdciteO approximately from the pedeltrian plaza at the east end of the iittnorse Lodge looking south up'tire Gondol-a lift line. A more specific legal description of the two view coniiors is on file ai the Community Development Department. Applicant: Town of VailPlanner: Allison Ochs The applications and information about the proposals arefvailable.for public inspection, during regular office hours in the project plannefs office, locaied at the Town of Vail Community Development O"p"rtr"nl, 75 Soutti Fro'ntage Road. The public is invited to attend_project orientation and the site u-iiitJ tLai pi"cede the pubtic Fearing in the iown of Vail Community Development Department. Pfease call 479-2138 for information. sign language interpretation available uPon-requ-est with 24-hour notification. ZaEo, fetephone for the Hearing lmpaired, for information. Community Development Department Published July 6, 2001 in the Vail Trail. TowNffiffi7,, ." "'ll. i '*15,',i;/$J_ Please call 479- Department of Community Development 75 South Frontage Road Vail, Colorado 81657 970-479-2138 FAX 970-479-2452 www.ci.vail.co.us July 24,2001 James Fitz & Lauren Gaylord Fitz & Gaylord Landscaping P.O. Box 1315 Vail, CO 81658 Re: The Holy Cross Parcel- 923 South Frontage Road James and Lauren: At its July 23'd meeting, the Town of Vail Planning and Environmental Commission approved your request for a conditional use permit to allow for commercial storage on the above-referenced property, subject to the following conditions: 1. Pursuant to Title 14 (Development Standards), Vail Town Code, the applicant shall exlend the existing landscape berm (not less than 4' in height) along the weslern lot boundary 75 feet north for screening purposes, subject to design review. Pursuant to Section 5-1-6, Vail Town Code, all noxious weeds (including Canadian Thistle) will be removed from the berm. The berm will be constructed and vegetated within 60 days from today's date. 2. There shall be no storage or dumping of hazardous materials or chemicals on the site. Pursuant to Section 5-1-3, Vail Town Code, this includes the prohibition of storage of junk or debris. 3. The applicant will remove all fill malerial and debris adjacent to the spruce trees (northwest corner of property) immediately. lf you would like to discuss this matter in greater detail, please contact me at (970) 479- 2140. Sincerely, F-'1^-- Brent Wilson, AICP Senior Planner {gun"uor ro a o toMEMORANDUM Planning and Environmental Commission Department of Community Development July 23, 2001 A request for a conditional use permit, to allow for commercial storage and vehicle storage in accordance with Section 12-71-5, Vail Town Code, located at 923 South Frontage Road West / Unplatted. Fitz & Gaylord Landscaping / Vail Resorts Brent Wilson ftfi TO: FROM: DATE: SUBJECT: Applicant: Planner: DESCRIPTION OF THE REQUEST The applicant's request involves the operation of two separate and distinct activities on the subject property. . Fitz and Gaylord landscaping is requesting a conditional use permit to allow for commercial storage. Specifically, the commercial storage request involves the slorage of plant materials, limited landscaping equipment, and overnight storage of 10-12 lrucks on the site. Fitz & Gaylord Landscaping leases a portion of the property from Vail Associates. . Vail Associates is requesting a conditional use permit to allow for the storage of vehicles on the subject property. Please refer to Section lV of this memorandum for details of the request. The "Holy Cross Parcel'-923 South Frontage Road The subject property is currently used to store overflow vehicles from Timber Ridge, vehicles abandoned in various Vail Associates parking areas and ski area fleet vehicles not used during the "off" season. Additionally, storage of ski racks and small outbuildings occurs at the southwest corner of the site. il. REVTEWTNG BOARD ROLES- qONDIT|ONAL USE pERMtT Planning and Environmental Commission: The Planning and Environmental Commission is responsible lor approval/denial of a Conditional Use Permit. The Planning and Environmental Commission is responsible for evaluating a proposal for: 1. Relationship and impact of the use on development objectives of the Town.2. Effect of the use on light and air, distribution of population, transportation facilities, utilities, schools, parks and recreation facilities, and other public facilities and public facilities needs. 3. Effect upon traffic, with particular reference to congestion, aulomotive and pedestrian safety and convenience, traffic flow and control, access, maneuverability, and removal of snow from the streels and parking areas. 4. Effect upon the character of the area in which the proposed use is to be localed, including the scale and bulk of the proposed use in relation to surrounding uses.5. Such other factors and criteria as the Commission deems applicable to the proposed USE. 6. The environmental impacl report concerning the proposed use, if an environmental impact report is required by Chapter 12 of this Title. 7. Conformance with development standards of zone district Design Review Board: The Design Review Board has no review authority on a Conditional Use Permit, but must review any accompanying Design Review Board application. STAFF RECOMMENDATION Fitz & Gavlord Landscapinq - Commercial Storaqe The Community Development Department recommends that the Planning and Environmental Commission approve ihe applicant's request for a conditional use permit to allow for commercial storage, subject to the criteria as described in Section lV of this memo and the following findings: 1. That the proposed location of the use is in accordance with the purposes of the conditional use permit section of the zoning code and the purposes of the district in which the site is located. 2. That the proposed location of the use and the conditions under which it would be operated or maintained would not be detrimental to the public health, safety, or welfare or materially injurious to properties or improvements in the vicinity. 3. That the proposed use would comply with each of the applicable provisions of the conditional use permit section of the zoning code. ilt. lf the Planning and Environmental Commission chooses to approve this request, staff recommends the following conditions of approval: 1. The applicant shall install a sediment fence along the western perimeter of the slorage area in order to prevenl erosion/sedimentation into Red Sandstone Creek and Gore Creek. 2. There shall be no slorage or dumping of hazardous materials or chemicals on the site. 3. The applicant shall renew the currently expired Town of Vail business license for this operation by no later than August 1, 2001. Vail Associates - Vehicle Storaqe The Community Development Department recommends that the Planning and Environmental Commission approve the applicant's request for a conditional use permil to allow for vehicle storage, subject to the criteria as described in Section lV of this memo and the following findings: 1. That the proposed location of the use is in accordance with the purposes of the conditional use permil section of the zoning code and the purposes of the district in which the site is located. 2. That the proposed location of the use and the conditions under which it would be operated or maintained would not be detrimental to the public health, safety, or welfare or materially injurious to properties or improvements in the vicinity. 3. That the proposed use would comply with each of the applicable provisions of the conditional use permit section of the zoning code. lf the Planning and Environmental Commission chooses to approve this request, staff recommends the following conditions of approval: 1. Pursuant to Title 14 (Development Standards), Vail Town Code, the applicant shall construct a landscape berm of not less than 4' in height along the weslern lot boundary lor screening purposes, subject to design review. 2. This approval is for vehicle storage only. There shall be no vehicle repair, maintenance, service or fueling on the site. There shall be no storage or dumping of hazardous materials or chemicals on the site. 3. The maximum number of vehicles parked on the site shall not exceed sevenly (70) at any given time. IV. REQUIRED CRITERIA AND FINDINGS - CONDITIONAL USE PERMIT A. CONSIDERATION OF FACTORS: 1. Relationship and impact of the use on the development objectives of the Town. Zonino: The subject property is zoned "Lionshead Mixed Use 2." This zoning designation allows commercial slorage and vehicle storage at street level, subject to the issuance of a conditional use permit. Seclion 1 2-1 6-7(AX9), Vail Town Code, sets parameters for the commercial storage of vehicles for transportation businesses. Pursuant to this section: . All vehicles shall be adequately screened from public rights of way and adjacent properties, consisting of landscaping berms, in combination with walls and fences, where deemed necessary to reduce the deleterious effects of vehicle storage." . The number. size and location of vehicles oermitled to be stored shall be determined by the Planning and Environmental Commission based on the adequacy of the site for vehicle slorage. Consideration shall be given to the adequacy of landscaping and other screening methods to prevent impacts lo adjacent properties and other commercial and/or residential uses. Land Use Plan: The Vail Land Use Plan places a designation of "Community Office" on this property. These areas '\rvill affect a transition from the more inlense commercial and resort uses to less intense uses outside of these areas." The proposed use is not in accord with the basic intended uses outlined under this land use designation. However, it is important to note this type of use is not prescribed in any of the land use designations outlined in the Vail Land Use Plan. Staff believes the applicant's proposal addresses a short-term community need. Given the proximity of this lot (and the adjacent VA shops site) to the ski mountain, staff believes this proposal is an adequate transitional use of the site in the immediate term. lt is anticipated the site will be developed for a more permanent use in the near future. Given the conditions suggested above, staff believes the proposed uses would be compatible with the Town of Vail's established development objectives. 2. The effect of the use on light and air, distribution of population, transportation facilities, utilities, schools, parks and recreation facilities, and other public facilities needs. Staff believes this proposal will have minimal impact upon the above- listed facilities. 3.Effect upon traffic with particular reference to congestion, automotive and pedestrian safety and convenience, traffic flow and control, access, maneuverability, and removal of snow from the street and parking areas. Fitz & Gaylord Landscaping owns 12 landscaping trucks that leave the site at 7:00 a.m. and relurn at the end of the day at 5:30 p.m. Given the fact that customers rarely access the site, staff believes this is an acceptable amounl of traffic. Vail Associates'storage of inactive fleet vehicles is not a significant generator of traffic to/from the site. Staff does not believe the existing access point presents any traffic circulation problems along South Frontage Road. There is adequate room on sile for snow storage needs. Effect upon the character of the area in which the proposed use is to be located, including the scale and bulk of the proposed use in relation to surrounding uses. Staff believes the aesthetic conditions of the site need substantial improvement. Adjacent properties (Vail Professional Office Building, Eagle River Water and Sanitation District) maintain quality landscaping along their respective lol perimeters. Currently old snowmobiles, abandoned vehicles, a gasoline truck, and assorted debris are visible along the western lot boundary of the subject property. The following photograph shows the conditions of this portion of the site. Staff believes additional screening in the form of a landscaped berm is necessary to mitigate visual impacts from adjacent properties and along South Frontage Road. Additionally, staff believes some form of basic erosion control is needed to prevent the silting of Red Sandstone Creek and Gore Creek. A sediment fence could be provided at very little cost to the applicant (Fitz and Gaylord +. B. Landscaping). The following photograph depicls disturbed soil on the site adjacent to the landscaping storage operalion. FINDINGS The Planning and Environmental Commission shall make the lollowing findings before granting a conditional use permit: That the proposed location of the use is in accordance with the purposes of the conditional use permil section of the zoning code and the purposes of the district in which the site is located. That the proposed location of the use and the conditions under which it would be operated or maintained would not be detrimental to the public health, safety, or welfare or materially injurious to properties or improvements in the vicinity. That the proposed use would comply with each of the applicable provisions of the conditional use permit section of the zoning code. 1. 2. 3. Questions? Qn" Planning Staff at 479-2738 APPLICATION FOR PLANNING AND ENVIRONMENTAL COMMISSION APPROVAL GENEML INFORMANON This application is for any project requiring approval by the Planning and Environmental Commission. For specific information, see the submittal requiremenb for the particular approval that is req uested. The application can not be accepted until all required information is submitted. The project may also need to be reviewed by the Town Council and/orthe Design Review Board. OF APPUCATION: Bed and BreaKast Conditional Use Permit Major or tr Mlnor Subdivision Rezoning Sign Variance Special Development District Major or tr Minor Amendment to SDD tr Employee Housing Unit ffype: _)n Major or tr Minor Exterior Alteration (Vail Village) Major or Minor Exterior Alteration (Lionshead) Variance Zoning Code Amendment Amendment to an Approved Development Plan - tr D tr TYPE tr ,Ftr tr tr tr n B. DESCRIPION OF THE REQUEST: c. n E. F, G. H. LOCATION OF PROPOSAL: PHYSICAL ADDRESS: PARCEL ZONING: NAME OF OWNER(S): BLOCK: -{o bST owNER(S) STGNATURE(S): NAME OF APPLICANT: MAILING ADDRESS: FEE: See submittal requiremenE for appropriate fee PLEASE SUBMIT THIS APPUCATION, ALL SUBMITTAL REQUIREMENTS AND THE FEE TO THE DEPARTMENT OF COMMUNITY DEVELOPMENT, 75 SOUTH FRONTAGE ROAD, VAIL COLORADO 81657. a/07 ,2l-', JP,,n G (Conbct Eagle Co. Assessors Office at 970-328-8640 for parcel #) 0 /-oo+2 Jur{ o | ffii I. PRE-APPLICATION CONFERENCE A pre-application conference with a planning staff member is shongly encouragcd. No application can bc accepted unless it is completc. It is the applicant's rcsponsibility to make an appointmant with the staff to determine additional submittal rcquircments. II. SUBMITTAL REOUIREMENTS n FEE S200.00. The fce must be paid at thc timc of submittal. O Stamped, ad&essed cnvelopes and a list of the names and mailing addresses of alt propcrty owners adjacent to ttrc subjcct proprry, including properties behind and across steets, Thc applicant is responsible for correct names and mailing addresses. This information is available fiom the Eagle County Assessor's ofrice. O A description ofthe precise nature ofthe proposed use and its operating charactcristics and mcasures proposed to make the use cornpatible with other properties in thc vicinity. The dcscription must also address: l. Rclationship and impact ofthe usc on devclopment objectives ofthe Town. 2. Effect ofthc use on light and air. distribution ofpopulation, transportation facilitics, utilities, schools, park and rccreation facilitics, and othcr public facilitics and public facilities nccds. 3. Effect upon traffic, with particular refcrcncc to congestion, automotive and pcdcstrian safety and convenicrce, baffic flow and control, access, mancuvcrability. and removal ofsnow from thc streets and parking arca. 4. Effcct upon the character of the arca in which thc proposed usc is to be located. including thc scale and bulk ofthe proposed use in relation to sunounding uses. O A preliminary titlc report. including schcdules A and B, to verifo ownership and eascmcnts. trt If the building is condominiumized, a letter fiom the condominium association in support ofthe proposal must be submittcd to staff. Four (4) conies of the followine: An improvement survey of the properry showing property lines, locations of all improvcmenB, topography, and nahral feahues. A site plan at a scale of at least l " = 20' showing proposed devclopmort of the site, including topography, building locations. parking, traffic circulation, useable open spacc, landscaped areas and utilities and drainage fean[cs. Building elevations and floo. plans, at a scale not smallcr than one-eighth inch cquals onc fooL oo SUBMITTAL REQUIREMENTS FOR A CONDITIONAL USE PERMIT tr a a Pagc I of 2 o dctcnnincd by-i Any additional nratcrial ncccssary for thc rcvicw of thc application as thc Adnrinistrator. For intcrior modifications. an improvcmcnt survcy and sitc plan may bc waivcd by thc Administrator. PLEASE NOTE THAT ONLY COMPLETE APPLICATIONS CAN BE ACCEPTED. ALL OF THE REQUIRED INFORMATION MUST BE SUBMITTED IN ORDER FOR THIS APPLICATION TO BE DEEMED COMPLETE. TIME REOUIREMENTS A. Thc Planning and Environmcntal Commission mects on thc 2nd and 4th Mondays of cach month. A complctc application form and all accompanfng matcrial (as dcscribed abovc) must bc accepted by the Community Dcvclopmcnt Departmcnt by thc appropriate submittal date, which is a minimum of four (4) wceks prior to thc datc of the PEC public hcaring. lncomplctc applications (as detcrmincd by thc planning staff) will not bc acccptcd B. All PEC approvcd conditional usc pcrmits shall lapsc if construction is not commcnccd within onc ycar ofthe date ofapproval and diligcntly pursucd to complction, or if the usc for which the approval is granted is not commcnccd within onc ycar. ADDITIONAL REVIEW AND FEESA. If this application rcquires a scparatc rcview by any local, Stratc or Fcdcral agcncy othcr than thc Town of Vail. thc application fcc shall be incrcased by $200.00. Examplcs of such rcvicw, may includc, but arc not limitcd to: Colondo Dcpartnrcnt of Highway Acccss Pcrmits, Army Corps of Enginccrs 4M, ctc. Thc applicant shall bc rcsponsiblc for paying any publishing fccs which arc in cxccss of 50Y" of thc application fcc. If, at thc applicant's rcqucst. any mattcr is postponcd for hcaring. causing thc mattcr to bc rc-publishcd, thcn. thc cntirc fcc for such rc-publication shall bc paid by thc applicant. Applications dccmcd by thc community Dcvclopmcnt Dqrartmcnt to havc dcsign. land usc or othcr issucs which may havc a significant impact on thc community may rcquirc rwicw by consultants in addition to Town staff, Should a dctcrmination bc nradc by thc Town staff that an outsidc consultant is nccdcd, thc Community Dcvclopmcnt Dcpartmcnt may hirc thc consultant. Thc Dcpartmcnt shall cstimatc thc anrount of moncy ncccssary to pay thc consultant and this amount shall bc forwardcd to thc Town by thc applicant at thc timc of filing an application. Expcnses incurrcd by thc Town in cxccss ofthe amount forwardcd by the applicant shall bc paid to thc Town by thc applicant within 30 days of notification by thc Town. Any excess firnds will bc retumcd to the applicant upon revicw complaion, III. rv. B. c. Page2 of2 Fitz & Gaylord Lilscaping, lnc. James FiE & Lauren Gaylord P.O. Box 1315 Vail. Co. 81658 May 23, 2001 Town of Vail 75 S. Frontage Road VailCO 81657 Dear Sir or Madam: This letter is to inform you of our wish to store vehicles on the propefi described on the attached application. The storage of vehicles will be for the winter seasons and will not impact any surrounding businesses. The area where the Fitz & Gaylord vehicles will be stored is at the back corner of the premises and will be out of sight of passers-by. We do not anticipate any problems with the storage of these vehicles and hope that this letter helps to make clear what our intentions are. Sincerely, Lauren Gaylord Vice-President Fitz & Gaylord Lffscaping, Inc.-, James FiE & Lauren Gavlord P.O. Box l3l5 Vail, Co. 81658 Phone & Fax (970) 476-3479 Adjacent property owners to 923 S. Frontage Road West-Parcel# 210312124001 For: 862 S. Frontage Road West Vail Corporation PO Box 7 VailCO 81658 For: 953 S. Frontage Road West H&K Management 953 S. Frontage Road West, Suite 230 VailCO 81657 For:934 S. Frontage Road West Amoco PO Box 8368 Chicago lL 60680 For: 890 S- Frontage Road West J- - fttf n, G7n,.n^rfi"s V ail BsaTaaf tot'. D isrr;c ?oO 5 Fron{a4" ld t' /ail C-o 8tLs1 For 1000 S. Frontage Road West Glen Lyon Office Building To, Sulie G.i*,',- looo 3, FrontaS< R'd'lD. 5uitc 7oo [/a;l Co ltb51 oI I I I I I I I I I I I I I I I '-)'1r ieeX4n-tl'qq: LION'S RIDGE FILING I UXPLATTEO { nlg - fsoicd\-E" ,'l- '' -ui.) RESIDENCES AT BRIAR PATCH CONDOS PHASEIV 6At VAIL LIONSI{EAO FIUNG 4 t INTERSTATE 70 (lr{ T.O.V.} \ VALLEY Ec .1 \,'c... RIDGE ,{T VAIL 4 't575 --,,_,-1\n RIOGE \-1583 TR.ACT DPARCEL A AIL POTATO PATCH FIUNG 2 \ \ iED SAT{DSTO}IE ELEXEIITARY SCHOOL :ltl FIUNG IEltt{ts couRTl r.Ras ga ll"I 706 I 10 A6 Page 7 --'f ' ;/) \:lr1;t 1\\ Etrzor/ el .t e ljLsPA I. n5,/ ,'- I i:/ ni"pn ' \ ^u,/ ,.t li71o ,--'=- { ronuneror i I ^',1ry:!:#trP\te I ."",;*," i, MoRcus \, D sugolMsloN \ 7"x l**tt**t*it+'tt++t+*** R00000087? Anpunt: $200.00 06/oLy'zOOtO4:03 prrcheck rnit : .IAR Notation: 13641 permit No: pEcO10O42 Tl|I)e: pEC - Conditional UeeParcel No: 210312100 OO 1Site Ad&ese: IJocation: 953 g prontage Rd lfeat - Unplatted Total pees: ?otal Alrtr pmte :Thia Payment :$200.00 Statement llrmtber: Palment ethod: $200.00 $200 - 00Balance: $0.00*l *ll *tl Itf | **l*lt*:l* * **{'* *rt**l'l***'}{t**t**'t'tt'}t*t *'t*'t*++t*+f r+ +f tt*rr***t*rtrr:r********{r*{, * **{r,*+ACCOUNT ITEM LTST: Account Code Descri pti on Current Pnts PV 00100003112500 PEC APPLICATION FEES 200. 00 TOWNOFVAII4 COLORADO gtatcrhent Hnn6cr: no0oooo877 tm[rt: szoo.oo o6lou2ooLoa:03 ptlPllrmnt letlrod: Check _r!- nh Site Mdrsas: Locatlosr! 9S3 ltria Paymcnt: S .Prontagc Rd feat $200.00 - llnplatted Total Fcce: Total ALIr htr: Belance: Sttucnt s200.00 9200.00 $0.00 ltotatl.sr: 13541---i--______ Perrnlt lto: PECO10042 Parecl lfo: ZIO3121OOOOI . Inl.t: iIAR Tyle: PEC - C@dltloal Use ACCOTJNTITEMLTST: Account Code Descrl ptl on PV 00100003112500 PEC APPLICATIOII FEES Current hs 200.00 Questlons? O*" planning Staff ar479-2138 APPUCATION FOR PI.ANNING AND ENVIRONMENTAT COMMISSION APPROVAL GENERAL INFORMATION Il-lP,ligti* is for any proiect requirins approval by the Planning and Environmentat commission. For specificInrormation, see the submital.requirements for the particular approial ttrat s requesteo. The application can not le acggpted. until all required information is submitted. lre piojea marauo niL to be reviewed by the TownCouncll and/orthe Design Radew Board. g DESCRTPTiON OF THE REQUEST: .I0-*m OF APPLICATION: Bed and Breakfast Conditional Use permft Major or tr Minor Subdivision Rezoning Sign VariancE Special Development District Major or tr Minor Amendment to SDD TYPE tr,xtr tru tr tr ! Employee Housing Unit fl-ype: _)tr Major or n Minor Exterior Alteration (VailVillase) Major or Minor Exterior Aheration (Lionshead) Variance. Zoning Code funendment Amendment to an Approved Development Flan tr tr tr E c. D. E. F. LOCATION OF PROPOSAL: PHYSICAL ADDRESS: PARCEL #: ZONING: NAME OF OWNER(S): BTdCK: ,,,.,1. (Contact Eagle Co. Assessors ffice at 970-32g-9640 for parcet #) x.G.owr{ER(S) STGNATURE(S) : H.NAME OF APPLICANT:d MAIUNG ADDRESS: 5e submitbl rquirunenE for appropriate fe fi:tz --igta6, Pl"EAsE suBMrr rHrs APPUCATIOI{, ALL suBMrrrAL REeurRErrrENTsAND THE FEE TO THE DEPARTMENTOF COMMUNITV OrVTr.OEr. rIri,7s souTl{ FROTTAGE ROAD, VAIIv COLORADO 81657. o /-oo+2 JUI{ o I mr I t. I i I JtJl.2.mL 423fPt'l IJAID TITIJB CI'IR]TIiITEE CO!{PANYDaced March 21, 1995Caee V25565 Dol5.cy SV24s0415 tREsoRrs DEvl-Pr co o I{O. 197 P.4/4 smbRsEuElw 110.3 !:ggel!ildilr_e_se PIRT oF sEgrrorrr 12, ToIfNsHrp s soulg, RAt{cE 91ICEST OF IgE 6Tg PR,IIICrPAL T,IERIDIADI PuygrlF_e-11"T__ TtE vArL coRpo&aTroN D8A varlr Assocta,rEs, rNc.,A COI€RADO CIRPORATIOII XTEM NO. 11 OF SCEEDT'I..B B TS SBREBY DELETED. rErs ENDoRSEIIEIIT rs MADE A PART oF TgE poIJIcy oR coMMITl,rEM: AltD xsSIIBJEC! TO ALIr TIIE IERI{S A}tD P&OVISIONS TI|EREOF e![D OF A![V PRIOREI'IDoRSEMEI{TS rHEREt(). EKCEPT To rgE E'CTENT E:pRtssrry STATED; rrNEITIIER MODIFTES ANY oF TEE TERttS AIitD PRovrsloNs oF TrrE por.ieY oRCOMMIIIT{EM A}ID PRIOR E}IDORSEME}mS, rF A}IY, }IoR DoBs rr g.rrrnlD rgsEFFECTTVE DATE OF THS POIJICY OR COMMTTMEN! ETID PRIOR EIOOiSETErfISOR I}ICREASE TIIE FACE AII{OIIIIT TEREOF. I I t' Jtx.e.ML 4t?9F''l Owaers Form 402 VAIL RESORTS DEVLPT @ -tt o NO. 187 P.?/4 1,. 2. 3. 4. Older No. \125565 SCEEDINA A Pollcy r{o. S\I24S0415 atrcunE $9+5, 500.00 Address Po1Lcy Date: Febnrary 21, 1995 aE 5:00 p,M. Nane oE Insuredr IIIE VAIIJ CORPORATtrON DBA \TAIIJ ASSOCIATBS, ItrIc., A COIORADO CORPORATION The estaEe or interest Ln the lasd described iu tbls Schedule and which ls covered by thls pollcy ls: A Fee Sinple Title to tbe estaLe or inEeregt covered by this policy at thedate lrereof is veeted in: THE VAII-, CORPORjATfON DBA \TAXIJ ASSOCIA?ES, INC., e, COIORADO CORPORATTON ttre land referred, to in Ebis policy ie sLcuated in EAGII.,ECounty, Colorado, and is descrlbed ae followej PART OF SEgrrON 12, TOWNSETP 5 SOIXIE, RAltcE 81 !{Esr OF THE 5TH PRINCIPAIT MERfDfAII, DESCRIBED AS SOLTLTOWS: BECIM{INC AT IgE POIIII OF INTER,SESrIOAI OF TgB TIEST I,INE OF A COUNTT ROAD WITH IIIIE NORTEERI"Y RICHT OF T{AY OF FORMERU.S. IIIGIIIIAY NO. 6 EROM.T{EICH POINT lEE IIORXEEAST @RNER OF SAID SECTION 12 BEARS NORXE 4.DEGREES 31 IITIITUTES EAST, 552.6 FEETr THEI\ICE SOITIE 73 DEGREES 4s I.{INUIES lfEST, AIlor{G} SAID IIIGHT{AY RIGI{I OEI WAT LT}IE, 252 FEBT TO TTIE C TtrER OF RED SAt{DsTolG CREEK; ltsENCE NORIa 4 DEGREBS 30 MINUIES WEST, AIJONG TgE CEI'IIIERL,IIIE OF RED S,AIIDSTONE (3EEK, 'L7O.4 FEET,' TEEIICE NORTII 10 DBGREES 44 MINIIIES EAST, ALON(; IUE CENTERTJIITE OF RED SAI\IDSTCIM CREEK, 34.3 EEET TO A POITIT ON TIIE SOTTTTTERTJY RIGHT OF WAY LIIIE OP U.S. INTBPSTATE EIGE!{AY NO. 70; TIIENCE TFRITFASTERIJY ON A CUR\IE m TEE RIGCT WITE A RADTUS OP 2715 FEEf, AII ARC DTSTA}ICE OE 264.25 FEET lto APoINI ON TEE WEST LINE OF SAID COItNllf ROAD; IEENCE SOI'IEERLY AIJO![G' SAID WBST IJINE, 222,3L FE T, Q22.39 FTEIJD lErasnREll8ltT), MoRE oR IJESS, TCt lgE pOMT OF BEGITU{rMi, COUllTg OF EAGIJE, STATE OF COI.ORADO 5. Page TtrtE Dollsy valld oly lf Schedula B iE atLached. Jnx.a'mt 4tryn vArL RESoRTS DEyLlr cp.. drmer Fonn roz "*? No. \r2ss65 NO.1e7 P.3/4 PolLcy No. s\t24s0415 g$rEqtr.B B '9lrrs_pglicy does not Lnsure agal.nsb ross or darnage by reason ofthe follold.rgl 1' filgl* ::.:*:y or Part'lde ln poesegeioo no' Ehotto bv tsbe 2. EasemesEs, or claine of easenents, lob ebowa by Cbe pr:b1tc. recorde. 3. Dlscrepancies, conflicEs tu borrndary Iinesl shortage in area,encroacbmento, and any fact,s whl,ch a correcg Eurrrey and inepecEion of the prenises rorld discloee.and whlsb are noE Eborm by tbe publtc reeollile. 4, Arry lien, or righE to a lient fot sertrlces, Ia.bor, ormaEerial Eheretofore or hereafEer f,urnlshed, lnposed by law and, aoF shown by tne publlc recordts. 5. 1995 TA:T8S NOT YET DIIE OR PAYABI.E A}ID A8SES8!,!EIITS NOT YBT CERTTFIED TO IgE TREASI'RERS OFFICE. 6. I.IENS FOR UIiIPAID WAIER A}D SEWER CEARGES, IF AI[Y. 7. RTGIXI OF PROPRIET1)R OF A \IEIN OR IPDE TO EXTRASI A}ID REMO\IE HIS ORE' THEREFROM SllotIIrD IEE SIME EE F(,IIND TO PE]IEIRATE OR IIIEERSECI $IE PREMISESA8 RESERVED TN IDTTTBD STATES PATEITT RE@RDED Decenber 29, 192q, IN BooK 93AT PAGE '12 - 8. RIGHI OF WAY FOR DITCEES OR ESNAI.S @NSIRUCT@ BY TEB AIIIIIoRT. T OF IIIB ITNITED STATES AS RESBRIIED fN UIIITBD STAIES PAIENT RECOBDED December 29,LgZO, rN BOOK 93 AT PA(IB 42 g. WATER A}ID TTATER RXGIITS, DITCE AIID DITCE RIGETS 10. EASEMENT AIID RIGIil OF WAY FOR RED SAIIDSIONE CNAEK.nCt1l EASEMEIIT As REgERrlm By EorJy cRoss Bllrctntc.tsgocrATroll, rnc. rN DEED\ / RE@RDED FBgRUeRy 21, 1995 I_!l_!@K 661 AT PACE 743. J1r1.2..?AaI 4z?9Pn ,-., Owaer6 Fonn 402 Poltcy No. SV2450415 I I Order No. V2556S emourrt $9+5,600.00 SCEEDI'LE A Address L. PolLcy Dat,e! Febnrary 2tr-, 1995 aE 5:00 P,M. 2. Name of Insured: THE VAII' CORPORATfON DBA \fAIL ASSOCIAIES, INC., A COIOITADO CORPORATION 3. The estabe or interest Ln the land descrilred ln tbie Schedule and which is covered by thls pollcy ls:A Fee.Siq)Ie 4. EiEle Uo the estate or iatereEts covered by this policy at thedate hereof is veet,ed in; THE VAII, CORPORATTON DBA \n'rIJ ASSOCIATES, TNC., A COI,ORADO CORPORATION 5. The land referred to in tb:is potiey is situaEed in EAGL,E Counby, Colorado, a.n'd is described ae followej PART OF SECTTON 12, TOWNSEIP 5 SOUTH, RANGE 81 WESr OF THE 6TII PRINCIPAIJ MERTDTA}I, DESCRIBED AS FOLIIOWS: BECTNNING AT TEE POII{T OF INTERSECTION OF THE TIEST IJIM OF A COUNTY R.OAD WITS IIIE NORTEERLY RIGI{T OT WAY OF FORMERU.S. IIIGH!{AY NO. 6 FROM T{SICT POI}IT XEE NORTEEAST CORNER OF SAID SEGTION 12 BEARS NORTH 4.DEGREES 31 MINUTES EAST, 552.6 FEET; TIIENCE SOIIIE ?3 DEGREES 45 MINIXIES WEST, el.,ollci SAfD IIIGHWAY RIGHT OF WAy r.,rM, 252 FEET TO TE CENTER OF RED SA\TDSTONE CREEK,. TIIENCE NORTII 4 DEGREEE 30 I'IINIIXES WEST, AIJONG THE CENTERTIIIE OF RED EAIIDSTONE CREEK, .L7O-4 FEET,. TEENCE NORTII 10 DEGRBES {4 MTNUIES EAST, AI,OT{G TIIB CENTERIJINE OF RED SA}IDSTONE CREEK, 34.3 FESI TO A POIIIT ON TIIE SOIITHERT,V RIGHT OF WAY LINE OP U.S. IITTERSTATE HIGE!{AY NO. 70; TTIENCE M)RIIIEASTBRITY ON A c{tRVE TO rTE RIGIIT WITXI A. RADIUS OF 2715 FEET, AII Ax'C DISTAIICE OE 264.28 FEET TO APoINt ON TEE WEST IrfNE OF SArD COItNIlf ROAD; ITIENCE SOIxIEERITY AIONG SAID WEST I.INE, 222.31. FEBT, (222.39 FrELD' MEASIIREMEIIT), I,IORE OR I{ESS, TO TEE POI!frI OF BEGIM{fNG, COITIIIV OF EACIIJE, STATE OF COI€RADO. VEIL RESORTS DEVI-PT CO -rt o NO.187 P.2/4 Page 1 lhte Pollcy va1ld only if, ScheduLE B ig aEEached. Jtlf-t.?2."a@! 42?Epn 5L REsoRTs DEy{r cp.. ovraer Form 402 order No. v25565 I No.1a7 P.3/4 SCEEDT'IJE B Pollcy No. SV24sO4xs 'Tl,l"-pglicy does no! insure againsc loss or danage by reason ofEhe foil.owing: 1. Rtghts or clains of parElds in poeseseion not showu by eheprtfic recordg 2, EasenreqEs, or claime of easements, BoE, ebowa by tbe pr:blic. records. 3. DJ-ecrepancies, conflicts i.n boundary Iines, shortage i:r area,encroacbmeute, and any f,acE6 wbich a correcg sunrey andinspection of, the premises would discloee.and whicL are not, sboyra by the publtc records 4. Any J.Len, or righE to a tien, for sa;nlceo, laboi, orrnateriaL Eheretofore or hereaftser f,urnished, imposed by J.awaad ao! ehown by tbe publtc recordg. 5. 1995 TAXES NOT YET DIIE OR PAYABI{E AITD A88ESS!{E}ITS NOT YET CERTTFIED TO TEE TREAS|I]RERS OFFICE. 5. tIE'NS FOR UNPAID WATER AIID SEITER CEARGEE, IF AN:I. 7. RTGHT OF PROPRIqTOR OF A VEIN OR IPDE TO EI(TRACT A}ID REMO\IE HTS ORE' THEREFROM SHOIIIJD fHE SAI{IE BE FOIrllD TO PENEIRATE OR II.IEERSECT THE PREMISESAS RESER\IED IN ItNrfED STATBS PATEIIT RECORDED Decernber 29, L92Q, IN BOOK 93AT PAGE 42. 8. RIGHT OF WAY TPR DITCES OR EAIIAI,S CONSTRUCTED BV THB ATITTIORIIY OF TH8 ITNITED STATES AS RESBR\/ED IN ITNITED STATES PATEIIT RECSRDED December 29,1920, IN BOOK 9.3 AT PAGE 42 9. WATER AI{D TTATER RIGETS, DITCE A}ID DITCE RIGETS. 10. EASEMENT AIID RIGIIT OF WAY FOR RED SAI{DSTOM CREEK, (frll EASEMEIIT AS RESER\IED BY EOI.rY e,OsS EITBCIRIC.ASSOCIATION, INC. IN DEED\ / RECORDED FBBRUERY 2L, L995 rN BOOK 551 AT PAGE 7{3. I I JJ{.e..?WL 4:3aml RESORTS DEVI.PT CO 1.U,187 P.4/4 IJAIID TITIJB GTIAR]LNTEE COMPENYDaced March 21, 1995Caee V25565Policy SV2450415 ENDORSEMENT 110.3 _ProperEylddrees PART oF sEcrror[ 12, TottNsgrp s sotrtE, RAr{cE 91WEST OF lEE 5TII PN,NCTPAL MERIDIATFur9r1!9l1er rsE vArL coRpoRATroN DBA verrr AssocrarEs, xNc.,A COI.oRADO CORPORATIO}I ITEM NO. 11 OF SCEEDI'IJE B TS HEREEY DELETED TEIS ENDORSEMEIIT rs MADE A PART oF TgE POLICY OR COI4'IIII{EIIT A}ID ISSIIB.IECI TO E.LL TIIE TERMS A}ID PROVISTONS 1IIEREOF AIID OF AIIY PRIOR ENDoRSEMEI\ITS THERETO. gltcEPT To TEE ECrBsIr ExPREssrJy srATED, rTNEITI{ER MODIFIES ANT OF TEE TERMS AT{D PROVTSIONS OF THE POr.iCV ON.COMMIIII'IEIII AIID PRIOR EIiIDORSEMEI{IS, fF ANs' NOR DOES IT EKIEIID THBEFFECTI\IE DATE OF TIIE POTJICY OR CICMMI1II4E}IT AI{D PRIOR EI.IDORSEMEIITSOR INCREASE THE FACE AI,TOIJITT THEREOF. otrolrFlj -n z >.'r-i E;.:QFr;ii Halii: Li3 !ic3;6 Eg x E76 i'_ /1 o .- o' = z'; e.E e3! fin1;I H[[ )Z="aP Lii r, " Floe tAa >=-r J i Eq:F- g*1. d:i;fr :a =F Z=1E -1= o9?* vi? e^ r 3i j'3i Eg;$e i€ E3o = < < ^F< A; -' =' (J,-J :" a f ; '1 > X" F-:'IO Fr O \-/ r--< r: i; zgT 1 o1 i,t l, L.! l.|{ i€ '-ra t )ra \oi'n -J(o iiiiiililfi'iti;a E t+;lr; ri; illi*iliiili:iiiii i;*ileil;rririi;ii; FiiitiiiiiiiFiiiii =gi'iiiE$iii'iiiIi rrf iii5:ii; si:'ir E$iiffElti:iiFi 'l 'ii;sfir;;;-5i;gl iiirf+:i:irir ci,iris iiiil$iiliiiiligiii: iiEs;s!; iiiii €;siiii iii:Ei*siiIl; n r;Eiii :!ig;i;iiiiiiiiiiiliiE1rIil?r;l iil[*lilliiiiiriiiiiFi*r:gEiii; Erf #rliiFrF{ giii;![ Fir#iiilinii €1g';ii ii *l$* iF[ii +F iii il uugrltii; i iiioo z -l F! I6 o F o...i o U' u, 'J F,tL'. $"A\1 = /.i <) -.1 ....._ )-.i I a 6 ct t PARC€L A AIL POTATO PATCH FIUNG 2 PHASE IV 665 VAIL UONSHEAD FIUNG 4 TRACI A t INTERSTATE 70 (rN T.O.V.) FIUNG TEN TS COURTT 4153.N 't3 7t6 758 I €aa \,l"10 716 11 736 RIOGE AT VAIL 1575 -.-'\rt RIDGE i-15353 \ VALLEY coNDOS UON'S RIOGE FILING I UIIPLATTEO t' {,.fk// if;,'( I E sRtaR /:,n lF -.,'[.'r 1ll_5 i I r3so''cqLo*^ :\ !''[ ,: :' RESIOENCES .AT BRIAR PATCH CONDOS .F' / -Y' ' IAI-gleJ, Zl \ Exz,|t ./ C) rt Iuorisro - \, tos r/ a7to /--;;:- ( Monrano,osItt Ltotttsxeno ""p i'""!E -1 \ 684 1.'"V \\ zttl r Lion': Squarc Page 7 m k 2 ii \ -{J 9,-,? e v=,r ;t; €"5 \--_ N ro. <<,oo.E- il .;*frx.' iE + o- 4-/^ /\9\1 1 t, q.o 9J t.L ilL'o lO'oF FF o\: RoAD 3 l, o I ,l:r J'r..,'!t trs't'>- 4,t{ f$, Fitz & Caylord ||dscaping, Inc. Adjacent property owners to 923 s. Frontage Road west-Parcel# 210312124001 For: 862 S. Frontage Road Wpst Vail Corporation , /POBoxl v VailCO 81658 For: 953 S. Frontage Road West / H&K Management ,/ 953 S. Frontage Road West, Suite230 VailCO 81657 For: 934 S. Frontage Road West . rU t -Amoco Y.nW -< ,, PO Box 8368 N" kN' ( Chicago lL 60680 u^il* f' For: 890 S- Frontage Road West G y rnn^tl-;'s ry For 1000€. Frontage Road Wey'For 1000€. Frontage Road Wes/ Glen Lyon Office Building ,/ralOr -\ulie (rri"'..'n tooo 5 . Fro"-taS< Rd. tD 5vi€c 7oo Ua;l Coltvsl d'J6,r' 4 Sa.- A!-g* - Z*'Y {Lv"\'\^Ja'b^ * 9* D;*{ OL4to Fry,ces) eI. ' J L.u"tt**J wq, James Fitz & Lauren Gavlord P.O. Box 1315 Vail, Co. 81658 i4so H(ss o \\v \; .ltu 1r { 's$ \+": I' ._--__:_.-_ ' ''t,., MEMORANDTJM TO: File , FROM: TammieV-"" "r Ivrwnwtffi DATE: November 8. 1996 SLJBJECT: HolY Cross Electric I spoke to Joe Macy of VA today. He says he, is aware that VA must file an applic{ion fo.r a *iaitioo"t *" p."-it for the Hoiy Cross lot. He said he will to get back with me on this project * r*" as possille, becasue he knows that the year they were given is fast approaching' lhil lssociatos, Inc. March 19, 1996 Mr. Jim Cumutte Senior Planner Town of Vail 75 South Frontage Road Vail, CO 81657 RE: Ot.e.t.hd Opetaton af V21L eeate. Crcek Retod a.d At to^ h e a.; tic !.t 3 t ^ 2. 3. i @" GOLDEN PEAK REDEVELOPMENT USE OF HOLY CROSS LOT Dear Jim: As requested, I am *riting this letter to confirm our understanding with regard to the requested use of the Holy Cross lot, for construction laydown and staging for the Golden Peak Redevelopment project: We acknowledge that the subject property is not necessarily zoned for use as a construction laydown and staging; We acknowledge that, as the owners of the subject property, we have permitted the Torm of Vail utilize the property for construction laydowl and staging in the past; We acknou'ledge that, prior to our purchasing the properfy, the previous orvner (Holy Cross Electric Company) used the property for 6onstruction laydorm and staging; We hereby commit that, we will not requ€st further use of the property as construction laydoun and staging without first making an application to the Toun of Vail requesting rezoning to permit construction laydoun and staging as approved use. It is our intention to make this application rvithin the next 12 month period. We appreciate your concems and your consideration in this regard. Please feel free to contact me if .vou ha'r'e any questions or require additional information. cc: Chris R1'man David Corbin Joe Macy Jac unn, Director gn and Construction tl PI PO Box 7 . Vail, Colorado . 81658 . phone 970.476 5601 t, PERIqIT NO. 390114 L Local ordinance requires a construcLion permit fron Torrrn ofvail .1 Driveway shall be constructed 24 feet wide with 50 footradii. surfacing for driveway approach is required asfollows: 12rr of class l- gravel ln 2, 6tt lifts; 5rr of class 6gravel in2 Fill/cut 1, 6n 1ifts.slopes shall bethe access aDD at a 6: L slope on the road$ray and roach. { ./1 . }.l at 6 : 1 on the access approach . //h/ nrtl n+-y€arL/ttl '"" cntry with eut epeed ehange lanes. Lt Thie h6-hi+ i< f^r annlarraa nrrlzina nnlv D6rni,|-+66 dh-l t ?nly with eut Epeed €harge }anes.This permit is for ernployee parking only. Pernittee shallprovide traffic counts preforrned and cert.if ied by aRegistered Professional Engineer using the followingscheduLe: Saturdays and Sundays between 7:OO AM and 9:OO AM and between 4:OO PM and 6:00 PM for the duration of thewinter season. Include aII vehicles entering and Ieavingthe parcel and the nainline traffic.A hew 18rr CMP culvert shall be used. All culverts (sidedrains) instatled in open ditches shall have f lare<i endsections. No drainage fron this site shall enter onto the surface ofthe highway. AII existing drainage structures shall beextended to accommodate all new construction and safetystandards.contractor shall follow the applicable constructionspecifications set for by the Department of Highways in theIatest nanual Standard Specifications for Road and BridqeConstruction. The property owner is responsible for anyutilities disrupted by the construction of this driveway andall expenses incurred for repair. Any darnage to anyexisting Highway facilities shall be repaired prior tocontinuing other work.conpaction of sub-grade, enbanknents and backfill shall conply vrith Section 203,1.1 of the Division of HighwaysStandard Specif ications,The first 2o feet beyond the closest highlray lane, includlng speed change lanes, shall sl-ope down and ahray fron the highway at a 28 grade to ensure proper drainage control .AII excavations on Utifity Iines, culverts, other trenchesor tunnels shall meet the requirements of Colorado Department of Highways, osHA, colorado Indust.rial commissionand the colorado Division of Mines whichever applies. The area around the ne!,r rrork shall be well graded to drain,top soiled, fertilized, nulched and reseeded. Work shall BEGIN AFTER 8:30 A.M, and all equipnent shall beoff the roadh,ay BEFoRE 3330 P.M, each day. 10 11 L2 PAGE NO. ], ,hh e"* FIL E COPY 75 soulh frontrge road Ydl, colorado 81657 (3(B) 4792138 (3qt) 47$'2139 olllce of communlty devdopmenl October29, 1991 Mr. Joe Macy Vail Associates P.O. Box 7 Vail, CO 81658 Re: October 14, 1991 Plannlng and Envlronmental Commlsslon apprcval of the request tor a condltlonal use permlt and a varlance to the parklng standards, Sectlon 18.52 of the Town ol Vall Munlclpal Code to allow for off-street surface parklng at the "Holy cross parcel" whlch ls generally located on the north slde of the South Frontage Road east of and lmmedlately adlacent to Red Sandstone Crcek. Dear Joe: Enclosed is a copy of the minutes of the October 14, 1991 Planning and Environmental Commission (PEC) meeting at which your conditional use permit and variance request was approved. The attached copy of the minutes will serve as your r'ecord of the conditions of approval. Please note that the approval of this conditional use permit and variance will lapse if construction has not commenced within one year ol the date of the PEC approval, and thereafter diligently pursued to completion, or if the use for which the permit is granted is not commenced wilhin one year. lf approval of this conditional use permit or variance lapses, an application for approval of this conditional use permit or variance must be resubmitted for reconsideration by the Community Development Department staff andior the PEC. lf you have any questions or comments regarding this information, please do not hesitate to contact Jill Kammerer at 303/479-2138. Since.ygly, 4 f,.r*L, 7$Zne/al Amber Blecker Planning Assistant Enclosure , ::f9lt?q P:foRrME'loF HrcHwAYs ]'"",;l*l[fl",,:.fi,srATE HlGHwAy nccEss pERMlr DoH perm' No.:.. ,., , Permlt Feg:.. ,. , ,, % SH No/MP/Side: r'l' I )f. n ') | : tnr\/.i Dat€ of Trangmiltal: Holy Cross Electrlc Assoclatlon r,iv'Vsl] Ass6cl.ates, Inc. .. ) .,,,,1. (Appllcant ).r,rr ! i, /, Box 772 .ocATtoN: r70r 175.02/r. Tonn of Vall 30219 390114 .$7s. 00 lL-30-90 '' Box, 7 'i is. herebv grinted permission to consiruct and use an a"l"is t6 rtre statS h'tgrir,iviiiii" tocatton'ririila'beiow. The access shall be constructed, malntained and used in accordance with ihe teims and condiflons bt thb permit,including the State Highway Access Code and llsted attachments. This permit may be revoked by the issuing a uthority it at any li me the permltted access and lts use vlolai€ any of the terms and conilllone ol thla permlt; The us6 of advance warning and constructlon signs, llashers, barricades and llaggbrs are required at all tlmei during accessconstructiqn within state right-of-way in conformance with the MANoAL oN U'NIFORM TRAFFIC CO-NTROL DEVICES, Part Vl. The issuing authority,.the Department and theirdulyappolnted agjqlts 6nd employe6s shall be held h arm less againsl any action for personal inju ry or property damage sustirined by reiion of the exer6lse of th€ p€rmit. On the north slde offeet east from Mile State Hlghway I-70 Post 175. Frontage,a dlstanbii'l of L24'' ,: tr ':'. nc,i i irr llr TCCESS TO PROVIDE SERYICE TO: Employee parllng :':i: ...1 ..: , . .:.| ':;,,:1 . ':'11, i r.)i lrrjll ,. r lilJ .-. iril r.i, . ,,, ,)l J,r,r ', ..,.i;.:.,i ' II'i,1 r.,.: . I :,.t,';i.,,!l,l - {: I i,r: lr' ,. 1ot. CTHER TERMS AND CONDITIONS:" 'irr ,l',. :li .,,t lJ, l See Attached Sheet. ':.: ,tt)r..1 t,it :,irl.tt. ./ . r , l,.rr :. .,.'.. (. :r..r,.., . , .lt I ,. I '.1' r,lllir;irr: I MUNICIPALITY OR Required only when COUNTY APPROVAL Bv (x) the appropriate local authority r€telns issuing authority. r Not Requlred Dat€ | . ': .Tlgo: Upon the signing ol this permit the p€rmltto€ agrees to the lerms and condltlons,and reforenc€d attachments contalned herein. All construction shall be completed In an expeditious and safe manner and shall be finlshed wlthtn 45 days lrom initiation. The permitted access shall be being used. The permlttee rhall notly e comp-lelgd in accordance wilh th€ terms and conditions of tho p€rmit prior to'Mike DeLonR wlth the Colorado Deparlmenl ol Hlghwaya In 21 845-7347 ,al least 48 hours prlor lo commenclng con3tructlon wllhln the Hlghway dghl-ol-way. The person sjgningr 6s the permittee must be the owner or prop€rty served by the psrmittsd access and have f ull to accept the permit and Permlttee (X){h, aq /t). This permit is not valid until signed by a 'i ' .," i,,'' ,".t't'rtrii STATE OF COLORADO,rsloN oF ROBERT/6CLEV CHIEF Bv (x) }PY DISTRIBUTION:Roquired: l. District (Origlnal) 2 Applicant 3. Stafl ROW ;'$i' duly authorized ropresentative t{IGHWAYS the State il.:i ' Prwlou! Edillonr !t! Ob.ol8ts end wlll not be u8.d DOH Form 101: 985 l.' Date 12-26-90' :' ' TltlJ"' Adnlhlstirator,'"',r',, '" (Date of issue) .., , Mako copiss as necestary lor: Locsl Authority Yz Inspecto. "MTCE Patrol ' Trattlc Englnesr: I T. hc lollowlng p.rrgrrph, [:it+f[i:,lUllfi:i"iUl*ilf*':{iil'li!*"* :8ffi.;;iJr":'"'jr1fir,"ir":tir';irffiHl r'urns eurf,odry ,"ijl, c.ir.m uji"iii i,I";1,",:#ilT::'#flt::# lfmf*t}lhjli{::::mil$1;;r;!'rlgnedlo lh' hlghwav' whal errctnirli" ""iiJ io-lriier puurtc r";d"';il;;'"i;i'r rvattearc, anc refory and derlgn 3rrnd!rd..wnrnset rn urc orcrclsn nSf l??roved bv lhe permlr ot*t"'iriur"g i;il;il il;HJ're rtrc rcvocerton o'u.p.nrlon or th. prrm*.I Appoelr ., - . ..' . - ' l' should ihe permittse or applicani chose to obj€ct to any ot the terms or concitipl::J^th9 p€rmit pracsc, thersrn by theDspa'tmont' an "pp"rtu'tiu"rii;i;i:h t;; illoraoo u!nwav-cJr,niJsriiwtr,rn 6ocraysdf rransmiitarorrne permitforpormtile€ stsnaruro. rre requesi roi'r'r,ri,iians .n"riu"liri-in,li,iiii,e._11g.r,1bmiir€; i" ir,l.dri.r"oo HishwaySllililiiiJ;i"'31fi:x#'fff"",tiu*:::i:";r,,'"x #n';i#h.!g:;i:1,:fi'ili; *ason. 'or rhe appeir ani 2' The Deparlm€nt m-ay conslder 8ny obr€ctlons and requested revisions at th^e request of the appricant or permitt€e. r,agrsomenl is reached' the Departm6nr, iiirt ftre-approveiol rhe ro"riisiri"i "ltt,oriry (if appricabrei, mriyievrse tne permiraccordinglv' or i"t'":-l?Y d:'Tn,.or ilquiie ii" appticant ro submir a new-applcationlor riconiiJir"ii,jn. cr,rnges in iho" - lttn'!.:t,.qppllcatlon' ptoposed o"ilgn. ii "lJ".i uso wiil normary require submntal of a new appricarion.' 3. F€sardress or any com*T*:i::lg:lils",.;r.T^s^"^,|;rj::: y-nl, ,;; ;";;;,,n"", regardrns revisions and ob,ections ro: i?:ffiTll ihTe3ilnl5ff'-;',fi,i";.li:ntl*:ii:,iil,l", ,;gilflilil ffI","n ro rhe comm,ss,on, rhsappea, musr be ' 4'' Anv ePi"ii uv rn":'ppllcant or permittes of actton bv:l:ig:ti;t r;; "r,lorly.:L"rir islhe eppropriat€ rocar eurhority' (undor bubsoctiori 2'lt), shall u6 irreo iirri"iiJiical aurnority ano re-consiJrenr wrrh rh€ appear procedures of rhe rocal. aulhorlty.- . ' ,:: -:,1,' . .- " :" 1:':'- t l,lTeBfj::'r:ction ls nol turther app€al€d, th€ Depa.tm€nr or tocat authority may record rhe decision wirh rho county cr6rkll Conttrucllon rtind.rdr .nd ,.qulr.m.nl.1' The accoss must bo undel conslruction within on-€.y€ar of the permit dats. Howev6r, under certain conditions a one yearttme €xtonston may be grant€d it requesteJ in iri'ng prlor ro b"rrii ;;;t;;;;".. ' 2' Ths appllcant thall notify tho otflce specttied on their-e-rmit at l€ast 48 hours prlor ro construction. A copy of the p€rmn shall' be avallable for review ai the constrJction Jt".' inrp".tions will be made during consrruction.3. The acc€ss construction w hin highway right-ot-way must be compreted within 4s daF.4' lt is the rosponsibillty oflh€ permllt€e lo complets tho constructlon of the access accordlng to lhe terms and condltions o,tho Permlt' It th€ permittes wlehes lo ut"rn"-""""tt prior ro comprerion, "irang".ents must be approved by ths is3uingaulhority and D€partmsnt and Includ€d on thJ permlt. rne oeiartmenf oi'issuing. aurhoriiy may order a ha1 to anyunaulhorlred use bl the access' Fecoiitrucliori or improvementi to the access may be required when the permittee hssfail€d io meet requlr€d,speclflc.atlons 91 uesiln o1 mat€rlats. tt any consiruction el€msnt fails within two years c,ue tolmpropor conslructlon o. matorial specif lcatio"ns, th6 permittes i3 responsiblo for all repsirs.5' In thg event it becom€g nocossary to romov€ any rlgh l-ol-way lence, rhe postg on eith€r 8ld6 Of th6 access sha be g€cutelybraced wlth an approved end poat betore the te;cJts c.ur to ireve;i;;ti;;it;g "r the remaintng tence. 41 posrs and wireromoved aro Department prop€rty and shall be turned ovei to a repreientative-or tnt o"f"rir""ni: '-- "' . ' 6' A copy of tho permit shall bB availabls for review at the construction sits. It n€cossary, minor changes and additions shall beordored by lho D€partmenl or local authortty tieta insleciorG;;;f;;;;ti;ilared sno condnions. 7' Th€acc€333hall be conglructed and malntain6d in a man n€r thal shall not caus6 water to snler onto the roadway, and shallnot Int€rtere with the dralnage system In tha right_of_way 8' Whers necessary lo removs,.r€locat€, or repair a trafllc control device or publlc or privat€ utilities lor the construction of apermltlod accass, lhowork shall b€ accomplished by th€ permittee without cosi to the D€partment or issuing authority, andat lhe dir€ctlon ot the Department or utllity company- eni damage to the state nighway or other public righl-ot-way beyondlhat whlch ls allowed In the pormit shall be rep'aireo lmmediateiy. vr vr"e' r'uv"e ' 'Y'r-! 9' Ad€quale advance warning is req uired at all tlmes during access conslruction, in conformance with the Manual on uniformTraflic control Devicee lor streeis and Highways. Tnis riay inctuoe tt " ,"" oi'"ig"t, flashers, uarricaoes ano flaggers. Thi3is also roquirodby s€ction 42-4-sot,c'n'5. as imended. Ttre issuing "uttrority, the Department and their duty appointedagents and employe€s shall be held harmless aoainst any action ior p"r.ori"t iniury or property damage sustained byrea8on of th€ exerclse of lh€ permit. lll Changer In ure and ylolallonr 1' It ihere 8re changes In the us€ of th€ access, the acg,e_T ?erm!t:issuing authority mustbs notif ied ot the chang€. A changs in" ' propgrty uss whloh makes tho oxlsllng access deslgn or use in non-conformince with the Access code or the terms andcondilions otlhe permlt, may rsqulre tlie reconstruct-ion or relocation otrne access. Examples of changes in access use are;an increase in vehicular-volum€ by 20 percent, or an increase by 20 percent ot a dlrectional characteristic such as a left turn_Th€ issulng authority will reviewihe orlginal permit; lt may deitde it is adeqr"t" or regre"t that you apply for a n€w perm1. 2. All t€rms and condltions of th€ per,rnlt are bindlng upon all essigns, succsssors-ln-inter€!t and h€irs. 3' W.frEn a!pemnt:9:,r,ll:YIl.t 1:t^11Y:l:d:.1T"d in violation of the Accese cod€, rhe tocat sov€rnm€nr or DqpartmEnr may'th;;ff;;;i#;il: tv Furlhcr Inform.tlon r€pr€sontative signs the p€rmii which is alter lhe permittee has 1' when the p€rmit holder wishes to mak€ improv€ments to an existing legal access, h€ shell make his r€qussl by filing acompl€ted permlt applicatlonrorm with.the issuing authority. The iss;ing";uthoiity maytareaction only on the request forlmprov€ment. Denial doeg not rovoke,thg existing-accese, , ,,. 2' The permilte€, his heirs, successorg-in-int€rest, and assigns, of the properly sorviced by the access shall be responsible formeeting lh€ terms and conditions of tho p€rmltand the removal or cleiranie ol snow or ice upon the access even thoughdsposit€d on the access. In.the course of Department snow removdl operalions. The Departmenl shall maintain inunincorporated aroas the highwaydralnage systom,lncluding lho." "rtr".rJ rno'eilhe access which are part ofthat syslemwlthin th€ rlght-of-way. 3. The lssue_date ot the permlt ls the date th6 Dopartmentr€turn?;d,lli g€rTlt slgnlq.?nd n!f! any requtrbd fees. The Dspartment may' whon.necessrry for the lmprovsd satety and oporation of the roadway, rebuild, modify, remove, orrsd€slgn lhe highway Including any auxiliary lan-e. ; Any drlvewoy, whether constructed.bPfore, on, or after June 30, 197g, may be required by the Department, rvith wri enconcurence.ol lh€ epproprlat€locel authodty, to bo reconstructed or reloaated toconlorm to tnoncciss doJeleitner ar . ttte.01one1y ownar'g oxpens€ if the recon$truclion or relocation is necessitated bt a change in lhe use ot the propeny' whlchJdsults In a change In the type of drlveway operation; or at lhe exp€ns" ottn6 Department it the r€construction orrelocation ls nec€ssltat€d by changes In road or iraific conditions. rne neceisiry toilne retocation or reconstruction sha'lvr .:r)lnrrnj!r.:d l:w rof:ron,:r:1,.., La cl.h.!:r.lc cot tnrlh ijr t;r, .o.r _r.1a C.:.tn I! : i I 4. 5. ti I t PERMIT NO. 39O1-]-4 Local ordinance requires a construction permlt from Town ofVail. Driveway sha1l be constructed 24 feet wide with S0 footradii. Surfacing for driveway approach is required asfollowsi r2tt of 6tass l- gravei i;-r; o;; rirlri-6i-or cl.ass 6gravel in 1, 6t' 1ifts. - Fil1/cut slopes shall be at a 6: 1 slope on the roadway andat 6:L on the access approach. \ Jnis a99gss and perrnit is TEMpoRARy and valid for one yearonly with.out speed change lanes.This.permit is for emplofee parking only. pernittee shallprovide traffic counts preforned aid ceitified bv aRegistered Professional- Engineer using the folloiingschedule: saturdays and Sundays between Z:00 AM and g:Oo AMand between 4:00 pM and 6:00 pM for the duration of thewinter season. Include all vehicles entering and leavingthe parcel and the rnainline t,raffic.A new 18rr CMP culvert shall be used. AII culverts (sidedrains) installed in open ditches shall have flareci endsections. No drainage from this site shall enter onto the surface ofthe highway. Alt existing drainage structures shatl beextended to accornmodate a1l nehr construction and safetystandards. 10 11 L2 Contractor shall followspecifications set for the applicable constructionby the Departnent of Highways in theIatest manualcolFlrgctiotr. The property owner is responsible for anyutitities disrupted by-the-construction bf this driveway andall expenses incurred for repair. Any damage to anyexisting Highway facilities shall be repaired prior tocontinuing other work. Cornpaction of sub-grade, embankments and backfill shallconply with Section 203.1L of the Divislon of HJ.ghwaysSf-andard Specif ications.The first 2o feet beyond the closest hlghway lane, including speed change lanes, sha11 slope down and away fron thehighway at a 2E grade to ensure proper drainage control .Al1 excavations on Utility lines, culverts, other trenchesor tunnels shal1 meet the requirenents of Colorado Department of Highways, OSHA, Colorado Industrial Commissionand the Colorado Division of Mines whichever applies.The area around the new work shall be well graded to drain,top soiled, fertilized, mulched and reseeded. Work shall BEGIN AFTER B:30 A.M. and alL equiprnent shall beoff the roadway BEFORE 3:30 P.M. each day.I I iti' ri:' F; g;il t:i H fr$ r','t lil ti' Y}ti l1; !ti.(! i:i FiIiIt' I tll iJ!i FI t',1 il. V:' tV It ri: i'i t.'l ti i ii ll r't; t., lrt PAGE NO. 1 Date of ,tt ,""t1no tLbba- //, / ?? / APPLICATION FO procedure is required for any project required to obtain a conditional permi t. application will not be accepted until all informatjon is submitted. A. NAME OF AppLICANT Vail Associatesf.Inc. ADDRESS----p.os-t-,or li cp Bn x 7 va i'l . co- . R]657 PHONE_-425-55!1 P, NAME OF APPL]CANT'S REPRESENTATIVE Joe Macy ADDRESS Post Office Box 7 \r:i'l . co- Rl657 PH0llE_425:56!1 NAME 0F ONNER(s) (print o Ho Cross Electric Association oWNER(s ) r srGNArURE(s)_ ADDRESS COiIDITIOIIAL oate of Aool ication I /'t 6 /a1 I. This use. The 0. LOOATlOil 0F PR0POSAL: LEGAL- iOT BLOCK p1L1l6Arterial Business District ADDRESS tE. FEE -9.o( pro JOoe cx *tgAgAiv /dy',r'ssoc<'fu THE FEE I'IUST BE PAiD BEFORE THE DEPARTHENT OF COI.II.IUNITY DEVELOPI,IENT IIILL ACCEPT YOUR PROPOSAL. ?HilNE q41-tBzL . f. A list of the names of owners of al l property INCLUDING PROPERTY BEHIND AND ACROSS STREETS, THE. APPLICANT I,IILL BE RESPONSIBLE FOR CORRECT II. PRE-APPLICATION CLAUSE adjacent to the subject property and thei r mailing addresses. OI,JNERS AND CORRECT ADDRESSES. A PRE-APPL]CATION CONFERENCE I,IITH A PLANNING STAFF I'IEI4BER IS STRONGLY SUGGESTED TO DETERI4IHE IF ANY ADDITIONAL INFORI4ATION IS NEEOED. NO APPLICATION UILL BE ACCEPTEO UNLESS IT IS COI'IPLETE (HUST INCLUDE ALL ITEI'IS REQUIRED BY THE ZONING :, . ADI4INISTRATOR). IT IS THEAPPLICAIITIS RESPONSIBLITY TO MKE AN APPOINTNENT . .:.i I.IITH THE STAFF TO FIND OUT ABOUT ADO]TIONAL SUBMITTAL REQUIREI.IENTS. .i- PLEASE I.IOTE THAT A COI.IPLETE APPLICATiON 1,']LL STREAI,ILTNE THE APPROVAL ppnaFce THAT THE I BEFORE A FOR YOUR PROJECT BY DTCREASING THE NUI.IBER OF CONOITIOI,IS OF APPROVAL fEc !'l^y STIPULATE. ALL CoHDtTloilS 0F APPR0VAL MUST BE Col.tpLIE0 l,llTHBUILOIIIG PERI.IIT IS ISSUEO. -/ngff;*JtLToa_,,,lkdqwatz"t . fra-"Y<z 25o . Bettto, o'proy-r:Jaz'adt aa r'>4%: leq Applic,ltion Da te Ptc ue tTnG OAII APFLICATIOII TOR A t.This procedure is required for any projectwl | | noI be accepted until al I information requesting a variance. The appl ication i s submi t ted. ADDR TS S ,. IIAI.II OF APPLICAIIT'S REPRESEIITATIVE PlrollE476-5601 ADORESS q;lrn.i PHOIIE D. LOCATIOI,I OF PROPOSAL ADOR ES S LEGAL OT5CRIPTIOII LOT ELOCK FILITIC F. A list of the names of or.rners of all property adjacent to the subject property Il{cLUDIrlc PR0PtRTY BtHl[0-Afl0 AcROss sTREETs-, and thei" mai)ing add.esies.TIII APPLICAI{T t.lILL BE RESPOIISIBLE FOR CORRECi I.IAILJIIG AOORT55E5. II. A PRE-APPLICATIOI{ CONFEPEI.ICE !IITH A PLAIINIIIG STAFF I.'IEI,I8ER IS STROIIGLY SUG6ESTTD TO 'DETIRI.IINE IF AI{Y'ADOITIOTIAL INFORI.IATIOII IS IIEEDEO. NO APPLICATIOI.I !.lILL BT AcctPTED uflLEss IT Is cOr'IPLETE (NUsr IlrcLU0E ALL IT€r,ts RtoutRt0 By THt zoilrlcADHIIIISIRATOR). IT IS TIIE APPLICAIIT'S RESPOIISIBILITY TO MXT AII APPOIITTI.IIIIT WITI{ THT STAFF TO FII{D OUI ABOUT ADOITIONAL SUBI.IITTAL REQUIRTI1EIITS. PLEASE I{OTI TITAT A COI'IPLETE APPLICATIOII t,lILL STREAI1LIIIE THE APPROVAL PROCT35 FOR YouR PRoJEcT 8Y DEcRtAsliiG THE t,tun8ER 0F coilDlTlolls 0F AppRovAL TilAr TltE pLAlilllllc All0 EllvtRoill.tiltTAL coi'l.il5510il l.rAy STIPULATE. nLL CoilDITI0i/5 ot A|PROVAL nU3T BE COI.IILI EO I.IITII EEFORE A BUILDIIIG PER,i.tII IS ISSI,,TD. III. FOUR (4) COptE5 0F Tl{t FOLLOwtNG MUST BE SUBr.llTTE0: A. A l,rRITTttl srATtNtilT 0F TltE pRtctSE |TATURE 0F THt vARtA CE RtQUtSTtD A 0 T i RtGULATlOil I V0LVtD. Tllt sTATti.lfltT l.lu5T nL50 AD0Rt55: ttfrt lssse /ti/ cadl utca/b.-a/to ) . .F rrs dx( nnro_-[[___cK t/I_{o!6rnii trhil Asaqib THE FTE IIUST BE PAIO BEFORE TIIE COI.II'IUi.IITY DEVELOPI.IEIIT DEPARII.IEItT I,IILL ACCEPT YOUR PROT'OsAL. L The relationship of the requested variance to othcr existing or potential uses and structures in the vicinity. 2. The degree to which relief from the strict or litcral interpretation and enforcement of a specified regulation is.necessary.to ach'ieve compatibilityand uni fonnity of treatment among sites in the vitinity or to att.in theobjectives of this title without grant of special privllege. 3. The effect of the variance on light and air, distribution of population, transportdtion, traffic faciljties, utilities, and public safety' :i'i:l lilii: i::i. ':ii::: ::'::l :i:i '::: TOWN OF VAIL DEPARTMENT OF COMMI.JNITY DEVELOPMENT SALES ACTTON FORM ^J I DATE: q //b/q 01000041330 COM.DEV.APPLICATIONFEES fI L J00-:JOo? 0l 0000 41540 ZONING AND ADDRESS MAPS $5.00 01000042415 I,NIFORM B I'ILDING CODE $s0.00 0l m0042415 TJNIFORM PLI'MBING CODE $36.00 0r 0000 42415 T'NIFORM MECHAMCAL CODE $32.00 01000042415 I,JNIFORM FIRE CODE $6.m 0l 0000 42415 NATIONAL ELECTRICAL CODE $30.00 0l 0000 42415 OTHERCODEBOOKS 0l 0000 4l5r|8 BLT'EPRINTS MYLARS)$7.00 0r0fpr042412 )GROX COPIES / STI,'DIES $0.25 0l 0000 42371 PENALTY FEES / RE.INSPECTIONS 0rffi42322 OFF HOURS INSPECTION FEES 01000041412 CONTRACTORS LICENSES FEES 0r 0m0 41330 OTIIER FEES 0r 000041413 SIONAPPLICATION FEE $20.m 010000 /o.?.q/ nt'k"ffi :ffi6#?#rJ'3#'ff 2"", ' - ,l"p 26oe h"/cag ,s*// a44>ed0 [MENTS:..,].::i ::l::r:..i::,iir.:i::l tl tuu [Jun**{u" [lirt, cr]- n i A t'*' trf-' r FlIATt tzt o,,(,/.f ,,- / A\,-ttL[,l"l ti>w-{ /An- I /l Qvail.@ Vail Associates, Inc. Creators and Operators of Vail and Beaver CreelP Resons Ms. Kristan PritzDirector Community Development Town of Vail 75 South Frontage Road WestVai1. Colorado 81657 Dear Kristan, Enclosed is an application for afor employee parking at the Holy Crossof our VaiI Associates shopyard. Alsofor a variance from the requirement toparking lot. Please inform me what the fee for this application should be. I have received a permanent CDOH Access Permit and haveattached a copy for your records. We plan on operating the lot in the same manner as lastyear with snow berrns, etc. to screen the lot from the west and south. We request that the term of the permit be permanent. I have updated the application form for this year. A11other details from last year's application are the same. Please call if you have any questions. Regards,n%'z Joe Macy Manager Mountain w0sEP i'6 1991 September 16, 1991 Conditional Use PermitLot located just west enclosed is an application pave and landscape the JMlkm Enclosure: 1991 19 91 1990 Application CDOH Access Permit Correspondence Post Office Box 7 o Vail, Colorado 81658 . USA - (103) 476-5601 Planning Th, tollowlng prr.g]rphr.rr p.rllt|Gnl hlghllghtr ol lh3 stote Hlghrrry Accatl Cod!. Thrto lro prorldad lof toulconlrn donot rltevtjl! coriptience with r1roclo-nr o'l lhe Acccn Cod.: Acopy ol th.6ht. Hlghw.y Accrrr codrl. rY.ll.blr tto' locrl lrrutng .ulhortty (to""l go"",n "ni; oithe Statc Oepartment oi Htghwryr (Oopltlment). When lhh pltmll wlr ltrulL ltrulng ruti'orlty maaq ltr aedrlon larsi in parl on Info;ma1on tubnltt€d by lh. fpllcanl' on ih!-rccatt ctl'gottr uhlcl' !'lgnGd lo tho htghway. wlrat etterniil-ril."Jtr io o6to,' pulrlc rordt snd !11o!lt lr rvll11bl., .nd rrlcty tnd dcrlen tl'nd'rdr chrng.t In ur. o. d"rtgn not rpproved'ui ," pjr'||tr ot t "itrulng authorlty may eau3e lhe favoclllon or rutp.nalon ol lhr p"mll' I App.rlr 1. shoutd thq pormittee or appficsnt cho3e to oblect lo any ot lhe terms or condltlons ot ths pormlt plsced thereln by lho Department, an appoat musl b; iil6d wlth the colorado Highway commlssion within 60 days ol transmittal of lhe permlt lor pe;mittee signal;;e. Tho r€quost tor the hearlng shali be liled in wrlting and submitted to the Colorado Highway Commission, ,l?0.t east arlaisai lvenue, Denver]Colorado 80222. Ths roquest shall Include reasons lor the sppoal and m8y includ€ recommandations by lh€ permitl€6 or spplicant that would bo accoptabl€ to him' 2. The Departm€nt may considet 8ny obioctions and requested tevisions at lhe requesl of th€ spplicant or pelmlitoo' ll agreem€nt ts reachad, tft" o"p",t.ini, iriih ths approvai ol th€ local issulng authority (il applicsbl€), may rsvis€ th€ p€rmll aicordingly. or lssu" " n"ru pirrit, o, ,"quir€ the abplicant to submit a new spplicalion lor reconsldsration. chsngos In th6 original aippiicalon, proposed dssign oi access use will normally roquire submlttal ol a n€l' appllcatlon. 3, Rggardlsss ol 8ny communlc8tions, meetings, or negollations with the D€partmBnt l€garding rovisions and obloctlons to thdpermit, if the pelmittee or applicint wishis toapp-ealthe Depa m€nt's d€cision tothg Commission, ths appe6lmu8t be " btought to tho Commission within 60 days of transmittal of th€ permlt' 4.'Anyappoalbyihospp cantorpermttteeotac onbytheloc6llssulngauthoritywh€nltisth6appropristslocalauthotitv (unaer'subsaitton i.l), strati u! iil"o *ith the tocal ;uthorlty 8nd bo conBistent with lh€ apposl ptocsdu(6s ot th€ local aulhorlty. {\ 5. ll lhs finel ection is not turltrer appeal€d, tho ogpaltment or local authority may rocotd the decision wlth th6 county clgrk and Fecordef. ll Conrtlucllon lltnd!]dt and .aqultaDanlr 1. The acc€!s must bs unoer constructlon withln on€ year of ths pormll d8te. Howover, under ceflaln conditlons e ons yoar time oxtsnsion may b€ granlsd il requ€stod in writing prior to permit expiration , 2. The applic6nt shall notity the ofilce Bpecilied on ths p6rmit 8t leasl48 hours prlor to constructlon. A copy ol the p€rmit 3h8ll be available lor review ai tho construction sit6. Insp€ctlons "till b€ made during construcllon' 3. Ths access construction [,ithin hlghway tight-ot-way must ba complelsd within 45 daF' ,1. lt is th€ responsibi ty ot the permittoo to compl€te th€ constructlon of the accsss according io lhe lorms tnd coodillon3 ol ths pgJmil. ll the p€rmi g6 wishes lo use lh6 access plior to completion, a.rangsments musl be approvsd by lho lssuing authority and D€partmenl "nJ in"irJ"o on tt e p.rmit. The Dapa.tm€nl or issuing sulhorily m8y o.dgr 6 hall lo any unaulhorlz€d use ot tho accaia. R6const.uctlon or lmprov€menl! lo the acce33 may bs requirod whon th€ psrmlllse hat failed to meet ,.qur,eo specilications ol deslgn or mat€rials. tf sny construclion €lement lel13 wllhln two ysar3 duo to imptop€t construction or matsrlal spgcilicstio;s, the pormittoe is r€sponsiblo lor all topalts' 5. In the ev€nt tt becom€3 ngcessary to Iemovo any tlght-ol-,sy lence, the postS on ellher sids oflhe acca33 thallbo seculely braced with an appror"o"no loir beto.e thelenceiscut to prevent any slacking ol lho remalnlng lenco. All port! snd wlrs removed ate DepaJtment proierty and shall be tutned over to a repr€sgntatlve ol th€ Departmont' 6. A copy ol the pormit shall b€ availablo for revisw at ths construction sit9. ll n€cassary, minor changes and oddilions shall be orOe16o Uv ttre Oepartmont or local authorlly lleld inspoctor to me€l unanlicipaled slls conditions 7. Tho accass shall bo conslluclsd and malnlaingd in a mann€r thal3hallnot causo wai6l to ont6l onto the toadway' and shall nol int€rfere with lhs dralnago 3ystem ln the rlghl-of-way' g. whetq n6c€ssEry to romove, Jelocale, or ropair a trgllic conlrol dovice or public or privatg utililies for ths construclion ol e psrmlttod 8cc83s,lh6 wofl shsll be accomplished by the pe,mittee wilhout cost to ths Department or issuing suthority, and at the direction ol the Oepartmeni or utilitycompani. Ani damag€ to tho state highway or other public right-ol-way beyond thst which is allowed in the p€rmit shsll be repaired immodiately 9'Adsquatgadvancawafningtsrequir€d8ta||tim€sduringacc€ssconslruc|ion,Inconlormanc€wilhtheMenua|onUni|orm Traf lic Control D€vicss f or Si;; a;d Highways. This riay Includ€ the use ol si9ns, llashers, barricades and llaggsrs. This is also requiredby section 4i-;-aoi,C.B.5. as imended The issuing authoritv'Jlt9 Dep"ltl:l!,:nd theirdulv sppolnlsd "g",;t" "J "rnpt;rvees st"riue-trlia narmteis against any action ior personal iniury or p.operty damage sustained by reason ot ths oxercise ol the permit. llt Chtngca ln uts.nd vlo|lllonr t. lfihsre ar6 changes in ths use ol ths access, th€ access parmiFissulng authority must b€ notilied ol lho change AchangeIn properry use wtricft m6k€s the existlng sccass design o. use in non-ionlormsnc€ wilh lhe Acc€ss codo o. the t€rms and [on'Aitidnsot tne permit, may require thie reconstruct-ion or relocation ot the access. Etamples of changes in sccoss use ar€; an increase an vehicrr", "otu."iy ZO purcenl, or an incr€aso by 20 percenl ol a directionalchslaclerislic such as a l6tt lurn' The issuing authority wif f review itre o'riginal pgrmil: it may decide it is ad€quate or r€quast that you apply lot a nsw p€rmit 2.A||termsandconditionso|thepermitarebindingupona||assigns,successors.in.interss|andheirs 3. Wh€n a pormttted d.tveway ts conslructed or us€d In viotatlon ol lhe Access codo. th€ local govornmonl or Departm6nt may obtain a courf ord€r to trait ttre viotation. Such acc€ss permlts mty b€ rovokod by lhe issuing authority' lV Furlhlt Inlormtllon 1. When the permit holder wishes to make imp.ovements to an exlsling legal access' hs shall make hie.€que3t by filing 6 completed permit appri"ationloim wi ,ihe issuing authorlty. The rssu-ingiuthority may tate action only on the request lor improvement. Denial does not revoke the existing accass 2. The permittee, his helrs, auccssaors-in-intefost, and assigns, ol th€ ptoperty serviced by the acc€ss shallbe f€sponsiblo lor-' .eeing tne ter.s ana conoitions ot rne permli and lhe removal or clearanc€ ol snow ot ice upon lh€ access 6v€n lhough deposiied on th€ access In the course of Oeparlmsnt snow romoval operatlons Th€ Departm€nl shall malntaln in unlncorporaled ataas th€ hlghway drainago systom, includlng those culvartg under lho accesgwhich a16 parl ot lhal 3ysl€m within the rlght-of-way. 3'Thoissuedatoo|th6p61m|t|sthgdatethoDepartmsnt]9p'esgnta|ivegignsthgpo'mItwhichisslterthope'm|t|eeha3 returnod tho pormll sign€d snd pald any requlred fe€a' 4. The Dspartm€nt may, vyh€n necossary for th6 lmproved salely and opalstion of lhs roadway, rebulld, modily. r€mova, or fod€sign the highway Including any auxlllary lang' 5. Any drivoway, whsther construclod b€lore, on, or alter June 30, 1979. may be roqulr€d by lho O€partm€nl. wlth wrltlon concurenco ol the approp.iato local authortty, to be reconstructed or r€local€d to conlorm to lho Access Code. oithgt at the p,op€rty owner's expense il lho reconstruction or relocstion is necessltat€d by 8 change in the use ol lhe prop€tty wh|chfosu||sinechsngeinthetyp€o'dliv6wayoperat|on;.oratth€erpens€o|lheDepartmenti|lhereconstructionor rslocation ls nocessrretso ov iiiri6eslnioao o, iraitic condltlons. The necasslty tor the .olocalion o, r6consltuctlon shall bg detcJminod by r€l€rPnca to th€ slandards sgl lo'th In lhe Accsss Code -:g!lDo DEPARTMENT oF HfcHwAYs ' T ATE HI GHWAY AccEss PERIT,IIT v"r" "onro,"iliiffi(,oa.EtAt,tho,Jty l^p""ro, SH No/Mplstd€;rToN/L7i:m Local Jurlsdlction: Oist/Seclion/pstfol; DOH permit No.; Pgrmit Fog: Dat6 of Transminali Toun of Val I 30279 390114 975,00 I I -30- 90 I Drincl tO.oilatl? pptrcanl co.iv Drstnrra;m Mt cE Flr.or ' i,iii,J e"ig,"*. noou.eaGii'.-ffi# STA|E OF COLORADO DEPARTIIENT OF HIGHWAYS ?22 South Sixlh Street, P.O. Box ?107 Grand Junction, Colorado 81 502-21 07 (303) 248-7208 JuIy 17, 1991. Joe lltacyVail Associates, fnc.P. O. Box 7vai1, co 8L658 Dear Mr. Macy: Enclosed is a copy of Access Pernit No. 3901L4, with Iten No. 3of the terms and conditions deleted, naking the pernit apernanent permit. )44 6 ^,+#Rose M. Burditt ROW Secretary Enc. I oelllg ucr'u' !|e P3r "||"e-e '':"'j;:'j-=::.:.-'..at OilJ-rJ{, I l- Diana pointed out that she would like to have the project corne back in two weeks. Johannes stated ttrat he would cone back with alnost the sane thing. He could not cone back in two weeks withsignlficant changes. Jay stated that over tlto weeks be coufd notsatisfy the staff and do the hotel . Gordon offered to discussthe concerns and try to nake the project work. Johannes statedthat they could wait 2 weeks, but there would not be najor changes. DaLton felt the need to study the proposal. Kristan replied that a project of this size desetrred a thorough study and that there vere significant issues. The proposal would have lncredible inpact on the character of the area' She added that the staff had been conpllmentary on nany issues. Regarding the height and setbacks, there ltere strong concerns, but the staff did not advocate throwing ln the towel. and forgetting theproject. She felt the issues di.d warrant review and was happythat Johannes was willlng to reconsider sorue issues. Jin 1oth 7. moved and Chuck seconded to table the proposal until December and the vote nas 6-0 to table. A recruest for a conditional use pernit and a variance to the parking standards, Section 18.52 of the Town of,Vail Municipal Code to allow off-street surface parkinq at therrHoly Cross parcelrr which is generally located on,the north side of the South Frontaqe Road east of and imnediatelv adjacent to Red Sandstone Creek. Applicant: Vail Assocl.ates, rnc. Jill Kannerer explained the request, sumnarizing that the applicant wanted a conditional use perrait and a variance to the p-iXing standards which required that all parking lots be paved and landscaped. Diana asked that a'fence be constructed to screen the lot. she thought the snow berms to be used in screening the lot would be dirtt and ugly. Joe Macy, of Vail Associates, stated that this Iot had been used for parking and storage for 20 years. Kathy asked that the unsightly fenie posts be removed from the site. itoe responded that to do the f,ences right would reguire sinking the fence post in a concrete base and he was reluctant to connit to this. Jiu stated that if the applicant grades and gravels the lot and then plows the snow to cleate snow ber:ms the plows will Just- ecrape up the Erave1 which would contribute to the dirty, ugly appearance of the betm. 10 -f Just thls building. She felt a building this size needed rnore space and added that the developer was not considering thepublic. Connie pointed out that only 40 roons were being gained with great rnass. She felt that the building was looking even bigger by belng so close to the property line and losing green space. Connle stated that the helght was nearly double thatallowed. She saw no need to encroach upon the setbacks. Mike had nentloned that uuch publlc land was being used for Iandscaping. Connie did feel that the Faesslers would take care of employee houslng. She suggested that the Vail Road walk be coordinated with the walk on Vail Road fron the Gateway proJect. She questioned the need for the pedestrian bridge. Regardlng the shade, Connie pointed out that not everyone would be walking near the Sonnenalp shops. She felt that X0 setback encroachnents were a substantial nunber and felt the there was not enough room on the lot to construct a building of thls size. Gordon felt the pedestrian experience would be inproved. Diana Donovan was concerned with snow sliding off of the roof, the traffic lanes and the need to protect the creek. She said the pool should be pulJ.ed back and that the ternporary construction road should not be on the south side of the lot because of the inpact on the creek. She felt the construction should be guleted on Saturdays and Sundays because of the weddings and se:rrices at the Chapel . Regarding Master Plan obJective 6.1, she was concerned about loading berths. She felt the East Meadow side of the building needed more attention to landscaping because it was even closer to the road than the Wf . Jay pointed out that there was ninimal landscaping on the WI side. Diana felt there should be housing restricted to ernployees, that the hotel units should be restricted so that they rernain hotel units, and that nore attention should be paid to the sub-area concepts. Dianats nain concern was that there litere not enoughpubfi- spaces and green spaces, especialty along Meadow Drive and especially sl.nce the develoPer was not doing the streanwalk. She fett ttre pedestrian bridge Itas essential and that rnore public space was needed in front of the building; Diana feLt the proJect had come a long way. Johannes Faessler adnitted that the property was not perfect for a hotel . He stated that if he were in the Board's chair, he sould welEh the Eane concerns' but that he could never take care of their ioncerns to everyoners satisfaction. He wanted to leave with sorne guidance, but stated that this was the best job he could do and that the project was close to not naking sense econonically. He wanted to have a vote wlth a list of concerns agreed upon. Perhaps the Eoard felt the concerns were nore inportant than having a hotel there. Krlstan stated that if the lot is not graveled it will be a nuddy Eess in the spring. Tey Ryzcat< lndicated the lot had been Eraveled 10 years ago and that there was rrroad baserr down now. Joe stated the lot had been Ln use si.nce 1970. Dalton saw nopoint in graveling the lot now. Jirn would rather see a trade off from graveling the lot. He would rather see a tree planted thanthe lot graveled. Dalton lnguired as to the Townrs liability if people were injuredvhile crossing I-70 to get to the lot. He also wanted to know if the police ticketed individuals crossing I-70. Discussion followed concerning the habit of the Tirnber Ridge residents walking across the Interstate and Dalton asked if the Town of Vail could enforce the violation. Kristan stated thatllike Mollica had checked with the Vail Police Departnent and found that they do ticket pedestrians htho cross I-70 and will continue to do so. Ted Ryzcak of vail Associates stated tbat there are other residents at Tirnber Ridge who were not V.A. employees and therefore were not.under vail Associatest control . Kristan asked if VaiL Associates would agree to reseed at the lot at the end of the ski season if it was deternined that the lot would not continue to be used by v.A. or the Town for parking, and Joe stated that he did not feel they should be asked to reseed, because in this case, the lot had been used for parking and storage for nany years, and rnuch gravel had been brought into the lot. Kristan then asked if he would agree to the other 6 conditions. Joe answered that he was not supportive of reseedingor regraveling the lot and that he did not believe granting the conditional use or variance would effect use of the lot. Kathy l{arren moved and Connie Knight seconded to approve the conditional use permit and the variance to the parking standards per the staff nerno based on Findings A, B, C(1) and C(2) with the following conditions: 1. The applicant will grade and gravel the parking lot. 2. The conditional use perrnit will be effective until May 15, 1991 or until the Town of Vail purchases the Holy Cross site and provides vail Associates 30 day advance written notice to vacate the parcel . 3. A11 of the mature evergreen trees wlll be protected by snow fences. 4. Pollution control as Proposed by the applicant will be provided. 11 5. The vote Tiuber Ridge residents will be allowed to store cars only on a long tem basis on the Holy Cross parcel . was 6-o in favor. 8. A work session on setback, densitv. cornrnon area, and a oarkincr variance in order to construct additions to the christiania Lodae - 356 Hanson Ranch Road. Lot D. Block 2 VaiI Villaoe lst Filinq.Applicant: Paul R. Johnston Jilt Kamerer explained that the applicant lilas reqluesting a work session on the Christianla Lodge in order to get sone direction frorn tlre PEC on the following issues: 1. Density variance2. Impact of developnent on view proposed corridors 3. Layout of Parking in northern parking lot Jilt indicated the Conrnunity Developrnent Departrnent staff thought it was appropriate for VaiL Associates and the Christiania to forrualize any agreenents relating to the use of Parcel P3 and Parcel J in the northern parking lot prior to Town issuance of any building perroits with the understanding that Vail Associates supported the proposal, proceeding through the planning; process. The staff would obtain approval frorn Council to proceed through the planning process tomorrovt (LI/27/9o) during the PEC report- She further indicated the changes to the plans since they were last reviewed by the Planning Con:rrission lncluded: In response to Conunission conments two weeks ago, two parking spaces had been renoved fron the northern parking 1ot. One of the spaces has been replaced in the western parking Iot. This space would be a valet space given its location in front of the dunpster. The second space has been replaced in the drop-off area by the porte cochere on Chateau Townhone Association owned property. Dunpster had been pulled back to the south,out of the existing planter area. The northwest corner roof line has been lowered in response to discussions regarding the inpact of the redevelopment on ttre proposed view corridor. There have been sorne uodi.fications to the landscaping. The applicant wltl connit to landscaping the northern and southern periphery of Parcel J. 1. 2. 3. 4. t2 flo/a (7oss rfr i c0P y Present Chuck Crist Diana Donovan Connie Knight Ludwig Kurz Kathy Langenwalter Jim Shearer Gena Whinen PLANNINC AND ENVIRONMENTAL COMMISSION October 14, 1991 Staff Kristan Pritz Mike Mollica Jill Kammerer Andy Knudtscn Shclly Mello Betsy Rosolack Amber Blccker 1. The worksession was called to order by Chairperson Diana Donovan at approximately 1:55PM. Condominiums and west of the Westin Resort. Vail. Applicant: East-West Partners Planner: Shellv Mello Mark Smith, Jerry Mullikin and Ned Gwathmey rcpresented the applicants. Shelly Mello began the discussion of the proposal by stating staff believed the project needed to be more materially compatible, a landscape plan, and a final suwey were ne€ded, and since it was an unplatted parcel, a minor suMivision would be necessary. Diana Donovan was unhappy that the Property would not remain oPen space' and the Commission agreed with her. Jim Shearer did not mind a difference in materials, and believed that the applicants should try to "bring up" the neighbortrood. Ludwig Kurz thought that, since there were distinct styles, urban and hotel, that compatibility was impossible. He said he could live with the design presently submitted. He was more concemed with both landscaping and sgeet surface materials- Ned Gwathmey asked what the opinion of the Commission was regarding a metal roof' and which type should it be. He advocated shake shingles stained to march the existing surounding buildings, but did not bclieve a materid match was the best solution. He suggested Jpraying the shake shingles to achieve a compatible roofcolor. Kathy Langenwalter did not see a problcm in not using a metal roof, as long as the roof lincs werc cornpatible. She suggested perhaps adding more stucco and changing the railings for a more refined appearance of ttre building. She also believed it was important to continue the paving pattern which was used in the Millrace project. She was concerned with the layout of the p-j"", and thc difference in scale between the hotel and this project. She said it felt like the east unit was very close to a large building. Ned asked if a landscape plan would be necessary for approval. The Commissioners told him it would. Chuck Crist asked if employee housing would be a par:t of the development. Shelly said staff would not require it as a condition of approval, as there was a rcduction in density from the previously-approved plan. Chuck asked if the applicants wcrc interested in providing a iaretaker-unit. The responded that they werr not. Shelly said staff would be supportive if such a unit was proposed, as long as it was intcgmted into one of the proposed units. Kathy brought up the issue of parking. Shelly explained thc proposal had 4 spaces more than the Town required. Kathy wondered whcre guest parking would be provided. Kevin McTavish, the manager of the existing units at Millracc, shared Kathy's concem, stating that their project had no guest parking, and it was a major problem. Ncd asked what a rcasonablc number of overflow parking spaces would be. He was not opposed to providing additional parking, but indicated it would require additional paving. Kathy suggested perhaps widening itre cirite. Ned agreed to look at diffeient possibilities for providing additional parking. Kathy said she would prcfer to have adequate parking for the project rather than insisting the project meet the 75% enclosed parking rcquircment. After a general discussion regarding parking, Connie Knight asked if there wcre any problem with thJUite path running across the project. Shelly said there should be an easement, and agreed to check the Special Development District documents to make sure. Kevin McTavish rpiterated that the present parking plan was inadequate' At this time, the public meeting was begun. l. A follow-up to the Aueust 12. 1991 PEC review of the staff anproval of the minor arnendmeni for Guden of the Gods. SDD No. 22. Lot K. Block 5A. Vail Vi[aee 5th Filins/365 Vail Vallev Drive. Applicant Marear€t Hill Marital Trust Planner: Shellv Mello Shelly Mello explained the differences between what had been submitted for thc PEC apprwal of the SDD, building permit and what was built, and the discrepancies. Staff asked thit the Improvement l,ocation Certificate (ILC) and future surveys rcflect the fact that the property lines not close. The sources of the discrepancy were attributed to thrce factors. The first is a difference in drawings. The submitted site plans at both PEC review and building p€rmit were soft line drawings. The I.L.C. is computer gcnerated. It is difficult to accuratcly scalc and compare a soft line drawing and computer generated drawing at l"-20" scale. The second source of change was generatcd by a nced to adjust the building in odcr to ensur€ that the building footen were not located in the right-of-way. The third rcason is that only 2 control points, 4 fcet from the north and 2 feet frrom the west property lines, were used in locatingthc building through the process. Because of the non-rectilinear shape of thc lot, and form oi the drawings, these control points were maintained, but still allowed for a slight shift in the building. Shelly indicated that the building was slightly turned ftom what was approvcd by the PEC, but the result was that the proximity to the view corridor was increased. Staff believed that the shift was rcasonable. Diana Donovan was bothercd that after thorough rcvicw by ttre PEC, the building had to be moved in order to accommodate the foundations. Kathy Langenwalter confrmed that the sources of the discrepancies were reasonable. After a discussion regarding the effect of the slight change in building location, Kathy asked that the Town copies of all surveys reflect the fact that the property lines did not close. Since the Commission ageed with staff's approval of the minor amendment, no action by the PEC was necessary on this item. Filins. Apolicanc Vail Associates Planner: Jill Kammerer Jill Kammerer explaincd the request. Staff recommended approval of the minor amendment to the development plan with conditions. Joe Macy, representing Vail Associates, said he would prefer not to construct an earthen berm to the wist oi t5e ptoposed lift unless Mr. Brown, the adjacent property owner, rcqucsted one. He suggested using a snow berm instead of an earthen berm with landscaping to screen the lift from the adjacent Property. Jim Shearer asked that Mr. Brown and the Meyers be contacted again for their input. Kathy Langenwaltcr was concerned about a buffer for privacy and noise control. She preferred to see the base of the lift moved to the east. Joe Macy indicated such a move would result in a loss of ski terrain. 2. Ludwig Kurz believed the proposal was an inoffensive installation, and would not result in a problem for the neighborhood. He did not bclieve it would make sense to move the base of the lift uphill, nor to install a permanent berm. Diana Donovan did not believe a berm needed to be required at this time, but wanted an allowance to be made to require its installation in the future if it became necessary. Joe Macy replied that the neighbors could always install a fence around their property if cross- uaffic became an issue to them. He would prefer to removc the lift suPport poles in the summer rather than construct a berm and landscapc if Diana stated her prefcrence of bushes being planted rather than a berm being installed. Chuck Crist asked what would keep out-of-control skicrs from skiing into a house. For control r€asons, he suggested a snow bcrm. Joe Macy replied that, most likely, a skier would simply sit down before they reached one of the homes. He reiterated that notices had been sent to adjacent property owners, and no one had indicated any opposition, but pledged to continue to try and contact them again. Connie Knight wanted the approval contingent on the a jacent property owners' approval. Kristan Pritz said that could be made a condition of approval.but an alternative would be that, if there was opposition, the applicant could return for an amendment to the proposal, if necessary. Kathy Langenwalter moved to approve the request for a minor amendment to the Golden Peak development plan to allow for the installation of a rope tow lift, 498 Vail Valley Driveflract B, Vail Village 7th Filing, with the following condition: If either of the two a jacent property owners requested mitigation by landscaping or through the construction of an-earthen berm, within two years of the installation of the lift, the applicant must provide such mitigation. Ludwig Kurz seconded the motion. It was approved, 7-0. Jack Rush from Manor Vail was in attendance to express support of the request. Aoolicant Vail Associates Planner: Jill Kammerer Jill Kammerer presented staff's findings on this request. Staff recommended approval of the request for a period of 2 years, with the conditions listed in the memo. Joe Macy, rcpresenting the applicant, thought a berm on the west side of the lot was acceptable, but that a berm on the south side was unnecessary, as the grade of the lot was high enough above the road that can parked in the lot would not be visible to drivers on the 3. South Frontage Road adjacent to the lot. Hc also had diffrculty with condition number 6, requiring the drivers to stor€ their cars on a long term basis only. He said therc was no way he could guarante€ compliancc with that condition. Kathy Langenwalter agreed there was no way to control when people could take their car from the lot, but suggested including the condition in the letter sent to residents of Timber Ridge. Kathy continued by stating that if, in 1993 the applicant wished to continue use of the parking lot, more p€nnanent improvements would likely bc required. Jim Shearer requested that the "long term" be defined in the letter to residents. He could agrec with berming only thc southwest comer of the lot. Connic Knight left the meeting at approximately 3:l0PM. Kathy Langcnwalter moved that the rpquest for a variance to the parking standards, Section 18.52 of the Town of Vail Municipal Code to allow for off-sueet surface parking at the "Holy Cross parcel" which is generally located on the north side of the South Frontage Road east of and immediately adjacent to Red Sandstone Cre€k be approved with the conditions as follows: l. The applicant construct a 3-4 foot high earthen berm along the southwestern corner of the property to scrE€n thc parking lot from the South Frontage Road and, further, the applicant seed this berm with native grasses in the Spring of 1992- 2. The conditional use permit be effective until May 15, 1993. After that date, if the variance and conditional use permit is extended, further improvements will be performed, such as paving, extending the berm, and landscaping. The improvcment to be requircd wil be determined at such time as approval of the variance and conditional use permit is rcconsidered. 3. All of the existing evergreen trees be protected by snow fences. 4. Surface run-off pollution control, as proposed by the applicant, |g providcd- 5. Applicant notify each V.A. employee who rents at Timber Ridge that it is illegal and eitremely hazardous for pedcsrians to cross I-70, and the only safe way to cross I-70 is via the pedestrian overpass or by crossing under I-70 at either the West Vail or Main Vail interchanges and, further, the applicant notify each V.A. employec who rents at Timber Ridge that residents will be allowed to store cars only on a long-term basis on the Holy Cross parcel. Chuck Crist seconded the motion. It was approved unanimously, G0. 4. Kathy Langenwalter moved that the request for a conditional use permit to allow for off-suect surface parking at thc "Holy Ctoss parcel" which is generally located on the north side of the South Frontage Road easr of and immediately adjacent to Red Sandstone CYeek be approved per staff memo, with the conditions as noted above. Jim Shcarer seconded the motion. It was approved, 6-0. Applicant The Walter Group Planner: Andv Knudtsen Andy Knudtsen prescnted thc request. Staff rccommended approval of the permit, with the conditions listed in staff's memo. The applicant, Dave Rutter, said he had a couple of clarifications to staff's memo. First, the dish to be installed on the roof was not a satellite dish, but a point-to-point rclay from Dowd Junction. Second, the carrier was McCaw Communications, acting under the name C.ellular One. Kathy Langenwalter asked that the shed roof be removed over the door, and the flat roof over the addition be extended. The applicant agreed to that change. Kathy also asked that, if the existing grade were lowered, and the waterproofing were exposed, it would be cleaned up. She sfongly encouraged avoiding exposing the waterproofing. Kathy wondered if more cell sites would be necessary in the future. The applicant hypothesized that, if 30-50,000 subscribers were signed up in the Valley, another site would be necessary. He did say, however, that an additional sitc in East Vail may be needed. Kathy questioned how the applicant was working with the school, and if the dumpster enclosure was acceptable to the school. The applicant responded by saying they had not specifically addressed the dumpster, but the applicants had committed not to affect the operation of the school. Ludwig Kurz was concerned with traffic and parking issues, and asked what kind of maintenance was going to be performed on the twice monthly visits. The applicant indicated it would be preventive maintenance, specifically to check on the batteries, and the visits should be approximately 30 minutes in length. He said if there was a power outage, for instance, an unscheduled visit might be necessafy. In addition, approximately evcry 6 months, a 2 hours maintenance visit would be necessary. Diana Donovan was concerned about the timing of the construction, as parking was a problem at the school. The applicant said the concrete would be formed off-site during the week, and poured during the weekend. When the trench was dug, a 24-hour watch would be posted to ensure safety. Sandstone School. 551 Nonh Frontaee Road/lrt 2. Block 8. Vail Potato Patch. TO: FROM: DATE: SI]BJECT: MEMORANDI'M Planning and Environmental Commission Community Development Departnent Ocober 14, L99t A rcquest for a yhich require all parking lots be paved and landscapcd in order b constnrct an parking lot on an unplattcd parccl of land commonly known as the 'Tloly Cl,oss" parcel, which is generally locarcd on the north sidc of the South Frontagc Road east of, and immediately adjaccnt to, Red Sandstone Cleek. Applicants: Vail Associates, Inc.[Ioly Cross Electric Association, Inc. Planncr: Jill Kammercr I. DESCRIPTION OF TTIE VARJANCE REOI.JESTED Vail Associates (V.A.) is requesting a conditional usc permit and a variance to the pa*ing standards which require that all parking lots be paved and landscaped. The companion conditional use permit is discusscd in a separate mcmo attached. On November 26, lgm, the Planning and Environmental Commission approved a conditional use permit and a request for a variance from thc design standards rcquiring all parting lots to bc paveti and landscapcd in order to allow a tcmporary parking arEa on the Holy Goss parcel. These approvals were effective for a period of one year. The rtquests under consideration at this meeting are more or less idcntical to the requests reviewed by the PEC in 1990. A l0l space parking lot is proposed for the Holy Cross parccl. The applicant is sccking pennanent approval to park ca$ at this location during the ski season. Thc site is owned by Holy Goss Elecric Association, Inc. The lease agrccment to use this sirc for long-term parking and sorage of vchicles belonging to V.A. employees who reside at the Sunbird Lodge and Timber Ridge is benpeen V.A. and Holy Goss Electric. In addition to providing parking for V.A.'s employees, 15 qpaces will be madc available to Lodge at Vail employecs who reside in Timbcr Ridge. The aoolicant is rcouestine a variance from Sections 18.52.080(E). 01 - Off SEEct Parkine and Louline. Pfl'kine - Standads. the desim standards which r€ouire all parkine lots to be paved and landscaped. Thc aoolicant has reouested this variance rpmain in olacc oennanentlv. There are approximately 101 parking spaces availablc in thc Holy Goss lot and each vehicle using the lot would be idcntifred with a parking pass assigrred to thcm by V.A.'s housing manager. Public access to thc lot will not be permitted" V.A' has indicated that approximately 75% of the parking in the lot will bc for long-term vchicle storage and approximately 25% of the parking wiU be used on a more rcgular in and out basis. Vail Associates' site plan for the Holy Closs lot takcs into account snow storage, drainage control, parking and Holy Cboss cquipmcnt storagc areas. Each of these aspects of the plan will-bc handled in the following mannen Snow Storage and Scr€ening Snow will be pushed to the southwest corner of thc lot and stored there. From thc southwest corner of the lot nonh to the ree line, snow will atso be pushcd west and bermed along the wcst side of the lot. Snow will also be pushed to the south end of the lot to crcate a bcrm to scr€en thc lot from the South Frontage Road. As the request is to continue this use for a number of ycars, staff recommends thc applicant construct an earthen berm to scrcen the lot from the South Frontage Road and, further, that thc applicant sccd the berm with native grasses in the Spring of 1992. Drainaee Sheet drainage flows from the center of the lot to the west and east. V.A. will install a row of hay bales along thc western edge of the lot which will reduce the amount of sediment reaching the crcck. From the center of the lot east,. sheet drainage will flow east and then south until it reachcs the drainage ditch along the north cdge of South Frontage Road- Drainage will then flow wcst to Rcd Sandstone Geek. Three hay bale silt traps will be installed in the above drainage ditch to trap any sediment beforc it reachcs Rcd Sandstone Geek. Use of hay bales is a standard and provcn tcchnique used in mad construction to trap sediment. Parkine Approximately 101 spaces would be providcd in thc lot. The parking demand for the Holy Ctoss lot is as follows: 2 Sunbird Lodge: 53 spaces Timber Ridge: 28 spaccs Lodge at Vail: 15 spaces Vail Associates Shop Employccs: 5 soaces Tota} 101 spaccs Sto'raec Holy Goss Elecric Association will continue to usc thc no'rth end of the lot for storage of materials, erc.; this area is screcned by uees and fences. In response to staff concerns rcgarding Timbcr Ridge residcnts crossing I-70 to get to the lot, Vail Associates will commit to notifying cach employcc who rents at Timber Ridge that it is illegal and extnemcly hazardous for pedesrians to cross I-?0. Further, V.A. wil notify the cmployecs that the only safe way to cross I-70 is via thc pcdesrian ovcrpass c by crossing undcr I-70 at the West Vail or main Vail interchanges. On July 17, 1991, the Colorado Division of Highways (CDOH) informed VA that the CDOH had made the access permit pennanent. CDOH has estimated that thc lot will generatc 52 auto trips per day. II. BACKGROUND With the addition of the Holy Cross parcel, V.A. will manage its parking facilities in the following manner: The Sunbird Lodge The Sunbird Indge was originally constructed as a time sharc p'roject. Four or five yeanl ago the project went into Chapter 11 bankruprcy and sat cmpty until V.A. purchased thc building at for€closurc. The Sunbird Lodge is located immcdiately adjacent to V.A.'s Lionshead Gondola building. Sunbird has below grade parking. This parking is to be utilized by V.A. employees who do not livc or work in the Sunbird. V.A. runs a 24 hour a day operation and Joe Macy, V.A.'s Manager of Mountain Planning, has indicated the rcason for not allowing Sunbird residcnts to use the lot is to make it available in the cvening for V.A. night shift cmployees. Parking dcmand gencrated for the Holy Choss parcel by Sunbird rcsidcntVemployees is 53 spaces. North Day Lot The north day lot is limircd to V.A. employees who car pool. l lVest Day Lot Thc west day lot, located west of the Mariott Mark is V.A. owned and opcratcd for employees. At 9:3G10:00 a-m. or so, if parking spaces arc remaining in the lot, V.A. knows its employee parking needs are mct and the lot is opened to thc gencral public. Landmark Building V.A-'s legal and real estate developmcnt offices aru located in the hndmart Building. Approximatcly l0 covered spaces within the building are available for managcment level employees. M. CRITERIA AND FINDINGS Upon review of the Criteria and Findings, Section 18.62.060 of the Vail Municipal Code, the Community Development Departnent recommends approval of the requested variance based on the following factors: A.@: 1. The relationship of the requested variance to other existing or potential uses and structur€s in the vicinity. The Holy Cross parcel has been used for parking and sto'rage since 1970. Land uses in the area includc parking lots, a commercial building, maintenance yards, a scrvice station, a waste watcr trcatment facility and warehouses. Each of the above uses has parking associated with the use. The adjacent properties would not be negatively impacted ifparking and storage continues to occur on the Holy Cross parcel. Potsntial frrture uses of the sitc are: an interstate highway exchange, pocket park, affordable housing site and of course, parking. 2. The degree to which relief from the strict and literal interpretation snd enforcement of a specified regulation is neccssary to achieve compatibility and uniformity of treatment among sites in the vicinity or to sttain the objectives of this title without grant of special privilege. V.A. proposes to usc the lot to provide long and shoft term parking for their cmployees. The applicant is requesting a pennanent variancc. The variance and conditional use permit granad by the PEC in 1990 were effcctivc through May 15, 1991 (one ski season). Staff recommends the use of this lot for , 4 soa.sonal pa*ing be approvcd for a period of 2 years. Staff believes it is a hardship to require V.A. to pavc the area givcn the staff-recommen&d temporary naturc of the usc. This type of limited and temporary variancc was also approved for the Town of vail at Ford Park which means this rcquest is not a spccial privilcge. 3. The efiect of the requested variance m ligbt and air, distribution of population, transportation and traffic fecilities, pubtic facilities and utilities, and public safety. The provision of parking for Timber Ridge and Sunbird residcntVemployces at this location ftrees up parking spaces at other sites to moet other cmployec pa*ing needs in Lionshead. Thereby possibly making parking more available to gucsts and improving the communities parting facilities. The public safety issue continues to be a conccrn to the staff. Staff bclieves that regardless of any written notification dclivered to Timber Ridge rcsidents regarding the dangen ofcrossing thc Interstarc to get to the lot, this situation may continue to (rcur. B. The Plannine and Environmental Commission shall makc the following findinss b€forc sranting a variance: l. That the granting of the variance will not constitute a grant of special privilege inconsistent with the limitations on other properties classified in the same district. 2. That the granting of the variance will not be dcrimental to the public health, safety or welfare, or materially injurious to propenies or improvements in the vicinity. 3. That the variance is warranted for one or morE of the following r€asons: a- The strict literal interpretation or enforcemcnt of the spccified regulation would result in practical diffrculty or unnocessary physical hardship inconsistent with thc objectives of this title. b. There arc exceptions or cxnaordinary circumstanoes or conditions applicable to the same site of the variance that do not apply generally to other p'mperties in the samc zone. c. The strict interprctation or enforcement of the spccffied regulation would deprivc the applicant of privileges enjoyed by the owners of other properties in the same district. I l.IV. RELATED POLICIES IN T}IE VAIL LAND USE PLAN Policy 2.8 Day skier needs for parking and access should be accommodated through qcative solutions such as: a) Increase busing from out of town. b) Expandcd points of access to the mountain by adding additional basc portals. c) Continuing to provide temPorary surface pa*ing. d) Addition of stnrctured pa*ing. V. STAFF RECOMMENDATION The Departrnent of Community Development rccommends approval of a temporary variance (until May 15, 1993), to the paving and landscaping standards, based on findings B(l), B(2)' . \,,. B(3)(a) and B(3)(c) with the conditions that: ,, (.(rr''" ,.,nkt)-l. The ppplicant consmrct a 34 foot high eanhen bcrm along the southffi $$)of the propeny to scr€en the parking lot from the South Frcntage R--oad an4 furthcr, the applicant seed this berm with nativc grasses in the Spring of 1992. 2. The conditional use permit be effective until May 15, 1993. 3. All of the existing evergreen tnees bc protected by snow fences. 4. Approval of the companion conditional use pcrmit request. 5. Surface run-off pollution control as proposed by the applicant be provided. 6. Timber Ridge residents be allowed to stone cars only on a long-term basis on the Holy Ctoss parcel. 7. Applicant shall notify each V.A. employee who rcnts at Timber Ridge that it is illegal and extremcly hazardous for pedestrians to cfi)ss I-70, and the only safe way to cross I-70 is via the pedcstrian overpass o'r by crossing under I-70 at either the West Vail or Main Vail interchanges. 6 In summary: Granting the variance rcqucst will not bc derimental to the public health, safety or welfarc, or marcrially injurious o properties or improvencnts in thc vicinity as thc usc of this lot for parking for seasonal cmployccs will provide much needed additional seasonal parking an4 thercforc, may frec up parking fo gpcsts, which would imp'rove the communiry's ability to mcet community parting nccds. Further, by V.A. notifying its tenants that it is illegal and dangcmus to caoss I-70, the likclihood of employccs crossing I-70 is decr€ased. Approval of this varianoe rcquest is not a grant of spccial pnvilegc as this type of lfunited and tcmporary variance was also approved fo thc Town of Vail at Ford Park. The variance is warranted bccause the suict interpretation m enforcement of the specified regulations would rcsult in practical difficulty or unnecessary physical hardship inconsistent with the objectives of this title because the use of this lot by V.A. is seasonal, and is limited to May 15, 1993. The variance is warranted because the srict interpretation or enforccment of thc specified regulation would deprive the applicant of privileges cnjoyed by Holy Cross at this location during other times of the year. If, in the future, another cxtension of the variance and conditional usc permit is requested, staff strongly recommends that a permanent drainage solution, and pcrmanent paving and landscaping be installed. clpcdocmoc\holycnl.El4 &r.n s-zzet,-, s D o.-^ #lf;;t&- Tant /4rbg no/ zb -zztsr*4 /ertn a try -onfua J. ."t/ t4- /7X/ b a//avr7 -6 *tzaz,r' s/"?g?4-/1n./ z$ a//azr: rt *zzaa,r' s7tfrj+4rr/:Prt Zaslfu df dsa* /d.o,+,g)'zyzhz"- f%, A ,a4a; .p- d 14 &./- '% - ?-" */aog alu.raarf _.hx -r,o ca>,,fra/ /?,,?c. /ary*r^-- r^;rz- trye ate-/'/ayu4y ,,- ./r4. asc- ti /ryj /.,/.-<t zleat rt v- ,,t*7rctaz.ezz? .,6 ./ay' /.4 # ;frnli*r7oY '*o,re .roo// re6 .ziottr69 / /of /o-l/ V a& pr' 5' a(ceafz?,na( rl a obiedh \//n)Aqn 4uv,u € A z/. Cr?/^e\-^ rl4 ffiA a cm&/. zft i,et ,nry,{*-:::: ;,#;;c/ .{rtc ry?l '|hn: leL"en'h'/ zvlfmleinal* r,r)r,// l- ^.^J.,..-, , &', 7r,rffi*/^,,t ,n- y' t',4!hoss a't// a//azr t/Ap/AlJCe -ktl, - /n,r/rha)a srh,2,.( a' t/:tt ' --' J +l '2** 5' td' 67ne'-' 2P / z ea-,,./,1 tk^ /??3 { u* k *b*d {4::#, ^/fuU tntpar(tt; t'b , z'd/' 6s /o'|25 ''o> */f lahr 'r 7 ^' tu)// bzz-.uoazkd ,ry4"* *ge fa',2;-- 44 tt'-'noy'a->4 .^r^b:f nmtua- E& resd!,c'e_s v^7s