Loading...
HomeMy WebLinkAboutVAIL VILLAGE WEST FILING 2 LOT 2 & 3 GENERAL LEGAL(T TOWNOFVAIL 75 South Frontage Road Vail, Colorado 81657 303-479-21 s8 / 479-2 I 39 FAX 303-479-2452 October 28, 1993 ;T,tlt'ffi'P{"'qf D e paronent of Comnunity Developrnent Theresa Burt Slifer, Smith and Frampton 230 Bridge Street Vail, CO 81657 RE: Parcels 2 and 3, Vail Village West 2nd Filing Dear Theresa: In regards to your letter dated October 20, 1993, regarding the Aldrete property located on Lots 2 and 3, Vail Village West 2nd Filing, I have the following responses. 1. Wetlands The Town of Vail does not map wetlands nor do we have an approved mapping system of the wetlands within the Town. Because the parcel is adjacent lo the creek, it is possible that wetlands may be present. The owner may need to have a consultant map these wetlands and the review would be completed by the Army Corps of Engineers. While the Town of Vail does not review wetlands, we will require that there be a sign-off from the Corps regarding the wetlands should they be suspected on the sile. 2. Reoradinq The regrading of a lot is a site specific issue. Topography, wetlands and setbacks would be considered during the review of an item such as this. Also, the height of the building would be based on the original topography of the site, not the proposed grading elevations. lf the height were based on the new topography, it would allow a person lo build up a lot, and therefore, build a house much higher than originally possible. The staff has required that the original topography be used for all other projects which have requested regrading. 3. Access The Town of Vail does not control the South Frontage Road. An access permit would need to be approved by the Colorado Department of Transportation (CDOT) in order to gain access to Lot 2 without crossing Lot 3. The Town of Vail does not have the ability to approve such a request and it should be coordinated with CDOT. o or Ms. Theresa Burt october2S, 1993 Page Two 4. Setbacks The requested bike path easement will not impact the setbacks. The setbacks are 20 feet from the side of the property where access is taken and 15 feet on both sides and rear. There is also a 50 loot creek setback from the centerline of the creek. The one hundred year floodplain should also be considered when developing a site plan as it may be more restrictive than the creek setback in some areas. 5. Floodplain The floodplain is shown on the topographic survey which was completed by Eagle Valley Engineering and Surveying. The Town of Vail has one on file, but a stamped copy can be obtained from the surveyor. We would only be able to release a copy and it may be to your benefit to have a stamped copy directly from the surveyor. 6. Sewer Seruice Please contact Upper Eagle Valley regarding their requirements on the removal of septic tanks and sewer hook-up. The Town of Vail does not control the sewer system. I believe that Upper Eagle Valley will require you to remove the septic tank. Should you have any questions please contact me al479-2138 as I will be out of the office October 29th through November 6th. In my absence, you can speak with Mike Mollica regarding this issue. ly' SHlly (q{d \ BEST :- !'' ;'{lcoPY I AVAILABLE