Loading...
HomeMy WebLinkAboutVAIL VILLAGE FILING 1 BLOCK 5D TRACT B C VAIL TRANSPORTATION CENTER 1990 EXPANSION FIELD TEST REPORTS FILE 1 OF 3 LEGALlmn 75 south lronlage road vail. colorado 81057 (303) 4792138 (303) 47$2139 otfice ol community development Vail Transportation center Final Inspection The following is a list compiled during the inspection this morning, Feb. 2, 1991, at the Vail Transportation Center done by cary Murrain and Mike whitaker from the Town of Vail Building Dept. with Scott from PCL in attendance. l-. Return handrails or remove stairs and rails from top level of infornation center to lower tenant spaces at interior. 2. Set heat detectors in high areas of the 4th level in information center in center and east lbays.rl 3. Set closer and smoke seal for door from tenant space 319 to corridor (on1y wood door in area). 4. Level tile floor in lobby/corridor outside of tenant space 3L9 where tile transition occurs fron old grouted pavers to non grouted pavers. some pavers missing with holes present in older sections. 5. Enployee lounge: Under sink plurnbing: drain fitting required above trap for iltil from 2 compartment sink drains, rsrr trap fitting not approved. open electrical outlet under sink. Verification that outlets adjacent to sinl< on counter are GFI protected required. Conbination retail bought outlet on counter is not allowed adjacent to sink compartments. No ventilation supplied to employee lounge (no windows either). 6. Leaks present through slabs creating ice patches in parking areas. 7. Set nissing louvers to exhaust duct where missing and covered by pl1nrood. 8. supply fan 1A is burned out. 9. woods shop area: open electrical panel in approved wood shop area needs to be closed. Wood shop is set up in the wrong room. Room size is linited to 5OO sq. ft. for wood shop to rnaintain 82 occupancy classification. Dust collection needs to be set up with make up air duct connected around overhead door. 10. Remove all sign to abandoned stair exits. 11. Set permanent signs to aII restroom and stair exits. Presentsigns are peeling off. L2. Return handrails in stair tower l-2. 13. Return handrails at top of exterior stairs adjacent toinformation center and transit center. 14. Patch waIl from employee storage room to parking(next toelevator mechanical room. 1.5. Label electrical mechanical room and set smoke seal for doorto such electrical mechanical room. L6. Phone line for automatic dialer not in place in el-evator mechanical room. 17. Plurnb pressure relief drain from hot water heater in closetin mens bathroom adjacent to stair tower 12 to within 6tr of floor. L8. Repair penetrations in stair tower 12 from stair tower toparking. l-9. Set one hour rated ceiling assembly below all wood truss roofstructures. This is mainly in storage room adjacent to Mike Rosersoffice and in Mike Rosers office. 20. Cab1e railing between the ramps and parkinq areas on levels2,3,4 is not acceptable. Tension is not adequate to maintain a rnaximum of 5rr opening. 2l . Exterior stair landing for stairs from top level ramp down needs to have extension to concrete guardrail to be approved. 42rt minimum height required. 22. The top level parking arears concrete guardrail is not to code height (varies fron 39 to 4l-rr due to drail swale adjacent to rail. 23. Head clearance for stairs from ramp level to parking level on levels 3 & 4 is too low. 6t8rr minimum reguired. Existing varies from 6fl-tr to 6'2 L/2n. This involves two sets of stairs. 24. Guardrail are temporary or not existing and not to code directly south of the transit center on the top level. 25. Barricade required at entrance to snow dunp area. The concrete guardrail within the snohr dump area is not adequate. Appears to be approximately 36rr and needs to be 42rr. 25. The door to exhaust tower mechanical room on top level ofstructure at extreme north west needs to have a lock and latch toprevent public access. 27. Roof drain directly south and east of information center attop level is clogged and needE grate cover. This is presently a hazard to someone stepping into it. 28. Gas meters at top level just south of the dumpster enclosure need to be supported adeguately. 29. Repair stucco at entrance to parking structure adjacent to mechanical room on level three on south side. lnwn 42 west meadow drive vail, colorado 81657 130314792250 uE!!o lirc department TO: FROM: DATE: RE! CHIEF DI'RAN, VAIL FIRE DEPARTMENT l,rrKE RosE, TRAN''.RTATToN cENTE" fl - -- MTcHAETJ MccEE, FrRE llARslIArJ U' ITARCH 12, 1991 TRC I conducted a walk through of the TRC as. you requested.have listed the iterns f observed. 1. The fire alarm panel is still producing RF interference stthe Fire Departnentrs energency radio frequency. 2. ,.The, fire alarm paneJ. status indicates an earth groundpresent. .. 3. The cover to the electrlcal roon door closure on Level 2off. 4. Electrical panel Hp I in the electrlcal roon is mlss 6,J spacers. ft rt' /et I] trl is l il ind ioJ s. !-ire extinguishers need to be nounted. ,(t 6. Handel on standpipe fire hose valve on 3rd level in stair a id'bu nissing. V.- -T"rnorary handrairs Etill remain on south side of Transi!Auilding. 8. There are no fire detectors in the ceiling of the inf,orroratiod -. L.- center lobby, the room beblnd the information- center front desk,PU or !'h-e_ hlgh ceiling in the ski museum space to activate the ftr{' , sprinkler systern. ^q. "/ ?. There is an open 2 inch pipe that looks to be a natural saeYg{v tt'n] on the south side of the structure east of the infornatlod I ^ cenEer. ,. 1.0. observation only, there is significant standing water (ice) orf qcv the sldewalk where the snohr is pushed off onto the Jouth stcie ldrrnf a 11. There is no sheetrock li.d beneath the wood frame cap on thestorage roon adJacent to Mike Rosets office. The agreenenl was tosheetrock the cap and delete the fl_re sprinkler reguirenent. . The two therrnal detectors in the lst floor east elevatoreqiripnent r.oom were wired in parallel , not serLes as reguj.red. llheelevator will not recall except upon actS.vation of one specl.ficfire detector in the equiprnen€ roora. suggest the recall be tledinto the F.A.P. to recall upon any alarm.-- tt 13. Decals on the stairway doors are pearlng off in numerous/tl locations. ,? 14. The accelerators on the fire sprlnkler system riser on levels 4l' 3 east, 3 center, and 2 west are not properly set up to operate. 15. .The fire sprinkler pipe hanger on level 2, stair ,5 lsnisslng. Thernal fire detectors are needed on the bottorn side ofthe landlngs in stair t.? fi{one of the thermal fire detectors instalr lf-have been tested or\.lnspected by the Valr Fire Department.S \.zbt 16.. There.is open electrical wiring in the 3 center, 3 west, 2west, sprinkler valve room. nr.U L7. The electrical roon adJacent to the elevators on level 3 eastf- does not have either fi:se+p=i*tcJers or fire detectLon. 9*tu.* t" 4l . 18. There is an etectrical extensl-on cord. running overhead fromp1[-t},e center elevator egulpnent room. rt shourd. be rernoved.r- - t ^,y L?. A cap Ls needed, for the fire department(^rl W siamese at 2 east. Y t , .J.. | 2O-.. A cover is nissing to an electrical racewaytrttl adJacent to what lookJ tike a tine ctock.'lu" connection on the on level 1 center, ,"1' fi 75 south lrontage road Yail, colorado 81657 (303) 47S2138 (303) 479-2139 office of community development Vail Transportation Center Final Inspection The following is a list cornpiled during the inspection this morning, Feb. 2, L99Lt at the vail Transportation Center done by Gary Murrain and uike whitaker from the Town of Vail Building Dept.with Scott from PCL in attendance. 1. Return handrails or remove stairs and rails from top level ofinfornation center to lower -tenant spaces at interior. 2. set heat detectors in high areas of the 4th level in information center in center and east rrbays.'l,6 ..,C a. Set closer and smoke seal for door frorn tenant space 319 to 00t' corridor (only wood door in area). , 4. Level tile floor in tobbyTcorridor outside of tenant space 319 \Lv where tile transition occurs from old grouted pavers to non groutedr pavers. some pavers missing with holes present in older sectj.ons. (J 5. Ernployee lounge: Under sink pJ-umbing: drain fittinq required above trap for rrtrr from 2 compartnent sink drains, trsr trap fitting not appro-ved. (uo ventilatio-n supplied to employee founge.) ap ftiu* y'4ve 6. Leaks present through slabs creating ice patches in parking areas.( Lv7. Set missing louvers to exhaust duct where nissing and covered by plywood. ,r.,0 8. suppty fan l-A is burned out., ',|J{'9. woods shop area: open electrical panel in approved wood shop .y'v area needs to be closed. Wood shop is set up in the wrong room.!1'v Room size is limited to 50o sq. ft. for wood shop to rnaintain 82pij0l occupancy classification. (Dust collection needs to be set up with Pj/'- make up air duct connected around overhead door.) fat/ ,to{ L0. Remove all sign to abandoned stair exits. C pfr'"lt;^" pcl- L2. Set permanent signs to all restroom and stair exits. Presentare peeling off. Return handrails in stair tower 12. ^.uL3. Return handraiLs at topyo information center and transit ,-L4. Patch wall from enployee " elevator mechanical room. of exterior stairs adjacent center. 1..4 jT t+e( 4 A.td l4/L, storage room to parking(next to to - ,15. Label electrical mechanical room and set srnoke seal for door([-to such electrical mechanical room. _r,r 16. Phone line for automatic dialer not in place in elevator/.Fmechanical roon. L7. Plunb pressure relief drain from hot water heater in closetjftin mens bathroom adjacent to stair tower 12 and level 2 westr bathroorn to within 6rr of floor. :r.18. Repair penetrations in stair tor.t ,h, fron stair tower toalVr parKrng. 1L9. Set one hour rated ceiling assenbly below all wood truss roof \ ,1r, o/structure:. - Thi.s is nainly in_-storage rbon adjacent to ltike Rose'sr/'' f1q office and in Mike Rosers office.t'\ 20. Cable railing between the ramps and parking areas on levels2,3,4 is not acceptable. Tension is not adequate to maintain a maximum of 6rr opening. 2L. Exterior stair landing for stairs frorn top leve1 rarnp down ML needs to have extension to concrete g"uardrail to be approved.\ 42rr mininun height reguired. tl(,hr722. The top level parking arears concrete g'uardrail is not to code flltheLVht (varies frorn 39 to 41" due to drail swale adjacent to rail. -1223. Head clearance for stairs from ramp level to parking level on ffiteveLs 3 & 4 is too low. 6!8-.|,rninimum iequired. ixistiig varies "/4O fro 6rl' to 6t2 t/zn. This"ihvolves two- sets of stairs.- 'ltv6'^2 24. Guard.rail are ternporary or not existing and not to codef" ' directly south of the transit center on the top level. t 25. Barricade required at entrance to snow dunp area. The /^U concrete guardrail within the snow dump area is not adequate.'lu Appears to be approxirnately 35rt and needs to be 42rr. 26. The door to exhaust tower rnechanical room on top level ofttl structure at extreme north west needs to have a lock and latch to40' prevent public access. j t' r A.27. Roof drain directly south and east of information center at $V top level is clogged and needs grate-cover. This is presently a' hazard to someone stepping into Lt. fc>< sa e4""o7-Fttt/- u , c,- 28. Gas meters at top level just south of the dunpster enclosure {,i+f neea to be supported adequately. t6" ",<sl 29. Repair stucco at entrance to parking structure adjacent to/p' mecltanical room on level three on south side. nrl- 3O. Grout/trin ["- exit tunnel . around door to storage room at level 2 southwest _..1 31.. AII foan insulation exposed in any of the compressor rooms is frv required to be covened with a nininun 1/4rr rnaterial or removed' outright. ^,, tr. Cornplete repair of drywall on ceiling at entry to west level(1" z autnrobns. , 33. An 8rr drain line outside of the break/ernployee lounge room is Itl apparently clogged or frozen. Pipe is overflowing and creating antP' ice hazzard. Repair as necessary. H4N0t44f hwn 75 3oulh lronlage road Yail, colorado 81657 (303) 4792138 (3{t3) 479213s olflce of community development VaiI Transportation Center Final Inspection The following is a lisc courpiled during the inspection this morning, Feb. 2, L99I , at the Vail Transportation Center done by Gary Murrain and Mike Whitaker fron the Torrn of Vail Building Dept.with Scott from PCL in attendance. 1. Return hand.rails or remove stairs and rails from top level of information center to lower tenant spaces at interior. 2. set heat detectors in higtr areas of the 4th level in infonnation center in center and east nbays.r 3. Set closer and smoke seal for door fron tenant space 3l-9 tocorridor 1on1y wood door in area), 4. Level tile floor in lobby/corridor outside of tenant space 3l-9 uhere tile transition occurs fron o1d grouted pavers to non groutedpavers. some pavers nissing with holes present in older sections. 5. Ernployee lounge: Under sink plunbing: drain fitting required above trap for trtn from 2 conpartment sink drains, rtsrt trap fitting not approved. No ventilation supplied to enployee lounge. 6. Leaks present through slabs creating ice patches in parking areas. Set nissing louvers to er<haust duct where nissing and covered plywood. Supply fan LA is burned out. 9. Woods shop area: open electrical panel in approved wood shop area needs to be cl'osed. Wood shop is set up in the wrong room. Roorn size is limited to 500 sq. ft. for wood shop to rnaintain 82 occupancy classification. Dust collection needs to be set up with nake up air duct connected around overhead door. 10. Renove all sign to abandoned stair exits. 7. by 8. 11. Set perrnanent signs to all restroom and stair exj.ts. Presentsigns are peeling off. L2. Return handrails in stair tower 12. l-3. Return handrails at top of exterior stairs adjacent toinfornation center and transit center. 14. Patch wall fron enployee storage roon to parking(next toelevator nechanical room. 15. Label electrical nechanical room and set smoke seal for doorto such electrical mechanical room. 16. Phone line for automatlc dialer not in place in elevatornechanical room. 17. Plunb pressure relief drain from hot water heater in closetin nens bathroom adjacent to stair tower L2 and level 2 west bathroom to within 6rr of floor.I18. Repair penetrations in stair tover iC from stair tower toparking. 19. Set one hour rated ceiJ-ing assernbly below all wood truss roofstructures. Thj-s is nainly in storage room adjacent to Mike Rosersoffice and in Mike Rosers office. 20. Cable railing between the rarnps and parking areas on levels2,3,4 is not acceptable. Tension is not adequate to rnaintain a maximum of 6rr opening. 2L. Exterior stair landing for stairs from top level ramp down needs to have extension to concrete guardrail to be approved. 42't minirnun height required. 22. The top level parking arears concrete gruardrail is not to codeheight (varies from 39 to 41rr due to drait swale adjacent to rail. 23. Ilead clearance for stairs fron ramp level to parking level on Ievel-s 3 & 4 is too low. 6'8rr minimum required. Existing varies from 5f1tr to 6t2 L/2a. This involves two sets of stairs. 24. Guardrail are temporary or not existing and not to codedirectly south of the transit center on the top level . 25. Barricade reguired at entrance to snow dunp area. Theconcrete guardrail vithin the snow dump area is not adequate. Appears to be approxinately 36rr and needs to be 42r', 26. The door to exhaust tower nechanical room on top Level ofstructure at extreme north west needs to have a lock and latch toprevent public access. 27. Roof drain directly south and east of infornation center attop level is clogged and needs grate cover. This is presently a hazard to soneone stepping l-nto lt. 28. cas meters at top level just south of the dumpster enclosure need to be supported adeguately. 29. Repair stucco at entrance to parking structure adjacent tonechanical roon on level three on south side. 30. Grout/trim around door to storage roon at leve1 2 southwestexit tunnel . 3L. A11 foam insulation exposedrequired to be covered with aoutright. 32. Conplete repair of drlnrall2 bathroons. in any of tbe compressor rooms is ninimum 1/4r rnaterial or rernoved on ceiling at entry to west level 33. An 8rr drain line outside of the break/enployee lounge room isapparently clogged or frozen. Pipe is overflowing and creating anice hazzard. Repair as necessary. luun To! FROU ! DATE :RE: 2. lhe electrical room on level 2 at Stalr IZ has a fire ,., sprinkler head but no ther:mar detector. The fire sprinkler head(L- should be removed and a smoke detector lnstaLled or l-eave the firesprlnkler head and add a thermal detector. trhe roou was notidentified as an electrical roon on the fire alarn drawings butnotes on the approved set indieate therrnal detectors nust beinEtalled. 5.n sprinklered rooms. &r'> h"."ll3u:'t'o'on the 4th level locker room at Stair 12 is not rise thermal detectors in the rest rooms on the4. The rate of Ludvick Electrlc requested I conduct a flnal inspection and ocL acceptance test at the TRC. r conducted the test and inspectionf-- thls norning. f have l-isted the result below: 1. lhe two thermal detectors ln the elevator nechanical roon onthe lst floor center zone (at stair 12) are not wl-red in tandern.one thernar detector is tied into the fire sprLnkler actuatingcircuit and the other is tled to a tlo vAc shunt trip for ttr5elevators. rn addition, the thermal detector tied into the shunttrip is danaged and needs to be replaced. The approved plans only..call for one thernal detector in that room. 42 west meadow drivevail, colorado 81657 {303147$22sO I,TEIIORANDt,}I cary Murrai-n, Chief Building OfficialMichael Mccee, Fire MarshaL/i)January 28, LggL ry-'TRC Fire Alam System fire department ltL ay| wgst end have.not been replaced with fixed teuperature detectors.u7 The rate of rise detectors have been activating when the door isopened which causes the treaters to turn on, which in turn, set offthe rate of rise detectors. nnlL,-S. The nanuar pul1 stations in the information center have the have been dl-sconnected for the tirne being. etL 6. The information center does not have the proper nurnber oft- wr0 /\8 the:mar detectors instalred. trbe plans showed a ther-mal- detectorin each of the bays. Tlro themal dltectors have been instarled inthe east bay along with a smoke detector but the west and centerbays do not have thermal detectors reguired to activate the flresprinkler system. 7. The fourth revel manual pull stations and thsmaL detectorshrere to be zoned on circuits 44 and 45. They are currently tiedlnto the third level circuits. 8.- _ The RF problen wlth the fire alarn panel has not beenaddressed. As it now stand,s, the stray RF is lnterfering wlth theFire .Department radio frequency - and hindering emergencycornrnunications. r understand frorn Motorola, this problen has-beeiridentified and solved in other locations. OTHER r also observed the covers for the recessed sprinkler heads inthe rest roons have been painted and thus rendered inoperable. Thenain electrical roon house panel is nissing a cover panel . Exitlights are inoperabre in the loner lever or tne trans-it center.rV lmn 1. 2. 3, 4. 5. 6. 75 soulh hontage road Ya|L colorado 816ltt (3G')4792138 (3q147$2139, offlce ol communtty Ootgo$nent Vail Transrortation Center Final Electrical Inspection February 6, L99L by Ernst Glatzle and Ieo Vasquez Lights in south Bus Shelter not working. (powerline out) Remove all conduits not in use fron switcli gears and J-boxes. Seal off openings in switch gears and J-boxes. 3' Feeder for pole lights on lrleadow Iane is cut off . ExLsting receptacles in structure & stair cases donrt work. Level #1 T.O.V. shops:, -open'J-boxes need covers on unit heaters and switches. -Wood shop bas open panel . -Wood shop; needs dustproof covers. -Wood shop make up air unit open J-boxes.i-Wood shop dust collector not installed. All o1d compressor rooms need J-boxe covers and reeeptacles. Remove old existlng swl.tch Eears on southside. old elevator room needs 110 volt feeder and receptacle. Install 6 X 6 J-box cover on heat trace J-box. Level 2 Mens room east end needs Light in janitor closet. Lunch room has open wiring irnder sink. west encl storage room has no{ tignt or outlets. East end feeder for gates is cut off. Level 3 nechanical roon near center stair*ray has open il-boxes. Feed wire #10 guage for three east end check out booths appears to be undersized for an dpprox. distance of 5oO feet. 7. 8. 9. xo. 11. L2. 13. 14. 15. 16. ChcnSNorthcl'rr,Inc.','Elllq l^1r'r-.r ao4 a'jlFnlrt. REPOI1T OF CONCRITI TIST CYLINDER D,ATA rt^!imr^t'rn'fcF'|ro.]t[r[1n|lF||!rE0,nolntsI|'vt-.'tttn''fI5|,|r:'t,'!nt]loAlI|rcor'llx'.lw''rr.frh{.r sr^rtltt.fti- cortt rnrrF on rxlrlcrt..orrrlt nr, uf.uJg ollt'tt ||rn^roa}uot |'tf raJn lo l(l rrl lrRrlltrc. ^ nr'!.' .. rrl 11itT'l c,-- or c6n r- rod {o. Cr{,!tJ a/eo -l'i! r TO: TorvN 0F v^t t. nttl: !lr. Stan Bcrr)nnan 75 South Frontage lload Vai.l C0 876!''7 PRo.rEcT A(ldi t ion to vail 'l'ransportati on JOU l.lo. 4 393 90 DAILY REPOIIT NO. INVOICE NO. Vir i. I , Co I ora<lo . DA;E: 10- 1i.-90 SHEET 1 OF ,1 Ccntcr, PIACEMI-NT LOCAITON:l{al1s, Level 2, Stair No. 5; []ATCI{ IICKET INFORI,{ATIOI{: suPruER lr/cs Lcrn Mob j. lc I nuc|( lto. 54 ]lcKEr l$01 2791, MV oEsrcN tlo. t\tix A cu. .ro. B llME tlAlclltD 1:43 P.M. nME ltltllvTJ J_:50 i).14. IluE Pl.,^c[D 1:50 P.II. FIELD TESIING INFORMATION: TfM€ IE't UXen 2:00PM sLUuB 3/4 n. An co rt}tr 5.0= wEr UNtr wEc I L43.9 pc.t. srurP|'.E ]EuP.6Bo lrt :I}.".6001-. JOo SPtClFlCAllOl6 sLuup O_-5 tN. ^R C0NTO|I 4_gE W^nin ADO@ Ar StrE d r/l,L ftEr4/\Jrr(s 24 of 4i vd3 CYIJNOER INFORMATION: tK). oF cYl lllDrE lS 4 cn rtrrlnr sUti ()tr x 12rr ltMri cnJrtotRs cJsf 2:15 P.M. v/lltj{E c-$t 0rr-Si tc CURING INFOIIMTTON: lNtlul cullE on-Site ntro srotlAcE l-^ctunEs Cure Box MIN.,/MM. o^rtnl,iE Ar ua]o-l J-go D{rE srnrppED 10-13-90 sr: S. Urton nr:rr fiKs AG€ DA)s o^l€ lESIE tur L t.oAD(ltr)UIAMtlEN(|l.rclt[5)lJrt(sq. H.) cor.rP. 51n. (r'31) TTPE OF Hr crune c-vl,,lti)t:fi w[]or{T(ur) crulr0mulrlr ll't:lct tI(rlcll 7 28 28 28 10-19-90 11-9-90 11- 9-90 11-9- 90 84 ,000 6. 00 6. 00 (r.00 6.00 28.23 28. 28 28.28 28.28 2974 conical 3000 Psl 0?6 O lsOFJ'GN STRE}I6N{ lt5T5 |ry tlUo't^lt w nt|.:i.rt Mr ot r.J:{)nrlrrrr h1trt ,ftl x:rrr l: a'nv uf-llDD:i |trlllSJ olllurratc llolto S{r!t rtlf{nu llorl olt l||ls lLsT ln,${rl u l l[ rn0vlo(D ttt orllulS. PROGRESS REPORI: Concrete was placed in the forms rvith a punp. Sarlnle was taken fron the tTuck discharge. coplF\ Michacl Barbcr Alchi tccturc; Andcrson f1 llastings; I)Cl, Construction Services; lllcstern Mobilc; UllS Consrrltants ; l.lr. Gary Murrian; - e rrr.rnn T. Larrdiik r.rci-b bub"rirveR APPRoVED ltr Chcn€Northcnr, hic. REPORT OF CONCRETE TEST CYLINDER DATA t'{;'''''\.) N^!unutFndrcTrtDd,rMIit.nfnnE^,|ool'Fttt'vl?\,|lnt'Y'fsr'i:3l,|.i!ri'oAsl||rcor'ro|H'W.-.|r|rfilnTlrKrr.lrs|^lfyf',l!..orri|r|'r,8o'rxtn|c1tnon[|cd|'r,.,."'*.ijn'.iiii'io,irj'rrnrnr,d-ounBl|t|tll^,|A, lour\lnJr ur4tss on(t ,rnw|oa|rtlns rfi ,aJll l o lt, lrl lYllllltx;. ^ M'h- .'. u.lif ff f I c,..l or .o-F.rr- trh th, CUtttJ {/CO '4rFllln1 lrqtrEri .n s<lltht. TO: JOU No.4 398 90. pgE; 8-28-90 TOWN OF VAIL Attn: Mr. Stan Rerrynan DALY REpOKf NO. SHEH- 1 oF 1 P.O. Box 100 Vail CO 81658_0100 tNVOtcE NO. P]R0JECT Acldition to Vail 'l'rlnspo rrt at i on Center. Vai 1, Colorado. PLACEMENT LOCAIION: Floor Slab., Level 4, Linc B to 89, Grid B to 11; BATCH NCKET INFORIiIATION: suPruER l,\testern lttobilc TIME IIAICIIED ncKE'r No, 1857 Mu DESTCN NO. c CU. YD. B nuE ARRIVED 7 : 45 A. M . TIME Pt Acs) 7 : 50 A.l"l . rnucl( lro. 49 7 :50 A .M. FIELD TEST1NG INFORMATION: lluE TEI TN(o{ 7:58 Atrl sLurJP 51t JOB SPECrnClnOtE stuuP 3-5 rN. NR col{rE r 7.2rwr UNIT \l1lcttlls7.0 A'R CONTOJT 4- 8I W^IEN ADD€D AT S'TE t'cl. STAr.|PLE TEtlP. 71o llR 1U/P.65 o p cor. nrrrnxs 32 of 67 ydr tll. CYUNDER INFORI,IA'TION: No. oF cruNoF-Rs 4 rrultDrn stzr 6rr x l"rl wllenE o\sl On-SitclluE cruNDEtls c,Sr 8:06 A.lt{, CURING INFORI,{ATION: tt{IIUL CURE On-Site RE! sron cE rActU1Es Cure Box MN./IJA(. oArEnuE AI U\n- 8-29-90 n TE srntppcD 8- 29- 90 r : B , Carr nEJunK* ACE rAts O TE TESIU) tur L LoAD (tBs) DAMC'IFJI (rfrc'rEs)NlEA(sa. .) co!P. sTR. (Psr) TYPE OF FIUTCTURE C/UIIDER w€xrlT (lrJS) c/uHDet{ uNtr woc+fr (Pcfl 28 28 56 9=4=90 9=.2s-90 9-25-90 10-23-90 96,000. L20,00o 121,000 L2B,0oo 6.00 6. 00 Cr.00 6. 00 28.28 28.28 28.28 28.28 3400 4250 4280 4530 conica 1 qcn,/shear shear con/ shear OESrcN STR€NGIH 4500 Psl o 26 DA.yt t6TS gf wgr^IoRt Ftrr'fr|'rn. r,rf ul /(rtr.ro^Icf lfrlnt {it!1 rrl'rf Alrrl uf.Itnm Inn l= on|tj$]3( tlorfD so!€ ltlloflrl^lloll oll lllts tlst lttFonl [l Y |I: ttllovllx, fi oll[r5' PROGRESS REPORT:Test sanples taken from truck discharge; coP,Es xillil:^'i'il::.lilli'"cture ; PCL Construction Scrvices; Wcstern lnlobi.le; URS Consultants ; Mr. Gary l'{utrain; B, Carr T. Lau,.l: ck FIELD ODSERYER APPROVED FT ChcnSNorthcnr, hrc 'a.alun? l.^gLHt 6.., S<r- rtl. REPORT OF CONCRETE TEST CYLINDER DATA r3^q,nut|9orrcTrnI,nF[ri-n|rnntt^,loo(,irrl'\4.s.r!Inl'Yfr:rr,{:|liun]''As|rrf,r']DlMIw..,}lfr'!t{ .t <tlttt ttrE t-nr4t | 7ixt6 orr fxln{islovntrll| Urtt5l ollrti rrlntr,ll/uns ^,( rr:tit l.o lo [l ri{lllll:. ^ r.-irr- .. ,*l r riij-lo-,o or .o6rd - t..i N6. Ctrf,l lll l/0O 'tt Tgtr,N OF VAIL Joo NO' 4 398 90 DATE: 8'30=90 Attn: Mr. Stan Berryman DALY REPORT NO. sHEEf 1 OF 2P.0. Box 100 Vail CO 81658_0100 |NVO|CE NO. PRGTECT Addition to Vail Tr:rnsrlot.t at i on Center. Vli1, Colorado. PI.ACEMENT LOCATION:Level 5, Dcck Topping, Lines Ii to G, Lines 3Q to 36; ITATCH TICKET lNFoRlvlAION: suPruri Western Mobi le lruE rr^rcHo mucK Ho. 4 ;31 A.M. 7I4 rCK[r ]lo. NUE ARRIYTD ,lv4z 4:43 Mtx DESTCN |.rO. c Cu. n'. I A.M. TluEPLrc@ 4:50 A,lvl. FIELD TESTING INFORMATION: IlrE rEs-r T XEN4:55 AM sLuuP 5k JOB SP€CtnC notls SUrUP 3_ q ,vn corrgrn6.9: wEr uNlT wEctn 159.Opct. ArR CONTDTT 4-g r WAIE I ADDu) AT Sm 6 s,aJ,tpLE rExp. 70o ,rtn rclP.40o col. nan^ Ks:8 of 40 yds lN. tN. CYLINDEIT INFORI,V\TION : |ro. oF cylJHoF-Rs 4 rin.nloE|l slzt:- 6rt X 12tt rur cruNDEns c^sr 5:08 A.M.On-SitcWIENE CAST CURING INFOR},6TION: DlrIW. CUR8 On-Site RELg sroRlcE r'fctuTlEs Cure Box UrN.,/1191. o E/nuE 11 1,{r 8-31'-90 oAlE slptppfD 8-31-90 F/: B. Carr REIrIRK& AGEDl€DAII IESIE) TOTAL I.O{D(ris)DI METE'I (rflclrEs)NlFA(sa. ru.) c!uP, sTn, (Psr) T/PE OF fllAcTUnE CAJNOFN wuclfr(urs) GtlJNOIR uNtr wlrfl |I(rryl 7A 28A 2BA 56A. 9-6-90 9-27-90 9-27-90 10-25-90 110,000 l-23,000 122,000 136 , 000 6. 00 6. 00 6.00 6. 00 28.28 28.28 28.28 28.28 3890 4350 4320 4B10 shear conical con/split con/ shear DESICN STREI ICTH 4500 PSI('26 0lT ff,sTs ttt tllro.Uloft/ FfFs.Flt,tl. l,lt |lr aa,r.-on0{,x:i: wnrl A,'fi r,,r f Anu rrlllltlts tltlll:jtri Ofttr'Frll3f llolfD gollt lNl ulllJ^lloll otl llt3 tlsl mrrofrr u Y tL l-ft(^/D(D ttt olll(nt' PROGRESS REPOKT Sample laken at the tnrck discharge; .nprtrq Mi chael Rarber Architccture; Anderson ti llastings; PCL Construction Services; I{estern ltlobile; URS Consultants; Mr. Gary Mr-trrain; B. Carr T. Laucli ck FIELD OBSEF/ER APPROVED iTT ChcndlNorthcrn,Inc coRRE$TEp QS|FY-',.Eltlrq hql,s.r .rx, scr-lhl. REPORT OF CONCRETE TEST CYLINDER DATA ^l^|,uI[|,FFimcTlI,q'r|.Tt'Il|tnmEr,lDlIW<l|'v1,l[Frlo|lIs[rf3|,t|!iarlnA.i'tt|rc4|'lr'|'.fw--.rb'|('r'^'Tr,ft45.cl''cttr|rtFo'rtxTnA:|smfIl(nnte^,r|,'r'oun"rx,,.rsri'-iiiirrr'iorliote 4ou.alnD utltlJS otllLi fatwlqrrurns r t rfitfo ro lrl lYlllllllc. ^ 16t- 6. rrl fitrfls-e or .0616r- ..m r|- Cr.tt lJ a^O To: JOU NO.4 398 90 DATE: 8-j0_90TOI1IN OF VAI L Attn: Mr. Stan Berryrnan DALy REPORT NO. SHEff 2 0F 2 P-0. Box 100 Vait CO 81658-0100 l|tNOlcE No. PRGTECT Addition to Vail Trflnsportation Center, Vai1, Colorado. PI-ACEMENT LOCATION:Level 2,Grid 36 to 33.2;Deck Topping, Line B to C, BATCH TICKET INFORIJAIION: suPruFi l{estern Mobile rnucl< lo. 119 ncKEr trc. 1950 Mrx DEslcN Aro. C cu, vo. 8 lluE II^rcHO 6:58 A.l{. nuE lRRt!'ED 7:10 A.M- lluE PL,ACED FIELD TEST1NC INFORMATTON: lluE TEsr rN<t}l 7:45 AMsLUMP 7 tN.NR @lflEtfT7.4 : wEr UNn woon1135 . g NR CoNTE|T 4- 8.r wArER ADDED Ar SrE SaJrPLE "lErP. -- AIR IDIP.71O rhr. RorAr cs g 6f I o,l v,l3 p";1. 6JOo SPEqnA T|OttS stuuP 3-5 CYUNOER INFOR}I.!\TION: lO. oi c.ruHunSi "'-"-4'- *,ror.,, ..,r,'. 6rr * 12rr truf crruHofrs crst ,.rn o " wume c,tsf.0n-Site CURING INFORMATION: IN|IUL CURE On-Site RE-o 519ttrcE F CIUTIE5 Cure Box MtN.,/r{AJ( o rEn}rE ar uU 8-31-90 q lf, srRlpPs, 8- 31- 90 rr: B , Carr nEl,^RK& ACE D1€ DA'IE lEs'tE TSTA]. LOAD (rBs) ut r,rEIF_n ([.lc]rEs)Nlf,\(so. rN.) @uP. fln. (rrsr) TYPE OF nucTune CruNOER WEc|IT(uts) clruliDf-R uNf r wllct fT (Pct) 7B 288 568 568 9-6-90 9-27-90 10/2s/90 ts/2s/ea 86, 000 105,000 126 , 000 123,000 6. 00 6.00 6.00 6. 00 28.28 28.28 28.28 28.28 3040 3'120 4460 4350 slpar son/shear con/ sh ear shear OESIG}I SIRENGII{4500. Psl o 26 D^\6 rErs t/ wtqurc|rr ltftsarl tl ,.nt lrl r.l^Jxro^r|:f, *1 t lFl iTJrf Aflu ltrlrnt6 Itrllf,s On[ftvl3e tlolto 5osc [r' unalotl otl llni ltsr ml!fit ]'AY l( ftlo'/tl)cD IJY on|t,,is' PROGRESS REPORT: Sanple takcn at truck discharge. Balance of rejected. Western Mobile represcntative requested another slump. -+concrete at J-. yd h/as Results were 6t'. ..rDr..q Michacl Barber Architccture; Andcrson fr llastings; PCL Construction Services; l{cstern ltlobile; URS Consultants; Mr. Cary Mur:rain; R rrrr^ T. Lautli ck nruo bn"sttrVeR APPRo\ED Lrr Clr0n€Nor1.hern,lnc . F['0 AUc 1 4 €m- REpoRT oF netxroRclNc srEEL oBSERVATIoN ffi ,.rE r., d'wnr tr-1qpg!!! *a ttrtrrD ," rlf oo'rrxn,. pia'rv of art cux'l rlo ,.tfixt rDl rDi PrT rE^- lxw q.i^nr.xrl c.'au-*t . rxri.ctt .r,rr t'r -irc^r.€ q,r r.of- g-iAriio'fii5-iirr rnntor 'riiiiirl- retaul nr r rl''qrJ f '^r|rn rrirlB rs iiiir?rri iiuro -ottr-r l*xurnr rE ,.iirx lo H rrtirrrr ^ .Et- r, t"[iiXl l-" .r ...it''r- tdn trn. Crat l! a/9O erAht 5rC-r Jrl ldrnlltr ortation Center,Vai1. Colorado To: Toh,r{ Attn: P.O. Vai 1 PROJECT OF VAII, Mr. Stan Berryntan llox 100 c0 81658-0100 Addition to Vai: 1. Tran JOB NO. 4 398 90 DAILY REPORT NO. rhNOtCE NO. DATE: ?/r/9O IB SHEET JOF sTRUCTIJftE llew wall cast on existing west ranp step footitgs:-Iegting pil cosuefis detail reg. 2 #5 toP will be in-place at tine of poul T'gyB Ber SteP 81. 2r +LaP Botton mat cont. Cont. eection A-A Sub /f5 Bottom, Schedule H 2#5 bottom 7tf4 a LB'r T&E co Z l3ars @ lZtroc ace /14 @ 18 oc 13 /17 each Tray 7#4lt\ #, 2B#4 @ 12"o L9o'/14 x 3tzx Btr l8rtoc eacli tow 1OO BrTo-BrB -tf A Line,/Il-I2 l\. $-8.2r 4Grld I ll 89 Line/Z? sPEurp Trtn$ $ErL cn IE 60 RElffiq a AlnrUUesC, Clean cur1Ar{cE ^trD coyEft 45 f€Qo SPtrc|Ne SPECfE TXX{! €tS }eO o B R gf,PoRIS: l'l?t E n rxs ttso 6 snoe Df, rrts usto El cogmrlon rsvtstD E nlr-rse osm/ noN E plrr-lw ortrylTlo|l rrer.,,rce conanrce JeE UET PROfCT UET PROJECTRgtulRorens REOURSaEXISIr€N tNtlUltY sl.lE{ Eurll{@ RE-EoAtrlN@ PROCRESS REPORT The rei-nforcing steel was placed in general confornance with project plans and specifications. llltl. Carr Steven L' Fawlak REll) OBSETWER APPRO/ED T' Michael Barb.er ArchitectuTe, COPIES Attn: I,11. Scott Ward; Gary N{urrai.n PCL Construction Scrvices' Attn: I'lr. Denny Arrnour; Andcrson fl llastings: Clren€Nonhern.lnc.CorrrrUng taslnio ..a Sd-{}.|. REPORT OF CONSTRUCTION ACTIVITIES rs A |lrnrl Fttotfcrxrr 10 clrxnl Irf, Frrr.E rro olr|rEtwl Alt if,t(fl:l laf ![n Tttr] as tri: oorfrfxn{ P'trFirt d ctt olxnl l,o a'nofiratrx ttt Af,tx- no.a aa sratfitx6 co{lus6 (! rxnlct! t?o{ on fi€n nta{ our arxxlr:-r instr*i.o prluro o.n rrrrnn rprtirx- s'^lrtct f[ oE DGFolrD d T fr larro 6 csa'ult:) r|rr,sl onI'l |Atr||€t|Ixrs |n{ l&ut lo lll lllllr(r ^ rr.r.r ., hl l.lltl lsrt .'. ..|h"'l.- fdrn tl.. Cr.ElOt '|./to To: TO'N oF VArL JoB No. 4 3e8 90 DATe 1/7/90 Attn: lt{r. Stan Berrynan D{Ly REpORT NO. t9 SXEef lOf JP.0. Box 100 Vail C0 81658-0100 lNVolCE NO. PRq,Ecf Addition to Vail Transportation Center, Vai1, Colorado wEATHER coNDmoNS AND TEMpERATRE cloudy, 60u CoNIR^CTOFTS CONSTRUSnON ACrvmES PMSONNfu I|AIOR EQUIPMENTT ICIMNES: CHEN-NoRTHERN's srTE AcIMnEs Obeervationr inspection and testin8' nil-iirriicfnd'ste'ei"i'eiriT pfaced in west ranp footings_and level on footing pad. Testlng of concr6te nein6 placed at A Line'/Ia11 Grids l1-I2' ireet ranp fo5tings and. Level one- footing pad tota_I pour BB cubic-yards. Tgo #4 x 3tz i B, 18" oc each face placed at time of pour f-7-90' Footing pad 89 Line in-pLace 7-7-90. VERBAL COMMUNICATION WTft CONTRA TOR, ENGINEER, ARCHTTECT, OWNER cop,Es Xill?"'rf"B::,t'fi1*;tl1i"il,,",i'-, PCL Construction Services, Attn: Mr' Denny Annour; Anderson G llastings; -.UllS Consultants, Attn: Mr. l,es l,llood; Bill Carr Steven I-,. Pavlak RNl) OESEfWER APPROVED FY 'Chen€Nortlrcrn.lnc -l I \ C{rrl|ht fnflr-r rl sd..aL|. REPORT OF CONCRETE PI-ACEMENT OBSERVATIONS |l A |lrnl. ?i('llElEl E cuml t'( rtfE l,|) qtnvB Al |rFfi rnf ti.llfD ar frf coaDctttl{- ti(rtrTY f ar,l c|lt lt llo artncllDl 7r' lt-|l-E^-m., d ttattE atl r€l'Ir! dl rxrxcrt rr(x rn [o [|a€ otr Ra.omt r |l:tivt' poot€ cr,r tElrt]t ^,rto/& sllftll ru !€ DltlcrD ct,rrtl lt n(l Eoorrurgt u1[r onrt ,aalrrxn x[ la.I-o m t{ Flltn A in-r.- d r'.[FiFln r rt ..nrntr fdrr t\ Crtt laa 4,/aO To: 161911 oF vnrl JoB No.4 j98 90 DATS ?/?/9O Attn : Mr, Stan Berryman .i .\p.o. Box 100 D ILY REPoRT No. f9 sHEEr zOF J Vail CO 81658-0100 D$/pICE NO. PROTECT Additi on to Vail Transportat.i on Ccntcl., Vai1, Colorado. spEEEATroir! st lnp 3- 5srrual,lt.t'iobilq1q m. 30OO @ 2BA '^n c(xrElrr 4-B ALrorr TEuPTnrTURE nrlrcE 60-80 IE;T Nq.rRUCr(l{L TC'GT t{().TUE BATCIIE) TIIIE ANn'lfiD 1 € SAIPIED RnOUflPt{@U TEN EBIN Ff\ourTtor.l@uxrfi oorPr.EIloN CUEC YAG t-oAD/ cUUUL IIVE I|A'ER AOOE)q^|.lJot|s I 2 3 4 5 6 7 106 4B 54 100 114 44 106 oLoz57 oro75E o10760 010761 olo?62 oto753 010764 5:O6 7 zA\ 7:L9 7:34 7:44 7 255 B:04 6:23 7 zZL 7:34 7:4o B:OO 8:05 8: 14 6t31visual 7 245visual rrisualvisual 8:25 as reg as req as req as req aB req a6 req as req a6 as as ag a6 AE as resl B.o req I 16.0reql 24.0reql JZ,Oroql 40.Oreql {8.0reql ,6,0 4 0 U U TETl{L sLlr? (Dr) lno(}{nilr(r) ET UilT ftlcHr(Pcf)YAD ooftcRErE TEIFE- RAIT'if co ffx^tu<s I I 3 3 L/4 5'O4 L/2 5.26.0 6.5 L45.i r42.1 L43.i 70 6B 70. PR(rcRESS REPOTT COptES MichacI llarbcr ArchitectureI Andcrson {i llastings i Gary Murrain PCL Construction Services; URS Consultants; Rill Caru Steven L. Pawlak FIELD OBSEFVETI APPROVED FY To: 1sp1,1 oF vnrl JoB No. 4 398 90 DATS ?/?/goAttn: t"tr. Stan Berryman .r /\ z .?p.o. Box 100 - DAtLy REPOFiT NO. L> sHEEr .2 0F 'Vail CO 81658-0100 h6.OtCE NO. eEq{ECT Ad(lition to Vail Transporration Ccntcr., Vai1, Coloratlo, sPsFEArn$r surup 3-5 An cor{rn{T 4-BEPflJml4t.l',1obi1s/u r.o. A ]0O0 @ 28 rao{rranpEn^ruRE R }tc€ 60-80 lElrt IFT.,C(t{L llcxET NO. llt!€ EATGITED "I[rE TREVED TUE S I|PIEO RnOU,IEN COU}IIER EOOI RE\rOUJIlOil @UNIER @UHI'IK' :u|Ic YA&ts t-o Dl CT,UUIAIII,E UAIE AOOS' oAllJot{s B 9 10 11 48 54 100 114 0loZee 9Lo767pr076B 010769 8:15 Bz25 B :44 9zL5 Bz34 B:40 9z2o 9:35 visualvisualvisual visual as req as req as req aa req as req as req a6 f,eq aa req 54 7? B1 BB U 0 si B lESr MT sll,tf(rn)An cxhfrE{r(r) *ET UHTT wtFltT (PcF) ra"o cormm TET'P€- t|^TUn[ cF) RDrffU€ 4 , ?2 74 Truck #1OO on-site for B0 nain. Truch #114 on-eite for P0 urin. Delay due to rebar level one and bob cat dovln tine. PROCRESS REFOTT nnplFe Michael Barbcr Archi tecture I Anderson fi llastlngs; Gary Murrain PCl, Construction Scrv.tces; URS Consultants; Bill Carr Steven L. Paw1ak RELD O6ERT/ER APPROVED FT 'Clrcn€Northern.lnc Cd-ftra t,rctrt tta Sd-tL REPORT OF CONCRETE PI.ACEMENT OBSERVATIONS at A tanut aDtrtf,t I| alrxlt r;rriE lr.l ottlrrv8 fll dtflt|t A,lt itfim at nE o!'arDflut tg(FttY (r dn drrtl |,l, arlt(lllt,tlDl For xrilrJr-rpr q nerrranr coormr'ti 'axnicrc-nrri a |[or-uic tif itrvrn n rrrwo mlIIrB d,n rruTrtl| ,l|Prdx- s l|'ut lrl E oarurD (f rmt lErrI EocttlrrD u.utr oDlt an qtl|I,fn ,|l. |.rll, lo lt t'|ttt A 'r:r-, r.lTiFlr- tt .rir.*. I-i l.. CIII l.|. a,/ao Chen€Northern.lnc.Co.r.d{t{ lngL|.fl .?td sd-'Utt REPORT OF CONSTRUCTION ACTIVITIES ls A lr,nr.L ?iofiEmi Itr clrxrl rrf, 'trrIl rrQ otr!f,rl,r!. r|. rrt'finr reE srrr'rrm rs nd coFrrxnrl PrttftrlY or oun ort'Tl rro ^r'DGorvDl foll aT n- iol or stltrlr"rfs, corrt"r!86 (r r:(nu6r! rltlu m s€orf'rm olr arrqiri-f-rnirvb- t'tittilto oxnior erirgt'rL 54ttnr frr E Dlsrqn c 'ftr [:n*' 5 co'tflrD lrr.I5l! (mrt rarraqraxni l,rf ll[rD lo fi rllll€- e rrrrr er *[irfX-ly* o, elrrrdr.. fld |a.. Clf,tcI/r ./CO To: TOWN oF vArL JoB No. 4 3e8 90 oNE;' 7/9/90 Attn: Mr, Stan Berrynan DAILy REpOFf NO. 20 SHEfil OF I P.O. Box 100 Vail C0 81658-0100 llWOlCE NO. pRqrECf Addition to Vail Transportation Center, Vai1, Colorado WE{THER CONOmONS AND TEMPERATURE cloudy-partly cloudy, rain 6honer6 a.n. - 7Oo CONTRASTORS CONSIRUCNON ACTMNES PERSO}INfu I.IA'OR EQUIPMENT: ACtMnES: CHO,I-NORTHERN'S Sm ACTMTIES Observation and inepecti-on: B8,cB Excavating cont1.nues to excavate for new building site east of ercisting structuret pipe for repahs to eewer linee, Level One, Stalrs #I1r are on-siter and gS.B is working on the repairs' Steel reinforcingr being placed for step footlngs Llne p.g-Grids 3O-13.5. Concrete cylindere of Saturday 7'7-90 pour were taken to Lab and f-day breaks of cylindere, A Line waII wlth ?tr slunB were nade. VERBAL coMMUNIcATIoN WNH CONTRACTOR, ENGINEER. ARCHITECT. OWNER REPOTICd TESUIIB Of ?;dat Cyllnder break to Denny Armour, contractor and Les lltoodr owner representatlver Michael Barber Architecture 'coPlEs Artn: Mr. Scott Ward;Gary i{urrain PCL Construction Setvices, Attn: Mr. Denny Armour: Andcrson fi llastings; tlRS Consultitnts. Attn: ltlr. T,cs ltlood; Bill Carr Steven L. Pawla, NE.D OSSEN/ER APPRO/ED FY Chen€Northern.lnc C.r|.rrt nC E gla...r ord s.raiJri. REPORT OF CONSTRUCTION ACTIVITIES rS A rlmnt Fi't|lCmX D cttxnt l|f ',1[t lr0 (xrttraw3. al i?troil:l |I€ ! lrartm AS n{ Co|'rt,.Iur t'litftrr t OLi Cl'f}fnt l,.t A'Trr|tI ip'l rn n,l - tyr. cf sl^rrl|.,xtt co€u!ro{! m rInrcl! rFo.a cn fuf(rt(l n'r apoirs-s -rii:rniio '1r.i'trriYt 'r'8 rrmru ipnrovr- s'lrtli $u tf l'6Fqrrl t lr[t lE tl€ E c(r4lrIll, I'|IIJS O llr .r8r^}rilr{ls ,.4( l&Ltr lo lll wftlllo. ^ "-r* ., r.[f fX-lc-r c ...w- fdir lrr, CUt ldA 1,/lO TO:TOWN OF VAILAttn: Mr. Stan Berrynan P.O. Box 100 Vail CO 81658-0.100 JOB NO. 4 398 gO DAILY REPORT NO. rtworcE No. Vail, Colorado DATE: ?/lO/9O 2L sHEEr I oF pR61JECf Addition to Vail Transportation Center, WEATHER CONOmONS AND TEMPEMTURE Clear 8rm1 1 partly cloudy-pain showerg p.n.?Oo CONIRA TOFTS CONSIRUCNON ACIMTIES P€RSOIIINfu IAIOff EOUIPMENI: ACIMNE$ cl{Et{-NoRTHERt{'S SITE AcrMTlEs Observation and inspection; lowering of 8asline north of Frontage R4,, west f,rour Village Center Dr. 1 €ast to-B1ue Cow Chute has started. We-obtalned a Eanple of road base naterial to be used. as fill for sianaard property tes-ting and moiEture-density relationehlp. Rebar being pliced Level One footingr F .LLne/1O. ^,Coordinatioir neetins /13 a[ fO:OO jobsite. B&F Excavating has con- pleted repairs to 2['r Lnd lZtr sew6r lines Level Oner Stairs- #11. B&B co*pactton rollerls down and repairs are being nade. Qbeerved excavation to natural 6oilse L,ine 99-34-36. VERML COMMUNICATION WTTH CONTRA TOR, ENGINEER. ARCHITECT. OWNER PLC has lald out stationing for lowering gas line 100t of line exposed today fron Sta. 10+OO to Sta. Denny Arnour north of project. ll+00. Michael Barher Architecture, COPTES Attn: Mr. Scott Ward;Gary Murrairr PCL Constructlon Services, Attn: Mr. Denny Annour: Anclerson fi llastings; UIiS (lorrsu ltnnts, n ttn: lilr" Ic5 !!ogt1!; - nill Carr Steven L. Pawlak FIE.D OBSERIER APPRO/ED BY Chen€Norrhern.lnc Co,!.ll|,{ [ntlr-r .ra Sd.fr. REPORT OF EXCAVATION OBSERVATION ,5 ,^ ||ultt^l Pi(/|TcrEH r clfxls n€ .H.E l[r oaJ{rJtl\f!, tt! Rfrr(rir: t rf stEf ID rs n€ ftfnYrur Piot{rrY of q,n crfxTl, rx, arl}IllclTn toi ti,arA-|l'|('5|^[l.t,.lJ.qial&|6|o{trlRA;|5fn6|(d&:qrn),*rqnhtx)'l|t6tr]r&tDtt|rub{;qx!|'fX^}f|lo/A-sl|3ll':ilIIEorF(E.D(ru|6crrI|rfl|| urat]! gntt |,a ||Ilamt ,rrt rarrrtr to t nnr ^ nrd- d s.fXfHlr-t ef ccnicrrr /..|n Xo. C|f l Ol a/to TO: TOI'JN Attn: P.0. Vai 1 PROJECT OF VAII Mr. Stan Bemynan Box 100c0 81658-0100 Addition to Vail Transportation JOB NO. 4 398 90 OAILY REPORT NO. lwolcE No. Vail, Colorado one ?/LO/9O eI sHEEr 2 oF Center, E(CAVATION FOR:16t x 3l 5tt footing LocA'floN: Line B-p, Grids t4-36 D(CAVA'ION BASE ELEVATIoNS: 8170 Mr(IERnrs E(PosED rN BASE(S) OF EICAVATION(S): l,tratural undlsturbed granular soils wele obEerved at the base of the footing excavatlon and appeara suitablefor support of the recomnended naxinum 6oi1 bearing pressure. REI1ARKS: This footing area ls suitable for reinforcing eteel placenent. VERBAL COMMUNICATION WTFI COI.ITRACTOR. ENCINEER, ARCHMCT, OWNER: PROGRESS REPORT: Michael Barber Architecturet COPIES Attn; Mr, Scott lttard;5apy Murrain Anderson € ltastings; PCL Constilrction Services, Attn! Mr. DennY Atmour; URS Consultants, Attn: Mt. l,e s ltlood; BlLI Carr Steven L. Pawlak FIELD OESEFVER APPROYED B/ Chen€Northern,lnc O-rfria f'rh-t -a Sdtrtlr REPORT OF REINFORCING STEEL OBSERVATION a! A xrnr.t rEnctDt tn cuxrr. D{ rt--t,ro dti(ttt:t5 at irport! r|( nf,rlrfD rr nt oofrluxn a Fm"ftlt c q,l cut{t!,trio tuDm D. Ioi A[EA- rut r srrnrrxrr coalrro€ rir rirrrcr: 'ri|| dt Eo.ria q! EFrIr E iti|\rD tcxlxtt d.| tmfix,f?irDt- 3rlrt6 lll r omrl) tr rftll tEmr] 6 oo4tfrrD u{l.,t o|lrt |, {Ix){I: frf, lGEo lo tl nm€. a .r-'rr ., s.liiiH lre , drd{.. r|'' r5. Crrl lu r/tO TO: TOI{N OF VArL JoB NO. 4 398 90- DATE ?/LO/gO Attn: Mr. Stan Berryman DAILY REPORT No. 2I sHEEfS oFj P.O, Box 100Vail CO sL658-0100 ll"lvolcE No' PROJECT Addition to Vall Transportation Center, Vai1, Colorado STRUCruRE Level One Footin&is r-G lxn tI5/ Tlsl RANFORCIIIO conrae{Ts wxnc L rofdzorfra LLne/ZB Ll.ne/29 LLne/30 BL5t.6" BL63.6i BL63.6i 58#6 @L?t'oc2t6 58/16 a tzla 216 58#6 @ L?tto 2t6 55#6 Eq. 8#6 x LLt6 c 36#6 Eq. 8/16 x LLt 6 c 44#6 Eq. 8/16 x 1116 Spacedtop nat @6n o/c bot/@ 22, eachside all threads Spacodtop nat @6n o/c bot @221 eacheide all threads Spacedtop nat - 22 E.W. N.S. @6r' o/c bot @ 22 each side all threads sP€culc l|otls! SIEL cR De 50 REt$mcNo crE1t{to{esr: clean ct.EARAlicE l}tD crtr/ft as req. sPuculo: sPEc1aAI11i1a aS feg. BAn s.,PPome rree brick FII{EH Hoctn @5r' p ners useo E srop ourtltcs us@ h corrnrcron,rnnseo F rur-lue dlsgnv mN D prrr-nur ocsmrmor hfirfE oour"Pl llcE yes U€T PROf,gI UET PRq'ECT FETITJIREI'OII:' R€Q(,|ROIE}ITSwr€t tNnur.LY w]l€]l DqTff{@ RE-ECATNTD DATE RE-EO{TINED PROCRFSS REPORT confolnance The reinforcing steeluj.th proJect plans and appears to be placed in general opecifi-catione. Section - B Michael Barber ArchitectuTe, COPIES Attn: Mr. Scott Ward; Gary Murrain PCL Constmction Sewices, Attn; Mr. Denny Arlnour; Anderson 6 tlastings ; llRS Consultants. Attn: Itft:. l,es l{ood: BiIl Carr Steven L. Pawlak RELD OBSERI/ER APPROVED BT C{ren€Northem.lnc.C.n.dung [n0lr|..,. ot|d S.J-lr.|. REPORT OF CONSTRUCTION ACTIVITIES as a rrrMt pi'stttlE|t Io crrxE Trf, FrrnlE ,r<) q.Rlfll,f:, at tfFo.mt ffE gtrtTtTD As rxr crnfnftlra PfFllTr at qr olfitll ^r',o-.41!!1!lflDl ttt t1,r s- nofi cf stlmrrli c(!'{ulsE.t! oi rxrt cn tron oR Ffrufi)rr.t arr ntxnn-s n:rnia prxcno otn iartrgr rmonr- SAtLEi wll. lE DGF(Irl, G rrnt lEnta 6 oqfrfl.D t|l-Isi on'ltt rai rqllxl3 anf, l&rD lo |tl rrllrlo- ^ 't!t -., rlfXiFlg..r.. o.nr'{- frrr To. cLlu^ 4IO To: T6WN oF vArL JoB No' 4 3e8 90 DATL 7/LL/9O Attn; Mr. Stan Berryrnan OALy REpORT NO. 22 SXeff 1 Of I P.0. Box 100Vail CO 81658-0100 ltwOlCE NO. pRilECT Addition to Vail Transportation Center, Vail, Colorado WFiTHER coNDmONs AND TEMPEMTURE clear BOo CONTRACTORS CONSTRUCNON ACIMNES PERSOIINE.: MA'OR EOUIPMENT: AdIMIIES: cHe.t-NoRrHERtt's sfrE AcrMrEs Obeervation and testing; Structural fill i,ei"e-iiiIc,id T;;'T;i;tfre, Leve] one stairs 11' So of A Line'-Gride ro- Lz.r; Excavation for neiv structurel Llne B.5-AO Grids 35.5-39.- I'laterials exposed i'n thls excavatioi not guitable for structural fill. Conpaction t6sting of fill be1n5 placed over 6tt gas liner i'I.^of-the pro:ect. Inspectlon of rebar being pl?cgq for Footing Line B9-3L-J3.5 in iew structure and footing B Line 2B-?9 existing structureo VERE,CL COMMUNICAIION WIITI CONTRA TOR, ENGINEER, ARCHTTECT. OWNER Michael Barber Architecture,UurlLs Attn; Mr. Scott Ward;Gary Murrain PCL Construction Services, Attn: Mr. Denny Arnour: Andcrson I llastings; UtlS Consultants, Attn: Mr. T,es lt'ood; Bill Carr Eteven L. Pawlak NELD OBSERI/ER APPRO/ED FT Chen€Nonhern.lnc ca.rl|rr|' t|t0atr. .i S.La.lt REPORT OF FIELD NUCLEAR DENSITY TESTING ^s a rurlt ;imErrr. r, ct rarrlt I]t Furt ,}{t q.Rrlvf,!. aI FEpttIf liG slf'tftD A3 lrf ooarotxl|^l PirtflTr cr cr,r q[xE rx, a|.tt]EEirD{ tn ttf-E^- Trcrt or srltrrftlnr. qrqlElr r (n rflt clt rf,qt oa Rro Rrrlc qx rg.tini-s-riffno priirri c..n rtrrrDt lfPirxa- sAltt-ct rL E D€r(lID c lfTa rEm'F d co.ttfiD ull-et g|lu ,f\|€DaI| ttf ,cGfD 10 !t witn|.o, A ,i..i.- c r'.[ffi] r-r d ...n?rrr trri to. Clflot^ 4./|O I OF VAII Mr. Stan Berryman Box 100co 81658-0100 Addition to Vai 1 Transportation Center, tot ,o* Attn P. O. Vail PRO.JECT JOB NO. 4 398 90 DAILY REPORT NO. tlworcE No. Vai 1, Colorado DATE 7/LL/gO 22 SHEETz OF SPEC|F|CATION COUPAC'TION & MATERIiAL MINIMUM REQUTRED IN_PLACE DENSN'T 98 I AS DEIERMINED SY: AST}4 D1557 CoNSIRUCnON CONTMCIOR: B&B Excavat. TESr LOCAIONS WERE SEECTED BY, Chen llorthern TYPE AhID NUMBER TYPE AI..ID NUMBER METHOD OF ADDING OF EARTH MOVING UNTTS oF CoMPACTION UNns f MOISTURE natural hoer I bob sheepsfoot t cat THICKNESS OF UFT I dual NUMBER OF PASSES roller, 1 jumB JaqE I as f€Qo fBQ rq,i) LOCATION DEPTH OR ELEVATION (FEEr) LABOMTOFTY REl-D PERCEXI OF (RE-ATllf./ rJN(||rtr|) OSIIICD SOIL T\?E IEJI NO.l/AxtMuM DtrY OENSTTY(ocf) OPnMUM MO|sruRE CONIENT (7) oRnr DENSMY (Pcr) MOISTURE CONTENI (7) 54, >5 53 53t ,4 52f S.of A Linep 14 t l,/. of 11 .rzt S. of A Line, 14r l,V. of 11 1Or S. of A Line Br W. of 12 ,10r S. of A Llne8r W. of 12 JZt S. of A. Llne 24r W. of 12 j r 6ilRrll 5| SnBl]I J I OilFFI J | 0!?BBI 2r BExl 5ttwatet L36.o L75.O 156.0 1r5.0 136'Ollne 5.9 5.9 5.9 5.9 5.9 151.0 L3r.2 L3L.3 L53.8 L33.9 1.9 6.r 5.2 6.4 5.L AA 99 97 OR 9B sl. silty sandy grav lltl ,i It It|l tr FULL TIME OBSEfI1/A]ION El PART TIME OBSERI/ATION Irs tfFfir picrtlflt o"t{tr6 Foru@ At A RctrLT of qJi o6fir rx r G nr pucfift{t tt }r \€ nf l ll TXE C(|rllGTOR TO OCmMt 'FPt'Y113 llf mcoaar€ftdrr cq1rrqnvf rtrtxr A1o r,5:rur!E ro nLL qrir€ nr rurr wrcn'qh cnstrw;_ s lof (Efnlt*t (Ptr ru{s' tEsB lnE U DC oF tl{f tlll oatY rs n-:.vril xtctrigi lo-drixen-q; o|Fo|ltt: Juooo*lMl. resr oe rrc -xrr i}I: ir.r orss fpn ontaFcl otl tol6[llfR ,llE n[ gEEnl :"fctfE^Ixt l ltE trucLE R DO.9ilEITn UEftfi) OF TES',rI].tC W S USED tN S{r6rAlflu|. 'ccoRo ilcE WIH ASrr 02992 ^|ID I]3017 PREUM|T{CFr OBSEIT/A'nONS Al.tolOR TEST RESULTS VERMLLY REPORTED TO: pRocRgss REpoRT The above compactlon tests urere perforned on structural fill Uefne place*-for footings Level One Stair /lflr S. of A Liner Grids l-O'l,2.3 E1evationtakenfromexistingfootingsLeveI0ner .norr:\e Mi cliae I Barber Archilecture,--"* Attn: tqr, Scott Ward; f,61y. Murrain PCL Construction Services, Attn: 'Mr. Denny Annour; Anderson li llastings; IIRS Consulf 3nf q. Af f n: Mr- I.os ltlood: 8111 Carr Stevon L. Pawlak REID OBSERI/ER APPROYED Ef To, TowN oF vArL JoB No.4 ssa 90 DAIE 7/LL/9o Attn: Mr. Stan Berryman DAILy REpoFlI No. 22 gHgET lgf I P.O, Box 100Vail C0 81658-0100 ltt{VOtCE NO. PROTECT Addition to Vail Transportation Center, Vail-, Colorado SPECnCATIOI{ Coyp^cnox & UATER| L MINIMUM REQUTRED IN_PI.ACE DENSTTY 9B X AS DEIERMINED BY: ASTIT D1557 CONSIRUGflON CONTMCIoR: B&B Excavatlon TEST LOcATtONs wERE sELECTED gy; Chen ltlorthern TYPE AI.'IO NUMBER TYPE AND NUMBFN METHOD OF ADOING OF EARfi MOMNG UN]TS OF COMPAfiON UNTTS I MO15TURE natural hoe, I bob sheepsfoot e CAt THICKNESS1 dual NUMBER oFrollert I iunp 1 OF UFT PASSESjack q,I) as I€Qr reqo LOCATION DEPTH OR ELEVATION (FEEI) LAAORATORT RELD PERCENT tr (R€l^T|\'€1 twol/{x) OT'TI|ED SOIL TY?E tr->l NO.},N(IMUM DtrY DENSIff (Pcf) OPnMUM MOISTURE CONTENT(z) DRT OENSTTY (pcr) MOISTURE CONTENT(/) >6 57 ,7 58 59 4)' S. OIA lrnet 10r E. of Ie 15f S. of A Line,5f E. of 12 I15r S. of A Line,5r E. of La 60r S. ofA Llne,1tr W, of 11 l0r S. of A Li.ne,Br W. of 12 k Bl,!ir 2toil BB]I . arorl BBF II BBF BF I 1r5.0 u6,0 L36.A 1J5.0 L35"0 5.9 ,.9 ,.9 5.9 5.9 Li3.'.l L3L.2 L35.6 L35.8 L1L.5 -/.O 6.7 7.Q 5.0 6.9 9B 96 99 99 97 sI. silty Bandy grav lt ll ll tl n tl fl FUu-'IIME oBsER/AIloN n pART TIME oBsERl/ATloN ntl rtFoif Pifrmt et|Ilal tUtO l3 A nE -tf OlXl Ocrst ]rt of ntf PucrrftXr. rt lttt ffIJED OlT E O('{tn^croi m Cd{I E /rPfLl O TtlE lfDouraxotD curEtlw ['tqiT al|o rnEn-if r(t tII oult|Mr }t|e lul:s wlf,x q,n oGfrntrn rs lrol o6fn4'{r eE'l^Tl('ls. r:srs /\R€ nloE (r n€ F|tl ot{l.Y ^s *lt1fD rr€ce$A;r ID calrn^f q-n o6fr9tr1t tt|'Dqro{l. ltsr orre ;at }|,I E SEI,I s sE| nn of|{o.6 0{ lntgnllE RIL ufEr! sPEgfprnor6. ]H€ Mrct.EAR DOGOUEIEN Ufl}IOO Of TEs'NT$ UIS T'SED IN ST.|ESTAIIUL TICCOfiOANCE WTITI ASIU 02992 AID D3O17 PREUMIMFT OBSERT'ATIONS A}.ID/OR TFST RESULTS VERBA,IIY REPORTED TO: PROGRESS REPORT ,..rer'rR Michael Barber Architecture,--"* nttn: Mr. Scott Ward; galy.Murrain PCL Construction Servlces, Attn: 'Mr. Denny Arrnour; Anderson 6 tlastings; llll.S Consrrl tflnf s - Attn: Mr" Lrrs Wnnrl' BiIl Carr Steven L' Pawlak RELD OBStrIVER APPROYED ST Clrcn€Nonhern.lnc,C6.-/l,tf t '!l|..r -a S.lrt REPORT OF FIELD NUCLEAR DENSITY TESTING rs A t(tnxt;Dl'flctg,t tn clfratl nr pvf_t ao ortrtitvr:. Ar| tfJ!(tlrE ff ! |tftl'D a! rE coaDfxlut P|loPlrl'r or (xi cllExaIl lJ[fr'IDN ri n[,ta-rE{ 6 sraltyo{nl o(rtu,!t$€ q ffrrrcl! rnqr fl nfiu.ri€ irr |tl'of'3 E Eti,o PI f,r€ (r,n fElTIx rFPio/A- srr?L6 utl oE onFqE c lflfl lE rD€ trcaaarflD ullea gntl ^m,*I,axE rf, ,gillD lo Dl trF0ltc, ^ h-'.- I r'.fXiFlnr .f -lltro... tdrr tlo. C|IIUTA {/aO I Tot TowN oF vArL JoB No.4 398 90 DATE ?/IL/go Attn: Mr. Stan Berryman DALy REpORT NO. 22 SUegf 4 of .B P.O. Box 100Vail CO 81658-0100 tlWOtCE NO. PRCITECT Addition to Vail Transportation Center, Vail, Color:ado SPECIF|CAnON COUP CTION & UATERIAL MINIMUM REQUIRED IN-PI.ACE DENSITY 98 X AS DEIERMINED Bf: A-CTM D}55? CONSIRUCflON CONTMCIOR:B&B Excavation IEST LOCATIONS WERE SntrCTED g:y; Chen Northern TY?E A}ID NUMBER TY?E AND NUMBER METHOD OF ADDING OF FJARTH MOVING UNITS OF COMPACTION UNTTS 1 MO15TURE natural I hoe, I bob catvib. sheepsfoottI juutp THICKNESS NUMBER OFjack OF UFT PAS5ES f€Qo r€![ r as a6 LOCAIION DEPTH OR ELEVANON (FEEr) LABORATORf FIELD PERCE.IT OF(Rflrl|t€/ r$orarx) O{TAICD SO'L T)?E tE)l NO.MiIXIMUM DRI DENStIY(pcf) OPnMUM MOISTURE CON1ENI(u) DTY DENSMT (P"r) MOISTURE CONTENT (7) 59 60 51 t 10r S. of, A Line8r W. of 7.2 36t s. of A ]-,ine5' }]. of 12 50r S. ofA Line Grid lL BF TOF TOr L36.O u6.0. r15.o 5.9 5.9 9.9 133.L L31.7 L35.o 7.7 6,4 6.1 9B 9B 99 s}. siltY sandy grav It tl tl It tl ts FULL TIME OBSERT/ATION D PAffi TIME OBSERI/ATION lris iIFHI piEl}r'|:t efitIA RniMti ^ rAn LT OF (llf miVilmC OF mL Pt rcrrrf}|I. rrf ]r\tr rflr@ Otl lllf coflIR|.T!.| rc @|Tt{t€,PPLtllXl ]}f REO6aOTD€D OOr|rgIlW IrIDit AltU lrGIUif llt nll. DURlllO n|€ .r|UfJ |vtlttl C.n OFEnrIrl !t lrot o6(Jn4t€ (FEllAIDat' |fSfS l,lf I{ Df tr ]}€ .[! OaY l^5 rf,.cwD '|tcfs fi lo c^r.6arE q,/R orFrfrrr:t druoo.txt. rrsr orre .rre rpr rc td.c o :t6 rqr wflxrs ol tl|€nm lxa fl"L |rEEnl f€c|fE^llcc' l}IE NtrctEAf DEI{SoIEIER UEIHq' OF TES|DTC WAS US€D tN St,BSrA|IUL TCCORD Trc€ wTlH ASIU D2eg2 ^lID DJO17 PREUMIMRf OBSEF/ATIONS Al.lDlOR rESr RESULTS IERBAILY REpORTED TO: Les l{ood PROGRESS REPORT cop,Es li:l?"'-f t;.i";li::"lllir,","o," PCL Constnrctlon Services, Attn: 'Mr. DennyArmour; Anderson fi llastings; llRS Consul f flnts . Af tn: [|?. I.os l{ond. 8lll Cam Steven L' Pawlak FIELD OBSEFI/ER APPRCIVED BY Chen€Nonhern.lnc.cd:{h{ t Cn-r lta tc.'b REPORT OF FIELD NUCLEAR DENSITY TESTING ^3 A rttnr|{. PFIIE ItI tO Ctfxla r}|c PUII l}|, |lftft!/t1 Al- F tGrS ,Jrt llFrTrrD A! D€ OOLIfXTrlt Pntllf Of q.i clE{nt, l,{, ArfnEArDx IUI rAXA-n(rl c sIAlttI(XB CsrllEoi{! fr IXIR aTr mfli oR RBInol{l CrX rt}Ofift E itrlfxl8| P€NOrIl (ln tl'n[}r lPPiOrrA- S lftIs Wl! IE D|lFo.eD 0r /$[r IE tl€ !mr'tfllD l/t{.et orff ritJtltaxTt rf, ,3ifID ro !{ r ll|n ^ llrrtrr d rt [XiF-]c".r - o.t"c- rdrh n. qflq' a/to I TO: TOI"N Attn: P. O. Vat I PROJECT OF VAI.L Mr. Stan Berrynan Box 100co 8165 8-.0100 Addition to Vail Transportation JOB NO. 4 398 90 DAJLY REPORT NO. lrwolcE No. Vai1, Colorado o^Ie 7/TL/9O 22 sHEErS oF Center, D(CAVATION FOR: New etructure east side LOCATIoN: tine 8.5-81 Gride 3r.5-36., and Line B-AO' Grids 37-19 D(CAVATION BASE ELEVAIIONS: r,t TER| ls E(PosED rN BASE(S) OF DTCAVATTON(S): REITARKS: Naterials exposed in thls excavation area are for strustural fill. We advi-sed that thls naterial be itr- site, as it contalns land flllr asphalt naterlal' not suitable removed fron VERBAL COMMUNICATION WIIH CONTMCTOR, ENG|NEER, ARCHITE T, OWNER: LCS V/OOd WAS advised of thj.s Eituatlon. PROGRESS REPORTT Michael Barber Architecture, COPIES tr11n; Mr, Scott l{ard;5x1y Murrain Anderson E Hastings; PCL Constftction Services, Attn: Mr' DennY Annour; URS Consultants , Attn: Mr. l,es ltrood; Bill Carr Steven L' Paulak RELD OBSEfiryER APPROVED FY Chen€Northern.lnc.Cdrdfhe €|!3l|Et arn S.r-lHr REPORT OF EXCAVATION OBSERVATION ls l tIJIu^t- FiO|fCn|. rD cltrn:, n|f Plu.E ^lr) q,tratvf!. A! EfP(Fnt ri( Srntrrm AS lll€ COtfExluL Ptt(trrTY t O(.[ C1f.Xll AIO A,rlOlCJrfPa mi nc-EA- tx'|(Ps|^rf!t,lliqrGusI|.!0lrrIR&-|$k!(|lt,ltg^hl'{|gJ|thriJt.tfliltl1t}mo'{||u'.]qItn|'rx,yP'l(^,A.s^r.,u5nIEollFotu)of!s(rr4rlrllr lflt:lt ollrr rrGra.{I)r}fl: |,rr drrD Io !r wl{||i|(l A irtt-.t r'.[ftfl-lt-r of -.nrr - fd 15. lr.f lOiA tfiO Chen€Nortlrcrn,lnc.Or4rf b*r! -!a S.,-tld.. REPORT OF REINFORCING STEEL OBSERVATION rt A l|,ml|. ff,nTctEt ra ctl}ol D.r rrt xo d.|l'ttr:t lll itFflTr rrf llritlttD |' l|f oorJu tl.t ?ffitTl c c|.r dlr|lll {9 Ar}@rlb{ mi PrEEA- ftrr or n^rf|{fil o(r'u!r{r6 oi rxrucrr nw ot [. ria q.' rtgrr-a nirr,tD tt)roa€ ort ;Emr ,rfti('v|L lr'fut lll E rFqID tr rfttl rEllllg tl cgftj|tD uralrt oltll lau}IllDflt llf ,gfllt to tl tinr€. ^ 'rr-r.- .. -lTiifrlF.r ,..."FJ- r|rr }rr. cr{l lc 4/il To: JoB No. 4 g9g 99_ DATE: T/LL/9OTOWN OF VAILAttn: Mr. Stan Be"ryman gALY REPORT NO. 2e 5HEEI6 OF B P.O. Box 100 Vail C0 81658-0100 II'{VOICE NO. PROJECf Additi-on to Vail Transportation Center, Vail, Colorado 16roil x 3l 6tt footingSIRUCruRE urcAlrotl E.EI/AIION REIF(nCS$cd,[E{Ts wmc L ltoEzfiI L B.g 3o-3L.3 B.g 3o-3L.3 8.9 3L.3'3L.6 B.g 3L.6-32 B.g 3?-3r., Other: Note 8162 8l'62 -@ #62 @62 #5 @ 2' 48" Grld LB #5 @ ril' 3tr chalre LB #6 @ 1|' ]rr chairs tB #6 @ tl'l ]rt chairs Rebar chai.r 'rq 42 1B 46 c @lIrtor @Lztt( @11t1 @ 111 #6 #LL ll5 #6 )c oc at 2l Btl Cont. bottomc botton nat oc E.W. toP oc N.S. top nat @ JOf O @L5t 5 nat nat aupport top nat Dywidag threaded anchore sPEEurc rtlts sIEL cRArE 60 Rolrinonc qrlxrll€s* Vefy Clean cl.Eln^r,|ct ^}ID @t/E& a6 feq. sPuctpo: sPEcrr no13 aa tBQr B^N IUPFOR|S: TiPE briCK FII{EH HECI{T ,N El nens useo E] goe Df, ulttcs usED E coffrnrcton ro/ts€D El ru-rue o6a\/Atx,N E prrr-nue txtsEn/moN tltPt.AcE corrLPt l{cE ye6 UET PR(}'ECT UET PROJ€CIR€q,NOlENn; RIQ(,|NOfXIStltEx lMru[Y lvtG]lDqltHED Rf,-Ec^rllNg) OAIE RE-DOTITI@ teet appears.-to be placed in Seneral conformance with proJect ftans and-ipecifications. Inspections perforned July tr 10 and 11. Michael Barber Architecture, COPIES Attn: Mr, Scott Ward; Gary Murrain PCL Construction Sewi ces, Attn: lulr. Dcnny Armour; Anderson & Ilastings; URS Constrltants. Attn: lt'lr. Les lVood'. 8111 Carr Steven L. Paw1ak RE-D OBSERVER APPROVED BY Chen€Nonhern.lnc-.Cd:n na ttCn-. -a Llt$ REPORT OF FIELD NUCLEAR DENSIfi TESTING ,s A rl,fu^! tm'tfctE.t lO cllxfr, l}f 't .F l{, (rfirtltut Ar. ntto|r Jl. 3.E'Irm rS ffi oar|.DaxrUr PiO?tlTY f dJi CrEfil lro ll,rroE rDa Il! ttrl-tr^- rDl r r'AIr) o{It mr€urqr€ rn rrlrrl-riol m moeinino ot.a ntxrn-a nsinn-o ptx(rE q./R rr{llDt tPfllo/A- s^l?Lel vr.! u€ o3lFfrD (r rrrll lE r}€ I! cq.ftD urt.El ol]lt ,*|r:rrxTr fi ,aitlD lo rN witnrn ^ ,lr.t - rr r'.lXiFlru ., ...rv'- f'r r.a crEtcr a/6 ro: __._- - JoB No.4 398 90 DATE T/IL/gOTOWN OF VAILAttn: Mr. Stan Berryman DAJLy REpORT NO. 22 SHEE1? OF B P.0. Box 100Vail CO 81658-0100 lflvolcE NO. PROJECr Addition to Vail Transportation Cente", Vail, Colorado SPEC|RCATIOil COUp CT|ON & UATERTAL MINIMUM REQUIRED IN_PIJCE DS{SMT 9, X AS DETERMINED BY; ASTM D15'7 CONSIRUC'TION CONTMCTOR: TEST LOCATIONS WERE SA.ECIED SY: ChEN }iOTthETN " TYPE AilD NUMBER oF EARTH MovlNG UNns I hoe TYPE Ar{D NUMBER OF COMPACTTON UNffS 2 juraptng METHOD OF ADDTNG MOISTURE NAIUTA1 THICKNESS OF UFT a6 reg' NUMBER OF PASSES a6 req.Jacke *BG=Below Grade LOCATION DEPTH OR ELEVANON (FEEr) LAAORATORT RELD PERCE T OF (Ro.^n\E1 'I^X[AI.)ogT lE SOIL T\?E It)l NO.},|A)(lMUM Dtr' DENSTTT(pcf) OPnMUM MOISTURE CONTENT(r) DRT oENSnv (Pcr) MOISTURE CONTENI(r) o1 61 64 b, Sta. 10+25 ,a". 1l+O0 Sta. 10+10 Sta. 11+00 4t BG* 4' ec J' BC Z, I RC 1.38.6 _138. 6 138,6 138.6 5.6 5.6 5.6 5.6 L36.6 L3'.I L35.6 L35.8 A? ?.9 6.4 6.0 99 97 98 98 B&B road base n lt It tl ll It lt ll 6 FUu- TIME oBsERl/ATloN El pART TIME oBsERl/ATroN l|G |fFoit pit:tr{Ir ot rr|t Enr€) At A tEit-T of otr o3!rtn/ trr€ f nL n/cnro{|- tE }ralE RflltD o.l llle cofnr/ctoi lo o(|atlltf ,FFL.I4'I! ttf R(@ar{rrD qapErvE t'tfrtt Aro regrtnt ro fltt urErag n|€ nurs wrcx ci <w-nrtn s Nor onst tn|Ir eftr^mNs. rtsrs l E ur* r tlf, tlt! o{.Y rs mr\,tO ntoess rt Io ca.tilTt o(r d6t ntr3-fvuqxxr. rgr uere ^,U -trn I|I 'oiI aasr' flr (rfixrm; ol YolEnf,Jl DIC nLL ltrnl Prc|f|c noc- l}E Mrct.E R Detso|fi[n UEIrm OF TESn]tC w S I]SED rN SI,BSrA{IUL 'CCOflOAT{CE WTm A5IU D2992 All0 0Jo17 PRzuM|NART OBSER/AT|ONS AI.|DIOR TEST RESULTS \ERMILY REPORTED TO: PROGRESS REPORT coP,Es Xill?"'"::"3:;.tTl*: "|]ffr,u,.""," PCL Constn:ction Services, Attn: 'Mr. Denny Armour; Anderson S llastings; llRS Consrr'ltnnts. Attn: lrlr, I.oq l{ood: 8111 Carr Steven L. Pawlak FIEI.D OBSER/ER APPRCIVED ST Chen€Northern.lnc"q db 4^.-r -ra s'Ltrtr' REPORT OF REINFORCING STEEL OBSERVATION ls A urnl{- tittTctDt rO (|.rxtt nf ntE fr3 orttttxl at rlloirt rrl slirYrn rt rxa o('fD.}nt||, tlctrrrt c cui ctDtll llo 'ljnnErrbl mi Pttrr^- rpr .,. rrl,,i.,rtr, oo.rlrm! oi rxnuicrt riar, ci rrq^ri€ ol r.loirl-s-ifiio'-rdrorn-o'r rrrrnr'rrrrnl :e n: rrt x trt|otr'o (r rF rr 16]}11 6 ct.rl-fllJ unlJ.t ottlt ,,lflrfllrxlt l f ,llfu, l(' ]l l{I}{l ^ 'i-r.- .. ".lTiiHllre rr ccr;c*r f.rrr rrr. C||'l laA l,/to TO: TOWN Attn; P. O. Vai 1 PRGIECT OF VAIL Mr. Stan Berryman Box 100 c0 816s8-0100 Addition to Val1 Tran JOB NO. 4 398 90 DAILY REPORT NO. iltvolcE No. DATE: ?/LL/9O 22 SHEEr I oF I rtation Center,Vai1. Colorado SIRUSTURE Step Footing Cont. E. to W.t@42#W.toS. botton nat OC COIIIT oc toP rnatl E.& W.oc lri, to S. oc bottoro nat OC CO[t. oc top rnat E. & W.oc li. to S. oc Gofltr toP nat E. C COntoroc cont. botton raat oc coltr botton nat I E.W. toP B #6 @ 11"o #LL @ l.atl 18 #6 @ rl,,11 #5@11 18#6@r1 20 #TL @L2 18#6@r1 'lB#5@11 LB#6@LL ' #6 @ LL'l IB#5@11 . #LL @ L2t1 standee6-e I LB #6 @ Iril AStr Grid 2l LB /t6 @ ll,l 48'r Grld-2 t L8 /16,@ 1r" 48rr Grid-21 Dywj.da6 anchor aE 99-10-33.' Bg-3o-33,5 Bg-3o-1t.5 Bg-30-t1.5 B9-10-13,, 52.L6 65.O9 67.99 70.89 SPEEUTAIO|* TE. GRAIE 60 Rorflncfic ctEArt-o{€se c lean C|^IAflA|CE AHO OOI/ER aS feqr sPuc|He sPEcEE^lxht* aE req. B R grPPofiIs: TVP€ bfiCk NilEH fflcflr 1tl E ne*s usru El snop oR ttrcs usg) El cornrson rtmsrP p nu-rue oFEry noN D prrr-nre oosEilmon HmlcE CO||I,PUr{C€ yeB UEI PnOECf YEf Pn0JECf rAlER€qunEllE{rs RE(UlRAfi}fls RE-D(^ra|t€Dwr€l lNfiuLLY mro{ O(^r|t @ Rf-OqllNE) pROcRESS REPOFr The relnforcing steel appears to be placed in general conforrnance with plans and specifications. Bill Carr Steven L. Pawlak RnJ) OBSEKIER APPRC^/ED BT Michael Barber Architccture, COPIES Attn: Mr , Scott Ward; Gary lllurrain PCL Constnrction Services, At-tn; It'lr. l)enny Annour; Anderson fi llastings; r55 150 145 lL() rL I Faz UJ(f Eo 140 135 130 r25 120 1r5 510 15 MOISTURE CONTENT PERCENT OF DRY WEIGHT zERo All volD SPECtFtC GRAVfi SPECtFTC GRAV'TY SPECtFTC GRAVrIY cunvES 2,00 2,70 2.60 \ \ \ \ \ I LOCATION : On-.Site: Vai 1 TransooTtation Cente.r MOISTURE-DENSITY RELATIONSHIPSSanrple No, 4 SOIL DESCRIPTON: -374rr ASgresate Basecourse Chen€Northern,lnc t,,r^x.onY DENSfi : 158.6PCF opT. trosT. cOr,rTENT : 5.6 13 PNOCEDURE: ASTM D-1557 Method C LOU|O LIdrT :PLASTICITY INDEX: N.P.JOB NO.: 4 398 90 FIG. NO. 6GnAvtL :62 "' sAl,D : 32x S|LT Ar.tD CLAY G200) : 6 %DATE I 7-11-90 ?a t|n. r lrn tr5 rUN 13 MrN-nn MrN. 19 MlN.a MtN. I M|lJ. CLAV rO SlLr cnAvEL 62 * sANo LIOUID LIMIT * sAMPLE oF -5/4" Aggregate (Sanple No. 4) .12 2.O DIAMEIEN OF PANTICLE IN MILIIMETENS lo 20 x, o 4t ll 50 r( 00 li t0 I lm I Ilat 32%srLT ANO CLAY 6 't Pt-ASnCrrY tNolx N. P . 'lr BasecourseFnoM Qn-$its: Vai 1 ( 7-11-e0) Transportati on Center 7lln. t!! utN. I rME ntA()rNGs aro utN. t9 urN. a MlN. u.$, SIAN(,A O SelnLS . tfi, .5o .{o.f,n .ti .ora .lae .?of | .5u0 l.l9 -rl Jo NIAMEI€N OF NANTICLE IN MILLIMETENS .'I SILT ANO CLAY PLASTICTIY INDO( FNOM o 3 F ,6.2 t?r t5? CLAY TO SILI GN VEL 'L LIOUID LIMIT SAMPLE OF $ ND tt }IYD'IOMEI ['I ANALYSIS GNADATTON TEST RESULTSChcnSNollhcrn,Ittc. Chen€Northern.lnc'Coortrlune tngkt.i. c.rd Sd.rdH, REPORT OF CONSTRUCTION ACTIVITIES rs A xrn4 FiofttrDr to qql!- Lf, PrJcE xro otRittt,fl 4r !qtqr!:r ^trf sJETttD rs m: corrr''f,xltr ffi^fl;ffitr# &,offiffitrtsfl;ii.i c-srr'iriirrii- dr|o.urrr<r .i r.nr,'cri'rrou oi rtn^ar'€ 0ijr Rf"PotTr3 6 mJtIvtD Prlolrlo o(n mnct{ conrru tnrss qnrr reirr€uarats |af, L4fl,, to lll ftllt€. To: TowN Attn: P.0. Vai l PRq'ECT OF VAIL Mr. Stan Berryman Box 100 c0 81658-0100 Additj,on to Vail Tra[sportation JOB NO. 4 398 90 DAILY REPORT NO. tNlfolcE No. Vai1, Colorado DATE 7/L2/9a 2t sHEEr I oF IO Center, WE{THER CONOMONS AND TEMPEMTT'RE clear, 600 - Boo CONTRACTORS CONSTRUCNON ACIIVMES PASOiINE! TA'OR ECUIPMENI: ICIMNES: cHEN-NOfIHERills slTE AcrvmEs Observation and testing i 32O cubic yardsof concrete placed for footlngs Level one, B Line, Grids 2B-29-5O and step footings fot new etructure 89 Linee Grldo 3Q-33.5. Compactionteetlng of naterials being placed for footlngs Level One, Stairs #Ilrconpaction testing of materials bein6 placed over 5rr gas li-ne north ofprojectl lnspectlon of reinforcing steel being placed in rrralls for newparklng ramp west of existing wall on Grid I. VERBAL COMMUNICATION WMI CONIRACTOR. ENGINEER, ARCI{NECT, OY'NER Michae I Barber Architecture,COPIES Attnt Mr. Scott ltlard;ga1y Murrain PCL Constluction Services, Attn: Mr. Denny Armour: Anderson & URS Consultants, Att!!Woocl B1II Carr Steven L. Pawlak NELD OSSSIVER APPRO/ED FT Chen€Nonhern.lnc.Ca-alna tdxr .!a SaLta.a. REPORT OF FIELD NUCLEAR DENSITY TESTING Ar A $JnX! ?ETTCTDT m CItXll lrf ttrc $O (ltllla, All E ('m rnE srfaT[M! 'rt c[raxf,xnrl PiG'ttrTY or (rr crrofll, xI) amoif,r1Dl Fn ttf-E - ncr{ {f st^ltrrxrl. c(rEllb.rr ti rxnucri rnoi m r*qirnrbro ori fl,oitt t9 Rstxvt! Fool|t q.n YETID{ ,|ppio/A- :AreLe3 fr.l lt oltFqED fu lE Dtc t oarrt.ftlD u|.cr orlr rrGfql{'.l! .rf, ,&ID fit u{ tF tc. ^ r'r..'.- .t a.(IiFl s.,r .. ..6rcr.- t'tn tL, (rfl(rt 4/6 Tor TowN 0F VArL JoB No.4 se8 e0 DATE ?/IA/9O Attn: Mr. Stan Berryman DAILy REpORT NO. aJ ,1661 2gpl0 P.0. Box 100Vail CO 81658-0100 tl.wOtCE No. PRq;ECT Addition to Vail Transport:rtion Center, Vail, Colorado SPECIRCAnON COUPACnoN & UATERT L MINIMUM REQuIRED IN-PLAcE DENsrr 9S x As DFIERMTNED BY: ASTI'1 DI5t7 CONSIRUCflON CONTRACTOR: B&B EXCAVAIJ.Ng TEST LOCATIONS WERE SELECTED FY: ChCN ITOTthETT TYPE A}IO NUMBER TY?E AI{D NUMBER MEIHOD OF ADDING oF EARrH MovtNG uNns -J-troe;-f-Fob cat OF coMPAcnoN UNrfs I sheepefoot roller, MolstURE natural I dual urheel , fiICKNESS OF UFT NUMBER OF PASSES jump .'iack a8 F€Qr l€Qo4Dt LOCAIION DEPTH OR ELEVATION (FEEr) LABORATOFY NELD Pmco|T oF(Rn ln€/ lrroou{x) oar tg) SOIL TYPE It)t NO.[IIJ(IMUM DFTT DENSTTY(pcf) OPTIMUM MO| TURE CONTENT(z) DRY DENSN'T (Pct) MOISTURE CONTENT (x) 66 67 5B 58, 69 l55t S. of A Line lGrid 1l- I IOr S. of A LineBr W. of 12 40r S. of A Line16r E. of 13 r l10r S. of A Line15r E. of 1] 50' S. of A LlneBt E. ot L5 2r abovrfootinl Jlabovrfootj,nl 3t 6tl BBF 3t 6tl BB}' 2t 5tl BBT L16.o 1J6.O L35.o 155.0 u6.o 5.9 5.9 5.9 ,,9 5.9 L33.8 r35.2 130.4 T33.6 L33.9 6.0 Ood 5.9 6.3 beC 9B 99 96 9B 98 sI. silty sandy grav ll |l n ltft E FUTI. TIME OBSERVATION N PART TIME OBS$VATION lll3 lftoif PllEf}fnt e n|3 trrir€D ^t A itrlLT Of (tr| OlltFy rmr€ rf, nl PrrrCrIC}fI. tt ]r \,/f inJED Ofi llIE COfiR rftff IO @fimf, ft"Ll|r€ l|fftcaritloCD corPrcttvE IITGI ArD r€Eruif Io nu Dint|o llG nuFJ rtf,x crr aElttniTi rs xtr oltlf,tl f{l 4ur Txn3. lEsr$ lff l{ D€ tr l}lf rlr ortY AS SLEYE! X..Rsll? lO Ctr-FArE d-A qtSEXVIT:t JUrXrXr{t. TUI DilA .I\E trrt Il{ rfl,f. EAsII Xn Offirc,al (tl lwenfrR l}16 F!,! neEn! :lPEOrElTrO.t. lHE Nt CtE R DO{S{I|IEIEX UEI}m OF lESIt}lO WAS USID tN SUBST Nn L i\C[[]ROAI|CE Wrm A$U 02992 Al{D DJO17 PRzuMlMfinr OBSERVATIONS Al.tD/OR TEST RESULTS \€RBALLY REpORTED TO: Les ivood pfOcRESS^REpO61 _ The above tests vrere performed. on structural fi-ll beingplaced for footings, Level One, Stairs /11I. Elevations were takenfron footing of existing structure. cop,Es Xill?"'"::'3il.fTli::"llii 1""*.," PCL Constmction Services, Attn: 'Mr. Denny Armour; Anderson & llastings illRS Consttl tnnts. Attn: ltlr Los hlon,l' Blll Cam Steven L. Pavrlak RELD OBSERI/ER APPRWED SY Chen€Nonhern.lnc.Cd:nk'a t ttlF .ra S.rrat REPORT OF FIELD NUCLEAR DENSIfi TESTING AS A l^ nr|l FprltE a rI| cLfxrt D( nt-E |t{t G.kILv6' a! Frtc[ '^! g'f,tntD rs t}c cogDo.rl|r. Pic{rrt or dt ct.txr:* ro atl}G tar tq 'lf'iEA-T..r o. fl^tfro.nl o.'cl.orr6 .. rxn crt no.a m "ts^ Dlrq q.l irrcr' B '!ltl..rg pr.xor€ q.R 'ETIDI rrriiiT r- 9n-a ru E DoPor! f rffit rE r'g 6 6.rrnD uGei o|}g rfil{rDarr l|t ,artf! lo x rRlD(r r 'i.'.- r r.[EiE-l?!t , ...nr'- r-.'n 15 cr(lqt a,/6 .-. rowr.r oF vArL JOB NO. 4 398 90 DATE 7/L2/gO . Attn: Mr. Stan Berryman DAILy REpORT NO. 25 Sfreff J Op 1OP.0. Box 100vail co 81658-0100 llwolcE No' PRoJEcf Addition to Vail Transportation Center, Vail, Colorado SPECnCAnOil COyPACTTOX t UATERI t MINIMUM REeUTRED rN-pLAcE DElrs[rr 98 r As DEIERMINED BY: AsTl,l D1557 CONSIRUCnON gqMrRAcTgp; B&B ExcavatindlEsT LocAnONs WERE SFTFCTED FY: Chen Northern TypE AND NUMBEff oF ffie, I bob cat rHtcKNESs oF uFT as req. TY"E A}ID NUMBER OF COMPAGTION UNTTS I ShCCPSfOOt TOIICTg NUMBER OF PASSES A8 XEq. MEIHoo oF ADDTNG MoFruRE natural I dual wheelr I iump iack LOCATION DEPfi OR ELEVATION (FEEI) I.ABOMTOR/FIEI.D PEFCe{r of'(ROrTNv lA)(u r|) OSTADCD sotL T)?E rr)l NO.TIN(MUMDff DENSITY(pct) OP].IMUM MOISTURE CONTENT(x) DFNT DENSTTY (PGr) MOISR'RE CONTENT(x) 7O 70 7L 4Br. S. of A Ll.nel0r E. of 14 4Br S. of A Linl0r E. of 14 {Or S. of A l,ine16r E. of 13 1'BBF 1I BBF BF L36.o L36.o L36.O ,5.9 5.9 5.9 L31,5 154.0 r-lt+.3 7,O 7.2 7.o 9"/ 99 99 sl-. silty sandy grav It tl Et FULl. TIME OESEF/ATION tr Prffr TIME OBSEF/ATIoN rlc! f,rqr pif,rlfl! er.o6 fEl.D rs l Rf9f,r fi d.'/R Gtrv rp6 rr ntr Pr-.cn o{r. rt lt v! !olE-^o1lt cd'rl EtoR ro ocr!|rr "ttrr€ t}f mum,Hffiffi;^t{mg.*hffi&y#B,m'H lFffi ffiffitrffi trA ff . ffi'"##.t' rltE Mrct.EAtr Dots0|EIER !Ert|O[) 0f TEinNC W S IJSED rH S[r6rArfiuL rccofttr |lcE WIIH ASIU D2992 ^}l0 DJo17 PRzuMIMRY OBSEF/AIONS Ar.rDlOn TESr RESULTS \ERB tLY REPOFIED TO: PROGRESS REPORT ^^-,- Michael Barber Archi tecture,tttt- Attn: Mr. Scott Warrt; Gary. lfurrain PCL Construction Services, Attn: -Mr. Denny Armour; Anderson G Hastings; llRS Cnncrrltnnts Attn: lrlr. I.as ltood: l:1i11 Cam Steven L. Pawlak RE.O O8SETl1/ER APPfiOVED FT Chen€Nonhern.lnc Cs-ltlra t'!rn tra s.J.tn- REPORT OF FIELD NUCLEAR DENSITY TESTING ,\t a qmJrl aE'ttctFr to qrxtt! tlf a,f,lc lro d.ttEtt!. ar Ftllrr ,Jlf, lrffM |s rrf oofDtyrut PictrtY c qt cLofil .ro rg!fi@(IDx fn tif-E - nii'c- iiehitn|. cirEt s6 <i rrrrrcrr rntrr q reorario c.r rocin-r rs[irito too€ qri -nUnDt AP?iora- l.|act uu l( rtc! c rfirl lE trlo 6 ErnfltD tra-ti (mrt rn|oc)axll rf, ,!EID to H lrl}n ^ ,r'rr- r r.ffriFlr..r d -ir-r.. r-rr r\ Clrtlqt^ 4r[O tor ,o* oF vArL JoB No.4 s98 90 DATE ?/LZ/9O Attn: lrlr. Stan Berryman DAtLy REpOFff NO. 23 SHEE; 4 OF I0 P.O. Box 100 Vail C0 81658-0100 ll.lVOlCE NO. pRGJECf Addition to Vail Transportation Center, \tail, Colorado SPEC|nCANOH COUPAS.NOH T UATERIAL MTNTMUM REOUTREI) tN-pt-ACE DSrSnr 9' X AS DEIERMTNED BY: ASTI'1 D155? coNsrRucnoN coNTMCToR: Flint/Ft.Lupto651 LOCAnoNs WERE snFcrED Bf: chen llorthern TV?E IT.ID NUMBER OF EARTH MOVING UNTTS TI?E A},ID NUMBER OF COMPAGTION UNTTS MEIHOD OF ADDING MOlsruRE 2 backhoesjump jacks THICKNESS OF UFT NUMBER OF PASSES AE as f€Qo req.4 LOO\TION DEPTH OR ELEVAI]ON (FEEr) t-A80R TOFf RELD PACEXI OF(F|Errfq laxrAx)osrrlfD SOIL T]?E tr.Jl NO.IIAXIMUM DRT DENSITY (Dcf) OPnMUM MOISTURE CONTENT(x) DRY OENSTTY hcr) MOISTURE CONTENT(r) 72 73 Sta. IO+20 Sta. 1l+OO l'er()w Grade Bel.ou Grade 2l 2l 138.6 138.6 5.6 .65 1]6,8 L36.5 8.0 8.1 99 98 B&B road base ll EI FULL TIME OBSFJTVAT]ON tr PART T]ME OBSERVATION I{S tfF('n Firlont Crrlltr tUi{D ^3 A Rf,liLI f (t,i OFttt AlnX! Or F',[L nr€Orol'. fI ]r \tr iBJO Sl ltrr CoatRACTOi m ocrrTD|rr rtftfiIl l}f |tEoarar|otD o(rt|c|tt€ t'run aao !n6n tf Io tlll lxj6f.o ltl€ l| ffN aii Eli1,tli E, lrol odi€twD€ o"f|^rpa{s' lEsnt r,lf ra o( 6 ffi ,u o.'Y ls trlEvtD xsl*iAir ro cat ErarE qJi (r8rrr:r .riJo*t{.xt. rc't rxtA .nf ist r}f, gr a t.t rn o"fl(rca (x nlrnf,R IHf fll utEnr =Ecltt^tE ar, l}rE MTCIEAR DBE(I|ETEn tlEllt{p OF TESnHC W S USE) tN sITBSI^I.ITUL ACCOffD ]rct MIH ASIx 029e2 A}lD DJO17 PRzuMIMFNT OBSER/ATIONS AI.IDIOR TEST RESULTS \ERBAI.LY RFPORTED TO: PROGRESS REPORf, ^^-._ Michael Barber Architecture,uurlD Attn: Mr. Scott Ward ; 631y. Irlurrain PCL Construction Services, nttn: 'Mr. Denny Arrnour; Anderson 6 Hastings; llQS Cnncrrltnnts - Attn: ltlr. Les lttood: B1II Carr steven L. Pawlak FIAD O8S81/ER APPRC'VED FT Chen€Northern.lnc C..nt||ht f.|||h-r ci S<ar,rJ.a. REPORT OF CONCRETE PI-,ACEMENT OBSERVATIONS ,r A |lrntt ?DltcE ttt .rlxtl lla ?rfE rf.r orritratf!, a1 irt('tnr rrf, J!.trm At rr oo.rrtrtlrl- t|n(ftxTt d- dlr cr Ixll lro arlrntET x 'ln Fll.r^-nrt o- lnarrrrxrt ooalur(|! c fitt crt rrrrr or ro,rario c,r x{Foitr'! it:til/tD tt o.$ q.f, ffiItft lt?t(trL s,\lrltr vrl E axFq'{D c- lntl rE l.s BC{.ianltD l'1rL ol}af r|n forxrr li siID lO l| |'rfr|r ^ ir.v.r , r'.l'i]ljt -l r..t ef era;rrr rcr r., CrIt 14| r,/|O To: TolvN oF v^rr, JoB No. 4 3e8 90 oxeT/L2/9AAttn: Mr. Stan Derrynanp.0. Box 100 OALY REPORT NO. 23 sHEEr 5 0F 10Vail CO 81658-0100 NlotcE NO. PR(IJECf Adtlition to YlLl 'l'Tansl)ortltion Ccntcr., Vai l, Coloratlo, sPeFEATpN! guw 3-5 -supruEMt.l4obilqru ror A 3000 28 days ln coilt[}{T 4-B AIESIT TEUPERAruRE &A}'|cE TESTilL lRrJCt( ML no(Er M'.llLE EATCfiED 'Il!E lRnnig, IL€ SrrrPLID Rn'QUrmfl@uma IfBtt{ RE\OI-I'IION @t t{tB @uP|-EDO CI'EC YAMt-ilD/ C,lJMUl-AItt/E t lB ADOS) AAU'T|S I 2 3 4 5 7 54 44 114 4B 100 106 48 ploe6, lorose4 I l010B55 010855 010867 010868 010859 5z2o 5:30 5:46 1255 5z5B 6:011 6:10 6zO7 6:10 6:15 6:2o 6225 6i30 6it, 6:L) as req, as reql a8 xeql ag req, as req req req as as as req aa rec as req as req as req as req as reQ B 1R 24 3? 40 4B 56 U 0 U, 0 o U 0 lE;rI{l.stl[?(r,t)tn OOIIEHT(t UET UN]|r[sHr (Pcr) YITLD @i{CRfIE IETFE- R^ruNE co RETAfU{S 2 4.0 6o1 r19.(.?oo sanple taken fron truck PROGRESS REFOKT Supplier is Slump of all trucks J.s visually observed when not tested.responsible for adding water aa requirod, CO'IES MicltacI Barber Architccture; Anderson {i Ilastings; Gary Murrain PCL Construction Scrvices; URS Consultants; BlIl Carr Steven L. Pawlak RELD OBSERIfER APPROVED AT ' Chen€Northern.lnc C.rrilrf f.'tt|.'t .ra Wb REPORT OF CONCRETE PI-ACEMENT OBSERVATIONS ,Iw,r'iiEgif&T6n'rffitt . d' sfarLxll @clri'a gt tnl.ctt txra ot [oait.e c! itnq6aIt@ u(al. qf|(r a*.rtaraTr ri. rcrl fn I tittr.c ^ "-rt- d t[EiFlp , -!r--'tri |\ Oall.. a/ts To: 19511'1 oF vAI LAttn: I'lr. Stan Berryman P.O. Box 100 Vail CO 816s8-0100 PR(}TECT Arltlition to Vnil Transtrortnti on sperrcAnoir! :nlsp 1-5suP?ut&,'t.g,iobilelu rD. A lO00 - 28 JOB NO. 4 398 90 DALY REPORT NO. |}S/OICE NO. Ccntcr' . Vai i .. Col oratlo. An coilr[}{r 4-B AraE{t lErPEn ruFE R llCE om ?/L2/90 23 sHEr 6oF 10 50 BO IETHI IRrcXi0 TEXET t|o.Tll{ B TC E) TIUE lf,Rtv@ 1l s IPL@ n6'ou,Inl@urfla EOOI R€\OUrTlOfl @arNra couPrSnot{ :rrEc Y rct-olD/ CUUI'I.AT E trATB ADOq) o^lloals 6 9 10 11 L2 L3 14 119 Lro ?g EB ,4 44 114 010870 010871 0r0872 0roB71 0roB74 oloB75 010876 5tL5 6:20 6225 6z10 6:35 6:40 6245 6 40 6:l+5 5z5o 6:55 7:O0 ? zaj 7:LO a6 reg a6 req as req as req as req a6 req aa req as req as req as req as req as req as req a6 req 64 72 80 BB 96 r04 112 \J rEsr HT sujl? (Dr) AnofiEfi(, I'ET UNTT TtrHT(Fcf)YIAD corrcnElETEfE- R nrE cr) REr fu(s -a- PROGRESS RE ORT coprEs )ii::il:"'i"ll::,lilll' ".#in',,",n PCL Construction Serviccs; UnS Consultants; Bill Carr Steven L. Paw1ak RE'D OBSERYER APPRCIVED FT ChendNorthern.lnc REPORT OF CONCRETE PI.ACEMENT OBSERVATIONS ffi R"'E rr., c...rr,lTg 4r- t!t!111 rrr t,..trrD a! rt cD.urrarFr-rirtt'rtt (r dtr o rxr* Ito a,nGrlD' tf,l ml'EA- r'- .r. n^nr.',rl ooqr' - or arrrcni rrq. o,r f,c.i.€ cl cniil-c-ir,{i"io-lriiiri-or rrcrrx ttnora- s^L't 15 r.L E rrctD or x]a lE rD€ 6 i;rriro itGrt grrrr ,-{-arxrr rra rttlt lrr rr rirr'q A irr.' .. t lFffr-lr-. er -a'rt fri |.. Oatl.| l./F Cdrfi a'rl-t ti Sd-i.Y, TO: 1s1111 oF VA1, JOB No. 4 398 90 DATE 7/L2/9O Attn: Mr. Stan BcrrYnanp.o. Box 100 uerrvm.rr o lLY REPoRT No. 23 sHEEr 7 oF 10 Vail CO 81658-0100 U't\DtCE NO. PROJECf Adtlition to Vail Trtnsl)ortation Centcr', VaiI, Colorado. SPEfTATp}|3 II.IJIP srrPfi.JEnyt.Yobilelu rD. A f000 3-5 rn cot{rt}{T 4-B Anon mrpenrruRE R^NCE 6o BO IET t{r.Tit o(}{L TP(ETt{}T i€ a^rctE, TtrElnnilE)Illr€s uPLg) RniqrfiXl.l @{JNTA EOO{ Rf\ouflxll @{rxtE t cogH.Enotl A'EC YAG r-oro/ cUUULAITVt wAlEn ADOo eru.oNs L' 15 L7 1B I9 zo 2L 46 100 106 4B 115 r19 116 010877 oroBTB o10B?g 010880 o10BB1 or08B2 o10B83 6z5a 6:12 7:00 ? zO6 ?: I0 I z16 7 z2O 7 zL5 7 z2O 7:25 7 z3o 7 235 7:31 ? 245 7:35 as rec as rec as xec as re( a6 re( ag re( aa re( as req aE req as req as req as req as req aa req 120 128 L36 r44 Lrz 160 168 0 0 o 0 o lESr}TI gjr|? (Dr) Ano(xrEr(r) TET UII'TrffHT (Pcr) TAD @ilCREIEIE'PE- RAIUNE cF) RETARXS t5 5.5 6.5 L19.o ?oo sample taken fron truck coP,Es lil:l::"T"ii::.ffiI'"."1;i,l,"",,, PCL Construction Services; URS Consultants; Bill Carr Steven L. Pawlak REl) OBSEFilER /PPROVED ET ' Chcn€Northem.lnc Cdrfr{ Crrlr-r .ri Sdrtt REPORT OF CONCRETE PI-ACEME-NT OBSERVATIONS ,'HH,^Ll$,ffi*iiffi,f $i,1Tl f#;-dH'[''#ft lrr .r rr^rrl-xtl aDal,l-Eoa! G r iirrrnii iir-rr ittia.t d.olrrr F. rgtlp lo tr t*nr.o' A a-.,8 J r.[Tf fl-lt t r e..rt *. la h O.Ill{ ./.o TO: 19Wp OF VAIL Attn: Mr. Stan BerrYman P.O. Box 100 Vail CO 81658-0100 JOB NO.4 598 90 OAJLY REPORT NO. IN\DICE NO. Ccntcr', Vai 1 , Col or'atlo. -'^{r corflE{r 4-B ATSO{T TEUPSAIURE RA}€E DATE 7/L2/9o 23 sHEEr B oF lo Adtlition to Vail Transltortation sftDrrATDtlS ![lJlrP supruRMt.l.lobilgo,., A ]OO0 rErlo,nrcx lr(L TEXET ). IIIIE EAICHEI) IUE AifivE) lluE SA|PLE) Rn'q.ftrEt|@uifia DEOT{ RE\OU,IbI.I @rJt{lER couPLEnot{ CT,HC YAGt-ilD/ cuuut III,E wAlE lDog) oAL!O S 2? 23 24 2' 26 27 2B 150 29 2B ,4 44 114 46 010884 OIOBB5 o10BB6 o10BB7 OIOBSB 010BB9 o1089c 7 224 '/ itd 7 t32. 7 236 7:4o 'l t45 7:54 7 245 7 253 7 z2B 7 t53 B:20 B:O) B:0O 8:20 as as req req req req req req reg a6 a6 AE aa aa as req as req as req as req as ieq as req a6 req L75 I84 L92 e00 208 2L6 ?24 4 4 TESTtn sll,lf(rlr) ln 6r|rE{T(t rET UNTT USHT (PCf) tltt 0 corEnglErorPE- RAruRE co REr nt(s z5 2+5.8 L19.6 ?2 test requested bY suPP1ier PROGRESS REPORIT ^taDrFe I'ti chac I Barber Architecture;wrrl'' Anclerson G llastings; Gary lt'lurrain PCL Construction Services; URS Consultants; Bj.ll Cam Fral) osERV Steven L. Pawlak ER APPROVD ry d dr drfi1 |rD artlirrcltrl{ 7tl titr.E^- ' Chen€Northern.lnc. REPORT OF CONCRETE PI.ACEMENT OBSERVATIONS ^|[:r'f,'TtTD Ar n; cotr'.''n4 jr'rt"rrY or dr o fxtl' '.lo a'noglrDr txl ttlE^_ tror. i/ 3farrrrxr\ Gr(rrrrrr G {xtrvct3 tio.a ol [g inc qr rr.crn-a er-rrt t fr]otll arl rrllt]l iiliirlrl- slntr nl r c'co t '/'trr lEn}.l B otutE u.I'. gna.l rF,flal.tl ,L rtlD lo lt llrrs A.r-nF r lr(ffil7rl .. ...ir-t tr' lr Clal l'L .^0 Cd-ttl. t4l-r -i Sd-lHt TO: 1gy11 OF vArL Attn: Mr, Stan Bcrryman P.0. Box 100 Vail C0 81658-0100 PR0TECT Atltlition to Vai I Transpor.tnti on sPErEAlE}ra ILJJIP 3-,silp?unl4t.tlobilod rD. A 5000 JOB NO. 4 398 90 DAJLY REPORT NO. IMrcICE NO. Centcr', Vai 1, Co1oratlo. rn coNrDn 4-8 ltEE{I TOIP€R 1URE 8 t{CE oArE ?/T2/9o 23 sHEEr 9 oF 10 60 Itsrt{r rnuo(t{L lExrt lto.llu€ EAlCltg) IgE ARR'VE) llll|€ s IPI-E) nad.rfin| @rJi{TIX EO0{ RflourlFal COIJNIEN @uFr.EIlO ;I,'EC YAEIS t-o,,D/ CUUUIAITYE tAlER ADotl) o^Llorts ?9 30 3L 32 33 14 3' 100 105 4B 116 ,4 44 1r9 0roBgl o10Bg2 01089, or0Bg6 0l0BgB o108g9 ologof d:UU B:05 B:1O B:46 9:14 925? lOz33 B:10 B:44 8:40 9zAZ 9226 9 :48 1O:5O aB req as req aa req as req as req as req as req a6 req aa req aa req aE req a5 I-8q a6 req aa req 212 240 244 215 264 272 280 4 4 L5 4 B IET !xl.!,ln?(nr)AIR O(I{IE{T(D UET UNITtsltt(Pcf)YIA.D CONERETE IE'PE- RAruEE cr) RAn fD(s 1L 32 ,t 7L 72 74 on-6ite I hour fron batch tine on-site t hour fron batch tiue on-site I hour from batch tine PROGRESS REPOET ryrerr.r Michacl Bnrber Archi tccture; AnrJerson I llastings i Gary lrturrain PCL Construction Scrvices I URS Consultants; BilI Carr Steven L. Pawlak RE-D OEEIIYER APPROVED EY 'Clren€Northern.lnc REPORT OF CONCRETE PI-,ACEMENT OBSERVATIONS a l lmtt tpr13rDr E cu>r . E( IrE .rro altlElvs, Ar Tr!{! raf r--.tlrD a! nr co.rxn^t-fi'.trrrtt r on o txEL po atoorcltD' Ti!,l fllt'E^- rD. or rtarrrtra ctErrlrt (r rxt1r61t tl(fl (11 [orita cu anin-o -rr-i;49 6 ni o-i ritlltx ;1.nFro,1l- :nrtt" trt '( 6'crD ct rnrr lgr]€ 6 isarrE| urrS a'|}a i.J{r.txTl ,,r lgG.D lo H tlnt{' ^ tr.- a tlffi-l;l t ol r;prl ,.ir ta., Oal t,aa tto C-r,|rf &tih-r t{ S.lr{j. TO: lshtN oF vnrl JoB No.4 JgB 90 DAT? ?/L2/9O Attn : l"tr . St an Berrymanp,o. Box to' elr rr'"'r' 0 lLY REPoFIT 119. 23 sHEsr looF 10 Vail CO 81658-0100 t|,nrct.E NO. PROTECI Atltlition to V:ril Transportation Ccntcr', Vail, Coloratlo spErEATDirs: !r.!!F 3-> nR @ilrE{r 4-U sJp?uql4t.lvlobilqru m. JOOO A aaor rorprn^runE R^r{cE 60 - B0 llsr 1{). IntEK ITT TDGTur.T f 8ATCfiq)r TUE Anntvtn lttl€ s lPt @ Rfl,rl.rrTsl @{,NITEWI RE\OU'INN @UXTER oouPEnof{ ;UgC YAEi t'oAD/ CT.'UUTAIN'E WAIER ^DOEDo uoNS 36 57 3B 39 40 r07 46 114 t+6 118 ologo6 0r09o7 o1090B ol0gog o1o9I0 11:05 11:2I LL:23 11:rO LL:36 11:15 Ll-:32 1I:fO LL2i5 11:40 LLz35 as req as req aEi req aa req as req as req as req as req aa req as req 288 296 304 3L2 320 o 0 4 5 TESIMI su,l?(sr)An CONIE{T(r) TET UNIT TSHT (Pcf) lltu)coficFflf, 'E'PE-RAILNE cF) RETTAE(S 36 4*6.2 L39.7O PROCRESS REPORT ^n'r,-" l'li chae I llarber Architecture; Anderson G ]{astings; Gary l,lurrain PCL Construction Servlces; URS Consultants; SI1} Catr Steven L. Pawlak Rg.D OSSERYER APPftOVg) FY Clren€Nonhem.lnc.C...r/ijr{ freL-. .rll' gdrirrL REPORT OF CONSTRUCTION ACTIVITIES wms,*mx#*.H,flffi#r"ffi 63HR^;tH{3HHiilI',mf, 'H8ffi co"ffi#i*Fa; a ,,-.t ., *FlFil r-t , ..'!'t"' frrr f|. c{tO2A a.[o o To: TOIJN OF VArL JoB No. 4 398 90 DATE 7/13/90 Attn: llr. Stan Berrpnan DALy REpORT NO. 24 SHEff I Of 3 P.O. Box 100 Vail co 81658-0100 - llWOlCE NO. pRarEcf Addition to VaiL TransPortati'on Center, VaiL, Colorado tvE THER coNDmoNs Al.1D TEMpEMTRE clear - partly cloudyl prno r81rl showers 60-8r CONIRACTOTS CON5IRUCI]ON ACIMNES PBSONNfu IIAJOR EQUIPMENT: ACIMNE* cHRt-NOfiTHERlt.S Sm AgrMnES Observation a19 testlng; stxuctural fill bej-ng piiEbd'-foi fo-otings Level Onel Sta-irs #11 and fiII naterial being placed bver 6tt gas line iorth of project on frontage road. Two hundred feet of pipe Ilne has been lowered fron or16inal elevation of 2t below road grade-to at 4r+ below road grade. fnspection of reinforcllg steel .being placed ln new parking-ranp wallr west of exleting wall on Grid I Line A1-B2. oFl#.TI$YU'fl ?l,Yg.ffi Y'%f TI,'96^5:*.TIIIT;*HT"'X$ ;ffi lf 3I.11'*"1' gas pipe backfilt for Saturaay 7/t4/9O. ili chae I Barber Architecture, COPIES Attn: Mr. Scott Ward;cary Murrain PCL Constnrction Services, Attn: lll' Denny Ittood I litl Carr Steven L. Pawlak I I RE-o oBsEh/ER APPROVED Ff I Chen€Nonhern.lnc.Cdrlthr E *rr. -ra S.l-S.4. REPORT OF FIELD NUCLEAR DENSIfi TESTING A3An,nxr'F'tEtE|toarxr|'f}IF.f,!||oo.Ea\4A1.|fF'r^['.E.fll|rr3T}(oofxEx|u|'''rc{fTr(ro.ic|',o|tll..)o4,|}@^''Drtnx!.n^- Tror cr j^lrltrxrt qoqln€ q rxJrrcrr r.rrx m ftcA[,]ro o.a rrro#*n-iEfiil--gciiie -aa nrnot rP"io/a- Srrlei'et rU' oC lrFoID q" rfir tE l]rq 6 oorttrlrD lra.Et ofllt ,Jrr.{rxrt rf, ,ftrD l0 l. r[r|ir ^ ir'.- d *@- d..r!r..J- F-rr ,r.. OrlOTA a,/O ro: JoB No.4 s98 90 DA1E 7/L3/9O.'. TohN OF VAILAttn: Mr. Stan Berryman DAILY REPORT NO. 24 SXEgf 2 of 3P.0. Box 100 Vail CO 81658-0100 ll'lvolGE NO. PROJECr Addition to Vail Transportation Center, Vail, Colorado sPEclnc^nox couP^cTtoN & UATERLAL M|NIMUM REQUIRED lN-PllcE DENSmY 95 t AS DEIERMINED Bf: ASg'I D1r57 CONSIRUCnON CONiw\CrORfr.lint/Ft,Lupton TEST LOCA'llONs WERE SELECTED B./: Chen Northern TY?E A}ID NUMBER OF FJARIH MOVING UNITS 2 bACK hOCS Tt?E Al.tD NUMBER oF coMPAcrtoN uNrts 4 iurnB iack MEIHOD OF ADOING MOISIURE water line THICKNESS OF UFT as req NUl,lBEff OF PASSES as req BG=Below Grade LOCATION DEP'IH OR ELEVANON (FEEr) LABORATOff RELD PACETT OF (RE ATrr€./ uDola'l) osTAl.g) SOIL TI?E tJt NO. ITNilMUM DFTY DENSfi(pct) OPT.|MUM MOlsruRE CONTENT(u) DRY DENSN'Y hcr) MO|sruRE CONTENT(t) 74 7' 76 ?7 7B Sta. u+75 Sta. 12+10 Sta. 11+75 Sta. 12+75 Sta. 12+25 4r BG' 4'BG 3'RG }IBG 2I BG l,38 138 138 138 138 6 6 6 6 6 5.6 5.6 5.6 5.6 5.6 L36.2 1j5.8 137.3 L15.9 ].36.6 8.4 8.1 8.2 7.o B.a 98 9,9 99 98 99 B&B road base nltll It ll rl lltl tr PART TIME OBSEFMAIION tll! |t}olt Picff! a.rr6 trrr[D at l ittJlr f o.f, oEltFr rr t d trr Pucr}'(}'I' tt ll w tlnftD -ot-rxf coffMclDi ro co{TDlf, rPTttl€ tlf FfEtli.o.otD otasrtw tttqr ^ro ucntf rt nLl oun'o nre nur: n*l'ij"'Git"rlr- c-*lgcqqg -a-rrlroG' rsns raf ulo€ f rH( tll o{Y A5 XIrWD XtrEs: rr r9 cat-Ei^Tf. qJi orgr1/a:t Juruun. nsl q^t^ A; T6i ii;-iia aess rcn <iftrnrs q{ r ET}lr'R THf ru rEErt lPEctftarEc' TltE NrrctEAR DEiEOI|ETEI UEftrD of TEs:n!€ w^s usED rN 5u6nrfiul rccoRD llcE wIH ASIU D2992 All0 DJOI7 pRzuMttUFr OBSFJI/ATIONS Al.'lDlOR TESr RESULTS \ERBALLY REPoRTED To: Lss t rs64 - EE R'Tl. TIME OBSEF/ATION The 6', PROGRESS REPORTwere perforned pro ject. Pending results of proctor. on f111 belng placed over the above co$paction tests gas line north of the ^^-.- Michael Barber Archilecture,LUrt- Attn: l-lT. Scott Ward; Gary Murrain PCL Construction Services, Attn: 'Mr. Denny Armour; Anderson fi Hastings; lles Consrrl tnnts . Attn : l.lr, Les l{ood: Bill Carr Steven L. Pawlak REI.O O8SER1/ER APPROYED B/, Chen€Nonhern.lnc.C..rriht ttCE| -{ 3.4-t REPORT OF FIELD NUCLEAR DENSITY TESTING ^3 A rlrrJ{ trorrEDt rD ttf|ot Dt ir.E l}o otrayE at |r c,tTt rtf !.nrtftD |! rlt tg.Exry-.lFqffrrft (f c.r clrxEl ^ro a'n<rc^rDl tn '\a-EA-ru. q srarrr.o.r:, qrcurror€ or rrrr crr tror'r m i€cr or.o orr onorri*iiEffip irilii an -rrrrot emiona $?t6 trr t llFru d ftrr lcm€ ! oc^.ElE utel g|lo rrirxL)atr ||: l!E!D t0 I{ tint}ac. ^ ir.r.- d r'.[FiElr-" d ...rpr- t-i t\ qalOtA a,/m JoB No.4 398 so DATE 7/L3/9O'-. TOI{N OF VAI LAttn: Mr. Stan Berryman DAtLy REpOFn NO. 24 SXeSf SOfj P.0. Box 100Vail CO 81658-0100 ll.NOlCE No. PRqJECr Addition to Vail Transportation Center, Vail, Colorado SPECnC TtoN coyp^cllolt & ITATER|,AL MINIUUM REQUIRED IN-PLACS DENSIIY 98 X ,S DE.IERMINED B/: ASTI'J D}5'? CONSrRUCTION CONIMCIOR:B&B Excavating 651 LOCAI]ONS WERE Sn FCTF! B./: Chen l'lorthern TY?E A},ID NUMBFi TYPE AND NUMBER MEIHOD OF ADOING OF EAR1H MOMNG UNTT5 OF COMPACNON UNTTS 1 MotsTURE natural I hoel I bob cat vib. sheepsfoot, THICKNESSI r.ruugen ordual wheel; OF UFT a6 reqr PASSES aS req.1 junp jack LOCATION DEPfi OR ELEVATION (FEEr) IAEoR TOFnr NELD PENctxT OF(RoIIIrfr/ rrAxuAx) OSTAICD solL Tr?E IEJI NO.IIAXIMUM DFff DENSTT(pcf) OPTIMUM MOISTURE CONTENT(r) DTY DENSMT(rcr) MOISTURE CONTENT(x) 79 BO B1 6d, o1 19t S. of A Linelor W. of 14 15r S. of A Line20r E. of 14 2Br S. of A Llne Br E. of 15 24r S. of A Li-ne Orid lt A 24t S. of A LlnGrid tI 4 ' Bilir JI BBF 2I BBT 4r above footln5 r 11 156.0 L36.O u6.o L36.o L36.o 5.9 5.9 5.9 5.9 5.9 133.8 L1r.7 L35.9 L31.2 L36.3 7.O 5.8 brY 5.0. 6.6 9B 99 99 99 sl. s1lty sandygravel It tlll n f FUI.I TIME OESE|I/AIION D PART T]ME OBSEFVANON I'13 ltFo(? Fmrxl3 tr|lnr funaD At l ta Ll f d,l o6tlir rns ('. nu FLrcnaf}ll. rt flnt ftIJED !n r oolTi^cl$ m oofDqt lfPlnu' l'f ftErr.€Errr Dcrrcrrw E Tur l.'.g r6n 11 To ru u.,f!f€ nt lur: *rrx'ii'n#ril';-rot qcarytlge[rafixs- ttsrs l8 lqf,]!::r!'-gaY ls aorwD ltlErsrr rs caln^r[ q.r ooeorvor:r JuDcrrJ{I. rgl q re ^d ifi iE*JiA E^;d'rut-moqs ot rxcftf,x ntc ru uEEfrl +tGtrE Doa' TtE Nt CIIAR D€ltsotrEEn UEIlrp Of rEsnr{c r S US@ N sU86iT NIUL rffiD llcE WIIH ^5Ir 02902 A}ID DJOIT PRzuMtMRf oBsFJt/ATloNs Al'tD/oR TEsr REsuLTs \ERBILLY REPoKTED 19, Les wood PROG,RESS REPORT Thefill being placed above compactlonfor step fbotin6s, tests were Level Onet performed on structuralStairs /111. ...ro,". Mi "hae I Barber Architecture,--"" Attn: Mr. Scott Ward; Gary lfurrain PCL Constnrction Servlces, Attn: 'Mr. Denny Armour; Anderson & Hastings; llRS Consrrltnnts. Attnr llr- l.es hlood: Bi-l1 Carr Steven L. Pawlak REID OBSERI\ER APPROYED gT Chen€Nonhern.lnc Cdr/iht tndEt ri 5.lta- REPORT OF FIELD NUCLEAR DENSIfi TESTING ^3 A q.mllt FG'ECnOT rO cl rran, nI Fl;tr ao {utl'twtl al rrftoltt lif, 3ur.mo t3 rE @Ttll]lL}txtfltrY c cf crrxB' rx) ||-ml'ia rDl ftt An ra- r|d{ d. r^tri|lr,Tt o(r{llrlofn crr rnFrcT| rr.|t oR mo^e.r]x, cn nrt#ij'r*riii,nio']diiid-or -wrnrn rraor,u- serto m cE olno (t lrm rE llre 6 cofiIltD ulrl! qD:t ,*flarrxrr ,r( lcitlJt lo ft lrFlfil ^ 6-'r- t, r.[xix-']'t. , ..nrG.'b r-'r }.q Crf,lot 4/aO TO: TOWN Attn: P.0. Vai L PRq|ECT OT VAIL Mr. Stan Berrynan Box 100 co 81658-0100 Addition to Vail Transportation JOB NO. 4 398 90 DAILY REPORT NO. tlworcE No. Vai 1, Colorado one?/L4/9o 2, sHEEr r oF Center, SPEC|nCAnOil COUPAfi|ON t }/ATER|AL MINIMUM REQUIRED IN-PIICE DENSIT 95 T AS DEIERMTNED Ff: ASTTI D1557 CONS1RUC1ON COmrmCrOR, PCL TEST LOCA1ONS SERE SELECTE er: Chen Northern TypE AllD NUMBER oF EARrH MovtNG uNlrs I loader, 1 backhoe THTKNESs oF UFT f t TypE AJ{D NUMSER oF coMpAg1loN uNns } hand tampers NUMBER oF pAssEs varies MEIH()D oF ADOING MOISTURE rain BSG=BeIow Subgrad LOCATION DEPTH OR ELEVAI]ON (FEEr) LqBOMTOMT FIELD PERCEXT Of (RE.i\Ttt/E/ M,rJflra{ru) OSIAICD SOIL TYPE rul NO.lvlAxlMUM DRY DENSIIY(pcf) OPnMUM MO|sruRE CONlENT(t) DRY DENSTTT hcr) MOlsruRE CONTENT(x) 3B B4 B' 86 B7 BB B9 Sta. 13+25 Sta. LJ+IJ Sta. ll1+f) Sla. LJ+I) Sta. LJ+IJ Sta. 14+50 Sta. 15+00 1.5r BSG 1.9rBSG 1.5 | BSC sub- grade tl fl tttl 138.6 158.6 138.6 138.6 138,6 138.6 158.6 5.O 5.6 5.6 5.6 5.6 5.6 5.6 1]4.8 r)7.o L36.2 L15.8 L34.9 L34.5 r37.2 5.7 brJ 6. L+ 5.0 5.4 6.7 6., 97 99 98 98 97 97 99 tl It lt It n ll ft tl u tl tl ll tl ll lt n Ba6e Cour€ N R'U NME OBSERVATION EI PETT TIME OBSEM/ATION ris kDoit ?ltrf,tm (F olt toir.tD at l FtllJLr Of Ol,l Ftlv^rr ! (r nll Ptrcfrf'{I. rE lt \t trfrjfD-,ol-nr co"rRAclon m €dn '|f lF an[o l}f fcorarrDrrr cr'.Ffqrw ttnrtr rrr, rrocnr,t m nu. Drrnrr€ rrc rrrts rn]n'iih'f;ii 6-drl lFttnnrp -'P'R tn.s ttirs li€ l^D( f nlf nI ('{Y As x.l,flrT, lr€cr:rirF ro crrnlrr q,n omtl'vrr1r JUt oo,er{r. nsr rxv, & -rii,i iiiirilI lrss m ot'illoas trl lllf'llnt rtlE fr.r rrnt strtcrufra- fiE NtrclE R DEr{lOsErER uEOm OF lEsnNC WAs USED tN suosta{ru|. rc@fitu}lcE wlTH ASIU D2992 ^|tD 0JO17 PREUMIM,RT OBSEfiTVATIONS A|D/OR TESI RESULTS VERBAIIY REPORTED TO: Contractor PROGRESS REPORf gbserved gae llne backfill ln the frontage roadnorth of the project. coPrEs ti;ll?"'"H'3:i,t'fi:il;cture, Anderson 6 llastings; !'lr ' lary Murrian; PCL Construction,-Attn: --llr.- Denny Annourl URS Consultants , ' Attn: Iur. Les wooo; S. Urton Steven L. Pawlak FIEU) OBSERI/ER APPRC'VED FY Chen€Northern.lnc.Conrlum lj|gln i. or'a sdr'lH' REPORT OF CONSTRUCTION ACTIVITIES ffi ,.-nE r., ou*rnwr. 4r,11rg!!!- ^hr s.-'',rrr As rr co]tn xr'.r 'ns-rrrYc"Htrffi i",ffiffir$rffi.% f,Ll frifiniii.ii-'aU-ryq1 .q1 nrqr1gfr-tff gt ;ngx;o-utr arFotrrf, B Rtstr,tr Ftxoolo oui rfirrx diiinlnii tiiiis-orr.r rer rqlrrrs rrlE ro[rrr lo Dl rnlt€' ^ '..'r- .a r.[lf X-l p-.t c, ...n .t|- t rri tac cralcl^ a/ao To: TowN OF vArL Jos No. 4 s98 90 DATE: 7/L6/9O Attn: Mr. Stan Berrynan DAILY REPORT NO. ?6 SHEfi I 0F 5P.O. Box 100 Vail CO 81658-0100 l|'lvolGE NO. PROJEclr Addition to Vail T1'ansportation Ccnter, Vail, Colorado WEAIHER CONDmONS At'rD TEMPERATURE clear 80o, p.rn. rain aholvers cHst-NORTHERtt.S SITE ACTMTTES tr'ull tlne observation and testj-ng of structural flt} being placed for footings Leve} Onel Stalrs #11. Inspection-of reintorctf,g-steel being ptaced for footings.Line -R-9t Grid 31.5-36.9 for scheduled concrete-pbur at 6:OO a.n' r-?/L?/9O. Excavation to natural eoils for footing new structurer Line AO, Grid 1A-1L.5. VERBAL coMMUNlcA]loN wfiH coNTRAgtoR, ENGINEER, ARcHrrEfi, oY/}lER'GiGE Snufti, PCL forenan has passed on informatlon for_ proposed new top 6f footlng elevatj-ons for ievet One, Stalr llLL at 7L.25 slope footi-ngs to 53.Q. l.r|r Carr Steven L. Pawlak NELD OBSEFryER lr'li chae I Barbcr Architccture 'COPIES Attn; Nlr. Scott Ward;6a1y Murrain PCL Constructi:on Services, Attn: Ivlr' Denny Annour: Anderson & llastings; --iifis-Eii="tdinii.-nttn: Mr, Lei wood; Chen€Nonhern.lnc,Cqrn}|' [nf5..r ra sffi REPORT OF FIELD NUCLEAR DENSITY TESTING s a r| ru,f ?iolfc|Ix tto q.txTl nf F|trE $o qJi'tltt'' al rf,'tttlt rnt s,./ir.mD AS nI: o(r'rf,xluL Ptrq'r'trY (I. d|l olo|ta xlo aT rqlzarD' nn l(,tE - 'ro^r (,. sr lfuf,..rl. crr. u!rr6 qr m1rc1; 1171, o{ Rgqr1,r.rq gt,a arr<i.'r*riii.ri[l'-rdi'r-cn -rrrnor prrora- 3lril8 all eE D$FC, 0r fnt rEl]lo ll crEtrllD u{.El ol}tt , rlrat{f,! xr ,ftfl) lo 5l lrnl.(l a 'r-rr- r ".[ftiX-lr. d cncl.. a.'r |.!. Cltltt^ a/ao To: To$/N oF vArL JoB No. 4 398 e0 oATE ?n6/9o Attn: Mr. stan Berrynan DALY REpoRT No. ?6 sHEEr2 oF 5P.0. Box 100 Vail CO 81658-0100 11worcE No. PRorEcT Addition to Vail Transportation Center, Vail, Colorado sPECtncATtoN coupAcnoH & UATERI L MINIMUM REQUIRED IN-PLqCE DENSITY 98 T AS CONSIRUCIION CONTRACTOR: B&B Excavating TES'[ DEIERMINED Bf: LOCANONS WERE ASTM Df55f(under footinl SrtFCTED FY: Chen Northern T\?E A}{D NUMBER TYPE A}.ID NUMBER METHOD OF ADDING OF EARIH MOMNG UNITS OF COMPACTION UNITS 2 MOISTURE I front loader, I bgb;tHlcKNEss sheepsfoot rollers"t"NUMBER oF OF UFT PASSES f€Q o tOQo a6 AE IAEF=Above Existlng 1g611.1gp Footin vEPTH OR ELEVANON (FEEr) LAEORATOFY Ftzu) P€NCENT OF (RE ATtfE/ trAxnA||) OSTA'ED SOIL TYPE Iul NO.I/AXIMUM DFY DENSTTY (Dcf) OPTIMUM MO|sruRE CONTENT (%) DRf DENSTTY (pcr) MOISTURE CONTENT(x) 9O 9L 92 93 95 4Or S. of A Lj-neat Grid ll 4Br S. of A Line8r E. of Grj.d 13 24r S. of A Line5' E, of crid 14 Br s. of A Llne8r E. of Grid 13 \ Br S. of A Li-ne Br E. of.Grid 1] 1' AEF 4' AEF 2I AEF 2I AEF 2I AEF L36.O u6.o U6.o L36.O L56.O 5.9 519 5.9 5,9 1.9 L33.3 L:3'3 rlr.o u0.0 L33.8 7.2 7.4 '/.8 7.L ?.2 9B 9B 99 95 9B sl. silty sandy gravel ll E8 FU|I nME oBsEF/ArloN tr PAtlr rlME oBsEfivATloN nrs rfFnI PitxJ.rt qlf,rt' trtl{D a! A Rf9 1 tr oin (Elfw |r|6 (r nf Pl|rtxf'.r. rlE lt \it FfllFo otl-tllF c(lfln'Gnn lo ot'r!flt 4ftt!!9 le F€Dor,irlrrf,D o(re,fcn f Errrxr lllo ransrurt m tru orrtnflc nt nurs trcx dr.n'ip*Fvin s sn o!+ln!9gTn nolg l€sls lar u^D€ lF nf-4!, oaY ls gtlE\rLo r{.crGsrir ro c r,an tr trll ocrrwrrS Julrot *Jl. nsl rxre,ri.-riiii ii-f 3iii illsrt nn ofxxrrl { rltol[n nlt fu IrEB !4crrArxr6' lHE NtrclI n DOFolrE|En uEnm tr rESIlllC WAS i,|SED lN St'IISt t{lUL 'TCCOffUI.|CE Wml ASDI 02992 A{0 IXX)17 PRzuMll{Art o8sEfivA'lloNs A},10,/oR TESr RESULTS VERB,CIY REPORTED TO: Le6 wood structural fill placed taken fron above existingPROGRESS REPOKT ThC abOVEfor footines Level One,footing. tests perforeed on theStair #11. Elevation coPrEs xtt,ii"t"F 3::.t'filil:cture, Anderson 6 Hastings; l'lr. Gary Murrian; PCL Construct ion, - Attn: --ltlr.- Denny {rmourl llRS Consultants. Attn: Ivlr. Les l{ooo; 3i1l Carr Steven L. Pawlak REU) OBSETWER APPROVED A' Chen€Northern.lnc irrnr-n-o llrlrt o|tat ,it rrrturlll lJ{ &nrtD lo lt tnttttr' ^ .'r-r.- .l *Fiiil-lr" .. .-rf-r- - .. .r-.a. a tal Cq-nhf t cr-r -aW REPORT OF FIELD NUCLEAR DENSIfi TE5TING ffir r.-' rr9..ilutr-4r-{tgl! Av !s.'nm ^t x( coq'xt*-ffitr-Btlfr4',,ffityffi ,r q tr^nrirna ur€llre,,. q ririffr-riri oa hi*il1-Crr rfn.nrr It rurrvtt, fo{rE qrl lEllr}l 'l To: TOI1N OF VArL ,,OB No.4 39.8 90 0ATE ?/L5/9O ] Attn: llr. Stan Berryman DNLY REPORT NO. 26 SHEEr, OF tP.O. Box 100 Vail CO 81658-0100 . 6WOICE NO. PRGJECI Additlon to Vail Transportati'on Center, Vai'l, Colorado *AEF=Above Existing Footing LOCATION DEPIH OR ELEVANON (FEEr) TADORATORT RELD PERC€{T OF(REJ\lrvtl u^)olrura) o{Il tt{6 SOIL TY?EIIA)OMUM DRT DENSfi (pc-r) Or'nMUM MOISTURE COMIENT(x) oFr DENSTNY (pc't) MOISTURE CONTENT(x) tLsl NO. 94 95 96 97 97 I 10f s.q, 1 t6t s.6r E. 16t' S.IOI E. 20r s. lO I \|i,. 20r s. IOr lT. of A LinelofGrld 12 | Iof A Lj-nQof Grid lf of A LinQof Grid 1] of A Lineof Grld 1 of A Lineof Grid 1 4I AEF 5' AEF 5' len 4 6' AEF ? 5I AEF 2 1]5.0 L36.O 1]6.0 1J6. o r]6.0 5.9 5.9 5.9 >.9 >.9 u4.0 L34.5 L13.8 1J0.O L31,9 7.O 7.2 ?.Q 7.8 7.9 99 99 oP, OR sl. s1ltY sandygravel ll ll ,i t' lr even L. Pawlak APPROYED Bf Michael Barlrer Architecture, COPIES Attn: Mr. Scott Wqrd; -- . Anderson t llastings; I{T. Gary luurrran; PCL Construction, Attn: Mr. Denny Arnour; URS Consultants, Attn: Mr. Les Wood; R{ 'l REU) .1 Carr St OBSEM/ER Chen€Nonhern.lnc.C..t dh{ &{h-r ..{ Sd-th REPORT OF EXCAVATION OBSERVATION as A ||lrn!|l pr('|fcrr'| m ctrxls, tr|f purt lra, (xrirtvt:, Al! flF(fnt rxf srfftD ls nf ctr'rlxrg( Fiofllft (F fI clfxrl ,,o, arllllu lDl 'F[-E - rtra (r sunrrxr\ o(ro lErr11 (1a llrn11;13 fl(rr an flfo {lrro q|rn nrcirr-s etsrimo ruiurr qx m lt}r lftttota- sll}u:i rll E oslcr! (r rflLr tEnlxl lsqr4ulu! uarr! o rr rg|rrxtl lrc lfll"Lo '| lt!|rfl(l ^.rrs- r -[XlFlr-. ., -r4clr. ft'rn ll* Cl'alOlA a/to TOr TOIVN OF YAILAttn: Mr. Stan Berryman P.O, Box 100Vail CO 81658-0100 PRGJECI Addition to Vail Transportation Center, ,,oB NO. 4 398 S0 DALY REPOFIT NO. hwolcE No. Vai1, Colorado DNe 7/L6/9O 25 SHEET4 0F D(CAVAIION FOR: Footing 7r0r? x 1r4'l LOCATIONT Line Alr Grid 3O-3I.9 E(CAVAIION BASE ELEVAIIONS: 20r at 60.15,step down 59.38 }'[ATERhI-S D€OSED IN BNE(S) OF D(CAVANON(S):I'latural undisturbdd soiLs were observed at excavatj-on, and appears suitable to support preBEure. the base ofthe design the footingsoil bearing REITIA,RKS: This footing area ie sui.table for reinforcing steel placement. VERBAL COMMUNICATION WTTH CONTRACTOR. ENGINEER, ARCHITEfl', OWNER: PROGRESS REPORT: Michael Batber Architecture, COPIES Attn: Mr. Scott ltlard;6a1.y Murrain Anderson 6 llastings; PCL Constilrction Services, Attn: Mr. DennY Armour; URS Consultants, Attn: Mr. Les Wood; tsill Carr Steven L. Pawlak REIO OBSERI/ER APPROVED BT Chcn€Norlhern,lnc Cr-dl|. f.effl.. -a S..it|,.a. REPORT OF REINFORCING STEEL OBSERVATION At A qmJrt tidtctDa !o rttxn I|I RrE X|r d-ill\itl, |tr nt'om.xta 3,n,TrD N nf cotDotr't F*{trt d. dt (rrx|a AIO X',nOaC III{ lfl Pi'{-EA- t{rr c- n^n{xrl c{r{luxr.t ('r rrrpctt trrr| dt rtcri.a C.r rnin-J-niri;i.o moil A.,l ritnDt i*'|Dl- ur|'l8 lrt sc rFr' (r 'ftlr lt:m€ 6 coal.fltl, trllrt Otltt ,ffrlrr{lt llf. |fiIl) lo ll fin}3' ^ t'-1L .t t fillXlnr r .-rwi.. fdrrr rb. clal tt^ afiO TO: TOWN Attn: P.O. Vai 1 PRO'ECT OF VAIL Ntr. . Stan Berrynan Box 100co 816sB-0100 Addition to ValI 'lTansporta ti. on Cente::, JOO NO. 4 398 90 OATLY REPORT NO. tlwolcE No. Vai.1, Colorado _ oATE: 7/L6/9O 26 sHEEr 50F STRUCruRE Footings LMA]n|a.El/ Ilorl REDIFORCIT€coure{Is vgnct|.HofltrOt{r L B9-3t.r/365 70. Bg standees 4BilGrid 2'B Dywld {Panchor a6 r IB #6a#6e -116 a #-LL@, rlrl llil ll. rf l,zn LB Qo oc conto top mat E. oc cont. top nat N. oe cont. botton nat oc cont. botton nat to W.to S. SPECuTNntie *rU cnra: 50 REnfmcwc crr^Hr.0Er! clean cLE RAfiCE Ar|o C('t E& AS f€Qr Spugfie SpECTEAIp6: aS feq. et8 S!PPOf,IS: TYPE BriCk m6H HOCtlr tt' F nms tso- P srtor Duffiics usED Xf, comnrton xrrlseo b r,.nr-nve ogtnv mN O prrr-nur ossEru nox |lsllcE @lllrt llcE yeB uEr PRO.ECT UEr PRorEGr DAIE,ffiffi, nEoumo{rs RE-D(^ru{@ OUIIIT{ED RE-OqTNED PROGRESS REPORT conformance vrith The reinforcing steel placed appearsproJect plans and speciflcatione.to be 111 Michael Bqrber ArchitectuTe, COPIES Attn: Mr. Scott Ward; Gary Murrain PCL Construction Services, Attn: Mr. Denny Annourl Anderson G llastings; URS Consultants. Attn: Mr. Les Wood; BiIl Carr Steven L. Pawlak RE..D OBSEM/ER APPROVED S/ Chen€Northenr.lnc uor|.lJung t,rghi. cDd s.r-rt}.L REPORT OF CONSTRUCTION ACTIVITIES To: T0WN OF VArL JoB No. 4 39s sn oATE: 7/L7/9O Attn: lrlr. Stan Berrynan DAILY REPORT NO. 2? sneff I of B P.0, Box L0.0 Vail CO 81658-0100. IWOICE No. pRqrEcT Addition to Vail Transportation Center, Vai1, Colorado WEATHER CONOMONS AI.ID TEMPERATURE CHEIf-N0RTHERN,S sm AGIMnES Concrete pour at 5:00 a.n.-1 footings P?[33.r'j6lg iotif-168 cuUic yards, full time observation and te-eting. _B&Bgxcivating placlng stiuctuial fill at Level One1 Stair i111. -Rebar-inspectioi br stef footing Line AO-JO-Jl.9' Elevati-on1 6Q'.L6-J9'38' B&B-continues to excavate for new structure on the east side' VEREALCOMMUNICAIIONWfiHCONTRACTOR,ENGINEER,ARCHITECT,OWNER Ilill Carr Steven t. Paw1ak RAl) OBSEM/ER APPROI'GD 8Y l{ichae I Barber Architecture , COPIES Attn; Mr. Scott Ward;Cary Murrain PCL Constructipn Services, Attn: Mr' Denny Armour: Anderson & lla-s-tings; ...rlRs consultants. Attn: tvlr" l,e !--lY-eegj ^ .i.rt- ., r,.[ff f X lc-? .. Ert'rh tr ||o. CuEtOt aFo Chen€Nonhern.lnc.C.r-rl.rf f4tf|r| -i sffi REPORT OF FIELD NUCLEAR DENSITY TESTING as A urnA PittrEIE|l rc (l,.rrt' nE F|lE rxt ofittwt:a al fitJD('tlt ^r!f suiqmD AS nf oc.|cf,rlut-firot'ftlrY f trl Gljfxll l]o amoEL|rD{ 7|l ntr E - rER '. sr^lr{x'. csanlfF 6 qr rnPrclll r'fit o{ Rto ff'€ g|n rrrqfJB*dnn'*!'-rcxjiri-or -rrrnut ^PFno'fl- sAPtI:' ru 4 rForD 6 Aflrr ll:tTlle 6 orErflD ul.t! g t ln gJarar| r{ ,erD Io ll t[|lrrl A tr-nr- I -@r-t d...lr?aa. f-ri t... CrIlotA a/|o To: TohlN OF VAIL JoB No. 4 sg8 90 DA1E ?/L?/9OAttni Mr. Stan Berrymanp.0. Box 100 r'e'rirxrerr DAtLy REPoFir No. 27 sner 2 oF B Vail C0 81658-0100 ;NVOICE No. PRqrEcT Addition to Vai 1 Transportation Center. Vai1. Colorado SPECmCAnoN couPAcTlox a MINIMUM REQUIRED IN_PL{CE CONSTRUCTION CONTMCIOR: }IATERIAL DENSTTY 98 T AS B&B Excavatingres'r ASTI'4 D1557( under footing SELECTED BY: Chen Northern DETERMINED Sf: LOCATIONS WERE TY?E AI{O NUMBER TYPE N.ID NUMBER METT.IOO OF ADOING OF EARTH MOVING UNtrS OF COMPACTION UNTTS T MOTSIURE nabural L D1 THICKNESS OF UFT as req. sheepafoot vibr ToIINUMBER OF PASSES as req. 2 junp .jacks *AEF=Above Existing Footing LOCATION DEPIH OR ELEVANON(rEfi) I-ABORATO'T FIELD PERCO{T OF(RErnE/ uNcrAr|) ogT tg) SOIL TYPE tE)l NO.I,IN(IMUM DFY DENSITY(pcf) OPnMUM MO|sruRE CONTENI(i) DtrY DENSTT (pcr) MO| TURE CONTEI.IT(r) 9B 99 10c t0l 102 ]5r S. of A LineGrid 12 12t S. of A Line5t E. of Grid 14 lor S. of A LineLr' E. of Grid 1. {0r S. of A Llne 5r Vir. of Grid 1I JOr S. of A Llne6r E. of Grid 12 7I AEF 4I AEF .8 I AEF. 9I AEF 10 ' AEF lJ6.O r35.0. L16.o L36.o L16.o 5.9 5.9 5.9 5.9 5.9 L35.7 L33.9 IJ4.} L35.8 L33.6 7.L '/.2 7,9 ( cO 7.L 99 9B 9B 99 9B sI. silty sandy graYel tr rutI TIME oBSER/ATIoN n PN{T TIME oBsER/ATloN nG irFo|rr p'frrtaf! opxE|a tunrfD Ar l iEtll|.T of drt o36ttv^rrr|! (r nll ptrcfr.f-xf. rt lt trf FfI rfo o{-lllf cttndott I) c0{ruUt 'Pf'ltxo rE ntooanrofD od!fcn,[ Itnttr ^nD rrcrlf m ittf urfirro na rruts nlx'uh'ii*]rw'rl c rrt rrlsrfrvl!9-oPrMmirs lf,srs rF€ rr De tr rrf ml q{r ^s gtrf,YLD x'r'<rrr ro (,rff.rr qJn urEnytl.|t Juuc$.txr. rtsr u,vr ld.i6i'n-i."ltl.f 0^s6 nn orNx;6 otl n|El}trtr Tllg ntl rET! g'Eorrc xr6' THE NrrCtE R Dtl€t t|ErER UEtm Or IE'nNC WAS Usf.D tN SUES[^}{I!\L lccoftD }lcE w[t}l ASIU 02902 AllD DJO17 PRzuMIMRY OBSFfl/ATIONS AllD/OR TESr RESULTS VERBAIIY REPORTED TO: Les Viood PROGRESS RepORT compaction being placed for footingsexisting footing uest of A tests performed on the Level One, Stait '/fLL. Line o structural fill l.llevations taken fron above coprEs titll?" tr3i"B:irt'fi'j'":: cture, Anderson € tlastings; Mr. Gary Murrian; PCL Constructlon,-Attn:,-Mr.-Denny {rmourl URS Consttltants, Attn: Mr. Les wood; Bill Carr Steven L' Pawlak FIEI-D OSERI/ER APPRWED 8T TO: TgwN oF vArr JoB No.4 j9.8 e0 DATE 7/I7/9O Attn: llr, 'Stan Berrymanp.o. Box 100 DATLY REPOKT NO. 27 SHEETJ 0F I Vail CO 81658-0100 . INVOICE NO. PROJECT Addition to Vail Transportation Center, Vai'f , Cofo"aao IEST NO.LOCATION DEPTH OR ELEVATION (FEET) uaoRAToFr FIELD PERCO{I Of(Rcl^ftq./ llA)oru|l) O|'IArtD SOIL T'/PE}IN(MUM Dmr OENSMY (p"f) OP'NMUM MOISTURE CONTENT(x) 0raf DENSTTY (pcf) MO|sruRE CONTENT(r) IO' ro4 ro5 16r S.Br !v. 5lt S. 5t E. 20r s. l0 | li/. of A Llneof Grid 12 of A Lineof Grid 1} of A Lineof Grid 14 llr AEI 'I AEF 6' AEF L36.O T36.o r55.0 5.9 5,9 5.9 Lt4.3 L34.O L33.8 7.4 7.o 7.2 99 9B 9B s1. silty 6andygravel tl tl Michael Barber Architecture. COPIES Attn: Mf. Scott Wafd; Anderson 6 Hastings; Mr' Gary Murrian; PCL Construction, Attn: Mr. Denny Arnour; URS Consultants, Attn: Mr. Les Wood; II1II Carr Steven L. Pawlak RELD OBSERI/ER APPROVED ET Clrcn€Nonhgrn'lnc c"rrui rr,*'o n' t"r"' . REPORT OF FIELD NUCLEAR DENSITY TESTING lt l |rrnr,t tF rErE lo qrxll fir 't;! To dEtwl Ar |'tort rlf, $r'rrD Ar nt ootntxlt{. tifitrr f 'rt c|nfil l o amo't(a|l trr rui'Erp tr>, ', rl^nurxrr .'rqrm. ir rxti.rclr rfi r oi iror.r.o q5 nlulii'o-iri-rriu xiirro-cr rrtnx'frolr 3{f{,t fir x ]IFJID 0/ lftu lllltl} 6 qrrlrtr,o t'arn o|llr rn ltf,rrylr ,r{ lolllll lu x lirll€' ^ ".-n - r *(llilt-lr.'r d ..nr-r- - ', ..-.-. .,4 Chen€Norlhern,Inc Orjtli ar*5r tia 5.|..tr!r REPORT OF REINFORCING STEEL OBSERVATION Al A rarnl|l trlfcrDt ro ctnara [|( |(rE ao qftltwl {r irFfrl 'lt 3rntrrtD |t nr @rlllxlr.f -PFr-rw (r dr cutflr' a0 ,r,l]oE rrl{ tul Fi-REA- rp, d. Jlllrlltttt' q .l.uqr'6 <ll rxtucrf tttrtl tlt ito^[t' crr rxin-c-ninr,rl tf'ltl€ ql linrJ'l 'F"xrn|. 3 l?La rll E rlr.qrD tr lftnt rEm,o 6 coa'rfltD ur|r:ra oltal t'xr€tlt {lt ltf, telIl, lo H l }t\ ^ .rr-r.- .. r-[iiiE-]r.t , ..ar..i- f.'G rra Cr{llaA a/tc TO: TOl4IN Attn: P.O. Vai 1 PRqJECT OF VAIL Mr. Stan B.errfman Box 100 JOB NO. 4 398 90 DAILY REPOKT NO. rlwolcE No. Vai1, Colorado DATE:7/17/9A 2? sHEEf 4 oF c0 816s8-0100 Addition to Vail Transpottation Center, STRUCrURE New parkinn ramn wall Lm^rxil :l.Eit^noN RSIFORCIM} oqaE{Ts !€Knca tr,fflzONML Line A1-82 W. of Grid I 93,48 #r@ /14 @ llrroc lBtroc /16 @ Lztl B fl6 eq.. 6paced #4 @15t''oc2 #6 cont.L #6 cont' 10 lt4 @ 3tl inside faceoutside face each facetop of haunchbotton offset of haunch haunch top of Z2tr waII oc haunch top of 22tt vlall SPECUT lxrts: StE CR O€: 60 Rftl{FmcNo CtIAllt0lES} Clean qX f, tCE ll{D OO1E& ag feq. SPrrc|Noc sP€CFlClTPll$ See note6 8Af, slrPP(mS: TypE 2rf & 8rt chair M{FH HECTIT d nens uso d goe DnAlurcs usED d conrnrcron rrpr,rgp H ruu-rue oosEnvnor O prrr-nve flrsEmtAnox lretlCE CO||l.rU0lCE ye6 u€r Pno,Ecr uEr PRqrECr R€DUNETftXIS R€qUIFEIETTStrr€{ IMIUI.LY rvllE{E](A!D{€D RE-OOA'TNED DAIE RE-E(^r4il@ obe erved of #4 @ lBtr oc and under 2rt clearance corrected by. contraCtor. A11 other steel appears to be placed in 6qeneral conformance with plans and specificatj-ons. , Michael Barb"er Architecture, COPIES Attn: Mr. Scott l{ard; Gary Murrain PcL construction services, Attn; Mr. Denny Arnourl Anderson S l{astings I llRS Consultants . Attn: Mr. Les Wood: Bill Carr RAD OBSERVER Steven L. Paw1ak APPROVED Bf ChenONortlrcrn.lnc Cqaltltl Etd-r tra sdtt|t. REPORT OF CONCRETE PI-ACEMENT OBSERVATIONS a A t|Jftn trtEtlx to otrtafr. ttt' RIE t.! q'llllwr, ,u i(toll! .tf t-n mD a! r|| c!.fDfxn^r P'll??'TY d drr qD.ni lro atftlrllllDl ^t xf,ra-'Iri'o- iiirniio:r- intiur!:rr -<i'irrr..rr rr(r, (r rfo$rao o|,r crun-c |rinio rrxio d.i tFttfl ,l,?f,or'a- s^lrt-t! nl qe oltrED d ,rtu .tt n€ 6 ooaai.IltD uttlt on{.i ,rt .rraratt ,rf ruo Io ta tf,ttn ^ '!r.r J .. [Eiii*lr." ' -rrrJ.. t6r L., CYtll.! a,/ao To: 19vs 0F vArL JoB No.4 seg e0 DAIE ?/L7/9oAttn: Mr. Stan Berrymanp.o. Box 100 DAILY REPORT No. Z|sngr,r 5Or g Vail CO 81658-0100 tM/OtCE No. PROJECf Addit.i on to Vail Tl'an sl)ortlt i. on Ccntcr, Vai 1, Colorado. SI,P?IJE SFErEAlx)r€s sLt Up l.ft.l4obiIuu r.o. A JOOO 3-5 An coirrEltr 4-B arro{T TETPER T'RE R r€E 6o0-800 ftsr hto Tntrc{ HL ICXET l.to. nr|E E Tcflg) TIUE ARnwtI) Ttu€ SAIIPI.ED RnIQLUIETI @T'NIERE![l RE\OU'Inl o(xrt{TEn couPr-EIlot{ CUTrc YAGt-ilD/ CUUUTAITVE w rn ADo€Douor|s I e 5 4 , 6 7 54 100 106 44 114 4B 119 o109BB 010989 01og90 0roggl alog92 010993 oro994 5ziL 5244 5t5L 5255 6:oo 6za6 6zL5 5251 6:00 6:11 6tLJ 6:2O 6zZB 6r40 6z2O Ut$ i a6 a6 aa as as as a8 req req req req. req req req a6 req a6 req a6 req ae req as Teq aa req as req A Ib 24 32 40 4B ,6 o o 0 LJ 0 o o TESTIT\sun? (Dr.) ArR oot{IE}tT(r) tEr uNn WTFHT (PGf) ttll0 CONCRF.TE IE}TP€- RAIUNE cr) RElaAe(s 7 3.5'(E 6.6 6B 64 sanple taken frorn truck Thj-s B cu. yd. was rejected by cont. PROGRESS REFORI The above test sanples were taken requested that all trucks visually observed torfor trucka over t0 uinutes. from slunp the and truck. Client tirne observed ^nDrEr Michacl Barber Architecture; Andcrson & llastings; Gary Murrain PCL Constmction Services; UllS Consultants; nill Carr Steven L. Pawlak FIEI.D OBSERI/ER APPROVE) BT Chen€Northern.lnc Cdr{fi Lnlt-r ti Sdt{hL REPORT OF CONCRETE PI.ACEMENT OBSERVATIONS at A r|rrul. ?I'tErE E alrx[, frc 'tft ^lf, lttttwt Al itroinr ^trG ln l'm At Tf oofirDfj{Tt^L FnoF?ttTY f dn clf,rr* lJo-,l,nw^nx rDr t(R-ra- rr'| (r Jr^irxxtl mrcu,lr.r orr rIIr.cI! rrou dt i[orriao qr mn*rr-d niwrD' ?ft[fut (t,'l hralt rl?io/a- 3'{|'ltt rrt E DI|iolro cr x-tn ltll]xl 6 ct IlrlID Dlrr gflrt ,nasa,|lt ,I r[ID lo x t'rll€' ^ i!r.- ., r- [Tiii-lr..r d ...rrrb 7n ra CItt.. ./rO To: 19r11p oF vArL JoB No.4 jg8 e0 DATE ?/L?/gAAttn: Mr, Stan Rcrryman 1r7 t Ap.0. Box 100 ' DALY REPORT NO. 6r sHEr o 0F v Vail C0 81658-0100 tMrptCE NO. PROTECf Atltliti.on to Vail Transpontat i.on Ccntcr', Vail, Colorado. sPrpuEllpr.ts: g.uuP 3-5sunprrnl4t.l{obiluu m. A f000 28 days ArR co?{rE{r 4-B AAS{T'IEUPCRATUFE RA}€E 60 BO IE;T tD.In cxl{L IEI(ET Ht TIUE a TctE) TIE /tf,nryE) ru€ s lrPt-En RE\,9(UfDt{ @ONTER EON REVqJIPN cxxrNftn o(xPtEIlo{ clrEc Y rulsto D/ crruuutwE w^nn ADo@ o tt6rs )< I 10 11 L2 T3 14 46 47 54 100 105 44 114 I00995 100996 100997 rooggB 100999 r0r000 101001 5t30 6t37 6:5L 6-.59 7: 14 7 225 7 z50. 5:39 6255 7: o1 7:1O 7 t35 7 t45 B:00 6:45 7:OJ aE req as req as req as req a6 req aF req as req as }eq as rec as req as req as req a6 rec as rec 64 ?2 80 8B 96 r04 8B o U o 10-20 4 adJustedtotal pour lESrt{L sLl[?(sr)llRo$fie{r(r) tEr ut{n WTFHT(Pcf)YttlD cor.rcf,fJEIE'PE- RANNE cF) RDr ru€ B 9 )t 6.8 6.6 64 62 thls B cu. yd' was rejected by cont.thls B curldr was rejected by cont. Total 56 yd. poured ln forns #114adJusted load dellvered to BB cuo ]d1 PROGRESS REFORT nnD*iR Michaol Barber Architccturc I Andcrson & llastings; Gary Murrain PCL Construction Scrvlces; URS Consultants; Bill Carr Steven L. Pavrlak RE.D OBSEfUER APPfiOVED Sf To: 19p11 oF vArLAttn: Mr. Stan Berryrnan P.O. Box 100 Vail C0 81658-0100 PROTECf Additi on to Vail Tr;rnsportation Ccntcr, JOB NO.4 398 90 OAILY REPORT NO. n*olcE No. Vai I, Colorado. DArE 7/L7/gA 27 sHEEr 7 oF srccu srpprlER },rt.lqobilrlr LD- A fO00 28 days A,gG r rElp€RAluRE Mr{c€ 60-80 lESr l,l0. IRtrcX Mt llCXET l.x). ITTE SAIC|E) ltuE lnfivED rlr€ SATPLq) R[l,QUrIDtl@urrn&u[l RA,OUTTPiI @(txtER oouPt-Elloll CUBC YAffi IA^D/ crruuIAIlvt WAIER /\DOE) cAlloa6 L5 L6 L7 1B r9 20 2L 119 4B 47 48 ,4 109 44 100e 10of 10o4 I005 ro05 1007 1008 7 249 B:05 B:21 B: ]0 B|35 9 ;04 9zLJ 8:01 8225 B:36 B:50 9:0o 9|T6 9z3a B:45 9:35 as req a€ req as req as req as req a6 req as req a6 req &s req a6 req as req as r€q as req a6 req 96 104 1r2 120 128 t36 r44 0 0 I 0 4 0 o TET HL sll,lP (Dr) tn OOilIE{T(r) TET UNTTUSHf (Fcf) YIEO @ilCR€IEIEPE- RATURE cr) RElr fU€ L7 2L 4 4 5,?68 7O sanple fron truck Eanple from truck PROCRESS REPORf, nn''ltre Michao I llarber Arcltitecture I Andcrson {i llastings i Gary Murrain PCL Construction Scrvices; URS Consultants; 8111 Carr Steven L. Pawfak FIEID OBSESWER APPRSVE) BY Chen€Northcrn.lnc,C..r|lfrrf Infb.rt ci s.4-frta. REPORT OF CONCRETE PI.ACEMENT OBSERVAT]ONS ,! a urntt aitncnt to .rDfll tl€ tt;E t f' (I.|!rlllfr. at rftt.iTt xrG ltfrrrrD ai nf cotln rrrit. Fi(IrfnlY (' qtr o lx{t, l.|, amrfl ID, 7q n,t-E -rE. (r lrrarrr{xrt, oo..clt.rotr 6 rfudi-n(|a q ec^rit o.r ruqrn-c hini.o rxirc (rn ffftnt ,,?F(trr- s4r''tr.i xll. 1- lrF(lrD o,',rrlrl lun€ B otra.Illlr ('.,r!| oDl| ttt$t{}rxlt l|f rf, D lo l{ l'nt[, A "rr- d r,.lTiiilr..r a d,ab t6 ra.. CIll{a .,&0 Chen€Nortlrern.lnc a n:r- , rlTllf-l r." r ..."-r.. tri r., Oatl l,L a/ao Coi.sl(}tl &|th.3r ol sdr{Jr{r REPORT OF CONCRETE PI..ACEMENT OBSERVATIONS To: lglvl'l oF vAI L Attn: Mr. Stan llerryman It.0. Box 100 Vail CO 81658-0100 PROTECf A<ltli.t i on to Vai 1 'l'rans JOB No.4 398 90. DAILY REPORT NO. llOr0lCE NO. Vai 1. . ColotaLlo. DAIE 7/L7/gO 27 sxrrr B or B t i. olr Ccntcr, sPECrEArI)ils lrurup 3-5 ln co}|rExr 4-B slrPPUm Mtot4obilrrx tD. A 3000 lrsErr TEIPEn^ruRE MIICE a6 re as re as re Lr2 IbU 168 as req. as req as req 22 2t 24 114 r00 119 1009 I0l0 IOII 9:34 9 237 9 t57 9 :40 9:53 1O:1 Bill Cam Steven L. Paw1ak FIEI.D O8SER1/ER APPNOYED BY r,.rtDrFe MichacI Barber Architecture l furderson & llastings i Gary Murrain PCL Construction Scrvices'; URS Consultants; ffi FrE *r, c.;'r'i *,**""pgXlr*H,ffii1ffi^;'S1g ffi f;;g"ffi'f'Sft'riji'r- iierriirtrr crttunr|' dt fxll.cln tror ('l iforfit€ qt rt,'( oonrunD l'lL! ont ,iir$rar{ll lif ,firD lo ll rBlll C{ren€Northern.luc.Con.dl,/ng :Jlglar... crd S.rot rt REPORT OF CONSTRUCTION ACTIVITIES a3 A |rmrt FiottET tD drXTS' nr FUnE rr.n dftrfwf!' AL ifFttlflS ,Ff lurrtTtrD as nf cDr.frrxq!, P|rnrtt c (rt ctrl{nl t|o ^undiufrr mi FJ! s- i(r. g. srrrra'.rs c(r€r@€ .rr [rtrucnl rporl rn Ftru^(r€ or crorn-r -rtiliil -rttttirri ix.R rgror iprilvr- sattrt fiu lf 1,6trD d rnti tEllll) 6 c!.|'trnt uust onlt ran^}lJ.rfllS |,lc ,F-Ll, lo ltl wElxc. ^ "..n- 'r ".[Tiiii-l* .. ...nr..i- l6in ni clal€a 4/to To: To1ryN oF yAIL JoB No. 4 ise s0 DATE 7/LB/9O Attn: Mr. Stan Derryman OALy REpORT NO. A8 SHEE1 1 OF 6P.0. Box 100Vail CO 81658-0.100. tWOtCE NO. PRo.rECf Addition to Vail Transportation Ccnter, Vail, Colorado WEAIHER CONOffiONS AltD'IEMPERAruRE clearr 8Oo, p.rn. ralnl CONIRACTORS CONSTRUCNON ACIMNES PERSOi{Nfu }TA'OR EqUPMENTI ACIMTIES: cHst-NoRIHERN,s srrE AcTrvmES F\.rlI time obaervation and testing concrete being placed for new parking ranp waII west of existin6 structure vrallr Grid I and footing east of exlsting structure, Line A1 r Grld 3O-3L.9. Conpaction testing of structural fi.ll being placed for footings Level One, Stair #1,L, inspectlon of rebar placed for footings Line Alt Grid ]0-31.9. B&B Excavatlng continues to excavate for footing eastof exlsting structure. \ERML COMMUNICATION WTH CONIRACTOR, ENGINEER, ARCHIECT, OV'NER It'li chae 1 Barber Architecture,uerlE5 Attn; Mr. Scott Ward;6;r1y Murrain PCL Construction Sewices, Attn: Mr. Denny Armour; Anderson € lla-s.tings; .. URS Consttltants, Attn: Mr" l,es y|ooo; BiIl Carr Steven L. Pawlak NEI.D OBSERIER APPROVED BT Chen€Nofthern.lnc.Ccrrnfrt &{5.r. .i ttrl REPORT OF FIELD NUCLEAR DENSITY TESTING ,s ^ q, |t ?iottE'D| E cl|ixTt I|E |tiE l}o o(,irttrd. Al af'G't ,|tf srF.rr?D ^s Tr c[''Doftut Fior.rnTY o. qn ct|(J{t3. l}o A,llInz^II'. 7tl 'r|t rl. rsl F nlrtrr?xrr' .!t€l[d t q mp'crt mrp ff iEo Rnrr' cr nrofi'rs-iii:ttiio'ft;i*t -cf -ntnot 'Pmo'a' s^FLel Ytt. E D'ttoltD f tflrl rE rr.c 6 oolrlrltD tra.Er orllr lrircrar,tl l|t rd'lD lo fi f,illtlc, ^ u-irr d r'.[HfFls* ., -rrF- F- t5 GrIlanA a^O To: TowN oF vArL JoB No. 4 598 90 DATE 7/LB/9O AttN: MT. StAN BCTTYMAN OALY REPORT NO. ZB SHEEr zOF 6P.O. Box 100 Vail Co 81658-0100 ;NVO1CE No. PR(IJEGT Addition to Vail Transportation Center, Vail, Colorado SPECIRCAnOH COypACTtox & yATERt L MINIMUM REQUIRED IN_PI.,,ACE DENSITT 98 tr A5 CONSfRUSnON CONIMCIOR:B&B Excavating TESr DEIERMINED BY:ASTIri DI5r7(under footlnge LOCATIONS WERE SEI€CIED BY: Chen I'lorthern I front ]oaderTYPE AI.IO NUMBER TYPE ANO NUMBER METHOD OF ADDING OF EARTH MOVING UNTTS OF COMPACNON UNTTS I MOISTURE natural THICKNESS sheepsfoot vj.b.ro11. NUMBER oF I iunn iack OF UFT PASSES req req, as AS LOCAT]ON DEFTH OR ELEVATION (FEEr) LADOR^TOFT RELD PERCE}{I Of (REfirv€./ lAxu|(n) OUTAIE) SOIL T]?E It)l NO,IIN(MUM DRf DENSTTT(ecf) OPT]MUM MOISTURE CONTENT(x) DRY DENSTTY (Pcr) MOISTURE CONIENI(r) LO€ to? r08 rog 24' S. of A Line5t E. of 0rl.d 11 l0r S. of A Linel0r W. of Grid Il 40r S. of A Li.ne12f E. of Grid 1: 5r S. of A Llnecrld 14 f2I AEF 7 | AEI. B IAEF 9IAEF t]6.0 l-36.O 136.o l-36,.O 5.9 5.9 5.9 5.9 !34.1 L31.9 L33.4 L33.6 7.9 7.5 7.O 7.? oo 98 98 9B sI. sj.lty sandygravel tt l? ET FU|I TIME O&SERVATION tr PN(T TIME OBSEM/ATION nnt lf,Fflf PiErxr! e o|! twrtD a! A lf,.qrLT tr qf (Fttr,ArnE (r mt Prrctl.rExl' tt lt vE !q!F-D..-Or!-nlr cttfi rnn m @fil|rr pPt\l1}€ rrf FtE61;r;g5 cp1rpfcrp trrufi ;1ts rrEn;1f m rt1 omrn nt rrrs rrix'if.' iniiiiif c-vn (Eanar€-(FrenG6 lF5as /\n€ rr E or nf n[ o'ar .l.s rlnrD Hrcrss ir ro cA n rf, qr o6rrvrr! Julpri.r.xr. rtsl urre r&i&'ii'idii Lir'niri-mxtcr <r{ w}lErlf,.R lxt ntl utlnt $'EcrE lto& THE NITCIIAR Dq|Is{)|IEIEt Ufnm OF rEs'nt|o w s usg) rN su8sr^}{Iu|. ^CCORO I{CE WITH ASIU 029e2 Al|0 DJo17 PRzuMlMrr OBSERyATTONS Al|DlOR TESr RESULTS VERBAIIY REPOFTED TO: 1s5 ltfee6 onPROGRESS REPORT The above tests)eing placed for footing8 Level the structural fj-llwere perforned One, Stair #IL. coprEs titl?" t"?i'3:i.t"ft1',h; cture? Anderson Q Hastings; Mr'.' Gary Mtlrrran; PCL Construction,-Attnr --Mr'- Denly {rmour;, llRS Consrrt tants, Attn: [lr. Les wooo; BiIl Carr Steven L. Pawlak RELD OSERI/ER APPRC'VED FT ChEn€Nortlrcrn,lnc Lrnhl b*r-r rta 5d..rt9, REPORT OF REINFORCING STEEL OBSERVATION ft A |lml|t tioTfcmr ro cuttct, Df tt||t x(, olftItw!, Al rF(rlt ,|G frtfittD At 'lf (Dallxrga. -PlttrTt f dt clD{Il. T'o AJnIxl rbl totl PURr - rxfl o. $Artr rL curaur{r! c'r rxnucir rriflr or ifo rr! ol arcri'l'iGnio ltiiiin-crrr nrrrx ,lltixrr. l^l?txt rrt { 0(tqr! or ,'tr'l Turr€ 5 cD.'tfnD t al.l! stlu lftrlcJl,.lt lfi ,arul lo l{ l[rfo' ^ ,rr.r't- ., r.lTiJn-]:* ., ..nrtr- fr.' f.'. C14 l a,/rO TO: TOlllN Attn: P.0. Vai 1 PROJECT OF VAIL Mr. Stan Berryman Ilox 100 JOB NO. 4 39-8 9.0" DAILY REPOT{T NO. [.{voEE No. Vai1, Colorado DATE: 7/LB/9O 28 SHEETJ oF co 81658-0100 Addition to Vail Transportation Center, STRUCTURE Footing ulc^lxt{ELA/AnOfi BED|rORCS{O corrtDfrs VEFNC^L tr(lfuzOilTA Llne AI Grid f0-31.9 6r.20 60.42 B#r@4L (AtTv lr, 1lrtoc 11 oc cont bottorn nat sP€Curc^Il$as! SrU- cnrx, 60 REDfmqNo crr^lto{€sr: 6ome nud ctE R tcE AND CgvEt aa req SPiJclllor sPECI'lCAIXil$ aS feq BAR 5IJPPTOfiIS: TI?€ brj-ck FII{EH on bars El nus uso f| soe outlt{cs u$ru E corrnrcmn prseo b rur.l-nug oosEnv noN D prrr-lue ossEnvlnon lr{Pt CE @utP$NCE ye$ UET PROfiCT lrET PRq'ECI Rgf,rtRsrE.ns 8EQ{JlRgle{IErr€l NlTl t.LY $atlolE(AI/H@ RE-EUr[[g) 3tl OAIE RE-E(^INNED pROSRESS REPORT The reinforcing steel appears to be placod in general confornance with plans and specif:,Lcations. Michac1 Barber Architecture, COPIES Attn: Mr, Scott Ward; Gary Murr:ain PCL Construction Services, Attn; Mr. Denny Armour; Anderson & ttastings; URS Consultants. Attn: Mr, Steven L. Pawlak TO: lgyp OF VAIL Attn: Mr. Stan Bcrryman P.O. Box 100 Vail CO 81658-0100 PROTECT Arltli ti.on to Vai 1 'l'ran suortati.on -- SPEtrEAIrcOT! !!!IIP 3-5 srrPPun !'il.l4obl1euu t.o. A 3O0O .JOB NO. 4 398 90. DAILY REPORT NO. Itt\olcE No. Ccntcr. Vai1, Color:arlo. /\|f, cor{rE{r 4-B AAEXI TEIPER^IURE M'IG€ oA'rE 7/tB/gO 28 5HsgT 4 or 60-80 IET tP.Truq(l{I IrcXET t{o. rlr€aflclE)nuE lnnilEn IIM€.s uPuD RElOu'fxN @UIIIEREOfi RE\o(lfiror.l @t,XIER @uPt Eltot{ ;IJHC YArct-oro/ CUMU[.AIN/E ll rB ^Dog)oru-olls I 2 3 4 , 7 54 IO0 ro6 114 48 54 119 011024 011025 0IIO25 or10a7 or102B 01103r or1034 5236 6:o7 6:18 7:08 7:3o '/ 255 B:24 9t57 6z2B 6245 '/:25 7 z4B 8 :05 Sz jB 7 zI9 aa req ae req as req as req as req as reg aE req as req a6 req aa req aa req as req as reg as rsg B Ib 24 3Z 40 4B 56 5 IO 'lz L5 TESTIn.silJrf(rfr) rn O${IExr(9 UET UMTwsHr (Pcr) ra!oolrcRErE]E'PE- MIUnI cr) ffUAroS 5 , 4.0 4.5 6.6 5.0 I42.1 I4e.0 6Bo 6Bo water added after test (11 cyls. cast)client request PROGRESS REPOff Sanples taken from truckr ' MichacI llarber Architccturc l--"]- furrlerson € llastings; Gary Murrain PCL Construction Scrvices; URS Consultatrts; 8111 Carr Steven L. Pawlak RE.D OBSEM/ER APPRO/ED Bt' ChenONorthern.lnc Clrdthf [r{h...r ti 3drl'|.a. REPORT OF CONCRETE PI.ACEMENT OBSERVATIONS ffi rinE rr., q.tavDi ^.,' ^l"9q!g.otgpoSr5;5q;;1grnT"li6gl f;;g1t""l1'#tffiihi'a-- jiei'iorrr coaJ,rr.r qt mDcxs rf,(ta flt if.{rr[ ol.f atm ooaarnD ulcl snat ,rir-[xrr F. rfito l0 ra rrrl|l ^ rr-rlr- d r'.[iliil-lrr r.q-b t nr f.. C!Ill,|. ./i ChendNorthern.lnc C-rrlht Eretxt ti sd..llL REPORT OF CONCRETE PI.ACEMENT OBSERVATIONS To: 19ryp or: vnrlAttn: Mr, Stan Berryman P.O. Box 100Vail CO 81658-0100 PRorECf Ad(lition to Vail 'fran Ccntcr'. Vail. Colorado. SPECrnAlnilS ![t uP An co{rEilr 4-B aEE}fi TETPER TURE RAllcE 50-80EJP?|J8 iT.i.lobi1d.u 1.o. A A, A r!n... tiolctu ro .,r'l "a "-" "., -tL ar irglr! rrtr rF.r''D a! rr @!!q!!l rF(trrrY c. ottr dtrrl'| rrr' a'nntoalu'f ^r tr-rrtr'- Do. q. tr^rr"Itct oor€.rrrrr qr rrrrrcrs rrrrr al f,o ^,rra u.r mroffo-idirib'-ltiiiri-an -rrrrrx rrir<*l- 3 rrut tu 9E rFGtD d'|rltl lE lt€ tr coaunD u3!tr o|ll,l rFarnrxll R- ,g[tg m fi t'| .o ^ ,L.t . r- (fltll-lr.t .. ...tr-r. r.r h Crllt,|. a/ao JOB NO. 4 g9B 90, DAILY REPORT NO. |}S/OICE NO. D^\t T/tB/gO aB sHEEr 5 oF 5 U L2 l-U 10 as re as Te asr as re as re a5 re a6 re 64 72 80 8B 95 104 lI2 B a 10 11 LZ L1 14 a6 re a6 re as tre as re r14 4B 46 114 ,4. 106 44 01r056 0110j8 011041 011044 o1ro47 0rr04B 0110 1O:06 B:46 9zLJ 9 245 I0 :17 1O:44 LOt59 1I: t7 B:58 9t37 9:53 10: J0 10:55 11:12 11':J0 6.0'L42.2 Bill Cam Steven L. Pawlak FEID OBSEM/ER APFRO/ED BT r..rDrFe Michael llarber Architecturc I Andcrson g Itastings; Gary Murrain PCL Construction Servlces; URS Consultants; ChcneNorthern.lnc. TOI 195111 Ot: Vn I L Attn : Mr. Stan llerrylnan P.O. Box 100 Vail CO 81658-0100 PR(IjECI Adrlit i on to Vai 1 Trans REPORT OF CONCRETE PLACEMENT OBSERVATIONS .JoB NO. 4 398 90. DA.ILY REPORT NO. INVOICE NO. :tti. orr Ccntcr', V:ri1, Coloratlo. Cmir|l ttth-t di S.rdl|' DArE 7/LB/9A aB sHEEr6 oF 6 sftDrE^Ipi6r glrruP 3-5 A|r coilrl}{r 4_g ATAE}IT TEIIPfR^IURE RANCESJPPIJa tll.lutobileuu m. A JOoO trArfR ADO@ o LlJ$ls o 0 PROGRESS REPOTT Tota1 pour 128 cubic yards rt A [|tu.( lFngfDl E 'tt:xfl r|f ttff rt" llll]rl T f illolrt! ^'i' :F Ttm A! nf, co'fDtrlrAt -r.i'r.tilt f dri o l"ta xO A'nuqlt Fn nf,IA- nd. 6' !r trrr)nr orclr;;rr G rr11rc6 rrrx fi ;1a a.i6 61r cnifiid'idivio'-ltiicrd-cr,n nrnx rriio'a- s rlt[r rrl E ErdD f lnrl rE rrE E @rttfrrD url!| ql|., Flartlxta ,lf tatD m n twllll A ''rr'r- , rrGiii-lr.r or eralrrb irrr h .ral l.. a./lo ag req as req a5 req a6 req 011053 011058 1I:47 12:44 12 :10 I :00 L2:.25 11 cylinders cast4.O b.)r42. Bill Carr Steven L. Pawlak FIE".D O6ER1/ER APPRSVED BT nnptF\ Michacl llarber Architecture; furderson 6 llastings; Gary Murrain PCL Construction Scrvlccs; URS Consultants; Tfrten*Northern.lnc. REPORT OF CONSTRUCTION ACTIVITIES AS A |^rn,|L Fi(mGrI r r! qrxnt nf rt,itr r.r (xrlFlwt al irtfini rnG g,rrgfrrD A9 n|? @l'rtxrul- PrFntrY G Cri ct flrt po a'ntlnz\rDl trttl ll,ll u- rr (r sr rnorrs. o.rq.ued dr rxrrarr! rF r oR ffn^mr€ on rcroii-r-irfr:ri.o' nitin6-ixn -nuliur 'edlovn- s't'tx u lf OrsFdttD co.fr.rru rr{I.sg grrlt /\li rarxrs NE ,grtt lo |rl llllrl| ^ rrr-,.r ., r'.fi flsp .. oomrr-. rdi N.| CgalOA a./ao Cd|.dlrno t,|olt -. otld 5.k .b To: TowN or VArL Jos No. 4 39s sq DATE: 7/26/90 Attn: Mr. Stan Berrynan DALY REPORT NO. J5 SHEEI f OF 4P.O. Box 100Vail CO 81658-0.100 ltWOlCE NO. pRo,EcT Additiorr to Vail Transportation Ccnter, Vail, Colorado yEATHER coNgmoNs AND TEMpERATURE clearl BOo coNlRActoR's coNSrRUcnoN AcrMnEs PERSONNfu MA'OR EQUIPMENT: ACIMIIES: CHEII-N0RTHERI{'S sm AcTn4TlEs Full time obEervation and testing of claymaterial being subexcavated from footing Level one, B Line and testingof the structural fill belng placed ln conpacted lifts to footing8rade. Corupactlon testing of structural fill being excavated an<i placedLevel Two, stair #LL and Level One, Stair /ILO, south and west of A Line. VERBAL COMMUNICATION WTM CONTRACTOR, ENGINEER. ARCHNECT, OWNER cop,Es Xi ill?" "|i'B$'t"ftli.:: [l]i" i,",,"," PCL Construction Services' Attn: Mr" Denny lVoodArmour: Anderson {i I las tings; URS Consrrltants, Attlr: Mr. l,cs ' Chen€Nonhern.lnc REPORT OF FIELD NUCLEAR DEN5ITY TESTING ffi FFtr r,., crr<,.rlrr - t!rr!n-#ogr^15ffp;;1g.f$18 frfrffit55f; rrcr c_ ttrtruni go€ltlor!! qr rrrtrcTt rrrP oN rfqranr.c ot iltctl cqitr,IftD t'rfi qI}Il ,Flqrl).rl ,{ l.,lllD lo x rrEor'o. a .cr- .. -(Ti-n-ln ., -'r't- ari ||. cralgT^ a/lo CarrlLa l,'d-r rra t*tr* To: TohrN oF vArL Attnr Mr. Stan Berryman P.0. Box 100 Vail C0 81658-0100 ition to Vail Transportation Center SPECffiCATtOt{ COUPACTTON & UATERTAL MTNTMUM REQUIRED tN-pLqCE DENsnr gB r AS CONSIRUC'IION CONTMCTOR: B&B Excavatine TEST JoB No. 4 3e8 e0 DArE ?/26/90 0ALY REPOFr NO. J5 SHEEr 2 OF 4 hrvorcE No. Vai I . CoLorado DETERMINED By: ASTM DI55f under footin TOCAI]oNS WERE SELECTED FY,Chen Northern TY?E AAID NUMEER OF EARTH MOMNG UNIIS T\?E AI.IO NUMBER OF COMPACTION UNTTS 2 METHOD OF ADOTNG MOTSTURE natural I hoe jump jacks T}IICKNEss OF UFT NUMBER OF PASSES 4D as req req LOCAT]ON DEPTH OR EI5/ATION (FEEr) I-ABORATOmT NELD PTRCE}IT OF (RE ^rtrlu xlr{|j)o{r lg) SOIL T'/PE ItJl NO,IIAXIMUM DRf DEI{SnY (Pcf) OPT|MUM MOISTURE CONTENT(u) Dff DENSITT @r) MOISTURE CONTENT(x) 14t L4i 14i r45 r5( 26. S. of A Line 5 | V'r. of 12 l6t S. of A Line 15 | I|/. of 12 Let 6n s. of ALine, Br E. of Gri_d I l8r S. of A Lj.ne6r E. of Grid 1 4t S. of A Llne @ Grid I 72.5 72.5 62.L6 6r.L6 bC.r V L16.o rJ6.o 140.0 14O.0 140.0 5.9 5.9 5.1 boL 6.1 L34.o L34.L 737.t L37.4 L37.9 6.4 OoC 6.9 6.8 Oo1 9B OA o,q 9B 9B sl. silty sandygravel ll ll r ll ll ll E ruLL TIME oBsEF/AnoN E PN{T rlMl lrl3 lfFqr Fitr,at: mrp6 tqirD a! I iEsu,T 6 orr B;rrlt(rrl (r nlr I Fftqa8ro cctfrcT'\,t Drlr' 4,ro scnfi to nu (r.rRlrro Di{ nstt -ll'tll q'R rs-rirro xd:asra Io crt.n^lt q.n odrrvrrr J\npulrl. ll.sl txll lft lrtl lHE NUC|.IAR oe$OvEIIn UEnm of TEs'nl€ trAs US@ lN sutr PREIJMIMRf OBSFff/A'nONS ^}{D/OR TESr RESULTS VE pRocREss REPoKT The above test // 146for footing tevel Two, Stairs /111. Texcavation for step footlnn. T,evel on : OBSEF/ATION nfcl]rFxl. lf, rlAW Fn lrl) ( (+i{F1?t 6 fr(,l (f15. ilt}€ ltf tstI B^:tA rrn ql t\ ;IANTUL '|CCOatD ltcE ' RBALLY REPORED and 147 wereests #148' Il e Stair /110. ff oaffituc?fi 10 CdlTrlt.F |Il.tlrl(l l}f rtfMrxt6 tEfi ,at rrlDt tr ll_f rnl c'|.Y s cn rrrflrr-a ll|t tal. vEI:l lftcltx rD6. IYIIH ASIII D2902 All0 OJO17 TO: performed on excavation +9r 150 were perforned on Elevation fron existins Steven L. Pawlak APPftCIVED BT coP,Es titl?"'"?i'B:1.t";,:*:l'"'u,. Anderson 6 Hastings; Mr. Gary murrran; pCt donstnrcti on'-Attn: .-Mr.. Denny-ArmourI Lns coiiiuttants , -Attn: Mr. Les ltiood; footingr BiIl Carr NE"D OBSS/ER Clrcn€Nonlrcrn.lnc.Codrtlif E tlt-| -a t Lnlr- REPORT OF FIELD NUCLEAR DENSIfi TESTING a3 A qrnlr{ ".olffEru. !! crrxnr nf FtttE llo cJftrttw!. Al irtr('tls trlt llF.rrrtr A! Tf cotDllflut-filafrw r gl crrxr:r' ^lo amffi TD' 7Tl fi't E - rrc,r or sr^rurnt oo€r lrnr.r <rr rflFrcn rr r (n mq &rro cn mrqiiif,inii#.u niiri€-cti innu rrmollt- s||rtr:t rtl Bt o'9r, f rfTrr tEnD(' |' €otul@ tlu! glttt ,Dn{rlxtl llt ,t[!, to N rBn*c a h-rr- .r t lTillls..r .r ..n!-r. rrrrir f|.' C|E|OTA r,/6 To: TohrN 0F vArL JoB No. 4 3sB 90 DATE 7/26/90 Attn: Mr. Stan Berrymanp.o. Box 100 DAtLy REPORT No. 3' SHEEIJ 0F 4 Vail CO 81658-0100 tlryotcE No. PRqrEcr Ad<lition to Vail Transportati.on ccntcn. vai1. colorado SPECIRCATIO}I COUPACTION & MATERIAL MINIMUM REQUIRED IN-PLACE DENSTTY 98 T AS CoNsIRUcnoN CoNTMcIoR: R8<B Excavating 691 OETERMINED RY: LOCANONS WERE ASTI{ Df55f-under footing SELECTED Bf: Chen ]'trorthern TYPE A}.ID NUMBER TYPE A}IO NUMBER METHOD OF ADDING OF EARIH MOVING UNTN OF COMPACNON UN]TS } MoISTURE natural I hoe, 1 DJ wheel roller, THICKNESS 1 NUMBER oFfront loader OF UFT PA'SES req req a6 as LOCATION DEPTH OR EI.F/ATION (FEEr) LABORATOTY RELD PF-FCEXT 6 (ROjT$€./lr,uu{n) otrr lE) sorL IiPE rL)l NO.}IAXIMUM DRT DENSTTT (Pcf) OPT|MUM MOISTURE CONTENT(7) DFTT OENSTTY (pcr) MOISTURE CONTENT(t) L12 r5: L5L L5i Llt L5 at 13 Line,Grid ]5 4t S. of Il Lj-neGrid J6.5 4r li. of B LineGrid 56 at B Line, GrLd 37 4r I'1. of B Line GrLd Jl 4r S. of Il LineGrid 55.5 2 | itBF 2t BRF ].I EBF ] ' PRI' footi-ng grade footi-ng grade 716.O 1J6.0 r]6. o L35.o L36.O 135.0 ).9 7.9 5.9 5,9 ).9 5.9 L33.2 r33.4 L33.9 134.0 L34.L L34,-3 6.4 5.8 brU 5.L 6.2 6.6 97 97 95 97 97 97 sl. silty sandygravel tt It rt ?l EI RJLL nME OBSEF/AION n PAf{T TIME OBSEm/ATION ntl ttF6T PRfjrt{It (Pltr'It trraD a! l Rtt t or q|t aFtf.fit/ trrlr (F nr A a:f.),f}at. rE l|^\tr nfl|lD oN Ixr mtfil cmf, Io oot|l|\nr: ,P"lnxo ]lf FEDora{xDrt oqr,.tcT|w unxt Alto v(Eirro 1u. qrnMt rrg tuu rrr.l iih iroci6,rr's-ler f!tfivlt{l -F i rrt6. lFsts Arlf lr roE r nF rll I ot{Y rs rf,uvtb trirssrrr l() rx-[R^fi qt o6tl|\ t1t .luuq.l4.xt. ttsl oele ri. -rrn rtr-:rr.r nrso rm oarHl(tat fi mlElltr ]llf Rtl rtalg SPtofE^llc6' IHE Hrc|I R D€l.60sErER Mfllm Of TESnl$ WAS t sED lH SUrlS',t l{Tlr|- ACCOfiD$CE WIIH AslU D2Se2 ^lIO DJO17 PRzuMtMftY OBSEF/A'nONS Ar.tD/OR TESr RESULTS VERBAILY REPORTED TO: Les Uiood pRocREss REPORT Theplaced for footing bottom of footing. above tests were performed on the structural fill being R Line, Grid 3?.5 - 34.5. Elevation taken fron Excavated to natural so coprEs xitl?"'"P'3:3.t'ftlll:"'"'"' Anderson 6 tlastings; l'lr. Gary' Murrian; PCL Construction,- Attn: -lt'lr. - Denny Arnourl llRS Consrrltilnts, Attll: Mr. Lcs llood; n111 Carr Steven L. Pawlak REI-I) OBSERI/ER APPRCIVED SY i Chen€Northern.lnc CdtdUDe &re|llrr gtd &lrihr REPORT OF EXCAVATION OBSERVATION To: JoB No. 4 3es 9_0 DATE 7/26/90TOI1IN OF VAILAttn: Mr. Stan Berryman DALY REPOF|T NO. j5 SHEEr 4 OF 4P.0. Box 100vair co 81658-0.100 ll"lvolcE No. PROJECf Addition to Vail Transportation Center, Vail, Colorado E(CAVATION FOR: 12t x ltl1'r footing LOCATION:B Line, Grid 38.? - 34.5 D(CAVAIION BASE ELEVATIONS: r50.6 Iens clay ?C. IIATERIALS E(POSED lN BASE(S) OF EKCAVAIoN(S): tindisturbed natural soils wereobaerved at the base of bhe footing from B Liner Grid tB.A - j?.j.of cray wag observed fron centerline of the rooting to- 6t soulhr- thelens extends to a depth of l-r to 2.6r'below footin[ base, CrLd j?.5 REIiARKS: BS.B Excavatin8 tobring structural fill back subexcavate footing toto desi-6n footing grade remove clay lens andin conpacted Lifts. \EtsBAL COMMUNICATTON WIH COI{TRACTOR, ENG|NEER, ARCHmCT. OWNER: Les Wood advisedof the clay lens location at footin! excavation. r,Vater seepageencountered at base of excavation at Jt below footing base. [{aterialsgxposed after removal of clay lens were srightly silty sandy 6ravels,2rr-3 crushed graver praced in water area and tiack packedr- sfructurilfill then placed j.n coropacted lifts to base of footing gride. PROCRESS REPORT: Michael Barlrer Architecture, COPIES g11n; Mr. Scott Ward;q;a1y Murrain Anderson € Hastings; PCL Constiuction Services, Attn: Mr. DennY Armourl URS Consrrltants, Attn: Mr. l,es ltlood; Bill Carr Steven L. Pawlak RELD OBSM/ER APPROVED Ff ^s A rrlrlurt PiqtTETxr{ to ctrrrl n|( purt A]., driralw\ aj. RfFoint reE Srro.Trrlt As t€ fDfrrxn^f Fno?fnTY of oul o r].xl, A3 Arrrfill^mf foi tta-E^-|x'.(t.'|^ltlfx|s'c{r€lnEoiutnrc|s'|i(|.(|R,.tor,u'0(l,ll'|lt-'\x|3s8trUn,urP€Iu'$qfirnr[x^fl1lo,A.5Jl|iI5ruE:Dt'ql,6lFlt.|l6|r{|qrAr|fD urlst onri xri r|rlxn! fra ,oitltr to Dr t|lnHo ^ ni-r-.a *(@r.t .t -.,rra.l- Frrrr Xo, c|alolA l./t(t Chen€Northern.Inc.Co,|.d!m Englrr... !'|d sd-tLH, REPORT OF CONSTRUCTION ACTIVITIES rs a rlml.l lnrnrtEr to flr ni rf, wn-c x|' o(|traq r{r- |fr.g!]! ^N€ 3urrrrtyn as trf cdrl|rtrrlt-trrtrrtt or Gt! orrrt ^'ro a'Trquatr'| Flt Tttl u- rrr{ d. sr^rr.rrs cquqr.r .n tfr!!!r! l!!! -g! -!tFlII! ar auqiri-d-m:tnil'tddtto-irn rwrU iprfrre- srfLE tt lf o6t'qID or mr [ttG E crrrirrul uuss ottrr rra^,€rtrxts lll{ lpth lo fi wnrr€' ^ i'nr- .t -[Xiii-]l.r 6. ooarr- rdri '|o' cLl@ 4./tO To: TOWN OF VArL Jou No. 4 398 go DAre ?/27/90 Attn: Irlr. Stan Berrynan DAILy REpORf NO. 35 SXEEf I Of 7 P.O. Box 100 Vail CO 81658-0100 llWOlCE NO. pRO,,ECf Addition to Vail Transportation Cettter, Vai1, Colorado WEATHER cONDmONs AND TEMpEp;qTRE clear, BOo CoNIRACIOR'S CONSTRUCflON ACrIVnES PBSO}TNfu [A'OR EQUIPMENT! ICIMTIES: CHO.I-NORTHERN'|S SITE ACIMflES FuIl time observation, testing and inspectionof rebar being placed for footj-ng and pad R Line, l,B.Z :34.5, concretebeing placed aane area at BO cur $dr and concrete being placed for slaband curb west end parking ranp at f,I1 cu. yd. Compaction testingnaterlals belng placed for subgrade for paving curb and gutter north sidefrontage xoa.do llxcavation observation for footing and pad Level oneneu structure, Line B7 - A0 Grid JB.5 - 39. VERBAL COMMUNICATION WTTH CONTRACTOR, ENGINEER. ARCHffECT, OY'}IER Michael Barber Architecture 'COPIES Attn: lulr. Scott ltlard;Gary Murrain PCL Construction Services, Attn: Flr. Denny Wootl 1]i11 Carr Steven L. Pavrlak FIEIJ OBSCM/ER APPROVED FT . Clien€Norrhern.lnc C-d:/thc trdF-r -a tffi REPORT OF FIELD NUCLEAR DENSITY TESTING a3 l w'rJ ( tio!?crua E cltxnt nf, FnE ^)o (t.ftn!t!. al, ftF rr Mf IF.'I.trD N tr': cE'|.I{)trur Pti(rlfrtY 0lr o(t crfx|:t rr{ |rtl!E|lc/']D{ mi i'tl t,r- rDr G JraFurxTr. (,Dqirlxr.E (F rfirrcir rFx 0n irq^rr.€ or nnofr'g-iG.iiir'-niliio-cn nnor i+;ova- srrt1"6 Yrr E D(For.D f rfil ritD'o 6 coarnD tx-cl (mtt l.F.|tt|,|I| rI lltllJt lo fi rEtlr{\ ^ .a.- t -@* ,.-rr'- tnrr r\ c{lE7 a/E To: Tolrrrv oF vAI LAttn: Mr. Stan Berryrnan P.0. Box 100Vail C0 81658-0100 PROJECT Addition to Vail Transportation Center, JOB NO. 4 .398 90 OA,ILY REPORT NO. TNVOICE NO. Vai1, Cglgrado o^Te ?/27/90 36 sHEEr e oF SPECINCANON COYPACNON & MATERIAL MINIMUM REQUIRED IN-PLACE DENSTT 95 jr A5 CONSrRUCnON CONTRACIOR: Il,&ll Excavating 651 ASTI.{ D155'l under pavemen snFcTED By: Chen liorthern DE:IERMINED ET: LOCATIONS WERE THICKNESS OF UFT 8.4 r€Qo NUMBER OF PTSSES AS rEq TYPE AI.ID NUMBER OF FARTH MOVING UNrIS TY?E A}.ID NUMBER OF COUPAC'IION UNTTS MFIIJOD OF ADDtNc MOtSn RE natural I I DB, 1 grader wheel roller LOCAT]ON DEPTH OR a-a/AnoN (FEFr) tAsoR ToFrr NELD PBC€xr tr(Rrl rtt€/ u xrAr) o{tTAlSD SOIL T}?E rt)l NO.I/AJ(IMUM Drr DENSTTT(Dcf) OPT|MUM MOISTURE CONTENT(x) DFT DENSTTY h"t) MOISTURE CONTENT(x) t57 L5B L19 160 g1s. g+00 Sta. 12+00 gtrs. ][+00 Sta. 20+25 l r 6r'Bac l r 5|'BDG 1r 6'rnRG l tllapg 140.O 140.0 140.0 ].4O.0 6.L 5,1 6.r boI L55.o r15.2 L1r.' L3'.L 6.0 6.2 6,0 6.3 yo 9? 96 sl, silty sandygravel ll tl E N,LL TIME OBSER/ATION N PAJTT TIME OBSEF/ATION l|{r f,FOr rifr}ar! c'irq'r! TfrtED a! iEt tt tr o.t otlttry^rrtrs (r nu P1 rcf,]trf).t. *[ r6W FnrrD ol{ rHr c.tflNlcT{n TO Clt{ttll'r 'Pt'l'rtrc tlf ftcoat{}|t|tD G0rr61tw Efroirr ^ro uGnlf m ntl ujitf.o nt t.rt, rrrx'r.'-ff;;;-lrl_q6rfrvll€_Q,Ftr rrt6 ra5'6 a^f l'r^ot tr nrl '.'|l o'r I AS XLEVTD t{.6:<{lT r9 rrLFATf q.t oEltyfr:t JIJDq).ofl. II5r Ir^rA f{. }rt llf gI BAgr rcn qTlxrS olt f)lrTlf,..R t}lt nu vl':E.I3 lttc''jt ID'l' IHE ltt c{I R DE'.soAtEIfR trEl}m OF lE'nrrc W S t]S@ tN SU8SIAHTUL ICCOROAIIC€ I{IIH AsilLl 02992 ANo n]O!T Subgrade rrpunpingrr observed at Sta. 9*Oq - 9!2O.-- Sta. L7+5O - lB+50. PREJMIMFf OBSFJRI'/ATIONS A,ID/OR TESr RESULTS \ERB^LLY REPORTED TO: Les Wood PROGRESS REPORT ThC AbOVE for subbase for Pavement were perforued curb and gutter naterlal belng Placednorth side of frontagetest6 and on at road.Elevation from exlsting travernent. .",orFq Michael Barber Archit_ecture,w'r rr-' Attn: Mr. Scott Ward; Anderson G Hastings; llr. Gary Murrian; PCL Construction,-Attn: -Mr. - Denny Armour I URS Consul tants , ' Attn: MT. Les wood; Ilill Carr Steven L. Paw1ak REI-I) OSStrIVER APPRO/ED AT . Chen€Nortlrcrn,lnc.erdlt' [tCn-r ri Lltltldr REPORT OF REINFORCTNG STEEL OBSERVATION lr A qrnllt ti'ftcnoa fo atrxtl ]lf tr|t ro dttrtwl ar |l'r.lltl rrf lurrrlfD At Df oqtlqtqll--lE?r;rrY cr dti o D{rl |ro A'l}I)KurI.{ mi PtJRrcA- no{ (t sl^tttrxtl ooxclrp! qt frlr*cllt trll! ol ifo.^o}l ql xlofr-n-minil tfiitir-qr rwllrx rr?irar- rrr?ltt ru r ltFqrl 6 rrtrr tt t€ B o(laa-fttr u.Ir6 olltt lfr$I,rjlxll ,lf ,A/rtll, lo tl lslt€. ^ "...nt- d ,-lTii[l r.r ., E r-.r. tdnr ,it. CLlla a/F TO: TOl1N Attn: P.O. Vai I PRO'EgT OF VAIL Mr. Stan B-errynan Box 100 co 81658-0100 Addition to Vai.l,'l'ransportation Center , JoB No. 4 3e8 9o DATE: 7/27/90 OA,ILY REPORT NO. f6 SHEET 3 OF 7 r.{votcE No. Vai 1, Colorado srRUcruRE Pad K footing t-oc^lroN E EVATON RE{FORc|lE cqa|Erfis \fiR'nc L lroRrzo.{r L B Line 38.2-34., Lrg,6- 150.6 20 L? #B }B #B N-s #B E-1|/ @ llrr oc frJ cont, Pad Schedule K Eq.spaced footing SPECUENPT.S: SIEL Gf,AOE: R8tfmqlfil curflt0{€slr cr,.E RAt{cE At{D COV& a8 SnrcfiC SPECSEAIP*5: as 5o clean req req F nrxs uso Kl snoe DnAtllrcs usrD b *.r" cron -n*& ruu-nue ossERv noN E mrr-nue oosa\' ltoN rlPt c€ @lllrt rlcE U€T PR(I'ECI UEI PROJECT R€t|tnR€nE{IS REOUn|oTo{lsh{N NrIratY w{o{ SAN g.PPORTSg TIPE M{FH Brlck 3'l DA]E RE-DGT.IT€D dalulg) w{th project specificatj-ons and plans. RE-O(^|IINID be placed in conpliance Michael Barb.er Architecture, COPIES Attn: Mr. Scott War<l; Gary Murrain PCL Construction Sewices, Attn; It4r. Denny A:nnour; Anderson $ llastings I tlRS Consultants. Attn: Mr. Les BilI Carr Steven L. Pawlak RET.D O8SER1/ER APPRO/ED Sf . Clrcn€Northern.lnc Carr(l|t &{h-r -ta Sd-{l& REPORT OF CONCRETE PI.ACEMENT OBSERVATIONS Al A lLttlrr( lEttElDx nt arxnl f|C turt ||o art;Avtl Al rlFctt! r,rf, t'itngD At nr mr"rl nlt--m('.frtY f Cr'l d fxl!' lro 'lm6lllEx lll |{R-EA- nt or tfrltLxtt otttlr,qti G rtnrcxt Ti.rr (! ttto,rt€ cl ruwi:*o-idnfu'lriilrp cr -twtiu rrrovc 3rt,rut ir't tc orFcttD cr lrnr rtrtxt B ooaarflrD ult tl st|Ir ||iaoaran ria r[ID ro x lrll[. A m-nts r s.(XtX lrt d eavr. t6 ||. Cllll,|| a/ro To: lgNN 0t: VAIL JoB No.4 398 90. DAIE ?/z?/goAttn! Mr. Stan Bcrryrnan r,.o. Box 100 DAILY REPORT NO. J6 SHEr 4OF ? Vail C0 81658-0100 NVOTCE No. PR0TECT Ad(liti on to Vail Transl)ortati. olr Cclltct'. Vai l, Colorado. sprDrEArpils au'up 3-5 An co rE{r 4_BSUPPI,JER l|IX tD. AISE}IT IETPERA]URE R^}ICE Irlrtt{L Tnrrc|(to.Trc|(ET hro. lIUE 0AICI€) TIUE ARnn E'rur€ sA.Pt.E, RE\rcUNF @UFTER I[{TN RElOurno0l couFTER @uP[-Ellorl 3rrlrc Ytftrslt o/ C{JUUIAIrvE !l lEn Arx'@ o u.oi{$ I I ? 4 , 5 7 8 44 54 II4 46 44 54 106 46 0112f8 ort73g r240 124r_ L242 L243 L24' L246 7 243 8zQ? A.7n 6|>> !:oB 9:22 9 t5a l0:11 7 255 B:16 B:54 9:o5 ,9224 9:32 10:O4 lO:2O Bt32 aE reg as req as req as req as req a6 req as req a8 req as req as req a6 req aa req as req aE req aa req aa req 16 24 32 40 4B ,5 64 ) gal. 0 0 4 0 0 rBr HL su,lp (Dr) AIR OI{IEII(r) TET UMTwtrln (Pcr) lttlo con|caf,IE TEIPE- RATUNf, co REIIAIU€ 2 4 L/2 7O ! cylinders cast sample taken fron bruck ^.,orre Michael llarber Arcltitecture; Andetson & llastingsi Gary Murrain PCL Construction Services; URS Consultants;FIE"D OBSEflIiER APPROVED BT , ClrcndNorthern.lnc Co.:lir||| E CIE! lta Sd-lr.a. REPORT OF CONCRETE PLACEMENT OBSERVATIONS A' I qrnA ?EntDt I0 cttlfft rtf r|tf! t ar ottrrtrS ar. trrt(trt! .rr J,f,tfl''D at nr oor!)axr$r--Prd'rritY (t fi|r d rrt3. f||.' x'fiEltrltDr rm R|i'EA- no, 6' tr1tf5r6 o1;atrrr.r oq 1a1ir6'tr t"Gt of r1q^,r6€ 61,a prorfr'o*ru--_nio"nriic-on -wrllx ,rfi'ot'a- s r'llJr nt ![ lxFcrD 0r lnrl lE tl! It o(rtul'lD ua.&t! cfllt ,n|rorxrt |lf ,fiID lo x lrtrfl' ^ '-.- d rfEifr-lr.t .. ...rr.rb lri || Clall.|. a,rto To: 1g1vx ol; vlrr, Joll No. 4 398 e0 DATE 7/27/90 nttu: Mr, Stalr lJcrrylnan zA _ q __ n t).O. Box 100 ' DALY REPORT NO. rv SHEET /OF ( Vail CO 81658-0100 US/OICE NO. eEqlECf Addition to Vail T'rarrsl)ortati.on Ccntcr, Vail. Colotarlo. slrpnnnli/.l{obiIe SPE TEATFM* lutx tJL A 1-5 An courET 4-B ATEE}|T 'IDIPER^IUFE slr,lP fo00 Mr.rc€ 60o-Boo TESTln rRUCt(MI llc|(ET NO. Ill|€ EAIEHE) TIUE AnfitrttD TUE$rPtg) Rf\,OUtrXH corJr{rEn sEosl RE\OUfinr @UNIEN couPt-EIptr ;UBC YIMt9 Dl CI.'UUIAIII.E IYA-IER ADO€T anlloars I 2 3 4 , 6 7 2B 44 100 ,4 105 46 r24g t249 Lzr0 L25L 1252. L2r3 L254 IO:59 I1:18 1I:25 LLz37 11:47 12:08 11: t7 LLt22 tI:40 11: 5l 12: OO L2225 11:48 reg req req req re![ req as a6 as atD as aa as req aa req as req aa req as req aa req B I6 24 32 40 4B 55 o 4 0 U 0 4 rEirtn sll,lP(ur)tnoo{rt}fi(r) TET UNTT wocHr (Pcf) Yta^o OONCNEIE TEIPE- RAIUnf cF) RETAfd(s ?3v4 boZ 7O 11 cylinders cast(supplier aj"r test at 5.7'E)on-site Q.C. l.tike Miller Ticket missing. f was dolng con-paction test for B&B work north of frontage road. PROGRESS REFORT Tine observed on al} trucks, except 5-6. A compactionteats was in progress. ..,norsr Mi clrae I llarber Architcctulcl Andcrson fi llastings; GarY Murrain PCL Constfuction Services; URS Consultatrts; 8111 Carr Steven L. Paw1ak FIED OBSERI/ER APPNOVED Bf ' ChcneNorthern.lnc C..r.,|ft &rthr| ti Sd-|t|.. REPORT OF CONCRETE PLACEMENT OBSERVATIONS ar A l.rnlr., trnltDl lo otrxll 1|l E ,rfr qrFfltrt a! ro|fit! ^m :nffil'D ar nr cot-oo{ll t'--tf(trrrY or c|t cr f}lt!' r'o a'nrtu trfl ^l fu('lcA- rl.. o' srarrrrtnt cu{rrrrri (r rtrucflr if,rrr dt ifq f,pa c.l rtr#'a-Eiiiio miird-cr'-trtirx rr*wl- 3lf'u;r ru DE dfimD c/ rnn lttlt*t B comrlD u(ttr otHl' ,;a.Daxlt tia l[r.D lo r lrfie ^ iii- 11 1.{Xii7lr.r r....rr--. f-r h Olll,L a,/ts To: 19g11 orr vAI LAttn: Mr. Stan llcrrynan l).0. Box 100 Vail C0 81658-0100 PR(ITECT Atldi ti.on to Vai. l 'I'Tansl)or.tati. on Ccnt.cr', JoB No.4 jes eo DAIE 7/2?/90 DALY REPOFT NO. J6 SHEET 6OT lhn/OICE NO. V;ri1. Coloratlo, SAErpArx,tB SuruP 5uppLmrt/.lfobile su r.ol A fOOO 3-5 ^n coilrarr 4-B laE{I rEuptnrruRE R nc€ TESTlo.lRrrct( ML l|cl€rlto.nrEl^rcl€r lru€ ARfiVED Tlu€s ltPt ED RnOufircil @UNTER Ep0{ REV(xl'nOal c(xr'{IER @uPtEnoa{ ;lr&c YARqi t-oro/ CUUUIAIIVE w lrR AmE) o^LlJot|s B I 10 44 roo 54 Lzr5 LzrA L2>7 12:16 L2226 12:19 L2234 12;4O L2:5L as req a6 req a6 req as req as req aa xeq 64 72 BO 0 TEST HT, sunP (Dr) lrR C${IE{T(:) }ET UNTT ftro}'r(Pcfl YIAD @NCREIETfifiE- RATURE c4 ffv ro€ PROGRESS REFOFT ^nDtrq Michacl llarbcr Archi tecture I Anderson G llustings; Gary Mumain PCL Constructiorl Scrvices; URS Consultants; BilI Carr Steven L. Patry]ak REID OBSERIGR APPROI/ED BT ' Chen€Nonhern.lnc C..rrrltLE 6nf kxr .l|d Sdf,tlti REPORT OF EXCAVATION OBSERVATION rs A !uTu{ pi(ntcT[r to crfrE, tf pttiE Art) o(tigtl.tt:, {l RtFoitS l&6 s{it!rm ls n[ drrDalfut PFo?ftrY of oui ctf.]all, Aro arnoruAlDl tQi ?tu-EA-lr'|fs|A[Itr6'(dr€tu1'6onl.rlnAj|s|ln8.(nttu,,n|irqJ|rXrAxt361tt5|,m!Pf,t(,ttE0ulr'n|[x|f"xXA.s.t{'u5ltllL.otFcll.Jf,fIlE|6ur?u.Iu, t|tar5i onai l.iurlt{Irat! |,lt .toillD lo |la brnttil ^ 'Er.' e. *(.!Er-r ., .'roir rrrir t5. Ctftol l/to To: JoB No. 4 3eB e_o DNe ?/Z?/gOTOIllN OF VAIL Attn: Ilr. Stan Berryman D lLy REpOFff NO. 36 SHEEr ?oF 7P.0. Box 100Vail co 81658-0100 llWOlCE NO. PRG,ECT Adclition to Vail I'ransportation Ccntcr. Vail, Colorado EXCAVATToN FoR: Footings ]t x It and Pad llr x lLr x 2l LOCAT1ON: Line AO-39 - P',4-39 o(cAVAlloN BASE ELEVATI'NS: 159.8 L/a - LrB.g r/z 'yIATERTAIS EKPOSED tN BASE(S) OF EXCAVAION(S): Natural observed in the footing area6. Ground $iaterat the base of the pad. undisturbed soils were and si-lty sand rvere observed REI'IA,RKS: Pad area was2 feet below design padgravel. Crushed gravel bearing level. mucked out and punped drytbase. ',iaterj.al exposed was was conpacted in lifts back overexcavation to aboutslightly silty sandyto design footlng VERBAL COMMUNEATION Wrn-l CoI,ITRACTOR. ENGINEER, ARCHffiCT, OWNER Les tjjood advj_sed of the ground lrater and overexcavation. PROGRESS REPORT: Michael Barber Architecture. COPIES 1111 ; Mr:. Scott lrlar<l;611y Murrain Andcrson G llastings; PCL Con st i't.r cti orl Services, Attn: Mr. DennY Arntour; URS Constrltitnts, Attlr: Mr. Les tVood; Bill Carr Steven L. Pavrlak RN.O OBSEfII/ER APPROVED FY OrenCNorthcnr.lnc.Con'dlrnC lrlLt s. otd Sd-db. REPORT OF CONSTRUCTION ACTIVITIES As ^ qrnr r nirnrrDt ,tr -qtftq qf, RnF r}I) outtftwt 4r !!t!!!! |,lf lstlirtrm As ni cofrrf,xl1.1l-tqtlll';lrJl1gtmfffi"m't$3Ftr; io.i rr- sirbilni--crflcru:m.! on txtrr;n rP(^t ort fir.ufitro oiJi R.Foftll E RlJln/u] ft]ltfto dn rfilnx comltD uusc gnr.t mR ra.rar{rs {tC l&tD l(.| ul w'ollls' ^ n-tt d *@* ol rorcrrr Jdr ab, Ctaloz| a/aa To: TowN oF VAIL JoB No. 4 398 g0 DATE: ?/ZB/9O Attn: Mr. Stan Berrynan MtLy REPOF|T NO. f? SHEEI IOF 4P.0. Box 100 Vail CO 81658-0100 llwOlCE NO. pRqrEcf Addition to Vail Transportation Ccntcr, Vai1, Colorado yEATHER coNDmoNs Al.,tD TEMpERATRE clear, BOo CONTRACTORS CONSTRUSNON ACITVMES PERSOT.INEI.: TAIOR EOUIPMENT: ACTMNES: cHEl.l-NofltHERl{'s srIE AcfvTnEs Ful] time observatlon, testingof excavation for footing, roinforcement bar inspection being placed at Llne B.5 A0 Gride 39-36. and l-nspectl-on and concrete VEREqL COMMUN1qANON WTTH CONTRi{CTOR, ENGINEER, ARCHTTECT, OWNER LCS IJ/OOd AdViSCd Of wet irpumping'r material at base of footing A0 T,ine. I''tichae I Batber Architccture ,COPIES Attn: Mr, Scott Ward;Gary Murrain PCL Constructi:on Services, Attn: Mr. Denny Arnoua: Anderson I tlastings; URS Consrrl tants, Attn : PIr"--!,e!Wood Bill Carr Steven L. Pawlak RE D OBSERI/ER APPRO/ED BY , ClrcndNorthern.lnc REPORT OF CONCRETE PI.ACEMENT OBSERVATIONS ffir ^rE rr., o.rrr..*r. al i'dns 4,. :r.-...flrD a! rf oorrtrlrl!--Ff,(rtttY .''dt d ftrt* ro a'Dlrclm '0i '.tl'tr^-mN r- ln^rnarft ooxcrlr.'r qr frrrcii arrx or iforrpl olr nrnd'n-ffinio-lriiiiri-o.i-rmrlrx-iii*il- s ltttrt nr" E rr'[D r 'fllr IEJrD{l G inrutt'l urr:r orr rancorn rf, E tl.D m H rrrlc' A r,r,,- . r,. (J:ttX-lr.." d .irrr{- 7.r th cr.lt{t a./ho Cddurt tn0ft-r tJ sd'ta... TO: ,fOt11N Ol; VAI L Attn: Mr. Stan Berrrnnan P.O. Box 100 Vail CO 81658-0100 PROTECT A(l(li t i on to Vai I Trarrsuortati.on JOB NO.4 3ss 90. DALY REPONT NO. IN\0lcE NO. . Col orado. DAIE 7/28/90 37 sHEEr e oF Ccntcr, V;ti 1 sftErrc$nil* lu,|tP suP?un l|l.Mobile lu LD. A fO00 1-5 ln coNr[}{r 4-B ||AE{I TETPEMTURE R^''ICE 5oo-Boo IEI t|(L rnt,c|(lo.IrcXET M'. nl|€ aAIGlt6D nuE ARFVS) Tltr€ SAIPLED RnounpNcou|fin EO|ll R€\OUrmil @UNIM COTPLEITiI ATIC YTXIE t-o,'D/ CUI|UI.AI E UAIER AOO@ qA!LO$S 1 2 3 4 6 ? 119 4B 46 100 44 119 46 L268 L269 L27O L27L L27z 12?3 t274 L2:OJ L2:Q9 L2224 1:08 1:10 I:48 2:43 .L2:42 l,2243 1:10 I: lb 1:20 1: 58 2zL3 L2:50 as req aa req as req a8 req aa req a6 req a5 req aB req as req aE req as req as req a6 req as req I 15 24 32 40 48 ,o,50 0 a U 5 4 4 z, lESrilI sutr?([t)IR ODIIE{T(r) TET UNIIuttoltf (Pcr) ]IEID co||cnElE TE}IPE- RATURE co Rfr$tu(s ?1u4 5.o ?20 { cylinders cast PR0CRESS REPORT Sanple taken from truck. Time and viaual slump observed on each truck. nnptF\ Mi chae 1 llarber Archi tecturo I fuidcrson I llastings; Gary Murrain PCL Construction Servlces; URS Consultants; gill Carr Steven L. Pawlak REID OBSERVER APPROVED FY Chen€Nonhern.lnc Coardth trnh...! cid Sd-ih. REPORT OF EXCAVATION OBSERVATION A5 A ywurl FitfctDa m frxB, llt€ RJtf,{a, oui:nlvt!, Ar. itP(ft:i Itt srr rrrD at Irf ctatllxn4L PnoafiTY of orri o.fm3'.^}3 Attx!a^rDr toi tr'Er4- |rlQJ|^n!tX|s.q|eu'I'|3oh|rIM.;|5'noudtRtoA|!'.qcrernr<rrrt:-cxrytwtDRtrqu:ou|rrnl]t'|A?f'A.s4!r,u5ruEtx'qt'(ll.,fIt'lll€6(:rft-nrl, t}rr-51 0rlrl rrirarrrl|l:r rrc tqur, Io Dl |tilw|} ^ 'i..!.- .f t-[if Uf lr-r , *rlqJ.. f.ti |.r. c{loJA a/lO TO: TOI{N Attn: P. O. Vai I PRO,,ECT OF VAIL Mr, Stan Berrynan Box 100c0 816s8-0100 Addition to Vail Tr:ansportation JoB NO. 4 398 9-0 DAILY REPORT NO. lt{volcE No. Vai1, Colorado DATe 7/28/90 37 sHEEr J oF 4 Centc r, E(CAVATIoN FoR: Footing 7t x Lt LOCATION: AO Line tB.B - 36., O(CAVATION BASE ELEVATIONS: 160.94 l,lATERlAtS D(POSED lN BASE(S) OF D(CAVATIoN(S): llatural undisturbed Eolls were observed at the base of the footing. A layer ofrrdumpingrt slightly silty clay was renoved aL 3r-9-36.2 Lo lr below design base of footing. Ground water was engountered and was removed. A compacted layer of crushed gravel ulas used to re-establlsh footing grade. REIARKS: The footing bearing conditions appeared suitable for support of the design bearing pressure. VERBAL COMMUNICATION WTTH CONTMCTOR, ENGINEER, ANCHIrE T. OWNER: PROGRESS REPORT: t-li chae 1 Barber Architccture, COPIES 1111n; Mr. Scott ltlard;5;11y Mur:rain Antlerson & Ilastings; PCL Constirrction Services, Attn: Mr. DcnnY Armour; l.fRS Consrrltants. Attn: Mr. l,cs ltlood; BilI Carr Steven L. Pawlak RELD OBSEitl/IR APPROVED FY ' Chen*Northern,lnc O.rdht lr{3r| ri t ,tru.', REPORT OF REINFORCING STEEL OBSERVATION ^r A run}! tf,rTcraa ro c(fxn lr( ilE Aro drtttr:t, ar !q9!!! r|f 9-t T|TD ^i nf cotllxr$t-FFftml G dt clltfil T o A,llsn(l^rDl tsi Ptfr^- ru. o' st^rrr.Jfll oor(llm.r oi rxri.ct! rtrtrr oi iaorrr€ c.r rNin-a-ninio'-nitdp-q; rwrrol Atttst& ratrtj tu f rrcr' 0r rtr:r rtllrlo 6 ooJnrn! rr{lrt o|tat l*f€lllxll lf, ,o[t-D lo l{ t'l!lt€' ^ fi-'.- .. rr{-lttHlr-r .. -'"|'d*. ro: JOB NO. 4 3s_8 e.0- onEz 7/29/)0TOWN OF VAILAttn: Ma. Stan Ilerryrnan oAlLy REPORT NO. 37 snfff 4 of 4P.0. Box 100Vail CO 81658-0100 lf{VOlcE NO. PRGTECT Aclditi.on to Vail Tr.rnsportation Ccntcr, Vail, Colorado SIRUCTIRE Footing Jr, I'ootin1 7t, Pad LIEAITO|{aEv^rxxl RAnFORCU{C @rato{Ts !6nclt'HOfUtOafiA 8.5 @ 39 AO @ .36 B-@ 39 160.94 L6O,g4 L59.gg #4 @ LBtt oc\ fiJ cont. @ llrt oc /15 conl. /,tJ cont,. #? each tt'6 { t.? L3 4# ry lfu @ Lztt J sldee @ off se #4 @ l8t' oc J sides @ off set cont. 11 @ 5r splice topJ #4 standeesbotton nat Schedule sPEqrEArloils! SIEL GR De 60 ffrXFmqt{c GtEAXt0€Ss: gl ean cutn^r|cE A o ool,Eft as req SPIJCIHC: SPECTE IPTIl aB feq a f, slPPofiIs: TYPE brick FHEfl lfoct{T 3" F n,rxs uset El snor DflAwrlrcs usEDp corrnrcron eomeo E ,ruu-lue oeaEfi/ATtoN E prrr-rvs u!$rwAnon uPrrcE co|rlPAllce yes UET PRGECT UET PR{}JECI oalER€rru|FlIrEXEi RfQulnoroals nr-o<,nrwo|rrDt lNllutlY wrol E(^TDT@ R[-O(^TINED PROGRESS REPOKI Reinforcing steel was placed in general conformancewith project plans and specifications. Michael Barber Atchitectule, COPIES Attn: Mr. Scott Flard; Gary Mu.r:r'ain PCL Constauction Serviccs, Attll: lt'lr. Dcnny Arrnourg Anderson & Hastings; tlRs Consultants - nttn: Mr. Les Woocl: Bill Cam Steven L. Pawlak R[lD OBSER/ER APPR0yED ry tlfr trd. C{llr aro Chen€Northern.lnc.Coordlft'g tnsl,!-.. ot kr.,Utl, REPORT OF CONSTRUCT1ON ACTIVITIES as ^ qmlrt m('rrrclE t ro -q {t{E- rlt FIEE rro (rnr'lvrt ar !I !!!. r,rrt 3lirurrrD As nr coftnrxrer- .ffirf tHtrF* f,ffiffi1r ffi."; ?iri' rr siririijirr--cnrcrtnurr ,rt t;;r;;f iirrri 6n plrr6r.o qrt ftFom:r E RIJIRYTD tflott€ oltl lllll'lljl ctnrrur trrrss olr|lJl lliwflfxls ,Jlt r&I.D lo ltl wtltlt€' ^ 'r-rtr.a rt (XU-lr-r.. cn"ti- rr ||o. Cr.Elql^ 4/r, To: TOWN OF VArL JoB No. 4 398 90 IATE: 7/3O/9O Attn: Itlr. Start Berrytnan DAILy REpORT *O. JB SHEE; 1 0F ?P.O. llox 100 Vail C0 81658-0100 ll{VOtcE NO. PROJESr Addition to Vail Transportation Center, Vail, Colorado WF.ATHER CONDmONS Al.rD TEMPEMTURE c1ear, 4Oo-BOo CONIRA TOR'S CONSTRUCNON ACTMNES PERSONNfu TTA|OR EQUIPMENT: AGIMIIES: CHE}I-NORIHERN'S SIIE AGIMIIES Full tine ob6ervat|onr testi.ng and inspectlonof excavation for footing A0 Line 35-32.2 and B LLne JIa.J-]O.5 and Lines B-B9 Grid 5I. Inspection of reinforcing steel bej-ng placed ln Footing A0 Line. Concrete teeting of 52 cu. ydo. being placed A0 Llne. Compaction testing north and south of B l,ine Footing 38.2-35. Obseevati-on of excavation for Stair ]tlo. 10 footine and slab Level No. 2. VERBAL COMMUNICA;NON WTTH CONTRACTOR. ENGINEER, ARCHTTECT' OWNER SCOtt GTCEN Of B&B Excavation with regard to grade for footing Stair No. lor Level Two. Also Les lt/ood, o\'rner representative, Denny Armour, contractor superinten- dentr and Scott Wardr Architect representative. Ir'li chac 1 llarber Architecture,COPIES Attn: lrlr. Scott lrlar'<l;Sa1y lvlurrain PCL Construction Services, Attn: Mr'. Dctrny Arrnour: Anrlersorr fi llastings; -. LIRS Consrrl tants, A!!llj l\4lr--!.:S: gll BiIl Carr Steven L, Pawlak REID OBSERVER APPRWED BT Chen€Northern.lnc Coirrt|.re &'f lrEt .nd S<rtiH. REPORT OF EXCAVATION OBSERVATION as A raunl^t PiortE.lDr nt cuxTs, n|f puu-E ^|r, (x.rE rtw!, at N{I|c|rnl !r€ Sur.lrD A9 nE co.rrttTA Pfcfift of o(Jn cfxl\ &! AmsIlamH toi lua.cr-lt'.|0srlI'|fx6'q'€t.Er'.](ntrlR|(1s't(r.{n'itqr,{trou,|||{t}'0{lf6[lf.xt1Dt{,|u|tEtI,lmrrtn,.^f?t('^|.9r.t[5ruEo.r'o*.Do..u!B|6(:r?tlltl, tll|l5l onll rJl|lrarnaxE rrt( r,|lIrD l(, D,t tr{Iul(L A "'r.r d r..[fffft--lc.r J oorrecrro rrnr rb, CUttOJ a./t(t To: JoB No. 4 3es e,s DATE 7/30/90TOIllN OF VAILAttn: Mr, Stan Berryrnan DALy REpORf NO. 38 SHEEf2 OF 7 P.O. Box 100vaiL co 81658*0100 ll"{volcE No' PRq,ECT Addition to Vatl Transportation Ccntcr, Vail, Colorado EKCAVATION FoR: Step footin8 and level footing LOCATION: Leve1 One to Level Tvro EKCAVATION BASE ELF/AIIONS: 65.L6 - 7r.66 },{ATERIAI,S D€OSED at the bases rN BASE(S) OF trKCAVAION(S): of the excavatlon, with Exiati-ng nanold rebart nade fill was obaerved concrete and asphalt. REI'|ARKS: Contractor,Reg. Section 3'7-rL2. B&B Excavatingl 0verexcavation advised of 3t deep and speci.ficatj.on6.9, wj-de. VERBAL COMMUNICATION WTr}IScott Green of B&BS-Ia, Section 39. CoNTRACfOR, ENCINEER. ARCHTECr. OWNER: Contractor forenan, Excavating advised of specifications - O2200-S and Les lVood advised of the communicatlon. PROGRESS REPORT: Michael Barher Architecture, COPIES 411n; Mr, Scott hlard;6a1y Murrain Anderson 6 llastings; PCL Constiuction Sewices, Attn; Mr. DennY Armour; tlRS Consrrltants, Attn I Mr. l,es Wood; Bill Cam Steven L. Pawlak REII) OBSEfiN/ER APPROYED B/ Chen€Northern.lnc,Co.t /fho Er9kxr cri Sd.in REPORT OF EXCAVATION OBSERVATION To: JoB No. 4 se8 eo DAIE T/3O/9OTOIIN OF VAILAttn: Mr. Stan Bcrrynan D ILy REpORT NO. 38 SHEE1 5Of 7P.0. Box 100vail co 81658-0100 lhlvolcE No. PRq,Egf Addition to Vail Transpor:tation Ccnter, yail , Colorado D(CAVATION FOR: Footing LocATfoN: B Line 3e.:>-34.i and B Line 89 at 3L D(CAVAIION BASE ET"F/ATIONS: MATERI I.S E(POSED lN BASE(S) OF EKCAVAION(S): l.latural undisturbed soils were obsexved at the bases of the footi-ng and appears suitable for supportof the design bearing pre66ure. RE}''IARKS: The footing area is sultable for forning and rebar placenent. VERBAL COMMUNICAIION W[}I CONTMCTOR. ENGINEER. ARCHrIECT, OWNER: PROCRESS REPORI: MichaeI Barber Architecture, COPIES 4g1n; Mr. Scott l{ard;5a1y Murrain Anderson I tlastings; PCL Constiuction Services, Attn: Mr. DentrY Arnourl tlRS Consultants, Attn: Mt' l,cs llrood; Bill Carr Steven ,L. Pawlak RELD OBSERIVER APPRO/ED Bf ,\3 ||Ulllrt Prorcrni 10 cttxE n|( PU E rrfr (rrisflvtl al Rtpoinl lJrf srnartm As ntt rsarrxrut FnGrnw f o(Jn (rr:M3. lr3 ajllslulafx'| t(||l ?tilr^-lf'|0l's|Alfn'(|lqr€|Lgt6olt'l|RAl;|sfl(!(,l&'ru,n|0qfktf,l|36|lt!trwo"txuru,lrnn|n*aro\,rLSrr.ttt5'uHD(r(xlttrrr!fltt uat5t oott ,attrrrltaxxt dlf reu) lo |rt tl!t|lx! | 'rri- c r'.[tttttlr-r .t c..r?'r- rrrrr r,b. ClttOJA a/to Chen€Nonlrcrn.lnc.Co||.Jljt|' &rfh.d t{ s.Llr.lt REPORT OF FIELD NUCLEAR DENS]TY TESTING as A rlrttlrt Prgr'GrDl D cttxrl' ]}f, Plit llo o.;:Flw]r- A! Rtt{'trr I,|if ri, 'Tl?o a't nf oOtlf}ttl{- ftd{irr f q|! orxnl |lo am![IltDl mi F-rnfa- rxr (F sfln:vrt rr. c(r€1r!rl!i on rnrrcr iF oR pao^^rr.ro c.n nrro6'd-iii:tliri-o -n-laiip u.n wtnun rrinonq- s lfua rr'r. lE ocFoltD coaurrD lrlll:l o$lt rDrr€t {xll flr ,olllo lo u llflllrxr ^ 'rrr.- ., ".[ff ffl I r... .. -rrdir Irir tao, CEIOTA 4,/F ro: TohrN oF vArL JoB No. 4 398 90 DATE T/3o/9o flSltu"l"lostan Berrvnan DALv REpoRr No. 38 sHEEr 4 oF 7 Vail C0 81658-0100 IWO1CE NO. l!9VECf Addition to Vajl 'fTansportation Ccnter, Vail, Coloraclo SPEC|nC nOX COUPAcTtox & yATER|AL fj-lt agains MINIMUM REQUIRED IN_PI-ACE DENSTT 95 ,r AS DETERMINED I'f: ASTI.{ D155l fOOtiNg CoNSIRUC'IION CONTMCTOR:R&B Excavating 151 LOCATTONS WERE SELECTED Br: chen I'trorthern + TYPE A}ID NUMBER T\?E A'.'ID NUMBER METHOD OF ADDINC OF FNRTH MOVING UNMS oF CoMPACTTON UNns I MOSTURE natural 1 front loader dual wheel roller1 junp jack THICKNESS OF UFT NUMBER OF P,TSSES aa a6 req req BTI'=Below Top of LOCATION 'ootinq DEPTH OR ELF/ANON (rEEr) l loRAToFlr FIELD PERCENT OF(Rtl IIvt/ lAxu4Ju)ottlllo SOIL TYPE rt)l NO.},AXIMUM Dft/ DENSTTY(ocf) OPTlMUM MOISTUIIE CONIENT(7j DRT DENSTTY (Pcr) MOISTURE CONTENT (z) r6l L62 L6a L6L L6: 9r I{. of B Line @18 l0 I S. of B Line @38 Br N. of R Line @ 35.' 9t S. of B Line @ 36.5 9t N. of B Llne @37 2 | BTI' 2I BTF I I BTI.' I' BTF Subgrade. t36.O 1J6.0 u5.o L36.o L36.O 5.9 5.9 5.9 2.9 5.9 L32.5 L52.2 1]1. B 131.0 r32.L 7 .O- 6.9 7.L 6.8 ?.2 97 97 95 97 sI. silty sandy gravel lltlIt El R lt 'nME OBSEF/AIION O PA'{T TIME OBSER/ATION rui rP(Irt Pitrrr|:r (P ultt 'In|{D ^3 A iEgJ(r of (t,l oFirlxr! or ntl Fir"vfrr' tt tt !tr RflJrD ot{,rxF cltoR^fl(x m cl|mM',c 'fftn|q nf FfEoa1,rmu c1;r'rctwf ufrrFr 1,,ro y1Enr11 m 1u- urnpo nu nws nnn',rh'ixr*rnii ,s-t.n orrmaro gnernrl rEsrs lF€ ru't (F l.' nt orY as Er-fvur xrg.sfrl rr, g{rnllE q;n otruwti.n Junrrrrr. rtsr utr,G;; lre;x; nss fG ofirnJS (,{ mlf llfta llrE nll. utEB srtqrE^ro( ntE Nt ctr R Dg..soraEIER yEftrco or TEsnNc s s us€D tN sutrsT NIUL lccollo^NcE wnH AsI D2992 AllD DJO17 PRBJMIMT' OBSEFVAIIONS AilD,/OR TESr RESULTS \ERIIALLY REPORTED TO: Les Vlood PROGRESS REPORf The above tests were performed on the structural fill being placed at Footlng ts Liner Level One. coprEs xiilii"t*li'B:5.t'ft']i5:cture' Anderson & Ilastings; l'lr. Gary lolurrianl PCL Construction,-Attn: --lt1r.- Dcntty Arrnour; tllls Consrrl tants. Attn: t\lT. Lcs l1looo" Bill Carr Steven L. Pawlak RELD OBSETUER APPIICIVED FY TO: TOWN OF VAIL Attn: llr. Stan Beryman P.O. Box 100 VaiL C0 81658-0100 JOB NO. 4 39.8 90 DAILY REPORT NO. twotcE No. Vai'l, Colorado _' DATE 7/3O/9O 3B sHEEr 5 oF PROTECT Additlon to Vail Transportatlon Center, TEST NO.LOCATION DEPIH OR ELEVATION (FEET) IAAORATOTT FIEU) PBCO{T Of(Fs^wE/ uNorw) OOTAIE} SOIL TI?EITN(IMUM DFT oENStfi (pcf) OP'NMUM MOISIURE CONTENT(x) DT{Y DENSfi (pcr) MO! TURE CONTENT(x) L 65 Br s. of B Line @38 Subgrade 136.O 5.9 L32.4 7.I 97 sI. silty 6andYgravel Mlchael Barber Architecture. COPIES Attn: Mr. Scott Ward; - Anderson G Hastings; llr. Gary llurrian; PCL Construction, Attn: Mr. Denny Arrnour; URS Consultants, Attnl Mr. Les Wood; Bill Carr Steven L. Paw1ak RELD OBSENNER APPROVED Ff Clren€Nonhern.lnc C.t- ha Ir{.Er -a ldra.a. REPORT OF FIELD NUCLEAR DENSIfi TESTING rr i |lml.t ?Fmcrrr tD qtrrl nr t{n! |,o oJirlwl At |'titltt lfi $r'mr At x( co!'I,r}{ [-tn].rt?rt G (tji dlma |'o ruDqE|In rfi F'lrF rrr{ q rr^nlrrnr .'na.r!c. oi rrn c1,r fl;1"1 11r ",o,.f,..1 gt.n rrxriii o*riinio"fubii-trrl -rnrrrx -iho*e- trln!:' ru r ut\llo (t 'fnr lfnla 6 qrrtrnD u{lrt d|lat ,it4rt{J{rlll rrl &|nllr lu L }filtlir' ^ ,n -.- J r.(Tlfl-lr.r .a -r.*.. - ., .|..a. .,6 Chen€Northern,lnc Crlilta t t.lnt -'i l&rlL. REPORT OF REINFORCING STEEL OBSERVATION rr A rrrntt ?ionctot ro a(rxq I|I 'rt.E ar! (lr:llttl 4r qtg!!.,,tt itr|ftfD lt II' o(ttlxtr.t fr'r-rrt l'. crt d ft(l!' l'l' A'I]$EZ^ lCi Ptn r - n.,n '" i^nrrfit o.rrllrfarr! (n rnr cir rrfla or rfo r'o trlt rxiri*c-iiiinio'-rriiiin-clr lsntrl rr+mnr- slrtE rrt * r@! or l'Ttl lE'll€ 6 otrt1firD irarrt olltt $l,[rrmt d ,|.ilr! lo ll ltll€' ^ F .- .t -liiiiil t-t '. .."tdr- rrri L'|. Cr.fl lt a/D TO: TOWN Attn: P.0. Vai I PR(IlECT Centcr, OF VAIL Nlr. Stan Berrynran Box 100co 816s8-0100 Addition to Vail Transportati on JoD No. 4 3e8 eo DATE: 7/3O/9O DA]LY REPORT NO. ,B SHEET 6 OF 7 ll.fVOlCE NO. Vai1, Colorado SIRUCTURE Foottnq LOCAIn|B.Eir^noft REilFORCIIIC @|ArEllrs wxncl|.IIOFZONITL A0 Llne 12,2 - 36.' L6L.34 B #5 Eq. #6 nq. ed cont. ed cont' spEcurcAnoil* srEE- GnAD€: 60 6 nets ,seo REpGDRctlo cu;ltt-E{Es! clean tr snoe omr$rcs usED cu R rrcE ^}|o CSVER as req 6 corrnrron acnnseo sPtrcfic sPEcFn IP$s: aS xeq 6 ;*t.L-uut oGERv TloN EAn sJPpoRxr: TrPE Brick El prxr-lne oBstwAnoN FTNFH tlPlrCE OOlllttAllCE Y eS Hoc'r j Hrffi ffi,'Effi *.-#'..-fr€ll lMtultY mEDClru{o t€-o(^rfitD pROCRESS REPORT Reinforcing steel appears to be ?laced in coropliance with project plans and Epeclf,ications. Michael Barber Atchitecture, COPIES Attn: Irlr. Scott Ward; Gary Murrain PCL Construction Sewices' Attni Mr. Dcnny Ar:lnouq Anderson S tlastings I llRS Consultants . Attn: Mr. l,es iq()dj-- Bill Carr Steven L. Pawlak RELD OBSERI/ER APPRCA/ED FY ' Chen0Northern.lnc. REPORT OF CONCRETE PLACEMENT OBSERVATIONS At A llrllll( aFtfiErta lro artl|rt ll( |rfE lra (tfrl'\t-t AI lrrtr']r! 't trtfIt' At Itf OOn"ll!!-irirttitY (t Ot d fi'tl' "O A'IrDUllDl /(I An'E - rE r -. in'rxrl qre.r-'.r o' fiDrcrr r'rrr trr rto^ro.e q,r nnin*d^ar'rrio'lrjcir -<l,a -wtlrx ff?nar,{- sllf.lt:t f,rl E l|ltGD (r rrtr :tJn€ 6 coaaurrD uall qtt|lf ,lirrrrxrt l|f, ,4llt l0 t{ tf,llx. ^ i:r.' , r-[ l]ltii-lr.. el r"-t trr ra. .Ill.. a/aa Cdrru|r| E |9li.| ai s.rtaH. TOr 1gy1'1 Orr VnrL JoB NO.4 39s e0 D IE ?/3O/gOAttn: lulr. Stan tlc rryrnan r,.o. Box 100 oALY REPORT NO. JB SHEEr ?OF 7 Vail CO 81658-0100 6WOICE No. PR(UECf Arltliti on to Vai 1 'l'ransrrottlti.on Ccntcr', Va.i1. Colotatlo. smErE^Ipral st_lrup llot r.o. A J000 3-5 ^N CoNIENT 4-B ATACr{T TB|PERATURE fu''IOE 600 -BOOsumJEdl.l"iobil lElir hn Inrcfi ML IP(ET NO. nl€ SATClED r€lnilg)nu€ surPttD RE\.Ol-lJIPI{ @UNTER EON RFJJoIJ'Ilot.I @U}{TER couPr,.EIloN erBc YAffi t_oro/ CUUUT]\IIYE li rB ADoo e u-otas I 2 3 4 5 6 7 ,4 114 106 LL? 114 107 11? r27' r276 L?77 L27g 128I. L283 LzB4 Lz39 2:O6 2:34 ?t54 3|28 5:4B 4:111 2:Q2 2zZl+ 2:45 3:LJ 3245 3:58 4:38 as req as req as reg aF req as req as req a6 req as req as req aa req a5 req aa req a6 req ae req B 1A ?4 7) 40 4B 52 0 0 0 1n o 0 rr lEr }TT s,rrF(rL)AtR o(}{rBn(r) TET UNT wmHt(pcf)Yra.o coNonErE ]EIPE- R^TWE co rlETAru$ 2 3 L/t ,.5 Llg,t 72 4 cyllnders cast pRO6RESS REpORf Tine observed on all trucks, r'.tpt'! Mi chac 1 lla rbcr Archi tccture ; furdcrson I llastings; Gary Murrain PCL Constructiotr Servlces; URS Consultarlts; IlBill Carr Steven L. Pawlak I I I ngl oBsEm/ER iAPPRo!/ED Br Clrcn€Northern.lnc'.Con.rrudg tngLr..r qn t<r.rt rt REPORT OF CONSTRUCTION ACTIVITIES AS ^ r^mtr( FltfErrx ro cl nTs. nf Pt|t E rt{t ct.finlirt, aI |trtanm fFf Itrtmt as nr @rtrt!Tl'{ -Ptt.rli'lnr It ol't olxT:tr ^'{) rl}|odiL^rDl rr|t nrt s- r"* .' ntrrlrr,ts 06{r.rrg5 11r trrl11;n3 rno{ m mnrrttxl an *troiri's ininnlr rlxuito'un rmru ii#rtt- s|rtil:t uu tf olsPcltD f lntt no E c{rat[ftt u1!5! ollrt rfi r(tLrlTlS |,rt rdtlt lo l]l vElt€. ^ rrrn r .a '!.l lllll lF.t .a .'t'*. r-i r|., Crtlol 4/tO To: TowN oF VArL JoB No. 4 3e8 e0 oATE 7/3I/9O Attn: Itlr. Stan Berryman DAtLy REpORT NO. 39 SHEEI1 OF 4P,O, Box 100Vail CO 8165B-0L00. llwolCE NO. pROrEcT Addition to Vail Transportation Center, Vail, Coloraclo WEATHER CONDffiONS AND TEMPERAruRE Partly cloudy at SOor Dotrr Bhovlers CONIRA TOffS CONSTRUSNON ACIMTIES PERSOI{Nfu MA'OR EOUIPMENr: ICIMNES: CHEI.I-NORIHERN'S STTE ACIMNES FUIlfill being placed at footJ-ngstructural fitl being placed tunnel at A Line 13-14" time observation and testlng of structural Level Oner new structure, east side. AIsofor footingr existing structurer Level One VERAAL COMMUNICATION WTFI B8tB B<cavating that optimum. CONTR^CTOR, ENGINEER, ARCHNEfi,naterial bing placed for o!YNER scott Greenfootlng at 89 vras of over coprEs XiilT'rf*:;.t"fili:;;l?i",1,u",oi,, PCL Constructi'on Services, Attn: Mr. Denny Ar:nour: Anderson fr llastings ;tlllS Constrl tants, At tn : iVr" Lcs lVood BilI Cam Steven L. Pawlak nEtD oBsd/ER APPRoVED Br Chcn€Nor{rcrn.lnc.C..-rtltl{ ltgLxt -i S.l-ar.a. REPORT OF FIELD NUCLEAR DENSIfi TESTING a3 A rl,nrt PitrtEIDa ro cltrol nf Fttrt t ,lo .lmavtl' |rl RtFrtrE l f lFr.rrrD ^5 T[ C0"Utr|nrt-frf{rrY (t (It cl icxnl ll{l rl,|}[rulrnx fll rr- fix 11. t^rr$xnr. o.rq uro11; ur 1-np;crr r".x (n Rrorr(rrq orr m.1n#'d-iiiiir*-o rt.x*ri-q,n -mrnu lFPRwa- s'urt.El rl'r DE Efin-D 6 rftr l6n€ o o(|tt.ftlD rrr.ul colt lFrq||rxl| l[ ,4[lt m u{ tElr(r . 'ri-nrr .| *.[Tt-Fl "-. ., .-te.ir. t6 tr Caflgt^ a,/F TO: TOhtN 0F VArL JoB No. 4 398 90 DATE: ?/jL/gOAttn: Mr. Stan Bcrrynanp.o. Box 100 oAtLy REpoRT NO. J9 SHrEr 20F 4 Vail C0 81658-0100 t|.I\/OtcE NO. PROJECT Adcli ti on to Vail Transpor-tllt j.on Centet , Vai l , Colorado SPEC|nCATION COUP CnoN & MINIMUM REQUIRED IN_PI.ACE CONSIRUCNON CONTMCTOR: MATERIAL DENSTTY l-\,,! 9B r AS DETERMINED I}/: TES'T LOCATIONS WERE AST}1 D1557 SELECTED FY: under footin6 Chen Northern TY?E A}ID NUMBER OF EARIH MOVING UNTTS TYPE AIID NUMBER OF COMPACTION UNITS METHoD oF ADDING MotsTURE natural I bob cat junp jacks THICKNESS OF UFT a6 req NUMBER OF PASSES as reoI LOCATION DEPTH OR ELEVANON (FEEr) LABORATORf HN.D PfJICENT OF (REiATD€/ M^)ol{t|l osrArcD SOIL T'TPE It)l NO.IIN(IMUM DT{/ DENSITY(pc{) OPTIMUM MOISTURE CONTENT(u) DITf DENSTTY {p"f) MOISTURE CONTENT(x) L6" 16t I5t at A Liner 4t X.ofu lZf S, of A LineaL 11 ]O' S. of A Llneat 12.5 BF Btr BF fl It It 14O.0 140.O 14O.O 6.L 6.L 6.1 136.8 L36.9 137.o 6.6 6.7 5.5 9B 9B 9B silty sandygravel B ruu- TIME oBsERvATloN D pru{r rME otJsEfivATloN Tltl f:Fofl F[t]tij||]:t o' Dttr fItUD |! ,| nf:lt T dr oll oFrfi^tr||6 (r rll. Fi rcf ytm. tt rr \6 Ftt llD ofi-nlt c.tllnAfoR IO Cdol{t'c 'iPtar' € ne Frlrr.rll||tr! cpfcrwf !rrrrr oro e(Eirurt m rtL ura[€ ttrt rurs rrrr'drh ilr*itwn a-vn ors.i\,^rp ernarult rF-sts lF€ !ro(,t-n!r aL 6tY ^s xlEvED arr.cr:is ri n qt.nnlrr q.n oaEt rvtt':r JurJqtrolt. nsr urr,r ari iiii l;; itod itss rui orntons f wlll-l,lul lllE ntr fEnt sPtoFrAfr6' lHE Hlrclf R Dets()sEEn UEnm Or TEnNC ft\S USED tN SUBST^,{|uL ^ccoRD }lct vvllH AsIx D2992 A}'lO &]Ol7 PRzuMlMf(Y OBSEfVATIONS Al'lD/OR TESI RESULTS VERBALLY REPORTED TO: Les lyood PROGRESS REPORT ThE AbOVE tCStSbeing placed for footi.ng leve1existing tunnel foundation. were perforned on A Line at L2-L3. the structural fj-ll Elevation from top of coPrEs Ti;ll?"'rf'B:i.t"fili::cturc, Anderson 6 Hastings; It'lr. Gary Murrian; PCl, ConstTuction, - Attn: --Mr. - Dcnny Aflflour; IIRS Consrrl tants, Attn: MT. Les wood; Bill Carr Steven L. Pawlak RE.o OBSERI/ER APPRWED FT Chen€Nonhern.lnc.Co.rrUrE E th.-t -i S.l-.1, REPORT OF FIELD NUCLEAR DENSITY TESTING as a tlrnJr( FoltcrDl rr .'',o,' ',f n;1E 1,.o Gtt1.LwJ' lrl F rr1p;E 'Jna St"'..mo ls ]lr corrfxrq'-frflrrY r q'l cllfxE aa'nGlllDl tll n'lta- x (,. sl^rxrxt!. c.'.ql,,(r6 r,n rnprcrr rlrrr (n mo^rr.€ arr nrxr.Jf,iii:€nri.o'-nxjio -trn -*nnur rtmcvn- slru: wu lf DBt\n' f rml lf,|lrle rt cosrrflD urr.r onrt lD.rfl.Lxrr |,l ,![II) lo [l liErlxq ^ 't- r- .. -fFillg..r d .-'!a'r- fr'r tlo. Clflot r/lO To: ToltN oF vArL JoB No. 4 398 90 oxe. 7/3L/9O Attn: Mr. stan Bcrryman DALY REpoRT No. 39 SHEETJ oF 4P.O. Box 100Vail C0 81658-0100 tr,{vOtCE NO. llqrEcf Addi t i on to Vai 1 Tralrsnortzrt i. on Ccnter, V:ri I , Coloraclo SPECmCAnoH couPACTtoN t MINIMUM REQUIRED IN-PI,ACE CONSIRUCNON CONTRAGTOR: MATERIAL oENSrr 9' i3&ts Excavati-nE TEST backfilL ASTI'i D155l against foot. sFltrCTED BY: chen Northern ASx DETERMINED IIf: LOCAT]ONS WERE TYPE AT'ID NUMBEfI OF EMTH MOVING UNMS TYPE AI'ID NUMBER OF COMPAgNON UNT|5 MEIHoo oF ADOtNc MotsruRE natural l hoe, 1 front loaderrntcKNess oF UFT a6 req dual wheel roller NUMBER oF pAssEs as reo2 jump jacks1 BTF=BeIou, Top of LOCANON Footing DEPTH OR ELEVANON (FEET) LAAORATOF'NELD P€RCfNT OF(ffurntr1 ll^xturr/)ooritld SOIL TYPE rc>l NO.IIAXIMUM DRY DTNSTTY (Pc() OPTIMUM MOISTURE CONTENT(t) DKT o€NSrr (pc't) MOISTURE CONTENT(x) t?c L7C r71 L77 L72 9t S' of AO Llneat 37.3 A 9r S. of AO Linrat 37.3 Br j'I, of AO Llneat 58 ABt }tr. Of A0 Lineat 58 9r N. of A0 Lineat 37 1I BTF 1' BTF 1I RTF II BTF 6''BTF 156.0 L36.O L36.o L36.a L36.O 5.9 5.9 5.9 5.9 5.9 128.O L3A.5 128.1 ul,0 L3L.g 5.0 6.4 6.2 6.6 6od 94 a6, 94 96 97 sl. silty eandygravel b rt LL TIME oBsER/ATtoN n Po'{T TIME oBsEm/ATloN nG ;.tq1J pif-;,1p q11il|r IUiT.tD A! A R€tt tl OF o|,|t Ol'grfv^rrrt{t (F nll t tacavf,{I. nt lr \,f mllm ttl rlr C(tItR;nOi m OGflltf ItTL}lfP If Pr-o6/t{r.rt grprcrwr ttttrT rrtD uEnnl to tlLl. Drttttlg lr nt rt *rfir'<ith'iriitiritn w-rrr rrrsr rvrro.tr+ nernn lrsts la€ lr{x tr nrr nl qrY ls rtrF/Mrtc(ssrJl/ ro c/{.trult o.n ocrlv{;:r JurJ*!r}lr. tsr u re iri 'iiiii 'ii-f-iti iirrs lm 0fTlxlts oN Y{llfllM ltlr fltl utrlr s'ECltlcllp6' rHE NlrctE fl Ds'asc EIER uEnpo oF TEsnt$ w^s us[D tN SUI}sIA}aluL ,c@Ro tlcE wItH ASIU 02992 AllD 0JO17 PREUMIMfTY OBSEJTyAIIONS AllD/OR TEST RESUL15 \ERI}AIIY REPORTED TO: Les Wood pRocREss REpoRr The above tests were performed on the structural fill beingplaced at footing A0 Line at 37-39 and AO Llne - 89 Line at 19-39.llevations from below top of footinq (BTF). F.rorrc Itli chae I ll.arhcr Architccturc,\'\" rr"' Attn: Ith', Scott $lard; Anderson & ltastings ; l{r- Cary l\lulrran; PCL Construction, - Attn : --ltlr.- Denl.y Annoua; llRS Consrrltants, Attlr: [lr. Lcs l1/ooo; BiIl Carr Steven L, Pawlak RELD O8SE}WER APPR€ryED FT TOWN OF VAIL Attn: Mr. 'Stan Berrynan P.O. Box 100 Vail C0 81658-0100 PR0JECT Addition to Vail Transportati'on Center, JOB No. 4 39.8 90 DAILY REPOFTT NO. ]NVOICE NO. Vail, Colo!?_da_ 0ATE ?/TL/gO 39 sHEEr 4oF LOCATION DEPIH OR ELEVANON (FEED LAAORATORT RELD PERCOIT OF(RO [vE/ u^)olru{)otrratg) SOIL TY?ETIAJ(MUM DRY DENSTIY(p"f) OPT|MUM MOISTURE CONIENT(x) oFr DENSTTT (pct) MOISTURE CONTENT(r) IEST NO. L7t 174 L7' 176 L?? L7B L79 LBO rB1 9r N. ofAO LineaL 38.5 Br S. of A Lineat 38.9 3' W. of 39 al .40,4 Br E. of 39 at B Line 5t V,l' of J9 at lf.O 6r E. of ]9 at B9 lor S. of 89 at 37 lBr S' of B9 at 36.' 1Or N. of 89 At 38.2 SG SG 1I BTF II RTF 6''BTF SG II BTF SG 1I BTF L36.Q L35.O L36.o L36.O Lr5.O 1]6.0 L36;a 135.0 L36.O 5.9 5.9 5,9 5.9 5.9 5,9 5.9 5.9 9 rj?.4 tJ1.r L12.2 L1L.9 L3Q.2 t3r.3 L24.3 124.0 B1.tI Ootr bol 5,2 6.0 6.6 6.t 19.4 L2.5 .O5 97 9? 96 97 97 96 95 9L o'l el. silty sandygravel |l tl |]ll It tf ll flll n Mlchael Barber Architecturc, COPIES Attn: Mr. Scott Ward; Anderson I Hastings ; l'tr. Gary Murrian ; PCL Construction, Attn: Mr. Denny Amtour; URS Consultants, Attn: Mr. Les Wood; B1II Carr Steven L. Pawlak REI-D OBSETWER APPROVED Ef Chcn0Nortlrcrn.lnc.C..EfUtl &llr..t na td-{... REPORT OF FIELD NUCLEAR DENSITY TESTING f,t A rlnlt titttErDl tE qtxtt rr ttfD ro qlllwl ,rl ifldllt 'fi !{tfnrlr A! nf oottnmr|. 7r,firfl ol qt qr?fil lro lLt||olu ttrl{ F0t tui"Elp lri '' r?rnrrrnr qr{ur. .,n ?rrR^cn ri.',r o,r rio ",.{r al r,u-?r''o*lii.rtiri'rtiirir-urr-rlrnr'-ri'rior'i4!rt ru' { trcirD (t tlrr n:nt{ ! qrt!fnD ttal'rt olrat ,!'w{oar{ll r f &dll, 'lo tl ltlrxL ^ ''i.6.-., r.lTii-rr*ln r, r-'rrrr - ., -,-.-. , rrr Chen€Northern.lnc.cor.dt D{ tngltF. ond 5cL'dru REPORT OF CONSTRUCTION ACTIVITIES ffir.grL ttt F'rt,ro dm{rwr. ar tqr'!!11 ^a€ e^m''D ^" ns 6prrrryq. ffif .XAStilE ;-tffi-i5tytgtr;il'i A;ft;;{ts-'cnairsn .n f-ir1r1l.r11lTry -qr S:gt-11c oun ntncrtrs 6 m sr-RYrD Fft'ur€ u'n rrltlrrx diinr.rur urrsr snr.l ,f,nArglxl3 ,rf, r*rtr lo ltl wnltrl' ^ ,i-nH t r.[i,.tlTls* .. 6.d"di.. rdn Ir. CLlOaA a/lo To: TowN or: VArL JoB No. 4 398 90 DATE: B/l/9O Attn: N{r. Stan l}errynan DALY REpORf NO. 40 SHEEr I 0F 9P.O. Box 100 Vail C0 81658-0100 l|.WolCE NO. PROJECT Addition to Vail Transportation Ccntcr, VaiI, Colorado WEAII{ER CONDffiONS A}lD TEMPEMruRE clear. a CHE\|-NoRIHERII'S sm AcIMnEs FulI time obBervationt te6ting and inspection: Reinforcing steel being placed in Footing 12r x 1110rrr B Line 3L-35tpad ZZt x 22. x 3t at B-89/3lr Jr x Ir footinge n/r add, //31'7. Excavation and conpactlon Level 21 Stairs No. 1Or also backfill area frontage road and bedding being placed for sewer line frontage road. 16O cu. yd. concrete being placed at 1:00 - 5:3Ot footings and pad Level One, B Line J1-51, new structurer €aat sid€. VisuaL bolt and Srout and weld inspection of 16rt x 26tt coluan base ood Rl't8e B9-L9-29. VER&CL COMMUNICAT1ON WTTH CONTRACTOR, ENGTNEER' AIICHIIEST, OWNER W111 Dayr P.C.L., RE:16rr x 26tt column base uod. Col.only one pasa weld on east side of plates Reg.5/L6tnot inplace sane Lr€a'r Comected by contractor. Greg Shulitz and 89 21, 22, 24nuts and washer Bill Carr Steven 1,. PawLak NELD OBSERVER APPRO''IED gY Ir'li chae L llarbcr Archi tecture, COPIES Attn: Mr. Scott lrlard;511y Murrail PCL Construction Scrvices, Attn: Ivlr. Dentty Arrnour: Anderson & tlastings; ..tlllS Consrrltants, Attll: rylr" l,es t,\|oo(l; Chen€Norllrcrn.lrrc.Cdn tL{ [rr3frr -i S.i.,ir* REPORT OF FIELD NUCLEAR DENSITY TESTING at A |rr |t PdrtcrDl lv ctfttrr' nf t,rit |rI, qj|tlfl !f1 Ar !!rrlq! flr( srttt'lD AS ltE O0fl'r-xn'r frflrY (F Oln d'fxrt' l'o amur'^1El t!tt F lr - rpt (r srawltxt! ct'.cl u!(r.! qr mPfcr! rrrll o{ Fro tntro un "rxrr['idGiiio'-ltxiiri-cx rtnu lulnwn' gurtr3 rtl lf Dit{E' cl'lrrrr Iull}€ 6 oofrunD urat:t '|lrt lfslr{.lr{rfil ,'a. ,oRtto lo u{ lYlsnRl ^ .nrrtr d t-[UtXl* .. ...vn'rr f-r6 r.d. C||tlqt a/to To: TohrN oF vAr L Attn: Mr. Stan Berrynran P.O. Box 100 Vail C0 81658-0100 PR0JECI Addit:ion to Vail TransTrortation Center, JOB NO. 4 398 90 DAILY REPORT NO. INVOICE NO. Va i 1, 1lq1!'r!,!lA DATE: B/L/9O 40 sHEEr 2 oF SPECInCATION COHPACNON & MATERIAL MINIMUM REQUTRED tN-ptAcE DENsny gB r As CoN51RUc'TloN CqNIMCI9R: B8xB Excavating p51 AS'-III D155l under footin srltrcTED gy: Chen Northern DETERMINED tr/: LOCATIONS WERE t hoe dual wheel rolIer2 jump jacks TYPE AI.ID NUMBER OF EAITTH MOVING UNITS TYPE AI.IO NUMBER OF COMPACTION UNTTS I METH9D oF ADDING MotsTURE natural as aa THICKNESS OF UFT NUMBER OF PASsEs req req LOCATION DEPTH OR ELEVATION (rEEr) TABORATOFnT FIELD PERCENT ff (Rg-i\TIvt/ lA){r{r|)ogr^lE) SOIL Ir?E IEJI NO.IIAXIMUM DRY DENsTT(pcf) OPTIMUM MOISTURE CONTENT(x) DRf OENSTTY (pct) MOI5TURE CONTEI.IT(x) r82 LBf LB4 rB5 l5r S. of A Line ,2t Vl. of Grid 1 fOr S. of A Line 32) Vl. of crld I 36t S. of A Line15r W. of Grld I 20r S. of A Line JOr W, of Grld I Jrnnr EIBBF I t BBI' BF 140.0 140.O.1 II1O.O I 140.O, bo I 5.1 bol' 5.1 L1B.g L38.2 IJB.O L38.4 6.2 6.7 6.6 5.1 99 99 99 99 si-lty sandygravel DI RJlr IME OBSEF/AIION E P Rr llM[ t fiFdlf Pifr)|r! er{0.t tqtaD at A iLtutr 0r olrt oFF,r tr|.|! (r nll I F[DO|'.(XO@ C('| PrCftt lttult AtrD lGlt'lr m tltl tlt||r€ IlE rll|ts lnf,t| (ln rs rutto xtrssfir lo ca.rult q.n 06u1\'ti':t Juuolratxl. lt-sl lxl^ lrll llrt n|E NiJCI.EAR DE}ISOUEIB HEN|q) OF IEsUTrc WAs USEI) PREUMIMFf OBSEJVATIONS AllD/OR TESr RESULTS VE PRoGRESS REPoRT The above tests were lelow footing base, per specifications )xcavated footinn area l,eve1 2. V/..q+ar i OBSER^/ATION i a:rlfllt. l/E lg*tr Ffl rrD ( tDlf-nvtn t9 llll rtEFlwltE lrf 3q.L Dlsll il,t ofifixt' ;I l{Iu|- /tccoRDrNcE ' RBA'IY REPORTED------- performed onj-n mannade r lrlo. 10 and fi rnF carrlnFJotl lo oal! rjf ,,r'ant€ n{ lPrMtuts. ltjls ^FF u,tDt (f n||: .nl O{.Y rs or{ tllfrltul lllE fl[ tru.xl st'toflc^lxt6. [rIH Asnl 02992 A]lD a]017 TO: Les V'lood ' the excavation to 3lfill. Contractor ha6 sub. 1-s placing fill back to rr: ^1.-^1 narkar Ar',-l1.i l'nr.frrro lfq-otine srad coPrES itiii?"'uii'r.ott w"ra; . Anderson G ltastings ; l1r. Girry Iuurrlan; PCL Construct ion,-At tn: .ltlr. - DcnLy Annour:; ilii c"iiiuitints , 'Attn: lnlr. Lcs lttood; Bill Carr Steven L. Pawlak FIEU) OESERI/ER APPfiOYtD AT Chen€Nonhern.lnc.Co ith trgh..r -a td-ttLt REPORT OF FIELD NUCLEAR DENSITY TESTING At A qrn$l ptE|t?cr!.r lo (lrr|'l nf nrrr ^lo ottt'llw:t Al F rrrrE ^,r( srFr'IrD At Tlr cs'-tll|tul-flfrltr 0F c|n cl fxTa o A'rrd[atnl mt n'iE - rE.r or $^nvr'.t!, oc|.|uut'('r on mPrcrt rFrx rn Rtererr€ crt nroirid inEniD'dii€ qn nnu a,Tao| - sL\IJ rll tf txl,'l"fD 0r ffrlr lutrr€ 6 c0rultD ut.ul ('rll.l , €u.txTl ,|rf ,6!.Il) lo sl litlnr€. ^ .':ir- , -FiF-lt-. r ...'r..r- r:r'r h CI€lotA a/ao To: To[rr'l oF vArL JoB No. 4 398 s0 DATE B/L/go Attn: Mr. Stan llerrymanp.o. Box j.00 DAtLy REpoRT No. 40 sHEEr J oF 9Vail C0 81658-0100 pWOtCE No. PROIEGT 1.1<lition to Vail Transportation Centcr, Vai l, Coloraclo sPECtncAnoN COUPACTION t I/ATERLAL MfNIMUM REeUIRED lN-pr-ACE DENsn y 9, r As DETERMINED gly: ASlliU D15r7 coNsIRuCnON CONTMCTOR: B&B,/pCt TESr LOCATTONS WERE SELECTED [rf, chen Northern TYPE A}ID NUMBER TY?E AND NUMBER MEIHOO OF ADDING OF EARTH MOVING UNITS OF COMPACTION UNIIS 1 MOISTURE water I loader lgadertruck THICKNESS OF UFT a6 req NUMIIER OF PASSTS varies LOCATION DEPTH OR ELEVANON (FrEr) titJoRATorr REt-T) OF (RtL Trv€i/ lliL\U{tl)ogrrl@ SOIL ryPE rut NO.[IA(IMUM D]{Y DLNSNY (pct) OPnMUM MOISTURE CONTENT(z) DRY OENSTTY (Pct) MOISTURE CONTENT(t) u B 8 L I t A t-]( U Sta. 7+O0 Sta. B+00 Sta. 7+50 .5 | llc SG DU r40.0 140.0 140.O 5.1 6.1 5.1 r54.0 L36.A L33.7 7.3 4.1 7.o 96 97 9' silty sandygravel It tr FULL 1IME OBSEfWANON E] PA}il TIME OBSEM/ANON rris iftoir pifrlal! o?'r[|lt mir{;o At A Relt LT oF crn o|sIr.tv rrntt (r nt H fcflttxt. 'rt lr Yr Rfl tro (rt ]ltr calnn}|/croR to coat l,t'(Yo€ tr{ Ftgrrartrtrr o6prclvf frrr; arro rr(Ernf to ntl urnrp n1q rurs q"r, uh'iirxtmnn r-l.n rlrcrmnu: crnetr. trirs lrl€ Y o€,or -nF f'll | ot-Y As xLEwD ft.6rs.ril tlt (Jlnn IE orn oosr.n./tr,! Juuelr(Jl, tsr rlere rrc. irrt lifsri osn ton ofittxJtts Gll f,llLlllul lllf Fll'L |rtl-ls 9llotrArxl6' IHE ituql n D€ltsotrElEn xEnFO Of lE'nNC Yf S t SED lN St t'st lflUt fCCOn0^t|C€ WIIH AsIU D2992 AllD DJ0l7 PRzuMIMRf OBSER1/AT|oNS AID/OR TESI IIESULTS VERMLLY REPORTED To: B&R PROGRESS REPOFT Observedjta. 7+00 to B+OO. backfill placernent over the gas li-ne from .^er'q Michael Barbcr Architecturc,'vr rL" Attn: Mr. Scott Ward; Anderson G llastings ' I\{r. 6ary l'lurliatr; PCL Constr:uction, Attn: -]lr. - Denny Allnouri IJRS Co srrl tants , Attn: IvlT. l,cs woo(l; 8111 Cam/S. Urton Steven L. Pawlak FIAD OBSERI/ER APPRC'VED SY Chen€Nomlrcrn.lrrc.Cofir&tg bgtxr -a s.LiL REPORT OF FIELD NUCLEAR DENSITY TESTING ^3Awru|lPimtlr'.rp(l''fIl'nf'rnttl}ou-ft|?fv'3.^lrqry|]!|Jtfgi..n?r'A'flro(x'Dfr.'ut'.m.''irYorg,iclfrllAoxmq!,^llt{'T|i'1nxl.no,r c.- sr^,,urx,r. oo'cr uFo]n c'yrFrcB rnr m arq^FrrNq ar mrcrif diEnrib'-idir,o-ir,n -rnriur l'rronr- slf-g wrr E o6tror'D t lnrt lLtTno 6 oo.ruttD ul,lr (mll ,f{rqrxll lrr ,4f,.LD lo lll fflr a ^ F-nr- J r-{HtX-lr-., -rrdl.- F-ir tt Cl|fllt Vm To: TourN oF vArLAttn: Mr. Stan Berryman P.O. Box 100 Vail. CO 81658-0100 PRorEcr Addi.tion to Vail Transrlortati. on Center, JOB NO. 4 398 90 DA'LY REPORT NO. IrworcE No. Vai l, Coloqado DATE 8/L/90 40 SHEEI4 oF SPECIRCAnON COUPACTION & I{NIMUM REQUIRED IN-PLACE CONSTRUC'TION CONTMCTOR: MATERIiAL DENSIIy 9B PCL/B&T3 X AS DETERMINED TIf: IEST LOCAT1ONS WERE ASTI'I D1557 belovr footin SELECTED Bf: Chen Northern c TY?E AllD NUMBER OF EAI{TH MOVTNG UNrrS } back hoe T}llcKNEss oF UFT 1ft. TYpE AxD NUMBER oF coMpAgnoN uNns 1 walk behind sheepg NUMBER oF PAssEs va:.ies MfiHoD OF ADDtNc MotsIURE non^ foot hand tarnpers LOCATION DEPTH OR ELF/ATION (FEEr) I,ADOR^TORY NELD FERC€NI OF (RE-r\TrvE1 }I^x|rt{tttOgrrl€, SOIL TY"E Inl NO.IJN(|MUM DFT DLNsTTY(pcf) OPTIMUM MOISTURE CONTENT(t) DR'T DENSMT (Pcr) MOISTURE CONTENT (u) 18t 1g( rgj L91 L9: L9L 23t W. of A Lj-ne 35t S. ofl Line 35t W. of A Lineeor S. of I tine 35t Ul. of A Line 20 I S' of I tine 55t \A. of A Li.ne 5Br S, of I Line 54r liJ. of A L,lne 50r S. of I Line 55' W. of A Lj.ne 50' S, of I Line eIllDI' ? I np.lr 'l I DDn BF 2I BBF BF 140.O 140.0 140.O 140.0 14O.0 140.0 6.1 6.1 5.1 6.r 5.f 6rL L38.7 1]B.g r39.L r39.3 IJB.B 140.1 5.L 4.3 4.0 5.L 4.5 4.8 99 99 99 99 99 100 tl tl s1lty sandy gravel trl RJII TIME OBSER/ATION D PATTT TIME OBSEfWATTON nftt |f,F(tr Pntjrxtt @lD6 rrutD at A nLLrll d otll Gtl\, |rr|t ('. rlt Frtvtxr' rt ]l^\|t FnrD o'r-rl|F clrrn":lql m o(|fltllf, l'ttrt€ nf Nfco.rr.g6 c('rprcr\rE rJrrrrr rrJo rJ(En,,r m rtr. urfnro nnr 'rrr.t ",""'irh- iiJi-nvii' Clrr qtr+ rvf{l lPtr^tpls lFirs ^r'r u,o€ oF n{c rtll orY As [lrvrD lnctss ir 19 c11r11 rr 91-ri o&r\,ur3 Juuo6.urt, ,trr ,r^t,r,, ii6r'nllJii rilso lm oft 16|5 q{ r'ltn|Ln lllE nlr lrtlls s''Lomllxr6" lHE NrJqf, n oENS()I|E|ER uEnm of lEsnNc w s rrsED tN SUtrsTA{rUL iCCOflD }|cE WIH /\slu 02992 ^}ID DJOIT PRzuMlMtrr OBSEfVAnONS AJ\{D/OR TESr RESUL1S VERBAI,IY REPORTED TO: RR F PRocREss REPoKf Observed overexcavatlon and subBequent backfilLing of thefootlng subgrade of Stairway lilo. lO. coprEs Ttilli"'"li'B:i.t"ftli::l'"": Anderson & tlasti.ngs; !!r- Gary Murrran; pCL Constr:uction, --Attn : -Mr'.-Denny Annourl llRS Consultants, Attn: Mr' Les woo(r; nill Cam,/S. Urton Steven L. Pawla REI.O OBSET{VER APPRCIVED SY Chen€Norrhern.lnc.Co fu|' engfr. fa S.r-0.L REPORT OF FIELD NUCLE.AR DENSITY TESTING as A wn|A Fio|rtFrx.lt .I.rfl ( trIrtE |rI) orttn.w:t Ar NrFrrrrr ,,rlf gri.|rrtD A3 nr cotxi:rrlAt,||ifrrY G Oi A [Xll' x) 'r'tlFr rDl rti Fn Er- nor cr. stlFurxrt [rrq rrt{"'r qr FflFrcxr rrrrr m Ntq rrrrc un mniri"a-iiiiii-o -itxiio on rnnu ,vmonr- ll|.'LrJ ru E xvrort oF T TIr IE T}ro 6 dttrlrD urltt oll.t ,rwgraxrr l[ x[r-D lro w wl6nr|c' ^ it!'nr- .. r'.[ Htlt-]r-r r 6rtlFi- Fmi tao. CI€lOtA Vlo To: TowN oF VArL JoB No. 4 i9B 90 DATE S/L/9OAttn: Mr' stan l3crryntan DALY REpoRT No. 40 sHEEr 'oF 9P.O. Box 100Vail CO 81658-0100 pryotcE NO. Bq,qcr Addi tion to Vai I Transportat'i on Ccnter', Vai 1 , Co l orado SPEClnCAnOil COHP CTToN & LATERIAL MlNlMuM REQUTRED lN-PtAcE DENSTY 9, I As DETERMINED B/: ASTlrt DI))/ CONSTRUCTION CONIMCIOR: PCL,/B&B . TEST LOCANONS WERE Srl FCTED Ff: ChEN }iOTthETN TY?E Al'lD NUMBER OF EARTH MOMNG UNrS I loaderr I backhoe THICKNESS OF UFT 4rt Ty?E A;'tD NUMBER oF coMpAcTtON uNfs I hand tanper NUMBER oF PASstls varles METHoo oF ADotNc MolsruRE none added LOCATION DEFTH OR ELEVANON (FEEr) TADORATOFry FIELD PERC€XI OF (Ra-ArTrE/ Mru0lr{ )o{ITA!€D SOIL T]?E rr-)l NO.ITIAXIMUM DI{Y DENSTTY(pcf) OPTlMUM MOISTURE CONlENT(/) DITY DENSIIY (P.r) MOISTURE CONIENT(z) 195 195 197 Sta. U+lO Sta. 16+25 Sta. 16+90 2IBRG 2I BRG 2I BRG L39.6 uB.6 L38.6 EC c,( 5.6 13r.4 lJI,B 132.O 5.3 Ood q.Q 9' 95 9' base cours ll lt l? d RJLL TIME oBsEril/ATloN tr PArfi TIME oBsEm/ATloN n|! EFOit Pltf'r)fir (PfiDlt tui{D a! A R€JUll of (rn (ElFiV lrrrt (r nl FiA'txfxT' tlf ll w Rll IFD otl rl|r lxtlrn'/clltR lo co'lrHt'E 'FRm|o n€ RftErl|{rrD(t o(rprc'l\tr urrrT ^1o r{Etr1f m rltl $rffrc n|{ r,,.rt r*'l|'rih'ii*tnii a lrn dnsr.nuno.mlrrro{s. rBrs |J|f ruD( t n'' rnl otY ls Elf\trrl H:cfssrrir ro (/lrnlrr q; o6urun: Ju{roo.txt. 1tgr txtr ffi;; lfi"iir; D^is nn qrxnrs trt mlrlllut lllr rlll lllTlt sforpllxrc THE NT,|CIIAR DGITS{XEIER UENlo() OT IENI€ IYAS USED IN SUITSTAflUL ,|CCOfiDAI{CE MIH AST}I 02S92 ^}ID DJO17 PREUMINART oBSERVA'IIONS A}IO/OR TEST RESULT5 VERBAIIY REPORTED TO: B&R Tests taken on 15+40 to 17+]0 PROGRESS REPORT rewer fron Sta. the bedding naterlalwill be placed. on vhich the storn coprEs xlili" tr?i'3:l,t"ftl';l:cture, Anderson 6 llastings; l'lr. Gary ltlurrran; PCL Construction,- Attnr --Nlr. - Denny AnnourI tlRS Consrrl tants , n ttn: tqr'. Les lrood; ,S. Urton/tsill CaTr Steven L. Pawlal RELD OESEF/ER APPROYED SY Chen*Nortlrcrn,lnc O.:dhl Lt*r| -i Sd..rtL'. REPORT OF REINFORCING STEEL OBSERVATION lr A ||rrr( trtttGtar ro cltxlt tll( i(tE x0 Oril\ft. A1 [t('lT|.,Jrt trsTltD ,tt I]f c0f[tlt!-lm'ft(s Or d'i Ct-p|[' rf0 LnGl IDl 7l lt'R'EA- rE{ c,. SrAlrEXn c.rquqr6 t r rin l-ri-rrm rr rrorrh cr nuofr*n-iGrrio -miorfc,li-rrriu rerrrxn- ufir: lu r txF(EI r rrtnt rfjllrq 6 cDr\fiD l,lrl! (nttr ravtn llllt Atf ,4ltll lo H lrnllB. ^ ,r-'.- { rll@ rt .t -'rrF- riri rh. c|{lll aAt TO: TO]IJN Attn: P.O. Vai 1 PROJECT OF VAIL Mr. Stan Bcrrynran Box 100 co 81658-0100 Addition to Vail Ttansportati on JOB NO. 4 39,8 9.0. OAILY REPORT NO. thtvotcE No. Vai1, Colorado DATE: B/L/90 40 sHEff 5 oF Center, SIRUCfURE Footinq Pads LOC IIOTI ElEVAnOtl RfIlFOfiClJ.lC @uut s vtnTlc L ltoFliloNra A Line at 1 Add #317 B-89 at JI B Line/3L-15 at B LLne/3L 162 ' 15'' 162 ! 1" L62tLtl 162 | 1" #4 @ gtt ocl/?tt aLL t 4#6@10"25 #4 @ lBtl #B @ 12t' oc LB#6 @ 9'r oc 3L #LO t{.-S. e6 il 10 E.-\t .V/r bottom ads @ 12rr oc-26r' exp. inserts c top & bottonont. Zt 6fi 3, x cOnt. jii. -S.cOnt. E.-ttrl' Iel 9t' ocl0rt oc schedule22nx22nx3 l.nto Ir x lrlorf L sPEqrrcArot* sIErL cRADe 60 Rgr1'q1c6c ctr1llr{Es& c lean crr nrncE AlrD co/Eft a€i req sflrcU{O: SPECSEAI|oIIS: aA feq B R grPFOfiT5: Tl?E BfiCk FT{iSH Hocttt 3 d rwrs usro El sttoe Dff wtltcs usED fil corrnrcron pnsro S ;rul-lue oB$ERv Tro D prrr-rug orlstfiv non lllPt CE OOllfUllCE yeS UET PROECT UET PFCJECT fr€o0lfigr€xIs F€(UlnfJro{lst11t6t tNtrutly wltENOq!D{ED Rf,-D(ATINTD D^TE RE-OGT'IH@ PROGRESS REPORT Reinforcement project sPecifications. steel appeared to be Placed in conforrnance with the Michael Balber Architecture, COPIF-S Attn: Mr. Scott Wartl; Gary Murrain PCL Construction Services' Attn: Mr. Denny Armourl Andcrson I llastittgs; tfRS Consultants. nttn: Mr. Lcs lttood: Bill Caxr Steven L. Paw1ak RE,.O OBSEFUER APPRCIVED S/ Chen€Nonhern.lnc Cdrrluf tr|Ch-r d{ s.r-t & REPORT OF CONCRETE PLACEMENT OBSERVATIONS at A unA FioncDl 'o crrx|ll f'f trrE rro GEwi1 al rrF.Ftn r,lf |lr'lrfD ai rr cofrajltl t-FrFrnw O- ql d lxra ?J'al Armffo tD. mf, Plrr(r^- nc1; or rralrExrl ooFErrrrrn q;r r;1;.,crr /Rtr qt r[o rD..e 9111 rg.od-d^iiinio ]tjioip-cr.t rwrtrx plnqrr, : t.trt ru lE oEruID (r lf|It f:tr]E d?rrttD !rr!r q|'tt ,fia-xxtt ttf tfir, m x ;rrrr|q. ^ 't r- r r(Tiir l;r.. .. ...'.rr- r.r ,.. *ll,L a/to To: 1sslp ofr vnrl JoB No.4 3es 90 DNE B/Vgo Attn: Mr. Stan Bcrrymanp.o. Box 100 DAILY REPORT NO. 40 sHEEr? 0F g Vail CO Bl6s8-0100 - NVotCE NO. eEgqECf Arlttition to Vail 'l'ransl)or-tati.on Ccntcr.. V:ri1. Col.or:ado. sfsFn^rx)l|s: stxuP srPPUEn i'J-liobileLu LD. A 3OOO J-5 Arn coi{rff 4-B TTAANT ]EUPER^ruRE R^}TCE 6oo-Boo IEST M'.Tnrcxr€.IrcXET ML lll€ EAICH@ TIME ARNryE' lll/€ SryPL@ RATOUfiX) COUMTEREp|ll REVTXJ'InI C(X,FTER @IIPIEIPN CUBIC YANDStaxt/ cuuuutrrE WA1ER TDO€D e llo]rs 1 I 3 4 5 6 2 106 11? 114 100 49 44 4B 1318 L3L9 L320 LSet r3az' L323 L324 12:50 1:04 1:10 1: 16 l:22 Iz29 L:45 ].r00 1 :21 1 .22 Lz39 1:47 ?:O5 2zI5 Lz32 2:08 a6 as cLit as reg req req req req req req as as as req aa req as req a6 req as req as req a6 req I 15 24 )1 40 4B 56 I L5 4 10 B 10 6 TESTln stl,|? (Dr)^n€ilrE{r(r) TET UMT UMHI (Pcf)YIBI) @ilcf,ErE TB'PE- RArUnf, c4 REIl^'U(s 3 o 4.0 4 3/4 6.2 6.1 L39.6 L39.6 72 7O { cylinders cast pROCRESS REFORT Saruples taken from truck. Time observed on all bucks. ^r.,Drrrc l*lichac I l};rrbcr ArcltitcctulcluvrlEr Andcrson G llastings; Cary Murrain PCL Construction Servlccs; URS Consultatrts; Bill Carr Steven L. Pawlak NED OSERVER APPRWED Bf " Chen*Northcrn.lnc Cdrrlha ttrf|.-t s|i 5.4-at{. REPORT OF CONCRETE PLACEMENT OBSERVATIONS |r A ||rru{ ?mtETD ro clrxlt, frE ?tf a rrrD (rrrll':" Al tttxtm ^if l'trtttttl At trf, oo,tr"xrur t*rrr''y F- dfl o fmr' Al|} A'nGlArDr 70i ftf'lca- rn tr trarrr'rrt orclt'rr- or rrtDrctt rrftr ot to ^trrt cr |tnorri'd^iiii.iib' ltiiil-cr nolrf A'fn{''& s,||tujt ru DC DclwltD cr rnfi l.'rl€ B oorl.tlltD lt.Itt onlt lfixDrrJll lf, ,ortlD lo x lllltl. ^ 'r,r'.' , rfftiiflrt.e d -.'r-b t rr ta. Crtl l.| a/ao ro: 1'91ur 0l' vlu, JoB No. 4 igs 90 DAre, B/L/9O llSl'u"l';ostan llcrrvtna' DAJLv REpoRr No. 40 sHEEr B oF 9 Vail CO 81658-0100 DSVOICE No. PROTEC'f A(l(liti on to Vail 'I'rnnsl)o:'t .ti.on Cctrtcr. Vai. 1. Cololatlo. SFEFNAIPil* suppusrlT. I'lobilqn '.o. A 3LI'UP ]000 t-2 ,\n cot{IENr 4 TETPERAIUREAIgEHT RAIIGE TET lto.rnrrx!{t IlcXET M'.TIHE AATCHg) 'n!E ATUVtD T .€ s ltPLE) Rnrcunpll cout{rEnroN RE\OU,IION @U'{IER @uPtEllotl ;u&c Y rurn,,o/ CT'UUI.AINE w lER ADO@ o^Lto$s o 9 10 l1 L2 L3 14 I,I9 54 105 117 114 100 49 L325 L326 L327 L32B l-329 . l-330 L13L 1 :58 2:0O 2:20 2:3L 2:4I ?z50 1zo5 2:20 1:11 2:35 2245 2:55 J:00 5tZL a6 req as req as req as req as req as req aa req as req as req as req a6 req as xeq as req as req 64 72 BO BB 96 r04 112 B U 0 0 \, rErrIL sur?(tr)^n@ilIEilT(r) tEr uflr WEOHT(Fcf)118 0 OO}ICREIEIEIPE- RAITNE cF) Rfiaru(s PROGRESS REFORT .yrorrra Michacl lJarbcr Archi tecturc; Andcrson & llastings; Gary Murrain PCL Construction Serviccs; URS Consultants; Bill Carr Steven L. Pawlak FELD O$EfiryER APPRSVED FY ", ChendNorthcrn.lnc cdhr(}rf frfh.f di Joa-Lt REPORT OF CONCRETE PI.ACEMENT OBSERVATIONS Ar a lml( ?ErrE|ur E ottxtl 'rf 'tf a xf, !i||.rtws, All rrt(nnt |,rt i!.flrD Ai rr[ cDrTaJ{n l ftxP?rtY (' ol o rrlr 4Q -{4t'ul lrtt ti! Ftalta- trr. or rrarrrrxrt, oDrqlrrr.. (t frpctl rrrt crt ttoraro c;r nrniaj-ri-rr-into' l.orip-c'| rgrltx lrtior'a- .'.Atrrrl: mt !c Dattlt{D (r rlnt tfjtt€ E ooautut trr.l.j! qnat tiia,rr|xtt .|Jrl r[ID lo n tt t0. ^ 'r'i!.- J r-[ttX-lnr .. ..'!-b 7.ir tb Cral l{ ./to To: 19ryp or: vAIr, JoB No.4 39E 90 DATE B/L/go nttn: Mr. Stan llcrrynatr t,,o. Box L00 DAILY REPORT NO- 40 sHEErg OFg Vai I C0 81658-0100 ti.{lptgE NO. l89{Egf Ad(lition to Vai l 'l'Tansl)ol'tati.orr Ccutcr', Vlil. Color:atlo, SI'PPIJB sPErFf,ATplt$ 3r ul|P urx r.o. A fooo AN CO IE}IT ArAE}.f TETPF.R TURE RAT,|GE 16r NO. TruC|( ML IIOGT t|(t. TIIIE EATGHE} ru€ ARRryE) TDt€s |lPftrD Rn,ou,Im|{ @UT'IER IFOOI REVOIJ'IION @UMER CO PI.EIION clrfic Y rctorg/ CUMUIAIIT/E WA'IER ^DO@o^u.ot|s L5 Ib L7 1B r9 20 48 119 LL? 114 4B 44 L333 L334 1337 L139 L342 L343 3222 3:2) 3t5L 4:13 4:3'/ 4:50 3237 3:43 4:05 4:4o 4:55 5:L6 3:58 as req as req as req as req as Teq as req aa req a6 req as req as req as reg aE req 120 128 L36 144 L52 r60 0 0 4 4, rElrt{t sllJlP(rlr)lnc(xIEfI(r) TET UNTT TSHT(Fcf)IIE-O @r|cnflE TUTPE- RAnnf, cr) REL au(s tb 5.0 5.8 L39.2 7O 4 cylinders cast PROGRESS REPOftT /rrtorE e Michac I l}arbcr Arclti tccturc I,r" r'4 Antlcrson I t hs t ings i Gary lnlurrain PCL Constmctiotr Scrviccs; UltS Consultarrts; Bill Caru Steven L. Pawlak REI.D OBSES/ER APPSOVED F/ I Chcn€Norrhern.lnc REPORT OF FIELD NUCLEAR DENSITY TESTING Co.-Jtlrt trylxr .t s.Li* m3sEP25tgg0 To: TohrN 0F vArL JoB No. 4 JgB 90 DATe 7/26/90 Attn: Mr. Stan Berrynanp.0. Box 100 DAtLy REPORT NO. 3' SHEETS 0F 4 vail C0 81658-0100 JNVotcE NO. PROTECI Addition to Vail Transrrortation Center. Vai1. Colorado sPECnCAnolt coHp^cTroN t ltATERtAt MINIMUM REOUIRED IN_PIACE DENSrrr 98 r AS CONSTRUC1ON CONTRACTOR: jlltT,l Excavating 651 DETERMINED IJY: LOCANONS WERE ASTl"i Dl55l-under footing SFt FCTED sY: Chen I'lorthern TYPE AT'{O NUMBER T\?E AI.ID NUMEER MEIHOD OF ADOING OF EARTH MOVING UNITS I hoe, I DJ oF coMPAc"TloN UNtrs I wheel roller, Mo|sruRE natural THICKNESS OF UFT L\uueER oF PAssEsfront Loader a6 req reqa6 LOCANON DEPTH OR EI.EVATTON (FEEr) LAOORATOFTT FIELD PERCE}{T OF (RErrTtr.t/ l,.^xunx) o{tr rE) sorL T/PE ILJI NO.ltAXIMUM DFT DENSTIY (Pcf) OPTIMUM MOI5TURE CONTENT(t) DF|T oENSnv(p'r) MOISTURE CONTENT (x) L5. t52 L5: L5L Lri Lrt at I3 Line,Grid ]5 4t S. of 1l LineGrid J6.5 4r ll. of B Li-neGrid J6 at B I-,ine, Grid f7 4r N. of B LineGrld 57 4r S. of B Line Grj-d 35.5 2 | IlnF 2I BRF 1! BFF' I t DB!- footing grade footlng grade L56,O 1J6.o 136.O 1J5.0 1J5.O L36.a 5.9 >.9 5.9 5.9 5.9 5.9 L33.2 L33,4 L33,9 L34to 154. t L34.3 6.4 6,8 OoU 6.1 6.2 6.6 9B 98 9B 99 99 99 sl. silty sandygravel ll rt El FUIL IIME OBSERT/ANON D PN{T TIME OBSERI/ATION tr|!| tEponr pirrxr! oPfin.|. trrqD A! a iE.tti.r o. on oesfJv^rrrd (r nl Pt r.tr,frtt r,E rir\tr 'rflED Otl r c.t rE//:ro( lo crfalllt f ,flanlxl n€ FfDoiri{xDit c(trPtcl'tlf ortFr pro-r<rsnnt m iu_ unrrro 1||r rr|f3 rlit| on o|xf.iwn 6 rrtt (rccF4f{l (FlF^lP|s. rEsas rrt ra,a( 6 rll ml. anY ls Elrvlr t{LcrJsrrt to c.^Lm^lt q"f ocfirvtrs iuuq.|{.xr. itgt uert ext -rri lic.rqi B$$ rn ofxxr|s (r{ wll€lnR lllE rltl utl]:t sPEclFrll)oa Ilt€ Nrrct-E^fi D€ltsouEIER uEnKxr or TESnNc w^s usfD tN !;uBs't l{tul ACCOfIOAIIGE tYnH /\slu 02992 ^lIO 0vr17 PREUMII{ARY OBSERT/ATIONS A}'ID/OR TEST RESULTS VERBAI'LY REPOTTCD TO: LES WOOd rnl^ -PROGRESS REPORT 'lI1E placed for footing bottom of footing. above tests were perfor&edll Line, Grid 37.5 - 34.5. Excavated to natural soilt on the structural fill being Efevation taken fron ]7.5 - 18.2 and Pad llrtxll+t. coPrES xltl?"t"f"3:5.t"filil:cture' Anderson & tlastings ; l:tr' 6ary Murrian; PCL Construction. Attn: I{r. Denny Armour; l)RS Consul tants , - Attn : Mr: . [,cs Wood ; ]1i11 Carr Steven L, Pawl-ak RELD OBSEfUER APPNSVED F' as a rlr|ll/lt pxrlrtlrr. rp qaml nli Fttt-D rro f-k!rrl ,rtl FDtFTT art !r,Frno AS nf coTlttranr( F$l'?tTY (F qn crfxE l,l, alrol2llpr t FIita_ tpt or stlrfutt{Tt oo€ruqt€ <rr rflrrcn tlrx (n Ftq r{r{t or,a mrcin*r -n:tnil ptrnir <xr txnrrt At'PifliA- sr}'?u! ral 8e D|tFor-o 0f lfltr lEllllo 6 cort.fllD rDt.El q}r lf|fiIraxlr ,.,lf rftLD to r| Itnllxq. ^ 6-nrr .r *@*, -'!rcr. r6i tL. Claltt^ Vb Clten€Northcrn.lnc.Comdun{ hgltF.r. c.t4 ld-dLtt REPORT OF CONSTRUCTION ACTIVITIES As A r^mxt FftnrDl ltt €trlfl:i nf riJn E |lQ (I,rrft'f!. 4f |!!t'!!fl rFt SUlnnm As Trt|| @f{Il'rw--Prif|"rr G qI ofxnt xO ||'IlmUAlOl fm l!'u- rX-r.d:f^rr.'.l3co.uuEqr(FrrIr,cn'nortoiitf$at'|oourrntrairs-dircrnirr'r.tlruirri_<r.nrrlrrol'';#A.s,'rf'JHuED6Pc6odrrIIrlE''G ootarrno urtrls o lt lflirr€llxr3 rt[ l4tt.D lo N fnlrr|(r ^ n-n- .. *[ftt -l "'.r o. Gott?'rr.. frri tc. clllor^ a/l(' ru: TowN oF vArL Jog No. 4 JgB g0 oArE 8-20-90 Attn: Mr. Stan Berryman Mlty REpORf NO. 54 SHEE1 1 OF 5P.0. Box 100 Vail CO 81658-0100 |I{VOICE NO. PRo.TECT Addition to Vail Transportation Center, Vail, Colorado WEATHER CONDffiONS AND TEMPEMTURE Clear. A-M.: partlv Cloudv, p_M. , Sho.rers_ CONIRACTOR'S CONSIRUCNON ACIMNES PERSOilNfu IIAJOR EOUIPMENT: AEIMNES: CHEN-NORfi€RN'S SITE ACIMTIES Fu11-tine Obserration, Testing. Inspection: Structural fill being placed for ser,rerlile ard inlet South Frontage Road. Reinfor- cing steel being placed for deck topping, Level 4, Line A{, Grid 6-8 and Beam, Level 4. Ccftpaction testing was perfo:rned on structural fill being placed for footing slope. L€vel 2, Stai-r No. 10, reinforcing steel placed for wall ard footing, Stair No. 10, Ievel 1-2. VERBAL COMMUNICATION WTTTI CONTRAGTOR, ENGINEER. ARCHITECT. OWNER L,es Wood was advised of the test results of fill placed for Pad at serer jnlet, South Frontage Road. coprEs xi:li" t"ri$rt';1ll; ;l,x'"" i,",,ui,, PCL Construction Scrvices, Attu: I'tr. Denny Armour: Andcrson G llastings; llllS Consrrltants. Attn: lvlt. l,es Woocl Clrcn€Nonhern.lnc.C..-/t!ot [rnfEr -a s.r.ts REPORT OF FIELD NUCLEAR DENSITY TESTING a3 A tt nt^! rrtclu{ rtt qrxTt, I}f F|rnr lrrt Gtrl't\tt Af Fft\rnt lrtf gFrl.TtD At rtr cualtoor4t- ioPrtTl (qf qlnnt l]lo AIrIloAlDl rf F'aEA- nor (r srAr,lxn, o rcl u!r{rr!r qr rrrrrcr! rFfl oa Rrtrv{,..o otn lrrqir'ir"'nijinip'rtiirird-q,n -mrnrx ^Prno/a- s^lt\-8 rar E ltluD d' Artoi lttrNe E ou?rflD t'll)l goll r&|r|rro{[ li. ,ar[r-D lo w f,i[IDir ^ n-nr- .. r- fXf-iE-Is... , d,+rr- t rir ,|l ttItqrA {./aO To: TotvN oF vArLAttn: Mr. Stan llerryman P.O. Box 100 Vail C0 81658-0100 PRqrEcr Addition to Vai.1 TransDortati.on Center, DATE 8-20-90 54 SHEET 2 OF JOB NO. 4 398 90 DAILY REPORT NO. ItwolcE No. Vai l, Colorado SPECIRCANON COUPACNOH t MATERIAL MINIMUH REQUTRED |N-P|JACE DENS|TY 98 r AS DETERMINED Lrf: ASm,l D-1557 CONS|RUCIION CONTRACIOR: B&B Sccavating TEST LOCATIONS WERE SELECIED Bt': Clren-Nortiern METHOD OF ADDING MOISruRE Natural TYPE A}ID NUMBER OF EARTH MOVING UNTTS 1 Bobcat TY?E Al{O NUMBER OF COMPACTION UNIIS L Dual !{Lreel Rol-Ier, THICKNESS OF UFTA= Required NUMBEII OF PASSESAs Required L Jrlrtpinq Jack *BFFBelcw Footing LocATtoNGt*d" DEPTH OR ELEVANON (FEEr) LABORATORY FIELD PERCENT Of'(Rtl Tl'€l Lt^xlr&u)ompd SOIL TYPE It)l NO.}/AXIMUM DRT DENSI T (pcf) OPNMUM MOISTURE CON1ENT G) DRf DENSMT (Pc{) MOISTURE CONTENT(r) 9 40 23 2 74L 242 L8' Souttr of A-Line G1 20r South of A-Line 01 24' Souttr of A-Lixe €1 26t South ofA-tine @1 3I BFG* 2I BF'G Lr BrG Footing Grade r.36. 0 136. 0 1"36.0 136. 0 5.9 5.9 5.9 5.9 132.9 1-33.1 133. 4 133. I 6.6 6-3 6.0 6.l- 98 98 9B 98 SIightly Silty Gra- velly Sand sl. Silty GravelllEand sl. silw GravelllBand sl. silw GravellySand EI FUII TIME OBSEf{VATION t] P$ff TIME OI]SERVATION tl{B fFoir FiErxIS (Pl{lr{!r n,!ral! Al A nclutl or o.n oGUllAl(r|! or ntl nA:tl,f.NT. trf lt^\t mll'o of{-Txt 'tt'rna:TttR TO Co|'r} r 'Ptrttr€ llf FrDotrrttxD qrPrcrtl f, ttFrtw ^tto t dsntrf m ltrl unrlo rxr rr*s rr tru'iih' iin* niirl n-rrn onsrnvrtlo -wnrrxrrs' rFJrs /rn€ uADf tr r.r ml c'r_Y s gtr-fytD rrrjrtrir rr rrrra rE s- orsrrrrft .ruDot)fxr, rtsr rrn li-'iii ii'ti'ir ii$"Ntt-ct+rnc rx $trlul Tllt FlLl vEnt sPEcltlc llo'3' lHE Nt CIEAR D€}tsottEIIR UEnm Of TEsnt€ w s usf! rlt 5UI'Sf^|.IIUL rCCOflO l{cE wnH ASlu 02902 A}lO DJO17 PRzuMlt{Afil oESFIT/ATIONS A}'lDlOR TESr RESULTS VERBAITY REPORTED TO: PROGRESS REpOFf Tests were performed on the stnrctr:ral fill being placed for footJngs Stair No. L0, Level 2. coprEs xt;li"tMli"B:I.t'ft'j*:cturc, Anderson 6 llastings; I'tr. Gary ttlurr; an; PCL Construction,- Attn: -.lrlr. Dcnny {nnour; llRS Consrrltirnts , Attn: MT. Lcs llroo(l '' B. Carr REU) OBSETWER frfoob'W Chen€Nofthcrn.lnc.{.drr0t|' t 'gh.rt .i Ll-d... REPORT OF FIELD NUCLEAR DENSITY TESTING At ^ |l,rtl|( ?rEIIEIul It' clrxlr, r}f |ltnE,.G,i'f1\t1 Al '|fIl,t't,,t 3ur.r'ro l3 l}f c07Df}.rw.fi.??iTY d f' ct Eff' Ao A,rrGl^ltx ^l F|r( l}- ror o. srArnftxrl G(rxrnta.r qr mr'c.r! ?,rrr m ruo^,rl,.ro q.n mrorf'fflni-o *ltiars-ori lnnrx rIPRava- 3Arfus rrl Ir ulF(ED 0r arln n:n o 6 corurrD t,|Jt q|rl't rrivrfrl,fl ,rr ,alllD m rl ffltll{(l ^ i't-.. r.Fiil-ll.r d a.r rr. F-ir |... CEICI r/ao TO: TOhtN 0F VAIL JOB NO. 4 598 90 DATE: g-20-90 Attn: l"lr. Stan Berr.ynan DAILy REpORT NO. 54 SHEE; 3 OF 5P.0. Box 100 Vail CO 8L658-0100 tlwOtCE No. lRo.rEcr Adcliti.on to Vai l. 'fransnortation Ccnter, Vli1, Colorado sPEclncAnolt coup cTtoN & UATER|AL MINIMUM REQUIRED IN-PL{CE DENSTTT 95 X AS DETERMINED BY: A.STM D-1557 CONSIRUCTION CONTMCIOR: TEST LOCATIONS WERE 5tr1 FCTED FY:Chen-Northern TYPE AND NUMBER OF EAfiTH MOVING UNns L Front Loader, L Hoe TYPE AND NUMBER OF COMPACflON UN|TS 2 Jtrncinq Jacks METHOD OF ADOING MOTSTURE Natural 'THICKNESS OF UFTAs Required NUMBER OF PASSESas Required *B9l=Be1cry Subgrade LOCATION DEFTH OR ELF/AIION (FEEi') LAtsOBATOMT RELD PF.RCBT OF (REr rrvE/ M'JflT'LU)ogutE) SOIL TYPE It->l NO.IIAXIMUM Dtaf DENSTTY (pcf) OPTIMUM MOISTURE CONTENT(x) DRY DENSTTY (p.t) MOISTURE CONTENT(x) 43 44 2 2 245 East of ErtranceNo. 2, S.D., Line C East of EntranceNo. 2,S.D., Lile C East of BxtranceNo. 2, S.D., I-,ine C 5' BSG* 4I BSG 1I BSG U 0 0 140 140 140 6.r 6.1 6.1 1"34.2 134.0 1"34 .4 7.6 'lA L0. 1 96 96 96 SlightlySilty Sandy Grave1 s1. silw Sandy Grlvel sI. silw Sandy Grlvel E FUII TIME OBSEFUATION N PN{T TIME OBSEF(VATION nnl rf,F(xtT Pierr{l:t mtD6 tuirfD A! A nf,t Ll or orrn otlltiv txttlt rr nl tl,.tufxt tt llAw nfl'FD ('l ntr 'JlrrR^fiwl m c('flmr' l'fLnMl rlf Rttrri{'Dr'ou'|F|gI|\[frr'I^|.o|,(En,rI''l|.l.u'$|ot|rtt'{svrr'.'riin'ijdar]r'na-',.rrf6f'T'l'.q.FFn^lr'(s'lrs's{rfr.ro(o|.1wlq{I As e(l,f.vt N[ctss rr ro qarrlE (rr o06ur\,ti! .rura!u.r. rrsr Ltrre ^ni'i*li iii]:iir,i orsri rtn tinflqrs ot wrfrfJl I]tE n[ uxl SfrorEAtx'6' THE NIJCI E S D€N5iOTaEIER uEnm oF lEsnNc w s USED tN SutrsrAlfiu|- lccgRo llcE wnH A5iIU 02992 A}l0 tr1o17 PREUMIMFy OBSERfA'IIONS AllD/OR TESr RESULIS VERIIATLY REPORTED TO: I€s Wood pROGRE5S REpORf Tests were performed on structural fill behg placed for the concrete sewer inlet and PiPe. coPrEs xtil?""}i'B:;.t'fili::cture, Anderson 0 llastings; Itr. Gary Murrran; pCL Construction,-Attn: --ltlr.- Dcnny Annour; llllS Consu I tants , Attn: Mr. Lcs woo(t; - B. Carr S.L. Par,rlak REI' O6E}WER APPRWED Sf ChenSNorthern,lnc. O.rdha f^rh-t n/ t r..|tx. REPORT OF REINFORCING STEEL OBSERVATION ' l wnr.. titttctlx rD qrxT* Irf xrt xo crrtwl ,u irF tt r|la luiflltD ls r|f @|Lxn.t tr'drfirY oF dt (l DlIt l,o a,ll{turD mi F1|| fA- nd. (r n^rrltrrrt crr(r!!(r6 (n mrctr rrrtl or itorfrra qrr nxriir-n-niini.o' rolup-qr rtnrDl lfiitxA- ! lrtEt ru. E EFcrD of rtr8 rlsD€ tr crrtntD uLLtt fllat l#rgrlral! l|f Llllll) lo tl ffiIllt ^ ''th .. r'.[-1ltf t-l r.r I oanyc*r f('i l.n G|{I lt^ a/to TO: JOB NO. 4 39B 90 OATE: 8-20-90 TOWN OF VAILAttn: Mr, Stan Berrynan DAILY REpOKf No. 54 sHEEf 0F5 P.O. Box 100Vail CO 81653-0100 ll'NOlcE No- PROJECf Addition to Val 1 Tran-sportation Center. Vail, Colorado SIRUCIURE Sl,ope Footing and WaI1 UE DO{o'.EvAlXXl RrffoRclllc cosuExrs l/8ncAL lroRrzot{T[ Stair No. L0 Stair No. 10 Stair No Stair No Stair No. 12 T2 12 Level 2 Level L Level L Level 1 Level 1 56#586"0.C.F.F 56#6e6"O.C.N.F 24#5@6"O.C.F.F 24#6e6"O.C.E.F 18#4€12"O.C.OF 1B#4e12" OCrF 30 +4 G6" 8#5e12" O.C 4 Rcnus#4Cont. Bottcm, 4 Rovrs# Cont. Bottcmrl 8*6@6"O.C.O.F. 8#4G6"O.C.r.F B*6[4K cor IFo 6" O.C. 5#4 IvlK Cor O.C e6" o.c. 4#5012uO.C. r.F 4#4e12"O.C. o.c. 8#4 MK Cor. 8#6 MK cor 4#4012" O-C- Section B Section B SecEion 2 (Sl-ope Footirtg) (Slope rooti:g) (Wall) (wa1l)Section Section (wal1) Section (wall) sPEclfE llolt$ $trl cRADe 60 F puxs uso REI|FORC$|(' Ctrrl{t 0{€s} clean El Srpp DR^f,u{Gs us€D cr.E R^llGE A}lD ccffin As Required El corrnrson- ADvtsED sPt curor sPEC[rc rnr* As Required El ruu-lue oEsrERl/ATTON B R g.Fpoffnt: T\pE - O PAflT-TluE oBstR[/AnoN n Efl llfr.lcE COILP$NCE Yes HEc r ffi,,ffi Htffiffi ^.-ffi,*tlrDl tNlrull.Y wllf}l #3 Bar SPreader EltA|ru{E Rf,-E11rNED PROGRESS REPORT Placsnent of reinforcing steel appears to be in general con- forrmnce with tlre project specifications. Michael Barber Architecture, COPIES Attn: Mf . Scott Ward; Glry lr{ur:rain PCL Construction Serviccs, Attn: Ml'. Dcnny Armour; Anderson 0 llastings; URS Constrltants. Attn: lE Chen€Northern,lnc trdh fhrb.-r -i S.l..tu..r REPORT OF REINFORCING STEEL OBSERVATION lr A \rrur{ tioncTrra ro cltxTr, .nf t(tt x|' (ltrr\/[]l ltr RfFrr xlf lrr.Tnt lr nf omaxrv\ FFttrt (r (I.t ctl}fll l,O ,l',rnr rrn tni ]ttrE^- ro,. g" gtan1arnl c.ra1,qr,! on rxtn cn rinr m ltor.o.c ql mx*.id -mrrwil mrrorn -o-a rrrrml rl+mre- 3rr4ut Yrr E lEFqr'o or rtrB rtjnrg 6 oo4lrttD ('utt oltat rewtlllxl' A[ ,gll[l) lo r| n!lr€' ^ '.,d'..t r"ftff;'-l r-.r rr orecr 7l'r *r. C{l lie a/6 TO: TOIllN Attn P.0. Vai L PROJECT OF VAIL Mr. Stan Berryman llox 100 c0 81658-0100 Acldi tion to Vail 'lTansportation Ccntcr, JoB NO. 4 3tg 9.0. DATE: B-20-90 OAILY REPOKT NO. 54 SHEET 5 OF ll.lVOlCE NO. Vail, Co I orado srRUCruRE Wa1I ttrAIloN EII/AnON RO{FORCI}E co0ro{Ts !EAnC I lroS[zo ra Stair No. 12 Ievel 1 19+5e12" O.C.4#4 MK Cor. 4#4 @ 12: O.C.Section 3 SPEElflCAnOnsr SIEI CRlOe RE nnc {Ct qI^m$ESSt GLEAnANCE At{D C{lfiR SPTJCIHC SPECFrcAIPTIS: lr R g.rPP(ms: TIPE NEH E nerc uso O sxoe o|uwrltcs usED [] comnrcrcn rouseo E ruu"-nue $r$nv rlox D prrr-rue ossEnl/Arlox IPLACE @guwlcE UET PRqf,CT UET PftO'ECT R€'IUIRtI'EXT5 REOI.'N€TE{IS}tnE NnuuY wtlE}lD(^TD{€D RE-E(^I|HE OAIE RE-OCC$tl€D PROGRESS RF9OFTT Miclrael Barber Architccture, COPIES Attn: t{r. Scott Ward; Gary lr{urrain PCL Construction Services, Atirr; Mr. Denny Armour; Anderson 6 llastings; URS consuLtants . Attn: lrlr. I,es l{oocl: B. Carr S.L. Pawlak RELD OBSERI/ER APPRWED Ff Chen€Northsrn.lnc Con.rrunt Lnsl,i...r .d scj- l'(. REPORT OF CONSTRUCTION ACTIVITIES ls A qmr|( Fioncrxx rD ot txnt n|e Prtr E rto f,REL\nJ' 4-t t!!t!!q 'af gnmIID As ni: @trrttlru{ t'tr't'rttY cr otn cr lxrt |ro 'ndu rn toi Ft D^- ,rr, ar nrrrt rrs crrqrlrcl<r (F rxrrl;In rB.rr on ntr$m.,o urn mrgns-c mirrno nlolo -orr rtnrrt,l iF?Rora- s t|'t-E trllr lf DtsiFGn tr rfr txtllD E (Ir.ruft-D DUJ:3 Olllli AAn rltLrlns l,tt ,.&.rJ lo lll ffiIllo. ^ rl.* ., r.. ffiil s-r d <p'r,c,*r f.nn x., Crfltl r/ao lo: TowN oF yAIL JoB No' 4 399 9g DATE: 8-2L-90 Attn: Mr. Stan lJerryman DAILy REpOKf NO. 55 SHEE; 1 OF gP.O, Box 100Vail C0 81658-0100 tt'tVOlCE NO. pRqJEcT A<Jdition to Vail Transportation Centcr, Vaii, Colorado WEATHER CONDMONS A}ID "IEMPERAIURE Clear, 70cF. COIffRACTOR'S CONSTRUCTION AGTMTIES P€RSO}IN& IAK)R EQUIPMSNT: AGIMTIES: CHE}I-NORIHERN'S S|TE ACTTVMES Fu11 Tjrre ObsenraLion, Testing, Inspection: Concrete being placed for topg:jrrg, Level 4 Deck, Ljle A{, Grid 6-8. Ile5nforcing steel being placed in same area. Ccnpaction testi:rg of basecourse and proof-rolling' rrorth side of Souti Frontage Road in prelnration for paving, Stalions 10+00 to 22+OO. VERML COMMUNICATION WTTH CONTRACTOR, ENGINEER. ARCI1ITECT, OIYNER cop,Es Xttlii""li'3::,t'ftll.t';Elliuri,u",oin PCL Construction Services, Attn: Mr. Dctrny Arrnour; Anderson G llas-tings; .. UltS Consult;rnts. Attn: tqr" l,cs woo(l;- B. Carr S.L. Paw1ak RE.D OBSEM/ER APPNSYED BT Chen€Nofthern.lnc.Co.-Jl,lnt gt*-. .{ S..taL REPORT OF FIELD NUCLEAR DENSITY TESTING Ar A Urnl|! piorrErpl rtr otrxlrr nr n,rtr lr{t (l-Rrtt\tt Al nttfE |Jr( lrtrafnD a! nt couxra-}tctrt F di q[tfrl ^]o AI]fL rDl 7rr ilt EA_ r"r d- srlrwxrl otro urrrrr orr m?rcxt rrtrp (n fo{rn€ q,. arr.lfirf iri:tnf -ptir(ird-qJn -rEnt,t /usTora- s'rlf{I:l Yrr 8( DttFort G rtrrr lEill€ 6 cl|runD ttrrtr onlt ,fiaf,rrxll l.I ,GID lo fl ttllr€. ^ rrir'o- d r.(Tiff-ln r d d4'- F trlhC||Clot a/s To: To$,N oF vArLAttn: l"lr. Stan Berrynan P.O. Box 100 Vail C0 81658-0100 lEqqE- f Ad<lition to VaiI Transrrortation Center, JOB NO. 4 398 90 OAILY REPORT NO. |I.{VOICE NO. Va i.1 , Colorado DATE: 8-21-90 55 SHEET 2 OF SPECMCATION COUPACTION t I/ATERIAL MINIMUM REQUIRED |N-PI,ACE 0ENSffr 95 X AS DEIERMINED Bf: ASTM r-1557 CONSIRUCilON CONTRACIOR: B&B Rcavatinq TEST LOCATIONS WERE SnFCTED BY: Chen-Northern T'/PE A^lD NUMBER OF EARTH MOVING UNffS 1 D-3r 1 Front l-oader T\?E Ar'lD NUMBER OF COMPACnON UNTTS 1 Dtal trttreel Roller METHOD OF ADDtNc MOTSTURE Natural THICKNESS OF UFTAs Required NUMBER 9p ptr55g5As Requi-red LOCATION DEPfi OR ELEVA1ION (FEET) LADORATOFry RELD PEFCDIT OF(REfirrf1 ta)ou{ru) onr [€o SOIL TYPE I E)| NO.[IN(MUM DI{Y DENSffY(pcf) OPnMUM MOISTURE CONTENT(r) . DRY DENSrIY (pa) MOISTURE CONTENT (7) 24 24 24e 249 25C e I Line AO.2 at crid 38.5 Line AO.3 at Grid 36.5 I-,ine AO.8 at Grid 38 Line AO.B at Grid 36 Line AO.5 at crid 38.8 Subgrade Subgrade Subgrade Subgrade Subgrade 136.0 136.0 136. 0 136. 0 136. 0 5,9 5.9 5.9 5.9 5.9 0 6 0 4 z L32 131 131 131 131 6.8 6.6 6.L 6.4 o.z 97 97 96 96 96 sJ.ightl-y Silty Gra- velly Sand sI. sil-ty GravelllBand sI. Silty Gravel116and 51. Silty GraveUl6and 51. Silty Gravellysand E FULL TIME OBSER/ATION tr PART IlME OBSEI{VATION nii ilr'Foir pifjr}fir (pxD€ trrt|4t Ar l Fetrtl of olrt (tsrFr' rx|6 ('f n|l n,aaruftal. rc lAvf nfl rru -oll llr cltnR ';to'l m cdJrm,,f' lPltYn{l ftf m3lr1r1 tOtL Orrr"rg115 1;rq1 AxD rrqsltrt m rtl. xr1, nU rr.rs m"X'Uh iiiiifni.f A-prf oEFrMt&l -OFFiArXt6. lr5rS /r,t U nt Of nrf trt G]Y ls sutr,tD Hrrfisrkr ro c{rnlrE tr-n or*rFvtr: Jur*.I{nr. rt:l rxra frT& ii'f-irr dtiri rlx oflxx}.s o+l srlrllnJl nt€ rltl ulEnt if[orr^rp6' ilE HtrcT.EAR D€.EOuEEn MEnm Or IESnr$ WAr USID tN SUgSnruL ACCOffD NCE WIIH ASIU 029c2 Ar{0 DJo17 PREUMIi{ F/ OBSEF/AIONS A}{D/OR TESr RESULTS \ERttALLY REPORTED TO: PROGRESS REPORT Tests \4rere perforned on the structural fill being placed for slab-- on-grade, Level One, Nevr Structure, Line B to Cf Grid 36 to 39. coPrEs Xttl?"'rP'B:i.t'fi:i::cture, Anderson & Ilastings; ldr' Cary Murrian; PCL Construct ion, - Attn: - -lt'lr. - Dcnny ArmourI l.lRS Consultints, n ttn: Mr. Les l1ooo; B.Carr FIELD OBSBUER S.L. Pawlak APPRCryED FT Chcn€Nonlrcm.lnc Crdrui [4lr| ei sffi REPCRT OF FIELD NUCLEAR DENSIfi TESTING ^' l l{rru|t ?rrrfEtEa l! arrxtt nl nnE |}o qrltltl ,rl lrtrtll| rq 3.r4na At ttf ootlQqlulr]T'?rr c qt cr'fiTf, l,{l amIig rl'l tti nf,'Elp ttt r ttattr.t'tt tttt€tlrc' .'l r*ruclt tt(^l 0,r irr{t' o' nxriir- o*iinid'irilir-irl -rrlnrx'-irltola' $rr(t: ri'l r( lrf,trD t' lfnr n:nlr ! qrttrnl, ('ll.lt orrll ,fwr{||,ttl ,Jr( l.tllfD lu tl flltltx\ ^ ff+.. r r,.Ffff f lr-" r.r'r-r.. - '. .r-.-. a ?-l TO: TOWN OF VAIL JOB NO. 4 39.8 90 DA'IE: B-2L-90 Attn : l|r. Stan Berrymanp.0. Box 100 r'r'rrJrrrrd'r o{LY REPoRT No. 55 sHEEr 3 0F 8 Vail CO 81658-0100 D{VO1CE NO. PRAJEGf Addition to Vail Transpo?tati'on Center, Vai'l , Colorado IEST NO.LOCAIION DEPfi OR ELEVANON (FEET? TAI}OT{ATORT RELD PERCOII OF(Rolnvq/ TAXUUU)@IAI€' SOIL TYPETlN(MUM DRY DENSfi (pcf) OPnMUM MOISTURE CONTENT(x) DtrY DENSTTY (pc-r) MOlsruRE CONIENT(z) 25L 252 253 254 255 256 257 Line B.3 at crid 38 Line 8.4 at Grid 36.5 tine B.8 at crid 38.5 Line 8.3 at Grid 37 Line B.8 at Grid 36 Line 8.5 at c,rid 38.5 Station LGr50 Subgrade Subgrade Subgrade Subgrade Subgirade Subgrade Footing Grade 136. 0 136. 0 L36. 0 l-36.0 r_36.0 136. 0 1_38.6 5.9 5.9 s.9 5.9 5.9 5.6 L32 132 L32 132 3 L32.0 L32.I L34.2 L 0 3 6.6 6.7 6.6 6.3 6.1 o.z 5.2 97 97 97 97 97 97 99 SlightJ-ySilty Gra- velly Sand sl. Silty GravellySand sl. Silty Gravel-lySand Sr. Silty Gravel116and 51. Silty GravellySand sI. Silty GravelllrSand B&B -3l4" Basecourse Michael Bartrer Architecture, COPIES Attn: Mr. Scott Ward; Anderson & Hastings; l{r. Gary Murrian; PCL Construction, Attn: Mr. Denny Arnourl URS Consultants, Attn: Mt. tes Wood; B. Carr S.L. Pawlak RELD OBSEFVER APPRCIVED Sf Chen€Northcrn,lnc. O.ritt|. la{3r| -ia t r.rt.o REPORT OF REINFORCING STEEL OBSERVATION |t a |rntrl|( rErtlErEr to clrxtL Df nrE ,|{, ortrtw\ ar |'txll! ,r( lrtrrmD rt $|1. ottr.Dlxr1|! rmtfrTt G Crt dI){Il ^'o x.'n6rl rDl Fdl 'R$-r*,x d sl^n1a,11t c1;€lrg ! (11 rx;n^cp ,l r oi ifo irri cur llfcri-B -rrir*ip- |t)rol<rl rEm rr?mnL S lfu:t nr E dFqm 6 "Trl lfJlllo 6 co.atfi! t rl,n olli.t ,f-ctll,||.}all Arf ,alillD lD H rnnrrl r 'r''.- .. r..l'jjiEl r-t d !..'i;c.- f.r. ||i. Clal lt^ a/F TO: JOB NO. 4 398 90 DAIE: 8-21-90TOIVN OF VAIL Attn: Mr. Stan Bemyman DAILY REpOKf NO. 55 SHEEr 4 0F BP.O. Box 100 Vail CO 81658-0100 lNVOlcE No. PROTECI Addition to Vai1 'h:rnsportation Ccntcr, Vai1, Colorado STRUCTURE Deck Loc^noN Ell/ lloN Rerronc0{c coloro{Ts wfinc L ltofu,toNrAL Line A-8.9 Grid 6-8 Level 4 193 Rcxos #4 @ B" Ibttdn,East West; L29 RCIrs #4 @ J,2"Irop,East West 110 Rcr,rrs#4 0 l-2"O.C. Ilop & Bottsn,ltrorth- Souttt; 3./4"S1ab Bols- ter e 36" O.C. sP€curc^ro s: srEr cR^E 60 Gl rus uso - RE'f(ncwc ctr llLNEss: Clean EI srpe Druwllcs us cII R^NCE ^fiD Cot/ER As Required El comnrcron ronsro sPt o e sPEcnc^rxrN! As Reouired El ruu-nue ossrF/ noH BAR slJPFofiTE: Tf?€ - tr P Fr-rrE oosmf noN FHFrI llPllCE COULPI IIC€ YesHoc'r ffi'm" #il,ffiffi ^.-ffi'*EX l/lt{@ RE-E(AIN@ PROGRESS REPOKr Reinforcjng steel alryears to be in general confo:rnance with pro- I j"tt q>ecifications. Michael Barber Architecture , COPIES Attn: Mr, Scott lrlard; Gary Murrain PCL Construction Serviccs, Attni Mr. DennyPCL Construction Services, Aflnouri Anderson 6 l{astings; URS Consrrltants. Attn: To: 195rp oF vn I L Attrr: Mr. Stan Bcrrynan P.O. Box 100 Vail CO 81658-0100 qlgyqcf Adtlition ro Vail TrnnspoTtation Ccntcr., JOB NO.4 398 90 DALY REPORT NO. tlt\ otcE No. Va.i1, Coloraclo.- DAIE 8-21-90 55 SHEET 5 OF I^bstern srrPPUm ltlobile SFEEFEATpN* sUAaP t9ltD' c 4soo 3r_5rl An coi{IENT Aug 7? AIITE}II IEIPERATURE R^}ICE 600 - 900F. rEr ML lnrcxMI IIG|(EIt(,.TIUE IrArcltan llu€ ARfiYEI) TrlE SATTP[.ED RnioLtflloll @UrfTER DEOltl RE\OU'ITN @IJNTER @llPt-ElKnr cuBc YAr[}s t-orD/clruut r E lt 'tER AIng) ol|.loNs L 2 3 4 5 6 7 44 L19 1I7 150 t2 27 48 L687 L688 1690 1691 1693 L694 1696 5:35AIul 6:474{ 6:59AIvI 7:O5Atvt 7:16AIvI 7 I27ANI 7:40AM 6:584M 7:L0A{ 7:23AM 7:25AlvI 7:30AM 7: 45AIt{ 8:00AM 7:28A14 7:45AM As Req As Req As Req As Req As Req As Req As Req As Req As Req As Req As Req As Req As Req As Req B l-6 24 32 40 48 56 I L2 L2 I I U 4 rESTt{r su[?(tn)AR corfit}|r(r) tEr uflr IECHI (Pcr) YtE.O oolrcf,ElEIE'PE- RAIT'RI cn REllAro(s 2 ) 5 4lz 7.0 7.0 I40.2 70 4 crylinders cast Sarple taken frqn hose PROCRESS REFORT Sanple taken frqn trud< for qflinders cast. Time observed on all trucks. Randcm slut[r test taken. n rDr're Mi chac I llarber nrchi tccture ; Anderson $ llastings; Gary Murrain PCL Constructiolt Scrvlces; URS Consultalrts; B. Carr S.L. Pawlak REID OBSERYER APPRSVED Bt' ClrcnONorrhern.lnc Cdrrrlr{ trth-. -a sd-ar.L REPORT OF CONCRETE PI.ACEMENT OBSERVATIONS At A tmA tEl?GDl D G{IXB t; Fttr ||.t g't'l'Yls' tu lt'|('rnr r,tf Irtr'TTtD a! r'f, c!.nfxrr|l Ff(t?'ttY ('. cr^ d rxri 'rr|)-AJnr,|ll^lrtl tDi nf-El- rxr. d- sI rTr.txrtr oDtll,l ., c rrr cnt rrqa 0r trf,o rrF qr nJ'drrj-d-ii.itio rdriri-cl,t rmrf}| lr.tfi(t& s rat6 rrl DE D(tlrttD or lnrl lrllrltl E OoiruTtll1|;l| qll|'i,Nil|Ioa,ftr llf EII.D tO ll lEll|q. i.-r- . r,.fXttj-llrrr J ...rwr- a6 b Cllllar aiC CheneNorthcrn.lnc.Ca.:rlttri t tttxt ta s.tJ{f, REPORT OF CONCRETE PI-ACEMENT OBSERVATIONS at a I'11.1 lro'r|ctDr to ettllfl lra tfiE ,rfr .|-frttrrr, Al- itFrrrT:r ^'rf lrDrTrro Ar nl orffnnur-_Ff''rrrY or dtr dlxra 4-o-4lnD\l'lrl'l tlr tutrl- rD. r srlrrrftrtl oor.qrrrr.r rfr frrlrgt! rrrx <rt rro*rt € qrt mr.orri-d-rr:irirto lTxi€ crr t[tltx Al?no/a- sltt'lrt tlll Dr DllFGD tr t EJn€ 6 oorttrtt tAttt oDtr tn rllxtt pa n t ft x tf,fte ^ "r-r.' d rlfTlFlrt- r. 6r-d- r.i |..' .lltll{ a./ao TO: '1gry1r1 otr vArL JoB No.4 398 90 DAIE g-2L-90 Attn: Mr. Stan 0crryrnanp.O. Box 100 -DALY REPORT NO. 55 sHEEf 6 0F I Vail CO 81658-0100 tl.rVOtCE NO. qBqlqCT Athlition to Vai I 'lra rrspolt,at i on Ccrtcr., V;r:i. 1. Cololado. Wbstern slrPPun l4obile sF&rDiID$S: SLUIP ru t.o. C 4500 3 "-5"llll @t{tr}lT Aug 7? AraolT Ia|PER^TURE RANCE 600 - g0ol.. IESTt{}TruC{ITI rrcr(Ertp.TUE E TCfltD lluE ARRryg) 'nuE s ltPttD RnOUfiPfl @UNIER IFOfi RE\DIJ'IIOII C(X'NTER @UPT.EIXXY C{,EN YIGt-ilD/ cuuuL^rt/E WA'TER ADOED oAu,ot|s I 9 L0 L1 L2 13 14 49 54 44 7L7 l.s0 100 119 1698 1699 1700 L707 L702 r.703 L704 7: 53A[,I 8:01AM 8:114M 8:2l.AM 8:314M 8:41AM 8:484M B: 05A[,I 8: L5AIuI 8:23AM 8:3144 8:45A14 8:58AM 9:05A14 As Req As Req As Req As Req As Req As Req As Reo As Req As Req As Req As Req As Req As Req As Rect 64 72 80 88 96 104 112 4 0 4 4 I 1 gr t{L su[?(sr)^nooftrtilT(:) WET UMT UEOHT (PcF) Y[U) CONCNEIE IEIPE- R^NNE co nor ro(s PROGRESS REPORT See Sheet 5 of I .optF\ Miclracl lJarbcr Architcctul'c i Anderson G Itastings; Gary Murrain PCL Construction Scrvlces; URS Consultants; B. Carr S.L. Pawlak RE1D OESERI/ER APPRqVED Ef TO: '1gsv* Ot: VAI L Attn : Mr. Stalt llc r.rynan P.O. Box 100 Vail CO 81658-0100 lSqfECf A(l(li ti on to Vai 1 T'riursl)ol'tat i.on Ccrrtcr.. JOB NO.4 39s 90. DAILY REPORT NO. tN\olcE No. Vai. 1, Co l.or:arlo. DAIE 8-2L-90 55 SHEET 7 OF I/{estern9M r,k,h.i.le SPEfEATIOiIS. SLUIIP 3 rr-5rr IIx t.D. C 4500 Alll cot{IDIT 78 Aug AUUENT TO|PEIrATURE RANC€ 60o-90oF. lESr NO. rnircrMI ICTET t{o. nu€ 0ATCl€) Tlu€ ARNWD .NM€ SATPI"E RErrcUfiF0l @IJ}'IER EOIN RE\OTJ'IION COU}JTER couPLEIloN ;I'BC YAREr9ro/ CUUUTAIIVE w IIR looGDq uon6 15 1.6 27 44 1705 1709 8:55AIt{ 10:06AI'1 9:23AM 10:20A14 9:30AM As Req. As Req. As Req. As Req. t20 L28 5 0 lEsrt{L sll,lf(nr)ln ootfiE}r(r) UET UMTumlft (Pcf) 11E-O coNorE E.IE'PE- RAII'RE cF) REU tU(s 15 4 314 6.8 140.1 72 4 Clzlinders Cast PROGRESS REFORT Prnp in use. Total Pour Mjx C vias "128 ydrSarple taken frcrn truck. ^^,"r.'e t"lichac I l}arbc r Architccturc IuvrrD Andcrson & ltastings i Gary Murrain PCL Construction Scrvices; URS Consultants; B. Carr FIE1D OBSERI/ER ChenONonhern.lnc Cd:tht t r0l|.-| ana S.r-lt REPORT OF CONCRETE PI-ACEMENT OBSERVATIONS A! A lt|lrt tDtfEE Io.trxlt nt nnE ,ro dEr?lwt at irFn:r ./rt tirrrrD ar Dr: ootrD.Itl_J|fid'r'ilY ('. dl d ftar:t llo-rrltnotll^tDl trt 2i'|(EA- n0. 07 rt ttrttTlt oDrtr.llrrlr cr frruc,tr rirx oi rto rrt€ orrr rtlno#-d^riiniD'trjrlt-ui wtlt]l ,'ffftllA- lrltlrt vu D( ocrcrD (l" ,rrtll rE ll€ B dtrrE ttar;l| clrll t rrr{lt xrt t.itt lo lt |lr|l|(l ^ '.rllrr d r.FiFlr* .. ...rr.b ?6 tar. alllaa .,/|O Chen€Northcrn.lnc,Cqdfi h3h.-r dla Sdrlt REPORT OF CONCRETE PL\CEMENT OBSERVATIONS Al a |.trr,( lldrEtrt| tto au]ltt, ltf arE arf, q|[rL!rt al rfFr[rr .nf tFrlttt, ai rtf @aocnrrr fao'?itY (r (ln ct f]"t l'o Al'nl)an^t' fl nltrA- rxr. q rf rrrr.rrt:l corarrrr.r (r rrnFcnr rrrrr ci rtcrdr{ qr ntrurrj-d-rdnio lrrxio -cn |trtrut ,rtlnor& s.rll'tlJ Yrl D( E lltD r rl[l lflf]r 6 cDrTulID lrllI cnlt ,firf,rxlr l'|f ,arll,It lo tEll€, ^ ,r'F., r-lTiii-l rq d ...,r-i. ?ri L.. qaltL /to To: 1gp11 orr vAI L nttn: Mr. Stan l)cffynarr l'.O. Box 100 Vail CO 81658-0100 $qqq A(l(lition to Vail 'fransl)or.t.tti.on Ccntcr.. JOB NO.4 Jgs 90 DAILY REPORT NO. ltwotcE No. Vli I , Colorarlo. DATE 8-21-90 55 SHEETB OF sPErnAnoil$ g.r,raP uq uL A 3000 3 "-5"An coME}{r 48-89 AISO{T TEIPTR^TUFE Western strPPiJa l{obile R^ltc€60"-90"F. TEST M'.Tn CXMI IO( T NO. nuE oArcHEl ltuE AflnryE TIII€s rPr.g) RA,OUnF|r @unEn OEOIN ttEwtxro @Ur.TER couH-Enot{ CU&C YTGl9ro/ Ct UUtAlIr/E w 'tER ADO@ oAuJq.as L7 L8 t9 20 2L 22 54 46 106 54 114 46 L707 1708 LTLI r772 1713 T7L4 9:214"1 9:314M 10: 46A[,I 11: 32A14 12:00PM L:04PM 9: 32AI.4 9:46AM LL:0BAI\{ 11.:41-AM 1"2: L0P[4 1:21PM 10:05A!1 As Req As Req As Req As Req As Req AS Req As ReS As Req As Req As Req As Req As Req B-24 16 24 3L 39 5 8 5 0 0 lEr ML su[?(nr)ArR o(xrE{r(r) tEr $rrwtr+ft (Pcf) tlg,.o corrcf,EIE TEHPE- RATUnf cr) Rf,Ir^TII$ 18 L9 3 t/+6.2 140.8 72 5 C)zlinders Cast: One for Early Break of Beam Pour, Balance of Concrete Truck #46 returned, over 90 minutes. ltucJ< #54 re- turned, over 90 nui.nut€s. PROGRESS REPOff Sanple taken frcm truck. p1nrp in use. Total pour of A lvlix is 45 cry r\,.ors.e Mi chac I llarbcr Arclti tccturc I Attdcrson I Ilastings; Galy Murrain PCL Constructiotr Scrvices; URS Consultants; B. Carr S.L. Pawlak RET.D OBSERI/ER APPROVED FY Clrcn€Norilrern.lnc.C.n d{l|g f,rgltt{. o.)d 5'.J{|lt REPORT OF CONSTRUCTION ACTIVITIES AS A ||,nr,rf nmrf6r[.t ro qfr.rs, Iri: nnE l,r) fEalwt Ant[nrs ^r€ 3urrrrrn] a5 nr ftrartxna frdrtf/ cf' o(! Grr'r3' l'o a/ng[ufn n)i atl u- rr f stlnll,rrrs, cfauglrt oi rxtra:li rF.x on FtoA,rtt{, cur ntxrirs-r iu.rr.ni nirutno-orn rmlu frrf sit!w] ru E u5ff' 0f {[r n:ttlo 6 c(^rttlrtlt itl.tsS omli lri^ra|I,|ns ,rt rlruD lo lll f,fi|lro. ^ "5!r- ., rrt lllll lF|. or oqtcrr td'| t5, craror^ a./eo fu: T6WN OF VAIL JOB NO. 4 398 90 OATE: 8-22'90 Attn: lt{r. Stan Berrynan gALy REpORT NO. 56 SHEE; 1 0F 6P.O. Box 10O Vail C0 81658-0100 lNvolCE NO. PR(}JECT Addi.tion to Vail Transportation Center, Vai1, Colorado WEATHER CONOffiONS At{D TEMPERATTRE Clear, partly Cloudy, 70oF. CONIRAffOFTS CONSTRUCTION ACIMNES PERSO}INfu liLtJOR EQUIPMENI: lclTvmE$ CHEN-NORIHERN'S SIIE ASIMNES Full-tire Obsenration, Testirtg and Inspection: Concrete being placed over 2r' ilsulation and 6x6 wire mesh, Level 3 Deck, for ten- ant spa.ce, Iine A1.4-8, Grids 11-15. Reinforcing steel bejng placed for Beam, I-eve1 4. Itesting of asphalt tltat is being placed norttr side of South I'rontage, Stabions 10+00 - 22+OO. lt'li chae 1 Barlter Architccture 'uurlL> Attn; I'lr. Scott lVard; f,11y Murrain PCL Construction Services, Attn: Mr. Detrny Annour: Anderson fi l'lastiltgs ; tlRS Consrrltants, Attn: lvJr., Les Wood; B. Rf].D omvEn APFft&,h;"H+"k Chen*Northern,Inc -rdha rt!{rrt -a sd..'t -.. REPORT OF REINFORCING STEEL OBSERVATION r, l rrnlA t,irfctDt m orrxTr, f'r E xr} d,trt|lll, ,tl |ttcrrt rft ltrrmD |s nf oofntxlt t _rit w or oltt clDftl l|o aJl]Edlm{ tE P1J|| r - m ', !t^,,r.r{tl o'.'r ur.{t oi rxnt..cn rrr:r,t tr,r rro ror.r crr rroin-n--riinio- rooeri-or rrnrrx rfttovtr- ranE' ru E rFqrt f r|Ttr IEn€ 6 corlr|tD u(l'! olllu lniu€arlrflt lJlf ,6.IIl lo H rafirr. a t*i- ., *lTlmr-f .. ornrr- t'6 N.. c|.lltt afto TO:'t0lrN Att : P.O. Vai 1 PROJECT OF VAIL Mr. Stan Berrynan Box 100 co 81658-0100 Adclition to Vall'Iransportation JOB NO. 4 39-8 90 OAILY REPORT NO. [.,{volcE No. Vai 1. Colorado DATE: B-22-9O 56 sHEEr 2 oF Ccntcr. STRUCTURE !m rpt{El.Ev^notl RSIFoftCtr|(i cortlo{Is wrnc.,\L HO{dZO{T L Line 82, 8-Ll-IeveI *4 st5rrups e LB" o.c. 6#9 Equally Spaced, $op tc Bottcm 090#9x1'0u' @ 48"O.C.to St4>- port Top Bar 2L"Bear Bols- ter @48" O.C. sP€CUXmqG: SIEIL GR De Rtrtfuclllo Ct.E |{t o{Esrc ctEARAr|cE ANO COVER sPuc$tc sPEcrt Tnt* BAR $JPPORTS: T'PE M{FH 60 Clean As Required As Required Cltair 2" Etr purrs useo El snop Dr nNcs usgl E comnrcmn romeo El ruu-nur ocsE U noN El prrr-nre o{rsavllox hPUCE COIrIP$}ICE UET PROECT UET PRq'ECT nEt|(rl REqnnolofis DA1E RE-OCATITI€Dwto,t Nru[Y rw]lEO\TN€D RE-EW{I'ITD Yes PROGRESS REPOKT Michael Barber Architecture, COPIES Attn: Mr. Scott lalard: Gary Murrain PCL Construction Serviccs, Attn: Mt. Dcnny Ar-rnourl Anderson Q Ilastings; tfRS ConsuLtants. Attll: It'lr. Lcs Chen0Northern.lnc.cqrr(,na [tClt-r qta sd.lr.lt REPORT OF CONCRETE PI.ACEMENT OBSERVATIONS A! A r..rnx. tilrrE Eir to cttta?l' Dt E |lo d:tllft al tflFolr:t ^it s.i.frTD at rlt: c(tfnorr|r lro'rtTY or ort tl frr:l T O- Amo.llrlD' frl Ft,llr -ru, F ryarrlrrrrtr (DrerrElr rr rxrircr3 rrq, (f rfq^f,r€ ur rurrlj-d riiinio -n,rp-q,r rrnlrx rvY'ort sllt'|tjt vrl De D(]!do r rrftr ftJl}E B oorurot urar.I clllt ,rnl)axl! ,ta l.lI-D ro x lltlxc ^ 'r-i.- r r. [i]'iir-lr" r1 .''r1*,*' tc r\ CLll.. .,/ts To: 19p11 ot; vAIt, JoB No. 4 g9s 90 DATE g-22-goAttn: lvlr. Stan llcrryrnanI'.0. Box 100 DAILY REPORT NO. 56 sHEEr 3 0F 6 Vail C0 81658-0100 ltSrcrcE No. lEqlECf Arkliti on to Vail 'l'Tansl)ottat i on Ccntcr. Vlil. Colorltlo. Western$Pnm uobile SPSlfEATprlt$ 3r lrUP 3" _ rxr LD. D 3ooo 28-davs 5"An coffIE{I 4g - BB AISEHI TEIPERAIURE RA}ICE 600 - 900 IErlp.TNUCX ML no(Er t|o.IIUE ITATCHED ITUE Arob/E} TUE s rPtE) RnOUtfXN cn{J'flr-R trout REVOU'IION OOUNTER q)UPI.ETION ar&c YA&)s t_$D/ cuUuUlrrrt WAIB ADDq) cALt NS 1 2 3 4 5 6 46 54 100 11.4 44 100 1723 r720 L727 1730 1735 L737 6: 51 AIul 6:36 AIvI 7:23 Ali 7:51 AIul 8:3L AItl 9t22 AM 6257 6:56 7 245 8: 15 9:00 9:35 Ai\,I AivI Al,I AM AIVI A[,1 7 zL5 7: 58 8: 35 9:20 9:48 Al,1 AIVI AlI A[4 At4 As Req As Req As Req As Req As Req As Rdq As Req As Req As Req As Req As Req As Req 1 I 16 24 32 40 3000 Grout 26 5 15 15 5 lErlII sll[?(0r)AN corflEilr(, tEr ulirtffHr (Pcf) Yta.o R€ll^f{(s 2 3 4 5 6 314 3 1./2 '6 3/4 2 t/2 115. 9 70 Four clzlinders casti Sarple taken frcrn prrq) hose. Slurp at hose=S". Slurp at truck=6 3/4" Requested by ormer represtntative, Les l{ood PROGRESS REFOKT Tine observed on all tnrcks. Total pour 40 yd3 ...rorre MichacL llarbc r Architccturc; Andcrson G llastings; Cary Murrain PCL Constructiort Scrviccs; UllS ConsuLtants; B. Carr S.L. pawlak RE,.O OBSERI/ER rppRono sf ' Chen€Nonhern.inc.C..-Jtltf tnC-. (n 5.r-fi4. REPORT OF ASPHALT PAVEMENT TESTING a3 A ramr.( pno||rctrx nr arxrl nf trr.E lr{, (rritltl It ifFutxt arf 3l,taTlfn a'i t|[ oc|rDtxtt,( tFtrlfY oF oun or]"r' llo aT rJln'flrx frt PLdxA- rrir (v sr^trrl!.r':1. ct1{r rxr.. (n r xrrgcn r;(x oi ntq ^rrc cl nxiii's*iiiioio'-njrrp or,r wtu lfftwa- s'rsns iu- lE DcFqt! (r |fnl rEm€ rt orfttnl, urt:t snrt ,[l.||I|lral! ,{r .rttl.o lo x lltlt l t ".rr* .. o. (l rrrf-l r..r c cd'l-l.. frri |... c:arl tol r/'F TO: 1ItnN OF \/ArL JOB NO. 4 398 90 OA'IE 8-22-90 Attn: Mr. Stan Berrlmlan DALY REPORT NO. 56 51161 4 OF 675 South Frontaqe RoadVail C0 8]657 tl.tvotcE NO. PR(I|EC[ Addition to Vail fransDortation Ccnter. Vail- Co] n*'rtn SPECIRCATION COMPACNON E MATERIAL Ull{llt U A\rmloE CXn€ N-Pl.lCE IEtgTf (F c(r\Emrtlxn co{|R clm PERCAfi OF THE |IAJOITII DBISTT IEST u)CAIXI}ts f,GRE SEICIID AT RANDOI N TCCM^NCE I|IIH ASTI' D JOI|L rtPE ^l.llt rlu$m (r oolPcnql uNITs L Stee] Roller,. - ' ' niqNrss a r""r 2u- 'l RrDber 'Ir_re ru|Pq runE v E lu.r 2500 - 27}or - MIm of "jTF __l!_Iqtgg IESTMI LmAnoil PA!6IENT UFT umR^rFroo|srr(Fcr) lfvtEu M,ctEAft FELD D€rrsITY (r'cF) Nt ctE aq.P,c[n{ (r) OOREII'I TH 0N.) ffi FrEll) DEr.asrv(Pcf) @nrcoaf cnoN(D 1 2 3 4 5 6 7 8 9 Station 21+85 Station 2L+25 Station 2Or50 Station 19+75 Station LB+50 Station L7+87 Station 16+79 Stagion 15+20 Station 14+40 Bottcrn 2" Bottcrn 2" Bottcrn 2" Bottcm 2tr Bott€m 2" Bottcn 2" Ilottcm 2" Bottcrn 2" Bottcm 2" 150r l-501 1501 150r 150r 150r 1501 1501 150t 143. L r43.2 145.9 L43.5 144.I L44.9 J.42.7 143.4 144.5 95 96 97 96 96 97 95 vt 96 B n LL ilrE GERr/ TlOl{ B pArr TluE oTFERVATXII ntt f?dit pif:{flrt oPrmnar flnr|fD as A msrrr F otn (nrtw mlt o. p^wrfxt coa|stnr[rlt r 4At!.- n!!Fn ofl T}€ ooaarnrcl TO CO!!111E??tYr€ n|{ Rrr rrfD c('.nrrw r1\xr rrr^e€ nrE nrf.s r,rrlr troGJntr s lsr'ijffimia-ieiirirrii- tt-sti l!tt-!!y,x d tllE P^w!tF alY a rq[vrD Errt6'^fr roc f,rlrt crn orr rytrs Jurcryr xr. ]rsr tvul fae ror lrt s(tf n^gs rri1nirrs-<i.i-iii'6-fi tttt piwtr-rrr uuts sPtttlE^Tn6" (E r''r ot,.xrY fE ts golJlr E cs urur) Rrr rryr u r.rJn cdrr.urfD ro @Rf rxl(nft rr nrili iffiixia ;dtn-s€corttxr:i cotrnrtllnl At vurlrL 6 sfvu tlc^rDr6' llfE MJCtr,^R D€|\asqfEIB rEnxro OF tESn C tN ^Cc[ru)AltCE tyrm As|u D2SO Ytfltl coRE conml-ATlo|.s PEIIFORTE) D{ '@tr}nrcE WIrl{ ASIU Drr20 Nr.EtER elrr u{E Troxler MOo. 341L B SERITL NIUER 62 s'IAliDAff) O(rr{T PREUMTMITT OG€FMATIONS AND/OR TESr RESULTS VERBALLY REPOFIED TO@ PROGRESS REFORT Pl-acqrent started @ 12:20 P.M. Michael Etarber Architecture, @PIES Attn: Mr. Scot.t Ward; C,ary Murrian; PCL @nstruction Services, Attn:- Itlr. Denny Anmur; Anderson & Hastjngs; U.R.S.Consultants, Attn: Mr. les l{ood; J. Hofftnan and B. Carr S.L. Pawlak RE.D OSSERI/ER APFRWED FY , Clrcn€Nonhern.lnc C..r.dr,{ trCf}dr dd Sd{iLL REPORT OF ASPHALT PAVEMENT TESTING ls A surut pnot06rEil ro crrxE llf prnE |,o olrisflyEf, AI irr{'rnr frf s{rlfrtfD as nc{tflxxrut tROrrtTt t oun ctDfr' {o lm{l(ami r( AJH,TA- trn oF starfuu{nl. c{rxttuorr! o. frrraas ft(x m sfo/{mn otn atl.tirs r lr:rnro n-m,no cr.n rntrttll lFPRorA- slraPus rJrl E oGFCx! f lfrn lE rDr, 6 c(la\r|Io u.Esr olrrl ,J!r^r€olxn| rlc ,o.wr fD n rfi|t€, a ir..r.- I s.fittX-lr-r , o."Tcr- 16 r|.' Clf,lllA 4nO To: rtr[,,JD{ oF \rArL JoB No. 4 398 90 DATE 8-22-90 Attn: Mr. Stan Berrlman Ec ^..-_ r75 South Frontage Road DAILY REPORT NO. 56 SHEEr 5 OF 6 VaiI CO 81657 INVO'CE No. PRGTECT Addition to Vail [tansport-ation Center, Vail' Colorado lEr M'.l,roc Tlot.l P VEUefi UFT lllpR roffr DE}6ITY (PcF) }|\/EEI,I r/^RsH r.r NT'C1EAR RO-D oE\6lw (Pcf) Nuct",€ R :otaPtsnolr(r) CORE LElrflH (rN.) @RE REI.O D€}ISITY (Pcr) @REcafrcrph(r) 10 L1 L2 13 Station 1,3+1,0 Station L2+25 Station 11+00 Station 10+10 Bottcrn 2" Bottcm 2" Bottcm 2" Bottcm 2" 150r 150r 150r 1-501 L43.2 143.5 143. 3 144.0 95 96 96 96 COpIES lLichael Barber Architecture, Attn: titr. Scrctt Ward; I\4r. Gary Murrian; PgL Construction Services, Attit: Mr. Den- ny Anmur; .Anderson & Hastings; U-.R.S. Consultants, Attn: l4r. Les Wood; B. Carr S.L. Pawlak REID OBSEIIVER APFROVED S' ' Chen€Norrhern.lnc cdrd.E tngh...r oia S.l-15. REPORT OF ASPHALT MIX TESTING ^t A rlm|t ?twftc|r'l to culxtl 1''f nnE r€ clJtrlr,El A-t tftqrE flf :rf'Trrt 's nE colfDo"ut Pic"rtrr c d,l cuxrlr ^,o-,r,ntrrz^tDf' rDi PUllJcA- IrJl rr stAlrlrG oo.Er!:rr6 oi r^TMcE nor f ffo&orn cn rxiri-s-fi:x,nD -fiii;-qt WnPt ,lPtior r- sl4'Lcl mr E 0gfqlD 0r rFfi rEfiF 6 cr|''trttD uusl ('ntt ,4 rEt axtj ltf lruD lo H r,rdllrl a.,-,i'- a r.[EiFl;* r.a.'- t-'n |\ Cltrtlt .r/I TO: TCT,JN OF \AIt JOB NO. 4 398 90 oATE: 8-22-gO Attn: Mr. Stan Berrlrnan7s south Frontaqe Road DAILY REPoFf No' 56 sHEEr 6 0F 5 Vail CO 81657 lr{\OICE NO. PRO.TECT Addition to Vail Transportation Center, Vail-, Co1-orado PI-ACO,iENT LOCATION Station B+98, Right Side of Iane SAMPUNG INFORMA'NON suFruER . B & B TRUGK l,lo. 75 nc|(Er r|o. 112465 Mlx DEsloN GraiLing ETo$6 16.59 nu€ sAIEnEr 1 . 59 nu€ ARR|VED 2. 2S M nte=Zj:S_ REI.D TESNNG INFORTTAIION rrE sArPtI Trxt}{ 2:31 S,r.r|PLE TE!run ruR€ 285oF- }fEATHa O,/ercast AR TEuPfi ruRE 75oF' Sirr|PtllB Pf,GED(lE Taken frCrn aq61er at rear of paver DfiRACIION - GRADATION INFORMA] uEnno oF DcR crr,H c.entrifuge KlsnnE C(}{IE{r ASPiT LT OofflEilr 5.9 | o€sE r lsPfl LT cu{rBfr I t .58 roN SIf\iE ^I.IALE SIEVE lro. PERCA P Sglro JOO U0( PSCENT P SSlllO JOO X TO|-ER NC€ SPECIFICATIONS 3/4 t/2 2/8 4 I 50 200 100 98 86 66 52 18 7.1 r8* r8E r88 t8? r6B t3g 100 3B-72 25-58 I,|ARSMII lNFORli{AnON l|urE of a.(rIs 50 CqPlgtpll TETPq IURE 250oF. lo.1 l|oJ l'loJ AVERTtr HIX DESEN EIIJ( SPEG|TE CR VTr uNrT rffrr STABUTY Ft.ow PERCE{T AR \OIE PERCI}{I \OG RTI.@ PERCOT V.rr. NTEOREIEAI. UMT UtrHT 2.421 15L. L 2448 18 2.429 15t.6 2483 16 2.429 151.6 2732 1.5 2.426 151.4 2555 L6 PROGRESS REFORT Michael Barber Architecture, Attn: COPIES I4r. Scott Ward; I4r, GarY flurrian;p(xJ'Construction Services, Attn:- I'lr. Derury Arnotirt Anderson & H,astings; U.R.S. Consultamts, AtLn: 1"1r. Ies Wood; J. Hofftnan S.L. Pawlak RE.O OBSERYER APPROYED B/ Chen€Northern.lnc.con JUn{ engh...t ond Cd.t'l'blt REPORT OF CONSTRUCTION ACTIVITIES ffi ntrx ,,o o.ft..wr:L Nr.11ry!!l ^FE e,tt'tmD ^s n'r co'r!1g1-.lrqlrry-frrX1trfte"ffiffitg"tlg; 'lr'r (r srlrrrt rt crtq rrqt6 - t;;i;ij-r rni 4 -+ly-ry Gn RiPfiT3 ts Rtlrttul trtt|0'r€ ofi r fltDl ciriinn riirss orl't ^tirr€al{rtls xrt ldll, lo Dl f6lre' ^ 'r.nr,r .. r'.flrtli-lt-r .t 6tar.. f.'.'ti rb. c|afor a/.o TO: TOWN OF VAIL JOB NO. 4 398 90 DATE: 8-23-90 Attn: lt'lr. Stan Bcrryrnan DAILy REpORT NO. 57 SHEE1 1 OF 4 P.O. Box 100 Vail C0 81658-0100 ltlVOlCE NO. PR(\JEg-r Acldition to Vail Transportation Ccnter, Vai1, Colorado WEATHER CONOMONS AND TEMPEMTURE Clear, 70"F. COTITRACTOR'S CONSIRUCTION ACIMTIES PERSOT{NE.: IIA'OR EOUIPMENT: AGIMNES: CHET.I_NOflIHER'{'S SITE ACTMTIES F\r11-tine Observation, Testing and fnqlection: @ncrete being placed at Retrab Colunns, Level One, ecisting structure. Rejnforcing steel fpr Beam, Ievel Four, Lirre B, Grids l-1-1.5. Concrete being placed sanle area. CorpacLion of sserline and inlet, South Frontage Road and curpaction of structural fill bejng placed over drain line, I€vel Ore, souttr of AO Ljne at 30.5- VERBAL COMMUNICATION WITH CONTRACTOR, ENGINEER' ARCHTECT' OWNER Ir'lichae L Barber Architccture 'COPIES Attn; Mr. Scott Wartl;53ay lilurrain PCL Construction Services, Attn: Mr' Denfiy Armour: Anderson fr Ilastings; URS Consultants. nttn: llr. Les Wood B. Cari. S.L. Pawlak RE.D OESEFryER APPROYED BY Chen€Nonhern.lnc.C. rfr,to artg/.r-. .i La-tL. REPORT OF FIELD NUCLEAR DENSITY TESTING a3 a qfllt|l FF lfEIE| Ttt alrxl\ Df rrttE ||() d-|uft\,rf. lll nt'f|Trr l,rt SFaTntt At r coTllxlw-frfinlY oa dn cl '(tft ^lo amolifL4rDl mR n'iE - lur 6. $Ary;xrr. orrrcr rr'(Drr qr rxl?rc;r rrrtl ff qfornoro <x.a nuririiin:tirvi-o mmrro f,t wttllDl rr'fnota- SrtfuJ wr'r aE D(fE'D f lfltr rtjTt€ c oqrt.lnD t'l8 Onfl |^ lrqrxn ltlf fslu.D lo w rrlnlHo. ^ ..!rr- d r'[Xifr-lc-r d r..rorr trrrr r5. cuuot^ 4/r To: TowN OF VAIL JOB No. 4 398 90 DATE 8-23-90 Attn: Mr' stan Berryman DArLy REpoFT No. 57 sHEEr- 2 oF 375 Souti Frontage RoadVail CO, 81657 tr.ryorcE No. $qlEcf Adrl.iti on to Vai. I Trflnsport:rti on Ccnter, Vai. I , Col.orado SPECIRCANOH COI4PACNON I MATERIAL MINIMUM REQUIRED IN_PI-ACE DENSffY 95 X AS DETERMINED BI,: A.STM D.1557 CONSIRUCNON CONTMCTOR: B&B II<CAVATiTT9 TEST LOCAIIONS WERE SELECTED RY: ChCN-NOTThETN TYPE AI.ID NUMBER OF EARfi MOVING UNrIS TYPE AI'{D NUMEER OF COMPAfiION UNTTS MEIHOO oF ADDTNG Mo|SIURE Natural 1 Front loader 1 Dual !{heel Roller THICKNESS OF llFTAs Required NUMBER OF PASSESAS Required *BGBeIor^r Rough f--- a ^ LOCATION * o"=DEPfi OR ELEVANON (FEn-) IJ\BOF.ATOFNT NELD PERCI}IT OF(R€rr[€1 ru)(D4,rr) o{rt tE) solL t'rPE lul NO,IIAXIMUM Dtr/ DENSTTY(pcf) OPTIMUM MOISTURE CONTENT(x) Drr DENSTTY (Pc{) MOISTURE GONIENT (z) 258 259 260 West of Sltrance Noz S.D. Line C West of Ertrance No2 S.D. Line C West of Ertrance No2 S.D. Line C 51 BRG* 3'Bre 1I BRG 140 140 140 0 0 0 6.L 6.1 6.1 l_34. I 134.1 134.4 t.J 7.2 7.1" 97 96 96 51ight1y Si-lty sandy Gravel S1. silty Sandy Gravel Si". Silty Sandy Gravel EI FULL TIME OBSER/ATION O PN{T TIME OBSEM/ATION ltts fFoit Pmrrt t:t (Pttltl! ;!,nIlD |Jt A nf-rult S Or,i OFrtw^rr|.ut (r nrl Pt^atl'fxr. tf tq\/E ml|fo (r|,rxF "'lTn;To'i m camliuq 'A'rPLIt{r nf rttaaarxom carr.rrcr|vf ttn',l l1o rr(En'lf m rrJ. (rr11o nlg nurs |r".r'uh'irrri-n;il c 'r'rint+r'arp.rnrern6. lt5E lFt 9'ot oF n€ ml o'_Y As Er'w' rrarjs ilr rp qr,-. '. q.,, o*utlln :t JuuotLttal. nsr u t,\ f i;ti ';; tr.f d.Jc-rul orlxnrs or ftEltt|Jl lllt nrl utf-l]l 'tqrEAln6' IHE NlrCtE R OeasqlEIB ugnm oF rESIlNc w S Usfl) tN SUIISIA}IIUL ,fCCOffDll{CE WnH ASIU D29c2 A}l0 DJOIT PRzuMlMfil OBSFJII/ATIONS AllD/OR TEST RESULTS VERUALLY REPORTED TO: Les Wood on the structural fill being placed cnrer concrete storm drain and inlet.. coprEs xlill?" tr3i'3:i.t'fili5:ctu'1'c' Anderson fi llastings ' l'lr. Gary Nlurri;tn; PCL Construction, Attn: - -l''lr. - Dcnny Annortr; llRS COnsrrltattts . Attn : Mr. l,cs l|lood ; B. Carr RH.O OBSET{VER S . I,._ Pawlar APPRCIVED TY Clren€Nonhern.lnc.Cn:/tl/|o f'*sr -l S&|.}'t REPORT OF FIELD NUCLEAR DENSIfi TESTING at A wnlra Fitlcrrl| lo cttxrl n|t nrtr ^}to uJ|trrvrll Alt Frt(frrt ,.Jrf srtsltvtr At nr: cDlrtoan r-Pi(trrrY ('. q'l cl [xra l]D amuiliArD{ r(f, lr'|arl- rur 6 stllrurxs, ot'rcr urrr6 qr rnt crr tirrr oR trf(umt€ o,n *tro,fii' s*iirEnio miiiri-o-n rnnlul imfi'J^r- s^lr.rt: wu E D.g\ltl tr lrnr ltll]ro 6 o6nrnD (rllt slr|tt r^i$f,rar(rl rI rfi.flJ m rl llsl|rIr' ^ 'rr.- .. n'.1 l.llH lF.. d .rr!di- a-i ,|i c|Ilt^ ./rO To: TofilN orr VAII, JoB No. 4 g9B 90 DATE 8-23-90 Attn: Mr. Stan Berryrnan DAtLy REpORf NO. 5Z SHEE; 3 OF 475 South Frontaqe RoadVail CO , 81657 ttWOtcE No. PRqrECf Addition to Vail TransDortation Ccntcr, V;ri1, Colorado SPECINCATION COUPACTION & YATER]AL MINIMUM REQUIRED IN-PLACE DENSIIy 95 x AS DEIERMINED [lf: ASTIVI D-1557 CONSIRUC'IION CONIMGIOR: Natkin IESr LOCATIONS WERE SELECTED Ff: Chen-Northern TYPE AfiD NUMBER OF EARIH MOVING UNIS I Bobcat TY?E AI.ID NUMBER OF COMPACTION UNNS 1 Dual l{heel ROl1er MEIHOD OF ADOING MOISTURE WAIETIiNE THICKNESS OF- UFTA= Required NUMBER OF PASSESRs Required LOCATION DEPTH OR ELEVAIION (FEEi',) uaoRATOR'r r ILLL' PERCENT OF (RETTfuE/ Lr$(u/(.u) ogT t@ SOIL TYPE ItSl NO.},IAXIMUM DRT DENSTTT (pct) OP.tlMUM MOISTURE CONTENT(t) DRY DENSTTT (pct) MOISTURE CONTENT (7) 261 262 20' South of A Lileat 30.4 50r South of A Lile at 30 60.33 61.33 136.0 136. 0 5.9 qo 13L.1. 131.6 6.0 6.2 95 96 SilshLty SilQr Gra- vel1y Sand 51. Silty Gravelly Sand E FULL TIME oBsERvATloN n P lrr rlME oBsEFt/ATloN rG rr.ffir tiifrtal:l q.D6 ru.|trr a! ir:il,tl or qn olsatw lrrr6 ()f ntt Fl A:tvf'tt. t'f rl^w ltfl ro,o rl|r ct,tntw;l(j't m crfTlrf lPla)lrio rr Frroa1;.tl.gaD oqrprqrw tt;1t11 Ano rr(Eintf m tt1t. I tnf,o ltr,+s *r*tl'iih'irt*rlmrr c_itn d6[ trvlf€ -qtn rxi's llJrs l'lt r4 Df f rlE t!l o'-Y as Errr,;, lfg5srkt ro cArnAIr q.a oarsutl6 Jultq,tr,txr. trst *t,r ^ri-'iiiti 'lr'i rdi nss lur ofrHnfis oil v"llllttJt lllE rllju u[ar3 sPtc'?rcalxt6' THE }tt ctrAfi DE'lsouElER uEnm of rEs"nNc w s usED rN sul]fl ].ftuL AcconDl]lclE wlr]l ilsnr 02992 A]lo oJol7 PREUMtMff OBSFfiVATIONS A|lDlOR TESr RESULTS \ERBAILY REPORTED TO: I€s Wood PROGRESS REPORT Tests were performed on structut'al fill being placed over draill line nesr structure. Elevations were taken frcrn bottcrn of Stair No. 12 footing. coprEs xi;ll?"'"11'3:i,t"ftli::ctureJ Anderson & tlastings ; l1r. Gary lqurrl an ; IrCL Construct ion, - Attn : .I1r. - Dcnny Armour;irils coiiirlifants,'Atttr: Mr:. Lcs ltlood; B. Carr S.L. Pawlak RE.O OSSEI|YER APPROYED FY To: 191y11 or vn I LAttn: Mr. Stan Bcrrynan 75 Souttr Frontage RoadVail Co 8L657 PRO|ECT Atltlit i orr to Vni I 'h:arrsp western sPsrE^no$* SuruP stPPtR Irbbile llu t.D. 3000 A JoB NO.4 398 90 DAILY REPORT NO. ri.{\otcE No. Ccntcr', Vai 1 . Col otaclo. An cot{It}fi 6g-89 A'SBII TBIPERATURE R^NGS DATE 8-23-90 57 sHEEr 4 oF ottat i.orr 3,,-5rt @ 28 dav 00-90"F. TEST ito.rnuc(t{r no(Er NO. 1llI€ lrAlctt@ IlrE lfnwEo lllr€ s ltPtg) R€I/OUJIXI0I @IJHTER EESI RE}OTJ,ITNN @UMTER @UPT.EIION clrDlc YArDst-oto/ CUUUI IIyE IY IB lmg) c^uor|s L 2 3 44 54 100 1762 1765 1766 12z57Wl 1:06PM 1:48PM 1:20 PM 2220 PM 3:10 PM As Req As Req As Req As Req As Req As Req 8 16 23 0 9 rEsrln sll,lP(nr)An @}{retT(r) TET UflTT UEOHT(Pcr)YA.0 c(titcnfrE IEIPE_ R^Tt'Rf, cf) REllAru(s 2 3 3/4 5.8 139. I 1n 5 Qrlinders cast. Required early breakto strip beam. PROGRESS RFSORT Sanple was taken frcrn tnrck; tire observed on all trucks. ,.\.",6rFe Michac I llarbcr Archi tccture IeurlrJ Anclerson G I lastings ; Gar:y Murrain PCL Constnrctiotr Scrviccs; URS Consultants; B. Carr S.L. Pawlak RE.D OBSEF/ER APPROYED BT Chen0Norrhcrn.lnc Ccrlr|{ t }rfrr cra S.L{.t REPORT OF CONCRETE PI.ACEMENT OBSERVATIONS |J A ramrl ?ErrGtDl E ctrxtl l|r ilrtt ltat (r.rtfwt' al ir't Tr ^ f, ti.T|TD ar nr co'.ft]' l--rnorrlTY or C|rl d rt"a ^|o |t'ntroatgl trf Ft[-E - rlri (7 narrrrrr.rl oolrlrx r olr txruct3 trrp ar Eo ^r.{ orrr arxiirj-a-iiinio'-njiio-nn rrntrx g'reovrtt- 3 l,'(I! lll 9c olF(Iito d- J/lD lDlT}rt lS co.rinrD lrrlt o|ttt ,[a,3ttar{tl r |oitlt to x |{rr€, ^ '!rn - d r-lTltTlr.r et ...!r.nr. tra xa {ll.. a./to Chen€Northcrn.lnc.Co..rrlutE t'|gL|.r. o.d 5'd-,1r.{. REPORT OF CONSTRUCTION ACTIVITIES ^s A r.rntt Fir'rltcmri to clrxla rrf, nnr |r|) qttFjwl 4r--l!r!!!l fr|( 3t {rrtrn As nr mrT|^,:xTul. lF "'trt cr 'rn o fnr:r' ^'l) rT}sttz lu|l foll ?rll iN- rr", (r 3t;1,,-xrs, co.tLulm<r (11 rllRr.jrt rF(rr on Rtorr11txr olr *trmrs'din:rnrl mmro orn rratn:r 'ri'rddi[ sirta xu ot Dcfr[D of 'rrlttl]€ 6 corttttD ltLffs o'ntJi 1,!l t€lr,|E tnf, lrur lo ltl lEltlq. ^ 't'rn|- r r-fttf tf lgr or onrrarr f..tn $., CI:lqlA a/t(, f(r: TowN oF vArL JoB No. 4 sg8 90 DATE: 8-24-90 Attn: Mr. Stan Bertyman DALy REpORT NO. Sg SHEEf t 0F OP.0. Box 100VaiI CO 81658-0.100 ll.lvOlcE NO. PROTECT Addition to Vail Transportation Centcr, Vai1, Colorado WEATHER CONOMONS AND TEMPEMTTJRE ano - zcon cor'rTRActoR's coNsrRucnoN AcrMnEs PffiSONNfu ,ilAlOR EQUIPMENT: ICIMIIES: CHEII-NOflIHER!{'S Sm ACINIIIES Full-time Testing 4nd Observ4tion; Concrete being placed for Level I Deck, new structure, Line A^B9, Grid 36-39, Toplift of asphatt being placed at the north side of South Frontage Ro4d, Station 10+00 to Station 22+00 and reinforcing steel being placed for w411s at Stair No. -10. VERAAL COMMUNICATION WITH CONTRACTOR, ENGINEER. ARCI.IITECT, OWNER Les Wood was advised of water being added to concrete, Irli chae I Barbcr Architccture,COPIES Attn: Ilr. Scott Ward;Gar.y Murrain PCL Construction Services, Attn: Mr. Denny Armour: Anderson 0 llastings; tlRS Constrltants. Attn: l"lr " I'cs Wood R fer^r. . S.t. Pawlak nd-b btFiERvER APPfittv'ED Br ChenONorthern.lnc.Cdr..rltf tf|tfl.-t .tta sdna.H. REPORT OF CONCRETE PI.ACEMENT OBSERVATIONS at A r|.tu{. aonclDa E al]txft, ni t!;E Arf! arttrwr' Ar. lfF('lnl ^n( tt.|lfil at nr cor-DfxTw-rnnFf|rr (I' o"r clf,xtt' l'o a'nDturr |.t |('tr^- fu. a7 :rlmrttt @Nar,:r d rx|r.cn; rrirr rrr rf.ufir{ q,r mrofr"d^n-r-nio'-rrjiio-a,r lwttlx lrrForrl- s !'trg ru tr ott'€dD o"ttll lEllxo B ooatrmt ur./ur of|rl ,aLnarfl ,f ,olllr.D llt lrltrl A ir.'f' r r..[X]tilr..r a 'tr,h t-ir taa GYll laa a./ao TO: 1gryp Ol; VAIL Attn: Mr. Stan Rcrryrnan 75 South Frontage RoadVail CO 81657 qlqUECf A(l(li ti on to Vai.l 'l'ransl)or.tati on Cclr tcr., JOB NO. 4 39s 90 DALY REPOKT NO. lN\olcE No. V;r.i. 1. Color:ado. DAIE 8-24-90 58 SHEET 2 OF 6 Western spEcFEATp ssluup jn-Sr An g0flIE|tT 49o -.89o sUP?uER Mobile rx tl. B jS00 AlnlElrr TETpEnrTURE nrIEE 60o=g0aF. IEI l,xr. TnrrcxtIl.TP(EI Mt TIlr€ BATCIIE) nuE ARntwD TIUE s^nH.g) RE'\,OU'TFII @ONIER EOIN RE\,OUIID}I @arxrER couPLEIO|| C{,DC YARE t-o4D/ CUUUI,,\ITvf w rB ADO€D o^Llrirs I 2 3 4 5 6 54 49 Lt7 100 44 114 106 L769 L770 L77L t772 L773 111/| I775 3:42 N4 3:47 AM 3:51 AM 3:56 AM 4:00 AM 4:11 AM 4:21 AItl 3:57 AM 5:53 AM 4:00 AM 4:I2 Nl 4:15 AM 4:20 AM 5:20 AM 4:50 AM As Req As Req As Req As Req As Req As Req As Req As Req As Req As Req As Req As Req As Req As Req 8 1 L6 24 5Z 40 48 T3 3000 crout 20 10 0 5 5 nsr ML sujr? (Dr) IET UNT TECHT (Pcf) Yto-0 @lffilE TE'P€- RANNE co RDTAd(s 4 41 1.5 r44.0 70 4 Cylinders Cast - No Air Mix PROGRESS REFORTT Sarnple was taken frorn truck. Punp in use. Tirne and visual slump observed on all trucks. noptF\ Michacl llarbc r Arcltitccturc; Anderson G llastings; Gary Murrain PCL Construction Scrviccs; UltS Consultants; B. Carr S.L. Pawlak RE'.O OBsEfrYER APPNOVED Ff ChendNorthern.lnc Cr-tlfi tnth.d '|l S.ttiH, REPORT OF CONCRETE PI-ACEMENT OBSERVATIONS ArAlJnxl?rtlErrtlDcuttll,ll(Ertr|tililr/riral|fFdrnrrtEirtnTltAirrlcorrrFTBl-toflrfrtrofcrndlt'tl'lroa'nnlztplmin'i'r^-tD. .. Jfarrf,rfl, @.clrr!r! o' rrlr.cf:i ri6r (;1 rto ifi,.o qa "1pofr'c.^ifrnio'-lrilio-cn ranttll ltla(ta- :J||rlJ rrl d DIF(rD c 'rnr ffrlt E o nrtrD tratr sl||t a*ff,t xtt lit ffrt lo x llllxll ^ ,i!..'.- d l.{Tiij-ltr." .t .'r-J- hti t\ {ll{ ../|a TO: 1'9511y 0r VAI L At tn i Mr . St an llc rrynan 75 South Frontage RoadVail C0 81657 qqlrECT Atkli.tion to Vail 'l'rarrsl)oltat i on Ccntcr', JOB NO.4 J98 90 DAJLY REPOF|T NO. tn/orcE No. V;ri I , Col.or:aclo. DATE 8-24-90 58 SHEET 3 OF Western SPEFnAlpll$: srlJuP 3n_5'r An coNIE{r 4%_S%$m MObile LD( t.D. B 3500 Arao{r TEIPERAIURE RA}lc€ 600-960 IET I'|(L Tnrrcrt0 TO( T Mt TIUE &rvcl{tD lruElnnilg)llu€ s l|nE R8/oi,Tm @{JI{IER BEOflT RE!oLT'IFN COIJHTER @uPumol arllc Y ffi t-orllD/ CT'MUI,ATIVE witB ^Do@qAUJOaS I I 10 11 L2 15 14 119 49 54 tt7 100 44 174 t776 1,777 L778 L779 1780 1,787 7782 5; L6 Alvl 5:L9 AM 5:34 AM 5:38 AIvl 5:42 AM 5:49 AIr{ 6:05 Al'l 5:20 AM 5:35 ANI 5;45 AM 6:00 AM 6:11 AM 6;20 AIt{ 6:15 AIvl As Req As Req As Req As Req As Req As Req As Req As Req. As Req. As Req. As Req. As Reg. As Req, fis Req. 56 64 72 80 88 96 104 8 6 11 10 4 0 1,3 tESr HL sul?(ur)^no(}fitltI(r) WET UNTT wE${r (Pcf) }IEI)coNcnElE TEI'PE- RAIT&E cr) RETTAfU(S PROGRESS REPORT - See Sheet 2 of 6 n DrGrc Mi chac I llarbcr Archi tcc turc I Antlcrson I Itastings i Gary Murrain PCL Construction Services; UIIS Consultants; B. Carr S.L. Pawlak NE.O OESERVER APPROIi@ F' ChenONorthern.lnc Cdrdlhf &{h.-r qta S#tl, REPORT OF CONCRETE PI.ACEMENT OBSERVATIONS at ^ rtnn trmErn ro crrxtl ll? ttiEr0ft ottltrri al ioxtrnr ^rrf rf.ftflt ar nf co.ffr{Irr-trot'trfi r drt Cllxr* |r0 AmEi('^tpr 7()i n'ff^- rD. o' 3r rrrf,trrl qrrurer (r rxfr.cr:! nrrrr dr rtorfira q. nnifJd^irrriio rriiorr-<rr rtflltt{ lrmor'rt- a'^lr"l tJ 7rl d flJ'or0 cf, rnrl rElrt{l ll oor'ttnD trt !| ott|t ,r;,rrxTr llt r4l1D lo H rmr{' ^ ii.,r.- d -[ltXl* d rdlrprJr 16 h CLll{ ./lO TO: 19ryp 0l: VAILAttn: Mr. Stan llcrryrnan 75 South Frontage RoadVail CO 81657 PR(\TECr Atttli t i on to Vni 1 'l'T:rn sl.ront rlt.i. on. JoB NO. 4 398 e0 DAjLY REPORT NO. hnrclcE No. Vrri. 1.. Col or:arlo . DATE 8-24-90 58 5HgEr 4 oF Ccn tcr'. We stern suP?un Mobile SPItrEEATPIIS: 3LUllP uD( r.D. B 3500. 3fl-5ir ^lT AgO|r TOIPERAruRE RAIICE 600-9ooF. lESrtp.rRucl(MI ncxEr Mt Tn€ 8 Tcfiq) TIUE ARn s)Tt!€s rPt@ Rf\r()ljtlrcal @{,NTER EDIN nEvourTloil @rJxtER @uPt-EIlo{ a,Irc YA&ts a_oto/ cuuurr$wE wAlB too@c l.l'oNs 15 16 L7 18 19 20 2L .106 119 49 54 777 100 44 J,783 7784 178s 7786 7787 - 1788 1789 6:11 AM 6:22 lM 6;26 AM 6:37 AItl 6:42 NI 7;04 Alvl 7:30 AIv| 7:05 AM 6:52 AIt{ 6:50 M 6;52 AIv| 7;50 AIvl 7;52 iarl{ 7:55 AIt{ 7;15 AM As Rqq As Req As Req As Req As Req As Req As Req As Req As Req As Req As Req As Beq As Req As Req 772 720 1,28 736 L44 J,52 160 5 0 72 8 0 rESrin tu[?(rlr)^nootfrE{r(r) IET UH.tr TECHT (PcF) tlB.O @ilcnHEIE'P€- R TTfiE cF) RIXATU(5 I6 s\742.3 72 4 Cvlinders Cast. - PROGRESS REFORT Sample was taken from truck. Punp in use, Miclrao I llarbcr Archi tccturc;uvrllr Arrdcrson & llastings; Gary Murrain PCL Constructiolr Scrviccs; URS Consultants; B. Carr S.t. Pawlak RE.D OBSESilER APPROVED FY TO: 19p1,1 Or: VAIL JOB NO.4 399 90 DATE 8-24-90 Attn: Mr. Stan llclryrnan 7s south Frontage Road 'ALY REPoRT No' 58 'HEET 5 oF 6 Vail CO 81657 thr\rOtCE No. PR(UECT Addition to Vai. 1 'l1'an sl)olt:rt i. on Ccntcr^, Vai. 1.. Coloratlo. We s ternrymm Mobile sP68rcAlx)lt$ gu,laP llD( l.D. B 3SOO 3rr_5rl l{r cot{IE{T 4en-8% AgE}iT n1IPERA]URE R^tICE 6oo-9ooF TESTlp.Tnrcx]4.IP(ETt{r.nrr€ AATCHE) nu€ A88ilED II'E sr0tPt tD Rf\ou,Inil co{Jt{IEnro0l @UXIEN @TPT.EDO :uBlc Y &)3 t-orol Clrtlut IIvt YAIIN ADOEDgALto.as 22 23 24 25 tt4 106 119 49 1790 779t L792 1793 7:45AM 7:51AM 8:03AM 8:40All 7:58 AM 8:15 AM B:20 AM 9:00 Alr,l As Req As Req As Req As Req As Req As Req As Req As Req 168 1,76 184 190 0 8 ( IErts sll,lp(|lr)lnc$|Itr{r(D WET UNTTwmflr(Pcf)Yta.D coircRElE]E'P€- RAIURE cr) RfrAtu(s PROGRESS REFORT Total pour 190 ydr r*,p's Michac1 llarbcr ArchitccturcI Arrdcrson & llastings i Gar:y Murrain PCL Construction Scrvlces l URS Consultants; Clten€Northcrn.lnc oo.alflE uar.I otarl lrFlf,mxrr x ,{'att lD l| fFnlrl a "i.r.' d rfi]iiTlr.r .l r.!r-- 7ri| t\ Oatl.. l./F Cdrrlrr|f t4f|.-r tta S#r.{, REPORT OF CONCRETE PLACEMENT OBSERVATIONS ffi( ,.'.rE x. d,.rlv* {r--lqt!1q1 .^t 'F nrn a! nr: oo.r,flflut rt tttr' f .'^ ct f"'* Aro a'nrrcrrDl 7n tui-r^- tDr t Srttratxtt' rttutrr- .tr fxrl.ctlt nrq. (t ttto'raltF ar nlnit'd^"ri-nil'-rrjnrrc -<rr ratlrx Fln<ie- s l'1" vrr. DE Dcr'crD or lfrIl ltJrt€ lt TO: 'IOI1rN Ol: VAIL JOB NO.4 39g 90 DATE 8-24-90 Attll: Mr' sta' llc'rvtnan DALY REpoRT No. 5g sHEEr 6 oF 675 South Frontage RoadVail C0 81657 lr.tvolcE NO. PROTECI A(l(lition to V;r i. l 'l'Tansl)o1'tirt iotr Cctrtcr', Vni l, Cololado. western sPErrcATplt$ SLullP 3tt-5tt A||t coilIE'{r 4%-8% suPruEn Mobi.le llD( r.o. A 5000 ArEo{T TETPEftAruRE R ltcE 60o-90oF. 10 5 6 8 4 8 L6 z4 31 34 Req. Req. Req. Reg- As Req. As Req. As Req. As Req. As Req. As Req. I 2 5 4 5 rt7 44 LL4 44 46 10:00 LOl.24 11:13 12:25 12:56 1L :05AM 1_794 L796 1797 1798 1,799 9:38 AM 0:08 AM 0:58 AM 2:09 PM 2:,43 PM 3 s/4 L42.0 Sanple was takenall trucks. frorn truck.Purnp in use.Time observed r,.riDirc Mi chae I llalbc r Archi tcctu lc ; Andcrson I ltastings; Cary Murrzrirr PCL Constructiolt Scrviccs; URS Consultants; ChcndNofthcrn.lnc.Cdiruq t gb.-r a/ Sdbira. REPORT OF CONCRETE PI-ACEMENT OBSERVATIONS L A tantl ?rnEtu to alttatl lra Fft rxar (t.Ftw3 al, ItF('xr ^nf, lrtrrm ar tti: @'rlt|rr^t-i'FdrlrrY G. crtt (r flr|lr l|''o Am(tll^rp\l txn ltlrLEA- ,E ', 3rarrrrx?l oo,clt'r! o.r rnr c,.. n6r (t ^tq,.'€ c- *rrr#j'a-fr-ii.rio^rtjlin nri -rnntx At?not'.l- srr{rt vrl tr txF([tD r 'tnrl rfjt]r' 6 rartE t lrtr oDlt rfia5lrlfl lf, ,srf,r|l to tl tt$trl A 'ri.- d r.. (-fffll-lr.r '. ...'trJ- a.i L.. Crrll.. a/ao Clrcn€Northern.hrc.Con.dltrg f,nolr}.sr o.d Sd-rtht REPORT OF CONSTRUCTION ACTIVITIES a3 A |Arntt Ffnt:crrrt r cirrf! n|i F|nE ,]ar otftttwjt. al. tfF( :t tnt s|rrfrD l! rn: @tfrtxrut ttrtfrrY c' f,l cr fxTl ,lo a.'Irgnz^f'| to|l n u- ffr. (,. sr^rrl,'r.ri crrnrr'.t. or rrrtx;B rg(x 0a m.lnrr€ orlr ntnuiri-riiniixrlu nidrr<j otn rrntn}r'ffiirr. s+ti-cl rru If DtsF(IrD of lrrtt ltlltc 6 c{rftltt-t t,us:r (,|rlt lln^}€..|.txll l f, roqll, lo lfl fEllrJ. ^ n-nr- r *.[rutlc- .. d'ird'.. t.rir rL. crf,ld^ aFO lu: TOWN OF VAIL JOB NO. 4 398 90 DATE: 8-25-90 Attn: ltlr. Stan Berrynan D{Ly REpORT NO. 59 SHEE1I 0F 4P.O. Box 100 Vail C0 81658-0100 llWolCE No. pRo.JECr Addition to Vail Transportation Cetrtcr, Vail, Colorado WEATHER CONOMONS AND TEMPEMTURE 4oo - 8ooF. CONTR^CTOR'S CONSIRUCTION ACTMNES PERSOI{N& ITA'Ofl EOUIPMENI: ACIMNE$ CHO{-NORIHE}U{'S SITE ACIMTTES Full-tirne Testing and 0bseryation: Conctete being placed for Level 2 Deck, New Structure, Line A0 - 89, Grid 36'5 - 39. VERBAL COMMUNICATION WITH CONTRACTOR. ENGINEER, ARCHTTECT' OIYNER coprEs Xt:ll?" "1i*::'t'fi'l*ft:"J"i4.,rrain PCL Constmction Services' Atttr: Mr. Denny Wood ChenONorthern.lnc Car,||}r. &rftt-t dra SdrtH. REPORT OF CONCRETE PI-.ACEMENT OBSERVATIONS a, A t(rnl, fErfcrr E cutxrt t: l(nt rrr ouEtlfl al ,rlt(ttrt ^nt J.rirrrm rr nr: orlEllll.rYr'rtrt .t (|tl d tt":\ l'o A'nlnt'lrE lll R'i-EA- 11 . (r rt111rp.rl (g,elrrri qr rxrrrct! ri(x (r itorrvrp gr,a mr6dj'd^fr-inio'-lrillis-an -n't'ttt't ,trf('/n- ." ltr (J lYrt t ocFcl{D cr lrrrl rttttr' 6 oo.arnD t (fr otrlt rixrrll,arrTt l|t rfltlg Io x trr|l|r .tat.- . r'.0iiii-lr-r r. ..',r-'.- tri L., CIll{ a./ao TO: 191vp ol; vnIL JoB No. 4 398 90 DATE 8-2s-90 Attn : Mr'. Stan llcrryman 75 souti Frontase Road DATLY REPORT NO. 59 SHEEr 2 OF 4 VaiI Co 81657 tltvolcE No. qlqrEGf Arltliti.on to Vnil 'franspott:rti on Ccntcr'. Vai. 1. Cololatlo. Western$m uobile SPSFTATPTa$ SLUllP grr_5rr Itlx l.D. C 4500 An co IE|T Aug 79o AI'SE}IT IETPERAIUFE RATTOE 6,Oo qooF IEsT M'.TNT'GKl{I no€r l{o. lluE BAICHE) .IIUE ARf,ilED Ilr€ SAIIPLED Rf\,(I,rflntl CDU.ITER IIOIN Rtl,ourlloil @UXIM @uPr..Ellorl cugc Y R6 t_MD/ CUUUI.AIIVE TYA'IE ADOED elu.oars I 2 3 4 5 6 7 7L4 100 44 49 46 119 106 1803 1.804 1805 1806 L807' 1808 1809 4i42 ltJ'l 4:50 AIvl 4:58 AII 5;04 AM 5;17 AM 5:25 AM 5:30 AM 4;55 Al4 5 ;05 AIt{ 5r1.0 AM 5:15 Alvl 5;35 AM 5:40 AM 6 :00 AIvl 5:10 AM 5:30 AM Rs Beg As Req As Req As Req As Req As Req As Req As Req As Beq As Req As Req As Req As Req As Req 8 l6 1 24 32 40 48 72 16 3000 Grout I 8 6 10 lESr Mr. sll[?(l&)An o(xrE{r(r) UEI U TT IEEHT (Pcf) TAI)coimflE TE'PE- R naE cF) ROIAro(s I 2 4k 5 6.0 140.0 70 Slump sanple taken from truck, 4 Cylinders Cast. PROGRESS REPOKT Sanple taken fron truck. The contractor requested that water be added. .'optF.lq Michacl Barbcr Arcltitectu.rc; Andcrson G llastings i Gary Murrain PCL Constructiort Scrviccs; URS Consultants; B.Cart PawLak FIELD OBSEM/ER FY To: Tgwt! 0t; yAIL JoB No.4 i9s 90 DATE 8-25-90 Atttr: Mr. Stan Berr)nnan 75 South Frontaqe Road DAJLY REPORT NO. 59 SHEEr 3 0F 4 Vail C0 81657 tln/OrcE No. PRGJEGI A(l(li ti orr to Vai. l 'lran srror-tat i.olr Ccrrtcr.. V;r:i l. Color:ado. Western$|m i4obire sPErEAtXm* $t!uP lltx l.D. C 4500 3rr-5rr /An coNIE{r Aug 7% ,TSO{T TEIPERAruRE RAT€€600 - 900F. lESr}(L TR{'CK ML TE|(ETH'.TIUE BAICHE) nuE ARNryE Tllt€s r|Pt E) REt/oUJIPtl @UMTER EON RE\,O{j TlO}l @UI{TER @UPI.ETION cuBrc Y mtaro/ crruut llvE IYAIB AOO€D 0 u.otrs 8 I L0 'tL L2 t3 I4 tt7 44 7L4 100 49 46 106 1810 1811 1812 1813 1814 t d15 1816 5:36 AM 5:45 AM 5:57 AM 6:06 AM 6:24 I'ttl 6:45 AIt4 7 |L7 Atri 6:00 AIV 6;10 AM 6:f2 AIl| 6:20 AM 6242 l,ltl 7 :00 Alvl 7:35 AM 6;L0 AItl As Req As Req As Req As Req As Req As Req As Req As Req As Req As Req As Req As Req As Req As Req 56 AA 72 80 88 96 104 6 i 12 18 10 I 1,4 lErHI Sll,|?([t)AAo$rrE{r(l) rrr uNnlE{I (Pcf) Yrg,CONCNEIElErPf- R^TT,|RE cf] Rfl.^fu(s 8 L1 3 Slurnp taken at hose. Over 90 ninutes on tnrck. Returned at 3 vdS. PROGRESS REFORT A Drsr Michacl llarbcr: ArchitccturcI Andcrsorr I llastingsI Gary Murrain PCL Constructiort Scrv.tccs; URS Consultants; B. Carr S.L. Pawlak RE"O OI}SEfWER APPROVED BT Clrcn€Norrhern.lnc.cdr{f}f &|fhdt ti sd-t.4, REPORT OF CONCRETE PI-,ACEMENT OBSERVATIONS At A tl,|ltt lEltElDL it GrtxlL rr |ttlt lrar (|ra?lwI al F F('rr Attt lifrrm at na oo.fltflw--ffffrf,?l (l' o'r o fxlS' fro a'nndllDl nt a'n-EA- rxr. '' tnar9rtt tl ort cltt;c.t (rr trri€is rrr (l ifo a).€ or..r nrrlii*d-rtinin -rridc -ai i'mlrx rvlorl srlt't t: rrl ![ D(tcLo r T nt Tt:F 6 co.runD ua,!a orrlt ,.r|rf,l.,.rt l|t ra.lt9 lo x tmr|r ^ ir.'.- r ;.0lilil n r .. a...t-b Trnr |L Oal laa rro ChenONortlrcrn.lnc CdirUr. t |'rrr| di sdnir.l, REPORT OF CONCRETE PI-,ACEMENT OBSERVATIONS ar A r.l'n |( tFftctDl tn otttatt, tf( nrlE lro (rF?ttnt A-t lt 'lnr ^it siF.Tlttt at rf oo.tt,t]ttul---lF('trtY f 'rtr crtrnl ,,o .|mwlrD' roi |t'i'EA- rpr r- 111^rr5rl oo.clrrrjar ol rrtrcrr 1111 (r ;fo$rr.€ g.rr mlori-a*liiiiib' r.rxip-an ntltx AtrnG'/l- s r.rls vrL l|t D(FottD ir l,.lrl tEmq' r3 oo.rtftrr ttttt qfill liilxnlxrt Ara ,a[tr to ]l t'rll{. ^ 'n-,nr' I *.[tltii-lr'.t r, ...r-r' 16r t. C[ll.. a/to To: Tght^r ot; vAIL JoB No.4 39s 90 DATE 8-2s-90Attn: Mr. Stan lScrrynan 75 South Frontaqe Road 0ALY REPORT NO. 59 SHEEr 4 0F 4 Vail C0 81657 tl{VrotcE No. q8qrqcf Ad(liti on to Vai I 'ltanspott:rtion Ccntcr. Vai l. Coloratlo. Western SPETEAIX'I€: SU,UP sfl_5rl An colrr r Aug 7% AIIIEXI IEIIPERATUFEI"lobile llD( l.o. C 4500 R^lrcE 600 - gooF. TEST M).TNUC{ }{T TCXET M'.nuE l^rcHs,Ill/E Annt\ig) 'nu€ s llPr.cD RArOurIFtl @utJta TEOIN Rf\o(rrh$l @UNIEN @uPt-EnoN it gc YAGtoto/ cuuuuYrvE WATER ADO@ o LtlI\rs 15 16 It4 46 1817 1818 8 I 07 AM 40 A[{ 8 9 20 AM OO AM As Req. As Req. As Req. As Req. LL2 L20 TEST!(l s{l,l?(0r)AIR coirrE{r(D WET UNTf TSI|T (Pcf) YIAI) CONCNEIE ]E'PE- RAIUffi cr) rlElr tu(s PROCRESS REPOTT Total pour 120 ydr ^netFr Michacl llarbcr Archi tccturc I Andcrson {i llastings; G:rry Murrairr PCL Cotrstruction Scrvlces; URS Consultant,s; B. Carr S.L. PawLak REl) OBSEIWER APPNOVED gY Chen*Northerrr.lnc.Con u&ng Lnsl6.... ond Sd<r rb REPORT OF CONSTRUCTION ACTIVITIES as A ttmllt FrtrtcTlt|| lp (arrxlt n||i FUit ll.) ot]tEtvrr. Al i?wtnt rf( 3l]||anm as n|f @tlrrf]rrw. tIYFitY tt n qI]aIl ao aJT]pnz md ti ?ttl g- rrrr (r stArrrrrs ooarun.<i (r rnRf.j[! rF.Jta oi Ft.un{r€ our rtrorrs-rs lirsrnto rtxirro-or,n rrrtru -rfirr. s.{tlrf lYltl tf o6T dD (r lfTlt 161}o 6 c€.f!f|tD u(tsti qnlt rN a€(t{rltll Ne ,grtl) fo ltl finlrE ^ 'r.t - .r r. Frrti-lr-. d d.a.*. tdtn tlo. Clf,lClA aIO .u: ToWN 0F VAIL JOB NO. 4 399 99 DATE: 8-27-90 Attn: Mr. Stan Berryman DAILY REPORT NO. 60 SHEET 1 OF 6P.O. Box 100 Vail CO 81658-0i00 tlwOlCE NO. PROJEgr Addition to Vail Transportati.on Centcr, Vail, Colorado WEATHER coNDmoNs AND TEMPERATURE Clear, 80op. CONTRACTOR'S CONSTRUCNON ASIMNES PERSOT{NEI.: TIA'OR EOUIPMENT: AgfMnEs: CHO'I-NORIHERN'S Sm ACIMTIES Full-tine Obseryation, Testing and Jnspection; Reinforcing steel being placed for walls, Stair No, 10, Level 3 and for deck, Level 4, Line B-B9, Grid 8-11. 52 yards of concrete placed in wall"s, Stair No. l0 and116 yards of concrete placed at Level 3, New Structure, Line A-.89, Grid 36-59. Tr{o sets or cylinders delivered to Edwards for stripplng and logging, 4:00 P.M. concrete continu- ous through 9:30 P.M.. Weather clear, tenperature 50o - 60oF, VERBAL COMMUNNANON WTTH CONTRAGTOR, ENGINEER, ARCHIIECT. OWNER coprEs xilll?"'"li"B$.t'fill:;tlli"i,u,'."r" PCL Construction Services, Attn: Mr. Denny Armour; Anderson li lla-s,titlgs; ..tlRS Consultants. Attn: Mr"" l,es wqqq; B. Carr S.L. Pawl-ak REU) OESETryER APPRCA/ED Ef Cl,rcn€Northern.Inc.ConEIrD! t.|gL.dr ot|d sdr'|Jrb REpoRT oF coNSTRUcTtoN ACTIVIIES E0 AUg A41990 TO: TOWN Or.. VArL JOB NO. 4 39s gq DATE B/2/gO Attn: lttr. Stan llerryuatr '*tLy RE'ORT NO. 41 SHEE1 I OF 4P.0. Box 100 Vai I CO 81658-0100 ll.lvolcE No. PRq|ECf Additi.on to Vail 'l'ransportation Centcr, Val1, Colorado WEAIHER cONDmoNs AND TEMpEMTURE clear sonr 1 rain p.m. CONTRACTOIT'S CON5TRUCTION ACTMNES PERSO}.IN& },INOR EQUIPMENT: IGIMNES: CHE}I-NORT}IERI{'S STTEStorn drain Line base 5r4rr x 4t4r?tunnel .4. Lj.ne at 6arne area. Sixat 39 and II. of AcrMTtEs FuIl tine observatlonl testing and inepection. Dr frontage road, Sta. 16+40 - t7+20, inlet vault and. Reinforcing steel being placedl Level Oner exleting L2-L3. Twenty-four yd. concrete bei-ng placed for footinginch roof draJ.n bein6 excavated A0-R9 Line 1l/. of footlngfooting AO Line 30-39. Bedding placed at pipe. VERBAL COMMUNICATION WTTH CONTRACTOR, ENGTNEER' ARCIjIIEfi, OWNER Itlichae 1 Bartrcr Aacllitcctuac 'COPIES Attn: M.r'. Scott War:rl;6;a11' l,{urrain PCL Construction Scrvices ' nttlr : l*lr. Denny Armour: Anderson fi llastings; lllls Conslrlt:1l1ts, Attn: Ml'" t'es Itlood , Bill Carr Steven L. Pawlak I I ns,D oBsER\ER APPRoGD sr ar^|.rrrfp'r(mtlurlocltto!-I]!fPt-itE^]r]olrtttlvftAr|!!t't!!!|a€srutrm}AcTrrc'rrrrtflul-wrr$AE.i;t&"ffiis]fin#frF;rx (r n^lrr. rns. ccrrcr rrtu.t rn r ilir.ri-ri<i -on -Clfg:: oui RrtfrT3 s Rtit-Ftl.tl Foofto o{'R il{ltrx ionLtto tiqr-ss onttn |.ii.rrr.r,rrs |,rC reIl) lo o{ rElr|o. ^ ,'.''.- I t-[f f H I *-r o, G..'tar- t.rnr rb. craloil^ {/to Chen€Nonlrcrn.htc.t)or.for|g t 9L*. ri s.ltd.l REPORT OF FIELD NUCLEAR DENSIfi TESTING ^s^g,n,|tFi('|Tt'DllotlfxTr'nrn|lE^roq-ft|t1lr1|l1fi'Fonltlnf3'rrrnt|^'nfcojli}fiwF'toE,rTY(folcr)c}|Br|loA'nrritr'D|7^^rA-rxx F srlrrtrrrE, oo€ltrlrrrn lrr Fnlrcr! rR6l dt Rfq.ao.€ orn m'c*r'l.r iir-:tndo nmip-cn tirtut tt?Ro/a- s rLet rrt E trttwt f lrrlt rElrr|o 6 6r!:nD rA-ctt o$ltl ,,Grr[JD{r| frt ,fiIlt lo w wr{rul ^ ,n .'.r r. -@*, ni?cr- F t|r Hr. CuEloTA {/aO f(': TohrN oF vArL JoB No. 4 398 90 DAIE B/2/9o Attn : Mr. Stan llerryrnanp.o. Box 100 oAtly REpoRT NO. 41 sHEEr 2 0F 4 Vail CO 81658-0100 tlworcE No. PROTECT Additign to Vai I Transportati.on Centcr, Vai1, Colorado SPECtncAnoH couPAfiON & MATERTAL MINIMUM REQUIRED IN_PL\CE DENSITY 95 T AS CONSIRUCTION CONTMGIOR: B&B ExcavatingTEST ASTI'I Df55l under pavenen SE|-ECIED ffrChen Northern DETERMINED Ef: LOCAT]ONS WERE backhoe. junp jacks TY"E A}IO NUMBER OF EARTH MOVING UNTTS 1 T\?E A}ID NUMBER OF COMPACNON UNrrS 2 METHOD OF ADDING MOISTURE THICKNESS OF LIFT NUMBER OF PASSES as aa req. req LOCATION DEPI'H OR ELEVAIION (FEEr) LAAORATOI T FIELI) PERC€NT Of,' (Ra-ATrv€/ ,.|^Hutra) ooTttg) SOIL TYPE IEJI NO.[,|ru(MUM DRT DENSTTY(ecf) OPTlMUM MOISTURE CONlENT(7) DR/ DENSTTT (p"t) MOISTURE CONTENT(/) 19i L9t sta. 15+40 Sta. 16+40 4rgsc J'BSG 14O.0 140.0 6.1 5.r L34. r34. ?.5 7.L 96 96 s11ty 6andy grave] E R'LL TIME OBSEJUATION T] PA}IT l]ME OBSEITI/ATION rr|s rtlrgtt piftxl:S F tDt! rdn et0 |s A Re! tt ol qn oc$nr rt)t{t or Flt H,rf}rf}|T. wE ltAtaf Rfr IFD otr rxF c aTRAcTut lo o('lTD|rr( ,rtt\lt€ fED,fr(J*c(D cfrrprcr|w ot{Fr r|lD |rtglr1t lo 1tt uratt|o n|f lurr tlrr'rxh itesgrin e t*rr rlrrnvrt€ oPtMttots. lf5^af 8 Df t rf flL GltY As Er.€l/r, lrcssrkr m ilrn^rE q,n oo6tntrr.,uu*rexr. lt5t t] tA mr Jrn rrr rcir ass tm ofitt(}{s oil lYll€lllul llE ntl tltEr3 t'Ec|Frc rs.r fiE lltrc[E R DOIsOUEIER UEnm OF TESn}|(i rYAs USED lN suBSrA{IUL /lCCOffD }lCE l.l}l ASIU D2992 AID DJolT PRzuMtI.T.AfTY OBSERVATIONS AI'.IDIOR TEST RESULTS WRIIAIIY REPORTED TO: ],gg $/gq6 tests were storm vaultPROGRESS REPORTbeing placed The abovefor pad and performed on thelI. of frontage etructural fill road. coPrES xlil?""f'B:5.t'ftlil:cture, Arrderson & llastings' l'lr. Gary }lurrialt; PCL Construction. Attni trlr. Dcnny frntour; llRS Consultants, -Attn: l"lr. Les Wood; Bill Cam Steven L. Pawlak FIEU) OBSERI/ER APPRO/ED FT Chen€Northern,lnc. er,tht t eVt-t na td.all... REPORT OF REINFORCING STEEL OBSERVATION Ar A llrRr|t fm|Icnra to cttxtl .trr F.t! x{r o.!il. Et at irF nr ||E lr|.mD |r Df o(l;rxtrr(-,tlrtrrnf of dt crDant ro ajtruaa]bl mi PUR EA- ,'', o. stl;1rrrll, 61f€trrqp c. rxtiactrl rir;a or itorro]€ cr mrcrrid-nidto I'rirolrc -qrr frltut rr"ixa- tltrnEl ru 0t E qtt r l'ra lEJnxl B ca.{rru, uall! olt(Jl ,Jr|filtLxll l,lf l.|llll) lll tl fillrF ^ ln-rir .. ,-[tf-O* et...ilc,r. fri| tlr. Cr4tll a/gt To: J'oB No. 4 39,8 90- onr* B/2/9O TOI'JN OII VAIL Attn: Mr. Stan Berryman OAILY REpOFff NO. 4I SHEETJ oF 4P.0. Box 100 Vail C0 81658-0100 II{VOICE No. PRGIECT Addition to Val 1 'l'Tansport-ati on Centcr, Vait, Colorado SIRUCTURE Footine ttrArorl EII/AIION REI{FORC0,|C couuanrs \EflNCJ\L t{ofdzo0{r L I a I Existlng tunneLevel 1 at A-1 Existing tunne Leve1 L @ A-Lz Existing tunneLevel I @ A-lf Existins tunneLevel l-*@ A-12 Level 2 \t{. ofA@lJ.B 59.2' ,9.25 99.25- 57.25 56.2r- 58.25 7L.5 , 20 f/4 @ 18"ac 3'3n L9 /14 @ 18" oc 3t 3tl t2 #4 @ 1B', oc Jt 3tr L4 //4 @ rB'' oc 3t 3tl 38 /14 dowelrat 16tt oc at 3', 3n B#5@6ttoB#9@6tto 7/15@6tto#5 6 oc Tra 4#4@9tt o 3 L/Ztt aLl 4#4@9tt o J L/Ztr a1,J- 4#4@9tt o TB 17 I/z,t aLL thread TB cont. tlansverse 6 /15 @ lBil oc Jr8rl TB cont. sverse COht rhread inta L/Ztt anchoru6&fiti"s foundatlon hread i'nto L/?tt anchorexi-sting foundation cont. spEcuE noftss srEE Gn^De 50 E n-$rs usto RElfoflctllc ctrAlltD{Es* clean E snor DRArltlcs usED cuAR t|cE AltD cttwlt aG feq ts corrnrton romro SPuO|lo: SPECTEATX,ilS: aE feq E,ruU-lUe OoSWAIION BAR sJprrogp T1p€ brick EI pmr-lvg oc$ffAnoN nNEH ltFl,rCE COlrLPl\tlCE YeS HEcHr 3n ffi'ffi ffiffiffi "-ffi'o-DOtrlUl€D RE-E(AIINED ffiinforcingstee1appearstobep}acedin5eneralconfornance with project plans and specifications. Michael Barber Axchitectule, COPIES Attn: Mr. Scott lVard; Gary lrlur-rain PCL Construction Serviccs, Attlr: ['lr. Denny Armour; Anderson $ l{astings; llRS Consultants . Atttl: Mr. Les hlood:- Bill Carr Steven L. Pawlak Rfl-O OSSEfiVER APPRC /ED FY TO: 19y1r1 0l: VAI Lnttn: Mr. Stan llcrryt an l). O. Box 100 Vail C0 81658-0100 PROTECf Ad(li t i on to V;ri 1 'l ranspottati.on Ccn tcl. JOB NO.4 J9g 90 DAJLY REPORT NO, tNv0lcE No. V;ri1. Colorado. DATE B/2/gO 41 sHEEr4 oF SPSFEATFT|E SUJUP W'MobilerD( 10. A 3000 3-'An Anrl{r 4-8 IIgfI{T TE'PER^TURE ,^rc€ 6o0-Bo0SUP?UTN TET lto.TNUCXMI TrcXTT lro. lluE EATC]IE} TIUE ARRIVED nrE s uPto R6/rrurrnN COUHTFX EOIN nryournrl@uxtcn couPt EIloN ;l,Trc YAM.#D/ cuuut rrr/E w rB ADOq) o^u,.rS 1 2 ? 4J 114 44 L3r7 L359 L362 12:44 1:0( L:2i L2z jA Lz45 2:oo as req as req a6 req as req as req as req 8 I5 24 L2 B 4 TETt{I 511[?([r)llllO{IEilT(r) YETU]truEclfl(Pcf) 11tL0 @NCflEIE TDIP€_ MTURE cr) ROr tu(s I 3 L/2 Rr\L39.4 7O { cylinders ca6t PKICRESS REFORf, Sarnple taken fron truckr PuIIIF 1n use. Time observed on all trucks. n orFe Michacl 0arber ArcltitccturcI Andcrson I llastings; Gary ]lur:rai1 PCL Construction Serviccs; URS Consultants; BiIl Carr Steven L. Pawlak RE1D OBSETYER APPfiOVED B' Chen€Northern.lnc Cdn lrr{ t rtrrr ri SdtraL REPORT OF CONCRETE PI-ACEMENT OBSERVATIONS At A llml.t ?EltE Dl E Qtrfi!. Itt tt[t lr{t oal!|ltTr' at lf.to.ot rtrf llitnH-t Ar nt: cottrt'mrr -ftrrtt_nfi f o' dfx|':l Ax) amrnoalD' lrt |ttlE^- trr o- srrrtran.tl (lr€lrtrD,' 6r rrlucrt r".rr o.r tq ir'a qr aniir'o-iilnig'rdirrn-qt -wtlrx rri'no,'q- 3^L1l: rll I ocrqrD 0r T fir rE tl{l B cuarr'tD uL"ttr q',ll ,Da.rrt'ftt ,i rslrt lo x tnrlt|(l ^ .rr.r* d r'.fffff-fl7r.r e. rrrrqb f6i t , €rat l,aa r./to C[en€Northern.lnc. REPORT OF CONSTRUCTION ACTIVITIES as a wn||t F|{rrF6rn| ro ctr}trt lri: ptrt.E ^ro (|rttarwl t[ rttF !r[ sunnmD as 1r cora[rtut- PtYftf (t cl cu]a[L,ro a'l]gitArpi x; ?ur 'u- rrHc.n^lf}|'{rscorcllBr'6r''I|lA;ni'P0gonat0!i'M|oornrgrrs-d''n.:rnil''tilo|}'o-ixxrrrrmrii#dids,rrru:tvlt.t.ED6''cEtJ'fu6corlr|I! rr{'tsr grrr.l ,Ni rq.|.,|rs x|f,. ,4tl,D lo ltl fftlrlo. ^ ,rr-i.- lr t-ft'tj-il-lir,-? or 6.6r'ir- rctr ro. c,ratotA /lo Con.dlJr|g lngln -. ond sd-rH, To: TOyN OIr VAIL JoB No. 4 398 90 DATE: . B/3/9O Attn: Ivlr. Stan lJerrynan DA1Ly REpORT NO. 4a SHEE1 I OF z P.O. Box 10O Vail C0 81658-0100 lNVOlcE NO. PRO,|ECT Addition to VaiI Transportirt iort Cctrtcr, Vai 1, Colorado yEATHER coNDmo*s AND TEM'EMTRE partly iiouoi, 7oo CONIRACTOR'S CONSIRUCTION ACTMTIES PERSO$IN& }TAIOfi EAUIPMENT: IGIMIIES: CHE}|-NoRTHERN,S sfit AcIMnEs Full time observation, inspection and testin8;structural fitl bein6 placed over roof drain line and fill being placedat footingo Level One, E. side nevr structure. Bolt inspection ofstructural steel at Level J and Level 4r Line A-A2, Grid 1I-14. B&BExcavating has attempted to dry out on-site fi.ll and conpact same.All tests have been fai.li-ng due to material bein6 over optlnun noisture. VER&cL COMMUNICATION WnH CONTnICTOR, ENcINEEII. ARCHrTECT, OWNER Scott Green of n*B-has been advised of naterial condition on slte. He does not wish to brlng stock pile naterial from Ford Park on site for backfill. Backfi[ing efforts have stopped. Michae1 llarbcr Architecturc,COPIES Attn; Mr-. Scott ltlartl;Cary lrlurrail IICL Construction Services, Atttr: Mr. Detrny Arnour; Anderson fi lla-s-tings; t.lltS Constrltants, n!! !L: lvl r-. -!rel Wood Bill Carr Steven L. Pawlak FIS-D OSSERVER APPRCryED TT Chen€Nofthern.lnc-.C..-ijtl|to arerrr .i S.ftab REPORT OF FIELD NIJCLEAR DENSITY TESTING At a wr^l FimETrx ro qrraltr Irf F|rirt l,{) oltrr vL!. !l FI|lt rr3 ,,lf Itr.nlD A! Tr Crtrrto'lut' ftr'frtrTY tr (tqi€t{r1 }O Itl€iu IDr m t'{^EA_ r|'{ (t sr^trnrt t!, mlrr ult{r.r on FnF/icttl(x of fo rntE a,n mnttifdidniD't'ti&l-q'c irml rrpnoar- 9l?t-ct mr E 0g'e! f rnn rcrll' 6 corrt.tltD ulrJll srrlr.t rFrsr.xrr lat ,ltll.LD lo ul wllllrtl ^ i*'!.- t r|llJlH |rr. d ocnpcrb rirn l|.. Cn€lO7 VaO To: TouIN oF vArL JoB No. 4 398 90 DAIE: S/3/9O Attn: Mr. stan Berryman DALY REpoRT No. 42 sneEi' Z or zP.O. Box 100 Vail CO 81658-0100 ttMOtcE No. qEoJEcr Addition to vail Trlnsportatiou Ccnter, Vail, Coloratlo SPECIFICA'TION COYPACNON & MATERIAL MINTMUM REQUTRED tN-pl-AcE oENSny 95 CONS-IRUCTION CONTMCTOR: B&B Excavating backfill ASTI{ DIr57 against found. SELECTED SY: Chen NorthernTEST ASx DETERMINED RY: LOCAT1ONS WERE TYPE AI.ID NUMBER OF EAJ{TH MOMNG UNfIS } TYPE AJ{D NUMEER OF COMPACTION UNTS f MFIHOD OF ADOINC MO| TURE front loadert dual wheel T\:eI THICKNESS OF UFT NUMBER OF PASSTS as ag req req LOCAION DEPTH OR ELEVANON (FEEr) ugot{AToFrr RELD PERC€NT Of(RE-^rMl rAxuAt4logrlrd SOIL TYPE tL)l NO.It/\XIMUM DKY DENSTTT(pcf) OPnMUM MOISTURE CONTENT(r) DtrY DENSTTY fu.r) MOISTURE CONTENT(z) 20( 201 202 20: 201 l4r S. of B l,ineat 3L Br lI. of B Lineat 32 Br IT. of B Lineat 33.5 6f W. of 39at A0.5 lor ll" of AOat 37.2 2' BF 1I BF 1I BF 2' BF ,' BF L36.o IJ5.O L35.O l]6.0 l.36.o 5.9 5.9 5.9 5.9 5.9 1e8.0 L28.5 I28.9 r29.0 129,3 11.1 10.9 11,4 11.0 LL.3 94 94 94 95 95 sI. silty sandygravel A FULL TIME oBsEr{vAloN D P^J{T THE OBSERVATION rrnr |f'"qtr pinF],at! (r'rrrrtlr ruraD A! A f:rrLl on oosrtFi n(s6 (r n Ft fcftrfHt. tt lr vr Rrt rfl -oltJxF GDrtucnm ro coflltf ,iPftnHq F{ FEo6l*,|0tDcF|cn,t!''tFr^,QKEirrFf'I'llu.u'||t|9rrrr.,t''r",...j.h'i.'rr&rvii.a-'rlGt3EFvrr€fPFrAnt.TrEiT5^,(l^^{,f(Ifnl'o..Y As f,l-Evrt r{rcrssrfi m cA"ErArE q-n ou6ur,u[4t .rurroElrj{r. nsr rtrr,fi.iii r-i't-irii li,iri-rrin tirl'u.rrs rn Yr|fnft-R t]tE rt! utfrs Eif,cltr^lxlc' rHE Nt CLEAR DO|S/O|TEIER MEIIKX' OF TESnl|c W S USED lN SUIlflAnuL,ccoflo NcE wIrH ASIU 92992 AltD DJOI7 B&B contractor notified the above tests were falling due to fill nateri-alon-site being over optinum noisture. pRzuMtMmr OBSERVATIoNS Atb/OR TEsr RESULTS VERMLLY REPORTED To: Les l'ood pRocREss REpoRr The above tests were performed on the structural fill being placed at foundationsl Leve1 One E. si-der new structure and 6rlroof drain line. coprEs xiilli""*i'3:irt"fi:i5;ctureJ Anderson 6 llastings; l'lr. Gary l*Iutrran; PCL Construct i on , -Attn: -l''tr. . Dcnny Annour I llRS Consrtltflnts, Attn: Mr. Les t1oo.J; Ctten€Northern.Inc.Con lung trsli..r .dd sd.'tJrl' REPORT OF CONSTRUCTION ACTIVITIES A.s A uJnA fiinfc Dt ro ctrxri nr Ffir r{n cttttfr.\tl tll ifF('tl3 frrf .lrtrrnm a! rr corrnaxrur. vl,rfaf (f tlt drxrL po Anlollz]r1x'{ l(t ann^- rrr. (,. srAfx,rfs. crrqrrl.r(n frir.rr rFoa. on atrurrr€ orn ntxxrs-r nr:r-nfl tt rBt€ oG nr$ttlt ippttwA- SAEu: wltr E oGArr! 0f FTU lf:rx) E ocrrun.D u{rs3 olltl rAi rqJllxrs lrlf, lcatl, lo lN vRlll€. ^ '-rrr- .l *[f rtf l I "-" .r o.(trd-. fr )|. CLtlCtA a/lo To: TowN Attn:p.o. Vail PR(\JECT OF VAIL l{r. Stan Berrynan Box 100 c0 81658-0100 Addition to Vail Transportation JOB NO. 4 398 90 DAILY REPORT NO. ftworcE No. Vai1, Colorado DATE: B/6/90 4' sHEEr t 0F Centcr, WEATHER CONDMONS AND TEMPEMTURE c1ear, B0o coNrRAcrotrs coNsrRucfloN AcrMTtEs PERSONNfu I'IA'OR EQUIPMENI: AgIMnESi CHEhI-NORn{ERN'S srfE AcrMnES f,UIl tine observation and testing of conpactedstructural flll being placed over roof drain 1ine at AO iine 30-39.Structural fill belng placed at foundations B9 Line 34.5-39. Conilactiontesting road base naterlal belng placed at storm drain vault Sta. 16+40N. of S. frontage road. Observation of narafi 5OOX being placed onpunping eubgrade areas of S. frontage road and placenent of road base same areas. VERBAL COMMUNICATION WIIH CONTRASTOR, ENGINEER. ARCHMCT, OIYNER cop,Es Xlili"'rli'3::.t"fi:i:;ElXl"ilu",uin PCL Construction Services, Attn: Mr- Dcnny Armour: Andersotr & llastings; URS Consrrltants, Attn: Mr" T,gi Ieg!! i Bill Carr Steven L. Pawlak NA.O OBSEFTVER APPRO/ED B/ C..ndhf er*t-r -l s.a.,lt-Chen€Nonhern.lnc. REPORT OF FIELD NUCLEAR DENS]TY TESTING As A r",nut pgn"cr'r r., .1f*,l nf ,'fE l,.D o,-f|trvr1 ^l ir FirlTa A t 3.turtro r:r rtr- oirrxr-rrut-Fn'rrir (r o,' q€xaro a'ncrf rDr 7Tl FInEA_ no.r or srArrur.t ,r, crr€l u!r{r (n rnrrTt rfrr oq Rra^r..)r€ ow "r.r.,rf'fiiiEiil -riii*i-ru -rnnur rpnwrc s tB ru E Dtt!*' 0r- rnn [Jr€ 6 o(EtrrtD ur.tjt ollll ,,i.rnrxrl ,lt ,altllJ lo 5l r/frn&q ^ 'rt-rt- .i r't.lfftH lr-t d ...riF.r- rF r ,ao. CuElOr a/lo TO: TO$/N OF VArL JOD No. 4 S9B 90 DATE: 8/6/90 Attn: Mr' stan Berrynta' oALy REpoRT No. 4J sHerr 2 or 4P.0. Box 100 Vail C0 81658-0100 tNVolcE NO. PRqrEgf Addi t ion to Vai 1 Transportat i.on Ccnter, Vai 1 , Coloradc.r SPECIRCANON COYPACTION & MATERIAL MINIMUM REQUIRED IN_PI.ACE OENSTTY 9' CONSrRUCnON CONTMCTOR: B&B ExcavatJ-ng trAS TEST DETERMINED BT: LOCATIONS WERE backfill ASTM D1557 agaj-nst foot. sFl FgT@ tlY: Chen Northern TYPE A}ID NUMBER T\?E A}ID NUMBER METHOD OF ADDING OF EARTH MOVING UNITS oF coMPAgnoN uNrrs I MorsruRE natural I hoer I front loaderJHlcKNt5s dual wheel roller NUMBFJ1 OF 2 iunn ..iacks OF UFT as req PAssEs as req LOCATION DEPTH OR ELEVANON (rEEr) LABOflATOI{/FIELD PEXCIXT OF (Rfl-ATrWr/ l/^)(ua(x)onrtt@ SOIL TYPE tEi)l NO.[lA)(lMUM DRf DENSITT(pct) OPnMUM MOISTURE CONTENT(/) DFf DENSTTY (P.r) MOISTURE CONTENT(t) lBC lBl aoc e01 zoz 2r|'' A lBf S. of 89at 36.5 A 10f N. of ll9at 38.2 A l4t S. of B Linat 3t A Br Nr of B Lineat 32 A Br }tr. of B Ltneat 33'5 A_f , ^X. .of 39 sG. I' BF 2I BF IIBF lrllF AIBF 136.o 1}6.o L35.O 136.0 L36.O L36.O 5.9 5.9 5.9 5.9 5.9 7.9 L32.O L32.2 L1O.4 1]O.B L32.O L32.L 7.6 ?.4 7.O 7.2 7.O 7.8 97 97 96 96 97 97 sl. silty sandy gravel E R rL T1ME oBsER/AloN D PNTT TME OBSEF/ATION nls it:Fgr p'lr$.r:t q'no€ rrrrfr a! A Rdlrtl o|- ol,i (plr|lv rr1rr (r 'r|l R,r.trn{|. vlf lr^vf nnD Oft_rlf 6tfnAcTruR lo oo'llllLE tPlLYlxr nr m@.fo.orD cnterdn\rt ttttnT ^r.D e<rsnnr: tt ttu^ r,rrttp nrq or,r *r"lx'd,h';fitf;; nf*;'o$t'ttw-otnllprs' lEsrs M[ v^ftE f nr Fnl or'Y as filniED Hec[isaiy ro c lrn rr o.rn oo6rx!f-R1t Juoot)*.xr. rtsr rxle "ri irr irt-iri nln nn rhxxxs qt w]ltlllul tll[ Fllr ut11lt lPtct;lc lEra' lHE NrJCt{ R De|s;OUErEn ME]lUq) Of 'tESnHc w\s usrx lN suss-raln L lcsoRo racE WIIH AS|U 02992 ANo 0Jo17 PRzuMIMIil OBSEf,IVATIONS A}{D/OR TESr RESULTS \ERIIAILY REPORTED TO: Les rtr/ood The above tests and replaced. PROGRESS REPORT bhat was removed were perfor&ed on ReteEt6 ot 7/3L/9O the structural fil} and retests of B/5/9O. coprEs ttilli"'rli'3::.1"fi'lil:cture, Anderson & Ilastings ' I'lr. Gary Murrran; PCL Construction,- Attn: .-Ilr. - Dcnny Anuour; IJRS Consrrl tants , Attlr: tvlr. Lcs llooc; Bj.]-l Caru Steven L. Paulak HN"D OSSERVER APPROYED SY ehen€Nonlrcrn.lnc.oodd|lrt trtlxr ri S.l-al- REPORT OF FIELD NUCLEAR DENSITY TESTING As A r|,nr,PPttgrua lo rar{Tt ru ritrtt l}o qJrtl [t al FtPolrt ,'\f sFrnrn At rf c$rrf)frt-Fllo'tlTY 0f u'l cllfxrq art-'''rmgilArlx tln i'tla- rpr 61. sr rarrxll c{rq u!66 qr rnrrcxt rtr;r 11r rto nor€ 31,11 mnriJ-r'-iir:tiii.o'-niiiri-ir.n'-lrlnu lrF lora- S lrtrJ wu q DE &9 c' rrTtl lullr€ 6 oqaullD (]llt! on An|,giar.It frr ,art!, lo t]l $ffnt.c ^ nr-'r- o. n [Hil-l e-,r .. ..,nrar- FG t|-. CtalOtA ,|,'fao To: TO$/N OF VArL JoB No. 4 s98 90 DAIE S/6/90Attn: Mr. Stan Berrymanp.o. Box 100 .: DAILY REPORT NO. 43 SHEEr 3OF 4 Vail C0 81658-0100 tNVotcE NO. PRilEgf Addi.tion to Vail Transportati.on Center, Vai I, Colo'r'aclo SPECInCATIOH COIIPACTION & MATERIAL MINIMUM REQUIRED IN-PLACE DENsrrY 95 CONSIRUCIION GONTMCIOR:B&B Excavatinq below founda- ASTI4 D1557 tion pavenent SELEGTED sY4hen Northern T A5 DEIERMINED tff: TEST LOCANONS WERE TY?E A^I.ID NUMOER OF EARTH MOVING UNTTSI hOE, TYPE AND NUMBER OF COMPACTIoN UNNS } dUAI MEIHoD oF ,oorNc MoTSTURE natural I front loader -rHlcKNEss oF LtFIas req wheel roller NUMBER oF pASsEs as reo2 junp Jacks LOCAION DEPTH OR ELEVATION (F-EEr) LABOR IoRr FIELD PEFCE}{T Of' (RE ATr,,E/ flN(ll4n) osTrrfo SOIL TYPE It)l NO.I'IAXIMUM DRY DENSTTY(ocf) OPT|MUM MOISTURE CONTEI.IT(x) DRf DENSTTT (Pct) MOISTURE CONTENT(t) c 206 zo? 208 t0g o2 N. of existlng pavoment @ Sta. 16+40 lor N. of AO LLne @ 3"1 5'W. ot39@ A0 Llne r0r 5B 101 Line @39 AO N. of N. of @14 SG 2I BF 1I BF DtI Dtr 138.6 tJ5.O L36.O 156.0 136.0 5.6 5.9 5,9 5.9 5.9 L33.6 L32.2 L32.O L32.4 L32.2 5.4 7.Q 7.1 7.2 7.4 96 97 97 97 97 road base sl. eilty Eandygravel Gf ruu- TIME oBsEm/AnoN D PAtil llME oBsEFvATloN nG ilputT piflr}fl! ct|r||rr FuntD A! l Rt-lulr oF qn oFrtv rllt' or nt F.ct)rfxT. t,f lr\f tlnrFn oll lt|r co.flFAcrn m ctl|o rt pRnr|o I{ Ft(r.fxDar cnr'fcn{ uFfr Alo |{Emrtf to rru. Drrtttt€ lt rvrs ntl'iih irxilwl s *m ra wi&t.-Fl Mlnr's rFJts lA€ gl€€ q lHr nl or-Y As rarvrr {Lcrssrlr ro ca,nr tt q,n ortiviilt ,iuucxxr. tsl uerr rri iiri lii--ixr D sE tun onNxns trl Y}lrllftJl lllf FItl lltrls srtc|f rltlloe fiE NT CLE^R Do|TSOUE1En UE|ltq) Of ]EsI}{; WrS US€D tN SUI}5rA{IUL ^CCORO^IICE WttH AS'X D2992 Alio DJolT PREUMIMFr OBSERyAIIONS Al.to,/OR TESr RESULTS VERBAIIY REPORTED TO: Les lllood PROGRESS REPORf The above tests riteTe performed on road base naterial placedN. o-f-frontl$e rd. and structural fillbing placed at footlngs and overroof drain line. Level One- n*rvr stnrrci.rr coprEs Ttilli"'"li'B:i.t'fili::cturc, Anderson 6 l'lastings ; l'lr. 6ary Murriatr; PCL Construction, Attn: - -ltlr. - Dcnlly Annour; llllS Constt l tirnts . Attn : Iqr. Les lloo(l'. Bj.ll Carr Steven L. Pawlak RELO OASAVIR APH{ryED Ff Chen*Nol'thcrn,Inc tu:runa Lt!91-r rr ld..])t. REPORT OF REINFORCING STEEL OBSERVATION At l |r,ruft FrnctDt ro tr'Jfrl ri rttE |,r, drttwl al rlFdrt "rf l'srrtD li rf o('rDllmf! fiiaf'nt or d'r (' fxtr' r,0 a'|nfic^rb' ;tlt A'nEA- no,. .,. nlrrr{rrit, c.rr11!11r oi rxtr,cr] 16, ol1 irc f(r{ or rexrtiin-idifro' niiirrc-o.ri -*nfu lr?rMr'- 3lnl:t rll ( c(Fqr! tr rrnr rfJtrro 6 cc.ultD uttlli (nttl lr*)Etvwll ^rf, ,r!lfu, lo ll tl{l}|l ^ 'n-'r- .r *[!1 * .. ...i?-'b trtr ,ra CL lA a/F TO: TOI1IN OF VAIL Attn: Mr. Stan B.erryman P , 0. Box J.00 Vail CO 816s8-0100 PRGJECT Addition to Vai I 'l'ranslrortation JOB NO. 4 398 90- DAILY REPOKT NO. fworcE No. Vai 1, Color::rdo DATE: B/6/90 41 sl€Er4 oF Center, stRucTURE !VaI} u)c llof{EE\/ rX)+| R&{FOfiqrC @urofis \ENC L lr(nzoNr L Existing tunneStairs No. 1I S. of A l,ine @ L2.5 L Leve1 I 22 #4 @ 18'' oc FF ?o /14 @ 18il oc NF 2 /i5 cont.t6 /14 @ 16'' 4 /14 @ L6tl L6 /14 @ 16" /14 @ L6tt oc top & bottom OG FrFr ,c at 21.4rt BF OC }IF BF extend through roofthe tunnel to spliceinto wa1I dcove of 5PEUnCATIOi€: stEIL GR^o€: 60 Rgrrmc1{oct6lxr.g€sg€ clgan ctIAMNcE lrrD cCtVER aS I' eq spt onc spEcm Ints| aA feq BA8 SltFoftrs: Tt"€ FI EH b n^ns uso El srrce DR $Ncs usED E corrnrron'Arn/Fr! f; k; ruu-rue oBsERl/AnoN D prnr-nue txrsEnvlrtotl tuPr.AcE oolrLPt llcE yes UET FROf,CT UET PFOI€CI narERslunorEfrs nEqulRg.o{rs ne-o<rrltoX1gt lNrutly tnED(ATHS) RE-E(^THO HECHT PROGRESS REPORT ThE confornance with reinforclng steelproject plans and appears to be placed sneci fi-cat1ons. in general Michael Barber Architecture, COPIES Attn: Llr. Scott ttlard; Gary Mrr:.rain PCL Construction Serviccs, Attn; Mr. Denny Armourl Anderson I llastings; lfRS Consultants . Attll: lt'lr. Le s ltroocl; Bill Carr Steven L. Pawlak REI.D O0SEF/ER APPRO/ED F' Clrcn€Northem.lnc.Conrdung t Ch.... o.d 9J-,1H, REPORT OF CONSTRUCTION ACTIVITIES as a wnt.r fiorrtrur ro qll{E- I!f, ttnE r,o ()t-n:Er!r!. {r .nF-'o!!-: |Ff, i-ftnn} ^t nt -rrrry4.$f "Hltstfi[,fo,ffiffirfft$i"";ncri oi <ir'iri;tr-'cfq.irrrc rn riirrcn -1191 -qn -F!alr.f oui nf,F(fir E RtsLRvfD fr'ruro o(n r llttl conln-o uuss oltrt.l lmrrrtra.raxt lR( l6to lo lx lftlr€' ^ 'r'.- .. rffil]c-. .. cnl'F Fdn X.. Clalo2 4/CO To: TOWN OF VArL JoB No. 4 399 9q DATE: . B/7/9A Attn: ltlr. Stan llerryman DAILy REpORT NO. 44 SHE; I OF 3P.0. Box 100Vail C0 81658-0100 ltwolCE NO. PRilEcf Adclition to Vail Transportation Centc", Vail, Colorado WEATHER coNDmoNs AND TEMPEMruRE clear, partly cloudy, BOo CONTRA TOR'S CONSTRUCTION ASIMTIES PBSO}INfu MAJOR EOUIPMENT: ICIMNES: cHEl.{-NoRTHERlt.S SITE AGTMIES Full time observationr inBpection and testing:structurat fitl being placed at footing C Llne at 36-39t new stlucturetLevel One, B&B Excavating for Stair lVo. 4 C Line at 11-12 and forconcrete vault sand and oil interceptor to be installed by plurbingcontractor. ltlatkin Plunbing has excavated under footing 7r x 1r4'r A0Llne at JO.Z to install 2-5'r sevrer line. Advieed to conrpact soilsor pour concrete same area. lnspection of reinforcj-ng steel belng placedfor wall Level One A Line at L2.5. B&B contj-nues to cut for slab-on-grade Level One, new structure. VERBAL COMMUNICATION WTH CONTMCTOR, ENGINEER' AIICI-ITIECT, OWNER Irlichac I Barber Architccturc,COPIES Attn: Nlr. Scott Ward;Gary Murrain PCL Construction Services, Attn: Mr. Denny ItloodArmour: Anderson & Ilaslirtgs; UltS Consultants, nttn: Mr" Lcs I | 3i11 Cam Steven L. Pawlak t'I nan oesEffiER APPRovED g\r t.- Chen€Northern.lnc C..l.talhe O|9l,rr .tn 5d-tt$r REPORT OF EXCAVATION OBSERVATION fs A wTtr l PifcTrrr r crfxE, n[ FJ!tr rr0 ooiyl!t:. aI mtoitt &qf StDat EIt as ntt crca.u]0tt PttcfnTY of oun q r].8, lr0 aJl]f\u rn t([ f't lrA-|r,|orstAnrrtrliq|G[rar.!ofrx''l|c|5'tlql(xt,.l4^,l!'|(|qfnFtn|36N|!l,,(vtoP.||u'li0t||ttt|||1,tl,\Fio/A.s{.'u5nIEF|qrralru, u{ltl onl| l.rH{{|.ratt ,Jrt ldrll' lo r{ tfitl}t(l A iEr.- .. s.[XtH ln .. stro*'. r1'| no. Cralo.9 arO TO: TolltN Attn: P.O. vali. PRO,'ECT OF VAIL Mr. Stan Berryman Box 100c0 81658-0100 Addition to Vail TransDortation JOB NO. 4 398 90 DAILY REPOFI NO. |l{volcE No. Vai1, Colorado DATE B/7/9O 44 sHEEr 2 oF a Centcr, D(CAVATION FOR: Sand 8. Oil Interceptor LOCAIION: South of A Line at 3Q.2 D(CAVATION BASE ELEVATIONS: 74.66 MATERIAIS E(POSED lN BASE(S) OF D(CAVATION(S): pagslal undisturbed soi16 were observed at the base of the excavation. REIIARKS: GrOund water observed atcontractor Natkin to rernove water base of excavatlon. Plunblng by pumplng. \ERBAL COMMUNICATION WIIH CONTriACTOR, ENGINEER. ARCHIIECT. OWNER: PROGRESS REPORT: Michae1 Barher Architecture, COPIES tr11n3 Mr, Scott lrlard;Gar:y Murrainfuidcrson fi Ilastings; PCL Constiuctiotr Services, Attn: Mr, DcnnY Anttour; l.lllS Consrrltants, Attn: Mr' Les l{ood; niff Cam Steven L. Pawlak RELD OBSffi1/ER APPRO/ED FT Chen€Nonhern.lnc,Cs|rJtLe tmfEr o{ Sdo0rrr REPORT OF EXCAVATION OBSERVATION TO: TOhIN Attn; P.0. Vail PROJECT OF VAI:L Mr. Stan Benyrnan Box 100co 816s8-0100 Addition to Vail Transportation JOB NO. 4 398 90 DAILY REPOFIT NO. |lwolcE No. Vai1, Colorado oATE B/7/9o 44 sHEErS oF Cente r, D(CAVATION FOR: FootlnS LOCATION:Stair llo. 4 Line C at 1l-12 D(CAVANON BASE ELEVATIONS: IBl.O tt TERhlS D(POSED lN BNE(S) OF EKCAVAIoN(S): l4annade fill naterial. REllAffKS: Indicated on Drawingsreplace wj-th structural fill to 5121 SectLon 3? to]r deep x !t wlde. overexcavate and VERB L COMMUNICATTON WITH CONTRACTOR. ENG|NEER, ARCHTECT. OWNER: scott Green Wlth B&B advised of naterials at exposed base of footj-ng also Le6 ll{ood orvnet representative. PROCRESS REFORT: Base excavation subexcavated to 178.0, structural f111to be placed in conpacted J.ifts. Michael Barber Architecture. COPIES 161n; Mr. Scott Ward;5a1y i,turrain Anderson G llastings; PCL Consthrction Services, Attn; Mr, DennY Arrnour; URS Consultants, Attni Mr. Lcs ltlood; Bill eam Steven L. Pawlak RB-D OBSERI/ER APPROVED ST AS |rt,lll^t PiottcrEl to cuxls, 'lrf Ptrrr r,I) (lJitrwa al ftorr3 lf suLtlfD at ndr.f[]nlt pRfir t ori cLrrE, ,13 ,ar]0\0lrDr mi nrd-ta-lrra or SlalfLltlll crl€r usrr6 0r ltln{;tt ft().t (n ftqrfr(| uJlt ft)Rtf 6 ttL!tFw! totua€ qf rtft trlt A,"i(ta- 9[us flI E t=qtD (f ,fu ltIF surfrlltl, uat"lt qnr lnrr.xtrraB rrr( rftIo t0 fi xfttDt(l ^ m-'.- d r.[fliH lr.,r , o..ean - f6n tlo. C|IIOIA a./ao Clten€Northcrn.Inc.Con.dun! t,lglrt.r. ot|d scl-,ttrL REPORT OF CONSTRUCTION ACTIVITIES Ai ^ r r r^{ Pi rclD. -Q' ,q!!l-!- Ilc Ft itE rrlr .r-ttt.rrtr. {r r!tt!!!:! AFt s trnD as rrr cortrt.}nr.|L ffi^f tH"Btffi i""f iH"StGF"%'tiri'rr liiriliDn's,- cfltl ndrr.r oa rrrr,.cr: rFo{ m ntrurltro (xi atPollrs B nlJLnl'tD frt}oo€ o(]n tfilll}l O(rr'Lfif.D ll(IJS OnI| rnl|lqlxXs tr ( r4fi' lO |rt rFllr€' ^ r!i.- .. r!.1 llltl |rrr .. a.r'?aJ- r.,n| tL, crrlot^ 'Vto To: TowN oF VArL JoB No. 4 398 90 DATE B/B/9O Attn: lt{r. Stan Berryman DAtLy REpORT NO.45 SHEE1I OF 5P.O. Box 100 Vail C0 81658-0100 ltwOlCE NO. pRo,lECT Acklition to Vail Transportation Ccnter, Vai1, Colorado yEATI1ER CONO6ONS Al.,tD TEMpERATURE clear, B0o CONTRAGTOR'S CONSTRUCflON ACITVINES PERSO}.INfu MA'OR EOUIPMENT: ASIMNES cH6.t-NoRTHERN's slrE AcrrvmEs Full tiure obeervation, testlng and inspecti-on;structural fill being placed at precast concrete colunns B9 Line 24-26;at ramp up to Level 2, existing structure; excavation and conpactionattempts by B8{B Excavatlng of fill material for footing Stair }lo. 4, C Ltne 11-12. Compaction tests are fai-l-ing due to high noisture. Reinforcing steel being placed for wal1 Level One, ecieting tunnelr area A Line at 12,r-L3. Rebar being placed for Level 4 deck topping. Craneset up to place precast concrete columns, Level One, nevr structure. I VERBAL COMMUNICAT]ON WTIH CONTriACTOR, ENGINEER. ARCHr|.ECT, OWNER LESrepresentative, and Scott Green, BSxB Excavating, advised and conditions at Stalr }io. 4 at Ll.ne C 11-12. Woodr or/Tnerof materials MichaeI Barber Architccture,COPIES Attn: Mr. Scott Ward; Glry l',lurrain PCL Constructi.on Services, Attn: lt'[r. Dcnny Arnour: An'Jerson € I lastings; UltS Consrrltants, Attn: Mr" l,cs Rill Carr REID OBSETNGR Steven L. Pawlak APPROYED B' Wood Chen€Nonlrcrn.lnc.Cd-rU|' ardrr na t r-5 REPORT OF FIELD NUCLEAR DENSITY TESTING AtAwTtAFR'|tctD.t!crrxlll}tFl^E^}oo,Fftt6'Ar!{'!41A,rf'tr,i/.tTtD|sn(c0fr'fxrur''raT'lTrtl.qlcrfxrlr^}oA'l}w/^'Drrfli.iI - rp. t sr^rrrnxrl cocrr.tt(t6 t'i rnrrcB rr(t oR ifq^art€ cu r-rriri-g-enrl nxip o'n flI}i rrPio'a- 91ff!6 rlr 8f DtFor'D (r lfTll IE I]F 6 carurE r'a.EI q tI /fFr{)a}.'l xll rtifD lo x lfltnt|q' ^ a-tr r r'. [XiE-lr... .. ..,.r'r- r-ir l.' CEIO' {/ts To: Tol,lv OF VAIL JoB No. 4 998 90 0ATE B/g/gO Attn: Ilr. stan Berryman DALY REpoFr No. 45 5gEg 2oF 5P.o. Box 100Vail C0 81658-0100 llWOtCE NO. PRq,Ecf Addition to Vail Transportation Center, Vail, Colorado SPEC|NCATIOI{ COYPACTION & )IATERIAL MTNTMUM REQUTRFD lN-pL,{CE DENSny 98 r AS CONSfRUCnoN CoNTMCI0R: R8,rB Excavating p51 DETERMINED Bf: LOCANONS WERE ASTl"i D1557 under footin5 sB-ECTED a|y: Chen Northern TY?E AI.ID NUMBER OF EJRTH MOVING UNNS T'/PE AI{D NUMBER OF COMPACT1ON UNTTS f MEruoo oF ADDTNG MotsruRE natural t hoe dual wheef rollerI junp jach THICKNESS OF UFT as req NUMBER OF PASSES A6 rEq LOCATION DEFTH ORg,.Et/AnoN (FEEr) LABORATOFNT FIELD PERCE}JI OF (RE.ATI\E1 tl^xra|r) OITIAI€) SOIL T-TPE It->l NO.lrAxrMuM Drr DE}.{STTY(Dcf) OPT|MUM MOISTURE CON1ENT(r) DRT OENSTIY (Pcr) MOISTURE CONTENT (u) 210 211 5r ll. of C ]-,i-neat 11 5r N. of C l_,j.neat 12 179 17A 140.O 14O.0 6.r 6.L L3L.2 128. B 10.9 12.'92 sl. silty sandygravel tl D Futt TIME oBsErvA]loN D PN{r rlME oBsER/AlloN nG arFgr pittrxT! exr>rt FlrrrD at ^ ict[r tr qt ocfF/ txt 6 f rltl ptrct)rDar. rt lr^!t Ff:llf! 0{ rHF crtnR(fm Io oD{rr{rt franHo tr{ ;ac1rargxgtD c1lrlrcrp urgrr {ro ix*n;11 rc nrr urqrp n1g nlts rrtx dh on'strwr c 1rfi 9!611i.19 -(1rrr r1r13 rf,srs r^r rrot tr 11f rnl 6;{Y As Elftir r..t<tltr tD c{an rE a,l oclFfir! Jtt\rdlrxr. rsr un ijlf -trn iir-gr rrss ful atr{xr6 otl f,llfl}Rn tttt n[ ulJTl vEt|rEArDS' fiE Nt C|IAR DO€OrIEIER UEnTOO OF IESnNC H S USED N SrrsS'rAXrUL rccof,tlfLcf wllH Asllr D2ee2 alD DJOIT PRELIMIMrY OBSFflAIONS AilD/OR TESf RESULTS VERBAIIY REPORIED TO! r oo ru.,..^ % pRocRESS REPORT The above tests were perforaed on the fillin compacted lifts for footing under-Stair #4, Line C at;tion 178, Advised contr^aetor-rn rnu'o[ mq!-si,riie content. being placed 11-12 base eleva- coP,Es Xt:l?"'"?l'E:i.t'fi*::l'"'u:. Anderson 6 Hastings; Hr. Liary !4urrlan; pCl, Cons truct ion,-Attn: Mr. - Denny Armourl ilii i.iiiiitintsl'nttn: Mr' Les wbod; BilI Carr Steven L. Paw1ak RU.D OSEM/ER APPROYED Ff Chen€Nonhern.lnc.C.rdft ardt ... .a ta- REPORT OF FIELD NUCLEAR DENSITY TESTING ll A riml{' utlclDl l! qn'.tt nt trt'E ,to qrat* a E @ fi: ttlttrlD rs r}G @tutql.!*'crr c ot cuxnl flo atfrrxt tDl tDt n'/i'tF tn g. rrn1axrr cpqlgr q; 1;ra.crr ?ftra q1 16j.p.r g1r 6,gfff,ffi6?ililiti*rianot reilg$t- ilrLE rrr r E CD t|r r E IF ! or'ttrD urgl ollo llhr[drr rl lm lD n [|'n' a rrr- I r-lffilr.- d -rt t r G-nr rh GItt ^ +/lf i i 1 To: Tol{N Attn: P.O. Vai I PRO.'ECT OF VAIL Greg Hall Box 100 co 816s8-0100 Construction Observation JoB No.4 463 eo DATE B/B/9O DALY REPORT NO. 45 SHEET J OF llwolcE No. Testing, 1990 Vail StTeet fnrprovernents, Vail sPECncAnoH coYP CnON & yATERt L MINIMUM REQUIRED IN-P|,ACE DE\lSrrr CONSIRUCTION CONTRACK)R: PCL x As DEIERM,N- o, ASWI Df55? TEST TOCATIONS WERE SNTCTED Ff: 95 under slab Chen l,lorthern TY"E A'iD NUUBER OF FIRTH MOVING UNfIS TY?E AI{O NUMBER OF COMPACI]ON UNTTS METHOO OF ADDING MOSTURE 1 bob cat junp jacks THICKNESS OF UFT NUMBER OF PASSES q.o as req req? LOCATION DEPIH OR ELEVATION (FEEI) I-ABORATOF'FlEl-o PEFCET{T OF(m rDv r. nl|ra) OAT||ID SOIL TI?E rt)l M).IINOMUM DFY DENSTT(pcf) OPTIMUM MO! TURE CONTENT(u) DFT DENSTTY (Pct) MOISTURE CONTENI(z) 71i ?u ?LIl by aE 1o R9 at 25 B9 at 24 Llne Line Line DLI DG DL7 rJ6.o u6.o 136.O 5.9 5.9 ,,e L3L.6 L3L.2 lJl.0 6.2 OoU 6.3 97 96 sL silty sandy gravel llll E ruu rlME oBsER/ArIoN tl PART TIME oBsEFvATloN IrFr f,FflT ?itIJ{I:t et{Or FdiaD at l iEntT or or! Gttrlr rprE oi rnr- Ptrcftft r. af }x\t inF clJ f cofll'GIII ml cDfill(f, lF"llln I': ftc'pr,rtxnfn ccrrtc.nrt oT(lrl ato uGnrr ro ntt rxrar.o n* nucr n*r'ih' iiei.,rr' e -xrn qca!!{tl?-4-rtl rp6. rsrs rif n D( c t tn {taY ^s rlryrD x.6Rsfrr m crr-nrrt a;i-rigrr,or:-lrrmrxr. isl orre r*' -lin iie tii i^!s rur rprlus at{ llgnm rHr nL lEnt sEofE T0!' u€ !|t,cu n ffxsglcrEt uEt]po or lEmt€ wls usg) tN slrsstl]fil L lccoRq ilcE trml Aslu D2992 Al{O DJO17 PREUInI{.{RT OBSERyAIIONS AND,/OR TESr RESULTS \ERB tLY REPORTED TO: Le6 ll'ood PRoc,REss REPoRT The above tests were performed on the structural fillbeing placed at precast concrete colunna, Line ll9 24-26. coPlEs lfuller Engineering co., Irc. BGB Excavating Bill Carr Steven L. Pawlak REU) O8SER1/ER APPROVED Ff Chen€Nonhern.lnc Conr|ttLr{ E telr|..t cnd sd-&i. REPORT OF EXCAVATION OBSERVATION ^s A slrlrxl Pi(tIErIr. lo crfrlsr lrt( PnllE l|0 qJis.rwl al fifl'dml rnt 3uraTED a5 nl€ oorrrrxn t PnrrnTY of (tn o-r,|is. xo Arnlr rn{ foi 'tn-rl-1|'r(|'slrnltx|5'c{'quat6f'|tfI|RA;|5''(I{nftqA,{|dou|trt'|oRl3r5nt!.rM,Ptrru'r,qJrtr'E||l}llf'lt('A-sllfu5nIr0C'|.c.Dtfll|tl:'|sqr2u]u, ul{ltt otlrr xrir,rralxllt .rr!t t4!,lD Io trntvql ^ '!-r.- .t r.[ t tlXlr-" e, o.traJ.. F n| rb, c|alOJA a/to ro: JoB No. 4 Js8 eo oxe B/B/9A'I'OI'TN OF VAILAttn: Mr. Stan Berrynan DAILy REpORT No. 45sHegf4 of , P.0. Box L00Vall CO 81658-.0.100 llrVOlCE NO. PROTECT Addition to Vaii. Tr:ansportation Center, Vai1, Colorado D(CAVAION FOR: Footing LOCATION: Stair l{o. 4r Line C at 11-12 O(CAVATION BASE ELEVATIONS: L76 IIAIERIAI-S E(POSED lN EASE(S) oF EXONAIoN(S): rltet nnanmade fil1, REI,tARKS: Pumping and lvet material renoved and area etabllized wi-th a compacted lift of crushed grayel. VERBAL COMMUNTCATION WtI]t CONTRACTOR, ENGTNEAR, ARCHmCT, OWNER: Les Wood, oufnerrepresentative, advised of removal of punping and wet material. PROGRESS REPORT: Michael Barber Architecture, COPIES Ag1n ; Mr. Scott hlartl; 5a1y lntur-rlin furderson G llastings; PCL Constfuction Services , Attn ; l'lr. DcnnY Armour; URS Constrltants, Attn: Mr. Les !{ood; Bill Carr Steven L. Paw1ak REI-D OBSERVER APPROVED Ff Chen€Nortlrern,lnc O(r.dfr Orfrt -!a 5.Lnrr.i. REPORT OF REINFORCING STEEL OBSERVATION ,J A r.mrr fDrrEtDt E clrxxl n( turE Alo (ri:rtlt:t |lf io'oirt ,a{ lrrrmD lr I}{ corrnnl,t- i'IrtrrY tr drl drxtL 4,o- fl!! qarDl lci Pr,{ r^- rx11 1yr stlnrardl 3rrttltxro ci mu41l 1r(tr ot [o^i.rt q; mrcrtr-s minio Foaotn crr riorDl ,ftittfA- : lftE tll c Dltlltt (r rfitn lt:mB (! (xrfrf|ID rnrtn o|t(t fA]aE lxM f l€|t[l) lo ll tllll€. ^ dr- .. ".1]lnr l:-r .. .6tar.. rrir ,.r. Cr{ll0 r/F TO: TOI1IN Attn: P.0. Vai I PRG'EGT OF VAIL Mr. Stan llerryman Box 100co 816s8-0100 Acldition to Vail Transportation Centcr:, JOo NO. 4 39_8 90- DAILY RF.PORT NO. rrwotcE No. Vai 1, Col orado DATE: B/B/9O 45 sHEErS oF sTRUcTgRE lVall roc TtQ{E"EYAIION FElroRc$rc cotaror5 r/f,FncrL HOEZOa{I L Existing tunneStair l1o. 11 S. of A Line @L3 Level 20 if4 @ 1B'? OC FF 2L /14 @ 1B'1oc ll!' L6 il4 @ L6tl L6 #\ @ ).611 e /t,4#4 4#4 top cor @ l5tr c @ 16'r c FF NF at 2t 5rt B.F. B.F. extend throughroof of tunnel to spliceinto wall 6ove + SPEC|FE nq.ts: stEL cR^r: 60 fl nens uso RElfBc|rfii ctfAilLe|etstg clean E snoe oR rlNcs uslD cu RrNcE ANo @vE t ag req. Ei corrnrcron rnrsro spuor{e spEcrrc rp * aa reo d;ruu-nue otFExr/ rloN BAR g'PF(nTS: TY?E . D PART-TIIIE OIISBVANOil FI{EH l}PtrlCE COI4PIANCE Ye S Ho'rr ffi,,ffi ffir.ffiffi ..-ffi,-W[€ lNrIlA(.LY WH€rl - EXAID{g) RE-ECIrIDIID PROGRESS REPORT The reinforcing steel appears to be placed in general conformance wi.th project plans and speci"ficationsn Michael Barber Architecture, COPIES Attn: Mr. Scott Ward; Gary Mur:rain PCL Construction Sewice s, Attn; ['lr. ttenny Arnour; Anderson G I lastings ;.llRS Consultants. Attlt: llr. l,es Woocl ; i3i11 Carr Steven L. Pawlak FIELD OBSERVER APPROVED BT Clpn€Northern.lnc.Coo.dUDC fngLr... orrt 5{t rurt REPORT OF CONSTRUCTION ACTIVITIES ^-s l |^n||t |'roI|cTDt to clr]f|!, nE FunE fO O(rrFtf/11-Al l!ltg!I_ ,( 9-l!fTm a3 n[ coF rfxruI,.- PrF rt rt otn ctlxT!! ']O A'ngrulru{ rn n'l u- ,rr. d sraFF'.rs onqrr:€.oi rxi/.j1! rroq o{ Frrrnmo ou mqnif*s-dg.ri,tl m;i[iMi-ixx irrnrtn ildwx- sart ct tllr u( D5t'ED oF AtTrt rurro 6 cc.r'uttD rl.rtls oltlt Alilr<lrtrxl rrc rsuD lo ol rulxr ^ ,,.'.r- .. *@* o. oo.'tt'-. rd6 15. (r.f,loA a/ao To: TOWN OF vArL JoB No. 4 398 s0 DATE S/9/9O Attn: Mr. Stan llerrynan DAILy REpOFff NO. 46 SHEE1 1OF 5P.0. Box 100 Vail C0 81658-0100- llWOlCE NO. PROIECr Addition to Vail Transportation Centcr, Vai1, Colorado WEATHER CONOffiONS AND TEMPERATURE clear, BOo CONIRACTOR'S CON5IRUCTION ACIMTIES PERSONN& MM)R EQUIPMENT! ASTMNE* cHEll-NoRTHERT{'s srE AcIMnEs FuIl time obgervationr tegting and.lnspection of stiuctuial f111 being placed for footingr Stair I'Io.4r C Line at 11-12. Reinforcing steel bing placed for footing Level 1 and 2r Stair Iio. II and Level 1 and 21 Stair I{o. 10. Placing 86 yds of concrete from I:15 througtr 6:41 p.n. for stair and walls llo' 11 and Stairs No' 10. VERBAL COMMUNICA1ION WITH CONTRACTOR, ENGINEER, ARCI-IITECT. OWNER trlichacI Barber Architcctulc,COPIES Attn: Mr. Scott Ward;Cary luturrain PCL Construction Services, Attn: Mr. Denny Arnour: Anderson ti l{astings; UltS Consrrltants, Att-n: Ml'. Lcs Itrootl B1I1 Carr Steven L. Pawlak F]E].D OSERI/ER APPRO'ED F/ Chen€Nonhern.lnc.C-IJU.{ lrah- .ra tC.fr REPORT OF FIELD NUCLEAR DENSIfi TESTING TOT{N OF VAIL Attn: Greg Hal1 P.O. Box 100Vail CO 81658-0100 PRqrECf Construction Observation Testing, 1990 JOB No.A 465 90 DAILY REPORIT NO. TNVOTCE NO. Vail Street Inprovenents, Vai I DAIE B/9/9O 46 5HEETA oF SPECINCANO}I COUPAGTIOH I IATERIAL MINIMUM REQUIRED IN-PLACE DENSTTY 98 T AS coNsrRucnoN CoNTMCTOR: B&R trixcavating rESf DEIERMINED Bf: ASTl,l DL5r7 LOCATPNS WERE SEI-ECTED EI: under footi-ng Chen }lorthern I hoe dual wheel rollerI Junp jack fiIcKNESS OF UFT &8 lBQr NUMBER OF PASSES &5 r€Qr TYPE ANO NUMBER OF EARTH MOVING UNTTS TYPE ^ND NUMBER OF COUPACTION UNITS I MEtHoD oF ADDtNc MotsTuRE natural LOCATION DEPTTI OR ELF/ATION (FEEr) TABORATORY REIO PENCEXI OF(Rs rDvnaoJu) OATAI6 SOIL T}?E I r-)l NO.IlA)flMUM DKY DENSTTY(pc{) OPnMUM MOISTURE CONlENT(r) DFT DENSTTY (Psr) MOISTURE CONTENT(z) 2t( 21i 2t: 1 !t 1'I. of C Lineat 11 [ 6r N. of C T,ineat 12 6r N. of c Lineat 11.5 L7B L79 L75 140.0 140.O 140.0 6.1 6.1 5.L r37.t L37.8 I}B.O 7.8 7.9 '/ .6 9B 9B 99 sl, silty sandygravel lltl tf E FUtt rME oBsErwAnoN tr PAI{r rME oBsERl/ATloN ItG |Ifoir piEFxI' q' n'6 Fdr.:D Alt A rEtal dr o(,N Glrll^rx t of, ntt ptfa]l.on. ffi }lAt/f irrnD (rl IrE c(rltlrcnoi 1o cof|xrr ^FFLY'€ rtf Ftoq||Dtrf,D D(lt C|t\/f fttfit AnO uogttif tD n[ fUnRo nrt nrrr rriX dh inctnnr f NOf Gtairto '('|rr^tlt{3 TEtli l'l( l|AD( o: nf, rf,L OtY rs ranrtl xrrrsrrr ro-ixrnrn ai-rfunjtri]uin*.xr, irsr o,rrr rii -riri iia-ttt iirrrs roi 4firt6 o{;l{flrrB r t nu vltT! lFIrr^tDB. THE Nuc|IAn D€XS(ITEIIR U nrclt Of lEStrlS t S rrSED N STTSSTANruL rcffiD^l{c€ firH A$r 02992 ll{0 un17 PREUUIMRr OBSER1/AT|ONS AND/OR TESr REULTS VERE l.LY REPORIEo TO: LeB Vfood pn(rcREss REpoRr The above tests werd perforned'on structural fill that nas removed and moisture corrected material run through Grizzly and placed in compacted lifts for footing Stair /14. C Lj-ne at Grid 11-12. @FlEs !tuller Engineering co", rnc. B€B Excavating BiIl Carr Steven L. Fawlak FIEID O681/EF APFRqVED ST SiffiffiEtr#ffiR#"ffitr"ffi8$""' "U"ffilfffi'f'ffitolru D ulr diu n@ rf, m to t nnc ^ m- I r-flffile ....n t- fFr rb oltdta {/|o Chen€Nonhern.lnc Cc.r.dlr{ E,rglrflr aiil ld-rl$t REPORT OF EXCAVATION OBSERVATION TO: TOI{N Attn t P.O. Vai I PRqJECT OF VAIL Mr. Stan Berryrnan Box 100c0 8t658-0100 Addition to Vail Transportation JOB NO. 4 398 9_0 OAILY REPORT NO. tlwolcE No. Vai1, Colorado MlE B/9/90 46 SHEEr] oF Center, E(CAVATION FOR: !'ooti.ng LOCITION:Stair #4, C Llne at 11-12 E(CAVATION BASE EL.EVATIONS: Originally @ 178.0, now at 126.O ldATERhts E(POSED lN BASE(S) OF D(CAVAION(S): l4anmade fill REITARKS: Additionar J 2t of fill xenoved due to wet punping rnaterial. VERBAL COMMUNICATION WrTTI CONTMCTOR, ENGINEER.of naterial exposed at subexcavation ARcHmcT. oWNER: Les VJood advisedlevel. Additlonal t 2r of fi"ll was Iremoved by g8.S ExcavatingrStructural fi}l w111 beplaced lnfooting base elevation.compacted Ufts to ori.ginal deeign PROGRESS REPORT: Micl'rae 1 Barber Archite cture . COPIES 411n; Mr. Scott tVard;53yy Murrain Anderson € llastings; PCL Constfuction Services, Attn: Mr. DennY Arnour; tlRS Consultants, Attn: Mr. Les Wood; RiIl Carr Steven L. Pawlak FIELD OBSEF/ER APPROYED F/ ,s ravn Al PiollcT|]i to ctrxB, nE PUEr ,Allt arital\t\ Il. Frtorls rJ|f sugtltfr] as nG ,aDfxrul pncffrY or 0f clrt{r:. lJ0 AlrtrmllDt toi a.aLta-|r,r(rs|^|l.ItrE.o(,aus{'4o{fr|R^c|5l'(I(n'.tq^'€o.Jl|lrtJ'0fl3!i|.t5.J{fDPtl.D|t|co{,|ln(lttI/r/Fl(rA.S^|?usiulio6iaID6|f|trluns(Ir|rtltil' utlll| onlt l.irl|rrx|.lt lrit ,a[rD t() H $trwlil a i:rt- ., r-fittHlr.r ..6.trdir.. F.rrn tlo. Ctf lolA r/a(t To: '19tu" or; vArL JoB No.4 j98 90 DArE S/g/gO Attn: Mr. Starr DcrTynt n t.r I E t).0. Box 100 ' OALY REPORT NO. +o SHEEI l OF 2 Vail C0 81658-0100 6MICE NO. PRGJECT A(l(lition to Vai 1 'franspoltirti on Cclttcr', Vail. Colotado. spErp^rpBs $,uup 3-5 An coNrEl{r 4-B suPPun vi.l'{obileuu Lo. A JoOo ^rrre{r rorruR^ruRg nrl'rc€ 60-80 lEr l|(l.TNT'CK ML IP(EI Mt IIUE a rclE)nuE ln&vtD Tll,l€ sAIPr.[D Rf\rcUrrFil @UHIER IEOIN RElOUrrEil @IJNIER @uPr.EIKtal A'Irc YAM LOrD// CUUUTAIII/E lt lER ^&€Do tt oaas I I 3 4 , 6 7 r50 Ilg 54 114 150 54 114 L479 14Bo 14BI 1483 1484. r4B7 1489 L:57 ?:?6 2242 f :OB 3:28 4 :11 4r25 I:2O 2:43 2z5B 3:L5 3241 4t26 4:40 2255 aa req as req aa req aE req as req aa req aE req aE rec as rec as rec aa rec aa rec as r6c ag Tec B 15 24 32 40 48 56 0 0 o 0 TEST 1'& $u,lp(ur)AIR OO{IEilT(r) TET U}ITT f,rtFlft (Pcr) YAD coNcnflE TETPE- RATI'RE cn Rfr.rro(s 2 4 t/2 6.8 L39.6 JA { cyU-nders cast PROGRESS REFORT Sarnple takenative, Le6 ltood, requested fron truck, punper intine and visual slunp 'u.B€o Owner obEerved on represent-aIl trucks. ^nerFr lrlichac I Barbcr Architccture; Andcrson I ltastings i Gary Murrain PCL Construction Scrvlccs; UlfS Consu ltants ; Bill Cam Steven L. Pawlak RELD OI]SER'ER APPRSVED SY Clrcn0Nortlrern.lnc.Cdn,lt|| entlrr ci sd-'lr.{, REPORT OF CONCRETE PI-ACEMENT OBSERVATIONS a! l l| nt|( tno'rErDt ro tltxTr. Dt rrnt ro 6.i?lltt, at rrtdrn| ^,lt lti.nrtt Ar trr @ntJ.rr^r-firrtrrtrY rr (ri dfxr* lro a'Drtt'atrtl t(t xfr^- tpr or srarnarrrl cdrlrrrf, 6 frtr,cn ni(rf (! ifer{rr€ o,r nrrxri-d^ciinib' j"rxro-cn rfrtttrl ,rtf(l/A- a'^lt'ttt trf lt oFfqrD f lnll tt:ttl$ E odru:llD rttttt t||tt tGr,Ilrxl| ,aa ,i'etD tl, l{ tf,ltro, A 'ir* d r'.[Xttl-lr..r ., ...r?.ir. hr )|. Crall{ a/to T0: 1gg1r1 Ol: VAI1, Attni Mr. Stan Bcrrynarr It.O. Box 100 Vail C0 81658-0100 !!!UECT Adtlition to Vai. I T-ransportati.on JOo NO. 4 S98 90 DAILY REPORT NO. |}ryolcE No. Vai1. Colotaclo- DATE S/g/gO 46 sHEr5 oF Ccntcr. SftErlCAIXt€r Srljup sllPPuEWo l"lobilelu r.o. A 3000 3-5 a&Err TETPER TuRE ,.^^c€ 6o0-8o0 tErtp.TNUCTtll.TIO(ET t{(t. TIT€ IIATCHED Tlu€ /lnftI/g' TIlrE SAI|PI.ED REIjO(UnO @UNTER tfulN RF]OUTDOa-| c{xr}|TER @uPtEloil CUIrc YAE}6 Lo D/ CIJUUI,AIIIiE UA1ER ADq)crurMs d 9 10 T1 r05 117 119 45 1490 1491 L492 1.493 5:O5 5:lJ 5z3B 5:5o 5z16 5z30 6: OO 5: 10 5:40 aa req as req as req aa req a6 req a6 req a6 req as req 64 72 80 AA 0 7 0 0 T€STm su[? (Dr) AtRo$rElfi(I) trET UNT UEAHT (Pcf)YAI) coNcrlEIETE'Pt- RAN'RE cr) RgrAfu(s 9 4 74 L/2 hour delay white novingpunper and set up for Stair #10 PRocREss REPoRf Last truck total 85 yds. Completed pour at 6235 p.w. ^norr.!c MichacI llarl:c r Arch-ltecturcl Andcrson I llastings; Gary Murrain PCL Construction Scrvices; UltS Consultants; BilI Carr Steven Lo Paw1ak REI} OFEFVER APPRWED ET ChenONorrhern.lnc C{r fi &Elrr 'ra Sd-iH. REPORT OF CONCRETE PI.ACEMENT OBSERVATIONS ar A ll,,|tll. norllc Et to cltxll l'f rtft ^rr| q||!*:r.]Tt. Att rrr.rl1r Arl€ nrrlD at t; cxttDtrtra fa(tlttft f ort Gr Ir6' AO- A-tnmrrrlDl Irn A[rA- noi'r' nerrir,nri- tilql'rr||-ri'rxrrcrr nnr ot itorrio q.r |'J\tti-6'llianD nirip qn rwu tt?frJl/rL s,llt'tl' ru E oI'llto d rrru fEft Ecor lltD tAlI ll|llt ,tt rrratll l[ .raitlt !o t{ twnn ^ 'rrv.- d t ljtiiilr..t r. ...rr-- tri 15 c|allal aIO Clrcn€Northenr.lnc.Co.r.dtlog fng|,ti. o.n Sckdr.lt REPORT OF CONSTRUCTION ACTIVITIES as ^ rrmrr 'ionctn lp qq{tr- r!f, P(nE fro crjtiEr}ci. ar !qt!!!! ra€ ltr| nrn ^s n'r cotto{qlffi,uTJl,*Effi trffin#tffift'rii*'rr iiririiirii- cordino|! oa rxruin -rrx m nfn4l|tt*r oui Rtt!(n3 B Fut'|mt Ft]olMl (xn rnfl n cq|,LfnD ttlSst o'|1t; |aipcrrx'l rE rdt,,D lo ll{ tErr€' ^ ll-rt- ., r'.lTiX-lgt ., 6lv.et . r-r. L., CrEl@A a/ao le: TowN oF yAIL JoB No' 4 398 q0 DATE: 8-10-90 Attn: Mr. Stan Berryman OAtLy REpOKf No. 47 SHEE1 1 OF 4P.O. Box 100Vail CO 81658-0.100" llwOlcE No. pRq,Ecf Addition to Vail Transportation Center, Vai1, Colorado WEATHER CONoflloNS N{D TEMPEMTURE Clear, 80oF.r Partly Cloudy in P.M. CONIRACTOtrS CONSTRUCNON ACTTVMES PERSOT{Nfu MA'OR EOUIPMENT3 ASIMNE$ CHEN-NORIHER'{'S SITE ACTMNES Full. time observation, testing and inspection of structuraL fill being placed at exterior wall and air shaft at new entrange to parking- ranp at C Line, 28-31.5; Stnrc- tural fill being placed at precast concaete colunns at Line 89, t9-23' Level One up ranp to Level Two; Structural fill being placed for footi.ng stair No. 4, Line C at Lin-es 11-12, Reinforcing steel being placed for SLtt topping of deck, Level Four, Line A-B, Grid 1-6. VERBAL COMMUMCANON WTTH CONTRACTOR, ENGINEER. ARCHNEST. OY{NER coprEs xi[l?"'"li"BH,t'fi]i:;El]l"fr,",.r" PCL Constauction Services, Attni Mr. Denny Woocl ,Chen€Nonhern.lnc cd-rlhg En*r-r -l g.ltfr REPORT OF FIELD NUCLEAR DENSITY TESTING rs l trrut tiottgtDt F ttrxf|, t]f 'ltr ,ro 6|,EalEt At [tottll llt g,r''trt at ]t( ooaDaxTl{. Ptt(tfr?t tr c,r d.Bml ^,o atl}Q @/ttDl rn tulE^- ibi- a- lirborrr cirqltEr€ d rrnd-rtu m if,orarin q.r lf,Fqrr! B iEgarifi! p().E€ c,i rElTDr rf?rorrr- 3lttt3 lt't E Dr'(|r, 0r rflr tEtDr 6 oqFrro ua-Dl gl}tl ra$cLr(lr ri( ,c@ lo x rsn*r a 'Ert- d ".[frifr-l r-r d...4-- ftr l.r CLlqt 4.nO '-' Tolr,rrl OF VAIL JoB NO.4 398 90 DATE 8/IO/9O Attn: Mr. Stan Berryman DAILY REpoRT No. 4? SHEEf A oFP.O. Box 100Vail C0 81658-0100 llwolCE No. pROJECf Addition to Vail Transportation Center, Vail, Colorado SPECIRCAT|ON COypAC'noN t UATERIAL MINIMUM REQUTRED IN-PIJCE DENSITT 9' CONSfRUCIION CONTRACTOR: B&13 Exc avatin g AsTIr4 D1557 Ext. Wall & SIab Sn rgTFJ Bl: Chen Northern X AS DEIERMINED Bf: TES'T LOCATIONS WERE TY?E A}'IO NUUBER OF EARTH MOVING UNTTS I TYPE A},tD NUMBER OF COMPACTION UNTTS 1 MEIHOD oF ADDtNc MotsIURE natural TH|CKNESS OF UFT a6 req jump NUueER OF PASSES as reqjack front loader hoe tamperr I LOC,ATION DEPTH OR ELEVANON (FEEr) I.ABORATORT FIELD PSCE{T OF (Rs-ATrE/ MN0lnra) osTrlE) SOIL T\?E IrJI NO. MAXIMUM orY DENSTT(pcf) OPnMUM MOISruRE CONTENT(u) DRT DENSTTT (pc'r) MOISTURE CONTENI (x) 2r( ',ZLi 21i ztt 5f ll, of C l,ineat 28.2 4t N. of C Llneat ?9.5 5r iY. of C Lineat 28 6r It. of c Lineat 29 14' ns 12r BS l0r Bs AI Dq 140.0 140.0 140.O 140.O 6.I 5.1 6.L 6.1 L37.4 L37.6 L37.8 J-17,2 7.6 7.2 7.Q 7.3 98 9B 9B 98 sl. silty sandygravel E RJLL TME OBSERVAIION D PAFTT TIME OBSEFVATION TG rEioit Pmx){l:r at rDS FlrliaD rS l iE:t LT f q.n Oc8\'^llrrt Of rlt n rcf)rotf. rf ]qvt rnJtD dl ltf COaIF^cmi m coxT]lt{ ,r+1nf€ It ir!or&xp cirtrcnt :rrurt lo trcEnrr m nu oucr.o Dt{ rsEi ftf,x q-r oGE Mn !r }rot {EtfrMr€ c{rarxrts. rf,sls r f u^tlt f fif tlu <>(Y rj-Eftrnntce$|'r lo cr,LnaE q! cE.]itrnt Juoc[){rt. rEn o^ra lfif rpr tr( rn aslt ton ortlD6 (ri l}r6nrl ll|t ru ltEft lrEcttarp.l IHf Ht CIIAR D0asouErB uElltcr) of TE'Itlrc trAs usED rN g.r8sra{TuL rccoftDANcE IYIIH A5I}r D2902 Ar{D DJO17 PRBJMIMF/ OBSEj|VATIONS Al.tD/OR TESr RESULTS VERMTLY REPORTED 1gr Les Vtood I par tak l.I o aIr kin en fil elv ns 'i'tre above tests $tere performed on the structuBlff$$-f"Wnt'exterior rvall and und.er exterior slab area ramp entrance and air shaft Level l"-4r Line C 2B-3O.5. Ele --.! -.r-lL - J- ur fo va ^"'Dr!c Michael Barber Architecture,--''- Attn: Mr. Scott Ward; Gary Murrain PCL Construction Sewices, Attn: 'Mr. Denny Armour; Anderson & Hastings; llRS C6nstrltants ^ Attn rfutu D l,I ll T,(,tt vtil Bill Carr Steven L. Pawl-ak RE-.o OASEFryER APPROVED F' Clren€Nonhern.lnc Cs-rtitrr Endn rta S*f REPORT OF FIELD NUCLEAR DENSIfi TESTING f.f Js"ffi-l? * ffi# ffiH.#"ffi*T"'#-"}#ffi',f .S-ffi &"ffi'S'#; rytr|rD ul-rt oDrl xi {raxtl lf, l4[ID lo N rnn*r ^ 'i-its d *[Tilfrlr... .. ...''r.rr- tr'i h cralsrl .^o JoB No.4 3e8 so oxe B/LO/9O'"' Tolrtr,l oF VAILAttn: lrtr. stan Berryman DALY REpoFtT No- 47 sHEEr 3 0F P.0. Box 100 Vail CO 81658-0100 ltWolCE No' PROJEgr Addition to Vail Transportation Center, Vail, Colorado MINIMUM REQUTREO tN-pt.',ACE DS{SIrr 95 r As DEIERMINED E/: ASTM DI557 under slab coNsIRUCnON 69[1plgTgp; PCL TESr LOCATIONS WERE SFr FCTED FY: Chen Northern TY?E AllD NUUBFff OF EIARTH MOMNG UNIIS TYPE AAID NUMEER OF COMPACTION UNITS METHOD OF ADDTNG MOTSIURE natural II bob catjunp Jack THICKNESS OF UFT NUMBER OF PASSES a.D a6 req req LOCATION DEPfi OR ELEVANON (FEEr) IJABORATOFf NELD SOIL TY"E IEJT NO.tf,{xtMuM DFY DENSTTY (Dcf) OPTtMUM MOlsruRE CONTEMT(r) DFTT DENSN'T bcr) MO| TURE CONTENT(r) PERCEXT tr(Rtl.^mv tuxuA.rr) OSTAffD 22C ??t ??) Line 89 at I-,ine 89 at Line 89 at r9 1L 23 SG Dtt Dtt J-36.o. L36.O 1]6.o 5.9 2.9 5.9 L3r.4 IJI.8 l-1L.6 6.3 6.5 6.8 97 97 97 sl. silty sandygravel tlll d nlu- TIME oBsEm/ATloN tr PAFr rME oBsERvATloNHffiffi{ffi#kffi}#ffi.&.ffiffiS' 1l€ HlrctE R DE}GOLEIR UEItm of rEsnNc w s usED tN suttsr^t.flul rcconoAllc€ wrTH ASIlt 02902 AND D3017 pRzuMtMFnf OBSEF/ATIONS Al.tDlOR TES1 RESULTS \ERBALLY RFTORTED TO: LeB Wood PROGRESS REPOFTT ThE AbOVE cei-n6 placed at concrete tests vrere perforrned on columns B9r Line L9-23, the structural filllevel existing structure. .-..ro,r= Miahael Barber Archi te cture, "-''* Attn: Mr'. Scott ltlard; Gary. l,turrain PCL Constnrction Services' Attnl 'Mr. Denny Arrnour I Anderson I Hastings; llRS Cnns,rrl trnts - Attn: [tT. Les l{ood: 8111 Carr Steven L. Pawlak REID OESERYER APPRWED 8T Clrcn€Northcrn,lnc. A rllt ltefxr r|a &r-l!. REPORT OF REINFORCING STEEL OBSERVATION |r A qmLt frElTctDa E Gtr)fll rHt tt.lE a|) (ll:nwl al itt Tr l|lt lurrrnD Ai l}r oo{ElxlvtiEttlTt f (Itt cuxll xo-T muc rbl tui RA E^- r(f o. s|lnra-r.rl oorEurn{t <n rxrucnt rrlrlr ot [qr.{ cr.r nrxriir-r-liinio ttird€-dt rrrnot rr+mnl ! fuJ xll E 0ctqL0 (F ItEn njllr} 6 oc.nr.ftlD {.}lr:rr ontr lAirrlrlxlt lrlt lgrll, ro N lFlDrl ^ 'i-r.- .. -[trf-tf fl r-r er crr4crr- trrrr t5. Ct{l llA r/9o TO: TOI'JN Attn: P.O. rt..-i 1 PROJECT OF VAIL lvlr. Stan Berrynan Dox 100 c0 81658-0100 Addi ti on to Vai l 'l'ransport-ati on JOB NO. 4 398 90 OAILY REPOTfi NO. rrwolcE N0. Vai ). , Co l or:ado o^rt B/Lo/go 47. sHEEr 4 0F Center , 5TRUSIURE Deck, traffic island rcc^ntl ILEyAnoil R@TFORCDTC cgllo{ni !€Rncr|.HO6:rO tA A-g Line,/1-5 A-B Line,/1-6 A-B 1ine,/I-5 Level 11 Level 4 Level 11 154 MK 4002 DV/LS @ 12'' ld @ Bt' oc #4 @ Lltt oc #5 x L7r2'r 1#4x4ot2#4x271 botton cont. N-Stop & botton Lap 2orr Min. Btt oc top of expansion Joint lap with #4 @ 2r" L #4 x 33t 8" 2 t'lK 400jL #4 x L6t ) Iocations sp€crnc lon* stEE" cR rE 60 all rebqr Rsrfrnq'c cr..E r{uNEss: .r33l"t coated GLEAI^NGE lltD COVER a6 req srucmc sPEcnc il)1t* as reg BAR g.FFORTS: TIP€ RIIEH 1s El naxs r.seo E snoe DR,rwrtcs us@ 6 conar*rcroo ^t tseo El ;ruu-nle ocsEff rrcN E prrr-nur rxlsavllloN Ir{PlrcE @uLPl llcE ye6 U€T PRO'ECT UET PROJECT REOUIFEIENIS Rf,.(UIR€r'A'TStltf}t tNIIur.tY VYHE}I O(^I.|NED RE-D(^THED o^lE RE-ECATIII@ pRocREss REPOKTThe relnforcing steel appears to be in conformance with the job specifications. Michae1 Barhcr Arcltitecture, COPIES Attn: I\,1r, Scott Ward: Gary Murr.ain PCL Construction Services, Ati:nl Mr. Denny Annourl Anderson S llastings; UltS Consultants. nttn: Mr. Lcs Wood: Bill Carr Steven t. Pawlak REI.O OBSERilER APPRCTVED F' orthern.lnc REPORT OF CONCRETE PI.ACEMENT OBSERVAT]ONS Al A lltrl|( ulctD. I alrf]llt lt( EIE rl]r, (t.*rrrTl Al' itFdrei {tt !tJr'f[D Al trf actDt]lTrr-lrt(fi'nr of dt O fx|lr lt5 Atnbi(t^?Itl tG 't[-t^-rnr 11' 3ral?rr$r;1 11r(ur111,r 91r D6r.cr]r r;1ra 6rr ifo f1;r€ gl,r nro#ii'o-idrrio"nrl'ii-un -r'[rttx /rrrF('/,{- s^rn8 ral tE DcFqrD d'ln[:tl]l' 6 oo.rt,IltD t a.lI onrt , Qlralt na tati r, ,l l[na. A 'r:r- d r.F]itill.r ,..rr.*. t6 L. Clal laa a./ao Co.nI|}{ I|ilh-r ri Sd.r{tr To: 19pp or: vAI r,Attn: Mr. Stan Berrynan P.O. Box 100Vail C0 81658-0100 EqITECT Atkli t i on to Vai 1 'fran spo'rt ati.on Ccntel', JOB NO. 4 398 90 DAILY REPOKT NO. tmrclcE No. Vai1. CoLotatlo. oATE B/LL/9O 48 sHEEr I oF slF UtR SPCETFEATpiB. rr.l,rp 3-5 AIr cor{rE{T |rxx l.D. c4500 ArsE{r TEUPERATUBE R^r,tc€ 50.90 lErilo lnircrt{L ncxEr t{).Ttu€ UAIGHE} IIUE ARNilEI' Ts€s lrPt-g) RA,OUJIX)f{ @ut|Ta EEO{ RE\'oU,INN @UNTM @uPrfllof{ crr&c YIG aOr{)/l cuuut Alrl/E WA'IER DDCD a^ll.or|s I 2 1 4 q 6 I 34 114 44 ro6 46 117 54 L514 L555 rr56 L55? L"B. L559 r550 5:43 6 :04 6iZ' 6:40 6254 7 ;00 7:Q7 5z50 6z2O 6256 6z jI '/: IO '/ z2O 'l:to as req a6 req as Feq aa req as req as req as reg as req as leq a6 req as req aa req as req as req B th 24 J2 40 4B ,6 U o 0 Lv o lEfMI su,|?(ur)An O$IIE{T(r) WET UI.IITweHr (FcF) YlA^O @rffiETEff- R^IT'RE cf) R[IA'U(S o 4 L/2 ?.L r40.r 70 PrcGRESS REFORT .9anples taken fr,ou truck. ifine and visual slunpobserved on al] trucks. ,^,nDrFe Michact Darber Architecture; Anderson G llastingsi Gary Murrain PCL Construction Scrvices; URS Consultants; nill Cam/Sam TJrton Steven L. Pawlak NED OSSEM/ER APPffOVED BT .ChenONonhern.lnc Cqrafra fr0b.'t sra Srj-a.L REPORT OF CONCRETE PI.ACEMENT OBSERVATIONS At A rltllLt lr|lrgtDl to (lrxfl ll( FrE Atf, ot;ilttt Ar irturlr ,nf ttF.tEtt A! nf CO.tt},TW r ''tnTt Or (|t dfxf,t, AID AmGllrrlr nr nilr -ixrr'r stetna'.B- crr€lr,!|c 'ci 'rrrrcrr rirr c atrirlirc qr au.of,ri-r nfrlto rorip-q.r m't rtx ^,?f,o/a- 34lrtlj Yu L ottiqlo tr ,rtrr lE llr' E oo*afltD ltall| qn|.l ,rirf,llxTt lI' rcILD ltt t{ rf,rro. A 'rrrr- .a -@t t .,...rt-- tri |.r CLSll{ a,/ao Tol 1'91yp ot: vAI LAttn: Mr. Stan llcrrytnan It.0. Box 100 Vail C0 81658-0100 PROTECT Atltli t i on t.o Vni I 'frarrsrrotta ti on JOB NO.4 Se8 90 DALY REPORT NO. rr.rvorcE No. Co l orado . DAIE B/LI/gO 48 sHrrr 2 or Ccn tcr', Vlr i 1 g,PPUA sfimrEAnor|s3 SUruP vx r.o. See Page I AtR @ rrJrr ||IIIENT TEIIPERATURE RAIICE ESir Mt Tnrcxto.IETET M). nu€ BATCHE, IIUE ARM/ED 1|u€ SAIIPLED ttE\'OUtU.l @U|{rER EOIN RE\OU'In$| OOUNTEN collPtEllorl CUIrc YARE l-Otllotl cutut-AlilE u lER ADO@ o^uoNs ){ 9 10 11 L2 L3 I4 114 112 44 r06 46 117 54 156r r5az L163 L564 rr65 l-66 L567 7:LJ n.17 7:42 7:50 7:56 B:02 B:08 7 z3o 7:45 B: O0 B:10 B:1) B:2J 8;35 as req aB req as req as xeq as req as req as req as req as req as req as req as }eq as req as req 54 72 BO B8 96 r04 1I2 o O 4 t-0 13 1E5rl{L sr.ur? (Dr) An@rflIlfI(r) IET UNT WEAHT (Pcf) lla.o CO}rcRE|EI[IP€- MTTNE cf) ffX\E(s PROGRESS RTPOTT nnpts\ I"li chac I llalber Architccturcl Andcrson Q Ilastings; Gary Murrain. PCL Construction Scrvlccs; Ul{S Consultatrts; Bill Cam/Sam Urton Steven L. Pawlak RE.O OTTSERI/ER APPROVED ET Chen€Norrhcrn.lnc C..rd|}{ t'|tb.-r ri sdn|,.a. REPORT OF CONCRETE PI.ACEMENT OBSERVATIONS At A |lrr'( titftEfr rO qtXTt' rt; 'lr'E ,Lt Ortltltl. At irtCrt eltt rrrfrm At nr c0rrrill.fi,ll-fltflttY (r (r'| tt fXl:li l]O-T 'n0!IelD' tit tua' tu,r o/ trarrrt,nr, cutqrrllrr q! rrri.cls rrtr{ (! itorr!!€ q,r rriE-a"arjirio'-rriorr-crn -rarttu rfno,ta- 34r16 tu EC rt!uttD or Itlrt lfJlDtl 6 od.tIIlD ur.lrI ot'|l rrlrrDa,ftt l|lf rtlLD fr, tr I'lll[. A 'nrr'- d r'fXllfln + ...-r-'r. i ir la., Cr:ll{ a,no TO: 1gy1,1 Or: VAIL JOB NO.4 398 90 DA1r-1 B/\L/9O Attn : Mr. Stan llcrryman r. or,.o. Box 100 ' DAILY REPORT NO. +o sHEEr 3 OF 3 Vail cO 816s8-0100 ;*cE No. ?R(\rECf A(l(lition to Vail 'l'r'ansportati on Ccrrtcl', Vail. Col.orado, SPEEEAIpilS: S|"UUP An COffIE{fSI,PPUA UIX LD. See Page #1 AIAT I IEIP€RAruRE R^}IC€ Itsrt{L Tn cx HO no{Er lx). II|€ EATCHg) llu€ ARftl/E Tlll€ S UP|.ED Rfvoufiptl COUNTAtro[l Rf\rounr)tl @Ul{lEN COUPT.EilON clrEc YA&15 r-MD/ CUUUIJ\Ilv€ WAIER IOO@ e uJoLs 15 16 t7 TB L9 20 2t 22 1r4 r19 44 105 46 LL? ,4 44 1568 L569 Lr?0 L'7L L572 L573 L574 Lr?5 B:17 B:28 Bz39 8:49 9:O3 9:o9 9zli 9:56 B:40 B:45 B: jZ 9:00 9z2o 9:33 9z3B 10: 15 as req aa req as req a6 req as rle a6 req as req as Teq aa a6 req req Teq req. req. req. req req as as a6 as a6 as 120 L28 L36 144 L52 r60 168 170 IO L2 10 B 9 IO 9 0 lEStt{r stt l? (t&)^no${nNt(r) WET UNIT WEAHT (Pcf)YIE'D cot{cf,flE TE'PE- RATLIRE co RElIffUTS 16 4 3/4 5.2 L42.7 72 PRocRES.s REF0RT Total pour tZO ydJ at tO:45. /rl1nr.,,F Michacl llarbcr Archi tecturc I--- '- Anrlcrson 6 llastings i Gary Mugail PCL Construction Scrvlccs; URS Consul.tants; ilill Cam/San Urton Steven L. Pawlak NE.D OBSF.TWER APPNOVED Bf C{rcn€Northern.lnc.Con rrung €rgh.ar .ftd Sdrtrrtr, REPORT OF CONSTRUCTION ACTIVITIES lt r |..m$r piotTcrDl ro clr n! nf, PttE lr(' ot;ttlwr. at |tft'{int |r€ SuirTlTr, As n|f @rrr}ocrrl &tF tY f crt cr-fHE r,o ruT}t'tlz|rDl l(i ?t,rg- rrr. .1. !it11111.]ri:! co.G1!6 6 qr 5;n^cnr rro{ m nrn fr{.r urr ntrqrs-s inC-rtio' rtinrirri oq rnnror 'rmion- s^lrtcl tlll lf ErE) of rfmlti' E cf,rralltt Dr-esi ontt Aar ]E {}fnl rr[ lEIn lo ltl lRtlr€. ^ 't r.- d r'.fHiiflrt ., o..n"c-. rlrri Fo. crctqu ,yao To: TowN oF vArL JoB No. 4 3g8 s0 oATE: B/L3/9O Attn: Mr. Stan Berrynan DAILy REpORT NO. 49 SHEE1 10F 4P.O. Box 100 Vail CO 81658-0100 ltWOlCE NO. PRq,ECT Addition to Vail Transportation Center, Vail, Colorado WE{THER CONDMONS AI'IO TEMPERAruRE clear, BOo CONIRACTORS CONSTRUSNON ACIMNES PERSO}.INEI.: IAIOR EOUIPMENI: AGIMTIES: CHEII-NOflIHERf{1S SITE AGIMTIES Full time observation,Structural fill being placed at outside wall andparklng entrance and aj.r shaftr Level 4r C ti-ne belng placed for topplng, Level l1 Deck, Line B-CwalI at L,evel I Ranp at Grid 1. Excavatlon for Level 1 S' of A tine at 28.)-3O1 38tB Excavatingthe excavatlon Lr€ar testing and inspection: under a]-ab for new 2B-1O. Reinforcing steel"at 1-6r and for L/2 Xhefooting at service coret cracked drain line in VERBAL COMMUNICATION WITH CONTRA TOR. ENGINEER, ARCHTTE T, OWNER LES WOOd iS AWATEof the broken drain line to be replaced by R&B Excavating' cop,Es Xitl?"'"li"B::.t'ft}*;811i"i,,,",," PCL Constnction Services, Attn: Mr. Denny Armour; Anderson fv Ilas.tings; .. UllS Consultnnts, Att! : l'1l.l-€-f- t1r-99$- Rill Carr Steven L. Pawlak NELD OBSEIiVER APPRO/ED EY Chen€Nonlrcrn.lnc c'dltttt ad-r .{ SdriL REPORT OF F]ELD NUCLEAR DENSITY TESTING A3 A ]l,nUt FEtttG r| lO ctlxnl ll( Fl[r,]o afrtltr]]' Al ff..rrE rlf, srIrarffD At I|q O(t.DfXn,t Plr*'rttY (t qll d[xB lL|,l'o6z^tDl ilt |la ta- lro.r (r :nlrrlrtlrr oo{rlrr{rr! orr .xnrcrt irf m f! m,r€ q.r mxili'a-iiidil'-pdiio-of -rrrrDt ftPilr'/A- 3^rae r - E 06cD f slrl ll:nx' B ooEuIlD l'rf,l (' l tir rutxrr rE rciEo lo fi l,Entl a ri.r.- d r-fHlX-lnr d..nr..t- rrn t\ €r.l0tA aIO TO: TOhrN OF VArL JoB No. 4 398 90 DATe B/L7/9O llSl'u"Y"iostan Berrvman DArLy REpoRr No. 49 sHEEr 2 oF 4 VaiI CO 81658-0100 tlwolCE No. PRGTECf Addition to vail Transportation Ccnter. Vai1. Colorado sPECtncATtoN collp cTtoN & I/ATER|AL MINIMUM REQUIRED IN-PITACE DENSTTY 95 T As DEIERMINED F/: AsIT,f D1557 CONSIRUC"IION CONTRACTOR: B8tB DXCAVatJ.ng .TEST LoCATIONS WERE SELECTED B|Y: Chen NorthErn TY"E A}.IO NUMBER OF EARTH MOVING UNTTS TYPE AI{D NUMBER OF COMPAfiON UNTTS I MFTHOD OF ADDING MOISTURE I hoedual vtheel roller1 jump Jack THICKNESS OF UFT as req NUMBER OF PASSES as req LOCATION DEPTH OR ELEVATION (FEEr) LABORATORT nEu) PEFCEr{r OF (RE.AITIE/ rA)(Inx) OSTI|iED sotL IyPE rt->l NO.IIAXMUM DFY DENSIIY(pcf) OPnMUM MOISTURE CONTENT(u) DRY DENSTTY (pcr) MOISTURE CONTENT (7) 22: e,24 22c 22( ?2i 22t 3r N' of C Lineat 29 5r N. of C Lineat 28 6r N. of c Lineat 28.5 4t N' of C Lineat 28.5 6r Ni of c Line aL ?9 ]r l'i. of C LineaL ?8 ? | 11< 6r Bs 5'BS 4rRS 2rBS lrBS 14O.0 r40.0 r4o.o 140.0 L40.o r4o.0 6.r 6.1 6.r b.I 6.1 6.1 L34.1 r34.9 L35.4 L1r.6 rjr.g L35.8 (.o 7.4 7.L 7.Q '/ tb 7.4 OA 96 97 97 97 97 sI. silty Eandy gravel I] rulI TIUE OBSFff1/ATIoN fI PART IME OBSEM/ATION 'trG ifFDit pir]{|! q' tllt! nlritD ar A nEstll (r oln tE'tn^rri|t (I. nl Ptrcrtrf,|T. tt rrArt RfD Ott llf c{t{TRAGIOa m OOIllt{ ATultlo 11{ NEtrreltlrrD oryP.crwf unxr rlrD sGnttf m tru. unwo rl; nrts trtx'drh'ii&nvrl c FoT (tliai\'llftl -(Pfufir6 rFJts ^Af ruDE <r rrlf 8! otY As gtl-Evrrr rrpesgrr tD cr{,nn tt qii os*hlorr Juuaytlxl. Trlir l}ct^ ttt -l€i lit ilr orsr rm qrmqs ot{ rrll€lllrn ll|E rlt,L uttl! sPtctrc no& lHE Ntrcl.E^R DELSor|EIER uEnm or lESnNc w S t SEI) tN suEsfA{Il L /rCCoRDrNct WIIH AStx D29e2 Al{D DJolT PREUMIMRT OBSEfiVATIONS AND/OR TESI RESULTS VERBATLY REPORTED TO: Les V/ood. PR(rcRESS REPORT ThE AbOVEplaced at wall and nevl tests were performed al-r vent for new auto on the structura] fi]l beingentrance-exit, Line C at 2B-J0 coprEs xttlf t,,f'B:5.t"ft1t;l:"."'", Anderson $ llastings; Mr. Gary Murrian; PCL Construction' Attn: - -Ilr. - Den.ny {nnourl URS Consultants, Attn: MT. Lcs wood; Bill Cam Steven L. Fawlak RELD OBSEINER APPROVED FT Chen€Northern.lnc ConariL{ fngLrt ..i s.r..ilt REPORT OF EXCAVATION OBSERVATION at A qnr,/rl piolfgmi to crrrars. ll|€ nfl"n lf, tfnEnE!, aL Ffpoils rr( 3lrrrtrn As n€ rj(|.r,fx]w En"rrTl of oi.n ctrraE lra xll]drtln mi nrql - rirr-tr. sl^n ntxr: (Ir€r uri|! <it trncrs f(tr (n ritq Err| o-n *g*r: s nisuml xxoo* <rn t tnt}l rfTio\/rl- s |.\Is rll F: Ere, f ri n:nDo s o.rlruTl uatrt onrt lrG.rfrl.rtl l,lf tatrlo lo H trrn l ^ nin - r $.GiF-lr-r rf ...!r!,- rdtn rao. Cliftotl a/to TO: TOI{N Attn: P. O. Vail PRO'ECT OF VAI.L Mr. Stan Berryman Box 100 co 81658-.0100 Addition to Vail Transpor.tation JOB NO. 4 398 90 DAJLY REPOFTT NO. rlwolcE No. Vail, Colorado DA'IE B/L3/9O 49 sHEEr ' oF Centc r , D(CAVAIION FOR:osfVlc€ core footine LOCATION:level on€1 Sr of A Line at 28.4-J0 D(C.AVATION BASE ELEVATIONS:,733 UqTERIAI.S D(PoSED lN BASE(S) OF EKCAVATIoN(S): Natural undistuxbed 6oils obaervedat base of footing excavation. The naterial appears suitable forsupport of the deslgn bearing pressurer RE1{ARKS: The area is sultable for forning and reinforcing steel placenent Twelve inch existing drain 11ne to be relocated out of footing &f,eao \CRBAL COMMUNICANON WTTH CONTRACTOR. ENCINEER. ARCHTTECT, OWNER: PROGRESS REPORT: Michael Barber Architecturc, COPIES Attn: Mr. Scott hlard; Anderson G Hastings; PCL Construction Services, Attn; Mr. DcnnY Armour; URS Consultants, Attn: Mr. Ics Wood; Bill Carr Steven L. Pawlak FIELD OBSETNER APPR@ED TY Clrcn€Northern,lnc erJ|h fr*E-. ..ra sd.t I., REPORT OF REINFORCING STEEL OBSERVATION lr l qtnt.t ?itnc|sx ro Gttjfit nf Rr.t xo o.frrtttl at ltrtqrft rlt Itr.IttD At nr @trr rrr ncrmt d 'ui oltltl l}o ,{,fin(t^rDl trl Pt'l'Ix - ,,'. o. 311rryrxrl srq1,qr6 cr mrAcrt iro. (r rtcrina q.l r-rofr-n-iErri-o rdtuo-oi-rtnDt inmnr- gru: ru E ult'q}fo tr T Trl lf:m|c 6 orrrtf,D urr:l onr.f r ltqra'alt A,[ llllllD rc fl mn]B. a .t-1t d r"ljln-il r.r { ....r'r. trtrr Ir, Cr.flla a,/- TO: TOWN Attn: P.O. Vail PRq'ECT OF VAIL Mr. Stan Berrynan Box 100 c0 81658-0100 Adclition to Vail Transportation JOB NO. 4 39-B IO DAILY REPORT NO. r.MotcE No. Vai 1 , Col.orado DATE: B/V/9A 49 sHEEr d oF 4 Center, SIRUS'URE L/Z waLL LGAIn|tlE\rAlorl RE{FWINC cxxoro$s \Enc l TI()6:IONTIL B1.5-81.9 at Level J 10 #4 @ 12', oc 5 #4 @ LO"o'at Br6rt SPECUTNXII!: SIEIL CR DE: 60 R8ffuqro ctfflil.D€sg clean crr R r{cE llto @vEE as req SPtJc|l|O| SPECrrc ililA a R sLPP\oRISs Tl"€ TTIFH HT]CHT EI nls useo El srme Dnrrrls us€D E comnrgon rryseo p ru-rue oB$IwAnoN E prnr-nur osnr/ rol tlFLfCE cOr|tPl^NcE ye6 UET PRO.ECT UEf PRq,EgT RO FAntXrS REO( ntlrefisIr€l lNllultY wfiC}lEOI{I{ED RE-OCilTNED DA1E RE-E(^I'II€D pRocREss REPORT The waIl reinforcing steel appears to be placed in general confomance with project plans and specifications. Michael Barber Architecturc, COPIES Attn: Mr. Scott Ward; Gary Murrain PCL Construction Sewices', Attn; Mr. Denny Arrnour I Anderson G Hastings; URS Consultants. Atttr: Mr nill Carr Steven L. Pawlak RE.o OBS$ryER APPRO/€D FT Chcn€Northern.lnc.Con.dlrog t sltF... .rd Sd.'Url, REPORT OF CONSTRUCTION ACTIVITIES A3^qm|.tF'intc'rnmc('xnilr|qPtItE|r.rout'gtl/TlAl'|f'{fi3^,r€g.ninrnAsI|'.c{N'r',tlw,'Y'fif'oTqnol'fiS'^,oA,r}r'itIAlII||o'ln'|s-,rtr r sr^r)rtfr! c4{1rr:rr6 or r.xrR^a,Tr rrrf o{t nt xrrq our npoiri-e*riii:i,il nrruirr-irrn"-xnru irioA- s,'ng iu If DlsFcrr co.,lirtrD r,lllt! o|rrt rf f.{raJtts l,rE ra{rn lo ol l$ltq' ^ n-nr-.a -@* d 6nTar rrrr lri. CLld aIO ror TOWN OF VArL JoB NO. 4 3e8 e0 DATE s/I4/goAttn: lrlr. Stan Berryrnan DAILY REPORT NO. 50 SHEEr I OF jP.O. Box L00. Vail CO 81658-0.100 IM/OICE NO. pRGtECf Addition to Vail Taansportation Center, Vail, Colorado WEAIHER CONDfiONS AND TEMPERATURE c1ear. nartlv cloudv. n-n-^ ?Oo CONTRACTOR'S CONSTRUCNON ACIMNES PERSOI{NE1.: TIA'OR EQUIPMENT: ACTMNE* cHst-NoRlHERtl's Sm AcrMnEs irull time observationr teatlng and inspecti-on:Structural bachflll bein6 placed north of C L1"ner Grid 29-30. Excavationfor Stair i'lo. 12, Leve1 One and eite walI footing, south of A Line,Grld 29-51. Reinforcement steel observation Level 4 Deck, Line B-6eGrid L-6. George Sehwandt vrith Independent Testi-ng Services, Inc:lnspection of precast weld6 at Leve1 4-) deck, wal1 panels, precast deck for new parld-ng ramp Level 4, weat of Grid I, new structure,Level One vlall panels and uelds to footing plates. VERBAL COMMUNTCAT]ON WITH CONTRACTOR, ENGINEER, ARCHTTEGT. OWNER Michael Barbcr Architccture,Uul'lE"s Attn : Mr. Scott Ward ; Gary l"lutrain PCt Constnrction Services, Attnl Mr. Denny Arnour: Anderson G llastings Itilts Consrrltants. Attn: Mr. Ips lvood; Bill Carr Steven L. Pavrlak RELD OBSERVER APPRO/ED Ff Clrcn€Nonhern.lnc.C..r/t!{ [rgh.-r -l Ll-{d. REPORT OF FIELD NUCLE.AR DENSITY TESTING |s A |lm,|t ?ro|tEtltl E .laxrt nf nrnE [|D (l.t'frwl. ar |[t('lrt |,lt Itrnr|?D AS nf OqfDt}'ruL ]io?f'fi (r (|i crfxxt xo A'ndrl^lDl t{l tinta- txr,t c st lrtltxu ortrl ltFrd qr rxlt ct! rFfll d ftq'qr o cr'a croff'fliiiiaio'-niiiro-tr'n -wnu lPPiwA- s lfLel tll E DdPorD 6 rfin r::trlc 6 OOrtr|lD I'lI! ODlr rnr||tra''Il ff, ,fiIlt lO $l l,itnr(r A 'r't- .. r'.{TiFlr..r , ..".... trrr t|. CIC!'TA 4/aO To: TowN oF vArL JoB No. 4 ss8 90 DATE B/U/go Attn: Mr. stan Berryrnan DArLy REpoKr No. 50 sHEEra oF JP.O. Box 100Vail CO 81658-0100 tNvolCE NO. tEqlEcf Addition to vail T"ansportati.on Centcr, Vai1, Colorado sPECtncAI|Olt coupAc'not{ t T.ATER|AL Backfill at MINIMUM REQUIRED IN-PIJ\CE DENSI.|"Y 95 X AS OETERMINED BY: AST!.1I D1557 VUAII & SIAbS coNsrRugnoN CoNIRACTOR: B&B Excavatingrpstr Loc TtoNs WERE sEfcTED FY: chen NOrthern TYPE A}ID NUUBER TY?E A}.ID NUMEER METHOO OF ADDINC OF EARTH MO/ING UNTTS OF COMPACTION UNTT5 2 MOISTURE natural . hoe, 1 frontjumping jacks I drrel wlrel'-l ]oader THICKNEIS NUMBER OF z.n'l I er. 1 OF UFT PASSES req req as AE LOCAnON DEPfi OR ELEVANON (FEEr) LABOMTOFff FIEU) FENCENT OF(RE nvEltrNflrx)ogrtlE SOIL TYPE tt)t NO.}/N(lMUM DRY DENSTTY (Dcf) OPT|MUM MOISTURE CONTENT(t) DRT DENSTTY (P"r) MOISTURE CONTENT (u) z2g z1c 237 ?12 )42 ztA Jr N. of C Lineat 29.2 4r I'1. of C Lj.neat 29.' 6t }tr. of c Lineat 3o 4r I'T. of C Lj-neat 29.' Jr l{r of C Llneat 29.? 51 }tr. of C Lineaf 4O 6tus SrBS 4rRS SrBS 2rBS 1r BS 14O.0 140.0 I40.0 r4o.o 140.O 140.0 boI 6.1 5.1 6.1 6.1 6.r L34.6 L34.9 ].35.j L3r.6 L35.8 L7r.6 7.O 7.L 7.3 7.2 7.O 7.L 96 96 97 97 97 97 sl. siltY 6andygravel lt tl lt lf tl ts RJtt TIME oBsER/ATloN o PAt{r rtME oBsERl/ATloN nlt riFo|tf pittrxE q' D|3 ttnrcD at A iErrLt (F orr (Ellttv rEr (,f ml n fcf).frfr. rf, HAlf nf] lm- o+l lr|r ottalF sno* To @|Trf,f, ry!ry9 n{ r€DdaEotD o(n"rdrw Fnrtr ^xD |,Grutr ro fltr orirfro ntf rruts rra 6r'ir'iriifin,{ c-rrol oFt twlf!.-olJr nms. tgsrs An€ v D( 0F rHr m[ o.{Y rs trrrvrD lrr.E serr rc c.rrrarf, qr octfirmr JuDclrln. nsr o*rr &ffi;'iiq.i u,is'rm-ii*lroF * rnlErtf,x trlE nu uttfs 3l'Ettrc rn& IHE NIrcISAA Do|ts{ EIER UENu) OT IEN!{C WAS T,ISED tN SUI}SI^}{IIAL ACCORDANCE WITH ASIU 02992 A}TD TNN17 PRzuMIMR1f OBSERVAIIONS AllO,/OR TESr RESULTS VERBAIIY REPORTED TO: Les Wood tests were Line wall, perfonned on Grj.d 29-f0 the structural and under slab fill beingfor new pRcrcRESs REpOff The above placed for backfill at auto entrance-exlt. coPrES xl;l?"'"1i"3:i.t'ft}i:;cture? Anderson € Hastings; Mr. Cary Murrran; PCL Construction,- Attn: --Mr.-Denny Armour I URS Consultants' Attn: Mr. Les v'|ooo; BiIl Carr Steven L. Pawlak FIEI.D OBSE}iVER APPROVED UT To: 1gp11 or vAI L Attn : lvlr, Stan ljc rrynan l).0. Box 100 Vail CO 81658-0100 PqlrECf Arltlition to Vnil 'l'1'a n sl)o:l't x t i.on Ccnccr'. JoB NO. 4 398 90 DALY REPORT NO. il:{volcE No. V:r:i. I . Co1olado. DATE B/L4/9O ,/'\J 5HEEr3 OF SPE|rEATF$T* 8U'UP srrmJaV/.l.iObile m( 1e. i3 no air AN COfiIE}IT ATTdENT 1UIPERATURE M}IC€60 to 9Oo IIST t{r.TFucr ML ICKET M). Illl€ BATCH€D TIME ARm/E) Ill,alE SAIPt.EI) RE\OU,Tpfl @u$rr-R&oll{ RE\loU/Irc'.I @UNTER @UPLEIIOH ;utlc YA&ls t.o.to/ GUUul lIvE WATER ^IX)@oAuotts I 2 ,4 100 L5B3 L'86 Y 43 L' B:05 9z7a B: 15 9:4o as req as req d.D a6 req req. x 1A 6 gal 0 lESr MT su,rP(n)An o${rt}{T(n w€r uNr wmfir (Pcf) YIAD coilcr{ElE TETPf- R nnf, cF) ROrAjUG PROGRESS REF0RT Orvner representatlve requested visual slump and observation time not to exceed !0 minutes. ^nDrtrc Michacl llatbc r Architccturcl Antlcrson & llastings; Caly Murrain PCL Construction Scrviccs; URS Consultants; Bill Carr Steven L. Pawlak RELD OI}SER'ER APPRCryED Ff ChcnONofihern.lnc C.rndlr tnfh.-r ri 5.1-&{, REPORT OF CONCRETE PI-ACEMENT OBSERVATIONS A|A|l,|l|.(|r'rlrrr.[.r''xrrllf'urt|l.'d,rllr/rl|llif'(ini{t(l[F.r|rDAtrrtc('ln([r^|..FForrYord'rctf'.rlAro^Unrm^n'|rnallr^- n<r,. o' trarrrrrrfll (rltlrlru sr rrrr.cnt rrl <rr if,o.ar€ crr ru.oirid^k.{nio mrn*-on tttlfx rtrt(xa- 3lt'tft tll s( DltldrD d x-ttl lttxt s oorunD ul,jr olltt lil.,[rt fil LLfilD lo ]r tglt|q, A 'r'- r, r,. fiiiii-ltr.r '. ...r-r- t-'i |\ Oal t,|. ../tO Chen€Northcrn.Inc.Conrd&|9 tj|gL|.r. org 5<J-dH, REPORT OF CONSTRUCTION ACTIVITIES Ar ^ wnA riorc|Dr m qt!r!- !f, FUaE |rrr ourElvrt ^u' tq,'!!! ^a€ ern'flm as rn: coxtrf'x|u|-W^f "ffiEtffi fffi'd$]F #;iirri,i sirtniixri- crrqir:*r<r nr rlirrin lmi c mrryt!1€ trn rtpdrnt 6 Ft9[F/t Frtrsrp ot.n mfllt]l o:rrrrn-o u{Is: glln f|lpqrar{t:s ,ft rrlrtu, lo lfl fflllrl. a ''rri.r , rlxiil-lr. t .. ..'ti''r.. t-ri t|.' ctato2^ a/to To: TowN Attn: P,O. Vai I PR(\IECT OF VAIL Itlr, Stan Bcrryrnan Box 100 co 81658-0.100 Addition to Vail Transportation JOB NO. 4 398 90 OAILY REPOKT NO. tNvorcE No. Vai 1, Colorado DATE: B/L7/9A 5T sHEEr I oF Ccnter, WEATHER cONOmONs AND TEMPEMIURE clear, B0o CONIRACTOR'S CONSTRUCNON ACIMNES PERSOI{Nfu IAX)R EOUIPMENT: AGIMIIES: CHB.I-NORIHERN'S Sm ACIIWflES Full time observation, testing and lnspection: 11111 cu. trldr concrete being placed for Leve1 4 deck; reinforcing steel being placed for Stair I'Io. lO, Level 2, conpaction tests for structural fill belng placed at Columns Level One 81-82, Grid B-L7.3. 2l cu. ydr concrete being placed for curb and gutter N. of S. frontage roadl plunbing contractor placing conpacted fill under Llne AO Footi-ng at JO.Z. Thleesets of 4 concrete test cylinders cast, VERBAL COMMUNICATION WTTH COIffRACTOR, ENGINEER. ARCHITECT' OWNER It'lichac 1 llarber Architccture 'COPIES Attn : lvlr. Scott Ward; Gary Murrain l'CL Construction Sclviccs, Attn: Mr. Denny Armour: Andcrson f' llastings; .. lJllS Consrrltants. Attn: Mr" lres woo(l j litt cart Steven L. Pawlak I I ne.o oesEFnrR APPRo/ED BY ehen€Nonhern.lnc.c..-rlhg E CaEr -a soLttL REPORT OF FIELD NUCLEAR DENSIW TESTING as A n n||L txnrjctDa ro cuttftr. t}{ A,f-E tro or.EnvE! At nf cr.l! rlE sri'tTrD at tr€ oorfDtMul- PlloPttlY f qr clElfl* xo llElgrq l!fl tti tr,nx -fui r srrrtia,m, cirsido6'ii iirrrrcrr-rirfli on ifoiKii, d- m'dn-E -*:dfu pekir <rr rrnot lP?iovA- glrt"et ru tE D3sclt c,rlll lEllr€ 6 cortlrtD llrlE ama rn|{ltofll ,f, toiltD n) x rrmo' ^ nr.rt- d rl(Ti-tFln r .. ...rc.'r- F lb Cralqr^ r/I To: JoB No.4 3e8 e0 DN* B/L5/9OTOWN OF VAILAttn: Mr. stan Berryrnan DAtLy REpoRT No. 5l SHEEI 2 oF 6P.0. Box 100 VaiL CO 81658-0100 llWOlCE NO. PROJECT Addition to Vail. Transportation Center, Vail, Colorado SPECIFIC T|ON COypACTtOlt & UATER| L MINIMUM REOUTRED IN-PI.,,ACE DENSfi 95 CONSIRUCI|ON CgMrRACTsp, PCL rAS TEST DEIERMTNED sf: ASTi"l DL557 LOCATIONS WERE SEI.ECIED FY: under slabs Chen llorthern TY"E A}'ID NUMBER OF EARTH MOMNG UNTTS TYPE A}.ID NUMBER OF COMPACTION UNITS 2 METHOD OF ADDtNc MOTSIURE water hose I bob cat junp jacks THICKNESS OF UFT as req NUMBER OF PASSES aa Teo LOCATION DEPTH OR ELEVANON (FEEr) LABORATORT RELD PENCENT OF(nErn!E./ |r Jortx) ogTl!'E) SOIL TYPE tE)l NO.IIAXIMUM DFY DENSTTY(ocf) OPT|MUM MOISTURE CONTENT(x) DRT OENS]rIY (pcr) MOI5TURE CONTENT(r) 21E ?36 ?3? ?38 Line 82 at B Llne Bl at 11 Llne 82 at 15 LJ-ne 81 at L7.3 DL} SG SG SG l4o.o I40.O 140.O 140.0 be I 6.1 6.1 5.1 L34.4 r34.6 134.8 L34.3 7.L 7.O 7.2 7.O 96 96 96 OA sI. silty sandygravel It till b FUII.'IrME oBsEftvATroN tr pART nME oBSERI/AIoN nB rEFOit piertflt cttEtt mno r3 iErfl (f €rn occll/Artrtar or rrr A.rcorc'fi. rE 'r w RaJo ot{ rxE ooa{rRActr)i lI' @{rD|rE lFPLraE rc rEtrnirttQE| odacttE fttrxl Ato-yo|sttrf, to nu ornxo nrt nres rrrx otF ffitm ts rxn G[ru{o etl ltr|3 t€sts lrc lr^r !r THE ru o(Y rs g.Evto teiiersrrr-lo-cliiri: di cEErft luaroixt. iEii orn ^,* -lsi k-ir.E o^sts rm er{It6 ct wfl€t}f,l tHE rtrl rfttnt lPEclfErJn6. lH€ mrclE R OOFqlErn UEI]|OO OF TEnNG rAS USED tN su6r NIl L ^CCORD ilGE Wm ASIU 02902 Al.lD DJO17 PREUMIMRf OBSERVAIIONS AllD/OR TESI RESULTS \IERBAIIY REPOKTED TO, D"ttny Armour PROGRESS REPORT being placed at The above tests wereLevel One colwnns. perfosmed Slab repair on the structural fillexisting structure. .^"'orFc Michael Barber Architecture,--"* Attn: Mr. Scott Wird; Gary. MurrainPCL Constnrction Services, Attn; 'Mr. DennyArnour; Anderson 6 Hastings; IIRS Consrrltanfs Af fn? Mr Loq Wood: BiIl Carr Steven L. Pawlak REU) OSENUER APPRWED FY Chen€Nortlrcrn,Inc O.!./tha tnfm ri S.|. ld. REPORT OF REINFORCING STEEL OESERVITION At A rlmrt ?slfclDr ro arrxFl Ix[ trrE ,,<, dlrtwl Al ll'flrt ^rf luurnD lt nf o('fntxn,t Fm|llft 6 crt 'uxll l|'t 'r,|r@alD' tltl PiJf, EA- rrr. '- g^[r.Jrtr, qrr.. rrqqr .', otf,rcn rrrrl rr iru ^arn arr nrcriil-c-irfdin -lriiirro-cr ltlnot rr+ronr- :rl'tr xll E DFEtt tr lfla r-:mE 6 cqft'rnn trtlJrt o|llt ll*r[ltxl! l,t( ,f,ttlr lo tl u!lr€. ^ r,-'rr d -[@* ., ..rnrdi.. t-i th. c|{lla ano TO: TOlllN Attn ! P.O. Vai I PROJECT OF VAIL Mr. Stan Berryman Box 100 JOB NO. 4 39.8 9.0- DAILY REPORT NO. tl.fvorcE No. Vai 1, Colorado _ DATE: 8/L5/9O 51 SHEETJ oF c0 81658-0100 Addition to Vail Transportati.on Center, srRUcruRE Deck ToPPin8 !rcAnoN B.W T|ON RErKrfiC$tC co$rofis WIMCA ltoEzot{T^L Li ne B-c/6-9 n tl ll tl ll It T,eVeI l1 tl tl |l tl Traffic IsIand I20 l"lK 4002 DwIs @ 12rr0 272 Row #4 e 3/4rt sLaa nt 96 Rows 94 66{ Rows #4 G 96 Rows /15 P ff\ @L2tr oc t /14 x 3BlL#4x271 lztt 0c T&B N.s.lster at ]6't 0C Btt 0c Bottom x.lry.larr 0C Top E.VI' 8,' Oc Top Lapw/#4 A 25" cont.plit center bean {r each sj.de #4 x 20t6u L fl4 x 33.6tt 1 MI( 4OO5 SPECUEATSISS SIEIL CRADE: ffD|Frncfic cu l{-0{Es* 6o clean XX narls tseo d o,o" Dmulrcs usED d corrnrrcn rumseo d ruu-nue txrsr w tlol D prrr-nue qrsEnv ror.l lurtrag cornPqlce fes UET PRO.ECT UET PR!q'ECT R@UTROTEXTS . REOTJIROIOMB WHE}I IN'IUITY Y'TIENEilTH@ RE-EqIilNED ct.E RAtlcE AID co/EE a6 1.eq sPuclllcr SPECnCATS& aS feq aAR STPPIORIS: TI"E FII{FH HECTIT DATE RE-E( talll€D pRocRESs REpoRT The deck confornance uith project reinforcing' steel appears plane and specifications' to be placed in general Michael. Barber Architecture, COPIES Attn: Mr. Scott Ward: Gary Murrairr PCL Construction Servi ces, Attn ; ["1r. Denny Amour I Anderson 6 llastings; llRS Consrrltants - Attlr: Mr. Les Wqod: BlIl Carr Steven L. Pawlak RE".D OBSETYER APPROYED FY 'IOII,N OI: VAIL Attn : Mr. Statr llc rryman P,0. Box 100 Vail CO 81658-0100 JOB NO. 4 J9g 90 D.AILY REPORT NO. INVOTCE NO. Vai1. Colotado. DATE B/I5/9O q1 _ /- sHEr4 oF llglEGf ArLlitiorr to Vai I'fTarrsllor.tlti.on Ccn tc1' . SPIDFEAIX)i{! 3r llllP sJppuER Vrl.l'iob11q1q '.o. C 4500 3-5@28 ln corrprr 4-Bdays ArsE{T TETpER TRE nr}rcc 6O-9Oo Trstlp,Inrc|(t(l.TICXET M'.nl|€ BAICH@ TIUE ARnryE) 1l!r€ SAUPLED RA,AUJIXH @IJtfIERlr[trt n€\o(.l'Iloil @TJNTER coltPt-Ellor'l glrdc YlR6Lo,o/ CUUUI.AITVE IYATER ADO@qAurt|s I 2 3 4 5 6 7 119 114 r05 44 49 4B 150 1511 L6L2 L613 1615 r6u 1616 L6L7 5239 5t4B 7 tQO 7 zj-g 7: oB 7 |26 7:35 6:55 7 zO2 7:I7 7:28 7:45 7.4o 7 z?O 7:42 aB req as req aa req as req as req as req aE req aa xeq as req a6 req as req as req as req a6 req 15 24 40 32 4B ,6 0 0 L2 IEST }TL su[?(ur)AIR@illE.fi(t) TET UNT wEolfl (Pcf)Yra.o coficnElE IE IPE- RATUfiE cr) Rf,l|A'O(s 4 3 L/4 5.6 140.4 72 4 cylinders cast Truck #49 down tinre on roaddellvered concrete under !O ntnutee pROCRESS REpORT Sanple takenrepresentatlve, Les Wood,on all bucks. from hose discharge at punper. requested visual slump and time Owner be observed n..,DtFc MichacI lJarbcr Alchitccturc l Anderson G llastings; Cary Murrain' PCL Constnrction Scrviccs; UllS Consultants; BiIl Carr Steven L. Pawlak RE..O OBSERI/ER APPROVED ST Clrcn0Norrhern.lnc,Cdrahf btfrrr ci S.J-'ir.'|, REPORT OF CONCRETE PI-ACEMENT OBSERVATIONS Ai A l.mr& lidEtt'. it alttlll l'f ilrE lfl o.|lllltr xl |'ndrrr Atlf lrt tt?D al nr cD.tDlT]il- Ffrf?tlTy Or crt (I fxll llo-,|rn|[lrDl tlt |tfra- rf or StririfI|l Coat'r- (i trrircltt trl(rr oi ito^|rt||a or rrWnii-n -rrjnO rt'rrp or,n nltt't ,rrfpFqvlS^ltl u rrt E lXFUltD cf rrnr [Jn€ B cp[ur|D uurr onll ,frattta,|rt ,n taatt m '. t[tln a '-r.- r *Glii-l r. '. r-r!r-r- a.i ||. Oall.. ano To: 1p1111 orr vAI l, Attn: Mr. Stan Dcrryman P.0. Box 100 Vail CO 81658-0100 PROTECr Additi orr to Vai I 'fTan sl)o1-t.rt i. on Ccntcr', JOA NO.4 398 90 OAILY REPORT NO. tlwolcE No. Vai 1, Colorado. DN:],j B/L5/9O R1/'sHEErS oF SPEFIATX)i{! !il,IJIIP rq t.D. See Page ISI.,PR.IER AR COTflE{I ATSE{T TETPER^TURE RA}€E TE;T M'.Tn cxt{I lE( T M). IIUE EAICHg) lluE ARfiV@ 'IlylE SAIPTED nn'Our|Xltl @U}(fEN EOIN Rnioujlx,$l C(X,NIERco Pt Enclt{ crr&c Y rctN/ cullt UlfvE YIATER ADOED o^rlJotls U 9 10 11 L2 L5 14 28 29 119 114 Lo5 44 4B 1518 1519 L620 1,627 L622 L523 L524 7;4L 7;47 7 t52 7 259 B: lO 8:31 B:42 7 254 B:04 B:20 Bz2J B:3o 8,45 Bz93 as req as req as req as req aa req as req as req as req a6 req as req as req a6 req aa reg aa req 54 72 BO BB 96 104 112 o 6 o 0 o. o IEST I\Il. sll,lP(Dq ArR oo{rE{t(r) TET UNIT WIFHT (Pcr) YTI.D comnElE TA'PE- R^IUftE cr) RITATO(S PROGRESS REPOKT .yrptF\ l"lichac I lJarbcr Architecturc i Aliderson G llastings; Gary Murrain PCL Constructiotr Scrvices; URS Consultants; Bill Carr Steven L. Pawlak FIEL.O OESER|/ER APPflOI/ED BY ehcnONorthern.lnc C..rdl|' ttth-r 6a S.rttf. REPORT OF CONCRETE PL.ACEMENT OBSERVATIONS ar a llm-u1 ?rnuE E.rtxE t'( ltfE Aro rrriravrs" ,{l |'tqrl! .r!( r.FdrrD a! t- corrf]m^r--t'irF ilY (t o't d Ertl l}o a'nnr[ lDl 7In n'i-r - trr. t jr^,rrrt rl o.'.cu-'r qr r;1]ic.rr rror, gi Eo|^r{ qr m-rrirfla-ilr._ni-o'-niiird -qa -tlqlra}l lrt'ncv& Sarrut rrl 0E DltaltD c lnrr lE3Dx' 13 corrunD t/rrr,r or|.t rff,rDar{lt lf roiu, lo r|f|r 0, ^ .a'- ., rFfti-lr- r.riF,b trri tr Or|Ilt,r r/to TO: .[ghtt{ Ol: VAI t, Attn: Mr. Stan Dcrrynan P.O. Box 100 Vail CO 81658-0100 $qrECT Arlditi on to Vai I Tl'alrsl)or.tati on Ccntcr', JOB NO. 4 39s 90 DAILY REPORT NO. ll.IvorcE No. Vai 1 . Color:atlo. DAIE B/TI/gO tr1/. SHEET6 OF SUPPUN SPEFEAIEiT$ 3TI,UP llu l.D. gss paee 1 flr @ffrElT ATSENT 1BIPERAruRE RA}ICE lESt t{r.mrcxt{L Trc'( T M'.nuE S rcHED TIUE ARnrytD 'nu€ STIP[.ED RAOUJTXII{ @UTOE IEOII RE\OUJTOT.I@urfitx @l|PtEIK)t{ ;I'EC YARE lartJD/ CI'lUUI,AINE YTATER ^IFg)o^uoBs L5 15 L7 18 150 29 119 r14 L625 L6?6 L627 r52B B:5o 9: Ol 9 :16 9:24 9:00 9;L5 9225 9245 9:2Q as req a6 r-eq aa req a5 req a6 req as req aE req a6 req L20 LzB L36 144 0 0 0 rEcrlp.su,|p(0r)AIR @ilIE}{r(l) f,ET UNTT WEGHT (Pcr) Ytan coilcnf,IE T6'PE. R ruif crt Rtrt/ffu(s L'4 3/4 5.8 T39.9 6B 4 cylinders cast - sarnple takenfron truck pROGRESS REpORf Total pour 144 cu. yd., finlstr at 1O:00 a.lo. CO'IES Miclracl l}arber Architccturc; Artdcrson I llastings; Gary Murrail PCL Constructiotr Serviccs; Ul{S Consultants; BilI Carr Steven L. Paw1ak RELD OBSEfiN/ER APPROVED BT ehendNorthern.lnc Cdrtlll|' tnf lFr lra S.Hf. REPORT OF CONCRETE PI.ACEMENT OBSERVATIONS Ar a il,|l,t unErE ro tttxtl r( f(fE rt, (tt-'?llrs. At itF rnr .Jrt lti.mn A! nr ccrrl'.r1|(--ri(IfrTf f (|!? o lxtr' a0 |l'rfoitt^nx fti 'l[tra-lxra qr Jr rTttt rl orrltnrr; ol rrtr!6[r ntrx rrt f.$ritrrt q.r rr,ruli-o'^ir-inirt -njnp-a.r 'nqlrx r,nawn- S rtl-it xltt E rqID 0f nn lE Tr$ B ocatrtrD |tlr.r o||.t ,|flall)a,rlt ,ta ldtt! lr, tr tEtlt(l A nrr- I r,.Ffftt-lnt rl rtnrrJr a-ri 1\ CIll.. aho Clien€Northcrrr.Inc.Con.dll|g tngLr-.r o.i scl-lr.t REPORT OF CONSTRUCTION ACTIVITIES as ^ qrnr|t m('ntrrl 'o qryls'- I!!r ?rttt rrr, (xfttflwr. u l!!t9!!! 'rtf sltsrnrn ^t nt 6sfrrt'xllL|Hr^r;H;rffi &ro"ffim][' #;fl;fihi fi.siiniijiii-'irtainoa & r.rti€ri iirtrt m itrrlrtta€ trn nf,pogr! E Ru{.RvrD Ffmo€ otn rxttnr cifrultl uu.s! otlri AniArcut {13 rft. loet}lt lo lta wnlt.o. ^ '-r- ., *[TtfH-lrrt o. ...!+.'-. rr l|'. GLf,tol^ ./to To: TowN oF vArL JoB No. 4 ig8 g0 DATE: B.J6t90 Attn: Mr. Stan Berrynan DALy REpORT NO. 52 SHEEtl OFsP.0. Box 100Vail CO 81658-0.100, ltWolCE NO. PRG,ECT Addition to Vail Transportation Center' Vail, Colorado WFITHER CONDMONS A''IO TEMPEMTURE Clear 70oF. coillRAgtoR's coNSIRucnoN AcIrvmEs PERSO}INEI.: I'AIOR EOUIPMENTI TICIMIIES: CHE}I-NORTHERI{'S S|TE AGTMTIES Full-tirne observation, testlng and inspection: Concrete heing placed for curb and gutter north of South Frontage lload, totaL 53 cublc yards, one set of cylinders'cast; concrete belng placed for s'lab repair Level One, existing stmcture, one set of cylin-. ders cast; re-inforclng steel lnspections for St.air No. J.0", Secti:ons E' F. G. H. J. and K. and for Stair No, 11, Sectlon BB; excavation for Stair No. 12, Level 0ne, south of A Line" VERBAL COMMUNICAT]ON WNH CONTMCTOR, ENGINEER. ARCHTTECT. OWNER Irli chae I Darbcr Archi t ccturc 'COPIES Attn: Mr. Scott lrJard;Gary lnlur:rain PCL Construction Services' Attn: Mr. Denny Arnour: Andcrsotr 6 llasti ngs; URS Consrrltilnts, Attn: Mr" l,cs l{oocl . Clrcn€Northern.lnc Co.i.,lth{ tar9h...t dr. sd.t*h. REPORT OF EXCAVATION OBSERVATION At A rull]|rt pi('lfcrEl ro cuxr:. nf pux.t lrrr ouilfltft,{! ffo.rfs |^f Sr.D.aTrD As rtf oof[fxnrL PfcffTY of oll cLfxE lro a.tI]0@rxl ;Di iaxA-txrt<rslrinrtxt3.ot'trt,!r|doitt,rrnrr;t:fXI({t'it.oA^t'p0JRttt'|,o'ttrsttr:rrlvioPlxoltxtq,tl|ll|ltl/r,PioVA.s'u}'tI5:llEF6tl'('.ls(rr|,tr D lrrtso onr| l,ti^rclr'fnl t ( fgltrr lo l| trr riG ^ ,irrt- .. rfiiUflr-r J c..,rcr,.. r.rnr }|o.6aro! t,/|o To: JoB No. 4 3e8 e0 DAIE B/L6/9OTO}"N OF VAI.L Attn: Mr. Stan Berrynan DAILY REPoFf No. 52 sHEEf 2 0F 5 P.O. Box 100Vail co 81658-0100 ll'NOlcE No' PRGJECI Addition to Vail Transportation Center, Vail, Colorado D(CAVATION FOR: Footing LocATloN: Stalr No. 12 1 Level 0ne1 S. of A LLne/3o-3L.z D(CAVAIION BASE ELEVAIIONS: ,9.33 |IIATERIALS D(POSEO tN BASE(S) OF D(CAVAION(S): Iiatural undisturbed solls uere observed at the footing excavation grade. The solls appear suitablefor support of the design bearing pr€saurer RENIARKST The footing area is suitable for forming and placenent of reinforclng steel. VERBAL COMMUNICET|ON WTTH CONTRACTOR, ENGINEER, ARCHIIECT. OWNER: PROGRESS REPORT: Michael Barbel Archi te cture , COPIES 411n; Mr, Scott Ward;631y Murrain Anderson & llastings ; PCL Const fuction Services, Attn: Mr. DennY Annour; URS Consultants, Attn: Mr. Les $lood; RilI Carr Steven L. Paw1ak RELD OBSENMER APPRO/ED B/ Chen€Norl.lrcrn,Inc fr.rtl{ lrdr-t -a s.,.nlri. REPORT OF REINFORCING STEEL OBSERVATION l' A |rrnrr! tEncrFi to qrxt|, rf FUrr rro o,Erwt, af |ttFtfit lret lrrrfrrfD rt ffi ooxmfxrw. fln|ttnr oF dt [rD{rt ro AT rom rb rui pullf^- ft o. g'1rrrl.xrt oorqlre! oi rrrucrt 6cr or [oAro.€ tur nrt*ri'f,Extin ltirriri-iin--i,rnrn xY#& tAlrl'E rt! E o6t(tr'o tr 'f'Ii mlD€ G (D.'t-ftID uraat olll.r r,trlEllxlt fif, ,allttl) rc H rnfllr' a 'i-r- .. ..[f tH I r.r .. ...irar- fdnr x,t. CltrlliA ./tO TO: TOh'N Attn: p.o. Vai I PRGJEgT OF VAIL l"lr. Stan Berryman Box 100 co 816s8-0100 Addition to Vail Tr:rnsportation JOB NO. 4 39-8 9"O DAILY REPOKT NO. |l{votcE No. Vai1, Colorado DATE: 8/16/90 52 sHEEr 5 OF Cent cr , srRUcruRE walI LGAnq{BI\'AIION RotF(ncu|c co|llgtls I/ERNC^L t{oRrzo rt|. Stalr No.t1 tl It tl tf Level tl 2 35 #4 @ 1B'r /1al\J\,/ lt. I . 11 #4 2 /t, 4#429 #4 @ 15'rc @ lrBil @16"c MK 4}] C BF Section BB cont' at lr8rt fron top of walI C to dowels fron T-,evel One B @ l2'r 0C cap SPEClfEAIlot{a sIE- Gfl DE: 60 R€Nrmcfic cu^l|l.Nes* c]ean ct.E R rrcE AllO @lrt& aB feq SpUOHa: spECnC il1tr aE feq a R s.PFORnil rrpr chair rNFH S rurrs tso ff groe Dnrwrlrcs usED d corrnrcron ro',rsro Q[ ruu-lue oosERvATtoN E prrr-lnt ossEntlAnon DeucE coslPr NcE yea UET PRGECT UET PRO|€CT R€OUIROIENIS REqUIROIO{TS IltE|t tNrIu,lIY wH€ O(^UN@ RE-DCAT'HED 2n oArE RE-O(^M €D -te wallPROSRESS REPORT. .lrrconformance with projec t, reinforci-ngplans and steel appear tospeclficatlons.be placed 1n general Michael Barher Architecture, COPIES Attn: Mr. Scott Ward; Gary Murrain PCL Construction Scrviccs, Attlr; Mr. Dcnny Anmourl Anderson & llastings; 'llRS Consultants . Attn I Mr. Lcs lrlaQdj- Rill Cam Steven L. Pawlah FIE..O OBSERI/ER APPRSVED F' Chen*Northcrn,lnc e:dh. (idt-r tta S.r-U'. REPORT OF REINFORCING STEEL OBSERVATION |t A lrmrt tinfctDa E qrxrl n|t f,lE ,r., d|l'rtrtt, ar 4t!q! xtt tli.mt] |t rr|i co|lE]ttvl-.-ri('lrr (,. dt cl.orfil l]o ajnnclr!.{ toll A[EA- rrr{ d rl.rra tl, ottrlrst{t on rrrDctr ,trlr (r rto lfi o.r nrNirig-r ni-o'-r'diirlp-af -wmn rrrort :rlrt'l tlt E rt'qltl 0f ,.rltll ltilrx] cl cofurtD ullt' ottl, lnrrrlx|t ,|f, ,o Il) rc tl lnnlIl ^ .i-n - .r r'. []If fl r-r r !..r'{- rdt| r.a C|flll ano To: JoB No. 4 3e8 eo DATE 8/L6/9o TOI{N OF VAIL Attn: Mr. Stan Berryman DATLY REPORT NO. 52 SHEEf 4 Of 5P.O. Box J.00 Vail CO 81658-0100 lhlVOlCE No. PRqJEcr Addition to Vai I Transpoltation Ccntcr, V:ri1, Colorado S'IRUCTRE ltla}ls LOCAI|OI E EV norl Rg{rof,clHo co.Ato{nl VTFNCAL ltoRuo r^I. Stairs No. l0 Level1&2 tl LeveI L-2 ll Level 1 76 #7 @ 5"0 FF 24 #4 @ lBr OC NF 22#4@Bn OC FF 37 #5 @ lorl OC NF 9#4@Lz"OC FF 7 #4 @ rgt, OC NF 10 L2tl #4 L5n oc #4 @ L6tl #4 r"tK 406 #4 B i'I 1B Section F Section F Section E Section E Sectlon C DwIs Secti.on BF BF 12rl 0c SPECFEAIPTS: srEL CR DE: 60 Rtll{Fmcilo Cl,.E l{llEs* Clean C1; x1TrcE A1p c6ry;11 aS feq sPt cDtc| SSECE|C^TFiII aa req aLa-' E R SJppOR1133 TypE Cnal-f R'{EH ffir$tf ztl El n*s uso 6 snoe Dfl uNcs usto El corrnrron ro,lsto & nurr-nng txrsoilt rxrN D mrr-nne ogstxvAnox tlPt cE coILPU]lCE UET PROr€Ct rEr PROJECT 0 1gIlgllJlR€tl€HTS Rf0lJlRErExIs RE-O1trl,altl@ U1161 lNgulty wt.|ENqA$TfD RE.EilTT{ED PROGRESS REPORT The wall reinforcing steel appears to be placed in general conformance Yrtth proiect plans and specifications. Michael Barber Architccture, COPIES Attn: Irlr. Scott Ward; Gary Nlurrain PCL Construction Sewices, Attn: Mr. Denny Armour; Anderson & llastings; llRs consultanti . Attn: Mr. Lcs lfloocl: BilI Carr Steven L. Pawlak NELD OBSEIWER APPNCVED S/ Chen€Nortlrern,lnc frdh &Ea-r ri s.r-U... REPORT OF REINFORCING STEEL'OBSERVATION At A tr,|lrt trurrEtD. r! q rxrf rl|i tatr t x|' oril]tr. ar nto,rn r|if !.if|rrD |' rrf @]Urorr( rio?trrY ar dt crDlfl' flD- 44rfir rDl nt Fff.r^- rx o. 3tlrtlfr{tl orr.nrlDor! on rnucr lrrx [q,rm€ o(r ntxin-n -nirii.o nrurc'ql tntln t ll'?i(lllr- $rrt ru EE ttr(Ior rfEt ltl]l{l 6 oortlllD t,{r-$ ('|llt ,l*trrllxlt l^f ,oartu, lo ll l?nlg. ^ i-t'.f r-liiiiTl rc .. Erar- are ,rn Glal lt^ a/6 TO; TOIfN Attn: P.O. Vai 1 PRCJECT OF VAIL Mr. Stan Derryman Box 100 JoB NO. 4 598 90 OAILY REPOKT NO. tl.fvotcE No. Vail, Colorado DATE: B/L6/90 52 sHEFr 5 oF co 816s8-0L00 Addition to Vail Transportation Centcr, 5TRUSTURE WaIl !rcAIION E.A'AIIOOI RgHFORC${O @uuo,fis vIImcrt HfrrzoNra Stair No. L0 l-.,eveI 2 25 0c L5 10 /14 @ 61,]F#4atz OF #4 @ 18" BF rL #4 @ 15" LL #4 MK 40422 #4 rqK 4O5LL #4 @ r6n 32 #4 MK 410 C BF Sections GrJrK outside cor.inside GoFr Sectlon GrJrK C BF Section H both cor. Section H SPECU|C notr$ SIEIL CRAO€: R ncmcnc cLEAxL0{Esr clean qTARANcE lr{D cot/En as req SPUCINOI SPECrrcAIPiEs aS feq tun gJPPOfiIS: TITE F[.NH HTICIIT 50 6 n urs uso B snoe DR rus us@ E corrnrson rovrseo 6 nu*rue oFERv TXTN D p,wr-rur o6m/ TaN uPl cE oomtt4r{cE Ye s MET PRq'ECT l.|ET PRO,,ECT RTIUIREIIEXTS REOi'NAIE{TStrt€l{ |N|Ir^LLY Wtlol E(^IIII'€D RE-EOIDIED OA1E RE-D(AIIOICD PROCRF.SS REPOKT ThE conformance with reinforcj.ng steel appears to beproject plans and specifications. placed l-n Seneral Michael Bqrber Architcctulc, COPIES Attn: Mr. Scott Ward.. Gary lrlurrain PCL Construction Scrvices, Attn; [4r. Denny Armour; Anderson Q llastings; URS Consultants . Attn: Itlr. Les ltlood: Bill Carr Steven L. Pawlak RELD OBSER/ER APPROVED ET C{ren€Northern.Inc.Cod.dUng €nel||...t oid 5d..'0d. REPORT OF CONSTRUCTION ACTIVITIES as A uriJr{ FfmgrEt lo ctrxni n( ?ltE ^t|r OLrt}tar/fL ar i!r'!q! AFt sr,F'|lto A3 n|f C0rrt)o'Tr|t-1'r-tilY ft clt fxlL ao amuizArDl En RT nF rrr. (r srrnlrrrs c(r.r.trrrt ."r rrrru.rs rFor. m F5urrr€ rn ntpoiri-n -liri.lniip"itiruro otrnrln;r'fin- 9 i?r-ci Yru tf D6'rqD tr lrTEi lE llo B conrrur urrsr ontt tfi r.{xr{xl ,& leln ro |r| f'!lr€, ^ ir'.- .. r [iftli-] r... cr oorr;arr lrtr ta6. QraldA 4/n To: TOI{N oF VArL JoB No. 4 398 90 DAT? B/L?/gO Attn: S{r. Stan Demyman DAILY REpORT NO. jj SHEEI} OF 3P.O. Box 100 Vail C0 81658-0100 llwolcE No. PRoJECr Addition to Vail Transportation Center, Vail, Colorado WEATHER coNomoNs AND TEMPEMTURE partly cloudy, /oon p.n. rain ahouerg CONTRACTOR'S CONSTRUC'NON ACIrVMES PERSOI'INfu MAKN EQUIPMENI: ACIMIIES: cHEll-NoflrHERN,s sffE AcrMTrEs J'uIl tj-me observatlonr-teati+g and ilspectlon: tsiTt}"'i'fi]dsl"'oi-E6ii[-rele beins placed for will Stair No. 10' . Level l-2 and fodtings Stair I,Io. 12, Level 1; inspection of reinforclng eteel bei-ng placed for Soting Stair llo. 12 and for wal1 Stair No. 111 observatlo; i,f hydraulic jacft stresslng of Dywidag allchorsr 6 each at 7lx It counterfort precast walls N. of 8.9 Llne. VERB^L COMMUNTCAT]ON WTTFI CONTRACTOR, ENGINEER, ARCHITECT, OWNER Michac1 Barbcr Architecture 'uUPlL5 Attn ; Mr . Scott Ward ; Gary lrlurrain PCL Construction Services, Attn: Mr. Denny Arrnour: Andcrson & llastings; UllS Cotisrrl tilllts, Attll'. Mr" l,er Wood I-I gltl Carr Steven L. Pawlak I lnn-o orermrtn APPRwED BY I C'h0n€Nortlrcrn,Inc Cr-dtt. t {rsr ra s.,.ntr.r REPORT OF REINFORCING STEEL OBSERVATION |' A urnrt ?r|tcrDa r! (rrxrl n|f t |)o dfrrlr|l ar Rrtoirr ||t !'f,drD ^r nf o(t Dfxll,( F rtnt 6 crt? o-p(lr' ao /lulr{nl^Irx frt F!.,llE^- lur o. srar,.rol .,ttu,,D6 G .'1tirc6 t1,111 (11 fo,{trl trr rroriii-o-iiinil -rriiiiri-trn rmmt lt}'ntA- $rrt6 rll. ot F(E! or rtTtr lt:ml| 6 oq.nr|ID t'rtgt olltt rmrE.'t}{lt ^|{ lqllJ lo N ttrllxl ^ dr-.-., -l@- ., r..aa.r. 7ri rrr. t:El llA a/6 TO: TOtltN Attn: P.0. Vai I PR(xECT OF VAIL Mr. Stan Berryman Box 100 co 8165B-0100 Addition to Vol1 'lransnortation JOB NO. 4 39-8 90- DAILY REPOKT NO. [wolcE No. Vai 1 , Colorado DATE: 8/I7/9O 55 rnErr z or Centcr, sTRUcTURE Footin6 LrmAnO{Eltv^Ioil R@tFORC$IC cql|o{Is vEnnca ]toBzoa{IAL Stalr lio.12 ll ll Level It tl tf tl I 26 #4 @ 18" 0C dwls. 5B #4 @ rB'r 0C dwls. 9 #4 @ tz,, 0C dw1s. LB /14 @ 12'r 0C dvls, rB #4 @ 12" OC dw1s. d rows #4 bc ls rows #4 bc 4 rows /14 bc 4 rows '#4 bc d rows /14 bc tton ttom ttom ttom ttoru Section Section Section Section Secti.on 1-V/. 1- S. a-W. 2-N. 2-E. sPgcurc Dot$ snrr. GnrDe 60 RElfmo]to cLEAflL0{Es& clean q.EARANCE ArrD OgVEft aS req SPlJc|Ne SPECFT IX,|S: aA feq ErR slf,FofiT$ 117g Rrick IX n-rxs useo- fl s+rce Dnr lrcs usED b coranrcron aonsp E ruu.-nue oosEn ArloN E prrr-nur oosart non DPL/rCE OoIII.P!\HCE y eS ufr PRorEgr ' rrEr PaoJECr R€IIUNOTEX'S REqUN€TBIIS Tt€N NITUI..LY WHO{E(^I/DIO RI-EqTHE) m{sH ffrcHT DAIE RE-D(Ar.rlr{€D ffihereinforcingstee1appearstobep1acedingenera1 conforrnance with project plans and specificatlons. Michael Barb.er Architecture, COPIES Attn: l"lr. Scott tttard: Gary lrlurrai.n PCL Constructiolr Sewiccs, Attn: l'lr. Detlny Armourl Anderson 6 llastings; URS Consultants . Attn: i'tr. L,cS-Waodj- Bill Carr Steven L. Pawlak RE.D OSSEKVER APPROVED SY .. €hen€Nonhern.lnc Cdrdlry &rttnr qia s.rta.L REPORT OF CONCRETE PI.ACEMENT OBSERVATIONS At I unut ?EtrErEt D cLr'|ri nf nft rr.r dftrrtlrs rlt if!'olls xrt tt flrD rr nr oolltllll!-tiofrftY d'dtt clfrl* l'D a'DgntlrD' mi run'E^- mx 6' r1mr;31 qratr1;r 0r txrpr;tt rrf rn tqor{ir€ 3111 mrt*a-11-{n'i.o -niiro-ant -rnnlt}l ,rer t(rr& g tftl trl E DCD6rrD (r 'vtfR ltt}rl !B ooar^rID ttt!' qDlt lffIrotxtl rf, ItlalD fo ll tllll|r a iirr* d r..(-iii-X-lr.r rf ..6r-r- t-i L. Cl.llaa r./to TO: lshll,l or; VArL JbB No.4 sgs e0 DATE B/I?/9O Attn : Mr. Stan llcrrynanp.o. Box 1.00 ' DAILY REPORT NO. 53 SHEf| 3 OF 3 Vail C0 81658-0100 F{VotcE No. PROITECT A(l(lition to Vni.l 'l'Ta n sl)or.t:rt ion Ccntcr'. Va.i. l. Col.oratlo, SPECrEAIE|I|3: lltrrupi[.llobile ru ro. A f000 3-5 ^n conrEr 4-8 AIEE}IT IEIPER^TURE RA'{CE 6O-gOo TEST t|o.rn cxf{L Ilct(Er M). lluE EATCHE) IIUE lf,nrytl TIUEs uPttD RA,OUfiPt{ @ur{rFn EPIN REVOUTnON @IJXIEN @uPtEllotl CUIrc YAffiaaro/ cl,IIUI.^IIVE ly^lm ^IDEDoau-o s T 2 3 4 , 6 a1( B 49 106 54 45 119 LL7 54 54 1658 L6r9 . IObI L663 1664. l.bb) r56B L669 8245 9:OZ 9:42 9:58 lO:11 10:28 12:06 12:10 B:58 9tZL 9:55 1O:18 LOz25 10:40 1,2:r.-/ LZtSO 9:40 as req req req req. req. req req. req a6 as as a.at a6 as as as req as req as req as req as reg as req a6 reg as xeq B 'tL 24 32 40 4B C,A 60 6 5 0 o 0 0 U 0 lESrIII sll[? (Dr) AIR @IIIE}{T(D tE uilrfftclft (Pcr) Ytru, COT|CRETE TA'PE- R runf, c4 R[lr ft(s 2 4 L/2 6.4'L39.t 7O caet 4 cylinders PROCRESS REFORT Sample fron truckr purnper j.n use' Tj-ne and vj-sua.-l- sl.unp observed on all firucks. ^flDrFa Michacl Darbcr Archi tccturc l Andcrson I Ilastiltgs; Gary Murrain PCL Construction Scrviccs; URS Consultants; Bill Carr Steven L. ParYlak NE.D OBSETWER APPROVED FY Chen*Northern,Inc SPECLE Txt|sl SIEI- CR De FElfIncD{o ctflHtD{6* GIIAnANGE AID CO/E& sPuctf{c sPEc6lclrpil* BAN S.IPFO(IsI Tl?€ rnEtl HOCHT O'-{t'| lhdEr -|. S.r.nu.r. REPORT OF REINFORCING STEEL OBSERVATION 60 Yes As Required As Required Chair 2tt F ners usto EI *oe omtn$s usED E corrnrrcn mrseo E ruu.-nue ossg trtAnoN D prrr-nur o{EEftir rlon rlfucE COUIPIAIICE uEr PROICr UET PROTECI RmUIRElt€Nrs RflltlRfiIO{fS DAIE RE-O(^uDl@ItEl NlrUl.tY E(^ltlll€D Yes mtDl RE-E TINED PROCRESS REPOFIT Placenent of reinforcing steel appears to be in general confoTnance with the project specifications, nab'oWnan fFtuBW At A |rn { ?iorrcrEl lo ctftarl. D( Flt xo c-rttwL at it}(rtr- lr{ stfmD lt nr' lqtj'lq-(iafiTt (r dt cl rtfl!' rx' a,||eFc,Arrll nr RRrA- n r. or ,,^ntf,ftt, o.'.,',95 or ,'tpct! ,l.rr dt fto,rrra qr nroriii's-Er.ip' r'riiille-cur rqltu rr'rronr- 3uart J irr. E rFqtu, 0r ltla l6n€ 6 cc.rrtrED rrullr ('lr|li lal$a[raxll lit lolll IIJ 10 H tfil]rl a i'=.- .r *'lTrtfTlr-r .. cw'r- Iltn trr, C|{'l lAr a/F TO: JoB NO. 4 398 90, DATE: 8-27-.90TOIVN OF VAIL Attn: Mr. Stan Bcrrynan DAILY REPORT NO. 60 SHEff 2 0F 6 P.0. Box J00 Vail CO 81658-0100 ll'lvOlCE No' PROTECT Adclition to VaiI 'lranspor-tati on Ccntor. V;ri l, Colorado Section F Section F Section E Section E Section B Section B 22 #4 @ 1.2t1 .c.B.F. #3 Bar as WalI Spreader #4 @ 16rl 4 @ J.ztl .c.B.F. 34 s4 G 18r' o.c.N. F. 774 *4 @ 7'l 0. c. F.F. 22 #4 @ 16tl o.c,F. F. 37 #5 G 10rl 0.c.N. F. lts e 6rl 0.c.N.F, #6 @ 6r! 0, c.F.F, Stair No. 10 Stair No. 10 Stair No. 10 Stair No. 10 Stair No. 10 Stair No. L0 Level 3 Level 3 Level 3 Level 3 Level 3 Leyel 5 Michael Barber Architecturc, COPIES Attn: I,lr. Scott Ward; Gary lrlulr-:ri n PCL Construction Serviccs' Attn: l'lr' Dcnny Armour; Andersoll & l{astings; ClrcnCNorthern.lnc,Cdr|irnf trglr-r dra Sdr{r.{. REPORT OF CONCRETE PI-ACEMENT OBSERVATIONS A.| A lrruat aDl"E|Da IO altxtt' nf, lrft Arrl (lFtlr,r"r' A1 rtfotrt lfi triaflt, ! llll c0'tllfxTul-Ii(rtllaY of (|ll cl;x|ll fl{) ArnbtlltDr tDi tUifA- rD. o. srrrna'r.rl qlrElrrlr.r (i l'](rr|ct! ztta (| rfqex''rc orr m|.grtj-ri-;JniD' t't{tt c.n imtttx !'\ttto/rl- '- l''l lJ vlt !t orFcctD c'- 'it]tl lftt}€ E oo.tr-c|ID rrrrF q|. ma,rrrrxll AI' ,siut lo l| rElr|e, ^ ,-r.- d rlttrll-lr- d...rr.{.' 16 t\ cratllL r.^o To: T61gNt 0t: vlll, JoB No. 4 J9s 90 DATE B-27-g0Attn: Mr. Stan llcrrymatr 75 Soutrr Frontaqe Road DAtLy REPORT NO. 60 sHEEr 3 0F 6 Vai I C0 87657 lN\0lcE No. PROJECf Atltli ti orr to Vai 1 'I'r:rnsr)o.r't;rti.orr Ccntcr.. Va.i. 1. (lolor:atlo. western$|'PtJtR rqobile sPE rE^r|olr& uu t.D. A An (pNIE{T 49o-B9o ATTflC}fi TUTPF.RAIURE 9lruP 5000 3||_5rt R^IIGE 600 - gooF. TEST]p.TRtrcT l,IL IICI(ET M). TIIIE E rcHo TIUE ARnS/@ nx€ s t|Pl-@ RA,gUrfFN@urfia IEOS{ RAOurrFil COU}{fER @uPr.Ello]l arBc Y ffilaro/ CUUUI IIYI wAru Aoo@ c Lt-oNs 1 2 3 4 5 6 119 Lt4 44 54 TL7 106 LL4 L824 18 25 L826 1827 1828 1829 L832 12 : 38PM 1 :03 PIr4 I:37 PN, 1 :58 P[,1 2:17 PI4 2:38 PM 3: L3 P1.,1 12:,S7PM L: 16PM 1:5OPM 2:18PM 2:24PM 2;53PM 3:20PM 1:45 PM As Req As Req As Req As Req As Req As Req As Req As Req As Req As Req As Req As Req As Req As Req 8 16 24 32 40 48 s2 5 0 6 I 7 4 rEsrt{t tu,l?(ur)UET UNTTIEHT(Pcf) YAI)oormE|E TETPE- RAILNE cr) RDr\fu(s 2 5 54 4Lt 6.0 .71 70 4 cylinders cast Slunp only PROGRESS REPOKT Sample taken from truck. Purnp in use. Tfune observed on all trucks. ^nplF< MichacI Barbcr Architecturc l Altdcrson I llastings; Gary Murrain PCL Construction Scrviccs; UltS Consultants; B. Carr S.L. Pawlak RE D OBSERYER APPRCIVED ST ChcnONorthern.lnc Cdn rht &|lh-! d]a S.hlb REPORT OF CONCRETE PI-.ACEMENT OBSERV,A,TIONS At A llrnl.|' iEt?GlEt E crtxti r{ Flft ll{t (|,lrtllrfl Al Eatrrt NnE Srrtmo ar nf, corr'')or{ ,rndrftrrY or q'l cl rr"l l'rD amrlfritrx 'I tt,rE - rxr. rr' 3ratrtfxrl oo{llrlrr (r rlrr,crr rrrta <rr rcqraD}xr orl ru"ori*d-i-inio'-lrjbo ir.n -rnrtirx lrnonu s rti rf, rrl Df @'crD (r 'lrtll lfJlxr 6 cu?rrrlD t ( !r orr|t tdrrrrxtt {ra f4rftD Tt x t'lDo, A ii-'.- .. s.[HiE]F.r .t ...rrr- t-r xr G|allaa a./to To: 1g1v1q 0F v^rr, JoB No. 4 398 90 DATE B-27-goAttn: lvlr. Stan llc rryrnan 75 south Frontaqe Road DAILY RrPorr No' 60 sHEEr 4 oF 6vail co 81657 tN\totcE No. lEqVECf Addition to Vai1 'fransportatj.on Ccntcr., VaiI, Color.ado. Westernsm Naobile SPECnCAJr)$I$ SUJlrP lItr l.D. C 4500 3r __5|l Arfr cor{IE}rr 7% Aug AASfi IEIPF.RAIURE RANC€600 - gooF. fBrt{t TRtrct( ML 1ICXET M). IUE 8 TC'rs) TIUE ARNryE TIII€ SATPTED nE1qUID|l @ulrrEn TEPIN RE\.oUJTIO+I @UIIITER @ltPLEIlOil ;UIrc Y^ro}Sroto/ c{ruuLAIwE wArER ^OO@gAuoNs d 9 10 11 T2 73 74 1,77 44 L19 49 L14 46 100 1834 1833 1836 7837 1838 ' L839 1840 3:47 Ptt 3:38 PM 4:35 PM 4:39 PM 4:44 PM 4i57 PM 5:L3 PM 4;f 0 PM 4:12 PM 4:46 PM 4:48 PM 4:55 PM 5:1.3 PM 5:20 PM 4 25 23 PM J PM As Req. f,s Req, As Beq. As Req-. As Req. As Req. As Req. As Req. fis Req. N,s Req, As Req. As Req. [,s Req, {s Req. 1I 8 16 24 32 40 48 Grout 10 10 8 0 6 4 TET MT su,lp (Dr) An @IIIEilI(D ffEr uNn WECHT(Pcf)Ytru) CONCNEIE IATPE- R^TUNf, cr) R[l|^ro(s I 13 3La 41 6.2 6.8 L40.2 72 7t Slunp and air only 4 cylinders cast. PROGRESS REFORT Sarnple taken frorn truck. Purnp in use. Time observed on all trucks. r..rDrEre Michacl llarbcr Archi tccturc ; Andcrson & llastings; Cary Mumain PCL Construction Scrviccs; UllS Consultatrts; B, Cafr S.L. Pawlak RA.D OBSER/ER APPRWED B' ClrcndNorthern.lnc.cd:,th bgrrr si Sd-arJ. REPORT OF CONCRETE PLACEMENT OBSERVATIONS Ar A |.rnt|' tFltEmr tO {atxTl lttr itftE,ilo d,ltltTl I i'F('ixl A'lt lFrftm Ai nr ([rnrr -Ilt(rrrY d- ot! d tttTl' llo AmrE trtpl 't n[-f - trtr o'- tratrrrxtl cltotlE n q ftltl.crt rrrr. an .rforirtq, q,t mrvril-d-;iniD'i"rit€ -cil isltrx lwnonr- srrf'l tt tnl t{ ocl'oD c"rrtl rDnD€ rs oorrrrnD trlltr snrt , allaxrl l,la rcrltr lo H nlllrl A 'ints r r,. lttf ti-lr.t r, ernrarro t6 le Oa(l l{ a./ro TO: 1gy* 0l: VAI t, Attn i Mr, Stan llcrryman 75 South Frontaqe RoadVail CO 81657 PRqrEgf A(ldition to Vai I I'Talrsl)o1'tat i.on Ccntcr', JOB NO. 4 39lJ 90 DAILY REPOFT NO. rln0tcE No. Vai.l . Co l.or:arlo. DATE g-27-90 60 SHEET 5 OF WesternslrPPUa l{obile SPETEATP$* SLUUP lrtr l.o. C 4SOO 3rt-5rt llR coNIE{r 7 eo Aug ATSO{T TUTPERA1URE R^}ICE 600 - 900F. IET }|(L lnlrcxt{L IrcXEI l,{r. nlrE B TCIiO TITIE Amr/ED IT€s nPL@ Rf\nurrEtl CO{J}.TER EOIH REV{XUTFN @{,IITER cotPtEltotl clrfic Y G t_oro/ CUMUI,AIIVE tf rER ^I)o@o^u.o s 15 16 77 L8 19 20 2I 22 54 t17 44 49 114 46 LL7 44 7842 1843 1844 1845 1845 1846 1847 1848 5;19 PM 5 :3i- PM 5:40 PM 6:00 PM 6:18 PM 6:48 PM 7:18 PM 7:58 PM 5;30 PM 5:48 PM 5:53 PM 6:L2 PM 6:25 PM 6:58 PM 7:50 PM 8:12 PM As Req As Req As Req As Req As Req As Req As Req As Reo As Beq. As Req. As Req. As Req. As Req. As Req. As Req. As Reo - 56 64 72 80 88 96 L04 11? 0 6 0 4 I 8 10 n lEillII sllfi?(rlr)IET UMT TECHT (PcF) }lTl"D coflcftflE TEIPE- R^TT'Rf, co mraAt0(s PKrcRESS REPORT Time observed on all trucks. noplFq Mi chac I llarbcr ArchitccturcI Andcrsorr ti IIastirtgs; Gary Mulrain PCL Constructiotr Scrvi ces I UltS Consultants; B. Carr S.L. Pawlak RE..D OBSERI/ER APPRWED FT ChenONorthcrn.lnc Can{ht Onh-r ata sC'{H. REPORT OF CONCRETE PLACEMENT OBSERVATIONS ar A rIlA trFEtDa E CtrXtr. l|t FrfD ltt dltt\l-i( al llTtt'rTr ^,lf :tF.rrm at na c.,trfJrTr4l-tFor.rr1Y 0f frtr ct'xrl 'ro ,|m(noltDl trt n'f-t!- lxr. o,- lrfattrrD.B otrorrrtrr d frtircB rr(x (rt Eor.r€ qrr rtlgrrj-d^rriiriil--tIrmt -crn rrrttx l|raor'a- s^rt.ltJ vrt lf O(Fot'D (f, T |fl lE lD€ ls oaaarrnD uartr q|llt l|flrfrrrxn ,,I' stlD lo l| rlftl{l ^ ',rr* rl r,.[ Un]l r.." rr rvrlrrrrr 7-r L., qalt.. a,no TO: 1gg1,1 0p VAI L Attn: Mr. Stan llcrrynan 75 South Frontaqe RoadVail C0 81657 qlq.JECf Ad(titi on 1:o Vail 'l'ransl)olt ti orr Ccntcr', JOB NO.4 j9B 90 DAILY REPORT NO. ll{\olcE No. Vai l. Colotatlo. DAIE: 8-27-90 60 sHEEf 6 oF WesternsrPPuB pbbile SFttrEEAlP}}s: qUrUP uu r.D. c 4500 5'|_5rt A,r co IE I 7% Aug Arlrt}{r lErpf-R ruRE R^Nc€ 600 - 90oF. lEif txt.INTUCT(t{L Ic|( T M'.ln€ OAICHgI TIUE ARft\i@ Tv€ SAI|PI.ED nfl,O(Infal @UNTER EOIN RE\DU'IIOI.I CO'JNTER @uPt-EnoN CUEC YAREta D/ ct UUL IIVE IYATER AD@ A^tL(l\tS 23 24 714 t74 L849 .1850 8;27 Plrl 8;50 PM As Req. As Req. As Req. As Req. 114 rL6 lESr ML surr?(nr)^n@rm}{r(D UET UNTT x,Ecltt (Pcf) TAt)corrcnElE IETPE_ RAll,rRf cF) Rfir tr(s PROGRESS REFORT Time observed on Total pour 116 all yds, trucks . rioplF\ Michacl tlarbcr Archi tccturc; Andcrsorr I llastings i Gary Murrair-r PCL Construction Scrv-tc6s; URS Consultants; B. Carr S.L. Pawlak REID OBSERVER APPROVED Ff 'Chcn€Northcrn.Inc. Conrdur'g angln ... ord sd-'U.lt REPORT OF CONSTRUCTION ACTIVITIES as ^ lrnr^t FfinrgtDt m drxTs' nf, PUrtE rr|' ouRtflwl flr t!It!!! r'nf suEinrD al lrr @rtrrrrur PFrfrrr 't ort (rltl:t' ]o amgnzatE { tG aT s- rrrr .,- strrDaxts" cfral rrur.' .n r.rtRA;rr rl(r. tn Ftnrrir€ nn nnnorns- n rr :rhru rtrurrc u-n rxrnx il'r*rorrr- s'rrrtEr Ll IE D6FGt! f 'fnt lttrr€ 6 ;qri;ni drtJs bnu rar,.rqrrxrs ^nt rrrrt! ro rtt f,ntn€. a 'tr-ir- .. rt lt{11{ lyrt d ...rt'l- fdrrr ,|-- Crf,lot^ 4,/aO TO: TOWN 0F VAIL JoB NO. 4 398 90 DATE 8-28-90 Attn: I,lr. Stan llcrryman DALy REpORT NO. 61 SHEE1 1 OF 1075 South Frontagc RoadVai.l C0 81657 lWOlcE No. pRo.rEcf Addition to Vail Transportati.otr Ccntcr, Vai1, Colorado WEA]HER CONOMONS AND .IEMPERATURE C1EAT 8OOF. CHEII-NORIHERN'S SITE ACIMTIES Ful1-.tine Obseryation, Inspection and Testingi Concrete being placed for deck toPping, existing structute, Level 4, Line B-C, Grid 8-11 , Reinfoicing steel being placed for crossover ramp, existing structure, Level 4 to Level 5, and core walls for eleyator south of A-Line at Stair No. 12. Density test- ing of stfuctural fil,l being placed for slab-on-grade, Level 0ne, Ranp up to Level Two, Line B-89, Grid 36-33 ana tic-kfifl at footings, Line 89, Grid 30-31 - Density test of roadbase and proof-rolli.ng same, north of South Frontage Road, prior to asphalt place- ment. Density tests for same. VERBAL COMMUNICAT]ON WTTH CONTMCTOR, ENGINEER, ^RCHrIECT' OIVNER R c.rr S.L. Pawlakna-6'o65Enrcn APPRoYED sY coprEs xitli"'*li"BH.t'ftll:;81x1"i,,,.,"r" PCL Construction Services, Attn: lvlr. Denny Armour: Anderson S llastings; --lllls Coisltltflnts. Attn: Mr" l,es }llood; Chen€Norrlrcrn.lnc.Co.:. JtX trC'..r -a S&iL. REPORT OF FIELD NUCLEAR DENSIW TESTING as l wrtxt tittzEToa ro flrxrl Df nnE ^|o ottt|ftv!:1 al Fft{tlrt |,rf, trtr|rTtD at xr c(lrDf)an t--FtrdiftrY o- crtt o ft'rSi A'{O A'nqr^lD. rm Fln l:A- txx c, srArrrrrxnl crrqurlrc on rnrrcrr rnd.r (n ffq^fi'.€ ca r-o"#'s-iiii,ri,io'fiiiro-qx rnnut rrrnovr'l- s,r''rlJ rrl If DIFE (r Itrll lurrxr 6 oortrfiD tDr.t:r q t rri.r.(f,rD.tt rf, l&lD lo fi lFnr|(r a t'-trr- a r.[UUlgt .. ..,tro.- adr ,le CEIO'A a/ao TO: T6nN 0F VAIL JOB NO. 4 398 90 DATE: 8-28-90 Attn: Mr- stan llerryn.n DALY REpoRI No. 67 sHEFr2 oF1075 South Frontaqe RoadVail C0, 81657 - INVO|CE NO. llqlEgf Addition to Vail Transportation center, Vail, Colo]rarlo SPECtnCATtoH couP cTtoN & MINIMUM REQUIRED IN_PLACE CONSIRUCNON CONIRACTOR: UATERTAL DENSTTY 95 B&B Excavating r AS DETERMINED IIf: IEST LOCATIONS WERE ASTM DJ557 (Specs. under strr FcrED ff, ch"r,-Nor.fl3Xitt' THICKNESS OF UFT45 Required NUMBER OF PASSESAs Required TYPE Al'lD NUMBER OF EARIH MOVING UNITS L Front Loader T'/PE All0 NUMBER OF COMPACTION UNnS 1 Dual Wheel Roller METHOD OF ADDING MOISTURE hrafe'. T1.rrr-k LOCAT]ON DEPTH OR ELWANON (FEET) LABORATORT FIEt.t) P€RCENT OF (RErrr\€1 lrN(u{x)otIr^ltd SOIL TYPE rE)l NO.[1N(MUM Dt{r DLNSTTY (Pcf) OPT]MUM MOISTURE CONTENT(z) DRf DENSTTY (pcr) MOISTURE CONTENT(r) 26! 26( 26 642 Station 9+75 Station 7+35 Station 6+10 Station 4+90 Subgrade Subgrade Subgrade Subgrade 138.6 _138.6 138 ,6 138.6 5.6 5,6 5,6 5,6 133.L 133.6 133,8 1.33,4 4,L 4,4 4.2 4.3 96 96 97 96 868 -3l4" Basecours e BeB -3,/4'l Basecours e 868 -.3/4tl Basecoutse BEB *5/4" Basecours e tr FULL TIME OBSERVATION I] PAJ{T TIME OBSEFVATION nB rFdl' pf,f,Jxr:t q't{E. ! nrrat A.t l rt:Rrtr oF otn ffiftw r{rrd (r nt Plra.flfiHl. r,f lqv! q!tr! -olj-lllr crtarRr/clin m c{xr lf, "F(Yn€ r}r FFfD|frOrDtD c{rPrcrrtf tttr[r Atro |rrrsnf tO llt]. urRttKl nl[ rurs wttl ti'n'inff,in a-r| n rt ruro -rpr nrrnr: IFJTs Atq rl{rr of rllr r'll I orrY As rtt-E\,Tt 1rpr.:5s Fi Tg cAp1^rr q.n oc6v11.1f .,urprt{rr. 1.Sr 1'te J; ifi ]t';|';fi isg'tul ornro+rs or t/rlttlg rltt ntl U6l: s'roncrno'L IHE Nt CI,EAR DOaSOyEIgq MEns) oF lEsll|lc w S Us€D lN SUI}SrA{TUL ,rccoflD^l€t WnH ASrx 02992 All0 OJO17 pRzuMll{AFY OBSERI/ATIONS Al.lD/OR TESf RESULTS VER&cIY REPORTED TO: Les Wood PROGRESS REPOKI Tests were perfoilned on the road base subgrade prior to paving north of South Frontage Road, Stations 4+00 to 9+50. r.^ortre Michael Barber Architccturc,v\''rrL't Attn : Mr, scott Ward ; Anderson 6 llastings; l'lr. Cary Murrian; PCL Construction,-Ai:tn: -l''lr. - Dcnny Annour; ItRS Consrrltants, Attn: Mr. Les tttood; PawlakafB. Carr FIELD OBSEMTER Chcn€Nonlrcrn.lnc.C..rdtro tr*r.-r -i S.Lrt6.a. REPORT OF FIELD NUCLEAR DENSITY TESTING At A Lrttl.( PrTtGTE a tt (tl}Itl nf tr! E [I] qfFt.vt:t Al ltrYFr[ Mf srifff, At rlf @fD(XTBI--PidnTl t Olt cl ft6' Am '{fr5{ZAIDil tTtl F'nt - rol rr sr [urr.rr crrqlrqr.lr .rr mFA;Tt ratl, (x rtq'"arr€ orn m.r'<riu-s ininvil -nrip q-n rnrtut lPF to'/A- s^ruJ vu E D'Y'orlr or ArIDr lt:irr'{r d CaftLgIE| ttrr.:I o|rit ,ti.rqtoarr t[ pttfD lO N rEnr|q ^ 'tr-nr- .. -[Iil-l c..r d ...'r-l- rtr t|.. Aalut Vro Tr.l,rv; Tg$rN OF VAIL JOB NO. 4 398 90 DATE 8-28-90 Attn: l"lr' stan Berrynan DAILY REpoRT No. 61 sHEEr g oF 1075 South Frontage RoadVail CO. 81657 tNVotcE No. PROrECI Addi tion to Vail. Transportation Ccnter, Vai. 1, Colorado sPECtnc Ttolt cot{pAcTloN t }/ATERLAL MINIMUM REqUIRED IN_P|JACE DENSTTT 95 x As DETERMINED BY: ASTM D-I.557 CONSIRUC'IION CONTMCTOR: BGB Excavating TEST LOCATIONS WERE SELECTED Eff: Chen-Northern TYPE AND NUMBER oF EARTH MOVING UNIfs 1 Front Loader, 1 D-J 6a1 THICKNESS oF UFT4, Requj.red TYPE A.].ID NUMBER OF COMPACTION UNITS ], Dual Wheel Roller.NUMBER oF PASSESAs Required MEIHOD OF ADDING MOISTURE Nautral *BSG=Below Subsrade-*nrr-P6fg1ofr;:":f,.,,DEPTH OR ELEVANON (FEn') IABOtrATOff FIELD (RErlrvt/ llAx[alr'l) Ot'TAfid OF SOIL T]?E lcJl NO.MAXIMUM DI{Y DLNSTTY (pcf) OPTlMUM MO TURE CONTENT(r) DRY DENSTTY hcr) MOISTURE CONTENT .,67 268 269 270 271 Line 82 at Grid 35.9 Line 83 at Grid 33.5 Line 82 at Grid 33.0 Line B9.5 at Grid 31 Line 89.2 at Grid 30.2 BSG* BSG BSG 1r 2l 6r 2r BTF*J Top of Footing 0 0 0 0 0 136 r36 ls6 156 136 5.9 5.9 5.9 5.9 5.9 1 155 t32 LJZ L33 133 5 6 2 0 6.2 6.4 6.1 6.3 o.u 98 97 97 98 98 Slightly Silty Gra- ve1ly Sand 51. Silty Gravelly Sand 51. Silty Gravel"ly Sand S1. Silty Gravelly Sand 51. Silty Gravelly Sand E FULL TIME OBSERVATION t] PNTT TIME OBSEFVATION nG |'FtltT pit!|xt! (t'ttDxt maut' at l Rts T tr olri anEf_nr rf,r.ur (r ml 'l atl.ftat Pf lr w mJ|fD Oll lllF f.r'rafrE^cTtFt m c(t|ntru{ lPPtYn(| nr Fo61r;a11of, coplcl\rf tt(!T rtru ucnri: m trl. urnrro nc n,rrs rrrt uh'hr'rnrn s rf o.t3t twlrro -oFrMnc6- lBrs lr{ [ Df- or lllf Jll I o{Y As rr.f,vrD xrf,roeiy ro crrm rr q-{ orFtr\{l! Jutptrf,xt. tsr rxle di -r]i!i lit: 3tlt nrld ntt ocllxlrs otl wtlalllt l nlE nlr ltrl:t sr"EoFlollrc'a' tHE Nt Ct"E R DcI{sot/tHB MEn|(x) Of TESnNC U^s UsF! lN SUIISIANTUL ^CCORU }lct wnH A5-IU D2902 ^}IO DJOIT PRzuMIMFf OBSEFVATIONS AID/OR TESr RESULTS \|ERBALLY REPORTED TO: Les wood PROGRESS REPORT Tests were performed on structuTal fill being pl4ced for slab-on- grade and backfill at footing, new structure, Line B-.B9, Grid 33-.36, Line B, Grid 30-31 . coPrEs xiil?" t"?i'3:;.t"fi'l*:cturc, Anderson 6 t{astings ' }'lT. Gary }lur:rianl PCL Construction, Attn: --Ilr.-Denny Annour; llRS Consrt I tants , Attn : Mr . l,cs woo(l ; ndo S.L. Pawlak APPfiOVED BY Chen€Northcrn,Inc O.:rt.}" f'rtEt -ra Sdr |.L REPORT OF REINFORCING STEEL OBSERVATION rtA|lmrrtFEttctDltoqrxltnrtrl.Err{ldE1lflatlftoiTt|rtrrriftlTD^t'tf@fDfxn'(rrtfrrtrct,lcrrxnt'A]oa'nno^lEltufPttll;i- 11r. g. 311n11;xrl o6rcll4rr6 11,r fxlp1.rt f1111 6rt [q.;'ta cu pnxli-n lninio lE[Trt€ q.rt lt ff lf"F/A- sAr.Prr:t x[ D(FU! (r 'fm rultro 6 @{'rrn-o r'|lj6 ollrt rftllEL}al! A[ ,aul lo x rnnlrl ^ 'n-!.- , *lTirri-l* ,...rird. tn ,lr. €r].tttA r/ro TO: JOB NO. 4 398 90 DATE: 8-28-90TOWN OF VAIL Attn: Mr. Stan Berrynan 0AILY REPORT NO. 67 SHEEr 4 OF 10P.0. Box 100 Vail CO 81659-0100 ll'lVOlCE NO. PROJECT Addition to Vail 'fransportation Ccntcr, Vail, Colorado STRUCTURE Level 4 Deck, Existing Structure LG ]lofi E EVATX)i| R@tFORCu|C corato{Ts VERNCAL HOQZO}{T|t Line B=C, Grid 8-11 Line B-C, Grid 8-11 Li.ne B-C, Grid 8-11 Line B-C, Grid 8-11 Line B-e Grid 8-11 tine Grid B.C, B-L1 Level tevel Level Leyel Level 4 4 4 4 4 Leyel 4 164 Rows #4 at 12rr 7 t, B 70 Rows #4 at SrrBottom 47 Rows #4 at 12!t Top 3/4t' SIab Bo1- ster, Coated at 36!' O.C. 1/4 Wire Coat- ed x5r0 at 36rt O.C. Lap to #4 at 2Stt; 70 Rows #4 at 8'r Tap North to South East to West East to West East to West SPECU|CAIICT$ sltrl GRAOe 60 El n-r*s uco RElfmcu,lo cu^tltNex! clean E st|oe Df,^ltllcs uss) ctEARAlrcE At{D Cgl/EE As Required El comnrcron grrseo sptrcfie slEcrrc rne As Required E ruu-lue ooscnt/ llon g R gfpfir$ Ttt€ D prrr-nle txrscnrvATloN FnEH ll{PtACE @ULPnNCEHoc$r 2,, ffi,m$, ffiffiff5 *r_s.T,,,- DCAr|D{ED RE-DCAIII}IO PROCRESS REPORT Michael Barber Architccture, COPIES Attn: Mr. Scott Ward; Gary Murrain PCL Construction Services, Attn: Mr' l)cnny Arrnour; Andcrson S l.lastings ; URS Consultants. nttn: Mr. Lcs ltlood: B, Carr S.L. Pawlak RELD OBSEfWER APPRC'VED SY Cherr*Northcrn.lnc. ot.:4r!a C,lgta-t -ta sdf|tH. REPORT OF REINFORCING STEEL OBSERVATION ,J A rlrnr{ ?m|ncflr D cttxrtL r|| ntE r|r o|ritwt Al rrtdnr ^|f S,rfnrD |r n|r @Grtxrlrf Fls"ltnt or nr o fxtl lP 4!!d4rEr rl'l PuR rA- rtrr trr ttlnr.rflr, (rr€(utnrc rrr rnD.ctt rrrtt (n rto.{r{ q,r ntrqnic nirnD t't,rrp qrt rnltttx lf?t(x& rlttj ill 9c D(tqrl) cr frrDt IIJtlro 6 cqrlfltD rrrltil o|rrt ,|Frrqj{r.lr rr( ralIll) 1() x f,lll}rl ^ &-,<b 1*l[li]l..r r...rtdr. tr t.. C|{lla a/to TO; JOB NO. 4 g9_g 99. DATE: 8-28-90TOWN OF VAIL Attn: Mr. Stan Bcrryman DAtLy REPORT NO. 61 SHEEf S OF 10 P.O. Box 100 Vai I C0 g165B-0100 lI.tVOlCE NO. PRGTECT Addition to Vail 'l'ransl)ortlti on Ccntcr. Vail. Colorado STRUGTURE Core Walls. Stair No. 12 Loc^not{Ew nON RfDtFORCrlrC !€Rnclt HONZONI^L South A-.Line, Grid 28.2--30 South A-Line, Grid 28.2-30 South A-Line Grid 28.2-30 South A-Line Grid 28,2-30 South A*Line Grid 28. 2-.30 South A-Line Grid 28.2-30 South A-.Line Gtid 28- 2-30 Leyel I Level 1 Level 1 Level 1 Level 1 Level 1 Level 1 8#4 72n O 26 #4 O.C, B 79 *4 12[ o 84 j5 at 6rr o.c. B.F. 104 #5 at 6rl o. c. E.F. at at 6tl at C 24 l|4 at f 2'r O.C.B.F Section .L 21. fi4 M.K.'400 at 12tt O.C./72 -#4 M.K. 401 L2 #4 14.K. 402 at L2tl Section 1 26 #4 M.K. 4O0 at 12tti 12 i,4 M.K. 402 at 12" I,F. i 24 #4 at 1.2tt O.C.E.F.; 1.8 f4 at 12" O.C.O.F,/36 *4 at 6r' 0.C.I.F. SPLICE BARS32 #6 at 6r' o.C.I,F. 32 #6 M.K, 603; 32 #4 at 6'r O.C.O.F. 37 #4 M.K. 402 Section 1 L6 #4 at lztto.C.i 16 #4 l,l.K. 402 at I2't; 16 #4 M.K. 401 at t2t1 Section 2 18 #4 at .16" 0.C.8.F.; Section 2 L6 #4 M.K. 401 at 12" 0.F. Section 3 sp€curc roNs srEL cR^De 60 El nrHs usto RArF(nCfiC Cr.t^ur.OrEs& clean El soe DR llllcs usED clIAR llcE AND corER As Required El corrnrcron rouseo sPuoxe sPEcrE rxl$* As Requirecl EI ruu--nle oosERV TloN E R srtPoflTs: TY?€ #3 Bai E prrr-nur oostrvlnoN M{EII INPI,^CE @ULPUNCE u€r PftoEcr |rEr PROr€cr oArEHocrr Zu ffi,ffi nEaumo{rs nc-frb:N@ O(^rlN€D . Rf,-OCATINED No Yes 8-29-90 PROGRESS REPORT #4 rnarked bar section 3 not installed at the time of our tnitial site visit, Michael Barber Architccturc, COPIES Attn: Mr. Scott Ward: Gar:y Murrrrin PCL Construction Services, Attn: lUr, tlcnny Annour; Anderson S llastings; URS Consultants . Attn : l'f r. l,cs ltlood I B. Carr S.L. Pawlak RELD OBSER\J€R APPROVED gf Ciren*Northenr, |nc.Otn/t,i arrtrrd -'a Sdrllr. REPORT OF REINFORCING 5TEEL OBSERVATION As^[mJ|(|rfictE|'ocrr.xTt.lll^'t^,{'qln\inlAli'}oiTrr|fqfrmD|'n|rco'n(xt.rfi'rrrYGdJrd.r'fir.^ro,l,nm'^rl'|rf,.4'l|c^-Irr. ' 3l^r|raj.ll (rrralEr! (n rxri.ctt ,rfl (r r'qrira crrr urcii- n-frInio'-xiiiip -an -nntx ^l7t$/a- l^lfl,t: rll { D(Fctu (I- ,'.T[tl ltllrlo 6 cur\rrtt' ul,la olttt f*rqrljfl! ,.i latlo rc R mtllrl ^ .-rl.- . -[rrrT'lr" .. *'!d{.. tdi r.t. Crllri^ a/t0 To: JoB No. 4 39-8 90 DATE: 8-28-90 TOWN OF VAIL Attn: Mr. Stan Berryman DAtLy REPORT NO. 6L SHEEI 6 DF 10 P.O. Box 100 Vail CO 81658-0i.00 ll'MOlcE No. PRq,EcrA<l<litiontoVai1.fTansl)oTtationCctltcr:,Vail,Co1ora<lo STRUCruRE t_oc^Irorl EEV llo REDIFORCIIIC co[ro{Is !8nca t{ofuzoNra Line B-C, Grid 19-23 Line B-C, Grid 19-23 Line B-C, Grid 19-23 Line B-C, Grid 19-23 Line B{, Grid L9-23 B-C. L9-23 Line Grid Level Lerrel LeVel IeveI Level Level 4-5 4-5 4-5 4-5 4-5 4-5 272 wy+s #4 at L2" O.C.T & B 83 Rcnvs #4 at 8" Ebttcrn 56 Rorps #4 at 12" Top 83 Rcn^is #5 at.7rZrt at 9,, Top 3,/4' Slab Bo1- ster at 36" o.c. l-l4" Wire at 5r2tr at 36" North to South East to West East to West Lap to #4 at 28" East to West A11 Rebar is AFory Coated. spEcuEATK'ilSr SrErL G31DS 60 E n,rrs useo FEDS(nONO CTEAI{U{ES! clean E snop DR rwcs usfD cuAR rcE lllD oofiE As Required E corrnrmn 'torreo sPt ofie sP€c[EArp$s As @uired El ruu--nue (xls€Rv lloN EAn $JPFffinr Tr?G Slab Bolster O P m-IluE otts8r'Ano|l Fll{E}l trfrrcE Oolll'Pt NcExoer 3/4 ffi,ffi #fi,ffie!! ^._ffi,*DWIOI€D R[.D(^YNED Yes PROGRESS REPOKT placsnent of reilforcing steel appears to be irr general conforrnance with the project specifications. Michacl Barber Architecture, COPIES Attn: Mr. Scott Ward; Gary lrlurrain PCL Construction Scrvices, Attn; Mr. Dcnny Arrnouri Anrlerson E llastings; tlRS Consu ltants . Attn : lt{r. Les Chen€Nonhern.inc.C.r-Jt,tr entt*r -i S.L|.,.L REPORT OF ASPHALT PAVEMENT TESTING lt A |l nl,( ttErrcrrtl r cr ftlTl n( Ptlt rrf) dfrlt?t' A! ttfFurtr 'tf suirrnD a! nr co'Dfxrlrf -t'ts'urtY F O(,I (,'fTl' "o a/nrnrL Dl rDi Pr'/ EA- rrrr ci Jl^,,,.xxr. mr€r 11fr.1 (. I xtn11"J: ti m g1 orrro o,n nNriniri-tii.rmr';jGo-o.t ttsrtDt lr?lt(xa- 3 rtll YGI Dc ErarD c lnLl nirlp 6 olft(n! u|.r.:r ('nrt l|ra$arrlrxll , f re|tt.Ilt lo tl l1!l]rl ^,r-n -.. -0@^" d .o.'"'i.- fdi Lo. Clrltt a^o To: tudll oF \ATL JoB No. 4 398 90 DATE 8-28-90 Attn: Mr. Stan Berryman DAtLy REpOfiT NO. 61 SHEEI 7 OF LO75 South Frontage RoadVail C0 81657 u{\otcE NO. PROJEGI Addition to Vail TransDortation center. vail. co] orado SPECIFICATION COMPAC]]ON & }IAIERhL UNl|trll AvBAoE OmE N-PtlcE D€lrsTY (F L50 PfRcAnr (F ilE l'l$0rtlt D€NIIY Cq\EIRttlU{ COttRlrCIm B&B E*Cavatincr IESr WC IPNS f,nf, SE.ECIED AT R ilInr N /\CCm }|CE I|IIH lStll D JO05. TypE llo umgr oF couprsnoN unrls 1 Steel lrlheel, l- Rtb- Tncl<xess or IJFT 2" Bottcrn ber Tire lErPs IUfiE VTEATXI.| 25Oo - 27 50 MJIECR OF PISSES A" fu lESrt€.LGATlol{PAVETTENT UFT ||i.ELE R FEll) DE.|SITY (Pcf) NT'CI.EAR corP GIu{(r) CORE LE}TGIH 0N.) COR€neD uEl.rslTY(Pcf) COREcorflcDotl(n 1 2 3 4 5 Statlon 9+25 Station 8+50 Station 7+30 Station 6+00 Station 5+00 2" Bottsn 2" Bottffr 2" Bottcrn 2" Bottcrn 2" Bottcin 150.0r 150. 0r 150.0r 1qn n+ 150.0r 145 145 L44 144 L44 2 U v tl + 97 97 97 96 vt) a rutL IUE 06fi\rATx)tl E P^trr TU€ 06ERr/ArpN rlE lr.Errff, DtltsouE ER uEnu) N rcO(Rnl€E lllll Asru Dz20 HrruAR c,tlr IAXE Troxler(62) M@E. PREUM|Mf|T O$€FNATIONS AND/OR TESr ni8 iFpoit Firf-!{xrr e$ss rorufi} As A }|f!ar-r of our ttfiJl^rE't q. P^vtltttT tfi|stittrDt llE !l E-EqSD Ol llf, colflnlcTltl ro c m|tf,-mY]€ TllE iro1111.11D crl1.;cnw rrnxr r;;mlc Trr nu6 nnl o(n ocutwr r rpr'ixiimirc--dpi'irliirr- ttsn rI-lr€ u'lllr P vTvotl oltY ls rut\1D,)rrrsrfr ro crr.Er^rt crr r65.rty1r5 Jupqfwm. nsr rur^ rnt urr llf, sflf, nrs r#-6iiiido- rii-*Errir nrr p vrJrrt r urlTs st'rxtrrluc' rrlrc(trr oarl3rY ftrrs trllD r ooHirtu) R:t Irtt utluss @'tRt.l,{tu' lo @E ourtllr:t r'r Dr'iiii lolTriii is-iri ricolt.,{r oont[urp t A rrllrlrJll of xvul !rAID oFIEnNcN|cctrto^l|cEwlmAsIuD2Gr0wrHcoR€coRRE.^T|o}|sPaf(nl@ 3411 B sf,ft L NrllEtx 50-0922 STANU RD Oqr{r 2896 645 RESULTS \ERtlAtLY REPOKIED To: Les Idood PROGRFSS REPORT eaving operators started at 2:30 P.M., North of Souttr Frontage Road, Stations 4+00 to 9+50. ltidrael sarber Architecture, COPIES Attn: l,lr. Scott Ward; Gary Murrian; PCt @nstruction Scrvices, Attn:- Mr. Denny Ar:rrf,ur; Anderson & Itastings; U.R.S.Consultants, Attn: Mr. Les Wood; B. Carr S.L. Pawlak FIELO O6ETI'ER APPROYED BT Chen€Northern. irrc.C. nt|' Ire!-t -ii S.Lrla. REPORT OF ASPHALT PAVEMENT TESTING A.] A ramA. '|$rtfirr to grxB nf tllf rfio GJarlwlr Al ,tfPotrt |,t( ruLTlTD lJ r[ cotrrf,x|l^t-tE'rttry (r 0t'! tlft{tl' l'{) atnf:r'lpl nn P1'l|l-E^- rrrr rf jl^lrrlr.n! c.n cu!l.r,' (n rrt .c,r! tirta o.r Rro^ r,o*r an nrarni,r-iGniio ir-iitlli-cr rrolrrrt A,?ro,a- 3lf,tD lu fr rFctr) (r |.nt n:ttf(l !t arrrl trtD ual.:tt gDtt ri$,rf,I'.lt ra( ,anur lo r t'trt€. ^ ,#,.- d rA.l-ifrftlr-t d o..',Fir- F ti f5. CLl tol {^O TO: Tt[4t{ oF verl JOB NO. 4 398 90 DATE 8-28-90 Attn: Mr. Stan Berrlrnan bruLy REpORT NO. 61 SHEE1 g OF 1075 South Frontaqe Roadvail @ 81657 rr.{volcE No. PR0JEC-[ Addition to Vail TransDortation center. va-il. co]or;rrlo SPECIRCAIION COMPACTION & }TATERIAL ulNluull AwnrcE c(nE H-PucE D€llgTY G 150 ftncElfi oF lHE l,|^)0rt,01 DEI|SITY oortsnt5nil cxxln cKn B&B D<cavatingTest loc^Tpias tvEru so-EcIED AT R^flmr N looffiHllcE ffIx rslu D Jacll TY?€ ltlo NttlB c c0lPrsrnN UNns 1 Steel blheel, THIO$ESS oF tlFI 2' Top 10 - ??6oF- 1 R'bber Rollet t"*n oF p sss As Required IESTt{t !rcArpN PAVE'IE}IT UFT uEn^_"Irxrr oE}.slw(Pcf) ITYEEM Mrqr n FEII) DO|SITY (t cF] NI'CIIAN colP igIxrN(r) @R€ LET'F'H (tN.) cm€ FIELD Do\aSW (Pcr) cfif colPtsDoN(r) 6 I 9 1,0 Station 9+35 Station 8+75 Station 7+50 Station 6+20 Station 5+10 2" rlop 2" Top 2" Top 2" Sop 2" Top 150.0t 150.0r 150.0t 150.0r 150.0r L44.2 L44.1" r44.6 t45.2 145.5 96 96 96 97 97 nis ifFoir pffsrxr3 (x'fit(t6 roftJm As A nEiu-T of, o{rt oRrtli\r^ln{ 6 P vtltxf o(l(lrrflrt E 4^E'lgfo (rt nE cdm{,'lq f) c{HmJLE lf?tt}|r D€ it@ tftrD crt?i6rrrf frnxr u.,Fvtc l}tr rrafr wrtl o.n o*tar1/fi rs r|or'inifmip-o'riu-riirr- I6xt ,,tt-,!lftt 'r rlE P wr.grr C'|!Y a! El[\a tEgfr .loc,l.nArtfrtn:'.Irrr5JUIEI,r,f'|'.rt5rq^r^,&lt('t|l-stx-fr,.s's'rf^tdiiio-cii-;;|';''i.i''t'plwt$rruu;tsg'rxrt^Ir..t.Ht.tfl|ltxJtl'rg.ur r ocr$ffrrr, Rrr^rvt ufluss mnnaAtar lo conf DUrrraJ el nr iii i&irifr, .tiii'iiciiltdcc oonnain r ^I ^ v|lrtr'al 0r l{YrJ' lft^In6 tr ru-L nuE oo6tR1/ArloN fl P^rr nu€ o6Elo/Arxr{ l}E M'CLEAR OOSIIEIER MEITU) OF TESNNG N ICCO'UIAIrE W]H ASIU rH mDoulu rlllll AsIu ozTm DzS{r wnu coR[ coRnfl.ATlo]|s PERFOfU'ED sEnu|. NtArm 50-0922 sr l{D^to cflr{r VERBAIIY REPORTED TO: NLrcLrrR c rr urxE Troxler(62) MOo- 3411 B PREUMTI{^fTT ONEFUATIONS N{D/OR TES'r RESULTS 2896 645 PRoGR€ss REPOKT rhe initial and firlal lifts were ccrrpleLed today' l{ictrael Barber ArchitesLure, COPIES Attrr: Mr. Scott Ward; Gary Murrian; PCL @nstruction Services, Attn:- I{r. Denny Anrpuri Anderson & Hastings; U.R.S.Consultants, Attn: NIr. Les Wood; B. Cag S.L. Pawlak RE1D OOSErI1/ER APPRCIVED Ff ChenONorthcrn.hrc crr lii ttlh-r olt Sd-llr REPORT OF CONCRETE PI-ACEMENT OBSERVATIONS a.r A ||rn,|t lErrEtrr D qrxll lli tti: ltrl o.L?:lwl al rft€'n:t atlf, tFrrlm al nt: oortlltn t-fit(rrrTY 6 (tr dlt'ra |'o rmBit^tD{ mi a'r't^- rpi t 3rarnrlrE srqrrDrr qr rrri.ant mrrr cr itq io.€ qr rurrrfr-n-i:irvir- -nriiip -crri nnrrrx rrrn<rr'|l' 3{.'1rr rrr E rt'qro c rtrr lE t}€ B toaat.trE rrarl oflIt ,lrtrorrall A|t raiaID llt ta lnnln, a .i.ir.- r -fFtti]rt i ...rr--. 7n r.a CItl l{a .|/|O TO: 'p91v1,'1 Ot: VAIL JoB NO.4 398 90 DATE g-2g-go Attn : Mr, Stan llcrryrnan t175 south Frontage Road DAJLY REPORT NO' 61 sHEEr 9 OF 10 vail co 81657 lN\olcE No. PRqrECf Addi.tion to Vail J ran sl)ort at i.on Ccntcr., V:ri. l. -Co'[or:ado. WesternsPPm uobil.e SPESEATPTTS: gltlUP 3"-5" llB LD. C 4500 rftt coiIIE{r 7Z Aug ArIUO{T IDIP€R^IUR€ R^}IG€60" - 90" lESr Mt rf,rrcr]{L lp(Er lt(t lruE OAICHE) TIUE AREVTD llu€ srrtPtID FA.OUTIENqX,}{TER &!ltl REVOIJ,TFTI @UNTER @UPI.ETION clrElc Y Gto4D/ CUUUI,AIITIE w IEn ADOO o^uolrs 1 2 3 4 5 6 I 7L7 27 L2 49 150 100 27 L852 1854 1855 1857 1859' 1_851 1864 6237 6:56 7 zO2 7:30 7 246 8: 01 8227 7:A2 7 zIO 7 225 7:45 7:5B B: 16 8: 33 7:15 7258 8t25 As Req As Req As Req As Req As Req As Req As Req As Req As Req As Req As Req As Req As Req As Req 6 16 24 32 40 48 56 L0 0 0 0 0 0 lErlfL slul? (H.) ta @I{TE.|T(, TET UNTT WoaHT (Fcr) xa.o @t'tcREtE TETPE- R^N,NE cr) RIIIARI€ 1 4 6 6 5\ 4 7.0 7.2 7.0 69 7l 70 Sarple taken at truck. Sanple taken at truck. Sanple taken at hose. PROGRESS REPOFT 4 qgl5nders cast on Test *4. Tfue obsenred on all truct<s. ...rorFc Michae1 lJarbc r nrcllitccturc; AnrJcrson C I las tirrgs ; Gary Murrairr PCL Construction Scrviccs; URS Consultants; B. Carr S.t. pawlak REI.O OT}SETUER APPROVED BT TO: 1'9h1;'t 0l: VAI l, Attn: Mr, Stan llcrryman 75 South Frontage Road Vail CO 81.657 PROTECT Ad(lition to V:ril 'l'rarr JOB NO. 4 39s 90 OALY REPOKT NO. tN/olcE No. V;ri. 1. (lololatlo. DATE 8-28-90 6l- sHEEno oF 10 Ttati on Cclr tc r SPE|FEATPTI$ SJIP lr0( LD. c 4500 /A{t cot{IE{I 78 Aug AAI}TT TEIPfIATURE R^}IC€ As Req. As Req. As Req. As Req. PROGRESS REPORT rine obssrzed on al1 truclcs- B. Carr 5.L, PawLak REu) OBSER/ER APPROVED FY ^^DrFe Mi chac I llarbcr Arclti tccturc I Andcrson {i llastings i Gary Murrain . PCL Constructiotr Scrvlccs; UltS Consultants; Chen€Nonhern.lnc Cdir(}|' t rgfFr di s.ant.{. REPORT OF CONCRETE PI-ACEMENT OBSERV.ATIONS ffi{ 'tnE lr.r (|jlr?rlTr Ar r!rrg1_"1 ^nf urpp ar nr: o('{t rfll,rfirrrrv d. dr cr fr|:t A,.o arno.r tDr fr! nf-EA- 'D.g3^1f|.1''loo.qrE'.'crrrTircltT'r(tf(!ltor.\f.[or,ranifr.d-ir.inio..lrjii6-c*rwtltx..fu,.r.3lr'llJ'|LfiEf,o'D(rlr'IIlEl'}€ltoortrrfrt tt1tl olflt rnxrrr|lt L r4iftt Io x tllllo' a'r-n - J r.l-fffXlr.r t' riFb t-i tb CIIll4l 4,/- Chen€Northern.Irrc.Cor'urilr|o trglrb-. oc, sd-'tht, REPORT OF CONSTRUCTION ACTIVITIES a3 A r|,ru|. ml'ncmx m ctfxrs. nf ntlt l,f, qttFlw:! ^lr itt{lni |,re surtnrD as lllli cot'rlFll|l J'Fwrrr ('. (|f rtrrt' x'o rD(luarDN Ftt FT g- rrr., .'. ,,^rrrs, orr.€1r,!trr5 (r rxrr crr rpGr fr FFrqi.{r oul arrvin-r.i-rr.igvi-l rtrru'Hq orn xntnx Hiix- tiFt'E tlu E mFqb d lrru lutlo 6 cqrirrtii rxi'-sr <ntr-r eawqrlrs ,te letrrl lo lt tnlllo- ^ 'n-n - .r r,.[irrr i-lr-. .. G..'lar- rd' t ta.. C|.lOl 4/tO T0: TOWN OF VAIL JOB NO. 4 399 9q DATE: 8-29-90 Attn: Itlr. Stan Bcrryman DAtLy REPORT NO. 62 SHEEI 1 OF 675 South Frontagc Raadvail c0 81657 fiwolcE No. PRoJEct Addition to Vail Transportation Center, Vail, Colorado wFATHER CONOmoNS AND TEMPERATRE Clear 80oF. CHEN-NORIHERN15 Sm ACI1\411ES zul1-tirle Inspection, Testing and Observation: Concete being placed for topping crossover ra$p frcrn I-€ve1 4' Bcisting Structure, Line B-B9, Grid :-9-.5-23 ana toppiir!, Level 4, Ljne Bi-C, Grid L1-l-3. Total pour was LB2L yd n*"i-ty testing of structiiiaf iiff being placed for slab-on-grade' Lerz.el l,_Line B{' Grid 33-36, Nelr Structure. Reilforcing-steel being placed for retainilg uall, Stair No. 11, sotrth of A-Line at L,ine 14 and-rebar for retaininq wall, east side of Stair No. 10. East core waII for elevator, Level One at Stair I{o. l-2, and inspection of 4x4 wire nesh over 2 3/4 ctair, I-evels 2 and 3, New Stf,ucbLre- VERML COMMUNICATION WTIH CONTMCTOR, ENGINEER. ARCIITECT' OWNER B. Carr. S.L. Pawlak RE.D OBSEIII/ER APPROVED FT lvlichae I Bartrcr Architccture ,COPIES Attn: Mr. Scott l{ard;Gary l'lurrail PCL Constructiolr Services, Attn: Mr. Denny Armour: Anderson fi Ilastirtgs; ijnlC-ciri s,, t tiir t i, n t t rr : Mr.-!gi- ltr99-4 Chen*Nortlrcrn,lnc A.-Jtt{ t relEt -i S6Lii,.t REPORT OF REINFORCING STEEL OBSERVATION ^t A rrmLitnc'oa to alrxll. nr FtE rro dlfltrl a[ lltctltt |,rt llrttnfD ^t nf cor.r.rn't lnrfrrt sl c(t crE|{l:L lro Arnullz ]br ft'l l't|l.E - rrr. o' statttfrcr, qrcflrrr6 ql rxtlrcrt rr.r.r (n ruo^f,r.r a.r x:lqrr-n -nrr^]i"o xirlrp a.lt rrurtx rr'lnln- Sltru:t rll D( ocFdlt! of rtrll lErtrq a oortrnD trrlra o|tlt ,*rqllxlr l t ,orfu, lo H lfilr€, ^ ii.rt'., ..[-gf lr.., a'roir.. fdn tb Cla 116^ |4O TO: TOWN OF VAILAttn: Mr. Stan Berryman75 South Frontaqe RoadVail C0 81657 PRGJECf Addition to Vall Transport:rtion Centcr, JOB NO. 4 39_B 90 OAILY REPOKT NO. ItwotcE No. Vai i, Col orado DATE: g-29-90 62 SHEET 2 OF STRUCTURE Retaining Wall rccAn$l a-Ev ltot{ RED{FORO'.IC cor0rors vgncAL l.roRtzoa{ra Stair No. 1"1 Stair No. 1,1 Stair No. 11 Ievel 2 Ie\rel 2 LeVel 2 40 #5 @ B"O.C. 20 #5 0 18"O.C 6 #4 @ 18"o.c. 7 #4 @ L6"O.C. 10 #4 @16"o.c. 6#4MKe 3O<16 dtt[s. Inside l"lat Ortside Face sPECnCArXils: SrE- GMrE 60 ts nerc usO FEINr(nc c cl,I^l,lt-D{€s* Clean El sttop DR Utt{cs usED ct.E RAtlCE Ar{D @t/Eft AS Required El corrnrtOn rrnaseo sptjcuo3 spEcErc Txl{& As Required El rur-lue oosEnl/ nol{ BAR srpFoRr* TtpE #3 Bar D prrr-nue ocsEnlr lloN Flt{EH ll9tiACE CflAriAllCEffrnr ffi,ffift Hmif; o._ffi,,_ Oq$T€D RE-E(^THO No Yes 8-30-90 PROGRESS REPORT L2" wall to have double rnat. Outs-ide nat not iJlstalled at tttis time. Michael Barber Architecture, COPIES Attn: Mr. Scott Ward: Gary Murrain PCL Construction Services, Atttt; trtr, Dcnny Annourl Anderson G llastings; URS Consultonts. nttn: Mr. l,cs WoodI B. Carr S.L, Pawlak RELD OBSEf{!ER APPROVED FT To: 1g1y1,1 or; VAIL JoB No. 4 398 90 DATE: g-2g-go Attn: Mr. Stan Bcrryman 7s south Frontage Road DAILY REPORT No' 62 sHEEr 3 0F 6 Vail CO 81657 tln/orcE No. PEqrECf Atl<liti.on to V;ril '['Ta rr sl)or-t lt i. on Ccrrtcr, Vai. l. Colorn<lo. WesternsuPPUEn lUobile SPECFEAITOIIS sllruP lurx r.o. c 4500 rn @ IE{r 7Z Atrg ATdO{I TEIPER^TURE R^}|G€ 60" - 9OOF. TE;T }|(t ln crtn IIC,€T ix). It!E SATGIE nrE ARfil/ED Tllr€ SATPIID nftounF @U}fTER BESN RftOUtTnCtcoutnm couPrEnoN ;UIIC Ylffivt,{'/ CUIIUU\Yrv€ w lER ADOS) o u.or,6 1 2 3 4 5 6 54 27 L2 106 46 r.50 54 L889 L892 1893 t-894 1895 . 1896 L897 6:38 6:57 7:06 7: 18 7 227 7:36 7:53 6: 51 7:05 7220 7r43 7:53 8:00 8: LB 7 zl5 7: 58 As Req As Reg As Req As Req As Req As Req As Req As Req As Req As Req As Req As Req As Req As Req I 16 24 32 40 4B 56 L0 2L I at 0 0 13 1E5r l,IL stlrP(sr)AnooilrE{t(r) TET UMTrrF{r(Pcf) YTID coNcftnE IEIPE- RArLntr cr) REL fo(s 2 4 s4 4lz 4\5.4 70 71 5! slurp at truck, 4L slutp at ded<. Sarple taken frcrn trancl<. 4 cylinders cast. - PROGRESS REFORT trucks.Les Wood advised of 5+ slunnc. Michael Barbcr Archi tccturc I Andcrson $ llastings; Gary Murr;rin PCL Cotlstruction Serv-lces; URS Consultants; B. Carr S.L. pawlak RELD OBSETUER APPfiOVED FT ClrcnONorthern.lnc C. {rtr E||lr-r dt{ Sd-arJ. REPORT OF CONCRETE PI-ACEMENT OB5ERVATIONS ar a [mJ( ?it G : Io ctt'ltt ll{ Ftnt l|at o(rtlrtt, al 'rrtt'irt r|r( fl!.Trfn at ni: oDtrrttlTl^l-t'tr(fintY (r c|[ d tx't' |,l) Amrfi tDl ml |tf,-E - rxr. a. 3' rr|f,xrl oelrrrr! G rffi.G|:! rr(x ci |[o ir,.€ c.r "tnqrfr-d^iJ1nio -rriiio -qn rrtltrx rrfnor,]- .'i/rrtt(tt xrl DC oEFcttD o- x-r[r rtll]F 6 oo..rtflrt ultttr qt}|ll rau.-r.xtl ,ia rfiL lo ll tElLq ^ ..r* , r'.[iiii]-ltr.t rf ...ttrr- tc |.. (tall{ ..4O To: T9$r* orr vAIL JoB No.4 398 90 DATE 8-29-90Attr: Mr. Stan l3errynan 75 south Frontaqe Road DAILY REPOKT No' 62 sHEEr 4 cF 6 Vail C0 81657 hvotcE No. ElqfECf A(l(liti on to Vail 'l'T:ur sl)ott a t i.on Ccutcr'. Vai 1. Colo-r'atlo. Western$m uorrile SFEFIATp$S SU,UP r.B r.D. c 4500 An co{rEXI 7eo Aug ATSE{I TDTPERA]URE R |lC€ f'OO - qnOF TETt$.muq(t{L 1lo€r Mt nuE EArCHg) IIUE lnnwtD llvlE s$aP|"ED RE1oU,IX'tt@urfia EOIN RE\OI.ttnoa.l @UNIER @uPrEIlo|l :UBIC YAGvt.D/ ct UUUtrvt WAIER AOD@qAuDts 8 I 10 11 I2 1.3 74 27 114 72 49 106 46 114 "1899 1900 1901 1904 1905' 1906 1910 8;11 8 :19 8t26 8;52 8:56 9:02 9:28 8:27 8:56 8:55 9; L0 9;15 9.J.7 9 243 9; 15 As Req. As Req. As Req. As Req. As Req, As Req. As Req. As Req. As Req. As Req, As Req. As Req, As Req. As Req. 64 72 80 8B 96 104 172 8 0 0 +10 +5 6 4 rEsrt{L slut?(Dr)^nOONIEfi(r) YET UN'T UEOHT (Pcr) YIEI) @ircREtE IETFE- R^runf cr) Rg!c&(s 1,1 5 6,9 Sample taken fron hose, -- PROGRESS REFORT ^.rDrFe Michac I llarbcr Archi tccturc I Antlcrsolt li llastings i Gary Murlain PCL Constmction Scrviccs; URS Consultants; D .-^n, S. L. PawlakFfrb-dd$Em/tR APPfllwg)-ar-- Chen0Northern.lnc Cdflrt}tt trEh-r ai sd-al{t REPORT OF CONCRETE PL"ACEMENT OBSERVATIONS at ^ Lrn|.| linEE Er clttat!. flf nilt lrfl {t-a trt al lrowrri ATt lr"rtD ar n- c0tltlt|Tnr--rf,"rmrl d (trr cr f"ta llro AmflitrArxx Foi |t'|r|r'_ rg. (z 3ra11rxr\ orr€l6 ! q D r1ecnt ta1x (r lqo4ir€ al mnofr*c-irr-nb' nrib*-otn trulltx ltt'Fgva- :trL,t r! rtt E otF(IltD 0,- ,|/'fl rttl€ B @al.trrlD tJ...|tr glttt lt;a-raraft ,rt l6al,o rt r lr|t[. A 'rri.,- r r'.lJ:ttii-| lrr , .-rrr't- '. ; h Crtl l,.. .rO To: 1g1y11 or: v^t LAttn: Mr. Stan Bcrryrnarr 75 South Frontaqe RoadVail C0 81657 JOB NO.4 398 90 DAILY REPORT NO. $NOICE NO. Vai I . Color:ado. DAIE 8-29-90 62 SHEEI5 0F PR(}JECI Adtliti on to Vai I 'l'Tan sl)ort;r t i. on Ccntcr'. WesternlPnE Mobi1e SPEFTAIP}II: SLUUP lrD( Lo. c 4500 An co$IE}IT 7% Aug AIIIRIT ]EIPERAIURE R^IIGE 600 - gooF. TE;Tl{L rnuc|( ML IrcXET l.(l. IIIIE E ICHq' lIUE ARNflED TII|€ s l|PtfD RA,O(-t,IXlll @UNTER EAN Rf-loLrlbat @ul.rEn @IIPLEIIO}I ;UIrc YIGLuo/ cuuut^ln/E w lB rDDg) o ura.rs 15 16 L7 18 19 20 27 49 7L7 54 106 100 48 1,17 79L2 1914 7977 1919 1920' 7927 7924 1,0:02 10:28 11 ;10 77:.32 LL:34 77:37 1,2:72 10:16 LO:43 17 t,23 11 :36 1L :45 17:47 12;1"7 1 0 :32 :5017 As Req As Req As Req As Req As Req As Req As Req As Req As Req As Req As Req As Req As Req As Req 119 L25 131 737 L43 1,49 155 0 +4 0 0 0 0 0 IETMI sLljt? 0n)^nO(}{IE{T(r) IET UN'T wEolfl(Pcf)\'raD ooNcnriE TEIFE- RAN'RE cr) IrEr to(s 15 21, \Lq 4\ 6.8 7,2 72 73 Sarnple taken at truck Sarnple taken at truck 4 cylinders cast PROGRESS REPORT Truck No. L06 was delayed in placing concrete due to down time on punp. ^nDlre Michacl llarbcr Architccturc I Andcrson G llastiugs; Gary Murrain PCL Constructiotr Services; URS Consultants; B. Carr S.L. Pawlak Hq.O OSSEM/ER APPRWED FY ChcnONorthern.lnc.Cdrru{ [trth.-r ti S#Jd| REPORT OF CONCRETE PI.ACEMENT OBSERVATIONS Ar a rrrttA aptrE1Da nt clrxtr, t( ntr E Aro o(r!1w:. Al rrF(finr .,rf, t(-t[rD 11 nr cgrr{l!!!!- t'i{FttY (r crti ct fxri' ao a'nrE^rlt{ foi ?illra- rE or tgratrrrlxtl otqtE 'r cr rrtnctt fir, (t aror^rF q'r mnirfr'd^fri'nil'rriSiri-q'r -rrntrx ,rriola- 3^r''t tt vrt. r DttdD tr' rrttl lE Tr€ E cD..?urrD ul.llr oDr, ,*alraxrt r|t rolr'D ro t! twllE a i!-r.- J r,.[ilif f--l r- d ...ir-r tc rb Crat t,|| VaO Chen0Nofthern.lnc Cmdl,r|| E rf!t'-r rti 9<r-lr.' REPORT OF CONCRETE PUCEMENT OBSERVATIONS at A |lrnA tFfttrul ro rtDfl!' r't n|tt |'f' dllll,rr' al iftntnt x!( lrntrrn a! nt corTr"fir'l--r'c(firrt tf o'l crfxl! lro a'nbfcllD' l[ n'i-EA-' rur o. lratrvxtr oorr rr.r qr ncr).crt rrrr rn rfo rp€ o.a mx]6'o-nrinio' rriiid-on-rrurlrx ,rrtovA- S''|lr"llJ rrl tE EFgrD c'- rfTn lEm€ ll ctr tftD lrart oltlt ad,oaxl| l a raf,rD lo tl l'tfn6' A 'rlttlr J rt I Xltl-Ir." oa errrrrl f6r b crall.. rFo To: 1gp11 orr vAI LAttn: Mr. Stan Bcrryman 75 Slouth Frontaqe RoadVail CO 81657 PROrECT A<ltliti.on to Vai l Tr:rn spor.ttt i.orr JOB NO. 4 S9s 90 DAjLY REPORT NO. [,tvtctcE No. . Col oratlo. DATE 8-29-90 62 SHEET 6 OF Ccntcr'. Vai l westernrylq r4obire sP€crEATI)N& St l,UP lltx LD. C 4500 An @r{1p{I 7eo Avg AIEE{T TA|Pf-RAIURE R^ttlCE 600 - gooF. TEIIr€.TRUCI(t{L ICI(ET M'.IU€ SATC|{A) TIUE ARnwE Trr€ s !Pt@ RA,OUtr|o}l @IJIITER EOIN R6.OurIlOa,l @{,t{rER @UPI.EIPN ;ulrc Y ffi L(110/ cuuuL/\lTvE w lB ^DO@c^u.ofis 22 23 24 25 26 49 44 -100 L77 7L4 7925 L925 1930 193i. 72:i1.5 1:13 7t25 1 :30 7:20 l. :35 '1,:46 As Req As Req As Req As Req As Req As Req As Req As Req As Req As Req L6L 767 LIJ L79 181 +5 5 10 TESTtn su[? 0tr) AN OOITT}|[(r) Hfr ulrn WEFHT (Pcr) Yra.D CONCf,EIE TEap€- RATUff cr) RElrAfUtS PROGRESS RTFOKT Time obseTved on all trucks. nn'* Michacl" Ilarber Architccture; Andcrson G llastings; Gary Murrain PCL Construction Scrviccs; URS Consultants; Chcn€Northenr.lnc.Con.t Ung Lnglr*. .td sdi,(r.(, REPORT OF CONSTRUCTION ACTIVITIES AS A |{'n|^t riotlfrtt Io crnfi I|r: n.nE A|Qarl,ELwS, At tttrlllf r€ Sqtratrn A9 nr erFrTlrn.l---fFEt-tY It rltl dfE3. r{t atTlfllltlt{ rt xnnA- rr ft tmrtxrs' crq.lr:tut! .n trnucr! tro'l oll f'wnt€ utr ntfqiri-finn'rrnu mituilo otn imnx ifirr- slJtu:r rtu tE o6r'c!t ltrll lullo 6 crtrtlftD u{r5s tnt.l rai|r€tt{,|Tt ,'rt ,4tlIJ lo lr fFllrrq. ^ 'n-.r- , s.[irlti-lr-. o. o.art - fdi }|.. clttoz^ 'llao TO: TOWN OF VAIL JOB NO- 4 398 90 DATE: 8-30-90 Attn: It'lr. Stan Bcrryman DAtLy REpOFf NO. 63 SHEE; 1 OF 675 South Frontagc lloadVail co s16s7 lNVolcE No. pRo,tEcT Additiorr to Vail 'fxansportati. ori Ccntcr, Vai 1, Colorado WEATHER CoNDmoNs AND TEMPERATURE Partly Cloudy, 40oF.; Clear, 70oF. CONTRACTOR'S CONSTRUCNON ACIMNES PtNSONNEI.: ITA'OR EOUIPMENT: ACTMNES CHSI-NORTHEUT'S SITE ACTMTIES Full-tine Testing, Observation and Inspection; B-C, Grid 33-36, core wall, Stair No. fill being placed No. 10 and new Park- 4:00 A,M. Concrete being plgced for topping, Levels 2 and 3, Line New Structure, total 118 ydr. Reinforcing steel being placed for !2 and retaining wall, Stair No. 11. Density tests on structural for slab-on-grade, New Structure and backfill, west side of Stair ing ranp walls. VERBAL COMMUNICAT]ON WTTH CONTRACTOR, ENGINEER. ARCHIIECT' OWNER l,lichac I Barber Arcltitcctttrc,COPIES Attn: Mr. Scott Ward;fin1y Murr.ail PCL Construction Services, Attn: Mr. Dcnny Arrnour: Attderson & llas-tings; .. tlRS Consrll tallts, Attn: Mr'" l,cs l,1lood I B. Carr S.L. Pawlak lns-D oBsEnMER APPRovED Ft Chen€Norrhern.lnq C..dUn{ tnfrrrt -a S.lt!ar.i, REPORT OF FIELD NUCLEAR DENSITY TESTING as A l^mrat Poftclx l to qfxTl' rra Ft'|tE lro ttlnvr'!' llL Rtr(nrE Ft Suunrn al rr corDflrtF{-tt'r'rnrY (f ol! G-l lfxrl art amoQlmd rrt FnE - irfi o. sr^r,,rxn (xn€ rrrr6 qr rfir.{rt rl(rr cn arqrnr"ro c'n "rrtiE diiirii.o -nxip -qn itnut rrriorl- s'^rf\-IJ ru sE rlFat (r lrrll TBrr€ 6 oo.rt.tltD ur|.ul gnu rfrrqr{r{rt lff loitlo lo lt{ lwnrxl a 'ir-'r.- d trl lill{ le..r .f FFrb t-'n r|r c|tldt a./tt TO: TowN 0F VAIL JOB NO. 4 398 90 DATE: 8-30-90 Attn: Mr. Stan Bcrryman D tLy REpOF11 NO. 63 SHEE12 OF675 South Frontage RoadVail CO, 81657 ltwotcE No. PRGJEGT Additi on to Vail Transportati.on Ccnter, Vail, Color;rdo SPECIRCATIOH COUPACTION & MAIERLAL MINIMUM REQUIRED IN-PI-ACE DENSTrY 95 X AS DEIERMINED Sf: ASTI\4 D-1557 CONSIRUCIION CONTMCIOR: BGB Excavating TEST LOCATIONS WERE SFl FCTED Bf: Chen.Northern TYPE A}ID NUMBER TYPE AI..ID NUMEER METHOD OF ADDING OF EARTH MOVING UNNS OF COMPACTION UN'TS MOIS;TURE Natural 3 Junping Jacks a 2 Front Loaders, 1 D-8^^*IHICKNESS OF UFTAs Required Dual wheel Rollers, 'otiuMBER oF PAssEsAs Required *BSG=Be1ow Subgrade LOCAT]ON DEPTH OR ELEVATION (FEEr') IABORATOMT RELD F$ICEXT OF (REt In€,/ lr^xur(lr) osr rd SOIL T]?E rE)l NO.IO\XIMUM DFT DLNSTTY (pcf) OP.r.|MUM MOISTURE CONlENT(/) DFNT DENSTY (pct) MOISTURE CONTENT(x) 73 74 27 2 2 275 276 Line 82 @ Grid 33,2 Line 82 @ Grid 55 Line A0.5 G Grid 35.5 Line A0.4 @ Grid 35 Line A0.9 @ Grid 54 4I BSG* 1r BSG Subgradt Subgrade Subgrade 0 0 136 136 136 156 136 0 0 0 5.9 5.9 5,9 5.9 5.9 0 I 6 4 r32 t42 1,32 L32 732 6.8 6.4 6.2 6.0 6.1 97 97 97 97 97 Slightly Silty Gra- velly Sand 51 . Silty GravellySand 51 . Silty GravellySand Sl . Silty GravellySand S1. Silty Gravel l"ySand ts R,,tL TIME OBSEF/ATION tr PART IME OBSEFMAT]ON nrs ifFl'lT Piftxllt Pl{D6 trt{D rt A f,Nrtl tr (trn miln A|tttt (r Ftl PtA:flrfNT' rt ltA\tr trfl|fD,Clll-nlr c(ltrFA:'1n m ofruu( lptanl}|(l Ir|: ifrara|}ml! c(r,FAc't|\( ttnFt ^,ru r{ntq ro trr,l. ot.rnro ne r,rrs *rtrr'oh'iiriiiin c-"<n rrrrwuo rrvnetnrs lF-sls '{!q !'ADf t rf nl o'aY ls q.Lfyu, lrlorJsak, ro c,{Eurf qn o.Et rvtr,f, Jurjoortxr. rtsr rxrr tr Tfr 'll'i tI; o s6 rqt of ir{xtrs ctr mlrlltiJt l}tf nLt utl]s srtorralp'd' THE NIJCI-E R Do|.SoUEIIX UEnm Of rEnttc w s usfD rN suE'r t{lul ^c@RD }lCE WIIH ASIU 02992 AND trrol7 PRzuMIMRf OBSETVAIIONS N.lolOR TESr RESULIS VERIIALIY REPORIED TOr Les Wood PROGRESS REPORT Tests were performed on the structural filt being pl"aced for slabaon-.grade, new section and backfill at walls, west end. coprEs xilli"'*11'3:l.t'filili'*"", Anderson G llastings ; l'lr. Gary l"lur"lan; PCL Construct ion , - Attn : - -l''lr. - Dcnny Arntour ; tlllS Consultflnts, Atttl: Mr. Les woo(j; Chcn€Nonlrcnt.lnc.C..-ruoa fn*xr .{ W REPORT OF FIELD NUCLEAR DENSIfi TESTING Ar A nn4 tturgttn to atrlt 1lf AID ,r d. t'r1* 4r -qtYor- rrit lri.trm rr lr tUrirrmtt-firr.ftnt ff qt q nfia I{' Amgr& Dl loi rrt"E F rri q !,^nrrrnr urerrxr. .'r rrrr/,cr. ,trlr o.t ,on/qr.e a5 ntrufr- u*irini'u"niilir-crr rtttrx'-Friidid rrrnr5 utr t( lrt'I'D (t trnt lunlo tr cuftl |l! urltt clltl tErrrl.lllltr , f ,guru lu tl lntll|(I ^ ,r,* ., r-fjiil y-r l. .,irGri - ., -.-.-. a ti TO: TOWN OF yAIL Jos No. 4 39.8 90 DATE 8-.50*90 Attil: l.lr. Stan Berrynan DAtLy REPORT NO. 6g SHEEr g OF6P.O. Box 100 Vail Co 81658-0100 1NVO1CE NO. PR(ITECf Addition to Vail Transportati'on Center, Vai'l , Colorado lESr NO- *BSG=Below Subgrade LOCANON DEPTH OR Hs/ANON (FEFr) TABORATORT FrEr-o PERCO{I Of (n€urFG,./ MAXIItl|) ot'IA0r€D SOIL TYPEIJAXIMUMDff OENSITY (pcr) OP'NMUM MOISTURE CONTENT(x) DKY OENSTTY (pc{) MOISTURE CONTENT(r) 277 278 279 Line A2 0 4t West Ramp Wall LineA@15tWest Grid.1 LineBe6fWest Ramp Wall of 6 | BSG* 2I BSG 4I BSG 136. 0 136.0 136.0 5.9 5.9 5.9 130 1 L31 .4 L37,0 '7i 7,0 7.2 96 97 97 Slightly Silty Gra- velly Sand S1. $ilty GravellySand S1. Silty Gra.vellySand Michael Barber Architccture, COPIES Attn: l'lr. Scott Ward; furderson 6 Hastings; ttlr. Gary }lurrr-an; PCL ConstTuction, Attn: Mr. Denny Armour; URS Constr ltants . Attn i Mr. Les llrood ; B. Car{ S.L. Pawlak RELD OIISER'yER APPROVED gt' CheneNorthern.lnc.C.i.rrl0lt t t!h-r a{ s.i-t & REPORT OF CONCRETE PI-,ACEMENT OBSERVATIONS ffi ,.fa r0' q,.ttwL 4r E'qE rr,. t'.rtm ar nt co'.,rrrur,''"'"rf d crn ct ft'll\ ,,o a,''*rcArDl t.' '''"EA-ttt rr tattlrtlrl' (nrQlult! ot rrlt\ct3 trrrr (rr ifoltt€ a'r nnnrii'd-ffiffD';;ili+6-il rerrrx'rrrioau siulr rl wrr E cFcrD tr'rrnr lerrro E (D'r-rI6 ua.at qt|tl l|fl,-llrJtf llr ldllD lo x lnlt},o. ^ iirr.- ., r..{EiiTlr..r .. t rt-r- Li t ClIt l{ r./ao To: lghrt\t oF vAI LAttn: Mr. Stan llerryman 75 Soutl Frontage RoadVail C0 81657 PR(NECT Adrli ti.on to Vai I Trnn sport;rt i. on Ccrr tcr, JOB NO. 4 398 90 DAJLY REPORT NO. lln/OrcE NO. Vai1, Colola<lo. DATE 8-30-90 6s sHEEr 4 0F, 6 western SPIDTEATnNS: SUrllP str-srr An cotflE{r 7% FvE AISE}IT IEIPER^TURErvhh.i ln lllx LD. C 4500 RAl.lCiE 600 -. 900F. TEST rF.Tnrcl(l{r TIOGT l,lo. IIIIE BAICHET 'nuE Af,fiVED IIUE SAIPIED Rf\,OlllrFil co{JrrB IFOOI REVOT-UIE$I @UIITER oouPr.EIror{ x,Irc YAm toAD/ CUUUI.AIII/E w rER ^Do€Do uchas 1 2 5 4 5 6 7 54 119 100 49 7L7 L74 54 1937 '1938 L959 1940 1941 1942 1943 3:42 Nti 4:02 AM 4:10 AIvl 4:27 Ptrl 4:31 Alvl 4:42 Ntl 4:52 AM 3:50 Alrl 4;10 Al't 4:25 l,l4 4;40 AM 4:43 AII 4:50 AItl 5;00 Al"l 4tZO 4:50 5:20 Atl AI\'l AM As Req. As Req. As Beg, As Req, As Req, As Req. As Req, As Req. As Req. As Req, As Req. As Req, As Req. As Req. 8 16 24 32 40 4B 56 5 15 15 8 30+ 6 6 1EST UL surr?(ur)An o(}{rE{r(r) UgT UNTT wEar{r (Pcf) tltu)coNcRgIE IElrPE- RAN'RE cr) Rf)uro€ z 5 6 4 8 59a 6.2 6.9 139,8 1.59.6 70 72 Concrete was rejected. The slwnp was in excess of 8rr tiue to the driver leaving watet on. 4 cylinders cast PROCRESS REF0RT 118 yd pour started at 4:00 A.M,, cornpleted at 10;00 A.M. One hour delay at 7:00 -.8:00 A.M. due to down tirne for punp. aoptFs Michael llarber Archi tecture; Anderson 6 llastings; GarY Murrain PCL Construction Serviccs; URS Consultants; Chen0Northern.lnc.C.ardlrof t rth.rt -rl Sarnar.L REPORT OF CONCRETE PI.ACEMENT OBSERVATIONS at A lllnr{' ?DfIErDa to artxll fti |rnE t,ft Gttrvrl ,lI trt(trxt |llf lt-trrm at lrt: @tfrr'xrtar- tFo|'frtY (F trrr d rrtl r'o T totr@rrDx loi n,llra- rn .. srlrrrt.rl o.,ilr,D.n G rrtrrcr! r ra {,. [ql]Frc c,r mniij'd^iiliiD'-Frrcrt-c,i iwtnx rlnov,'r- $lt'lrt tu E D(]clrD t'rml ?E rr*t E oqFtIjE tArt qflat ,iflrarrrr.tt na x'ltt fo ra lfitlc ^ irr.- d r.[ lttfl-lr-t .a .rrr.*. t6 t|. Crallaa afo TOr 1gp1 0rr VArL JOB NO.4 39s 90. DATE 8-30-90 Attn : Mr. Stan llcrryrnan 75 South lYontage Road DAILY REPORT NO' 63 sHEEf 5 0F 6 Vail CO 8t657 [,ftotcE NO. qEqrECT Ad(li t i on to Vai. I 'fTarrsl)ortati.on Ccntcr' , V;ri 1 . Col orarlo . V\lestern sfEcrE^rx)tl! suruP lllx l.D. '- rd ( nn 3rt_5rl ln @NIEt{t 7 e" \ug rTAE T TEIP€R TURE RANCEM,-J-j'l 600 * gooF. lEt MT nwxt{L lrcr€T !ro. nu€ EAICHE) Ill/E ARNryED llr€s ltPt@ Rfl/oLfTIn{ @UNTAEItr{ RE\OUJITO$I c(x[ITER @trPt gtKt SUEC YAG.DD/ CUUULAIN€ w^lrn ADo@ c LLoi{s 8 9 10 11 1,2 15 L4 119 100 777 49 114 54 119 7944 1945 7946 7947 1948 ' -1949 1950 5;03 AM 5:25 AII 5:36 AM 5;43 AM 6:14 AM 6:36 AM 6:58 AM 5:15 Al,{ 5;40 AM 5;50 AM 5;58 AM 6:30 AItl 6:50 AM 7;10 AM 7:45 Alvl As Req, As Req. As Req, As Req. As Req. As Req. As Req. As Req.. {s Req. [s Req. As Req, As Req, As Req. As Req, 64 64 72 80 88 96 .104 5 0 11 , 10 6 IESTxt s!l?(ur)^no('{rtxl(D w€r ufin WEAHT(Pcf)YIAD coifcfiEtE TEiIPE- RAIL'RE c4 nEu^fd(s 72 74 7.4 135.8 7L Oyertime limit exceeded, Balance of load.Teturned due to doun tine on punp at 4l yd. Balance of concrete at 31 yd, was te-jected, Western Mobile representatiye requested another slump, Results were 6rr. 4 cylinders cast. PRocREss REPORT rime observed on all trucks. ^^DrF< MichacI Batbcr Arclti tccture I Anrlorson $ llastings ; Gary Munain PCL Consttuction Scrvlccs; URS Consultants; B. Carr S.L. Pawlak FIE.D OEETWER APPROVED BY TO: 1g1y;g OF VAI LAttn: Mr. Stan Bcrrynan 75 South Frontage RoadVail C0 81657 PROJECr Atkli ti orr to Vai. .l 'fTa sl)or-tilt j.on JOB NO.4 398 90. DAILY REPORT NO. tl.firc|cE NO. V:ri1. Colorar.lo. DATE 8-30-90 63 SHEEr 6 0F Ccn tc r' , V{esternsJftq r"robile sPErn^Iplr$ suruP vtx t.D. c 4qnn 3lr-5rf An @ IENI '7e, Aug ATTSO{T IEIPER^TUFE R l€€ 600 - 90oF, IEIt{I Inrcxt{L TEI(ETlo.IUE EATC',IE' Iu€ ^fifi\rED . Illr€ S,AIPtED RnO(ltlEtl @urtrm Eprll REVOlJtrnl @{r[TEn @snEnoN DUBIC YAG t_oro/ ct uur.AlrvE IYA'IER ADO€D oA[I(,ars 15 16 100 49 19s 1 L9s2 7;09 AM B:47 fi{ 8;00 AM 8;58 AM .{s Req. As Req. As Beq. As Req, 712 118 lESr ML 5lr,|?(n)rEr ulrtfwrHr (Pcf) Tg'D coilcRm TEIPE- RATT'Rf, cr) RET|AE(S PROCRESS REFORIT Tine observed on all trucks. ..'nptFq Michac1 Barber Architecturc I fulderson G llastings i Gary Murrain PCL Construction Scrviccs; URS Consultants; Clrcn0Northern.lnc,Cdn ll! Entlrt .ri sdrfl, REPORT OF CONCRETE PL\CEMENT OBSERVATIONS ffi niE r' ..rra'1 4lr t!It!fl! rm tr.nrD a.. nt ootlglryl--rF ,'''tY o. ut cr r*'!' ,'., A rniiz^r'.' tt'l nrt " ,u. (,. rra'axrl op.cutr1'r 1pr rrrErctt ir o,r rfo irro orl rurcfi'd^dirio'rriiiri-cr rwltrx'lrriore- S lftrt rrl E o(r\rrD 0r xTl tErt€ E 6A.!JE t,illtl of'rl ,mrloatll! Ea ,citt lo '| Itllr,c' A 'rr.- ., r,.[ljiF-lr..,r t -'rrr a-ir 15 Cltll... ../tO Qren€Northern.lnc. ^.n %6@ REPoRT oF coNSTRUcrtoN AcrtvlrtEs *{t:r'-' c{rairTu, ur-tls otrllt rJlutq.rlrrs ,R rqtD lo lll villl€' ^ m.'.r d t frrrl_lr-" d dlqoata ro.ri $.. c{lot^ a/t(, ar ^ qrnl^t ,i r6rE't tg qi!t}_ 1!r Fr,rr ^r., o(Fr.lw:t, Ar i!r!q:- |,rr sritutnn a! nii c;( |'rrxrur,- ''t{rrFrtt,lAlitf,} f;#s'f-tr St;;of ; rifti,i{ri-'ciiol,:ocro na r.rnirhi-riri -rn *"qg!!3 C ri f,fporns B Ft r{-F\/fr) Pf.}rut€ (lrR llnl IlJr Coo.edtrg tnolrt.rr ot sd-tlr,tr. To: TowN Attn: P.O. Vail PROJECT OF VAIL Irlr. Stan Berxyman Box 100 co 81658-0100. Addition to Vail Transportation JOD NO. 4 398 90 DAILY REPORT NO. INVOICE NO. Vail, Colorado DATE: B/3I/9A 64 sHEEr l- oF Centcl', WEATHER CONDMONS AND CONTRACTOR'S CONS'RUCTION ACTMTIES PERSONNfu MA'OR EOUIPMENT: IGIMTIES: CHEN-NORIHEF!{'S SnE ACIMnES FUl} tine observation, testing and inspectionofg concrete being placed for slab-on-6rade Level One, nevr 6tructure, Line AO-R Grj-d JJ-J6r and Level {, metal deck, light weight concrete Line A-BI1I-151 density testing of structural fill being ptaced at wal-IsStair ltlo. 1O and new parking ranp; reinforcing steel being placed for decktoppingl Level 11 , I-,ine B-C/L3-L|. Density tests as required. Concreteplacernent started at 4:00 a.m. VERBAL COMMUNICATION WITH CONTMCTOR, ENGINEER, AJTCHITECT, OWNER l.'tichae l llarber Architccture,COPIES Attn: Mr. Scott Ward;5a1y Murrain l)CL Construction Services, Attn: Mr. Dcnny Armour; tlllS Consttl Wood Rill Carr Steven L. Pawlak t. I nn-o oasEnrER APPRcIVED srt-I Chen€Nonhern.lnc.Co /tlnf t !h.... -ta S.L.di. REPORT OF FIELD NUCLEAR DENSITY TESTING At A rr.mjrt pdrtE rx n cttral\ Ilr Ftnr rro o-ntfl.w3. Ar F tTnTr l,tl: lrtr.TI?D A! Ilr: co{rD1}|Tt^t-lrtr.|ir'tTY (F qcrIxT!' l}o a'T}o[tAlIx rul nnrf- ,x d sr^n|.tr.ts. ctrrtlrF||r (rr mr,crlrilt m Rfo,rrrrr€ o(n rr-nrf' rs-iiiiiii,o-rnio-crn rrtnl,| ^tfltova- suJ uu r DsT o" G [T Erxc 6 clrlr.IrtD urxr qnlr lnrrr[ffrt rrl rtlt' to w fEn$q' ^ nE . tFttl ls..r , !.,',16.r.- tdrr ,|' cralct a/F To: TorrIN oF VAIL Attn: Mr. Stan Bcrryman P.0. Box 100 Vail CO 8165B-0100 PRqrEcr Additi.on to Vail Transnortation Centcr, JOB NO. 4 398 90 DAILY REPORT NO. INVOICE NO. Vail, Coloraclo DATE: B/3I/gO 64 sHEEra oF SPECINCATION COIIPACTION & UATERIAL MINIMUM REQUIRED IN_PI.ACE OENSrrY 9' T AS DETERMINED BY: CONSfRUC1ON CONTMGIOR: B&B ExcavatingTE5T LoCATIoNS WERE backfill at AST['1 D155l waII & footin SE.ECTED FY: field tech. OF UFT PASSES asOF EARTH MOVING UNITS OF COMPACTION UNITS 1 MOSfURE na t u ns'l TYPE A}ID NUMSER TYPE A}.IO NUMBER METHOD OF ADDING I lront loader sheepsfoot, 2 THICKNESS jump NUMBER OF jacks as f€Q o xeq. LOO\T|ON DEPTH OR ELEVATION (rEFr) TABORATOFY RELD (RE ATrv€/ lJrJ0lrrrJ)OUIAIE of SOIL T\?E ILJI NO.ITIO(IMUM DR/ DENSrIY(pcf) OPTIMUM MOISTURE CONlENT(/) 0Rr OENSffY (Pcr) MOISTURE CONTENT(r) ) 281 >-82 I5t S. of A Line20t W. of Grid I 25t S. of A Llnelor W. of crid I JOr W. of Line Ilor S. of Line A BSG l1D t7 BSG 7l AI 5. 136.O r35.O 116.o 5.9 ,.9 5.9 l_31. B L1L.6 L3?,5 6.2 Or\,, 6.r 97 97 9B s1. silty sandygravel fl 11 E FULL NME OBSERI/ATION tr PART TIME OBSEM/ATION rris tF6r pigF}tl:t (pxDtr 't'lr{D at l nt:lutl of qn qEai\r rtl\!! (r trll f1^a-flrf.tar. tt llE ll!r-D--o|.l rrla crtfcrn m cd{!['( "tttltxl Trtf Ftora{-lnt oat rrcwt frra'n ^No rr(ETrif m nu- tr,mrrq nq nurs qitr'Gh inr+tn,r n rs {tr 9qi, !ftqJFR trttc. lFliri ltc saof c ff mt or'Y ^s Et-Er/tD Nrrlssar, llr crlFArE (ri orsla\{I.1r Junotrr]xr- nsr rxr,r'iri T.ir 'ii'i iii rir:a rm qrrurs ql w}tt-rlf,Jl nlt ntl utrnr SftutErrrra' rHE l{t ctEAR DE\aSO|/EIER UEnrc[) 0r lEs[flc w^s usED tN sugSIA{IUL ACCOfiO llct wnH asIll D2992 ^l\l0 a]o17 PRzuMlMRrf OSSgilAnONS AND/OR TEST RESULTS VERBAIY REPOTTED TO: Les $/ood _ . PRocREss RFPOKI' The above tests rvere performed on structural fi.ll belng placed for backfill at Stair llo. l0 and parking ramp. Michael l]arbcr Arclii tccturc,uurlLr Attn: Mr. Scott ward: Anderson € llastings' Ilr. Gary Murrlan; PCL Construction, - Attn: -.lrlr.-Dcnny Annour; llRS Consrrltants, Attn: MT' l'cs n'oo(l; R. Cam,/S. Urton Steven L. Pawlak FIEI.o OEERYER APPROYED E/ Chen€Nonhern.lnc.CdrrU||C Cngl'. d S.l-tlb REPORT OF FIELD NUCLEAR DENSITY TESTING To: TohlN oF vArL JoE No. 4 s98 e0 DATE B/3L/9O Attn: Mr. Stan Berryman DA1Ly REpORT NO.64 SgEEf 3 Of 9 P.O. Box 100 Vail. C0 81658-0100 lNvotCE No. PRqrECf Addition to Vail. Tr?rnsnortati on Center, Vai1, Coloraclo SPECnCAnOI COUP CTIoN & MATERIAT MINIUUM REQUIRED IN-PI.ACE DENSITY 90 X AS DETERMINED F/: ASTI'1 D.].557 coNsrRucnoN CoNTRACroR: PCL TEsr LocATIoNs wERE SEI-ECIED E/: Chen Northern TYPE A'-ID NUMBER OF EARTH MOVING UNTTS 1 fTONt CNd IOAdCT ]HICKNESS OF UFT TypE Al.lD NuMBFx oF coMpAGTloN UNrfs 2 hand tampere NUMBER oF PAssEs varies PEnCAT oF(Rfurrvt/ llA)uttll) osr rd sil.ty sandy 8rave1 r24. Oel4o,oLine 111 , 10r lV.of Line C subgra O FUtt TIME oBsER/AnoN b PAI{r rlME oBsERvATloN n(i |'tqlt PiftM:r (P Dd [Ulr{-D Art I Nf,JtttI t On oFtiv rxNt or nl Plr"!D{t' r'f lt^\t trr-l,F-D--otl r]lr Ct'nnx:l(ft m OO'IIAJ€ fPrtl lO I}f Fttdaraxot! cfr,nr6',1\t frrFr ^xD r{rstrtt 1. t!tl. urfllt*l lc rt,el *r"-tt'dth' i6*]rriin ..-ptn stivlro -q-trunG6 tFJIs ^tlr u'ot of niF nl oRY ls ELfvtt ratcrrsrrr ro a.rrnlrE .".t oGmvrr,:l Jurnrrrtr. tt:,r -t^ roi fi 'ii'i iixr ir'.id'rtit-<rrxlcts o{ wllLllM lttt r''- Ent srlotralE l rHE trclEAR Dg\aS(r|E|ER uEnm of rESnNc wAS Us€D tN SUnSrA{luL lccoRo4Nc[ Wllll Aslll D2992 A)10 DJ0l7 pREUMtMFf OBSEMTIONS N,lDlOR TESr RESULTS VERBAIY REPORTED TO: 393 PR(rcRESS REPORT Today we tested fill placed north of the structure. S. Ijrton Steven L. Pawlak REl) OSE}I1/ER APPRWED FY ^^DrFc Michael Barber Arcliitccturc,vvrrE'r Attn: Mr. Scott ward; Anderson € tlastings ' Ilr. Gary Murrtirn; pdi Constructi on ,' Aitn : - .l''lr. - Dcnny Armour ; ilnS Con=rtitants, -Attn: Mr' Lcs ltlootl:- a3 A r.,mrl( FinYcrDa r0 tlrxTl IrI Fl'|E lf{t cttiRr'tt1 4 r--lltq..rr* rnt 9Fr.frD A! rrl cqrDf-r'n t-lrn{ltTY or qI o'fr'E rx) a'T{t!_lAIDl txl at!g- rDr d srartLrl.rt, (rrErlrqr.r ('r tllrrcxr rtrr|. m Rto^no q (ln rri 'rs-ir]nii,o-Ptxig-<rn wrrnul ir'folA- s^rjuj wr'r a( st[-D f lrrrrlE DE rt oDrutrl' t'r"ct qrltl ln flrtxl| far ,arltlD ]D N rfinla ^ 'trrnr- ., rlGiillg.r d dt9'i- rrn 15, CEIO'A a/ao Clrcn€Nortlrcrn.lnc O.rdh| ln€r-r r'a s*rtl, REPORT OF REINFORCING STEEL OBSERVATION ,J A l trrt fr'|fc|Dx tn tlrxll lr|t nrE lrrt ct:lwll {l nttdlrt r,lf !r tnD ,r nf @trrxll,t, rmFrrr r (r-t on'rl xo A'llw rbl roi PUI([A- rrr. 11,, lAtfra.xtt o11qurr61r 1lr 1npcxt rf or rroreoxr cli mrcltn-s nintto tlolDlrt qt rRnlot ,rlrxxa- }\r4(rlt n! E lrJF(lx! of u rfJtt'o 6 cua1tltD t.}r.rlr olllt ll!|rgtlxlt lll ,4ltl) lo t{ tlllrE ^ ii-.r' r *lijixl rc d d'F.r. r.,rr rh. Crtli^ r/g(t TO: TOt'lN Attn; P.0. Vai 1 PROJECT OF VAIL Mr. Stan Berryman Box 100 co 816s8-0100 A<ldition to Val I Transportation JOB NO. 4 39_8 90_ OAILY REPORT NO. rNvolcE No. Vai 1, Col orado DATE: B/3L/9O 64 snrEr 4 or 9 Cent er , STRUCTURE Deck Topplng toc notl atvAnoN REDIFffi}IC c00/efis wn'nc L Hmzo rn- Line B-C,/L1-L,Level 4 r,\K 4OO2 #4 DwIs @ I2"o f0 rows #4 @ 47 rows #4 @2lB rows #470#r@8"t t r,rr # 4008r#4x3olL#4X3Ol Btt oc bottom 12ttoc top @ 12il T&B oP laP @ 25tr '7o north-sout north-sout east-west #4 east- west Trafflc Is1and spf,Etfpruxr.s: StErL GR^r: 60 E nrNs UssD Rtxlrficlllo GtE llt$Es* clean f,l soe Dn wDlcs usED cLE Ml{cE At{D oorfft aE feq Xf corrnrrcn pwsso sH'*'Nc sPEcrEADsrs: as req o ruu-lue oo'E^v ror! BR srf,pof,t:r: nve 1/4 BOlster )0 prrr-lue oosERvATloN FnE llPtlcE CO|d'AI{CEHrrc'r ffiffi ffim&% ^,-ffi,,,-EqTW@ RE-EqTNIDye6 PROGRESS REPORT Michael Barber Atchitecture, COPIES Attn: Mr. Scott Wardl Gary Murrji.n PCL Construction Scrvices, Atin; ['lr. Dcnny Armour; Anderson & llastings; tlRS Consultants. Attn: Mr. Les Wood; nill Carr Steven L. Pawlak RE D OBSERI/ER APPRCTVED BY TOIVN OI; VAII,Attn: Mr. Stan Bcrrynan P.O. Box 100 Vail CO 81658-0100 JOB NO.4 398 90 DALY REPORT NO. [{\olcE No. V;ri I , Coloratlo. DATE B/3T/9O 64 sHsr 5or 9 lEqJEGf Addi.tion to Vail 'fransl)or-tati on Ccntcr, spEEFE/rrxl}r$ surup 3_5 ln co}{IExf no air nixffiW. l{obilo.u LD. R f500 adorr TI]TPER^TURE R ftcE 60-90 lEr|o.IRUCKMI T|O(Er NO IIIIE ITAICHE' IIUE AnnryEI) lluE s^ltPt-g) RA'OUfln{c{xrNrn E[Til Rfloufinl@trtflfn @ltPt"EItot{ cuEc YA[rst-oro/ crruut llvE IIATB IDOEDcru-o6 I I 3 4 a1 ,4 r00 45 LL7 49 ro5 54 L959 rybu 195r L962 L963 L964 L965 3z4o 5:59 4:Il1 4:27 4:39 4:47 4:22 3:50 4;L5 4z50 4242 4:49 5:05 5:L7 4:40 5:05 as leq aa req as req as req a6 req as req a6 req AE a-b req req req req req req. req as as a6 as a6 I 15 24 42 40 4B U 10 10 0 TESTur.sur? (r&)^nC(}{IE}|T(r) TET UNrtr Y'SHT (Pcr) l,lE.D @T'CRflE TUTPE- RAIINE cr) ROtAe(s 3 q. 5 L/4q 5 L/4 145.4 146.0 7O 59 5 t/4,, slunp at truckSrr at the hose { cylinders ca6t PROCRESS REFORT Sanrple taken at truc\ pump in use' Time observed on all trucks. Pour started at 3t55 a.m. coplFs Michacl llarber Arch.i"tecturc I Andcrson I llastings; Gary Murrlin PCL Construction Services; URS Consultants; RiIl Carr Steven L. Pawlak RE-D OBSEFilER APPROYED BY Chen€Northem.lnc C{i{.|li &llfrt ri S.lFa|{. REPORT OF CONCRETE PI.ACEMENT OBSERVATIONS ,s A nnl|t |FllrE rx Io crrxn D|r Rit ll|o o(|Elllwl aI ifl,of,ts rrt J,arrtrD ar lrf oorrrt .tu[ PioPfrTr r o,l o fxt* llo Arno@altx ttr'l |tri.E^-rnr o- srerriirrrr tnanrm'& -inr.cn r*r. oi roiqip €t' mflcrrrs-a -||jni:o ltxi€ .r.f, wtttl|,r,vt(fr& s lrrttt urr- E ocrdD or rrtlr lE trr r:qlttr|t] ul,fl ollljt ,mrrrxtt ,rf, ,slllr to r| rwlrrr ^ 'rir* d r.FjiX-lrt ,.4cs t rr taa .ltrll.. V'o To: 1sp11 oF vAIL JoB No. 4 se8 e0 D Te B/|L/go Attn: Mr. Stan Berryman _.._ E .'p.o. Box 100 DAILY REPORT NO. 64 SHEEf b OF 9 Vail CO 81658-0L00 tN\plCE NO. PROJECI Adtlition to Vnil 'fTtllsl)ort.r t i on CcrrLcr', Vai. 1 , Coloratlo. SPSTEAIEiT! g.l,rrP AIR @NIE{T ST,PPIJER UD( LD. AAE}|T IE,IPEMIURE RA}ICE lEr t{}.TRT.|CXt€.IANET M). TIUE SATCHE' llu€ AnnvE, rlr€ s ltPtfD RnmurrE+l cDtJ!|TERE(Irl RE\OUflXrN @UHITR @uPtEno :UEC YAG .-oAD/ ClrUUtAIll/E w lB aDg)q uxt.s R 9 t0 11 L2 L3 r00 46 117 49 106 54 L956 L969 L968 L969 r9?o. L97L 5t06 5:I2 ):28 5246 6:O0 6':3L J:26 5:3o 5:32 6tL4 7 :0O as req as req aa req a6 req as req as neq a S req req req req req req as as a8 as a6 64 72 BO B8 96 LQz.' 0 o 0 U , 5 lESr HL su[?([r)lll COiIIEXT(r) TET UNtr trEOHT (Fcr)YE.D ooNcftflE IEIPE- R nnf, cF) REr.Ae(s PROCRESS REFORT CO'IES Mich;rc 1 llarbcr Arcltitccture I Andcrson li Ilastings; .Gary lvlurririn .PCL Construction Services; URS Consultants; lill Carr Steven L. Pawlak RELD OBSETUER APPRO/E) BT Chen€Norrhern.lnc Gdrff! tnth...r cla s.r-'ltL REPORT OF CONCRETE PLACEMENT OBSERVATIONS at A rrmr|. fmtllcrrr ro a,txB '}[ |lf t |rr' cr.Ertrrt, al iff(Enr rrr! In flTD ar nt corf }{Tr t- af,oPtiTr (r (lrt cl fxlli ,.fo Ajlllfi'llD| ^t All-Ea- nof. d" Stlr tall @crrtn r (i trtr.af3 rro{ ot [o iri€ qr rg.*tt'_r-arf rvr-O rfrrip dJR rntltlx lf"iqr'A- 3 ,|'tl! rrl DE Dttcro or /|/1Ir lt-tt]|, 13 carulrD l'l.rr oD,a, ,#,{rarfir ,ta rtf,rD Io lt tKrl{l ^ 'rr.nr,r , l.Fiil-lr,r rt i.rr.i. r-i| l| G|Illaa r/ta To: 19t',ll ol: vArL JoB No. 4 Jes 90 D Te S/3L/9OAttn: Mr. Stan llenylnan / , ,.._ n o r).0. Uox 100 DA,ILY REPORT NO. 64 SHEEr '/OF y Vail C0 81658-0100 D{\4OICE NO. llqJECT Arkliti on to Vai. l 'l'Tan s'l)o r-tlt:i olr Ccrrtcr'. V;ri. l, Colotado- SPEFEAIpiT$ $.rryP V'i.i'4obileru rc. E 35OO 3-5light Atal coNrE{r - 5?6nax' AIdE}Tf IOIPEF^TUFE R^lrcE 60-9AslrPPun IE;Tt{r.nucfit{L IIG|(ETl{).lluE SATCHD TIUE ARnwE) TD/€s ltPt@ RA,OUrfFal @U}TTB EOIN RFt/OUrTrOa,l @{rNlfn COTPLEIIO}I ;t Brc YAn0s l'ol,D/ CUUUIAIITiE w rB ADOS) e&lor-|s I4 L5 16 L7 1B L9 20 ru 46 49 106 46 49 46 L973 L974 L975 L976 19Br' r9B2 1985 B R 9 IO IO II >7 32 CA o7 20 46 ,5 B:10 B :49 9 :10 1O:00 lAz36 11:OO L2zO? aa req as r-eq as req a6 req aa req as req as req aa req as req as req aa req as req as req as req B I6 24 B o L5 ( t0 6 R lEsrt{r su[?(rt)An @ilIE}II(D TET UNTT uttoKt (Pcf) YO-D @NCRf'JEIE'PE- MTUNE cr) Rfta ft(s t 1 L/4 3 LL9.2 7O { cyllnders cast pRocREss REFORT Sanple taken from hose. Tine observed on all trucks. ^nptFe Michacl Barbcr Archi tccturc; Anrlcrson 6 llastings; G:ry Mu::r'ain PCL Consttuctio[ Scrviccs; UltS Consultants; BilI Carr Steven L. Pawlak RE.D OBSEfiMER APPNWED ET 'ClrcndNofthern.lnc,Cdr{hf f,|th{r ri Sdnar.(. REPORT OF CONCRETE PLACEMENT OBSERVATIONS At a rrut tI||tcru r! alrxtl rrt TtrrE xl|t, oltE|lwi al it7(!rr rm strrftrtr ar.nr: orl)frTr^r_t't irfiY (r di cl fxr\ llo-,'r,ffiE^tr,' rri nf-r^- Dor. q' sr rlrxE oor(rrrE . a fxrircr! rkx (! Eorrr€ q,r ntrorfr-d^rrr_nin'-rtiiig-on rwfrrx rrfno/A- slt'trJ rll, Dt 0ct'ffiD c flfl lfjtlrl lt otat!'|D t a-tt otllt trirallxll tia ,orrD lo H llnl|C A '-n - r r'.fiillTlr-t .. '.".?- 7-t h Clat l|.| a/to "ChcnONorthcrn.lnc Cdrd,]|l fnlt|+ft ri Sdrrrrl, REPORT OF CONCRETE PI-ACEMENT OBSERVATIONS |' A t nlt urtEtt! tt alrtfl lt( tlf E t fr dtltlrt |tt ,lt}('rn ff :ri.TtTD at ni: o('r-Trfmul ,norfrifi (F dt! q fxrl ^|&l- A'ttlxllArl ioi rt]' rxrr q rr tDrxrl ooanrrrr.r (! rxrFrcrr .F.x cr iforrrrr.o olt nlw6-d--rr-inio' r'rrno cln lwlltx ^r?f(r/& .!'llf(rJ xrt. tE 0lF(lttD (r lrnl rElll€ B ooarullD ual! orxlt ^i$rrnaxll Na ntt lo H tf,txr A i-r.- r r'.(ltrtTl7| r , ...tr--. ra ||, Clal l.. r./to To: 1gp1g or: vAIL Attn: Ivlr. Stan llcrryrnan P.O. Box 100 Vail CO 81658-0100 |E!!FCT Arttli ti on to Vai. 1 'l'r.ansporr.rti orl JOB NO. 4 398 90 DAJLY REPORT NO. il.{\olcE No. . Col otarlo, DATE B/3I/9O 64 5HsET B or Ccrrtcr:. Va:i.1 spmrp^rprrs sLrrup 3-5 ^n colllptr 5% nax sJPPun!'/.Mobile uo< r.o. E f500 lig1ht wt. rrrflo{r rulprmtunE R Nc€ 60-90 TTST t{).rnirct(t{L T|O€r M). nuE SATEHq) llrrE ^Itttl/D 1ln€s lrPtID Rfi Ol-lrTxlt{ @UT'TEREpltl RE\OU,NON @ONTER @uPtEllotl CI,,IIC YARF l-Or.D/ CUMUTAII./E WAIB ADO@ e Llrnas 2L 49 1985 LZzL'/1.2z30 a6 req as req to rEsrtn sll,l?(0r) uEr ul|r TEA}IT (Pcr) 11tl.o coircREtE IEIPE- R^TUnf cr) Rfr lu(s PROGRESS REPORr Tlne observed on all trucks. .tnDtr:e Michacl llarber Architccture I Andcrson S Ilastings; Gary Murrain PCL Constructiotr Scrv"lccs; URS Consultants; B1II Carr,/S. Urton Steven L. Pawla} FIE.D OBSERI/ER APPROVED Bf To: 19p11 or: vArL JoB No. 4 398 90 DATE AfittgOAttn: Mr. Stan llcrryman t,.o. Box 100 DAtLy REPORT NO. 64 sHEErg OF 9 Vail CO 81658-0100 tlg)tcE No. E8qlEqf Atltlition to Vai l 'l'1':r n sl)o rt irt i.orr Ccntcr', Vl.i l. Color:arlo, spEuEATxlsB suJup 5;5 ln cor{rD{r 4-B sJpprJER W.UobiIe yD( t.D. A J000 ^lao{T Tp,tpER ruRE R^!\|GE 60-90 lESrlp.Tnrc|( ML TtcxtEf M'.llu€ EAICI|A' TIUE ANRilEI) lll/€ SA!PIED Rfl,OLUfFt| @tJtfrER EBO{ Rf\owTnil @t t{tE @IIPLEIION clrgc Y Gta,o/ cuuur-AlryE w lB ADO€D cAllor|s 22 23 ?4 2' 26 2'7 114 46 49 I19 1r4 46 19BB 1989 1990 199r L992 L993 LzOJ 1.en 1:51 2:L9 1zL5 3z2l I :15 L:47 2: O0 2z20 3z2O ]:40 a6 req a6 req as req aE req as req aE req as req as req as req aa req a6 req a6 req B Iet 24 2,2 41 50 10 q a to 0 IE Tt{L sll,l?(sr)lno(xrEltl(r) TEI U TTtErr (Pcf) xa.D @T$ftEIEIE.PE- RAIUTE cn Rflr e(s PROGRESS REFORI Tine observed on all trucks. .yrDts\ MichacI llarbcr Arclri tccture l Andcrson 6 llastings; Gary Murrlin I'CL Construction Scrviccs; UltS Consultants; S. llrton,/B. Calr Steven L. Pawlak RE.D OBSERVER APPRCA/ED BT 'CheneNorthern.lnc Con .rlrrf t,|fb-r di Sdt(|l. REPORT OF CONCRETE PL.ACEMENT OBSERVATIONS l! A l1|lt\ 'E'nttu. D rtl B f|t FnE ,ro ot-'lr|twL Al ittciT|t .r( t(i.nrD ar nt: DoaDo{l4l moFfttY f drl cl fxrt Alo- 4flllllto^tn Ffl FrrtEF yrrr or- 3r rrllxrt' rnrtlrrlrr or fJlldfn rtt(x dt rfqrrr€ crr nuwrj-l rr-inil rucir cut rttrttx ,t?no/A- 9r|flrt xlll DE Da9F(IltD cr lml lf:lll|o ooatlfrD url'r onn r*aIrrxlt ,t[ rdD lo n trrr|c ^ ,,..n ' , r'.fffiii-lr't .r -irri- r-r t\ Oal li|. a./to Oren€Northern.lnc.Conrulu,r tngltt r. o.n i#H, REPORT OF CONSTRUCTION ACTIVITIES al l ramrAt Fiorfcrxrt m cl rxrt nf, n;E l,{, dltr!|trt-l ^!r ryFllll lrf :trnr'ttD At r @rrft-xtul. ,nYr'riw (r ott o,at'rs' xo a,Tlsir^lul mi ;.lJl n - 'r'frn^rr'.}.rs.c('ctFq.J'!t(nIx|lA;n'txonq9r'Irfqrargr,rtj.i^iii_serrio'miirirri_ir.n'-xrrru'F'#A.sllf't.6fuED.5'.0!tDof6cirtiitrt tirs-ontr re q.x,rxt xc E t lo N rE ll€' ^ h.i.- .. lrl lllll lr'-. .. dt'i.. frii l|( CIf,loIA 4/1, To: rowN oF VArL JoB No. 4 3es 9q DATE: 9/4/90 Attn: Mr. Stan Berryman DAtLy REPORT ttO. 65 SHEEr I OF 5P.O. Box L00 Vail C0 81.6s8-0100 lNVolCE No. pFtOJEcT Arldition to Vail Transportation Ccntcr, Vai1, Colora<lo WFITHER CONDMONS AND IEMPERAruRE C1CAT, 4O-BOO CONIRACTORS CONSTRUCNON ACIMTIES PtxsolrNtu }itA'OR EOUIPMENT: AGIMIIEST cHElt-NoRlHERlt's srE AGm4TlEs FuLl time observation, testing qtq inspectlon 6z6sm, start tlme for placing_conirete Level 4, i-,ine g-g/LJ-L5, Level i;e;-new parki"e-""*pr'ifne [f-ne at 45t west irf Cria 1, walls-and iooti"e foi. staii ilo.'iOJ reinforcil. g!qe+ being placed for walls. a'; St"ir fio. 1t; aensiiy tests for backlill blng placed at walls south of lO tite new itruct"#, Grld 33-39. Inepection of.4 X.4 wire mesh and i l7+ chair placed foi Level 3 deck topping new structure' VERML COMMUNICAT]ON W'TH CONTMCTOR, ENGINEER. ARCHrrECT, OWNER l''lichac I Barber Archi t ccture ,coPlEs Attn: Mr, scott tvard; Gary Murrain t'CL Construction Services, Attn: Mr. Dcnny Armour: Andcrson 6 ltastings; Ul{S Consrrltaltr!, Attn: Ivlr " l,cs Wood I lRill c.m Steven L. Pawlak I nao omxvrn APPRoYED FY I Chen€Norlhern.hrc Co.rrtlx t relt-t -a SdLfr REPORT OF FIELD NUCLEAR DENSITY TESTING ls A llnrlt pirnqrr'| D.l.xll nf |tfE lr{t crfI|t[t, Ar RrwtI! |,rr: stlFllro At Tf cq'|r|fJttv'{-ftrftit (tr olt ofrIO rnOttAlbl 7rt Fnr}- t,cfl (r gAmtxtt' or'.cruqt6 .,r rn'rcrt t*,t. oR RE! 'rluo on *u"#'diiii;M;'Pr;r6r€-qn wrnu imnorx- sL'rlJ rr'l E D':'ql! or ^trll rE Trro 6 o[rtlnD Uar.t:i unlt tfrrfiltxll |,I ,AfrrD |t) U rrfirr|o. ^ 'r,-nt-.a *@* d -,rF.- rlri 15, CEl'n 4,/lO To: TohrN oF vArL Attn: Mr. Stan Berryman P.0. Box 100 Vail C0 81658-0100 PRNEGT Addition to Vail T'ran sport a t i.on Ccnter, JOB NO. 4 398 90 DAJLY REPORT NO. INVO|CE NO. Vai. I, Co1 orado DAIE: 9/4/9O 6, sHEEr 2 oF SPECMCATION COUPACTIOX & UATERIAL MINIMUM REQUTRED rN-priCE DENSrY g, r As CONSIRUSIION CONIMCTOR: B&B Excavating TEST DEIERMINED BY: LOCATIONS WERE ASTIi D1557 SFI FCTED BY: backfill at wal1sfield tech. OF EARIH MOVING UNTTS OF COMPACNON UN]TS 2 MSI5TURE natural I front loaderr 1 &d,fTFtlcKNESs oF lJFr as reql dual wheel rollers NUMBER OF PASSES as req 2 juqP iacks TY?E A},ID NUMBER TY?E AI{D NUMBF.R METHOD OF ADDING LOCATION DEPTH OR ELEVAT]ON (FEEr) uaoRAToFr FIELD PEACB{T OF (Rfl.^rnE/ lAnra{ru)o0tAfld SOIL Tl?E rESI NO.}/AXIMUM Df{r DENSTTY (Pcf) OFNMUM MOISTURE CONTENT(z) Dmr DENSIIY (P"r) MOISTURE CONTENT(z) 284 )_85 >_86 )_97 2BB 6r S. of .4,0 @ 38 4fS.otLO@37 5tS.ofA0@36 4rS.ofAO@34 4'S.ofAO@33 20 | BsG 19r BSG 18' BSG 17I BSG 15I BSG Lt6.O L36.O IJ6.O L36.O 1J6.0 ,.9 5.9 5.9 5.9 5.9 L?9.7 l.,29.9. lJUo b 130. B L30.7 6.3 6.0 5.f 6.0 6.2 95 9' oA 96 sl. siltY 6andYgravel ll ll llll || ll tr RJLL nME OBSERVATION n PAKr rlME oBSER^/ATION rrn' ilFdlr Pi'I.,.|! qT,|D{t.utr.,D Ar ^ Rt!{,Ll or or,i fl|5'|n,A'xt6 .)f ml Pl ^.xl.fHl. |t lt^\lf Rf| |rD..-o|l.rxr o.'ol|lt;luq Io corD|tf |,Ttnr*r nf FEco,ittrorD otrtP^crt\f ttn t ^rto rrosnrrf m lfll- u,wro ltr lrut:r rrrr'<irh'itn*r#n r i"n rrsr rutpo llcarrnrs ] t5ls xrE IrADE tr tlr ml c'lY AS ElrVtD '.r.rit{tlt To c{-,^rf q_n ocrrvtii.:l Juucrxrtr. tsr rr^r^ -i Tirr 'rrf iri ii,id'lun (rrrxr6 ."l $lnlf,-R tlrt nLr l,ra* sPtorr.llo.' IHE NtrclE f, D€\ts()UEIf,R UEnrcO OF IESnNC WAt uSFD lN SUtl$ r{u|. ACCOfiO }lcE wnH /ls'lu 02992 AIO DJO17 pREUM1M,RY O6ERyAIISN5 AllD/OR TES; RESULTS IER6IALLY REPORTED TO: Les Wood PRocREss REPOKT The above tests were performed on structural backfill belng ptaced at wa1ls south ot AO/53-39 new structure. MichaeI Barbcr Archi tccturc,Lurllr Attn: Mr. scott ward; Anderson Er llastings ; llr. Gary Murrlall; PCL Constructiotr, Attn: Itlr.- Dcnlty Annour:;ilif c"iii,iiiinii,'itttn: trlr. Les t{9i9i- Bill Cam Steven L. Pawlak FIEU) OBSERVER APPROVED FY Chen€Nortlrcrn,lnc Or:rDi |.,*rr -la S.r.ntlL REPORT OF REINFORCING STEEL OBSERVATION Ar A |tml|( |iolrctEt ro ttrxnl ]rt nrE rro d;l.lwl 4r !q9!1rlrt ItrTnD At ttf cor|I)rxflA-iprrrt c d' df}rla r}o a'nfiuln' t(|l PrJf('c - ,t. '' 3l^,,itxrl drauro,.t oi rxrdcr! ri'1r trr iro^r.o ar mroi *n-nr.-_;f,D'-t'o&€-ar rrlltrx hrxn- !^l?txr tu E o'tt(IrD o' ^'la rfjlllo 6 cD.\fll, Ittrllt (' rr l&v,qrralt lf, ,ftu, Io tl mnt|r ^ '|i.d'- .f *.lTfUf lr-r ., ...nF.-. frr 15. C[lla a/6 OF VAIL Mr. Stan B.errynan Box 100 c0 81658-0100 Addition to Vail Transportation TO: TOWN Attn: P.O. Vai I PR(I'ECT Center:, JOB NO. 4 398 90 DAILY REPORT NO. lt{volcE No. Vai L, Colorado DATE; 9/4/9O 65 sHEEr 3 oF SIRUCTURE wall6-deck LOG TXIN E.EYAIX)}I R&TFORCOrc couro{Is wrncAL HORIZONTA Statr No. 11 wa}1 Ao-B/33-36 Level 2 Level 5 L9 #\ @ lB" OC BFB#4@L6"oc BF L6 /14 @ 15'r OC BF 2I rows #4 @ l8rr oc 22 rows #4 2 #5 top 4#4@l,2'' 2 #' top 4 '#4 @ L2" t rows #4 @ 4X4wirelaped as re ah over 2 3/41', chairired chairs at 216'f 15't oc BF Section BF veFtr BF vert. Bil oc BF spliced 20" Section S spliced 2ort Section R Section G oc it4 #4 spEctFEAltOrS SIEL cR DEr 50 0l nr,rs uso Rorfreuo qIA{tDEss: Clean d orO" DR^tl}6 us€D ctr^R lrcE AxD co/Ee as f eq E cornrron 'rovrseo snrcnc SPECTEATnT* a6 req 6l ruu--lue o'rsErt/ noN gAn s.ppo1n* 119E 2tr chalr - D Plar-rllE oosavArloN FtllEH lreLACE COI{PIAI|CEHEcHr ffi'ffi H"ffiffi ^.-s.5,,.-o(^Ml€D Rf-o&AtllNED no Yes o-q-qo PROGRESS REPORT f,levation change of 6rr top row ot #5t too short from top of pourr resplice to added coverage. Michael Barber Architccture, COPIES Attn: Mr. Scott Ward; Gary Murrain PCL Construction Scrvices ' Attn; l'lr. Dcnny Arnourl Anderson & llastings; tfRS Consultants . Attn: Mr. l,es Wood: lill Carr Steven L. Pawlak RE1D OBSERVER APPROYED ry .ClrenONortlrcrn.lnc Cat irUrl t.||tF-r lra sdalr.r, REPORT OF CONCRETE PI-ACEMENT OBSERVATIONS at A r|rRl,( li'|ttD| [ errtrR n( ?!fE t|) qlr7lEr al irFFrr 4|f :tr.r|'D a! t'f cotnfflTul nxrr'rY or c,r cl fr'tf' ao a'noulrpr rn nnx!_ tarr (r surrrrxrl orqrr'rr, G rrrircf! rrrrr r, f,c .rrr qr ntro*j"d^nii'rio hirrld -a,n mrr$t Ayfirl/a- ! lftl! vll !( DcrldD o. /J.|tl ttllDrc ls oorurtD ulII .m,It ,n r,Irarflt ,tr' ,afl.o m n r[ll[, A ii-r.- , r..(tfii-ilr-t .f -.ir-r- tqrr ta. Gral t{ a./S To: 1sp11 oF vnIL JoB No.4 jes e0 DAIE 9/4/90Attn: Mr. Stan llcrrymanp.o. Box 100 DALY REPORT NO. 55 sHEEr4 0F 5 Vail CO 81658-0100 6VotCE No. PRoJEqf A(l(li.tion tor/ai1 'fran sl)o.rtir t i. orr (lcrrtcr., Vai. l. Color.ado. SPEFE lpits: glulf srrP?un W.l.Jobllelu m. 4500 at 3-'2B days ln col11p{r lart avg. Arsefi TurPgR luRE 60-90RAflC€ lESrl{t nucxiTI ICKET Mt T|rE OATCHE) IUE ARnvtD 1|r.€s llPt_ED RnOUfiPfl @{Jt{rEn EOTI RAOUflnl @I.INIER @uPl-Ellotl CUBIC YAtrIS t_oto/ c,t uut lwE wA1ER IDOE) a^LLOlrS 1 2 z 4 , o 7 ,4 100 106 TL7 46 u9 ,4 L994 L99> L997 1998 r996' r999 2000 5:4o 6: lB 7:o9 7:LB 7 zAZ 7:18 7:43 6:00 6z2O 7:LB ? zZJ 7:46 7:47 7:54 7:L5 7:40 aa req as req as xeq a6 req a6 req as req a5 req aa req as req as req as req as req aa req a6 req B L6 32 40 24 4B ,6 o U R o 10 10 lESrtn sr,ul?(rr)AIt OOIIE}{I(l) IET Ulrr UECHT (Fcr)YIIID cot$nEIE TEIPE- RATINE cr) ftDTATU(s 2 4 5 5 4 L/2 6.2 6.6 L39.6 u9. B 5B 7O sampled at truck { cyllnders cast. Sanpled at truck Dovln tine on roadr concrete dellvere under 90 ninutes. PROGRESS REF0RT Tlme observed on all trucks. One hour delay in placing concrete due to punp truck not advised of 6:00 &onr start tine. coptFs Michacl llarbcr ArchitccturcI Andcrson S Ilastings i Gary Murrain PCL Construction Scrvlccs; URS Consultants; Bill Carr Steven L. Pavrlak RAD OBSERI/ER APPRCIVED ET , Clrcn€Northern.lnc REPORT OF CONCRETE PI.ACEMENT OBSERVATIONS ai a rtmJt tErtGfD. E arrxft n( trlrE xo crrrtlvrl ru. arlrrrrr ft :ri.fltn ai nr odtr{xrr r tfif?rrY tr o|,i d fxtl 1tq 4lnglqltDrl rDi ni-E'}- tt,. o. rr tTE 'Ill ooqr,!'|t (rl rrl|rcr! rRtr (! rfc ni,lE q.r nggrfi-d*iii;,tD -rf,tiF ql lnltrx ,|fnova- s',lritlt xu tE |xr(IED or lrm lEJrl€ lg corrurrtt uar.! qDGl rMrlrxtl ,E taf,It to rf$r|r ^ i-r.' d r.fiiiiJlr-r .r -ir-r- ,.ri ,a1 GLlt{ a,/F Cdrrlth tnftt.-t rd s.rnt {. To: 1g1tl1 orr vAIr, JoB No. 4 398 90 DATE 9/4/90 Attn: Mr, Stan llcrrynanp.o. Box 100 D JLy REPORT NO. 55 srrrr 7oF 6 Vail CO 81658-0100 lt{\rctcg NO. PROTECT A(t(lition to Vail 'l'Tarr sl)olt irti on Ccntcr., V;ri1. Col.oratlo. SPEIFEATTfi* llrruP An @t{rE{TslrPPrJER rD( t.D. 4500 Ar{o{T TAnffRATURE R^}tcE lEst r{r.mtrcxt{L no(Er 1|(,. IIUE DATCHg) ltuE ARRI\iE) Il!€s lrPtED RnAU,In{ @ur.nEn EON RE\OUfitOlt @ul{rEx @UPLETIOT{ ;UflC YAGtoro/ CT,|MUIAIII/E HA]ER ADOE)q^urNs B 9 10 1I T2 L3 100 105 LL? 46 54 100 2001 2002 20A3 2004 2OO5 2006 7 249 B: l0 9r25 9:36 9:48 IO:29 A.1R B: IB 9z3L 9 t45 1O:02 LO:39 as req a6 r€q aa req as req a5 req a6 req as req as req as req as req aE req a6 req 64 l1 BO BB OA 9B -t 5 n 4 lESrrll sll[?([t)An O$ITEIT(D WEf UN]tr UMHT (Pcf) llaD @t{cftEtE T6TP€- RATT,RE cF) RGll^ro$ PROGRESS REPOKI Time observed on all trucks. Total deck toppj-ng pour pB yardsr finished at 10:45. {toptFs Michacl l}arbcr Architccture; Andcrson I llastings; Cary Murrain PCL Constructiott Scrviccs; URS Consultants; Bill Carr Steven L. PawJa.k RED OESERVER APPRWED Bf To: 1gs11 or; vArL JoB'No.4 398 90 oaw, 9/4/90 Attnl Mr. Stan Bcrryman rr.o. Box 100 DArLy REPORT NO. 61 sHEEr6 OF 6 Vai I CO 8165 8-0100 ltflptgE No. PR(ITECI Adtlition to Vail Transl)ortation Ccntcr', V;ril. Color:atlo. SFTDtrEATI)}T! gtJ 'UP r.rx r.D. A ]000 3-7 4 BAncoilID{r sumJEnW.Mobile AlaE{T TEIPERATURE MTSE 6o-90 TEs' M'.TRrrct(t{t no(rrto.lllr€ EAlCltE) Ir|E ^f,nflE) TIIIE s{lrPt-@ Rn/OufiXnl @Ur{IB IIIXN RE\OUTX)'.I @.,NTER couPtEnoi{ cugc YA&lsuvo/ cuuuulrys WA1ER ADO@olt t|s 14 L' 15 106 LL? 45 2OO7 2008 2O09 LO:52 11;19 11: fB 11: 12 It: f6 LLtSJ 11:20 aa a6 as req re! rec as req as req as req B L6 24 A 5 rEsrlrl su[?(rlr)An@ilrilr(r) IET UNTTrs}|t (PcF) Yttu) coa{cnflf,rufE- R^IT'RE co RE'AId(s r4 t 3/4 5.8 T39.4 ?30 4 cylj-nders cast PROGRESS REPORI Tlme observed on all trucks. Sarnple taken from truckat L2:15 total 2/4 yards. ^nDrrlc MichacI llarbcr Architccturc I Andcrson S llastings; Gary Murrain PCL Construction Scrvices; URS Consultants; 8111 Carr Steven L. Pawlak FIEI.D OE6EfVER APPROVED Bf 'ChenONorthern.lnc Cdn lr| bffFt ana Sd-ilr.{, REPORT OF CONCRETE PI.ACEMENT OBSERVATIONS at A nnl.l FrrErD. E ct|ltff.l flf FnE ^to o(|!rtrrr:3' at rf'|('rn| ft tf, rD at rrf orlrttltl l--ri'rtf,tY or 'rT cl Exnl "O- AttttrlolrDr ;rt nnr'- rtl. or :rarrrrt rl ocr.uE r (r rxrrrcr:r riorr (! rfor{rrq otrr nrolE-d^idnio' rriiio-o,a -rrnla lrlfor'a- sr.r.r'r{f, rrl De D('lottD (r ,'nr 16rr€ B oo.?lltE ul.|jtt o|ltt rfiatlltm xrt rtllD rr, '| fiJttf, ^ '!i.nF , r.litttt lrt r| r-rr.{- 7d l.a ctal l,|| an. Clten€Northern.lnc.Conrulurt! Engltl?.r. oDd s.rr't .L REPORT OF CONSTRUCTION ACTIVITIES ffi n,'.E r., orrr*tw!. Ar t[t9!!! ^Ff sr t".,,.,t rs n,r coqrr]!l-t-F-- " "r olxn'. ,,., A,r*nl rn xr ?ui s- ,,. d srAnrr'r. O(f1us6 qr r,,t cni rp'.t (,' frrr(r{, Or rtf'in-d nrSrfnr rarm'{r O{.n rrnrrrX f1l 3^11151 lg lf D6I'rXlI' $ILr ItiTtO 6 cirrrno tnrss qtllt ralrrq.Ltlls xlE lqtrr, lo Dl tfill'€' ^ ,ri.'.- .r t-Fifil - o, .."'r.. t..h tb, Grf,l@A a/ao To: TowN 0F VArL JoB No. 4 398 90 o*tE: i/J/)O Attn: Mr. Stan Berrynan D\tLy REPORT NO. 56 SHEEr I 0F 6P.O. Box 100 Vail C0 81658-0100 INVOICE No. PFqIECT Addition to Vail Transportation Ccntcr' Vail, Colorado IYFITHER CONDffiONS AND TEMPERATURE 4O-BOU. cl€ar. p.m. 6howers CONIRACTOR'S CONSTRUCNON ACIMNES PERSONNfu lilNOR EQUIPMENI: AGIMTIES: CHEN-NOflTHERII'S SITE ACTMnES Fulltime observationr testlng and-insBection: Concrets belng ptaced for deck topping Level,5r_Line AA-B 55.)56 new structure; deisity testlng of struituial baskfill being placed.at AO Llne souti Orta fi-fi; reinforcing steel being placed for topping on irossover rarnp Li-ne-glC, Grid a3-ZB and walls-for Stalr 1io' IIt Leve1 2, we6t 61de. concrete pour started 4:00 a'n' COMMUNICATION CONTRACTOR, ENGINEER, ARCHTECT. coPrEs Tl:tl:" t Barber Architecture, Attn:Mr. Scott Ward; Gary Murrain,vrr.-.' Attn: Mf . bcotr waro; Gary Murraln PCL Construction Services, Attn: Mr. Dcnny Armour: Anderson f,1 llas-tings; .. tfRS Constrltants, Attn: Mr. l,cs wood RiIl Carr Steven L' Pawlak nA-O O6Etn/ER nPPnOVeD SY Chen€Nonhern.lnc C...:rlr||r t C.*r r{ S.Ltat* REPORT OF FIELD NUCLEAR DENSITY TESTING To: TO'N OF VArL JoB No. 4 i98 90 DA'IE 9/r/9O Attn: Mr. Stan Berrynan DAiLy REpORT NO. 66 SXeff 2 Of 5P.O. Box 100 Vail CO 81658-0100 ttwol6E No. PROJECT Adclition to Vaj.l T-r-ansDortl t i on Ccntcr, Va.i 1, Colorado SPEC|nCATlOil COIIPACTION & MATERI L MINIMUM REQUIRED IN-PLACE DENSITY 9> T A5 CONSIRUCflON CONTMGTOR: BRIB Excavatln6; H DETERMINED BY: LOCATIONS WERE ASTI4 D1557 backfill @walls SFTFCTED tr, fiel_d tech. TYPE AT.ID NUMIIER OF FARTH MOVING UNMS f fTONt CNd }OAdCT THICKNESS OF UFT A6 TEq TYPE At{D NUMBER OF COMPACTION UNrS 2 dual wheel I bob cahuueER oF PASSES aa reqrollers PERCENT OF (RElATr\€./ M^J(|r|tl|)o{lTtro sl. silty 6andy gravel |lll 97 97 9? 7.3 7'O 6.9 5.5 6.8 L12.O ul. r L31.5 T3L.3 13r. B qo ,.9 5.9 5.9 5.9 f}5. o L35.O L36.O L36.O 136. o 5t s. of Ao @ 33115' n 4r S. of AO @ lgt nS 5f s. of Ao @ 35lIL' BS 4'S.ofAO@ l9tBS 6fs.ofAo@341 7tB b ru[ TIME o&sElilArloN tr PAIr rlME oBsEFvATloN ris ifpirr, pif:FaE c,'run n r/f,D a! l Rutr(r of qn oFtn^rrlat or n pl ra-r)r€r]. tr lt \tr 'lf m oN-ltlF (ttoR..;rtn m co"rDrut l,'lart€ rrf FEcrr.,*to.1 co..'.crrr trr(Fr ^*o ,cr4 m r,1l urt o rrrrs rrir,'iirr'#+-#;' ;-tq frsrrvrno lrr nernn rr5ts l'f ]4ot of nF rlll oKY ls Ilfvur xlcf,ss.rr nr GrLF lt q.n qsutvtrs Ju,qtrirrl. nsr rxrr ffi ii6i 'rt':- iixi n'js rur ofiNx]rs orl wrlflllul lrtt rlll l/trnr srtoirlr]crc. lHE Nt Gt-E n ITo\aSo|TEIEl UEn|oO oF IEnlrc w s usED tN suBsr lfiul /rccoRD llcE wnH ASIU 02992 AID DJO17 pRzuMtN ff OBSER/ATIONS ANo/OR TESr RESULTS \ERIIAIIY REPOR'IED TO: Les lVood PROGRESS REPORT ThE AbOVCaterial being placed at tests were performed on walls at new structure 6tructural backfill south of AO Line Grld Bill Carr Steven L. PawLak REu) OESE}ryER APPRWED F/ coprEs xi:l?"t*?i'B:I.t'ft'li::cturc' Anderson & l{astings; l!r. Gary Murrran; PCL Construction, Attn, "Y:.r,33't{"tloutttlRS Consrrlt;rnts, Attll: Mr. Les I9!"; ^ 'nirr- r t-[HUt-le-r d -trarb F-ri h dtl0t^ a/ao Chen€Nortlrcrn,lnc O.:rt tt ajndxr -ia td-u... REPORT OF REINFORCING STEEL OBSERVATION At A rarnA,rgrtct!.r ro qrxl|, nt titE rro d|lrtrrt, at irtdrr_ xrE JrrfYrtD At nf corrt!!!.-_rttrirr or (xr dD{rl A'o A'nnErlrD' tii PrnEA- r(;1 4. stltrilrft c11(unr11rt cr rrTi.ct! tr l on irn ;1ta cU rxrri-d-nfm5 11111rp q;1 rr$lrx 'n;io/A' !^l1ou3 r11 t !'Fo!" t rrirl tntp B corfino ult:a o|ltf rl*}EJrmt rJ![ l!11[l, lo tl xErrI' r ,i-r.- .. -l-lltil- .t .-rdrr- trrrr ur. ({llOA a,/to TO: TOlllN Attn: P.O. Vai 1 PRGJECT OF VAIL Mr, Stan Berrynan Box 100 co 81658-0100 Addition to VaiI Tl'ansportation Ccntcr, JOB NO. 4 39_8 90 OAILY REPORT NO. [wolcE No. Vai 1., Col orado DATE: 9/5/90 66 sHEEr 3oF sTRUcruRE deck slab/deck topping utc^Ttc{E.EVAIION RED{FORC|NC co|rl|ofis \r8nC+lL IJOftZSTIilf R-C/21.28 Ao-B/3t-36 cros6- over ramp Level 2 272 rows # BJ rows #4 56 rows #4g5 rows #5 3/I+,, sLaa 1,/4 wire X 4X4wire2 3/4,t cha @ Lztt oc T&B II-S Btr oc botton B-lV l2rr oc top E-\tr Btt oc top lap al 2)tl #4lster @ 35tt ocr at 35n oc splice to toP ll4 ,esh laped as required ,S at 2rG,t| OC to spEEtrE nors: srEE cR De 60 GI n-$ts uses R€r5r(nco{o cr.EAt{r.[,Es!r clean Ql srtoe Duru$s usED cLEAR^flcE $tD @vER aS feq ul cofrngfon ,tovtsto snrcfie sPEcrrcATxllt* a6 req d puu-nle o8stfft/ TKIN u^R srJF*nr,. rypE ]/4 bolster fl prrr-nus oosm{ TloN FDIEH lN'lr0€ OO||LP$ffct Hoc r ffi,mff, ffiffiffi ,,-$.fi*- EC^I||NO RE-EqINED ye6 PRocRESs REPoRT AlI rebar is epoxy coated. Michael Barber Architecture 'COPIES Attn: Mr. Scott War<l; Cary l.,lulrain PCL Construction Services, Attn; l''lr. Dcnny Amourl Anderson $ llastings; llns Consultants. Attn: Mr:. l,es Wood: lilI Carr Steven L' Pawlak REID OBSERYER APPROYED BY Chen€Northern,lnc O.:drta f^*rr -ra 5|d nl3. REPORT OF REINFORCING STEEL OBSERVATION ,s A rrrng{ '.EtrctDt ,o clrxn, r( xrE ao clttLtft 4r,tqto!r_It- rJl( ltrfinD ^r r{f oornaxn'{'_ri)"rrrr (r r d-Earl ,ro aT rw^rrr| fttl Pt'lf, x}- '.,.', o. n^',.rrt co,qrre! o, rxriac13 ,r m if,o ^i.a 6r.r nroriii] r-itif-o'-rtioir -a5 r*rrnr'rlritir- rrrto rrl gc rF(Irl) cr rtra ran€ 6 co.rfftD rr.llrl onlul ,n rqtlxr| Itt Al{rD lo t.| frtrrc' ^ n-i,* .t ,- ljTrrr l;-. , .q'la... tEi rh. C.4l la a/F To: JoB No. 4 3gB 9.0- DATE: 9/5/90TollN oF VAIL ,.. ,. .Attn: l"lr. Stan Berryman oA,lLy REpoRT No. oo sHEEf '+ oF o P.O. Box 100Vail CO 81658-0100 ltwOlcE No' PRO.TECT Adclition to Vail Transportation Centcr, Vail, Colorado StRUCruRE step down footing L(EATIOI BEl/ lx)|l ROIFORCOIG courao{rs wxnc.AL ltoftitofira Stair No. I0 Level 2 L5 /14 vr42 dowels at 12tt oc dowels 12rr oc L4 #4 at l4l{ 3#4 xt7'i /i4 x. L6t 6 7 il4 lrK 4L4 3 #4 t4K 42O LB /15 Trans L3 i4 X l4l 5 /14 X L6l LO /14 @ lB'' tr botton top Z bar Z barat 9'r ocrr botton rr top oc X 4r5t' Section sPECnCArXilss snE- cn IE 60 FIE {F(nGile cr.E t{10{el* Clean ctI R^lrcE lt{D @t/E& as req sfllqlc sPEcrE no$$ aa req BAR swPoRT* rt?€ Brick nilsfl E ruls useo El snor DnAtrrcs usut b conn**ton -nt-E ruu-ue ocscn AIKIN O prrr-lue ocEnvlnox |tPt,CE OolttPtAilcE UET PnoECr uEr PR(ITECT DAIEFEtlJlRErrO{rs nEq(xEqftXIS nr-O<4lneOmEl tNm LLY wll€x E( III'{@ RE-D(ATH@ HooHr 1 PRocREss REPORT Footing location noved lf east due to change Stair l0 location. Michael Barber Architecture, COPIES Attnl Mr. Scott Ward; Gary Murrain PCL Constmction Services' Attn: It'lr. Dcnny Armourl Anderson $ llastings; URS Consultants. Att@ nill Carr Steven L' Pawlt RELD OBSEFilER APPROVED S' Clrcn€Northern.lnc,Cqiffht [rrgh.rr ti Sd-a!, REPORT OF CONCRETE PI-ACEMENT OBSERVATIONS Ar a urn,r tn'nGrll ro atl.ratl l|f n;t ,ro .tf,r:t-wl At ifFfiI' |ilE snrrwn Ar r: cotrt.l{Tr^t ltoafnTY or Crrr ct tr'at:l |ro,lrDffl rDl troR 'tfxl'-nol trr JtattLxfl oorqtrlrc ort ?rrrctr rrrfl ol rro arp otl ruwlj-d^ininio hxie-crrr rlnltlt ,lrffi<l/a- sll.lrrJ rrl oE otr(IltD d |fm lfjtt€ B odrtllE, !'.r! ol|-t ,riff,rt{rl ||a rfiLD to n rmtrl ^ '..r.- r r..F:trij-lg ', ...'rrb 7-r t CIti.. a./lo To: Tglvn 0r: vArL JoB No. 4 sgs 90 DATE g/r;/go Attn: Mr. Stan llerrytnan a . t).O. Box 100 DAILY REPORT NO. 56 SHEEI /0F o Vail C0 816s8-0100 tl116)tgE No. llgrECT Ad(lition to Vail 'l'ran sl)or.t at i on Ccntcr., Vaj I, Colorarlo. sFrcuEATp $ SLlrUP supPr.rn lV.l'lobile uu m. C 4500 3-5 An cot{tT}tr 7?t, aV g, TGO{T TUIPERATUFE R lrcE 60-90 tE;rts.lnucx r{L TCTET NO, mr[ EATCHg) mrE ARNryE' lllt€ SAl|PLED RA,OUTIDI{ @U IB IICIN RE\OU'Ipa.l@UHI$ collPr-Ellor{ :u&c Y m t_oID/ CIJUUTAIIT€ lfAlER ,lDO@ oru.otrs I 2 3 4 , 6 5t+ 100 rL? 44 49 I19 54 2027 2028 2029 203o 2OTL 2Ot2 2033 3:39 4 :01 4:18 4r34 4:50 ,t03 5:2L 4. qR 4:10 4:38 4:5o 5:O5 5:10 5234 4225 as req as req B ]6 24 12 40 4B q B B 10 B A lErIG sLlfl?(nt)^ncolfn}|r(r) UEI U'{T WTFHT (Pcf)llat)corfftE lEilP€- RATI}RE co REr ro(s ? 5 4 T/2 4 3/4 5.4 6.8 L39.t .11 69 4 cylinders cast PROGRESS REPOff Sample taken fronr truckr pump in use, time observed on all trucks. rytptFq Michacl llarbcr Architecturc I Antlcrson 6 Ilastings; Gary Murrain PCL Construction Scrviccs; URS Consultants; Bill Carr Steven L. Pawlak REI.D OBSERI/ER APPNOVED BY T0: lgpp or; vArL 'JoB No.ffi Attn: Mr. Stan llerrytnan t rp.o. Box 100 D lLy Reporr No. bb snErr 6 or 6 Vail CO 81658-0100 tN\otcE No. PR(IrEC!f Atltliti.on to Vai. I 'fran spor.t;rt ion Ccntc1., Vai l. Col.orado. sFErEAlp $ $.rruP V,l.i4oblleyl{ to. C-4500 3-'ATI @NIENT AEEXI 7% avg. lBIPEMIURE Mr{c€ 60-90$nPtm TEs't$.lnrrc{MI ncrEr M'.Il€ BATCHEI' t|U€ ARNryE IU€ s uPL@ RE\,qfittl @U}IIER OEOIN REV(xJrnOfl Ofl,|xrEN @uPtEltot{ cu&c Y ffir-ilD/ CUUUL\I'T/E IIAIB ADOED o^u-ols I 9 100 1r7 2034 2035, 5:A7 5 :40 6z20 5:50 a6 req as req as aa req req 64 o( o o rEsTrn sllr?(ur)ln @$rE{r(n trET UNTrsHr(Pcf)TA.D @}rcNEIE.IE'PIE- RATTNE cF) RfLAlu(s PRocRESs REPORf Time observed on all trucks; total pour 67 yards. nrnDrFq Michacl llarbcr n rchi cecturc; Andcrson G llastings; Gary Murrain PCL Construction Scrvlccs; URS Consultants; Bill Carr Steven L. Pawlak RE'D OBSERI/ER IPPRUVED Ff ChenONortlrcrn.lnc Cdrllhf E rfl|..t '|a S.rr'(,.l. REPORT OF CONCRETE PI.ACEMENT OBSERVATIONS Al A rrnA asrEtDa F crttttt D( Frf E t.., o-rtttrrr, Al tifF(lE ^it trrfrtD al t[ ottorxlul--ff('.trTY IF On Cl fxlt' ^to-,|,'ro|ultlf nDi |tRxA- ro. q 3rrrrrrxrl orrxlrmr or rxrlrcrr r.r r or ifo{rr€ ot.r rurcxE-d^iriniD-tr}na a-a ixnltt{ lfrn(ltA- it^!rtl! xrl DE lxFcl{D (t- llrn lE rl€ 6 ooafitD trr,a.:I oDrl l|rxrrtatt xif rstrt D !t ttttt o. A "-r.r r r-F]rti-l:-t .. -,rr.r- fri l.a Oal lal ../ts Chen*Northern.lnc.Con.uIJn{ trgL-... ord 5dnt,.t' REPORT OF CONSTRUCTION ACTIVITIES To: TO*N OF VArL JoB No. 4 393 9s DATE: 9/5/90 Attn: ltlr. Stln Berryrnan OALy REpORT NO. 67 SHEE1I OF 5P.0. Box 100 Vail C0 81658-0100 INVOICE NO. pRqJEcT Aclclitiorr to Vail Transportation Ccntcr, VaiI, Colorado wE THER coNDmoNS Al'lD TEMPEMTURE 35-700. partly cloud Ct{S{-NOmH€ml'S SITE ACIMflES Fufl time observatlonr testlng and inspection: Concrete being placed for topping Level 2 I\0-8-33.9-36 nerv structurel density testing of structural fill being placed for slab-on-grade S. of frontage road Sta. 14+50-19+5Of i-nspectlon of reinforcing steel belng placed for west wall, Level 2, stair 1lo. 12. Concrete pour started 4:0O a.m, VERBAL COMMUNICATION WTTH CONTMCTOR, ENGINEER, ARCH|TECT. OWNER qlll Carr Steven L. Pawlak NED OBSERI/ER APPROYEO B' Itli chac I Barbcr Architcctur:c, COPIES Attn: Mr:. Scott Ward;ga1y lrlurr:ain PCL Construction Services, Attn: Mr' Denny Armour: Anderson 0 I lastrng s; ... llRS Consultants, Attn: Mr" l'es llroo(l; ^ .,.irr'- d s. frttii-lt-.t .. ..i,t..tr. rii *.. fJlElOlA a/- ehen€Nomlrcrn.lnc C..:rlrl|f Er*r. oa Ll.rfi4. REPORT OF FIELD NUCLEAR DENSITY TESTING at A rlrnl|t PitltEtl| tt cLtxll, n( 7t;tE llo c,r:tnws, Al ,[Frtrrs fd 9t{frrD a1 rrI ccl7T"}frrl-?i€r'ttTY 0'qtr qJora' A}o a/noi2 rD' Iln Rttra- tE f sr ttt rxE cnqu'r. qr rnrfcxr rF[ m atorirno orn ntrodi'n-iii-sti#-o -nrltiirc on nnol rrrltx'tt- s ['uJ rr'r E Dtlrq{! oor|.t.:nD rta'cl| gfilt l'l.rql.t,rtr flt rfrID lO El I'tll||c a 'tr-r.' t r.Fiil-lp..r !,r r'h Frtr l|o. C|.:lttA ano To: To'N oF vArr, JoB No. 4 398 90 DAIE 9/6/90 Attn: Mr. statr l3errynau DAtLy REpoRT No.6Z sHEEr a 0F 5I'}.0. Box 100 Vail CO 81658-0100 lNVOtcE No. qRGrECf Adcliti.on to Vail Transrrortat.i"on Center, Vai1, Colorado sPEClncAnoH couP^cTlor{ t MINIMUM REQUIREO IN_PI,ACE CONSIRUCNON CONTRACTOR: MATERIAL DENSIry 95 X As BPzB ExcavatingTEST DETERMINED B/: ASTH DL557 LOCAIIONS WERE SBfCTED FY: under slab field tech. as as T\"E AI{D NUMBER OF EA'ITH MOVING UNITS T TYPE AI{D NUMBER OF COMPACTION UNITS I MEIHOD oF ADDING MoISTURE natural bobcat dual wheel roller3 'iumP TIIICKNESS OF UFT NUMBER OF PASSES iacks req" req LOCATION DEPTH OR ELEVAT]ON (FEEr) LAAOr{ATORY FIELD FERCENT OF (RO,ATr\E/ ItA(|lRil) o{tTtlfD SOIL Tr?E IEJI NO.IIAXIMUM DR/ DENSTTY(pcf) OPTlMUM MOISTURE CONTENT(x) DFT DENSTTY (P"t) MOISTURE CONTENT (%) 29t1 2qc 29e ?97 7-9e 20a Jr N. of R l-,ineat 35 6r iv. of B Lineat 34 4t N. of B Lineal 5r.5 Jt N' of B Lineat 51,5 6r l{. of B Li.neat 34.52r N. of B Lineof 46- 5 5' BsG 4' BsG 3t RSG 2I BSG II BSG sub- oz.a d a 1f6. o r]6. o L36.O 1J5. o L36.O 1]6. o 5.9 ,.9 5.9 5.9 5.9 ,.9 I-33.L L33'o L3L.3 IJl.8 r32.5 7,2 7,O 7.3 7,L 7.o 97 97 96 9? 97 sI. silty sandygravel B rUU TIME ORSEfI1/ANON tr PA'{T TIME OBSEM/ATION nG liF r Fit;}|Ir (F lXtrt tIIn{D l\! lt RSULT ff (IlR Gq|\ rx!r' (r ftll n f"'llfl{l' Dt IAW nfl'm O -ntF c"fiR/'iTo* rc OOfiflUf rtflY|lo ff Fforra{lo@ oorPfcrw ttrrFr ^rlo rrEntt{ lo tlu- D.rato nu rttrt twn'oh';;6t#;;-rrn rrsrru+ro -crnernrs' r''srs AAt u o( or r.f rnl crY ts E!fu! fltcuisrf rr canlrt tr,n rx6t rrn .,urro(rttxt. tsf txre er*- Trii Tril!ii orsr ftt oallrnrs cr{ Yntrnttlr r]tr nutfE sEcaarn'& rHE NIJCIEAR Do'a9O/EIER UEnm of TESnNC w^s LSED tN SUT|5I NIUL lCco{tDANcE WnH ASIU 02992 A}'lD OJO17 PRzuMtMFf OBSEfiVATIONS A},lDlOR TESr RESULTS VERIIAIIY REPOKIED To: Les Wood pRocREss REpoFr The above being placed at Level One tests were performed on thefor slab-on-grade north of Etructural fif} 3 Line vtaLL 33-15. coplEs xiil?.'"li'3:5.t'fi'li::cturc' Anderson fi llastings ' l'lr. Gary Murrran; PCL Construction,- Attn: lrlr. Dcnny Armour; ifiS d6iii,li tinii , 'rrttn : lr'lr . Lcs ltlood ; B11l Carr Steven L. Pawlak FIEI.O OBSERYER APPR€IVED FY Chen€Nonhern.lnc.&.:/llr|' t4*xr -a s.rrihl REPORT OF FIELD NUCLEAR DENSITY TESTING TO: TOlrrN OF VArL JOB No. 4 398 90 DATE: 9/6/90 Attn: Mr. stan Berryman DArLy REpoRT No. 6? sxeEr ]or5 P.O. Box 100 Vai I CO 81658-0100 . ltwolgE No. PRqrEcT Addition to Vail TransDortation Ccntcr, Vai1, Cololado SPEGIRCATION COI4PACTION T M^TERIAL MINIMUM REQUIRED tN-ptAcE DENStry 95 x AS DETERMTNED Er/: AsTl'1 Dr55f under paving CONSIRUCflON CONTMCIOR: B&R llxcavatingTES,I LOCATIoNS WERE SELECTFJ W: field tech T\?E AIID NUMBER TYPE ANO NUMBER MEIHOD OF ADDING oF EMTH MovlNc uNns I scraper, OF coMPACnoN UNII5 I sheepsfoot MO15TURE natural THICKNESS OF UFT as reo NUMBER gF pASTSES 1 frontloaderroJ-Ier slIty sandy gravel tl /ob 7.4 f e 1 L35.6 L3'.L L35.5 5.1 5.1 5.1 140.O 140.0 I4O.0 sub- grade ll Sta. l4+5O Sta. 17+00 Sta. l9+r0 6 RJLL TIME oBsEIivATloN o Pntl'l' llME oBsEm/AroN n|3 f,Flt Pit:frnt qrutt rui{D A! A RS[r OF OtXt tFrtir' tril! oF ntl Pl'cf }rtNr' *t lr w mlttD otljllF elt'rR t.jlofi T" Co{nt|ut !'?tr}€ nf FrcottrotD cotacuw ttr(Fr ^lrD ,xtsnl.f lo ttu. Dlrqlr€ ng ,tws -*,"rt'dth'rp*Fin s -tpr drstlwlr€ {t'rn f}rs rrrs ^lrl 9ro€ or ntr ml o{Y ls Elfwl l[cesslkr rD or{nrlrE q.,i rxru(vtt'! Jurotyotr, trsr *t^ *t Tr6i iiTifii;"fi'rsl o{rinri crr vnmnn lllt rlL-L lt.rrs srEuff 1106' ffi MrctI R DA$OIIEIER HEn|oO of TEsnNc w s usED lN sutlst lfiul AccoRoAllcE wnH As-!U D2992 ^lt.lo D$17 pRzuMtMR/ OBSER/ATIONS AllD/oR TESr RESULTS VERUAILY REPORTED TO: Les lVood The above tests wereroad. Proof rolllng perfonned on the observed on area subgrade area tested and found acceptable. 8111 Carr Steven L. Pawlak REI.D OBSENYER APPROYED S'pCi Consttuctionr.-Ai:tn: ..lr'1r., Denny,Armourl coprEs xlil?"t*11'3:i.t"fili5:l'"'".'. Anderson 6 l{asti.ngs; l!r. Gary l{urnall; ililS d;;;r;itinti,'nttn: Mr. Les woo a ''\-ir-, *@* d .ir'r',b t?tr ?|, Clcldt a,/ts Clrcn€Nortlrcrn,lnc O':rtht &dn -t il S.,.*rtlr, REPORT OF REINFORCING STEEL OBSERVATION ^t ^ q,nlrt ?i'rrc|D. to ctlxr|. l|f 'tIE !|, dll'l.tlr. At rt'|fltt-l,|f, 'r,'.f|TD ^t rll- oo|rf}m^(.-I;r'rrTr c' q' cuxrr.,x) Amq|,lID{ 'o'l l|l'|..rA- rrrr cl- sl^rrrttt orllrloo (rr rxrtactt lrrl trr ?a911!!! cl rxfr-rr-ffiil -rdiiro-crr rrnnx fr1oln-:erts rlt rt ltF(x! cr rttu iEm€ 6 conno urr:a (nrlt lmlllrltnt |^f ,o(r, ro ll tlllt€. ^ i!.-'.- .. -[@- .l..a?''r. rdir tb. C{ltl a/F To: JoB No. 4 3e"8 90- DATE: 9/5/90TOWN OF VAIL Attn: Mr. Stan Bcrrynan oArLY RepoRT No. 67 sHEEr 4 OF 5 P.O. Box 100Vail CO 81658-01.00 ll'{VolcE No' PROJEGT Addition to Vail Transportation icntcr, Vai1, Colorldo STRUCTURE ry611 !rcAroll E-erAIOrl RA|FORqt{c coalofis VERNCIL HOftZOt{rA Stalr |io. I0 Level 2 lBrto l0rr lBrl Lztl 9#4@TB#'@oc-0F 11 #4ooc-0F L4#4@ OC-IF LO /14 @ L6tl L4 #4 @ 16" L4 #4 @ l6tl LO /lt+ L6rt o oc IFoc 0F oc 0F II N. Section M N. Sectlon ti. S. Section i\i S. Section l'1 sp€curc non* srEE GMo€! 50 d ners ,reo FEnF(nCNC CtE Ni.0{GSA: c}€an E goe oR flt{Gs usD cu eAilcE ANo @vE& a6 req EI comn'tcron 'Ao/rsED s^lcrror spEcqrcArpra* aE req d rT -'--nue oosrnvATx'N a n ,n;,pofinr: ','E chair fl prrr-nue oosav/{noN Flt{E}l l}Pl,^CE @lllfnilCE HmHr ffilffi ffir'ffiffi *.-ffi,*wllE'{ lNfiullY ffio{ E)(.ATO'{ED RE-EqTI @ ve6 PROCRESS REPOKT Michael Barber Atchitecture, COPIES Attn i Mr. Scott Ward; Gary lr'turtain PCL Construction Serviccs, Attn; l''lr. Dcnny Armour; Anderson G llastings; llRS Consultants. Attn: lr'tr. Leq Weldi- BilI Carr Steven L. Pawlak RETD OSSERYER APPROVED Bf To: 1g1r111 or; vnrr, JoB No. 4 J98 90 DATE 9/6/9a Attn: Mr. Stan llc r- ryrnanp.0. Box 100 - DAtLy REpOrr NO. 67 SHEEr 5 0F 5 Vail C0 81658-0100 INVO1CE No. qlllqGf A(l(li ti on t'o Vnil I'Tansl)or.t tion Ccrrtcr', Vai. I, Coloratlo. SPEfrcAfXils: lltrryp An @ IEiTsllm !t/.l.4obj-le fu r.o. arstr{r TEIeERATRE nelcE IESI}{'.rnuo(ut Tto( T fl(t nu€ E TCHED TII'E ARf,IVE) lllr€ saaPtE) RA,!oII'IEII @UTTER rf,B||l RE\Oufllorl @ariaTEn @UPLENON 0t otc Y rc a_o^D/ CUUUI,AIIVE WAIER ADO@ oruor|s I 2 3 4 , 6 ( B 54 49 r00 44 LL? ,4 49 100 2O7L ?o72 20?1 2074 2071 2076 2077 2078 f :41 4:02 4tL3 4:25 4:50 5:16 5:Ot 5z3O 4: oO 4r12 5:00 5: 1O 5zL5 5225 6':L5 7:18 4:55 a6 req as req a6 req aa req aa req aE req a6 req a6 xeq as req as req as req as req aa req as req a6 req as req B r6 24 32 4o 4B 64 10 to l1 B L2 L1 IESTMI sun?(ur)lnO$fiEfi(r) TET UNT wtoHr (Pcf) Ylru) coilcf,ElE IE.PE- R^IT'NE c4 RE$E$ 2 3 t/2 5.8 140. C 72 11 cylinders cast PROGRESS RF$OTTtrucks, 45 Sanple taken from theninute delay in placi-ng truck. concrete Time due observed on allto plugged hose. ,'\.'.rFc MichacI l}arber Architccturc l Andcrson I llastings i C::rry Murrain PCL Construction Scrviccs; URS Consultants; RlIl Carr Steven L. Pawlak RED OBSEflVER APPROVED AT Chen0Nonhern.lnc Cdrllrq E |gh-r t{ Sd..it{. REPORT OF CONCRETE PLACEMENT OBSERVATIONS ar a |.l rut tFtEtu| to crtxn I'f nFE |rlr ..-rr7trrl at rrF('fr! A,rf, tirrrtD at nr (t rr]LJul F?d'l'llY f (|l d f]nl a9 4Jn!1o tDr trfr |(n(x - rp. c- lrltnalrt, orrrtrEDr qr rxri cn! rrrlt rrr irq ^nrr qr rrrrrE-d-rr-iir.ril'hittp 0t r t*tlfx Arrfra- s rtir! rlD€ D(FqrD o'rttl rurl! l3 oo?lfnD l,(r;r onat tfixrr.xrr l,!t rsrrD ro n rrl|t|l A -'ts r r..[iliX-]n r .. -n?'r- fc L CLll.. r/to Clien*Northcrrr.Inc.Con.dlJ0c tngL!.r. oi{ si:L,t,'|, REPORT OF CONSTRUCTION ACTIVITIES as ^ qmrrt nwnt|rt to qrI!- Lte Ptntr r.n flRf.tvlL ar.,rftr'rlT3. |rt .! rr|TtrD As n|( co''trtfrul-w.rtrl.Etfir i"'ffiffi'tft#;ftt;'';nri;;;i- itai,:lott ('r ri1ili,:iJ-ttii * rytlfqg oun ntFom:t E nf,3x1trD rarurro q''n rxnrt'l c{.r.irtfD ltl,t.sr qrrtt tai^rerx|:t lt[ lartrll lo N rRlllo' ^ 'r-i.- ., r."Fiff il g..r d dt dt 16 {.. c|.Elol .l/to To: TowN oF vArL JoB No' 4 398 e0 DATE'9./?/9O Attn: Mr. Stan Bcrrynan DAILy REpORT NO. 68 SHEEI 1 OF,6 P.O. Box 100 Vail CO 81658-0100 l|\lVOlCE NO. PROJECr Addition to Vail Transportation Cetrter, Vai1, Colorado WEATHER CoNDffiONS AND TEMPEMruRE Cle CHEN-NORTHERil'S Sm ACIMIIES FulI time observation, testing and inspectlon: 4:00 a.m.r concrete being placed for topping, Leve1 2 to j, new structure, Lj-ne B to C, LLne j3 to36, crossover ranpat exj-sting structure, Line B to C, Line 2J to 28 and forwall and footing, Stair lrlo. 101 Density test of structuralf111 belngplaced for footing, Stair lio. 10 and wall backfillsouth of Line A from LLne 33 to 39 and east of Line 39 fron Line A0 to A0.6 and for slab on grader Llne B to Cr Line 51to 32, Level 1, new structure. Reinforcing steel beingplaced for wa1I, Stair I'tro. 10. VERBAL COMMUNICATION WTTH qO,[,{IRACIO&- ENGINEER. ARCI{ffECT,, OWNER--"CieA Sihultz of PCL was b.dvised to remove wet fill and re-place with suitable moisture fill i-n slab on grade arearLevel1, due to leaking hose. Bill Carr Steven L. Pawlak nfro oesErl,tR APPRoYED Fr cop,Es Xlllli""?i'BH,t"ftll::ElXl";,""""r,' PCL Constnrction Services' Attn: Mr. Detrny Armour: Anderson fv I las-t ing s ; ... llRS Consultflnts. Attn: Mr" l,es llood; Chen€Nodrern.lnc.c..n irrtc En*t -r ra s.l-€.- REPORT OF FIELD NUCLEAR DENSITY TESTING To: To$tN oF vArL JoB No. 4 s98 90 DATE: 9/7/90 Attn: lt'lr. Stan llerryman DAtLy REpOKf NO. GB SHEET Z OF 6P.O. Box 100 Vail C0 81658-0100 lWolCE NO. PRoJEcr Addi tion to Vail Transnortation Centet, Vail, Colorado SPECmCAnOH CoIIPACnON & MATERTAL MINIMUM REeutRED lN-pt-AcE DENsrry 95 x as DETERMTNED tlr:ASTl4 D15r7 for backflll _--a!- Ualls-.and slab on 5ra CONSIRUCflON CONTMCIOR: Band B Excavatffi LoCATIONS WERE SFIFCTED tr Field Tech- TY"E AID NUMBER T\?E A}ID NUMBER MEIHOD OF ADDING oF EMTH MovlNG UN|TS Front Loaderr Bobcat THtcKNEss OF COMPACTION UNrfS Dual wheel roller NUMBER OF MO|STURE natural As Req. 46 req. PEFCENT OF (RgrTT\€/ lA)outx) osr lco Slishti.ysilty san gravele llLl tl 97 97 9? 7,2 ?.1 7.2 7.1 1J1 ,ty 1Jl .B 133.o 133,2 5.9 9.9 ,.9 5.9 5.9 135.O 136.O 116.O 136.O 116-o OI RRG 19 r llRG ISIBRG 1 6I BRG Subgrad 3' E. of Llne Jtat Line AO.) 4r E. of Line 39at Llne A0.4 ]r E. of Line J9at Line A0.2 4r S, of Line A0at llne ]8 12t S. of Llne Cat 15r E. of ]1 b FUtt TIME oBsER/ATtoN I PART llME oBsEE/ATloN ntrl iftoGr P||;rxr:r (p Dtlt nFr{D at A Rt-9Jtr f cillt ffitlv^r{tl' rI- ntl F rt-nrfxl' w€ Invf nn lru -otl rxt ';ltlrRfcTl0'l m c(.n Jf l"PtYllp t}f arcoarrcn ctrplcrr"f atrrF ^no qsntrf m nll. urnrro ttu rtws "rrlt'&h'#+ft;'d-*' &rsrlulo -w erlrrrs rr:ils ^trt g{'E (F nrr nt trr-Y ls r.LEvt ltolts it To c{.mlrr q.tr oct wrrs JUDotr[xI. rtsr rr rr ft iiii'iit-':iiri iirss rm (tcr{tors otl wrllllf,I tttt nll ,rrTs sff,ctncrlpot. IHE NUCITAR Dg\rso|rErEl UEnm of lEsnNc wAs USED tN SUEIA{IUL tCCORt} }lCE Wn}l /\slu D2992 A}lD DJO17 PREUMT{ ff OBSERI/AIIONS Al.lDlOR TESr RESULTS VERBAIIY REPORTED TO: trss ilut.6 pRocREss REpoRT The aboveplaced for slab on grade on the structural fill beingvrere performedwall backfill Ri1l Carr Steven 1,. Pavllak RELD O6EF/ER APPROVED BY coprEs xt:l?""1i'3:{.1"ft}i5:l'"'"'. Anderson & llastings ; !!r. Gary r"lurrr an ; iiCt Contttuct ion ' "Attn : l'lr.- Dcnny Arnour; ifis c"iii,iitiriti,'nttn: Mr. Les wood; ^ |'|l.- , t (XU lr-t , .ao.r- t-ri ,ai, CItldrA 4/F Chen€Nonlrcrn.lnc.Co.rrlrr|9 trC!.rr -{ J.JJd.i, REPORT OF FIELD NUCLEAR DENSITY TESTING To: TohtN 0F VAIL JoB No. 4 398 90 one:9/7/9o Attn: Mr. Stan Bcrryn'' DAtLy REpORT NO. 68 SHEEr J OF 6P.0. Box 100 Vail CO 81658-0100 11wotgE NO. PRGTECT Addition to Vail Tr:ansDortati on Centcr, Vail, Colorado SPECIflCANO}I COIIPACNON & UATERIAL MfNtMuM REeutRED tN-pLAcE DENsn'y 9B x As DETERMTNED By:ASTI!' D1 557 under footing CONSIRUCIIoN CONTRACIOR:3 & B Excavatinp'r LocATlONs WERE SELECTED W: Field Tech TYPE AND NUMBER TYPE N{D NUMBER METHOD OF ADDING THICKNESS oF UFT As req. NUMBER OF PASSESAs req. oF EARTH MOVING UNrS rront Loaderr Bobcat OF COMPACnON UNffS Dual rsheel roller MOISTURE natural SI. silty sandy gra- vels 7.o 6.9 6.6 133'O 133.2 133.6 .Oi 5.9 1]6.01 ,.9 136.O1 5.9 Subgra l IRBF BF at l0r \'/. of 32 BOt S, of Line Aat 49r 'Jl. of 1 7Or S, of Line Aat 50t W. of 1 b FuLL TIME oBs$vATloN n PART TIME oBsEFvATloN ris lfFrr titlrrfs tpltolr tuirrD ! a iell|tl (r ot|| oltsfit/ llot8 (t' Flll Pl rtlrt'{I' ra lrt\t nrlnD,oll lF crtotw"T(n m c(fnr f 'rttaYt€ Df Frcoa."DrD c!.""rcr!!,, trrrrir anu rr(En ' lo nu_ utnrp n,r n,*s rtr.t 'tiir'iiri.r,nn slrn rrrrlto trr nerrrrs lrits ^Jlf u oE 6 n : rn I olY rs Er,EvtD xtrf,ssarr rD cArrurE qn o&nvt;.3 Ju-rotLlxr. nn *re lfi- iiiti ;'f ':il; it sri rut gnglq'rs ttl wllrlllut lllt ntl utr'Ts 3rfoncarrc r! THE ltt ctr R DE soraErB uErlm oF TEn]lc w^s t sED lN sunsrA{Iul lccoRo }lcE WIIH /rgu D2992 ^}lD DJol7 PRzuMINAiY OBSEf,I/ATIONS A'ID/OR TEST RESULTS \ERB,AIIY REPORTED TO: PROGRESS RFfOKt Tests iqo. 3O9 and ]1 0 were perforned on the structura.I fill being placed for footings, Stair llo. lOr Level llo.2e Section M. Bill Carr Steven L. Pawlak REI.D O85ER1/ER APPRO/ED SY coPrEs xi:l?"'*li'3:5.1'fi11::l'""", Anderson 6 tlastings ' l'lT. GilTy lolurrlan; pdi Construct ion , .-At tn : Nlr. Dcn.ny Annour; ilil5 i.iiiniiinis,'nttn: Mr' Les Wood; AS A }lrutt ?dlfctrra tI, alrtaTt' rlf F|'rttc x{, qf'trvr!' al F nrnrs ^'it llrt|mD At n[ cotDrxrur'-ti"rrrt (r olF cr fxTa ao aT rcllz^tD' ml FJ|l EA_ rDt '. Srr.r'rr.lt oot.qlUtrofr sr rrrlf6Tr tFf f Rro xfrl.<l cr,n nroi'i-A-iii:rliiO"f.;ii€ -d.n wtnu ^r'r'tlo,A- suriu3 vtt IXF[t F Ftrr ]6no 6 oolrunD t'ult ql}ll t/;rfltolll rrtl' rc[LD lo w lrnll|||c' ^ 'n.r.' ., *.(Tift-lg-. d r.rrc'b rc! tlr, CLlqt a/ao To: 191s11 ol: v^rr, JoB No.4 39s 90 DAi::.. g/?/goAttn: Mr. Stan llcrrynan P.0. Box 100 DATLY REPORT NO. 68 SHEEr 4OF 6 Vail C0 81658-0100 tNr/plCE NO. PR(UECT Addi ti on to Vnil 'frarrsPort:r ti. on Ccntcr., Vai l. Coloratlo, SUP'IJER sP@rEATr)$A SLUUP 3rr- ,ttlVestern ru LD. C 4500 An coNrBfr 7% Ara€Xl Avg. ]ETPEMIURE nrllcE 6Oo-99op TE T lto.TNUCXt{L TO( T M'.nuE lArcHE) T|rE ARNWED Solllr 1llr€ S IIPLED &r o Rf\ournan @(,,rlfEn IEPIN RE\OU,NON @UIOER corPLEno ;I.|EC YARITS t_MD/ CUUUllItr/E WAIER ADO€D o llJoits I 2 4 5 o 7 B 9 10 11 12 ,4 49llg 44 54 49 119 44 117 150 29 4B 2085 2086 2087 2OBB 20Bg 20go 2491 2Og2' 2093 2094 2095 2o96 3t41 4:O2 4:194zi) 5:04 6:3o 6t43 6:58 7:13 ?:27 7 t32 7 243 4: O0 4:1o 4231 4244 5z2O 6:38 'o z50 '/ tOJ 7 219 7:39 7:47 7 z5'/ 4;2J 5:00 As As As As As As As As As As As As neq. req req req req req req req req req req reql As rer As rer As re( As rer As rer As rer As rer As rer As rer As rer As rei As rei a o lb,24.32.40.48.55.64.72.80.BB.96 B 3 4 f.\ 4 10 12 B+4 1O+11 1O+{+4 4+4 TESTMI surr?(ln)AtR CO{IEXI(r) WET UNIT IEAHT(Pcf)Ylg.D @NCR TE IETPIE- RAruiE cF) R[T/{U€ 2 ?4 1/2 4 6,4 6.o 139.t 140.e 71 72 4 cylinders cast PK)GRESS REFORT Sarnples taken on all trucks,from truck,pump in use. Tj-ne observed ry.tolFc Michacl Barbcr Archi tccture I Andersotr $ llastings i Gary Murrail PCL Constructiotr Scrvlccs; URS Consultants; Bill Carr Steven L. Pawlak RE..D OBSF-}WER APPROVED BY Clrcn0Norrhern.lnc Cqrsl0Da [rfh.-r dra sd-{d, REPORT OF CONCRETE PI-,ACEMENT OBSERVATIONS Al A llrltlrl, FolttDr 'lt art{ta flf FfE ^rrr ori!7rrrl' Al if-rrtrrt r|r( 3h4tm al nf co'attxrgr ftl(''lttf ('' ott cl ft'la |ro ,.rmrnl'^tE l 'l 'tn-'rirr-lr- srrherrti- oriixr-'n'ixrcrs tr.r. oi f,o t'r, orr mnirri-d-rrirwo ff}np qr nflrtx lt?ior'a- srrflrl rrl of o(tqtaD r flrt lurl€ E oa$rultD ttal:ta oDrt , rraxl| l,rf, tfiL m ra itrtL(l ^ t r.' d r..(Ifti-lrr rr -'!"-r-t )a- Ottt{ ../S CheneNorthern.lnc C6.r.rrifi &{}t -r si Sd-ara, REPORT OF CONCRETE PI.ACEMENT OBSERVATIONS Ar A tltnA tElrGtE E q,r'ffl lrt trff ,rat drlTlEi, al ifrqrrt {if iirrtm at nF c[rano lr|l nr<]frrf t cut d f]tra llo-Atn{ng rD' m |tis- lg, 6' ttarrratrrl qr(1;r;qr 1;t 6rrrc13 ri1;a (;1 ;qo.Gr€ qr ruxinj-d-rri-riio' I'$rip o'n mrtu |lrngv& :"Alf'(rJ ru E 0ln(IED cr ,\nrl rf:llt€ B odaunD urlr.lt oDq rn .lnarll l a rcato m R trrt|q, a ii..r- d rlTiF-|r... r, -ir-r- aG r. ell lal aro To: 19vp or: VAIL JoB No.4 398 e0 DAI1 g/?/go Attn i Mr. Stan llcrrytnan r,.o. Box 100 DAJLY REPOFT NO. 68 sHEErS OF 6 Vail CO 81658-0100 tNVOtcE No. 189!qCT A(l(lition to Vni I 'l'T;rlsl)ort tiorr Ccntcr.. Vail, Color:atlo. SPEEEAII)II$ SU'TP rx r.D.c 45OO 3n-'tl An corflE{r 7% Avg. ATSE T TtrTPERAIUREslrPn n lvestern RAr{C€6oo-gootr lE;r txr.TnrfrMI no€rl{).TUTE BTTCHq) IIUE RfiryE I|!€ s^lrPt-g) RA,OUIIIO @UNTER rtroN RElrcUfiON @{,NTER couPLEIlorl xrHc YAm rlJt!/o/ CUUUUTTVE WAIN ADOEDo^urts 1' r4 15 16 17 IB 1g ?o 21 119 44 117 100 29 4B 44 100 l lg 2099 210i 2102 2103 2105 2107 2r oB 21 10 2111 7 z5? B:OBu:lb B:25 B:51 9224 9:40 I O:0J 1O:12 8:06 Bz25 B:27p,. eo 9 :04o. a? 9:55 1O:1 5 1O:24 B:45 AE req. As req. A6 req. As req. As req. As req. AF req. 46 req. As req. As req As req As req Ae req As req As req As req As req As req 104 112 120 128 136 144 152 150 l68 t t b B 4 B t1 0 3 3 3 TESTilL sll,lP(nr)ArR co|lE}{r(r) WET UNTT WEFHT(Pcf)ilTLD @r$nflE TT}IP€- RANNE cF) Rf,IA&(s 13 4 1/2 6.8 139.8 71 { cyli-nders cast Truck no' 29 delayed in placlng concrete due to contractorrs equip- nent problens. Balance of Truck no.llp was placed ln Stair $o. 11 , wall pRocREss REFoff Total pour for {lO0 ruix was 168 yds. Tirne was observed onall trucks. Relocated pumper for I'rix A wall pourr ^t^orEre Michac I l}arbcr Arclti tccturc Ivr''r 'r' Andcrson I llastings; Gary Murrain PCL Constructlon Scrvlces; URS Consultants; BilI Carr Steven L. Paw1ak REI..D OSSER/ER APPROVED FY ClrcnONorthcrn.lnc,Coo..fi{ t|r'}r.d ai :dr{t t REPORT OF CONCRETE PUCEMENT OBSERVATIONS at A ltntA liorElu to cl,tml l'r Ff E rrn qllavrI. al ,rff!nr! r ( F r|fD ar l'r ocr-ftrn r-,rffftiw or qt d f'ffi ,|'rt ,{'nll!z tDl mi A|tta- trp q Jrarf,t [, ooraulrr ort trri$Tr rRta or [c 6a q,r nrrirn-o rl-inco rgxip dt twttt]l lrfnorA- S^rrntt tll E ol]Fctro f ]-nr lE Ir€ E oq|.r.[fE Urllll nflat ,nrrrlxtt FE ,r'Ito llt '| ttrnl[, ^ .rri+5 d r,.{ttttt-lrt r{ ..'nrrib a-ir h GIll{ afiO TO: 19vp orr vnrl JoB No. 4 3eB e0 D Ie g/?/goAttn: Mr. Stan Derryrnanp.o. Box 100 DA,tLy REPORT NO. 68 sHerr 6o16 Vail C0 816s8-0100 6M1CE No. $!!Egf Arl(li ti on to Vai I 't'r:nr sl)oltlt i on Ccntcr, Va:i 1 . Co l or-atlo. sPEctrnAlff! SuruPsffi i{esteril{ to. .0, 3000 3n-5tl ^n co$IENT 4-816 ATSEHT TEIPER^TURE nnrce 5,6o-9gop .IET M).mrc{MI IrcTET ML TD€ EAICH@ lluE ARE\iE) Tlrr€s r|Pt-ED Rn0(xDof{ @tJI{TER EOO{ RE\Ournotl @UXTER @rPt€noil CUEC YANE t-orlo/ ct uut^ltvE WAIER ADOEDo{!o$s 11 23 242' 26 4o 114 119 44 150 ct r+ 2115' 21 1B tl a1 1 +Y 20 01 r4.;Io 12:37 1 :1J te 12 c2 45 gs feQo As req.s req, .A,rJ I'Cq As req As req o1t 24 32 40 0 rESr Mr. surr?(sr,^|RcotfiE{r(n IET UNTT WrcHT (Pcf) YlEI} ooisRnE TE'PE- RAlrnE cF) RETAfU(S ?2 23 ? 1/2 4 1/2 7.3 7.2 1 59.' 39.7I /c 71 Balance of load reiected { cylindera ca6t pRocREss REpoRf Sarnples taken from truckr PumP in use. Tirue observed onall trucks, ,r.a.iF. Mi chac I llarbcr Arcl'ti tccturc I furdcrson I Ilastings; Gary l'lurrain PCt Constructiotr Scrvlccs; URS Consultants; g111 Carr Steven L. Pawlak RE"D OESE:FYER APPROYED ET Cl,ren€Northenr.Inc.C,on'|rurt9 Entla...! o?n 5d-iLt REPORT OF CONSTRUCTION ACTIVITIES rs A r rmrt Ftirtcmx to clr rr, nf, FrtrE lro tl-rsttwl Ar ttlt{ft! ^ft sl[.tltD as nf, corfrr]rnrt-,pF rtY or crt crrxra rt1o lltnotu^'trtr Ft tul Dr- rr (r ',^r,.rrs o.r€ru*.., (r rrnx:[ rFq. rn RFurirxr cn ntnoiri-rs"finiu ntiiiim-dn inrrnn'ii'rnona sfu: r E DGFmr or r[t lullo 6 c;rrr.rrut ultss onui tailrqttrug N( rgttll lo ll{ fnlrg ^ .nrr- .. r[TtX]o.. o, .'itar- rrrr r|o. CEIC a/lo TO: TOWN OF VAIL JoB No. 4 398 90 DATE 9-8-90 Attn: Mr. Stan Berrnnan DAILy REpORT NO. 69 SHEE; 1 OF 4P.O. Box 100 Vail CO 81658-0100 llwOlCE NO. PRqJECI Addition to Vail Transportation Centcr, Vai1, Colorado WEATHER CONDMONS A}ID TEMPERAruRE 400 - 800F. CONIRACTOtrS CONSTRUCTION ACTMTIES PERSONNfu MA,Ofl EQUIPMENT: ACIMIIES: CHI}|-NORIHERII'S Sm ACIMflES zull-tjnE Observation, Inspection and Testjrg: 5:00 A.M. Concrete being ptaced for slab-on-grade, Line B-C, Grid 32.5-36 and Line B"{, Grid 3I-32, ttqw Structurel Density testing of fill being placed at wall, souttt of AO Line, Grid 33-39 and east of 39; Reinforcing steel bejrg placed for topping cross- oqer ramp. Line B-C, Grid 28-30. VERBAL COMMUNICATION WTTH CONTRACTOR, ENGINEER. ARCHrrECT, OWNER Ivli chae I Barbcr Architecture,COPIES Attnr Mr. Scott Ward;611y lfurrain PCL Construction Services' Attn: Mr' Dentry Wood Chen€Northern,Ins tu;dhl b*sr rta SdQtL' REPORT OF REINFORCING STEEL OBSERVATION lt A |r,frut ?ElTCtDr lO alrHl!. n( |ttE rT r d-RnVft Al frlql! 'rt af,fmD At ll{ O(t. rtl{nrt--rittifY G qT Cr-fxtlt l'O A'nCRn rDl tIf, PtI('c - rrr. c,- sr^'.r,la coxq,,qr. qr rr6,rcrr r"'"l 1rr r1orma crr rrofr-c-Eiiio--xjd.i-irrr -rwr rtx iirmrrr- gcrr: rrr E rFtll' cr- ,fta l6rrE [t corFtrlrD t'l-ltt onlt ,n+rllrxlt |lt ,|IIID lo x ffinDrl ^ n-r-., r"lTliXl nr rr ooarqcrr tr|r tlr, Clal laA a^O TO: TOWN Attn: P.O. Vai 1 PROJECT OF VAIL Mr. Stan Berryman Box 100 c0 816s8-0100 Addition to Vai 1 l'ransport at i on JOtt NO. 4 398 90- DAILY REPORT NO. il.{volcE No. Vail., Colorqlo _ DATE 9-8-90 69 SHEEr 2 OF Ccntcr, STRUCTURE Rarr[O LOCAnOI rrfv rxx{ RE0tFORCS|C co|Iltofis \/trnc.AL HOaU'Zo.{rA Line B-C/28-3L Level 4-5 110 Rcfi^ts +4 e l_2" O.C. 83 llcn^rs #4 G 8" O.C. 55 RCI^/s #4 C 12" O.C. 83 #5 @ 8"O.C. -bF and rkrttcrn North to South Bottcm East to West Top East to West Ib,p Lap with #4 East to West All Rebar is upoq' coated spEcrncArnt3 $Et cRADe 60 El nexs useo ROr|FrncD{c qr ilu{€s! clean E st|oe DR^HltG us@ cl-E RAI&E ,rlID OOIIR As Reguired E COrrnrcron plseo snrc|ro: sPECtrcATEir* As Required El ru[-nse oosiEFv rloH 8 R sl,Profirs! TYP€ 3/4" Slab Bolster 0 prrr-nur oosErw roN F EH llP[,ACE COI{'urrcEH'cm ffi,ffi #fl,ffiSn ne-ffir'eo DOAlf|rIE) RE-DO\XIND PROCRESS REPOFf Michael Barbcr Architecture, COPILS Attn: Mr. Scott ltlard; Gary trturrain PCL Construction Services, Attn; Mr. Denny Armourl Anderson $ llastings; URS Consultarlts. Attn: Mr. Lcs Wood: B. Carr S.L. Pawlak RELD OBSETWER APPROVED SY Tol 19p1i1 ot: vAIr, JoB No.4 39s 90 DATE 9-8-90Attrr: Mr. Stan llcmyman t).O. Box 100 ' DALY REPORT NO. 69 sHEEf3 0F4 Vail C0 81658-0100 tN\plCE NO. lEqrECT Ad(lition to Vai I 'l'ra n sport at i.on Ccntcr', V;ri. l. Colorarlo. Western SF&fE $pirs3 SrIJUp 3"-5" An @irll}r 48-BB slrPPUn }bbile uD( t.D. B 3500 No Air ^rsoIl ru.pER ruFE R '€E 60o - 90oF. lEir NO. TRI.EI( HL ICXET t{r.TIIIE EATEIIEI TIUE ARRffiD Trl€ s^r|Pt.ED REr,OUfiffi COUNTEN EOOI Rf\ou'Inl @UNIEN couPt-EIlot{ 3{nrc Y &)5tsD/ CUUUTAfiTE lfArER ^DOOc ulsts 1 z 3 4 5 6 7 54 100 LL7 44 49 114 48 2L31 2132 2L33 2134 2135, 2I36 2L37 4243 4: 58 5: L4 5: 28 5:43 5:58 6: 13 AIVI A!4 A,I Aivt At4 AII,I A[4 4:56 Al4 5:14 Al4 5:30 AM 5:40 AIvl 5:55 Al4 6:07 AIvI O:'ZS eU 5: 45 AIt{ As Req As Req As Req As Req As Req As Req As Req As Req As Req As Req As Req As Req As Req As Req 16 24 JZ 40 48 56 6 a 7 5 0 J 4 lEir]{L su,l?(rlr)AN @TNE}|T(r) IET UNTTwslr (Pcr) YITID @NCNEIEID'P€- RATUTE cr) REIATU(5 3 s 3/4 14L.2 7L 4 Qrlinders Cast Sanple taken frcrn truck, tr>tflql in use. Time obsenred on all trucks. PROGRESS REFORI .-nDrFc Michacl llarbcr Archi tccturc I Andcrson G llastings; Gary Murrain PCL Construction Scrviccs; UllS Consultants; B. Carr S.L. Pawlak REI.D OBSE}WER APPROVED B' ehenONorrhenrlnc.Cdrruof [tgh...r crl Sdct rb REPORT OF CONCRETE PT.ACEMENT OBSERVATIONS At A lrnx, tFltGtE D ttttltt, lx( F;E rro u!f,lwx ftr itFrtnt rJr(:tF TffD ar t'r cotfD'Iw-tfi?fllTY (r dr dfxnt l'o lltnrnd'Aln' 7fl |(/ -r - ymr {. :.r rytxrl cor{rri.r.r oe rlr!}.cnr rr r (r rtq.r€ q,r ruuri-d^irirvio'-rriiir -ar -rmttN ll'FnqtA- s rtitrt rrl E DoF(nD crT tlr iEnr€ B octtf|tD t a.|ta gno ,rrrrrxtt *L x'ltD ro t| lKltlc a .n ', r.[Tiij-lr* r r-4rrr rrir t\ Clall{ t/t To 'rotvl't otr VAIL JoB No. *- * t^* t*-Attn: Mr. Stan llcrryman t).O. Box 100 D tLy REPORT NO. 69 SHEEr 4 0F 4 Vail CO 81658-0100 tN\1gtCE NO. PR(UECT Ad(lition to Vni.l 'l'Tan sPo rt;rt.i. on Ccrrtc.r.. Vail, Color:atlo. Western sflerf,Arxlut slurp 3"-5" A,R cor{re{r 48-89 srrPPLJER l4obile tro( t.D. B 3500 AaE T TErp€RAruRE 61r.1qE 60" - 90"F. IEST Hr.TRrrct( t{L ICKET M'.Tl|rE SAIENT@ Ttu€ ARNryE Tr!€ sA|lPt [D nfi cufix)fl @UNrfR IfDtrI RFftoI-UnOlt @I,NIER couPt.EDor'l CUBC YIGt-o!o/ CUUUIAIM w^lrn ADO@ oAlloa{s I 9 r.0 L1 t2 13 L4 t5 1.19 54 L00 LL1 49 54 100 49 2138 2L39 2140 2L4I 2L43' 2'1,46 2L47 2L49 6:30 At't 6:44 AI"1 6:58 AIvl 7:2L AIvl 7:37 AIvl 8: 29 AIvI 8:35 AIvI 9:20 Al4 5: 43 6:53 7 tt5 7:35 7 r.49 8: 41 8: 51 9:30 AIq A!,1 AIq At4 AD,! AIt, AI',1 AI4 As Req As Req As Req As Req As Req As Req As Req As Req As Req As Req As Req As Req As Req As Req As Req As Req 64 72 80 BB 96 104 LL2 '120 +4+4=8 +2+6=8 .1 4 5 0 I 0 1ESTMl gln? (nr)An COflIE}{T(D WET UMT wEctr (pcr) YlE-D oorrcRErE TE'PE- RAII'RE co ffnAfd(s L2 6\Slurp taken atter 3/4 unloaded PROCRESS REFORT Test sarple taken frcrn the tnrck, purp irt use. Tfuie obsenred on all trudcs. Total 120 cu.yd. ^n'rFq MichacI llarber Archi tectur-c; Andcrson G llastings; Gary Murrain PCL Constructiotr Servfccs; URS Consultants; B. Carr S.L. Pawlak RET.D OBS$N/ER APPRO/ED ET ClrcnONorthent.lnc C.fidt r{ t4h.-r ri sd-rrd. REPORT OF CONCRETE PL\CEMENT OBSERVATIONS a! A ||,mIa a[ltcr['t |lt .ttxtr. lll Flft rro (r|lttrri xL ntt('rts ^,lt lrrrtt at nf corrt]flul tnfnTt G'on d fxB LrD amrxnlftl mi Rfl,?r- rD, r naiirr.ri ao.ctras ti ixlrcr: rxr. dt rGori'xt otl nlwri-d'h-:rnto rtxio qrn rfilrDt ,/?Fwa- s{f'l{t rrl E olFcltD cr rr,tl rf.:lt}Il 6 corarnD tra-ai cmrul l|u,Irrrat! xa ,atj to x tr|l.q. A ''rr.- .r r".fijjii-lrt ', .-r.'l trrr taa Crtl l,|. a,/ao ChcnONorthcnr,lnc ;', ii;i"' a.-rn,q tngl,a.i nr'.l 54r-dh{. REPORT OF CONCRETE TEST CYLINDER DATA rt^vUnut.Bn'rrcJr'.n'q[|[:.\Il|tFl[r!odntt|.w\,|ln'JT}fr5,,|fstmr{rnrDA!T|tfr,!frrx!n^|'|'r|'frrd rr.lrr or rtAtt n,-t4s. fJrf€t thrt6 on txtR/r:rilorrlt.||tr urn tss on||n |tr|w{|r rJttrls lJrt LJlt t.u lo Ir h_xrllrx;, ^ "'-.- o. r.;1[ed,o or .ohponr.. To: Joo No.4 g9g 90 DATE: 1o-9-loTOIVN OF VAIL Attn: Mr. Stan Berryrnan DALy REpOI-{T NO. SHEE1 i OF 2 P.0. Box 100 Vail CO 81658-0100 lM/olcE No. PRcrEcT Addltion to Vail Transportation Center, Vail, Colorado, PIACEMENT LOC41ION:Slab-on-Grade,Level 1 to 2,Line B to C, Line 51 to 33; BATCH TICKET INFORI,IATION: SUPruER We-stern Mobi lc rnucx Ho. 49 nuE BArcHED 8:51 A.M. TlcKcT No. 2713 wx DEs,cN tlo. B cu. 'YD, B nuE AnfirvED 9:01 A.M.ruE PucED 9:14 A.M. FIELD TEST1NG INFORMATION: lruE TEsr rru<or 9:25AM sruup 6 JOB SPEQIFIQ{NONS IN, AJR IN. AR CDMTENT -- z yt[t UNIT wEcl n 747 ,6?ct. coMIDtT .__ I WATSI IDOED-AI SIIE SAIPLE ]E}TP. Gal. nDTARX&suJuP 3 - 5 70oxR rulP.40oF 24 of I2B ytL3 CYLINOER INFOR},IATION: nO. oF CnJNoEnS 4 cralllDEn slzt:(rl| Y 12rl IME cn-tND[Rs c^sr 9:38 A.M. MTFIE c{sr on.-sitc CURINC INFORMATION: rNnw cuRE On-Site Ra.o srofucE FAcrrmEs Cure Box MN./M^x. o TLnuE ar wr10-10-90 ralE srnrFp@ 10-10-90 By: S " Urton nE r fixs ACE DA'r€ DAIE ]ESTED TOIAL LO,\D(uls) Dr uElfjl (0'lclrEs)^Ilt^(sa. rr{.) coMP. fln. (PSD TYPE OF trucTUnE CNJNDF'T wE offr(u$) CrUtlD€n uNrr wuc|fr (r.cr) 7A 28A 2BA 28A r.0-16-90 11-6-90 11-6-90 11-6-90 87,000 6.00 6, 00 6.00 6. 00 28.28 28.28 28.28 28.28 5080 con/sp1it OESICN S'R€NGTH 3500 Psr oza D\Ys rf,tns rt wlqurofit r{ Rs{rlrrtl ^ a ol f(trrt(|r}ral t/lrrl Ar'r'll7trf f,frr, rrlllh(rli tn{f.:s ontrxvYlfl: }lolfo lorrf, lll,ollra^llon oll lllts lLSr l|trlrlr u Y m fft(^tr)fD ttl ollllftt' PROGRESS REPORT: Sample taken frorn truck discharge, Punp in use; coP,Es x;::*"T'li::.ffi11'"cture; PCL Construction Serviccs; Wcster:n Nlobile; URS Consultants; Mr. Cary Murrian; B. Carr T. Laudick FIELD OOSEFVER EPPROVED TT ChcnCrNofl.hcr-n,Inc '..rrur{ trgt'&tt .t, scl-r}.r. REPORT OF CONCRITE TEST CYLINDER DATA r5lvlmu|FF0TfcTrNctt'xT|!n|rnntE^'|nqt8t'l'w\,t!nf'txflsl,|i3lrn.rnrDA!|fr.|'rtxl.ltAt'rroPfrf.fo|l,lc|.fLno! ar q^rr {tt0s. rt l:t tr.irt6 00 fxmA:rt rTn{ ft 4tG nD[m aoufltnD ur{Ls3 on{t {rwqlrlxls rr{. |.rrl lu lo |tr wRrllllc. ^ '*rnr of ti. I I lll | | e.n F or como6r- Tat.rv: TgWN OF VAIL JoO No.4 398 90 DATE: 10-9-90 Attn: Mr. Stan Berrynan DALY REPORT NO. SHEE.r 2 OF 2P.O. Box 100 Vail CO 81658_0100 lNVOlcE No. PRGTEGT Acldition to Vai-1 Transportation Center, Vail, Colorado, Slab-on-Grade,Level One, Stair No. 12; IIATCH TICKEI INFORIiIATION: suPruER l{estern Mobi 1e IIIIE IArcHED llcKEt lro. 2729 MU oEslcN }lo. B cu. YD. 8rnucK ilo. f14 l2:43 P.M.IIUE ARRN€D 1:02 P.M.T]ME PtrCE) 1:12 p.M. FIELD TESNNG INFORMATION: TIUE IEST TAltE}l ,l ; IQptvl 3LUMP 4 JO0 SPECIFEAnOITS suJuP5-5 tN. tN. Arn col{TE}frs.0; wE'r uNr wEGrJtI59.8 JR coNTsJT T WATER ADDCD AI slTE 0"1. sr.rrP[E forp.690 ,tn rr!r,.40oF 6 c<rt. nol^Re120 of 128 yds CYLINOER INFOR}"{ATION: NO. oF CYLINDEIIS 4 cY1_tlloER slzE 6l| x 12rr l',rur: o/LTNoERS C,|usr 1:30 P.lvl.wltutE c^sr On-Si te CURING INFORL{ATION: lNfluL cuRE On-Site Ro-g sTonAcE FlcttmEs Cure Box M1N./M x. M]E/nuE ,r,r regl0-10-90 o lE sIRrPptD 10-10-90 Urr s. urton nEr RXs AGE T)^\5 IUTE TESIE' Tot L r.o D(rrs)DUT4ETEN (DtclrEs)NlFA(sa. rN.) couP, $n. (Psr) TYPE OF FIIACTURE CY1JNOER wEto+lT (urs) CTUNDFX uNtr wocllT (Pcf) 78 288 288 288 10-16-90 11-6-90 11-6-90 1_1-6-90 108, 500 6.00 6.00 6.00 6.00 ?8,28 28.28 28.28 28.28 3840 conf shear OESIGN SIRfNGTH 3500 Pst o za o,rYs fESIS ft llDOi^fOJn |'fttsdt|ln A,lf tl lr.tf)no lr:f ttnl AtrPl n fif Aslu uf-lll(,|ti l'rllfs; OrlltjtrYt9e l|oltD 50rf, llltotlralloll oll tllls |LSI RtFo{lI 14 Y rf l"iq/$(D ttY olllcftS' PROGRESS Sampte taken frorn truck discharge, Pump in use; Michael Barbcr Architecture;uL,rrLJ Anderson fi llastings; PCL Construction Services; Western lt'lobilc; URS Consultants; Mr. Gary Murrian; B. Carr T. Lauch ck FIELD Ot.]SEJil/ER APPRO\&D Ff Chcn*Nortlrcnr,lnc '..alll vt (r9llBr i'<, S.l'nhl. REPORT OF CONCRETE TEST CYLINDER DATA ^.sAuUnwfri'rcTn{lo.]tF'rT:Ll|tnEt^'l.'ot,i.I|.!r5'^l!I'ri.r'n5^,rfi(mi,in'DAlirrfcot'1rxxrw..flfnn.. or ! lttrurtns. cnft trlrfr< on fxfrr.:rs4ovr\.ttt|| ur4t5t olllft ,{t fo(lrt o5 r,ll lraJnl_ll lo Il w|||lllr;. r .<6r, o. u- | r-tiiTl c-+ o( .6010.!!- Joa No.4 398 90 DATE: 10-10-90TOIVN OF VAIL Attn: Mr. Stan Berrl'nan DALY REPORT NO. SHEEr 1 OF 1P.O. Box 100 Vail CO 81658_0100 tr,volcE No. PRGJECT Addition to Vail Trnnsportation Center, Vai1, Colorado. PIACEMENT LOCAIION:Structural Slab, Stair No. 10, Levels 3 to 4; Footing, St-air No..J..l., Lines L3"3 to J4.2, 40' South. of Line A; I]ATCH TICKET INFORMTION: SUPruER Western Mobi 1e NME BATCHq) ]nucK ilo. Lt7 2:16 P.M. TrcKEt lro. 022477 Mtx nME ltrnrvED 2..26 p.M: ooo* *. Mil A cu, Yo.6 25 TIUE Pl,ircen 2:30 p.lvl. FIELD TEST1NG INFORMATION: TIME IE'r TAX€X 2:35PM sLUuP 4 AIR @lrTEflT5.9: WET UNIT WLrclr f 42.6 ArR CoNTE},IT 4-g I WARTI AIDED AI stIE s JrPLf TuJP. 620 ,ttt turr. 65op Cdl. nor^rlKs: 12 of Z) ld.3 ?".1. 0 Ifi. {}r.JOO SPECtFp{nO}$5LU!P 3_5 C\1JNoEll lNt OItlitATtON: lro. OF CT1INDFXS 4 rluE ct,r.tNDeRs crsr 2:50 P.M.CYLIN0E StZl:r)'' x 12rl WHERE c^Sr Or-r-Sitc CURING INFORI.{A]ION: rNrIuL cuRE: on-Site no, sroRrGE Flcunrs MIN./M X. oArE/nuE ar wr" 10_1.,1_9( 0ArE SIRIPP@ 10-11-90 , rr: S. Urton RE},(ARXs AGE DArS DAT€ rES'IE) T TAL LOAD (Los) DTAIIETt:N (hrclrEs)AJIFA(sq. rN.) couP. sm. (15D TYI'E OF fIUICTURE CruNOFfl w€.lcllT (LlJs) (;ttlltDeR u\tr wEGrfi (Pcf) 5 .7 2B 28 10-1s-90 -10-17-90 -11-7-90 11-7-90 67 ,000 6. 00 6. 00 6 .00 6. 00 28.28 28.28 28.28 28.28 2370 shear DTSICN STRENCIH PSIo26 DYS3000 rESIS ttt l/Iryt rofi .t,t5,ar,rn. Araf Dl rarifro rt:[ i'rnl ^t{lx2vrt l!<tv ,lt-llxx):i l,ln t3i onlt-tt1lYEf, llolfo 50ut lrt uur l|oll oll llxs llsr ,.U\)rlt l4^r tI- T'|('vlDtD |tr ollltns. PROGRESS REPORT:Concrete was placed truck discharge, fonns with a purnp; Sample rrras takell from theLn CO'IES Michael Barb.er Architecturc; Anderson ll llastings; PCL Constructi.on Scrvices; Western Mobile; UllS Consultants; lrlr. Gary l.'lurrian; 'S" Urton T. Laudick FIELD OT]SER/ER APPROVED B'T Chcn*Northcnr,lnc ',x-d&{ t gl,r.fr onil g.lalhl. REPORT OF CONCRETE TEST CYLINDER D,ATA ^3^UtmutP||olIcTli|mn|r'm..nltit|t|EA'|o0ti3Il.vri.rtlnrm,nsl/'':,tnntIrrDA<ll|rcor'ldrtulEn.Ir'Yf'd,Rcl,[m:\,,lon|,^liIrrot at start {t trT! a:orx;t.t6nrE o[ rxmlcr:t ':orrnlDD uxu5s onrti ,nrq'rx)rtM3 urf. |.'allD lo lrr r||{rlltlc. r ni-!rr* rr ,-liliillo.-, or co,nro,ir.. ?r^. JoD NO.4 398 90 DATE: 10-11-90TOWN OF VAIL Attn: Mr. Stan Berryman DAILy REpORT NO. SHEE-f 1 OF lP.0. Box 100 Vail C0 81658_0100 lNvotcE NO. PRc'JEcr Addition to Vail Transportation Ccntet, Vai1, Colorado. PIACEMENT LOCAIION:Entry }llay Apron, Slab-on-Grade, Slab on Deck, Line A to C at Line A-17 nnd A-?R: Station 11+00 to Slation 12+50; 33t 01d Stairway Caps at Lines I]ATCH TICKET NFORhIATION: sUPruEn l{estern Mobi 1e NUE BATCHED ncKEr No,01 2767 Mtx oEsrc}.r nrc. Mlf C cu. yD.B A.M. 'muo( No. 104 il":2i. A.M.nuE RRIVED L1:3L A.M,nME PL,rco .11:40 FIET.O ]ESTING INFORI,IATION: lluE IEST Tx€|1l:504M StuMp JOD SPEC|nCAnO|rs SLUMP srrrPLE rElrP.6so Nn tlr4go col. n$r'rnr<s: 52 of 56 vd3 pd, 6 tN. rN. 3 -) - --t An colfTEl{I6.2 ; wEr uNff wtfrut 142.2 AR CONIENT ;t \{AIEN ADD€D AT SrrE CYLINOER INFOR}I^TION: NO. OF C\AJNDERS 4 ciruNocn stzE (lrr x 12'l ' Mr: cruNDrRS CJ\sr L 2 : 05 P. M.wflglE C^sr On-Sitc CURING INFOR}IATION: llltluL CURE On-Site RttD sitonrcE F ctunEs Cure Box MN./[a(, oA.I[/nME AI l,A&._10-12-gC o^IE SIRIPPS) 10-]2-90 $/: S. Urton nEffiK* ACEo)6 DATE IE TE' T TAL LqAD (LDs) DU'{EIlfi( .rc'rEs)NIFA(sq. rN.) couP.5m. (PSD T/PE OF TTIACTURE CTUNDFJi wE oalT (uts) cfulto€R UIIII W]GIff (Pcr) 7A 28A 28A 284 10-18-90 11-B-90 11-B-90 t-1-8-90 95, 000 6. 00 6.00 6.00 6.00 28.28 28,28 28,28 28.28 3360 con/shea.r oEstcN sIN€NGfi 4500 P$ o2a D\16 IE5T5 ttY LAl|OalAIotlt rlfR:rrorn. l f tft f(a.arrrrr]&f, I'lDr ^pnt]rrf A<tr, !r-llF)it5 tnlcss onll,fillrsE ltoltD 3otlf, llo oriu l|ofl oll lltts ILST ml!fll r{ Y tI: t to?lD(D try onll'ts' Michael Barber Architccture;\'ur-lLJ An<Ierson fr Ilastings; PC[, Construction Serviccs; Wcstcrn Mobile; URS Consultants; Mr. Gary Murrian; S. Urton 't. Lurrilick FIELD OT]SETWER APPRO!€O IJY ChcnirNorthcnr,Inc '4,*rll,nt LTtld. nnr, Scl-lkr. REPORT OF CONCRETE TEST CYLINDER DATA {!^gtmWPno'TcTrHrofr{T!ntfF|'nr^,|o('i,F3t|'vT\-|tt'irr'fnnsr,rf:llmaftl.DAtt|fro''tx|.lwi'r''f'rrVq..'im|:t'.rno||(r$^rv'rrtG'||ctl6(t6olrxl'|.:ts'lo{fnn|c^,|o|'r,ounnrxrris-'ri.'niiiliirloll;aovnlntr uDtl.ss on{,l frlfi^l|(r|t}|uns ,J!l ,6rnro ro lrl $(n[rc. ^ tur*, o. u-lilrrt I o.*" or c6r{.,r.. r.d Pr. Cr.tl lt^ a/go TO: TgWN 0F VAIL JolJ No.4 398 90 DATE: 10-11-90 Attn: Mr. Stan Berryman DALY REpOt-{T NO. SHEff 2 OF 2 P.O. Box L00 Vail CO 81658_0100 f{votcE No. PRoJEcr Addition to Vail Transportation Center. Vail, Colorado. PLACEMENT LOCAI'ION: L4.2. 40r Southnf I ine A South Footings, of Line A; Wall, Stair No. 12; Stalr No. L1, Walls, Stair No. 11, Lines 10.9 to 11.5, Lines 1-3.3 to 40t-60r South []ATCI{ TICKET INFOR}/ATION: SUPruER Western Mobi le TIME IIATCHg) rnucx Ho. 119 5:00 P"M. 'ncxEr No. U 2774 MX DEsrcN rto.2/l,tirx A cu. w. B nME ,^RRwS) 3:08 P.M.TIME PLrcs) 3; 09 i, .l{. FIELD TLSI]NG INFORMATION: luE rEsr rrr(Eil3;1s Plvl sLuup JOO SPEC|nCAnOITS SLUUP lN. tN, An comufi 5 .2 : wEr uNr woo'fiI 1,44 .7 d. ltR coMrsfi .lw lut IDD@ AI Sm d 3ArrPl,E lE P60o xtl IElP6gol. fhl. CYUNOER INFORMATION: NO. OF CIIJNOF-RS 4 Cffrorn srzE (rrt x 12ll llUE C NDERS CaSr 3:30 P"M, MrEnE c^st on-Site CURING INFORIJATION: lNlTlAL CURe on-site RELD sTOITTCE FACIUIIES cure Box MtN./l/a( o lEnME AT tln 1p_12_g1 o^IE SIRIPPg) 10-.12-90 Br: S. Urton Rr-lr(tlK& ACE D \1S o^IE rEstu) T TAL LO{'(us)Dr xnEn ([JCflEs) nE(so. rrr.1 couP. sTR.(lst) TYPE OF frucTune C.YUNDFR w€rarr (LrJs) CYLIIIDER uNfr wllca rr (Pcr) 7B 28 2S 28 10-1 8-90 11-8-90 11-8-90 11-8-90 84,000 6.00 6. 00 6.00 6.00 28.28 28.28 28.28 28.28 2970 con/sp1it OES'GN 9RENGI}I 3000 Pst o 2a DAYs rf,s|s ItY U{E.UrXrY FfFsaf|tlrl. Mt |ll raar)fllr ]rf w'nl rPt'l x'-.rlf altu r.inlxtos lltll|:ss onlfjlll'Ef tlolfo 30ll€ lllo.$r l|o{ oll llltS lLSr Rfrro.lr U Y tf, lltovl0fD ItY olllllts. PROGRESS REPORT:Concrete was punpcd into forrns. Sanple uas taken from the truck discharge.. cnpttrq Michacl Barbcr Architecturc; Andcrson fi Ilastings; PCL Construction Services; Wester:n l{obi.le; UllS Consultants; Mr. Gary Murrian; S . Urton T. LauJ i. ck FTELD OOSETWER APPROVED fi