Loading...
HomeMy WebLinkAboutVAIL VILLAGE FILING 12 BLOCK 2 LOT 1TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT 75 S. FRONTAGE ROAD VAIL, CO 81657 970-479-2138 ADD/ALT COMM BUILD PERMT Permit #: B03-0024 Job Address: 3094 BOOTH FALLS CT VAIL Status ...: ISSUED Location.......: 3094 BOOTH FALLS RD COMMON ELEMENT Applied ..: 05/02/2003 Parcel No....: 210102302001 Issued ...: 01/22/2004 Project No .: ~y ~ 7 b.~ _ 6 =,o ~ Expires ...: 07/20/2004 CONTRACTOR EWING TRUCKING P.O. BOX 2303 EDWARDS, CO 81632 & CONSTRUCTI003/20/2003 Phone: 970-926-2770 License: 128-X APPLICANT EWING TRUCKING & CONSTRUCTI003/20/2003 Phone: 970-926-2770 P.O. BOX 2303 EDWARDS, CO 81632 ~s 128-X OWNER BOONE, C HERINE S. & MICHAE09/20/2001 Phone: `' _ BOULDER RD BOULDER CO 80303 Desciption: COMMON ELEMENT- PARKING LOT EXPANSION AND RETAINING WALLS Occupancy: Type Construction: Type Occupancy: NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES Rl Multi-Family ~~ Valuation: $140,000.00 Add Sq Ft: 0 Fireplace Information: Restricted: # of Gas Appliances: 0 # of Gas Logs: 0 # of Wood Pellet: 0 ********************************************************************* FEE SUMMARY ************************************************************ Building------> $1, 217.7 5 Restuarant Plan Review--> $ 0.00 Total Calculated Fees--> $ 2 , 012.2 9 Plan Check---> $ 7 91.54 DRB Fee---------------------> $ 0.0 o Additional Fees----------> $ 0.00 Investigation-> $0.00 Recreation Fee--------------> $0.00 Total Permit Fee---------> $2 , 012 .29 Will Call-----> $3.00 Clean-up Deposit----------> $0.00 Payments -----------> $2,012.29 TOTAL FEES-------------> $2 , 012 .29 BALANCE DUE---------> $0.00 ************************************************************************************************************************ ************************* Approvals: Item: 05100 BUILDING DEPARTMENT 05/05/2003 JRM Action: AP Item: 05400 PLANNING DEPARTMENT 06/20/2003 ao Action: AP Item: 05600 FIRE DEPARTMENT Item: 05500 PUBLIC WORKS 04/15/2003 is Action: DN awaiting for revised plan. Need some form of guardrail on South walls. 04/29/2003 is Action: AP New proposed curb and gutter has been submitted. 05/13/2003 is Action: DN Need to address drainage issue off of new parking lot. as proposed, site plan shows all surface drainage will impact driveway on Booth Fall Ct, below parking lot. 05/28/2003 is Action: COND See condition See page Z of this Document for any conditions that may apply to this permit. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, Uniform Building Code and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANEE BY TELEPHONE AT 79-2149`OR AT OUR OFFICE FROM 8:00 AM - 4 PM. SIGNATUF.E OF OWNER ORtct~TOR FOR HIMSELF AND OWNEF PAGE 2 ************************************************************************~**~~~********************~x~**** CONDITIONS OF APPROVAL Permit #: B03-0024 as of 01-22-2004 Status: ISSUED Permit Type: ADD/ALT COMM BUILD PERMT Applicant: EWING TRUCKING & CONSTRUCTION CO 970-926-2770 Job Address: 3094 BOOTH FALLS CT VAIL Location: 3094 BOOTH FALLS RD COMMON ELEMENT Parcel No: 210102302001 Description: COMMON ELEMENT- PARKING LOT EXPANSION AND RETAINING WALLS Conditions: Cond: 1 (FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY WORK CAN BE STARTED. Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: CON0005883 PW is approving construction of wall but before new parking lot is contructed. A new revise plan need to be submitted for approval. There is a drainage issue on driveway on Booth Creek Ct. that need to be resolved before new parking lot is built. Spoken with Mr. Steve P. President of the Booth Falls Mountain Homes and he is aware of issue. Cond: CON0005951 Landscaping as per approved by DRB on 11 /6/02 with the addition of 12 trees as per neighbor agreement. Applied: 05/02/2003 Issued: O 1 /22/2004 To Expire: 07/20/2004 TOWN OF VAIL, COLORADO Statement Statement Number: 8040005369 Amount: $2,012.29 01/22/200404:11 PM Payment Method: Check Init: DDG Notation: Booth Falls Home Owners ----------------------------------------------------------------------------- Permit No: B03-0024 Type: ADD/ALT COMM BUILD PERMT Parcel No: 210102302001 Site Address: 3094 BOOTH FALLS CT VAIL Location: 3094 BOOTH FALLS RD COMMON ELEMENT Total Fees: $2,012.29 This Payment: $2,012.29 Total ALL Pmts: $2,012.29 Balance: $0.00 *************+~x****************************~*********~:************~************************* ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------------- ------------------------------ ------------ BP 00100003111100 BUILDING PERMIT FEES 1,217.75 PF 00100003112300 PLAN CHECK FEES 791.54 WC 00100003112800 WILL CALL INSPECTION FEE 3.00 ----------------------------------------------------------------------------- w -~'-; ., ELECTRICAL: $ APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UNSI~iy~~ -' Q~~J~~ Project #: ~ ~"J Building Permit #: 970-479-2149 (Inspections) ~~ ~DA'NOFY~lIL ~ Tow al Separate P u 75 S. Frontage Rd. Vail, Colorado 81657 General Contractor: Town uf~ail Reg &`Construction 128-X PER AP CATION trical, i c , e MATT Contact an Phone #' s (970)926-2770 cell#(970) 390-3708 Email address: Contractor Signature: ~~~ ~' ~ COMPLETE VALUATIONS FOR BUILDING PERMIT {Labor & Materials) BUILDING: $ PLUMBING: $ OTHER: $ 140, 000.00 ~aaa- qa 140,000.00 ._ _ -I~MECHANICAL:_$ - _ _ - _ JL TOTAL: $ For Parcel # Confact Eagle Counfv Assessors Office at 970-328-8640 or visit www.eaple-countv.com I 1~~ r!` n ~ fE ~. 210102302001 ~ corrunon element Job Name: ~I Job Address: Booth Falls Townhomes Tc~rbrovement Plans 3094 ~ootYi F~~,~,s Road Legal Description Lot: 12 Block: 2 Filing:12 (VailVillage~ Subdivision: Owners Name: I Address: ~I Phone: inc~t-h Falb Hc~m.~nwnPr~ Ars~r r` _ _ p 7~i1 .I`ll R1tiS7 Zn~ s~q.Q n~qa Itsencnmarx ~ngineerinq , Po Boa 4619f Eagle, CO 81631 ~~0)328-2111 ~~ Engineer: _ ~ Address: Phone: ' !Ti nP~=>ri ncr Rn~r ~b 1 A~-- F~`71 " ~~l ~i 1~'~ n )_~~~ ~ ~ ~ ~ Detailed description of work: Parking Lot E~~~nsion .3.n R~tai inq.Walls _ Work Class: New O Addition ( ) Remodel ( ) Repair ( ) Demo ( ) Other (X) Site Work/Parking Work Type: Interior ( } Exterior (X} Both ( ) ~ Does an EHU exist at this location: Yes ( ) No Type of Bldg.: Single-family ( ) Two-family ( ) Multi-family ( ) Commercial ( ) Restaurant ( )Other (X) parking Lot No. of Existing Dwelling Units in.this. building: No. of Accommodation Units in this building: No/Type of Fireplaces Existing__ _Gas Appliances Gas Logs ( )-Wood/Pellet ~ }Wood Burning ( ) No/T e of Fireplaces Proposed: Gas Appliances ( )Gas Logs ( ) WoodlPellet ( )Wood Burning N¢~~O~ft/ED) Does a Fire Alarm Exist: Yes ( ) No ( ) Does a Fire Sprinkler System E ~~No ~ ) *********~*~****~*******~«************FOR OFFICE USE ONLY*******************~****** ********~~~ 1 a) L~U~ Other Fees: I ~ Type of Construction: I Ac epte~By: _, nFV . I DRB Fees: I Occupancy Group: , I Pla ner Sig~,gf,~1`~'!/' Public Wav Permit Fee: I ~ Date Received: I ~~-°-'` ,, 1\Vail\datalcdev\FORMS\PERMITS\t3LQGPERM.DOC 07/26/2002 07/Z61~`~ gg:18 i t i i r i i t i, ~N,~„~,.r~ a i ~~4~,g8344 ~~ ~ ~~ awn +~"~~ ,~,E ~ AS's i 's ~ ~~w,~,~ ~ ~~~ a~ #' oils a10'"`~ . ~ ec~ ~ eefi+ soot ~~~.aax ~li~~ w~ r j • ~~~~~~ ~ Q~pNd~ ~_ ~ ~~AM~~ ~AMI~~' !~~ ~~~ ~,~"°ta°°n~s~~~.°t°; a t TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT 75 S. FRONTAGE ROAD VAIL, CO 81657 970-479-2138 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ADD/ALT MF BUILD PERMIT Permit #: BOS-0206 Job Address.: 3094 BOOTH FALLS CT VAIL Status.....: ISSUED Location......: 3094 BOOTH FALLS ROAD , #1 Applied ...: 07/27/2005 Parcel No....: 210102302001 Issued ...: 08/25/2005 Project No...: -~~~ v ~ - p 2 3 ~ Expires ...: 02/21/2006 OWNER BOONE, CATHERINE S. & MICHAE07/27/2005 7266 S BOULDER RD BOULDER CO 80303 APPLICANT BOONE, CATHERINE & MICHAEL 07/27/2005 Phone: (303) 499-2434 7266 S. BOULDER BOULDER COLORADO 80303 License: 362-L CONTRACTOR BOONE, CATHERINE & MICHAEL 07/27/2005 Phone: (303) 499-2434 7266 S. BOULDER BOULDER COLORADO 80303 License: 362-L Desciption: ENCLOSURE OF SOUTHSIDE DECK FOR BEDROOM ADDITION Occupancy: R-2 Type Construction: V-A Type Occupancy: ?? Valuation: $5,500.00 Add Sq Ft: 84 Fireplace Information: Restricted: Hof Gas Appliances: 0 Hof Gas Logs: 0 ~ of Wood Pellet: 0 ************************************~*********************s*****~*** FEE SUMMARY ~**~**********~**~******~***~*********************~***~:*~*** Building------> $125.25 Restuarant Plan Review--> $0.0o Total Calculated Fees--> $234.86 Plan Check---> $81.41 DRB Fee---------------------> $0. oo Additional Fees----------> $0.00 Investigation-> $0.0o Recreation Fee--------------> $25.20 Total Permit Fee---------> $234.86 Will Call-----> $3.00 Clean-up Deposit----------> $o. oo Payments-------------------> $234.86 TOTAL FEES-------------> $234.86 BALANCE DUE---------> $0.00 *t•~*******~********* **~r************* ********************s*~***~******************************~*s*s**s****************** x*~*~******~s*****ss~*** Approvals: Item: 05100 BUILDING DEPARTMENT 08/15/2005 cgunion Action: AP Item: 05400 PLANNING DEPARTMENT 08/12/2005 bgibson Action: CR The new deck handrails must match the existing handrails (materials, colors, etc.). 08/24/2005 bgibson Action: AP revisions received for "same-for-same" deck rail Item: 05600 FIRE DEPARTMENT Item: 05500 PUBLIC WORKS See page 2 of this Document for any conditions that may apply to this permit. PAGE 2 CONDITIONS OF APPROVAL Permit #: BOS-0206 as of OS-25-2005 Status: ISSUED Permit Type: ADD/ALT MF BUILD PERMIT Applicant: BOONE, CATHERINE & MICHAEL (303)499-2434 Job Address: 3094 BOOTH FALLS CT VAIL Location: 3094 BOOTH FALLS ROAD , #1 Parcel No: 210102302001 Description: ENCLOSURE OF SOUTHSIDE DECK FOR BEDROOM ADDITION Conditions: Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: 14 (BLDG.): ALL PENETRATIONS IN WALLS, CEILINGS, AND FLOORS TO BE SEALED WITH AN APPROVED FIRE MATERIAL. Cond: 1 (FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY WORK CAN BE STARTED. Cond: 40 (BLDG): (MFR/COMM) FIRE ALARM REQUIRED PER NFPA 72. Cond: 19 (BLDG.): GUARDS ARE REQUIRED TO MEET SECTION R312 OF THE 2003 IRC OR SECTION 1012 OF THE 2003 IBC. Cond: 39 (BLDG): EMERGENCY ESCAPE AND RESCUE OPENINGS ARE REQUIRED TO MEET SECTION R310 OF THE 2003 IRC OR SECTION 1025 OF THE 2003 IBC. Applied: 07/27/2005 Issued: 08/25/2005 To Expire: 02/21/2006 DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2149 OR AT OUR OFFICE FROM 8:00 AM - 4 PM. SIGNATURE OF OW~R OR CONTRACTOR FOR HIMSELF AND OWNEF TOWN OF VAIL, COLORADO Statement Statement Number: 8050001385 Amount: $234.86 08/25/200501:41 PM Payment Method: Check Init: JS Notation: 970/CITADEL INC. ----------------------------------------------------------------------------- Permit No: B05-0206 Type: ADD,/ALT MF BUILD PERMIT Parcel No: 2101-023-0200-1 Site Address: 3094 BOOTH FALLS CT VAIL Location: 3094 BOOTH FALLS ROAD #1 Total Fees: $234.86 This Payment: $234.86 Total ALL Pmts: $234.86 Balance: $0.00 ACCOUNT ITEM LIST: Account Code -------------------- Description - Current Pmts BP 00100003111100 ---------------------------- BUILDING PERMIT FEES - ------------ 125.25 PF 00100003112300 PLAN CHECK FEES 81.41 RF 11100003112700 RECREATION FEES 25.20 WC 00100003112800 WILL CALL INSPECTION FEE 3.00 TbWN OF 75 S. Frontage Rd. Vail, Colorado 81657 Separate WILL N E ACCEPT IF IN O LETE OR UNSIGN~~j~ Project #: l r ~- uildmg Permit #: 70-479, 2149,(InsRtectio~js) OF VAIL BUILDING PERMIT APPLICATION ermits are required for electrical, plumbing, mechanical, etc.! CONTRACTOR INFORMATION General Contractor: Town of Vail Reg. No.: Contact and Phone #'s: Email address: ~T gO,d~y ~ ~rr~r~ ~, ~~ Contractor Signature: ~.~1 v' COMPLETE VALUATIONS FOR BUILDING PERMIT (Labor & Materials) BUILDING: $~ ~ -~''~~,,rj ~~ ~I ELECTRICAL: $ II OTHER: $ PLUMBING: $ NSA II MECHANICAL: $ ~ ~,c~. I TOTAL: $ Uzi l For Parcel # Contact Eaq/e County Assessors Office at 970-328-8640 or visit ~l o ~ ~a3 0 ~ d~ ~ Job Name: anoN~ t~~~ ~nr~~.c~sv2~ Legal Description I Lot: Owners Name: ~~~ Block: "1i Filing: II Address: 17~In I Address: R~ iy~i2. Engineer: I Address: Detailed description of work: ~~LtW~UiLE dF Svv~~ 5-l~v ~L~ II Job Address: 3 v cf ~( ~vT?-1 '~.4t-~ ~PrO ~ ~ ~~> II Subdivision: Phora ,: , ~ Ib5$ II Phone: yR~~.. ~'r, Ito--~il~-'13~'7 ~~ Phone: Work Class: New () Addition ( ) Remodel (~'f Repair ( ) Demo ( ) Other ( ) Work Type: Interior ( ) Exterior ( ) Both ( ) II Does an EHU exist at this location: Yes ( ) No ( ) Type of Bldg.: Single-family ( ) Two-family ( ) Multi-family (~ Commercial ( ) Restaurant ( )Other ( ) No. of Existing Dwelling Units in this building: ~ ~ No. of Accommodation Units in this building: No/Type of Fireplaces Existing: Gas Appliances ( )Gas Logs ( )Wood/Pellet ( )_Wood.,Burning (.~ No/Type of Fireplaces Proposed: Gas Appliances ( )Gas Logs ( )Wood/Pellet ( ~ Wood Burning (NOT ALLOWED --- Does a Fire Alarm Exist: Yes ( ) No ( ff -~ Does a Fire Sprinkler System~Exist: Yes ( ) No (•~'J' FOR OFFICE USE ONLY. ~ ~~ .......~_..~....__...~_k_~_~A._....~. ... Other Fees: DRB Fees: ~ Pu li v Permit Fee: Document2 Accepted By: `~ s'a ~~, I Planner Sign-off: :~' REVD J U L 2 6 2005 05/20/2005 TO ~~~ OF VAII, Bui/dins Permit submitta/Check/ist Department of Community Development Project Name: ~e - ~« ~ Nc~.~sv~ Project Address: .305.1 ~a ~~~ ~,oa~ *~ 1 / This Check/ist must be come/eted bel~vre a Bui/dins Permit aov/ication is ameQt+ed, ^ All pages of application is complete ~ Has DRB approval obtained (if required) Provide a copy of approval form ^ Condominium Association letter of approval attached if project is aMulti-Family complex ^ Plan Check Fee required at submittal for projects valued over $100,000.00 (See attached Construction Fee Schedule for calculations) ^ Complete site plan submitted ^ Public Way Permit application included if applicable (refer to Public Works checklist) ~/~ ^ Staging plan included (refer to Public Works checklist) No dumuster.oarking or material storage allowed on roadways and shoulders without written approval ^ Asbestos test and results submitted if demolition is occurring n1 ~ ~ e( Architect stamp and signature (All Commercial and Multi family) Full floor plans including building sections and elevations(3 sets of plans for remodel/additions, 4 sets of plans for new SFR and Duplex, 5 sets of plans for Multi-Family and Commercial Buildings) Window and door schedule ^ Full structural plans, including design criteria (i.e.loads) ^ Structural Engineer stamp and signature on structural plans (All Commercial and Multi Family) r^i/p~ ^ Soils Report must be submitted prior to footing inspection ~~A o Fire resistive assemblies specified and penetrations indicated nl/ A ^ Smoke detectors shown on plans /+1 /,o. ^ Types and quantity of fireplaces shown Min I have read and understand the above listed submittal requirements: Applicant's Signature: ~~ Date of submittal: Received By: Document2 05/20/2005 1 VI'I l~ ~i' BUILDING PERMIT ISSUANCE TIME FRAME If this permit requires a Town of Vail Fire Department Approval, Engineer's (Public Works) review and approval, a Planning Department review or Health Department review, and a review by the Building Department, the estimated time for a total review may take up to six (6) weeks. All commercial (large or small) and all multi-family permits will have to follow the above mentioned maximum requirements. Residential and small projects should take a lesser amount of time. However, if residential or smaller projects impact the various above mentioned departments with regard to necessary review, these projects may take up to six (6) weeks to review and approve. Every attempt will be made by this department to expedite this permit as soon as possible. I, the undersigned, understand the plan check procedure and time frame. I also understand that if the permit is not picked up by the expiration date, that I must still pay the plan check fee and that if I fail to do so it may affect future permits that I apply for. Agreed to by: ~~~.~~ S ~orv~l~c: Print name ~~ ~ ,~;~~ Signature Project Name: ~~c~L.- E ~.I LL-r~5~ ~ ~h1 t~ Date: ~ ~ i ~ I ~ S Document2 ~ 05/20/2005 ~~ ~F WHEN A "PUBL~ WAY PERMIT" 15 REQUIItED PLEASE READ AND CHECK OFF EACH OF THE FOLLOWING QUE~ i DNS REGARDING THE NEED FOR A ~pUBLK WAY PERMIT": ^ Is this a new residence? YES NO / ^ Does demolition work being performed require the us of the Right-of-Way, easements or public property? YES NO ^ Is any utility work needed? YES NO / ^ Are there any improvements being done to the driveway ? YES NO ^ Is a different access needed to the site other than the existing driveway? YES NO / ^ Is any drainage work being done that affects the Right-of-Way, easements, or public property? YES NO / ^ Is a "Revocable Right-of-Way Permit" required? YES NO ^ YES eRight-oNWO ay, ~ ements or public property to be used for staging, parking or fencing? If answer is N0, is a parking, staging or fencing plan required by Publ'~c Works? YES NO / If you answered YES ip any of these questions, a "Public Way Permit" must be obtained. 'Public Way Permit" applications may be obtained at the Public Work's office or at Community Development (a sample is attached). If you have any questions please call Leonard Sandoval in Public Works at 479-2198. I HAVE READ AND ANSWERED ALL THE ABOVE QUESTIONS. ~~~ ~~~ Contractor Signature fob or Project Name: ~0~~ ~ ~~~ ~~`os~5~-E Date S igned: 7 ~ ~5 I n ~l Company Name DocumenY2 05/20/2005 e. ~,. .............. a,,...... n.ia........n APPLICATION FOR TOWN OF VAIL PUBLIC WAY PERMIT 20 1. Job Name 2. Excavating Contractor Name City 3. Start Date Mail Address State Zip Completion Date (If unknown call 479-21391 TOV Contractor License Number - REQUIRED Phone # (Permit Expiration Date) 4. Work is for (circle one) Water Sewer Gas Electric Telephone CATV Landscaping Temp. Site Access Other 5. Trench-width Length Depth (min. 4') Total SF $ Total LF Bond Amount $ Permit Fee $ Total Permit Fee $ 6. ALL MATERIAL, EQUIPMENT, AND TRAFFIC CONTROL DEVICES MUST BE ON THE JOBSITE BEFORE THE JOB IS STARTED. 7. Rubber out-riggers are required on excavating equipment when working on asphalt. Asphalt surfaces underneath the bucket and lugs shall be protected at all times. 8. A signature below indicates a review of the area and utility locations and approval. Once all utility company signatures are obtained , permittee has option of routing application through the Public Works office to obtain the necessary Town of Vail signatures. Please allow up to one week to process. Xcel Energy !Public Service Company (1-800-922-1987) Xcel Energy High Pressure (1-800-922-1987) Quest (1-800-922-1987) Comcast Cable (1-800-922-1987) Eagle River Water & Sanitation District (970-476-7480, ext. 114) Holy Cross Electric Company (1-800-922-1987) Town of Vai] Electricians (970-479-2158) Town of Vail Irrigation (970-479-2158) THERE WILL BE NO TOTAL STREET CLOSURES! A construction tratlic control plan must be submitted and approved by the Public Works Deparnnent prior to issuance of the permit. 9. All excavation must be done by hand within 18" of utilities - (Senate Bill 172). 10. Perntittee must contact the Public Works Deoarhnent at 476-2 ] 98 24 hours nrior to commencine of work. Failure to Notify the Town will result in forfeiture of bond money. Scheduled inspections that are not ready may result in the Town charging the contractor a re-inspection fee. 11. I certify that 1 have read all chapters of Title 8 -Public Ways and Property, of the Vail Municipal Code and all utility Company agreements, signed by me, and will abide by the same, and that ail utilities have been notified as required. Conhactot's Signature of Agreement Print name clearly Date of signature ATTACH PLAN OF WORK, INCLUDING CONSTRUCTION TRAFFIC CONTROL PLAN White- Public Works Show street with names, buildings, and location of cuts. USE DASH LINES FOR CUT. Yellow -Contractor Document2 05/20/2005 PRJ #: - PW #:-- ----- Parcel #:_ _ ___-__-___ Bldg. Permit #: B _ _ -- - Street Address ~1DWN~F PUBL~ WORKS AND THE PUBL~ WAY PERMIT PROCESS How it relates to Building Permits: - Fill out the attached check list with the Building Permit Apolication. If yes was answered to any of the questions then a "Public Way" permit is required. You can pick up an application at either Community Development, locatied at 75 South Frontage Road orPublic Works, locatied at 1309 Elkhorn Drive. - Notice sign-offs for utility companies. ALL utilities must field verify (locate) respective utilities prior bD signing application. Some utility companies require up do 48 hours notice to schedule a locate. - A construction traffic control/staging plan must be prepared on a separate sheet of paper. An approved site plan may also be used. This plan will show locations of all traffic control devices (signs, cones, etc.) and the work zone, (area of construction, staging, etc.). This plan will expire on November 1st and will need do be resubmitted for consideration for approval through the winter. Be aware that your resubmission for winter may be denied depending on the location of construction. - Sketch of work being performed must be submitted indicating dimensions (length, width and depth of work). This may be drawn on the traffic control plan or a sitie plan for the job. - Submit completed application th the Public Work's office for review. If required, locaties will be scheduled for the Town of Vail electricians and irrigation crew. The IocaiJes take place in the morning, but may require up bD 48 hours do perform. - The Public Work's Construction InspectiDr will review the application and approve or deny the permit. You will be contacted as tp the status and any requirements that may be needed. Most permits are released within 48 hours of being received, but please allow up th one (1) week to process. - As soon as the permit is approved, the Building Department will be notified, allowing the "Building Permit" do be released. Please do not confuse the "Public Way Pem~it" with a "Building Permit". - NOTE: The above process is for work in a public way ONLY. Public Way Permits are valid only until November 15th. Anew Public Way Permit is required each year if vwrk is not complete. Re-application each November 15th does not mean an automatic renewal. I have read and unde ~ nd the above. Signature Date Signed Document2 05/20/2005 ~DW21i' ~F DRAINAGE AND CULVERT tNSPEv ~ i()NS ARE REQUIRED BY PUBLIC WORKS! Please read and check off each of the items below: ^ The Town of Vail Building Department has developed the following procedures to ensure that new construction sites have adequately established proper drainage from building sites along and adjacent to Town of Vail roads or streets. ^ The Town of Vail Public Works Department wi{I be required to inspect and approve drainage adjacent to Town of Vail roads or streets and the installation of temporary or permanent culverts at access points from the road or street onto the construction site. Such approval must be obtained prior to any requests for inspection by the Town of Vail Building Department for footings, temporary electrical or any other inspection. Please call Leonard Sandoval at 479-2198 to request an inspection from the Public Works Department. Allow a minimum of 24 hour notice. ^ Also, the Town of Vail Public Works Department will be approving all final drainage and culvert installation with resulting road patching as necessary. Such approval must be obtained prior to any Final Certificate of Occuoancv issuance. Agreed to by: Print Name Signature Project Name: Date Signed: DocumenY2 05/20!2005 j [lf7i~ ~[` MATERL0.L STORAGE AND CONSTRUCTION PARKING Please read and check off each of the items below. (Copies of complefie text are available upon request) CODE 5-2-10: DEPOSITS ON PUBL= WAYS PROH18ffED ^ Unlawful deposits: Subject th subsection C thereof, it is unlawful for any person th litter, track or deposit; or cause th be littered, tracked or deposited, sand, gravel, rocks, mud, dirt, snow, ice, or any other debris or matierial upon any street; sidewalk, alley or public place, or any portion thereof. ^ Notice; Abatement: The Director of Public Works may notify and require any person who violates or causes another th violate the provision of subsection A hereof, or who has in the Director's employment a person who violates or causes another to violate the same, top remove such sand, gravel, rocks, mud, dirt, snow, ice or any other debris or material within twenty four (24) hours after receipt of said notice by the Director of Public Works. In the event the person so notified does not comply with the nonce within the period of time herein specified, the Director of Public Works, or other authorized agent, may cause any such sand, gravel, rocks, mud, dirt, snow, ice, debris or any other material bo be removed from any street or alley at the expense of the notified. ^ Summons and Penalty: As an alternative th the notice for removal provided in subsection 6 above, any person who violates or causes another th violate the same, may be issued a summons th appear before the Municipal Court of the Town for said violations, and upon being found guilty of a violation hereunder be punished as provided in Section 1-4-1 of this code. ^ Notice and Penalty: It is unlawful for any person to fail or refuse th comply with the notice of the Director of Public Works as provided in subsection B hereof, and any such person shall, in addition to payment of the expense of removal incurred by the Director of Public Works, as provided in subsection B hereof, upon being found guilty of a violation hereunder, be punishable as provided in Section 1-4-1 of this Code. (1997 Code: Ordinance 6 (1979). CODES 7-3A-1 AND 7-3A-3: PARKING OBSTRUCTiI•IG TRAFFIC & ZINPOUNDMENT AUTHORIZED ^ No person shall park any vehicle upon a street or at any other place within this Municipality in such a manner or under such conditions as th interfere with the free movement of vehicular traffic or proper street or highway maintenance. (Ord. 2(1968) § 1) ^ Whenever any police officer finds a vehicle attended or unattended, standing upon any portion of a street or upon any place within this Municipality in such a manner as m constitute a violation of any section of this Article, or left unattended for a period of twenty four (24) hours or more and presumed to be abandoned under the conditions prescribed by Colorado Revised Statutes section 42-4-1102, as amended, the officer shall require the vehicle do be removed or cause it to be removed and placed in storage in the nearest garage or other place of safety designated or maintained by this Municipality, and the charges for towing and storage of such vehicle shall be charged th the owner of the vehicle in addition ip a ten dollar ($10) impoundment charge. (Ord. 2(1968) § 3: Ord. 28(1981) § 1) I have read and will comply with the above code provisions: Position or Relationship to project: O~ ~ ~... ` r tt.~.,~ t~E glued: '11 125 O~ C~Ry~~'~«v~ ~ !~p - Signature 05/20/2005 Vai12004 Vail Village and Lionshead Village Construction Hours Information Handout Problem Statement The Vail Village and Lionshead Village are invaluable assets to the community. Thousands of people come to Vail each year to sightsee, recreate, shop and to enjoy everything the Vail Valley has to offer. The community and merchants rely upon our guest to generate revenue. Our summer/winter guests expect a pleasant experience while in Vail. To insure that all of the proposed construction has as little negative impact on the community and on our guest as possible, the Town of Vail finds it imperative to create and implement the Vail Village and Lionshead Village Construction Hours Handout. It would be irresponsible for the Town of Vail, the Construction Contractors and the Merchants, to not actively participate to minimize the impact of construction in the Vail and Lionshead Village areas. New for 2004-2006 will be the Vail Village Streetscape Improvement Project. Work to include all utility related improvements, streetscape, drainage, snowmelt systems and landscaping. All Construction projects andlor remodels within the Vail Village Core Area should contact Scott Bluhm Town of Vail Streetscape Coordinator at 970-477-3418 for further information. Givens The following givens are intended to provide the basic foundation by which construction will be completed in the Villages: • The public's health, safety and welfare shall be honored at all times. • Adequate pedestrian, loading/delivery, vehicle, and emergency vehicle access and circulation shall be maintained. • Roadways and pedestrian walkways shall be kept clean and free of dirt and debris. • All construction deliveries, equipment, tools and materials entering the Vail Village and Pedestrian areas must go through Check Point Charlie. All Lionshead construction activity must go to the Vail Police Department for a parking permit. Do not use delivery zones for construction parking, refer to approved staging plan or make other arrangements for parking. • The hours of Outside Construction Activity shall be as follows: - April 15 -June 18 & September 7 -November 19, 7 a.m. until 7 p.m., seven days a week. June 18 thru September 10, work must end by 4:00 p.m, on Fridays. November 13 -April 15, 2005 work allowed within daylight hours only. - Deliveries shall be restricted to the hours of 7 a.m. to 11:30 a.m. on Gore Creek Drive and 7 a.m. to 8:30 a.m. on Bridge Street. - Special Construction delivery permits must be requested in advance, from Public Works in conjunction with Code Enforcement at Checkpoint Charlie. - No construction activity shall occur on Saturday or Sunday between June 19 and September 5. - No outside construction activity shall occur on the following dates: Document2 05120/2005 TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT 75 S. FRONTAGE ROAD VAIL, CO 81657 970-479-2138 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ADD/ALT MF BUILD PERMIT Permit #: BOS-0367 dos -~z~~ Job Address.: 3094 BOOTH FALLS CT VAIL Status.....: ISSUED Location......: 3094 BOOTH FALLS ROAD , #1 Applied...: 12/15/2005 Parcel No....: 210102302001 Issued ...: 01/06/2006 Legal Description: -~~ 05-U 2 31 Expires...: 07/05/2006 Project No...: OWNER BOONE, CATHERINE S. 7266 S BOULDER RD BOULDER CO 80303 & MICHAEI2/15/2005 APPLICANT BOONE, CATHERINE & MICHAEL 7266 S. BOULDER BOULDER COLORADO 80303 License: 362-L CONTRACTOR BOONE, CATHERINE & MICHAEL 7266 S. BOULDER BOULDER COLORADO 80303 License: 362-L Desciption: WEST DECK ENCLOSURE Occupancy: R-3 Type Construction: V-B Type Occupancy: ?? Valuation: $9,550.00 12/15/2005 Phone: (303) 499-2434 12/15/2005 Phone: (303) 499-2434 Add Sq Ft: 156 Fireplace Information: Restricted: Y # of Gas Appliances: 0 # of Gas Logs: 0 # of Wood Pellet: 0 *s*******ss**************s******s*****s**************~*r***********s FEE SUMMARY **** *x***s****~s*~**************x***~a***:~*********s**as***a Building------> $181, 25 Restuarant Plan Review--> $0.00 Total Calculated Fees--> $325.46 Plan Check---> $117.81 Recreation Fee--------------> $23.40 Additional Fees----------> $0.00 Investigation-> $0.0o TOTAL FEES-------------> $325.46 Total Permit Fee---------> $325.46 Will Call-----> $3 , 00 Payments-------------------> $325.46 BALANCE DUE---------> $0.00 ~*~************~******~***~*******~***~****~*****~***********~****************~***~*~******************~*******s*~****~*~*********~*****s******** Approvals: Item: 05100 BUILDING DEPARTMENT 01/04/2006 MROYER Action: AP Additional 156 square feet~of enclosed living space. Item: 05400 PLANN2NG DEPARTMENT 12/15/2005 bgibson Action: AP Item: 05600 FIRE DEPARTMENT Item: 05500 PUBLIC WORKS 12/19/2005 gc Action: COND New grade not to exceed 2:1. See page 2 of this Document for any conditions that may apply to this permit. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVAN BY TELEPHONE AT 79- OR A E FROM 8:00 AM - 4 PM. ~~ n SIGNATURE 19P'O~VNER OR O~1 TR~Q'TOR FOR HIMSELF AND OWNEF PAGE 2 CONDITIONS OF ArrxOVAL Permit #: BOS-0367 as of 01-06-2006 Status: ISSUED Permit Type: ADD/ALT MF BUILD PERMIT Applicant: BOONE, CATHERINE & MICHAEL (303);.499-2434 Job Address: 3094 BOOTH FALLS CT VAIL Location: 3094 BOOTH FALLS ROAD , #1 Parcel No: 210102302001 Description: WEST DECK ENCLOSURE Conditions: Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: 14 (BLDG.): ALL PENETRATIONS IN WALLS, CEILINGS, AND FLOORS TO BE SEALED WITH AN APPROVED FIRE MATERIAL. Cond: 1 (FIRE): FIRE DEPARTMENT ArrxOVAL IS REQUIRED BEFORE ANY WORK CAN BE STARTED. Cond: 40 (BLDG): (MFR/COMM) FIRE ALARM REQUIRED PER NFPA 72. Applied: 12/ 15/2005 Issued: 01/06/2006 To Expire: 07/05/2006 TOWN OF VAIL, COLORADO Statement Statement Number: 8060000015 Amount: $325.46 01/06/200604:36 PM Payment Method: Check Init: LT Notation: Boone / ck 1425 ----------------------------------------------------------------------------- Permit No: B05-0367 Type: ADD/ALT MF BUILD PERMIT Parcel No: 2101-023-0200-1 Site Address: 3094 BOOTH FALLS CT VAIL Location: 3094 BOOTH FALLS ROAD #1 Total Fees: $325.46 This Payment: $325.46 Total ALL Pmts: $325.46 Balance: $0.00 ACCOUNT ITEM LIST: Account Code Description ----------- - Current Pmts ------------ --- BP ----------------- 00100003111100 - ----------------- BUILDING PERMIT FEES 181.25 PF 00100003112300 PLAN CHECK FEES 117.81 RF 11100003112700 RECREATION FEES 23.40 WC 00100003112800 WILL CALL INSPECTION FEE 3.00 { APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UNSI~~ ~~ _U~l Project #: Building Permit #: ''~'~'~- (~ <'S 6 / 970-479-2149, (Inspections) ~~ d TOWN OF YAIl, 75 S. Frontage Rd. Vail, Colorado 81657 L N mech al, etc.! wrv i rcH~ i urc mrurcm~-~ iun General Contractor: ~ Town of Vail Reg. No.: Contact and Phone #'s: DWNI=R / 13UTL~LR 3(a Z-L ~N.3D3-`19°1•a`i3Y C.3(~3~517-08y~ Email address: IST f3001V® l~UL . C.(7 M Contractor Signature: ~y~ COMPLETE VALUATIONS FOR BUILDING PERMIT (Labor & Materials) BUILDING: $ 93UD. OO II ELECTRICAL: $ abQ, (~ I! OTHER: $ - PLUMBING: $ II MECHANICAL: $ it TOTAL: $ ~iSS D, QD For Parcel # Contact Eagle County Assessors Office at 970-328-8640 or visit www.eagle-countY.com ~ .~?arc`el # ZlD ~~2~ c~"Ldoi Job Name' 6lX~TN FA115 TaWIV HDMLS Legal Description ~' Lot: + +I Block: Z.II Filing: Owners ~~i~ ~ ~~~~ ~ Qr~ L ~I Address: lad b S Address: ~~ 6Q ~I Job Address: ~. J _3t,~'1y F~~~c~-~ ~~LS !~,r~ I ~ Z ~I Subdivision: C~,~~~r1~A-c.x..5 MTN :f.{b,vt 0. C30U LD~zR 1ZD • ~I Phone:~_ `fy5~ay3y X ~~i~~ UI?LL 5165"S I~ Phone: II Engineer: II Address: II Phone: Detailed description of work: wrsT ~rZ~~c r~c~as un~. Work Class: New ~ Addition ( ) Remodel (~ Repair ( ) Demo ( ) Other ( ) Work Type: Interior ( ) Exterior ( ) Both ¢Qj ~~ Does an EHU exist at this location: Yes ( ) No ( ) Type of Bldg.: Single-family ( ) Two-family ( ) Multi-family ~ Commercial ( ) Restaurant ( )Other ( ) No. of Existing Dwelling Units in this building: 3 NolType of Fireplaces Existing: Gas Appliances No/Type of Fireplaces Proposed: Gas Appliances Does a Fire Alarm Exist: Yes ( ) No (~0) II No. of Accommodation Units in this building: Gas Logs ( )Wood/Pellet ( Wood Burning (~) ) Gas Logs f )Wood/Pellet ( )Wood 8urninq NOT ALLOWED) +I Does a Fire Sprinkler System Exist: Yes ( ) No QQ .. ~ ~ ~ _ ... . ~..... FOR OFFICE USE ONLY_ ....._ ............._ I Other Fees: ~''=:;F ~ "I ~ Type of Construction ~ :a ,~ I DRB Fees: I Occu ancv Group: li W Permi#~,ge: ~ J D t a ived• s;. ~~~ Document2 [~ 1 J L~~ ~~V_~'Q05/20/200E architects January 4, 2006 Mr. Matt Royer Plans Examiner Town of Vail Building Safety and Inspection Services 75 S Frontage Road Vail, CO 81657 Re: Boone Residence Vail, Colorado Dear Matt, In response to our telephone conversations regarding the above referenced project, I offer the foIlowing: ^ All window and door headers will be 6x12 timbers, Douglas fir. -Please note the lower level windows on the Proposed South Elevation are in a non-load- bearing exterior wall, however, 6x12 headers will be provided just the same ^ The soil bearing pressure is assumed to be 2000 pounds per square foot. Also, we would like to revise the foundation wall as follows: -Footing is to be 24" x 12" with (2) #5 bars continuous -Foundation wall is to be 8" thick concrete wall with (2) #4 bars continuous, top and bottom w/ 2x6 pressure-treated sill plate with '/2"~ x 12" anchor bolts @ 32" oc -Concrete is to be minimum 3000 psi w/5%air-entrainment. If you have any more questions or require additional information, please do not hesitate to call me. APPROVED Subject to inspection and Compliance to 911 relevant Adopted Building and Municipal Codes. Changes in Plans MUST be approved. Date of o 1DDl~ By Code: ZDo3 /~ Colorado Inspection Agency Bos.. 03~? Thank you, Olifice Copy PO Box 1492 Vail, CO 81658 trdubois@att.net tel.• 970-479-7387 fax: 970-476-0077 ~ Thomas R Du Bois, AIA TO~ti~1r OF I~ACL Project Name: Project Address: Bui/ding Permit submittal Checklist Department of Community Development / This Checklist must be come/eted before aBui/dins Permit ano/ication is / accevted. ¢f All pages of application is complete as DRB approval obtained (if required) Provide a copy of approval form c~ Condominium Association letter of approval attached if project is aMulti-Family complex ^ Plan Check Fee required at submittal for projects valued over $100,000.00 (See attached Construction Fee Schedule for calculations) ^ Complete site plan submitted ^ Public Way Permit application included if applicable (refer to Public Works checklist) ^ Staging plan included (refer to Public Works checklist) No dumoster.uarkina or material storage allowed on roadways and shoulders without written a~oroval ^/ Asbestos test and results submitted if demolition is occurring ei/ Architect stamp and signature (All Commercial and Multi family) ~i Full floor plans including building sections and elevations(3 sets of plans for remodel/additions, 4 sets of plans for new SFR and Duplex, 5 sets of plans for Multi-Family and Commercial Buildings) Window and door schedule ^ Full structural plans, including design criteria (i.e.loads) ^ Structural Engineer stamp and signature on structural plans (All Commercial and Multi Family) ^ Soils Report must be submitted prior to footing inspection ^/Fire resistive assemblies specified and penetrations indicated t6 Smoke detectors shown on plans ^ Types and quantity of fireplaces shown I have read and unde. ~l.an the bove lis submittal requirements: Applicant's Signature: Date of submittal: Received By: Document2 05/20/2005 i } T1DW~V ~F BUILDING PERMIT ISSUANCE TIME FRAME If this permit requires a Town of Vail Fire Department Approval, Engineer's (Public Works) review and approval, a Planning Department review or Health Department review, and a review by the BuildingDepartment, 'the estimated time for a total review may take up to six (6) weeks. All commercial (large or small) and all multi-family permits will have to follow the above mentioned maximum requirements. Residential and small projects should take a lesser amount of time. However, if residential or smaller projects impact the various above mentioned departments with regard to necessary review, these projects may take up to six (6) weeks to review and approve. Every attempt will be made by this department to expedite this permit as soon as possible. I, the undersigned, understand the plan check procedure and time frame. I also understand that if the permit is not picked up by the expiration date, that I must still pay the plan check fee and that if I fail to do so it may affect future permits that I apply for. Agreed to by: Project Name: int m Signature Date: Document2 05/20/2005 Boothfalls Mountain Homes >usan Fritx President rum Taiboc Serrefary, Treasurer Gray Rubin Beard t~fember Dee Wisor hoard Member Craig flnsfield Board Member Dear Michael, August 4, 2005 The Boothfalls Homeowner's Board of Directors has met and ~~ ~, r..~ ~ ved of your plans to enclose the west deck facing ~ls Road, including i,,,~,~,~„~ ~emeirts to the c.~ _1~...aan area with the following conc~ior~: 1. You must do as mach a po~'bk to match ,:..r:l~..g the buildings. 2. Windows must be aluminum clad with dark i,.~~.,ze exterior finish 3. Sidmg shall be 6" rough saw cedar and run vertically. 4. Stain and trim shall mate exi~g aobrs. 5. You seek and receive all n~.,,:,~.~.~ approval ~, ~,::. the Town of Vail. In addition you understand and ~ ~:. that any '. ~,r~., ~ ~~:,.~..:...ts made in a common area are the ~ ~r „~nsibility of the individual homeowner to maintain and that you will hold the Association harmless from any liability associated with this i..ry .,,vement. The Association is in favor of the architectural aspects of this project. Other deck enclosures have visually improved the overall ~; ~ ~, ~:..,: ~ ~..ce of the buildings. Unfortttt~ately 30 years ago your building was laid out with the deck encroaching iirto an easement by ar~Yr ~.~.:...ately 24 square feet. As this so,.. ~ ~ ghat unsightly foot print has existing for over 30 }~:.a..s we believe granting a variance and encbsing this deck will be a great i.~~~.~~~ cement. S.u..:..:.ly, __-- ~'~.-- Susan Fritz Pr+egiderrt, Boothfalls Mountain Homes Planning and Environmental Commission Project Description: Participants: ~t i ~sACK VARIANCE (DECK ENCLOSURE) OWNER BOONE, CATHERINE S. & MICHAE08/08/2005 7266 S BOULDER RD BOULDER CO 80303 APPLICANT BOONE, CATHERINE S. & MICHAE08/08/2005 7266 S BOULDER RD BOULDER CO 80303 Project Address: 3094 BOOTH FALLS CT VAIL 3094 BOOTH FALLS ROAD , # 1 Location: Legal Description: Lot: 1 Block: 2 Subdivision: BOOTH FALLS MTN HOMES Parcel Number: 2101-023-0200-1 Comments: BOARD/STAFF ACTION Motion By: K]ESBO Second By: BERNHARDT Vote: 5-0 Conditions: Action: APPROVED Date of Approval: 09/13/2005 Cond: 8 (PLAN): No changes to these plans may be made without the written consent of Town of Vail staff and/or the appropriate review committee(s). Cond:300 PEC approval shall not be not become valid for 20 days following the date of approval. Cond: CON0007522 This approval shall be contingent upon the applicant receiving Town of Vail approval for the related design review application. Planner: Bill Gibson At, ~ iON FORM Department of Community Development TOWN OF VAIL 75 Souk Frontage Road, Vail, Colorado 81657 te1:970.479.2139 fax: 970.479.2452 web: www.ci.vail.co.us Project Name: BOONE RESIDENCE PEC Number: PEC050066 PEC Fee Paid: $500.00 e ,a ~~~,~a ~~ ~ p5~ ~~ ~e: is „~ ri~- 1 _... t~+rw'"" °`'~" arm ~~~ _~...~ r'~ ~-+~ r ~~~ s ~~~ w L \y .~ :, i i 4 r ~~ o~°~ ~ ~ ~' ~*'"'~,a ~~ ~~ ate' ~~ ,,~,~ ` co ~,~ «~` ~_ ~~ .j d v.~ o 'd°a` Pb°r ~ a~ *~+,r 1 °~,.~.~ ags=ta 5° to ,,,~Qn ~+~6a"'~a6_ais ~ •.- idow and ::idinS, inc ~ir,orl4Yday,#SOl7 ` n, Cq 80126 ~' s:3D3 47'l-6960 :303 a7~•s9~t- CZl Prj #: ---- 474 ~ System #: G A®abr Prj #1: t:74 SOId To: 2 Customer iD: ` COLORADO WINDOW ANL1$iAING IIvC, 72386 DUMONT WAY #100 LITTLETON, CO 8(11 ~:5 Project IYr.,-,'._,~.. Prirrted: S131IOd ii::,i::..... ~: :.: rs :. ;t: : ;'c.1 iG5 valid Date: CJ30/05 .,._.. L t: !; . ~ i ~ L' ~ .. ~ V' 140G'>h! AND SIDWt3 INC. ~. a i ~ .::11~ .," dVAY #100 1.:`'ti:.Y~':; C:: 30125 Phone: 303471-6960 Fax: ,034;1 ci5!i~ ~ cr.~:: 3t?3471.6960 Few: ~... - Instructions: chipping Instructions: `JNeathr~r Shit::: I.fg. ~ - ~' ~~ <;; :~ I ~fralbi: Products as Stated Below. _ = i . •.:i: ~ is ~,.;~ ~:i t-: ~ Exterior. Item Numb®r: ! 'ti`;aa;ner Spacer Material-~Verm ~~;; Quantity: "4~ ~~ ass:n?c: ; Capillary Tubes-Yes Total Jamb To Jamb; 2E~ X 84118 ~.i:ctang~ Oas•Argon Total Rough Opening: 29 X 55 3~'8 -r~uiucl . , r .. r;~: ,,..:. I ~ : Jt ra Lice Configuratbn-1 Life ' - tiry !" it.. ~ ....... -., Sash Locks-poubis C asp k i•:,.- !". ;~ ~ l Handle.Options-Folding Crank ~` ij J +r~ ~ ~ ~~,~.EsS r+x ~e al ~ , r o , ... °,', `' r' . 0 -de ~ . 3 9 , ~~~ ~~~ ~- @ dt C--~ - ," +4 +~y, s ~ ~~~ . (tE iDt ~' n 5 s. ~ :l is I' • ~.,~,:'lnUf'. Clad ~1,~,;' t;. d~ v .; r ' ~ ! : .~ rr :.'4m Clad hO: QOOM1tE Ptr; Unir: JOB NAME: BOONS LOCATION: _ Unit price: $f•47.CE9 item Number: --- 2 r.'eathF~:: r ~~~t ! SpECer Materiab'~'Janr. ~~~r~,; . . Cluantity: ~ Gasin ~ :: f; Capillary Tubes-Yes Total Jamb To Jamb: n X 5A 11B F.~tt~n: ~ Ga5-Argon Total Rough Opening: 23 X 55 3l$ F ~oc~c' ,~ P sr1: ~ r a i.:- V ;:'.e Lite Configuration-1 Lke ,/~ ~ 'tn;~ t," ::' ~d ~ .f ~ ..,. t8 SaSh Locks-Double / 'fir) C,iaa3 i ~ >< E : dandle Options-Folding Crank {~~a ~: + .amb F' ~ iiE ~ rfi 7 !'. ~~~~~ ~rc~ Her„ t.~,~ s ~t. ~~,,. i h`, ' I ~~ ~ Operutir.3 C ~C3 F i; h '~- 4', ,; ~ ' ExtEriof~ . r e t f s, t r.lu°•:inum Clsid ' ~s' a:f ExZErio: c9-i!= °i •,i 3t ~ ;R;isSUm Ciad ~' z rya .~ 4 f;eg az:= : } ,r.ss = '~ 3u..az~ :5te s,1r lrxtesio' ~~~ ur-0'~ ft I ;n :3rcnae 1a:35t8'';'i:E-ti1S: ic.td C.. OY' :: P0: [300riE Per Unit: _ .. JOB NAME: 6Cx7NE - LCICATION: Unit. Prioe: 5347.06 ,,. - _. - ---- -- -• ---- '.- YVesther Sheldl CustomQuate Syatt.r: Koechlein Consulting Engineers, Inc. Consulting Geotechnical Engineers 12364 W. Alameda Pkwy • Suite 115 • Lakewood, CO 80228-2845 www.KCE-Denver.com LAKEWOOD (303) 989-1223 (303) 989-0204 FAX March 1, 2006 ..~...~ Catherine Boone 7266 S. Boulder Road Boulder, CO 80303 Subject: Excavation Observation for Proposed Addition 3094 Booth Falls Road Vail, Colorado Job No. 06-019 AVON/SILVERTHORNE (970) 949-6009 (970) 949-9223 FAX Boy- odd) d~Y~„ As requested, a representative from our office observed the foundation materials exposed in the open excavation for the proposed addition at the subject site on February 21 and 22, 2006. The purpose of our observation was to verify that the materials exposed within the excavation are natural soils and that the exposed materials should support the proposed addition designed for a maximum allowable bearing pressure of 2,000 psf. The depth of the excavation at the time of our initial observation was approximately 3.0 to 3.5 feet. The material exposed in the bottom of the excavation at the time of our initial observation consisted of dark brown to black, loose, clayey sand with gravel and cobbles. We recommended that the material within the excavation be excavated an additional 1.0 to 1.5 feet in order to expose'more cortipetent bearing material. At the time of our 2"d visit, the depth of the excavation was approximately 4.5 to 5.0 feet. The material exposed in the bottom of the excavation at the time of our 2"d observation consisted of natural, brown, medium dense to dense, clayey, sandy, gravel with cobbles. We understand that'/,-inch rock will be placed and compacted in the excavation to footing grade. Provided that the '/4-inch rock is properly compacted, it is our opinion that the materials exposed within the excavation should support a spread footing foundation system designed for a maximum allowable soil bearing pressure of 2,000 psf. Our opinion is based on the foundation subgrade being properly prepared and the subgrade remaining dry, unsaturated, properly compacted, unfrozen, and frost free during construction. The opinions presented in this letter are based on observation of the materials exposed at the base of the foundation excavation. It is possible that subsurface conditions could change below the exposed foundation excavation. We appreciate the opportunity to provide this service. If we can be of further assistance, please contact our office. ENGINEERS, INC. Scott B. Myei=s, Senior Engineer (3 copies sent) ~ ~ 4~ ~~ APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UNSIGN~p~~ Building Permit, ~~ ~(r#p~eCtt~>s) REVISION TO TOWN OF VAIL BUILDING PERMIT n1WNOFYAI~ Separate Permits are required for electrical, plumbing, mechanical, etc.! 75 S. Frontage Rd. Vail, Colorado 81657 CONTRACTOR INFORMATION General Contractor: .~ Town of Vail Reg. No.: Contact and Phone #'s: 1 1SWN~ R J i3U'_TLD~_R_-~1 3~ a _~ L ~IH.303-'~99-a`I3w C. 303 -511-0 S y s ATTENTION: JOE, JR, CHARLIE, GREG -''~. Contractor Signature: /i~~~ ~,~`~` j COMPLETE REVISIONS EVALUATIONS FOR BUILDING PERMIT (Labor 8~ Materials3 REVISED AMOUNT: $ ~..~, 4OO.~E7Q~~ ELECTRICAL: $ iSO. OO , ~I OTHER: $ ~.. h -- f PLUMBING: $ MECHANICAL: $ II REVISED TOTAL: $ .4.1.,'S7l , OO For Parcel # Contact Eaple County Assessors Office at 970-328-8640 or visit www.eaale-countv.com, ~~ Parq~t # a1 D 10 a 3 0 a ~ 01 Job Name: ~~ ~~H tRLI..] TDUII~~IVUZ~ UIU1 l~1 4 Job Address: WEST DECK CNCLOSUR G ~I 3D9y gD0"~N BALLS (DAD ~~.. Legal Description ~ Lot: 1 ~~ Block: ~.. ~~ Filing: ~., e~. ~, Subdivision: Owners Name:MTICr ~ liR1~~~~lll~l~ ~~r R„ `(~ ~~03~~ 1e:y9~1 •aN3H i i e g r d L4 (~ r7 . ~~o.~.g ~ n 7 En ineer: ~I Address: ~I Phone: 9 REASON FOR REVISIONS: ZONING S ~=-1 ~~~~L IC VRIIlHNC~ VI/H S T~Tr~UTIC. r-orz w~ s T or ~ is ~_NGLL~ S U Rl~ Work Class: New ~ Addition (~ Remodel ( ) Repair ( ) Demo ( ) Other ( ) yp : _~-~__ Exterior ( ) Both Wf ~~Does an EHU exist at-this locati f _ - es (~) No ( ) Work T e--- Interior --+-----.--` +^---' on: Y .. ` - Type of Bldg.: Single-family ( ) Two-family ( ) Multi-family ~ Commercial ( ) Restaurant ( )Other ( ) No. of Existing Dwelling Units, in this -building: 3 No. of Accommodation Units in this building: „3 No/Type of Fireplaces Existing: Gas Appliances ( 1 Gas Loos ( )Wood/Pellet ( 1 Wood Burning (~.) NoRvpe of Fireplaces Proposed_ Gas Appliances ( )Gas Lo, s { )Wood/Pellet Wood Burnmq - _ _ _ ~rpoes a Fire S nrikier S} sfem Exst^ _ (NOT ALLOWED) Does a Fire Alarm Exist: Yes ( ~ ~ IVo (~f)-`~` p ' y Yes ( ) No (~ **************«**,-********,-****,-******FOR OFFICE USE ONLY***********************.************** Oti~~i~ lees: ~ I ~ Type 4f ~'pnstructior-: ~ ( ~ Aacgptect Bv.:~ ~- l9RB~ FeesH , ~ Bl /P1~r4n~r SI n-off,: ' ,I f=. OccupancyGroua; ~ ~- I~uhli~ Wau~mlE Fee: .: I: Dete'Received: . F:lUsers\cdevWPPL1CAT{ONS\BLDGREVISIONS2004.doc ` ~1~02/2004 APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UNSt~ ` ~ ~• _U~( Project #: ~ 1~-~ ~7 Building Permit #: t'- t~ cS to 7 ;~~ ~~NOFYAIL ~ OF UI T PL N t 't a eq or ei tric u , mech al, etc.l 75 S. Frontage Rd. Vail, Colorado 81657 CONTRACTOR INFORMATION General Contractor: Town of-Vail Reg. No.: Contact and Phone DWIIi~R / (3USL~LR 3C,Z-~ 1~.303-`1~~•d`i3`i Email address: IST 1300N®1~IjL . C.t~ I~t Contractor Signature: ~~~ s: C . 3C)3 -517- 08 ~a COMPLETE VALUATIONS FOR BUILDING PERMIT (Labor 8~ Materials) BUILDING: $ 9300. OO ~ ~ ELECTRICAL: $ abQ, O(~ I{ OTHER: $ PLUMBING; $ II MECHANICAL: $ ~ TOTAL: $ X155 D. DD F~oarjParcel # Contact Eagle Counter Assessors Office at 970-328-8640 or visit www.eaa/e-countv.com Zlo ~p2..3 o2.dO1 Job Name' 60TH FALLS TQ~~ H~MLS Job Address: ~, 3v~y gbo~-r; ~~~5 ~~ ~ 1 ..- ~--i-- ._ _.- ----~-- Legal Description !I Lot: 1 ~~ Block: ~ ~ Filing: y 'Z I~ Subdivision: Bcx~Trt~,~.~5 M~rr., +-~.ivt Owners rz ~ I~H~T ~ "...[3()DYUL=~ Address: 7a6b S0. B_ D__U _L.DfZ1Z fZD • ~ ~ ~~ Phone:- ~~,~y3~ ... Architec Address: ~ Phone: ~I_J [3;OT,5 PD. 6oX ~y5~ UAIL S~.6S$ { Engineer: IrAddress: ~I Phone: Detailed description of work: w r sT ~ rZc~c r ~scL ns u~ ~. Work Class: New ~ Addition ( ) Remodei (~(') Repair ( ) Demo ( ) Other ( ) Work Type: Interior ( ) Exterior ( ) Both ~ ~rpoes an EHU exist at this location: Yes ( ) No ( ) Type of Bldg.: Single-family ( ) Two-family ( ) Multi-family ~ Commercial ( ) Restaurant ( )Other ( ) No. of Existing Dweiling Units in this building: .3 No. of Accommodation Units.in this building: No(Type of Fireplaces' Existing: Gas Appliances ( )Gas Logs !!) WoodiPeilet ( )Wood Burnin ~) No/Type of Fireplaces Proposed: Gas Appliances ( )Gas Logs ( )Wood/Pellet ( )Wood Burning (NOT ALLOWED) Does a Fire Alarm Exist: Yes ( ) No (~) ~ ~I Does a Fire Sprinkler System Exist: Yes ( ) No Q<) .... _. ~ FOR OFFICE USE ONLY'"",..,,.,. , .. . . FOthec;Fees.:' `' ' ~~ ~ ,1 ~~Type of.Construction ~ I .'DRB Fees. . y ,.. ~ ' A" I ,OccupancX Group ~~ ~ ~.~: e ~ _•vea... ~a:~~ ~, W .a ~.~. t ~.~~ ..~.~~~ ~Z ~~' Document2 .~ ~~~'nr J L~~" '1~'OV-CA~ImDIEV. ~, TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT 75 S. FRONTAGE ROAD VAIL, CO 81657 970-479-2138 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ADD/ALT MF BUILD PERMIT Permit #: B06-0081 Job Address.: 3094 BOOTH FALLS CT VAIL Status.....: ISSUED Location......: 3094 BOOTH FALLS ROAD , #1 Applied...: 04/14/2006 Parcel No....: 210102302001 Issued ...: 05/22/2006 Legal Description: ~~~~~~5`~~ ~' Expires...: 11/18/2006 Project No.... OWNER BOONE, CATHERINE S. & MICHAE04/18/2006 7266 S BOULDER RD BOULDER CO 80303 APPLICANT BOONS, CATHERINE & MICHAEL 04/18/2006 Phone: (303) 499-2434 7266 S. BOULDER BOULDER COLORADO 80303 License: 362-L CONTRACTOR BOONS, CATHERINE & MICHAEL- 04/18/2006 Phone: (303) 499-2434 7266 S. BOULDER BOULDER COLORADO 80303 License: 362-L Desciption: BOOTH FALLS MTN HOMES #1-NORTH DECK ENCLOSURE/ADDITION Occupancy: R-3 Type Construction: V-B Valuation: $32,980.16 Revision Valuation: Add Sq Ft: 368 Fireplace Information: Restricted: Y # of Gas Appliances: 0 # of Gas Logs: 0 # of Wood Pellet: 0 ***sss**************************~*************************~****~**** FEE SUMMARY ********+*****~************************~******************** Building------> $472.05 Restuarant Plan Review--> $o. 0o Total Calculated Fees--> $1, 002.28 Plan Check---> $306.83 Recreation Fee--------------> $110.40 Additional Fees----------> $0.00 Investigation-> $0.00 TOTAL FEES-------------> $1,002.28 Total Permit Fee---------> $1, 002.28 Will Call-----> $3. oo Payments-------------------> $1, 002.28 BALANCE DUE---------> $ o . 0 0 *********************~**********************************************s**********x***************************************************************** Approvals: Item: 05100 BUILDING DEPARTMENT 05/18/2006 cgunion Action: CR 05/18/2006 cgunion Action: AP approved corrected plans. Item: 05400 PLANNING DEPARTMENT 04/23/2006 bgibson Action: AP Item: 05600 FIRE DEPARTMENT 04/19/2006 JJR Action: AP Smoke detectors required per IRC R313(2003). Item: 05500 PUBLIC WORKS See page 2 of this Document for any conditions that may apply to this permit. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADV CE BY TELEPHONE AT 479-2149 OR AT OUR OFFICE FROM 8:00 AM - 4 PM. SIGNATURE OF OWNE CONTRACTOR FOR HIMSELF AND OWNEF PAGE 2 CONDITIONS OF APPROVAL Permit #: B06-0081 as of OS-22-2006 Status: ISSUED Permit Type: ADD/ALT MF BUILD PERMIT Applied: 04/14/2006 Applicant: BOONE, CATHERINE & MICHAEL Issued: 05/22/2006 (303) 499-2434 To Expire: 11/18/2006 Job Address: 3094 BOOTH FALLS CT VAIL Location: 3094 BOOTH FALLS ROAD , #1 Parcel No: 210102302001 Description: BOOTH FALLS MTN HOMES #1-NORTH DECK ENCLOSURE/ADDITION *****~*~***~:~****~~~********~******************Conditions:******~******~:~*~******~**~~****~**~*:~*~**~** Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: 14 (BLDG.): ALL PENETRATIONS IN WALLS, CEILINGS, AND FLOORS TO BE SEALED WITH AN APPROVED FIRE MATERIAL. Cond: 1 (FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY WORK CAN BE STARTED. Cond: 40 (BLDG): (MFR/COMM) FIRE ALARM REQUIRED PER NFPA 72. Cond: 16 (BLDG.): (SFR) SMOKE DETECTORS ARE REQUIRED PER SECTION R313 OF THE 2003 IRC. Cond: 18 (BLDG.): STAIRWAYS ARE REQUIRED TO MEET SECTION R311.5 OF THE 2003 IRC OR SECTION 1009 OF THE 2003 IBC. Cond: 19 (BLDG.): GUARDS ARID REQUIRED TO MEET SECTION R312 OF THE 2003 IRC OR SECTION 1012 OF THE 2003 IBC. Cond: 34 (BLDG.): A COPY OF THE SOILS REPORT WILL BE REQUIRED BEFORE A FOOTING INSPECTION WILL BE CALLED FOR. TOWN OF VAIL, COLORADO Statement ******************************************************************************************** Statement Number: 8060000658 Amount: $1,002.28 05/22/200604:33 PM Payment Method: Check Init: DDG Notation: Boone 1504 ----------------------------------------------------------------------------- Permit No: B06-0081 Type: ADD/ALT MF BUILD PERMIT Parcel No: 2101-023-0200-1 Site Address: 3094 BOOTH FALLS CT VAIL Location: 3094 BOOTH FALLS ROAD #1 Total Fees: $1,002.28 This Payment: $1,002.28 Total ALL Pmts: $1,002.28 Balance: $0.00 ******************************************************************************************** ACCOUNT ITEM LIST: Account Code Description Current Pmts --- BP ----------------- 00100003111100 ------------------------------ BUILDING PERMIT FEES ------------ 472.05 PF 00100003112300 PLAN CHECK FEES 416.83 RF 11100003112700 RECREATION FEES 110.40 WC 00100003112800 WILL CALL INSPECTION FEE 3.00 APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UNSIGt~ ' '~ ~'_ ~ Z 3 Project #: u ~ - Building Permit #: ~ U (~ ' ~On?~ ~~ ~ ~ • 970-479-2149. (Inspec#io~s) ~~~~~~~~ ~ TO N OF VAIL BUILDING PERIV~IT APPLICATION Separate~ermits are required for electrical, plumbing, mechanical, etc.! 75 S. Frontage Rd. Vail, Colorado 81657 CONTRACTOR INFORMATION General Contractor: Town of Vail Reg. No.: Contact Person and Phone #'s: ~-~u.,~~!'. Cq~~c.~N~ ~~i~l 3fo2-L (I ~i'?o~~t"1b-r~t~1 Email address: ~~ ~~ A ~~~ a~ Fax#: cl~~ _ ~1~, ~~~•~ Contractor Signature I ~~ I+ COMPLETE VALUATIONS FOR BUILDING PERMIT (Labor 8~ Materials) ~Z~~~ '~ BUILDING: $ II ELECTRICAL: $ ~I OTHE~ --~~ l PLUMBING: $ II MECHANICAL: $ I~ TOTAL: $ ~" ~ ,~t~~9~9,.'.- ~ ~ ------ For Parcel # Confacf Eagle County Assessors Office at 970-328-8640 or visit www.eagle-count~c_om Parcel II 21(71- O`Z3 - d ~ - ~ Job Name: II Job Address:3~ ~ ~~ F~Lg ~~ ~ I Legal Description 11 Lot: ~+- ~I Block: 2 JI Filing: ' ~ ~I Subdivision: ~~~~,~F~~M~rl r~j Owners Name ~ ~~I Address:,l~~ s ~,~~ ~~ ~~ II Phone~;c3 ~~ .~ ~Y Architect/Designer• Address: + Phone: Engineer: I~ Address: I Phone: Detailed description of work: No i~twt DE c..1[.- ~ t,-La~ Sy l~r / A'~Ql~.Q Work Class: New () Addition Remodel ( ) Repair ( ) Demo ( ) Other ( ) Work Type: Interior ( ) Exterior ( ) Botfj,~ ~I Does an EHU exist at this location: Yes ( ) No ( ) Type of Bldg.: Single-family ( ) Two-family ( ) Multi-family Commercial ( ) Restaurant ( )Other ( ) No. of Existing Dwelling Units in this building: ~? II No. of Accommodation Units in this building: 3 No/Type of Fireplaces Existing: Gas Appliances ( )Gas Loqs ( )Wood/Pellet ( )Wood Burning (~ No/Type of Fireplaces Proposed: Gas Appliances ( ~ Gas Loqs ( )Wood/Pellet ~_) Wood Burning (NOT ALLOWED Does a Fire Alarm Exist: Yes ( ) No~~ -~~Does a Fire Sprinkler System Exist: Yes ( ) o tru~ ~~ . ~ ~ FOR OFFICE USE ONLY, ....... ~~ ~f.~..~ ...... ~~* T pe of C its ction: 1 Date Received: ~')I Occupancy Group: ~~~~: Accepted By: ' >,:~,ts ~~. ~n APR 14 2006 TOWN AFL _" F:\cdev\FORMS\Permits\Building\building~ermit.DOC Page 1 of 16 02/09/2005 Questions? Call the Building Team at 479-2325 ~~~'~~ ` Buildin4 Permit Submittal Checklist Department of Community Development Project Name: ~0D'~~ 1J~ 2-T"1-4- ~~L~ ~~ ~,.,~,o~u 2E" Project Address: ~o~i ~-Q }~,~r7-1 ~,~-- ~ S e,p ~ ) / This Checklist must be com,oleted before a Buildin4 Permit avvlication is accevted., ^ All pages of application is complete ^ Has DRB approval obtained (if required) Provide a copy of approval form ^ Plan Check Fee required at submittal for projects valued over $100,000.00 (see attached fee schedule) ^ Complete site plan submitted ^ Public Way Permit application included if applicable (refer to Public Works checklist) ^ Staging plan included (refer to Public Works checklist) No dum~ster.aarkina or material storage allowed on roadways and shoulders without written aioaroval ^ Asbestos test and results submitted if demolition is occurring ^ Architect stamp and signature (All Commercial and Multi family) ^ Full floor plans including building sections and elevations(3 sets for remodels, 4 sets of plans for SFR and Duplex, 5 sets of plans for Multi-Family and Commercial Buildings) ^ Window and door schedule ^ Full structural plans, including design criteria (i.e.loads) ^ Structural Engineer stamp and signature on structural plans (All Commercial and Multi Family) ^ Soils Report must be submitted prior to footing inspection ^ Fire resistive assemblies specified and penetrations indicated ^ Smoke detectors shown on plans ^ Types and quantity of fireplaces shown ' ~ Applicant s Signature: Date of submittal: Received By: F:\cdev\FORMS\Permits\Building\building~ermit.DOC Page 2 of 16 02/09/2005 ~~ PLAN CHECK FEES TABLE Department of Community Development Building Safety and Inspection Services 75 South Frontage Road Vail, Colorado 81657 970-479-2138 FAX 970-479-2452 www, vailgov.com Plan check fees are required for projects with a valuation over $100,000, at the time of Building permit submittal. Please use the table below to calculate your plan check fee total. $100,000-$150,000 Multiply by $150,001-$250,000 Multiply by $250,001-$400,000 Multiply by $401,000-$750,000 Multiply by .0055 of Valuation Total .005 of Valuation Total .0045 of Valuation Total .004 of Valuation Total $750,001-$1,000,000 Multiply by .0035 of Valuation Total Valuations over $1,000,000 will be calculated by the Town of Vail Building Department. If you have any further questions, please contact the Town of Vail Building Department at 970-479-2128. F:\cdev\FORMS\Permits\Building\building~ermit.DOC Page 3 of 16 02/09/2005 ~nwxo~vn~, . ASBESTOS TESTING REQUIREMENTS THE TOWN OF VAIL AND STATE OF COLORADO DEPARTMENT OF PUBLIC HEALTH REQUIRE ASBESTOS TESTING ANY TIME WHEN MORE THAN 160 S.F. OF MATERIAL WILL BE DISTURBED OR REMOVED. AN ASBESTOS I t5 i AND REPORT IS REQUIRED TO BE SUBMI i t tD WITH YOUR BUILDING PERMIT APPLICATION FOR ALL REMODEL, ADDITION OR OTHER PROJECTS INVOLVING ANY DEMOLITION OR REMOVAL OF BUILDING MATERIALS THAT MAY CONTAIN ASBESTOS. BUILDINGS CONSTRUE i tD AFTER OCTOBER 12, 1988 THAT HAVE NO ASBESTOS CONTAINING MATERIALS ARE EXEMPT. A COPY OF THE REPORT MUST BE SUBMl I I CD WITH YOUR BUILDING PERMIT APPLICATION, • I have included the asbestos test and report with my building permit application applicant signature date • I certify my project will not disturb or remove more than 160 s.f. of building material. The construction plans submitted with my application clearly indicate this information. (This will be verified during plan review, and will delay your project if found to be inaccurate) ~ ~ applicant signature OR date • The building was constructed after October 12, 1988. The date of construction was original wnstruction date applicant signature date F:\cdev\FORMS\Permits\Building\building~ermit.DOC Page 4 of 16 02/09/2005 TC1i~N~VAII. BUILDING PERMIT ISSUANCE TIME FRAME If this permit requires a Town of Vail Fire Department Approval, Engineer`s (Public Works) review and approval, a Planning Department review or Health Department review, and a review by the Building Department, the estimated time for a total review will take as long as three (3) weeks. All commercial (large or small) and all multi-family permits will have to follow the above mentioned maximum requirements. Residential and small projects should take a lesser amount of time. However, if residential or smaller projects impact the various above mentioned departments with regard to necessary review, these projects may also take three (3) weeks to review and approve. Every attempt will be made by this department to expedite this permit as soon as possible. I, the undersigned, understand the plan check procedure and time frame. I also understand that if the permit is not picked up by the expiration date, that I must still pay the plan check fee and that if I fail to do so it may affect future permits that I apply for. Agreed to by: ~~-~ N E S ~o° ~~ Print name C~ tCi'r/ Signature Project Name: ~°~~" ~~- ~~`' `'` °s`' ~ Date: ~~ ~ i`~ ~Q ~ F:\cdev\FORMS\Permits\Building\building~ermit.DOC Page 5 of 16 02/09/2005 How it relates to Building Permits: - Fill out the attached check list with the Building Permit Aoolication. If yes was answered to any of the questions then a "Public Way" permit is required. You can pick up an application at either Community Development, located at 75 South Frontage Road or Public Works, located at 1309 Elkhorn Drive. - Notice sign-offs for utility companies. ALL utilities must field verify (locate) respective utilities prior to signing application. Some utility companies require up to 48 hours notice to schedule a locate. - A construction traffic control/staging plan must be prepared on a separate sheet of paper. An approved site plan may also be used. This plan will show locations of all traffic control devices (signs, cones, etc.) and the work zone, (area of construction, staging, etc.). This plan will expire on November 1~ and will need to be resubmitted for consideration for approval through the winter. Be aware that your resubmission for winter may be denied depending on the location of construction. - Sketch of work being performed must be submitted indicating dimensions (length, width and depth of work). This may be drawn on the traffic control plan or a site plan for the job. - Submit completed application to the Public Works office for review. If required, locates will be scheduled for the Town of Vail electricians and irrigation crew. The locates take place in the morning, but may require up to 48 hours to perform. - The Public Works Construction Inspector will review the application and, approve or deny the permit. You will be contacted as to the status and any requirements that may be needed. Most permits are released 48 hours of being received, but please allow up to one (1) week to process. - As soon as the permit is approved, the Building Department will be notified, allowing the "Building Permit" to be released. Please do not confuse the "Public Way Permit" with the "Building Permit". - NOTE: The above process is for work in a public way ONLY. Public Way Permits are valid only until November 15th. Anew Public Way Permit is required each year if work is not complete. Re- application each November 15th does not mean an automatic renewal. I have rea¢~~~nderstan the abov . C Signature ~1 %~I ~ o~ Date Signed ;~ F:\cdev\FORMS\Permits\Building\building~ermit.DOC Page 9 of 16 02/09/2005 DRAINAGE AND CULVERT INSPECTIONS ARE REQUIRED BY PUBLIC WORKS! Please read and check off each of the items below: • The Town of Vail Building Department has developed the following procedures to ensure that new construction sites have adequately established proper drainage from building sites along and adjacent to Town of Vail roads or streets. • The Town of Vail Public Works Department will be required to inspect and approve drainage adjacent to Town of Vail roads or streets and the installation of temporary or permanent culverts at access points from the road or street onto the construction site. Such approval must be obtained prior to any requests for inspection by the Town of Vail Building Department for footings, temporary electrical or any other inspection. Please ca{I Leonard Sandoval at 970-479-2198 to request an inspection from the Public Works Department. Allow minimum of 24 hour notice. • Also, the Town of Vail Public Works Department will be approving all final drainage and culvert installation with resulting road patching as necessary. Such approval must be obtained prior to any Final Certificate of Occupancy issuance. Agreed to by: Project Name: Date Signed: Print Name Signature F:\cdev\FORMS\Permits\Building\building~ermit.DOC Page 10 of 16 02/09/2005 ~~ YAK Qepartment of Community Dieve%pment Building Salty and Inspecirbn Services 75South Frontage Road jai/, Co%rado 81657 970-479 2138 FAX 970-479 2452 www. vai/govcom GILDING SAFETY AND INSPEa. ~ iON SERVICES PLAN REVIEW COMMENTS= TO: Contractor/Applicant Architect owner TRD Architects proj# none FAX/Email #: ktboone@aol.com trdubois@att.net NUMBER OF PAGES: FROM: DATE: BUILDING PERMIT #: OWNERS NAME: SITE ADDRESS: OCCUPANCY GROUP: TYPE OF CONS ~ r.Ua, ~ iON: NUMBER OF STORIES: BUILDING AREA: 2 Chris Gunion, Building Plans Examiner OS 16/2006 Catherine Boone 3094 Booth Falls Court #1 R-3 V-B 3 addition 368 s.f. addition The documents submitted for this project have been reviewed for compliance with the 2003 International Building Code, 2003 International Residential Code, 2003 International Mechanical Code, 2003 Intemational Fuel Gas Code, 2003 International Plumbing Code, 2003 International Energy Conservation Code and 2002 National Electrical Code as modified and adopted by the Town of Vail. The fig//owing avinments wi//need tv be add~al prnor to issuance of a bu//ding pern~it: For processing: • Plead submit four complete sets of revised constn~ction documents containing the requested information with all plan revision items clouded or otherwise identified. • Please respond in writing to each comment by marking the attached list or creating a response letter. Indicate which plan sheet. detail, specification. or calculation shows the requested information,, PlP~se sPnci revisions to the attention of the plans examiner with the buildinq permit application number noted. • Please be sure to include on the resubmittal the engineer's or architect's "wet" stamp. signature„ registration number and date on the cover page of anv structural calculations. all structural details and structural sheets of the plans. For commercial or multi-family proiects all sheets of the plans must be stamped. 'fir` Architectural Comments: i Please include a site plan showing location of the proposed addition, existing building and location of property lines. 2 Amend lower level stairway design to comply with the following: (R311.5) -maximum riser height 7 3/a" 3 Show ceiling heights at living room and powder room addition. structural C~~ent£ 4 Specify design criteria used in structural design: Roof live load Floor live/dead load Wind Speed/Exposure 5 Include specifications for all structural wood framing. Include lumber species and grade for conventional framing. Also specify manufacturer, series and design values for engineered lumber products (LVL, Glulam etc.) 6 Amend structural specifications to reference the soils report for this project. If no soils report is available, a geotechnical engineer will be required to verify the bearing capacity in writing once the excavation is complete, before a footing inspection. Revise notes on S201. 7 Specify top of wall/bottom of footing elevations. Clarify maximum foundation wall height with the standard reinforcing detail referenced. 8 Amend framing plans to clearly identify all beam hangers and beam to beam connections. 9 Amend plans to show rafter size and spacing in accordance with allowable spans. TJI 210 @16" o.c. are shown to span 17'. Design must accommodate an 80 psf roof live load (snow). 10 Amend structural specification notes on sheet S201 to indicate Town of Vail where City of Glendale is currently referenced. 11 Clarify TJI 360 specifications on sheet S201 noted. Plans show TJI 210 series. 12 Include framing plan/details for the new entry porch roof on sheet S201. 13 Include footing/foundation plan for the new entry porch on sheet A200 foundation plan. Please refer ~ the cover sheet for information on resubmitting plans. in order to avoid delays in issuance of a permit, please check gJl requ.:..,::.1 information is included with tl~e resubmitbrd plans. Please submit revised plans as a complete set. Partial plan resubmittals will not be reviewed. F: \cdev\CHRIS\PERMIT.COMMENTS\606-0081\806-0081. DOC A' ~- I- architects .................. May 17, 2006 Mr. Chris Gunion Town of Vail Community Development 75 S Frontage Road Vail, CO 81658 Re: Boone Residence Building Permit # B6-0081 Dear Mr. Gunion, In response to your Plan Review comments dated May 16, 2006 regarding the above-referenced project, I offer the following responses itemized per your letter: Architectural: 1. Site Plan has been provided. Please note expansion is in the same foot print as existing porch 2. Lower level stair has been revised-Please see drawings 3. Ceiling heights have been added-See drawings Structural: 4. Design criteria. has been added-Please see drawings 5. Wood framing specifications have been added-Please see drawings 6. Note regarding a required open hole inspection has been added-Please see drawings 7. Elevations have been added-Please see drawings-Please note this is an existing structure and new footing and foundation elevations need to match existing. 8. Beam hangers have been added-Please see drawings 9. Rafter size has been revised-Please see drawings 10. Note has been amended-Please see drawings 11. Superceded by new specifications-Please see drawings 12. Framing details (notes) have been added-Please see drawings 13. Foundation plan has been added-Please see drawings Feel free to contact me if you have any more questions or would like any additional information. Sincerely, ~ ~~~ ~ Thomas R Du Bois, AIA PO Box 1492 Vail, CD 81658 ~~Q 9's'O 0 Thomas ~ Robert C~uBofs yk ~~~ ~~~ ~~~~ trdvbors@attr~et tel.• 970-479-7387 fax: 970-476-0077 HrVtiaR~s•; :rnWi: ; ~ccx:.....,....t, Ire. 5t?2~ C:ou^n~ itc~a:: t i- Gklwtu.c: 5;..iq~s. »~r.,iu ~ ;~i::i1~ ~Funu 97~•~~.=...y*r :I~~WORTH - PAWLAK GEOTe'CHNICAL Fay: 97J-44>: •~;e Jung 20, 2006 1V;;ile Boone „i x..66 South Boulder Boulder, Colorado 8(1303 fah !`TO. 106 05?9 Subject: Observation of l xcavacion, Proposed Entry Addition w Lzxting 4 ~~"` Condominium, Unit 1, Booth Fa]ls CoAdominiuuu, 3094 Roc~rJt Fall, ~! ~ Road, yail, Colorado O _ ~ Deslr Mr. Boone: O ~,, , ~ 4s requestod, . represeata[ive of H~~~y~Drdt-PaWlal: Gcotechnica!. Int. c~bsen~acl the . i exc-avatiou at the subject site on June 2, 2006 to evaluate the ~~ils cxpos~i fur Foundation support. The findings of our observations arui recomtnendationc for the foundation desi~ ar~ ~~..,,tntod in this report. The servicca were per;~...,.:d in acwrdaacc with our agreement far professional engineering services to von. elated June 2, 2006. Ao~ential geologic iatpacts to the properly are heyaad the scope Uf c><ur scrc~iccs. Tlta proposed ..~.;.j addition is located oa the notch. side of the existing crn~ciomuuum building, Foundations were designed for an assumed allowable soil hearing pressure of I,S00 psf. Ar the tinse of our visit to t1u site, the foundation excavation had been ettt in crane levr~i from S to 9 feet below the adjacent grrnmd aurfact. T'hc soils exposed in the bottom of the excavation consisted of medium dense to stiff, gt8velly sand and clay.. Urtdismrbed sampling of the bearing soils was not possible dtu to the rock ccmtent. 11 o h~ water .. was encouatczal is the excavation and tlae soils were moist W very moist. T'!~ excavation was 1 to 1 rh Ertl t)elow the bottom of the existing buiiditrg foc~tin~s. No fill '~ wa.~ rlbscrvad in the botwm of the excavation. {~ Consideria; the conditions exposed in the excavation and the Hamra of the p^opc~sed canstcvctian, spread footings pIued on the utidisturbnci natural soil degi~ed for an iallc~wahie soil bearing pressure of 1,500 psf should tie adequate for support of the proposed w.,.; addition. Footings shouIci he a ntiaimum width of 16 inr,~ fb* cc~ntinuoua walls and 2 fret for columns. Loose and disturtxd soils i>4 footing attics shc>'u1d be retaov~ add the bearing level r~xterafed down to the undisturbed natwrat svi3s. Fxtezivr footings should be r.~~~ided with adequate soil cover aba~~c their bearing elevations far frost protection. Cantinuotr~ foundation walls should be reinforced tap and bottom to span local anomalies such as by assumitlg a~ unsupported length ~f at tease 12 feet. Foundation walls acting as retaining structures (ir a:zy) should ParkEr ~~3-E341-7119 Goloraclo Spr;ngs 719-b33.55b2 Silvrrth4rnc 9;0-468-1989 Miiw Boone 1u~e 20, 2006 Pave also lac dasiened to resist a lateral earth r.sure based oA zn eCt.it~ale!it raid unit weight of at least 55 pcf for oa-site soil as baekfill. A p..:,...^ser foun6atit+n drain stwuld br prcnidod to prevent tempcnary buildup of hydrvsta:ic ,pressure liohind cet:sini~ng walls and prswetu wetting of the lower level. Struc;RU-al f 1. pla:.:.d wi:hin any floc~s• sigh arras can consist of the can-site soils c,~~..~,actcd to at l:;,ast 95 4~ :~t" ~:andard Pr;~ctar dansit3• at a mois7ure current star optirrntttt- $xclcfill pla: e;i a:ours the strs~'turc should he compacted and the svrfa:e graded to prCv:sn: banding within at mast ]0 fret of the building. The rec~~~...radations submitted in this letter are based ott our o3~scn~aticm.ol' the coifs cxpcned within the foutsdatiop exeavition:nd do not itarh~de suosurface ezl~taration to evaN.satc the subsurface conditions within the loaded depth of foundation in~ircace. This study is based on flit assurnptian that soita t~nratti the fuotictcs pave 2cr~a! or btt~r support than those eacpoged. T2~ risk of foundation maveratnt may ix €rratcr thsin indicated in this reporr becaaae of possible variaaoas it the s:rbst>~facc ;auditions. In c~:-dcz w reveal the nature xnd extent of variations in the subsurface contaitiars below the excavation, drilluig would be reguireoi. It is possible the data obtained by~ substtrfast explvratioa could change the rxoramendatious a~.~aK~.ined in ,~s trae-. Our sen•i~es do not include determining the presence, prrverttiAn oz passibiiit;~~ of mok3 or other biological contatrtinarttc (MOBG7 developing in the future. If the cliant ss ec~zzcCrned about MOBC, then a professional in this special fold of praetic:e snouid be o;ansc:lted. If you have +n3' questions or aced further assistance, please calf our offut: s,~~~rGly, x~~ ~+oRTx - Pawi,~~'i~c.~u-, rNc. Daniel E. Hardht, P Rev. by: SI.1' DE.pl/icsw !Ah 4 c. ]060529 ("1 Tt]7AL P.03 ~ .~ - ar~hitects .................. June 2, 2006 Mr. Chris Gunion Town of Vail Community Development 75 S Frontage Road Vail, CO 81658 Re: Boone Residence Building Permit # B6-0081 Dear Mr. Gunion, Please note that the foundation design as submitted for the above referenced project will accommodate a soil bearing pressure of 1500 lbs/sgft as de~:,...uined by the soils report in accordance with IRC 2003 Table R403.1. Feel free to contact me if you have any more questions or would like any additional information. Sincerely, --a .~ ,- ~ ~~ Thomas R Du Bois, AIA ~~ pF C0~ p9q ~~Q• 00 Thomas ~ Robert DuBois 306044 l~cFti ~~~~ SED A~~~` PO Box 1492 tel.• 970.479--7387 Vail, CO 81658 trduboisC~attnet fax: 971-47(r©1I77 TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT 75 S. FRONTAGE ROAD VAIL, CO 81657 970-479-2138 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ELECTRICAL PERMIT Permit #: E05-0193 _~~- S-G ~OC~ Job Address: 3094 BOOTH FALLS CT VAIL Status ...: ISSUED Location.....: 3094 BOOTH FALLS ROAD , #1 Applied . .: 08/29/2005 Parcel No...: 210102302001 Issued . .. 09/02/2005 Project No ~~U~-d~ 3 i Expires . .: 03/01/2006 OWNER BOONE, CATHERINE S. & MICHAE08/29/2005 7266 S BOULDER RD BOULDER CO 80303 APPLICANT BOONE, CATHERINE & MICHAEL 08/29/2005 Phone: (303) 499-2434 7266 S. BOULDER BOULDER COLORADO 80303 License: 362-L CONTRACTOR BOONE, CATHERINE & MICHAEL 08/29/2005 Phone: (303) 499-2434 7266 S. BOULDER BOULDER COLORADO 80303 License: 362-L Desciption: relocate 2 electrical outlets and add one new; relocate existing baseboard heater. Valuation: $250.00 Square feet: 84 ******************************************************************* FEE SUMMARY *************~******** *************************+************ Electrical---------> $51.75 Total Calculated Fees-- > $54.75 DRB Fee---------> $0. oo Additional Fees---------- > $0.00 Investigation----> $0.00 Total Permit Fee-------- > $54.75 Will Call---------> $3.00 Payments------------------ > $54.75 TOTAL FEES--> $54.75 BALANCE DUE-------- > $0.00 ********************************************************************************************************** *************************************** Approvals: Item: 06000 ELECTRICAL DEPARTMENT 08/29/2005 shahn Action: AP Item: 05600 FIRE DEPARTMENT ************************************************************************************************************************************************* CONDITIONS OF APPROVAL Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. ***************************************************s************s*************s****************************************************************** DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2149 OR AT OUR OFFICE FROM 5:00 AM - 4 PM. 7 TOWN OF VAIL, COLORADO Statement Statement Number: 8050001446 Amount: $54.75 09/02/200502:40 PM Payment Method: Check Init: DDG Notation: Catherine Boone 1423 ----------------------------------------------------------------------------- Permit No: E05-0193 Type: ELECTRICAL PERMIT Parcel No: 2101-023-0200-1 Site Address: 3094 BOOTH FALLS CT VAIL Location: 3094 BOOTH FALLS ROAD #1 Total Fees: $54.75 This Payment: $54.75 Total ALL Pmts: $54.75 Balance: $0.00 ******************************************************************************************** ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------------- ------------------------------ ------------ EP 00100003111100 ELECTRICAL PERMIT FEES 51.75 WC 00100003112800 WILL CALL INSPECTION FEE 3.00 APPLICATION WYLL NOT BE ACCEPTED IF INCOMPLETE OR UNSI~TI~ i~~~ Project #: ~'~C.~ Building Perm' :~.O.S OZc~~ E I ct " rm ~L--OS- l ~ 3 9 - - 9 ( ections) ~DWN ~F YAIL N C~RIC I`T A I O N 75 S. Frontage Rd. Vail, Colorado 81657 CONTRACTOR INFORMATION _ ~,?~ _: t;~,' j f Electrical Contractor: alt= ~ ~--~-~~-~,ti ~ E-Mail Address: K'r app ~, ~ ~ ~, _ C fh~Y~, Contractor Signature: ~~, _ ~„~- COMPLETE SQ. FEET FOR NEW BUILDS and VALUATIONS FOR ALL OTHERS (Labor & Materials) AMOUNT OF SQ FT IN STRUCTURE: gj~ cJC? ~, ~~ELECTRICAL VALUATION: $ ~ 25 ~? "- Contact Eag/e County Assessors Office at 970-328-8640 or visit www,ecgle-county, com for Parce/ # Parcel # .Z l~ ~ -- d~~ - t~ ~Z~ - ~ ___ Job Name: ~, ~~.,~ ~c~ ~~~~`,~~ Job Address: ~- Legal Description Lot: ~-- Block: ~- I Filing: ~ Z.`~ Subdivision: l~a-~ ~ •t rrkt-~--,N~n~ t-kc~b1~S Owners Name: (j ~~, N G II Address: ~ ~ ~ ~ S . ~~ ~~~-~ ~ I Phone: ~-~._ ~~5._ L~ .3~~ I~ Engineer: ~~ Address: II Phone: II Detailed description of work: R~Ln Co,,,r.-E ~- EL~~IYLII 11~~ co uT' LET .~-eJ A Ar D p a.~.6. lvf ~ Q-E Lo c,~i'E C x t S R~ 5 ~- c~ Ar~~ ~~ Work Class: New ( ) Addition ( ) Remodel~Xj Repair ( ) Temp Power ( ) Other ( ) Work Type: Interior (~ Exterior ( ) Both ( .)" Does an EHU exist at this location: Yes ( ) No ( ) Type of Bldg.: Single-family (. ) Duplex ( ) Multi-family ~ Commercial ( ) Restaurant ( )Other ( ) ~ No. of Existing Dwelling Units in this building: 3 II No. of Accommodation Units in this building: ~ Is this permit for a hot tub: Yes (_) No ~)_ Does a Fire Alarm Exist: Yes (x) No ( ) Contact and Phone #'s: Does a Fire Sprinkler System Gist: ~ Yes ( ) No (per } ~~~~ti ~ ~~~~:~,~,~*~,~*,~~***:~~,~~:~*~:~~:*~~::~**~~~*FOR OFFICE USE ONLY:~x~~xx~~~x~~:*~~~:~~xx**~*~*,~*x***:~x,~~x ~~ ''1 ~~~ b5 ~~ ~ Other Fees: Date Received: ~ \ I DRB Fees: Accepted By: Planner Sign-off: \1Vail\data\cdev\FORMS\PERMITS\ELECPERM.DOC 07/26/2002 Town of Vail Reg. No 3~Z-L • .Q iF ~:'~~.. y~1. f +!ii, A1'". 1 ~ . ~R R~? ~'t~, ., ~~' °~4.a~ . Amendment to the 1999 N.E.C. Town of Vail Ordinance 14-1-6., Overhead services are not allowed in the Town of Vail. Underground services have to be in conduit (PVC) from the transformer to the electric meter, main disconnect switch and to the first electrical distribution circuit breaker panel. The main disconnect switch shall be located next to the meter on the exterior wall of the structure easily accessible. All underground conduits are required to be inspected before back-filling the trench. In multi-family dwelling units, no electrical wiring or feeder cables shall pass from one unit to another. Common walls and spaces are accepted. NM Cable (Romex) is not allowed in commercial buildings or structures exceeding three (3) stories. No use of aluminum wire smaller than size #8 will be permitted with the Town of Vail. TOVIiN OF VAIL ELECTRICAL PERMIT G~lIDELINE~ ^ All installations of exterior hot tubs or spa's require a DRB approval from planning. This application wil! not be accepted without a copy of the DRB approval form attached (if applicable). ^ If this permit is for installation of an exterior hot tub or spa on a new elevated platform or deck over 30" above grade, you must also obtain a building permit. ^ If this permit is for installation of an exterior hot tub or spa on any existing deck or elevated platform, a structural engineer must review the existing condition and verify that it will support the added concentrated load. Please provide a copy of the structural engineers wet stamped letter or drawing with this application. ^ If this is a remodel in amulti-family building with a homeowners association, a letter of permission from the association is required. ^ If this permit is for a commercial space, two (2) sets of stamped drawings are required. I have read and understand the above. ~_ ~~ ~ ~~ ~ ~~ (~5 Signature Date Signed If you have any questions regarding the above information or have additional questions, please contact the Town of Vail Electrical inspector at 970-479-2147. The inspector can be reaches! on Tuesday, Thursday and Friday mornings between the hours of Sam and gam. You may also leave a voice mail and the inspector will call you back. TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT 75 S. FRONTAGE ROAD VAIL, CO 81657 970-479-2138 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ELECTRICAL PERMIT Permit #: E06-0022 Job Address: 3094 BOOTH FALLS CT VAIL Status .. .: ISSUED Location.....: 3094 BOOTH FALLS ROAD , #1 Applied . .: 03/02/2006 Parcel No...: 210102302001 Issued . .. 03/02/2006 Project No ~ Z';~SG `; -~ ~ ~ \ Expires . .: 08/29/2006 OWNER BOONS, CATHERINE S. & MICHAE03/02/2006 7266 S BOULDER RD BOULDER CO 80303 APPLICANT BOONS, CATHERINE & MICHAEL 03/02/2006 Phone: (303) 499-2434 7266 S. BOULDER BOULDER COLORADO 80303 License: 362-L CONTRACTOR BOONS, CATHERINE & MICHAEL 03/02/2006 Phone: (303) 499-2434 7266 S. BOULDER BOULDER COLORADO 80303 License: 362-L Desciption: REPLACING AN ELECTRICAL PANEL Valuation: $350.00 Square feet: 1700 ***~s********m****************~***s******~********************~**** FEE SUMMARY *****************************~****************************~:~ Electrical---------> $ 8 6.2 5 Total Calculated Fees--> $ 8 9.2 5 DRB Fee---------> $0.00 Additional Fees----------> $0.00 Investigation----> $ o . 00 Total Pernvt Fee--------> $ 8 9.2 5 Will Call---------> $3 .00 Payments------------------> $89.25 TOTAL FEES--> $89.25 BALANCE DUE--------> $0.00 ****r******x**~*******************************************~*********~******************************************************~*******************~* Approvals: Item: 06000 ELECTRICAL DEPARTMENT 03/02/2006 SHAHN Action: AP Item: 05600 FIRE DEPARTMENT CONDITIONS OF ArrxOVAL Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVA BY T LEPHONE AT 479- RAT OUR OFFICE FROM 8:00 AM - 4 PM. / SIGNATURE OF OWNER OR CONTRACTOR~SELF AND OWNEF TOWN OF VAIL, COLORADO Statement ******************************************************************************************** Statement Number: 8060000194 Amount: $89.25 03/02/200604:43 PM Payment Method: Check Init: DDG Notation: Catherine Boone 1481 ----------------------------------------------------------------------------- Permit No: E06-0022 Type: ELECTRICAL PERMIT Parcel No: 2101-023-0200-1 Site Address: 3094 BOOTH FALLS CT VAIL Location: 3094 BOOTH FALLS ROAD #1 Total Fees: $89.25 This Payment: $89.25 Total ALL Pmts: $89.25 Balance: $0.00 ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------------- ------------------------------ ------------ EP 00100003111100 ELECTRICAL PERMIT FEES 86.25 WC 00100003112800 WILL CALL INSPECTION FEE 3.00 APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UNS~jht~~QS_ ~ Z 3 , Project #: ~'' ~~JJ _ • O~ Building Permit #: ~~OS' O ZatD Electrical Permit #: /%') rn bC.~ Z Z 970-479-2149 (Inspections) TOWNOFYAI~ ~®s--v3G 7 TOWN OF /AIL ELECTRICAL PERMIT APPLICATION 75 S. Frontage Rd. Vail, Colorado 81657 Electrical Contractor: E-Mail Address: Contractor Signature: r n-Yty~ c ~y ~ CONTRACTOR INFORMATION J~ Town of Vail Reg. No.: ~Co Z- L ~1 c tltt~Z ~ c~C~ I~yC II Contact and Phone #'s: ~ 3c,3-y~~_ aLQ3 ~ COMPLETE SQ. FEET FOR NEW BUILDS and VALUATIONS FOR ALL OTHERS (Labor & Materials) AMOUNT OF SQ FT IN STRUCTURE ~ ion Contact Eag/e County Assessors Office at 970-328-8640 or visit www, eaa/e-county, com for Parce/ # Parcel # 7_ I U ~ - ~ 3 - r~_`~_ ~'~~ Job Name: I'JJc~ol~Fftc~S ~/L I ELECTRICAL VALUATION: $ ~~(~ Job Address: 3-d~y ~~ i~,( ~~~ Kc~~~ ~ Legal Description Lot: ~ Block: ~ I Filing: ~ ~ I Subdivision: C3c,~T}-! ~~~ ~U(;fi ~~~,~~ Owners Name: IC~+TF ~ NE II Address: -12~~ S . ~~~ 2 2,p II Phone: ~ ~3 _ ~~/~ _~~ 3y Engineer: II Address: Detailed description of work: R ~~~~ ~~~.~,Li c_ ~/'~-~J cL Phone: Work Class: New ( ) Addition ( ) Remodel ( ) Repair Temp Power ( ) Other ( ) Work Type: Interio~) Exterior ( ) Both (~ Does an EHU exist at this location: Yes ( ) No ( ) ~' ~_ ~ --- Type of Bldg.: Single-family ( ) Duplex ( ) Multi-fa~ Commercial ( ) Restaurant ( )Other ( ) No. of Existing Dwelling Units in this building: ~ ~ No. of Accommodation Units in this building: Is this permit for a hot tub: Yes ( ~ No~ Does a Fire Alarm Exist: Yes ( ) No~ ~ Does a Fire Sprinkler System Exist: Yes ( ) ~-~ ,~~*~*~**~~**~ ,>~****~******~***********FOR OFFICE USE ONLY~~~~xx~,~**~*~~,~~~~~:~**~~~~~~~~~~*,~~x:~ `III ~~ ~~ ~ ~' ~,~,' ~ I Other Fees: Date Received: ~l i I ' ~ ~' ~ DRB Fees: Accepted BV: ~~ ff ~ 2 2006 Planner Sign-off: '.' 1 i ~ " "' Y ~I w \\Vail\data\cdev\FORMS\PERMITS\ELECPERM.DOC ~ TOWN Of~~~~~/'Y~~ ~Wr~ ~F Amendment to the 1999 N.F.C. Town of Vail Ordinance 10-1-6. ^ Overhead services are not allowed in the Town of Vail. ^ Underground services have to be in conduit (PVC) from the transformer to the electric meter, main disconnect switch and to the first electrical distribution circuit breaker panel. ^ The main disconnect switch shall be located next to the meter on the exterior wall of the structure easily accessible. ^ All underground conduits are required to be inspected before back-filling the trench. In multi-family dwelling units, no electrical wiring or feeder cables shall pass from one unit to another. Common walls and spaces are accepted. ^ NM Cable (Romex) is not allowed in commercial buildings or structures exceeding three (3) stories. ^ No use of aluminum wire smaller than size #8 will be permitted with the Town of Vail. TO9-i/N OF VAZ9 ELECTRICAL PERMIT GiIIDELINE~ ^ All installations of exterior hot tubs or spa's require a DRB approval from planning. This application will not be accepted without a copy of the DRB approval form attached (if applicable). ^ If this permit is for installation of an exterior hot tub or spa on a new elevated platform or deck over 30"above grade, you must also obtain a building permit. ^ If this permit is for installation of an exterior hot tub or spa on any existing deck or elevated platform, a structural engineer must review the existing condition and verify that it will support the added concentrated load. Please provide a copy of the structural engineers wet stamped letter or drawing with this application. ^ If this is a remodel in amulti-family building with a homeowners association, a letter of permission from the association is required. ^ If this permit is for a commercial space, two (2) sets of stamped drawings are required. i h e ead nd understand the above. Signature Date igned If you have any questions res~ardiing the above information or have additional questions, please contact the Town of Vail Electrical inspector at 930-479-3147. The inspector can be reached on Tuesday, Thursday and Friday mornings between the hours of Sam and gam. You may also leave a voice mail and the inspector will call you back. TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT 75 S. FRONTAGE ROAD VAIL, CO 81657 970-479-2138 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ELECTRICAL PERMIT Permit #: E06-0041 Job Address: 3094 BOOTH FALLS CT VAIL Status .. .: ISSUED Location.....: 3094 BOOTH FALLS ROAD , #1 Applied . .: 04/07/2006 Parcel No...: 210102302001 Issued . .. 04/ 10/2006 Project No ~ ~~ ~ 5 _d ~ 31 Expires . .: 10/07/2006 OWNER BOONE, CATHERINE S. & MICHAE04/07/2006 7266 S BOULDER RD BOULDER CO 80303 APPLICANT BOONE, CATHERINE & MICHAEL 7266 S. BOULDER BOULDER COLORADO 80303 License: 362-L CONTRACTOR BOONE, CATHERINE & MICHAEL 7266 S. BOULDER BOULDER COLORADO 80303 License: 362-L 04/07/2006 Phone: (303) 499-2434 04/07/2006 Phone: (303) 499-2434 Desciption: WEST DECK ENCLOSURE ELECTRICAL-RELOCATE 3 OUTLETS; ADD OUTLET AT LEVEL 2; RELOCATE 1 OUTLET, 1 LIGHT AND SWITCH AT LEVEL 1 Valuation: $150.00 Square feet: 156 ***************~*************************************~************* FEE SUMMARY ******************************************~************x**** Electrical---------> $51.75 Total Calculated Fees--> $54.75 DRB Fee---------> $0.00 Additional Fees----------> $0.00 Investigation----> $0.00 Total Permit Fee--------> $54.75 Will Call---------> $3 .00 Payments------------------> $54 .75 TOTAL FEES--> $54.75 BALANCE DUE--------> $0.00 Approvals: Item: 06000 ELECTRICAL DEPARTMENT 04/10/2006 shahn Action: AP Item: 05600 FIRE DEPARTMENT CONDITIONS OF ArrttOVAL Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances. and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2149 OR AT OUR OFFICE FROM 8:00 AM - 4 TOWN OF VAIL, COLORADO Statement *****************************+****~x*********++**************************************~x******* Statement Number: 8060000349 Amount: $54.75 04/10/200603:21 PM PaymentMethod: Check Init: LT Notation: Boone / ck 1493 ---------------------------------------------------------------- Permit No: E06-0041 Type: ELECTRICAL PERMIT ------------- Parcel No: 2101-023-0200-1 Site Address: 3094 BOOTH FALLS CT VAIL Location: 3094 BOOTH FALLS ROAD #1 Total Fees: $54.75 This Payment: $54.75 Total ALL Pmts: $54.75 Balance: $0.00 ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------------- ------------------------------ - EP 00100003111100 ELECTRICAL PERMIT FEES ----------- 51.75 WC 00100003112800 WILL CALL INSPECTION FEE 3.00 f APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UNS~ E Project #: .- ~~ ` dZ?J~ ,,..,~ Building Per~it #: ,-"~c7 S-~ ~' Electrical Permit #: ,~~~ ~ ~ • ~~~' C 970-479-2149 Ins ections 75 S. Frontage Rd. Vail, Colorado 81657 TOWN OF VAIL ELECTRICAL PERMIT APPLICATION CONTRACTOR INFORMATION I Electrical Conrtra~cto~r; Town of Vail Reg. No.: Contact Person and Phone #'s: E-Mail Address: ,~ Boo~E ~ ~~ ~cM, Fax#: cf-~p _ c{-1 ~_ (~ .,, 7 Contractor Slgnature:/y~ ~~~ ((~. COMPLETE SQ. FOOTAGE FOR AREA OF WORK AND VALUATION OF WORK (La~br & Materials) AMOUNT OF SQ FT IN STRUCTURE: ~.+{OQ 55T~- Contact Eat/e Counter Assessors Office at Parcel # •Z~ p ~ _ 0.~~ _ b Job Name: ', ~,.i EST p•F~~. Eht Legal Description ~ Lot: ~~I Block: 2 Owners Nam Address: Engineer: Address: ELECTRICAL VALUATION: $ V~~( Q c' y'? ~- - -_ or visit for Parce/ # Job Address: Filing: ~ '7 Subdivision: ~~ ~ ~~~,~ 'l 2.bl. S ~~ u~s'-L. ~0, ~ Phone: 303_~°~-2U 3~ Detailed description o~ work: t~ ~..1~~c,~. _ ~ ~__~, ~. ~ _- ~,, , r~-fir} ~~+ ~] L IS ~ ~ tV~1 h' T ~f'rIJ't. ~ ~~ Work Class: New () Addition ( ) Remodel ( ) Repair ( ) Temp Power ( ) Other ( ) Work Type: Interio~ Exterior ( ) Both ( ) ~- I~ Does an EHU exist at this location: Yes ( ) No ( ) Type of Bldg.: Single-family ( ) Duplex ( ) Multi-family bX Commercial ( ) Restaurant ( )Other ( ) No. of Existing Dwelling Units in this building: ~ " ~ ~~No. of Accommodation Units in this building: Is this permit for a hot tub: Yes S ~ No (~' - _ Does a Fire Alarm Exist: Yes ( ) No ~~}~-'~ Does a Fire Sprinkler System Exist: Yes ( ) Nof. ) ****~r*,r******one***********~r*********~**FOR OFFICE USE ONLY~********~r****~****************,r****~ ~ ~- ., ~ I er Fees: ~ _ ~ ` J Date Received: ~ ? ~ ~ ~ ~ ~ ~~ '`I I ~~ Feeg: Accented Bv: ~~ I tanner Sign-off: ' ~ ~ l d1~~006 ~ , I ~ ~, r F:\cdev\FORMS\PERMITS\Building\electical~ermit_1i-23-2005.DOC Page 1 of ~ TOWN O F VAI L~ - 123/2005 il.f ftll Vi ~~~ y Amendment to the 2002 N.E.C. Town of Vail Ordinance 4. Series of 2005 ^ Overhead services are not allowed in the Town of Vail. ^ Underground services sha// be in conduit (PVC) from the uti/ity transformer to the electric meter, main disconnect switch, and to the first electrical distribution circui` breaker panel. ^ The main disconnect switch shall be readi/yaccessib/e, an,d located next to the meter on the exterior wall of the structure. All underground conduits are required to be inspected before back-filling the trench. ^ In multi-family dwelling units, no electrical wiring or feeder cables shall pass from one unit to another. Common walls and spaces are exempt. ^ NM Cable (Romex) can be used on/y in sing/e and mu/ti-fami/y dwe//ings net exceeding 3 stories Type NM cannot be used in any bui/ding mixed with Type A,B.E,~,H,I,M &S occupancies o A/uminum conductors smaller than size #8 are not permitted with the Town of Vail. TOWN OF VAIL ELECTRICAL PERMIT GUIDELINES o All installations of exterior hot tubs or spa's require a DRB approval from planning. This application will not be accepted without a copy of the DRB approval form attached (if applicable). ^ If this permit is for installation of an exterior hot tub or spa on a new elevated platform or deck over 30"above grade, you must also obtain a building permit. ^ If this permit is for installation of an exterior hot tub or spa on any existing deck or elevated platform, a structural engineer must review the existing condition and verify that it will support the added concentrated load. Please provide a copy of the structural engineers wet stamped letter or drawing with this application. ^ If this is a remodel in amulti-family building with a homeowners association, a letter of permission from the association is required. ^ If this permit is for a commercial space, two (2) sets of stamped drawings are required. E/ectrica/ one-/ine and pane/ schedu/es are required if /oad is added ar distribution is a/tered. I have read and understand the above. Signature Date Signed If you have any questions regarding the above information or have additional questions, please contact the Town of Vail Electrical Inspector at 970-479-2147. The inspector can be reached on Monday thru Friday mornings between the hours of Sam and gam. You may also leave a voice mail and the inspector will call you back. F:\cdev\FORMS\PERMITS\Building\electical~ermit_11-23-2005.DOC Page 2 of 2 11/23/2005 TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT 75 S. FRONTAGE ROAD VAIL, CO 81657 970-479-2138 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ELECTRICAL PERMIT Permit #: E06-0154 Job Address: 3094 BOOTH FALLS CT VAIL Status ...: ISSUED Location.....: 3094 BOOTH FALLS ROAD , #1 Applied ..: 09/06/2006 Parcel No...: 210102302001 Issued . .. 09/11/2006 Project No -~ ~-~ ~ - G •;( ~ ~ Expires . .: 03/10/2007 OWNER BOONE, CATHERINE S. & MICHAE09/06/2006 7266 S BOULDER RD BOULDER CO 80303 APPLICANT OTTO'S ELECTRICAL SERVICE, I09/06/2006 Phone: (970) 328-9382 PO BOX 4029 EAGLE COLORADO 81631 License: 372-E CONTRACTOR OTTO'S ELECTRICAL SERVICE, I09/06/2006 Phone: (970) 328-9382 PO BOX 4029 EAGLE COLORADO 81631 License: 372-E Desciption: WIRE NEW ADDITION Valuation: $0.00 Square feet: 348 ~****~********~**************************************************** FEE SUMMARY ********************************************************a*** Electrical---------> $51.75 Total Calculated Fees--> $54 .75 DRB Fee---------> $0.00 Additional Fees----------> $0.00 Investigation----> $0.00 Total Permit Fee--------> $54.75 Will Call---------> $3.00 Payments------------------> $54.75 TOTAL FEES--> $54.75 BALANCE DUE--------> $0.00 **************************************~*********«******~*******~****:a*******************************************************************~******** Approvals: Item: 06000 ELECTRICAL DEPARTMENT 09/06/2006 SH Action: AP CONDITIONS OF ArrxOVAL Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN AD/~ ~ BY~TELE/P~E A 7 -2149 OR AT OUR OFFICE FROM 8:00 AM - 4 PM. ~! ~11~-1f---~ / - , . SIGNATURi/ OF OVIt-PGEI~ pF'(,C~O i~ FOR HIMSELF AND OWNEF TOWN OF VAIL, COLORADO Statement Statement Number: 8060001407 Amount: $54.75 09/11/200610:57 AM Payment Method: Check Init: DDG Notation: OES 113 ----------------------------------------------------------------------------- Permit No: E06-0154 Type: ELECTRICAL PERMIT Parcel No: 2101-023-0200-1 Site Address: 3094 BOOTH FALLS CT VAIL Location: 3094 BOOTH FALLS ROAD #1 Total Fees: $54.75 This Payment: $54.75 Total ALL Pmts: $54.75 Balance: $0.00 ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------------- ------------------------------ ------------ EP 00100003111100 ELECTRICAL PERMIT FEES 51.75 WC 00100003112800 WILL CALL INSPECTION FEE 3.00 APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UNSIGI~E~n `O ~ _~ Project #: ~,,1 Building Permit ~#: ,~ ® ~ Q ~' Electrical Permit #: ~~ ' UG ' ~ ~ ~ ~ 970-479-2149 In `~~F~1~ ( spections) 75 S. Frontage Rd. Vail, Colorado 81657 TOWN OF VAIL ELECTRICAL PERMIT APPLICATION CONTRACTOR INFORMATION Electrical Contractor: Town of Vail Reg. No.: Contact Person and Phone #'s: --- E-Mail Address: ~ ~ <~' lz <- , ~ ~ ~~ ~ . ~ Fax#: ~ 7U ~~ 3~ 8 - S ~ F~ ~ Contractor Signature: //~ '/ ~~' COMPLc ~ ~ SQ. FOOTAGE FOR AREA OF WORK AND VALUATION OF WORK (Labor & Materials) AMOUNT OF SQ FT IN STRUCTURE: 3~/~ ELECTRICAL VALUATION: $ 1 ,S"-C~Cj Contact Ea9/e County Assessors Olfce at 970-328-8640 or visit www.eagle=county, com for P~rce/ # .,. Parcel # Job Name: r~ Job Address: ~O ~ ~Dp~t fills `4X , ~ -, ..-~ r tio~ , Legal Description ((Lot: ~ Block: Filin Subdivision: /.~~ ~~~~ /il,,C ~~ ~ ~I g" -II • - - .. Owners Name: ~~,~ ~ ` ~ ~~~ Address: ~,~2 ,~.~ ~~ ~~ ~~ s d:'d . II Phone: ~ .~ _ ~ ~ ~ y ~ 4 r , Engineer: ll Address; II Phone: Detailed description of work: - nn1J Work Class: New O Addition ( ) Remodel ~ Repair ( ) Temp Power ( ) Other ( ) I Work Type: Interior ( ) Exterior ( ) Both (~ ~ I Does an EHU exist at this location: Yes ( ) No ( ) Type of Bldg.: Single-family ( ) Duplex (~) Multi-family ( ) Commercial ( ) Restaurant ( )Other ( ) No. of Existing Dwelling Units in this building: ~ ~ No. of Accommodation Units in this building: ~ Is this ermit for a hot t ub: Yes No _ __ Does a Fire Alarm Exist: ~ Yes ( ) No (~) ~~ Does a Fire Sprinkler System Exist: Yes ( ) No-(~) I F:\cdev\FORMS\PERMTTS\Building\electical~ermi1L11-23-2005.DOC Page 1 of 2 11/23/2005 mss- ^ k 'r. d • • {re~_ i~ ~: .. Amendment to the 2002 N.E.C. Town of Vail Ordinance 4. Series of 2005 ^ Overhead services are not allowed in the Town of Vail. ^ Underground services sha// be in conduit (PVC) from the uti/ity transformer to the electric meter, main disconnect switch, and to the first electrical distribution circuit breaker panel. ^ The main disconnect switch shall be readi/yaccessib/e, and located next to the meter on the exterior wall of the structure. All underground conduits are required to be inspected before back-filling the trench. ^ In multi-family dwelling units, no electrical wiring or feeder cables shall pass from one unit to another. Common walls and spaces are exempt. ^ NM Cable (Romex) can be used on/y in sing/e and mu/ti-farm/y dwe//ings net exceeding 3 stories Type NM cannot be used in any bui/ding mixed with Type A,B.E,F,H,I,M &S occupancies ^ A/uminum conductors smaller than size #8 are not permitted with the Town of Vail. TOWN OF VAIL ELECTRICAL PERMIT GUIDELINES ^ All installations of exterior hot tubs or spa's require a DRB approval from planning. This application will not be accepted without a copy of the DRB approval form attached (if applicable). ^ If this permit is for installation of an exterior hot tub or spa on a new elevated platform or deck over 30" above grade, you must also obtain a building permit. ^ If this permit is for installation of an exterior hot tub or spa on any existing deck or elevated platform, a structural engineer must review the existing condition and verify that it will support the added concentrated load. Please provide a copy of the structural engineers wet stamped letter or drawing with this application. ^ If this is a remodel in amulti-family building with a homeowners association, a letter of permission from the association is required. ^ If this permit is for a commercial space, two (2) sets of stamped drawings are required. E/ectrica/ one-/ine and pane/ schedu/es are required if /oad is added or distribution is a/tered. I have read and understand the above. Signature Date Signed If you have any questions regarding the above information or have additional questions, please contact the Town of Vail Electrical Inspector at 970-479-217. The inspector can be reached on Monday thru Friday mornings between the hours of Sam and gam. You may also leave a voice mail and the inspector will call you back. F:\cdev\FORMS\PERMITS\Building\electical~ermit_11-23-2005.DOC Page 2 of 2 11/23/2005 TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT 75 S. FRONTAGE ROAD VAIL, CO 81657 970-479-2138 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES MECHANICAL PERMIT Job Address: Location.....: Parcel No...: Legal Description: Project No 3094 BOOTH FALLS CT VAIL 3094 BOOTH FALLS ROAD , #1 210102302001 -~~-~5-oZ3~ OWNER BOONE, CATHERINE S. 7266 S BOULDER RD BOULDER CO 80303 APPLICANT MR. PLUMBER, INC PO BOX 1563 EAGLE COLORADO 81631 License: 333-M CONTRACTOR MR. PLUMBER, INC PO BOX 1563 EAGLE COLORADO 81631 License: 333-M & MICHAE09/14/2006 Permit #: M06-0245 Status ...: ISSUED Applied ..: 09/14/2006 Issued . .. 09/21/2006 Expires . .: 03/20/2007 09/14/2006 Phone: (970) 574-6768 09/14/2006 Phone: (970) 574-6768 Desciption: COMPLETE HYDRONIC HEAT INSTALLATION Valuation: $15,000.00 Fireplace Information: Restricted: Y # of Gas Appliances: 0 # of Gas Logs: 0 a of Wood Pellet: 0 ******************************************************************** FEE SUMMARY ~x**************~**s***************s**************s********** Mechanical---> $300.00 Restuarant Plan Review--> $0.00 Total Calculated Fees--- > $378.00 Plan Check---> $75.00 TOTAL FEES--------------> $378.00 Additional Fees----------- > $0.00 Investigation-> $0.00 Total Permit Fee---------- > $378.00 Will Call-----> $3.00 Payments------------------- > $378.00 BALANCE DUE--------- > $0.00 Item: 05100 BUILDING DEPARTMENT 09/15/2006 cgunion Action: AP Item: 05600 FIRE DEPARTMENT CONDITION OF APPROVAL Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: 22 (BLDG.): COMBUSTION AIR IS REQUIRED PER CHAPTER 7 OF THE 2003 IMC AND SECTION 304 OF THE 2003 IFGC AS MODIFIED BY TOWN OF VAIL. Cond: 23 (BLDG.): BOIILER INSTALLATION MUST CONFORM TO MANUFACTURER'S INSTRUCTIONS AND CHAPTER 10 OF THE 2003 IMC. Cond: 25 (BLDG.): GAS APPLIANCES SHALL BE VENTED ACCORDING TO CHAPTER 5 OF THE 2003 IFGC. Cond: 29 (BLDG.): ACCESS TO MECHANICAL EQUIPMENT MUST COMPLY WITH CHAPTER 3 OF THE 2003 IMC AND CHAPTER 3 OF THE 2003 IFGC . Cond: 31 (BLDG.): BOILERS SHALL BE MOUNTED ON FLOORS OF NONCOMBUSTIBLE CONST. UNLESS LISTED FOR MOUNTING ON COMBUSTIBLE FLOORING. Cond: 32 (BLDG.): PERMIT,PLANS AND CODE ANALYSIS MUST BE POSTED IN MECHANICAL ROOM PRIOR TO AN INSPECTION REQUEST. Cond: 30 (BLDG.): BOILER ROOMS SHALL BE EQUIPPPED WITH A FLOOR DRAIN OR OTHER APPROVED MEANS FOR DISPOSING OF LIQUID WASTE PER SECTION 1004.6. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY PHONE AT 479-2149 OR AT OUR OFFICE FROM 8:00 AM - 4 PM. SIGNt~TURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNEF ******************************************************************************************** TOWN OF VAIL, COLORADO ~ Statement Statement Number: 8060001496 Amount: $378.00 09/21/200611:00 AM Payment Method: Check Init: LT Notation: Mr. Plumber / ck 257 ----------------------------------------------------------------------------- Permit No: M06-0245 Type: MECHANICAL PERMIT Parcel No: 2101-023-0200-1 Site Address: 3094 BOOTH FALLS CT VAIL Location: 3094 BOOTH FALLS ROAD #1 Total Fees: $378.00 This Payment: $378.00 Total ALL Pmts: $378.00 Balance: $0.00 ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------------- ------------------------------ ------------ MP 00100003111100 MECHANICAL PERMIT FEES 300.00 PF 00100003112300 PLAN CHECK FEES 75.00 WC 00100003112800 WILL CALL INSPECTION FEE 3.00 APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UNSIGNE~~. (~• ~~~ TOV Project #: w ! Jt ~ ~ ~ ~~ ( ~ Building Permit #: \- O°? OG _ _ i• V J Mechanical Permit #: J lU~~r vtuL • 970-479-2149 (Inspecti ns) TOWN OF VAIL MECHANICAL PERMIT APPLICATION 75 S. Frontage Rd. Permit will not be accepted without the following: Vail, Colorado 81657 Provide Mechanical Room Layout drawn to scale to include: ~"ate Mechanical Room Dimensions ~ Combustion Air Duct Size and Location Flue, Vent and Gas Line Size and Location ,~ Heat Loss Calcs. t-'o 'equipment Cut/Spec Sheets !~ ~ (~ 1 \ 1 'Nl C~ 'E ~ T E-Mail Address: Contractor Signature• CONTRACTOR INFORMATION Town of Vail Reg. No.: Contact Person and Phone #', Fax#: cr-~ ~s~ ~ ~I Job Address: II Subdivision: ~z~.o2,~~~`~c~ II Phone: ~I Phone: COMPLETE VALUATION FOR MECHANICAL PERMIT Labor & Materials ~I MECHANICAL: $ `~ h Contact Eaq/e County Assessors Office at 970-328-8640 or visit www.eagle-county, com for Parce/ # I Parcel # ~ _...... .._ _ Job Name: Legal Description II Lot: II Block: I~ Filing: Owners Name: ~~ ~dl Addr-ens ~: ~ ~ ~ Sao mac. Cn .~~. Engineer: ~I Address: Detailed description of work: ~r, rri c~~sr ~ ~ ~ : ~: c ~~> v.: c ~~c~~ Work Class: New (~ Addition ( ) Alteration ( ) Repair ( ) Other ( ) Boiler Location: Interior (~) Exterior ( ) Other ( ) ~~ Does an EHU exist at this location: Type of Bldg: Single-family ( ) Duplex ( ) Multi-family ~,.~f Commercial ( ) Restaurant ( )Other ( ) No. of Existing Dwelling Units in this building: 3~b ~~~ C, ~ Yes ( ) No ( ) II No. of Accommodation Units in this building: No/Tvoe of Fireplaces Existing: Gas Aooliances ( 1 Gas Logs ( ) Wood/Pellet ( 1 Wood Burning ( ) No/Type of Fireplaces Proposed: Gas Appliances ( )Gas Logs ( ) Wood/Pellet ( ) Wood Burning (NOT ALLOWED) Is this a conversion from a wood burning fireplace to an EPA Phase II device? Yes ( ) No ( ) ********* ~*************FOR OFFICE USE ONLY***************************** ~~ F:\cdev\FORMS\PERMITS~Building\mechanical~ermit_i1-23-2005.DOC 11/23/2005 r Town of Vail Mechanical Codes and Desian Criteria • You must obtaiP Design Review Board (DRB) approval if any of the mechanical work will involve ANY exterior work. This includes and is not limited to removal and replacement of driveway snow melt systems. Please contact the Development Review Coordinator at 479-2128 for additional information. • The Town of Vail has adopted the 2003 international Mechanical Code and the 2003 International Fuel Gas Code. • All new construction within the Town of Vail is considered to be of unusually tight construction, thus all combustion air is required to be drawn from outside the structure for mechanical equipment. Town of Vail Fireulace Ordinance In September of 1991, the Vail Town Council adopted an ordinance which restricts to construction and use of open hearth fireplaces within municipal boundaries. Since that time the ordinance has undergone numerous changes and revisions, striving for compromise, yet effectiveness in addressing the air quality issue. Therefore the following criteria has been adopted: • Construction of open hearth wood burning fireplaces is no longer permitted within Town of Vail municipal boundaries. • Dwellina Units -Each new dwelling unit may contain: One (1) EPA Phase II certified solid fuel burning device and no more than two (2) gas appliances (B vent) OR Two (2) gas log fireplaces and no more than two (2) gas appliance fireplaces (B bent). • Restricted Dwellina Units -Each new restricted dwelling unit may contain: One (1) gas log fireplace and not more than one (1) gas appliance fireplace. • Accommodation Units -Each new accommodation unit may contain: One (1) gas log fireplace or one (1) gas appliance fireplace. • If two or more separate dwelling units or accommodation units are combined to form one larger unit, the combined unit may retain one woodburning fireplace (if one already exists) and no more than 2 gas appliance fireplaces, or may convert up to two existing fireplaces to gas. • If during the course of a remodel an existing woodburning fireplace is altered or moved, the unit must then comply with all provisions of the ordinance. That is, the fireplace must be converted to natural gas or replaced by an EPA Phase II certified unit. F:\cdev\FORMS\PERMITS\Building\mechanical_permit_i1-23-2005.DOC 11/23/2005 TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT 75 S. FRONTAGE ROAD VAIL, CO 81657 970-479-2138 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ~b`~ -~ ~ G ~ "~jc>5.a ~~~ MECHANICAL PERMIT Permit #: M06-0287 Job Address: 3094 BOOTH FALLS CT VAIL Status ...: ISSUED Location.....: 3094 BOOTH FALLS ROAD , #1 Applied ..: 10/06/2006 Parcel No...: 210102302001 Issued . .. 10/11/2006 Legal Description: _ ~ ~ ~' ~(2 SDS Expires . .: 04/09/2007 Project No OWNER BOONE, CATHERINE S. & MICHAEIO/06/2006 7266 S BOULDER RD BOULDER CO 80303 APPLICANT WESTERN FIREPLACE SUPPLY, 1685 PAONIA COLORADO SPRINGS COLORADO 80915 License: 323-M CONTRACTOR WESTERN FIREPLACE SUPPLY, 1685 PAONIA COLORADO SPRINGS COLORADO 80915 License: 323-M Desciption: INSTALL FIREPLACES Valuation: $3,100.42 IN10/06/2006 Phone: (719) 591-0020 IN10/06/2006 Phone: (719) 591-0020 Fireplace Information: Restricted: !t of Gas Appliances: 0 N of Gas Logs: 0 li of Wood Pellet: 0 *************~****************************************************** FEE SUMMARY ************************************************************ Mechanical---> $80.00 Restuarant Plan Review--> $0.00 Total Calculated Fees---> $103 .00 Plan Check---> $20.00 TOTAL FEES--------------> $103 . oo Additional Fees-----------> $0.00 Investigation-> $o. 00 Total Permit Fee----------> $103 .00 Will Call-----> $3.00 Payments-------------------> $103.00 BALANCE DUE--------- > $ o . 0 0 Item: 05100 BUILDING DEPARTMENT 10/11 /2006 JRM Action: AP Item: 05600 FIRE DEPARTMENT CONDITION OF APPROVAL Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: 22 (BLDG.): COMBUSTION AIR IS REQUIRED PER CHAPTER 7 OF THE 2003 IMC AND SECTION 304 OF THE 2003 IFGC AS MODIFIED BY TOWN OF VAIL. Cond: 23 (BLDG.): BOIILER INSTALLATION MUST CONFORM TO MANUFACTURER'S INSTRUCTIONS AND CHAPTER 10 OF THE 2003 IMC. Cond: 25 (BLDG.): GAS APPLIANCES SHALL BE VENTED ACCORDING TO CHAPTER 5 OF THE 2003 IFGC. Cond: 29 (BLDG.): ACCESS TO MECHANICAL EQUIPMENT MUST COMPLY WITH CHAPTER 3 OF THE 2003 IMC AND CHAPTER 3 OF THE 2003 IFGC . Cond: 31 (BLDG.): BOILERS SHALL BE MOUNTED ON FLOORS OF NONCOMBUSTIBLE CONST. UNLESS LISTED FOR MOUNTING ON COMBUSTIBLE FLOORING. Cond: 32 (BLDG.): PERMIT,PLANS AND CODE ANALYSIS MUST BE POSTED IN MECHANICAL ROOM PRIOR TO AN INSPECTION REQUEST. Cond: 30 (BLDG.): BOILER ROOMS SHALL BE EQUIPPPED WITH A FLOOR DRAIN OR OTHER APPROVED MEANS FOR DISPOSING OF LIQUID WASTE PER SECTION 1004.6. *****s******~********************~*~***************,:************«**~************************************~**************************************** DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEP NE AT 479-2149 OR AT OUR OFFICE FROM 8:00 AM - 4 PM. ~ ~ /,~~ ,e. SIGNA E OF WNE R CONT CTOR FOR HIMSELF AND OWNEF ******************************************************************************************** TOWN OF VAIL, COLORADO Statement Statement Number: 8060001683 Amount: $103.00 10/11/200603:19 PM Payment Method: Check Init: DDG Notation: Western Fireplace 1374 ----------------------------------------------------------------------------- Permit No: M06-0287 Type: MECHANICAL PERMIT Parcel No: 2101-023-0200-1 Site Address: 3094 BOOTH FALLS CT VAIL Location: 3094 BOOTH FALLS ROAD #1 Total Fees: $103.00 This Payment: $103.00 Total ALL Pmts: $103.00 Balance: $0.00 ********+kt********************************************************************************** ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------------- ------------------------------ ------------ MP 00100003111100 MECHANICAL PERMIT FEES 80.00 PF 00100003112300 PLAN CHECK FEES 20.00 WC 00100003112800 WILL CALL INSPECTION FEE 3.00 _ d~31 APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UN .. ~ ~ ~ ~ Project #: ~~ Building Permit #:. Mechanical Permit #: 970-479-2149 (Inspections) fi /~~, oZ9, TOWN4FYAIL TOWN OF VAIL MECHANICAL PERMIT APPLICATION 75 S. Frontage Rd. Permit will not be accepted without the following: Vail, Colorado 81657 Provide Mechanical Room Layout drawn to scale to include: • Mechanical Room Dimensions • Combustion Air Duct Size and Location • Flue, Vent and Gas Line Size and Location • Heat Loss Calcs. • Equipment Cut/Spec Sheets Mechanical Contractor: CONTRACTOR INFORMATION ~ Town of Vail Reg. No.: ~~ Contact and Phone #'s: ~- Ica 3 E-Mail Address: Contractor Signature: ~~~/~'~.. .I v COMPLETE VA.L,U.yATION FOR MECHANICAL PERMIT (Labor $ Materials) II MECHANICAL: $ ~ J ~ ~ ~_~ _._ _~~ Contact Eagle County Assessors Office at 970-328-8640 or_ visit _w_ww.ea /e-counfY.com for Parcel # Parcel # ~_ ~`~_111 ~'v "~ (~,~ ('aQ ( ~~ Job Name: ~- ~^ -~ ~ Job Addres ' Legal Description II Lot: ~ Block: ~' Filing: ~I Subdivision:"~JyYY! ~~„ Owners Name: Address: Phone: ~ Engineer: ~~ ,a~ I Address( I ~,~t' ~r~ ~, /~3 II Phone:~~-y~_/ ~~~,aJ--~~~ Detaiied descriptio f wor : ,~- [ ids E ~~~~ ~.l ~~, _ Work Class: New () Addit~n ( ) Alteration (vf Repair ( ) Other ( ) MI Boiler Location: Interior (J~ Exterior ( ) Other ( ) I~ Does an EHU exist at this location: Yes ( ) No ( ) Type of Bldg: Single-family ( ) Duplex ( ) Multifamily ( ) Commercial ( ) Restaurant ( )Other ( ) fi No. of Existing Dwelling Units in this building: II No. of Accommodation Units in this building: I++ No/Type of Fireplaces Existing: Gas Appliances (Gas Logs ( ) Wood/Pellet ( ) Wood Burning (~) ~~ No/Type of Fireplaces Proposed: Gas Appliances (/f Gas Logs ( ) Wood/Pellet ( ) Wood Burning (NOT ALLOWED) Is this a conversion from a wood burning fireplace to an EPA Phase II device? Yes ( ) No ( ) +I ****** ***************FOR OFFICE USE ONLY************~.***************,~ .Other Fees; __.... ._Planner Sign-off; I Accepted Bv: I '_ DRB .Fees: . _D_ ate_Received;__ I ~ \\Vail\data\cdcNFORMSIPERMITSIMF.('HPERM.DO(' 07/24/?002 HEAT~GLO.. Where everything comes together Models: 6000GCF-IPI 6000GCF-IPILP GAS-FIRED C uL US LISTED CAUTION ~ ~ • ~ DO NOT DISCARD THIS MANUAL ~~$ n • Important operating • Read, understand and follow • Leave this manual with ~rj~~ and maintenance these instructions for safe party responsible for O instructions included. installation and operation. use and operation. A ~ A WARNING: If the information in these instructions is not followed exactly, a fire orexplosion may result causing proper- tydamage, personal injury, or death. • Do not store or use gasoline or other flamma- blevapors and liquids in the vicinity of this or any other appliance. • What to do if you smell gas - Do not try to light any appliance - Do not touch any electrical switch. Do not use any phone in your building. - Immediately call your gas supplier from a neighbor's phone. Follow the gas supplier's instructions. - If you cannot reach your gas supplier, call the fire department. • Installation and service must be pertormed by a qualified installer, service agency, or the gas supplier. This appliance may be installed as an OEM installation in manufactured home (USA only) or mobile home and must be installed in accordance with the manufacturer's instruc- tions and the manufactured home construction and safety standard, Title 24 CFR, Part 3280 or Standard for Installa- tion in Mobile Homes, CAN/CSA Z240MH. This appliance is only for use with the type(s) of gas indi- cated on the rating plate. A WARNING HOTI DO NOT TOUCH. SEVERE BURNS MAY RESULT. CLOTHING IGNITION MAY RESULT. Glass and other surfaces are hot during ,;~,;,,~„ti~_„j, operation and cool down. • Keep children away. • CAREFULLY SUPERVISE children in same room as appliance. • Alert children and adults to hazards of high temperatures. • Do NOT operate with protective barriers open or removed. • Keep clothing, furniture, draperies and other combustibles away. This appliance has been supplied with an integral barrier to prevent direct contact with the fixed glass panel. Do NOT operate the appliance with the barrier removed. Contact your dealer or Hearth & Home Technologies if the barrier is not present or help is needed to properly install one. In the Commonwealth of Massachusetts: • installation must be performed by a licensed plumber or gas fitter; See Table of Contents for location of additional Commonwealth of Massachusetts requirements. Installation and service of this appliance should be stv ~'+~, performed by qualified personnel. Hearth & Home ~ ~~ Technologies suggests NFI certified orfactory-trained ,N•, T ~ professionals, or technicians supervised C rkhnlcelrr•fnMp by an NFI certified professional. "~°°" °9r -~ ~ . Owner's Manual ~, ~ ~ Installation and Operation Heat & Glo • 6000GCF-IPI, 6000GCF-IPILP • 2110-900 Rev. D • 7/06 Read this manual before installing or operating this appliance. Please retain this owner's manual for future reference. Congratulations Congratulations onselecting aHeat & Glo gas appliance This Owner's Manual should be retained for future reference. -an elegant and clean alternative to wood burning We suggest that you keep it with your other important appliances. The Heat & Glo gas appliance you have documents and product manuals. selected is designed to provide the utmost in safety, The information contained in this Owner's Manual, unless reliability, and efficiency. noted otherwise, applies to all models and gas control As the owner of a new appliance, you'll want to read and systems. carefully follow all of the instructions contained in this Your new Heat & Glo gas appliance will give you years of Owner's Manual. Pay special attention to all Cautions durable use and trouble-free enjoyment. Welcome to the Heat and Warnings. & Glo family of appliance products! Homeowner Reference Information We recommend that you record the following pertinent information about your appliance. Model Name: .Date purchased/installed: Serial Number: Location on appliance: Dealership purchased from: .Dealer Phone: Notes: Listing Label Information/Location The model information regarding your specific appliance can be found on the rating plate usually located in the control area of the appliance. Type of Gas Gas and Electric 7h1. w.d~.~+m.v w oo..~.a w w~. «mor. •rm. roanro wros-: (ue. a~oaws.wd mw.m wr ~, .• vnw«d. d.. em.n.w.ra): lwnm set..) 45e3eto, 4900e07, 4750570, 47iW72, tl77534. 5mot02,1070000, es7ez54, 5777M3, steten, azteem, 51e5477, 5aese, 5547704, T34700s, 542W05, 545270e, O6tl40I, 50Dte73, 5013/07, Oe4711o, 9000000, e7d20R. 577680, 5000105, 0037007, 54H707, 60471T2. X75, BtM707tl, e0700W, 00N105, eo9st~, mla5oz, 9770797, 0737M0, a=90N4, 0074073, e/70979, el3ozaa, etl17u, 0517M0, O'AOe07, 0997s7e, 0077oe0, 0®0a162, en97z4B3, 97xast, e7597», e71ee1o, e7lewz, 0ez99s, 01o9n4, t>7e31x; Ic.~.a.)uernw, zteazes, a79/ae; «•7hr u.s..nd 7wNpn Pe.n. pd7mlro (.. .uln. e~ww.m.w.ln. e.n.ro•~ •n r7.na). 6AS-FIRED H E AT G L. to Hnt a qo, a Bone of FNerth a Hom. T~chnobONd, Inc. '' 20802 Kendlnpton Boulevard, Ldhvlls, AKJ 55044 ~ {~~ „p worn evsrytlen0 Wrlra7o0ethdr W Not for use with solid fuel. LISTED (Ne doit pas enfre uHNse suet un combustible solide). type of l-aad (Sorts Da G'az): ThN applhnw must M IMtNled In axortlanca whh lonl coda, Hany; Rnaf, klbw ANSI 2723.7 NATURAL GAS In Ma USeIOrCAWCC3A B1aB hdtellatlon ~od.s.(InaNlrl'.ppoa dwonrodeoa., aurefllananN locsux W. M l~abierrca N told ,,, ~ ~ f, dabs Isd Codes d~lnstWlatlon CAWCGA-8719.) AN81 Z21XX-XXXX • C8A 2.XX-MlU( • ULa07a Information Mlnlmum Pennlsslble Gas Sappy for Purposes of Input Adjustment. Approved Minimum (De Gaz) Acceptable 0.0 In w.c. (Po. Col. d'eau) Maximum Pressure (Presslon) 0.0 In w.c. (Po. Col. d'eau) Maximum Manifold Pressure (Presslon) 0.0 In w.c. (Po. Col. d'eau) Minimum Manifold Pressure (Presslon) 0.0 in w.c. (Po. Col. d'eau) Total Electrical Requirements: OOOVac, OOHz., less than 00 Amperes ~ MADE IN USA IN CANADA ModN; XXXXXXXX ALTITUDE: 0-0000 FT. 0000-0OOOFI: ~/edaN): MAX. INPUTBTUH: 00,000 00,000 MIN.INPUTBTUH: 00,000 00,000 aerlN ORIFICESIZE: #J0000( #X)000( ~~e); ~uuuu~XXX Model Number Serial Number Heat 81 Glo • 6000GCF-IPI, 6000GCF-IPILP • 2110-900 Rev. D • 7106 - Table of Contents - Section 1: Listing and Code Approvals A Appliance Certification ................................ .4 B. Glass Specifications ................................... .4 C. BTU Specifications ...................................... . 4 D. High Altitude Installations ............................ .4 E. Non-Combustible Materials Specification .. . 4 F. Combustible Materials Specification .......... .4 G Requirements for the Commonwealth of Massachusetts ........................................ . 5 Section 2: Getting Started A Design and Installation Considerations......6 B. Tools and Supplies Needed ........................6 C. Inspect Appliance and Components...........6 Section 3: Framing and Clearances A Selecting Appliance Location ....................... 7 B. Constructing the Appliance Chase .............. 8 C. Clearances ................................................... 8 D. Mantel Projections ........................................ 9 Section 4: Termination Locations A Vent Termination Minimum Clearances ....10 Section 5: Vent Information and Diagrams A Vent Table Key ............................................12 B. Use of Elbows ............................................12 C. Measuring Standards .................................12 D. Vent Diagrams ............................................13 Section 9: Gas Information A Fuel Conversions .................................... 29 B. Gas Pressures ........................................29 C. Gas Connection ....................................... 29 Section 10: Electrical Information A Recommendation for Wire ...................... 31 B. Connecting to the Appliance .................... 31 C. Intellifire Ignition System Wiring .............. 31 D. Wall Switch ..............................................31 E. Junction Box Installation .......................... 33 F Wall Switch Installation for Fan ...............33 Section 11: Finishing A Mantel Projections ................................... 34 B. Facing Material ........................................34 Section 12: Appliance Setup A Remove Shipping Materials .................... 35 B. Clean the Appliance ............. .................... 35 C. Accessories ......................... .................... 35 D. Install the Refractory ............ ....................36 E. Ember Placement ................ ....................36 F. Positioning the Logs ........... ....................37 E G Glass Assembly ................... .................... 39 H. Screen Mesh ........................ .................... 39 I. Grilles and Trim ................... .................... 39 J. Hood .................................... ....................39 K. Air Shutter Setting ................ .................... 39 Section 6: Vent Clearances and Framing A Pipe Clearances to Combustibles ............17 ~ B. Wall Penetration Framing ..........................18 C. Vertical Penetration Framing ......................19 Section 7: Appliance Preparation A Attaching Sheetrock Ledge ........................ 20 B. Temporary Access Panel ........................... 20 C. Securing and Leveling the Appliance ......... 21 D. Installing Flue Restrictor ............................ 22 E. Installing the Fiberglass Gasket ................22 Section 13: Operating Instructions A Before Lighting Appliance ........................ 40 B. Lighting Appliance ...................................41 C. After Appliance is Lit .................................42 D. Frequently Asked Questions ...................42 Section 14: Troubleshooting A Intellifire Ignition System .........................43 Section 15: Maintaining and Servicing Appliance............ 45 Section 8: Installing Vent Pipe Section 16: Reference A Assembly of Vent Sections ......................... 23 A Appliance Dimension Diagram ............... 47 B. Disassembly of Vent Sections ...................25 B. Vent Components Diagrams...................48 E C. Installing Heat Shield & Termination Cap .26 C. Service Parts ............................................51 E' D. Installing Roof Flashing and Vertical D. Warranty ................................................... 54 Termination Ca 27 E. Contact Information ..................................55 p ......................................... ~ =Contains updated information. Heat i£ Glo • 6000GCF-IPI, 6000GCF-IPILP • 2110-900 Rev. D • 7/06 3 Listing and Code Approvals A. Appliance Certification C. BTU Specifications MODELS: 6000GCF-IPI, 6000GCF-IPILP LABORATORY.• Underwriters Laboratories, Inc. (UL) TYPE: Direct Vent Gas Fireplace Heater STANDARD: ANSI 221.88-2000•CSA2.33-M98•UL3076 This product is listed to ANSI standards for "Vented Gas Appliance Heaters" and applicable sections of "Gas Burn- ing Heating Appliances for Manufactured Homes and Rec- reational Vehicles", and "Gas Fired Appliances for Use at High Altitudes". NOT INTENDED FOR USE AS A PRIMARY HEAT SOURCE. This appliance is tested and approved as either supplemen- tal room heat or as a decorative appliance. It should not be factored as primary heat in residential heating calculations. B. Glass Specifications Hearth & Home Technologies appliances manufactured with tempered glass may be installed in hazardous locations such as bathtub enclosures as defined by the Consumer Product Safety Commission (CPSC). The tempered glass has been tested and certified to the requirements of ANSI 297.1 and CPSC 16 CFR 1202 (Safety Glazing Certification Council SGCC# 1595 and 1597. Architectural Testing, Inc. Reports 02-31919.01 and 02-31917.01). MOdel Maximum Mlnlmum 3~ea U.S. (0-2000FT.) or Canada (2000-4500FT) Input BTUH Input BTUH (DMS) us 30,000 18,200 37 6000GCF-IPI caN 27,000 16,380 38 us 30,000 18,200 52 6000GCF-IPILP carv 27,000 16,380 53 D. High Altitude Installations U.L. Listed gas appliances are tested and approved without requiring changes for elevations from 0 to 2000 feet in the U.S.A. and Canada. When installing this appliance at an elevation above 2000 feet, it may be necessary to decrease the input rating by changing the existing burner orifice to a smaller size. Input rate should be reduced by 4% for each 1000 feet above a 2000 foot elevation in the U.S.A., or 10% for elevations between 2000 and 4500 feet in Canada. If the heating value of the gas has been reduced, these rules do not apply. To identify the proper orifice size, check with the local gas utility. If installing this appliance at an elevation above 4500 feet (in Canada), check with local authorities. A WARNING This statement is in compliance with CPSC 16 CFR Section 1201.5 "Certification and labeling requirements" which refers to 15 U.S. Code (USC) 2063 stating "...Such certificate shall accompany the product or shall otherwise be furnished to any distributor or retailer to whom the product is delivered." Some local building codes require the use of tempered glass with permanent marking in such locations. Glass meeting this requirement is available from the factory. Please contact your dealer or distributor to order. NOTE: This installation must conform with local codes. In the absence of local codes you must comply with the National Fuel Gas Code, ANSI 2223.1-latest edition in the U.S.A. and the CAN/CGA 6149 Installation Codes in Canada. ~~~ec~ ro. ISO "` - 9001 * * ~ Heat & Glo Quality Systems SGS ICS istered b y reg Do NOT use this appliance if any part has been under water. Immediately call a qualified service technician to inspect the appliance and to replace any part of the control system and any gas control which has been under water. E. Non-Combustible Materials Specification Material which will not ignite and burn. Such materials are those consisting entirely of steel, iron, brick, tile, concrete, slate, glass or plasters, or any combination thereof. Materials that are reported as passing ASTM E 136, Stan- dard Test Method for Behavior of Materials in a Verti- cal Tube Furnace at 750°C, shall be considered non-com- bustible materials. F. Combustible Materials Specification Materials made of or surfaced with wood, compressed pa- per, plant fibers, plastics, or other material that can ignite and burn, whetherflame proofed or not, orwhether plastered or unplastered shall be considered combustible materials. Heat & Glo • 6000GCF-IPI, 6000GCF-IPILP • 2110-900 Rev. D • 7/08 NOTE: The following requirements reference various Massachusetts and national codes not contained in this document. G Requirements for the Commonwealth of Massachusetts For all side wall horizontally vented gas fueled equipment installed in every dwelling, building or structure used in whole or in part for residential purposes, including those owned or operated by the Commonwealth and where the side wall exhaust vent termination is less than seven (7) feet above finished grade in the area of the venting, includ- ing but not limited to decks and porches, the following re- quirements shall besatisfied: Installation of Carbon Monoxide Detectors At the time of installation of the side wall horizontal vented gas fueled equipment, the installing plumber or gasfitter shalt observe that a hard wired carbon monoxide detector with an alarm and battery back-up is installed on the floor level where the gas equipment is to be installed. In addi- tion, the installing plumber or gasfitter shall observe that a battery operated or hard wired carbon monoxide detector with an alarm is installed on each additional level of the dwelling, building or structure served by the side wall hori- zontalvented gas fueled equipment. It shall be the respon- sibility ofthe property owner to secure the services of qual- ified licensed professionals for the installation of hard wired carbon monoxide detectors. In the event that the side wall horizontally vented gas fu- eledequipment is installed in a crawl space or an attic, the hard wired carbon monoxide detector with alarm and bat- tery back-up may be installed on the next adjacent floor level. In the event that the requirements of this subdivision can not be met at the time of completion of installation, the owner shall have a period of thirty (30) days to comply with the above requirements; provided, however, that during said thirty (30) day period, a battery operated carbon monoxide detectorwith an alarm shall be installed. Approved Carbon Monoxide Detectors Each carbon monoxide detector as required in accordance with the above provisions shall comply with NFPA 720 and be ANSI/UL 2034 listed and IAS certified. signage A metal or plastic identification plate shall be permanently mounted to the exterior of the building at a minimum height of eight (8) feet above grade directly in line with the ex- haustvent terminal for the horizontally vented gas fueled heating appliance or equipment. The sign shall read, in print size no less than one-half (1/2) inch in size, "GAS VENT DIRECTLY BELOW. KEEP CLEAR OF ALL OB- STRUCTIONS". Inspection The state or local gas inspector of the side wall horizontally vented gas fueled equipment shall not approve the installa- tion unless, upon inspection, the inspector observes carbon monoxide detectors and signage installed in accordance with the provisions of 248 CMR 5.08(2)(a)1 through 4. Exemptions The following equipment is exempt from 248 CMR 5.08(2)(a)1 through 4: • The equipment listed in Chapter 10 entitled "Equipment Not Required To Be Vented" in the most current edition of NFPA 54 as adopted by the Board; and • ProductApproved side wall horizontally vented gas fu- eled equipment installed in a room or structure sepa- ratefrom the dwelling, building or structure used in whole or in part for residential purposes. MANUFACTURER REQUIREMENTS Gas Equipment Venting System Provided When the manufacturerof ProductApproved side wall hor- izontally vented gas equipment provides a venting system design or venting system components with the equipment, the instructions provided by the manufacturer for installa- tion ofthe equipment and the venting system shall include: • Detailed instructions for the installation of the venting system design or the venting system components; and • A complete parts list for the venting system design or venting system. Gas Equipment Venting System NOT Provided When the manufacturer of a Product Approved side wall horizontally vented gas fueled equipment does not provide the parts for venting the flue gases, but identifies "special venting systems", the following requirements shall be sat- isfied by the manufacturer: • The referenced "special venting system" instructions shall be included with the appliance or equipment installation instructions; and • The "special venting systems" shall be ProductApproved by the Board, and the instructions for that system shall include a parts list and detailed installation instructions. A copy of all installation instructions for all Product Ap- provedside wall horizontally vented gas fueled equipment, all venting instructions, all parts lists for venting instruc- tions, and/or all venting design instructions shall remain with the appliance or equipment at the completion of the installation. See Gas Connection section for additional Common- wealth of Massachusetts requirements. Heat 8 Glo • 6000GCF-IPI, 6000GCF-IPILP • 2110-900 Rev. D • 7/06 Getting Started A. Design and Installation Considerations Heat & Glo direct vent gas appliances are designed to op- eratewith all combustion air siphoned from outside of the building and all exhaust gases expelled to the outside. No additional outside air source is required. CAUTION Check building codes prior to installation. • Installation MUST comply with local, regional, state and national codes and regulations. • Consult local building, fire officials or authorities having jurisdiction about restrictions, installation inspection, and permits. When planning an appliance installation, it's necessary to determine the following information before installing: • Where the appliance is to be installed. • The vent system configuration to be used. • Gas supply piping. • Electrical wiring. • Framing and finishing details. • Whether optional accessories-devices such as a fan, wall switch, or remote control-are desired. C. Inspect Appliance and Gomponents AWARNING ~~ Inspect appliance and components for damage. Damaged parts may impair safe operation. • Do NOT install damaged components. • Do NOT install incomplete components. • Do NOT install substitute components. Report damaged parts to dealer. • Carefully remove the appliance and components from the packaging. • The vent system components and trim doors are shipped in separate packages. • The gas logs maybe packaged separately and must be field installed. • Report to your dealer any parts damaged in shipment, particularly the condition of the glass. • Read all of the instructions before starting the in- stallation. Follow these instructions carefully dur- ing the installation to ensure maximum safety and benefit. QWARNING Keep appliance dry. • Mold or rust may cause odors. • Water may damage controls. B. Tools and Supplies Needed Before beginning the installation be sure that the following tools and building supplies are available. A WARNING ~~ Hearth & Home Technologies disclaims any responsibility for, and the warranty will be voided by, the following actions: • Installation and use of any damaged appliance or vent system component. • Modification of the appliance or vent system. • Installation other than as instructed by Hearth & Home Technologies. Reciprocating saw Framing material I Improper positioning of the gas logs or the glass door Pliers Hi temp caulking material Installation and/or use of any component part not approved by Hearth & Home Technologies. Hammer Gloves Phillips screwdriver Framing square Any such action may cause a fire hazard. Flat blade screwdriver Electric drill and bits (1/4 in.) Plumb line Safety glasses Level 1/2 - 3/4 inch length, #6 or #8 Self-drilling screws Manometer Voltmeter Tape measure Non-corrosive leak check solution One 1/4 inch female connection (for optional fan). 6 Heat 8 Glo • 8000GCF-IPI, 6000GCF-IPlLP • 2110-900 Rev. D • 7/06 Framing and Clearances NOTE: • Illustrations reflect typical installations and are Q Q~SIGN PURPOSES ONLY. • Illustrations/diagrams are not drawn to scale. • Actual installation may vary due to individual design preference. A. Selecting Appliance Location When selecting a location for your appliance it is important to consider the required clearances to walls (see Figure 3.1). B ~~ C A WARNING Fire Risk Provide adequate clearance: • Around air openings • To combustibles • For service access Locate appliance away from traffic areas. NOTE: For actual appliance dimensions referto Sec- tion 16. I" E I F (MINIMUM) T G 1 ddition to these framing dimensions, also referent lions: aearances and Mantel Projections (Sections 3.C an gent Clearances and Framing (Section 6). rt A B C D E Inches 51 1 /2 51 72 42 Miiiimeters 1295 13 1295 1829 1067 Figure 3.7 Appliance Locations F G H I See 1 Section D 42 22 Mantel 25 Proiections 1067 559 Heat 8 Glo • 6000GCF-IPI, 6000GCF-IPILP • 2110-900 Rev. D • 7/06 J K 42 1 /2 1067 13 t 7 B. Constructing the Appliance Chase A chase is a vertical boxlike structure built to enclose the gas appliance and/or its vent system. Vertical vents that run on the outside of a building may be, but are not re- quired to be, installed inside a chase. Construction of the chase may vary with the type of building. These instructions are not substitutes for the requirements of local building codes. Local building codes MUST be checked. Chases should be constructed in the manner of all outside walls of the home to prevent cold air drafting problems. The chase should not break the outside building envelope in any manner. Walls, ceiling, base plate and cantilever floor of the chase should be insulated. Vapor and air infiltration barriers should be installed in the chase as per regional codes for the rest of the home. AdditionaNy, in regions where cold air infiltration may be an issue, the inside surfaces may be sheetrocked and taped for maximum air tightness. To further prevent drafts, the wall shield and ceiling firestops should be caulked with high temperature caulk to seal gaps. Gas line holes and other openings should be caulked with high temp caulk or stuffed with unfaced insulation. If the appliance is being installed on a cement slab, a layer of plywood maybe placed underneath to prevent conducting cold up into the room. C. Clearances A WARNING Fire Risk. Odor Risk. • Install appliance on hard metal or wood surfaces extending full width and depth of appliance. • Do NOT install appliance directly on carpeting, vinyl, the or any combustible material other than wood. A WARNING Fire Risk. • Construct chase to all clearance specifications in manual. • Locate and install appliance to all clearance specifications in manual CLEARANCES TO COMBUSTIBLES: A B C D E F G H I J K Rough Opening Rough Opening Rough Opening Rough Opening Clearance NorrCombustible Combustible Behind Sides of Fbor to To Front (Vent Pipe) (Height) (Depth) (Width) to Ceiling Fbor Flooring Appliance Appliance of Access Panel of Appliance Inches 10 44-3/4 22 42 31 0 0 0.5 0.5 4 36 mm 254 1137 559 1067 788 0 0 13 13 102 914 Figure 3.2 Clearances to Combustibles Heat & Glo • BOOOGCF-IPI, 6000GCF-1PILP • 2110-900 Rev. D • 7/06 D. Mantel Projections Note: All 18 measurements in inches, 14114 1 o-vz f-- s~~a 3 I ~ "1 ' , ~ 11-3~a 10-5/8 i j 9-vz 8~/8 •~ 7-114 ~. 1 Top View 1 inch I 3 feet MANTEL LEG Flgure 3.4 Clearances to Mantel Legs or Wall Pro)ections (Acceptable on both sides of opening.) i NOTE: Measurement is taken from top of the opening, NOT the top of the fireplace. Figure 3.3 Clearances to Mantels or other Combustibles above Appliance Heat ~ Glo • 6000GCF-IPI, 6000GCF-IPILP • 2110-900 Rev. D • 7/06 g Termination Locations A. Vent Termination Minimum Clearances or als ~i~ Measure horizontal clearances from this surface. (See Figure 4.4 for specific clearances) Figure 4.1 HORIZONTAL ~--^ - _ _... ~"~'f, OVERHANG .I 2 FT. 20 INCHES I { ~ MIN. - VERTICAL f ~ WALL / LOWEST If F DISCHARGE OPENING ~ i TERMINATION / ' ~ cAP , / ~ /~\ ~1z I ~~~ `- ROOF PITCH Is w1z l H (MIN.) -MINIMUM HEIGHT FROM ROOF TO LOWEST DISCHARGE OPENING I -~..'~ Boof Pitch H (Mln.l Ft. Flat to 6/12 .......................................................... 1.0' Over 6/12 to 7/12 ............................................ ...1.25' Over 7/12 to 8/12 ............................................. ..1.5' Over 8112 to 9/12 ............................................. .. 2.0' Over 9/12 to 10/12 ........................................... .. 2.5 Over 10/12 to 11/12 ......................................... ..3.25 Over 11112 to 12/12 ......................................... .. 4.0 Over 12/12 to 14/12 ......................................... .. 5.0 Over 14!12 to 16/12 ......................................... .. 6.0 Over 16/12 to 18/12 ......................................... .. 7.0 Over 18/12 to 20/12 ......................................... .. 7.5 Over 20/12 to 21/12 ......................................... .. 8.0 ' 3 foot minimum in snow regions Figure 4.2 Minimum Height from Roof to Lowest Discharge Opening Figure 4.2 specifies minimum vent heights for various pitched roofs. OAS, WOOD or FUEL OIL TERMINATION le 201N. \y I ` (MIMMUM) 70 PERPENDICULAR OAS I I WALL (OAS ONLYI 13 tN. TERMINATION T I 1 ~ A -.~_ J~ _ `L~ ~ ~C ~ _i 1. I~__}i J ~.^ ~U~ f _ _~ i 1~ ~1 ~( ~M..: Gss Tsrmlrtatlon Wood 6 Fwl 011 TsrminaHon) A ~ 8 In. ~ 20 in. 11 Figure 4.3 Multiple Vertical Termination WARNING Fire Risk. Explosion Risk. Maintain vent clearance to combustibles as specified. • Do not pack air space with insulation other materials. Failure to keep insulation or other materi away from vent pipe may cause fire. Measure vertical clearances from this surface. I:I 111 10 Heat ~ Glo • 6000GCF-IPI, BOOOGCF-IPILP • 2110-900 Rev. D • 7106 M N P CADG ~ R H f a (See Note 2) ~~1~ ~ ~ ~ ~ U.3. (3t=~ v ~~ ~ LvJ ~ ~ ~I '~'! 11'x' V I L_h-'® A ~~ L'J or K =VENT TERMINAL ~ =AIR SUPPLY INLET A = 12 inches ............. clearances above grade, veran- (See Note 1) da, porch, deck or balcony B = 12 inches ............ clearances to window or door that may be opened, or to per- manentlyclosed window. (Glass) D* = 78 inches ............. vertical clearance to unventilat- ed soffit or to ventilated soffit lo- cated above the terminal *30 inches............ for vinyl clad soffits and below electrical service F = 9 inches .............. clearance to outside corner G = 6 inches ............... clearance to inside corner H = 3 ft. (Canada) ...... not to be installed above a gas meter/regulator assembly within 3 feet (90cm) horizontally from the center-line of the regulator ! = 3 ft. (U.S.A.) 6 ft. (Canada)....... clearance to gas service regula- torvent outlet J = 9 inches (U.S.A.) 12 inches (Canada)clearance to non-mechanical air supply inlet to building or the combustion air inlet to any other appliance a vent shall not terminate directly above a sidewalk or paved driveway which is located between two single family dwellings and serves both dwellings. only permitted if veranda, porch, deck or balcony is fully open on a minimum of 2 sides beneath the floor, or meets Note 2. NOTE 1; On private property where termination is less than 7 feet above a sidewalk, driveway, deck, porch, veranda or balcony, use of a listed cap shield is suggested. (See vents components page) NOTE 2: Termination in an alcove space (spaces open only on one side and with an overhang) are permitted with the dimensions specified for vinyl or non-vinyl siding and soffits. 1. There must be 3 feet minimum between termination caps. 2. All mechanical air intakes within 10 feet of a termination cap must be a minimum of 3 feet below the termination cap. 3. All gravity air intakes within 3 feet of a termination cap must be a minimum of 1 foot below the termination cap. Flgure 4.4 Mlnlmum Clearances for Terminatlon T V s Eleetrial S V Service V ~~ ® =AREA WHERE TERMINAL IS NOT PERMITTED K = 3 ft. (U.S.A.) 6 ft. (Canada) .... L** = 7 ft .................... (Sae Note 1) M*** = 18 inches .......... 42 inches ....... .. clearance to a mechanical (powered) air supply inlet .. clearance above paved side- walk or a paved driveway lo- cated on public property .. t~earance unc~r veranda, porch, deck, balcony or overhang .. vinyl Alcove Applicationr,• N = 6 inches ... .............. non-vinyl sidewalls 12 inches .............. vinyl sidewalls P = 8 ft. QMIN RMAx 1 cap 3 feet 2 X Q gCTUAL 2 caps 6 feet 1 x Q nrniai 3 caps 9 feet 2/3 x Q gcrvaL 4 caps 12 feet 1/2 x Q ,~,,,,, Qrw ~ # termlllatbn caps x 3 R,u, ~ (2 / # termination cape) x Q„ ~,,,,, S = 6 inches ................. clearance from sides of (see Notes) electrical service T = 12 inches ................ clearance above electrical (Sse Note 5) service NOTE 3: Local codes or regulations may require different clearances. NOTE 4: Termination caps may be hot. Consider their proximity to doors or other traffic areas. NOTE 5: Location of the vent termination must not interfere with access to the electrical service. WARNING: In the U.S: Vent system termination is NOT permit- ted in screened porches. You must follow side wall, overhang and ground clearances as stated in the instructions. !n Canada: Vent system termination is NOT permitted in screened porches. Vent system termination is permitted in porch areas with two or more sides open. You must follow all side walls, overhang and ground Gearances as stated in the instructions. Heat & Glo assumes no responsibility for the improper perfor- mance of the appliance when the venting system does not meet these requirements. CAUTION: IF EXTERIOR WALLSARE FINISHED WITH VINYL SIDINC3 IT IS SUGGESTED THAT A VINYL PROTECTOR KIT BE INSTALLED. Heat ~ Glo • BOOOGCF-IPI, &OOOGCF-IPILP • 2110-900 Rev. D • 7/06 11 Vent Information and Diagrams A. Vent Table Key The abbreviations listed in this vent table key are used in the vent diagrams. Svi»bol QesCriutlon- V~ First section (closest to appliance) of vertical length Vp Second section of vertical length I'i1 First section (closest to appliance) of horizontal length I"12 Second section of horizontal length A WARNING Fire Hazard. Explosion Risk. Asphyxiation Risk. Do NOT connect this gas appliance to a chimney flue serving a separate solid-fuel or gas burning appliance. • Vent this appliance directly outside. • Use separate vent system for this appliance. May impair safe operation of this appliance or other appliances connected to the flue. B. Use of Elbows CAUTION ALL vent configuration specifications MUST be followed. • This product is tested and listed to these specifications. • Appliance performance will suffer if specifications are not followed. Diagonal runs have both vertical and horizontal vent as- pectswhen calculating the effects. Use the rise for the ver- tical aspect and the run for the horizontal aspect (see Fig- ure 5.1). Two 45° elbows may be used in place of one 90° elbow. On 45° runs, one foot of diagonal is equal to 8.5 inches hori- zontal run and 8.5 inches vertical run. A length of straight pipe is allowed between two 45° elbows (see Figure 5.1). Vertica I Figure 5.1 . ~~ ~' ~~`~. ~ ... IN .~~ry I~ i ' ~ I 8-1/2 in. ~' ~' C. Measuring Standards Vertical and horizontal measurements listed in the vent diagrams were made using the following standards. 1. Pipe measurements are shown using the effective length of pipe (see Figure 5.2}. 2. Measurements are made from the appliance outer wrap, not from the standoffs. 3. Horizontal terminations are measured to the outside mounting surface (flange of termination cap) (see Fig- ure 4.1). 4. Vertical terminations are measured to bottom of termi- nationcap. 5. Horizontal pipe installed level with no rise. 1 I Pipe Length/ Inches DVP4 4 DVP6 6 Effective DVP12 12 Height/Length DVP24 24 DVP36 36 DVP48 48 1 DVPBA 3 to 6 DVP12A 3 to 12 DVP12MI 3 to 72 DVP24M1 3 to 24 Figure 5.2 DVP Pipe Effective Length 12 Heat ~ Gio • 6000GCF-IPI, 6000GCF-1PILP • 2110-900 Rev. D • 7/06 Horizontal ~-' ~.,.~ D. Vent Diagrams A WARNING Fire Risk. Explosion Risk. Do NOT pack insulation or other combustibles between ceiling firestops. • ALWAYS maintain specified clearances around venting and firestop systems. • Install wall shield and ceiling firestops as specified. Failure to keep insulation or other material away from vent pipe may cause fire. 1. Top Vent -Horizontal Termination One Elbow V, Minimum H, Maximum 6 inches 152mm 3 ft 914 mm 1 ft 305 mm 3 ft 914 mm 2ft 610 mm Eft 1,8m aft 914 mm 9ft 2.7m Oft 1.2m 12ft 3.7m V, + H, = 40 ft (12.2m) Ma~amum H, = 20 ft (ti.1m) Maximum V, = 6 inches (152 mm) Minimum Figure 6.3 Two Elbows Figure 6.4 t[l~l-\ 1 l INSTALLED HORQONTALLV H, + HZ = 17 ft (5.2m) Ma~amum V, =1-1/2 ft (457 mm) Minimum Heat 8 Glo • 6000GCF-IPI, 6000GCF-IPILP • 2110-900 Rev. D • 7/06 V, Minimum H, + Hz Maximum 1 ft 305 mm Cannot do 1-1/2 ft 457 mm 1-1/2 ft 457 mm 2ft 610 mm aft 914 mm aft 914 mm Eft 1.8m Oft 1.2m I 9ft 2.7m V, + H,+ HZ = 50 ft (15.2m) Maxmum 13 1. Top Vent -Horizontal Termination - (continued) Three Elbows V~ Min. 6 in . 152 mm 1 ft 305 mm 2 ft 610 mm 3 ft 914 mm H~ +Hz=20ft(I H~ Max. 3 ft 914 mm 3 ft 914 mm 6 ft 1.8 m 9 ft 2.7 m i.1 m) Max. H: Flgure 6.6 14 VZ Min. 1 ft 305 mm 1 ft 305 mm 2 ft 610 mm 3 ft 914 mm V~+Vz +H,+H2= HZ Max. 3 ft 914 mm 3 ft 914 mm 6 ft 1.8 m 9 ft 2.7 m 50 ft (15.2m) Max Vz V~ + V Z Min. 1-1/2 ft 457 mm 2 ft 607 mm Oft 1.4m 6 ft 1.8 m V~ = 6 inches Heat & Gio • 6000GCF-IPI, 6000GCF-IPILP • 2110-900 Rev. D • 7106 H~ + H2 Max. 6 ft 1.8 m Eft 1.8m 12 ft 3.7 m 18 ft 5.5 m 152 mm) Min. 2. Top Vent -Vertical Termination No Elbow V, = 40 ft. Max. (12.2m) 3 ft Min. (914mm) NOTE: If installing a vertical vent/ termination off the top of the appli- ance, the optional flue restrictor should be used. See Section 7. D. Flgure 5.6 Two Elbows Flgure 6.T 0 ~. V, H, Maximum V2 V,+ VZ Minimum bin. 152 mm aft 914 mm 1 ft 305 mm 3 ft 914 mm ~ 2ft 607 mm Eft 1.8m "' " I Oft 1.2m 12ft 3.7m V, + VZ + H~ = 50 ft (15.2m) Max. *No specific restrictions on this value EXCEPT V~ + V2 + H, cannot exceed 50 ft (15.2m) V~ = 6 inches'(152 mm) Min. ~~ Heat & Gio • 6000GCF-IPI, 6000GCF-IPILP • 2110-900 Rev. D • 7/06 15 2. Top Vent -Vertical Termination - (continued) Three Elbows V~ bin. 152 mm 1 ft 305 mm 2ft 61Omm~, 4 ft 1.2 m H~+ HZ V2 V~+ VZ Minimum H~+ HZ A aft 914 mm aft aft 914 mm aft Eft 1.8m Eft 12ft 3.7m '" 12ft H~ + HZ = 17 ft (5.2m) Maximum V~ + Vz + H~ + Hz = 50 ft (15.2m) Ma~amum V~ = 6 inches (152 mm) Minimum w INSTALLED HORIZONTALLY Flgure 6.8 H, laximum 914 mm 914 mm 1.8 m 3.7 m 16 HeatBGlo • 6000GCF-IPI,6000GCF-IPILP • 2110-900 Rev.D • 7/06 Vent Clearances and Framing A. Pipe Clearances to Combustibles A WARNING Fire Risk. Explosion Risk. Maintain vent clearance to combustibles as specified. • Do not pack air space with insulation or other materials. Failure to keep insulation or other materials away from vent pipe may cause fire. Note: Slope not required. S In. TOP CLEARANCE 1 In. CLEARANCE AROUND VERTICAL SECTIONS Flgure 6.1 Plpe Clearences 1 T ~ 1 In. SIDEAND BOTTOM CLEARANCE Heat Shield Above First 90° Elbow A WARNING Fire Risk. Installation of this appliance may require the use of heat shield 570-290 above the first 90° elbow in the venting system. • Heat shield required if vertical distance between top of horizontal elbow and any combustible surface above elbow is less than 4 inches. • Heat shield not required if distance is more than 4 inches. COMBUSTIBLE SURFACE ~" MIN. I (78mm) HEAT SHIELD ~~ ~ ~ ~ ~~ ~I ~ Flgure 6.2 Fasten the shield in place using the four pilot holes pro- vided in the part. • Position the shield so the longest dimension (131/2 inch) is placed in same direction the elbow is pointing. • Center the shield directly above the elbow with a 1/2 inch air space between shield and combustible surface (see Figure 6.3). CORRECT ~•.w~wR-~ INCORRECT 1 ..:..H 1 OF J L T HFwrs~o O O wtuow to o I to o~ Flgure 6.3 • Attach elbow heat shield to the exhaust pipe if combus- tible materials are not present at install (see Figure 6.4). • Cut the tabs as shown and bend down. Using the screws found in the manual bag secure the heat shield to the pipe maintaining 3 to 4 inches between the pipe and shield. 3" (78mn Flgure 6.4 Heat 8 Glo • 6000GCF-IPI, 6000GCF-IPILP • 2110-900 Rev. D • 7/06 17 B. Wall Penetration Framing Note: Heat shields MUST overlap by a minimum of 1-1 /2 in. (38mm). The heat shield is designed to be used on a wall 41n. to 7-1/41n. (102 mm to 184 mm) thick. If wall thickness is less than 4 in. (102 mm) the existing heat shields must be field trimmed. If wall thickness is greater than 7-1/4 in. (184 mmj a DVP-HSM-B will be required. HEAT SHIELD 1 i 1 WALL SHIELD FIRESTOP WALL 9 IN. TOP CLEARANCE HEAT IIN.CLEARANCE BOTTOM SfDES Y "Shows center of 10" x 12" vent framing hole for top venting. The center of the hole is (1 j inch (25.4mm) above the center of the horizontal vent pipe. With minimum vertical or 6 inch and 90° elbow. A* I s 49-1l2 in. I 48-1/2 in Figure 6.5 Horizontal Venting Clearances to Combustible Materials Combustible Watl Penetration Frame a hole in a combustible wall for an interiorwall shield firestop, (Figure 6.6) whenever a wall is penetrated. Use same size framing materials as those used in the wall con- struction. The wall shield firestop maintains minimum clear- ancesand prevents cold air infiltration. Non-Combustible Wall Penetration If the hole being penetrated is surrounded by noncombusti- ble materials such as concrete, a hole with diameter one inch greater than the pipe is acceptable. Figure 6.6 Exterior Wall Hole 18 Heat & Glo • 6000GCF-IPI, 6000GCF-IPIlP • 2710-900 Rev. D • 7/OB C. Vertical Penetration Framing ~ WARNING Fire Hazard Keep loose materials or blown insulation from touch- ing the vent pipe. • National building codes recommend us- ing attic shield to keep loose materials/ blown insulation from contacting vent. • Hearth & Home Technologies requires the use of an attic shield. Installing the Ceiling Firestop • Frame an opening 10 inches by 10 inch- es whenever the vent system pene- trates aceiling/floor (see Figure 6.7). • Frame the area with the same sized lum- ber as used inceiling/floor joist. • When installing a top vent vertical termi- nationappliance the hole should be di- rectly above the appliance, unless the flue is offset. • Do not pack insulation around the vent. Insulation must be kept away from the pipe. Installing Attic Shield Note: An additional ceiling Firestop is not required if attic shield is used. • Frame opening for attic shield. • Attic shield may be installed above or below ceiling (see Figure 6.t3). • Secure with three fasteners on each side. • Foid tabs at top of attic shield in toward vent pipe. Tabs must keep vent pipe centered within shield. • Field construct additional shield height if insulation is deeper than height of at- ticshield. A B I I P PE I10 n.,1O n1 Flgure 6.7 BEND TABS IN AROUND PIPE 3FASTENERS PER SIDE i 1 .1 ATTIC SHIELD INSTALLED BELOW CEILING Flgure 8.8 Installing the Attlc Shleld __ T T ATTIC SHIELD INSTALLED ABOVE CEILING Heat & Glo • 6000GCF-IPI, 6000GCF-IPILP • 2110-900 Rev D • 7/06 19 Appliance Preparation A. Attaching sheetrock Ledges Attach sheetrock ledge assembly to the top of the unit using the provided slots. The face of the sheetrock ledge assembly Attach sheetrock ledges together using the attachment and the unit surround should be flush to each other. holes (see Figure 7.1). Figure 7.1 DETAIL A I• ATTACHMENT HOLES SEE ~ NAILING DETAILA TAB The sheetrock ledges will attach to the top of the unit (see Figure 7.2). B. Temporary Access Panel Remove the lower access panel to run the electrical and gas lines to the unit (see Figure 7.3). Once the electrical and gas lines are hooked up, the lower access panel must be put back on the unit. SEE DETAIL B ~ * ~ + * -r I ~ a I UNR DETAIL B SHEETROCK SURROUND / LEDGE / CLEARANCE SLOT ATTACHMENT HOLES 8 PLACES Figure 7.2 ``~ ~ LOWER Af:{:E35 YANCL Figure 7.3 20 Heat & Glo • 6000GCF-IPI, 6000GCF-IPILP • 2110-900 Rev. D • 7/06 C. Securing and Leveling the Appliance A WARNING Fire Risk. • Prevent contact with sagging, loose insulation. • Do NOT install against combustible materials such as exposed insulation, plastic and insulation backer. The diagram shows how to properly position, level, and se- curethe appliance (see Figure 7.4). Nailing tabs are provid- ed to secure the appliance to the framing members. • Place the appliance into position. • Level the appliance from side to side and front to back. • Shim the appliance, as necessary. It is acceptable to use wood shims. • Bend out nailing tabs on each side. • Keep nailing tabs flush with the framing. • Secure the appliance to the framing by using nails or screws through the nailing tabs. FG Q WARNING Fire Risk. • ALWAYS maintain specified clearances around the appliance. • Do NOT notch into the framing around the appliance spacers. Failure to keep insulation, framing or other material away from the appliance may cause fire. Heat & Glo • 6000GCF-IPI, 6000GCF-IPILP • 2110-900 Rev. D • 7/06 21 Securing of Appliance D. Installing the Flue Restrictor 3. Center the Flue Restrictor on vent and secure in place by using two self-tapping screws (see Figure 7.8). 00000 7 2 ~ 4 6 SETTINGS 7 2 4 6 O O O O O Figure 7.5 1. Break the Flue Restrictor (see Figure 7.5) into two piec- es. Do this by bending the part back and forth until it breaks (see Figure 7.6). oVooooo s BREAK HERE o~ooooo Figure 7.6 Flue Restrictor 2. Match the amount of vertical in the system with the chart to find the appropriate position to set the Flue Restrictor (see Figure 7.7). CHART Vertical Top Vent Top-Vent NG LP 4' 1-1 No Restrictor 8' 2-2 1-2 15' 3-3 3-2 20' 3-4 3-3 25' 3-4 3-3 30' 4-4 3-4 35' 4-4 3-4 40' S-4 4-4 45' 5-4 4-4 50' 5-4 4-4 Figure 7.7 Figure 7.8 E. Installing the Fiberglass Gasket The fiberglass gasket supplied in the manual bag seals between the first 8 inch (203mm) vent component and the outer fireplace wrap. Using 2self-tapping screws from the manual bag secure the gasket to the outer wrap (see Figure 7.9). 22 Heat & Glo • 6000GCF-IPI, 6000GCF-IPILP • 2110-900 Rev. D • 7/06 i'184fB (A r~unry~aaa vaa noa Installing Vent Pipe A. Assembly of Vent Sections A WARNING Fire Risk Exhaust Fumes Risk Impaired Performance of Appliance • Overlap pipe slip sections at least 1-1/2 inches SSS • Use pilot holes for screws. • Screws must not exceed one inch long. • Pipe may separate if not properly joined. Attaching Vent to the Firebox Assembly To attach the first pipe section to the collars, slide the male end of the inner vent of the pipe section over the inner collar on the firebox assembly. At the same time, slide the outer flue over the outer collar on the appliance. Push the pipe section into the appliance collar until all the lances (see Figure 8.1) have snapped in place. Tug slightly on the section to confirm it has completely locked into place. Assembling Pipe Sections Insert the inner flue of section A into the flared inner flue of section B. Start the outer flue of section A over the outer flue of section B (see Figure 8.2). Note: The end of the pipe sections with the lances/ tabs on it will face towards the appliance. Once both inner and outer flues are started, press section A onto section B firmly until all lances have snapped into place. Check to make sure they have snapped together (see Figure 8.3) and the seams are not aligned (see Figure 8.4). Tug slightly on section A to confirm it has completely locked into place. It is acceptable to use screws no longer than 1 inch to hold outer pipe sections togeth- er. If predrilling holes, do NOT penetrate inner pipe. ~~~~.' >~ CORRECT For 90° and 45° elbows that are ~ Flgure 8.a seams changing the vent direction from horizontal to vertical, one screw minimum should be put in the outer flue at the horizontal elbow joint to prevent the elbow from rotating. Use screws no longerthan 1 inch. If predrilling screw holes, do NOT penetrate inner pipe. ~~.~. ,. ~= s~- '~.~ Flgure S.S Note: Make sure that the seams are not aligned to prevent unintentional disconnection. ,~ k ~~_ `~ {;; ,,, ,~ ~~ , ~' ~, ~ r '~ ~ G k~ V f , "'' :~; ~` ~,- Flgure 8.1 Lances ~__ ,~~ INCORRECT Heat & Glo • 6000GCF-IPI, 6000GCF-IPILP • 2110-900 Rev. D • 7/06 23 Flgure 8.2 Assembling Minimum Installations (MI) Sections MI sections are non-unitized so that they can be cut to a certain length. Cut these sections to length from the non- expanded end (see Figure 8.5). They can then be attached by first connecting the expanded end of the MI inner flue with the inner pipe from the adjacent pipe section and securing with three screws. The expanded portion of the MI inner flue must overlap completely with the unexpended end of the adjacent pipe section. The outerflue can then be inserted into the adjacent outer flue expanded end and attached to the next pipe section with three screws. The other end of the MI pipe section can then be attached by fitting another pipe section to it and snapping it together, as normal. Assembling DVP-12A Slip Sections The outer flue of the slip section should slide over the outer flue of the pipe section and into (inner flue) the last pipe section (see Figure 8.6) . Slide together to the desired length, making sure that a 1-1/2 inch outer flue overlap is maintained between the pipe section and slip section. The pipe and slip section need to be secured by driving two screws through the overlapping portions of the outer flues using the pilot holes (see Figure 8.7). This will secure the slip section to the desired length and prevent it from separating. The slip section can then be attached to the next pipe section. If the slip section is too long, the inner and outer flues of the slip section can be cut to the desired length. k ... a . d ~' ~ ~ ~ yi 1;~~.:; ~y~kC;. ~I)Q~ )"(t~)@ , ~. , Figure 8.6 Sllp Section Pilot Holes s .<.~- ~~~ ~~ Figure 8.7 Screws into Slip Section 24 Heat & Glo • 6000GCF-IPI, 6000GCF-IPIIP • 2110-900 Rev. D • 7106 Securing the Vent Sections Vertical Sections Vertical sections of pipe must be supported every 8 feet after the 25 foot maximum unsupported rise. The vent support or plumber's strap (spaced 120° apart) may be used to do this (see Figure 8.8). Horizontal Sections Horizontal sections of vent must be supported every 5 feet with a vent support or plumber's strap. B. Disassembly of Vent Sections To disassemble any iwo pieces of pipe, rotate either section (see Figure 8.10), so that the seams on both pipe sections are aligned (see Figure 8.11). They can then be carefully pulled apart. A WARNING Fire Risk. Explosion Risk. Combustion Fume Risk. Use vent run supports per installation instructions. Connect vent sections per installation instructions. • Maintain all clearances to combustibles. • Do NOT allow vent to sag below connection point to appliance. Improper support may allow vent to sag or separate. Flgure 8.8 Securing Vertical Plpe Sectlons Flgure 8.9 Securing Horizontal Plpe Sectlons E t ~... x i Flgure 8.10 Rotate Seams for Disassembly Heat & Glo • 6000GCF-IPI, 6000GCF-IPILP • 2110-900 Rev. D • 7/06 25 Flgure 8.11 Align and Disassemble Vent Sectlons C. Installing Heat Shield and Horizontal Termination Cap A WARNING Fire Hazard Impaired pertormance of appliance • Telescoping flue section of termination cap MUST be used when connecting pipe section to termination cap. • Maintain a 1-1/2 inch minimum overlap on telescoping flue section of termination cap. Installing the Horizontal Termination Cap Vent termination must not be recessed in the wall. Siding may be brought to the edge of the cap base. Flash and seal as appropriate for siding material at outside edges of cap. When installing a horizontal termination cap, follow the cap location guidelines as prescribed by current ANSI ZZ23.1 and CAN/CGA-8149 installation codes. Q WARNING Fire Risk Exhaust Fumes Risk Impaired Performance of Appliance • Overlap pipe slip sections at least 1-1/2 inches. t( Use pilot holes for screws. SS) • Screws must not exceed 1 inch long. • Pipe may separate if not properly joined. Heat Shield Requirements for Horizontal Termination Forall horizontally vented appliances, a heat shield MUST be placed one inch above the top of the vent between the wall shield firestop and the base of the termination cap. There are two sections of the heat shield. One section attaches to the wall shield firestop with two screws. The remaining section is attached to the cap in the same manner. If the wall thickness does not allow the required 1-1 /2 inch heat shield overlap, an extended heat shield must be used. The extended heat shield will need to be cut to the thickness of the wall and be attached to the wall shield firestop. The small leg on the extended heat shield should rest on the top of the vent (pipe section) to properly space it from the pipe section (see Figure 8.12). A WARNING Burn Risk • Termination caps may be hot. Consider their proximity to doors or other traffic areas. qtr ,;1~ Local codes may require installation of a cap shield to prevent anything or anyone from touching the hot cap. HEAT SHIELD OR EXTENDED HEAT BHIELD OUTER VENT INTERIOR ~/ REARVENT HEAT BHIELD 7.1/21N. (9lMM) MIN. OVERLAP EXTEwoR 9HEATHINO Ftgure 8.12 Venting through the Watl NOTE: Where required, an exterior wall flashing is available. When penetrating a brick wall, a brick extension kit is available for framing the brick. IESTOP Z6 Heat & Glo • 6000GCF-IPI, 6000GCF-IPILP • 2110-900 Rev. D 7/06 D. Installing Roof Flashing and Vertical Termination Cap To install roof flashing see Figure 8.13. For installation of vertical termination cap see minimum vent heights for various pitched roofs (see Figure 8.13) . HORIZONTAL OVERHANG ~, 2 FT. ~ 20INCHES f VERTICAL MIN. i, / WALL LOWEBT '~/ ~~ DISCHARGE ~~~ OPENING YIINATION / ~ 1 CAP ~~_ J ~ '. X 12 T ~ ROOF PITCH \ 18 Xf 12 ~.,'., 1 H (\MIN.) • MINIMUM HEIGHT FROM ROOF i TO LOWE8T DISCHARGE OPENING ~ I j ~r ~% Flat to 6/12 ...................1.0" Over 11/12 to 12/12 .... .4.0 Over 6/12 to 7/12......1.25' Over 12112 to 14/12.... . 5.0 Over 7/12 to 6/12 ........1.5' Over 14/12 to 16/12.... . 6.0 Over 8/12 to 9/12 ........2.0" Over 16/12 to 18/12.... . 7.0 Over 9/12 to 10/12....... 2.5 Over 18/12 to 20/12.... . 7.5 Over 10/12 to 11/12 ... 3.25 Over 20/12 to 21/12.... . 8.0 * 3 foot minimum in snow regions Figure 8.13 Minimum Height from Roof to Lowest Discharge Opening A WARNING ~~ Fire Risk. Explosion Risk. Inspect external vent cap regularly. • Ensure no debris blocks cap. • Combustible materials blocking cap may ignite. • Restricted air flow affects burner operation. To attach the vertical termination cap, slide the inner collar of the cap into the inner flue of the pipe section and place the outer collar of the cap over the outer flue of the pipe section. Secure with three screws into the outer flue. Secure the cap by driving the three self-tapping screws (supplied) through the pilot holes in the outer collar of the cap into the outer flue of the pipe (see Figure 8.14). Figure 8.14 ~N CAP TORM ~OLLAR SCREWS Heat t£ Glo • 6000GCF-IPI, 6000GCF-IPILP • 2110-900 Rev. D • 7/06 27 Assembling and Installing Storm Collar CAUTION Sharp Edges • Wear protective gloves and safety glasses during installation. Connect both halves of the storm collar with two screws (see Figure 8.15). Wrap the storm collar around the exposed pipe section and align brackets. Insert a bolt (provided) through the brackets and tighten nut to complete storm collar assembly (see Figure 8.16). Slide the assembled storm collar down the pipe section until it rests on the roof flashing. Caulk around the top of the storm collar (see Figure 8.14). ~« 28 Heat 8 Glo • 6000GCF-IPI, 6000GCF-IPILP • 2110-900 Rev. D • 7106 Figure 8.18 Assembting the Storm Collar Around the Pipe Figure 8.15 Assembling the Storm Collar Gas Information A. Fuel Conversions Before making gas connections ensure that appliance being ins#alled is compatible with the available gas type. Any natural or propane gas conversions necessary to meet the appliance and locality needs must be made by a quali- fied technician using Hearth & Home Technologies speci- fied and approved parts. C. Gas Connection NOTE: Have the gas supply line installed in accordance with local building codes, if any. If not, follow ANSI 223.1. Installation should be done by a qualified installer approved and/or licensed as required by the locality. (In the Commonwealth of Massachusetts installation must be performed by a licensed plumber or gas fitter.) B. Gas Pressures Proper input pressures are required for optimum appliance performance. Gas line sizing requirements need to be made following NFPA51. AWARNING Fire Risk. Explosion Hazard. High pressure will damage valve. • Disconnect gas supply piping BEFORE pressure testing gas line attest pressures above 1/2 psig. • Close the manual shutoffvalve BEFORE pressure testing gas line at test pressures equal to or less than 1/2 psig. A WARNING Pressure requirements for appliance are shown in the ta- ble below. Minimum pressures must be met when other household gas appliances are operating. Verify inlet pressures. • High pressure may cause overfire condition. • Low pressure may cause explosion. • Verify minimum pressures when other household gas appliances are operating. Install regulator upstream of valve if line pressure is greater than 1/2 psig. Pressure Natural Gas Propane Minimum 5.0 inches 11.0 inches Inlet Pressure w.c. w.c. Maximum Inlet 14.0 inches 14.0 inches Gas Pressure w.c. w.c. Manifold 3.5 inches 10.0 inches Pressure w.c. w.c. NOTE: A listed (and Commonwealth of Massachusetts ap- proved) 1/2 inch (13mm) T-handle manual shut-off valve and flexible gas connector are connected to the 1/2 inch (13mm) control valve inlet. • If substituting for these components, please consult local codes for compliance. Refer to Reference Section 16 for location of gas line ao- cess in appliance. NOTE: Gas line may be run from either side of the appliance provided the hole in the outer wrap does NOT exceed 2-1/2 inches in diameter and does not penetrate the firebox. Q WARNING Gas Leak Risk • Support control when attaching pipe to prevent bending gas line. NOTE: The gap beiween supply piping and gas access hole may be caulked with high temperature caulk or stuffed with non-combustible, un-faced insulation to prevent cold air infiltration. Heat & Gfo • 6000GCF-IPI, 6000GCF-IPILP • 2170-900 Rev. D • 7/06 29 • Ensure that gas line does not come in contact with outer wrap of appliance. Follow local codes. • Incoming gas line should be piped into the valve com- partmentand connected to the 1/2 inch connection on the manual shutoff valve. WARNING Fire or Explosion Hazard • Gas build-up during line purge may ignite. • Purge should be perfonned by qualified technidan. • Ensure adequate ventilation. • Ensure there are no ignition sources such as sparks or open flames. • A small amount of air will be in the gas supply lines. When first lighting appliance it will take a short time for air to purge from lines. When purging is complete the appliance will light and operate normally. AWARNING CHECK FOR GAS LEAKS T~'~ Explosion Risk Fire Risk Asphyxiation Risk • Check all fittings and connections. • Do not use open flame. • After the gas line installation is complete, all connections must be tightened and checked for leaks with acommercially- available, non-corrosive leak check solution, Be sure to rinse off all leak check solution following testing. Fittings and connections may have loosened during shipping and handling. Q WARNING Fire hazard. Do NOT change the valve settings. • This valve has been preset at the factory. • Changing valve settings may result in fire hazard or bodily injury. HIGH ALTITUDE INSTALLATIONS U.L. Listed gas appliances are tested and approved without requiring changes for elevations from 0 to 2000 feet in the U.S.A. and Canada. When installing this appliance at an elevation above 2000 feet, it may be necessary to decrease the input rating by changing the existing burner orifice to a smaller size. Input rate should be reduced by 4% for each 1000 feet above a 2000 foot elevation in the U.S.A., or 10% for elevations between 2000 and 4500 feet in Canada. If the heating value of the gas has been reduced, these rules do not apply. To identify the proper orifice size, check with the local gas utility. If installing this appliance at an elevation above 4500 feet (in Canada), check with local authorities. 30 Heat ~ Glo • 6000GCF-IPI, 6000GCF-IPILP • 2970-900 Rev. D • 7/OB Electrical Information A. Recommendation for Wire This appliance requires 110-720 VAC be wired to the junction box either for proper operation of the appliance. NOTE: This appliance must be electrically wired and grounded in accordance with local codes or, in the absence of local codes, with National Electric CodeANSI/NFPA 70- latestedition orthe Canadian Electric Code, CSA C221.1. B. Connecting to the Appliance WARNING Wire 110V to electrical junction box. Do NOT wire 110V to valve. Do NOT wire 110V to wall switch. • Incorrect wiring will damage millivolt valves. • Incorrect wiring will override IPI safety lockout and may cause explosion. C. Intellifire Ignition System Wiring This appliance requires a 110 VAC supply to the appliance junction box for operation. A wiring diagram is shown in Figure 10.1. This appliance is equipped with an Intellifire control valve which operates on a 3 volt system. This appliance is supplied with a battery pack and a 3 volt AC transformer, which requires the installation of the supplied junction box. It is highly recommended that the junction box be installed at this time to avoid reconstruction. The battery pack requires two D cell batteries (not included). NOTE: Batteries cannot be placed in the battery pack while using the 3 voltAC transformer. The transformer must be unplugged if the battery pack is used or battery life will be reduced. • This appliance may be used with a wall switch, wall mounted thermostat and/or a remote control. • If using thermostat use one compatible with a millivolt gas valve system. • Follow parameters for locating thermostat (see individual thermostat instructions) to ensure proper operation of appliance. • Use low resistance thermostat wire for wiring from igni- tion system to the wall switch and thermostat. • Keep wire lengths short as possible by removing any excess wire length. • Low voltage and 110 VAC voltage cannot be shared within the same wall box. CAUTION Battery polarity must be correct or module damage will occur. Optional Accessories Requirements Wiring for optional accessories should be done now to avoid reconstruction. CAUTION Label all wires prior to disconnection when servicing con- trols. Wiring errors can cause improper and dangerous op- eration. Verify proper operation after servicing. WARNING D. Wall Switch Shock hazard. • Replace damaged wire with type 105° C rated wire. • Wire must have high temperature insulation. Position the wall switch in the desired position on the wall. An assembly of 18 ft of 20 AWG is provided with the fire- place to connect the wall switch to the appliance. Instead of the supplied assembly, wire with a length of 25 ft or less and a gauge of 20 AWG through 14 AWG is acceptable. The wire needs a jacket with a temperature rating of 140°F (60°C) or higher. At the appliance connect the wire to the ON/OFF switch pigtails. Heat & Glo • 6000GCF-IPI, 6000GCF-1PILP • 2110-900 Rev. D • 7/06 31 ao PLUG-IN 3V TRANSFORMER Ou ON/OFF IOOOOO WALL L SWITCH r--- I I I ~~ j IGNITION M LE ` V I I I ) 3 I I I I I_ - I I I 1 I I VALVE I I LOW VOLdTAGE ~ SEEN TE1 ~ _____ ------ _ QI REMOTE NEUTRAL _ CONTROL HOT GROUND BLACK WIRE CAN BE PLUGGED INTO ANY OF #1 • #3 LOCATIONS ON THE HOT SIDE r I --- I I PIG GYBACK ION/OFF SWITCI L------' TRANSFORMER 3 VAC t ~~! r PLUG IN INTERMITTENT PILOT IGNITOR WHT ORG `Note: Appliance will not opera~e LVE unless properly grounded. Figure 10.7 Intellifire Pilot Ignition (IPI) Wiring Diagram 32 IGNITION MODULE 3 VAC .~ I BATTERY I ~ PACK ~ I I 14 I ~ I I ____ I WHITE WIRE CAN BE PLUGGED `.INTO ANY OF #1-#5 LOCATIONS ON THE NEUTRAL SIDE c~ Heat & Glo • 6000GCF-IPI, 6000GCF-IPILP • 2110-900 Rev. D • 7106 GROUND TO FIREPLACE CHA8818 E. Junction Box Installation If the box is being wired from the appliance: • Remove the screw attaching the junction box to the outer shell, rotate the junction box inward to disengage it from the outer shell (see Figure 10,2). • Pull the electrical wires from outside the appliance through this opening into the valve compartment. • Loosen the two screws on the Romex connector (not included with unit), feed the necessary length ofwire through the connector and tighten the screws. • Make all necessary wire connections to the receptacle and assemble the receptacle and cover to the junction box. Romex Connector ,,,. 'I ,•, l I .y; {~~ I {j'' 74/2VUG ° ~ 1 Cover Plate ,.~ outside firebox 0 ' ~ Copper \ ground attached GRN wire to GRN screw with inside box GRN wire NOTE: Do NOT wire 110VAC to wall switch. Figure 10.Z Junction Box Detail F. Wall Switch Installation for Fan (Optional) If the box is being wired to a wall mounted switch for use with a fan (See Figure 10.3): • The power supply for the appliance must be brought into a switch box. • The power can then be supplied from the switch box to the appliance using a minimum of 14-3 with ground wire. • At the switch box connect the black (hot) wire and red (switch leg) wire to the wall switch as shown. • At the appliance connect the black (hot), white (neutral) and green (ground) wires to the junction box as shown. • Add a 1/4 inch insulated female connector to the red (switch leg) wire, route it through the knockout in the face of the junction box, and connect to the top fan switch connector (1/4 inch male) as shown. e a wHr JI BLK ~~\ VVF1T' I BLK MINIMUM f4JAWG WITH GROUND Bl~~k 1lJhlta Gmer JUNCTION BOX __1__ NlYiRlll I s s 1 i o 0 0 0 o '~ ® O ® ~ e ;/I~; A ~ W R s T -__ ~~ I Rad Figure 10.5 Junction Box Wired to Wall 5wltch SWITCH leek W61h Groan POWER SUPPLY WIRES SWITCH BOX Heat & Glo • 6000GCF-IPI, 6000GCF-IPILP • 2110-900 Rev. D 7/06 33 ~~ Finishing A. Mantel Projections Figure 11.1 shows the minimum vertical and corresponding maximum horizontal dimensions of appliance mantels or other combustible projections above the top front edge of the appliance. 18 Note: All 14-1/4 measurements 10-1/2 in inches. ~- 6-3/4 -- 3 11.314 ~f 1 I 10-618 • ,i I 9-1/2 8a/a 7-1/4 ~.I 1 NOTE: Measurement is taken from top of the opening, NOT the top of the fireplace. Figure 11.1 Clearances to Mantels or other Combustibles above Appliance U Top View 1 inch I 3 feet MANTEL LEG Figure 11.2 Mantel Leg or Wall ProJectlons (Acceptable on both sides of opening.) B. Facing Material A WARNING Fire Risk Explosion Risk • Facing and/or finishing materials must never overhang into the glass opening. •Overhanging materials may ignite. • May interfere with proper operation of glass assembly. FINISH WALL MATERIAL MAYBE COMBUSTIBLE • TOP AND SIDI~S NON-COMBUSTIBLE /J BOARD ~ r o„ ~ ~ T A n AIAi n A ~ i i o„ `I / o,. SEALANT MATERIAL Figure 11.3 Noncombustible Facing Diagram A WARNING Risk of Fire • Non-combustible cle maintained. • Sheetrock, wood or other combus be used as sheathing or facing in non-combustible zone. • See Section 11 for proper clears • See Section 1 for combustible/no combustible definitions. A WARNING arances must be tibles must NOT the nces. n- Fire Risk. Finish all edges and fronts to clearances and specifications listed in manual. • Black metal appliance front may be covered with non- combustible material only. • Do NOT overlap combustible materials onto appliance front. • Install combustible materials up to specified clearanc- es on top front and side edges. • Seal joints between the finished wall and appliance top and sides using only a 300°F minimum sealant. 34 Heat & Glo • 8000GCF-IPI, 6000GCF-IPILP • 2110-900 Rev. D • 7/08 12 Appliance Setup A. Remove Shipping Materials Remove shipping materials from inside or underneath the firebox. B. Clean the Appliance Clean/vacuum any sawdust that may have accumulated inside the firebox or under- neath in the control cavity. C. Accessories Install approved accessories per instruc- tions included with accessories. See Ser- vice Parts List for appropriate accessories. Refer to Section 16. Removing Optional GFK-160A Fan rrEM 1 -Remove front from the fireplace (see Fig- ure 12.1). 2 - Remove glass assembly from the fire- place (see Figure 12.1). 3 - Remove logs. 4 - Remove grate (see Figure 12.1). 5 - Remove side and back refractory. 6 - Remove burner assembly (see Figure 12.1). 7 - Remove valve assembly (see Figure 12.1). Figure 12.1 8 - Disconnect fan and remove it through the valve assem- blycavity (see Figure 12.2). P' r a~p ~~ RIB -~~ .E ~~ /i REMOVE FAN THROUGH VALVE ASSEMBLY CAVITY Figure 12.2 RHEOSTAT I r+l Flguro 12.3 Rheostat Location Heat & Glo • 6000GCF-IPI, 6000GCF-IPILP • 2110-900 Rev. D • 7/O6 l: 8 35 A WARNING ~~ Shock or fire risk. Use ONLY optional accessories approved for this appliance. • Using non-listed accessories voids warranty. • Using non-listed accessories may result in a safety hazard. • Only Hearth & Home Technologies approved accessories may be used safely. ~ D. Install the Refractory E. Ember Placement A WARNING STEP 2. Place the Left side refractory onto the left side of the burner. Push the back refractory against the back wall. Place the bumps on the bottom of the left refractory into the grooves on the burner surface. Push to top gently against the side of the fireplace. Once in place push it back so the bevel cuts sit against each other and the seam is minimized. STEP 3. Repeat step 2 for the right side. Explosion Risk. Placing the Ember Material Ember material is shipped with this gas appliance. To place the ember material: • Embers CANNOT be placed directly over ports. Care should be taken not to cover the lighting trail of ports (from back to front). • When placing Glowing Embers onto the burner care should be taken so that the ports are not covered. Place the dime-size ember pieces just in front of the port trail, but not on or in between the ports (see Figure 12.7). Failure to follow this procedure will likely cause lighting and sooting problems. • Follow ember placement instructions in manual. • Do NOT place embers directly over burner ports. • Replace ember material annually. Improperly placed embers interferes with proper burner operation. Figure 72.7 Placement of Embers • Place Mystic Embers on areas of base refractory away from port holes. Use this material to give the appliance a realistic ash bed. • Save the remaining ember materials for use during appli- ance servicing. The embers provided should be enough for 3 to 5 applications. 36 Heat 8 Glo • 6000GCF-IPI, 6000GCF-IPILP • 2110-900 Rev. D • 7/06 STEP 1. Place the back piece of refractory in back of the firebox. The small indentation on one side goes down. Lean the refractory slightly so it doesn't tip over. F. Positioning the Logs If the gas logs have been factory installed they should not need to be positioned. If the logs have been packaged separately, refer to the following instructions. STEP 1. CAUTION: Logs are fragile! Carefully remove the logs, grate and supporting cardboard from the inside of the fireplace See Figure 12.8. STEP 2. Place the metal grate on top of the burner. ~ Position the legs of the grate into the forward set of indentations in the burner top. Make sure that grate is all the way forward. See Figure 12.9. STEP 3. LOG #1 (SRV2103-107): Place the log on the burner so the cutout in the log goes around the hump in the burner. The outer legs of the log should self center on the sides of the burner. Pull the log forward. The ramp shape in the bottom of the log sits fully against the ramp shape molded into the burner. The right side of the log will touch the smaller hump. There will be a 1/4 inch or so gap around the hump. See Figures 12.10 and 12.11. Log Assembly: LOGS-6000G ~.. . ,~~ Y z~o3-s~oc Heat & Glo • 6000GCF-IPI, 6000GCF-IPILP • 2110-900 Rev. D • 7106 37 STEP 4. Log #2 (SRV2103-108): Place log #2 on top of the left side of log #1. The bottom of this log has a slot in it that goes over the tab molded into the top of log #1. The left end sits behind the simulated ember cluster on the burner top. STEP 5. Log #3 (SRV2103-110): Place log #3 on top of the burner surface in front of the hump. The bottom of the log has a square groove cut through it. The groove sits over the second grate tine from the left. Slide it back against the hump. STEP 6. LOG #4 (SRV2103-109): Place log #4 on top of the right side of log #1. The bottom of this log has a slot in it that goes over the tab molded into the top of log#1. The other end of the log rests on the grate, against the second tine from the right. -~ STEP 7. LOG #5 (SRV2103-111): Place log #5 in front of log #3 the notch in the bottom of this log rests over the center tine on the grate. The log shouldn't cover any ports. 38 Heat 8 Glo • 6000GCF-IPI, 6000GCF-IPILP • 2110-900 Rev. D • 7/06 G. Glass Assembly A WARNING ~~ Handle glass doors with care. • Inspect the gasket to ensure it is undamaged. • Inspect the glass for cracks, chips or scratches. • Do NOT strike, slam or scratch glass. • Do NOT operate appliance with glass door removed, cracked, broken or scratched. • Replace glass door assembly as a complete appliance. Removing Glass Assembly Pull the four glass assembly latches out of the groove on the glass frame. Remove glass door from the appliance (see Figure 12.20). Replacing Glass Assembly Replace the glass door on the appliance. Pull out and latch the four glass assembly latches into the groove on the glass frame. ri LATCHES ~ (BOTH BorroM AND TOP) GLASS ASSEMBLY Flgure 12.20 Glass Assembly H. Screen Mesh The screen mesh is built into front, I. Grilles and Trim Install optional marble and brass trim surround kits as desired. Marble, brass, brick, tile, or other non-combustible materials can be used to cover up the gap between the sheet rock and the appliance. Do not obstruct or modify the air inlet/outlet grilles. When overlapping on both sides, leave enough space so that the bottom grille can be lowered and the trim door removed. J. Hood Hood is included with the front and required in all installations. K. Air Shutter Setting This appliance has an adjustable air shutter (which controls the primary air) factory set for the minimum vertical vent run {see Figure 12.21). If your installation has more than the minimum required vertical vent length, adjustment of the air shutter may be necessary to obtain optimal flame appearance. This should be adjusted by a qualified installer at the time of installation. By pushing the air shutter handle in, you will be closing the air shutter. To adjust loosen the wing nut. Care should be taken when adjusting the air shutter so as not to cause the appliance to soot. If sooting occurs the air shutter will need to be opened by pulling the handle out. When finished tighten wing nut. Flgure 12.21 Shutter Settings Bumer Heat ~ Glo • 6000GCF-IPI, 6000GCF-IPILP • 2110-900 Rev. D • 7/06 NG I LP 1/8 in. I] Full Open 39 13 Operating Instructions A. Before Lighting Appliance CAUTION If installing Intellifire ignition battery backup: • Do not install batteries if the backup mode may not be used for extended time. • Batteries may leak. • Install batteries only when needed for power outage. Before operating this appliance have a qualified technician: • Remove all shipping materials from inside and/or underneath the firebox. • Review proper placement of logs, rockwool, lava rock, and vermiculite. • Check the wiring. • Check the air shutter adjustment. • Ensure that there are no gas leaks. • Ensure that the glass is sealed and in the proper position. • Ensure that the flow of combustion and ventilation air is not obstructed (front grilles and vent caps). AWARNING S1! Glass door must be in place when appliance is operating. Risk of: • Combustion Fumes • Fire Do NOT operate appliance with glass door removed. • Open viewing glass for servicing only. • Glass door MUST be in place and sealed before operating appliance. • Only use glass door certified for use with appliance. • Glass replacement should be done by qualified technician. WARNING HOTI DO NOT TOUCH. SEVERE BURNS MAY RESULT. CLOTHING IGNITION MAY RESULT. Glass and other surfaces are hot during `rf `Fj~J~ operation and cool down. • Keep children away. • CAREFULLY SUPERVISE children in same room as appliance. • Alert children and adults to hazards of high temperatures. • Do NOT operate with protective barriers open or removed. • Keep clothing, furniture, draperies and other combustibles away. This appliance has been supplied witi- an integral barrier to prevent direct contact with the furedglass panel. Do NOT operate the appliance with the protective barrier removed. Contact your dealer or Hearth & Home Technologies if the barrier is not present or help is needed to properly install one. AWARNING Improper installation, adjustment, alteration, service or maintenance can cause injury or property damage. Refer to the owner's information manual provided with this appliance. For assistance or additional information consult a qualified installer, service agency or the gas supplier. A WARNING Do NOT use this appliance if any part has been under water. Immediately call a qualified service technician to inspect the appliance and to replace any part of the control system and any gas control which has been under water. 40 Heat & Glo • 6000GCF-IPI, 6000GCF-IPILP • 2110-900 Rev. D • 7/06 B. Lighting Appliance Intellifire Ignition I FOR YOUR SAFETY ~ READ BEFORE LIGHTING WARNING : If you do not follow these Instructions exactly, a fire or explosion may result causing prop- erty damage, personal Injury or loss of Ilfe. A This appliance is equipped with an intermittent pilot ignition (IPI) device which automatically lights the burner. Do L141; try to light the burner by hand. B. BEFORE LIGHTING, smell all around the appliance area for gas. Be sure to smell next to the floor because some gas is heavier than air and will settle on the floor. WHAT TO DO IF YOU SMELL GAS Do not try to light any appliance. WARNING: a terafion, servtce or maintenance can cause injury or property dam- age. Refer to the owner's informa- tion manual provided with this ap- pliance. This appliance needs fresh air for safe operation and must be in- stalled so there are provisions for adequate combustion and ventila- tion air. If not installed, operated, and main- tained in accordance with the manufacturer's instructions, this product could expose you to sub- stances in fuel or fuel combustion which are known to the State of Cali- fornia to cause cancer, birth de- fects, or other reproductive harm. Keep burner and control compart- ment clean. See installation and operating instructions accompany- ing appliance. Do not operate the appliance with panel(s) removed, cracked or bro- ken. Replacement of the panel(s) should be done by a licensed or qualified service person. NOT FOR USE WITH SOLID FUEL For use with natural gas and pro- pane. Aconversion kit, as supplied by the manufacturer, shall be used to convert this appliance to the al- ternate fuel. Also Certified for Installation In a Bedroom ora Bedsitting Room. For assistance or additional informa- tion, wnsuft a qualified installer, ser- vice agency or the gas supplier. For additional information on operating your Hearth 8 Home Technologies rireplace, please refer to www.fireplaces.com. Final Inspection by • Do not touch any electric switch; do not use any phone in your build- ing. • Immediately call your gas supplier from a neighbor's phone. Follow the gas supplier's instructions. • If you cannot reach your gas sup- plier, call the fire department. C. Do not use this appliance if any part has been under water. Imme- diatelycall aqualified service tech- nician toinspect the appliance and to replace any part of the control system and any gas control which has been under water. CAUTION: DO NOT CONNECT 110 VAC Hot while in operation. Do not TO THE CONTROL VALVE. touch. Keep children, clothing, fur- niture, gasoline and other liquids Improper installation, adjustment, having flammable vapors away. LIGHTING ~ ~NSTRUCTIONS~ ~ (IPI) 1. Turn off all electric power to the appli- ance. 2. This appliance is equipped with an ig- nition device which automatically lights the burner. Do Il4S try to light the burner by hand. OC~J~1 GP~S O O vALVE O 3. Wait five (5) minutes to clear out any gas. Then smell for gas, including near the floor. If you smell gas, STOP! Fol- low "B" in the Safety information located on the left side of this label. If you don't smell gas, go to next step. 4. Turn on all electric power to the appli- ance. 6. To light the burner, flip the ON/OFF switch to the "ON" position. (The ON/ OFF switch may include a wall switch if so equipped). 6. If the appliance will not operate, fol- low the instructions "To Turn Off Gas to Appliance" and call yourservice tech- nician or gas supplier. ~ ~ TO TURN OFF I I GAS TO APPLIANCE 1. Turn off all electric power to the appli- ance if service is to be performed. 2. Flip ON/OFF switch to the "OFF" posi- tion. 593.913D Heat $ Glo • 6000GCF-IPI, 6000GCF-IPILP • 2110-900 Rev. D • 7/O6 41 C. AfterAppliance is Lit Initial Break-in Procedure When you light the appliance, you may notice that it pro- duces heat which does have an associated odor or smell. If you feel this odor is excessive it may require the initial three to four hour continuous burn on high followed by a second burn up to 12 hours to fully drive off any odor from paint and lubricants used in the manufacturing process. Condensation of the glass is normal. NOTE: The appliance should be run three to four hours on the initial start-up. Turn it off and let it cool completely. Remove and clean the glass. Replace the glass and run the appliance for an additional 12 hours. This will help to cure the products used in the paint and logs. During this break-in period it is recommended that some win- dows inthe house be opened for air circulation. This will help avoid setting off smoke detectors, and help eliminate any odors associated with the appliance's initial buming. A WARNING Fire Risk. High Temperatures. Keep combustible household items away from appliance. Do NOT obstruct combustion and ventilation air. • Do NOT place combustible items on top of or in front of appliance. • Keep furniture, draperies away from appliance. D. Frequently Asked Questions ~ssuE Condensation on the glass Blue flames Odor from appliance Film on the glass Metallic noise I Is it normal to see the pilot flame II bum continually? CAUTION Prevent accidental appliance operation when not attended. Unplug or remove batteries from remote control if absent or if appliance will not be used for an extended period of time. Property damage possible from elevated temperatures. CAUTION Smoke and odors released during initial operation. • Open windows for air circulation. • Leave room during initial operation. • Smoke may set off smoke detectors. Smoke and odors may be irritating to sensitive individuals. WARNING Fire Hazard. Keep combustible materials, gasoline and other flammable vapors and liquids clear of appliance. • Do NOT store flammable materials in the appliance's vicinity. • Do NOT use gasoline, lantern fuel, kerosene, charcoal lighter fluid or similar liquids in this appliance. • Combustible materials may ignite. SOLt1TIONS This is a result of gas combustion and temperature variations. As the appliance ~ warms, this condensation will disappear. J This is a result of normal operation and the flames will begin to yellow as the appliance is allowed to bum for 20 to 40 minutes. When first operated, this appliance may release an odor for the first several hours. This is caused by the curing of the paint and the buming off of any oils remaining from manufacturing. Odor may also be released from finishing materials and adhesives used around the appliance. This is a normal result of the curing process of the paint and logs. Glass should be cleaned within 3 to 4 hours of initial burning to remove deposits left by oils from the manufacturing process. Anon-abrasive cleaner such as gas fireplace glass cleaner may be necessary. See your dealer. Noise is caused by metal expanding and contracting as it heats up and cools down, similar to the sound produced by a furnace or heating duct. This noise does not affect the operation or longevity of the appliance. In an Intellifire ignition system it is normal to see the pilot flame, but it should turn off when ON/OFF is turned off. In a standing pilot system the pilot will always stay on. 42 Heat & Glo • 6000GCF-IPI, 6000GGF-IPILP • 2110-900 Rev. D • 7106 Troubleshooting nth proper installation, operation, and maintenance your gas appliance will provide years of trouble-free service. If you do experience a problem, this troubleshooting guide will assist a qualified service person in the diagnosis of a problem and the corrective action to be taken. This troubleshooting guide can only be used by a qualified service technician. A. Intellifire Ignition System Symptom 1. The ignitor/module makes noise, but no spark. 2. Pilot won't light, there is no noise or spark. 3. Pilot lights but continues to spark, and main burner will not ignite. (If the pilot continues to spark after the pilot flame has been lit, flame rectification has not occurred.) Possible Causes a. Incorrect wiring. b. Loose connections or electrical shorts in the wiring. c. Ignitor gap is too large. d. Faulty module. a. Transformer installed correctly. b. A shorted or loose connection in wiring configuration or wiring harness. c. Improper wall switch wiring. d. Module not grounded. e. Faulty module. a. A shorted or loose connection in sensor rod. b. Poor flame rectification or contaminated sensor rod. c. Module is not grounded. 1 Corrective ActEorrts _ Verify "S" wire (white) for sensor and "I" wire (orange) for ignitor are connected to correct terminals on module and pilot assembly. Reversed wires at the module may cause system to make sparking noise, but spark may not be present at pilot hood. Verify no loose connections or electrical shorts in wiring from module to pilot assembly. Rod closest to pilot hood should be ignitor. Verify connections underneath pilot assembly are tight; also verify connections are not grounding out to metal chassis, pilot burner, pilot enclosure, mesh screen if present, or any other metal object.. Verify gap of igniter to pilot hood. The gap should be approximately .17 inch or 1/8 inch. Turn ON/OFF rocker switch or wall switch to OFF position. Remove ignitor wire "I" from module. Place ON/OFF Rocker switch or wall switch in ON position. Hold ground wire about 3/16 inch away from "I" terminal on module. ff there is no spark at "I" terminal module must be replaced. ff there is a spark at "P' terminal, module is fine. Inspect pilot assembly for shorted spanker wire or cracked insulator around electrode. Verify that transformer is installed and plugged into module. Check voltage of transformer under load at spade connection on module with ON/OFF switch in ON position. Acceptable readings of a good transformer are between 3.2 and 2.8 volts AC. Remove and reinstall the wiring harness that plugs into module. Verify there is a tight fit. Verify pilot assembly wiring to module. Remove and verify continuity of each wire in wiring harness. Verify that 110/VAC power is "ON" to junction box. Verify black ground wire from module wire harness is grounded to metal chassis of appliance. Turn ON/OFF rocker switch or wall switch to OFF position. Remove ignitor wire "I" from module. Place ON/OFF Rocker switch or wall switch in ON position. Hold ground wire about 3/16 inch away from "I" terminal on module. If there is no spark at "I" terminal module must be replaced. ff there is a spark at "P' terminal, module is fine. Inspect pilot assembly for shorted spanker wire or cracked insulator around electrode. Verify all connections to wiring diagram in manual. Verify connections underneath pilot assembly are tight. Verify connections are not grounding out to metal chassis, pilot burner, pilot enclosure or screen if present, or any other metal object. Verify that flame is engulfing sensor rod. ff the pilot assembly does not have a ground strap, consider installing one to increase flame rectification. Verify correct pilot orifice is installed and inlet gas specifications. Flame carries rectification current, not the gas. ff flame lifts from pilot hood, the circuit is broken. A wrong orifice or too high an inlet pressure can cause pilot flame to lift. The sensor rod may be contaminated. Clean sensor rod with emery cloth. Verify that module is securely grounded to metal chassis of appliance. Verify that wire harness is firmly connected to module. Heat $ Glo • 6000GCF-IPI, 6000GCF-IPILP • 2110-900 Rev D • 7/06 43 Intellifire Ignition System - (continued) ;3ymptom 3. (Continued) Pilot lights but continues to spark, and main burner wilt not ignite. (IF the pilot continues to spark after the pilot name has been lit, flame rectification has not occurred.) 4. Pilot sparks, but Pilot wilt not light. PassibM Causes d. Damaged pilot assembly or dirty sensor rod. e. Faulty module a. Correct gas suppy. b. Ignitor gap is too large. c. Module is not grounded. d. Module voltage output /Valve/Pilot solenoid ohms readings. _. Corrective Acttniiss Verify that ceramic insulator around the sensor rod is not cracked, damaged, or loose. Verify connection from sensor rod to white sensor wire. Clean sensor rod with emery cloth to remove any contaminants that may have accumulated on sensor rod. Verify continuity with a multimeter with ohms set at lowest range. Tum ON/OFF rocker switch or wall switch to OFF position. Remove ignitor wire "P from module. Place ON/OFF Rocker switch or wall switch in ON position. Hold ground wire about 3/16 inch away from "I" terminal on module. ff there is no spark at "~' terminal module must be replaced. ff there is a spark at "~' terminal, module is fine. Inspect pilot assembly for shorted spanker wire or cracked insulator around electrode. Verify that incoming gas line ball valve is "open". Verify that inlet pressure reading is within acceptable limits, inlet pressure must not exceed 14 in. W.C. Verify that spark gap from ignitor to pilot hood is .17 in. or 1/8 in. I Verify module is securely grounded to metal chassis of appliance. Verify battery voltage is at least 2.7 volts. Replace batteries if voltage is below 2.7. 5. Pilot will not stay a. Pilot plate out of Ensure pilot plate is in proper postion (see Section 7). lit after carefuly position. following lighting instructions. 44 Heat & Glo • 6000GCF-IPI, BOOOGCF-1PILP • 2110-900 Rev. D • 7106 15 Maintaining and Servicing Appliance Although the frequency of appliance servicing and maintenance will depend on use and the type of installation, a qualified service technician should perform an appliance check-up at the beginning of each heating season. WARNING Risk of injury or property damage. Before servicing: • Turn off gas. • Tu'm off electricity to appliance. • Disable remote control, if one is present. • Ensure appliance is completely cooled. After servicing: • Replace any screen or barrier that was removed. • Reseal and reinstall any venting removed for servicing AWARNiNG Annual inspection by qualified technician recommended. Check: • Condition of doors, surrounds and fronts. • Condition of glass, glass assembly and glass seal. • Obstructions of combustion and ventilation air. • Condition of logs. • Condition of firebox. • Burner ignition and operation. • Bumer air shutter adjustment • Gas connections and fittings. • Obstructions of termination cap. Clean: • Glass • Air passageways, grilles, control compartment • Bumer, burner ports Risk of: • Fire • Delayed ignition or explosion • Exposure to combustion fumes • Odors CAUTION ~~ Handle glass assembly with care. NOTE: Clean glass after initial 3-4 hours ~~ operation. Longer operation without cleaning glass may cause a permanent white film on glass. When cleaning glass door: • Avoid striking, scratching or slamming glass. • Do NOT use abrasive cleaners. • Use a hard water deposit glass cleaner on white film. • Do NOT clean glass when hot. • Turn off appliance after 3-4 hours of operation and ALLOW TO COOL. • Remove and clean glass assembly. • Replace glass assembly and operate appliance for additional 12 hours. Refer to maintenance instructions. Q, WARNING Inspect external vent cap regularly. • Ensure no debris blocks cap. • Combustible materials blocking cap may ignite. • Restricted air flow affects burner operation. Heat 8 Glo • 6000GCF-IPI, 6000GCF-IPILP • 2110-900 Rev. D • 7106 45 Inspect Doors, Surrounds and Fronts Gasket Seal, Glass Assembly and Glass Valve Compartment and Firebox Top Logs Firebox Burner Ignition and Operation Venting Remote controls Maintenance Tasks place as necessary. Recommend addition of s creep f one issnot present.f screen and re 2. Inspect for scratches, dents or other damage and repair as necessary. 3. Verify no obstructions to airflow through the louvers. 4. Verify maintenance of proper clearance to combustible household objects. 1. Inspect gasket seal and its condition. 2. Inspect glass panels for scratches and nicks that can lead to breakage when exposed to heat. 3. Confirm there is no damage to glass or glass frame. Replace as necessary. 4. Verify that latches engage properly, clip studs are not stripped, and glass attachment components are intact and operating properly. Replace as necessary. 5. Clean glass. Replace glass assembly if severely coated with silicate deposits that cannot be removed. 1. Vacuum and wipe out dust, cobwebs, debris or pet hair. Use caution when cleaning these areas. Screw tips that have penetrated the sheet metal are sharp and should be avoided. 2. Remove any foreign objects. 3. Verify unobstructed air circulation. 1. Inspect for broken, damaged, or missing logs. Replace as necessary. 2. Verify correct log placement and no flame impingement causing sooting. Correct as necessary. 1. Inspect for paint condition, warpage, corrosion or perforation. Sand and repaint as necessary. 2. Replace appliance if firebox has been perforated. 1. Verify burner is properly secured and aligned with pilot or igniter. 2. Clean off burner top, inspect for plugged ports, corrosion or deterioration. Replace burner if necessary. 3. Replace ember materials with new dime-size and shape pieces. Do not block ports or obstruct lighting paths. 4. Check for smooth lighting and ignition carryover to all ports. Verify there is no ignition delay. 5. Inspect for lifting or other flame problems. 6. Verify air shutter is clear of dust and debris. 7. Inspect orifice for soot, dirt or corrosion. 8. Verify manifold and inlet pressures. Adjust regulator as required. 9. Inspect pilot flame strength. Clean or replace orifice as necessary. 10. Inspect thermocouple/thermopile or IPI sensor rod for soot, corrosion and deterioration. Clean with emery cloth or replace as required. 11. Verify millivolt output. Replace as necessary. 1. Inspect venting for blockage or obstruction such as bird nests, leaves, etc. 2. Confirm that termination cap remains clear and unobstructed by plants, etc. 3. Verify that termination cap clearance to subsequent construction (building additions, decks, fences or sheds) has been maintained. 4. Inspect for corrosion or separation. 5. Verify weather stripping, sealing and flashing remains intact. 6. Inspect draft shield to verify it is not bent, damaged or missing. 1. Verify operation of remote. 2. Replace batteries in remote transmitters and battery-powered receivers. 3. Verify batteries have been removed from battery back-up IPI systems to prevent premature battery failure or leaking. 46 Heat & Glo • 6000GCF-IPI, 6000GCF-IPILP • 2110-900 Rev. D • 7/06 Reference Materials A. Appliance Dimension Diagram Dimensions are actual appliance dimensions. Use for reference only. Forframing dimensions and clearances referto Section 3. A g '~ -° 1 D ~ ~ v D 0 0 t GAS LINE E ACCESS ~ ~ ~~ i A CIA A O 1 F I H 1 .o ~ 1 ~= K -I G~ ~ L M O 1 I - - -; O Q 00.0 (.r ~ A 6 G 0 E F G H t J K L M N O P Q 1»ches (28-1/2 14-1/4 21-12 12-7/8 8 38 6-7/8 2-1/8 21-1/2 32-1/4 36-1/8 41-1/8 7 44-3/4 2-1 /4 5 48-1/2 Millimeters ~ 724 362 546 327 203 965 175 54 546 819 918 1045 178 1137 57 127 1232 Figure 16. 1 Appliance Dimensions i 1 ELECTRICAL ACCESS Heat 8 Glo • 6000GCF-IPI, 6000GCF-IPILP • 2110-900 Rev. D • 7/06 47 ~i . B. Vent Components Diagrams I 10-1/2 in. 1 10 in. >~ 1 in. O I t 11-3/8 in. 7-3/8 in I r• • ~ r1 ~- lain. ~9-1/4 i Is-13-1/4 iR. ~ 1/2 in. TYP DVP90, DVP90ST (90° Elbow) 14 in. 12 in. >~ ~ I~--1 in. 8 in. F DVP-FS (Ceiling Firestop) ~- 6 In. r DVP-WS (YYall Shield Firestop) L._J U --I 10 in. h- r- 10 in. : ~ ~ ~1-1/2 In. III I I UP 24 in. 12 in. T 6 in. • 1 i DVP-HVS (Vent Support) DVP-AS (Attic Shield) Figure 16.2 DVP vent components ` Pipe Lengthllnches I I DVP4 4 DVP6 6 DVP12 12 EffectNe DVP24 24 HeighULength DVP36 36 DVP48 48 DVP6A 3 to 6 DVP12A 3 to 12 DVP12MI 3 to 12 DVP24MI 3 to 24 DVP Pipe (see chart) 45° r- 4-7/8 in. ~ T ~ 4 ° i T ~107/8in DVP45 (45°Elbow) _~ 48 Heat & Glo • 6000GCF-IPI, 6000GCF-IPILP • 2110-900 Rev. D • 7/06 B. Vent Components Diagrams (continued) Note: Heat shields MUST overlap by a minimum of 1-1 /2 in. (38 mm). The heat shield is designed to be used on a wall 4 in. to 7-1/4 in. (102 mm to 184 mm) thick. If wall thickness is less than 4 in. (102 mm) the existing heat shields must be field trimmed. If wall thickness is greater than 7-1/4 in. (184 mm) a DVP-HSM-B will be required. 8 in. _~ I (203 mm) Heat Shield \ / ~ ~.~ ~ . 15-1/8 in. 4 (384 mm) HOT NOnintum m~ ~" ite Maxktiwm ~ ms _ I -; c> p ,. INCHES MM INCHES' '~MM . I TRAP1 4-1 /8 1051 5-5/8 143 12 in. _ ~ Max ~ TRAP2 6-3/4 171 10-5/8 270 (305 mm) Effective Length DVP-TRAP Horizontal Termination Cap Wall Shield Firestop DVP-TRAP1 Wall Shiel d Firestop HSM Heat Shield DVP-TRAP2 , / Heat field ~ ~/ / ~B . ~~~~ ~ ~. n ~B . ~0~0. ~•O DVP-TRAP1 DVP-TRAP2 Horizontal Termination Cap Kit i~lrl~r>~hTJ~timirtalbbmo~i~Rshieid) (Shown with optional extended heat shield) Wall Shield Firestop DVP-TRAP1 Wall Shield Firestop DVP-TRAP2 DVP90ST HSM / DVP90ST Heat Shield Heat Shield ~ I . I n ~ ~~~ ~. ~• ~~~• ~~ ~-~ DVP-TRAPK1 DVP-TRAPK2 Horizontal Termination Cap Kit Horizontal Termination Cap Kit Figure 16.3 DVP vent components Heat ~ Glo • 6000GCF-IPI, 6000GCF-IPILP • 2110-900 Rev. D • 7/06 49 B. Vent Components Diagrams (continued) 7-3/5 in.~ I 1-1I21n ~ i .~ 1T-314 in. 141n. I . 12 in. r DVP-T61 Basement Vent Cap DVP-TV Vertical Termination Cap Not for use o-~-ese models. 31 in 245/8 ~~~~ '-1/2 in. 24-5/8 in. 1 in. 13-1/4 in. RFSM Roof Flashing Multi-pak RF12M Roof Flashing Multi-pak i= 13-3/4 in. 1 ~ 51n. ~I • •~ T .. .. 7-114 in. 13-314 in. 12-1/2 in. 5-1/I4 in. I I 1 ~ .I / ~- ' BEK DVP-TVHW Trap Cap Brick Extension Vertical Termination Cap (High wind) r+ 13-7/8 in. J 19-112 in~ \ 11-518 in. ~ ~~~0~ 00 'I 12-1/8 in. ~~~~~ ~~ 7-118 in. 14 in. I ~ I 1 ~~~~~ ~~ i° ~ ~ ~ 5-314 in. DRC-RADIUS COOL-ADD Cap Shield Cap Shield (For use on Infellifire appliances only) PVK-8O Figure 16.4 DVP vent components power Vent 50 Heat ~ Gio • 6000GCF-IPI, 6000GCF-IPILP • 2110-900 Rev. D • 7/06 H EAT G LO_ c• service Parts 6000GCF-IPI where everything comes together ~NGy LP) Exploded Parts Diagram Beginning Manufacturing Date: 5-06 Ending Manufacturing Date: Log Set Assembly Heat ~ Glo • 6000GCF-IPI, 6000GCF-IPILP • 2110-900 Rev. D • 7/06 51 Part number list on following page. C. Service Parts List 6000GCF-IPI IMPORTANT: THIS IS DATED INFORMATION. The most current information is located on your dealers VIP site. When ordering, supply serial and model numbers to ensure correct service parts. ~~ DESCf2IPTtON SERIAL ~ PART NUMBER 1 Surround 2092-103 2 3 4 5 6 7 8 9 10 11 12 13 14 Noncombustible Board Glass Door Assembly Bumer NCB LP Log Grate Log Set Assembly Log 1 Log 2 Log 3 Log 4 Log 5 Junction Box Sheetrock ledge Surround Cover Flue Restrictor Vent Gasket Vermiculite Embers I Mineral Wool Glass Latch Touch Up Paint Refractory Stratford Tan Right Refractory Left Refractory Back Refractory See following page for additional IPI service part numbers. PRE 7/06 POST 7/06 PRE 7/06 POST 7/06 2092-107 2092-107A GLA-0OOOG 2103-007 2103-005 LOGS-6000G S RV2103-107 SRV2103-108 SRV2103-110 SRV2103-109 SRV2103-111 4021-013 2092-110 2092-107A 2092-108 385-128 2025-114 Mystic-Embers 050-721 386-122A TUP-GBK-12 BRICK-6-S S RV2101-472 S RV2101-471 SRV2101-470 52 Heat 8 Glo • 6000GCF-IPI, 6000GCF-IPILP • 2110-900 Rev. D • 7/06 T G I..O,~ service Parts 6000GCF-IPI H EA Where everything comes together (NG, LP) F~CPLODED PARTS DIAGRAM Beginning Manufacturing Date: 5-06 Ending Manufacturing Date: Intermittent Pilot Ignition Valve Assembly 11 2 12 9 SERIAL. # s 10 ITEM pESCFtipTION 1 Valle Bracket 2 Flex Ball Valve AssembN 3 Remote Wire Assembly 4 Wire AssembN 5 Valve NG 5 Valve LP 6 Burner Orifice NG (#37C) 6 Burner Orifice LP (#52C) 7 Module 8 Wire Assemby 9 18" Flepble Gas Connector 10 Pilot AssembN NG 10 Pilot Assembly LP 11 Shutter Bracket AssembN 12 Shutter Assembly Battery Pack 3 Volt Transformer Pilot Spud NG Pilot Spud LP Regulator NG Regulator ILP Conversion Kit NG Conversion Kit LP Gasket Assembly Heat & Glo • 6000GCF-IPI, 6000GCF-IPILP • 2110-900 Rev. D • 7/06 PART NUMBER 2110-102 302-320A 2103-013 2045-024 '750-500 750-501 582-837 582-852 593-592 593-590A 530-302A 2090-012 2090-013 2026-017 2026-130 593-594A 593-593A 593-528 593-527 NGK-DXV LPK-DXV NGK-6G-IPI LPK-6GIPI 2103-081 53 D. Limited Lifetime Warranty LIMITED LIFETIME WARRANTY H EAT~G LO. HEAT $ GLO GAS APPLIANCE PRODUCTS where everything comes together BASIC ONE-YEAR WARRANTY, HEAT & GLO, a brand of HEARTH & HOME TECHNOLOGIES INC., located at 20802 Kensington Boulevard, Lakeville, MN 55044, ("HEAT & GLO") warrants to the original owner that your new HEAT & GLO Gas Appliance (the "Product") will be free from defects in materials and workmanship for a period of one year from the date of installation. During the first year, HEAT & GLO will replace or repair, at its discretion, any defective components at its sole cost and expense, including payment of all reasonable labor costs incurred in replacing or repairing such components. This basic warranty is subject to the conditions, exclusions and limitations described below. EXTENDED LIFETIME COVERAGE, HEAT & GLO warrants that the firebox, heat exchanger, log(s), and burner will not be defective in material or workmanship during the period the Product is owned by the original owner, subject to the following conditions, exclusions and limitations described below. CONDITIONS. EXCLUSION SAND LIMITATIONS: 1. This warranty applies to the original owner only and is nontransferable. 2. This warranty applies only to Products installed in the United States ofAmerica or Canada. 3, This warranty is limited to the replacement or repair of defective components orworkmanship and HEAT & GLO may fully discharge all obligations under this warranty by repairing or replacing, at its discretion, the defective components. The maximum amount recoverable under this warranty is limited to the purchase price of the Product and, if HEAT & GLO is unable to provide replacement or repair in an expedient and cost-effective manner, HEAT 8~ GLO may discharge all obligations under this warranty by refunding the purchase price of the Product. IN NO EVENT SHALL HEAT & GLO BE LIABLE FORANY INCIDENTAL OR CONSEQUENTIAL DAMAGES CAUSED BY DEFECTS IN THE PRODUCT. 4. Any labor and related repair charges relating to the costs and expenses of replacing or repairing defective components under the Limited Lifetime Warranty are not covered by this warranty, except as provided for under the Basic One-Year Warranty. 5. Components and parts made by other manufacturers, whether sold with the Product or added thereafter, are NOT covered by this warranty unless expressly authorized and approved by HEAT & GLO in writing. 6. Any damages caused by environmental conditions, inadequate ventilation or drafting caused by tight sealing construction of the structure, air handling devices such as exhaust fans or forced air furnaces, or other such causes are not covered by this warranty. 7. This warranty will be void if: a) The Product is not installed, operated and maintained in compliance with local building codes and with the instructions in the Installer's Guide, Owner's Guide and Listing Agent Identification Label furnished with the Product. b) Any parts or components made by other manufacturers are added or used in the Product, unless expressly authorized and approved by HEAT & GLO in writing. c) Any service work is performed on the Product by anyone other than an authorized HEAT & GLO representative. d) The Product is damaged due to shipping, improper handling, accident, abuse or misuse. e) Fuels other than those specified in the Installer's Guide and Owner's Guide are used. f) Modification was made to the Product which was not expressly authorized and approved by HEAT & GLO in writing. EXCEPT TO THE EXTENT PROVIDED BY LAW, HEAT & GLO MAKES NO EXPRESS WARRANTIES OTHER THAN THE WARRANTY SPECIFIED HEREIN. THE DURATION OF ANY IMPLIED WARRANTY IS LIMITED TO THE DURATION OF THE WARRANTY SPECIFIED ABOVE. Some states do not allow limitations on how long an implied warranty lasts, or do not allow exclusion or limitation of incidental orconsequential damages, so those limitations may not apply to you. This warranty gives you specific legal rights, and you may also have other rights which vary from State to State. If warranty service is needed you should contact your installing dealer and if the installing dealer is unable to provide necessary parts or components, contact the nearest authorized HEAT & GLO dealer or supplier. NOTES TO CUSTOMER: 1. In order to insure proper installation, operation and maintenance HEAT & GLO strongly recommends annual servicing by an authorized HEAT & GLO dealer. Please complete this information and retain this warranty in a safe place for future reference: Installation Date: Model #: Serial #: _ Installing Contractor: 3. HEAT & GLO reserves the right to make changes at any time, without notice, in design, material, specifications and prices of the Product, HEAT & GLO also reserves the right to discontinue styles and products. m 2005 Hearth 8 Home Technologies Inc. 060-981D 3/05 54 Heat ~ Glo • 6000GCF-IPI, 8000GCF-IPILP • 2110-900 Rev D • 7106 D. Contact Information HEAT~GI_O- Where everything comes together Heat 8~ Glo, a brand of Hearth & Home Technologies Inc. 20802 Kensington Boulevard, Lakeville, MN 55044 www.fireplaces.com Please contact your Heat & Glo dealer with any questions or concerns. For the number of your nearest Heat 8r Glo dealer, please call 1-888-427-3973. -NOTES - CAUTION • DO NOT DISCARD THIS MANUAL n Important operating Read, understand and follow Leave this manual with and maintenance these instructions for safe party responsible for use instructions included. installation and operation. and operation. This prakxY may be covered try one ormore oflhefdWwing patents: (Urrted States) 4593510, 4688807, 4766878, 4793322,4811534, 5000162, 5016609, 5076254, 5113843, 5191877, 5218953, 5263471,5328356, 5341794, 5347983,5429496,5452708, 5542407, 5801073,b813487,5&17340, 5686568,oiocw<,5775408,5~0~485,5931661,5941237,5947112,5996575,6006743,6019099,8048195,8053165,6145502,6170481,6237588,6296474, 6374822,8413079,8439226,6484712,6543698,6550687, 6601579, oor cwu, 6688302(32, 671572482, 6729551, 6736133,6748940, 6748942, 6769428, 8774802, of aow~, 6840261, 6848441, 6863064, oouocw, ax~xr o, 6675012, 6880275, 8908039, 6919884, D320652, D445174, D462436; (Canada) 1297749, 2195264, 2225408, 2313972; (Australia) 780250, 780403, 1418504 or other U.S. and foreign patents pending. Printed in U.S.A. -Copyright 2008 Heat & Glo • 6000GCF-IPI, 6000GCF-IPILP • 2110-900 Rev. d • 7/06 55 TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT 75 S. FRONTAGE ROAD VAIL, CO 81657 970-479-2138 NOTE: THIS PERMIT MUST BE FOSTED ON JOBSITE AT ALL TIMES PLUMBING PERMIT Permit #: P06-0109 Job Address: 3094 BOOTH FALLS CT VAIL Status .. .: ISSUED Location.....: 3094 BOOTH FALLS ROAD , # 1 Applied . .: 09/06/2006 Parcel No...: 210102302001 Issued . .. 09/11/2006 Legal Description: Expires . .: 03/10/2007 Project No OWNER BOONE, CATHERINE S. & MICHAE09/06/2006 7266 S BOULDER RD BOULDER CO 80303 APPLICANT MR. PLUMBER, INC. 09/06/2006 Phone: (970) 574-6768 PO BOX 1563 EAGLE COLORADO 81631 License: 345-P CONTRACTOR MR. PLUMBER, INC. 09/06/2006 Phone: (970) 574-6768 PO BOX 1563 EAGLE COLORADO 81631 License: 345-P Desciption: GAS LINE FOR BOILER, RANGE, FIREPLACE, BBQ, NEW DINING AND WOTER FOR KITCHEN SINK AND BAR SINK Valuation: $4,000.00 Fireplace Information: Restricted: ?? # of Gas Appliances: ?? ****~**************************************************************** FEE SUMMARY ************************************************************ Plumbing---> $60.00 Restuarant Plan Review--> $0.00 Plan Check---> $15.0 0 TOTAL FEES-- •-> $ 7 8.0 0 Investigation-> $ 0.0 0 Will Call-----> $3.00 Item: 05100 BUILDING DEPARTMENT 09/06/2006 CG Action: AP Item: 05600 FIRE DEPARTMENT # of Gas Logs: ?? # of Wood Pallet: ?? Total Calculated Fees---> $78.00 Additional Fees-----------> $0.00 Total Permit Fee----------> $78.00 Payments------ -----> $78.00 BALANCE DUE---------> $0.00 ********************************************************** CONDITION OF APPROVAL Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2149 OR AT OUR OFFICE FROM 8:00 AM - 4 PM. `-77~ SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNEF *~r***~~~~***~*******,r******************************************************************~**~* TOWN OF VAIL, COLORADO Statement Statement Number: 8060001408 Amount: $78.00 09/11/200612:06 PM Payment Method: Check Init: LC Notation: #238/Mr. Plumber Inc. ------------------- Permit No: ----------------------------------------------- P06-0109 Type: PLUMBING PERMIT ----------- Parcel No: 2101-023-0200-1 Site Address: 3094 BOOTH FALLS CT VAIL Location: 3094 BOOTH FALLS ROAD #1 Total Fees: $78.00 This Payment: $78.00 Total ALL Pmts: $78.00 Balance: $0.00 ACCOUNT ITEM LIST: Account Code ----------------- _ Description Current Pmts --- -- PF 00100003112300 ---------------------------- ---- PLAN CHECK FEES -------- 15.00 PP 00100003111100 PLUMBING PERMIT FEES 60.00 WC 00100003112800 -------------------- WILL CALL INSPECTION FEE ----------------------------------------------- 3.00 ---------- APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UNSI~~!~~~ , O~3 / Project #: I Building Permit #: ~l~C - C~~d\ .._ ~ ~' Plumbing Permit #: ~ l ~~ ~ritLr ` O ~ - ~ l ~ 970-479-2149 (Inspect~bn~)" ~ r 75 S. Frontage Rd. Vail, Colorado 81b57 TOWN OF VAIL PLUMBING PERMIT APPLICATION CONTRACTOR INFORMATION Plumbing Contractor: Town of Vail Reg. No.: Contact Person and~Phone #'s: ' E-Mail Address: r Fax #: C~~ ~ c~~N _ ~~ ~}`~ Contractor Signa COMPLETE VALUATION FOR PLUMBING PERMIT (Labor & Materials) ~~ PLUMBING: $ ~,~ (O ~ ~ Contact Eaq/e County Assessors Office at 970-328-8640 0~ visit www, eao%-county, com fog Pace/ # Parcel # GZ ~ ~ -~ _ t'~`~'~ -- G `? G (1 -- ,1 Job Name: vv~~ Job Address: ~ (~ c:~.1~t Y ; n~ ~ ~`'~'; ~~\Ct~\ ~Oc :fir 'ZZ1 G1~ ~a c,~h ~~~~~~ Q.~ ~egal Description ~I Lot: '~_ ~I Block: ~ ~I Filing: ~ Subdivision: Owners Name: Address: Phone: Engineer: II Address: I~ Phone: Detailed description of work: GR~ \~~ "r a + C3 v:`~c ~ ~ k_c~~z ~ ~ ~ c~~c< <c ~ br~v~c~c - ~~~ art>r~ r,9~~, `.,~~~C« ~c;r i~'.~~~~r-~ `~ai1~'~ ~ ``~~ ~-,tit~`C: Work Class: New () Addition (~) Alteration ( ) Repair ( ) Other ( ) Type of Bldg.: Single-family ( ) Duplex ( ) Multi-family ( ) Commercial ( ) Restaurant ( )Other ( ) No. of Existing Dwelling Units in this building: 1~ No. of Accommodation Units in this building: *************************************~*FOR OFFICE USE ONLY*:~******************************~**** - i,~; ~g o i coos L TOWN CAF vn I I F:\cdev\FORMS\PERMITS\Building\plumbing_permit_11-23-2005.doc Page 1 of 1 11/23/2005 ~~ ,. ?OfPN OF PAIL ~~ HOW DID WE RATE WITH YOU? Town of Vaii Survey Community Development Department Russell Forrest, Director, (970) 479.2139 Check all that applies. 1. Which Department(s) did you contact? Building Environmental Housing Admin Planning DRB PEC 2. Was your initial contact with our staff immediate slow or no one available ? 3. If you were required to wait, how long was it before you were helped? 4. Was your.project reviewed on a timely basis? Yes I No if no, why not? 5. Was this your first time to file a DRB app PEC app Bldg Permit NIA 6. Please rate the performance of the staff person who assisted you: 5 4 3 2 1 Name: (knowledge; responsiveness, availability) 7. Overall effectiveness of the Front Service Counter. 5 4 3 2 1 8. What is the best time of day far you to use the Front Service Counter? 9. Any comments you have which would allow us to better serve you next time? Thank you for taking the time to complete this survey. We are committed to improving our service. ~a° ~~ r `~ C ,y J ~~ ~ "1~J ~~ (~ ~ ~rC ~ rc(~~c~cc __.~- s_ G5~ 00~ ~~~ Z~~~~~ O r // ~. ~_% ~ : ~^ 7 ~ J~?'- 4 p q ~ ~nC ~c.CVC Q> vy. ~ \~ ~~ 'S o- . J1~, s. `~. ~2' i~-'_ ~~ r~ v ~ r ~ ~ ~ ~ r ~° ~~ ~ o G i r ~~ ~~ r~ ~ ~ ~ o a C. .~ _ ~~ 04-23-2008 Inspection Request Reporting 4:10 qm fail, C_ O - Citw Of Requested Inspect Date: Thursday, April 24, 2008 Inspection Area: CG Site Address: 3094 BOOTH FALLS CT VAIL 3094 BOOTH FALLS ROAD , #1 A/P/D Information Activity: 605-0206 Type: A-MF Sub Type: AMF Const Type: Occupancy: Use: V-A Owner: BOONE, CATHERINE S. & MICHAEL Contractor: BOONE, CATHERINE & MICHAEL Phone: (303) 499-2434 Description: ENCLOSURE OF SOUTHSIDE DECK FOR BEDROOM ADDITION Page 5 Status: ISSUED Insp Area: CG Requested Inspectionfs~f Item: Requestor: Comments: Assigned To: Action: Comment: 90 BLDG-Final BOONE, CATHERINE SOUTH DECK ENCLC JMONDRAGON VV1LL I:HLLtU NkiAN CHAEL E; JOBSITE PHONE 970-476- By: LCAMPBELL K ~ta~ t~HNt;EL INSP Requested Time: 10:30 AM ~-~, Phone: 303-517-0842, CATHERINE ;- 10"47 Inspection History Item: 30 BLDG-Framin g "Approved " 09/07/05 Inspector: JRM Action: AP APPROVED Comment: Item: 50 BLDG-Insulati on 12/19/05 Comment: Inspector: MROYER Action: APCR APPROVED/CORRECTION REOD Relocate exhaust and hose bib that is still inside the storage area Item: C . 60 BLDG-Sheetrock Nail "Approved "* `, 12/20/05 Comment: Inspector: SHAHN Action: AP APPROVED INSPECTED SCREWS FOR ADDITION AND UNDERDECK Item: 90 BLDG-Final . 12/11/07 Comment: Inspector: JRM Action: NO NOTIFIED WILL CALLED NO ANSWER NO ACCESS CANCEL INSPECTION Item: 534 PLAN -FINAL C/O "" Approved "` 08/24/07 Inspector: bgibson Action: AP APPROVED Comment: REPT131 Run Id: 7906 ~-- 04-23-2008 Ins~ecti~n Re 4:10 pm Veil, CI Requested Inspect Date: Inspection Area: Site Address: A/P/D Information ~ue~__C~ ~~®rting Thursday, April 24, 2008 CG 3094 BOOTH FALLS CT VAIL 3094 BOOTH FALLS ROAD , #1 Activity: 605-0367 Type: A-MF Sub Type: AMF Const Type: Occupancy: Use: V-B Owner: BOONE, CATHERINE S. & MICHAEL Contractor: BOONE, CATHERINE & MICHAEL Phone: (303) 499-2434 Description: WEST PECK ENGLOSURE Reouested C Inspection History Page 6 Status: ISSUED Insp Area: CG 90 BLDG-Final Requested Time: 01:00 PM BOONE, CATHERINE & MICHAEL Phone: 303-517-0842, CATHERINE NU H(:1:t55 J~OSURE; JOBSIT~I- HONE 970-476-1047 Time Exp:I Entered By: LCAMPBELL K ~ Item: 10 BLDG-Footings/Steel + UFER rd ** Approved ** 03/06/06 Inspector: JRM Action: AP APPROVED Comment: Item: 20 BLDG-Foundation/Steel ** Approved ** 03/06/06 Inspector: JRM Action: AP APPROVED Comment: 03/09/06 Inspector: JRM C Action: AP APPROVED Item: omment: SLAB APPROVED 30 BLDG-Framing ** Approved ** /~ 04/11/06 Inspector: shahn C b Action: AP APPROVED I I V omment: edroom and basement inspected ~ I Item: 50 BLDG-Insulation ** Approved ** 04/13/06 Inspector: JEC Action: AP APPROVED It . Comment: Paper on insulation in walls to be removed in basement at final & vapor barrier installed 60 BLDG Sh ** ** em: - eetrock Nail Approved 04/20/06 Inspector: JEC Action: AP APPROVED Comment: Main floor only. No rock in baseme nt Item: 90 BLDG-Final 12/11/07 Inspector: JRM Action: DN DENIED Comment: NO ACCESS Item: 534 PLAN -FINAL C/O ** Approved ** 08/24/07 Inspector: bgibson Action: AP APPROVED Comment: REPT 131 Run Id: 7906 04-23-2008 Inspection Request Reporting Page 7 4:10 rJm Mail, CO -City ~f A/PID Information Requested Inspect Date: Thursday, April 24, 2008 Ins ection Area: CG Site Address: 3094 BOOTH FALLS CT VAIL 3094 BOOTH FALLS ROAD , #1 Activity: 606-0081 Type: A-MF Sub Type: AMF Const Type: Occupancy: Use: V-B Owner: BOONE, CATHERINE S. & MICHAEL Contractor: BOONE, CATHERINE & MICHAEL Phone: (303) 499-2434 Description: BOOTH FALLS MTN HOMES #1-NORTH DECK ENCLOSURE/ADDITION Requested Insoectionfsl ~, ,~ Item: Requestor: Comments: Assigned To: Action: Comment: Comment: Ins4ection History Item: 10 BLDG Item: 20 ~i RINE $~ MICHAEL NCL,QSSURE; JOBS Time Exo: Vl Status: ISSUED Insp Area: CG Requested Time: 02:00 PM Phone: 303-517-0842, CATHERINE 970-476-1047 Entered By: LCAMPBELL K A FOUNDATION DRAIN INSPECTION. CALLED BACK i ONE WAS NOT REQUIRED. HE THOUGHT ~Q6_~~OS + UFER grd "` Approved " tor: JRM Action: DN DENIED =LLED BY CONTRACTOR tor: JRM Action: AP APPROVED PROVIDE SOILS REPORT .APPROVED FOOTERS GC PROCEEDING AT OWN RISK /ILL TEAR OUT IF SOILS REPORT PROVES DIFFERENT gel "'" Approved " 06/08/06 Inspector: JEC Action: AP APPROVED Comment: NOT READY FIRST TRIP. HAD CALLED FOR 3:00 POUR. POUR CANCELLED. READY AT 2:00 & APV'D 06/16/06 Inspector: JRM Action: AP APPROVED Comment: SLAB ON GRADE Item: 30 BLDG-Framing 10/10/06 Inspector: JRM Action: DN DENIED Comment: fireplace permit in plan check no inspection 10/13/06 Inspector: NSC Action: PI PARTIAL INSPECTION Comment: partial inspection on frame only because fireplace is still in plan check and builder needs to submit letter for plan changes. Item: 50 BLDG-Insulation "* Approved 10/17/06 Inspector: shahn Action: COND APPROVED/CONDITIONS Comment: INSULATION APPROVED PENDING INSULATION INTALLATION CERTIFICATE. Item: 60 BLDG-Sheetrock Nail "' Approved "" 10/25/06 Inspector: JRM Action: PA PARTIAL APPROVAL Comment: APPROVED KITCHEN AND UPPER AREA ONLY 07/11/07 Inspector: JRM Action: PA PARTIAL APPROVAL Comment: APPROVED ALL EXCEPT FOR UNDER STAIR STORAGE AREA Item: 90 BLDG-Final REPT131 Run Id: 7906 08-17-2007 Inspection Request Re orting Page 38 4:10 Dm V ' Requested Inspect Date: Monday, August 20, 2007 Inspection Area: SH Site Address: 3094 BOOTH FALLS CT VAIL 3094 BOOTH FALLS ROAD , #1 A/P/D Information Activity: E05-0193 Type: B-ELEC Sub Type: AME Status: ISSUED Const Type: Occupancy: Use: Insp Area: SH Owner: BOONE, CATHERINE S. & MICHAEL Contractor: BOONE, CATHERINE & MICHAEL Phone: (303) 499-2434 Description: relocate 2 electrical outlets and add one new; relocate existing baseboard heater. Requested Insoection(sR Item: Requestor: Comments: Assigned To: Action: 190 ELEC-Final BOONE, CATHERINE 8~ MICHAEL WILL CALL ';~Q~,7, NO NAME LEFT SHAHN Time Exp: ~, i~~ Requested Time: 08:30 AM Phone: (303) 499-2434 Entered By: LCAMPBELL K ~/rl2 DV~ S~,9,/ Inspection History Item: 110 ELEC-Service Item: 120 ELEC-Rough 09/07/05 Inspector: shahn Action: APCR APPROVED/CORRECTION READ Comment: RECEPTACLES IN BEDROOM AT FNAL ULT PROTECTION WILL BE REQUIRED FOR NEW SMOKE DETECTORS WILL BE REQUIRED IN BEDROOMS AND OUTSIDE BEDROOMS AT FINAL. Item: 130 ELEC-Conduit Item: 140 ELEC-Misc. Item: 190 ELEC-Final REPT131 Rua Id: 6998 08-17-2007 Inspection Request Reporting Page 39 4:10 ~m Vail, CO -City Of Requested Inspect Date: Monday, August 20, 2007 Inspection Area: SH Site Address: 3094 BOOTH FALLS CT VAIL 3094 BOOTH FALLS ROAD , #1 A/P/D Information Activity: E06-0022 Type: B-ELEC Sub Type: AMF Status: ISSUED Const Type: Occupancy: Use: Insp Area: SH Owner: BOONE, CATHERINE S. ~ MICHAEL Contractor: BOONE CATHERINE & MICHAEL Phone: (303) 499-2434 Description: REPLAG~ING AN ELECTRICAL PANEL Requested Insoection(s) Item: 190 ELEC-Final Requestor: BOONE, CATHERINE & MICHAEL Comments: WILL CALCi°A`~, NO NAME LEFT Assigned To: SHAHN Action: Time Exp: Requested Time: 09:30 AM Phone: (303) 499-2434 Entered By: LCAMPBELL K ~~,~rK~ ~~ Inspection Historq Item: 110 ELEC-Service Item: 120 ELEC-Rouggh Item: 130 ELEC-Conduit Item: 140 ELEC-Misc. Item: 190 ELEC-Final ~~~ REPT131 Run Id: 6998 _ _ - "~ 08-17-2007 4:10 Dm A/P/D Information Inspec~a, CeQquest Reporting Requested Inspect Date: Monday, August 20, 2007 Inspection Area: SH Site Address: 3094 BOOTH FALLS CT VAIL 3094 BOOTH FALLS ROAD , #1 Activity: E06-0041 Type: B-ELEC Const Type: Occupancy: Owner: BOONE, CATHERINE S. & MICHAEL Contractor: BOONE CATHERINE & MICHAEL Description: WEST BECK ENCLOSURE ELECTRICAL-I RELOCATE 1 OUTLET, 1 LIGHT AND SWI' Requested Inspection(s~ Item: 190 ELEC-Final Requestor: BOONE, CATHERINE & MICHAEL Comments: WILL CAL~I~O NAME LEFT Assigned To: SHAHN Action: Time Exp: Page 40 Sub Type: AMF Status: ISSUED Use: Insp Area: SH Phone: (303) 499-2434 3 OUTLETS; ADD 1 OUTLET AT LEVEL 2; Requested Time: 09:00 AM Phone: (303) 499-2434 Entered By: LCAMPBELL K Fw,~ ~0~~~~-1~ ~5~.~, Inspection History Item: 110 ELEC-Service Item: 120 ELEC-Rou h Item: 130 ELEC-Conduit Item: 140 ELEC-Misc. ** Approved'"` 04/11/06 Inspector: shahn Action: AP APPROVED Comment: rough approved. arc fault and smok detectors required at final inspection. Item: 190 ELEC-Final REPT131 Run Id: 6998 02-01-2007 Inspection Request Reporting Page 16 4:18 om ~/ail~ GO _ Ci v ~f A/P/D Informal Activity: Const Type: Owner: Applicant: Contractor: Description: Requested Inspect Date: Friday, February 02, 2007 Inspection Area: SH Site Address: 3094 BOOTH FALLS CT VAIL 3094 BOOTH FALLS ROAD , #1 :ion E06-0154 Type: B-ELEC Occupancy: BOONE, CATHERINE S. & MICHAEL OTTO'S ELECTRICAL SERVICE, INC. OTTO'S ELECTRICAL SERVICE, INC. WIRE NEW ADDITION Requested Inspectionlsl Item: 190 ELEC-Final Requestor: OTTO'S ELECTRICAL SERVICE, INC. Comments: will call Otto 904-0126, unit #1 Assigned To: SHAHN Action: Time fxp: Sub Type: ADUP Use: Phone: (970) 328-9382 Phone: (970) 328-9382 Status: ISSUED Insp Area: SH Requested Time: 08:00 AM Phone: 904-0126 Entered By: DGOLDEN K Inspection History p~ ,~ A ~ n ~' Item: 110 ELEC-Service 1~" ~ ~'//+' („~ / 11Y/~9,(~ Item: 120 ELEC-Rough *" Approved ""' ,I 10!05/06 Inspector: SHAHN Action: AP APPROVED Comment: ROUGH FOR THE NEW ADDITION UPPER, MAIN AND MECH ROOM. Item: 130 ELEC-Conduit Item: 140 ELEC-Misc. ~ ~ ~ ~(~/' Item: 190 ELEC-Final ~- a. C I/ `VG a~'7. rr ~v ~ r~ 7 e COOL ~ N 5 (~ ~r /t be ~2eP ~~ ~ 6/,~ dew C~~~az~, D~R,", ~N r~~ / ~ / REPT131 Run Id: 6336 } s 08-21-2007 4:13 r,m Inspection Request Reporting Vail_,_C~ _CitTOf Page 38 Requested Inspect Date: Wednesday, August 22, 2007 Inspection Area: CG Site Address: 3094 BOOTH FALLS CT VAIL 3094 BOOTH FALLS ROAD , #1 AIP/D Information Activity: M06-0245 Type: B-MECH Sub Type: AMF Status: ISSUED Const Type: Occupancy: Use: Insp Area: CG Owner: BOONE, CATHERINE S. & MICHAEL Contractor: MR. PLUMBER INC Phone: (970) 574-6768 Description: COMPLETE HYDRONIC HEAT INSTALLATION Requested Inspection(st< Item: 390 MECH-Final Requestor: MR. PLUMBER INC/ Dan Comments: Unit #1 /will calf Dan Assigned To: GDENCKLA Action: Time Exp: ~i~~ Requested Time: 01:00 PM Phone: 970-476-1047 red By: LTILLMAN K ~' v~ ~~, 'V off, ~~ 6 ~i ~ ~-, a Inspection History ~ ~~ ( Item: 200 MECH-Rou h *' Approved ""` 10/06/0 Inspector: cdavis Action: AP APPROVED Comment: 100 # airtest on all heat hydronics radient floors, base boards & heat mains. installed. have not run co enstae f fines or vent for boiler Item: 310 MECH-Heating. Item: 315 PLMB-Gas Piping Item: 320 MECH-Exhaust Hoods Item: 330 MECH-Supply Air Item: 340 MECH-Misc. Item: 390 MECH-Final REPT131 ~J Run Id: 7007 ~'1 08-21-2007 4:14 Dm Inspection Request Reporting /ail, CO - CitTQf Requested Inspect Date: Wednesday, August 22, 2007 Inspection Area: JRM Site Address: 3094 BOOTH FALLS CT VAIL 3094 BOOTH FALLS ROAD , #1 A/P/D Information Activity: M06-0287 Type: B-MECH Sub Type: AMF Const Type: Occupancyy: Use: ContOractor: WEOSTE~2NAFIREPLACE~SUPPLYAINC. Phone: (719) 591-0020 Description: INSTALL FIREPLACES Reauested Insoection(sl Item: 390 MECH-Final Requestor: WESTERN FIREPLACE SUPPLY, INC.! Dan Comments: Unit #1 /will call Dan Assigned To: GDENCKLA Action: Time Exp: Insaection History Item: 200 MECH-Rouggh Item: 310 MECH-Heafing Item: 315 PLMB-Gas Piping Item: 320 MECH-Exhaust Hoods Item: 330 MECH-Supply Air Item: 340 MECH-Misc. ** Approved ** 10/12/06 Inspector: NSC Comment: Fireplace cleaence is good. Item: 390 MECH-Final Page 54 Status: ISSUED Insp Area: JRM Requested Time: 01:30 PM Phone: 970-476-1047 Entered By: LTILLMAN K ~~~ ~ ~~ Action: AP APPROVED REPT131 Run Id: 7007