Loading...
HomeMy WebLinkAboutPRJ02-0129 B02-0097 LEGALTO\^/N OF VAIL DEPARTMENT OF COMMUMTY DEVELOPMENT 75 S.FRONTAGEROAD VAIL, CO 81557 970-479-2138 NOTE: THIS PERMIT MUST BE POSTED ON TOBSITE AT ALL TIMES ADD/ALTMFBUILDPERMIT Permit #:802-0097 ]ob Address.: 2844 SNOWBERRY DRVAIL Status.....: ISSLIED Location......: 2854 SNOWBERRY DR Applied...r 04/29/2002 Parcel No....: 21.0314301,057 Issued...: 05/01,/2n2 ProjectNo...: ?RT OA -ol2-1 Expires...: 1.0/28/2ffi2 owNER PETERSON, THOMAS iI. & SttE r,.O4/29/2O02 phone: 2854 A SNOWBERRY DR VAIL CO 8l_ 65 7 I-,icense : CoNTRACTOR WESTERN MTN. ROOFING & SHEET} /29/2002 phone: 970-328-3300 P.O. BOX 3052 EAGI-,E, CO 81631 I-,icense I 58 9-S APPL,ICAIflT WESTERN MTN. ROOFING & SHEETO /29/2002 Phoner 970-328-3300 P.O. BOX 3062 EAGLE, CO 81631 License: 589 -S Desciption: DEMO OF ROOFING-SAME FOR SAME Occupancy: Type Construction: Type Occupancy: ?? Valuation: $8,000.00 Fi.replace Information: Restricted: Y AddfuFr 0 # of Gas Appliances: 0 # of Gas l-ogs: 0 # of SO. o0 Total Calculated Fees-> $209.25 S0.00 AdditionalFees-->so.0o SO. OO Total pe,rmit Fee_> S2O9 .25 S0 .00 Payments-----> 5209 .25 TOTALFEES---> g2oe.2s BALANCE DUE-> Wood Pellel Building--> $125.00 Restuarant Plan Review-> Plan Check-> Investigation-> Will CalI--> S81- 25 DRB F€e-_--_> S0 . 00 Recleation Fee------> $3 .00 Clean-up Dq)osit-> $0. 00 Approvals: I€e.m: 05100 BUILDING DEPARTMENI o4/29/2oo2 DF Action: Ap Item: 05400 PLANNING DEPARTMENT Item: 05600 FIRE DEPARTMEMr Item: 05500 PUBLIC WORKS PAGE2 *#***********r*ffi#'H*****!t***********n*r|************,*it****rnt***************rr*********iht*!}lts*rt*rt***li:* CONDITIONSOF APPROVAL Perrrit#: 8;024097 asof 0F01-2002 Status: ISSUED *dil**!t!t!t"ltitt+ih|lhl******!t*lnt**rH!*************x**********************:h*rt*!ht***fitt*lr*dit**!t*!t************* PermitType: ADD/ALTMFBUILDPERMIT Applied: M/29/20O2 Applicanf WESTERNMTN.ROOFING&SHEETMETL Issued; 05/01./2002970-328-3300 ToExpire: 70/28/2002 Job Address: 2844 SNOWBERRY DR VAIL Location: 2854 SNOWBERRY DR Parcel No: 210374301057 Description: DEMO OF ROOFING-SAME FOR SAME Conditions: Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: 14 (BLDG.): ALL PENETRATIONS IN WALIS,CEILINGS,AND FLOORS TO BE SEALED WITH AN APPROVED FIRE MATERIAL. Cond:15 (BLDG.): SMOKE DETECTORS ARE REQURED IN ALL BEDROOI{S AND EVERY STORY AS PER SEC.310.6.1 OF THE 1997 UBC. Cond:1 (FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY WORK CAN BE STARTED. See page 2 of this Document for any conditions that may apply to this permit. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the infonnation required, completed an accurate plot plar; and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoninp and subdivision codeg design review approved, Uniform Building Code and other ordinances of the Town appticable thereto. REQTJESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS PM. Send Clean-up Deposit To: N/A CTOR FOR HIIViSELF AND OWNEI _#* 75 S. Frontage Rd. ! Building Vail, 1'to- 328- @ g'so COMPTETE VATUATIONS FOR BUILDING PERMIT tabor & Materials Contad Assessors Office at 97O-328-864O or visit BUILDING: $ TOTAL: $ 4\ nt b5a ,ooo9'ffi1 s ta9lalalian a/ /d/l r*f at4atwsi WorkClass: New( ) Addition( ) Remodel\{ Repair( ) Dem() Other( ) Work Type: Interior ( ) Exterior fuf Both ( )Does an EHU exist at this location: Yes ( ) No tra) Typeof Bldg.: Single-family( ) Two-familyOO MultFfamily( ) Commercial ( ) Restaurant( ) Other( ) No. of Existing Dwelling Units in this No. of Accommodation Units in this building: GasLoos( ) Wood/Pellet( ) Wood Does a Fire Alarm Exist: Yes Yes( ) Nd *********************:l****************FoR oFFICE USE ONLY********************************:r{tjrt!* DRB F:/everyone/forms/bld gperm IUMYOF WHEN A *PUBLIC WAY PERMIT" IS REQUIRED PLEASE READ AND CHECK OFF EACH OF THE FOLLOWING QUESNONS "PUBLIC WAY PERMIT": a Is this a new residence? YES o Does demolition work being performed req REGARDING THE NEED FOR A of-Way, easements or o tr t-.| o public propefi?YES Is any utility work needed? YES Is the driveway being repaved? Is a different access needed to the site other than the tEl1"tfi"5t"* donethat No-x- '''fiJH'""9*t1 ng driveway? YES- NOX- the Rioht-of easements, or public property? Is a "Revocable Right-of-Way Permit" required?No/- propeny be used for staging, parking or fencing? ng plan required by Public Works? If you answered YES to any of these questions, a "Public Way Permit" must be obtained. "Public Way Permif'applications may be obtained at the Public Work's office or at Community Development (a sample is attached). If you have any questions please call Leonard Sandoval in Public Work at 479-2t98. ANSWERED ALL THE ABOVE QUESTTONS. Contractor Signature Job or Project Name: fl(t t?l4n Date Signed: F : I ev ery one I f or ms I bldperm4 LO/o z How it relates to Building Permits: Fill out the attached list with the Buildinq Permit Aoplication. If yes was answered to any of the questions then a "Public Way" permit is required. You can pick up an at either Community Development, located at 75 South Frontage ted at 1309 Elkhorn Drive.Road or Public Works, Notice sign-offs for ity companies. ALL utilities must field verifu (locate) respective utilities prior to signing schedule a locate. pplication. Some utility companies require up to 48 hours notice to A construction traffic ing plan must be prepared on a separate sheet of paper. An approved site plan devices (signs, cones, plan will expire on also be used. This will show locations of all traffic control ) and the work 1st and area of construction, staging, etc.). This to be resubmitted for consideration for t--{\ Sketch of work being $erformed must be suUmiha*.hdlcating dimensions (length, width and depth of work). Thfs maV be drawncnJhq$ffic control plan or a site plan for the job. Submit completed applifation to the Public Worf'hce for review. If required, locates will be scheduled for the Town of Vail electricians and irrilation crew. The locates take place in the morning, but may require up to 48 ho\$pe#6rm. \_ The Public Work's Con{truction Inspector will revielEthe application and approve or deny the permit. You will $e contacted as to the status and any requirements that may be needed. Most permits bre released within 48 hours of being received, but please allow up approval through the for winter may be denied depending on the to one (1) week to procFss. As soon as the permit [s approved, the Building Department will be notified, allowing the "Building Permit" to be released. Please do not confuse the "public way permit" with a "Building Permit". I ) NorE: The abovel p(rcess is for work in a public way oNLy. public way Permits are valid onlf until November 15th. A new Public Way Permit is required each year if work is itot complete. Re-applicaUon each November 15th does not mean an automatic r€newal. /I bate SignedSagnature F:/everyone/forms/bldperm5 the above. TUMYOF BUILDING PERMIT ISSUANCE TIME FRAME If this permit requires a Town of Vail Fire Department Approval, Engineer's (Public Works) review and approval, a Planning Depaftment review or Health Department review, and a review by the Building Department, the estimated time for a total review will take as long as three (3) weeks. All commercial (large or small) and all multi-family permits will have to follow the above mentioned maximum requirements. Residential and small projects should take a lesser amount of time. However, if residential or smaller projects impact the various above mentioned departments with regard to necessary review, these projects may also take three (3) weeks to review and approve. Every attempt will be made by this department to expedite this permit as soon as possible. I, the undersigned, understand the plan check procedure and time frame. I also understand that if the permit is not picked up by the expiration date, that I must still pay the plan check fee and that if I fail to do so it may affect future permits that I apply for. Agreed to Project Name: Date: Signature F: everyone/forms/bldperm3 pw*:I[-[!nI APPLlcArloN parcer#:InIn-IIX-II-III Rh FoR rowN oF vArL n -.1 f*/_ J PuBLfcwAYPERMtT 1e- Brds. Perrnit#,EI f,'f I I L T*WNffiy 1,Job Name Str€ol Addresg Tl n n-[l (ttunknorvncallI | | I | | I | 479-Ztg8ext.0) 4. 5. Excavating Conlractor Name Start Date Work is for (cirde on€) Other Trench-width (min.4') Bond Amount $ 6. ALL MATERIAL, EOUIPMENI JOB IS STARTED. 7. L Rubber out-riggers are required qn Asphalt surfaces undemeath thet A signature below indicates a signatures are obtained, necessary Town of Vail Public Service Company (1 working on asphalt. at all times. utility locations and approvals. Once all utility company appllcation through the Pubtic Works ofiice to obtain the up to one week to process. Mailing Address TOV Contraclor's Liconse Numb€r REOUIRED () Phone # Complstlon Date (Permit Expiration Date) Water Sewer Gas Electric Telephone CATV Landscaping Temp. Site Access Depth ToralsF $ TotalLF $ Permit Fee Total Permit Fee $ BE ON THE JOBSITE BEFORE THED TRAFFIC Public Service Nalural Gas Group (1-800-922-1987) U.S. West (1 -800-922-1987) Holy Cross Electric Company (1€00-922-1987) Town of Vail Electricians (970-479-2158) Inspector (970-479-21 98) CLOSURESI A construction trafiic control plan must be approved by the Public Works Department prior to issuance of the permit. All excavation must be done by hand within 18'of utilities - (Senale Bill 172).10, 11. 12. Contractor's Signalure of Agre€ment ATTACH PLAN OF WORK, INCLU Prlnt name cl€arly CONSTRUCTION TRAFFIC CONTROL PLAN location of cuts. USE DASH LINES FOR CUT. ';!. Failure to notiiy Date of Signature Whit€ - Public Works Yellow - Contrador. the Town will result in forfeiture bond money. Scheduled inspections which ar€ not ready may result in the Town charging the contractor a loe. I certify that I have read all chapters of Title I - Public Ways and Property, of the Vail Municipal Code and all utility company agreements, signed by me, and will abide by the same, and that all utilities have been notified as required. Show streets with names, buildings, Please read and check off each of the items below: o The Town of Vail Building Department has developed the following procedures to ensure that new construction sites have adequately established proper drainage from building sites along and adjacent to Town of Vail roads or streets. o The Town of Vail Public Works Department will be inspect and approve drainage adjacent to Town of Vail llation of temporary or permanent culverts at access points the to ny requests inspection by the or the construction site. Such approval must be bbtal Town of Vail Buildi I or any other inspection. Please cal 479-21 request an inspection from the Public Works Department.a mini mof24 notice. o Also, the Town of Vail Public Works will be approving all final drainage Such approvaland culvert installation with resulting road patching as necessary. must be obtained prior to any Final Certificate of Occuoancv issuance. Agreed to by: Print Name Project Name: Date Signed: required F:/everyon{forms/bldperm6 Signature F Please read and check off each of the items below. (Cqpies of complete text are available upon request) CODE 5-Z.IO: DEFOSITS ON PUBUC WAYS PROTIIBITED Unlawful deposits: Subjedt to subsection C thereof, it is unlawful for any person to litter, track or deposit or cause to be littered, tracked or deposited, sand, gravel, rocks, mud, dirt, snow, ice, or any other debris or material upon any street sidewal( alley or public place, or any portion thereof. cruse any such sand,rocks, mud,snow, ice, debris or any other material to be removed from any street or alley at tfle expense of the a: Summons and any person who before the M hereunder be an alternative another Town for in Section for any in for removal provided in subsection B above, may be issued a summons to appear upon being found guilty of a violation fl\ Notice and Pel/ Director of Public to comply with the notice of the such person shall, in addition to payment of the I incuned by of Publii as Drovided in subsection B hereof, upon being of a violation be punishable as provided in Section 1-4-1 of this Code. (1997 nce 6 (1979). $ Whenever any police officer finds a vehicle attended or unattended, standing upon any portion of a/ street or upon any place vfithin this Municipality in such a manner as to constitute a violation of any section of this Article, or leff unattended for a period of twenty four (24) hours or more and presumed to be abandoned under the londitions prescribed by Colorado Revised Statutes section 42-4-1102, as amended, the officer shall require the vehicle to be removed or @use it to be removed and placed in storage in the nearest garage or other place of safety designated or maintained by this Municipality, and the charges for towing and storage of such vehicle shall be charged to the owner of the vehicle in Position or Relationship to Project Date Signed: F:/everyone/forms/bldp€rm? /)1aa