Loading...
HomeMy WebLinkAboutPRJ04-0286 B04-0287 LEGALTOWN OF VAIL DEPARTMENT OF COMMT]NITYDEVELOPMENT 75 S.FRONTAGEROAD VAIL, CO 81657 970-479-2138 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TMES ADD/ALTMFBUILDPERMIT Permit #: 804-0287 OWNER PEARSON, VICKr - DE MOCTE?LI409/27/2004 phone: BARBARA PO BOX 6235 VAIL CO 81-558 License: CONTRACTOR MASTER SEALERS 09/27/2004 Phone: 910-475-3975P. O. BOX 4473VAIL, CO tJl-bfd I-,icense: 577-B APPLTCANT MASTER SEAIJERS 09/27/2004 Phone: 9'70-416-3975P. O. BOX 4473VA]L, CO 81658 License : 577 -B Desciption: REROOF OVER EXISTING TO MATCH UNITS NEXT DOOR, GRAVEL. THIS WORK THAT WAS APPROVED SAME FOR SAME BY ANOTHER CONTRACTOR THAT WAS NOT COMPLETED CORRECTLY Occupancy: Type Construction: Type Occupancy: ?? Job Address.: 303 GORE CREEK DR VAIL l,ocation.....,: Vail Rowhouses Units 2A & 2C Status.....: ISSUED Applied...: 09127/2004 Issued...: 10105/2004 Exoires...: 04/03/2005 Add Sq Ft: 0 # ofGas Logs: 0 # of Wood Pellet 0 FEE SUMMARY ***r*r.rrlt'rr'*.*r.rrttr.r*rtr*.'rr*r*r,.1nr'*rrtr'ri**rrl.a'r S0 . 00 Total Calculated Fees-> 9509 . 96 S0. 00 Additional Fees-----> 50 . 00 s0.00 Total Psrmit Fec-----> 5509.95 50.00 Payments--------) 5509.96 s0.00 *:*i:i** **,* i.* **,1.* * t+,.,t ** * * *,1. *:* +* * a* * *{. '1.*+,r*:i* * a:t tr+.** +:}r' **,t r** * Valuation: $18,500.00 Fir€place Information: Restricted: Y # ofGas Appliances: 0 Building---> 53 07 . 2 5 Restuarant Plan Review--> Plan Check*-> S199.?L DRB Fee-------------> lnvestigation-> Will Call----> S0.00 RecrstiooFee-----..---> S3.00 Clean-upD€{Dsit-----> TOTAL FEES---------> 5509.96 BALANCE DUE------> Approvals: Item: 05100 BUfI-.,DING DEPARTMENT 09/27/2004 JS Action: AP Item: 05400 PLANNING DEPARTMENT It.ern: 05600 FIRE DEPARTMENT Item: 05500 PUBIJIC WORKS See page 2 of this Document for any conditions that may apply to this permit. DECLARATIONS I hoeby acknowledge that I have read this applicatioa, filled out in full the iaformation require4 completed m accumte plot plan, and stat€ that all the information as required is corregt. I agree to comply with the inforrration and plot plan, io'comply with all Town ordinances and state laws, and to bnrild this sEucture according io the 16sns zoning and codes, designrwiew approvd uuiform Building code and othcr ordinmces of the Towa applicable thereto. REQUESTS TOR hISPECTION SHALL BE MA.DB TWENTT.FOUR HOURS IN ADVA}.ICE OR AT OUR OFFICE FROM E:00 /{ll - 4 PM. OWNER OR CONTRACTOR FOR HIMSEIf, AI{D OWNER PAGE 2**'|.*{.****!****,}'|.*{.:t.'t'**:}:t.****!*'t*****{.:l'**+{.+*******,F**{.*'l.,i:|.'.:&**{.!}**,t.*|td(:***, CONDITIONS OFAPPROVAL Permit #: B'04-0287 as of 10-05-2004 Status: ISSUED*!f*4t:t*:t*'t*+:8*'t****,***,l.**:t.*{.*{t:t|*****!**,***:t,}!t****:t.**|'tt*ttt******,r:**'**,t**!*'},t{.{.!8*!**:***'t*.&********* PemritTvpe: ADD/ALTMFBTJILDPERMIT Applied: e9/27/2004 Applicant: MASTER SEALERS Issued: t0/0512004970-476-397s To Expire: o4/03/200s Job Address: 303 GORE CREEK DR VAIL Location: Vail Rowhouses Units 24, & 2C ParcelNo: 210108230003 Description: REROOF OVER EXISTING TO MATCH I.]NITS NEXT DOOR, GRAVEL. THIS WORK THAT WAS APPROVED SAME FOR SAME BY ANOTHER CONTRACTOR THAT WAS NOT COMPLETED CORRECTLY Conditions: Cond: 12 @LDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: 14 (BLDG.): ALL PENETRATIONS IN WALLS,CEILINGS,AND FLOORS TO BE SEALED WITH AN APPROVED FIRE MATERIAL. Cond: 16 (BLDG.): SMOKE DETECTORS ARE REQUIRED IN AI-L BEDROOMS AND EVERY STORY AS PER SEC.31O.9.I OF THE 1997 UBC. Cond: 1 (FIRE): FIRE DEPARTMENT APPROVAL IS REQI.]IRED BEFORE A}IY WORKCANBE STARTED. ***lt{'l'*****{r'l'***ar**++tftt+++*atttttfft***fttrr****+****{.*titttfttff+++*li*tl*tllt****a*tttt TOWNOFVAIL, COLORADo stat€G€Nrt*+*{rt{r+{.1.1**+lr*t+**aaa*tlal+++tttt+fttft'}+ttat*t*********ft+++++++tt+++**+***********r***rt** Statenent Nurnber: R040006820 Amount.: $509.96 lO/05/2OO409:18 A!{Payment Method: Check . Init: DDGNotation: Mater Sealers 7827 . Permit No: 804-028? I!4le: ADD/AIT Ur BUILTD PER!(ITParcel No: 210108230003 -- Site Address: 303 @RE CREEK DR \TAIIJLocation: Vail Rowhouses Units 2A &. 2C Total FeeE: $509.95This Payrnent: $509.95 Total ALI" pmts: 5509.96Balance: 30.00**t+{t{tt{'{'+'arlt*'i*+a111*aa**a*:}{.1r4't{'*t *tl**t'f*'}**att t*tt***'}*|.ttttt*t{'**{.**t'+**+******t++t+{tt ACCOIJNTITEM LtrST: Account Code Description Current plntg BP OO1.OOOO31111OO BUIIJDING PERMTT FEES 307.25 PF 00100003112300 pIJAI{ CHECK FEES 199.17 v',c 00100003112800 WILL CetL TNSPECTTON FEE 3.00 MWNOFYIN 75 S. Frontage Rd. Vail, Colorado 81657 APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR CONTRACTOR INFORMATION tl Project #:r&,0 z-od I I it #: TION , etc.t ,+zry''tzz gEict/-z rnd Phone #'s: c.zet 7fa' 6>a? Email address: COMPLETE VALUATIONS FOR BUILDING PERMIT Labor & Materials BUILDING: $ELECTRICAL: $orHER: $,/t SaG-ct-' PLUMBING: $MECHANICAL: $ToTAL: g e v tz: For Parcel # Contact *+***+*+***+*r***:r1.:r******sr.r*****FoR oFFlcE USE ONL Assessors Office at 970-328-8640 or visit wvwv. P=ari€!"#V,zaz ? t& 7a aez Job NameS4z/. a/,{ o..o,az., L-^-/ t ,h4to'oP9y €a-</ - /--2./z//1az-.. Legal Description Lot:Block:Filing:subdivision: =:17 K-;* "" Owners Name->Z;"Z"aec{ c c C Address:-F.€-FgF /?aa. . -€tqSPhone:ArchitecUDesigner:Address:Phone: Engineer:Address:Phone: Detailed description of work 4fZzcf Qa-t/-t E+.rfrz-{ E -*.-y'.o y'e*cZ ea)--.- t- €tzaz-// , -.n-rfi ,nr'z,{.aaz:-< WorkClass: New() Addition( ) Remodel ( ) Repair( ) Demo( ) Other(4rtad Work Type: lnterior ( ) Exterior ff eotf, ( )Does an EHU exist at this location: Yes ( ) No ( ) Type of Bldg.: Single-famif ( ) Two{amily ( ) Multi-family ( ) Commercial ( ) Restaurant ( ) Other ( ) No. of Existing Dwelling Units in this building:No. of Accommodation Units in this building: No/Type of Fireplaces Existing: Gas Appliances ( ) Gas Loqs ( ) Wood/Pellet ( ) Wood Burninq ( No/Type of Fireplaces Proposed: Gas Appliances ( ) Gas Loqs ( ) Wood/Pellet ( ) Wood Burninq (NOT ALLOWED) Does a Fire Alarm Exist: Yes (lf No (Does a Fire Sprinkler System Exist Yes ( ) No ( ) // \Wailbata\cdev\FORMS\PERIVIITS\BLDGPERM.DOC tt ruffi\,m Questions? Callthe Building Team at 479-2325 Depaftment of Community Development Project Name: Project Address: / This Chelclist must b ampleM tuforc a Buitdino Permit aoolication is arcoEd, u2zAll pges of application is complete a UHF DRB approval obtained (if required) Provide a copy of approval form s//tondominium Association letter of approval attached if project is a Multi-Family complex o r /omplete site plan submittedr'. ic Way Permit application included if applicable (refer to Public Works checklist) ng plan included (refer to Public Works checklist) No dumoster,parkinq or material storaoe /AEbegrcs test and results submitted if demolition is occurring / lfchitect stamp and signature (All Commercial and Multi family) s Full floor plans including building sections and elevations(S sets of plans for MultFFamily and Co7rmercial Buildings) o y')lindow and door schedule { fult structural plans, including design criteria (i.e.loads) 7.,Ar,Atruflural Engineer stamp and signature on structural plans (All Commercial and Multi Family) D Soils Report must be submitted prior to footing inspection afne resistive assemblies specified and peneb-ations indicated 2 ,Smoke detectors shown on plans ,p/ Types and quantity offireplaces shown Applicanfs Date of submittal: Wail\data\cdev\FORMS\PERMITS\BLDGPERM.DOC Received By: 04,n2no03 BUILDING PERMIT ISSUANCE TIME FRAME If this permit requires a Town of Vail Fire Department Approval, Enginee/s (Public Works) review and approval, a Planning Department review or Health Department review, and a review by the Building Department, the estimated time for a total review will take as long as three (3) All commercial (large or small) and all multi-family permits will have to follow the above mentioned maximum requirements. Residential and small projects should take a lesser amount of time. However, if residential or smaller projects impact the various above mentioned departments with regard to necessary review, these projects may also take three (3) weeks to review and approve. Every attempt will be made by this department to expedite this permit as soon as possible. I, the undersigned, understand the plan check procedure and time frame. I also understand that if the permit is not picked up by the expiration date, that I must still pay the plan check fee and that if I fail to do so it may affect future permits that I apply for. Agreed to by: Project Name:,6.a.t E-rz -7o..at/r- / ,/Date: 7 / 7)/-r 4.t/a,r'/ F:everyone/forms/bldperm3 HOW DID WE RATE WITH YOU? Town of Vail Survey Community Development Department Russell Forrest Director, (970)47s-213s Check all that applies. 1. Which Departnent(s) did you contac0 Building _ EnvironmenEl_ Housing_ AdminPlanning DRB PEC _ 2. Was your initial contact with our stafiimmediate no one avaitabte4fo2l? slow 3' tl:,iiir.Wwas it berore You were 4. Was your project revieured on a timely UasisZ 6l ruo lf no, why no? 5, Was this yourfirsttimeb fte a DRB "p{erc ^ppBldg Permit I\UA Counter? 9. Any comments you have which would allow us to beter serue you next time? Thank you for taking the time b complete this survey. We are commited b improving our service. i', 6. zP&gse rate the performance of he staffperson who assisted you:(9t 3 z l Name: J.+,/' (knowled ge; responsiveness, availability) 7. Overallefiectiveness of the FrontService Countq) + I 2 L Whatisthe bestlime 1 pf day for you to use fie Front Service rh l// WHEN A *PUBLIC WAY PERMIT" IS REQUIRED PLEASE REAE AND CHECK OFF EACH OF THE FOLLOWING QUESTIONS REGARDING THE NEED FOR A "PUBLIC WAY PERMIT'': No/o o o o o 0 Does demolition work being performed require the Usgdf tne Right-of-Way, easements or public property? yES_' NO_ d-_ Is any utility work needed? YES- NO! ./ Is the driveway being repaved? YES- NO--tr Is a different access needed to the site other than the existing driveway? YES_ Is this a new residence? YES Is any drainage worlq bg|afYES NO // No/ done that affects the Right-of-Way, easemenB, or public property? n o Is a "Revocable Right-of-Way Permit" required? YES_ NO_5_ i?y" *"tti$:Ury*Ofr or public property to be used for stasins, parkins or fencins? If answer is NO, is a or fencing plan required by Public Works? YES NO If you answered YES to any of these questions, a "Public Way Permit" must be obtained. "Public Way Permit" applications may be obtained at the Public Work's office or at Community Development (a sample is attached). If you have any questions please call Leonard Sandoval in Public Works at 479-2t98. ED ALL THE ABOVE QUESTIONS. Job or Project Name: Date Signed: F:/everyone/forms/bldperrn4 I HAVE READ AND A Contractor Signature Company Name APPLICATION FOR TOWN OF VAIL PUBLIC WAY PERMIT 19 PW*:TT TTTN PATCEI#:!ITT'[[T-TN-TtrT A(h Brds.Permit#:E I I,[ [ f I rumvffi z. Job Namo Excavating Contractor Name |-l Tl n-n (lfunknowncatl L_' | | | r LJ 479-2139sxt.9 TOV Contractor's License Number REQUIRED () ziPCity Phone # Completion Date (Permit Explration Date) Water Sewer Gas Electric Telephone CATV Landscaping Temp. Site Access Slart Dale Work is for (circte one) Other Trench-width (min.4') BondAmount $ ALL MATERIAL, EQUIPMENT, JOB IS STARTED. Bubber out-riggers are required on Asohalt surfaces undemeath lhe A signature below indicates a Depth TolalsF $ Toral LF $ Permil Fee Total Permit Fee $ 7. D TRAFFIC BE ON THE JOBSITE BEFORE THE working on asphalt. at all times. utilily locations and approvals. Once all utility company application through the Public Works office 1o obtain the 8. signalures are obtained, necessary Town ol Vail up to one week to process. Public Service Company (1 Public Service Natural Gas (1-800-922-1987) U.S, West (1-800-922-1987) TCI Cablevision of the Rockies (1 -1e87) Eagle River Water & Sanitation District {970-476-7480, ext. 114) Holy Cross Electric Company (1-$00-922-19871 _ Town of Vail Efectricians (970-478-2158) _ Town of Vail Inigation (970-479-2158) 9. 10. 11. 12. Town of Vail Public Works Construction Inspeclor (970-479-2198) THERE WILL BE NO TOTAL STREET CLOSURESI A constructi Public Works Department prior to lissuance of the permit. THERE WILL BE NO TOTAL STREET CLOSURESI A construction traffic control plan must be approved by the Public Works Department prior to lissuance of the permit. i' Failure to nolity the Town will result in forfeiture ol I money. Scheduled inspections which are not ready may result in the Town fee. ''charging the contractor a I certify that I have read all chapters of Title I - Public Ways and Property, of the Vail Municipal Code and all utility company agreements, signed by rne, and will abide by the same, and that all utillties have been notified as required. Contractor's Signature of Agreement ATTACH PLAN OF WORK, INCLU Prlnt name clearly G CONSTRUCTION TRAFFIC CONTROL PLAN All excavation must be done by hand within 18" of utilities - (Senate Bill 172), Show streets with names, buildings, and location of cuts. USE DASH LINES FOR CUT. Signature PUBLIC WORKS AND THE PUBLIC WAY PERMIT PROCESS How it relates to Building Permits: Fill out the attached check list with the Building permit Application. If yes was answered to any of the questions then a "Public Way" permit is required. You can pick up an application at either Community Development, located at 75 South Frontage Road or Public Works, located at 1309 Elkhorn Drive. Notice sign-offs for utility companies. ALL utilities must field verifi7 (locate) respective utilities prior to signing application. Some utility companies require up to 48 hours notice to schedule a locate. A construction traffic control/staging plan must be prepared on a separate sheet of paper. An approved site plan may also be used. This plan will show locations of all traffic control devices (signs, cones, etc.) and the work zone, (area of construction, staging, etc.). This plan will expire on November lst and will need to be resubmitted for consideration for approval through the winter. Be aware that your resubmission for winter may be denied depending on the location of construction. Sketch of work being performed must be submitted indicating dimensions (length, width and depth of work). This may be drawn on the traffic control plan or a site plan for the job. Submit completed application to the Public Work's office for review. If required, locates will be scheduled for the Town of Vail electricians and irrigation crew. The locates take place in the morning, but may require up to 48 hours to peform. The Public Work's Construction Inspector will review the application and approve or deny the permit. You will be contacted as to the status and any requirements that may be needed. Most permits are released within 48 hours of being received, but please allow up to one (1) week to process. As soon as the permit is approved, the Building Department will be notified, allowing the "Building Permit" to be released. Please do not confuse the "Public Way Permit" with a "Building Permit". Permits are valid only until November 15th. A new Public Way Permit is required each year if work is not complete. Re-application each November 15th does not mean an automatic renewal. I have read and u F:/everyone/forms/bldperm5 IUmY0r The Town of Vail Building Depaftment has developed the following procedures to ensure that new construction sites have adequately established proper drainage from building sites along and adjacent to Town of Vail roads or streets. The Town of Vail Public Works Department will be required to inspect and approve drainage adjacent to Town of Vail roads or streets and the installation of temporary or permanent culverts at access points from the road or street onto the construction site. Such approval fiust be obtained prior to any requests for inspection by the Town of Vail Building Department for footings, temporary electrical or any other inspection. Please calJLeonard Sandoval at479-2198 to request an inspection from the Public Works Depai'tment. Allow a minimum of 24 hour notice. o Also, the Town of Vail Public Works Department will be approving all final drainage and culveft installatio4r with resulting road patching as necessary. Such approval must be obtained prior to any Final Certificate of Occupancy issuance. Agreed to by: .z:a,t*ruzr'c ,(4 -o 'f Project Name: Date Signed: ,/^/,4.a.2 /a c-,1 4 azz, ,a/y'- -/7r"/' '-/e, "2 Please read and check off each of the items below: F:/everyone/forms/bldperm6 Please read and check off each of the items below. (Copies of complete text are available upon request) CoDE 5-2-10: DEPOSITS ON PUBLIC WAYS PROHIBITED a Unlawful deposits: Subject to subsection C thereof, it is unlawful for any person to litter, track or deposit, or cause to be littered, tracked or deposited, sand, gravel, rocks, mud, dirt, snow, ice, or any other debris or material upon any street sidewalk, alley or public place, or any portion thereof. D Notice; Abatement: The Director of Public Works may notify and require any person who violates or causes another to violate the provision of subsection A hereof, or who has in the Director's employment a person who violates or causes another to violate the same, top remove such sand, gravel, rocks, mud, diG snow, ice or any other debris or material within twenty four (24) hours after receipt of said notice by the Director of Public Works, In the event the person so notified does not comply with the notice within the period of time herein specified, the Director of Public Works, or other authorized agent, may cause any such sand, gravel, rocks, mud, dirt, snow, ice, debris or any other material to be removed from any street or alley at the expense of the notified. D Summons and Penalty: As an alternative to the notice for removal provided in subsection B above, any person who violates or causes another to violate the same, may be issued a summons to appear before the Municipal Court of the Town for said violations, and upon being found guilty of a violation hereunder be punished as provided in Section 1-4-l of this code. o Notice and Penalty: It is unlawful for any person to fail or refuse to comply with the notice of the Director of Public Works as provided in subsection B hereof, and any such person shall, in addition to payment of the expense of removal incurred by the Director of Public Works, as provided in subsection B hereof, upon being found guilty of a violation hereunder, be punishable as provided in Section 1-4-1 of this Code. (1997 Code: Ordinance 6 (1979). CODES 7-3A-I AND 7-3A.3: PARKING OBSTRUCTING TRAFFIC & IMPOUNDMENT AUTHORIZED o No person shall park any vehicle upon a street or at any other place within this Municipality in such a manner or under such conditions as to interfere with the free movement of vehicular traffic or proper street or highway maintenance. (Ord. 2(1968) 5 1) o Whenever any police officer finds a vehicle attended or unattended, standing upon any portion of a street or upon any place within this Municipality in such a manner as to constitute a violation of any section of this Article, or left unattended for a period of twenty four (24) hours or more and presumed to be abandoned under the conditions prescribed by Colorado Revised Statutes section 42-4-1102, as amended, the officer shall require the vehicle to be removed or cause it to be removed and placed in storage in the nearest garage or other place of safety designated or maintained by this Municipality, and the charges for towing and storage of such vehicle shall be charged to the owner of the vehicle in addition to a ten dollar ($10) impoundment charge, (Ord. 2(1968) g 3: Ord. 28(1981) 5 1) I have read and will comply with the above code provisions: Position or Relationship to Project: Date Signed: F:/everyone/fomrVbldpernr7 a..*'/n t€-- Signature Vail Village a actively participate to minim New for 2004-2006 will be utility related All Gonstruction projects Bluhm Town of Vail Givens The following givens are in the Villages: The public's health, safety Adequate pedestrian, be maintained. - No construction September 5. areas. all Scott at all the Vail refer to shall occur on Saturday or Sunday between June 19 and VaiI 2004 Information Handout Problem Statement The Vail Mllage and Village are invaluable asseb to the community. Thousands of people come to Vail each year to recreate, shop and to enjoy everything the Vail Valley has to offer. The community and mercha expect a pleasant experience rely upon our guest to generate revenue. Our summerArinter guests Lionshead Village Construction Hours in Vail. To insure that all of the construction has as little negative impact on the community and on our guest as possible, the Town of Vail finds it imperative to create and implement the Vail Village and Lionshead Village Hours Handout. It would be irresponsible for Tortn of Vail. the the Merchants. to not the impact of Vail Village The hours of Outside Activity shall be as follows: - April 15 - June 18 &nber 7 - November 19, 7 a.m. until 7 p.m., seven days a week. June 18 thru 10, work must end by 4:00 p.m. on Fridays. November 13 - April 1 , 2005 work allowed within daylight hours only. Deliveries shall be to the hours of 7 a.m. to 11:30 a.m. on Gore Creek Drive and 7 a.m. to 8:30 a.m. on Bridge Special Construction permits must be requested in advance, from Public Works in conjunction with Code Enforcement at Checkpoint Chadie. No outside construction activity shall occur on the following dates: Saturday, February 14, Sunday, February 15, and Monday, February 16. (President's Weekendl Saturday, May 22, Sunday, May 23 and Monday, May 24 (Memorial Dav) Friday, June 25, Saturday, June 26 and Sunday, June 22. (Vail Arts Festival) Friday, July 2, Saturday, July 3 and Sunday, July 4 and Monday July S. (lndependence Dav) Saturday, September4 , Sunday, September 5 , and Monday, September 6. {Labor Dav Weekend). Friday, September 10, Saturday, September 11, Sunday, September 12 in (Llqnghead) Saturday, September 18 and Sunday, September 19- at ryail Villaoe) - (October Fest) Thursday, November 25, Sunday, November2S. . November2T and Friday, December 24, Saturday, {Christmas Dav Holidavl Friday, December 31, Satu Work allowed the entire week of The Town of Vail Noise construction activities from The Noise Ordinance shall be November 13, 2004 to April 15, All construction sites will be of Vail Public Works staging/parking plan is waming), Expectations The following expectations are estrablished to insure the success of the Vail Village and Lionshead Village Construction Hours Plan: r Full and complete cooperation and understanding from all parties involved in the construction activity in regards to this plan. r Strict adherence and compliance with the requirements outlined in the construction plan. . Respect and consideration for the affected intErests and parties. lf you have any questions, Please contact the Town of Vail Public Works Department (Construction Inspector) or the Vail Police Department (Gode Enforcement Officer) for 19. 970.479-2198 970476-7603 TOWN0'FVAIL Vail 2004 Staging / Parking Plan Information The Staeine / Parkins PIan Philosophv- Is a very important step in the buitding process. Striking a balance between safe public access and giving construction projects room to build is becoming increasingly challenging, for us to meet all the needs of those who will be impacted by construction projects. The fact is, there is less room to build in the Town of Vail. Developing a creative Staging Plan is a must. Staging in the Tovrn of Vail Public Right of Way is a Privilege, not a given right. We take into account when we review and approve staging / parking plans, impacts on neighborhoods, tourism, business and the traveling public along with your right to build. The General Contractor is resoonsible for all subcontractors and aII construction activitv relating to the building proiect. The staging plan will be enforced according to the Approved Set of Building and Staging Plans. You are required to keep a copy of the Approved Staging Plan on site. Two staging /parking plans are required, a surtmer and winter. Summer staging plans expire on November l, and winter staging plans expire on April 15. (Note: There is nS_gg street parking in the winter season and all materials" equipment. etc must be l0' offthe eds.e of asohalt). Enforcement of all staging / parking plan is as follows. A) Staging / Parking Plans to scale required. B) Once the plan is approved, they will be held to complete compliance. C) We will use a 3 step and you're out, process. Step One- Verbal and written warnings as to the staging plan violation, then have contractor sign and date field memo waming. Step Two- Police Departrnent issue tickets and tows or public works writes second written waming to all violators who have been notified under step one and who are still in violation of the approved Staging / Parking Plan. The Town of Vail Chief Building Official will call the contractor and notify flrem, the next time any violation happens, the building department will red tag the construction site for 48 hours. Step Three- If still in violation after step two, a 4$_bour_Belul-Ag will be issued to the project site. If you have any Questions, Please contact the Town of Vail Construction Inspector at 970-479-2198 Requirements for an Acceptable Staging Plan It is preferred that and Approved site Plan is used to draw a staging plan, but a hand drawn plan may be used as long as it is dawn to scale and is neat and legible. 1.) The Staging Plan must show the following: (a) Show all parking that is required for the job site. (Including construction equipment). (b) Show the location of all material that will be staged on site. (c) Show the location of all dumpsters and port-o-john ttrat are to be on site. (d) If a fence is required, then show the location of the fence and describe the material used for the fence. (e) Iftrees and / or vegetation is required to be protected, then show how this will be done. (f) If this staging plan is for a Demo Permit, then show staging for dump trucks and all related equipment. If the Town of Vail Right of Way area is needed for staging, then a Traff,rc Control Plan is required in conjunction with the staging plan. (g) Please provide and show an Erosion Control Plan, (h) No equipment, vehicles, materials are allowed on Town of Vail Right of Way in the Winter Staging Plan. 2.) If work needs to oscur in the right of way, then add a Traffic Control Plan to the staging plan showing the following: (a) The work zone (area that is to be performed) (b) Traffic Control Devices (waming, signs, cones, flaggers, etc,) (c) Distances that all devices will be set up from the work zone. AIso show all dimensions of work being performed in the right of way. All traffic control plans must conform to the MUTCD manual.Manual of Unifom Traffic Control Devices) 2.) This plan will be reviewed by Public Works and if Necessary the Police, Fire, and Community Development Department. Once the staging plan is approved, it will be registered with the departments listed above and enforced. 3.) The Village and Lionshead area have outside construction restrictions, please become familiar with the Vail 2004, Vail Village and Lionshead Construction Hours handout. Design Review Board ACTION FORM Departnent of Cofiimunity De\dopmert 75 South Frontage Road, Vail, @lorado 81657 tel: 970.479.2139 Jax: 970.479.2452 web: www.ci,wll,co,us Proiect Name: Pearson Residence Addition DRB Number: DRB020024 Project Description: Fianl rerriew of remodel to Units 2A&2C, Vail Rowhouses Partlclpails: OWNER PEARSON, VICKI - DE MOCIEZUM02/06/2002 phone: BARBARA PO BOX 6236 VAIL@ 81658 License: APPUCANT Pam Hopkins 040612002 Phone:476-2201 Snowdon & Hopkins Archltecb, rc POB 3340 Vall, Co Pam@snowdonhopkins.com 81658 License: Prcject Addrcss: 303 GORE CREEK DR VAIL Location: Vail Rowhouses Units 2A & 2C l€gEl Descdption: loE 2 Blodc 5 Subdivision: VAILVILI-AGE RUNG I Parcel Number: 210108230003 C.omments: Approred per plans submltted BOARD/STAFF ACTTON Action: APPROVED Gonditions: Cond:200 A conceptual revieu, is NOT a Design Redew Board approval. Cond: CON0005248 Approved per plans submltted and stamped approved 41til002 Planner: George Ruther -1