Loading...
HomeMy WebLinkAboutB01-0167 LEGALTOWNOFVAIL 75 S.FRONTAGEROAD VAIL, CO 81657 97H79-2738 Building-> Plan Check--> lnv$tiEation-> will call_> DEPARTMENT OF COMMUNITY DEVELOPMENT NOTE: THIS PERMIT MUST BE POSTED ON IOBSITE AT ALL TIMES OWNER SCHNEIDER, RAYMOITD 35]-5 TIFFANY RIDGE LN CINCINNAII OH 4524L License, CONTRACTOR iI.B. Builders P.O. Box 3233 0365 L,arkepur Lane Avon, CO 315.4 License( 656-B') APPLICTNT,J.B. Buiibe)fg* P.O. Box 3233 0366 L,arkspur Lane Alron, CO S1620 License:656-B Description: REPAI.tE FRONT DECK. UNO qHATIGESU SA.I4E FOR SAME Occupancy: R3 Single Family Residence TypeConstruction:VN TypeVNon-Rated Valuation: $4,200.m AddSqFr 0 ADD/ALT SFR BUILD PERMIT Job Address: 2409 CHAMONX RD VAIL Location.....: 2409 CHAMONX LANE ParcelNo...: 210311!t01018 Project No : S95. oo Restuarant Plan Review-> 561 . ?s DRB Fe€-_-._-_> SO. OO Recreation Fee ->$3. oo Clean-up Deposit------> TOTAL FEE$__.---.> Permit Status. .. : ISSUED Applied..: 06/1.4/2W1. Issued... : U7/O9/2C[7 Expires...: m/05/2ffi2 06/t4/2oo]-Phone: 06/L4/200r Phone: 970-845-8984 06/L4/200t Phone:970- 945 -g 994 # of Gae Appliancee;0 # of Gas Logs: 0Fireplace Infornation: Restricted: Y Wood Pelleh #of s0 .00 s2o. oo s0.00 s0. oo s1?9. ?5 Total Calculated Fees--> Additional F€es--> Total Permit Fee-----> Payments------> BALANCE DUE-.--.> 9179 .7s 9100.00 9279.75 s279.1s s0.00 Approvals: Itse:m: 05100 BUILDING DEPARTMBTf O6/2L/20O]. rRln Action: AP Item: 05400 PLAIINING DEPARTMEIflI Item: 05600 FIRE DEPARTMBIT Item: 05500 PITBLIC WORKS See page 2 of this Document for any conditions that may apply to this permit. PAGE 2 CONDITIONS OF APPROVAL Permit #: W'1,4767 asof A78-2@1 Status: ISSUED #ffi rH**ffi !Hffi lH**r!Hr!ffi **:hSt**ff *trrffi |H#tt*rffi *tt#*t**ff SlHf # Permit Type: ADD/ALT SFR BUILD PERMIT Applied: M/74/2ffi7 Applicant J.B. Builders Iszued: A7/@/2ffi1YZ&8/'S-B984 ToExpire mlOs/ZJOz fob Address: 2409 CHAMONX RD VAIL Location: 2409 CHAMONX LANE Parcel No: 21031140m8 Description: REPALCE FRONT DECK."NO CHANGES" SAME FOR SAME *********{#**fft*****lu***ff****it****s******* Conditions *******************rE**!l*iur*rfl***#***s Cond:12 (BLDC.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond:16 (BLDG.): SMOKE DETECTORS ARE REQUIRED IN ALL BEDROOMSAND EVERY STORY AS PER SEC.310.6.1 OF THE 1W7 UBC. DECLARATIONS I hereby acknowledge that I have read this applicatioru filled out in full the information required completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, Uniform Building Code and other ordinances of the Town applicable thereto. REQUESI]S FOR INSPECTION SHALL BE MADETWENTY-FOUR HOURS IN PM. Send Clean-up Depcit To: NrlA ANCE BY TELEPHONE AT 479.2138 OR AT OUR OFFICE FROM &OO AM . 5 CTOR FOR HIMSELF AND OWNER t,l*:t* *:l *'+{' {r **** *{r * {r *'} 't !t** * t *:i *:i* {r**:tr** *** 'ttr*t {' {' * {r't,t'tr * *{r ***r.* *** * ** t{r{t{r * *** ** *:l t ** ***** *+*i t* * TOWN OF VAII, COLORADO Statement t '1.**t**'t*** * * * +l' t*{.*l* ****t* + *+ +l 'tt* * t* **f + +t*+ + **t+t+*'t 'tr:}*+ +{.* + +* ***tt +'},tr'tr* {r{t*++**:t** ***+*dr ' Stat.ement. Number: R000O01044 Amount: i219-75 O7/09/2OO]-OB:54 AM Palment l,lethod: Check Init : JRIiI Notation: 582 Permit No: 801-0157 Type: ADD,/ALT SFR BUILD PERIT{IT Parcel No: 2103114 010 L8 Site AddreEB: 2409 CHA}IONIX RD \tAIIr Location: 2409 CHAMONIX LANE Total Feeg: 5279.75 This Payment,: $279.75 Total ALIJ PmEs: $279.75 Balance: $0.00 **:t:l:i't*+*:*****f'l' 'lr'lr*'l'lr|'t'lt*!i'l,lr+**** *++** {.*l"t+ *{r * +*** *}**** **,}****'}'tf**++ttl'*'l **+** * * *******'l ** ACCOUNT ITEM LTST: Account Code Descripti on Current ffis BP OO1OOOO31111OO BUILDING PERMIT FEES cL 00100003123000 C0NTRACToR LICENSES DR OO1OOOO31122OO DESIGN REVIEW FEES PF OO1OOOO31123OO PLAN CHECK FEES I.IC OO1OOOO31128OO MLL CALL INSPECTION FEE 95.00 100.00 20.00 61.75 3.00 ll l zn t NOT BE ACCEPTED IF TNCOMPLETE OR UNSIGNED Proiect #: Building Permit #: 97 O 47 9 -2L49 (Irupections) il)rii0F 75 S. Frontage Rd. Vail, Colorado 81657 CTOR INT'ORMATION Contact and Phone #'s:-W'ffi3'/ Crll'J76-o733 BUILDTNG: $ 1/.AoO.q (applibaffod o subdivision: 0*s 37pa/E r fii"-t Jalc ,{o c,Va,notr WorkClass: New() Addition( ) Remodel( ) Repairflf Demoffi Other( ) Work Type: Interior ( ) Exterior p{ Both ( )Does an EHU exist at this location: Yes ( ) No ( ) Typeof Bldg.: Single.familyQd Two-family( ) Mult'-family( ) Commercial ( ) Restaurant( ) Other( ) No. of Existing Dwelling Units in this building:No. of Accommodation Units in this building: GasLoqs( ) Wood/Pellet( ) WoodBumi Does a Fire Sprinkler System Exist Yes ( ) No ( )Yes( ) No( ) COMPLETE VALUATIONS FOR BUILDING PERMTT Labor & l.laterials For Parel # ConEGt Assessorc Office at 970-328-864O or visit tr********:t*'t** **** ************ * ***** **FOR OFFICE USE ONLY**** ** * ***** **** **tr******************* Type ofConstnrction: OccupancT Group: Date Receined:RECEIVED JUN r 0 not r f",llIOI,T'N Department of Community Development Project Name: Project Address: This Checklist must be omoleted beforc a Buildino Permit apph-cation is accephd. All pages of application is complete Has DRB approval obtained (if required) Provide a copy of approval form Condominium Association letter of approval attached if project is a MultFFamily complex Complete site plan submitted Public Way Permit application included if applicable (refer to Public Works checklist) Staging plan included (refer to Public Works checklist) No dumoster,oarkinq or material storaoe allowed on roadwavs and shoulderc without writlen aooroval Asbestos test and iesults submitted if demolition is occurring Architect stamp and signature (All Commercial and Multi family) Full floor plans including building sections and elevations(4 sets of plans for Multi-Family and Commercial) Window and door schedule Full structural plans, including design criteria (ie.loads) Structural Engineer stamp and signature on structural plans (All Commercial and Multi Family) Soils Report must be submitted prior to footing inspection Fire resistive assemblies specified and penetrations indicated Smoke detectors shown on plans Types and quanUty of fireplaces shown Questions? Callthe Building Team at479-2325 EI a a tr tr D o o tr D T1 o o a 3 fl' Appticant'ssisnature: y "{F6^Ia Dateof submittat: 6-f-O I F:/everyone/forms/bldperm2 Received By: /-:\ - ,trI'^'*At+/'J NnioFuMV HOW DID WE RATE WITH YOU? Torm of Vail $rvey Community Development Deparfinent Russell Fonest, Director, (9701179-2139 Check all that appfies. 1. Which Depag[rrent(s) did you conhct? Building -/ Environmentrl_ Housing Admin Planning . DRB _ PEC _ 2. Was your initial contact wifr our sbfi immediate-/1 s|ow no one available 3. lf you were required b wai[ how long was it before you were heloed? 4. Was yourprojectreviennd on atmely lasis@ruo lf no, why not?_ 5. Was this yourfrstdmeb file a DRB qpb PEC app- Bldg Permit frt tUA 6. ryg€se rab fie performancc of fie stafi person who assisAd you:(5)1 3 2 1 Name:\z (knowledge, responsiveness, avalability) 7. OverallefectivenessoffreFrontServiceCounter.@ 4 I 2 1 8. What is the beg time of day fur you to use fie Front Service Countef tJa-irt 9. Any commenb you have which rrrrculd dlow us b betbr senre you nexttime? Thank you for kking tre time b complete his survey. We are commifrd b improving our seruice. 0r TOWI{ OF WHEN A'PUBLIC WAY PERMIT" IS REQUIRED PLEASE READ AND CHECK OFF EACH OF THE FOLLOWING OUEfiONS REGARDING THE NEED FOR A "PUBLIC WAY PERMIT": Is this a new residence? YES NO-X_ O Does demolition work being performed require the use of the Right-of-Way, easements or public prcperty? YEs No >( No-x- No_:r_ Is any utility work needed? YES Is the driveway being repaved?tr U tr -l l Is a different access needed to the site other than the existing driveway? YES- NO k Is any drainage work being done that affects the Right-of-Way, easements, or public property?YEs_ NO_ x Is a "Revocable Right-of-Way Permit" required?YE5 No >( Is the Right-of-Way. eryements or public property to be used for staging, parking or fencing?YES_ NO_ X_ NO, is p parking, staging or fencing plan required by Public Works? NO}( If you answered YES to any of these questions, a "Public Way Permit" must be obtained. "Public Way Permit" applications may be obtained at the Public Work's office or at Community Development (a sample is attached). If you have any questions please call Leonard Sandoval in Public Works at 479-2198. I HAVE READ AND ANSWERED ALL THE ABOVE OUESTIONS. Company Name Datesigned: <-t-Ol If answer is YES F:/everyoneforms/bldperm4 TVWNOP PUBLIC WORKS AND THE PUBLIC WAY PERMIT PROCESS How it relates to Building Permits: Fill out the attached check list with the Building Permit Apolication. If yes was answered to any of the questions then a "Public Way" permit is required. you can pick up an application at either Community Development located at 75 South Frontage Road or Public Works, located at 1309 Elkhorn Drive. Notice sign-offs for utility companies, ALL utilities must field verifo (locate) respective utilities prior to signing application. Some utility companies require up to 48 hours notice to schedule a locate. A construction traffic control/staging plan must be prepared on a separate sheet of paper. An approved site plan may also be used. This plan will show locations of all traffic control devices (signs, cones, etc.) and the work zone, (area of construction, sbaging, etc.). This plan will expire on November 1st and will need to be resubmitted for consideraUon for approval through the winter. Be aware that your resubmission for winter may be denied depending on the location of construction. Sketch of work being performed must be submitted indicating dimensions (length, width and depth of work). This may be drawn on the traffic control plan or a site plan for the job. Submit completed application to the Public Work's office for review. If required, locates will be scheduled for the Town of Vail electricians and irrigation crew. The locates take place in the morning, but may require up to 48 hours to perform. The Public Work's ConsFuction Inspector will review the application and approve or deny the permit. You will be contacted as to the status and any requirements that may be needed. Most permits are released within 48 hours of being received, but please allow up to one (1) week to process. As soon as the permit is approved, the Building Department will be notified, allowing the "Building Permif'to be released. Please do not confuse the "Public Way Permif'with a "Building Permlt". NOTE: The above process is for work in a public way ONLY. Public Way Permits are valid only until November 15th. A new Public Way Permit is required each year if work is not complete. Re-application each November 15th does not mean an automatic renewal. read and understand the above. F: /everyone/forms/bldperm5 Date Signed BUILDING PERMIT ISSUANCE TIME FRAME If this permit requires a Town of Vail Fire Department Approval, Enginee/s (Public Works) review and approval, a Planning Department review or Health Department review, and a review by the Building Department, the estimated time for a total review will take as long as three (3) weeks. All commercial (large or small) and all multi-family permits will have to follow the above mentioned maximum requirements. Residential and small projects should take a lesser amount of time. However, if residential or smaller projects impact the various above mentioned departments with regard to necessary review, these projects may also take three (3) weeks to review and approve. Every attempt will be made by this department to expedite this permit as soon as possible. I, the undersigned, understand the plan check procedure and time frame. I also understand that if the permit is not picked up by the expiration date, that I must still pay the plan check fee and that if I fail to do so it may affect future permits that I apply for. Proiect Name: Date: 6-f^Ol tiAgreedtoby: JoL^ F. Ga,r"/ ^ Print name ( F : aneryoneforms/bldperm3 APPLICATION FOF TOWN OF VAIL PUBLIC WAY PERMIT 19 - IT IT-I,II!rl Job Name Strest Address [l l-l j-l - l--] ( unknown callI rl ll i i t +29.2t38 ext. O) Excavating Contrac,tor Name Maillng Addr€ss TOv Contraclor's Licarce Number REOUIREO () Phon€ fZpCity 4. Starl Dale Work is for 1circle one; Water Comolellon Dale Sewer Gas Electric (Permit Expiration Dale) Telephone CATV Landscaping Temp. Site Access Other Trench-width (min.4) Bond Amount $ ALL MATERIAL, EQUIPMENT, ANO TRAFFIC JOB IS STARTED. 7.Rubber out-riggers are requir€d on Asphalt surfaces underneath the A signature below indicates a srgnatures are oblai ned, permittee necessary Town of Vail signatures. BE ON THE JOBSITE BEFORE THE working on asphalt. at all times. utility locatlons and approvals. Once all utility company application through the Public Wor|(s office to obtain the up to one week to pmcess. Depth TotalSF $ TotalLF $ Permit Fee Total Permit Fee $ Public Service Naiural Gas Group (1€00-gU-19871 Public Service Company (1 U.S. West (1 -800-922-1 987) TCI Cablevision ol the Rockies (1-800-922-1987) Eagle River Water & Sanitation District (970-476-7480, ext. 114) Holy Cross Electric Company (1-800-922-1987) Town ot Vail Electricians (97047$2158) Town of Vail lrrigation (970-479.2158) Town of Vail Public Works Construction Inspector (97C479-2198) 9. THERE WILL BE NO TOTAL STREET CLOSURESI A construction traffic control plan must be approved by the Public Works Department prior to issuance of the permit. 1" 10. All excavation must be done by hand within 1 8. ot utilities - (Senate Bill 172). 11 . Permittee must contact Publlc Works D€partrn€nt at 479-2198 24 houts prior to commencino of nork. Failure to notify the Town will result in forfeiture of bond money. Scheduled inspections which are not ready may result in the Town chargirig he contractor a reinsPecilon fee. 12. I certify that I have read all chapters ot Title 8 - Public Ways and Property, ot the Vail Municipal Code and all utility company agreements, signed by me, and will abide by the same, and that all utllities have been notified as required. Contractor's Slgnatur€ of Agreement Print name cleady ATTACH PLAN OF WORK, INCLUDING CONSTRUCTION TRAFFIC CONTROL PI.AN Show streets with names, buildings, and location ol cuts. USE DASH LINES FOR CUf- Dato ot Signature White - Publlc Wo*s Y6llon, - Conbaclor DRAINAGE AND CULVERT INSPECTIONS ARE REOUIRED BY PUBTIC WORKS! Please read and check off each of the items below: o The Town of Vail Building Department has developed the following procedures to ensure that new construction sites have adequately established proper drainage from building sites along and adjacent to Town of Vail roads or streets. The Town of Vail Public Works Department will be required to inspect and approve drainage adjacent to Town of Vail roads or streets and the installation of temporary or permanent culverts at access points from the road or street onto the construction site. Such approval must be obtained prior to any requests for inspection by the Town of Vail Building Department for footings, temporary electrical or any other inspection. Please call Leonard Sandoval at 479-2198 to request an inspection from the Public Works Department. Allow a minimum of 24 hour notice. Also, the Town of Vail Public Works Department will be approving all final drainage and culvert installation with resulting road patching as necessary. Such approval must be obtained prior to any Final Certificate of Occupancy issuance. Agreed to by: Project Name: Date Signed:6-n -o1 F : /everyoneformVbldperm6 Please read and check off each of the items below. (Copies of complete text are available upon request) CODE 5.2.10: DEPOSITS ON PUBLIC WAYS PROHIBITED o Unlawful deposits: Subject to subsection C thereof, it is unlawful for any person to litter, track or deposit, or cttuse to be littered, tracked or deposited, sand, gravel, rock, mud, dirt, snow, ice, or any other debris or material upon any street, sidewalk, alley or public place, or any portion thereof. o Notice; Abatement: The Director of Public Works may notiry and require any person who violates or causes another to violate the provision of subsection A hereof, or who has in the Director's employment a person who violates or causes another to violate the same, top remove such sand, gravel, rocks, mud, dirt, snow, ice or any other debris or material within twenty four (24) hours after receipt of said notice by the Director of Public Work. In the event the p€rson so notified does not comply with the notice within the period of time herein specified, the Director of Public Work, or other authorized agent, may cause any such sand, gravel, rocks, mud, dirt, snow, ice, debris or any other material to be removed from any street or alley at the expense of the notified. a Summons and Penalty: As an altemative to the notice for removal provided in subsection B above, any person who violates or causes another to violate the same, may be issued a summons to appear before the Municipal Court of the Town for said violations, and upon being found guilty of a violation hereunder be punished as provided in Section 14-1 of this code. I Notice and Penalty: It is unlawful for any person to fail or refuse to comply with the notice of the Director of Public Works as provided in subsection B hereof, and any such person shall, in addition to payment of the expense of removal incurred by the Director of Public Works, as provided in subsection B hereof, upon being found guilty of a violation hereunder, be punishable as provided in Section 14-1 of this Code. (1997 Code: Ordinance 6 (1979). CODES 7-3A-1 AND 7.3A.3: PARKING OBSTRUCTING TRAFFIC & IMPOUNDMENT AUTHORIZED o No person shall park any vehicle upon a sfeet or at any other place within this Municipality in such a manner or under such conditions as to interfere with the free movernent of vehicular traffic or proper street or highway maintenance. (Ord. 2(1958) $ 1) D Whenever any police officer finds a vehicle attended or unattended, standing upon any portion of a street or upon any place within this Municipality in such a manner as to constitute a violation of any section of this Article, or left unattended for a period of twenty four (24) hours or more and presumed to be abandoned under the conditions prescribed by Colorado Revised Statutes section 424-1102, as amended, the officer shall require the vehicle to be removed or cause it to be removed and placed in storage in the nearest garage or other place of safety designated or maintained by this Municipality, and the charges for towing and storage of such vehicle shall be charged to the owner of the vehicle in addition to a ten dollar ($10) impoundment charge. (Ord. 2(1968) g 3: Ord. 28(1981) 5 1) I have read and will comply with the above code provisions: Position or Relationship to Project: Date Signed: F:/weryonc/formVbldpermT