Loading...
HomeMy WebLinkAboutPRJ02-0109 B02-0070 LEGALTOWN OF VAIL DEPARTMENT OF COMMUMry DEVELOPMENT 75 S.FRONTAGEROAD VAIL, CO 81657 970479-2138 NOTE: THIS PERMIT MUST BE POSTED ON TOBSITE AT ALL TIMES PLUMBING PERMIT Permit #: P02-0032 Job Address: 612 W LIONSHEAD CR VAIL Status . . . : ISSLIED Location.....: 610 W LIONSHEAD CIRCLE Applied . . : M/24/2002 ParcelNo...: 270106307024 Issued. .: 05/02/2002 ProjectNo ' f {:f OZ-0 IO1 Expires. .: 1'0/29/2002 ovlNER SCHNETDER!{ArV, CHARTJES S' E[-'YSO4/24/2O02 Phone: 12 BERMT'DA I,AKE DR PAI,M BEJACH GARDEIIS FI, 33418 -4583 License: CoIITRACTOR COLORADO PLUMBTNG SERVTCE O4/24/2OO2 P]rone: 2335 AIRPORT ROAD RIFITE, CO 81550 L,icense t L29-P AppIJICAIim COIJORADO PIJUMBING SERVICE O4/24/2OO2 Phone: 970-625-0766 2335 AIRPORT ROAD RIFIJE, CO 81550 License: Desciption: RELOCATE KIT. SINK ROUGH AND REPLACE ADD 1 t-A'V AND REPLACE 2LAVSANDFAUCETS Valuation: $2,900.00 Fireplace hfornution: Restricted: ??# of Gas Appliances: ?? # of Gas Logs: ?? # of Wood Pallet Plumbing-> 945 . 0o Restuarant Plan Review-> $0. 00 Total Calculated Fees-> $59 ' 25 plan Check-> S11 .25 DRB Fee------> gO . OO Additional Fe€s-> SO. OO Investigation-> $0. oo ToTAL FEES--------> $59 .25 Total Permit Fee--> 559.25 will call->$3.00 BAL\NCE DUE->90. 00 Item: 05100 BUILDING DEPARTMENI o4/3o/20o2 ,JRvi Action: AP Item: O55OO FIRE DEPART!,IEN| CONDITIONOF APPROVAL Cond: 12 (BI,DG.): FIELTD INSPECTIONS ARE REQUIRED TO CHECK FOR CODB COMPLIAIICE. DECLARATIONS I hereby acknowledge that I have read this applicatior; filled out in full the information required, comPleted an Payments--> S59.25 accurate plot Plan, and state that all the infornration as required is correct. I agree to comply with the inforuration and plot plan" to comply with all Town ordinancee and state laws, and to build this stmcture according to the towns zoning and subdivisioncodee, designreview approve4 Unifonn Building C-ode and other ordinances of the Tov.rnapplicable REQT'ESISFORII\ISFECNONSHALLBEMADETWENTY.FOIJRHOTJRSIN ADVANCEBYIELEPFIONE AT479-A38 ORATOUROFFICE FROM 8dDAM.5 'l'******* ****+++**** **+ ****t{.* * ***,tot*** *****+t t{.* *f+{. !i * + * * * * * * {. {. * * * * * * * ********* ******+*** *** TOWN OF VAIL. COLORADO Statement f *t * * * * * ** ++ ++ + *t f **t***i***+*++************ *l**t*** ********++**+*** ***t * * ************{.***** stat.enent. Nuiber: R000002280 Arnount 3 $59.25 05/02/20O2t2.25 Pl,4 Paltment Method: Check Init: L,C NoEation: #305061/Colo Plumbing Srv Permit No: P02-0032 Type: PIJITMBING PERMIT Parcel No: 2\0106307024 Sit.e Address: 512 W LIONSHEAD CR VAIL Location: 510 W TIONSHEAD CIRCIJE Total Feea: $59.25 This Payments: $59.25 Totsa1 ALL Pmts: S59.25 Balance: $0.00 **** * * ******+** * *+ * * * f*+ * + +* ** * ** * + f *++* * * *t + t * * +++ *:t + *+ * **'*** *** ** * * * lt * * + +* * + * t+ ** **+ * f *** ACCOIJNT ITEM LIST: Account Code DescniDtion Current Pmts PF 00100003112300 PLAN CHECK FEES 11.25 PP OO1OOOO31112OO PLUMBING PIRI',IIT FEES 45.00 I,JC OO1OOOO31128OO I,'JILL CALL ]NSPECTION FEE 3.OO IJ//WT{WYAE 75 S. Frontage Rd. Vail, Colorado 81657 CONTRACTOR INFORMATI ON Contact and Phone #'s:w;:;;;;"ftragil;{/,t', uctioA COMPTETE VALUATIOiI FOR PLUMBING PERUIT (tabor & Materials) PLUMBII{G: $ LqOO ff,aahgtec or forPatel # 'f,Emmm I ZtOt O;SorLOzv @'L?tontn,rk, lrtn R6s. robAddress: tlilrtttzr 9',?^r?,;" t tr Legal Description Lot:Block ll Filing:Subdivision: owners name: 721nta/ [nooress:Phone: Engineer:Mdress:Phone: Detailed description of workt Rebc*Ie U+.g)nkgor,,L.*Reotacc-. MA lLav, +Kepl<cc ZLq.vs { Fq'r&s WorkClass: New() Addilion( ) AlteraUon(y'j Repair( ) fther( ) Type of Bldg.: Single-family ({) Duptex ( ) Mutt-family ( ) Commercial ( ) Restaurant ( ) Other ( ) No. of Existing Dwelling UniB in this building:No. of Accommodation Units in this building: Is this a conversion from a wood buming fireplace to an EPA Phase il device? Yes ( ) No ( ) *|l*i*r**.ir*tr**r*i**i**ir*****r*.****iFioR oFFIcE usE oNLY*r*r*.*t**r*rr*ir*a*'.i*.*rrr*t.ri*r** \>[3 F/e\rerlprie/forms/plrnbperm fi€eitveo APR z '' 2002 rov-9!9u'oEv' ftv^ TOI^/NOF VAIL DEPARTMENT OF COMMLINITY DEVELOPMENT 75 S. FRONTAGEROAD VAIL CO 81657 970479-2138 NOTE: THIS PERMIT MUST BE POSTED ON TOBSITE AT ALL UMES ADD/ALT MF BUILD PERMIT Permit #:802-0070 Job Address.: 612 W LIONSHEAD CR VAIL Status.....: ISSLIED Location......: LANDMARK #T-24 Applied...: 04/1.6/2002 Parcel No....: 210106307024 Issued ...: 04/19/2002 Project No...: ( (rtbL -610\ Expires...: 1.0/1.6/2002 oI{NER SCHNETDERMAN, CHARIJES & ELYS04/16/2OO2 Phone: 12 BERMUDA IJAKE DR PA]JM BEACH GARDENS FI-| 3 3418 -4s83 I_,icense: coNrRAcroR T & M coNsTRucTroN 04/L6/2OO2 Phone: 970-32A-4467 P.O. BOX 2034 EAGIE, CO 81_531_ License: 551-B APPr.,rCArinr T & M CONSTRUCTTON O4/L6/2002 Phone: 970-32A-4467 P.O- BOX 2034 EAGLE, CO 8 r_531 Lricense: 651-B Desciption: REMODELOF KITCHEN Occupancy: R1 Multi-Family Type Construction: III 1-HR Type III l-Hour Type Occupancy: ?? Valuation: $24,958.00 Fireolace Information: Restricted: Y AddfuFr 0 # of Gas Appliances: 0 # of Gas Logs: 0 # of S0 . 00 Total Calculated Fees-> $489 .75 S0 . OO Additional Fees->$0.00 SO . OO Total permit Fee__> 9499. ?5 $0.00 Paymmts--> 5489.75 TOTAL FEES--> S489.7s BALANCE DUE--> Wood Pelleh Building-> 9295.00 Restuarant Plan Review--> Plan Check-> 9191.75 DRB Fee.-----._._> Investigation-> will call-> 90 - 00 Recaeation Fe€*--> $3 . 00 Clean-uP DePosit-> 90. 00 Approvals:f€em: 05100 BUILDING DEPARTMENT o4/t8/2jo2 JRNL Action; AP Item: 05400 PLANNING DEPARTMENI ItCM: O55OO FIRS DEPARTIi{ENT Iten: 05500 PIIBLIC WORKS PAGE 2 Permit #: BO2-0fJ70 CONDITIONS OF APPROVAL asof M-79-2002 Status: ISSIIED PermitType: ADD/ALTMFBTIILDPERMIT Appted: 04/76/2002 Applicant T&MCONSTRUCTION Issued: 04/19/2002 970-32V4467 To Expire: 70/1.6/2002 |ob Address: 612 W LIONSHEAD CR VAIL Location: LANDMARK#T-24 Parcel No: 270106307024 Description: REMODEL OF KITCHEN Conditions: Cond:1.2 (BLDG.): FIELD INSPECTIONS ARE REQLIIRED TO CHECK FORCODE COMPLIANCE. Cond:14 (BLDG.): ALL PENETRATIONS IN WALISCEILINGS,AND FLOORS TO BE SEALED WITH ANAPPROVED FIRE MATERIAL. Cond:16 (BLDG.): SMOKE DETECTORS ARE REQUIRED IN ALLBEDROOIvISAND EVERY STORY AS PERSEC.31O.6.1 OF THE 1997 UBC. Cond: L (FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY WORK CAN BE STARTED. See page 2 of this Document for any conditions that may apply to this permit. DECLARATIONS I hereby acknowledge that I have read this application, filled out in ftrll the information required completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, Uniform Building Code and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN PM. Send Clean-up Deposit To: N/A AT 479-2138 OR AT OUR OFFICE FROM 8:ffi AM - 5 CTOR FOR HIMSETJ AND OWNEF tl APPLICA OR UNSIGNED Project #: Building Permit #: e7 o47 9 -2149 (Insp€di_.nq) Geqeral Contractor:Town of Vail Reg. No.:Contact and Phone 1'1"1-lo7"lL (Y\ottie_ 329_44a7 PLUMBING: $Jq5YS Tutrt{OFVIN 75 S. Frontage Rd. Vail, Colorado 81657 uired for t- R INFO PLETE VALUATIONS FOR BUILDING PERMIT & Materials 9f- ?* Parcel# zrotObbC-1.oa4 (application will not be accepted rob Name: Mannlesi JencS-Job- Address ford,Xl*t- WorkClass: New() Addition( ) Remodel({) Repair( ) Demo( ) Other( ) Does an EHU exist at this locationt Yes ( ) No Cf )) Exterior( ) Both( ) Type of Bldg.: Single-family ( ) Two-family ( ) MultFfamily ( ) Commercial ( ) Restaurant ( ) Other No, of Accommodation Units in this building:No. of Existing Dwelling Units in this building: Wood Burninq (NOT ALLOWED Does a Fire Sprinkler System Exist: YesDoes a Fire Alarm Exist: ...fiHT.irfil F:/everyone/formybldgperm For Parcel # Contact ** ** * ** *** Assessrc Office at 97O-328-864O or visit cE usE oNLY***********************r!************** l)D.rit4,,l- Questions? Call the Building Team at 479-2325 rul|/Ar Department of Community Development Project Name: Project Address: r' This Chekhlst mu# be omoleted beforc a Buildino Permit application is arcoted. o All pages of application is complete - '{ nut DRB approval obtained (if required) Provide a copy of approval form o Condominium Association letter of approval attached if project is a Multi-Family complex d Complete site plan submitted d Public Way Permit application included if applicable (refer to Public Works checklist) q Staging plan included (refer to Public Works checklist) No dumpster,oarkano or materaal storaoe allowed on roadwavs and shoulders without written aooroval e/ Asbestos test and results submitted if demolition is occurringd Architect stamp and signature (All Commercial and Multi family) d Full floor plans including building sections and elevations(4 sets of plans for Multi-Family and Commercial) 0/ Window and door schedule ctl Full structural plans, including design criteria (ie.loads) e/ Structural Engineer stamp and signature on structural plans (All Commercial and Multi Family) {Soils Report must be submitted prior to footing inspection 6 Fire resistive assemblies specified and penetrations indicated ( Smoke detectors shown on plans {types and quantity of fireplaces shown Date of submittal: _ Received By: _ F:/everyon{forms/bldperm2 HOW DIDWE RATE WTTH YOU? Toum of Vail Survey Gommunity Dwelopment Deparfnent Russell Fonest Direstor, (970)179-2139 Check all that applies. 1. Which Departnent(s) did you contact? Building _ Environmenbl_ Housing_ Adnin; Planning . DRB _ PEC _ 2. Was yourinitialconbctwiilr oursffiimmediate dow no one available__? 3. lf you were required to wa[ how long was it before you were helped? Was your project reviewed on a lfunely basis? Yes / No lf no, why no0- 5. Wasfiis yourfirstlimeb fle a DRB app_ PEC app Bldg Permit_ N/A Please rate fie perfonnance of he staffperson who assisbd you:54321Name: (knowledge; responsiveness, avdlability) Overall efiecliveness of he Front Service Counter. S 4 I 2 What is the best lime of day for you to use fre Front Service Counter? 9. Any comments you have which would allow us to betbr serve you nextlime? Thank you for taking the lime b conpleb ilris survey. We are commitbd h improving ourservice. 7. 8. TUR4VOF WHEN A *PUBLIC WAY PERMIT'IS REQUIRED PLEASE READ AND CHECK OFF EACH OF THE FOLLOWING QUESNONS REGARDING THE NEED FOR A "PUBLIC WAY PERMIT'': tr Is this a new residence? YES tr Does demolition work being performed requi easements or public propefi? NO t/ 'i jlf" "e Ris ht-of-way, No,/-o B tr o Is any utility work needed? YES Is the driveway being repaved?NO_-/__ Is a different access needed to the site other than the existing driveway? YES- NO Is any drainage work bging done that affects the Right-of-Way, easements, or public property? YES NO / Is a "Revocable Right-of-Way Permit" required?YES Is the Right-of-Way, glsements or public property to be used for staging, parking or fencing? YES NO I./ If answer is NO, is aparking, staging or fencing plan required by Public Works? YES_ NO_Z_ If you answered YES to any of these questions, a'tPublic Way Permit" must be obtained. "Public Way Permif applications may be obtained at the Public Work's office or at Community Development (a sample is attached). If you have any questions please call Leonard Sandoval in Public Works at 479-2198. I HAVE READ AND ANSWERED ALL THE ABOVE QUEfiONS. --a* 1|\ Qout\ar^c\\ur\ Job or Project tlamell\ Date Signed: F : /everyoneforms/bld perm4 Company Name TOVTNOF PUBLIC WORKS AND THE PUBLIC WAY PERMIT PROCESS How it relates to Building Permits: Fill out the attached check list with the Building Permit Aoplication. If yes was answered to any of the questions then a "Public Way" permit is required. you can pick up an application at either Community Development, located at 75 South Frontage Road or Public Works, located at 1309 Elkhorn Drive. Notice sign-offs for utility companies. ALL utilities must field verify (locate) respective utilifies prior to signing application. Some utility companies require up to 48 hours notice to schedule a locate. A construction traffic control/staging plan must be prepared on a separate sheet of paper. An approved site plan may also be used. This plan will show locations of all traffic control devices (signs, cones, etc.) and the work zone, (area of construction, staging, etc.). This plan will expire on November 1st and will need to be resubmitted for consideration for approval through the winter. Be aware that your resubmission for winter may be denied depending on the location of construction. Sketch of work being performed must be submitted indicating dimensions (length, width and depth of work). This may be drawn on the traffic control plan or a site plan for the job. Submit completed application to the Public Work's office for review. If required, locates will be scheduled for the Town of Vail electricians and irrigation crew. The locates take place in the morning, but may require up to 48 hours to peform. The Public Work's Construction Inspector will review the application and approve or deny the permit. You will be contacted as to the status and any requirements that may be needed. Most permits are released within 48 hours of being received, but please allow up to one (1) week to process. As soon as the permit is approved, the Building Department will be notified, allowing the "Building Permit" to be released. Please do not confuse the "Public Way Permit" with a "Building Permit". NOTE: The above process is for work in a public way ONLY. Public Way Permits are valid only until November 15th. A new Public Way Permit is required each year if work is not complete. Re-application each November 15th does not mean an automatic renewal. I have read and understand the above. Signature F :/everyone/forms/bldperm5 Date Signed BUILDING PERMIT ISSUANCE TIME FRAME If this permit requires a Town of Vail Fire Depaftment Approval, Engineer's (Public Works) review and approval, a Planning Depaftment review or Health Depaftment review, and a review by the Building Department, the estimated time for a total review will take as long as three (3) weeks. All commercial (large or small) and all multi-family permits will have to follow the above mentioned maximum requirements. Residential and small projects should take a lesser amount of time. However, if residential or smaller projects impact the various above mentioned departments with regard to necessary review, these projecls may also take three (3) weeks to review and approve. Every attempt will be made by this department to expedite this permit as soon as possible. I, the undersigned, understand the plan check procedure and time frame. I also understand that if the permit is not picked up by the expiration date, that I must still pay the plan check fee and that if I fail to do so it may affect future permits that I apply for. Agreed to by: Project Name: (T\o\\,v- daq, Print name J F:everyoneformtbldperm3 APPLICATION FOR TOWN OF VAIL PUBLIC WAY PERMIT 19- pw*:I I-l I n n PATCEI#:T T X N' T I T' T T' T T T Brds. Permit#'E I ! - [ f f I 1.Job Name Excavating Conlractor Name Street Address nnn-[l (lfunknowncallrrl rr LJ 479-2139 "*1. g 2.Maillng Address TOV Contractor I Licenae Number REQUIREO Phone #zbCity -' Slarl Date 4. Work is lor (circt€ one) Comol€tlon Date Water Sewer Gas Electric Telephone (P€rmit Explration Dat€) CATV Landscaping Temp. Site Access Other Trench-width (min.4') Bond Amount $ ALL MATERIAL, EQUIPMENT, AND TRAFFIC JOB IS STARTEO, 7.Rubber out-riggers are required on Asphalt surfaces underneath the A signature below indicates a signalures are obtained, permittoe necessary Town of Vail signatures. BE ON THE JOBSITE BEFORE THE working on asphalt. al all times. utility locations and approvals. Onc€ all utility company application through the Public Works office to obtain the up to one week to process. Depth ToralSF $ Total LF $ Permit Fee Total Permit Fee $ 8. Public Service Natural Gas Group (1'800-922'1987) Public Service Company (1 U.S. West (1 -800-922-1 987) TCI Cablevision of the Rockies (1'800-922-1 987) Eagte River Water & Sanitatlon District (970'476-7480, ext. 114) Holy Cross Electric Company (1-800-922'1987) Town of Vail Electricians (970479-2158) Town of Vail lrrigation (970-479'2158) Town of Vall Public Works Construction lnspector (970'479'2198) 9. THERE WILL BE NO TOTAL STREET CLOSURESI A construction trafiic control plan must be approved by the Public Works Department prior to issuance of the permit. All excavation must be done by hand within 18" of utilities - (Senale Bill 172)' Permittee must contacil Publlc Works Dopartment et 479-2198 24 hours prior to commencing of work' Failure to notify the town wjll result in forfeiture of bond money. Scheduled inspections which are not ready may result in the Town chargirig the contraclor a reinspection fee. I certify that I have read all chapters of Title I - Public Ways and Property, of the Vail Municipal Code and all ulility company agreements, signed by me, and will abide by ihe same, and that all utilities have been notified as required. 10. 11. 12. Contractor's Signature of Agro€menl ATTACH PLAN OF WORK, INCLUDING CONSTRUCTION TRAFFIC CONTROL PLAN show streets with names, buildings, and location of cuts. usE DASH LINES FOR CUT. Pdnt name clearly Dale ol Signature Whit€ - Public Works Yellow - Contractor DRAINAGE AND CULVERT INSPECTIONS ARE REOUIRED BY PUBLIC WORKS! Please read and check off each of the items below: q The Town of Vail Building Department has developed the following procedures to ensure that new construction sites have adequately established proper drainage from building sites along and adjacent to Town of Vail roads or streets. o The Town of Vail Public Works Department will be required to inspect and approve drainage adjacent to Town of Vail roads or streets and the installation of temporary or permanent culvefts at access points from the road or street onto the construction site. Such approval must be obtained prior to any requests for inspection by the Town of Vail Building Department for footings, temporary electrical or any other inspection. Please call Leonard Sandoval at479-2t98 to request an inspection from the Public Works Department. Allow a minimum of 24 hour notice. o Also, the Town of Vail Public Works Depatment will be approving all flnal drainage and culveft installation with resulting road patching as necessary. Such approval must be obtained prior to any Final Ceftificate of Occupancv issuance. Agreed to by: fr\r^trro t\a^^ Print Name\-J Project Name: Date Signed:4\-\Ob?- F:/everyoneformtbldperm6 Please read and check off each of the items below. (Copies of complete te)C are available upon request) CODE 5-2-10: DEPOSTTS ON PUBLIC WAYS PROHIBTTED o Unlawful deposits: Subject to subsection C thereof, it is unlawful for any person to litter, track or deposit, or cause to be littered, tracked or deposited, san(, gravel, rocks, mud, dirt, snow, ice, or any other debris or material upon any street, sidewalk, alley or public place, or any portion thereof. o Notice; Abatement: The Director of Public Works may notiff and require any person who violates or causes another to violate the provision of subsection A hereof, or who has in the Director's employment a person who violates or causes another to violate the same, top remove such sand, gravel, rocks, mud, dirt, snow, ice or any other debris or material within twenty four (24) hours after receipt of said notice by the Director of Public Works. In the event the person so notified does not comply with the notice within the period of time herein specified, the Director of Public Work, or other authorized agent, may cause any such sandr gravel, rocK, mud, dirt, snow, ice, debris or any other material to be removed from any street or alley at the expense of the notified. o Summons and Penalty: As an alternative to the notice for removal provided in subsection B above, any person who violates or causes another to violate the same, may be issued a summons to appear before the Municipal Court of the Town for said violations, and upon being found guilty of a violation hereunder be punished as provided in Section 14-1 of this code. o Notice and Penalty: It is unlawful for any person to fail or refuse to comply with the notice of the Director of Public Works as provided in subsection B hereof, and any such person shall, in addition to payment of the expense of removal incurred by the Director of Public Works, as provided in subsection B hereof, upon being found guilty of a violation hereunder, be punishable as provided in Section 14-1 of this Code. (1997 Code: Ordinance 5 (1979). CODES 7.3A-IAND 7.3A-3: PARKING OBSTRUCTING TRAFFIC & IMPOUNDMENT AUTHORIZED o No person shall park any vehicle upon a street or at any other place within this Municipality in such a manner or under such conditions as to interfere with the free movement of vehicular traffic or proper street or highway maintenance. (Ord. 2(1968) $ 1) o Whenever any police officer finds a vehicle attended or unattended, standing upon any portion of a street or upon any place within this Municipality in such a manner as to constitute a violation of any section of this Article, or left unattended for a period of twenty four (24) hours or more and presumed to be abandoned under the conditions prescribed by Colorado Revised Statutes section 42-4-1102, as amended, the officer shall require the vehicle to be removed or cause it to be removed and placed in storage in the nearest garage or other place of safety designated or maintained by this Municipality, and the charges for towing and storage of such vehicle shall be charged to the owner of the vehicle in addition to a ten dollar ($10) impoundment charge. (Ord. 2(1968) g 3: Ord. 28(1981) 5 1) I have read and will comply with the above code provisions: Position or Relationship to Project: Date Signed: F:/€veryone/forms/bldpennT Arr,l2.2tt02 l;24P|l|DESTINAII(]N FESORT lio.l79l P, l DESTINATION RESORTS 6tO WTST LIONSHBAD C'RCIE v-All- cotonADo tt6r7-rzet TELEPHONE (970) 476-lt5o FAX {9m) {76-1517 Fpnl 12,2Wt Town Of Vail Building Dept. 75 S. Frontage Rd. Vail, GO E1657 Re: Landmak T l+24 Remodel To lMrom I May Concem: Please let this fetter serve notice that T&M construction has the landmark cordorninir.rm Association's permission to proced with their kitcfien remodel of Tor,rrrrhouse#24. Please fet me knour if yoir require anything else. CreotrWright General Manager, l-andmark Destination Resgrt Managemenl. Inc. A Lrrrft E ictprirdE (bmpny TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT 75 S.FRONTAGEROAD VAIL, CO 81657 97M79-2138 NOTE: THIS PERMIT MUST BE POSTED ON TOBSITE AT ALL TIMES ELECTRICAL PERMIT |ob Address: 612 W LIONSHEAD CR VAIL Location.....: 610WLIONSHEADCIRCLE ParcelNo...: 270706307024 ProjectNo : ($-SW-oOq OlrlNER SCHNETDERIIAII, CHARIJES & F.LYSO4/24/2OO2 Phone: 12 BERMUDA LAKE DR PALM BEACH GARDENS FI, 33418-4583 Iricense: CONIRACTOR NE!iI ELECTRTC INC, P O BOX 957 AVON CO 8162 0 License: 1l-0-E APPIJICAI\M NEW EIJECTRIC INC, P O BOX 957 AVON CO 4L620 I-,icense: 110-E Desciption: REMODELELECTRICALSYSTEM Valuation: $1,900.00 04/24/2oo2 Phone : 97o-949-465L 04/24/2oo2 Phone: 97o-949-465L Permit #: E02-0043 Status...: ISSUED Applied. . : 04/24/2002 Issued. .: 04/30/2002 Expires. .: 1.0/27/2002 Total Calculated Fees-> Ss3 .00 Additional Fees----->$0.00 Total Permit Fee-> 953 - 00 Payments---> $53 .00 BALANCE DUE-->$0.00 FEE SUN'MARY Elechical--> DRB Fee-----> lnvestigation--> will call-_> $s0. 00 $0.00 $0.00 $3 .00 TOTAL FEE}> S53. OO Approvals:Item: 05000 EI-,ECTRICAIJ DEPARTMEMT o4/24/2oo2 DF Action; AP Item: 05500 FIRE DEPARTMEM CONDITIONSOF APPROVAL Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPI-,IAIiICE. DECLARATIONS I hereby ackno$iledge that I have read this applicatioo filled out in full the information required, completed an accurate plot plan, and state that all the in{ormation as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoninl and subdivision codes, design review approved, Uniform Building Code and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TVVENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2138 OR AT OUR OFFICE FROM 8:00 AM - 5 SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OI^/NE} ft+ttlf*ta*rlr*'afll''ff+flffll***rlirl*tl*'a*'}ffltlll{.**rfltl*'}*l'tft}lttf*frlfftft'}ttfl*l'lff,+l'f* TOIVNOFVAIL, COITORADO San€tneot *la*a*alatta*t*al*lfl*+ltal*+**l+laa+l***'illattaf**{'*aflll**a*+**allt**tltaaa*{tlt*alfllfll*+a Staternent lihrniber; R000002253 Arnount: $53.00 04/30/2002L1 :15 Alt Pa)ment Method: Check Init: LC Notation: *33737lNEw ErJEcTRre Permit No! 802-0043 Type: EtEqfRIeAJJ PERI4IT Parcel lilo: 2L0L06307O24 SLte Addreee: 612 W IJIONSHEAD CR \IAIL IJocation: 510 lY LIONSHE;AD CIRCLE Total Fees: S53. OO ThiE Paytn€nt,: $53.OO Total ALL Pmta: $53.00 Balance: 90.00 *al'++fa*1ti****'.a***a**a*'ia*{rt*+**{'laa*aal}**+fl+******{'a{'{t*t***l**l*+lr*f****a**faaalff***t** ACCOUNT ITEM LIST: Account Code DescriDtion Current Pmu EP OO1OOOO31114OO TEHPORARY POI,{ER PERMITS l\lc OO1OOOO31128OO WILL CALL INSPECTION FEE s0 .00 3. 00 OEt:53A New E]ectric P -O2r-24-oz IF II{COMPLETE OR BuildingaElectrical Permit #: g7 O- 47 I -2,119 (I nsPections) mrll0pYi,IL 75 S. Fronugc Rd. Vail, Colondo 81657 ractor:Contact and Phone *'s: N€-ur,t €.1 F ('l-Y?-l(-ln<.n 1 D-1,/9 -t l(a5/ Itractor Slgnature: COI||PIETE sQ. FEET FOR NEW BUILDS and VALUATIONS FOR ALL OTHERS (Labor & Ma :rials) AMOUNT OF SQ FT IN STRUCTURE:ELECTRICAL VAIUATION: f Contect Assessors Ofllce ,;t 97O-3.or Yisit for P. "cel # # (Required if no bldg. permit {!above) JobNamc:LOndrnarK 6H - l/,rUl TOT#.lobAddress: lotZ_ g, Lrrrnljhnc.r.d CrrC0P r***tr.tt*tt*trr*i*t**+*t**t*t t*at*rlrFOR OFFICE USE ONLY t*t* r * r l***a * F :/evEryorra/3(rtis/ElECPG| In BEST COPY AVAILABLE descripticn gf work:_fu etEtu* qv\W. _=, Work Class: Ncw ( ) Addition ( ) Remodet (X) n"pttt t I Tttp P"*"'t Jffi-ffi Type of Bldg.: Slnglefarnily ( ) Duplex (I ItUtr+"tifv tp. tommercial ( ) Restaurant ( ) other ll No. of Accommodation Unlts in this building:ito. of ErFting Dwelling Units in this building:{ Is this perrnit for a hot tub: Yes ( ) No dffi'File-FfiEer Svstcm Exist Yes ooes a rire Alarm Exist: Yes (K ) No ( ;BE-*c*ffi.8?.. z 4 ?0c2