Loading...
HomeMy WebLinkAboutPRJ08-0057 B08-0054 LEGALNOTE: rHrS PERMIT MUST BE POSTED ON JOBSTfE AT ALL TIMES ,'-:'-\ l-\".4t 10fl!{trvt[,17 Town of Vail, Community DevelopmentJffiuth Frontage Road, Vail, Colorado 81657 p. 97 0.47 9.21 39 t. 97 0.47 9.2452 inspection s 97 0.47 9.21 49 Permit #: Eo8-0065 Gor oo5'r Project #: PRJ08-0057 ELEGTRICAL PERMIT AMF Job Address: 434 GORE CREEK DR VAIL Location.....: ALL SEASONS B-5 Parcel No...: 210108237012 OWNER WYMAN, TIMOTHY E.. MORGAN, O4I25NOO8 TRUSTEES 31 S HARRISON ST EASTON MD 21601 APPLICANTBOSTONELECTRIC O4l25l2OO8Phone:970-748-6980 P.O. BOX2472 AVON co 81620 License: 155-E CONTRACTORBOSTONELECTRIC 04l25l2OOBPhone:97G748-6980 P.O.BOX2472 AVON co 81620 License: 155-E Desciption: KITCHEN REMODEL ADD 1 ART LIGHT, PUCK LIGHTS lN LIVING ROOM, AND 3 PLASMA TV OUTLETSValuation: $5,000.00 Squa,€ feet: 1600 FEE SUMMARY ISSUED 0/.t25t2008 o4t25t2008 10t2212008 Electrical Permit Fee-----> I nvestigation Fee--------> Will Call Fee----------> U se Tax Fee------------------> Total Calculated Fees----> $86.25 $0.00 $4.00 $0.00 $90.25 Total Calculated Fees-> Additional Fees----------> TOTAL PERMIT FEE-.> Payments---- BALANCE DUE----..> $90.25 $0.00 $90.25 $90.2s $0.00 APPROVALS Item: 06000 ELECTRICAL DEPARTMENT 0412512008 tlt Action: AP Item: 05600 FIRE DEPARTMENT CONDITIONS OF APPROVAL Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plol plan, and state that all the information as required is correct. I agree to comply wilh the information and plot plan, to comply with all Town ordinances and state laws, and lo build this struclure according to the towns zoning and subdivision codes, design review approved, International Building and Residenlial Codes and other ordinances of the Town applicable thereto. REQUESTS FOR I OFFICE FROM 8:00 Date elec orm 041908 or Contractor Print Name elec_prm_041908 * '3 * * | | * * * r.,r * * * * * * * * r * * * tt* i I r r * * * * * * * * * i * * * * * 't 'l 'l 't t't't* * * * I * * *** * * * * * 't,t't 'f 'lrl* * * * **l*t,t,t,l * * * * * * * TOWNOFVAIL, COLORADO Statement * * ** * * * * * * * * * * * | | t * * r. * * * * ** | | * * * * * * I * {r | * * I | | | I | | * * 't 't * ** * 't 't '} * * * * I I *:t 'l 'l 'l' l' * * * * * * * 't* | t 'f l* * * * * * * * Statement Number r R080000541 AmounE, I $90,25 04/25/200803:53 PM PaymenL Method: Check EI,ECTRIC INit: SAB Notation: 1712 BOSTON Permit No! Parcel No: Sit.e Address : Irocation: This Palment: ACCOIJNT ITEM LIST: Account Code EP 00100003111100 wc 00100003112800 E08 - 0065 2t0t-o82-370t-2 434 GORE CREEK DR VAIL AI.,I, SE]ASONS B-5 s90.2s Descriotion Type; EIJECTRICAL PERMIT tt* * **********t t * I t*tt *l * *t********trt tft'|' tlt 't* f tr* * 'l I t' | * * * | * * * | * t * * *:t:l' 'l * * * * * * * * * * * {' I ll 't * + * 'l 'i I' Totsal FeeE : Total ALL Pmts: Balance : $90.2s $90.25 $0.00 CurrenE Pmts 86.25 4.00 EIJECTRICAIJ PERMIT F'EES WfLL CALL INSPECTION FEE 75 S. Frontage Rd. Vail, Colorado 81657 CONTRACTOR INFORMATION Town ofVail Reg. No.: 5\r\e-tC<-\N.L FOR AREA OF WORK AND VATUATION OF WORK (Labor & Materials) AMOUNT OF SQ FT IN STRUCruRE: k-c)D ELECIRICALVALUATIoN: $ SOCI\- (, 2}?O Job Name: flo\.^ [aUd-t,..<Job Address:t3'1' Cr""e. Subdivision: $,\\ Se.osons /L, 11 S.\nr.l,r,^ Sli :':':Poon lworl: K,Vh,","ss;4. qn L [r\ ir*,.,..",.. .. _ ile-\ , q\L 0\ c"F\ \';\\, e-.1, \'r\h .1 WorkOass: New() Addition( ) Remodel M Repair( ) TempPower( ) Other( ) b<terior( ) Both( )Does an EHU exist at this location: Yes ( ) No ( ) Typeof Bldg.: Single-family( ) Duplex( ) Multi-familyffi Commercial ( ) Restaurant( ) Other( ) No. of Existing Dwelling Units in this building:No. of Accommodation Units in this building: for a hot tub: Yes ( ) No Does a Fire Alarm Exist: Yes ( ) No ( TOWN OF VAIL Conbd Awrc Offie at 97h328-86tttt or visit ***************************************FOR OFFICE USE ONLY****** I F :\cdev\FORMS\PERMm\Buildi ng\€lectical_!ermit_l 1-23-2005. DOC for Patel # Page I of 2 7r1231200s ,*m o o o o Amendmentto the 2OO2 N.E.C. Town of Vail Ordinance 4, Series of 2005 Overhead seruices are not allowed in he Town of Vail. tlnderground serices shallbe in conduit (PVC) from the utility tansformer to the electric meter, main disconnect switch, and to the first electrical distribution circuit breaker panel. the main disconnect sfftch shall E radily arcssiile, andlocated next to the meter on the exterior wall of the structure. All underground conduits are required to be inspected before back-filling the trench. In multi-fami[ dwelling units, no electrical wiring or feeder cables shall pass from one unit to another. Common waffs and spaces are exempt- NM Cabfe (ttomex) can b uN only in single and mufti-family dwellings net qding 3 sbrfiB. Type NM cannot b u*d in any building mixd with lype +B.EEH,I/M &S oanpnde. Aluminum onducbrs smaller than size #8 are not permitted with the Town of Vail. TOWN OF VAIL ETECTRICAL PERMIT GUIDEUNES All installations of oderior hot tubs or spa's require a DRB approval from planning. This application will not be accepted without a copy of the DRB approval form attached (if applicable). If this permit is for installation of an exterior hot tub or spa on a new elevated platform or deck over 30" above grade, you must also obtain a building permit. If this perrnit is for installation of an exterior hot tub or spa on any existing deck or elevated platform, a structural engineer must review the existing condition and veriff that it will support the added concenbar:ed load. Please provide a copy of the structural engineers wet stamped lefter or drawing with this applicaUon. If this is a remodel in a multi-family building with a homeowners association, a letter of permission from the association is required. If this permit is for a commercial space, two (2) sets of stamped drawings are required. Elsfrical oneline and pnel schedule arc tquircd if load is added or distribution is alhrcd. I have read and understand the above, Date Signed If you have questions regarding the above information or have additional questions, pfease contact the Town of Vail Electrical Inspector at97O-479-2I47. The inspector can be. reached on Monday thru Friday mornings betyneen the hourc of 8am and 9am. You may also leave a voice mail and the inspector will call you back. F:\cdev\FORMS\PERMm\Building\electical]ermit-l 1-23-2005. DOc Page 2 of 2 LU23l2OOs TOWN OF VAIL DEPARTMENT OF COMMLTNITY DEVELOPMENT 75 S,FRONTAGEROAD VAIL, CO 81657 9'10-479-2138 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ADD/ALT MF BUILD PERMIT Permit #: 808-0054 Project #: 08-0057 Job Address.: 434 CORE CRJEK DR VAIL Status.....: ISSUED Location......: ALL SEASONS B-5 Applied...: 03/252008 Parcel No....: 210108237012 Issued ,..: 03/3112008 Expires...: 09/2712008 ohrNER WYMAN, TTMOIHY E. - MORGAN, 03/25/2008 TRUSTEES 31 S HARRISON ST EASTON MD 21_607 APPLICANT ATLAS CONSTRUCTION 03/25/2OOg Phone: 970-926-L455 144 WILDCAT STREET EDWARDS co 8L632 License: 255-A CONTRACTOR ATLAS CONSTRUCTION 03/25/2OOA Phoner 970-926-1455 ].44 WILDCAT STREET EDWARDS co 81532 License: 255-A Desciption: WINDOWADDITION Occupancy: R2 Type Construction: VA Valuation: $20,000.00 Revision Valuation: $0.00 Total Sq Ft Added: 0 ''l.'l|lt+t+*.:tl...|.*..*|**t'|*t*|t|l|'l''lt+.*.|t.*'}:}**.:|*t.l:}|+'t+.'||.+FEESUMYBuilding---> $321.25 Restuannt Plan Review-> $o.oo TotalCalculated Fees-> 5534.06 Plan Check--> $208. 81 Rccrealion Fee-----------> go. oo Additional Fees-----> So. oo lnvestigataon-> 90.00 TOTAL FEES-------> $534.06 Total Permit Fee------> 9s34.06 Will Cdl--> g{ . OO Pa}ments-._..----_---> S534. 06 BALANCE DUE-----> 50.00 t l rl a+*a +r a+r +a t t Approvals:Item: 05100 BUILDING DEPARTMENT 03 /28/2009 cgunion Action: AP a * * r* l t*a t* l l r *'l. r See Conditions page of this Document for any conditions that may apply to this permit. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns mning and suMivision codes, design review appnoved, Intemational Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHAII BE MAI'E TWENTY.FOUN I|OURII IN TDLEPHONE AT 479-214t OR AT OUR OITICE FROM t:00 AM ' 4 PM, WNEROR ANDOWNER **********'t.*1.**'t{t{t*'***'l.*****'i{.'}*'|.**,}'t!i.**,}****'|.********'|'l.******:t****f'}*d.,}!t,|.******|}*'|.******* CONDITIONS OF APPROVAL Permit #: 808-0054 as of 03-3 I -2008 Status: ISSUED {.'t{.**tl.*{.{.*'l.,}{.**i.*{.*'|.***'!**'i*****:t**.|.,}***l.*1.****'|.'}*.|.**'t*,t,l.'|l.+:l.***************+ Permit Type: ADD/ALT MF BUILD PERMIT Applied: 0312512008 Applicant: ATLAS CONSTRUCTION Issued: 03/31/2008 970-926-1455 To Expire: 0912712008 Job Address: 434 GORE CRXEK DR VAIL Location: ALL SEASONS B-5 ParcelNo: 210108237012 Description: WINDOWADDITION ***,i*'t't*{.'}'1.******+*'1.*****'1,1.*,t**********'*rl.**'t*{.{.Conditions.{.**r.t 'r***{.{.'t*********{.*{.*.1.'t*'t**************{.* Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: l4 (BLDG.): ALL PENETRATIONS IN WALLS, CEILINGS, AND FLOORS TO BE SEALED WITH AN APPROVED FIRE MATERIAL. Cond: I (FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY WORK CAN BE STARTED, Cond:40 (BLDG): (MFRiCOMM) FIRE ALARM REQUIRED PERNFPA 72. { {' * t * * {' * t t t t { {' I t * {' * * + * * * r' * * I' I t {t * a' * t a a' * ** **r't*t***t*t*****{'aif**rr*rf***t*a**rti**r**'}***'l *t*t TOWNOFVAIL, COLORADO Statement aaa**alaatattt*'|*tt'}tatt*+tlt||'|'|a*atal * i'* + ft tt t t * | | l a t t t * | | t * ****f * | t '} * t **t* * t * | | | 't 't * * * * * * * * sEatement Number: Ro8ooo0364 Amount: s534.06 03/3L/2OO8L0:07 All Payment Method: eheck ConsuructioD 5544 Inits: DDG Notation: Atlas Permit No: Parcel No: Sit.e AddreBE: L,ocation: This Payment: BP 00100003111100 PF 00100003112300 wc 00100003112800 B08-00s4 2101- 082 - 3 701- 2 434 GORE CREEK ALIJ SEASONS B-5 $s34. 06 T)G)e: ADD/ALT MF BUfIJD PERMIT DR VAII, Total FeeE: TOtAl I\IJIJ E\NtA : Balance : $534 . o5 $s34 . 05 $o. oo * * * * i t * * * * * 'l '|' * *a * * * * * * * * * * * * * * * * * * * * * * * * | * | * *'l * * * * * * * * * {' * * 'l * * * f t * {' t * * l' {' * * * * * * * * 'l * 'l * 'l 'l * {t t 'l t t * ACCOIJNT ITEM LIST: Account Code Description Current PmtE BUII,DING PSRIIIIT SEES PIA}I CHECK FEES WfLIJ CAIJJ INSPECTION FEE 321 .25 208.81 4.00 tl Iffiyl{trIftll,t.7 75 S. Frontage Rd. APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR BUI APP TION Separate @lumbing, mechanical, etc.l CONTRACTOR INFORMATION Vail, Golorado 81657 Project #: Buildinq Permit #: To-so',. ?r"r* ?zo COMPLETE VALUATIONS FOR BUILDING PERMIT Labor & Materials For Parcel # Contact Cou Assessors Office at 970-328-8640 or visit Ato 1 - ct 02- -37at -L JobAddress: {3{ (uz' cre-cLJobName: fu WorkClass: New() Addition( ) Remodelp{ Repair( ) Demo( ) Other( ) Does an EHU exist at this location: Yes ( ) No ( )WorkType: Interior( ) Exterior( ) Both Type of Bldg.: single-family ( ) Twe.family ( ) Multi-family pQ commercial ( ) Restaurant ( ) other ( ) No. of Accommodation Units in this building:No. of Existing Dwelling Units in this building: : GasAooliances( ) GasLoss( ) Wood/Pellet( ) Wood GasLoqs( ) Wood/Pellet( ) Wood FOR OFFICE USE ONL Bc8'ccSq l',iAil 2 I Zt]tifl TOWN OF V,AIL F:\cdev\FoRl.lS\Permits\Building\building jermit-+ 17-2007. DOC Page 1 of 7 MlL7l2ffi7 J rtloo-s3 IC.r-rN-o'=rn-o:\oz. E -r E ITsgF(E (tr--(J 3{s+ rrrz E,Fo LJJ(/l o- Eo- Eu33 ;EHHg:R* =;?'Jif x*o|.i .G oc 3 P ca cg - Ulfr<(,z tr(, =Lll ?392aeE#EB 6gm+=trtts>''r5rSilGOZr-rrIlHl! -\ 'r l- r8si-?nJ-unT-Fa\=*tso?lF !==:Eni6-r.rI -z-)-l-=<>zzFrgoo A-G' CJl*l C5IlJ-U-G' P.O. BOX 2494 AVON. CO 81620 PH 970.949.7100 FAx 970.949.3377 lulions NGINEERING PROJECT MORGAN REMODEL JOB NO. SHEET NO. CALCULATEP 3Y JPL P415 GENEFT\L NOTES: MOAGAN FEMOOEL JOB# 030248 0ESIGN CRITERIAI ROOF UVE LOAD: lOO PSF ROOF DEAD LOAO: 15 PsF BASIC WND SPEED (3 :lEC GUSD: 90 MPH WIND EXPOSURE B SEISMIC DESIGN CAIESOFY: C IRC EDITION: 2OO3 S'IFUCIUFAL WOOD F ?AMING: 1, EXCEPTWHERE NOTED OTHEBWISE, ALL ? NOM1NAL LUMBER EXC€PTSTUDS SHALL BE DOUGTAS FIR-LAFCH #2 AND BET]ER. ALL SOLID TII\,IBER POSTS AND BEAA'S 3'NOMNALAND WIDER SHALL BE DOUGLAS FIF.LAFCH #2 UNLESS NO'IED OTHER1flISE Oi PIAN. 2, STUDS SHALI BE S']UD GFADE AND BETTEF HEM FIB OR DOUGLAS FIF-LARCH 3. BLOCKINGWTHIN T:LOOF JOIST SPACES BENEATH POSTS NO]ED ON PT.AN SHALI- BE OF EOUIVALENT AFEA OF ]HE COLUMN ABOVE. SINGL€ STUD TFIMMERS DO NOT FIEOUIRE ADDINONAL BLOCKING IN THE FLOOR, 4. REFEF TOTITE 200:r IRC TABLE R602.3(1) OR 2OO3 tBC TABTE 2304.9.1 FOF MINIMUI.r| FAS]ENING I;CHEDULE. A COPY OF TllIS TABLE CAN BE PROVIDED UPON REOUEST. AS S IATED IN SECION 2304.9.5 OF]HE 2OO3 IBC SECNON 2304.9.5: FASTENERS FOF PRESEFVAII!€-'IFEATED AND FIRE-RETAFDANT.'IFEATED WOOD SHATI BE OF HOT-DIPPED ZNC-COATED GALVANIZED S]EEL, STAIN|"ISS S'IEEL SILICON BFONZE OF COPPER. FASIENINGS FOF WOOD FOUNDATIONS SHALI BE AS REOUIRED IN AF&PA TECHNICAL REPOFT No 7. 5. UNLESS NOIED OIHERWSE. STEEL CONNECTORS SHAL BE USED TOJOIN FAFIERS, JOISTS ANO BEAMS SUCH AS SII,IPSON SIRONGTIE CONNECTORS OF EOUIVALENT 6. NUMBER OF STUDS INDICATED ON PTANS FOR BUTLT UP POSTS ARE TFIMMERS ONLYANO DO NOT INCTUDE KJNG STUDS. 7. AT EEAM BEAFING -OCATIONS IN STUO WALLS. PROVIDE MULTIPLE.S'TUD POSTS EOUAL TO WCTH OF BEAM UNLESS NO'IED O'THEFiWSE, 8, t-AMINATED V€NEE ] LUMBER (LVL) SHALL HAVE]HE FOLLOWNG MINIMUM PFOPERTIES:. FLEXUFAL BENDIN3 SI;IESST mOO psl . MODULUS OF ELAIITICITY: 1.9OO.OOO psl . TENSION PARALLELTO GRAIN: 185OPSl. COMPRESSION PA?ALLEL TO GRAIN: 2310 PSI. COMPRESSION PAIAU-EL TO GRAIN: 750 PSt PERPENDICULAI TO Gi-UE LINE. HOFIZONTAL SrlB\F:285 PSt FOLLOW lHE MANUFI.CTURER'S RECOMIVENDAIIONS F=GAROING BLOCKING, BRACING AND WEB SI1FFENEFS Al.lD l\,IULT|PLE MEMBEB CONNECTIONS. GENERAL REOUIREMENTS i. CHECK ALL DIMENIJIONS AAAINST ARCHITECTURAL DRAWINGS PRIOR TO CONSTRUCTION, DO NOT SCALE DRAWINGS. CONTACTENGINEER IF DISCREPANCIES lN Ol !,IENSIONS ARE o|SCO\€FED. 2. T}IE S1FUCTURAL I)RAWINCS DESCRItsE THE COMPLETED STFUCTURE IHESE DRAWNGS HA'/E BEEN PREPARED FOR THE USE OF A OUALIFIED CONTFACTOF WIIH E XP ERIENCE ] N -THE CONSTRUCT]ON SYSTEI\,IS AND TECHNIOUES DESCFI3EO. THE CONTRACTOB SHALL PROVIDE ADEQUATE SHORING AND BRACI!G IN THE PROPER SEOUENCE, AS MAY BE REOUIREO TO ACHIEVE THE FINAL CCMPLETED S]RUCTURE. THE SEAUENCE OF CONSTFUCIO\I lS TF E FESPONS|BIL]TY OF INE CONTBACTOR. CONSULT wT TH THE ENGINEER FOR SJHORING DESIGN AND RECOMMENDATIONS (NOT IN coNTRACl. 3. THE CONTFACTOF IS FESPONSIBLE FOF ]HE MEANS, ME'THODS SEOUENCES AND PROCEDUFES F()R CONSTFUC]ION OF IHIS PFOJECT. NOTIF/ SMUCTURAL ENGINE:ER OF ERFORS OR OMISSIONS IN THE CONS'IRUSTION DOCUMENTS IMMEDI,\TELY. DO NOT PROCEEO UNl]L ERRORS OF CIMISSIONS ARE RESOL\€D, COC)RDINAIE BEQUIREMENTS FOR ALL PENE'IIAT]ONS THFOUGH STFUCTUNAL MEMBERS \A1lN STRI]CTURAL ENGINEER, JOBS]]E SAFETY IS THE SOLE IIESPONSIBILITY OF]HE CONTRACTOR. 4, OBSERVATION !1S TS BY THE STRUCTURAL ENONEERARE FOR DETERMINATION OF (iENERAL COMPLIANCE WITH lHE CONSTRUCIION DOCUMENTS THIS CIBSERVATION VISIT IS NOT AAI INSPECTIoN ]HE CON]XACTOF SHALL CONTACT THE ENGINEEB AT THE APPFOPF]ATETIME TO SCHEDULE THIS VLSII 5. IF NEW CONSTFUCTION ADJO1NS AN EXIS]ING STRUC'IURE ]HE CONIFACTOF SHALL BE BESPONSIBLE FORVERIFflNG DIMENSIONS. EIEVA'TIONS AND ALL EXIST]NG CONDINONS. UNDERPINNINGAND SHORING OF EXISTING STFUCTURES SI-iALL BE lHE FESPONSIBIUTY OF]HE CCNTRACTOR CONSULTWIH THE ENGINEER FOF SHORING DESIGN AND RECOMMENDATIONS (NOT IN CONTRACTI. 6, WHILE E\,€RY EFFOFT IS I\,IADE TO PRO\IOE A COI,4PLETE AND ACCUFA]E SET OF CONS]RUCTION DOCUMENTS, ERRORS OF OIVISSIONS MAY OCCUR. RELEASE OF THESE DRAWINGS ANTICIPATES CONNNUED COOPEFANON ANO COMMUNICATION BETWEEN THE CONTFACTOR, AFCHIIECT AND ENGINEER TO PFOV]DE T.IE BEST DOSSIELE STtIUCTUqL, ABBREVIATIONS LIST ABV. BLKG. BM. BRG. coL. EQ, EXSTG. HDR. JSTS, K.S, LVL o.c. R. REF. T TYP. VIF ABOVE BLOCKING BEAM BEARING COLUMN CRIPPLE POST EOUAL EXISTING HEADER JOISTS KING STUD LAMINATED VENEER LUMBER ON CENTER PLATE REFERENCE TRIMMER ryPICAL VERIFY IN FIELD WITH P.O. BOX 2494 AVON. CO 81620 PH 970.949.7100 FAX 970.949.3377 lutions N G I T\E E RIN G MORGAN REMODEL SHEET NO. CALCULATEp gy JPL ll _L_l _r_L-J_ | [,' ., ' lt, -l E| | cd'gr@s,e{z-(r)l ,rl r tl Allrrrrll' t2 II||l -r:t.*\ t hI lllr'4fu,i iii ili u),i xa ql-,a>l,l lr XDllll|,' I a^ll, t rl ,-uE.TiT_---1_>1|'4^ ,'r | 1l (JAll , o;ll:l I z*o ,,o = lltlltlit ,rz* ll ':lril lJLUlrrl gg ll_i_l_l_ -r-l-t-l-f-l-t-l-tl _lr II s - ... : TJJ (5z ax uJao-ul- =t z o_ CDz r LL LLoot r.l =h_U.Jx1UJ EUJul>>oU'D 6.( xoy.J 9=d \)> -l- Jz_E H; o{cc(9o-r T I I I I Il: l = o LUF () dz z =EIL 3 uJz z : I I J alIFa ot! k ooza;zz>>dgo lL:qx =iF-'-;-\ --al I ciluF (J oz [! I=.. a')oiu.l ]uk9 ^x>Y g1 Z <z =Rd66Zg) uJ?> --'! (D =<tr><o OLL AAql66 HIP Rzl=='rrll! t! <l= z ilt;N(9 Dclgn Rwlcw Borrd ACTIOI{ FORII DtDrtln|at of @nnunltt Mm.nt t5 Sot dr fil*re. lo.d, W!, Color.do alatt trl: tm.|,t.utt frr: tto.att.rtl rel: rrr.vdllw.ecn Proiect Name: MORGANAVYMAN WINDOW Prcject Description: Padicipanb: APPUCANT ATLAS CONSTRUCNON 144 WILDCAT STREET EDWARDS co 81632 License: 255-A CONTRACTOR ATI-AS CONSTRUCNON 1,T4 WIT-DCAT STREET EDWARDS co 81532 License:255-A 434 GORE CREEK DR VAIL DRB Numb€r: DR8080057 03/10/2008 Phone: 970-926-1455 03/10/2008 Phone: 970-926-1455 Location: ALLSEASONS B-5 FINAL APPROVAL FOR A TMNSOM WINDOW ADDMON owNER WYMAN, TIMOTHY E. - MORGAN,03/10/2008 TRUSTEES 31 S HARRISON ST EASTON MD 21601 Proiect Address: Legal Description: Parcd Number: Comments: loh B Block Subdivision: ALL SEASONS CONDO 2101-082-3701-2 BOARD/STAFF ACTION l.lotion By: Gillette Second By: Dantas Vote: 4-0-0 Conditions: Action: APPROVED Date of Approval: 03/19/2008 Cond: 8 (P|-AN): No dranges to these plans may be made without the written consent of Town of Vail staff and/or the appropriate review committee(s). Cond: 0 (PLAN): DRB approval does not constitute a permit for building. Please consult with Town of Vail Building personnel prior to construction activities. Cond: 201 (PLAN): DRB approval shall not become valid for 20 days following the date of approval, pursuant to the Vail Town Code, Chapter 12-3-3: APPEAIS. @nd:202 (PI-AN): Approval of this proJed shall lapse and beome void one (1) year following the date of final approval, unless a building permit is lszued and @nstructlon is commenced and ls diligenUy pursued toward ompleton. Cond: CON0009828 The applicant shall add a center mullion to the proposed window to match the sliding door below and shall submit a revlsed renderirp at the tme of building permlt. Planner: Nlaole Peterson DRB Fee Paid: S2!tO.0O ALL SEASIONS COITDOMINITIM ASSOCIATION .I34GORE CREH(DRTT/E vArr,, c0E1657 Muth 6,2008 Towuof Veil ConmrnityDcvelopmart l l l S. Frontage Road West Va,ll, CO 81657 RE: Rcmodcl - rVindow Addition in Unit 85. Dcar Ladics and Gentlcmqr: This letcr is to infonn you tba the Board of lvlaoragas of thc All Seasons Condomlnigm Associatiou has approvcd the addition of a wlndow above thc dcsk door on thc sorlb side of Unit B5. Permission has also becn granted to vsnt onc appliance eitbcrtbmqhthc cast wall ortbroughthe roof. If you should have any qucsdons, pleasc do not hesitate to @ntact mG. Sinccreln Y^r1-T*l P \-e'e"+ IrryG. Barnes ManagingAgcnt tl f0m,,ffi Questions? Callthe Building Team at 479-2325 Project Name: Project Addrcss: This Chedrlist murt fu omoleW fufore a Building permit application is a' All pages of application is complete Co 6K,'s? {1la6€5,tcE test and results submitted if demolition is occuring Lt/vDe)L 6tz Architect stamp and signature (All Commercial and Multi family) /uo4 o Full floor plans including building sections and elevations(s sets of plans for Multi-Family and Commercial Buildings) o -Window and door schedule 6 Full structural plans, including design criteria (i.e.loads) 6Y Sptdrural Engineer stamp and signature on structural plans (All Commercial and Multi Family) r.a/ |oils Report must be submitted prior to footing inspection d fre resistive assemblies specified and penetrations indicated o Smoke detectors shown on plans o Types and quanUty offireplaces shown Applicant's Signature: Date of submittal:3 fu/or Department of Community Development ,{nutDRB approval obtained (if required) Provide a copy of approval formy' Condominium Association letter of approval attached if project is a MultFFamily complex ,{ Cnmpletesite plan submitted f 9nlic Way Permit application included if applicable (refer to Public Work checklist) pd Saging plan included (refer to Publh Works chectdist) No dumoster,oarkinq or materiat storaoe \WailWata\cdev\FORMS\PERM ITS\BLDGPERM.DOC Received By: ut0212003 BUILDING PERMIT ISSUANCE TIME FRAME If this permit requires a Town of Vail Fire Depaftment Approval, Engineer's (Public Works) review and approval, a Planning Department review or Health Department review, and a review by the Building Department, the estimated time for a total review will take as long as three (3) weeks. All commercial (large or small) and all multi-family permits will have to follow the above mentioned maximum requirements. Residential and small projects should take a lesser amount of time. However, if residential or smaller projects impact the various above mentioned departments with regard to necessary review, these projects may also take three (3) weeks to review and approve. Every attempt will be made by this department to expedite this permit as soon as possible. I, the undersigned, understand the plan check procedure and time frame. I also understand that if the permit is not picked up by the expiration date, that I must still pay the plan check fee and that if I fail to do so it may afFect future permib that I apply for, Project Name: out", 3lzu [o8 -T-T Signature F:everyone/forms/bldperm3 /'1\ - ISJ'r.-At=s/, J TowdvnV HOW DIDWE RATE WITH YOU? Town of VailSurvey Community Development Departnent Russell Fomst Directot (970)479.2139 Check all thd applies. 1. Which Deparfnent(s) did you contact? Building la Environmenbl_ Housing_ AdminPlanning DRB }( PEC 2. Was yourinfial contactwilh ourstaffimmediate o4 sbw no one avdlable lf you were required b wait, how long was it bebre you were helped? N l*' 4.Was your project revieured on a timely nasisZ @l No lf no, why not? 5, Was this your first time to fle a DRB ep-F - PEC app Bldg Permit k NilA 7. Overall efiectiveness of tre Front Service Counter.@ 4 3 2 1 8. What is the best time of day for you to use fie Front Service Counter? 9. Any comments you have which would allow us to better serve you nexttime? Thank you for taking the time b complete this survey, We ue commifted b improving our seMce. Please rate the performance of $e sbffperson who asssfud you:(S)t 3 21 Name: tj..it-- -loest-ril*r* {nowledge; responsiveneffi WHEN A'PUBLIC WAy PERMIT" IS REQUIRED PLEASE REAS AND CHECK OFF EACH OF THE FOLLOMNG QUESTIONS REGARDING THE NEED FOR A "PUBUC WAY PERMIT": o Is this a new residence? o Does demolition work being public propefi? performed require the use of the Right-of-Way, easements or YES No__!<- NO.K YES No D< Is a different access needed to the site other than the existing driveway? YES- NO\ Is any drainage work being done that affects the Right-of-Way, easements, or public property? YES NO 4 Is a "Revocable Right-oFWay Permit" required?NO_K - Is the Right-of-Way, easements or public property to be used for staging, parking or fencing?YES NO h yag** is NO,is lqrkinO, staging or fencing plan required by Public WorK? If you answered YES to any of these questions, a "Public Way Permit" must be obtained. "Public Way Permit" applications may be obtained at the Public Workt office or at Community Development (a sample is attached). If you have any questions please call Leonard Sandoval in Public Works at 479-2198. I HAVE READ AND ALL THE ABOVE QUESTIONS. 4Ans &s{zue:zhr) Contractor Signature Job or Poect Name: Date Signed: YES NO K Is any utility work needed? YES Is the driveway being repaved? D J -lo-Ot F:/everyone/forms/bldperm4 Company Name APPLICATION FOR TOWN OF VAIL PUBLIC WAY PERMIT 19 PW*:Tf'TTfT Parcer#:I r f, [ - I I I - [ ! - I I I Brds. Permit#,8 n I' n I I I 't. Job Name Str€et Address T] n n-[-l (tfunknowncetlI ll ll | | | 479.2198 ext. O)2.Excavating Contractor Nams Mailing Addr€8s TOV Contrac{or's License Number REOUIREO () Phone #ApCity 4. Start Dat6 Work is for lcircle one; Comolslion Dale Water Sewer Gas Electric Telephone (Psrmit Explratlon Dat€) CAW Landscaping Temp. Site Access Other Trench-width (min.4') Bond Amount $ ALL MATERIAL, EQUIPMENT, AND TRAFFIC JOB IS STARTED. 7.Rubber out-riggers are required on Asphalt surfaces underneath the A signature below indicates a signalures are obtainedr permitt€e necessary Town ol Vail signatures. ST BE ON THE JOBSITE BEFORE THE working on asphalt. at all times. utility locations and approvals. Once all utility company application through the Public Works ofiice to obtain the up to one week to prooess. Depth Total sF $ Total LF $ Permit Fee Total Permit Fee $ Public Service Company (1 U.S. West (1 -800-922-1 987) Public Service Natural Gas Group (1-800-922-19871 TCI Cablevision of the Rockies (1-800-922-1987) Eagle River Water & Sanitation District (970-476-7480, ext. 114) Holy Cross Electric Company (1-800-922-1987) Town ol Vail Electricians (970479-2158) Town of Vail lrrigation (970-479-2158) Town of Vail Public Works Construction Inspector (970'479'2198) 9. THERE WILL BE NO TOTAL STREET CLOSURESI A construction trafiic control plan must be approved by the Public Works Department prior to issuance of the permit. 1 0. All excavation must be done by hand within 18" of utilities - (Senate Bill 172). 11. pennitte€ must contact Publlc Works D€oartment al 479-2198 24 houGt prior to commencino ol work. Failure to notify lhe Town will result in forfeiture of bond money. Scheduled inspections which are nol ready may result in lhe Town charging the contractor a reinspection fee. 12, I certify that I have read all chapters of Title 8 - Public Ways and Property, of the Vail Municipal Code and all utility company agreements, signed by me, and will abide by lhe same, and that all utilities have been notified as required. Contractor's Signature ot Agrooment ATTACH PLAN OF WORK, INCLUDING CONSTRUCTION TRAFFIC CONTROL PLAN show streets with names, buildings, and location of cuts. usE DASH LINES FOR CUT. Pdnt namo clearly Dale ol Signature Whits - Public Works Y€llow - Conlractor NW0FYt PUBLIC WORKS AND THE PUBLIC WAY PERMIT PROCESS How it relates to Building Permits: Fill out the attached check list with the Building Permit Application. If yes was answered to any of the questions then a "Public Way" permit is required. You can pick up an application at either Community Development, located at 75 South Frontage Road or Public Works, located at 1309 Elkhorn Drive. Notice sign-offs for utility companies. ALL utilities must field verifli (locate) respective utilities prior to signing application. Some utility companies require up to 48 hours notice to schedule a locate. A construction traffic control/staging plan must be prepared on a separate sheet of paper. An approved site plan may also be used. This plan will show locations of all traffic control devices (signs, cones, etc.) and the work zone, (area of construction, staging, etc.). This plan will expire on November lst and will need to be resubmitted for consideration for approval through the winter. Be aware that your resubmission for winter may be denied depending on the location of construction. Sketch of work being performed must be submitted indicating dimensions (length, width and depth of work). This may be drawn on the traffic control plan or a site plan for the job. Submit completed application to the Public Work's office for review. If required, locates will be scheduled for the Town of Vail electricians and irrigation crew. The locates take place in the morning, but may require up to 48 hours to perform. The Public Work's Construction Inspector will review the application and approve or deny the permit. You will be contacted as to the status and any requirements that may be needed. Most permits are released within 48 hours of being received, but please allow up to one (1) week to process. As soon as the permit is approved, the Building Department will be notified, allowing the "Building Permit" to be released. Please do not confuse the "Public Way Permit" with a "Building Permit". NOTE: The above process is for work in a public way ONLY. Public Way Permits are valid only until November 15th. A new Public Way Permit is required each year if work is not complete. Re-application each November 15th does not mean an automatic renewal. g/../o* nd the above. Date Signed DRAINAGE AND CULVERT INSPECTIONS ARE REOUIRED BY PUBLIC WORKS! Please read and check off each of the items below: /tnu Town of Vail Building Department has developed the following procedures to ensure that new construction sites have adequately established proper drainage from building sites along and adjacent to Town of Vail roads or streets. A The Town of Vail Public Works Department will be required to inspect and approve drainage adjacent to Town of Vail roads or streets and the installation of temporary or permanent culverts at access points from the road or street onto the construction site. such approval must be obtained prior to any requests for inspection by the Town of Vail Building Depaftment for footings, temporary electrical or any other inspection. Please call Leonard Sandoval at 479-2798 to request an inspection from the Public Works Depatment. Allow a minimum of 24 hour notice. sy' Also, the Town of Vail Public Works Depaftment will be approving all final drainage and culvert installation with resulting road patching as necessary. Such approval must be obtained prior to any Final Certificate of Occupancv issuance. Agreed to by: . \^r^ Po^et" Project Name: Date Signed: F:/everyone/forms/bldperm6 ?-zu - 96 MATERIAL STORAGE AND CONSTRUCTION PARKING Please read and check off each of the items below. (Copies of complete text are available upon request) -,- CODE 5-2-10: DEPOSITS ON PUBLIC WAYS PROHIBITED ./ S{ Unlav'fiul deposits: Subject to subsection C thereof, it is unlawful for any person to litter, track or- deposit, or cause to be littered, tracked or deposited, sand, gravel, rocks, mud, dirt, snow, ice, or any other debris or material upon dny street sidewalk, alley or public place, or any portion thereof. F Notice; Abatement: The Director of Public Works may notiff and require any person who violates or- causes another to violate the provision of subsection A hereof, or who has in the Director's employment a person who violates or causes another to violate the same, top remove such sand; gravel, rocks, mud, dirt, snow, ice or any other debris or material within twenty four (24) hours after receipt of said notice by the Director of Public Works. In the event the person so notified does not comply with the notice within the period of time herein specified, the Director of Public Works, or other authorized agent, may cause any such sand, gravel, rocks, mud, dirt, snow, ice, debris or any other material to be removed from any street or alley at the expense of the notified, 1g,/Summons and Penalty: As an alternative to the notice for removal provided in subsection B above, any person who violates or causes another to violate the same, may be issued a summons to appear before the Municipal Court of the Town for said violations, and upon being found guilty of a violation hyevnder be punished as provided in Section 1-4-1 of this code. 6 Notace and Penalty: It is unlawful for any person to fail or refuse to comply with the notice of the Director of Public WorK as provided in subsection B hereof, and any such person shall, in addition to payment of the expense of removal incurred by the Director of Public Works, as provided in subsection B hereof, upon being found guilty of a violation hereunder, be punishable as provided in Section 1-4-1 of this Code. (1997 Code: Ordinance 6 (1979). CODES 7.3A-I AND 7.3A-3I PARKING OBSTRUCTING TRAFFIC & IMPOUNDMENT AUTHORIZED o{ no person shall park any vehicle upon a street or at any other place within this Municipality in such a manner or under such conditions as to interfere with the free movement of vehicular traffic or proper street or highway maintenance. (Ord. 2(1968) g 1)/' Et-11{hene\ter any police officer finds a vehicle attended or unattended, standing upon any portion of a street or upon any place within this Municipality in such a manner as to constitute a violation of any section of this Atticle, or left unattended for a period of twenty four (24) hours or more and presumed to be abandoned under the conditions prescribed by Colorado Revised Statutes section 42-4-1102, as amended, the officer shall require the vehicle to be removed or cause it to be removed and placed in storage in the nearest garage or other place of safety designated or maintained by this Municipality, and the charges for towing and storage of such vehicle shall be charged to the owner of the vehicle in addition to a ten dollar ($10) impoundment charge. (Ord. 2(1968) g 3: Ord. 28(1981) 5 1) I have read and will cornply with the above code provisions: Position or Relationship to Project: Date Signed: 3 | zo l"* F:/everyone/fomrs,6ldpermT ;-t Jnso^ ?o.pt.- Vail 2004 Vail Village and Lionshead Village Construction Hours Information Handout Problem Statement The Vail Village and Lionshead Village are invaluable assets to the community. Thousands of people come to Vail each year to sightsee, recreate, shop and to enjoy everything the Vail Valley has to offer. The community and merchants rely upon our guest to generate revenue. Our summer/winter guests expect a pleasant experience while in Vail. To insure that all of the proposed construction has as little negative impact on the community and on our guest as possible, the Town of Vail finds it imperative to create and implement the Vail Village and Lionshead Village Construction Hours Handout. It would be irresponsible for the Town of Vail, the the Merchants, to not actively participate to minimize the impact of New for 2004-2006 will be the Vail Village utility related improvements, All Construction projects and/or Bluhm Town of Vail Stleetscape Givens The following givens are intended to in the Villages: r The public's health, safety and o Adequate pedestrian, be maintained. areas. all Scoft construction the Vail , refer to The hours of Outside Construction Activity shall be as follows: - April 15-June 18& SeptemberT-November 19,7a.m. until 7 p.m., seven daysaweek. June 18 thru September 10, work must end by 4:00 p.m. on Fridays. November 13 - April 1 5, 2005 work allowed within daylight hours only. - Deliveries shall be restricted to the hours of 7 a.m. to 11:30 a.m. on Gore-Creek Drive and 7 a.m. to 8:30 a.m. on Bridge Street. - Special Construction delivery permits must be requested in advance, from Public Works in conjunction with Code Enforcement at Checkpoint Charlie. - No construction activity shall occur on Saturday or Sunday between June 19 and September 5. -3418 for No outside construction activity shall occur on the following dates: Saturday, February 14, Sunday, February 15, and Monday, February 16. (President's Weekend) Saturday, May 22, Sunday, May 23 and Monday, May 24 (Memoriat Dav) Friday, June 25, Saturday, June 26 and Sunday, June 27. (Vail Arts Festival) Friday, July 2, Saturday, July 3 and Sunday, July 4 and Monday July 5. (lndependence Dav) Saturday, September4 , Sunday, September 5 , and Monday, September 6. (Labor Day Weekend). Thursday, November 25, Sunday, November28. Friday, December 24, Saturday, (Christmas Dav Holidav) warn ing), The following expectations are established to insure the success of the Vail Village and Lionshead Village Construction Hours Plan: . Full and complete cooperation and understanding from all parties involved in the construction activity in regards to this plan. r Strict adherence and compliance with the requirements outlined in the construction plan. . Respect and consideration for the affected interests and parfies. lf you have any questions, Please contact the Town of Vail Public Works Department (Construction Inspector) or the Vail Police Department (Code Enforcement Officer) 970479-2198 970476-7603 TOIriN0,FVAIL Vail2004 Staging / Parking Plan Information The Staeine / Parkine Plan Philosophv- Is a very important step in the building process. Striking a balance between safe public access and giving construction projects room to build is becoming increasingly challenging, for us to meet all the needs of those who will be impacted by construction projects. The fact is, there is less room to build in the Town of Vail. Developing a creative Staging Plan is a must. Staging in the Town of Vail Public Right of Way is a Privilege, not a given right. We take into account when we review and approve staging / parking plans, impacts on neighborhoods, tourism, business and the traveling public along with your right to build. The General Contractor is responsible for all subcontractors and all construction activitv relatine to the buildins proiect. The staging plan will be enforced according to the Approved Set of Building and Staging Plans. You are required to keep a copy of the Approved Staging Plan on site. Two staging /parking plans are required, a summer and winter. Summer staging plans expire on November 1, and winter staging plans expire on April 15. (Note: There is no on street parkine in the winter season and all materials. equipment. etc must be l0' offthe edge ofasphalt). Enforcement of all staging / parking plan is as follows. A) Staging i Parking Plans to scale required. B) Once the plan is approved, they will be held to complete compliance. C) We will use a 3 step and you're out, process. Sten One- Verbal and written warnings as to the staging plan violation, then have contractor sign and date field memo waming. Step Two- Police Department issue tickets and tows or public works writes second written waming to all violators who have been notified under step one and who are still in violation of the approved Staging / Parking Plan. The Town of Vail Chief Building Official will call the contractor and notify them, the next time any violation happens, the building department will red tag the construction site for 48 hours. Step Three- If still in violation after step two, a 48 hour Red Taq will be issued to the proj ect site. If you have any Questions, Please contact the Town of Vail Construction Inspector at 970-479-2t98 Requirements for an Acceptable Staging Plan It is preferred that and Approved site Plan is used to draw a staging plan, but a hand drawn plan may be used as long as it is dawn to scale and is neat and legible. l.) The Staging Plan must show the following: (a) Show all parking that is required for the job site. (lncluding construction equipment). (b) Show the location of all material that will be staged on site. (c) Show the location ofall dumpsters and port-o-john that are to be on site. (d) If a fence is required, then show the location of the fence and describe the material used for the fence. (e) Iftrees and / or vegetation is required to be protected, then show how this will be done. (0 If this staging plan is for a Demo Permit, then show staging for dump trucks and all related equipment. If the Town of Vail Right of Way area is needed for staging, then a Traffic Control Plan is required in conjunction with the staging plan. (g) Please provide and show an Erosion Control Plan. (h) No equipment, vehicles, materials are allowed on Town of Vail Right of Way in the Winter Staging Plan. 2.) If work needs to occur in the right of way, then add a Trafhc Control Plan to the staging plan showing the following: (a) The work zone (area that is to be performed) (b) Traffic Control Devices (warning, signs, cones, flaggers, etc.) (c) Distances that all devices will be set up from the work zone. Also show all dimensions of work being performed in the right of way. All traffic control plans must conform to the MUTCD manual.(Manual of Uniform Traffic Control Devices) 2.) This plan will be reviewed by Public Works and if Necessary the Police, Fire, and Community Development Department. Once the staging plan is approved, it will be registered with the departments listed above and enforced. 3.) The Village and Lionshead area have outside construction restrictions, please become familiar with the Vail 2004, Vail Village and Lionshead Construction Hours handout.