Loading...
HomeMy WebLinkAboutVAIL RIDGE BLOCK B LOT 19 LEGALTOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT 75 S.FRONTAGEROAD VAIL, CO 81657 970-479-2138 NOTE: THIS PERMIT MUST BE FOSTED ON JOBSITE AT ALL TIMES ADD/ALT SFR BI.JILD PERMIT PETMit #: BO5-0281 Job Address: 2645 DAVOS TR VAIL Location.....: 2645 DAVOS TRAIL Parcel No...: 210314203016 Project No : ?r'r of_O filaJ OWNER OBERTJOI{R, RUPERT 2545 DAVOS TR VAIIJ BuildtuU----- > S139.25 Resauarant Plan Rcview- > Plan Check--> 590.51 DRB Fee-----------> Status...: ISSLJED Applied. . : Wll4l2005 Issued. .. : Wll4/20O5 Expires. ..: 0311312006 S0.00 Total Calculated F€es-> 9212 .76 S0.00 Additional Fees-----> $50.00s0.00 Total Permit Fee-----> 5282.16 $0. 00 PaFnents---------> F282 .16 09/t4/20os co 81557 APPITICAI{:r OBERLOHR, RttpERT 09/L4/2005 p}rone:970-476-33!3 2545 DAVOS TRAIIJ VAII., co 81657 License:372-I-' coNrRAcToR oBERIOHR, RTIPERT O9/L4/2005 phone: 970-47643a3 2545 DAVOS TRAII, VAIL co 81657 Lricense: 312-TJ Descripion: RE-ROOF-SAII{E FOR SAII{E-CEDAR SITAKES Occupancy: Type Construction: Valuation: $7,m0.00 Add Sq Ft: 0 Fireplac€ Information: Restdcted: Y #of Gas Appliar@s: 0 # ofGas l,ogs: 0 #of Wood Pellet: 0 +}{+++++s++++++:.+a+i++:|+''t+,l,|c+,|,}tt||+i*'***{.*:t***3**,t*******t,|tt*+l.* Investigation- ) Will Call----> $0.00 RecreationFer---:-*-> $3.00 CIearFUpDeposit------> TOTAL FEES-------- > 5222.16 BALANCE DUE-------->$0.00 Approvals: Item: 05100 BUILDING DEPARTMENI o9/r4/20os ,Js Action! AP IIEM: O54OO PI,ANNING DEPARTMENT Item: 05600 FIRE DEPARTMENI Item: 05500 PTBIJIC WORKS ,r:.+++++++++|++++++++|+t|+tt+++*++*+++++**+*+*+**itt+'tt:it|ti++ttt|t| See page 2 of this Document for any conditions that may apply to this permit. DECLARATIONS I hereby acknowledge that I have read this application, filled out in frrll the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances ald stat€ laws, and to build this sbucture according to the towns zoning and subdivision codes, design review approved, Inernational Building and Residential Codes ard other ordinances of the Town applicable tbereto. REQUESTS FOR INSPECTION SI{ALL BE MADE TWB.rTy-pOun xotsffn't ADv PM. TBLEPHONB AT 479-2149 OR AT OIJR OFFICE FROM.8:00 AM - 4 OR CONTRACTOR FOR ANDOWNER, PAGE 2**,t***:*+********,f***,f*,r*****,**,*******'t't*:F|t'f*{.:**'l*'t*!**'t*'t'*****:f:t.ttl*t*{.:s!r{.*:e:r:**,|.*,r*i.********+++:*+*+:*:|.***** CONDITIONS OF APPROVAL Permit #: 805-0281 as of 09-14-2005 Staus: ISSUED**{<,t{.*****.****:l.********:******{.***'t:ti,f*:t*'|:*!***'#*{!'F't.:*:*******!i:|*'|t'Fi**:t+{t'tt'',*!':t*!********* Permit Type: ADD/ALT SFR BUILD PERMIT Applied: 09fi4t2D5 Applicant: oBERLOHR, RUPERT Issued: w/14/2w597U476-3313 To Expire: 03/t3t2006 Job Address: 2645 DAVOS TR VAIL Location: 2645 DAVOS TRAIL ParcelNo: 210314203016 Description: RE-ROOF-SAME FOR SAME-CEDAR SHAKES ***************:F:t****************:r*****:i*:f:i**r*r** COnditiOns *******'r*****,t ****************************** Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQLJIRED TO CHECK FOR CODE COMPLIANCE. Cond: 16 (BLDG.): (SFR) sMoKE DETECTORS ARE RFQUIRED PER SECTION R3I3 OF TTIE 2OO3IRC. t**+f f f,{"1't***{t'l.t}**'lt*!t!t**{.!*******+++*f *+++ t * * ***t+*'tf *,}***+r+f *******ti****f '8't*d.*i({.{.**rr.{.{r{rr.{r*ri TOWNOFVAIL, COLORADO Statement*{t****ttt++++************************+t*****ff+t+***'}*'t**{r{.**+***********************++++++f Statement Nr.rmber: R050001519 Amount.: i292,76 09/1,4/2OO5O2:13 pM Palment Method: Check Init: DDG Notsation: Oberlohr L449 Permit No: 805-0281 114)e: ADD/ALT SFR BmIrD PERMITParcel No: 2103 -142 -0301-6Site Address: 2645 DAVOS ?R \,AILLocation: 2645 DAVOS TRAIL Tot,al Fees 3Thia Payment: BP 00100003111100 CIr 00100003123000 PF 0 01000031123 00 wc 001000031L2800 BUIIJDING PERMIT FEES COI{TRACTOR IJICENSES PI,,ATiI CHECK FEES WII.,IJ EELL INSPECTION FEE S2B2.7G ToTaI .ALL Pmts: Balance: $2e2.76 9282.75 $0.00 Current Pmts ***+******,1*+*t***+i+'i't'*****++++++++tttffffft't't**********{,{.**************++++++++***+++**+tt ACCOI.JNT ITEM LIST: Account Code Description t39.25 50.00 90.51 3 .00 APPLTCATION WLL NOT BE ACCEPTED IF INCOMPLETE OR Project #: Separate@ tl Permit #:G mvxuFytn 75 S. Frontage Rd. Vail, Colorado 81657 -ovzd ins?dat( l, etc.! CONTMCTOR TNFORMATION COMPLETE VALUETIOruS FOR BUILDING P ERMIT & Materials ELECTRICAL: $OTHER: $PLUMBIN_MECHANtffi For Parcel # Contact Assessorc Oflfce at 920-32S-g6a 0 or visit %oRoFFtcEUsEoNLy@ JobAddress: Z6+, Work Class: New ( )Addition( ) Remodet ( ) Repair Demo( ) Other( )Work Type: Interior ( )Exterior F\ Both ( )Does an EHU exist at this rocation- yeiJl-ffi Itt" "t"t., a,"t'"* No. of Existing Dwelling Uniti in tf,i. Uuiffi No. of Accommodation Units in ttris UuitOingJ qs LogglDd Wooq/peilet ( ) Wood Oocument2 -H: 05/20t2005 ll rum'm Department of Community Development Project Name: Project Address: r' This chsklirtmufibeamolefud beforca Building permitaooticatrbn is acepte-------------d, VAll Wges of application is complete o Has DRB approval obtained (if required) provide a copy of approval formo Condominium Association letter of approval attached if project is a Multi-Family complexo Plan Check tue required at submittal for projects valued over g10O,OOO.00 (See attached C.onstrudion Fee Schedule for calculations) o Complete slte plan submitted tr Publlc Way Permit application included if applicable (refer to Publlc Works checklist) o Staging plan included (refer to Publk Works drecklist) No dumoster,oartinq or material s,toraoe allowed on roadwavs and shoulderc without written aooroval o Asbestos test and results submitted if demolition is occuningo Architect stamp and signature (All Commercial and Multi family) o Full floor plans including building sections and elevaUons(3 seE of phns for remodel/additions, 4 sets of plans for new SFR and Duplex, 5 seb of plans for MultFFamily and Commercial Buildings) a Window and door schedule o Full structural plans, including design criteria (i.e.loads) o Structural Engineer stamp and signature on sfuctural plans (All Commercial and Multi Family) o Soils Report must be submitted prior to foottng inspection o Fire resistive assemblies specified and penetrations indicated o Smoke detectors shown on plans o Types and quantity offireplaces shown I have read and Applicanfs Signahrre: Date of submittal: Doorment2 Received By: 05t20t2005 ll BUILDING PERMIT ISSUANCE TIME FRAME If this permit requires a Town of Vail Fire Department Approval, Enginee/s (Public Works) review and approval, a Planning pepartment review or Health Department review, and a review by the Building Departmeht, the estimated time for a total review may take up to six (6) week. All commercial (large or small) and all multi-fami[ permiE will have to follow the above mentioned maximum requirements. Residential and small projecb should take a lesser amount of time. However, if residential or smaller projects impact the various above mentioned departments with regard to necessary review, these projects may take up to six (6) week to review and approve. Every attempt will be possible. made by this department to expedite this permit as soon as I, the undersigned, understand the plan check procedure and time frame. I also understand that if the permit is not picked up by the expiration date, that I must still pay the plan check fee and that if I fail to do so it may affect future permib that I apply for. Agreed to by: Project Name: Date: YEs- No,x. Is a dlftrent access needed b the sits otrer than the exbting driveway? Is any dninage work being done that afiec1s he Rpht-of-Way, easernenb, or public property?YES_ NO x. Is a 'Revocable Right-of-Way Permit" required? YES- NO 'X Is the Rightof-Way, qasernenb or public property to be rsed for sbging, parking or fencirg?YES_ NO K If anslver '6 NO, b q parkirg, sbging or tsnclng plan nquired by Publlc Works?YES_ NO x. If you arswered YES b any of these questions, a '?ublic Way Permif' must be obtalned. ? ubllc Way Permit" applications may be obbined at the Publk Wok's offce or at Community Developnent (a sample is atbched). If you have any questors please call Leonard Sandonl in Publk Works at479-2198. tl WHEN A "pUBLr WAy pERMfr" E REQUIRED PIEASE READ AND CHECK OFF EACH OF THE FOIOWING QUESTpNS REGARDTNG THE NEED FOR A ?UBLT WAY PERMI[": o Is thb a new r.esidence?YEs- Nox o Does demoliton work being performed require the use of the Rightof-Way, easemenb or publk property? YES t{O-X_ Is any utility work needed? YES_ NO )< Are there any impmvements being done b tre ddveway ? o o o o YEs- No x o Job or Ppject Name: Dab Sigred: I)PiANSWERED AtI rHE ABoVE QUESIIoNS. Docum6nE 49c6 Company Narne 05f2012005 PRJ #:_ PW#:APPLICATION F'OR TOWN OF VAIL PUBLIC WAY PERMIT 20_ l. Parcel #: tl ,-m Bldg. Perrnit #: ! Job Name Street Address (If unknown call2. 479-2139\ Excavating Conh?clor Name Mail Address TOV Contractor Lir:ense Number - .REQUIRED Start Date 4. Work is for (circle one) Other Compl*ion Date 'Water Se*er Gas Electric Telephone , (Permit Expiration Date) CATV Landscaping Temp. Site Access 5.Trench-width t ength Depth (min. a') Bond Amount $Permit Fee $ Total SF $ Total LF Total Permit Fee $ 6.ALL MATERIAL, EQUIPMENT, AND TRAFFIC CONTROL DEVICES MUST BE ON THE JOBSITE BEFORE THE JOB IS STARTED. Rubber out-riggers are required on excavating equipment when working on asphall Asphalt surfaces underneath the bucka and lugs shall be protected at all times. A signature below indicates a rcview ofthe area and utility locations and approval. Once all utility company sigmtures are obtained , permittee has option of routing application through the Public Works oflice to obtain the trece3sary Town of Yail signatures. Please allow up to one week to process. Xcel Enerry / Public Servicc Company (l -800-922-198?) Xcel Enerry High Pressure ( I -E00-922-1987) Quest ( I -800-922- 1987) Comcast Cable (l -800-922- 1987) Eagle River Water & Sanitation District (970-476-7480, cxt. I 14) Holy Cross Electric Company ( I -800-922- I Town of Vail. Electricians (970-479-2158) Town of Vail lrrigation (970-479-2158) THERE WILL BE NO TOTAL STREET CLOSURES! A con"struction traliic control plar must be suhnitted and approved by dre Public Works Depamnent prior to issuance ofdre pennit. 9. All excavation must be done by hand within 18" of urilities - (Senate Bill 172). 10. Pemritte€ must contact the Publis Works Deoamncnt at 476-2198 24 hours priol to comnlencins of work. Failure to Notiry t}re Town will result in forfeiture ofbond money. Scheduled inspections that are not ready may result in the Town charging the contractor a re-inspection fee. I t. I certifi tlrat I have read all chapters of Title 8 - Public Ways and Property, of the Vail Municipal Code and all utility Company agreemcnts, signed by me, and will abide by the same, and that all utilities have been notified as requircd. 8. Contracbr's Signature of Aggeernent Print nome cleorly ATTACH PLAN OF WORIq INCLUDING CONSTRUCTION TRAFFIC CONTROL PLAN Show steet with names, buildings, and location of cuts. USE DASH LINES FOR CUT. Date of sigaorure White - Public Works Yellow - Contractor .rEllnl.>i < ll PUBLT U|oRKSANDTHE PUBLT WAYPERMIT PROCESS How it relates to Building Permits: Fill out he atbched check list with the Building Permit Apolication. If yes was answered b any of the questions tren a 'Public Way" permit is required. you can pick up an application at eidrer Community Developmenf locabd at 75 Soutr Frcnbge Road or Public Work, locaEd at 1309 Elkhom Driue. Notice sign'offs for utility companies. ALL utilities must field verifo (locab) respective utilities prior b signing application. Some utility companies require up b 48 hour notice b schedule a locaE. A consEucton taffic conboly5bging plan must be prepared on a separab sheet of paper. An approved sib plan may abo be used. This plan will show locations of all traffic control devices (sigrs, cones, etc.) and tre wod< zone, (area of consfudion, staging, etr.). This plan will expire on November lst and will need b be resubmitEd for considention for approval through the winEr. Be awarc that your resubm'ssion for winEr may be denied depending on $e location of constuction. Sketh of work being performed must be submitbd indicating dimensions (length, width and depfi of work). This may be dnwn on the faffic confol plan or a sib plan for the irb. Submit complebd application b tre Public Work's office br review, If required, locabs will be scheduhd for the Town of Vail elecUicians and irrigation crew, The locaEs bke place in the moming, but may require up b 48 hours b perform. The Public Work's Consbuction hspecbr will review the application and approve or deny the permil You will be conhced as b fte shhls and any requirements hat may be needed. Most permits are rcleased wiUrin 48 hours of being received, but please allow up b one (1) week b prccess. As soon as he permit is approved, fie BuiHing Departlent will be notified, allowing the "tsuilding Permif'b be released. Please do not confuse he Yublic Way Permif with a "Building Permif'. F NOTE: The abbve process is for raprk in a public way ONLY. Public Way Permits are valid only until November 15h. A new Public Way Permit is rcquired each year if ralork is not compleb. Re-application each November 15th does not mean an aubmatic reneural. Oocumene 0520i2005 tl TVWTIOF DRAINAGE AND CULVERT INSPECTIONS ARE REOUIRED BY PUBLIC WORKS! Please read and check off each of the items below: The Town of Vail BuildingrDepartment has developed the following procedures to ensure that new construction sites have adequately established proper drainage from building sites along and adjacent to Town of Vail roads or streets. The Town of Vail Public WorK Department will be required to inspect and approve drainage adjacent to Town of Vail roads or streets and the installation of temporary or permanent culverts at access points from the road or street onto the construction site. Such approval must be obtained prior to any requests for inspection by the Town of Vail Building Department for footings, temporary electrical or any other inspection. Please call Leonard Sandoval at479-2198 to request an inspection from the Public Works Department. Allow a minimum of 24 hour notice. Also, the Town of Vail Public Works Department will be approving all final drainage and culvert installaUon with resulting road patching as necessary. Such approval must be obhined prior to any Flnal Certificate of Occupancv issuance. Agreed to by: Print Name Project Name: Date Signed: Signature rl TORI|IOF Pleae rcad and checkofreach of the iEms below. (Cop'es of compleE Ext are avaihbh upon request) CODE 5-2-10: DEFOSITS ON PUBLD WAYS PROHIBITED q Unlawful deposils: Subject bc subsecdon C trereof. it is unlawful for any pecon b litEr, back or depcif or cause bc be litbred, hacked or depmibd, sand, gravrel, rocls, mud, di4 snow, ice, or any oher debrls or maErial upon any sreeq, sidewalk, alley or public place, or any portion thereof. o Notice; Ababnenil The Direcbr of Publ'rc Work may notiff and requirc any person who violaEs or causes another to v'lolaE the provbion of subsection A hereof, or who has in he Direcbr/s employment a peFon who viohbs or causes anotier to violaE the same, bp remove srch sand, gravel, rocks, mud, dirt, snow, ice or any oher debrb or maErial within twenty four (24) hours after receipt of said notice by the Direcbr of Public Work. In the event he person so noUffed does rpt comply with the notice within the period of time herein specified, the Direcbr of Public Works, or oher auhorized agent, may cause any such sand, gnvel, rock, mud, dir! snow, ice, debrb or any other maErial b be removed from any sheet or alley at the expense of the notified. o Sumrnons and Penalty: As an alEmative b the notice br remolal provided in subsection B above, any person who violaEs or causes another b viohb the sarne, rnay be bsued a summons b appear before the Municipal Court of the Town for said violaUons, and upon being found guilty of a violation hereunder be punished as provided in Section 14-1 of th's code. o Notice and Penalty: It is unlawful for any person to hil or retuse b comply with the notice of the Direcbr of Public Wod<s as provided in subsection B hereof, and any srch person shall, in addition to payment of the expense of removal irrurred by the Direcbr of Public Works, as provided in subsection B hereof, upon being found guilty of a violation lrereunder, be punbhable 6 proviJed in Section L4-I of thb Code. (1997 Code: Odinarre 6 (1979). CODES 7-3A.1AND 7-3A.3: PART(NG OBSTRUCTNG TRAFFT & IMPOUNDMEI{TAUT}PRZED tr No person slnll park any vehhb upon a sFeet or at any oher place within this Munklpallty in such a manner or under such condiUors as b inErfere with the free movement of vehkular taffic or proper sBeet or hi'ghway mainbnance. (Ord. 2(1968) 5 1) o Wheneler any police officer finds a vehhle atEnded or unatEnded, standing upon any portion of a sEeet or upon any place within th's Munbipality in srch a manner as b corstituE a violation of any section of this Afticle; or left unatbnded for a pedod of tuenty four (24) hours or more and presurned b be abandoned under the condiEons prescribed by Colondo Rev'sed SbUtes section 424-1102, as amended, he officer shall require the vehicle b be removed or cause it b be removed and placed in sbcrage in he nearest garage or otrer place of safety designaEd or mainbined by ttis Municipality, and the charges for bwing and shcrage of such vehicle shall be charged b the owner of the vehkle in addition b a bn dollar ($10) impoundment charge, (Ord. 2(1958) 5 3: Ord. 28(1981) 5 1) I have read and will corply with &e above code provisions: Position or Rplationship to Project: MHgned: ?tl Z :c > 'ttlrUeA 05t20t2005 tl VaiI 2004 Vail Villagq and Lionshead Village Construction Hours Information Handout Problem Statement The Vail Mllage and Lionshead Mllage are invaluable assets to the community. Thousands of people come to Vail each year to sightsee, recreate, shop and to enjoy everything the Vail Valley has to offer. The community and merchants rely upon our guest to generate revenue. Our summer/winter guests expect a pleasant experience while in Vail. To insure that all of the construction has as little negative impact on the community and on our guest as possible, he Town of Vailfinds it Hourc Handout. to create and implementthe Vail Village and Lionshead Mllage Construction It would be inesponsible for the Town of Vail, the Construction Conhactors and the Merchants, to not actively participate to minimize the impact of construction in the Vail and Lionshead Mllage areas. New for 2004-2006 will be the VailVillage Streetscape lmprovement Proiect. Work to include all utility related improvements, streetscape, drdinage, snowmelt systems and landscaping. A,ll Construction projects and/br remodels within the Vail Village Core Area should contact Scott Bluhm Town of Vaif Streetscape Goordinator at970477-3418 for further information. Givens The following givens are intended to provide the basic foundation by which construction will be completed in the Mllages: . The public's health, safety anp welfare shall be honored at all times. . Adequate pedestrian, loadingfdelivery, vehicle, and emergency vehicle access and circulation shall be maintained. . Roadways and pedestrian walkways shall be kept clean and free of dirt and debris. . All construction deliverieS, equipment, tools and materials entering the Vail Mllage and Pedestrian areas must go through Check Point Charlie. ,All Lionshead construction activity must go to the Vail Police Department for a parking permit Do not use dglivery zones for construction parking, refer to approved staging plan or make other anangements for parking. . The hours of Outside Constnlction Activity shall be as follows: - April 15-June 18 &SeptemberT-November 19,7 a.m. until 7 p.m., seven daysaweek. June 18 thru September 10, work must end by 4:00 p.m. on Fridays, November 13 - April 1 5, 2005 work allowed within daylight hours only. - Deliveries shall be restrictbd to the hours of 7 a.m. to 11:30 a.m. on Gore Creek Drive and 7 a.m, to 8:30 a.m. on Bridge Street. - Special Construction delivery permits must be requested in advance, from PublicWorks in conjunction with Code Enforcement at Checkpoint Charlie. - No construction activity shall occur on Saturday or Sunday between June 19 and September 5. - No outside construction ""{iuity shall occur on the fotlowing dates: 0F'DODflOS o0DttttY tElEt IFtEf$ Design Review Board ACTIOT{ FORiI Department of Communitl Development 75 South Frontag€ Road, Vail, Colorado 81657 tel:970.{79.2139 faf,:970.479.2.+52 web: www,vallgov.com Prcject Name: OBERLOHR RE-ROOF Project DescripUon: RNAL APPROVAL FOR A RE-ROOF-SAME FOR SAME-CEDAR SHAKES Participants: OWNER OBERLOHR, RUPERT 26.15 DAVOS TR VAIL co 816s7 APPUCAiIT OBERLOHR, RUPERT 2645 DAVOS TR VAIL @ 81657 09lL4l200s wl14lzoos ProjectAddrcss: 2645DAVOSTRVAIL Locauon: 2645DAVOSTRAIL Legat Descdption: l-oh 19 Blodc B Subdivision: VAIL RIDGE ParcelNumber: 2103-142-0301€ Comments: SEE CONDilONS DRB t{umber: DRB050492 Motion By: Second By: Vote: Gonditions: EOARD/STAFF ACTIOI{ Action: SrAFFAPR Date of Approvab 091 14 I 2005 Condr 8 (PLAN): No changes to these plans may be made without the written consent of Town of Vail staff and/or the approprlate rs/iew commlttee(s). Condr 0 (PLAN): DRB approval does not constitute a permit for building. Please consult with Town of Vall Building personnel prior to construction activiUes. Cond:201 DRB approval shall not become valld for 20 days following the date of approval. Oond:202 Apprwal of thls proJect shall lapse and become void one (1) year following the date of final approval, unless a buildlng permlt ls lssued and construction is commened and is diligently pursued toward completion. Joe Suther DRB Fee Paid: $20.00Planner: