Loading...
HomeMy WebLinkAboutBUFFEHR CREEK RESUBDIVISION LOT 16! TOWN OF VAIL 75 S. FRONTAGE ROAD vArlf co 81657 97 0-47 9-2138 Description: INSTATL METAL ROOF Occupancy: Type Construction: Bui tding---> Pl,an check---> Investigltion> t,i L t ca l.l,----> DEPARTMENT OF COMMUNITY DEVELOPMENT ktr ltn (ruJ1"t, C L , ON JOBSITE AT ALL TIMES Permit #: 896-0298 NOTE: THIS PERMIT MUST BE POSIED aoo/elr sFR BUrLD PERMTT APPLICANT JLF PAINTING/JERRY FARQUOHAR P.O. BOX 6307, VArt, co 81658 CONTRACTOR JLF PAINTING/JERRY FARQUOHAR P.O. BOX 6307, VArL, CO 81658 OWNER FARQUHAR JERRY L & DEBORAH R 1879 MEADOW RrDGE RD, VArL CO 81657 Job Address: 1879 BUFFEHR CREEK RD Location...: 1879 MEADOW RIDGE RD ParceI No.. : 2103-123-02-003 Project No.: Single Type V Status...: ISSUED Applied. .2 09/27/L996 Issued...z 09/27/L996 Expires . .: 03/26/1997 Phone z 845-7867 Phone:845-786? R3 VN 107 .25.00 R.cre€tion Fee---------->3.00 Ctcan-up D.posit----> .m Tota[ crtcutated Faes-->50.00 Additional Fees------>.00 Totst Perrit Fee--------> ^lulnt 1?5.25 .@ 125.25 165.m Rrstuarant Ptan Revicu-> 100.00 PayDcnts-------- ffi*******ffiffi,r*ffirr**ffi.,t***.]llll-ffli;;iffi**********lii*ii***--lllllll*lli;;;;;;;i-***o**;*** Iten: O51OO BUILDING DEPARTMENT DCDI: BUILDING DiVJ-SiON:09/27/1996 CHARLIE ACTiON: APPR CHARLIE DAVISItbm:, O54OO PTANNING DEPARTMENT DepI: PLANNING DiViSiON:09/27/L996 CHARLIE Action: APPR PER LAURENI!e4i'.q56q0 FIRE DEPARTMENT Dept: FrRE Division:09/27/1996 CHARLIE Action: APPR N/A I!'e.ni'.055Q0 PUBLTC woRKS '. Dept: PUB WORK Division:09/27/1996 CHARLIE Action: APPR N/A *t***k*r*****r#***rrt***ffi*ft*t****r**ffi#r*ffi See Page 2 of this Document for any conditions that nay apply to this permit. DECLARATIONS I hereby acknowtedge that I hav! rcad this.pplicBtion, fil,ted out in futl, thc intormation requircd, conpl,eted an accuratc ptot Ptan, and statc thrt att th. information provided as rcqui rad is correct. I agf.e to comp Ly vith thc infornation and pl.ot pLan,to corpl,y vith 81,1, Tovn ordinances and strtr tevs, and to buitd this structur. according to the Toynrs zoning and subdivision codes, design revicv approvrd, uniforr BuiLding code.nd other ordinancca of th. Toyn appticabl.a thcrcto. REQIJESTS FOR INSPECTIOI{S SHALL BE IIADE TUENW-FOUR HOURS IN ADVAI{CE BY Send Cteln-Up Deposit To: JERRY FARoI HAR TOViComm. Dev. Clean-up approved Family. Residencg mOUntNon-Rated -'aiate De Refund Valuation:12,000 Add Sq Ft: Fireptacc lnfornation: Rlst ri ctad:fof Gas Apptiances:#Of Gas Logs:#0f tlood/Prl.tct: *****#(***#r#****r.**ffit*ffirffi*t*ffi**fi**** FEE SUllttARY **r*f*f**ftlrr*ffiifi*rr***ffi* t. Page 2 ******************************************************************************** CONDITIONS Permit #: 896-0298 as of 10/03/96 status---: TSSUED *********************************************r.********************************** Permit Type: ADD/ALT SFR BUILD PERMTT Rpptied--: 09/.?7/.\226 applicani,l-: JLF'PATNTTNG/JERRY FARQUoHAR rssued---: 09/.?7/.\229 845-786'l To ExPire: O3/26/t997 Job AddrESS: 18?9 BUFTEHR CREEK RD Location---: 18?9 MEADOW RIDGE RD Parcel No--: 2103-123*02-003 Description: INSTALL METAL ROOF * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * COnditiOnS * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * I. FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. 2. SMOKE DETECTORS ARE REQUIRED IN ALL BEDROOMS AND EVERY STORY AS PER SEC.1210 OF THE 1991 UBC. 3. ROOF WORK MUST COMPLY WITH 1991 UBC CHAP 32 ,f::i";]tr1ti "r vArL coNsou"rro? PERUIT APPI,ICATION TOR}' PER}IIT /I DATE: 9-z{-<) , ' APPLfCATION MUST BE FfLLED OUT COITPLETELY OR IT IttAY NOT BE ACCEPIED It***************************** PERUIT TNFORI{ATTON *****************************rl Onners Name:.G-f-,"7*/- L* -L E. .eu.L$ddress: /e-r? tu\^,.."0.*rBr.D.l /an ph. Address:Architect:Ph. I i-Building [ ]-Plunbing [ ]-Electrical [ ]-Mechanibal [ ]-other p"-.-E Job Nanes @ Job Address: Legal Description: LotJS;_Block Filing ceneral Description: Work Class: [X]-New [ ]-Alteratl.on [ ]-Additional 1 1-nepair 1 l-other Number of DwelLing Units: I ^ tlpnber and Tlpe of Fireplaces: Gas appliances_ Gas Iogs_ I{ood,/pellet_-J_vf,* *** **** ************* ************ VALUATTONS *********************************tl Bgb-o Jq+ BUTLDTNG: $ - E&ECIRICAL: $ oTHER: $--dl>Atr -- BLtlt'tBTNG, T-- uEcndidiii-- ;oil;: ? ,- zo,r c*TOTAL 3 l_1f,-.<r -. . csn CONTRACIOR INFORUATION * * * * * * * * * * * * * * * * !. * * * * * * * * * *F-.o,.-L* c\,.,-.,^-8,-n-s -Town of VaiI Rea. no.23r/-LContractor:- ^'ter#^.,^F-k?,.-[._ f.,.,,r^_g".os,Jown of Vail Reg. NO.ASc/-.Address: /5,2" /Vt-3-T phone Nurnber: .z/?C_ Electrical Contractor: Address: Nurober of Acconmodation Units: ^ PLrrr'lBrNG, T-- uEcididiii-v.lI* * * * * * * * * * * * * * * * * * * * * * * * * * * coNTlRAc:tOR TNFORIifATIO7 Eenefal Contractor: ^€ - r -,. n Plunbing Contractor: Address: llechanLcal Contractor: Address: ** * * *** **** * ********** ********** FOR Town of Vail Reg. NO. Phone Number: Town of Vail Phone Nunber: Town of VaiI Phone Number: Reg. NO. Reg. No. oFFrcE usE ** * * * ** *** * * * *** *** **** * * * * **** BUTLDTNG PI,AN CHECK F8E: PLUUBTNG PI,AN CITECK FEE: IIIECITAI{ICAL PIAN CHECK FEE: RECREATION FEE: CLEAN-UP DEPOSIT3 TOTAIJ PERI,IIT FEES: BUTLDTNG PERMIT FEE: PLUMBING PERI.ITT FEE: IfECHANICAIJ PERI'IIT FEE: ELECTRTCAL FEE: OTHER TYPE OF FEE: DRB FEE: BUILDTNG: SIGNATIIRE: ZONTNG: SIGNATTIRE: caE4ry uP rrEPosIT nEFrnrD Tro:fu"f ftr.,.g.-L"--. ,T -{'tir-l!ri .F._y Fq-F otgn Revrew Acrron Fo} TOWN OF VAIL Category Number o"t" 3€\. t &, t<11- Project Name: Building Name: Project Description: Architect/Contact, Address and Phone: l. Legal Description:Lot lL? Block- SubdiMsion Project Street Address: Comments: Zone Districl Motion by: Seconded by: n Approval tr Disapproval ft*ttocc*/ Conditions: I" revls6d 8/1?,/94 o"rr"" **rrrCboARD AppLrcATroN - rowN O.ror", coLoRADo DATE RECEIVED: Sept- 17. 1qg6 DATE OF DRB MEETINC: .l,r : . .' . ..; i i ********** . 't,i, "f+,1+:+r **********i.rur SEPlS1996I. A. B.TYPE OF REVIEW: New Const.ruction ($200. 00)Addition ($s0.00) Minor Alteration ($20.00) Conceptual Review ($0) ADDRESS. 1879 Meadow nidge Road Vail, Coc. rt LEGAL DESCRIPTTON: Lot '1 6 BlockSubdivision Buff,er Creek Re-Sub If properby is described by a meets and boundsdescription, please provide on a separate sheett.o this applicat.ion. ZONING3 Res. legaI and att,ach E. F. H. NAME OF APPLICANT: Jerrv L. FarquharMailing Addressl 1R7e Meariow Ridge RoadVail-€o.81657 Phone 476-3185 G.NAME OF APPLTCANT' S REPRESENTATIVE: Mailing Address: Phone NAME OF OWNER(S): J L. & Debonah R. Far OWNER(S) SIGNATURE: Maitinq Address ; lVt9t6Iead idqe Road vail i eo- 81657 Phone 4JS=3J35 APPLICATIONS WILL NOT BE PROCESSED WIIIHOUT OWNER'S SIGNNN/.F-E Condominium Approval if applicable. DRB FEE: DRB fees, as shown above, are Lo be paid aE bhe Eime of submicLal of the DRB applicaEion. L,ater, when applying for a building permiL., pLease identify the accurat.e valuat,ion of E,he proposal. The Town of Vail will adjusL Ehefee according to the L.abl_e below, to ensure the correcb feeis paid. I. J. FEE SC}IEDULE: VAI-JUATION $ o $ 1-0,000 $ 10, 001 - $ 50, 000 $ 50, 001 - $ 150, 000 $1-50, 001 - $ 500, 000 $500,001 - 91,000,000g Over $l-,000,000 DESIGN REVIEW BOARD APPROVAIJ EXPIRES APPROVAIJ T'NLESS A BUILDINO PERMIT ISIS STARTED. FEE $ 20.00 $ s0.00 $L00.00 $200.00 $400.00 $s00.00 ONE YEAR AFTER FINAI., I$SUED AI\D CONIITRUCTION LIST OF MATERTAIJS I.,EGAI, STREET The following informauion is Review Board before a final A, DUIIJDING MATERII\I.IS ; Roof Siding OLher Wall Mat,erials Fascia Sof f i t,s Windows Window Trim Doors Door lland Flues Trim or Deck Rails Flashings Chimneys Trash Enclosures Greenhouses ReLaining walls ExLcrior LighLing OLher LANDSCAPING: NAME OF PROTJECT: .rerry r,_ & Deborah R. Farquhar DESCRIPTION:LOTI g _ BIJOCK S UBDIVT S r ON Bu.lfer-SceeL.re - s ub ADDRESS:e oad Vail, Co. rcquired for submittal approval can'be given: TYPE MATERTAIJ Lo bhe Design COIJOROF Metal Aqed Bronze Dcsigncr: Phone: B.Name of t-Ootr) Uur e= tu ts(n c0o-zo Fo- IJJY ulo oF tr E uJ o- l!o(n >oro-"\ - .-{ ts =elrlo-zo F C)f,EFazoo tr!tr z o=z4(no =zJO(L t! ).-i5\J \.,' = =F'=-.: /\.! -r ": t!mE= r-r rr Pir L__l Ll PSI F UJ o- ogl z f oF I CEo- JFut-h= o- tliEO-O|!oo\ r-u x> u,JJtr llJ @ oF sE\a\s. o €q; *E*tr=E :!A O oz ts =E UJo- col \ --.rlgJ>'? I I I I I El.5t .r"l,< .916*rtr ,,ilb9lo4,2 I I l." .Ft<ro I I I I I,,otF-l<(EIFloz t=to -i- ooti (! '=(Do*iorl-rOctro(6cout €Eg E.= 3 e 6Ec-o c: i:ged'i =c96 3Et E E-ssOO -rF o Eos!q! c.=- (6 CI(5 CL aEE oP o-Ef;e E6:OE:- c.Y E's_6 FFE_ag 6 6.=-c; oP-E nr Or EE:@i'36> 9 ca 6l E .B'f e9Ecre5g -o6 l! uJo:i lt ar Fo CEF2 G, .Eo -o 3oF aJ 3 F ut drr-<:og JI<l -l zl zl .. >l UJ uJ UJz U)F llJ(L J z Eoo :<eo =2ze-o ootr ^ 62I5 >eE P 6f, ooE5b ?l3= 6oq ig-E:F 2'. Y l!aot(, I,loot (d >l r{ot o.!l ool tl -1il ite =>d -I(4fut.t =oN ol =.1(,l ull 5l al>l t!lol zl 3l 9tFI I I IEIrl -'1 |-l .;l =.1(9l Hl _rl <l>lttlol zl 3lolFI qJ (s .-l q) l.r a-ltr or-llr =e. tr I .lol =.1ot uJl 5l t<l l!lol =t .., 9l uJFI F zl ol ql <l>l z oluG J z 3 F qJl ^l;l o C)lr =I l,|- J/ AJ AJtr H q.l r.t-{ (H +Jlr o)o H B tld trd ui E z ot ln bq co .Fll cr')&tll\O FI F.ql -f ,*t r =lIo,lFl@l o-l o I .rrl A Xi'.1 HEaJ><tr =o (d tr(!E u.J z z -C) [U = E irI o2 o t -..r O<FE<)r!<zEll.l F(tZoo JE<oOF F3 EE E >Y =#=F)zlr-o F uJ T 75 iouth tronlage rosd vril, colondo 81657 (303) 479-2138 ot 479-2\39 ottlcc of communlly drvclopmenl BUILDING PERI,iIT ISSUANCE TIME FMNE If thi.s permi.t requires a Town of Vail Fire Department Approval, Engineer"s. (Pyblic }Jopks) reyiew and approval, a plannin!'Oepariment review or Health Department review, and a review by the auiliing Department, the estinated time for a total review nny take as l6ngas three weeks. A'll conmercial (large or smal'l) and all mu'lti-fami'ly permits will have to follow the above mentioned maximum requiremlnts. Residential and smal'l projects should take a'l esser amount of tjme. However, iffesidential or smaller projects inpact the various above mentionid departments wi.th regard to necessary review, these projects mayalso take the three week period. Every attempt wi.l'l be made by this department to expedite thispermi't as. s.gon as possible. I, the undersr'gned, understand the plan check procedure and time frame. Project Name Date Work Sheet was turned into the Communi ty Development Department. \-rl 75 soulh tronlage road rail. colorado 81657 (303) 479-21.38 ot 479-2L39 TO: FROM: DATE: SU&TECT: offlce of communlly developmenl ALL CONTRACTORS CI'RRENTLYL REGISTERED I{ITH THE TOWN OF VAIL TOWN OF VAIL PUBLIC WORKS/COIOIUNITY DEVELOPMENT !,IARCH 16, 1988 CONSTRUCTION PARKING & MATERIAL STORAGE rn surnmaryr.ordinance No. 6 states that it is unrawfur for anyperson to litter, track or deposit any soil , rock, sand, debrisor rnaterial , including trash durnpsters, portable toileti andworkrnen vehicles upon any street, sidewalk, alley or publicpI?9" or any portion thereof. The right-of-way on al1 Town ofVail streets and_roads is approxinately 5 ft. 6ff paveroent.This ordinance wilr be stri-Lly enforcEd by the Town of vailrg!_li-c works Department. persons found violating this ordinancewill be given a 24 hour written notice to remove-said uraterial .fn the event the person so notified does not cornply with thenotice within the 24 hour tirne specified, the puLfic WorksDepartment will remove said rnateriar at the expense of personnotified. The provisions of this ordinance sfriff not bEapplicable to construction, maintenance or repair projects ofany street or alley or any utilities in the right-a-way. To review Ordinance No. 6 in full, please stop by the Town ofvail Building Departrnent to obtain I copy. riranl you for yourcooperation on this natter. Date (i.e. contractor, owner) 5/0/ oor= 6 - Z-ff JoB NAME Ka//,'rl K PERMIT NUMBER OF PROJECT READY FOR INSPECTION: LOCATION: CTION REQUEST TOWN OF VAIL 479-2138 '4 A-4-*CALLER TUES WE THUR FRI BUILDING: tr FOOTINGS / STEEL PLUMBING: T] UNDERGROUND tr ROUGH / D.W.V. tr ROUGH / WATER tr FOUNDATION / STEEL tr FRAMING ROOF & SHEER PLYWOOD NAILING T] GAS PIPING tr POOL / H. TUB tr FINAL FINAL ELECTR!GAL: tr TEMP. POWER tr HEATING O EXHAUST HOODS tr CONDUIT tr SUPPLY AIR tr FINAL r] DISAPPROVED tr REINSPECTION REQUIRED CORRECTIONS: INSPECTOR 4r ts-.*o* INSPECTION REQUEST PERMI DATE T NUMBER OF PROJECT .r -rc- Q.r JOB NAME INSPECTION: MON TUES WED THUR FRIREADY FOR LOCATION: AM PM /! 7 t''-'o,/o..,, "''/fc ^ ^' TOWN OF VAIL CALLER BUILDING: O FOOTINGS / STEEL PLUMBING: O UNDERGROUND tr ROUGH / D.W.V. tr ROUGH / WATER O FOUNDATION / STEE- tr FRAMING ,_ ROOF & SHEER" PLYWOOD NAILING tr GAS PIPING tr INSULATION tr POOL / H. TUB SHEETROCK NAIL tr FINAL ELECTRICAL: El TEMP. POWER MECHANICAL: O HEATING O ROUGH tr EXHAUST HOODS B CONDUIT tr SUPPLY AIR tr FINAL APPROVED CORRECTIONS: tr DISAPPROVED tr BEINSPECTION REQUIRED INSPECTOR rNs#"toN REeuEsr PERMIT NUMBER OF PHOJECT ante /NAME CALLER MON TUES JOB READY FOR LOCATION: INSPECTION:WED THUR FRI AM TOWN OF VAIL BU DI DI trl r-1 | trl EII tr ILDING:PLUMBING: FOOTINGS / STEEL tr UNDERGROUND O ROUGH / D.W.V. tr ROUGH / WATER FOUNDATION / STEEL FRAMING ROOF & SHEER tr GAS PIPINGPLYWOOD NAILING INSULATION tr POOL / H. TUB SHEETROCK NAIL tr Vr,"o,-tr FINAL ELECTRICAL: tr TEMP. POWER MECHANICAL: tr HEATING tr ROUGH tr tr tr EXHAUST HOODS tr CONDUIT SUPPLY AIR tr FINAL tr FINAL ROVED D DISAPPROVED tr REINSPECTION REQUIRED CORRECTIONS: INSPECTOR nF$oP ]ro* r'sPEcrroN's couPLETED O The ltens below aeed to givingapernl.taflnal Please check off ln the FINAL PLU{BINC be complete before Cof0. box provlded. DATE! n tl FINAL UECHANI,CAI, DATE: DTPROVS}fiNT SIIRVEY RESID. NAME: DATE: tr TE}IPORARY C OF O DATE: CERTIFICATE OF OCCI'?A}ICY DATE:tl I.A}IDSCA?ING DIIE DATE: b^rO (7$,01, INSPECTION REQUEST. TOWN OF VAILPERMIT NUMBER OF PROJECT oor. J / olt/lz JOB NAME @ WED THUR rf7 / )) READY FOR INSPECTION: LOCATION: /6tr5a f )ecK or@ )t r)ilt),ulrt /rt,t\JU/( BUILDING: tr FOOTINGS / STEEL "tr UNDERGROUND tr ROUGH / D.W,V. tr ROUGH / WATER tr FOUNDATION / STEEL O FRAil/ING - ROOF & SHEER" PLYWOOD NAILING tr GAS piprNc tr INSULATION D POOL / H. TUB tr SHEETROCK NAIL rrrunl U/tr FINAL ELECTRICAL: O TEMP. POWER MECHANICAL: tr HEATING ROUGH D EXHAUST HOODS CONDUIT tr SUPPLY AIR tr FINAL OVED CORRECTIONS: tr DISAPPROVED tr REINSPECTION REOUIRED O r\'' .J- \ ./ oo-. "-T,/q/E z rNSPEcroR// o o =tr =E UJo- o u'] o\ oo.+IJ1 .J' UJ llJu- b =e uJo- DNSS$.1$$s o\ !n (t r'1M tsH Fd3 Flrrl Ei H h{ F{FHxxE to\r6\ lFl l\ot: l!! (9 t^< z F1.AH z M ts JZ 0 u- z f tllF EoF eFIz o zz o uJF z z -J € zz a') ILJ uJat =I u- o o zoo .Eo H ti H ft >.!g& F:| H Zl rll Ff tq, o ! (E =o-cl G 3 Fq () -( o ruo (! = o o o) f d) E o =l q) (t '.g E atto g;o .9 .2 .=Eo q) Ec6 ol coN :nc 'ot- q) o o) ooo(lt E () o .9 : .o o E o o '(5 -i- q, '=9l,)*Eog8F F.e gl;Rg E=E O YEc-o'63s E+; J:gPj'i =e9d'- o.-c EEE EE-e,FOO;Eo Eagtq! c.=- (o o- a! cl sEEg,- oE€e E6:o!:- c.Yc)6: EEF -vC6 0'-5aes*: EElo o; -r=E3i8 .i6 e9E or PEg -o(l rn C\|\c .t @ !n FI ln C{o lno\a F = uJ z J5 :< uJ () z J CL J = tr.l C,z lo = Iz -C) UJ: X N!n c.,l ul4rltz tr IIJ IJJ @ =uJ ul z 6 u,/o F o UJ o- z ll,,Jo x F ul(t) U't!ulll- tr =t IJJ ) F F ozoJ o o IJJ UJ z !o = E J = tu F NO[Vn]VA 14 u FI .lF!LTx:.; 6B 3.-., 5E ;9 3'z JH<rl IJJ.: AEo< (\I (\l zzootr^a95a9 0 ao66QZr!<oqgU FO.i$i UJ co l3 Itr]IA l(/, t:tz loIt)tzt< lEtxlfrl lorl(at< z tr UJ ooo\ o (L t!E z Eoo q g o e CEt! =utz I Iq Fz:z tr I Fz:l 2 uJ =o UJ Jo- E Az t z F 6I IJJl) E uJzY i z F J oz I lr1z z -1- u,J B F ul TL IL o 3 a o 3l zl zl .. >logJ llJ IJJzoL E IJJ J z E o z F at 6 fa J, z I I I fr>l[) _f,o / 44dt/l ?, & uJF o UJF U) .oo-zo F TLt!Y llJo oF F = =cBO\ IL FIo.>o aL -{oocirpr< LrJFoz .-*6\J\J= =81dd= EHr F (C uJcl! :t!EZ.E<llf606oE9tt i!be Ed:> =ul-E h=.) J ;iiE R}*E 669 \urEXo-E X>o=Fo. ".1o-!* llJ co oF I -- z,'.9 Z*.(nO =z dP E =E lrJ o-z9F()f4F, zo() F!! I I I I ol =.1ol IJJI 5l al>l t!lol Pl E Hq q frlAHAI 3 =lcltr ol =.1olurl 5l <l>l t!lol zl 3l ONH .it Io\.+ CA ol =.1olurl 5l <l>l ttlol zl 3lolFI tlI lIl* lT | .rf, | \O SlFl r F.'I XI>l olot € | 'lo IEI A Ir4t IFll <rl dt Edq qF EI 3E ll l,lI(,lI IJJIItrl Hl il El bitzl>t 3lst 9lrr.r Fl @ (t) I\o J o. & B E o\ Fo an <ttll J a t:l Ifrll&l cl h' Fq E z =tr FftrloIr't& 4 F * h i.'i =z trb =.L IYFtrOz () (Jz o = Jo- -rO<FcouJ<zg I,IJ F., Z,o <o -,$H t f ?5 .oulh lronlago rord Yril. colorldo 81657 (303, 479-21.38 or 479-2139 TO: FROM: DATE: SUR'ECT: offlcc of communlly developmenl ALL CONTRACTORS CI'RRENTLYL REGISTERED IIITH THE TOWN OF VAIL TO!{N OF VAIL PUBLTC I{ORKS/COMMUNTTY DEVEIOPMENT lilARcH 16, 1988 CONSTRUCTION PARKING & I,IATERfAL SIORAGE please stop by the Tovrn ofa copy. Thank you for your In sunrnary, _Ordinance No. 6 states that it is unlawful for anyperson to litter, track or deposit any soil, rock, sand, debrisor naterial , including trash duurpsters, portable toilets and workmen vehicles upon any street, sidewalk, alley or publicplgce or any portion thereof. The right-of-way on alt Town ofVail streets and roads is approxirnately 5 ft. off pavenent.Tbis ordLnance witl be striLtty enforced by the Town of VailPublic Works Department. persons found violating this ordinancewill be given a 24 hour written notice to renove said material .fn the event the person so notified does not conply with thenotice within the 24 hour tine specified, the pultic WorksDepartrrent will remove said material at the expense of personnotified. The provisions of this ordinance strltt not bLapplicable to construction, naintenance or repair projects ofany street or alley or any utilities in the rJ-ght-a-way. To review ordinance No. 6 Ln fuIl,Vail Building Department to obtaincooperation on this raatter. Read and acknowledcred bv:acknowledged by: Pro ect (i.e. contractor, owner) 1 lnwn 75 south frontage road vail, colorado 81657 (3q]) 4792138 (3Gt) 479'2139 PROJECT NUMBER: 81090 ADDRESS: 1879 I,IEADOW RIDGE olffce ol community deYclopment LOT ]-5, BUFFER CREEK ' CONTRACTOR: OWNER OCCT,PANCY: R-3 ARCHTTECT: MUELLER TYPE OF CONSTRUCTION: V-N ENGINEER: MUELLER PI,ANS EXAMINER: I,IICHAEL WHITAKER Plan Review Basedl on the 1988 Uniforn codes coRREClrONs RSQUIRED NAME: FARQUHAR REMODEIJ DATE:8/Ls/9O 1.. 2. 2 4. 5. 6. All decks within Town of VaiI to be desigmed for a minimun 1oo Ib. per 3q. ft. lLve load. All roofe within Town of Vail to be designed for a minimum 8o lb. pet sg. ft. snow loail. AII glazing in hazardous locations as per uBc 5406 to be safety glazing. water supply for hot tub to be protected for cross connection with an ipprovea backflow prevention device' UPc 1003' Steps off deck to be constructed as per UBC 3306' 8tt itax rise, 9r! min. run., handrail fot 4 or more risers' slqrlight material shaLl be as Per UBc 3402 or 5207 ',a i" 6urb shall be provided depending upon slope of roof as per UBC 3404 or 5207. Field verify transfer of bearinq for glu-Ian in_ roof franing pian at center of existing stru-ture through wall to found. Deck pads to be set nin. of 48rr below grade for frost protect. A ninimurn of one exit required fron structure to be 3 t door ninimum. 8. 9. 10. Add 2 #5 around all blockouts for windows and doors in foundations extending mininum of 24n past opening. uBc 2614(d)7. -. INSPECTIONTOWN OF -': : ,:, -;l -l , REQUEST VAIL JOB NAMF Y/A READY FOR LOCATION: INSPECTIO @PM BUILDING: O FOOTINGS / STEEL PLUMBING: tr UNDERGROUND N FOUNDATION / STEEL tr ROUGH / D.W.V. FRAMING tr ROUGH / WATEB ROOF & SHEER PLYWOOD NAILING tr GAS PIPING INSULATION SHEETROCK POOL / H. TUB E FINAL ELE trT trF trc tr_ MECHANICAL: TEMP. POWER tr HEATING tr EXHAUST HOODS CONDUIT tr SUPPLY AIR N FINAL' APPROVED RECTIONS: tr DISAPPROVED tr REINSPECTION REOUIRED INSPECTOR CTION RE NUMBER OF PROJECT q JOB NAME READY FOR LOCATION: INSPECTION:PM.AM BUILDING: tr FOOTINGS / STEEL PLUMBING: O UNDERGROUND O ROUGH / D.W.V. tr ROUGH / WATER D FOUNDATION / STEEL - ROOF & SHEER " PLYWooD NAIL|NG tr GAS PIPING tr INSULATION tr POOL/ H. TUB D SHEETROCK NAIL tr TEMP.tr HEATING tr tr tr o tr EXHAUST HOODS tr SUPPLY AIR (neenoveo CORREdTIONS: tr DISAPPROVED tr BEINSPECTION REQUIRED ome ,//-//2 rNsPEcroR O "{flJ *1- Planning Environmental Cornmission fa;1urt Connunity Developnent Department December 10, 1990 Pfr'\hreAz ,S.,nd 6, CL*L ance to encroach o andTO: FROM: DATE: SUBJECT: A reguest for a 0.5 foot side setback variance for an addition to a single family structure located at Lot 16, Buffehr Creek Subdivision, 1879 Meadow Ridge Road.Applicant: Jerry Farquhar /J.o,oaw"/ f_o.utl I. BACKGROUND AND DESCRIPTION OF THE VARIANCE REOUESTED On JuIy 23, 1990, the Planning and Environrnental commission (PEc) approved a side setback variance for this applicant. The variance granted allowed the applicant to construct an addition to his single family residence within 8.5 feet of the property 1ine. However, one point of the construction has been located 8.0 feet frorn the property line. As a result, the applicant is reguesting a second variance to expand the originaL variance by half a foot. The original concept was to build a sun room on the front of the house which would line up with the side of the house. (See survey. ) The west side of the addition was to be Iocated flush with the west side of the house. The construction has been built according to this concept. However, because the side property line is not exactly parallel to the side of the house, the further the addition extends to the front of the property, the closer it gets to the side property fine. The back corner of the house j"s 9.L feet from the property line in question. The forner front corner has a 8.5 foot setback. The new front corner of the house has a 8.0 foot setback, The basic infornation of the proposal has not changed. The sun room is 1,6 feet by 12 feet (194 sg. ft. GRFA). The existing structure currently encroaches 6t-6fl into the west side yard setback. Because the house is anqled toward.the side propertv line, the setback for the new construction As a result, the applicant7.0 feet into the side is requesting a var (west) setback. ,7,1 fii") \h1 ) II.ZONING CONSIDERATTONS Zoning: Lot Area: GRFA: Prirnary,/Secondary Residential L4,854 AIIowed: 3,7L3Existing: L,9L2 Proposed: 2 tLO6 sq. ft. sg. ft.sg. ft.sq. ft. Site Coverage: Height: Setbacks: Front - Allowed: 2,97Q sg.Existing 1,323 sq. Proposed: 1,501 sq. €+ ft.ft. Rear - Existing: Proposed: East - Existing: ProPosed: * west - Existing: ProPosed: Allowed: Existing: Proposed: Existing: Proposed: 33.0 ft. 22.5 tt. 22.5 ft. 49 ft. 38 ft. 56 ft. 66 ft. 41 ft. 41 ft. 7.5 ft. 8.0 ft. *Area of setback variance request. III. CRITERIA AND FINDINGS upon review of criteria and Findings, section 18.62.060 of tire Vail Municipal Code, the Department of Comnunity. Development rec-ornrnends approval of the reguested variance based uPon the following factors: A. Consideration of Factors: t-. The relationship of the feguested variance to 66FExistinq or potential uses and structures in the vicinity. Even though the existing residence encroaches into the setback, there is adeguate distance between ttre Farguhar residence and adjacent home to the west. Because the applicantrs house is already Iocated 7.5 feet frotn the htestern property line, the addition should not create a noticeable impact on the surrounding area. The addition is located where there used to be a deck, which further dirninishes the irnpact of the expansion in the setback. Although the addition could have been shifted to the east so as not to encroach into the reguired 15 foot setback, staff believes that the aadition as designed is more compatible with the existing structuie. Specifically, the roof lines will align, instead of being offset' 2. The deqree to lthich relief fron the striqt and Literal interpretation and enforcement of a specified requlation is necessarv to achieve cornpatibilitv and unifornitv of treatment anonqsites Ln the vicinitv or to attain the obiectivesof this title wlthout grant of special privileqe. Because of the existing residencers location in the side setback, it is reasonable to considerthis circumstance a practical difficulty warranting the variance. Relief frorn the strictinterpretation in cases like these is appropriate and has been granted to other property oltners. 3. The effect of the recruested variance on liqht and Because this single fanily horne is one story, theresulting 8.0 foot setback provides rnore than adequate light and air separating it from the neighboring structure. There are no impacts on the otber considerations. IV. FINDINGS The Planninq and Environmental Conmission shall nake the followincr findings before ctrantinq a variance: A. That the granting of the variance will not constitute agrant of special privilege inconsistent with the linitations on other properties classified in the sane district. B. That the granting of the variance will not bedetrinental to the public health, safety or welfare' ornaterially injurious to propert.ies or improvenents in the vicinity. c. That the variance is warranted for one or nore of the following reasons: 1. The strict literat interpretation or enforcementof the specified regulation would result inpractical difficulty or unnecessary physical hardship inconsistent with the objectives of thistitl-e. 2. There are exceptions or extraordinary circumstances or conditions applicable to the sane site of the variance that do not apply generally to other properties in the same zone. air, distribution of population, transportation and traffic facilities, public facilities andutilities, and public safetv. v. 3. The strict interpretatl-on or enforcement of the specifJ.ed regrulatLon would deprive the applicantof privileges enJoyed by the owners of otherproperties in the same district. STAFF RECOITTIiENDATTON Staff reconnends approval of the requested variance. The concept of the addition has not changed and still meets allof the criteria and findings of the previous setback variance request. EGcaulc the exletJ.ng house is ln the setback creatlng a physlcal hardship, the ohrner deservesrellet frclia tlre etrict retback reguirement. ThLs varianceis not a grant of specltlt prlvlt€Ee aE thic -t1pe ofeltuation has JustlfLed other varl.ances in Uif..ft;t. There are no negntLve lupacts on adJacent properties. The variance criteria cited include Findings Iv A, B, c1&2. C: \mo\farguh_2 t*r/'U Lr"J S ^f( ^+ o E lOg.TO, mrD.4 5' F, l UTILITY EASEMENT !@..lln/6rr,av --... 7EP I I I iltlI'' l WsP I LOT 16 P Ila,o HN, LS. 1t201 \! $ $ P'N A UPL.S.nzv / 1.,l' L{ t4zn w MEADOW ROAD DE/.AIL I hereb for the land su upon fo I ines. on this of the descrlb i ndl cat cross I n Thls ce to detr easemen relied IMPROWMENT LA LO| RffiJWWgON tI I aI I IIt IIII II a II\ I!E\r lt i$/ . LOT lt s 1." I C\fs $c s u, l7 ntotl w ENT OIER ^( \ "*JPAnQt$ \e,- -A'3tlot59'.' R " l75.QO'A='it.t t' (50') ra- sl€: ftlltrL XlvUeEE[cq.o Era GE I EI.qE' olldcriloddnr Englnccrlngr.u.twfi{ tr tt( x!A,- ,A|r rrGrq r rSta l.Jtra3 o.o st '1t t- N<fit ,++ al t+a /b ot dri.* JPT 16a>tt x*- +t tt -+t t al.+ il '$ o gacr T-- f ^o,o,ttp*,r46.1|Jb ar,L) IrdT I--t 2o'*tw PCAVelv-? K*^ilS COHEN CONSTRUCTIONnTc' TO^,n of Vall December 5, | 990 Deportment of Com m unity Dwelopment 75 South Frontage Rd. Vatl, Color$ E1657 RE: Varlanca for dltlon, Forquhar ResiGnce, lE79 Neffit/ Rldge Rd. ToWhom lt mqrConcarn, I hare been a rasident and owner of unit * I , l850 Msadow Ridge Rd., Euffer Creek Condominiums, for the past eight years. t1y front thor is laoted mross the street and approximately flfty yards to the east of the Farquhar reslGnce. I feel wlthout questlon that the addition being built onto the Farquhar resiGnce will lmprwe the neighborhod both in a visual and economic wq1. I would also like to state that since the Farquhar's have mored lnto their home thqy have ontinually lmprwed its appeor^ance. They are a redit to the neighborhmd. P.O. Box 837 / Vail, CO 81658 / 303'827'5739 Slnce:ely, o 21 Noverber 1990 ilerry and Deb Farquhar Or'rners of I.ot 16, Buffer CreekVail, Colorado Subject: L:ivi.ng Roon Additlon Farquhar ResidenceVaLl, Colorado Dear Jerry and Deb: Please see our letter dated 18 June 1990, at tlrat tine we approved the conceptual desJ.grn for the addition to thesouth eide of your hone. We understand an additionalvariance of 5rr is reguired to conforn with the Town ofVail Zoning Code. The addition has been built asanticilnted and is a fittlng addition to the existing residence and surrounding neighborbood. we strongly reconmend approval of the variance application. and C1mof Iotvail ,colorado i-tzfer Creek Sincerely yours, ,fiDpgFArf,ijbre.. t, Novenber 23, 1990 TO: TOIIN OF YAIL It ts my understanding tbat ,terry and Deborah Farquar of 1879 Meadow Rldge Road, are reguestlng a variance for thelr nen addltlon ln thelr hone. As a hosreowner at 1880 Meadon Rldge Roddr I ask that you grant the varlance. The Farquarst have done nore to lnprove our neighborhood anyone, and thelr addltlon is a beautlful upgrade. Thank you for your co-operatlon. P.O. Box 488 Vatl, C,olorado 81658 jill"i' REQUEST VAIL tNs CTIONWN OF NAME READY FOR LOCATION:ttl INSPECTION: tl PFOJECT /1 0 ,o" BUILDING: tr FOOTINGS tr FOUNDATI tr FRAMTNG / STEEL PLUMBING: tr UNDERGROUND tr ROUGH / D,W.V. tr ROUGH / WATER ON / STEEL ; ,_ ROOF & SHEER" PLYWOOD NAILING tr GAS PIPING D INSULATION D POOL i H. TUB ELECTRICAL: tr TEMP. POWER tr HEATING tr EXHAUST HOODS tr SUPPLY AIR - O FINAL tr FINAL tr DISAPPROVED tr REINSPECTION REQUIRED ,f ..+, oarc.,/? - .1f - i)( rNSPEcroR UM l N I( INSPECTIONTOWN OF REQUEST lo'' ,'rz/Y I OJECT o .loa r{nNle CALLER READY FOR INSPECTION:MON TUES WED TH LOCATION: tr DISAPPROVED PM tr APPROVED CORRECTIONS: tr REINSPECTION REQUIRED BUILDING: O FOOTINGS / STEEL PLUMBING: tr UNDERGROUND tr FIOUGH / D.W.V.tr FOUNDATION / STEEL FRAMING D ROUGH / WATER ROOF & SHEER tr GAS PIPING" PLYWOOD NAILING fl INSULATION I] POOL i H. TUB tr SHEETROCK NAIL tr FINAL tr FINAL ELECTRICAL: tr TEMP. POWER tr HEATING ROUGH tr EXHAUST HOODS CONDUIT O SUPPLY AIR O FINAL tr FINAL INSPECTOR niFsrop INSPECTION REQUEST TOW VAIL ANIq/rql CALLER READY FOR LOCATION: CTION:MON @..WED THUR PERMIT NUMBER F PROJECT BUILD!NG: D FOOTINGS / STEEL PL D n tr D tr E fl UMBING: D FOUNDATION / STEEL UNDERGROUND ROUGH / D.W.V. ROUGH / WATERf,r*o",*o tr tr tr o ROOF & SHEER PLYWOOD NAILING GAS PIPING INSULATION POOL / H, TUB SHEETROCK NAIL tr FINAL tr FINAL ELECTRICAL:MECHANICAL: tr tr tr tr TEMP. POWER tr tr E o HEATING ROUGH EXHAUST HOODS CONDUIT SUPPLY AIR O FINAL tr FINAL O APPROVED CORRECTIONS: O DISAPPROVED tr REINSPECTION REQUIRED DATE INSPECTOR niGsxor o _ $['0 NO\/ 2 81990 PUBLIC NOTICE NoTIcE fs HEREBY GIVEN that the Planning and Environmental Conmission of the Town of vail wilL hold a public hearing in accordance wittr Section l-8.56.060 of the municipal code of the Town of Vail on Deceuber J.0, 1990 at 2:00 p.n. in the Town of Vail Municipal Building. Consideration of: A request for a conditional use pennit in order to establish a bed and breakfast operation on Lot P, VaiI Village 2nd Filing, 141 west Meadow Drive. Applicant: Joan M. Norris A request for a minor subdivision in order to vacate a lot line between Lots 46 and 47, Vail Village West Filing No. 2.Applicant: ANJA Corporation A request for an anendroent to Chapter 18.54.020 (E) of the Vail Municipal- Code, Design Review Board organization, in order to delete ttfifthrr Wednesday of each month. Applicant: Town of VaiI A request for a front setback variance in order to construct a garage and a wa1l height variance in order to construct retaining walls at L448 Vail Valley Drive; Lot L8, Block 3, VdiI valley First Filing.Applicant: John and Barbara Schofield A request for a najor anendroent to SDD No. 4, conmonly refered to as Cascade Village, Section 18.46 - Area D, in order to add office floor area to the GIen Lyon Office Building, 1000 S. Frontage Road l{est, Lot 45, Block K, GIen Lyon Subdivision. Applicant: Glen Lyon Partners A request to amend Chapter 18.54.050, Design Guidelines, of the Vail Municipal Code in order to arnend Section cr6 and delete Section C,L3.Applicant: Town of Vail A request to amend the Town of VaiI Zoning Code by repealing and reenacting chapter 8.28 to expand, strengthen , and clarify code provisions relating to Air Polfution Control . Applicant: Town of VaiI 1. 2. 3. 4. 5. 6. 7. 8.A request for a side yard setback variance in order to construct an addition to a single family dwelling on Lot 16' Bueffer Creeki l-879 Meadow Ridge Road.Applicant: Jerry farguar 9. A request for a conditional use pernit and a variance toparking standards Section L8.52 of the Town of Vai-l Municipal Code to allow off-street parking at the "HolyCross parcelrt described as follows: Connc::ei:rg'a! Bhe IIE corrcr of jaid :t::ion l2; c!e::ec Sousb 88'19'29" Hcrc. elcng tn" ootlo'it"t''i't":o r".f/t' a-Jitlr;:: of 43'l facc to cbc inecrsccgioa oi tr"-i'"io"'"iiit of.cbe-ai:c liee o! raid garccl; rhcacc south 0'01'33" 1t"r'"ti;;;";;il Pt"toog"Ioi'-ll3'2 iecc go tbe aorthcast ccr::cr of raid p"r.lf-riilf, is tlc poi:c of begi::i::3; Ehcnce souch 0'01'33" Eascl :i""g"'"ia-'":! I::i"T;::,t;;!rt;":ll,'iillilit"' ii rul* *:i H':i: i.,iill;'i:.:rii,iil,i"ilt"Li::i,'il,T:1r,,39.t2'34" g€si, !I. il..i is.lg'04i r".c, 121.45. rees to :::.';;";;-p"r..r ybicb is . ;;;;;. nor:haascarlY elonB lhc norci tt"iorrr"t-i..lr-lrot.l 22'39'2E" gcrt)' loi-*"s.". (a racial so sai'd o""l:::;..:'llilz!'ill."i..i.iir angt' 'q*r'iii:l"la radiuc curtc coocavc louclctly' 10"c3t 5--' ..----- ;|;i,;;;i co shc poiec o! begianiag' This t:act, ar dcsc:ibcC' cont:ias 15'940 rquae !a:!' or 0'366 ectcs' lotE - or lccs. Applicant: Vail Associates l-0. A reguest for a setback, density, conmon area, accessory use and parking variances in order to construct addj.tions to the Christiana Lodge, 365 Hansen Ranch Road, Lot D, Block 2 vail Village Lst Filing. Applicant: Paul R. Johnston The applications and infornation about the proposals are available for public inspection i.n the Comrnunity Development Department office. Town of VaiI Conmunity Development Department Published in the Vail Trail on Novernber 23, 1990. \t^\ and r;'" 'January 5th. l Betsy Rosol.ack reviewed the conditional use and bed and breakfastcriteria, then stated that the staff fert the criteria naa ueen-lneiand recomrnended approvar. Jim shearer moved and chuck cristseconded to approve the request for the bed and breakfastconcrEtonal use. The vote was 5-0. Dan replied that he.felt the. najority of the trucks wourd be goneby Decenber 2r and he was wirling to- crean up as rnuch of the siteas possibre. He added that he wo-uta like to'roir christmis-";;k;otherwi-se the project wourd. be delayed further into February, whichwould then be gettinq into the hig-h tourist seistn. Darton repeated that he fert there shourd be no appearance ofconstruction during presidentsr week, and he wouid """"Lrug"shutting down. 3. 4. Betsy RosoLack explained that the reason the applicant wanted tovacate the rot rine was so that he could constr-utt a parking area9l Lot 46, an elnnty lot. Art Kleiner, r"pre""niing ni"niiaStrauss, the applicant, asked if there ""." urrf questiont. cnucfsrrst mentioned that it appeared that the parking-was already dug.Mr. Kleiner stated that-he had not known thii. Kristan-prilzstressed that a Design Review Board approval was necessary beforework was conmenced on a project. :l:?I_r"":9_t_? -.pptove the- reguest and Kathy warren seconded themoEron. The vote,was 5-0 in favor. \1"9v\*lroTTgd the board that they had approved a side setback onY$y 72, 1?_90 to alrow rvrr. Farquar to construct his addition 8.5 T::-_tol_jhe ploperty line. However, because the side propertyrlne rs not exactly paralrel to the side of the house, the- rui-trreithe addition extends to the front of the property, the croser itgets to the side property line. The fronf co-rner of the addition ' l! 5. ANJA Corporation tilffil ANDPI,ANNING ENVIRONMENTAL COMMTSSION Minutes December LO, 1990 PRESENT chuck Crist Diana DonovanJin Shearer Kathy warren Dalton Willians Connie Knight rras present for Sonnenalp issue ABSENT Ludwig Kurz The neetingt rdas chairperson. STAFF PRESENTKristan Pritz Mike MollicaJill Kanmerer Andy KnudtsenShelly Mello Susan Scanlan Betsy Rosolack 1. called to order at 2200 p.n. by Diana Donovan, 29. Kathy Warren corrected a sentence on page 7 of the ninutes of Novenber 26. Kathy moved to approve the minutes of both meetings, and Jirn Shearer seconded the notion. The vote was 5-0 in favor. 2. Update on vail vallev l4edical center Parkind structure conpletion and recruest to extend the interim parkinq plan on Lots F. E. 1.0, vail village 2nd Filing. Applicant: Vail Valley Medical Center Kristan Pritz explained that the construction of the parking structure was taking longer than had been anticipated. Dan Feeney, representing the hospital, affirmed Kristanrs explanation, and stated that the structure would probably be completed by the niddle of February, depending on the weather. He added that they planned to continue using the temporary parking arrangenents until receiving a TCo for the complete structure. Feeney planned to obtain a Tco for the west half of the top level by chiistmas which would provide 35 parking spaces to augment the temporary ones being used. Dalton lvas concerned about the additional construction traffic on the Frontage Road and the appearance of the construction activity over the Christnas holidays. He felt the site should be cleaned up as much as possible for the time period between Decenber 20th is now 8 feet from the property line, and the applicant isrequesting an additional,variance bf .s feet. Kathy moved and chuck seconded to approve the request per the staffnemo dated December 10, l_990. 6. A fequest for a rnaior arnendrnent to SDD No. 4, commonlvreferred to as Capcade Villaqe. Section i_8.46. Area D. inor9er, to add office floor area to the clen Lvon officeguil9i?q, fOOO Soutn rrontaqe noaa. Lot eS. glock X, elen LyonSubdivision. Shel1y Mello explained that the request was to change an existingexterior deck on the Glen Lyon Office Building to 400 sguare feelof interior office space. The applicant wishea tire to imend sDD4which incruded the addition of zebo sguare feet of office space tothe existing Glen Lyon Office Building. A number of conditions ofapproval addressing site improvernents were attached to the SDD atthe time of approval. The applicant was reguesting to neet onlya portion of the required conditions for the office expansion.The applicant agreed to the undergrounding of the electricalutilities and to the addition of rnore landscaping around theexisting surface parking 1ot. The staff recommendation was forappro-rral- provided the applicant underground the electrj_caIutilities along the north side of the clen Lyon property. (The fPPIicant had agreed to complete the undergrounding as well as toinprove the siters landscapinS.) Dalton Willians moved to approve the reguest per the staff neno,and Jin Shearer seconded the notion. The vote was 5-O in favor. 7. A recruest to establish a Special Developnent District for theSonnenaln redeveloprnent,. located at 20 Vail Road; a part ofIot L, Block 5-8. VaiI Vitlaqe lst Filing.Applicant: Sonnenalp Pronerties, Inc. Kristan Pritz explained how the presentation would proceed. MikeMolLica reviewed the changes highlighted in the nemo. Mike pointedout that the applicant had agreed to incorporate the 13 surfaceparking spaces near the Swiss Chalet into ths parking structure andproposed a pocket park design where the surface parking had been. Regarding a traffic study for Vail Road, Mike stated that theapplicant did not want to do another traffic study. He added thatArnie Ullevig, Tohrn of Vail Transportation consultant, was ingeneral agreement with the study, but that additional survey work was needed. Due to the widening of Vail Road to accommodate theSonnenalprs additional traffic Ioad, the staff was suggesting that sone mitigation was needed in the forn of planted rnedians, two of which would be near the Gateway Building to break up the view downVail Road and discourage additional traffic. Mike added that the catertay project had pullgd their sidewalk back to accomrnodate the medians. According to the traffic study, the Sonnenalp is required to have a left turn lane, and thus the staff felt a median was needed inthis area. A survey is still needed to see how the medians willfit. Kristan pointed out that the parking at the bank needed to remain. Regarding Fire Departnent concerns, Mike stated that the applicant had met with the Fire Departrnent and the Fire Department had signedoff on the conceptual design. Modifications had been nade to the Talisrnan parking and to the northeast corner of the Sonnenalpproperty which would facilitate fire truck access. A portion of the swirnrning pool had been pulled back out of the rear setback, but the staff felt that the entire pool should be completely out of the rear setback area and that the deck should also be pulIed out of the setback. Mike then explained that athird toaaing space had been provided, but that aII the spaces were 4 feet narrower than the required width. The applicant felt that these spaces were wide enough for the type of trucks used for Sonnenalp deliveries. Connie Knight arrived at this point. Andy Knudtsen continued the description of itens of staff and PEc con-ern, beginning with a description of additional landscaping being added to the intersection of Meadow Drive and Vail Road, and also along Vail Road. The staff felt that rnore landscaping was still needed. Andy said that the applicant had not incl.uded the streanwalk in his proposal , but the staff still felt that the streamwalk should be incorporated into the proposed plan. Regarding enployee housing, the staff felt that a rninimurn of 7 of the Sonnenalprs existing employee units should be pernanently deedrestricted and at'least 4 nernt ernployee'units should be reguired. This calculation did not include additional enployees for the 4700 square feet of new restaurant area. (More infornation was needed on this area. ) The Talisnan access easement issue still had not been finalized. Concerning the height of the building' the applicant had reduced ttre height of the building by approxirnately 6 feet for a portion of the building at the northwest elevation along VaiI Road. Andy showed the changes on elevation drawings which included an addition 4rt, PERMIT NUMBER F PROJECT DATE READY FOR LOCATION: INSpECTION: dO* -./ ".a wED -*' FRI cffi o* PM /',@ ''. \i1.1 l]'.,rL't:': t,t;, t'r.:, .l Z9 JOB NAME INSPECTION REQUEST TOWN OF VAIL tr REINSPECTION REQUIRED CALLER tr DISAPPROVED BUILDING: tr FOOTINGS / STEEL PLUMBING: tr UNDERGROUND tr ROUGH / D.W.V. N ROUGH / WATERO FRAMING _ ROOF & SHEER" PLYWOOD NAILING EI GAS PIPING tr INSULATION D POOI / H. TUB tr FINAL tr FINAL ELECTRICAL: tr TEMP. POWER MECHANIGAL: O HEATING O EXHAUST HOODS - tr SUPPLY AIR O FINAL tr FINAL CORRECTIONS: INSPECTOR PERMIT NUM OJECT INSPECTION REQUESTVAIL .\ JOB NAME TOWN OF READY FOR INSP LOCATION: - $$s, N TUES ED THUR R BUILDING: tr FOOTINGS / STEEL PLUMBING: D UNDERGROUND O ROUGH / D.W.V. tr ROUGH / WATER tr tr tr tr ROOF & SHEER PLYWOOD NAILING tr GAS PIPING INSULATION tr D tr POOL i H. TUB SHEETROCK NAIL tr FINAL tr FINAL ELECTRICAL: tr TEMP. POWER MECHANICAL: E HEATING tr o tr tr ROUGH o o tr tr EXHAUST HOODS CONDUIT SUPPLY AIR FINAL FINAL O APPROVED flEsneenoveo frerruseecroN REoUTRED CORRECTIO INSPECTOR . . ,.'' ',1. .- "F INSPECTION REQUEST TOWN OF VAIL JOB NAME @ CALLER TUES WED THU AM PMREADY FOR LOCATION: JECT BUILDING: O FOOTINGS / STEEL PLUMBING: tr UNDERGROUND g FOUNDATTON / STEELt'- tr tr tr tr ROUGH / D.W.V. ROUGH / WATERtr D tr tr tr FRAMING ROOF & SHEER PLYWOOD NAILING GAS PIPING INSULATION POOL / H. TUB SHEETROCK NAIL tr FINAL tr FINAL ELECTRICAL: tr TEMP. POWER MEGHANICAL: tr HEATING tr ROUGH o tr o EXHAUST HOODS tr o CONDUIT SUPPLY AIR D. FINAL I tr FINAL IA,eeaoveo tr DISAPPROVED D REINSPECTION REQUIRED codREcTto D^rE 4/244 rNSPEcroR priFs,-" ts6 PERMIT NUMBER OF PROJECT op;re o6'Lo-Q JoB NAME INSPECTION:MON r?-2p"/Fha(il7& (aaaun< .'r&.,,. . r; llrs#cnoN REQUEST VAILTOWN OF CALLER @ *'o '1':____@ PMFRIREADY FOR LOCATION:M I BUILDING: tr FOOTINGS / STEEL PLUMBING: tr UNDERGROUND tr ROUGH / D.W.V, N ROUGH / WATER tr FOUNDATION / STEEL tr FRAMING ,.1 ROOF & SHEER- PLYWOOD NAILING tr GAS' PIPING tr INSULATION tr SHEETROCK tr POOL / H. TUB NAIL tr tr tr FINAL ELE trl FF o( u CTRICAL:MECHANICAL: TEMP. POWER E HEATING ROUGH tr EXHAUST HOODS CONDUIT tr SUPPLY AIR tr FINAL tr D FINAL ffi*neenoveo CORRECTIONS: tr DISAPPROVED tr BEINSPECTION REQUIRED INSPECTOR Application PEC MEETING Date DATE APPLICATION FCP .q VARIANCE I.This will A. procedure is required for any project request'ing a variance. The app'lication not be accepted until a'l'l information is submitted. NAME OF APPLICANT ADDRESS B. I{ME OF APPLICANT'S REPRESENTATIVE IJUaUE(Z Q,INci ADDRESS VleL,htptAoo 0t(# , eHoNEhb.zoTT C. NAME 0F 0HNER(S) (type or print)&44 aM( pee- €Avao#e- Siqnature(s) ADDRESS D.LOCATION ADDRESS OF PROPOSAL LEG.A.!- OESCRIPTION LAT-]!O BLOC I:.L:,j'|le wftzc2& E.FEE $1OO PAID cK#FROM THE FEE MUST BE PAID BEFORE THE COMMUNITY DEVELOPMENT DEPARTMENT }IILL ACCEPT YOUR PROPOSAL. F. A'list of the names of owners of all property adjacent to the subilct property INCLUDING PROPERTY BEHIND AND ACROSS STREETS, and their mailing addresses.I"WWBE RESPoNSIBLE F'R c'RREcr MAILING AD'REssEs' II. A PRE-APPLICATION CONFERENCE l.tITH A PLANNING STAFF MEMBER IS STRONGLY SUGGESTED TO .:DETERMINE IF ANY'ADDITIONAL INFORI,IATION IS NEEDED. NO APPLICATION I.IILL 8E ACCEPTED UNLESS IT IS COMPLETE (MUST INCLUDE ALL ITEMS REqUIRED BY THE ZONING ADMINISTMTOR). IT IS THE APPLICANT'S RESPONSIBILITY TO MAKE AN APPOINTMENT I{ITH THE STAFF TO FIND OUT ABOUT ADDITIONAL SUBMITTAL REQUIRS'IENTS. PLEASE NOTE THAT A COMPLETE APPLICATION }IILL STREAMLINE THE APPROVAL PROCESS FOR YOUR PROJECT gY OECTffiifrFTHE NUI'IBER OF CONDITIONS OF APPROVAL THAT THE PLANNING AND ENVIRONMENTAL COMMISSION MAY STIPULATE. ALL CONDITIONS OF APPROVAL I'IUST BE COMPLIED I.IITH BEFORE A EUILDING PERMIT IS ISSiiED. III. FOUR (4) COPIES OF THE FOLLOI,IING MUST BE SUBMITTED: A. A }'RITTEN STATEMENT OF THE PRECISE NATURE OF THE VARIANCE REQUESTED AND THE REGULATION INVOLVED. THE STATEMENT MUST ALSO ADDRESS: l. The relationship of the requested variance to other existing or potential uses and structures in the vicinity. 2. The degree to which relief from the strict or literal interpretation and enforcement of a specified regulation is necessary to achieve compatibi'lity and uniformity of treatment among sites in the vicinity or to attain the objectives of this title without grant of special privilege. 3. The effect of the variance on light and air, distrjbution of-population, transportation, traffic faci'lities, uti'lities, and public safety. Vari ance 4. How your request complies wjth Vail's Comprehensive Plan. B. A topograPhi.c and/or l.mprovement survey at_a scale of at_least l. - Z0' stampe<' by a Colorado.llcensed surveyor including^lggltlg!: of al't.existing imprJve-ments, inc'luding_grades and elevations. Other e'lements which must-be shownare parking and-loading areas, lngress and egress, landscpped areas ina'-'-'.uti'lity and drainage features. C. A site plan at a scale of at least l" = 20' showing existlng and proposed bu i 1di ngs. D. All preliminary building elevations and floor plans sufficient to indicate the dimensions' general appearance, scale and use of all bul'ldings and spacesexisting and proposed.on the site. E. n prei'iminary tltle report to verify ownership and easements F. If the proposal is ]ocated ln a nulti=family development which has a homeownerslassociation, then written approval from the association in support of theprojebt must be received by a duly authorized agent for sald iisociation. * For interior modifications, an improvement survey and site plan nay be waived by the zoning administrator. G. Any addit'ional material Cetermined by the zoning Time Requi rments The Planning and Environmental Comrnission meetsof each nonth. A complete app'lication form and (as described above) must be submitted a minimum PEC publ ic hearing. l'lo incomplete app'lications administrator) will be accepted by the planning nated submitta'|. date. necessary for the review of the application as admi ni strator.. IV. on the 2nd and 4th l,londaysall accompanying material _of 4 weeks prior to the date of the (as determined by the zoning staff before or after the desig- >,+i oo o,' c, c.cU ) O .e. .aJC Ll-o,ro.PEE |,|g !, OE EI.Cl (,lGIFTFU.r (l Ot tt t,r.}, +' ut !o >roItrLEc,E.eO'!lr IPC'CECouoooo>r 0, tt Cl +, l,'rF.e !l LI Olr COi'!t !t .Es+, c,t>utUt+rcoELi' 'tl .E.rAc,C'tU IF L.CLE EC'Utoo5('EF- C|- Ct.F Cor>ar!o(., (l !, .r-!tL.Uu.Pocro c6arU|.P>o(J-Et 5 EcC C'.F.rCgllUPE9bg,bo .lr o, It ctu9>.lJ ,E '.P >., r-.e |U ).}|.,E Ut > L.. Er o, :l rFlr.| OC UIC,Ll p.r OECUIc,F >*, .F.1,O C-.F Ct|!! = r! t H,lrtt doo|(Y) r-l o =Lo o .L :/lr', rngLCc, Gt =JoE(u,-o.F, tn Or(l, d. ( q, i 3 Rtrelrt e8 otEb- ry! Ar^ OC ;(t, U (u tr.e =.r .lJ L 'e .r- !l t\I|\tFC.t'L +r CDL -E c,(uCLTE(l, C Cr! =O.IJL E -OCtaO l4I O)O) \L() (l'!CprsE Otc-.OC(u>OJ(UCL''-.icL .o o-ct o c.lry' '.gc,(' t..F-o O O-rE tdClozL'FO CLr- O.O, (u +rO(U -CL .l-, E () (U = L, C.F C 6+, .?. ti .C X >r 5 +,.F .=tn.P P o|+tut(l,E'. OrEo|=rtt o (Ult +, tu'o = E c x =+rCL CC. O I llrJ.=- ru = (U.F c, t'/llF.p L o -a(uttn+)><E ooo orFE aE.!r+r.r JO+,-c ut C.|-rC.F{|U rF -cl .F (J.F C C.'- Ctu .+, .d = ro E o:t l-. +, !,'- >..- L O (U.F ttt .- C FtF C (l, (U >rL L ur >F. = g.'- rEP -g-C F C' cl. +) -O rlt O trlr CLt!.rrS O C LO_ ==LE-cc'L(UO)O(u-qLrtr oJ O.F, E.r- C tJ UOL EUC, LO+rO.r-OX Ltr- (l, FEO ccclJO lg .lJ ;E(UE (,(u .r- C (u EvOcrlt'..|J CrOO. (, .r-..F E (')g: (l, L'eEF 1J.lr.g .C(U L.O .tJ.r- C, (U L.l..n L.|J.F E rE .O > Ct F c)! f'':u516 IrO (U Ot.pCrLJO o-r- > .L >\ rE .p (U O <r '-' C CL'F O r,'l (u C +, CL +, l- U =Lc-c€cc,>.ts, >O cl_ O.|-r (l, E .rt rts ! etrCr(l, E.'- CL'r O o(l,F> .'F+r.u O ct Ct (U $CLE+rLO (,.U O- ul +r(,OFO.'-r(J(uO.C|,CL 5+r 6>+rut Es c+r+J|Ul| +r <(U(JOo).PEEO.e(lJ--L (U.F, iF O.(l,O +J F {-,crE c +r6cE-+, rn iD.e 9lE.l, {''(F t! -(l, L E ur.tJ.gEO.C>O>rr'o O .lt e!tO +r+r-C 9.- O (J(UL-irn C >.|'t .r('.rL O>.F ctO C>\F- CL(l,>.rJL I-C L(l,rF.et,ELC Oc'>_?.lJ LCL$.rPr!r': O Gt C (o'9 -oE.c€5 -E o.=+, tt .F (a L +, >r.lJ O) Yt .F- | OrEg .F O.+J O.Jc! C O4rF=.c(uLF-()O.(l, +r.r OVtO:L+rF- O-O (ut'(,)lEC TtLtFctL(,X(u-c(l, A.A>o.pPo x(U rr.rr! c, E+r9r+- o) rE vr.E O L .u =-c E.'- trJ'-' o+, .EE 5 tt'OOlq.L.' ('r O. L .F (l, c-O (, .r- JL.|r (tJ:t0JolL(l .r(l,!O L >-Cr+-+r(, cl. L rtsC C(J)O(lJ{J .!L -O'r.F.c'E> HE|U'O! .pE(n0- -o(l)5o ur -ct+, E o(Uc(l,.C 3n rF ..F (u.F C'.F (, .ts, (l, EL.P rr.c-C i-(J(, (UE(l,O '(, Ec,+r.P |J'F (, mEq,'e.c L E O E Ut€ O 'F .n -.Ot!Q-.ecrtsOCL -COro c,F.(F'- =F OOIt"- U F+,OL , qi ! N H t-. (] ..J ';;ilil gitir "-..- q;d .$.61r.r.l.-o-;<'tlr; o rth Bs s$ ?RRo.J -Jlrl l{ \ ssEiE=o o u gNtoTuE h-.$.-t I I ,bg'gbt rt9 =vt .j e o. tl E' tlt 3 R rfjo IN\t oN|o &E-- H8= ll lt lls t<t---3\\ t IEo F E fi rrl f; \ \fr lrlt UI .o I (o l-o -'.l a cio q (\l (o oot E I N E {rt n t tI rl I t \o a (jt B F I a I q -j I I I \l T I H F $ F $ ]- F E Eg FE\>' -[E sEs, ${l Hbl s P Vt Btr E qi G -lo o a uo IU E Ictr H ||tI f, Fo -.1 f3 ( lr re$ rlH :<_--,€-'- -.{- - NOTICE IS HEREBY GMN that the Planning and Environnental.'--b\-K * ConmissLon of the Town of vail will hold a public hearing in accordance with Section 1.8.66.060 of the nunicipal code of the Town of Vail- on December 10, 1990 al 2:OO p.n. in the Town of Vail Municipal Building. Consideration of: A request for a conditional use pennit inorder to establish a bed and breakfast operation on Lot P,Vail Village 2nd Filing, 141 West Dleadow Drive.Applicant: Joan M. Norris A reguest for a rninor subdivision in order to vacate a lot line between Lots 45 and 47, Vail Village WestFiting No. 2.Applicant: AIIJA Corporation A request for an anendment to Chapter l-8.54.020 (E) of theVail Municipal Code, Design Review Board Organization, inorder to delete ttfifthtf Wednesday of each nonth.Applicant: Town of Vail A request for a front setback variance in order to constructa garage and a wall height variance in order to constructretaining walls at 1448 Vail Valley Drive; Lot 18, Block 3,vail valley First Filing.Applicant: John and Barbara Schofield A request for a najor anendment to SDD No. 4, connonlyrefered to as Cascade Village, Section 18.45 - Area D, inorder to add office floor area to the Glen Lyon OfficeBuilding, 1000 S. Frontage Road West, Lot 45, Block K, Glen Lyon Subdivision.Applicant: Glen Lyon Partners A request to amend Chapter 18.54.050, Design Guidelines, ofthe Vail Municipal Code in order to anend Section C,6 anddelete Section C,l-3.Applicant: Tolyn of Vail A request to arnend the Town of Vail Zoning Code by repealing and reenacting Chapter 8.28 to expand, strengthen , andclarify code provisions relating to Air Pollution Control .Applicant: Town of Vail 1. 2. 3. 4. 5. 6. 7. 8. 9. A request for a side yard setback variance in order to construct an addition to a single fanily dwellj-ng on Lot Bueffer Creeki 1879 lteadow Ridge Road.Applicant: Jerry Farquar A reguest for a conditional use pernit and a variance toparking standards Section 18.52 of the Town of Vail Municipal code to allow off-street parking at the rrHoly cross parcelrr described as follows: Cornc:ei;g 'et Ehc IIE corrar of jaid Jec:ion l2: slarcc Soucb 88'19'29' Hcrs, along tn" ootl'-ii;t'';-';-ne.r/rl'-r-ai'itatc or 43'l facs to sha insersccgion oi crrt-ircioi"iii" of.ct'"-clsi l:rc oi reid parccl; rheacc sou:b 0'01'3:" rt'c"tio"g""il rtoroogttloi'-lts'2 iccs !o Ebc rorthcarl coritc, of raid p.t.ll-"t:,Il is ltc poi:c o! bcgi::i::3; lhcrcr soucb 0'01'33" Eastl ei'"'"'"ia'i:: t::i'T;::.t;:!rT":l!r'llllili'"' iiilit'r ;*l :::::ll,'Ti";":il'ilt:i:i;* ""'ll-:!'0i lrici' f) nor:b !g'r2'3i" u.'.., r-r'ii'i";:-;;';;':l :::t:":il"::;l,ll"lt.f "lii."ll,llt, il".i ig'og'04i Hest' I2l'45. feec go :l:.;;';;;-e.r..r cbicb is r ;;.;;. ro-hcascerlv elong thc rorss l':"1";.;1;Jt-rlit.l 21'3t'2E" gcts)' lil;*i;t:"1i":'i;*.':.:::1."::;Hili'i'ilil'i:"="i;;;';'r anir''q*ti ;:;i,t;;i.i .u. poirc of begiaaiag' Tbis tracr, rs dcsc:ibcc, conBaias 151940 rquar: tc:r, or 0-366 actc3r !ot! - or lcls. ApplJ.cant: VaiI Associates 1-0. A request for a setback, density, common area, accessory use and parking variances in order to construct additions to the Christiana Lodge, 365 Hansen Ranch Road, Lot D' Block 2 Vail village lst Filing.Applicant: Paul R. Johnston The appJ.ications and inforrnation about the proposals are available for public inspection in the Community DeveloPment Departrnent office. Town of Vail Connunity Development Department Published in the Vail Trail on November 23, 1990. L6, tr Project Application P-/^ 7aDate Projecr Name: f V*ft SU tPOt)t4 Pro,ect Description: Contact Person and Owner, Address and Phone: Archirecr, Address and phone: /hltl /11.,, el /, r t Pl ,8N z ?4 7, Va,'/. f O , Ft 0<,r Legaf Descriptio n: tot / (l -a+oae.riti^s Brr#{- Ca-€zl , r.^" f/S Com ments: Design Review Board 4-a o^r" t-/'?o DISAPPROVAL o , l;crr. -rt Town Plan ner o.,", &'/- 70 E statt Approval ^r Project FALA,,ilA'/? Date of application_Je:_?-f PEC DRB Town Council ,;in.,.Pa1 c--U; d ,q/ F44.No.-|., 6O S,a-a *^nT, t-l t/-zfra 4,tt-u;tz-"( fle" -4L.AJ aaQ, eare.j '-eef{^-L. -v ion o(t cbPr TO: FROM: DATE: Planning and Environnental Conmiss Conmunity Development Department July 23, 1990 SURTECT: A request for a slde Eetback variance for an addltion to a single fanily Etructure located at Iot 16, Buffehr creek Subdivision, 1879 Ueadow Ridge Road Applicant: Jerry Farquhar I. DESCRIPTTON OF THE VARTANCE REOUESTED The applicant proposes to build a sun room on an existing deck in front lsoutn side) of his single fanily residence. -The sun room Li 16 feet by 12 feet (194 sq. ft. GRFA) and Ls located in front of the living roon of the residence. The existing structure currently encroaches 3r-6tr into the west side yaid setback and the applicant proposes to align the new addition with the existlng house creating a sinilar setback encroachnent. As a result, the applicant is requesting a variance to encroach 3-L/2 feet into the Eide (west) setback. II. ZONING CONSIDERATIONS Site Coverage: erinaryr/Secondary Resl-dential 14,854 sq. ft. Allowed: 3,7L3 sq. ft. nxisting:1r912 sq. ft. Proposed: 21106 sq. ft. Allowed: 2'97o sq. ft. Existing L,323 sq. ft. Proposed: 1r5ol sg. ft. Zoning: Lot Area: GRFA: Height:Allowed:Existing: Proposed: Front - Existing: Proposed: Rear - Existing: Proposed: East - ExlstLng: Proposed: Setbacks: * West - Existing: Proposed: *Area of setback variance request. 33.0 ft. 22.s tt-. 22.5 ft. 49 ft. 38 ft. 56 ft. 66 ft. 41 ft.4l ft. 11.5 ft.tl.5 ft. III. CRTTERIA AND FTNDINGS Upon revien of CrLteria and Flndlngs, Section 18.62.050 ofthe Vail Municipal code, the Department of Connunity Developnent reconmends approval of the requested variance based upon the following factors: Consideration of Factors: 1. The relatl-onshl-o of the reduested variance toother exLstlng or ootential uses and structures inthe vicLnitv. tven though the existLng residence encroaches intothe setbaek, there is adequate distance between the Sarquhar residence and adJacent hone to thevest Because the appllcantrs house is already located 11.5 feet fron the wester property line, ttre addition ehould not create a notl.ceable lnpact on the surrounding area. Tbe addition is located on an existing deck which further dlninlshes the inpact of the expansion in the getback. Althoughthe addition could be shifted to meet the 15 foot setback, staff believes that unlforn roof lineswill provide a more compatible structure than onethat iE strifted to meet the standard side yard setback. Because of the existlng residencers location in the side setback, it is reasonable to considerthis circumstance a practical dlfflculty warranting the variance. The applicant Ls reguesting a variance that does not exceed the existing encroachment. This degree of relief fron the strict interpretation ls appropriate and has been granted to other property owners. utl-Iitles. and public safetv. Because this single fanily hone is one story, the resulting lI.5 foot Eetback provides nore than adeguate Ltght and air separating it fron the neighboring structure. There are no inpacts on the other considerations. A. The decrree to which relief fron the EtrLct andliteral Lnterpretation and enforcenent of aspecified reoulatlon is necessarv to achLevecompatibilitv and uniformitv of treatnent anoncrsites in the vicinitv or to attain the objectiveEof this title without qrant of special privileqe. 2. 3. I IV. FINDINGS The Plannincr and Environnental ConnLssion shall make the fotlowincr findinqs before qrantinq a variance: That the granting of the variance will not constltute a grant of -pecial privllege inconsistent with the tinitationl on other properties classified in the same district. That the granting of the variance will not be detrinental to the public health, safety or welfare, or materially injurioul to properties or inprovenents in the vicinity. That the variance is warranted for one or more of the following reasonss 1. The strLct literal interpretation or enforcement of the specified regulation would result inpractical difficulty or unnecessary physical hardship inconsistent wittr the objectives of thls title. 2. There are exceptl.ons or extraordinary circunstances or conditions applicable to the same site of the variance that do not aPPly generally to other properties in the same zone. 3. The strLct interpretatlon or enforcement of the specified regulalion would deprive the applicant of privileges enjoyed by the owners of other properties in the same district. STAFF' RECOI.IMENDATION Staff recomnends aPproval of the reguested variance. Because the existing nouse ls in the setback creating a physical hardship, the owner deserves relief from the strict setlaclc requirement. This variance is not a grant of special prilvitege as this type of situation has justified olher variances-in the past. There are no negative inpacts on adjacent properties.- The variance criteria cited include f indings M, B, C1&2. A. B. c. v. l.n}.larto o- 1Dr{-,: rl.Ja- prote* Bf ou /l4R Date of application L, -a.5- PEC z-z= DRB Town councif- :: ::::J::: {."!{i ,;i.'...i iiili'.'i .ii i::::iri::::: : ::: :]:]: :: :,:,r:: a-s rt* /,-,'ft^l l,vr- /, At/r". -o*etallt '6' 30 st"rws 8"t"""---t- sk# D.e 7-oet r 12 ,tL"1a a&n*,tl^*J ittctcl; ( Ev<h*6 nlLih^*'' --r{J t?44 2lota * Yvi*i"y lq$' 3o- z's ZONE CHECK FOR sFR, R, R P/S ZONE DTSTRTCTS fnrmEi. --)//? /4^U.LLL'. % LEGAL DESCRIPTION: IOt /t ADDRESS: OWNER ARCHITEST ZONE DISTRIED PROPOSED USE IPT STZE lleight TotA], GRFA Prinary GRFA Secondary GRFA Setbacks: Front Sides Rear Water Course site cove".q"( Z*/\ /.\Landscaping lG0/ / Fence/Retaining Wal-l Heights Parking Z.S df'''t- Credits: carage llechanical Airlock storage Drive: Slope Permitted Environmental/Hazards : Block - Filing PITONE PHONE Allowed (30) (33) s73.4q 20. 15 1 15 1 (30) (so) 2410 zoi/ Proposed ?272 ()t / d' 2t o6 th{(4 t9l tp1. b( -A x Actual .L Y 6-lt/w t Slope 6r Geologic Hazards Zoning: Date: Approved/Disapproved rocL d^a-l 0 Y l"h, Lri-.^'-,n < ( "tl-/.*"t"*\r----+/ (3oo)l(600)z_.r 6 (eoo) (1200) fsex+ee) t++xso) (2oo){4€o) E5l--3X- ok slope Avalanche Flood Plain ' t ln *-^A'l * r""l -*t,^, rl' ,.:)# ftcl'6 'l A-*.U. "7r,Vh fi"'f ft^"* 6r*"^".-L (trc r (,, r r'fu! .<-'4- -3o\ -,Qt -1-2a) k'**zu/-7h : //o 6 77o -z*rc+A t+/ta ZtO 1o -e*-sha7' B. t-. i/6tr- /?tr /lbt - /7tr _3o -/1-t-z o z/oG - tf6 - / (.L /qP r4" e procedure is required for any project requesting a variance. The application not be accepted until all information is submitted. NAME OF APPLICANT APPLICATION FOR A VARIANCE Appl ication Date PEc MEETTNG DATE JULY Qq, tqqo Rti'D J Lji\ NO%,t I.This will A. ADORESS B.NAME OF APPLICANT'S REPRESENTATIVE ADDRESS c. VAu,oqtam Ol@ pHoNEhb.?.o4 Siqnature(s) ADDRESS wonr.04b,bL? D.LOCATION OF PROPOSAL ADDRESS LEGAL DEscRrPTroN lor-jL aloc FILINGW@ ../ # rre $'100 eanlfoZL?29K #e6tL-FRoM Jm/ U trfr&HM THE FEE MUST BE PAID BEFORE THE COMMUNITY DEVELOPMENT DEPARTMENT }IILL ACCEPT YOUR PROPOSAL. A'l ist of the names of owners of all property adjacent to the subject property INCLUDING PR0PERTY BEHIND AND ACROSS STREETS, and thejr mailing addresses. THE APPLICANT t.IiLL BE RESPONSIBLE FOR CORRECT MAILING ADDRESSES. II. A PRE-APPLICATION CONFERENCE t,lITH A PLANNING STAFF MEMBER IS STRONGLY SUGGESTED TO.:DETERMINEIFANY'ADDITIONAL INFORMATION I5 NEEDED. NO APPLICATION I,IILL BE ACCEPTED UNLESS IT IS COMPLETE (MUST INCLUDE ALL ITEMS REQUIRED BY THE ZONING ADMINISTRATOR). IT IS THE APPLICANT'S RESPONSIBILITY TO MKE AN APPOINTMENT I.'ITH THE STAFF TO FIND OUT ABOUT ADDITIONAL SUBMITTAL REQUIREMENTS. PLEASE NOTE THAT A COMPLETE APPLICATION t.tILL STREAHLINE THE APPROVAL PROCESS FOR youR pRoJEcr sv oEclmir,iFrHE NUMBER 0F coNDrrroNs 0F AppRovAL THAT THE pLANNTNG AND ENVIRONMENTAL COMMISSION MAY STIPULATE. ALL CONDITIONS OF APPROVAL MUST BE COMPLIED t,IITH BEFORE A BUILDING PERMiT IS ISSIED. IlI. FOUR (4) COPTES 0F THE F0LLOWTNG MUST BE SUBMITTED: A. A WRITTEN STATEMENT OF THE PRECISE NATURE OF THE VARIANCE REQUESTED AND THE REGULATiON INVOLVED. THE STATEMENT MUST ALSO ADDRESS: t/ 1'. The relationship of the requested variance to other existing or potential. uses and structures in the vicinity. t/'$. The degree to which re]ief from the strict or literal interpretation and enforcement of a specified regulation is necessary to achieve compatibility and uniformity of treatnent among sites in the vicinity or to attain the objectives of this tit'le without grant of special privilege. ul'5. The effect of the variance on light and air, distribution of population, transportation, traffic faci'l ities, util itiesr and pub'lic safety. ,l 5@wb Affi)afiar Vari ance /; How your request complies with Vail's Comprehensive plan. / J I topggiltll:31949f lnprovement.survev at,a scale of-at-least l. - 20, stamped' by a co'lorado.licensed surveyor including-locations of ar'r existing irp"one-ments, including grades and elevations. Other elements which musi-uJ'5iro"nare_parking and.loading areas, lngress and egress, landscpped areas ind"-utility and drainage features. I l!!g plan at a scale of at least l" = 20' showing existing and proposed buildings. All pre'liminary building elevations and floor plans sufficient to indicate llg_9ll9r:i9n!:_gglglal .pp!.I?l!e, scale and use of all buildinss and spacesexrstrn9 and proposed.on the site. n j A preliminary title report to verify ownership and easements F. If the proposal is located in a multl-family development which has a homeowners'association, then written-approval from the association in support of theprojebt must be received by a du'ly authorized agent for said iisociation. G. Any additi.ona'l.material necessary for the review of the application asdetermined by the zoning administrator.. * For interior modifications, an improvement survey and site plan may be waived by the zoning administrator. IV.Time Requi rments The P'lanning and Environmental Commission meetsof each month. A complete app'lication form and (as described above) must be submitted a ninimum PEC public hearing. No incomplete applications administrator) will be accepted by the planning nated submitta'l date. on the 2nd and 4th l,londaysall acconpanying materialof 4 weeks prior to the date of the(as determined by the zoningstaff before or after the desig- ./ STATEUNM OT PROPOSED \TARIANCE FARQI'ITAR RESIDENCE REUODELJerrl, and Deb Farq'har 1879 Ueadow Ridge RoadIot 16, Buffer CreekVail, Colorado Requested Variance: Bulld wlth-Ln TOV 15r-Orr etde setJcack. A varlance l-s being reguested for the west side of thelot for the above referenced proJect. Tha existingsingle-fanily residence iE constructed on a lot whlch iizoned prinaryr/eecondary. lltre exl-sting reELdence wasbuilt 10,-6rr off ttre property line, existlng fireplace8'-6rr. The neighbor next to the proJect has alieadyconstructed a garage next door and approves thE proposedproject (see attached letter). rhe proposed proJbcdwiIInot effect the existing neighboring residences. Housesin thiE inmediate ne5-ghborhood tlpibally have been buLltclose to the west property lines. llhe proposed renodelwlll not effect the maeE or density -of the present nel.ghborhood. 18 itune 1990 ;Ierr? and lleb Farquhar OrnerE of Iot 16, Buffer CreekVall, Colorado Dcar 'f6rry and Deb: lle have rEvl.ewed trllans for your propoced addltlon agprepared by IHE ttJ UUEI,IAR Co;, INC-. dlted ts itung 1990.lltre -propoeed, additlon aa lo6ated on plane wilt not Ttggatlvely effect our exlgtlng resl.dence.- We rrnderstandthat the propoeed sunroou wltt fe bullt wlthln the 15r-0rr TOV Eetback requlreuents, and rgconnend approval ofthe neceseary varlancs. StevE OnnerE Val.I, of Iot L7, Buffer Colorado Creek a Steltz PUBLTC NOTTCE NoTIcE Is IIEREBY GfvEN that the Planning and Environmental Conmission of the Town of VaiI will hold a public hearing in accordance nlth Section 18.66.060 of the municlpal code of the Town of Vail on July 23, 1990 at 2300 p.n. in the Town of VaiI Municipal Building. Consideratlon of: 1. A requeBt for a conditional uee perait for a nTelevision Stationrr in the Connercial Core II zone district located at I,ot 2, Block 1, Vail Lionehead 3rd Filing, Sunbird Lodge, 675 Llonshead Place.Appllcant: Vall/Beaver creek Televl.sion Network. 2. A request for an exterior alteration, a site coverage variance, a height variance, a landscape variance and a floodplain nodification on Lot C and Lot D, and the southwesterly 4 feet of Lot B, all in Block 5-B' VaiIVillage lst Fillng, 227 Bridge Street.Applicant: tlillis of Snownass, Inc. and Bruce Ann & Associates. 3. A reguest for an exterior alteration and a landscape variance in order to construct an addition to the Bel.I Tower Building at 2Ol Gore Creek Drive, Part of Tract A' Block 58,VaiI ViIIage 1st Filing.Applicant: Hermann Staufer - Lancelot Restaurant 4. A request f,or a Eide eetback variance in order to construct an adaitlon to a single fanily structure 3-L/2 feet lnto tbe western side yard setback located at Iot 16, Buffehr Creek subdivislon, 1879 Ueadow Rldge RoadApplicant! Jerry Farguhar 5. A reguest for a conditional use pernit in order to expand offj-ce space for a magnetic resonance inaging systen and a satellite dish at the vail valley Medical Center, Lots E and F, VaiI village 2nd Filing, 181 tlest Meadow Drive.Applicant: VaiI Valley }ledical Center 6. A request for a landscape variance in order to provide two additional parking spaces on the southern portion of Tract G, Vail Village 2nd Filing, 17 Vall Road.Applicant: First Bank of Vail 7. A request for a side setback variance at L,ots 1-6, Block 5vail Village lst Siling, Unit 3B--vai1 Rowhouses, 3o3 Gore Creek Drive.Applicant: Stewart colton 8. A reguest for a conditional use perrnit and a setback variance for a rernediation system eguipment building at the Alpine standard Station, part of Lot A, VaiI Village 2nd Filing, 285 S. Frontage Road West.Applicant: Amoco corp. t|Ao,rtg''1 9. A requestVall V111 ApplJ.cant o for a slte coveraEe varl.ance age 1et Flllng, 8l Beaver Dam: ll. RoaB Perot at Iot 31, Block 7, Road. 10. A reguest for an anendnent to Sown of Vall ordl.nance No. 24, Series of 1983 and Ordinanc. llo. 28' Serle3 of 1987 governing wood-burnLng flreplaces, gaa loEE' and gas appliances.Appllcant: fown of Vail 11. A request for a naJor anendnent to sDD No. 16' part of parcel A, Llonerldge Subdl.vlelon, Flllng 2. (The Valley Phaee III)Appllcant: Brad & suBan TJoaeen t2. A rGqu€st for a variancc fron the rall hclght regul'renent on Lf,!- 19, Block 1, Vail Potato Patch, 805 Potato Patch Drive.Appllcant: Patsy and P€dro Cerlgola 13 A reguest for a naJor subdlvLslon, to approve the prel{ninary plan, a reguest for a varlance to the naxinum hetght for retalnlng walla, and a request for a variance to the naxirnum percent grade for a road, on t parcel connonly referred to is Spraddle Creek, an approxlnate 40 acre parcel located north tnd east of the llaln Vall I-70 lnterchange and east of the SPraddle Creek llvery. Appllcants George Glllett' Jr. 14. A reguest for a uaJor amendnent to SDD No. t0, Coldstream Condonlniuns in order to anend Sectlons 18.i06.o90 (B) denslty, 18.46.100 (B) floor area' 18.46.220 enployee houslng and 18.46.230 tine requlrenents to.convert existLng racgueiball facitlty into an enployee housLng unit, nanagenent offl.ce, laundry and owner atorage area at I.ot 53 clen Lyon Subdivlslon, 1476 lfeethaven Drl've- Applicint: Coldstrean Condoninlun Aseoclation. 15. A reguest to anend the vaLl llunlclpal Code Section 18-04 to add i definltion for a bres pub and a request to anend the Connerclal Serrrlce center Zone Dlstrict 18.28 to allow a brew pub aE a Pernitted uee. Appllcant: Dean Llotta lhe appllcations and Lnfonnation about the proposals are available for publlc lnspectlon I'n the Connunl'ty l!'evelopnent Departnent offlce. Town of Vail Connunlty Developnent DePartnent Pr,rblished in the Vall Trall on ilu1y 11, 1990. t a #Wuwe ?4ErmFI@. t@twc y'oJarNnrZ>Woruwa -- oaN€'t*- O srura ard c(u.rutA *t€;te- "fl&G,|4&+aou p-tre, Foae v^L.(@, ateT @ wNffi r2tepolW xaMa V)qea 136p_te. hagz @ r4PaA MD<6a UW6*L@4L D6<r @Nrytpgg, 7a thV,4oz Wqo, gtab _ Ylre r4uec v &cs@,td fubo &e1, lh1 l,tmt rztffi PonP l)KlLrn,O/c€7 Mf€ uaail b,fft,z- e26</- (Agr Cbatw lHa Ma'AgaJ F-4?e l4ao vftLt-rh. olasT ,( @Ao :\N\ Nr.,",\\ '.\\ N \\\, \\:\. 1: \r.L\[] \r-\-\ r..- AjW_, TfM OwnerB Form 2312 File No. V10219 SCHEDULE A Poircyf. ez.*to;t Amount 912O, OOO.00 Addrees l-. 2. Policy Date: May 05, 1987 at 83OO A.M. Nane of Insured: JERRY L. FARQUHAR and DEBORAH R. FARQUHAR , as ;Ioint Tenants The estate or interest in the land described ln this Scheduleand which is covered by this policy ie: A Fee Sinple 4. Tit1e to the estate or interest covered by this policy at thedate hereof is vested in: JERRY L. FARQUHAR and DEBoRAH R. FARQUHAR , as Joint Tenants 5. The land referred to in this poticy iE situated in EAGLE county,Colorado, and is described as follows: IpT 15, FESUBDMSION OF BUFFER CREEK, ACCORDTNG TO THE RECORDED Pr.AT THEREOF, coItNTY oF EAGLE' srATE oF coroRADo. This Policy valid only if Schedule B is attached. 3. Page TIM Owner Form 2313 This policy does not foJ-lowing: 1. Rights or claimspublic records. tO"o. v1o21e 3. 2. Easenents, or clairns of easements, not shown by the publicrecords. Discrepancies, conflicts in boundary lines, shortage in area,encroachments, and any facts which a correct survey andinspection of the premises would disclose and which are notshown by the public records. 4. Any lien, or right to a lien, for services, labor, or rnaterialtheretofore or hereafter furnished, imposed by law and notshown by the public records. 5. 6. 7. 1-987 TAXES NOI YET DUE OR PAYABLE AND ASSESS}TENTS NOT YET CERTIFIED TO THETR.EASURERS OFFrcE. i ILTENS FOR T'NPAID WATER AND SEWER CIIARGES, IF ANY. RIGHT OF PROPRTETOR OF A VEIN OR I.,oDE TO EXTRACT AND REIIOVE HIS ORETHEREFROM SHOULD THE SAME BE FOI'ND TO PENETRATE OR INTERSECT THE PREMTSESAs RESERVED rN UNfTED STATES PATENT RECORDED October 04, 19L8, IN BoOK 93AT PAGE 3O1. **ENDORSEMENT 100.29]C* THE COMPANY HEREBY INSURES AGAINST I,oSS T{HICH THETNSITRED SHALL SUSTAIN BY REASON OF DAMAGE TO EXISTING IIr{PROVEMENTS,INCLUDING LAWNS, SHRUBBERY OR TREES, RESULTING FROIII THE EXERCISE OF ANyRTGHT TO USE THE SURFACE OF SAID I"AND FOR THE EXTRACTION OR DEVELOPMENT OFTHE UTNERALS EXCEPTED FROI'{ THE DESCRTPTION OF SAID LAND oR sHowN AS ARESERVATTON IN SCHEDULE B. RIGHT OF WAY FOR DITCHES OR CANALS CONSTRUCTED BY THE AUTHORTTY OF THEUNITED STATES AS RESERVED IN UNITED STATES PATENT RECORDED october 04,1918, IN BOOK 93 AT PAGE 3OL. rEN PERCENT ROYALTY IN PROCEEDS DERIVED FROM THE SAIE OF ANY I,IINERALS PRODUCED AND MINED FROM SAID PREMISES AS RESERVED BY INSTRUMENT RECORDED TNBOOK 166 AT PAGE 407. 8. 9. ]ri"y No. A2445073 SCHEDULE B insure against loss or damage by reason of the of parties in posseEsion not shown by the Page TIM Owner Forn 23L3 riQ llo. v1o21e licy No. A2445J73 SCHEDULE B 10. EASEIiIENT AND RTGHT OF'WAY FOR GAS PURPOSES AS GRANTED TO GAS FACILITIES ININSTRWENT RECORDED AUGUST 11, 1955 rN BooK 190 AT PAGE 405. 11.. RESTRICTIVE COVENANTS, }JHICH DO NOT CONTAIN A FORFEITT'RE OR REVERTERCLAUSE, BUT OMITTTNG RESTRTCTIONS, IF ANy, BASED ON RACE, COIOR, RELrGroN, OR NATIONAL ORIGIN' AS CONTAfNED IN fNSTRIIMENT RECORDED October OB, 1963,IN BOOK 178 AT PAGE 75 AND AS AJ'IENDED IN INSTRUI.IENT REcoRDED April 01,L966, rN BOOK 192 AT PAGE 343 AND rN DOCUI'fENT RECORDED MAy 25, Lg66 rN BOOK197 AT PAGE 1. ].2. EASEMENT AUD RIGHT OF WAY FOR IRRIGATION DITCH AS SHOWN ON THE RECORDEDPI,AT OF THE RESUBDIVISION OF BUFFER CREEK. 13. UTILITY EASEMENT FIVE FEET IN WIDTH AIFNG THE NORTHVIESTERLY I-,oT LINE OFSURTECT PROPERTY AS SHOWN ON THE RECORDED PLAT OF THE RESUBDIVISION OFBUFFER CREEK. 14. EXISTING LEASES AND TENANCIES. ].5. EASEMENT DEED IN CONNECTION WITH ENCROACHMENT OF STAIRS AND PI..ANTER RECORDED l.tAy 4, L987 IN BOOK 451 At PAGE 985. 16. DEED oF TRUsr DATED April 29, Lgg7, FRo!,t JERRY L. FARQuHAR and DEBoRAHR. FARQUHAR TO THE PUBLIC TRUSTEE OF EAGI,E COUNTY FOR THE USE OF FIRSTNATroliAL BANK oF sALTDA To sEcrrRE THE sn!,t oF ggo,ooo.oo REcoRDED May 04,L987, IN BOOK 461 AT PAGE 988- f;m 2\nngfnccrtngra Norman Robinson Land TitIe Box No. 978 Avon, Colorado 81620 94$5072 Drnwr 893.153t Aprfl 29, 1987 l.lr. Jerry Farquhar c/o Land TltIe 108 S. Frontage Rd. ll.Vall, C0. 81657 Re: Lot 16, a Resubdivision of Buffer Creek ProJect No. V-7060. Dear Mr. Farquhar, I have requested that Land Title deliver this letter to you along wlth a copy-of the Improvement Locatlon Certlflcate whlch we have prepared. You wlll note that two sets of lot corner plns were found for thb eastllne of your property. It is beyond the stope of our current work to detennlne why the second confllcting set of corners ls present, howeverI wou'ld strongly reconmend that you engage our firm to perfonn a boundary survey of your lot to determjne the actual 'location of your ]ot corners.- Thank you for this opportunity to serve you and lf I can be of further assistance please call. Sl ncerely, l,{m Vanco Strcot Lslavrood, @lorado 802t 5 Phone: 232{158 .1ef o A'd e-g I Ei:*E I(l .r lJ oJ I-c tt, r,| I+,.P Ut L I 3 '. F3 IE.F I .o > . I3t8855 I>,8* 9" g I E €oo E-P I.P o.c I.?gr"E IE'Eo E-e I! ia.F e: Ig " >tE.9 |TtLoO+r Iooo Ect I ;E* 3Hf IEF*A:; Io.tJ o, .o(J IL' (,> ' Icr.o '+r>q, I<-.:6gf I'6|/r>L I.. OD oJ =rF Ir.r.l O E UtO Il!, r-.F O I.ccU|q, IF >P .e*r Ie FEsf € | I I I I I I F{ocn(v) r-l o =Lo c, L5 a/', ! (oJ Eo!oPvl El(u& N I o) OJI ciz c .9 o .9 c,c, E Eo C) F -J coo Eoc) oo c E oa(9 -c.=F !tc,oJ coa ='oo oL, (tr E.T (DglE (u|, crC(l, U (U c'F.r *, L.r- .r-E ctFCtE! P U)L!t o(UcL.E(U E ErEO.ttL E E.c(,@ lrl (:,) glL o c, !, c +, .r, E c, clE C (u > O J O E L'eo. -oo-ooc+rt, L O) v, L.F rt O 0-.6 Gt E (l,l._o o.L cL(t)(u +rO(l,O *, E (J C, = (, C'F C+, .- tnE X>r = P.r-.t.- P (U€(,(UE. OO(')ci ooE .r) nt'o =Eci+rE L CC . (l, | ! lrJ- rtt 3(U.FC) u|(F+, LOorst,+)>-cE ooo c,(Fc+,P.rJOP.cl, C Pc'FtO r+- -Cl "- C,'F C E .F .g(J 6+, rO = lo E C': (/t H +J.r >r.r- L O O.r- |! r- ErF g O (I) >\L L r, >r '- t 'F .E+r.C-C F (J CL P -O ,O O+, o-.o.|..}J (u c Lo- =L E-c o L O sto O -C L IoJOP E.e c (J uoL(J(J LO+)O.F(UX LLL(uEO Ctrg(J(u tU 'lJco,C: tn(U .'- C O Co o .t' ..|J o, o o - r/'t . '-..FC g,C c, L"aE'- '('+, a, . c o L (o!.r o, O L ..OLP.FE 'E tE>() FOE(J5,68C' O', (l,L .PUL OU|F-F >.l->, rg.-OOF c O-.F O ur 0, E+, O- .P L () =Lcsdc (l,, +) >-o cL o.p o E ct r+- Lc(u(U' E"- cL'r O-(l, r_ > ^..- .lJ.F, O .U .O (l) rF EP!O.' (J(' CLU) +)(/lO(U.Ftu(l,(Ugulo. =+J>+)t,/n c-c c+).PG'rts +' C(lJO C, +, c E O .- (U r-i' oJ+.| lF O.(tJO PE+ro.cc +toEEcP 0 0),FE P C.' rF.rt -o ! c v|.lJ.- E OE >,O > r, J! O rE.tt O +, +r'-C O'F CL (, (u Lu|C>.F, .'- ut l- O.F .E O C >\ '- o-O >r .P L -C L (Urts'.Frn EL c OO>.rJ L cL E.r-.P ct.:- (U dl g 'r'o EsP = .E O-=+, !t.F t/l L +, >+, CD (,..- |.dc .F O, +J CL-O C C, =rF-C(tJL-A(f-(u P'e OulO+r; o-o (UrJu).oc'lrL316!uXOrS(l, Ot v1>6JP.P (D XC, r'+rE c,CP(F' ED |E VrC (U l- P =€.'- fiJ '- (u.P . EE 5 .6 O gl.|J ED O- L .F (l, E.-O uL€ (U=(U(|JL,6 'r (rL(l, L >.cr+-.t-, u o- L rF coo(u'.p 6L 'O'r'r'E> F.E ru!!, li Et4 -o'o= o r, -o.|.,g: O(uCEGorF..eO.rto.r (J+)(Ug +J .r.c-c t- o t, c,, E(U !, E O+r+, O.r. r, (,|-('(u =LEOCtEO'Ft,/|O r! cl.r Eq- 0J C L ..C O rUF{ (Fr- =F. O OE.r- U F.P(l, ----,axt o@41 - - -- ---- ----- --.i qi h*(i .-J I I I I L___ ,:\\r, """,' ii]\'.r, +1r ",'i -A ; {-+.;i;io.$-t;:,..i m \-o,l'-',4F -'rl.'. ".#l,r ,'. , -....' "...j' ';lttY ! I t s Jl4ii-- :/t I \f ltla ,^vt - Rtrt UJ E o $ $() u BP s3 TRR() -J -Jl{tut EsEQ= (3 !,.1'l =li, sl'i'' tlHdl \l "l 3l rl ) $t .J $<t sg-- H8=hrth<ttq (D ? q.t(\| ut -j ,rg'grt fslb,Zt oag S r --!:>a sr'\+; * q E t$ 3 N rto R o s a 3t =oat !N\t o Nlf) |f)t \_ - --J \\ $o $ t$ QI EE J -.L 1rt ;}\ F*.(]d r '--l\of e/l \- t\+LN.J i{::rt-': .:l . ]l &e,i, (:, 'co) 7,'cttF t-:' wl.-^., -"-..rot !')" o 1-.o -.l .1. \ -\a=\ 4 \_-* '4\r>_-; v,t\ N(o oot I x t\ R R \t F H lRItrt- l- H t- lb t EI (i v i a I F i I q s .j i gi \l t I H E bfr F $ l-.' F E uE Fd\x .[F \eH Sfi Bs Hg =P c.) =ot- R<I qi d (o a uou E u I t- tre $q l{ = Fo -.1 s $ sHI d EIH i[' EroaO bq? dqi fltu I DRB IPPLICAITON DATE AppLrcATroN RE.ETVED: REC'D JUN 2 51990 DAIE oF onrnririne; W *iT**T'HIS APPLICATTON WTLL NOT BE ACCESIED I'NTIL ALL INFORI'IATION rs SuBI{II:IED***** I. PRE-APPLICATION USEtTI{C: A pre-appllcation meeting wlth a planning staff nenber is stiongly suggested to detetmine if any additlonal Ene zoninE iamini.stratort. It is the applicantrs appol.ntnent wlth the staff to find infornation is needed. A.PROJEqI DESCRIPTTON: respons:.DulEy Eo DaKe an aPPolnElmenE wrEn Efict EL.t out- about add-itional subnittal requLrenentB. PleaEe note that a COMPLETE application will streamlLne the approval process for your proJect by decreasl'ng the-nunber of conditions of approval that the DRB rnay stipulate. ALL conditlons of apiroval must be resolved before a bullding per:nit is issued. appftcation wlll not be processed without Onnerrs Signature. B.IOCATTON OF Address !^8, Phone *to.Qbza d $ o- $ 10,001 -$ 50,001 - s150,001 - $500,001 -$ Over I 10,ooo $ 50,O0O$ 15O,OooI 5Oo,Ooo 91, 000, 0oo $1, 000, oo0 EEE $ 10.00 I 25.00 $ 50.00 s100. 00 s2oo. o0 $3 00. 0o 6,e2,?a e(&(?s"s(zEa Iegal Description rct I O Block Subdivision C. NAI.fE OF APPLICANT: Mailing Address: Ykt\ b. ?w% en D. NAIIIE OF APPLICNIIIS REPRESENTATIVE: ttalling Address: E.NAI.IE OF OWNERS: STGNAEURE (8) r Mailing Address F. $$ Condoninium Approval Lf applicable. DRB FEE:permit is paid for. VALUATTON (ovER) rr. rI'IPoRTANT NorrcE REGARDTNG ALL suBlrfssroNs ro TIIE DRB: A. In addition t9 neeting- gubnittal requlrenents, theappricant nust stake f.he site co ildi;;i" propertvrines and buirding corners. Trees ttrat wriiTl-i3r"""anust aleo be narked. This work nust be conpletedbefore the DRB visits the site- B. The revl.ew proceBs for NElr BUrLDrNcs wlll normallvinvolve two separate meetings--i-lhe D";id-R;;i;;Board, so^the appllcant shoite pfan on-it .Leart twoneetings for a final approval. c. Appricants who fait to lppear before the Desigm ReviewBoard at their scheduled-neeting ana wrro have-noC-asieafor a postponenent will be required to- be repuDtsrrea. - D. At the discretlon of the- zonl.ng adrninistrator, theforlowing iterns nay not have t6 be piesentea io trreDesign Review Board. Tbey, however', frive to Uepresented to the plannlng Departneni eor approval: a. Windows, skyllghts and slnilar exterior changesthat do not alter the existing pJ.ane of thebuilding; and b. Building additions that are not viewed fron anyother lo! g" public space, whlch have had fetiirssuburitted-frorn adJoin-ing property owner. approvinqthe addition; and/or approvaf tr6n tne aseit-i;;l'or Danager of a condoninlum association. E. You may be required to conduct Natural Hazard studieson your property. you should check with a Town prannerbefore proceeding. UATERIAL TO BE SUB!,TITTED I.NEW CONSTRUCIION A. Trro copies ofscale of 1tr =following: a topocrraphic nap and site plan at a 20r or-larger, of ttre sl'te containlng the 1. Licensed sutlreyorfs stanP. 2. Contour lntenrals of not uore than 2r unless the Parcel consists of 6 acres or Dore, ln vhI'ch case' 5t contour l-nterrrals uay be accepted. 3. Existing trees or grouPs of trees having trunks with dianeters of 4rr or Dore one foot above grade. 4. Rock outcroppings and other slgniflcant natural features (large boulders, Lnternittent streaus, etc. ) . 5. Avalanche areas, centerline of stream or creek, creek or strean setback, lOo-year flood plain and slopes of 4o* or Dore, if applicable. 6. Ties to existing benchnark, either USGS landmark or sewer invert. 7. Locations of the following: a. Proposed surface drainage on and off eite, snowing size and tlpe of culverts, Ewales, ete. b. Exact locations of all utilities to include existlng sources and proposed senrice lines fron sources to the structure. Utllities to include: Cab1e TV TeJ.ephone c. Property lines and a basis of Sewer Gaswater Electric showing distances and bearlngs bearing d. Proposed drl.veways with percent slope and spot elevations e. All easements (Title rePort must also include existing easenent locations) 8. Exlsting and finished grades. 9. A1l existing and proposed inprovenents lncludlnq stnrctures, -lands-aped areas, setlrice areast storage areas, walks, driveways, off-street- -parking, Ioading areas, retal'ning !?Ils (with Epot Lrevatiins of top and bottom of walls), and other slte lnprovenents. 10. Elevations of too of roof ridqes (Pi!h. exlsFlncr underneath) to determine[EIt[t of buiraing. Arr ridge lines should be indicated on the site PIan. Landscaoe Plan (lt = 20r or larger) - 2 copies reguired 1. Show the location of 4x dianeter or larger trees,other shnrbe and natl,ve plante tbat are on theelte and the locatlon and deelgrn of proposed landscape areaa wlth tbe varietl.es and elzes ofplant materials lndicated. 2. Conplete the attached landscape materlalg list. 3. Designate all trees to be saved and aII tlrose to be reuoved. As much of the above inforuatlon aa posslble ehould be Lndicated on the slte plan, eo that the lnter-relatLonof the varl.ous couponents ls clear. fhe landscape plan should be separate. The exletlng topographic and vegetational characteristlcs Day be shown on a e€Irarate Dap. c. Siqnature fron each utLlitv cornpanv verifylng locationof senrice and availability (see attaclred). D. Preliminarv tl.tte report to acconpany all subnLttale,to insure property ownership and 3}l-ggEeggngg on Property. E. Architectural Plans (L/4" - 1r or larger) 2 cop!.ee reguired. 1. llust lnclude scaled floor plans and all elevatlons as tlrey ulll appear on cornpletlon. Elevations must show both exlEting and finished grades. 2. one set of floor plans nust be nred-linedn to show how the GRFA was calculated. 3. Subnlt one aet of reduced (e L/2n x 11n) floorplans, elevatl.ons and eite plan for I'ncluelon in Demos to Planning Cornrniesion and Town Council . 4. Exterior surfacing nateriale and colors ehall be specified and subnitted for review on the naterials llst (attached). Color chips, slding eanples etc., should be presented at the Deslgm Review Board ueeting. F. Zone check llst (attached) nust be conpleted lf proJect is zoned Single-Fanily' Prluary/Secondary or Duplex- c. The Zonl.ng Adnlnlstrator and,/or DRB Day regulre the eubrnission of additlonal plans, drawlngs, specifications, eamples and other materLale (J.ncl'uding a-uodel) lf deened necessary to detemlne rhether a proJect wlll conply ulth lleslgn Guldelines. II . UTNOR ALTERATIONS TO ITHE EXTERIOR OF BUILDINGS. Plrotos or eketches that clearly lndicate what ls proposed and the location (site plan) of the proposal nay be. subrnitted in lleu of the nore for:rnal requirenents gtven above, as long as they provlde all inportant specifl'cations for the propoial includinE colors and naterials to be used' B. NOTE: va "/1. gq,?O.C. -r#' ITI. u J original floor plans wlth all speciflcatLons ehown. u G H: :::i.?l'Elono""d rloor plans (L/4" = 1' or lareer) tlTo copies of a elte plan showing exleting and proposed constrrctlon. Indicate roof rldge elevations sith existlng and proposed grades shown underneath. ElevatlonE of propoEed addltion. Mucnn,) \, / 1. Photos of existing stnrcture. ,./ I. Speclficatlons for all naterl'aIs and color samples onrt naterl.als llst (attached). At the reguest of the Zonlng Adnlnlstrator you may aleo be required to subnit: G. I staternent fron each utilJ.ty verlfyinE locatlon of eerrrice and availability. See attached utillty location verification forrn. A site lnprovement su::rrey, starnped by registered professional sunreyor. A prelininary tltle report, vert'fying ownership of property and lists of easements. IV. FINAL SITE PLAN After a building pemit has been I'ssued, and nhen the proJect is undenly, ttre following will-be reguired !"f:t:iny-building receiiis a franing inspection from the Building Departnent: - awo copies of a certified improvenent sunrey showing: A. Bullding locations wlth ties to property corners, i'e' distances and angles. B. Buildlng dimensions to the nearest tenth of a foot' c. All utility senrice lines, as-builts, ehowlng-size of lines, typE of naterial used, and exact locations' D. Drainage as-builts. E. Basie of bearlng to tie to eection corner. F. AII property pins are to be either found or set and stated on DaP. G. All easements. H. Buildlng floor elevations and all roof ridge elevatl.ons with existing and proposed grades shown underneath' CONCEI{TUAL DESIGN REVIEW 1. Subnittal recruLrement?: The owner or authorized agent @g design approval as.prescribed by this-chipter niy sulitt plins ior concbptual review li tne Oesign Review Board to the Departnent of c-oununity D6velopnent. The purpose of a- conceptual revLew shall be to give the applicant a baslc understanding with iespect to the design concept and the conpatibillty of a-proposal with the Design euiaefdres conta-inea wittrin this chapter. This procedure is reconrnended nalnly for those applications v. 2. of a higher lnpact than sl.ngle-fanily and two-fanlly residences although proJectE of that nature shall not be excluded fron the opportunlty to request a conceptual deslgn revlew. The follovl.ng Lnfornatl.on ehall be subultted for a conceptual revl.ew: a. A conceptual slte and landscape plan at a ulnlnrun scale of one lnch oguals twenty feet; b. Conceptual clevatl.ons and exterior materials and a description of the character of the proposed atnrcture or etnrrcturesi c. Suffl,clent lnfonoation to ehow that the proposal conplles wlth the developuent standards of the zone distrlct ln which the proJect is to be Iocated (i.e. GRFA, site coverage calculatl,ons, nurnber of parking spaces, etc.); d. Coupleted applicatlon forni e. Plannlng and Envlronnental Counission and or Town Councl.I approval lf required. Procedure: Upon recelpt of an applicatlon for conceptual design revlew, the Departrnent of Conmunl.ty Developnent shall revl,ew the subnltted uaterlals for general conpliance uith the appropriate reguirenents of the zoning code. If the proposal Ls in basic conpliance wlth the zonlng code reguirenents, theproject shall be fonarded to the DRB for conceptualieview. If the application is not generally in cornpliance slth zoning code requirements, the application and subnittal naterials shall be returned to- the appll.cant vith a vrl.tten explanation of the Departnent of Connunity D,evelopnentrs findings. Tha DRB shall revlew the application and supporting uaterial that has been submitted for a eonceptual review in order to determine whether or not the proJect generally conplies with the design gruidelines. No vote ot ttre DRB vill be reguired unless reguested by the appllcant. The property onner or his representative shlfr be present at the DRB hearing. LIST OF I,IATERIALS NAI,TE OF PRGTEqT: I,EGAL DESCRIPTIONZ IfiI-UL BIPCK suBDIvIsIoN Bfu@ STREET ADDRESS: DESCRII{TION OF PRo.TECI: The following lnfonnation ls Review Soard before a final A. BUILDING UATERIAISs Roof siding other wall Uaterials Fascia soffits Windows Window Trin Doors Door Trin Hand or Deck Rails FIues Flashings Chinneys Trash Enclosures Greenhouses Other required for subnlttal to the Deslgn approval can be given: TYPE OF UATERIAL COIPR B.IATDSCAPING:Nane of DesLgner: Phone: PIANT UATERIAI.S: PROPOSED TREES Botanical Nane Ay\E Conrnon Nane ouantitv Size* EXTSTING TREES lIO BE REUOI/ED ltinlnun caliPer for height for conlferous*Indicate caliper for deciduous trees. deciduous trees is 2 l-nches. Indlcate trees. PIANT }IATERIAI,S: PROPOSED SHRUBS EXISTING STIRUBS TO BE REUO1IED rlndicate size5 gallon. Conmon Nanne ouantity Size* of proposed shrubs.llinimun size of shrubs is Botanical Nane luAv. TvDe S.$rire-Eeeles GROI'ND CO\TERS soD SEED TYPE OF IRRIGATION TYPE OR UETHOD OF EROSION CONTROI, Ag te, c. OTHER LANDSCAPE FEAIITRES (retaining walls, fences, swinning poo1s, etc.) Please specify. Indicate heights of retaining irafls. Uaxingn height of walls within the front setback is 3 feet. l{aximum height of salls elsewhere on the proPerty is 6 feet. J DATE: LEGAL ADDRESSs OI{NER ARCHITECT ZONE DISTRIET PROPOSED US IPT SIZE Height Total GRFA Prinary GRFA Secondary GRFA Setbacks: Front Sides Rear tlater Course Site Coverage Iandscaping Fencer/Retaining Parking Credits: Garage Uechanical Airlock storage Drive: Slope Pernitted Environrnental/Hazards : Zoning: Date: ZONE CHECK FOR sFR, R, R P/S ZONE DrSTRrqrs l{all Heights Block Filins wruLu4- Allowed (30) (33) 201 15 1 151 (30) (50) (3oo) (600) (eoo) (1200) (50) (1oo) (25) (50) (200) (4oo) Slope Actual Proposed lc?l 0zA. 4?,?.+4 ttuQ b6' Avalanche Flood Plain Slope Geologic tlazards Approved/Dlsapproved Staff Signature : IITTLIIY IOCATTON VERIFICABION The locatlon of utllltles, vhether they be laln trunk llnee or proposed lLnes, lust be approved-and vCrlflert by the folloring utllltles for the accoDpanying slte Plan. SUBDIVISION 'OB NA}TE I'T BIOCK FILING ADDRESS Authorlzed Sl.qnature Dsle U.s. tlest cornmunicatione 1-800-922-1987 {68-6860 0r 9{9-4530 Publlc Senrice coDpany 949-5781 Gary HaII Holy Cross Electric Assoc. 949-5892 Ted ltuskyr/Uichael Laverty Heritage cablevision T.V. 949-5539 Gary atohnson Upper Eagle Valley water & Sanitation District * 476-7480 Fred Haslee NOTE:These verificatlons do not relleve the his responstbility to obtaLn a atreet in any publtc . A street contractor of cut penit frorn lforks and to Thls fotn I's to verifY location.'iltris ehould preParing Your utility lnstallations. I P1ease bring a sl'te Plan uhen lfater & Sanltatlon elgrnatures. cerntl.ce avallabllltY and be uEed in conJunctlon wlth plan and schedullng obtalnlng Upper Eagle valleY