Loading...
HomeMy WebLinkAboutVAIL DAS SCHONE FILING 1 BLOCK E LOT 12 AROSA TOWNHOUSES UNIT 1TOWN OF VAIL DEPARTMENT OF COMMTINIry DEVELOPMENT 75 S,FRONTAGEROAD VAIL, CO 81657 g',t0479-2t38 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ADD/ALTMFBUILDPERMIT PCTMit #: BO3-035I Job Address.: 2607 AROSA DR VAIL Status.....: ISSUED Location......: 2607 AROSA DR (AROSA TOWNHOMES) Applied...: ll/12/2003 Parcel No....: 210314204016 Issued ...: ll/13/2003 Project No...: Expires...: 05/1112004 owNER ISIDOR EISENMAIIN LL/L2/2OO3 Phone: 2607 A AROSA VAIIJ CO 816s7 -4205 Iricense: CONTRACTOR ISIDOR EISENMANN tL/L2/2003 Phone: (97o) 328-2664 PO Box 419 7 Eagle Colorado 81531 License z 295-T' AppIrICAtiIT ISIDOR EISENMAI.IN LL/L2/20O3 phone: (970) 32a-2664 PO Box 4197 Eagle Colorado 8163 L License:295-L Desciption: REPLACE FAILED BRICKWALL UNDER NEW GUIDELINES & REMOVING TREES Occupancy: R3 Single Family Residence TypeConstruction: VN TypeVNon-Rated Type Occupancy: ?? Add Sq Ft: 0Valuation: 54.800.00 Fireplace Infomalion: Restricted: Y # of Gas Appliances: 0 Building-> $111.25 Restuarant Plan Review--> # of Gas Log: 0 # of wood Pellet: 0 FEE SUMMARY .'rt't+*.'tr+.t'l*:r**:.***'**.r:r:rt'rt go. oo Total Calculat€d Fe€s-> $185. 56 $0. 00 Addilionsl Fees-> s50. 00 SO. OO Total Permit Fee----> 5236. 56 90. 00 Pal'ments-----> 5236 . 56 $0.00 Plan Check-> lnvestigalion-> Will Call---> $72.3L DRB F€e-----.....-> 90 - 00 Recleation Fe€--------> $3 . 00 Clean-up Depo5il..-....-> TOTAI- FEES__-_> S185.56 BALATICE DUE---> Approvals:IEem: 05100 BUIITDING DEPARTMENT LA/A3/2OO3 JRNI ACIiONI AP APPROVED BY E.E. Item: 05400 PLANITIIIG DEPARTMENT IICM: O55OO FIRE DEPARII{E}TT Item: 05500 PITBLIC WORKS a*l +tt*:l:tl *att+:tl 'ta,l la*:r:|:tir lt *r *:l | * a* lt+r +a* * a* lt*t'ill iat I *:l*'l *t *a* t++l See page 2 of this Document for any conditions that may apply to this permit. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, Uniform Building Code and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION STI,ALL BE MADE TWENTY-FOUR HOIru IN ADVANCE BY 479-2149 OR AT O{JR OFFICE FROM 8:m AM - 4 PM. SIGNATI]RE OF OWNER OR CTOR FOR HIMSELF AND OWNEF PAGE 2 **t*******:f*++*:*!**{.'|***:***:t+*****!*lt:td.'}*'}**+**'}!i*'|t***,t*'t'|t:t't**'*'}*'}****'t**:t*:t,}!*,$**'|.!|.'********* CONDITIONS OF APPROVAL Permit #: 803-0351 as of I l-13-2003 Status: ISSUED {.*'*'t,|t{.********,i{i****;f,***'!{.,*{.!t************'}:}*,t*,t*!t!t,}!t***,}**,}*'t'*'l!**:|,|t|t*****,t*,**|i*********** Permit Type: ADD/ALT MF BUILD PERMIT Applied: llll2l2l03 Applicant: ISIDOR EISENMANN Issued: ll/13/2003 (970) 328-2664 To Expire: O5llll2004 Job Address: 2607 AROSA DR VAIL Location: 2607 AROSA DR (AROSA TOWNHOMES) ParcelNo: 210314204016 Description: REPLACE FAILED BRICKWALL UNDER NEW GUIDELINES & REMOVING TREES Conditions: Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CffiCK FOR CODE COMPLIANCE. Cond: l4 (BLDG.): ALL PENETRATIONS IN WALLS,CEILINGS,AND FLOORS TO BE SEALED WITH AN APPROVED FIRE MATERIAL. Cond: l6 (BLDG.): SMOKE DETECTORS ARE REQUIRED IN ALL BEDROOMS AND EVERY STORY AS PER SEC.3IO.9.I OF THE I997 UBC. Cond: I (FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANIY WORK CANBE STARTED. * * * + * * t t * * + + ** * * * * * f t + t 'f lt + * + + * * * *** * * * ** * * * * * * + * * * * ** * * * * * * ** * + + * * * + * * * * * t,l '! * * a * + + * + {. * * * t:1.:} * TOWN OF VAIL, COLORADO Statement 'l' * * '* * * * * * * ** * * * + * * * {. * * '* * * ****** * * * * * + * + * * + * + * rl' t * * * * t * * * * * * * * * * * * ***ttt* * * * * * * * * * * 't + * * * * * * * * * Statement Number: RO3OO05124 Amount: $236.55 LL/L3/200304:39 PM Palment Method: Check rnit: DDG Notation: Eagle Development & InveatmenE CorD 1021 Permit No: 803-0351 Type ! ADD,/ALT MF BUILD PERMIT Parcel No: 2103]-42040L6 Site Address: 2607 AROSA DR VAIL IJocation: 2507 AROSA DR (AROSA TOWNHOMES ) Total Fees: $236 .55 This Payment: $236.56 Total ALL Pmts: $236.55 Balance: $0.00 * * f+ * * * +*** ++t** +t f + + *'t '** *'t{'* * **** * * * *** * * * *t * * ** * *'}{i* + + +t * * * ** * + + ++ * * * * ** f * + +* * * * ** * *** * * * * ACCOIJNT ITEM LIST: Account Code Description Current Pmts BP OO1OOOO31111OO BUILDING PERI'1IT FEES CL OO1OOOO3123OOO CONTRACIOR LICENSES PF OO1OOOO31123OO PLAN CHECK FEES hJC OO1OOOO31128OO WILL CALL ]NSPECTION FEE 111 .25 50.00 72.31 3.00 ' -' 'r' ' .'l rrp APPL,.A''NW,LLN.?Ail$-#I I I -- APPLrcArroN wrLL No' "ttJr=.jo":,t#tffi3.01a?-q_ffi._ 75 S. Frontage Rd. Vail, Colorado 81657 Buildi TOR INFORMATION General Cpntractor: ESidor Eisen yytartlt 'H^t Vail F 1e9. No.: I\ ' Contact and Phone #'s: rqrb) e2s zDl f Email address: Contractor Signature: _d / 2il'zld'm fiz///4/4'd'4( COMPLETE VALUATIONS FOR BUILDING PERMIT Labor & Materials BUILDING: S 37 0p- oo ELECTRICAL: $orHER: $ I t 0O. oa [-ab-y PLUMBING: $MECHANICAL: $rorAl:s 4 8pe, oa For Parcel # Contact Assessors Otlice at 970-328-8640 or visit m*ffi Lto3tq2oL/Dtl Job Name: fl* ph " " e t#yy d/z/'{i u4/4 ,ooo*r, 2607 Flro sa f)r Va' L- 9/6t7 LesatDescription ll t-ot: // ll etocr: f ll rltins:Subdivision: ITrosa To*n AooneS Phone: ArchitecUDesigner:Address:Phone: Engineer:Address:Phone: Work Class: newil Addition ( ) Remodel 1j/ Reoan ( ) D".91_I_ jth"t! l Work Type: Interior ( ) \ Exterior 1p Both ( )Does an EHU exist at this location: Yes ( ) No (. ) t----.a- Type of Bldg.: Single-family ( ' ) Two-family (l) Multi-family ( ) Commercial ( ) Restaurant ( ) Other ( ) No. of Existing Dwelling Units in this building: lJ F No. of Accommodation Units in this building: No/Tvpe of Fireplaces Existinq: Gas Appliances ( ) Gas Logs ( ) Wood/Pellet ( ) Wood Burning (X) No/TVpe of Fireplaces Proposed: Gas Appliances ( ) Gas Logs ( ) Wood/Pellet ( ) Wood Burning (NOT ALLOWED) Does a Fire Alarm Exist: Yes (y) No (ToeseEieEFrrnkler System Exist: Yes ( ) t'lo (f) ******s***************l*t**tt**FoR OFFICE USE ONLY**************#.*'r*!!,.**|lt******** \\VAiIWAtA\CdEV\FORMS\PERMITS\BLDGPERM.DOC 07 t26t2002 tl Questions? Callthe Building Team at 479-2325 Depaftment of Community Development Ptoject Name: Project Address: This Chdrlist must be ampleW befote a Building Petmit application is arcobd. All pages of application is complete Has DRB approval obtained (if required) Provide a copy of approval form Condominium Association letter of approval attached if project is a Multi-Family complex Complete site plan submitted Public Way Permit application included if applicable (refer to Public Works checklist) Staging plan included (refer to Public Works checklist) No dumoster,oarkino or material storaoe allowed on roadwavs and shoulderc without written aooroval Asbestos test and results submitted if demolition is occurring Architect stamp and signature (All Commercial and Multi family) Full floor plans including building sections and elevations(s sets of plans for MultFFamily and Commercial Buildings) Window and door schedule Full structural plans, including design criteria (i.e,loads) Structural Engineer stamp and signature on structural plans (All @mmercial and Multi Family) Soils Report must be submitted prior to footing inspection Fire resistive assemblies specified and penetrations indicated Smoke detectors shown on plans Types and quantity of fireplaces shown o o E o D o tr D o o o o tr o D Applicant's Signaturer Date of submittal: \WaiIUata\cdev\FORMS\PERM ITS\BLDGPERM.DOC Received By: 04t02t2003 BUILDING PERMIT ISSUANCE TIME FRAME If this permit requires a Town of Vail Fire Department Approval, Engineerb (Public Works) review and approval, a Planning Depaftment review or Health Depaftment review, and a review by the Building Depaftment the estimated time for a total review will take as long as three (3) weeks. All commercial (large or small) and all multi-family permits will have to follow the above mentioned maximum requirements. Residential and small projects should take a lesser amount of time, However, if residential or smaller projects impact the various above mentioned departments with regard to necessary review, these projecls may also take three (3) weeks to review and approve. Every attempt will be made by this department to expedite this permit as soon as possible. I, the undersigned, understand the plan check procedure and time frame, I also understand that if the permit is not picked up by the expiration date, that I must still pay the plan check fee and that if I fail to do so it may affect tuture permits that I apply for. Agreed to by: Print name Project Name: Date: F: everyone/forms/bldperm3 Signature HOW DIDWE RATE WITH YOU? Tom ofVailSurvey Community Development Departnent Russell Fomst Director, (970)179.2139 Check allthat applies. 1. Which Departnent(s) did you contact? Building _ Environmenhl_ Housing_ Admin Planning DRB _ PEC Was your inilial conbct wifrr our s1aff immediate no one available ? slow 0r o. 7. 8. 3. lf you were required to wait how long was it before you were helped?_ 4.Was your project revienred on a timely basis? Yes / No lf no, why not? Was this yourfirstlime to file a DRB app_ PEC app_ Bldg Permit_ t',I/A Please rate the performance of &re staf person who assisted you:54321Name: (knowledge; responsiveness, availability) Overall effectiveness of the Front Service Counter. 5 4 3 2 What is the best time of day for you to use fie Front Service Counter? 9. Any comments you have which would allow us to betbr serve you nexttime? Thank you for taking fie time to complete this survey. We are committed b improving our seMce. TVWT{-OF WHEN A'PUBLIC WAY PERMIT" IS REQUIRED PLEASE REAO AND CHECK OFF EACH OF THE FOLLOWING QUESTIONS REGARDING THE NEED FOR A "PUBLIC WAY PERMIT": Is this a new residence? Does demolition work being public property? YES NO performed require the use of the Right-of-Way, easements orYES NO Is any utility work needed? YES Is the driveway being repaved? Is a different access needed to the site other than the existing driveway? YES- NO Is any drainage work being done that affects the Right-of-Way, easements, or public property? YES Is a "Revocable Right-of-Way Permit" required?YES Is the Right-of-Way, easements or public property to be used for staging, parking or fencing?YES NO If answer is NO, is a parking, staging or fencing plan required by Public Works? YES_ NO_ If you answered YES to any of these questions, a "Public Way Permit" must be obtained. "Public Way Permit" applications may be obtained at the Public Work's office or at Community Development (a sample is attached). If you have any questions please call Leonard Sandoval in Public Works at 479-219A. I HAVE READ AND ANSWERED ALL THE ABOVE QUESTIONS. Contractor Signature Job or Project Name: Date Signed: NO NO F :/everyone/forms/bldperm4 Company Name APPLICATION FOH TOWN OF VAIL PUBLIC WAY PERMIT pw*:rl-nnrl PATCEI#:T T T !' N T [ - T !' I T T le- Brds. Permit#,8 n I'I I f I Job lGme Excavalin g Contraclor Name Stro€t Address n n n-Tl (lf unknowncallLJ LJ r"_J | | 479-2138 axl.o Maillng Address TOV Contractof's License Number REQUIREO Phofle #ziqCity 4. Start Date Work is for (circte one) Completion Dato Water Sewer Gas Electric Telephone (Permit Expkatlon Date) CATV Landscaping Temp. Site Access Other Trench-width (min.4') BondAmount $ ALL MATERIAL, EQUIPMENT, AND TRAFFIC JOB IS STARTED, 7.Rubber out-riggers are required on Asohalt surfaces underneath the L A signature below indicates a signatures are obtained, permittee necessary Town of Vail signatures. BE ON THE JOBSITE BEFORE THE working on asphalt. at all times. utility locations and approvals, Once all utility company application through the Public Works office to obtain the up to one week to process. Depth TotalsF $ llotal LF $ Permit Fee Total Permit Fee $ Public Service Company (1-800-9 Public Service Natural Gas Group (1-800-922-1587) U.S. West (1 -800-922-1 987) o 10, 11. 12. ATTACH PLAN OF WORK INCLUDING CONSTRUCTION TFAFFIC CONTROL PLAN Show streets with names, buildings, and location of cuts. USE DASH LINES FOR CUT. TCI Gablevision of the Rockies (1-800-922-1987) Eagle River Water & Sanitation District (970-476-7480, ext. 114) Holy Cross Electric Company (1-800-922-1987) Town of Vail Electricians (970-479-2158) Town of Vail lrrigation (970-479-2158) Town of Vail Public Works Construction Inspector (970-479-2198) THERE WILL BE NO TOTAL STREET CLOSURESI A construction traftic control plan must be approvod by the Public Works Department prior to issuance of the permit, All excavation must be done by hand within 18'of utilities - (Senate Bill 172)' Permittee must contact Public Works Departmenl at 479-2198 24 hours Drior to commencing of work. Failure to notify the Town will result in lorfeiture ol bond money. Scheduled inspections which are not r€ady may result in the Town charging the contractor a reinspection fee. I certify that I have read all chapters ol Title 8 - Public Ways and Property, of the Vail Municipal Code and all utility company agreements, signed by me, and will abide by the same, and that all utilities have been notified as required. White - Public Works Yellow - Contractor PUBLIC WORKS AND THE PUBLIC WAY PERMIT PROCESS How it relates to Building Permits: Fill out the attached check list with the Building Permit Aoplication. If yes was answered to any of the questions then a "Public Way" permit is required. You can pick up an application at either Community Development, located at 75 South Frontage Road or Public Works, located at 1309 Elkhorn Drive. Notice sign-offs for utility companies. ALL utilities must field verifo (locate) respective utilities prior to signing application. Some utility companies require up to 48 hours notice to schedule a locate. A construction traffic control/staging plan must be prepared on a separate sheet of paper. An approved site plan may also be used. This plan will show locations of all traffic control devices (signs, cones, etc,) and the work zone, (area of construction, staging, etc.). This plan will expire on November lst and will need to be resubmitted for consideration for approval through the winter. Be aware that your resubmission for winter may be denied depending on the location of construction. Sketch of work being performed must be submitted indicating dimensions (length, width and depth of work). This may be drawn on the traffic control plan or a site plan for the job. Submit completed application to the Public Work's offlce for review, If required, locates will be scheduled for the Town of Vail electricians and inigation crew. The locates take place in the morning, but may require up to 48 hours to perform. The Public Work's Construction Inspector will review the application and approve or deny the permit. You will be contacted as to the status and any requirements that may be needed. Most permits are released within 48 hours of being received, but please allow up to one (1) week to process. As soon as the permit is approved, the Building Department will be notified, allowing the "Building Permit" to be released. Please do not confuse the "Public Way Permit" with a "Building Permit". NOTE: The above process is for work in a public way ONLY. Public Way Permits are valid only until November 15th. A new Public Way Permit is required each year if work is not complete. Re-application each November 15th does not mean an automatic renewal. I have read and understand the above. Signature F:/everyone/forms/bldperm5 Date Signed DRAINAGE AND CULVERT INSPECTIONS ARE REQUIRED By PUBLTC WORKS! Please read and check off each of the items below: o The Town of Vail Building Department has developed the following procedures to ensure that new construction sites have adequately established proper drainage from building sites along and adjacent to Town of Vail roads or streets. The Town of Vail Public Works Department will be required to inspect and approve drainage adjacent to Town of Vail roads or streets and the installation of temporary or permanent culvefts at access points from the road or street onto the construction site. Such approval must be obtained prior to any requests for inspection by the Town of Vail Building Department for footings, temporary electrical or any other inspection. Please call Leonard Sandoval at479-2798 to request an inspection from the Public Works Depaftment. Allow a minimum of 24 hour notice. Also, the Town of Vail Public Works Depaftment will be approving all flnal drainage and culveft installation with resulting road patching as necessary. Such approval must be obtained prior to any Final Certificate of Occuoancv issuance. Agreed to by: Print Name Project Name: Date Signed: F:/everyone/forms/bldperm6 Signature Please read and check off each of the items below. (Copies of complete text are available upon request) CODE 5-2-10: DEPOSITS ON PUBUC WAYS PROHIBITED s Unlavvful deposits: Subject to subsection C thereof, it is unlawful for any person to litter, track or deposit or ctruse to be littered, tracked or deposited, sand, gravel, rock, mud, dit, snow, icg, or any other debris or material upon any street sidewal( alley or public place, or any portion thereof. o Notice; Abatement: The Director of Public Works may notifo and require any person who violates or causes another to violate the provision of subsection A hereof, or who has in the Director's employment a person who violates or @uses another to violate the same, top remove such sand, gravel, rocks, mud, dirt, snow, ice or any other debris or material within twenty four (24) hours after receipt of said notice by the Director of Public Worls, In the event the person so notified does not comply with the notice within the period of time herein specified, the Director of Public Works, or other authorized agent, may cause any such sand, gravel, rocks, mud, dirt, snow, ice, debris or any other material to be removed from any street or alley at the expense ofthe notified. tr Summons and Penalty: As an alternative to the notice for removal provided in subsection B above, any person who violates or @uses another to violate the same, may be issued a summons to appear before the Municipal Court of the Town for said violations, and upon being found guilty of a violation hereunder be punished as provided in Section 14-1 of this code, o Nofce and Penalty: It is unlawful for any person to fail or refuse to comply with the notice of the Director of Public Works as provided in subsection B hereof, and any such person shall, in addition to payment of the expense of removal incurred by the Director of Public WorK, as provided in subsection B hereof, upon being found guilty of a violation hereunder, be punishable as provided in Section 14-1 of this Code. (1997 Code: Ordinance 6 (1979). CODES 7.3A.I AND 7-3A-3: PARKING OBSTRUCTING TRAFFIC & IMPOUNDMENT AUTHORIZED D No person shall park any vehicle upon a street or at any other place within this Municipality in such a manner or under such conditions as to intefere with the free movement of vehicular traffic or proper street or highway maintenance. (Ord. 2(1968) 5 1) r Whenever any police officer finds a vehicle attended or unattended, standing upon any portion of a street or upon any place within this Municipality in such a manner as to constitute a violation of any section of this Article, or left unattended for a period of twenty four (24) hours or more and presumed to be abandoned under the conditions prescribed by Colorado Revised Statutes section 424-1102, as amended, the officer shall require the vehicle to be removed or cause it to be removed and placed in storage in the nearest garage or other place of safety designated or maintained by this Municipality, and the charges for towing and storage of such vehicle shall be charged to the owner of the vehicle in addition to a ten dollar ($10) impoundmentcharge. (Ord. 2(1968) $ 3: Ord. 28(1981) 5 1) I have read and will comply with the above code provisions: Print Name Position or Relationship to Project: Date Signed: F:/everyone/forms/bldpermT Signature TO!I'NM VaiI 2003 Vail Village and Lionshead Village Construction Hours Information Handout Problem Statement Vail Village and Lionshead Village are invaluable assets to the community. Thousands of people come to Vail each year to sightsee, recreate, shop and to enjoy everything the Vail Valley has to offer. The community and merchants rely upon our guest to generate revenue. Our summer/winter guests expect a pleasant experience while in Vail. To insure that all of the proposed construction has as little negative impact on the community and on our guest as possible, the Town of Vail finds it imperative to create and implement the Vail Village and Lionshead Village Construction Hours Handout. It would be irresponsible for the Town of Vail, the Construction Contractors and the Merchants, to not actively participate to minimize the impact of construction in the Vail and Lionshead Village areas. Givens The following givens are intended to provide the basic foundation by which construction will be completed in the Villages: o The public's health, safety and welfare shall be honored at all times. . Adequate pedestrian, loading/delivery, vehicle, and emergency vehicle access and circulation shall be maintained. r Roadways and pedestrian walkways shall be kept clean and free of dirt and debris. r All construction deliveries, equipment, tools and materials entering the Vail Village and Pedestrian areas must go through Check Point Charlie. All Lionshead construction activity must go to the Vail Police Department for a parking permit. Do not use delivery zones for construction parking, refer to approved staging plan or make other arrangements for parking. r The hours of Outside Construction Activity shall be as follows: - April 15 - June 20 & September 8 - November 14,7 a.m. untilT p.m., seven days a week. June 20-September 5, work must end bv 4:00 p.m. on Fridavs. November 14 - April 15,2004 work allowed within daylight hours only. - Deliveries shall be restricted to the hours of 7 a.m. to 11:30 a.m. on Gore Creek Drive and 7 a.m. to 8:30 a.m. on Bridge Street. - Special delivery permits must be requested in advance, from Public Works in conjunction with Code Enforcement at Checkpoint Charlie. - No construction activity shall occur on Saturday or Sunday between June 21 & September 7. No outside construction activity shall occur on the following dates: Friday, February 14, Saturday, February15, Sunday, February 16, and Monday, February 17. (President's Weekend) Saturday, May 24, Sunday, May 25 and Monday, May 26 (Memorial Day) Friday, July 11, Saturday, July 12 and Sunday, July 13. (Vail Arts Festivat) Thursday, July 3, Friday, July 4, Saturday, July 5 and Sunday, July (lndependence Davl Saturday, August 30, Sunday, August 31 , and Monday, September l. (Labor Dav Weekend). / a Friday, September 12, Saturday, September 13, Sunday, September l,f in (Lionshead) and then on Saturday, September 20 and Sunday, September 21. (Vail Village) - (October Fest) Thursday, November 27, {Thanksqivinq Dav) Friday, November 28, Saturday, November 29 and Sunday, November 30. Thursday, December 25, Friday, December 26, Saturday, December 27, Sunday, December 28. (Christmas Dav Holidavl Monday, December 29, Tuesday, December 30, Wednesday December 31, Thursday January 1. (New Year 20041 Friday January 2, Saturday January 3 and Sunday January 4, 2004. No Work allowed the entire week of the Christmas/New Year Holiday. The Town of Vail Noise Ordinance has been waived by the Town Manager from 7a.m. - 7p.m. for construction activities from April 15 through June 20, and from September 8 through November 14. The Noise Ordinance shall be in effect and strictly regulated from June 20 through September 5 and November 15, 2003 to April 15, 2004 All construction sites will be required to obtain an Aporoved Construction-Staqino Plan from the Town of Vail Public Works Department in conjunction with Code Enforcement. (The approved staging/parking plan is required to be on-site at all times). The Town of Vail reserves the right to amend the Vail Village and Lionshead Village Construction Hours regulations at anytime should abuses or problems arise. The Three-Strike Rule will be enforced. Step 1. (Written warning), Step 2. (Written warning), Step 3. (Construction site will be Red Tagged until all violations are resolved). The following expectations are established to insure the success of the Vail Village and Lionshead Mllage Construction Hours Plan: . Full and complete cooperation and understanding from all parties involved in the construction activity in regards to this plan. . Strict adherence and compliance with the requirements outlined in the construction plan. . Respect and consideration for the affected interests and parties. lf you have any questions, Please contact the Town of Vail Public Works Department (Construction lnspector) or the Vail Police Department (Code Enforcement Officer) 970479-2198 970475-7603 TOWN OFVAIL ll Vail 2003 Staging i Parking Plan Information fhe Staqinq / Parkinq Plan Philosophv- ls a very important step in the building process. Striking a balance between safe public access and giving construction projects room to build is becoming increasingly challenging, for us tg meet all the needs of those who will be impacted by construction projecis. The factlj, there is less room to build in the Town of Vail. Developing a creative Staging Plan is a must. Staging in the Town of Vail Public Right of Way is a Privilege, not a given right. We take into account when we review and approve staging / parking plans, impacts bn neighborhoods, tourism, business and the traveling public along with your right to build. The General Contractor is responsible for all subcontractors and all construction activitv relatina to the l\ildtlg-Wiect The staging plan will be enforced according to the Approved Set of Building and Staging Plans. You are required to keep a copy of the Approved Staging Plan on site. Two staging /parking plans are required, a summer and winter. Summer staging plans expire on November 1, and winter staging plans expire on April 15. (Note: There is no on street parkinq in the winter season and all materials. equipment, etc must be 10' off the edoe of asohalt). Enforcement of all staging / parking plan is as follows. A) Staging / Parking Plans to scale required. B) Once the plan is approved, they will be held to complete compliance. C) We will use a 3 step and you're out, process. Step One- Verbal and written warnings as to the staging plan violation, then have contractor sign and date field memo warning. Step Two- Police Department issue tickets and tows or public works writes second written warning to all violators who have been notified under step one and who are still in violation of the approved Staging / Parking Plan. The Town of Vail Chief Building Official will call the contractor and notify them, the next time any violation happens, the building department will red tag the construction site for 48 hours. Step Three- lf still in violation after step two, a 48 hour Red Tag will be issued to the project site. lf you have any Questions, Please contact the Town of Vail Construction Inspector at 970-479-2198 \\Vail\data\cdev\FORMS\PE RM ITS\BLDGPERM. DOC 03/04t2003 tl Requirements for an Acceptable Staqinq Plan It is preferred that and Approved Site Plan is used to draw a staging plan, but a hand drawn plan may be used as long as it is dawn to scale and is neat and legible. 1.) The Staging Plan must show the following: (a) Show all parking that is required for the job site. (lncluding construction equipment). (b) Show the location of all material that will be staged on site. (c) Show the location of all dumpsters and port-o-john that are to be on site. (d) lf a fence is required, then show the location of the fence and describe the material used for the fence. (e) lf trees and / or vegetation is required to be protected, then show how this will be done. (f) lf this staging plan is for a Demo Permit, then show staging for dump trucks and all related equipment. lf the Town of Vail Right of Way area is needed for staging, then a Traffic Control Plan is required in conjunction with the staging plan. (g) Please provide and show an Erosion Control Plan. (h) No equipment, vehicles, materials are allowed on Town of Vail Right of Way in the Winter Staging Plan. 2.) lf work needs to occur in the right of way, then add a Traffic Control Plan to the staging plan showing the following: (a) The work zone (area that is to be performed) (b) Traffic Control Devices (warning, signs, cones, flaggers, etc.) (c) Distances that all devices will be set up from the work zone. Also show all dimensions of work being performed in the right of way. Alltraffic control plans must conform to the MUTCD manual.(Manual of Uniform Traffic Control Devices) 3.) This plan will be reviewed by Public Works and if Necessary the Police, Fire, and Community Development Department. Once the staging plan is approved, it will be registered with the departments listed above and enforced. 4.) The Village and Lionshead area have outside construction restrictions, please become familiar with the Vail 2003, Vail Village and Lionshead Construction Hours handout. M^A ^9 u?& d^u^Z % t-es-qDNL'^ I t--flTu n6 0u' Pn"nrus- \WailWata\cdev\FORMS\PE RM ITS\BLDGPERM.DOC 03/04/2003 Design Review Board ACTION FORM Departrnent of Community Development 75 South Frontage Road, Vail, Colorado 81557 tel: 970.479.2L39 faxt 970.47 9.2452 web: www.ci.vail.co.us Project Name: Ellefson exterior changes DRB Number: DR8030493 Prcject Description: Replace o<isting decks with new, west side of duple& same-for-same, to comply with building codel new flooring ofdecks to be redwood. Pafticipants: OWNER ELLEFSON, TASHINA 11/03/2003 Phone: 2607 A AROSA VAIL CO 816574205 License: APPUCANT DOUGLAS SMIUANIC 11/03/2003 Phone: 2607 AROSA VAIL CO 81657-4205 License: ProjectAddressz 2607 AROSA DRVAIL Location: 2507 AROSA DR (AROSA TOWNHOMES) Legal Description: Lot: 12 Block: E Subdivision: AROSA TOWNHOUSES Parcel Number: 21031420,()16 Comments: seeconditions BOARD/STAFF ACTION Mouon By: Action: STAFFAPR Second By: Vote: Date of APProvalz LLlO6l2003 Conditions: @nd:8 (PLAN): No changes to these plans may be made without the written consent of Town of Vail staff and/or the appropriate review committee(s). C,ond: 0 (P|-AN): DRB approval does not constitute a permit for building. Please consult with Town of Vail Building personnel prior to construction activities. Cond: CON0006220 New decks to be same-for-same, without bottom railing, so as to match deck on east side not yet being replaced Entry: 11/06/2003 By: ee Action: AP Cond: CON0006221 New decks must not incorporate colors, as indicated on the original application Entry: IL10612003 By: ee Action: AP Planner: Elisabeth Eckel DRB Fee Paid: i20.00