Loading...
HomeMy WebLinkAboutVAIL DAS SCHONE FILING 2 BLOCK H LOT 13BTO\^TN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT 75 S.FRONTAGEROAD VAIL, CO 81657 970-479-2138 NOTE: THIS PERMIT MUST BE POSTED ON TOBSITE AT ALL TIMES ELECTRICAL PERMIT Permit #: E02-0036 Job Address: 2427 GARMISH DR VAIL Status . . . : ISSUED Location.....: 242TGARMISHLINIT # B Applied..: 04/23/2002 Parcel No...: 21,0311,4'1,301,5 Issued . . : 04/23/2002 ProjectNo: Expires..: 70/20/2002 ol{NER DEPAOLO, GERARD GARY O4/23/2OO2 Plrone: 2427 GARMISCH DR. VAIIJ CO 81657 License: coMfRAcroR SHEARoN ELEcrRrc o4/23/2oo2 Phonez 910-949-6456 P.O. BOX 43 AVON, CO 4L620 License:121-E APPr.,rcAlflr SHEARoN ELEcrRrc 04/23/2oo2 Phone: 910-949-6456 P.O. BOX 43 AVON, CO 8162 0 License : L2!-E Desciption: PANEL UP GRADE,NEWOUTLET IN GARAGE Valuation: $1,200.00 FEE SUMMARY Electrical-----> DRB Fee------> Investigation----> will call-----> 04/23/2OO2 DF Item: 05500 FIRE DEPARTMENT $50.00 $0.00 $0.00 Total Calculated Fees-> $53 - 00 Additional Fees----> So . 00 Total permit Fee__> S53 . 00 Payments------> $53 - 00 TOTAL FEEg-> S53 . OO BALANCE DUE--> S0 - 00 Approvals:Item: 05000 EL,ECTRICAI-, DEPARTMENI Action: AP CONDITIONSOF APPROVALCond: 12 (BLDG.): FIEI-,D TNSPECTIONS ARE REOUIRED TO CHECK FOR CODE COMPLIANCE. DECLARATIONS I hereby acknowledge that I have read this applicatioo filled out in fulI the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoninS and zubdivision codes, design review approved Uniforrr Building Code and other ordinances of the Town applicable thereto. REQI'ESISFOR INSMCTIONSHALLBE MADETWENTY.FOI,JR HOI'RSIN ADVANCE BYTELEPHONE AT{79-Z13S ORATOT]ROII'ICE FROM&M AM-5 OFOWNEROR CTOR FOR HIMSELF AND OWNET APPLICA PTED IF INCOMPLETE OR UNSIGNED Proiect #i ,/\/o,v€ Buifding Permit #' N6NE Electrical Permit #: _ 970-479-2149 (Inspections) INFORMATIOI{ mm{oFVtn 75 S. Frontage Rd. Vail, Colorado 81657 Electrical Contractor: -V/m,t,/ Ezez-r7z/<._ Town of Vail Reg. No.:/zt- r Contact and Phone #'s: t4orz,J/g*K,,,J - ?t9'6'tSU Contractor Siqnature: .\ /G, rq Uy-(*..--- COMPTETE SQ. FEET FOR NEW BUILDS and VALUATIONS FOR ALt OTHERS (Labor & Materials) AMOUNT OF SQ FT IN STRUCTURE:ELECTRICAL VALUATION: $ l, bo ,- Conbct Assessrc Offie at 970-328-8640 orvisit for Parcel # Parcef # (Required if no bldg. permit # is provided above) 2/O.g / / t{ /j O./S rob Name: /.*l*"* ptsroouo rob Address: Ze7 /3 6d.*,;/ Legal Description ll Lot: ll atock: ll riting:Subdivision: ownersNamez n* 4./6- llnooress: 2427 6 h.n,,-L ll ehone: 47g- gsgZ Engineer: ll Address:Phone: De^ite2m:'onorry): &#,, rr/<,--t a."4/; 6"^; WorkClass: New( ) Additionaffi--Remodel ( ) Repairp$ TempPower( ) Other( ) Work Type: InteriorlF<J Exterior ( ) Both ( )Does an EHU exist at this location: Yes ( ) No ( ) Type of Bldg.: Singlefamily ( ) Duplex 0{ Multi-family ( ) Commercial ( ) Restaurant ( ) Other ( ) No. of ExisUng Dwelling Units in this building:No. of Accommodation UniE in this building: Is this permit for a hot tub: Yes ( ) ruo fXt Does a Fire Alarm Exist: Yes ( ) ruo X)Does a Fire Sprinkler System Exist: Yes ( ) No OQ ***************************************FOR OFRCE USE ONLY************************************* Otlrer Fees:Date Received: DRB Fees:Accepted By: Planner Sign-off: F :/everyone/forms/elecperm J o c rum{0F Amendment to the 1999 N.E.C. Town of Vail Ordinance 10-1-6. o Overhead services are not allowed in the Town of Vail. o Underground services have to be in conduit (PVC) from the transformer to the electric meter, main disconnect o B switch and to the first electrical distribution circuit breaker panel. The main disconnect switch shall be located next to the meter on the exterior wall of the structure easily accessible. All underground conduits are required to be inspected before back-filling the trench. In multi-family dwelling units, no electrical wiring or feeder cables shall pass from one unit to another. Common walls and spaces are accepted. NM Cable (Romex) is not allowed in commercial buildings or structures exceeding three (3) stories. No use of aluminum wire smaller than size #8 will be permitted with the Town of Vail. TOWN OF VAIL ELECTRICAL PERMIT GUIDELINES All installations of eliterior hot tubs or spa's require a DRB approval from planning. This application will not be accepted without a copy of the DRB approval form attached (if applicable). If this permit is for installation of an exterior hot tub or spa on a new elevated platform or deck over 30" above grade, you must also obtain a building permit. If this permit is for installation of an exterior hot tub or spa on any existing deck or elevated platform, a structural engineer must review the existing condition and verify that it will support the added concentrated load. Please provide a copy of the structural engineers wet stamped letter or drawing with this application. If this is a remodel in a multi-family building with a homeowners association, a letter of permission from the association is required. u If this permit is for a commercial space, two (2) sets of stamped drawings are required. I have read and understand the above. If you have any questions regarding the above information or have additional questions, pfease contact the Town of Vail Electrical Inspector at97O-479-2L47. The inspector can be reached on Tuesday, Thursday and Friday mornings between the hours of 8am and gam. You may also leave a voice mailand the inspector will call you back. Signature HOW DID WE RATE WITH YOU? Town of Vail Survey Community Developmert Departnent Russell Forrest Director, (970)47e.213e Check allthat applies. 1. Which Departnen(s) did you contact? Building _ Environmental_ Housing Admin Planning DRB _ PEC 2. Was yourinitialcontactwifrr oursffiimmediab dow no one avaflable_? 3. lf you were required to wait, how long was it before you were helped?_ 4.Was your project reviewed on a limely basis? Yes / No lf no, why not? 5. Was this your first time to file a DRB app- PEC app Bldg Permit_ IUA Please rate fte performance of he staffperson who assisted you: 54321Name: (knor/edge; responsiveness, avallability) Overall effectiveness of fie Front Service Counter. 5 4 3 2 What is the best lime of day for you to use he Front Service Counter? 9. Any commenb you have which would allow us to better serue you next tirne? Thank you for taking the lime to complete this survey. We are committed b improving our sewice. o. 7. 8.