Loading...
HomeMy WebLinkAboutVAIL INTERMOUNTAIN BLOCK 4 LOT 6 COLUMBINE NORTH UNIT 2A.-T^ 'Krilten Fox' To: <SteveM@gscon@.com> lful <kfox6monrce-newel cc: <BradF@gs@n@.@m>, <anncdarby@yahoo.@m> ;fn l.com> Subject Re: ftaming issues -.at v 11relot20o4 o7:49AM I Prease respond to UWM-I"Kristen Fot'' IJp/ | -T'R\ ot\ -o €6 Steve, I In response to your framing issues belolrr Ng@ 1. (2) 2xO kings and (2) 2x6 trimmers is acceptable al these columns' Z. Wnat rr,outi you tiie reuiseO on the roof p6n, S3.5? The most recent set is the U25l03 CD set. lf you *ant it reviie<t, I need to knorv wfrich issues are required to be changed on there. You should have everything on I 112 x 1 1. ls that not sttfficient? 3. My not* say to use 16"' LVL ripped to 14 5l1d' at 1'4'' 4. This is a shear uaall and does riiuire plywmd sheathing on one side with 3' nail spacing at plyvtood panel edges. The plyumod can be on either side of the wall. lcisten ----- Original Message ---- From: DillonE-Mail To: Kristen Fox Sent Monday, November 29,2N42:21 PM Subject: FW: framing issues --€riginal ltlessage--- Flom: StereM@osconco.com [mailto:SteveM@gsconco.om] Sen$ Monday, Norember 29,2W4 2:20 PM To: dillon@monroe-newell.com SubjecG framing issues GEORGE SHAEFFER CONSTRUCTION COMPANY Steve Metcalf Phone (970) 476-0704 Fax (970) 479-2906 Hello Kristen: Kristen I am having some issues with the building Inspector here in Vail. They won't do a Sheetrock inspection until I hive these issues ansncrcd, So i uras wanting to kno,rr if you could help me out with a feur of the questions that the building Inspector has. (1) in the garage where the W16 X 31 ridge beam oomes dou/n b€t\,l'een Grids #6 & #7 and sets on ltp # -12" V.L. on Grid I on the south urall, On page S3.5 you have (4) - 2XG column? We,have #2-2e , king studs with #2 -?rti trimers on eacfr sideoflhe windorrrr, is this sufficient for that load? lf it is could you note this in your report. (2) Then the building Inspector r,riould like to be prwided with a revised roof framing plan (S3.5) (3) As discussed before on the garage roof framing with the BCI that coutd not be cut because of the rake 'aatl on Grid #9 ue all decid€d [o use 14" V.L.on 1'-4" centers because of the pitch of the roof and the rake rlall cirqlmstance, could you please note this in your report. (4) On gfd #5 and north of grid E, I believe that is a sheer wall and u/e will add plywoo<l totfie exterior udtt at lfris tocation, I cannot install plyvrood to the interior of the house because of size of the windorr jamb. lf this is sufficient could you note stis in your report. Thanks Steve Metcalf. '.71/22'12664 22159 97OSL?7272 Dillon E Mail PAGE 82/63 Pagc I of2 Frrml SbveM@ggconco.com Senh We&e$day, Nov€rnber 17.2004 9:20 AM To: Dillon@Monroe-Netrrell.com Subjcct: conctcte core GEORGE SHAEFFER COI{STRUCTION COUPA}IY Sscve Mstcdf Phonc (970) a76-0704 Fax (n 0\ 479 -2905 -Fo grdcd by Slevr: Melc.llrgrc on 11/1tr2004 0g:15 AM .- Delivery Failure Report Ycn r docurtgil: oonct€E cqc r€s .rot ddir€rad to: <O||lor€l.lonr!.-ilorrJ,co.n> . Eno. fi|rr&rrtra l(' T||.I.U9NROE NEWE|L.COM; 3lfIP Probccl Rshrncd r Prfi.na erot tt50 r,ntno,r'| urarDcc€r/r': <gliongMo lc$rbrdl,cfri' Itliat $hordd you do? a Yo, can r€aard trc t'|dGlivcnolc doqrrcnl b tha arrparitt Drtd !bo!G by cltoo*R fia Rasmd brdqr gr ur Rctcnd @rnrand on fla Adinrmc . . Onca yo{ lr.yc rtaa th3 docrmmt you nry ddab t'|I Oiirry Frl|tt Raoc.t a lt r.|lndhg ttlG docutFnt E nd $rocaatfu you rnl .acaivr a ncry aatrtc ,cpol|, a Urlc$ you rrciv. dr.. Drh,lry Falr? R6Dd!', tr. do6nl'tl rvra succa8tirry d.ilvtao lo !a dhcr t6cFlrf ltl- 8.doc*rFc ecd6c0oac To: <D0io6€lro,r1t.l.b||ll.o0n> 6. orb: 08;5940A11Tcdry OllbFd' co'rc'cl' ccc GEORGE SHAEFFER COI{STRUCNOiI COSPATY Stcve Metcalf Phonc (970) 47&0704 Fax (970) 479-2906 Good Moming Krbtcn: Kristen, I nced to saw cut a square opening bcween gnd 4 and 4.1 in line rvith grid l{. lo accesg lhe nlr712004 ,.tll22t2o64 22i59 97A51.3727?PAGE 63/83 Page 2 of2 4l flutnbing for the hot tub. The access needsto be 27"x27". the to9 ot the saw cut wil be 2O 'lf2 dowrr hom ths top of coflcrete and 12, from ttxr stone ledgc et gdd 4.1 W l this dintnsions bo OK? il(2) oo pago S3.2 GitdG, we havo a trx 5" aqrle iron 0rct.ims thc enLre inlile ol he foundation, We have ptecad the noor iosls on to9 of thc 5'x fl angle iron wilh Hod<ing b€{weefl 0le floor ,ioists. with bp frage Fbts harqec on fie sEel bcam W t6 x 36st grid E. On lidhe? rcvicw I have notbed rhat wc trave lhe lbor ioisb ot 1 6F cefltcn. You hane thqn on 1 " c€ntcrs, Wotat the I 6' corriErs be sulficient for ilre lloor loao at the livhg roor||. Could you Plcase let me know. Thanks Sleve Mctcalf. Wh#W,2tM"H,noT 0g{rt'rlt"^r-,*lfrrtdWin un +tnr CanUwk Wnl,( ls Lbil& eLl<'tiT rytfu +inu if i.> q^ AMI/.4 0F4i(\ 4d of,,uiut is ok.frw ad[':?fuve$aLtt q,^ir-'r+ Mytr A,Wrz-rU- a#f ,tL, l+ ru utu otlb{o.c-.,'6a&rya?fu +n lBLo, fr.n o,+++tL Lina?1 r@u-.OTt. artrd deeA fie* Cde 'r,ail"ot"Ws,M 'r\rlt{ huw /a Wr17a d.t{Wfirt", 'XJ'r*n W t* %;6A"W,u Ule Vwwand-\4^!- nt^lw4L ol ietes {i^-u+{,u, 6tA-M'. Wa*'c;u A;.'*Cdfr*-^@!*{ %'*yJff* a,r.ra'-q +tc, Ca^g E Vet^=ol+]5-t*t*" oew ,^fi* *hz€il"S+h 4w Y;;;asi;l -\Y ie *vuc*t'uatJtr4 . ^a"que$€ W r|Vtr"U \\-Lb-ryrv17ta004 TOWN OF VAIL DEPARTMENT OF COMMUMTY DEVELOPMENT 75 S.FRONTAGEROAD VAIL, CO 81657 970-479-2138 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES DEMO. OF PART/ALL BLDG. Permit #: D04-ml9 Gocr- 6101 JobAddress: Status...: ISSUED l,ocation.......: 2831 KINNIKINNICK ROAD, BLDG 'A', UMT 2 Applied . . : 08124120{J4. Parcel No....: 2lO3l43MW2 Issued. . . : 08l3Ol2W4 Project No . : ?? jg16c1 _O( S0 Expires . . .: 0212612ffi5 owNaR McIrEjAtrI, GOR.DON A. & HEIDI p.O8/24/20O4 phone: 31218 WHISTIJER CT EVERGREET{ co 80439 I_,icense: CoNTRACTOR A & rr ABATEMENT 08/24/2004 phone:. 303-475-3576 6732 WEST COAIJMINE Al/E #443 IJITTIJETOII, CO 80123 License: 155-S APPIJICAIIT A & t ABATEMENI O8/.24/2OO4 Phone: 303-475-3575 5?32 WEST COAIJMIIIE AVE #443 IJITTIJETON, CO 80123 Li.cense:165-S Desciption: ADD ONE WINDOW Occupancy: Type Construction: Type Occupancy: ?? Valuation: $1.775.00 Fireplace Infonnrtion: ResEicted: Building---> 563.15 Restnrant Plan Review-> Plan Check-- > $41. 05 DRB Fee----------> AddSqFt: 0 # of Gas Appliarres: 0 f of Gas t gs: 0 # of Wood Pelles 0 FEE SUMMARY so. 00 Toal Calculated Fecs- > 5L27 .2o S2o. 00 Additional Fee's---->s0.00 SO. OO Tobl Permit Fee---- > lI27 .2O s0.00 PaynEn6------- > SL27.2O InYestigarion- > Will Call--- > S0. 00 Rccrestion F€€---.-.--> 93 . 00 Clc{n-up Depo6it-----> TOTAL FEES---------> St21 .20 BALANCE DUE------- >$0 .00 *ar*tl.'l*l*'ttt*a'lt Approvals: IIEM: O51OO BUIIJDING DEPARITI{EI{'T o8/2s/2oo4 Lc Action: DN o8/3o/2oo4 Lc Action: AP Item: 05400 PIrAL{NING DEPARTMENf Item: 05600 FIRE DEPARTMENI o8/25/2oo4 mvaughan Action: DN site plan required O8/3L/2OO4 mvaughan Action: AP Item: 05500 PI]BIJfC WORKS trta*t***1*i**tttt,tttttitttttttatl See page 2 of this Document for any conditions that may apply to this permit. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information requrred, completed an accurat€ plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to cotrply with all Town ordirunces and $tate laws, and to build this stnrchre according to tbe towns zoning ard subdivision codes, design review approved, Unifomt Building Code ard other ordirunces of the Town aplicable tber€to. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOLJR HOURS IN ADVANCE BY TELEPHOM AT 479-2149 OR AT OLJR OFFICE FROM 8:(X) AM - 4 PM. SIGNATURE OF OWNER OR CONTRACTOR FOR HMSELF AND OWNEI PAGE 2 **'f*!t.*,.*******:**'t*'}'|**'i**:*:t*****'*:|.*'|.**:t:t'|!8****:t**'f't*x.lt**{.****{<*{.***!t.****'t:8:*{.*{.***:8:t:F*:t:t:8;t****** CONDITIONS OF APPROVAL Permit #: D04-0019 as of 03-23-2005 Status: ISSLJED ********:t******{.***rf *:t*!t*************!t*!t(******'t*****1.****t *****1.***,e*!t*!**!t*:t ***x<*******:t *********:t*****:t Permit Type: DEMO. OF PART/ALL BLDG. Applied: 08124120M Applicant: A&LABATEMENT Issued: 0813012004 303-475-3576 To Expire: 0212612005 Job Address: Location: 2831 KINNIKINNICK ROAD, BLDG 'A", UNIT 2 Parcel No: 21031430f[{J2 Description: ADD ONE WINDOW Conditions: Cond: 38 (BLDG.): THIS PERMIT IS GOOD FOR ASBESTOS ABATEMENT ONLY. AN ASBESTOS ABATEMENT CERTIFICATE SHOWING THE AREA FREE FROM ASBESTOS IS REQIIRED PRIOR TO ANy FURTHER WORK occuRING oN THIS SrTE. rF FT.JRTHER QUFSTIONS ARISE, CONTACT THE VAIL FIRE DEPARTMENT AT 479-2250. Cord: I (FIRE): FIRE DEPARTMENT APPROVAL IS REQI.JIRED BEFORE ANY WORK CAN BE STARTED. Cond: 12 (BLDG,): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. APPUCTI:IOil WILL TOT IE A@EPTED IF I'ICOTTIPLETE OR Frrcct f:- o.Eo Bulldlng Pennlt #: ArDfibr Prnnlt*: RECEIVET] ':ii. / r;$ 75 wlll^tot bc affipted wldroutdle qrG9srng: I detalb of aba disabling of tln nanrcs ard @ntact vrlste lo.d out arca exlung plans lbr ttE drpants d the struchJre in unafrected areas, * gt 63:,LlsO 6oo\,rrrr A,tt lrlrvI *63t t4 t Jobt{amer ,fuoLan B#A R<r*clel o,*d1o< a(d\,ot*^ 6f ,t*t b'r'aonr nrronnt*rcmOs: LlneilFeeu- Squa.cf* //.q 5s/GalDrums: Workdass: New() Addtlon( ) Retnoddff Rmalr( ) Demo( ) Other( ) Ecerior( ) Bott( ) dlb at92&, TeKlt- Dtf,4to;;;;;;..-;ii..*..*pgR oFFIcE usE oI{LYrr**}r*t"'*'trtr..'tt't'**rf 't"*'t l;l ) €,ap;,</ r wiltrLrlrr{-rl tf'lPM<tPFf HnS\AqEEPERM.OOC 07n612fi2 $S A&LAbrament' IIC 3111WHamPden Ave Eng[ewood CO 80110 Office 303419-1254 Far 303-761-9488ArtErrfturrll|dlr- facsimile transmittal Mr- Dorrir Flores 9'N.479'24s2 AcodcCaAtm Argrtd23,2m4 Norce: Please f€el ftee to call with any qucstions regrding this fax' 30}4.19-125/. Bcnnie CarnPton AEdL Abatement I,LC a 3 ircludhgcowrAbatetr.ot }lcl*rn reridence trF Euh, trPbecqrnnt trPh-FdY trPL-Rqlb a V€-q-rn*rQ - Q. ats - lryr.^)r4^ 4 ,""1 1 ?rf.- llan5t.--' ^. i"" n+;..^ 22-Oc.-04 Town of Vail Department of Community Devclopmcnt 75 South Frontage Road Vail, CO 81657 RE: Permit#E04-0153 Orlginal Permit issued to Choics Electric PO Bot( 1767 GYPtum CO 81637 Llcense 29FE To whom it may mncern, Cholce Electric is unablc to do thc work for thls Job due to hoepitalization. Per attached nott on the permlt, please transbr the permlt to: Dave Peterson Eleclric lnc PO Box 711 Edvvards CO 81632 Uccnse: 119-E /\inceretV,rdvid, P.O. Bcx 7ll i Edwards, Colorado 81532 + Tel' (97o) 9264140 i Fax (970) 92U626 0!T 2 8 luii lu}t@ffinal/. ra 39vd lc3-'t3 NoslEt_3d SAVC 9Z9i9Z6AL6r et:gr iaszlzzlqr MRY-19-a@ e3:34 FRO{:BRt)$l MILIN CO.FTRl.rc XA*I%947 '@ BROWN-WOLIN CONSTRUCTION, INC. GE'{ERA' *,#ffit?tc BESHI ro,..ru.ro*. REMoDELS, PRoPERlY,"iffi sffi;ffi?8g;rRt grot',t TO.47%15?P:1 /of*/oLl A^, *r '. qn-"1{52'p.'- Eo44l53 RECEIVHD OCl:;ir' , TOV-COM.DEV.D--Tou BV.W, flt* .lq* .r* l,*,t / tL 4' '7+(+) /*^/l"J,d*uf "' g*Tl".J, /,J TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT 75 S.FRONTAGEROAD VAIL, CO 81657 970-479-2138 NOTE: TIIIS PERMIT MUST BE POSTED ON IOBSITE AT ALL TMES DEMO.OFPART/ALLBLDG. P€rmit #: D04-0019 JobAddress: Status...: ISSUED Location.......: 2831 KINNIKINNICKROAD, BLDG'Au, UNIT 2 Applied. . : 08/24/2004 Parcel No....: 210314306002 Issued. . . : 08/3012004 ProjectNo.: ?? ?Gso(-ots<) Expires...: 02/2612005 OWNER MCI,EAN, GORDON A. & HEIDI P.O8/24/2004 Phone: 31218 WHISTLER CT EVERGREEI\Ico 80439 License: CONTRACTOR A & IJ ABATEMEI{T 08/24/2004 Phone: 303-475-3576 5732 WEST COAI,MINE AVE #443 I-,ITTLETON, CO 801_23 License: 165-S APPLICANI A & L ABATEI.{EIiIT 08/24/2004 Phone: 303-475-3576 6732 WEST COAI,}ITNE AVE #443 I,ITTIJETON, CO' 80r_23 I-,icense:155-S Desciption: ADDONEWINDOW Occupancy: Type Constuction: TypeOccupancy: ?? Valuation: $1,775.00 Fireplace Infomntion: Restricted:f ofGas Appliances: 0 AddSqFl 0 # ofGas Logs: 0 # of Wood Pellel: 0 FEE SITMMARY rt.1:traaat.::r:t.r.t.lt.*t*:..:r*tttl.*aat*.'rt:]'*....r.r. S0. 00 Totsl Calculated Fees-> SL27 .2O $20. 00 Additional Fe€s------> S0 ' 00 S0. 00 Total P€rmit Fee-----> 5127 .2o Building----> Plan Check--> Investigation-> Will Call----> 563 . 15 R€stuaranl Plan Review-> $4L.05 DRBFe-----._----.> $o ' oo ft6qr€atior F'ee"-_-----'> 53.00 Clcan-upDepo6it------->$0.00 TOTAL FEES-----> Sr21 .20 BAI^ANCE DUE------->s0.00 *t ta{.atat tt*t+t'taat I'a't'tatr't'at aa,tta'trtaa *'aa t'ttt ata't*aata'ti'taa t'a'tI Approvals: IEen: 05100 BUIL,DING DEPARTMEIiIT 08/25/2004 Lc Action: DN 08/30/2004 Ic Action: APltem: 05400 PLANNING DEPARTMEI\IT Itern: 05600 FIRE DEPARTMEbIT 08/25/2004 mvaughan Action: DN site plan required .'-!*:-.-0.?-?9-9..lJ.llI-9-.T91Tf|.r.'1.|.|...|...t.....,l.|'....*r:r1.:|||'.l|l.*.*.''l::| See page 2 of this Document for any conditions that may apply to this permit. DECLARATIONS I hoeby acknowledge that I have read this application, fillod out in frrll the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this stRrctu€ according to the towns zoning and subdivision codes, desip rwiew approved, Unifomr Building Code and other ordiaances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOI.'RS IN ADV 47$2 149 OR AT OUR OFFICE FROM 6:00 AM - 4 PM. SICNATTJRE OF OWNER OR CONTRACTOR FOR HMSELF AND OWNER PAGE 2 't:}l.**,i't*'t|.***!t*!t*'t*{.,}*'r*++{.|t'tlt**'|''tt**f:f*'t*:}:t***!*{t'}:}*'t***:t'|,}'}'l****+****** CONDITIONS OFAPPROVAL Permit#: D04-0019 asof08-30-2004 Status: ISSUED *'t*,t,|*'f****,}*,t:tl+*'}:|'!t*'t*****+|*t**'}'t**t*|'t't|*t:t***t}*,t**:i*****,t!t|'}***'t*|'}f,t*,***!**,|,t,}|t't,}'},}!l{t,Ft*i Pennit Type: DEMO. OF PART/ALL BLDG. Applied: 08/24/2004 Applicant A&LABATEMENT Issued: 08/3012004 303475-3576 To Expire: 02/2612005 Job Address: l.ocation: 2831 KINNIKINMCK ROAD, BLDG "Au, LJNIT 2 ParcelNo: 210314306002 Description: ADDONEWINDOW Conditions: Cond:38 (BLDG.): THIS PERMIT IS GOOD FOR ASBESTOS ABATEMENT ONLY. ANASBESTOS ABATEMENTCERTIFICATE SHOWING THE AREA FREE FROM ASBESTOS IS REQLIIRED PRIOR TO AI.IY FURTIIER WORK occuRING oN TIIIS SITE. IF FIJRTI{ER QT.JESTIONS ARISE, CONTACT THE VAIL FIRE DEPARTMENT AT 479-2250. Cond: I (FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY WORKCANBE STARTED, Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQIJIRED TO CHECK FOR CODE COMPLIANCE. ++++t*****a**++*++***********t***f,tt***+****a*********a*+at**********t+*+*++++**+**+t*+***** TOWNOFVAIL, COLORADO Statement ******+**+*'t+**+**+*+*++++*t**i*****ttil:t++'i*++'l'tl'f***+***++****************tl.l.**+***'l'i***** Statenent Number: R040006537 Arnount: St27.2O O8/3O/2O04O4:03 PM Pa]'menE Method: Check Init: DDG NoE.atsion: Brown wo1in8772 Permit No: Parcel No:Site Address : Location : This Payments: D04-0019 T14)e: DEMO. OF PART/ALL BLDG. 2103143 0 5002 2831 KINNIKINNICK ROAD, BLDG 'A., UNIT 2Total Fees: $t27.2O Totsa1 Ar-,L Pmtss : Balance : BUTLDTNG PER"T{IT FEES DESTGN REVIEW FEES PI,AN CHECK FEES WILI.J CAIL TNSPECTION FEE >tzt.zv sL27.2O $0.00******f+++flttf**'}r*'}a********t+*++'lt+t!t**+l'l't+****+++*+*fl***+*a***++++t+*r********++*++*+** ACCOIJNT ITEM LIST: Account Code Descript.ion Current Pmtss BP DR PF wc 00L00003111100 00100003112 2 00 0 0100 0 03 L12 3 00 0 010 00 03112 80 0 o5 .l-f, 20.00 41 .05 3 .00 TOWN OF VAIL DEPARTMENT OF COMMUMTY DEVELOPMENT 75 S.FRONTAGEROAD vArL, co 81657 970-479-2138 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TMES ADD/ALTMFBUILDPERMIT Permit #: 804-0209 Job Address.: Status.....: ISSITED Location......: Columbine North Condos unit A Applied...: 08lll/2004 Parcel No....: 210314306002 Issued ...: 08/30/2004 Project No...: ? RSott-6 t66 Expires...: 02/26/2005 OWNER MCLEAN, GORDON A. & HEIDI P.O8/]-1/2004 Phone:, 31,21,8 WHTSTIJER CT EVERGREENco 80439 I-,icense: CONTRACTOR BROWN-WOLrN CONSTRUCTION 08/1,1/2004 Phone: 970-949-4186 P.O. BOx 701 VAIIT, CO 816 s8License: 1-00-A APPLTCANT BROhIN-WOLTN CONSTRUCrION 08/LL/2004 Phone: 970-949-4185 P.O. BOX 701 VAIL, CO 81,65 8License: 100-A Desciption: Redo existing 6'x8'bathroom, r€place bathtub, with steam shower Add an exterior window in shower area Occupancy: Rl Multi-Family Type Constuction: V l-HR Type V l-Hour Type Occupancy: ?? Valuation: $16.000.00 Fireplace Information: Restricted: Building---> 5265.25 Restuarant Plan Review-> Plan Check--> SL72 .4L DRB Fee*-.__--__> Add SqFt 0 # of Gas logs: 0 # of Wood Peller 0 FEE SIIMMARY r'*.raa*t'**t*t.rrttl*:l*t*tr*t*r,t*ra.t'r+rta*'t**a'r****,|*t..:.:i:r:3*r S0 . 00 Totat Calculated Fees-> 5440 ' 66 S0.00 Additional Fees-------> S0 . 00 S0. 00 Total Permit F€€------> 5440. 66 50.00 Paymcnts-----------> $440.56 # ofGas Appliarces: 0 Investigation-> W'll Call---> S0 , 00 Recrration Fee--------> 53.00 Clean-upDeposit------> TOTAL FEES_.-_..-> 5440.66 BALANCE DUE_-._.>s0 .00 Approvals: Item: O51OO BUILDING DEPARTMEIiIT 08/19/2004 cdavis Action: COND No plans subnitted for review.Make note of conditions listed under this permiL Item: 05400 PLANNING DEPARTMEI{T Item: O55OO FIRE DEPARTMENT Item: 05500 PUBI-,IC WORKS *t*:}*':l,t|..'|*.*i'l.l..:l*|'l'l:t'||'.',tt'|.*'t|t...|*.*..'.tr'.ll'tt|l'+|*..|*****ait'.r*'t.||*.!|l.ll.l*l'||'t1*.*|* See page 2 ofthis Document for any conditions that may apply to this permit. DECLARATIONS I her$y aclcnowledge that I have read this applicatio4 ffllcd out in full the information required, completed an accuraie plot plan, and state that all ihe information as requircd is concct. I agrce to comply with the information and plot plan, to comply with all Town ordinances and starc lawe, ed to build rhis structurc accorditrg to the toms zoning and subdivision codcs, desip review ryrovd Uniform Building Codc md othcr ordinancee of the Town applieable thercto. REQUESIS rcRNSPECTTONSt{ [L BE MADE TWEt{Ty-SrOrJR HOTJRS tN ADV SIGNATTJRE OF OWNER. OR @NTRACTOR FOR HIMSELF A}.ID OWNER PAGE 2 ,|'f*!t*'*'t't:*{.**'}t*:t*'t:|.*'}'}'}**!t*'}****'|'3********:},|**'*'t*'}|,t**i!t+**'t**d.t{t***,t**'*lt,t:}******** CONDITIONS OFAPPROVAL Pennit#: 804-0209 asof08-30-2004 Status: ISSUED +*+:|t:f'f'f'}'t:t'l'}'t'}:|.***:+'|'*,it'|t***'t'}***t'}!t****'t*:lt*:}'t'}*{.'}'}*'}'t**t**!**|}'t********* Perrnit Type: ADD/ALT MF BUILD PERMIT Applied: 08/ll/2004 Applicant: BROWN-WOLINCONSTRUCTION Issued: 08/30/2004 970-949-4186 To Expire: 02/26/2005 Job Address: Location: Columbine North Condos unit A ParcelNo: 210314306002 Description: Redo existing 6'x8'bathroom, replace bathtub, with steam shower Add an exterior window in shower area Conditions: Cond: 12 (BLDG.): FIELD INSPECTIONS AREREQLIIRED To cHEcKFoRCODE COMPLIANCE. Cond: 14 (BLDG.): ALL PENETRATIONS IN WALLS,CEILINGS,AND FLOORS TO BE SEALED WITII AN APPROVED FIRE MATERIAL. Cond: 16 (BLDG.): sMoKE DETECTORS ARE REQUIPSD IN ALL BEDROOMS AND EVERY STORY AS PER SEC.310.9.1 OF TIIE 1997 UBC. Cond: CON0006628 Safety Glazing required in new window at the bathroom if located as part of the shower or tub enclosure. 1 997 UBC section 2406. Mechanical ventilation shall be required if window is not operable. 1997 LJBC section 1203.3 All wall assemblies shall be l-hr fire-resisitvre construction 1997 LJBC table 6-A Shower enclosure diameter shall be not less than 900 square inches of interior cross sectional area and not be less than 30" dimension 1997 IPC section 417.4 shower waste outle shall be 2" in diameter 199? IPc section 417.3 New exterior window shall ahve struchral drawing for opening PRIOR to a framing inspection a*******llfla*******flt*+'il'+**+*+**f***++++f*t+**+t+{r**{'****f+tfa****ar************'rr***r*** TOWNOFVAIL, COIORADO Stat€m€Nrt **f*l****f**fff+ff|t**l*t*l*f***:t++l'**+*****aaa*++*********t**t+++++*++***ta*a++***+********* Staternent Number: R040005535 Anount: Pal'ment Method: Check Construction 8?50 S440. 55 08/30/2o04o3 :50 PMIniI: DDGNotation: Brorrn-wolin Permit No: Parcel No:Site Address : Location : This Payment: B04-0209 21031_4306002 Colurnbine North I\4)e: ADD/ALT Ur BUIL,D PERMIT Condos unit A Total Fees: 5440.66Total AL,L Prnts: $440,66Balance: S0.00 s440.65 ******t***************+++***+{''}lt*'l***l****t***a+*****+a***:}+**'t:}****af+*********t1**+*++tf+ ACCOUNT ITEM LIST: AccounE Code Description Current Pmts BP .v! wc 0 010 00 0311110 0 00100003112300 00100003112800 BUILDING PER}4IT FEES PIJAN CHECK FEES WILI, CAI,I, INSPECTION FEE 265.25 L'|2 .4r 3.00 4{D'y NWtl0FYt tl -algo Building Permit #: Separate rt ffi75 S. Frontage Rd. Vail, Colorado 81657 ^Y AK l\.-nt* C O NTMCT oR I NF"o R MAT IoN General Contractor: Brown- (ilol,n C,*t,To Town of Vail Reg. No.: /oo-A Contact and Phone #'s: EoA Bron ?'/1 -L//8 C contractor sisnature: //UJ k 6ir* coM PLETE VALUATIONS FOR BUITDING PERMIT (Tabor & Materials BUILDING: $ 12,000 -00 ELECTRICAL: $ /, 0OO.oO OTHER: $ PLUMBTNG: $ 3,000.,d0 MECHANICAL: $rorAl: S / 6, Oo0. OO Parel# at 03lt/56 (oo>- (application will.not be accepted without parcel number) JobName: ,MeLu" B"YA Peryadr/Job Address: a83/ P., nntk, nicQ Pd-k}l_.A._ i",* z E rl<r ,rr*,1"^ , wrs Uo"( Subdivision: j,.,,lw,,. 114 4 6!e, t, $u#t' n",l; 7lacla w Detailed description of workl R<do eVtitnl 6 +t \E Pf bntA.rooir. - P'-pia.t z+,tqfn7 ["fA*aLrnt*], Eteo,n. thcact. All cyter,+ wrrd*, in sAowq 4v4 (5e< D,Rel4O^r"r4\ ) - ' WorkClass: New( ) Addition( ) Remodel (\,ll) Repair( ) Demo( ) Other( ) Does an EHU exist at this location: Yes ( ) No ( )WorkType: Interior( ) Exterior( ) Both Type of Bldg.: Single-family ( ) Twa.family ( ) MultFfamily (!f Commercial ( ) Restaurant ( ) Other ( ) No. of Accommodation Units in this building:No. of Existing Dwelling Units in this building: NoML Does a Fire Sprinkler System Exist: Yes ( ) NoDoes a Fire Alarm Exist: Yes For Parcel # Contact Ie Coun Assessorc Office at 97O-328-8640 or visit I deurdq.**************************************FOR OFFICE USE ONLY************************************** of Construction: Date Received! Planner Siqn-off: F:/everyone/forms/bldgperm '^ffi 16o "t Questions? Call the Building Team at 479-2325 trvr D a o v,/ tr B tr o o o D D tr blII{l\tl\l NI\l $|.'fl{ltl'-a.l\l 5l \ \ I0l{,'N Department of Community Development Project Name:A" /*un B.:,?A ?" *olel Project Address: ?p).B/l.!n,t2 A/n^"" Alarlh Anlos PvSw ,- t^ltZf t/oi( r' This Cheklist must be ompleted heforc a Building Permit appliation is acepted. All pages of application is complete Has DRB approval obtained (if required) Provide a copy of approval form Condominium Association letter of approval attached if project is a Multi-Family complex Complete site plan submitted A,rt* Public Way Permit application included if applicable (refer to Public Works checklist; //* Staging plan included (refer to Public Works checklist) No dumpster,parkino or materiat storaoe allowed on roadwavs and shoulders without written aporoval No n<_ Asbestos test and results submitted if demolition is occurring Architect stamp and signature (All Commercial and Multi family) Full floor plans including building sections and elevations(4 sets of plans for Multi-Family and Commercial) Window and door schedule I nr,.t "^ytw,* t^tnJr"t (r.r, bnl Aff **!)rv -/Full structural plans, including design criteria (ie.loads) Structural Engineer stamp and signature on structural plans (All Commercial and Multi Family) Soils Report must be submitted prior to footing inspect ion N A Fire resistive assemblies specified and penetrations indicated Smoke detectors shown on plans I dev,ig n, n4* k^l Types and quantity of fireplaces shown g6 FvtT(qa,,'hntr - I Applicant's Signature: Date of submittal: F: /everyone/forms/bldperm2 Received By: 6ilf$/"J NVNMY HOW DID WE RATE WITH YOU? Town of Vail Survey Community Development Departnent Russell Fomst Director, (970) 479-213s Check alf that applies. 1. Which Departnent(s) did you conhc0 Building _ Environmental_ Housing_ AdminPlanning DRB PEC _ 2. Was your initial contacl witr our staf immediate_ dow _or no one available ? 3. lf you were required to wait how long was it before you were helped?_ 4. Was your project reviewed on a timely basis? Yes / No lf no, why not? 5, WasthisyourfirsttimetofleaDRBapp_PECapp_ i Bldg Permit- l.UA ! ' 6. Please rate the performance of fie staffperson who assisted you:54321Name: (knowledge; responsiveness, availability) 7. Overall efiectiveness ofthe FrontService Counter. 5 4 3 2 t 8. What is the best time of day for you to use fte Front Service Counter? 9. Any comments you have which would allow us to better serve you nexttime? Thank you for taking the lime to compleb this survey. We are convnitted b improving our service. WHEN A'P,uBLrC *y:rr"rr" rs REQUTRED Nour- /rr* //46"* PLEASE READ AND CHECK OFF EACH OF THE FOLLOWING QUESNONS REGARDING THE NEED FOR A "PUBLIC WAY PERMIT": Is this a new residence? YES ruo)- Does demolition work being performed require the use of the Right-of-Way, easements or public propefi? YES NOJ.- No)/-Is any utility work needed? YES Is the driveway being repaved? Is any drainage wo.rk being done that affects the Right-of-Way, easements, or public property?YEs_ NoA- Is a "Revocable Right-of-Way Permit" required? -of-Way, easements or public property to be used for staging, parking or fencing? NOX x If answer is NO, is a parking, staging or fencing plan required by Public Works?YES_ NO__\l_ If you answered YES to any of these questions, a "Public Way Permit" must be obtained. "Public Way Permit" applications may be obtained at the Public Work's office or at Community Development (a sample is attached). If you have any questions please call Leonard Sandoval in Public Works at 479-2t98. I HAVE READ AND ANSWERED ALL THE ABOVE QUESTIONS. Is the Right YES Btu-- fuo/,^ (^'/. >^- @ntractor Signature Job or project u"nru, /W L u ^ {3'*A ro^',', l?o,r* /"/ Date sisned: b />a /a'/ Nov Is a different access needed to the site other than the existing driveway? YES Noz- F :/everyone/forms/bld permq Company Name PUBLIC WORKS AND THE PUBLIC WAY PERMIT PROCESS How it relates to Building Permits: Fill out the attached check list with the Building Permit Aoplication. If yes was answered to any of the questions then a "Public Way" permit is required. You can pick up an application at either Community Development, located at 75 South Frontage Road or Public Works, located at 1309 Elkhorn Drive. Notice sign-offs for utility companies. ALL utilities must field verify (locate) respective utilifies prior to signing application. Some utility companies require up to 48 hours notice to schedule a locate. A construction traffic control/staging plan must be prepared on a separate sheet of paper. An approved site plan may also be used. This plan will show locations of all traffic control devices (signs, cones, etc.) and the work zone, (area of construction, staging, etc.). This plan will expire on November 1st and will need to be resubmitted for consideration for approval through the winter. Be aware that your resubmission for winter may be denied depending on the location of construction. Sketch of work being performed must be submitted indicating dimensions (length, width and depth of wor(). This may be drawn on the traffic control plan or a site plan for the job. Submit completed application to the Public Workt office for review. If required, locates will be scheduled for the Town of Vail electricians and irrigation crew. The locates take place in the morning, but may require up to 48 hours to peform. The Public Work's Construction Inspector will review the application and approve or deny the permit. You will be contacted as to the status and any requirements that may be needed. Most permits are released within 48 hours of being received, but please allow up to one (1) week to process. As soon as the permit is approved, the Building Department will be notified, allowing the "Building Permit" to be released. Please do not confuse the "Public Way Permit" with a "Building Permit", ) NOTE: The above process is for work in a public way ONLY. Public Way Permits are valid only until November 15th. A new Public Way Permit is required each year if work is not complete. Re-application each November 15th does not mean an automatac renewal. I have read and underctand the above. Signature F:/everyone/forms/bldperm5 Date Signed BUILDING PERMIT ISSUANCE TIME FRAME If this permit requires a Town of Vail Fire Department Approval, Engineer's (Public Works) review and approval, a Planning Depaftment review or Health Department review, and a review by the Building Department, the estimated time for a total review will take as long as three (3) weeKs. All commercial (large or small) and all multi-family permits will have to follow the above mentioned maximum requirements. Residential and small p@ects should take a lesser amount of time. However, if residential or smaller projects impact the various above mentioned departments with regard to necessary review, these projects may also take three (3) weeks to review and approve. Every attempt will be made by this depaftment to expedite this permit as soon as possible. I, the undersigned, understand the plan check procedure and time frame. I also understand that if the permit is not picked up by the expiration date, that I must still pay the plan check fee and that if I fail to do so it may affect future permits that I apply for. Asreed toay: il..wh Srourr- | Beow^ 'hlt l'* 6"*'V'*printffi Project Name:AtL"o^ &*,rnu.'. (?'e*oJ"( " ox", L/>a/o/ Signature F: everyone/forms/bldperm3 PW*:T N'N T T T APPLlcArloN parcer#:Inf ['ItI'nf 'III,(th FOR TOWN OF VAILpuBucwAypERmr le- Brds. Permito,E I I-! [ I n Tgr{ryffitt Job Namo Str€€t Addresg I ln n-n (llunknowncall t"J LJ LJ I | 479_2138 ext.o) 1. zipCity Phone # 4. Starl Date Work is for lckcte onel Complelion Dale Water Sewer Gas Electric (P6rmit Explration Dato) Telephone CATV Landscaping Temp. Site Access Other 5.Trench-width (min,4') Bond Amount $ ALL MATERIAL, EQUIPMENT, AND TRAFFIC JOB IS STARTED. 7.Rubber out-riggers are required on Asohalt surfaces underneath the A signature below indicates a signatures are obtained, permittee necessary Town of Vail signatures. BE ON THE JOBSITE BEFORE THE working on asphalt. at all times. utility locations and approvals. Once all utility company application through the Public Works ofiice to obtain the up to one week to process, Depth Total SF $ Total LF $ Permit Fee Total Permit Fee $ Public Service Nalural Gas Group (1-800-922'19871 Public Service Company (1 U.S. West (1 -800-922-1 987) o 10. 11. 12. TCI Cablevision of the Rockies (1'800-922'1987) Eagle River Water & Sanitation District (970-476'7480, ext. 114) Holy Cross Electric Company (1.800'922'1987) Town of Vail Electricians (970-479'2158) Town of Vail lrrigation (970'479'2158) Town of Vail Public Works Construction Inspector (970'479'2198) THERE WILL BE NO TOTAL STREET CLOSUREST A construction traffic control plan must be approved by the Public Works Department prior to issuance of the permit' All excavation must be done by hand within 18" of utilities - (Senale Bill 172)' pennittee must contact Public Works Departm€nl at 479-2198 24 hours pfior to commencing of work. Failure to notify ttre Town witl result in forfeiture of bond money. Scheduled inspections which are not ready may result in the Town charging the contractor a reinspection toe. I certify that I have read all chapters ot Title I - Public Ways and Property, of the Vail Municipal Code and all utilfi company agreements, signed by me, and will abide by the same, and that all utilities have been notified as required. ATTACH PLAN OF WORK,INCLUuNG CONSTRUCTION TRAFFIC CONTROL PLAN show streets with names, buildings, and location of cuts. usE DASH LINES FOR CUT. white - Public Works Yellow - Contractor DMINAGE AND CULVERT INSPECTIONS ARE REOUIRED BY PUBLIC WORKS! Please read and check off each of the items below: q The Town of Vail Building Department has developed the following procedures to ensure that new construction sites have adequately established proper drainage from building sites along and adjacent to Town of Vail roads or streets. The Town of Vail Public Works Department will be required to inspect and approve drainage adjacent to Town of Vail roads or streets and the installation of temporary or permanent culverts at access points from the road or street onto the construction site. Such approval must be obtained prior to any requests for inspection by the Town of Vail Building Department for footings, temporary electrical or any other inspection. Please call Leonard Sandoval at 479-2t98 to request an inspection from the Public Works Department. Allow a minimum of 24 hour notice. o Also, the Town of Vail Public Works Department will be approving all final drainage and culvert installation with resulting road patching as necessary. Such approval must be obtained prior to any Final Ceftificate of Occupancv issuance. Agreed to by: A A Print Name Project Name: Date Signed: F:/everyoneforms/bldperm6 Signature Please read and check off each of the items below. (Copies of complete text are available upon request) CODE 5-2-10: DEPOSTTS ON PUBUC WAYS PROHIBITED D Unlawful deposits: Subject to subsection C thereof, it is unlawful for any person to litter, track or deposit, or cause to be littered, tracked or deposited, sand, gravel, rocks, mud, dirt, snow, ice, or any other debris or material upon any street, sidewalk, alley or public place, or any portion thereof. tr Notice; Abatement: The Director of Public Works may notifu and require any person who violates or causes another to violate the provision of subsection A hereof, or who has in the Director's employment a person who violates or causes another to violate the same, top remove such sand, gravel, rocks, mud, dirt, snow, ice or any other debris or material within twenty four (24) hours after receipt of said notice by the Director of Public Works, In the event the person so notified does not comply with the notice within the period of time herein specified, the Director of Public Works, or other authorized agent, may cause any such sand, gravel, rocks, mud, dirt, snow, ice, debris or any other material to be removed from any street or alley at the expense of the notified. a Summons and Penalty: As an alternative to the notice for removal provided in subsection B above, any person who violates or causes another to violate the same, may be issued a summons to appear before the Municipal Cpurt of the Town for said violations, and upon being found guilty of a violation hereunder be punished as provided in Section 1-4-1 of this code. D Notice and Penalty: It is unlawful for any person to fail or refuse to comply with the notice of the Director of Public Works as provided in subsection B hereof, and any such person shall, in addition to payment of the expense of removal incurred by the Director of Public Works, as provided in subsection B hereof, upon being found guilty of a violation hereunder, be punishable as provided in Section 14-1 of this Code. (1997 Code: Ordinance 6 (1979). CODES 7.3A.I AND 7-3A-3: PARKING OBSTRUCTING TRAFFIC & IMPOUNDMENT AUTHORIZED o No person shall park any vehicle upon a street or at any other place within this Municipality in such a manner or under such conditions as to interfere with the free movement of vehicular traffic or proper street or highway maintenance. (Ord. 2(1968) 5 1) o Whenever any police officer finds a vehicle attended or unattended, standing upon any portion of a street or upon any place within this Municipality in such a manner as to constitute a violation of any section of this Article, or left unattended for a period of twenty four (24) hours or more and presumed to be abandoned under the conditions prescribed by Colorado Revised Statutes section 42-4-1102, as amended, the officer shall require the vehicle to be removed or cause it to be removed and placed in storage in the nearest garage or other place of safety designated or maintained by this Municipality, and the charges for towing and storage of such vehicle shall be charged to the owner of the vehicle in addition to a ten dollar ($10) impoundment charge. (Ord. 2(1968) $ 3: Ord. 28(1981) S 1) I have read and will comply with the above code provisions: Print Name Position or RelationshiD to Proiect: Date Signed: F :/everyone/forms/bldpemrT Signature TOI4'NM Yail2002 Vail Village/Lionshead Construction Hours Handout The Vail Village and Lionshead are invaluable assets to the community. Thousands of people come to Vail each year to sightsee, recreate, shop and to enjoy the vail Valley. The community and merchants rely upon the summer/winter tourism to generate revenue. Our summer/winter guests expect a pleasant experience while in Vail. To insure that all of the proposed construction has as little negative impact on the community and on our guest as possible, the Town of Vail finds it imperative to create and implement the Vail Village/Lionshead Construction Master Plan. Maps of the Village and Lionshead are included to show areas of construction being affected by this plan. It would be irresponsible for the Town of Vail, the Construction Contractors and the Merchants, to not actively participate to minimize the impact of construction on the Village and Lionshead areas. Givens The following givens are intended to provide the basic foundation by which construction will be completed in the Village: . The public's health, safety and welfare shall be honored at all times. r Adequate pedestrian, loading/delivery, vehicle, and emergency vehicle access and circulation shall be maintained. o Roadways and pedestrian walkways shall be kept clean and free of dirt and debris. . All construction deliveries, equipment, tools, materials, etc. to the Village must go through Check Point Charlie. All Lionshead construction activity must go to the Vail Police Department for a parking permit. Do not use delivery zones for construction parking, refer to approved staging plan or make other anangements for parking. . The hours of Outside Construction Activity shall be as follows: - April 15 - June 21 & September 9 - November 15,7 a.m. until 7 p.m., seven days a week. Between June 22 -September 6 work must end bv 4:00 p.m. on Fridavs. November 15 - April 1 5, 2003 work allowed within daylight hours only. - Deliveries shall be restricted to the hours of 7 a.m. to 11:30 a.m. on Gore Creek Drive and 7 a.m. to 8:30 a.m. on Bridge Street. - Special delivery permits must be requested in advance, from Public Works in conjunction with Code Enforcement at Checkpoint Charlie. - No construction activity shall occur on Saturday or Sunday between June 22 & September 6 - No outside construction activity shall occur on the following dates: Friday, February 15, Saturday, Februaryl6, Sunday, February 17, and Monday, February 18. (Presidents Weekendl Saturday, May 25, Sunday, May 26 and Monday, May 27 (Memorial Dav) Friday, June 28, Saturday, June 29 and Sunday, June 30. (Vail Arts Festival) Wednesday, July 3, Thursday, July 4. Friday, July 5, Saturday, July 6 and Sunday, July 7. (!41!e@gq@yl Saturday, August 31, Sunday, September l, and Monday, September2 (Labor Davl. Friday, September 13, Saturday, September 14, Sunday, September 15 in (Lionshead) and then on Saturday, September 21 and Sunday, September 22, (Vail Village) - {October Fest) Thursday, November 28, (Thanksoivinq Dav) Friday, November 29, Saturday, November 30 and Sunday, December 1. Wednesday, December 25, Thursday, December 26, Friday, December 27 Saturday, December 28, Sunday, December 29. (Christmas Dav Holidav) Monday, December 30, Tuesday, December 31 , Wednesday January 1, (New Year 2003) No Work allowed the entire week of the Christmas/New Year Holiday. . The Town of Vail Noise Ordinance has been waived by the Town Manager from 7a.m. -7p.m.For construction activities from April 15 through June 21 , and from September 9 through November 15. The Noise Ordinance shall be in effect and strictly regulated from June 22 through September 8 and November 15 to April 15, 2001 r All construction sites will be required to obtain an Approved Construction-Staoino Plan from the Town of Vail Public Works Department in conjunction with Code Enforcement. (The approved staging/parking plan is required to be on site at all times). . The Town of Vail reserves the right to amend the Vail Village/Lionshead Construction Plan regulations at anytime should abuses or problems arise. . The Three-Strike Rule will be enforced. Step 1. (Written warning), Step 2. (Written warning), Step 3. (Construction site will be Red Tag until all issues are resolved). Expectations The following expectations are established to insure the success of the Vail Village/Lionshead Construction Master Plan: o Full and complete cooperation and understanding from all parties involved in the construction activity in regards to this plan. o Strict adherence and compliance with the requirements outlined in the construction plan. . Respect and consideration for the affected interests and parties. lf you have any question, Please contact the Town of Vail Public Works Department. (Construction Inspector) or Vail Police Department (Code Enforcement Officer) 970479-2198 970476-7603 TOItrN OF VAIL Vail2002 Staging / Parking Plan Information The Staeine / Parkine Plan Philosonhy- Is a very important step in the building process. Striking a balance between safe public access and giving construction projects room to build is becoming increasingly challenging, for us to meet all the needs of those who will be impacted by construction'projects. The fact is, there is less room to build in the Town of Vail. Developing a creative Staging Plan is a must. Staging in the Town of Vail Public Right of Way is a Privilege, not a given right. We take into account when we review and approve staging / parking plans, impacts on neighborhoods, tourism, business and the traveling public along with your right to. build. The General Contractor is resnonsible for all subcontractors and aII construction activitv relatins to the buildins proiect. The staging plan will be enforced according to the Approved Set ofBuilding and Staging Plans. You are required to keep a copy ofthe Approved Staging Plan on site. Two staging /parking plans are required, a summer and winter. Summer staging plans expire on November l, and winter staging plans expire on April 15. (NSIgj__TheIgjt nq_A! street parkine in the winter season and all materials. equipment. etc must be 10' off the edee ofasphalt). Enforcement of all staging / parking plan is as follows. A) Staging / Parking Plans to scale required. B) Once the plan is approved, they will be held to complete compliance. C) We will use a 3 step and you're out, process. Sten One- Verbal and written wamings as to the staging plan violation, then have contractor sign and date field memo warning. Step Two- Police Department issue tickets and tows or public works writes second written waming to all violators who have been notified under step one and who are still in violation of the approved Staging / Parking Plan. The Town of Vail Chief Building Official will call the contractor and notifu them, the next time any violation happens, the building department will red tag the construction site for 48 hours. Sten Three- If still in violation after step two, a 48 hour Red Tag will be issued to the project site. If you have any Questions, Please contact the Town of Vail Construction Inspector at 970-479-2198 F:\cdev\FORMS\PERMITS\Staging-Pa rki ng.doc .r. Requirements for an Acceptable Staging Plan It is prefened that and Approved Site Plan is used to draw a staging plan, but a hand drawn plan may be used as long as it is dawn to scale and is neat and legible. 1.) The Staging Plan must show the following: (a) Show all parking that is required for the job site. (Including construction equipment). (b) Show the location of all material that will be staged on site. (c) Show the location of all dumpsters and port-o-john that are to be on site. (d) If a fence is required, then show the location of the fence and describe the material used for the fence. (e) Iftrees and / or vegetation is required to be protected, then show how this will be done. (f) If this staging plan is for a Demo Perinit, then show staging for dump trucks and all related equipment. If the Town of Vail Right of Way area is needed for staging, then a Traffic Control Plan is required in conjunction with the staging plan. (g) Please provide and show an Erosion Control Plan. (h) No equipment, vehicles, materials are allowed on Town of Vail Right of Way in the Winter Staging Plan. 2.) If work needs to occur in the right of way, then add a Traffic Control Plan to the staging plan showing the following: (a) The work zone (area that is to be performed) (b) Traffic Control Devices (warning, signs, cones, flaggers, etc.) (c) Distances that all devices will be set up from the work zone. Also show all dimensions of work being performed in the right of way. All traffic control plans must conform to the MUTCD manual.(Manual of Uniform Traffic Control Devices)' 2.) This plan will be reviewed by Public Works and if Necessary the Police, Fire, and Community Development Department. Once the staging plan is approved, it will be registered with the departments listed above and enforced. 3.) The Village and Lionshead area have outside construction restrictions, Please become familiar with the Yail2002, Vail Village and Lionshead Construction Hours handout. F:\cdev\FORMS\PERMITS\Staging-Parking.doc Jun-|6-0{ 03:52m FrorT0lli 0F yAlL C0trlfllil DEVEI0PEIIT---07uIu$a T-0gr P 003/001 F-lts Project Name: Pruiect Deecription: R'ERGREiENm 80439 Lipnse: APPUCANT BROVI'N-WOUN P.O. 8o)( 701 vAIt_, co 8165E Liense: ProicctAddrcs: 2831 KINNIKINNIq( ROAD, BLDG "A", UMT2 lrgsl Defqiption: Parcd NumDcr: ComnettB: Partidpantr: owNER MCLE\N, GORDON A. & HEIDI p.O6t}4l2cf,a phorc: 31218 WHIS?LER CT Ldl Elodc { Snbdhddon: COLUMBINE NORTH 210314305002 $t Design Rerdew Boald ACIION FORlr,l Dlpltnent gf Gonrnr*ty Oa'GOpncnt 7550utr Fontage bad, V.jL CobFdo 8t6F/d: 9'rc.17€'2ts, te,.j 97bq79.z4sz wrb: www_d.dl.co.u9 DRB l{umber: DRB0!m2?5 Add one 2' x 5 window to west gf condomlnium betyriren two e,rlsUng wlndows - to makh finishof o<isting windows .4eLp*l.t-o€Tq ', 6u.<- 6/c Tat .DaB W*(( M^ut/;xt BOARD/gfAFF AC'ION Modon By: Saond By: Vofte: Condfions: Roger ftoper 4-O-0 Ardon: APPROVED Dila of ApprovaF 06l lilz004 Cond:8 6nen1 l,lo qharrges b these pftans may be msde without the written consent of Town of Vail saff and/or tho appmpriate revier commltEds). @nd:0 Cnlf{ffi DRB apprural does not aondtue a pettnit 1gr bultiing, Hease consuft witl ior',o br rron euibirE Felsonnd prbr to construction activlties' Cond:201 Ong ipp.t^l shall not beorne wlid for 20 days trlo'wing ttre datc of aPprwal' Cord:2oz oppri*i "r m project shatl l+se and !9911 vqa -o1e (l).veat follov'''f lT d:,t" Jiiolip-p*"1' utiless " u,riilitu ptttit rs issueo ano consurranon is ommenced and is dih-tlenW pursucd torarad compledon' Z | lun' V bTryt !@ v1,7'toyy alq tA,t il)07 Pry_ .izt|",twtx.$w lggz zvrntleaLuTVPU TWTIWVAIL 75 S. Frontage Rd. Vail, Colorado 8f657 APPI-ICATION WILL T{OT BE ACCEPTED IF II{COMPLEIE OR UITISIGTIED Ptoject #: Bulldlng Permlt #: Asbesbs Permit#: peiordlnance No. 19' Series of 19fQ Permit application will not be accepEd without the following: 1. Copies of General Abatement Certificate and State of C.olorado Certification 2. A iopy of wrltten anangemeng with the facility op€ratoru for any temporary disabling of the air handiing systerns, fire sprinkler slstem, and alarm qfstems with the names and contact phone numbers cf these individuls. 3. SiE plan with detaits addresslng: waste ontainer storage locatbn, waste load out area location. entry and o<iting details of abatement area. debils of entry and exiUng plans fior the oc€upants of the structure in unaffected areas. :ONTRACTOR INFOR.'iIA On Site Abatement Contractor:Torrn bF Vall Reg. No.: -* -"€ontrct and Phone #'s: . .,i -'t I E-Maif Addressz i I ,t n HTT Contracbr SPnature: \. /I ConEct Aggg,rc affre at 970-328-8ffi or uieit for Parel # obName: ,fuoLeon B"*h Renodel ****** * ****** ** **** **r * ********* * ******FOR OFFICE USE ONLYT ********************** UtoLtrLN- J/aFE- '- n 8/t/0,1 r^ih A+L /4?t-tos',','A fJl a"1,.* f.*."4 f'*v /.D 07/26/2OO2 TOWNOFVAIL 75 S.FRONTAGEROAD vArL.co 81657 970479-2138 DEPARTMENT OF COMMI.]NITY DEVELOPMENT NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TMES PLUMBINGPERMT Permit Job Address: Status . . Location.....: 2831 KINNIKINNICKROAD, BLDG "Au, LJNIT 2 Applied. ParcelNo...: 210314306002 Issued. hoject No : e|'eTOL{ -6 ( Fo Expires . OII'INER MCLEAN, GORDON A. & HETDI P.09/15/2004 Phone: 3l-21-8 IIII{ISTIJER CT EVERGREnIco 80439 License: #: P04-0111 Bo{ -o to1 .: ISSUED . : 09/1512004.: 09/23/2004.: 03122/2005 CONTRACTOR CASEY PIJ'MBING & HEATING P-O. BOX 1830 EDWARDS, CO 8L632License: 2L3-P APPLTCANT CASEY PIJ'MBING & HEATTNG P.O. BOX L830 EDWARDS, CO 8r632License:2L3-P Desciption: ADD ONEWINDOW Valuation: $600.00 Fireplace Infornution: Resticted: ?# ofGas Aprpliances: ? 09/L5/2004 Phone: 970-553-4300 09/75/2004 Phone: 970-553-4300 #ofGrlogs: ?? #of WoodPallef ?? FEE SI.'MMARY 50,00 Total Calculated Fees--> 50.00 AdditionalF€es-----> S21 .75 Total P€rmit Fe+-----> Palments--------'> BAI.ANCE DUE----.> Plumbing---> Plan Check--> Inv€stigation-> Will Call---> s2L .15 $0. 00 q?1 ?5 $0.00 S15.00 Restuarant Plan Review-> 93.75 DRBF€€-----------> SO. OO TOTALFEES > s3.00 Item: 05100 BUIIJDING DEPARTMBIT O9/t5/2004 JS Action: APItem: 05500 FIRE DEPARTMENT CONDITION OF APPROVAL Cond:12 (BLDG.): FIEL,D INSPECTIONS ARE REOUIRED rO CHECK FOR CODE COMPLIANCE. 1la'|at *aaa'attaaat DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the infomration required completed an accurate plot plan, and state that all the inforrration as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this shucture according to the towns zoning and subdivision codes, design review approved, Uniform Building Code and other ordinances ofthe Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADV 149 OR AT OUR OFFICE FROM 8:00 AM - 4 PM. *ft*lt'fltllflff'|**l'l***ttlf+***air+*ttt+++******t**i***f*t******+++t***t*+'|++****t*++++it'l*+*** TOWNOFVAIL, COLORADO Statement +++{'{"t{t**ttaat+t*'t*****aa{r+a*lla+*+tl++tf*if*l*t*'t*a*t{rlr*****'t*'}*'}f+fffff+*++*+*++t++*fi+++** Statenent Nuriber: R040006725 Anount: Palment Method: Check 883 4 S21.?5 09/23/2004tL:22 ANtInit: DDGNotation: Brown - Wolin PermiC No: Parcel NolSite Address : Location: This Payment.: ACCOT]NT ITEM IIST: Accoune Code 0 01000 031123 00 001.00 003111100 00100 003112 80 0 PO4-0111 114)e: PLU}AING PERMIT 2L0314306002 2831 KINNIKINNICK ROAD, BI-,DG "A" I'NIT 2Total Fees: S21 . ?5 Toral Ar,I-, Pmts: Balance ; Descript ion PLAN CHECK FEES PLI'I.{BING PERMIT FEES WILI, CA].,L INSPECTION FEE $21 .75 $21 .7s $0.00 Current Pmts PF PP wc 3 - 15 15.00 3.00 APPLICATION WILI NOT BE ACCEPTED IF INCOMPLETE OR UNSIG Rf tr{ otBoProject #: Building Permit Plumbing Permit #= fu(! - O tl( l'nL7L-2149 (Inspectiohs) - TVWTIOFUAIL 75 S. Frontage Rd, Vail, Colorado 81657 CONTRACTOR IN FORMATION Contact and Phone #'s: oo oR ,{.tf,-92Town of Vail Reg. No.:';7' /* CoMPLETE VATUATION FOR PLUMBING PERMIT (Labor & Materials) PLUMBING: $ ConteLt Assessorc Office at 970'328-86t10 or visit Parcel # robNanilCl €a/1/ rob^dilesk7/ M Legal Description ll t-ot: ll Block: ll Filing:Subdivision: owners N^ *o4c/_€eOu Wz Phone: Engineer:Address:Phone: Detailed description of work: zJnua€ lnD 1o 5Y/o cD€R Work Class: New ( ) Addition ( )Alteration( ) RePair( ) Other( ) Type ofBldg.: single-family ( ) Duplex ( ) Multi-family ( ) commercial ( ) Restaurant ( ) other( ) - No. of Existing Dwelling Units in this building:No. of Accommodation Units in this building: for Parcel # ***********************,t*******t'****'t**FOR OFFICE USE ONLY********t'**************rr************* t !'a*t""s,:$l \WAiI\dAIA\CdETAFORMS\PERMITS\PLMBPERM. DOC -'75 '4 t --," {-. I 07 t2612002 ffi^)t+/"J NVNGI1Y HOW DIDWE RATE MTH YOU? Town of Vail Survey Comm u nity Development Department Russell Fonest Director, (970)47s-213s Check allthat applies. 1. Which Deparfnent(s) did you conbct? Building _ Environmental _ Housing_ Admin Planning DRB _ PEC 2. Wasyourinitialcontactwithourstaffimmediate_dow-or,:,,, :, no one avaiiable ? 3. lf you were required to wait, how long was it before you were helped? 4. Was your.projmt reviewed on a timely basis? Yes i No lf no, why not? 5. Was this yourfirsttime to file a DRB app- PEC app-, ,, Bldg Permit_ N/A 6. Please rate the performance of the stafi person who assisted you: 54321Name: (knowledge; responsiveness, availability) 7. Overall efiectiveness oifre FrontService Counter. 5 4 3 2 1 8, What is the best time of day for you to use the Front Service Counter? 9. Any comments you have which would allow us to beter serve you next time? Thank you for taking the lime to complete this survey. We are committed b improving our service. TOWN OF VAIL 75 S.FRONTACEROAD VAIL, CO 81657 970-4'.t9-2138 DEPARTMENT OF COMMUNITY DEVELOPMENT NOTE: TIIIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TMES ELECTRICALPERMIT Permit #: Job Address: Status. . Location.....: 2831 KINNIKINNICK ROAD, BLDG UAU, LNIT 2 Applied. Parcel No...: 210314306002 Issued . Project No : Po- rut - ot?O Expires .' ' 'Altl -olto OWNER MCLEAN, GORDON A. & HEIDI P.O8/27/2004 Phone: 3]-2]-8 WHISTLER CT EVERGREENco 80439 License: CoNTRACTOR CHOTCE ELECTRTC 08/2'1 /2004 PO Boxl"15? GlT)sum, Colorado 8L637 License: 295-E APPLICANT CHOICE ELECTRIC 08/2"1 /2004 PO Box1757 Phone: 970-926-8283 Phone: 9'10-926-8283 GlPsum, Colorado 81637 License z 295-E Desciption: REPLACE FEEDER FROM METER TO LINIT PANEL, 125 AMP MAIN, INSTALL CIRCIIIT FOR FUTIJRE STEAM BATII Valuation: $1,500.00 1 +**t*:tt *t:t a::t*'i:t Total Calculated Fe€s-) Additional Fees-----> Total Pamit Fee----> E04-0153fu{ -^>dl .: ISSIIED . : 08/2712004 . .: 02/27/2005 ss3.00 s0.00 ss3.00 $53.00 BALANCE DUE_---.>s0.00 Approvals: Item: 05000 ELECTRICAL DEPARTMEIIII 0B/27 /2004 JSItem: 05600 FIR.E DEPARTMENT Action: AP CONDITIONS OF APPROVAL Cond: 12 -!?J?P-9.;,l-;'-lI'Tl?'.lTs.'."*93I-9x:..l5I-.TI9-Y'I1,E-?-J.9.'9]:P-'c'T-'|.91t-9;o-?-l.-9-9Y-|-l-1llI9.'"-.-*.'l*t|'tl*.:||:l**'t*t*,'ll|.*|*,}'* DECLARATIONS I hereby acknowledge that I have read this application, filled out in full tbe information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this stucture according to the towns zoning and subdivision codes, design review approved, Uniform Building Code and othsr ordinanso$ of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2149 OR AT OUR OFFICE FROM 8:00 AM - 4 PM. Electrical----> DRB Fee__-> Invcstigation-> Will Call-----> TOTAL FEES.-> $s0. 00 s0.00 s0.00 s3 .00 5s3 .00 TOWNOFVAIL, COI.ORADO Stat€m€nt Slaeement Number: R040006542 Amount: S53.00 08/31/200411 :34 AM Palment Method: Check Init: DDG Notati,on: Choice Electric 1908 Permi t No: E04-0153 1!'pe: ELECTRICAL PERl4tTParcel Nor 210314306002Site Address : I.,ocation: 2831 KINNIKINNTCK ROAD, BI,DG 'A", UNIT 2 ToE,aI Fees : $53 . 00 This Palment: $53.00 Tota1 AIJL Pmts: $53.00Balance: $0.00l*lllll*{r*lr*tllttttltl**fllllllll++******'}'}a*t}t}*at*f+***t**t***{'{'t+*++***'}**lfffff******t'}lt ACCOI.JNT ITEM LIST: Account Code Description Current PmCs EP OO1OOOO31111.OO TEI4PORARY POWER PERMTTS WC OO1OOOO31128OO WILL CALL INSPECTION FEE s0.00 '3 .00 APPLICATION WILL NOT BE ACCEPTED IF INCOMPLETE OR UNSIGNED Project #: Building Permit #: Electrical Permit #: 97 O- 47 9-2L49 (Inspections) - o8o rcM]OFUAIL 75 S. Frontage Rd. Vail, Colorado 81657 CONTRACTOR INFORMATION Electrical Contractor: CHo,c.g Etrcrp tc Town of Vail Reg. No.:279-e Contact and Phone #'s: ilordqPD 370-77 7? E-Mail Address: Contractor Signature: 7.42.-wr.1fu--e+a- t COMPLETE SQ. FEET FOR NEW BUILDS and VALUATIONS FOR ALL OTHERS (Labor & Materials) AMOUNTOF SQ FTIN STRUCTURE: t,oaO ELECTRICAL VALUATIoN: $ l7t20 e- for ParcelContactAssessors Ofl'ice at 970-328-8640 or visit # Parcel + e tO3ty_VO6DoZ fb^urn4E NtFil Caq>cs )ob Name: rl4"l*fu Job Address: )33 I Ftxu tctzt{Ntcrz BLe A sryr4) LegalDesffiption ll Lot: ll Block: ll Filing:Subdivision: o$frf"IlDfl'u tuLBzt Mdressi 3) ?18 L)tltsrLFR cttFT - b,ipnnEcl..? 7r4.i1 Phoneiso < -bzq- tryas Engineeri il/4 Address:Phone: fO tryrf ptNELI l25a ry|,qt,v,Iutr4tL a pq ch- Fdt FDTURE STE4^ "&|fi/ workclass: New( ) Addition( ) Remodel (a) Repair( ) TempPower( ) other( ) Work Type: Interior (; ) Exterior ( ) Both ( )Does an EHU exist at this location: Yes ( ) No ( ) Type of Bldg.: single-family ( ) Duplex ( ) MultFfamily (X) commercial ( ) Restaurant ( ) other ( ) No. of Existing Dwelling Units in this building: t-f No. of Accommodation Units in this building: Is this permit for a hot tub: Yes ( ) No (x) Does a Fire Alarm Exist: Yes (X) No ( )Doefi FireEprin[er System Exist: Yes ( ) tlo (X **,!**,r****rr************************'****FoR oFFIcE usE oNLy***rr******rr************SSIS)***./. h$if,r*h\nw'-;3 Gz6zao4Date Received: DRB Fees:Accepted Byl rn-vU !1! Planner Siqn-off: , . rlauint\WAiMAIA\CdCV\FORM S\PERM ITS\ELECPERM.DOC 7 z"pi 0't i2612002 tr a o o o n Amendment to the 1999 N.E.C. Town of Vail Ordinance 10-1-6. Overhead seruices are not allowed in the Town of Vail. Underground services have to be in conduit (PVC) from the transformer to the electric meter, main disconnect switch and to the first electrical distribution circuit breaker panel. The main disconnect switch shall be located next to the meter on the exterior wall of the structure easilv accessible. All underground conduits are required to be inspected before back-filling the trench. In multi-family dwelling units, no electrical wiring or feeder cables shall pass from one unit to another. Common walls and spaces are accepted. NM Cable (Romex) is not allowed in commercial buildings or structures exceeding three (3) stories. No use of aluminum wire smaller than size #8 will be permitted with the Town of Vail. TOWN qF VAIL ELECTRICAL PERMIT GUIDELINES All installations of exterior hot tubs or spa's require a DRB approval from planning. This application will not be accepted without a copy of the DRB approval form attached (if applicable). If this permit is for installation of an exterior hot tub or spa on a new elevated platform or deck over 30" above grade, you must also obtain a building permit. If this permit is for installation of an exterior hot tub or spa on any existing deck or elevated platform, a structural engineer must review the existing condition and verify that it will support the added concentrated load. Please provide a copy of the structural engineers wet stamped letter or drawing with this application. If this is a remodel in a multi-family building with a homeowners association, a letter of permission from the association is required. o If this permit is for a commercial space, two (2) sets of stamped drawings are required. I have read and understand the above. 8f ao/c'/ Date Signed If you have any questions regarding the above information or have additional questions, pfease contact the Town of Vail Electrical Inspector at97O-479-2L47. The inspector can be reached on Tuesday, Thursday and Friday mornings between the hours of 8am and 9am. You may also leave a voice mail and the inspector will callyou back. // 3 zG-t*rz / 6:46 am Inspecfl on Requant Reportlng_ vAtL, c_o:rowil oF_ __ Requ€ted In3p€ct Date: ![ursclay, Sepbmber 30, 20{X' Inlpcd0on Area: CD Sltr Add.cag: <tlone Llsbd> Columblne North Condos unlt A 80+0209 Type: AMF Occuprity' rt cLEAt{. GoRDoN A. s rle|Dt?. -JT BROW$I,VO|_IN COfUSTRUCTTON BROWT'&trUOr_lN CO}|STRTJCIOil Rodo cxbilm drg bdtaoom, rodaca b€fifub, wtth 3t€sm sho{il Add an eftrlor wfi|dory ln !ho*€r srE RoUTED T6 CFIARLIE . cDAvIs Sub TYD€: AAPT(fn: V l-HR A/PrO lniorm.flon Acilvlty: Consl TYrn: osiier: Aodlconl: ConbEctor: Dscrlp{on: Corninent: sbh$: IncpAma: ISSUED CD Pflorie: 9ru',9494186 Phon€: 97$9494186 Reouesbd lnsocc0on(sl Acthn: _ Tlmc Exp: lbrr|: 30 BLDG-Frunino Requodor: BROWiIWOLIN dOI,ISTRUCTION cofiim€nb: locl( bor( llPM. h.Ei a bdrfootn vrffiofl As6€n€d To: JMONDRACiOiI R€quested Tlme: 08:00 All. Phons: 97Cl-949'186 Enbr€d By: DGOLDEN K Insoec{on Hlstory dufrV ?sdar (o/r c F EVF' -,rr7 F </4o//F')-" Ta Tvwyilem: 226 Itcm: 30 It6m: 50hm: 60 !t m: 70 Itrm: fl) FIRE DEPT. NOTFNATON BLDGFromlno Bl-tlG-lnsuta6n BLDG-She.tock Nrll BLDC'-l/Stc. BLDG.FInd ffiF REPTl31 Run fd: 24A7 the mj mueller co., inc. 2l September 2004 Mr. Rich Brown BP.OWN.WOLIN CONSTRUCTION, INC. PO Box 701 Vail, Colorado 81658 Subject: Bathroom Window Addition Columbine North Condos, Building A, Unit #2 Vail, Colorado Dcar Rich: The purpose of this letter, is to confirm that this office has engineered and inspected, the header for the new window mentioned above. The z-VI. | % x 9 % header has been installed within the 2 x 10 floor diaphragm, glued and nailed. Each end of the header is supported by 2-2x4 minimum to th; flg;r bcneath. This header is capable of supporting aO isf snowplus 40 psf residential floor live toads. All construction must comply with the 1997 UBC as adopted by the Town of Vail Building Department. Ifyou have any questions regarding this inspection and report, please contact this office at the phone.number shown below. Siircerely 1'ours, . THEMJMUELLERCO.,INC. civif architecnrral and sructLtral engineering o p.o. box 2747 vail. colorado 81658 4762627 4762637 IFN<I