Loading...
HomeMy WebLinkAbout2010-1006 DRBTCIWNOFVAIL PROJECT ORIENTATION MEMBERS PRESENT Tom DuBois Pete Dunning Brian Gillette Rollie Kjesbo Libby Plante DESIGN REVIEW BOARD AGENDA PUBLIC MEETING October 6, 2010 Council Chambers 75 S. Frontage Road - Vail, Colorado, 81657 MEMBERS ABSENT SITE VISITS 1. Wilhemsen Residence — 2910 Booth Creek Drive 2. TOV Banner Poles — 82 East Meadow Drive 3. Red Sands Corporation — 100 East Meadow Drive 4. Woo Restaurant — 100 East Meadow Drive 5. Blumberg Residence — 366 Forest Road 6. Lion Square Lodge — 660 Lionshead Place 7. Vail Spa — 710 West Lionshead Circle 8. McDonalds — 2171 North Frontage Road West 9. Ribiero — 1479 Aspen Grove Lane 12:30pm PUBLIC HEARING — TOWN COUNCIL CHAMBERS 3:OOpm Red Sands Corporation DRB1 00456 / 10 minutes Bill Final review of a minor exterior alteration (windows) 100 East Meadow Drive, Unit 26 (Village Inn) /Lot O, Block 5D, Vail Village Filing 1 Applicant: Red Sands Corporation, represented by Nedbo Construction ACTION: Denied (motion for approval failed by split vote) MOTION: Gillette SECOND: DuBois VOTE: 2 -2 -1 ( Kjesbo recused, Dunning and Plante opposed) 2. Blumberg Residence DRB100461 / 10 minutes Bill Final review of a minor exterior alteration (re -roof) 366 Forest Road /Lot 2, Block 1, Vail Village Filing 3 Applicant: J. Seth Blumberg, represented by Peel /Langenwalter Architects ACTION: Approved with condition(s) MOTION: Gillette SECOND: Plante VOTE: 5 -0 -0 CONDITION(S): 1. The applicant shall install asphalt shingles to match the adjacent half of the duplex. Page 1 3. Lion Square Lodge DRB100465 / 15 minutes Rachel Final review of a minor exterior alteration (re- paint, re -roof, balconies) 660 Lionshead Place /Lot 1, Vail Lionshead Filing 1 Addition 1 Applicant: Lion Square Lodge Phase 1 HOA, represented by Bill Anderson ACTION: Approved with condition(s) MOTION: DuBois SECOND: Plante VOTE: 4 -1 -0 (Gillette opposed) CONDITION(S): 1. The applicant shall match the yellow and brown paint colors to the colors used at the Arrabelle at Vail Square, to be confirmed by the Administrator prior to painting. 4. Powder Tools DRB100485 / 10 minutes Rachel Final review of a sign (projecting, business id) 278 Hanson Ranch Road (Bridge Street Lodge) /Lot A, Block 2, Vail Village Filing 1 Applicant: RAD Three, LLC, represented by Ron Riley ACTION: Approved MOTION: DuBois SECOND: Gillette VOTE: 5 -0 -0 5. Four Seasons Concierge DRB100416 / 15 minutes Bill Final review of a minor exterior alteration (stairs, ramp) 227 Wall Street / Lot C, Block 5C, Vail Village Filing 1 Applicant: HB Development Co., represented by TJ Brink ACTION: Approved with condition(s) MOTION: Kjesbo SECOND: DuBois VOTE: 3 -2 -0 (Dunning and Plante opposed) CONDITION(S): 1. The applicant shall install the wider wall design option (eight inch block and six inch veneer). 6. Woo Restaurant DRB100501 / 15 minutes Rachel Final review of changes to approved plans (chimneys) 68 East Meadow Drive /Lot O, Block 5D, Vail Village Filing 1 Applicant: Rick Woo, represented by John Martin ACTION: Approved with condition(s) MOTION: Kjesbo SECOND: Plante VOTE: 5 -0 -0 CONDITION(S): 1. This approval is contingent upon final approval of a minor amendment to the Special Development District. 2. The applicant shall paint both the mechanical equipment and the metal screen tan to match the existing chimneys. 3. The north side chimney and adjacent landing area walls shall be stucco to match existing building materials and colors (tan). 4. The applicant shall utilize a woven metal for screening where applicable. 7. Block 16 DRB100513 / 10 minutes Warren Final review of a sign (wall) 16 Vail Road (The Sebastian) /Lot M, Block 5D, Vail Village Filing 1 Applicant: Ferruco Vail Ventures, represented by Mauriello Planning Group ACTION: Approved MOTION: DuBois SECOND: Gillette VOTE: 5 -0 -0 Page 2 8. West Haven Condominiums DRB100493 / 10 minutes Rachel Final review of a minor exterior alteration (re- paint) 1325 Westhaven Drive /Cascade Village Applicant: West Haven LLC, represented by JL Viele ACTION: Approved MOTION: DuBois SECOND: Gillette VOTE: 5 -0 -0 9. Ritz Carlton Sales Office DRB100499 / 10 minutes Rachel Final review of changes to approved plans (signs) 288 Bridge Street, Unit C -3 (Rucksack Building) /Lot D, Block 5A, Vail Village Filing 1 Applicant: Ritz Carlton, represented by Kevin Roth ACTION: Tabled to the October 20, 2010 MOTION: DuBois SECOND: Gillette VOTE: 5 -0 -0 10. McDonalds DRB1 00495 / 1 5 minutes Rachel Final review of a minor exterior alteration (landscaping) 2171 North Frontage Road /Part of Lot 2, Vail das Schone Filing 3 Applicant: McDonalds, represented by Mark Helms ACTION: Denied MOTION: Gillette SECOND: Kjesbo VOTE: 5 -0 -0 11. Vail Spa DRB100482 / 15 minutes Rachel Final review of a minor exterior alteration (entry /parking) 710 West Lionshead Circle /Lot 1, Block 2, Vail Lionshead Filing 3 Applicant: Vail Spa Condominium Association, represented by KH Webb Architects ACTION: Approved with condition(s) MOTION: Plante SECOND: Gillette VOTE: 4- 0- 1(Kjesbo recused) CONDITION: 1. This approval is contingent upon approval from utility companies and the Colorado Department of Transportation to be submitted in conjunction with the Building Permit. 12. Vail Recreation District DRB100524 / 5 minutes Bill Final review of a change to approved plans (lightning shelters) 1778 Vail Valley Drive /Unplatted and Lot E, Vail Village Filing 7 Applicant: Vail Recreation District, represented by Scott O'Connell ACTION: Approved MOTION: DuBois SECOND: Gillette VOTE: 5 -0 -0 13. Wilhelmsen Residence DRB100521 / 15 minutes Rachel Final review of a minor exterior alteration (entry feature) 2910 Booth Creek Drive / Lot 2, Block 4, Vail Village Filing 11 Applicant: Axel Wilhelmsen ACTION: Approved MOTION: DuBois SECOND: Gillette VOTE: 5 -0 -0 14. West Vail Fire Station DRB100511 / 5 minutes Bill Final review of changes to approved plans (window color) 2399 North Frontage Road /Parcel B, Resub of Tract D, Vail Das Schone Filing 1 Applicant: Town of Vail, represented by Mark Miller ACTION: Approved MOTION: DuBois SECOND: Gillette VOTE: 5 -0 -0 Page 3 15. Town of Vail DRB100506 / 5 minutes Bill Final review of a minor exterior alteration (banner poles) 75 South Frontage Road /Unplatted Applicant: Town of Vail, represented by Todd Oppenheimer ACTION: Tabled to the October 20, 2010 MOTION: Kjesbo SECOND: Gillette VOTE: 5 -0 -0 16. Ribiero Residence DRB1 00252 / 10 minutes Rachel Final review of a minor exterior alteration (trash enclosure) 1479 Aspen Grove Lane /Lot 2, Lions Ridge Filing 4 Applicant: Pedro Ribiero ACTION: Approved with condition(s) MOTION: Gillette SECOND: Plante VOTE: 5 -0 -0 CONDITION: 1. The applicant shall replace any trees that are removed, damaged or dead within three years of construction with the same number of feet of trees that are removed, damaged or dead. STAFF APPROVALS Castro Residence DRB100341 Final review of changes to approved plans (windows, roof) 965 Fairway Drive /Lot 1, Vail Village Filing 10 Applicant: Manuel Castro, represented by Berglund Architects Aff Oliver Residence DRB100392 Bill Final review of a minor exterior alteration (landscaping, deck) 754 Potato Patch Drive, Unit E /Lot 3, Block 2, Vail Potato Patch Applicant: Nancy Oliver, represented by Landscape Technology Group Cerisola Residence DRB100393 Bill Final review of a minor exterior alteration (landscaping, address marker) 754 Potato Patch Drive, Unit W /Lot 3, Block 2, Vail Potato Patch Applicant: Pinetree Holdings, represented by Landscape Technology Group Tarr Residence DRB100422 Final review of an addition (loft, entry) 5020 Main Gore Place, Unit M2 (Gore Creek Meadows) /Unplatted Applicant: Jeff & Andrea Tarr, represented by Nedbo Construction Rodriguez Residence DRB100438 Final review of a minor exterior alteration (windows) 4071 Bighorn Road, Unit 13D (Pitkin Creek Park) /Unplatted Applicant: Judy Rodriguez Vail Racquet Club DRB100440 Final review of a minor exterior alteration (re -roof) 4695 Vail Racquet Club Drive /Unplatted Applicant: Racquet Club Owners Association Rachel Rachel Warren Page 4 Snowstorm LLC DRB100441 Final review of a minor exterior alteration (re -roof, skylights) 2009 Sunburst Drive /Lot 15, Vail Valley Filing 3 Applicant: Snowstorm LLC, represented by Chad Alcock Spaeth Residence DRB100447 Final review of a minor exterior alteration (window) 2773 Kinnickinnick Road, Unit D5 (Columbine North Condos)Lots A -C 3 &4, Block 4, Applicant: Edmond (Alex) Spaeth First Chair DRB100448 Final review of a minor exterior alteration (parking) 600 West Lionshead Circle (North Day Lot) /Lot 1, Block 1, Vail Lionshead Filing 3 Applicant: Vail Resorts, represented by Kyle Griffith Cascades on Gore Creek DRB100449 Final review of a minor exterior alteration (re -roof) 1390 Westhaven Drive /Cascade Village Applicant: Cascades on Gore Creek, represented by Fritzlen Pierce Architects Smith Residence DRB100450 Final review of a minor exterior alteration (windows) 3931 Bighorn Road, Unit 5R (Pitkin Creek Park) /Unplatted Applicant: Sandra Smith Columbine West Condominiums DRB100451 Final review of a minor exterior alteration (re -roof) 2823 Kinnikinnick Road /Lot 5, Block 4, Vail Intermountain Applicant: Catherine Holonitch, represented by Paul Huntoon Gateway Land & Development DRB100452 Final review of a sign (business identification) 183 Gore Creek Drive, Suite 5 (Sitzmark) /Lot A, Block 5B, Vail Village Filing 1 Applicant: Gateway Land & Development, represented by Michelle Horak Birch Residence DRB100453 Final review of a minor exterior alteration (deck) 1773 Shasta Place /Lot 13, Vail Village West Filing 1 Applicant: David & Kathryn Birch, represented by David Korbel Shay Residence DRB100454 Final review of a minor exterior alteration (re- paint, stairs) 4545 Bighorn Road /Lot 3, Bighorn Subdivision 3 rd Addition Applicant: Jenifer Shay Schutz Residence DRB100455 Final review of an addition (5 Floor) 600 Vail Valley Drive, Unit F8 (Northwoods) /Unplatted Applicant: Stephen Shutz, represented by Nedbo Construction Rachel Bill Vail Intermountain Warren Warren Rachel Rachel Rachel Rachel Rachel Warren Page 5 Red Sands Corporation DRB100457 Bill Final review of a minor exterior alteration (stairs) 100 East Meadow Drive, Unit 26 (Village Inn) /Lot O, Block 5D, Vail Village Filing 1 Applicant: Red Sands Corporation, represented by Nedbo Construction Interlochen DRB100459 Warren Final review of a minor exterior alteration (planter, retaining walls, stairs) 2958 South Frontage Road /Lot 4, Block 5, Vail Intermountain Applicant: Interlochen Condominium Association, represented by Darrell Cooter Strattan Residence DRB100460 Rachel Final review of a minor exterior alteration (windows) 4460 Timber Falls Court, Unit 1608 /Unplatted Applicant: Gaar Strattan, represented by Rob Hall's Kitchens Plus Dieterich Residence DRB100462 Rachel Final review of a minor exterior alteration (hot tub) 4459 Timber Falls Court, Unit 1801 (Timber Falls) /Unplatted Applicant: James Dieterich Bighorn 4792 LP Residence DRB100463 Warren Final review of an addition (bedroom, bathroom, laundry) 4792 Meadow Lane /Lot 5, Block 7, Bighorn Subdivision 5 Addition Applicant: Bighorn 4792 LP, represented by Nedbo Construction Ferdows Residence DRB100466 Final review of a minor exterior alteration (windows, doors) 4957 Juniper Lane /Lot 3, Block 4, Bighorn Subdivision 5 Addition Applicant: SCIC, represented by Christine Ferdows Vail Property Holdings DRB100467 Final review of a minor exterior alteration (landscaping) 254 Beaver Dam Road /Lot 23, Block 7, Vail Village Filing 1 Applicant: Joe & Lucie Pal, represented by Moon Hsu Kelton Residence DRB100468 Final review of a minor exterior alteration (deck) 1034 Homestake /Lot 5, Block 6, Vail Village Filing 7 Applicant: Art Kelton, represented by Duane Piper Rachel Aff Rachel Weiss Residence DRB100469 Rachel Final review of a minor exterior alteration (windows) 62 East Meadow Drive, Unit 304, 305 (Talisman #380) /Track K -L, Block 5E, Vail Village Filing 1 Applicant: Lawrence & Suzanne Weiss, represented by Tom Saalfeld Martin Residence DRB100472 Tom Final review of a minor exterior alteration (landscaping) 5127 Main Gore Drive /Lot 6, Block 1, Bighorn Subdivision 5 Addition Applicant: Landis Martin, represented by Charlie Sherman Page 6 Diones Residence DRB100473 Tom Final review of a minor exterior alteration (landscaping) 1626 Golf Terrace /Lot 2A, Warren Pulis Subdivision Appliant: Donald & Frances Diones, represented by A Cut Above Forestry First Chair DRB100476 Warren Final review of changes to approved plans (retaining wall) 600 West Lionshead Circle /Lot 1, Block 1, Vail Lionshead Filing 3 Applicant: Vail Resorts Development Corporation, represented by Kyle Griffith Evergreen Hotel DRB100477 Warren Final review of a minor exterior alteration (re- paint) 250 South Frontage Road West /Lot 2, Block 1, Vail Lionshead Filing 1 Applicant: HCT Development, represented by Chris Hanen Matterhorn Inn DRB100479 Bill Final review of a minor exterior alteration (deck) 1552 Matterhorn Circle /Matterhorn Village Applicant: Matterhorn Inn Owners Association, represented by Matt Hansen Kirschner Residence DRB100480 Warren Final review of a minor exterior alteration (landscaping) 1995 Chamonix Lane /Lot 27, Buffehr Creek Applicant: John Kirschner Safeway DRB100481 Rachel Final review of a sign (business identification) 2131 North Frontage Road /Lot 3, Vail das Schone Filing 3 Applicant: Safeway Store 0631, represented by Chuck Hand Timber Ridge Apartments DRB100483 Warren Final review of a minor exterior alteration (re -roof) 1280 North Frontage Road, Buildings J, K, M, N, O & P /Lots A -P, Block C1, Lion's Ridge Filing 1 Applicant: Timber Ridge Affordable Housing, represented by Joe Costa Milmo Residence DRB100484 Bill Final review of changes to approved plans (chimney) 996 Ptarmigan Road /Lot 2, Block 4, Vail Village Filing 7 Applicant: Ptarmigan Vail, LLC, represented by Michael Suman Architect Lady Belle Partnership DRB100486 Bill Final review of a minor exterior alteration (re -roof) 521 East Lionshead Circle (Vail 21) /Part of Lot 3, Block 1, Vail Lionshead Filing 1 Applicant: Lady Belle Partnership, represented by Plath Construction Link Residence DRB100494 Warren Final review of a minor exterior alteration (re -roof) 2692 Cortina Lane /Lot 10, Block B, Vail Ridge Applicant: Ted Link, represented by Wes Brown Roofing Page 7 Ortegon Residence Final review of a minor exterior alteration (door) 1459 North Green Hill Court /Lot 6B, Glen Lyon Subdivision Applicant: Vera Ortegon, represented by Ross Knittel Warren The applications and information about the proposals are available for public inspection during regular office hours in the project planner's office, located at the Town of Vail Community Development Department, 75 South Frontage Road. Please call 479 -2138 for information. Sign language interpretation available upon request with 24 hour notification. Please call 479 -2356, Telephone for the Hearing Impaired, for information. Page 8