Loading...
HomeMy WebLinkAboutM97-0176TOWN OF VAIL਍ഀ 75 S. FRONTAGE ROAD਍ഀ VAIL, CO 81657਍ഀ 970-479-2138਍ഀ L&(ve F-?Ia)c- r਍ഀ Vp-( L.', vts~uad Rintl਍ഀ DEPARTMENT OF COMMUNITY DEVELOPMENT਍ഀ NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES਍ഀ MECHANICAL PERMIT Permit M97-0176਍ഀ Job Address...: 452 E LIONSHEAD CR Status...: ISSUED਍ഀ Location......: TREETOPS CONDOS Applied..: 09/18/1997਍ഀ Parcel No.....: 2101-064-04-029 Issued...: 09/26/1997਍ഀ Project Number: Expires..: 03/25/1998਍ഀ APPLICANT TARA MASONRY, INC Phone: 3039262150਍ഀ P 0 BOX 146, EDWARDS CO 81632਍ഀ CONTRACTOR TARA MASONRY, INC Phone: 3039262150਍ഀ P 0 BOX 146, EDWARDS CO 81632਍ഀ OWNER TREETOPS ASSOCIATION % GREAT WES਍ഀ MANAGEMENT & REALTY INC, 3201 SO TAMARAC 200, DENVER CO 80231਍ഀ Description: Valuation: 3,000.00਍ഀ INSTALL STAINLESS STEEL FLEX PIPE IN FIRE PL & PIP਍ഀ Fireplace Information: Restricted: f0f Gas Appliances: f0f Gas Logs: fOf Wood/Pallet:਍ഀ FEE SUMMARY਍ഀ Mechanical--->਍ഀ 60.00 Restuarant Plan Review-->਍ഀ .00 Total Calculated Fees਍ഀ 78.00਍ഀ Plan Check਍ഀ 15.00 DRB Fee----------------->਍ഀ .00 Additional Fees >਍ഀ .00਍ഀ Investigation>਍ഀ .00 TOTAL FEES-------------->਍ഀ 78.00 Total Permit Fee-------->਍ഀ 78.00਍ഀ Will Call---- >਍ഀ 3.00਍ഀ Payments >਍ഀ 78.00਍ഀ BALANCE DUE------------- >਍ഀ .00਍ഀ Item: 05100 BUILDING DEPARTMENT Dept: BUILDING Division:਍ഀ 09/18/1997 LORELEI Action: APPR APPROVED PER M MCGEE਍ഀ Item: 05600 FIRE DEPARTMENT Deppt: FI Division:਍ഀ 09/18/1997 LORELEI Action: APPR APPROVED M MCGEE 91E7/97਍ഀ CONDITION OF APPROVAL਍ഀ 1. FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.਍ഀ 2. COMBUSTION AIR IS REQUIRED PER SEC. 607 OF THE 1991 UMC.਍ഀ 3. INSTALLATION MUST CONFORM TO MANUFACTURES INSTRUCTIONS AND਍ഀ TO APPENDIX CHAPTER 21 OF THE 1991 UMC.਍ഀ 4. GAS APPLIANCES SHALL BE VENTED ACCORDING TO CHAPTER 9 AND਍ഀ SHALL TERMINATE AS SPECIFIED IN SEC.906 OF THE 1991 UMC.਍ഀ 5. ACCESS TO HEATING EQUIPMENT MUST COMPLY WITH SEC.505 AND਍ഀ 703 OF THE 1991 UMC.਍ഀ 6. BOILERS SHALL BE MOUNTED ON FLOORS OF NONCOMBUSTIBLE CONST.਍ഀ UNLESS LISTED FOR MOUNTING ON COMBUSTIBLE FLOORING.਍ഀ 7. PERMIT PLANS AND CODE ANALYSIS MIUST BE POSTED IN MECHANICAL਍ഀ ROOM PkIOR TO AN INSPECTION REQUEST.਍ഀ 8. DRAINAGE OF MECHANICAL ROOMS CONTAINING HEATING OR HOT-WATER਍ഀ SUPPLY BOILERS SHALL BE EQUIPPED WITH A FLOOR DRAIN PER SEC.਍ഀ 2119 OF THE 1991 UMC.਍ഀ DECLARATIONS਍ഀ I hereby acknowledge that J have read this application, filled out in full the information required, completed an accurate plot਍ഀ plan, and state that all the information provided as required is correct. I agree to comply with the information and plot plan,਍ഀ to comply with all Town ordinances and state laws, and to build this structure according to the Town's zoning and subdivision਍ഀ codes, design review approved, Uniform Building Code and other ordinances of the Town applicable thereto.਍ഀ REQUESTS FOR INSPECTIONS SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2138 OR AT OUR OFFICE FROM 8:00 AM 5:00 PM਍ഀ SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNER I਍ഀ 4 ~਍ഀ ***7k'k71"k***7k'~Cl~t~~f*7k*1k *91''A'Yti***~'*7k *'~1f*YI 'A" ~[1ti lti *'k 1k 7k 7k 7ti**7~f 7k t~'~'7k 'k**!~***1~'1ti 1~f 7~['A[਍ഀ TOWN OF VAIL, COLORADO਍ഀ Statemnt਍ഀ ਍ഀ Statemnt Number:਍ഀ REC-0334 Amount: 78.00਍ഀ 09/26/97 13:47਍ഀ Payment Method:਍ഀ ਍ഀ CHECK Notation: £5183਍ഀ ਍ഀ Init: LRD਍ഀ ਍ഀ Permit No:਍ഀ M97-0176 Type: B-MECH MECHANICAL PERMIT਍ഀ Parcel No:਍ഀ 2101-064-04-029਍ഀ Site Address:਍ഀ 452 E LIONSHEAD CR਍ഀ Location:਍ഀ TREETOPS CONDOS਍ഀ Total Fees:਍ഀ 78.00਍ഀ This Payment਍ഀ 78.00 Total ALL Pmts:਍ഀ 78.00਍ഀ Balance:਍ഀ .00਍ഀ ਍ഀ Account Code਍ഀ Description਍ഀ Amount਍ഀ 01 0000 41312਍ഀ MECHANICAL PERMIT FEES਍ഀ 60.00਍ഀ 01 0000 41332਍ഀ PLAN CHECK FEES਍ഀ 15.00਍ഀ 01 0000 41336਍ഀ ਍ഀ WILL CALL INSPECTION FEE਍ഀ ਍ഀ 3.00਍ഀ ਍ഀ TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT਍ഀ 75 S. FRONTAGE ROAD਍ഀ VAIL, CO 81657਍ഀ 970-479-2138਍ഀ NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES਍ഀ MECHANICAL PERMIT Permit M97-0176਍ഀ Job Address...: 452 E LIONSHEAD CR Status...: APPROVED਍ഀ Location......: TREETOPS CONDOS Applied..: 09/18/1997਍ഀ Parcel No.....: 2101-064-04-029 Issued...:਍ഀ Project Number: Expires..:਍ഀ APPLICANT TARA MASONRY, INC Phone: 3039262150਍ഀ P 0 BOX 146, EDWARDS CO 81632਍ഀ CONTRACTOR TARA MASONRY, INC Phone: 3039262150਍ഀ P O BOX 146, EDWARDS CO 81632਍ഀ OWNER TREETOPS ASSOCIATION % GREAT WES਍ഀ MANAGEMENT & REALTY INC, 3201 SO TAMARAC 200, DENVER CO 80231਍ഀ Description: Valuation: 3,000.00਍ഀ INSTALL STAINLESS STEEL FLEX PIPE IN FIRE PL & PIP਍ഀ Fireplace Information: Restricted: f0f Gas Appliances: f0f Gas Logs: f0f Wood/Pallet:਍ഀ FEE SUMMARY ******kk***਍ഀ ਍ഀ Mechanical--->਍ഀ 60.00 Restuarant Plan Review--> .00਍ഀ Total Calculated Fees਍ഀ 78.00਍ഀ Plan Check਍ഀ 15.00 DRB Fee-----------------> .00਍ഀ Additional Fees >਍ഀ .00਍ഀ Investigation>਍ഀ .00 TOTAL FEES--------------> 78.00਍ഀ Total Permit Fee-------->਍ഀ 78.00਍ഀ Will CaLL---- >਍ഀ 3.00਍ഀ Payments >਍ഀ .00਍ഀ BALANCE DUE------------- >਍ഀ 78.00਍ഀ ***~~icicitic*,t*਍ഀ ***it*****t~t਍ഀ ਍ഀ Item: ,05100 BUILDING DEPARTMENT Dept: BUILDING਍ഀ 09/18/1997 LORELEI Action: APPR APPROVED PER M MCGEE਍ഀ Item: 05600 FIRE DEPARTMENT Deppt: FI E਍ഀ 09/18/1997 LORELEI Action: APPR APPROVED M MCGEE 917/97਍ഀ CONDITION OF APPROVAL਍ഀ 1. FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.਍ഀ 2. COMBUSTION AIR IS REQUIRED PER SEC. 607 OF THE 1991 UMC.਍ഀ 3. INSTALLATION MUST CONFORM TO MANUFACTURES INSTRUCTIONS AND਍ഀ TO APPENDIX CHAPTER 21 OF THE 1991 UMC.਍ഀ 4. GAS APPLIANCES SHALL BE VENTED ACCORDING TO CHAPTER 9 AND਍ഀ SHALL TERMINATE AS SPECIFIED IN SEC.906 OF THE 1991 UMC.਍ഀ 5. ACCESS TO HEATING EQUIPMENT MUST COMPLY WITH SEC.505 AND਍ഀ 703 OF THE 1991 UMC.਍ഀ 6. BOILERS SHALL BE MOUNTED ON FLOORS OF NONCOMBUSTIBLE CONST.਍ഀ UNLESS LISTED FOR MOUNTING ON COMBUSTIBLE FLOORING.਍ഀ 7. PERMIT PLANS AND CODE ANALYSIS MIUST BE POSTED IN MECHANICAL਍ഀ ROOM PkIOR TO AN INSPECTION REQUEST.਍ഀ 8. DRAINAGE OF MECHANICAL ROOMS CONTAINING HEATING OR HOT-WATER਍ഀ SUPPLY BOILERS SHALL BE EQUIPPED WITH A FLOOR DRAIN PER SEC.਍ഀ 2119 OF THE 1991 UMC.਍ഀ Division:਍ഀ Division:਍ഀ ਍ഀ DECLARATIONS਍ഀ I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot਍ഀ plan, and state that all the information provided as required is correct. I agree to comply with the information and plot plan,਍ഀ to comply with all Town ordinances and state laws, and to build this structure according to the Town's zoning and subdivision਍ഀ codes, design review approved, Uniform Building Code and other ordinances of the Town applicable thereto.਍ഀ REQUESTS FOR INSPECTIONS SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2138 OR AT OUR OFFICE FROM 8:00 AM 5:00 PM਍ഀ SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNER਍ഀ *Contact Eagle County Assessors Office਍ഀ at'970-328-8640 for Parcel TOWN OF VAIL CONSTRUCTION PERMIT #਍ഀ PARCEL 41਍ഀ PERMIT APPLICATION FORM਍ഀ p~~~~' w7' b~,b Z DATE :਍ഀ APPLICATION MUST BE FILLED OUT COMPLETELY OR IT MAY NOT BE ACCEPTED਍ഀ PERMIT INFORMATIO਍ഀ [ ]-Building [ ]-Plumbing [ ]-Electrical [ -Mechanical ]-Other਍ഀ Job Name: 2 - Job Address.਍ഀ Legal Description: Lot Block Filing SUBDIVISION:਍ഀ Owners Name : 6w-,& 4L-5. Address:਍ഀ Architect:਍ഀ General Description:਍ഀ Address:਍ഀ - , / 1਍ഀ Ph.਍ഀ Ph.਍ഀ 82਍ഀ I Lr f਍ഀ Work Class: [ ]-New [ ]-Alteration [ ]-Additional [ ]-Repair [ ]-Other਍ഀ Number of Dwelling Units: Number of Accommodation Units:਍ഀ N mber and Type of Fires: Gas Appliances. Gas Logs Wood/Pellet਍ഀ VALUATIONS਍ഀ BUILDING: $ ELECTRICAL:$~ OTHER:$਍ഀ PLUMBING: $ MECHANICAL:$ TOTAL:*਍ഀ * * CON C OR I F RMATION਍ഀ Keneral Contrac or: f Vail Reg. NO.i~S਍ഀ Address: PZ9 l Phone mber: (72-1, -਍ഀ Electrical Contractor:਍ഀ _਍ഀ T wn of ail Reg.਍ഀ NO.਍ഀ Address:਍ഀ e N mber:਍ഀ Plumbing Contractor: v਍ഀ O Town f Reg.਍ഀ NO.਍ഀ Address:਍ഀ Pho e u er:਍ഀ Mechanical Contractor:਍ഀ own Vail Reg.਍ഀ NO. /਍ഀ Address:਍ഀ Phone mber:਍ഀ ਍ഀ FOR OFFICE USE਍ഀ ਍ഀ ਍ഀ BUILDING PERMIT FEE:਍ഀ BUILDING਍ഀ PLAN CHECK FEE:਍ഀ PLUMBING PERMIT FEE:਍ഀ PLUMBING਍ഀ PLAN CHECK YEE:਍ഀ MECHANICAL PERMIT FEE:਍ഀ MECHANICAL PLAN CHECK FEE:਍ഀ ELECTRICAL FEE:਍ഀ RECREATION FEE:਍ഀ OTHER TYPE OF FEE:਍ഀ CLEAN-UP਍ഀ _਍ഀ DEPOSIT:਍ഀ DRB FEE:਍ഀ TOTAL PERMIT FEES:਍ഀ TYPE GROUP SQ.FT. VALUATION਍ഀ BUILDING:਍ഀ SIGNATURE:਍ഀ ZONING:਍ഀ SIGNATURE:਍ഀ Comments:਍ഀ CLEAN UP DEPOSIT REFUND TO:਍ഀ 10WH਍ഀ 75 south frontage road਍ഀ vail, colorado 81657਍ഀ (303) 479-21.38 or 479-2139਍ഀ office of community development਍ഀ TO: ALL CONTRACTORS CURRENTLYL REGISTERED WITH THE਍ഀ TOWN OF VAIL਍ഀ FROM: TOWN OF VAIL PUBLIC WORKS/COMMUNITY DEVELOPMENT਍ഀ DATE: MARCH 16, 1988਍ഀ SUBJECT: CONSTRUCTION PARKING & MATERIAL STORAGE਍ഀ In summary, Ordinance No. 6 states that it is unlawful for any਍ഀ person to litter, track or deposit any soil, rock, sand, debris਍ഀ or material, including trash dumpsters, portable toilets and਍ഀ workmen vehicles upon any street, sidewalk, alley or public਍ഀ place or any portion thereof. The right-of-way on all Town of਍ഀ Vail streets and roads is approximately 5 ft. off pavement.਍ഀ This ordinance will be strictly enforced by the Town of Vail਍ഀ Public Works Department. Persons found violating this ordinance਍ഀ will be given a 24 hour written notice to remove said material.਍ഀ In the event the person so notified does not comply with the਍ഀ notice within the 24 hour time specified, the Public Works਍ഀ Department will remove said material at the expense of person਍ഀ notified. The provisions of this ordinance shall not be਍ഀ applicable to construction, maintenance or repair projects of਍ഀ any street or alley or any utilities in the right-a-way.਍ഀ To review ordinance No. 6 in full, please stop by the Town of਍ഀ Vail Building Department to obtain a copy. Thank you for your਍ഀ cooperation on this matter.਍ഀ Read and acknowledged by:਍ഀ )(]Position/Relationship o Project i.e.਍ഀ 7 ( contractor, owner)਍ഀ Da e਍ഀ MEMORANDUM਍ഀ TO: ALL CONTRACTORS਍ഀ FROM: TOWN OF VAIL PUBLIC WORKS DEPARTMENT਍ഀ DATE: MAY 9, 1994਍ഀ RE: WHEN A "PUBLIC WAY PERMIT"IS REQUIRED਍ഀ Job Name:਍ഀ Date:਍ഀ Please answer the following questionnaire regarding the need for a "Public Way Permit":਍ഀ 1) Is this a new residence?਍ഀ 2) Is demolition work being performed਍ഀ that requires the use of the right਍ഀ of way, easements or public property?਍ഀ 3) Is any utility work needed?਍ഀ 4) Is the driveway being repaved?਍ഀ 5) Is different access needed to site਍ഀ other than existing driveway?਍ഀ YES਍ഀ NO਍ഀ 6) Is any drainage work being done਍ഀ affecting the right of way, easements,਍ഀ or public property?਍ഀ 7) Is a "Revocable Right Of Way Permit"਍ഀ required?਍ഀ 8) A. Is the right of way, easements or਍ഀ public property to be used for staging,਍ഀ parking or fencing?਍ഀ B. If no to 8A, is a parking, staging਍ഀ or fencing plan required by Community਍ഀ Development?਍ഀ If you answered yes to any of these questions, a "Public Way Permit" must be obtained.਍ഀ "Public Way Permit" applications may be obtained at the Public Work's office or at਍ഀ Community Development. If you have any questions please call Charlie Davis, the Town਍ഀ of Vail Construction Inspector, at 479-2158.਍ഀ I have read and answered all the above questions.਍ഀ Job Name Contractor's Signature Date਍ഀ