Loading...
HomeMy WebLinkAbout1969-09-26 Town Council Minutesm OFFICE COPY DO NOT REMOVE [7 _• -0 -10 MINUT1a S CF THE MEF TING VAIL RCARD CF TRUSTETZ ,SEPTEMBER 26, 1969 The Meeting was called to order by Mayor Dobson at 4:10 P. M. ROLL CALL: moll Call found the following members present: Mayor John Dobson Trustee John Kaenzmer Trustee J^seph Langmaid Trustee Richard Bailey Trustee Thomas Steinberg .Absent: Trustee John Donovan Trustee C. E. Kindel Others present: Messrs. Blake Lynch I. This meeting called to discuss Unit 1 proposal for design/ fabrication of vehicle and pedestrian signs for Vail. Blake Lynch reviewed their proposal (attached hereto as Ezi:hibit A) and sug- gested accepting it, excluding pedestrian signs, on an hourly basis with a maximum fee of $1, 500. `.trustee Bailey advocated approporiating $1, 000 for this purpose and having Unit I start on vehicle traffic signs --excluding pedestrian signs for the time being. Trustee Steinberg made a motion that we spend up to $1, 000 on design for vehicle signs only, and reconsider the proposal at the end of that design phase. Motion was seconded by Trustee Bailey. VOTE: Approve above proposal. Mayor Dobson YES Trustee Kaemmer YES Trustee iailey YES Trustee Steinberg YF3 Trustee Langmaid YrM Blake Lynch will notify Unit 1 of decision and advise them to begin work. With no further business to discuss, the meeting was adjourned at 4:30 P. M. graphic design 628 Sherman street denver, Colorado 80203 T 303 / 825-8733 Septerru.e,. 2", 2 yt-c r. Blake Lynch Town of Vail Box 631 . Vail, Colorado 816;7 1 Unit i ine proposes to develop a coordinated design program to be used in Nail and grail LiorsHead. PF'.ASF I The first phase of development would be the vehicle and pedestrian traffic signs. The estitrated cost of this phase is based on the following list of signs. Additional signs could be developed atA i n_ lemented or substitutedas the need deznards. :vehicle Pedestrian Stop - American Inrorreation Yield - American--z Bas stop Speed lim T Mens..and women restroores . One -.ay Restaurant One say do rot enter Coffee shop Parking "(with, an arrow) Telephone. No parking First aid ar clinic j Enter/entrance Ticket cfiice Baz September 25, 1969 Page 2 Vehicle continued Pedestrian continuo-. Service .road Lost and found Loading zone (with time) Lounge or bar No smoking Speed bump No skis ...Pede= Tian area Gondola �e Golf . , .. Tennis 'de irould design and do finished art on each sign, including color, size and material recommendations. ae wo-Od work with a sign company to coordinate and supervise t=.e fabrication of the signs.' The actual cast of,fabricatior_ and >hiument would be additional. If desired; we*would work wit'^ you on the placement of these signs at an hourly rate._' Estimated cost of Phase 1. $2,244.04 September 25, 1969 PIIA SE 2 We would work v,-ith the problem of directories and information centers and. their coordinationirith the overall graphic program. A partial estimate iaould be submitted prior to starting th3_s phase. PHA SE 3 This is the final phase in which we would consider the design and coordination of remaining items such as: Construction fence Trash receptacles Movable sign posts Shop signs Posters cetera An estimate would be submitted prior to starting eac_-'- item. Page 3 September 25, 1969 Page 4 All work is bille? at $20.00 per hour for creative and design time. and $12.50 for production and conference time. Mileage is billed at 100 per Kle. Meals, film, phone calls, etc. are billed at cost. Since there would be an overlapring use of this program, the cost could be shared by the Town of hail, VAI and VRA. Thank you for letting us submit this proposal. Sincerely yours,